WO2020026287A1 - エアロゾル生成装置並びにこれを動作させる方法及びプログラム - Google Patents

エアロゾル生成装置並びにこれを動作させる方法及びプログラム Download PDF

Info

Publication number
WO2020026287A1
WO2020026287A1 PCT/JP2018/028365 JP2018028365W WO2020026287A1 WO 2020026287 A1 WO2020026287 A1 WO 2020026287A1 JP 2018028365 W JP2018028365 W JP 2018028365W WO 2020026287 A1 WO2020026287 A1 WO 2020026287A1
Authority
WO
WIPO (PCT)
Prior art keywords
power supply
aerosol
load
temperature
sensor
Prior art date
Application number
PCT/JP2018/028365
Other languages
English (en)
French (fr)
Inventor
一真 水口
剛志 赤尾
拓磨 中野
将之 辻
創 藤田
Original Assignee
日本たばこ産業株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 日本たばこ産業株式会社 filed Critical 日本たばこ産業株式会社
Priority to JP2020533890A priority Critical patent/JP6994115B2/ja
Priority to PCT/JP2018/028365 priority patent/WO2020026287A1/ja
Priority to CN201880096193.1A priority patent/CN112512354A/zh
Priority to EP18928750.1A priority patent/EP3831227A4/en
Publication of WO2020026287A1 publication Critical patent/WO2020026287A1/ja
Priority to US17/161,661 priority patent/US20210177063A1/en

Links

Images

Classifications

    • AHUMAN NECESSITIES
    • A24TOBACCO; CIGARS; CIGARETTES; SIMULATED SMOKING DEVICES; SMOKERS' REQUISITES
    • A24FSMOKERS' REQUISITES; MATCH BOXES; SIMULATED SMOKING DEVICES
    • A24F40/00Electrically operated smoking devices; Component parts thereof; Manufacture thereof; Maintenance or testing thereof; Charging means specially adapted therefor
    • A24F40/50Control or monitoring
    • A24F40/53Monitoring, e.g. fault detection
    • AHUMAN NECESSITIES
    • A24TOBACCO; CIGARS; CIGARETTES; SIMULATED SMOKING DEVICES; SMOKERS' REQUISITES
    • A24FSMOKERS' REQUISITES; MATCH BOXES; SIMULATED SMOKING DEVICES
    • A24F40/00Electrically operated smoking devices; Component parts thereof; Manufacture thereof; Maintenance or testing thereof; Charging means specially adapted therefor
    • A24F40/50Control or monitoring
    • A24F40/51Arrangement of sensors
    • AHUMAN NECESSITIES
    • A24TOBACCO; CIGARS; CIGARETTES; SIMULATED SMOKING DEVICES; SMOKERS' REQUISITES
    • A24FSMOKERS' REQUISITES; MATCH BOXES; SIMULATED SMOKING DEVICES
    • A24F40/00Electrically operated smoking devices; Component parts thereof; Manufacture thereof; Maintenance or testing thereof; Charging means specially adapted therefor
    • A24F40/40Constructional details, e.g. connection of cartridges and battery parts
    • A24F40/42Cartridges or containers for inhalable precursors
    • AHUMAN NECESSITIES
    • A24TOBACCO; CIGARS; CIGARETTES; SIMULATED SMOKING DEVICES; SMOKERS' REQUISITES
    • A24FSMOKERS' REQUISITES; MATCH BOXES; SIMULATED SMOKING DEVICES
    • A24F40/00Electrically operated smoking devices; Component parts thereof; Manufacture thereof; Maintenance or testing thereof; Charging means specially adapted therefor
    • A24F40/50Control or monitoring
    • A24F40/57Temperature control

Definitions

  • the present disclosure relates to an aerosol generation device that generates an aerosol to be sucked by a user, and a method and a program for operating the same.
  • an aerosol generation device for generating an aerosol to be sucked by a user, such as a general electronic tobacco, a heated tobacco, and a nebulizer
  • a user when the aerosol source that becomes an aerosol by being atomized is insufficient, the user is instructed.
  • suction is performed, a sufficient aerosol cannot be supplied to the user.
  • an electronic cigarette or a heated tobacco there may be a problem that an aerosol having an intended flavor cannot be generated.
  • Patent Literature 1 discloses a technique for determining that an aerosol-forming substrate is empty based on a rising speed of a heater temperature at an initial stage of power supply and a threshold value.
  • Patent Literature 2 discloses that while the heater is not operating, it is determined that the aerosol-forming base material is empty based on a heater temperature after a predetermined time has elapsed from the start of power supply or a rise rate of the heater temperature at the beginning of power supply. A technique for performing this is disclosed.
  • Patent Literature 3 discloses a technique for detecting the remaining amount of liquid in a wick based on the resistance value of the wick.
  • Patent Literature 1 or 2 needs to focus on a minute amount and set a threshold value so as not to be affected by noise, error, and the like, so that the determination may be delayed. Further, Patent Document 3 does not disclose or suggest a method for hastening the determination that the remaining amount of liquid in the wick is empty.
  • Patent Documents 1 to 3 disclose, for example, which part of a tank of an aerosol-forming base material, a wick, and a path from a tank to a wick has a problem such as a shortage of an aerosol source. To be distinguishable, the problem of estimating or detecting the state of at least one of the tank and the wick is not disclosed or suggested.
  • a first problem to be solved by the present disclosure is to provide an aerosol generation device capable of judging the occurrence of depletion or shortage of an aerosol source earlier, and a method and a program for operating the same.
  • a second problem to be solved by the present disclosure is to provide an aerosol generation device capable of estimating or detecting the state of at least one of a storage unit and a holding unit of an aerosol source, and a method and a program for operating the same. It is.
  • a storage unit that stores an aerosol source or an aerosol base material that holds the aerosol source, and the aerosol source is generated by power supply from a power supply.
  • a load to be atomized a sensor that outputs a value related to the temperature of the load, and a control unit, wherein the control unit supplies power from the power supply to the load in response to an aerosol generation request to perform a power supply cycle.
  • An aerosol configured to execute and determine occurrence of depletion or shortage of the aerosol source in the reservoir or the aerosol base material based on an index based on a deviation of the output value of the sensor in a single power supply cycle.
  • a generation device is provided.
  • the depletion or shortage of the aerosol source can be determined based on the standard deviation or dispersion of the temperature of the load in a single power supply cycle. Can be detected.
  • control unit is configured to perform the depletion or the depletion based on a comparison between the index and an index based on a deviation of an output value of the sensor in the single power supply cycle when the depletion or the shortage does not occur. It is configured to determine the occurrence of the shortage.
  • the standard deviation or dispersion of the load temperature at the time of occurrence of depletion or shortage of the aerosol source can be used as the threshold, it is possible to detect the occurrence of depletion or shortage of the aerosol source with high accuracy. Can be.
  • control unit is configured to determine at the start of a single power supply cycle, at the end of a single power supply cycle, at one or more times within a single power supply cycle, and at the single power supply cycle.
  • An output value of the sensor during at least one of a portion of a cycle is configured to have zero or reduced impact on deriving the indicator.
  • control unit is configured to determine at the start of a single power supply cycle, at the end of a single power supply cycle, at one or more times within a single power supply cycle, and at the single power supply cycle. The method is configured not to obtain the temperature of the load during at least one of a portion of a cycle.
  • the data mixed with noise due to a change in room temperature or the like can be excluded from the data used for deriving the standard deviation or the variance of the load temperature, etc., when the aerosol source is depleted or shortage occurs Temperature fluctuations are no longer buried in noise, and the detection accuracy regarding depletion or generation of an aerosol source can be improved.
  • control unit sets the output value of the sensor in one or both of a heating period and a cooling period in a single power supply cycle to have no effect on deriving the index, or Configured to reduce.
  • control unit is configured not to acquire the temperature of the load during one or both of a heating period and a cooling period in a single power supply cycle.
  • the temperature fluctuation when the aerosol source is depleted or shortage occurs. It is no longer buried in the temperature change during the cooling period, and it is possible to improve the detection accuracy regarding depletion or shortage of the aerosol source.
  • control unit divides the single power supply cycle into a plurality of phases including a first phase and a second phase that is chronologically later than the first phase, and includes only the second phase. It is configured to determine the occurrence of the depletion or the shortage based on the index derived from the output value of the sensor.
  • control unit divides the single power supply cycle into a plurality of phases including a first phase and a second phase that is later in time series than the first phase, and It is configured such that the influence of the output value of the sensor on the derivation of the index is smaller than the influence of the output value of the sensor on the derivation of the index in the second phase.
  • the depletion or shortage of the aerosol source can be determined using the standard deviation or dispersion of the load based on only the latter half of the sample obtained in the power supply cycle. In such a case, it becomes difficult to pick up an exceptional temperature fluctuation in the first half of the power supply cycle, and it is possible to improve the detection accuracy regarding depletion or shortage of the aerosol source.
  • the control unit divides the single power supply cycle into a plurality of phases including a first phase and a second phase that is chronologically subsequent to the first phase, and includes a plurality of phases in the first phase. Deriving a first index that is the index derived from the output value of the sensor and a second index that is the index derived from the output value of the sensor in the second phase, It is configured to determine the occurrence of the depletion or the shortage based on a difference from the first index.
  • the depletion or shortage of the aerosol source can be determined by using the difference between the standard deviation and the variance of the first half and the second half of the data acquired in the power supply cycle.
  • the temperature fluctuation in the latter half of the power supply cycle, which occurs only when the exhaust gas is depleted, is emphasized, and the detection accuracy regarding the exhaustion or shortage of the aerosol source can be improved.
  • the first phase is shorter than the second phase.
  • the data acquired in the power supply cycle can be divided so that the latter half becomes longer, a part that does not include temperature fluctuations in the power supply cycle is excluded, and the aerosol source is depleted or insufficient. Detection accuracy can be improved.
  • control unit is configured to control the index derived from at least a part of the output values of the sensor after the output value of the sensor reaches a steady state in a single power supply cycle. It is configured to determine the occurrence of the depletion or the shortage based on the depletion.
  • the depletion or shortage of the aerosol source using the standard deviation or dispersion of the temperature of the load focused on temperature fluctuations that may occur after the temperature of the load reaches a steady state. As a result, it is possible to improve the detection accuracy regarding depletion or shortage of the aerosol source.
  • control unit divides the single power supply cycle into a plurality of phases including a first phase and a second phase that is chronologically subsequent to the first phase, and in the first phase, Whether or not the output value of the sensor has reached a steady state based on at least one of the index derived from the output value of the sensor, the output value of the sensor, and the average value of the output values of the sensor. Is determined.
  • whether the temperature of the load has reached a steady state can be determined based on the average value, the standard deviation, the variance, and the like of the load temperature. Therefore, a simple method that does not require a dedicated sensor or algorithm. It can be determined whether the temperature of the load has reached a steady state.
  • control unit determines the occurrence of the depletion or the shortage based on the index and an output value of the sensor or an average value of the output values of the sensor in a single power supply cycle. Be composed.
  • the detection accuracy for the depletion or shortage of the aerosol source can be determined. Can be improved.
  • control unit performs the depletion only when an output value of the sensor or an average value of the output values of the sensor in a single power supply cycle is higher than a temperature at which aerosol is generated from the aerosol source.
  • it is configured to detect the occurrence of the shortage.
  • the depletion or shortage of the aerosol source can be detected only when the average temperature of the load exceeds the boiling point of the aerosol source, etc., so that it becomes difficult to pick up an exceptional temperature fluctuation, and the depletion of the aerosol source Alternatively, the detection accuracy for the shortage can be improved.
  • an operation method of an aerosol generation device wherein the aerosol generation device includes a storage unit that stores an aerosol source or an aerosol base material that holds the aerosol source, and a power supply from a power source.
  • a load that atomizes the aerosol source with heat generated by the sensor, a sensor that outputs a value related to the temperature of the load, and a control unit, wherein the control unit is configured to perform the method according to an aerosol generation request. Executing a power supply cycle by supplying power from the power source to a load, and depletion of the aerosol source in the storage unit or the aerosol base material based on an index based on a deviation of an output value of the sensor in a single power supply cycle. Or determining the occurrence of a deficiency.
  • a storage unit that stores an aerosol source or an aerosol base material that holds the aerosol source, a load that atomizes the aerosol source with heat generated by power supply from a power supply, and a temperature of the load.
  • a sensor that outputs a related value
  • a control unit wherein the control unit performs power supply cycle by supplying power from the power supply to the load in response to an aerosol generation request, and performs the power supply cycle in the single power supply cycle.
  • An aerosol configured to determine the depletion or shortage of the aerosol source in the storage unit or the aerosol base material based on the behavior of the output value of the sensor after the output value of the sensor reaches a steady state, A generation device is provided.
  • an operation method of an aerosol generation device wherein the aerosol generation device includes a storage unit that stores an aerosol source or an aerosol base material that holds the aerosol source, and heat generated by power supply from a power supply.
  • a load that atomizes the aerosol source, a sensor that outputs a value related to the temperature of the load, and a control unit, wherein the control unit is configured to control the load to the load in response to an aerosol generation request.
  • a program that, when executed by a processor, causes the processor to execute the above-described method.
  • the depletion or shortage of the aerosol source can be determined based on the standard deviation or dispersion of the temperature of the load in a single power supply cycle. Can be detected.
  • a storage unit that stores an aerosol source, a load that atomizes the aerosol source by heat generated by power supply from a power supply
  • the storage unit includes: A holding unit that holds the supplied aerosol source in a form in which the load can be heated, a sensor that outputs a value related to the temperature of the load, and a control unit, wherein the control unit responds to an aerosol generation request And performing a power supply cycle by supplying power from the power supply to the load, and at least in the first power supply cycle derived from the output value or the output value of the sensor in the first power supply cycle that is a single power supply cycle.
  • the states of the storage unit and the holding unit can be estimated based on the temperature behavior at the past and the present load, the states of the storage unit and the holding unit can be determined quickly and accurately.
  • control unit is configured to determine that at least one of the first value and the second value, the temperature of the load is equal to a first temperature at which aerosol is generated from the holding unit when the aerosol source is in a saturated state.
  • the steady state is indicated at a higher second temperature
  • the remaining amount of the aerosol source in the storage unit, the remaining amount of the aerosol source in the holding unit, and the remaining amount of the aerosol source in the holding unit It is configured to estimate or detect at least one of a relationship between an atomization speed and a supply speed of the aerosol source from the storage unit to the holding unit.
  • the storage unit, the holding unit, any one of the storage unit and the holding unit can identify that a problem has occurred.
  • control unit when the first value indicates that the temperature of the load has become a steady state at the second temperature, the shortage of the remaining amount of the aerosol source in the storage unit or It is configured to estimate or detect at least one of depletion and that the atomization rate of the aerosol source in the holding unit is higher than the supply speed of the aerosol source from the storage unit to the holding unit.
  • control unit indicates that the temperature of the load is in a steady state at the second temperature at the first value, and that the temperature of the load is the second value at the second value. It is configured to estimate or detect a shortage or depletion of the remaining amount of the aerosol source in the storage unit when the steady state is indicated at two temperatures.
  • control unit indicates that the temperature of the load is in a steady state at the second temperature at the first value, and that the temperature of the load is the second value at the second value.
  • the control unit indicates that the temperature of the load is in a steady state at the second temperature at the first value, and that the temperature of the load is the second value at the second value.
  • control unit when the second value indicates that the temperature of the load has reached a steady state at the second temperature, the remaining amount of the aerosol source in the storage unit is insufficient or It is configured to estimate or detect that it is depleted.
  • control unit indicates that, at the first value, the temperature of the load is in a steady state at the second temperature, and at the second value, an average value of the second value and When at least one of the value based on the deviation of the second value is larger than a threshold, the remaining amount of the aerosol source in the storage unit is insufficient or depleted, and the remaining amount of the aerosol source in the holding unit is insufficient. It is configured to estimate or detect that the amount is depleted.
  • the temperature of the load in the past power supply cycle calms down at a temperature higher than the boiling point of the aerosol source or the like, and it is possible to detect that the temperature of the load in the current power supply cycle is rampant. The exhaustion of the remaining amount can be detected.
  • control unit is in a steady state at the second value, the temperature of the load is higher than the temperature at which aerosol is generated from the holding unit in which the aerosol source is in a saturated state. If so, it is configured to estimate or detect that the remaining amount of the aerosol source in the holding unit is depleted after a predetermined number of power supply cycles.
  • control unit determines that the temperature of the load is in a steady state at a temperature higher than a temperature at which aerosol is generated from the aerosol source at both the first value and the second value. In the case shown, it is configured to estimate or detect that the remaining amount of the aerosol source in the holding unit is depleted after a predetermined number of the power supply cycles.
  • control unit is configured to output a continuous output value of the sensor, an average value of the output values, and a value based on a deviation of the output values in the first power supply cycle or the second power supply cycle. Is configured to determine that the first value or the second value indicates that the temperature of the load has reached a steady state based on at least one of the following.
  • an operation method of an aerosol generation device wherein the aerosol generation device atomizes the aerosol source with heat generated by power supply from a power supply from a storage unit that stores the aerosol source.
  • a load a holding unit that holds the aerosol source supplied by the storage unit in a manner that the load can be heated, a sensor that outputs a value related to a temperature of the load, and a control unit, wherein the method includes: Performing the power supply cycle by supplying power from the power supply to the load in response to the aerosol generation request, at least the output value of the sensor in the first power supply cycle that is a single power supply cycle, A first value, which is a value relating to the behavior of the temperature of the load in the first power supply cycle derived from the output value, and a single value after the first power supply cycle.
  • the storage value based on the output value of the sensor in a second power supply cycle that is the power supply cycle or a second output value that is a value related to the behavior of the temperature of the load in the second power supply cycle derived from the output value. And estimating or detecting a state of at least one of the unit and the holding unit.
  • a storage unit that stores an aerosol source, a load that atomizes the aerosol source with heat generated by power supply from a power supply, and the load can heat the aerosol source supplied by the storage unit Holding unit, a sensor that outputs a value related to the temperature of the load, and a control unit, the control unit supplies power from the power supply to the load in response to a request for aerosol generation.
  • a power supply cycle and derives the temperature of the load in a single power supply cycle based on the output value of the sensor, and in a plurality of the power supply cycles, the temperature of the load is in a state where the aerosol source is saturated.
  • the remaining amount of the aerosol source in the storage unit is insufficient or dead.
  • the estimated or is to be detected by or constituted aerosol generating device so that the remaining amount of the aerosol source in the holding unit after the feeding cycle of the default number is estimated or detected and depletion are provided.
  • the aerosol generation device includes a storage unit that stores an aerosol source, and a load that atomizes the aerosol source with heat generated by power supply from a power supply.
  • a holding unit that holds the aerosol source supplied by the storage unit in a manner in which the load can be heated, a sensor that outputs a value related to the temperature of the load, and a control unit, wherein the method includes: The control unit performing a power supply cycle by supplying power from the power supply to the load in response to a request for aerosol generation, and deriving a temperature of the load in a single power supply cycle based on an output value of the sensor.
  • the load is in a steady state at a temperature higher than the temperature at which the aerosol is generated from the aerosol source.
  • the remaining amount of the aerosol source in the storage unit is estimated or detected as being short or depleted, or when the remaining amount of the aerosol source in the holding unit is depleted after a predetermined number of power supply cycles. Estimating or detecting.
  • a storage unit that stores an aerosol source, a load that atomizes the aerosol source with heat generated by power supply from a power supply, and the load can heat the aerosol source supplied by the storage unit
  • a controller that outputs a state of the load or the storage unit, and a control unit, wherein the control unit determines that the output value of the sensor is the remaining amount of the aerosol source in the storage unit.
  • An aerosol generation device is provided that is configured to detect or inhibit powering the load after a predetermined number of the powering cycles.
  • the aerosol generation device includes a storage unit that stores an aerosol source, and a load that atomizes the aerosol source with heat generated by power supply from a power supply.
  • a holding unit that holds the aerosol source supplied by the storage unit in a manner in which the load can be heated, a sensor that outputs a state of the load or the storage unit, and a control unit, and the method includes: When the output value of the sensor indicates the shortage or depletion of the remaining amount of the aerosol source in the storage unit, but does not indicate the depletion of the remaining amount of the aerosol source in the holding unit, a predetermined number of times. Estimating or detecting that the remaining amount of the aerosol source in the holding unit is depleted after the power supply cycle, or supplying power to the load after a predetermined number of power supply cycles. The and a step of throttling, a method is provided.
  • a program that, when executed by a processor, causes the processor to execute the above-described method.
  • the states of the storage unit and the holding unit can be estimated based on the temperature behavior at the past and the present load, the states of the storage unit and the holding unit can be determined quickly and accurately.
  • FIG. 1 is a schematic block diagram of a configuration of an aerosol generation device according to an embodiment of the present disclosure.
  • 1 is a schematic block diagram of a configuration of an aerosol generation device according to an embodiment of the present disclosure.
  • FIG. 2 illustrates an exemplary circuit configuration for a portion of an aerosol generation device, according to one embodiment of the present disclosure.
  • 5 is a flowchart of an exemplary process for determining occurrence of depletion or shortage of an aerosol source according to an embodiment of the present disclosure.
  • 5 is a flowchart of another exemplary process for determining the occurrence of depletion or shortage of an aerosol source, according to an embodiment of the present disclosure. It is the graph which plotted the temperature of the load in each power supply cycle.
  • 4 is a graph plotting the temperature of a load in two power supply cycles. 4 is a graph plotting the temperature of a load in two power supply cycles. 4 is a flowchart of a first exemplary process of determining whether an aerosol source is depleted or insufficient according to an embodiment of the present disclosure. 4 is a graph plotting the standard deviation of the load temperature for each power supply cycle. 5 is a flowchart of a second exemplary process of determining whether an aerosol source is depleted or insufficient according to an embodiment of the present disclosure. 4 is a graph plotting the standard deviation of the load temperature for each power supply cycle. 11 is a flowchart of a third example process of determining whether an aerosol source is depleted or insufficient according to an embodiment of the present disclosure.
  • 4 is a graph plotting the standard deviation of the load temperature for each power supply cycle.
  • 11 is a flowchart of a fourth exemplary process of determining whether an aerosol source is depleted or insufficient according to an embodiment of the present disclosure.
  • 4 is a graph in which the standard deviation of the temperature of the load and the average temperature are plotted for each power supply cycle.
  • 13 is a flowchart of a fifth exemplary process of determining whether an aerosol source is depleted or insufficient according to an embodiment of the present disclosure.
  • 5 is a flowchart of an example process for estimating or detecting a state related to an aerosol source according to an embodiment of the present disclosure.
  • FIG. 5 is a flowchart of a first exemplary process for estimating or detecting a state related to an aerosol source according to an embodiment of the present disclosure.
  • 4 is a graph plotting the standard deviation of the load temperature for each power supply cycle.
  • FIG. 7 illustrates several patterns of transition of average temperature between power supply cycles.
  • FIG. 5 is a flowchart of a second exemplary process for estimating or detecting a state related to an aerosol source according to an embodiment of the present disclosure.
  • FIG. 1A is a schematic block diagram of a configuration of an aerosol generating device 100A according to an embodiment of the present disclosure.
  • FIG. 1A schematically and conceptually shows each component included in the aerosol generation device 100A, and does not show the exact arrangement, shape, size, positional relationship, and the like of each component and the aerosol generation device 100A. Please note.
  • the aerosol generation device 100A includes a first member 102 (hereinafter, referred to as “main body 102”) and a second member 104A (hereinafter, referred to as “cartridge 104A”).
  • the main body 102 may include a control unit 106, a notification unit 108, a power supply 110, a sensor 112, and a memory 114.
  • the aerosol generation device 100A may include sensors such as a flow sensor, a pressure sensor, a voltage sensor, and a temperature sensor, and these are collectively referred to as a “sensor 112” in the present disclosure.
  • the main body 102 may also include a circuit 134 described below.
  • the cartridge 104A may include a storage unit 116A, an atomizing unit 118A, an air intake channel 120, an aerosol channel 121, a suction unit 122, a holding unit 130, and a load 132. Some of the components included in the main body 102 may be included in the cartridge 104A. Some of the components included in the cartridge 104A may be included in the main body 102. The cartridge 104A may be configured to be detachable from the main body 102. Alternatively, all the components included in the main body 102 and the cartridge 104A may be included in the same housing instead of the main body 102 and the cartridge 104A.
  • the storage unit 116A may be configured as a tank that stores the aerosol source.
  • the aerosol source is, for example, a liquid such as polyhydric alcohol such as glycerin or propylene glycol, or water.
  • the aerosol source in the storage unit 116A may include a tobacco raw material that releases a flavor component when heated or an extract derived from the tobacco raw material.
  • the holding unit 130 holds an aerosol source.
  • the holding unit 130 is made of a fibrous or porous material, and holds an aerosol source as a liquid in gaps between fibers or pores of the porous material.
  • the aerosol generation device 100A is a medical inhaler such as a nebulizer
  • the aerosol source may also include a medicament for inhalation by a patient.
  • the storage unit 116A may have a configuration that can replenish the consumed aerosol source.
  • the storage unit 116A may be configured so that the storage unit 116A itself can be replaced when the aerosol source is consumed.
  • the aerosol source is not limited to a liquid, but may be a solid.
  • the storage unit 116A when the aerosol source is a solid may be a hollow container.
  • the atomizing unit 118A is configured to atomize an aerosol source to generate an aerosol.
  • the atomizing unit 118A When the suction operation is detected by the sensor 112, the atomizing unit 118A generates an aerosol.
  • the holding unit 130 is provided so as to connect the storage unit 116A and the atomizing unit 118A. In this case, a part of the holding unit 130 communicates with the inside of the storage unit 116A and comes into contact with the aerosol source. Another part of the holding unit 130 extends to the atomizing unit 118A. Note that the other part of the holding unit 130 extending to the atomizing unit 118A may be stored in the atomizing unit 118A, or may again pass through the atomizing unit 118A to the inside of the storage unit 116A. .
  • the aerosol source is carried from the storage unit 116A to the atomization unit 118A by the capillary effect of the holding unit 130.
  • the atomizing unit 118A includes a heater including a load 132 electrically connected to the power supply 110. The heater is arranged so as to be in contact with or close to the holding unit 130.
  • the control unit 106 controls the heater of the atomization unit 118A, and heats the aerosol source carried through the holding unit 130 to atomize the aerosol source.
  • An air intake channel 120 is connected to the atomizing unit 118A, and the air intake channel 120 communicates with the outside of the aerosol generation device 100A.
  • the aerosol generated in the atomization unit 118A is mixed with air taken in through the air intake channel 120.
  • the mixed fluid of the aerosol and the air is sent out to the aerosol channel 121 as indicated by an arrow 124.
  • the aerosol flow channel 121 has a tubular structure for transporting a mixed fluid of aerosol and air generated in the atomizing unit 118A to the suction unit 122.
  • the suction port 122 is located at the end of the aerosol flow channel 121, and is configured to open the aerosol flow channel 121 to the outside of the aerosol generation device 100A. The user takes in the air containing the aerosol into the oral cavity by sucking and sucking the mouth part 122.
  • the notification unit 108 may include a light emitting element such as an LED, a display, a speaker, a vibrator, and the like.
  • the notification unit 108 is configured to give some notification to the user as necessary by light emission, display, utterance, vibration, or the like.
  • the power supply 110 supplies power to each component of the aerosol generation device 100A such as the notification unit 108, the sensor 112, the memory 114, the load 132, and the circuit 134.
  • the power supply 110 may be a primary battery or a secondary battery that can be charged by connecting to an external power supply via a predetermined port (not shown) of the aerosol generation device 100A. Only the power supply 110 may be removable from the main body 102 or the aerosol generation device 100A, or may be replaced with a new power supply 110. Further, the power supply 110 may be replaced with a new power supply 110 by replacing the entire body 102 with a new body 102.
  • the sensor 112 may include one or more sensors used to obtain a value of a voltage applied to the whole or a specific part of the circuit 134, a value related to a resistance value of the load 132, a value related to a temperature, and the like. Sensor 112 may be incorporated into circuit 134. The function of the sensor 112 may be incorporated in the control unit 106. Sensor 112 may also include a pressure sensor that senses pressure fluctuations in air intake channel 120 and / or aerosol channel 121 or a flow sensor that senses flow. Sensor 112 may also include a weight sensor that senses the weight of a component, such as reservoir 116A. Sensor 112 may also be configured to count the number of puffs by a user using aerosol generation device 100A.
  • the sensor 112 may be configured to accumulate the energizing time to the atomizing unit 118A. Sensor 112 may also be configured to detect the level of the liquid level in reservoir 116A. The sensor 112 may also be configured to determine or detect the SOC (State of Charge, state of charge), current integrated value, voltage, etc. of the power supply 110. The SOC may be obtained by a current integration method (Coulomb counting method), an SOC-OCV (Open Circuit Voltage, open circuit voltage) method, or the like. The sensor 112 may be an operation button or the like that can be operated by a user.
  • the control unit 106 may be an electronic circuit module configured as a microprocessor or a microcomputer.
  • the control unit 106 may be configured to control the operation of the aerosol generation device 100A according to computer-executable instructions stored in the memory 114.
  • the memory 114 is a storage medium such as a ROM, a RAM, and a flash memory.
  • the memory 114 may store, in addition to the computer-executable instructions as described above, setting data and the like necessary for controlling the aerosol generation device 100A.
  • the memory 114 stores various data such as a control method of the notification unit 108 (e.g., mode of light emission, utterance, vibration, and the like), values acquired and / or detected by the sensor 112, and a heating history of the atomization unit 118A. May be.
  • the control unit 106 reads data from the memory 114 as needed, uses the data for control of the aerosol generation device 100A, and stores the data in the memory 114 as needed.
  • FIG. 1B is a schematic block diagram of a configuration of an aerosol generation device 100B according to an embodiment of the present disclosure.
  • the aerosol generation device 100B has a configuration similar to the aerosol generation device 100A of FIG. 1A.
  • the configuration of the second member 104B (hereinafter, referred to as “aerosol-generating article 104B” or “stick 104B”) is different from the configuration of the first member 104A.
  • the aerosol-generating article 104B may include an aerosol base material 116B, an atomizing section 118B, an air intake flow path 120, an aerosol flow path 121, and a mouthpiece 122.
  • Some of the components contained within body 102 may be contained within aerosol-generating article 104B.
  • Some of the components included in the aerosol-generating article 104B may be included in the body 102.
  • the aerosol-generating article 104B may be configured to be insertable into and removable from the main body 102. Alternatively, all the components included in the main body 102 and the aerosol-generating article 104B may be included in the same housing instead of the main body 102 and the aerosol-generating article 104B.
  • the aerosol substrate 116B may be configured as a solid that carries the aerosol source.
  • the aerosol source may be a liquid such as a polyhydric alcohol such as glycerin or propylene glycol, or water.
  • the aerosol source in the aerosol base material 116B may include a tobacco raw material or an extract derived from a tobacco raw material that releases a flavor component when heated. If the aerosol generation device 100B is a medical inhaler such as a nebulizer, the aerosol source may also include a medicament for inhalation by a patient.
  • the aerosol substrate 116B may be configured such that the aerosol substrate 116B itself can be replaced when the aerosol source is consumed.
  • the aerosol source is not limited to a liquid, but may be a solid.
  • the atomizing unit 118B is configured to atomize an aerosol source to generate an aerosol.
  • the atomizing unit 118B When the suction operation is detected by the sensor 112, the atomizing unit 118B generates an aerosol.
  • the atomization unit 118B includes a heater (not shown) including a load electrically connected to the power supply 110.
  • the control unit 106 controls the heater of the atomizing unit 118B and atomizes the aerosol source by heating the aerosol source carried in the aerosol base material 116B.
  • An air intake channel 120 is connected to the atomizing unit 118B, and the air intake channel 120 communicates with the outside of the aerosol generation device 100B.
  • the aerosol generated in the atomizing unit 118B is mixed with the air taken in through the air intake channel 120.
  • the mixed fluid of the aerosol and the air is sent out to the aerosol channel 121 as indicated by an arrow 124.
  • the aerosol flow channel 121 has a tubular structure for transporting a mixed fluid of aerosol and air generated in the atomization unit 118B to the suction unit 122.
  • the control unit 106 is configured to control the aerosol generation devices 100A and 100B (hereinafter, also collectively referred to as “aerosol generation device 100”) according to the embodiments of the present disclosure by various methods.
  • FIG. 2 is a diagram illustrating an exemplary circuit configuration of a part of the aerosol generation device 100 according to an embodiment of the present disclosure.
  • the circuit 200 illustrated in FIG. 2 includes a power supply 110, a control unit 106, sensors 112A to 112D (hereinafter, also collectively referred to as “sensor 112”), a load 132 (hereinafter, also referred to as “heater resistance”), a first circuit 202,
  • the circuit includes a second circuit 204, a switch Q1 including a first field-effect transistor (FET) 206, a converter 208, a switch Q2 including a second FET 210, and a resistor 212 (hereinafter, also referred to as a “shunt resistor”).
  • FET field-effect transistor
  • the electric resistance value of the load 132 changes according to the temperature.
  • the shunt resistor 212 is connected in series with the load 132 and has a known electric resistance value.
  • the electrical resistance value of the shunt resistor 212 may not change with temperature.
  • the shunt resistor 212 has a larger electrical resistance value than the load 132.
  • sensors 112C and 112D may be omitted. It will be apparent to those skilled in the art that not only FETs but also various devices such as IGBTs and contactors can be used as switches Q1 and Q2. Also, the switches Q1 and Q2 preferably have the same characteristics, but need not be. Therefore, it is preferable that the FETs, IGBTs, contactors, and the like used as the switches Q1 and Q2 have the same characteristics, but they need not be.
  • Conversion unit 208 is, for example, a switching converter, and may include FET 214, diode 216, inductor 218, and capacitor 220.
  • the control unit 106 may control the conversion unit 208 such that the conversion unit 208 converts the output voltage of the power supply 110 and the converted output voltage is applied to the entire circuit.
  • the conversion unit 208 be configured to output a constant voltage under the control of the control unit 106 at least while the switch Q2 is on. Further, the conversion unit 208 may be configured to output a constant voltage while the switch Q1 is in the on state or constantly, under the control of the control unit 106.
  • a constant voltage output from conversion section 208 under the control of control section 106 while switch Q1 is on, and a constant voltage output from conversion section 208 under the control of control section 106 while switch Q2 is on. May be the same or different.
  • the constant voltage output from the conversion unit 208 under the control of the control unit 106 while the switch Q1 is on is changed by the conversion unit 208 under the control of the control unit 106 while the switch Q2 is on.
  • the voltage may be higher or lower than a constant voltage to be output. According to such a configuration, since the voltage and the parameters at the time of measuring the voltage are stabilized, the estimation accuracy of the remaining amount of the aerosol is improved.
  • the conversion unit 208 may be configured such that the output voltage of the power supply 110 is directly applied to the first circuit while only the switch Q1 is in the ON state under the control of the control unit 106.
  • the conversion unit 208 is not an essential component, and can be omitted.
  • the circuit 134 shown in FIG. 1A electrically connects the power supply 110 and the load 132, and may include the first circuit 202 and the second circuit 204.
  • the first circuit 202 and the second circuit 204 are connected in parallel to the power supply 110 and the load 132.
  • First circuit 202 may include switch Q1.
  • Second circuit 204 may include switch Q2 and resistor 212 (and, optionally, sensor 112D).
  • the first circuit 202 may have a lower resistance than the second circuit 204.
  • the sensors 112B and 112D are voltage sensors, and are configured to detect a potential difference between both ends of the load 132 and the resistor 212 (hereinafter, also referred to as “voltage” or “voltage value”). You.
  • the configuration of the sensor 112 is not limited to this.
  • the sensor 112 may be a current sensor, and may detect a value of a current flowing through the load 132 and / or the resistor 212.
  • the control unit 106 can control the switches Q1, Q2, and the like, and can acquire the value detected by the sensor 112.
  • the control unit 106 is configured to cause the first circuit 202 to function by switching the switch Q1 from the off state to the on state, and to function the second circuit 204 by switching the switch Q2 from the off state to the on state. Good.
  • the control unit 106 may be configured to alternately switch the switches Q1 and Q2 so that the first circuit 202 and the second circuit 204 function alternately.
  • the first circuit 202 is used for atomizing the aerosol source.
  • the switch Q1 When the switch Q1 is turned on and the first circuit 202 functions, power is supplied to the heater (that is, the load 132 in the heater), and the load 132 is heated.
  • the aerosol source in the case of the aerosol generation device 100B of FIG. 1B, the aerosol source supported on the aerosol base material 116B held in the holding unit 130 in the atomization unit 118A is atomized and aerosolized. Is generated.
  • the second circuit 204 is used to obtain a value of a voltage applied to the load 132, a value related to a resistance value of the load 132, a value of a voltage applied to the resistor 212, and the like.
  • the sensors 112B and 112D included in the second circuit 204 are voltage sensors.
  • switch Q2 When switch Q2 is on and second circuit 204 is functioning, current flows through switch Q2, resistor 212 and load 132.
  • the values of the voltage applied to the load 132 and the value of the voltage applied to the resistor 212 are obtained by the sensors 112B and 112D, respectively.
  • the value of the current flowing through the load 132 can be obtained using the value of the voltage applied to the resistor 212 acquired by the sensor 112D and the known resistance value R shunt of the resistor 212. Since the total value of the resistance values of the resistor 212 and the load 132 can be obtained based on the output voltage V out of the conversion unit 208 and the current value, by subtracting the known resistance value R shunt from the total value, The resistance value R HTR of the load 132 can be obtained. If the load 132 has a positive or negative temperature coefficient characteristic in which the resistance value changes depending on the temperature, the relationship between the resistance value of the load 132 and the temperature, which is known in advance, is obtained as described above.
  • the temperature of the load 132 can be estimated based on the obtained value and the resistance value R HTR of the load 132.
  • the value of the current flowing through the resistor 212 can be used to estimate the resistance and temperature of the load 132.
  • the value related to the resistance value of the load 132 in this example may include a voltage value, a current value, and the like of the load 132.
  • Specific examples of sensors 112B and 112D are not limited to voltage sensors, but may include other elements such as current sensors (eg, Hall elements).
  • the sensor 112A detects the output voltage of the power supply 110.
  • Sensor 112C detects the output voltage of converter 208.
  • the output voltage of converter 208 may be a predetermined target voltage. These voltages are voltages applied to the entire circuit.
  • R HTR resistance value of the load 132 when the temperature of the load 132 is T HTR.
  • R HTR (T HTR ) (V HTR ⁇ R shunt ) / (V Batt ⁇ V HTR ) (1)
  • V Batt is a voltage applied to the entire circuit.
  • V Batt is the output voltage of the power supply 110.
  • V Batt corresponds to the output voltage V out of the converter 208 or the target voltage.
  • V HTR is a voltage applied to the heater. Instead of V HTR , a voltage applied to the shunt resistor 212 may be used.
  • the circuit included in the aerosol generation device 100A may include a temperature sensor that directly outputs a value corresponding to the temperature of the load 132 instead of or in addition to at least one of the sensors described above.
  • FIG. 3A is a flowchart of an example process 300 for determining the occurrence of a depletion or shortage of an aerosol source, according to an embodiment of the present disclosure.
  • the remaining amount of the aerosol source is“ depleted ” means a state where the remaining amount of the aerosol source is zero or almost zero.
  • the remaining amount of the aerosol source is“ insufficient ” may mean a state where the remaining amount of the aerosol source is not sufficient but is not depleted. Alternatively, it may mean that the remaining amount of the aerosol source is sufficient for instantaneous aerosol generation, but insufficient for continuous aerosol generation.
  • the temperature of the load 132 varies depending on the boiling point of the aerosol source or evaporation of the aerosol source. It is in a steady state at a temperature (hereinafter referred to as “boiling point etc.”).
  • the temperature of the load 132 is in a steady state at the boiling point or the like.
  • the remaining amount of the aerosol source for the holding unit or the like is “sufficient” when the remaining amount of the aerosol source in the holding unit or the like is equal to or more than the certain amount or the remaining amount of the aerosol source in the holding unit or the like.
  • the boiling point of the aerosol source and the temperature at which aerosol generation occurs coincide when the aerosol source is a liquid having a single composition.
  • the aerosol source is a mixed liquid
  • the theoretical boiling point of the mixed liquid determined by Raoul's law may be regarded as the temperature at which the aerosol is generated, or the aerosol is generated by the boiling of the aerosol source.
  • the temperature generated may be determined experimentally.
  • the remaining amount of the aerosol source in the storage unit 116A is less than a certain amount, the supply of the aerosol source from the storage unit 116A to the holding unit 130 is stopped in principle (a very small amount of the aerosol source is supplied). Or the aerosol generation device 100 may be slightly supplied by tilting or shaking).
  • the remaining amount of the aerosol source in the storage unit 116A is “sufficient” when the remaining amount of the aerosol source in the storage unit 116A is equal to or more than the certain amount or when the aerosol source in the holding unit 130 is saturated. Alternatively, it means that the supply of the remaining amount of the aerosol source to the predetermined amount or more is possible.
  • $ 302 represents a step of determining whether aerosol generation has been requested. For example, based on information obtained from a pressure sensor, a flow sensor, or the like, when the control unit 106 detects the start of suction by the user, it may be determined that aerosol generation has been requested. More specifically, for example, when the output value of the pressure sensor, that is, the pressure, falls below a predetermined threshold, the control unit 106 can determine that the start of suction by the user has been detected. Further, for example, when the output value of the flow sensor, that is, the flow rate or the flow rate exceeds a predetermined threshold value, the control unit 106 can determine that the start of suction by the user has been detected.
  • the aerosol can be generated according to the user's feeling, and thus the flow rate sensor is particularly suitable.
  • the control unit 106 may determine that the start of suction by the user has been detected.
  • the control unit 106 may determine that the start of suction by the user has been detected based on, for example, pressing a button for starting generation of the aerosol.
  • the control unit 106 may determine that the start of suction by the user has been detected based on both the information obtained from the pressure sensor or the flow rate sensor and the pressing of the button.
  • step 304 If it is determined that aerosol generation has been requested, the process proceeds to step 304; otherwise, the process returns to step 302.
  • # 304 indicates a step of turning on the switch Q1. By executing this step, a current flows to the load 132 via the switch Q1, and the load 132 generates heat.
  • # 306 indicates a step of turning off the switch Q1 and turning on the switch Q2. By executing this step, a current flows through the shunt resistor 212 and the load 132 via the switch Q2.
  • This sensor may be any sensor that outputs a value related to the temperature of the load 132, for example, one or both of the sensors 112B and 112D.
  • # 310 indicates a step of turning off the switch Q2.
  • # 312 indicates a step of storing data based on the output value obtained in step 308.
  • the “data based on the output value obtained in step 308” may be the output value itself obtained in step 308, or may be a value derived from the output value obtained in step 308.
  • the “value derived from the output value” may be, for example, the resistance value of the load 132 derived from the voltage value when the output value is the voltage value from the voltage sensor 112D.
  • the “value derived from the output value” is, for example, when the output value is a voltage value from the voltage sensor 112D, obtains a plurality of voltage values from the voltage sensor 112D, and derives the average value and the average value.
  • the value may be a given value.
  • the data needs to be stored in a manner that indicates the order in which it was stored.
  • the data can be stored in association with the time at which the original output value was obtained.
  • the time may be a relative time, for example, a relative time based on the time at which it is determined in step 302 that aerosol generation has been requested. If the time required for the loop from step 304 to step 304, which will be described later, returns to step 304, the relative time associated with each data is stored even if the data is simply stored in an understandable order. Note that can be estimated ex post.
  • the time may be an absolute time that is the current time instead of the relative time described above.
  • # 314 indicates a step of determining whether generation of an aerosol has been requested. For example, based on information obtained from a pressure sensor, a flow sensor, or the like, when the control unit 106 detects the end of suction by the user, it may be determined that generation of an aerosol is not requested. Here, for example, when the output value of the pressure sensor, that is, the pressure exceeds a predetermined threshold value, the control unit 106 determines that the end of suction by the user has been detected, in other words, that generation of the aerosol has not been requested. be able to.
  • the control unit 106 detects that the end of the suction by the user is detected, in other words, the generation of the aerosol is requested. Can be determined not to have.
  • This threshold may be larger than, equal to, or smaller than the threshold in step 302.
  • the control unit 106 determines that the end of the suction by the user has been detected based on, for example, release of the button for starting the generation of the aerosol, in other words, that the generation of the aerosol has not been requested. You may.
  • control unit 106 detects that the end of aspiration by the user is detected, in other words, the aerosol May not be requested.
  • step 316 If it is determined that aerosol generation has not been requested, the process proceeds to step 316; otherwise, the process returns to step 304.
  • # 316 indicates a step of shaping the data stored in step 312 such as excluding a predetermined portion of data.
  • the “predetermined portion” may be, for example, a portion corresponding to a temperature rising period or a cooling period of the load 132. That is, according to step 316, shaped data excluding portions corresponding to the temperature raising period and the cooling period can be used in step 318 described later.
  • FIG. 4A is a graph 400 in which the temperature of the load 132 in each power supply cycle is plotted at each time.
  • a time change of the temperature plotted at each time is referred to as a temperature profile.
  • the horizontal axis of the graph 400 represents a relative time based on the time at which it is determined in step 302 that aerosol generation has been requested, and the vertical axis represents the temperature of the load 132.
  • the time 407 corresponds to the time when it is determined in step 314 that the request for the aerosol has not been generated.
  • Each temperature profile corresponds to each power supply cycle.
  • One power supply cycle starts when a continuous or intermittent substantial power supply to the load 132 is initiated in response to a request for aerosol generation, or until aerosol generation is no longer required or for aerosol generation. Is a period including one period until the substantial power supply to the load 132 ends in response to the request being stopped.
  • one power supply cycle may be a period from when it is determined in step 302 that aerosol generation has been requested to when it is determined in step 314 that aerosol generation has not been requested.
  • one power supply cycle is assumed to start at time 405, which is the time at which it is determined in step 302 that aerosol generation has been requested, but is not limited to this.
  • One power cycle may begin, for example, before it is determined in step 302 that aerosol generation has been requested.
  • the time at which it is determined in step 302 that aerosol generation has been requested is different from the time at which substantial power supply to the load 132 is started.
  • One powering cycle is when power is substantially supplied to the load 132 after the aerosol generation is requested in step 302, for example, when the power supply to the load 132 is greater than a predetermined threshold (including zero). , May be started when or before the supply of the electric energy, the supply of the current, or the application of the voltage is actually performed.
  • One power supply cycle may be a period from when it is determined in step 302 that aerosol generation has been requested to when it is next determined in step 302 that aerosol generation has been requested.
  • each power supply cycle may be different or the same. Since one power supply cycle can be generated by one inhalation (puff) of the user of the aerosol generation device 100, it is also referred to as one puff.
  • the temperature rising period is a period from when the temperature of the load 132 starts rising until the temperature change stabilizes or reaches a predetermined temperature. Whether or not the temperature change of the load 132 has stabilized may be determined based on a time differential value of the temperature of the load 132, a difference between the previous temperature and the current temperature, and the like.
  • the heating period is a period from time 405, which is the time at which the generation of the aerosol is requested in step 302, to time 406 with a sufficient margin.
  • the heating period may be a period that is manually obtained after a graph such as the graph 400 is created in advance. In this case, it should be noted that the length of the heating period is constant in each power supply cycle.
  • the heating period may be a period determined by the control unit 106 determining a time at which the temperature of the load 132 starts increasing and a time at which the temperature change is stabilized by an arbitrary method. For example, the control unit 106 determines the time at which the generation of the aerosol is requested in step 302 as the former time, and the temperature rise rate (the temperature rise per unit time) of the load 132 has become equal to or less than a predetermined threshold.
  • the time or a time when the number of times becomes equal to or less than a predetermined threshold for a predetermined number of times can be determined as the latter time.
  • the time at which the difference between the temperature of the load 132 acquired last time and the temperature of the load 132 acquired this time becomes equal to or less than a predetermined threshold may be determined as the latter time.
  • the time at which the standard deviation or the variance of the plurality of temperatures of the load 132 acquired most recently becomes equal to or smaller than a predetermined threshold may be determined as the latter time.
  • the length of the heating period may vary depending on various conditions such as individual differences between the cartridge 104A and the aerosol-generating article 104B and the ambient temperature.
  • the cooling period may be a period from when the temperature of the load 132 starts decreasing until the temperature change stabilizes or reaches a predetermined temperature. Further, the cooling period may end when the next power supply cycle or the heating period starts. In graph 400, it is assumed that the cooling period starts at time 407, the time at which it was determined in step 314 that aerosol generation was not required.
  • the cooling period may be a period manually calculated after a graph such as the graph 400 is created in advance. Note that in this case, the length of the cooling period is constant in each power supply cycle.
  • the cooling period may be a period determined by the control unit 106 determining a time at which the temperature of the load 132 starts decreasing and a time at which the temperature change reaches a predetermined temperature by an arbitrary method. For example, the control unit 106 determines the time at which the generation of the aerosol is not requested in step 314 as the former time, and determines the time at which the temperature of the load 132 becomes equal to or less than the predetermined threshold value or the predetermined number of times. The time at which the time falls below the predetermined threshold value can be determined as the latter time.
  • the time at which the difference between the temperature of the load 132 acquired last time and the temperature of the load 132 acquired this time becomes equal to or less than a predetermined threshold may be determined as the latter time.
  • the time at which the standard deviation or the variance of the plurality of temperatures of the load 132 acquired most recently becomes equal to or smaller than a predetermined threshold may be determined as the latter time.
  • the length of the cooling period may vary depending on various conditions such as individual differences between the cartridge 104A and the aerosol-generating article 104B and the ambient temperature.
  • the process for determining depletion or deficiency of an aerosol source in the present disclosure comprises the steps Even after it is determined in the step corresponding to 314 that the generation of the aerosol is not requested, another process of acquiring the output value of the sensor and storing the data is not excluded. Accordingly, in such another example, the “predetermined portion” in the step corresponding to step 316 may include a cooling period.
  • the “predetermined portion” in step 316 includes one or more of the following at the start of the power supply cycle, at the end of the power supply cycle, at any one or more points in the power supply cycle, and at any part of the period in the power supply cycle. It may be a corresponding part. Therefore, according to step 316, for example, data that includes data corresponding to the start of the power supply cycle but does not include data immediately after that can be used in step 318 described below.
  • a portion corresponding to one or more of any part of the period in the above-described power supply cycle may include a start time of the power supply cycle and a time end of the power supply cycle. In this case, a predetermined period from the start of the power supply cycle and / or a predetermined period going back from the end of the power supply cycle may correspond to the “predetermined portion”.
  • $ 318 indicates a step of determining whether the aerosol source is depleted or insufficient based on the data partially excluded in step 316.
  • “based on data” includes being based on at least a part of data.
  • FIG. 3B is a flowchart of another exemplary process 320 for determining the occurrence of depletion or deficiency of an aerosol source, according to one embodiment of the present disclosure. Some of the steps included in the example process 320 are the same as the steps included in the example process 300, and therefore, steps that are not included in the example process 300 will be described below.
  • # 322 indicates a step of determining whether to store data based on the output value of the sensor acquired in step 308. If it is determined that the data should be stored, the process proceeds to step 312; otherwise, the process proceeds to step 314.
  • step 322 when the output value of the sensor obtained in step 308 corresponds to the predetermined portion described above with respect to step 316, it can be determined that the data should not be stored as data. That is, according to step 322, data corresponding to the temperature raising period, the cooling period, and the like can be prevented from being stored in step 312 in advance. Accordingly, the storage capacity of the memory 114 can be reduced, so that the cost, weight, and size of the aerosol generation device 100 can be reduced. In addition, since the step 316 is unnecessary in the exemplified process, the determination of the depletion or the shortage of the aerosol source in the step 324 can be performed more quickly.
  • # 324 indicates a step of determining whether the aerosol source is depleted or insufficient based on the data stored in step 312.
  • FIG. 5 is a flowchart of a first exemplary process 500 executed in step 318 or 324.
  • # 502 indicates a step of calculating an index based on the deviation of the sensor output value acquired in step 308.
  • the “index based on the deviation” may be, for example, a standard deviation or a variance.
  • Step 502 is a step of calculating the index based on the data based on the output values of the sensors partially excluded in Step 316 or Step 322 (hereinafter referred to as “calculation data”).
  • the index may be calculated from the calculation data itself or from a value derived from the calculation data.
  • the calculation data that is, the standard deviation of the output value is clearly an “index based on the deviation of the output value of the sensor”.
  • the sensor when the sensor outputs a voltage value and the resistance value of the load 132 derived from the voltage value is stored as data in step 308, the calculation data, that is, the temperature of the load 132 derived from the resistance value is obtained. Since the statistical nature of the value is the same as the voltage value output by the sensor, the standard deviation of such a load 132 temperature value is, after all, an "index based on the deviation of the sensor output value". .
  • the index based on the deviation of the output value of the sensor may be an index based on the deviation of various physical quantities derived only from the output value of the sensor in each power supply cycle, in other words, it can be generated from a single power supply cycle. It may be an index based on a large deviation.
  • # 504 indicates a step of determining whether or not the index calculated in step 502 is equal to or greater than a predetermined threshold. If the index calculated in step 502 is equal to or greater than the predetermined threshold, the process proceeds to step 506; otherwise, the process ends. If the index calculated in step 502 indicates a larger value as the variation of the calculation data is larger, such as a standard deviation, in step 504, it may be determined whether the index is equal to or larger than a threshold. On the other hand, when the index calculated in step 502 indicates a smaller value as the variation of the calculation data is larger, it should be noted that in step 504, it is sufficient to determine whether the index is equal to or less than a threshold.
  • # 506 indicates a step of determining that the aerosol source in the storage unit 116A or the aerosol base material 116B (hereinafter referred to as “storage unit or the like”) has been depleted or insufficient.
  • FIG. 4B is a graph 420 plotting a temperature profile 422 of the power supply cycle when the remaining amount of the aerosol source in the holding unit or the like is sufficient and a temperature profile 424 when the remaining amount of the aerosol source in the holding unit or the like is insufficient. Is represented.
  • the power supply cycle corresponding to the temperature profile 424 is a power supply cycle visually confirmed that the load 132 has firstly undergone discoloration due to scorching, oxidation, and the like. The remaining amount of the source is depleted.
  • the remaining amount of the aerosol source in the storage unit 116A when the remaining amount of the aerosol source in the storage unit 116A is sufficient, the remaining amount of the aerosol source in the holding unit 130 is also sufficient. However, if the remaining amount of the aerosol source is insufficient in the storage unit 116A, supply is delayed, and the remaining amount of the aerosol source in the holding unit 130 is depleted or insufficient. In particular, when the remaining amount of the aerosol source is depleted in the storage unit 116A, the supply is completely stopped, so that the remaining amount of the aerosol source in the holding unit 130 is depleted. Conversely, when the remaining amount of the aerosol source in the holding unit 130 is depleted, the remaining amount of the aerosol source in the storage unit 116A is depleted or insufficient.
  • the remaining amount of the aerosol source in the aerosol substrate 116B is depleted.
  • the remaining amount of the aerosol source in the storage unit or the like is depleted or insufficient.
  • the temperature profile 424 corresponding to the power supply cycle in which the remaining amount of the aerosol source in the holding unit or the like is depleted has a larger fluctuation in the temperature of the load 132.
  • the fluctuation of the temperature of the load 132 is evaluated using a standard deviation or the like.
  • a power supply cycle can include multiple phases.
  • the length of each phase may be the same or different. At least some of the phases may overlap. Some of the phases may be considered to correspond to one or both of the above-described heating period and cooling period.
  • Reference numeral 432 indicates an example of a first phase that is a phase of the plurality of phases.
  • Reference numeral 434 denotes an example of a second phase that is a phase of the plurality of phases and that is later in time series than the first phase.
  • the first phase 432 and the second phase 434 are adjacent to each other in the graph 420, one or more phases may exist between the first phase 432 and the second phase 434. Further, the first phase 432 and the second phase 434 may at least partially overlap. In FIG.
  • the first phase 432 and the second phase 434 respectively include a period from time 435 (in this example, the same as time 406 in FIG. 4A) to time 436 and a time from time 436 to time 437 (in this example). , The same as time 407 in FIG. 4A).
  • FIG. 6 is a graph 600 in which the standard deviation of the temperature of the load 132 based on the calculation data for each power supply cycle is plotted in each power supply cycle.
  • the standard deviation plotted in each power supply cycle is referred to as a standard deviation profile.
  • the horizontal axis of the graph 600 represents the number of power supply cycles, and the vertical axis of the graph 600 represents the standard deviation of the temperature of the load 132.
  • Reference numerals 602 and 604 indicate power supply cycles corresponding to the temperature profiles 422 and 424 in FIG. 4B, respectively.
  • Reference numeral 612 denotes a standard deviation profile derived from calculation data corresponding to both the first phase 432 and the second phase 434.
  • Reference numeral 614 denotes a standard deviation profile derived from calculation data corresponding to only the second phase 434 of the first phase 432 and the second phase 434.
  • the standard deviation of the temperature in the power supply cycle 604 is larger than the standard deviation of the maximum temperature in the previous power supply cycle, that is, the standard deviation in the power supply cycle 602.
  • the power supply cycle 604 is a power supply cycle in which the remaining amount of the aerosol source in the holding unit or the like is depleted, and corresponds to the temperature profile 424. Further, a power supply cycle before the power supply cycle 604 corresponds to a temperature profile when the remaining amount of the aerosol source in the holding unit or the like is sufficient or not enough but not exhausted.
  • the temperature of the load 132 is in a steady state due to the boiling point of the aerosol source and the like.
  • the temperature of the load 132 is in a steady state (described later in Section 3-2). Therefore, in the power supply cycle before the power supply cycle 604, the standard deviation of the temperature tends to have a small value.
  • the aerosol source is extremely small in the entire or local area of the holding unit or the like.
  • temperature unevenness occurs in the load 132 according to the distribution of the aerosol source in the holding unit and the like. Since the temperature unevenness fluctuates the temperature of the load 132, it is considered that the standard deviation of the temperature shows a large value in the power supply cycle 604. In the power supply cycle after the power supply cycle 604, the standard deviation of the temperature of the load 132 is further increased due to a point that the aerosol source does not function as a refrigerant of the load 132 and a point that the discoloration of the load 132 further proceeds. It is considered to be.
  • the predetermined threshold value in step 504 is equal to or less than the standard deviation of the temperature in the power supply cycle when the aerosol source in the storage unit or the like is depleted or short (power supply cycle in which the aerosol source in the holding unit or the like is depleted) (for example, , The standard deviation of the temperature in the power supply cycle 604) and the maximum standard deviation of the temperature in the power supply cycle otherwise (eg, the standard deviation of the temperature in the power supply cycle 602). This means that it can be determined that the aerosol source in the storage unit or the like is depleted or insufficient.
  • the difference 624 between the standard deviation in the power supply cycle 602 and the standard deviation in the power supply cycle 604 for the latter is the standard deviation in the power supply cycle 602 for the former and the standard value in the power supply cycle 604. It is larger than the difference 622 from the deviation.
  • the standard deviation profile 614 that is, the standard deviation profile derived from the calculation data corresponding to only the second phase 434 in the first phase 432 and the second phase 434 is better in the storage unit and the like. This means that the difference between when the aerosol source is depleted or scarce and when it is not is large.
  • the relatively large value of the standard deviation of the temperature in the power supply cycle 602 means that the amount of the aerosol source in the holding unit or the like becomes excessive due to, for example, leaving the aerosol generation device 100 for a long time, and the initial temperature profile It can be explained from the fact that the temperature of the load 132 has hardly risen.
  • FIG. 7 is a flowchart of the second exemplary process 700 executed in step 318 or 324. Some of the steps included in the example process 700 are the same as the steps included in the example process 500, and therefore, steps that are not included in the example process 500 will be described below.
  • # 702 and 704 indicate steps of calculating a first index and a second index based on the deviation, respectively, which are derived from the sensor output values obtained in step 308. Steps 702 and 704 are the same as step 502 except for calculation data for deriving an index based on the deviation.
  • the calculation data for deriving the first index in step 702 may be the calculation data corresponding to the first phase 432, and the calculation data for deriving the second index in step 704.
  • the calculation data may be calculation data corresponding to 434 in the second phase.
  • # 706 and 708 indicate a step of calculating a difference between the first index and the second index, and a step of determining whether the calculated difference is equal to or larger than a threshold, respectively.
  • the first index and the second index show larger values as the variation in the calculation data is larger, and the difference between the first index and the second index is the first index from the second index. It is assumed to be calculated by subtraction. In the case where the first index and the second index use smaller values as the variation of the calculation data increases, the difference between the first index and the second index is calculated by subtracting the second index from the first index. In that case, it should be noted that in step 708, it is sufficient to determine whether the calculated difference is less than the threshold.
  • FIG. 8 is a graph 800 plotting the standard deviation of the temperature of the load 132 derived from the calculation data for each power supply cycle, and is similar to the graph 600.
  • reference numeral 814 denotes a standard deviation profile obtained by subtracting the first index from the second index.
  • the difference 824 between the standard deviation in the power supply cycle 602 and the standard deviation in the power supply cycle 604 for the latter is the standard deviation in the power supply cycle 602 and the standard deviation in the power supply cycle 604 for the former. Is greater than 822. That is, the standard deviation of the temperature in the power supply cycle when the aerosol source in the storage unit or the like is depleted or insufficient (the power supply cycle in which the aerosol source in the storage unit or the like is depleted), and the maximum temperature in the power supply cycle otherwise.
  • the phenomenon in which the difference between the standard deviation in the power supply cycle 602 and the standard deviation in the power supply cycle 604 is larger in the standard deviation profile 814 than in the standard deviation profile 612 can be explained as follows.
  • the temperature of the load 132 is unlikely to rise at the beginning of the temperature profile due to leaving the aerosol generation device 100 for a long time, the temperature of the load 132 is settled to a steady state at a boiling point or the like after the middle stage of the temperature profile. It is thought that. That is, in the power supply cycle 602, since the standard deviation after the middle stage of the heating profile is small, a value obtained by subtracting the first index corresponding to the former from the second index corresponding to the latter tends to indicate a small value.
  • the temperature of the load 132 tends to fluctuate because the remaining amount of the aerosol source in the holding unit or the like is depleted during the cycle. That is, in the power supply cycle 604, the standard deviation after the middle stage of the heating profile is large. Therefore, a value obtained by subtracting the first index corresponding to the former from the second index corresponding to the latter tends to show a large value.
  • FIG. 9 is a flowchart of a third exemplary process 900 executed in step 318 or 324. Since some of the steps included in the example process 900 are the same as the steps included in the example process 500 or 700, steps that are not included in the example process 500 or 700 will be described below.
  • # 902 indicates a step of determining whether the first index is less than the first threshold. The purpose of this step is to determine whether the variation in the data from which the first index is derived is small, that is, whether the temperature of the load 132 is in a steady state. If the first index is less than the first threshold, the process proceeds to step 704; otherwise, the process ends.
  • # 904 indicates a step of determining whether the second index is equal to or greater than a second threshold. This step is intended to determine whether the data from which the second index is derived has a large variation.
  • the second threshold may be equal to or different from the first threshold. If the second index is greater than or equal to the second threshold, the process proceeds to step 506; otherwise, the process ends.
  • the first index and the second index show larger values as the variation of the calculation data is larger.
  • FIG. 10 is a graph 1000 plotting the standard deviation of the temperature of the load 132 derived from the calculation data for each power supply cycle, and is similar to the graph 600.
  • reference numeral 1012 denotes a temperature profile derived from calculation data corresponding to a period from time 435 to time 436, which is the first phase (see FIG. 4B).
  • the second phase is a period from time 436 to time 437 (see FIG. 4B). Therefore, each point of the standard deviation profiles 1012 and 614 corresponds to the first index and the second index determined in steps 702 and 704, respectively.
  • the standard deviation 1022 of the former is smaller than the standard deviation 1024 of the latter.
  • the temperature in the first half of the load 132 has a small variation, but the second half is small. Is large.
  • the standard deviation 1032 of the former is larger than the standard deviation 1034 of the latter.
  • the temperature of the load 132 hardly rises at the beginning of the temperature profile and does not enter a steady state, but after the middle of the temperature profile, the temperature of the load 132 is settled to a steady state at the boiling point or the like. It is considered that the variation in the first half is large, but the variation in the second half is small.
  • an erroneous determination is made using this feature by using the second index derived from at least a part of the output value of the sensor after the output value of the sensor has reached a steady state. Can be reduced.
  • whether the output value of the sensor has reached the steady state is simply that the output value of the sensor is within a predetermined range for a predetermined time or that the average value of the output value of the sensor for a predetermined time is equal to a predetermined value. The determination may be made based on whether the difference is equal to or smaller than a predetermined magnitude. This point will be described in detail. When the remaining amount of the aerosol source in the holding unit or the like is sufficient, the temperature of the load 132 converges to the vicinity of the boiling point or the like, and shows a slight vertical movement up and down in a steady state. become.
  • the determination in step 902 in the example process 900 may be based on one or both of the output value of the sensor and its average value, or may be combined with the determination based on the first index.
  • the first threshold and the second threshold in Steps 902 and 904 are determined in the power supply cycle when the remaining amount of the aerosol source in the storage unit or the like is depleted or insufficient (the power supply cycle in which the aerosol source in the holding unit or the like is depleted).
  • FIG. 11 is a flowchart of a fourth exemplary process 1100 executed in step 318 or 324. Since some of the steps included in the example process 1100 are the same as the steps included in the example process 500, steps that are not included in the example process 500 will be described below.
  • # 1102 a step of calculating an average value of the temperature of the load 132 based on the calculation data.
  • # 1104 indicates a step similar to the step 504. However, the difference is that the “threshold value” in step 504 is the “first threshold value” in step 1104, and the process proceeds to step 1106 when the calculated index is equal to or greater than the first threshold value.
  • the index indicates a larger value as the variation of the calculation data is larger. It should be noted that in the case of using an index that shows a smaller value as the variation of the calculation data becomes larger, it is sufficient to determine whether or not the index is less than the first threshold in this step.
  • # 1106 indicates a step of determining whether or not the average calculated in step 1102 is equal to or greater than a second threshold. If the calculated average is greater than or equal to the second threshold, the process proceeds to step 506; otherwise, the process ends.
  • FIG. 12 is a graph 1200 obtained by plotting the standard deviation and the average temperature of the temperature of the load 132 derived from the calculation data for each power supply cycle in each power supply cycle, and is similar to the graph 600.
  • reference numeral 1216 denotes an average temperature derived from calculation data corresponding to a period from time 436 to time 437 (see FIG. 4B).
  • the average temperature plotted in each power supply cycle is referred to as an average temperature profile.
  • the average temperature in the power supply cycle 604 is higher than the average temperature in the power supply cycle or the power supply cycle 1206, which is the maximum average temperature of the power supply cycle before that.
  • the average temperature in the power supply cycle when the aerosol source in the storage unit or the like is depleted or insufficient is larger than the average temperature in the power supply cycle when the aerosol source is not sufficient.
  • the second threshold value in step 1106 is equal to or lower than the average temperature in a power supply cycle when the aerosol source in the storage unit or the like is depleted or insufficient (power supply cycle in which the aerosol source in the storage unit or the like is depleted), and May be greater than the maximum average temperature of
  • the reason why the average temperature in the power supply cycle when the aerosol source in the storage unit or the like is depleted or insufficient shows a relatively high value is that the aerosol source is configured. This can be explained from the point that the mixed solution having a lower boiling point is preferentially atomized and the cooling effect of the load 132 by the aerosol source is weakened.
  • FIG. 13 is a flowchart of a fifth exemplary process 1300 executed in step 318 or 324. Since some of the steps included in the exemplary processes 1300 are the same as the steps included in the exemplary processes 500 and 700, steps that are not included in the exemplary processes 500 and 700 will be described below.
  • # 1302 indicates a step of initializing the index calculation condition.
  • the index calculation condition specifies data for deriving the first index and the second index in steps 702 and 704.
  • FIG. 4C The graph shown in FIG. 4C is identical to that of FIG. 4B.
  • the calculation data is divided into two parts with a certain time as a reference (hereinafter, referred to as a “division time”), and the first index is calculated from the calculation data corresponding to the first half and the second half.
  • the second index can be derived from the calculation data. Therefore, in step 1302, for example, the first index is calculated from the calculation data corresponding to the first half portion (which may correspond to the first phase) 442 divided by the time 440, and the second index (which may correspond to the second phase) 444.
  • the index calculation condition can be initialized so that the second index is derived from the calculation data corresponding to.
  • the latter half 444 relating to the initialization is preferably shorter. This is because, as will be described later, fluctuations in the temperature of the load 132 after the middle stage of the heating profile, which can occur only in the power supply cycle in which the aerosol source is depleted in the holding unit or the like, can be easily observed.
  • # 1304 indicates a step of determining whether or not the difference calculated in step 706 is equal to or larger than a threshold. If the calculated difference is greater than or equal to the threshold, the process proceeds to step 506; otherwise, the process proceeds to step 1306.
  • # 1306 indicates a step of determining whether or not the index calculation condition can be updated. If it is determined that the index calculation condition can be updated, the process proceeds to step 1308 for updating the index calculation condition; otherwise, the process ends.
  • Updating the index calculation condition may be, for example, moving the division time earlier.
  • the division time is changed from time 440 to time 450 by updating, and in the next steps 702 and 704, the first index is calculated from the calculation data corresponding to the first half 452 to the calculation data corresponding to the second half 454. Can be derived from the second index.
  • the first index can be calculated from the earlier calculation data and the second index can be calculated from the later calculation data in time series. it can.
  • the amount of movement of the division time may be constant or different for each update.
  • Whether the index calculation condition can be updated can be determined by executing step 1308 a predetermined number of times, determining whether the division time has reached a predetermined time, and determining whether the length of the first half is equal to or less than a predetermined length. For example, the determination may be made by an arbitrary method.
  • the index based on the deviation changes according to the part of the calculation data for calculating the index.
  • the temperature of the load 132 tends to fluctuate in the middle and later stages of the heating profile. If the index calculation condition is gradually updated, the temperature (sample) of the load 132 for calculating the second index gradually increases. Therefore, it is possible to determine whether or not the aerosol source is depleted or shortage occurs in the storage unit or the like while paying attention to the temperature fluctuation of the load 132 after the middle period. Therefore, according to the example process 1300, the possibility of making an erroneous determination can be reduced by calculating the index based on the deviation while changing the calculation data.
  • FIG. 14 is a flowchart of an exemplary process 1400 for estimating or detecting the state of at least one of the storage unit 116A and the holding unit 130 according to an embodiment of the present disclosure. Since some of the steps included in the example process 1400 are the same as the steps included in the example process 300, steps that are not included in the example process 300 will be described below.
  • # 1402 indicates a step of estimating or detecting the state of at least one of the storage unit 116A and the holding unit 130 based on the data stored in step 312.
  • FIG. 15 is a flowchart of the first exemplary process 1500 executed in step 1402.
  • # 1502 indicates a step of calculating an index ⁇ based on the deviation of the sensor output value acquired in step 308 based on the data stored in step 312.
  • the index ⁇ is an example of a value related to the behavior of the temperature of the load 132.
  • a step 1504 calculates the average value T ave of the temperature of the load 132 based on the data stored in the step 312.
  • Reference numeral 1510 denotes a step of determining whether the index ⁇ is smaller than the threshold ⁇ thre and whether the magnitude of the difference between the average value T ave and the first predetermined temperature T 1 is smaller than the threshold ⁇ thre .
  • the determination of whether the index ⁇ is smaller than the threshold ⁇ thre will be described.
  • the fact that the index ⁇ is small means that the variation in the sensor output value in step 308 is small, and therefore, that the temperature of the load 132 is stable.
  • FIG. 16 is a graph 1600 plotting the standard deviation of the temperature of the load 132 derived from the calculation data for each power supply cycle, and is similar to the graph 600.
  • the standard deviation 1612 of the temperature in the power supply cycle 604 that visually confirms that the load 132 has firstly undergone discoloration due to charring, oxidation, or the like is the largest among the power supply cycles earlier than that.
  • the standard deviation is larger than the standard deviation 1602 in the power supply cycle 602.
  • ⁇ thre is set to a value larger than the standard deviation 1602 and equal to or smaller than the standard deviation 1612, ⁇ ⁇ thre becomes false in the power supply cycle immediately before the load 132 undergoes discoloration due to scorch or oxidation. Therefore, the determination in step 1510 is false.
  • the temperature T 1 is the temperature reached by the load 132 when the remaining amount of the aerosol source in the holding unit 130 is sufficient, that is, the boiling point of the aerosol source.
  • 411 shows such temperature T 1.
  • the temperature T 1 may be 200 ° C.
  • temperatures T 1 can be determined by experiment.
  • the remaining amount of the aerosol source in the holding unit 130 is not sufficient, all of the energy supplied from the power supply 110 is not used for atomizing the aerosol source, so the average temperature T ave of the load 132 is equal to the temperature T It is known to exceed 1 .
  • the temperature of the load 132 is an example of a process for determining whether a steady state boiling like T 1 of the aerosol source. Whether the temperature of the load 132 is in a steady state at a certain temperature is simply determined by whether the output value of the sensor falls within a predetermined range corresponding to a predetermined range of temperatures including the certain temperature for a predetermined time, or Alternatively, the determination may be made based on whether the difference between the average value of the output value of the sensor for a predetermined time and the predetermined value corresponding to the certain temperature is equal to or smaller than a predetermined value.
  • step 1512 If the index ⁇ is smaller than the threshold ⁇ thre and the magnitude of the difference between the average value T ave and the first predetermined temperature T 1 is smaller than the threshold T thre , the process proceeds to step 1512; Goes to step 1520.
  • $ 1512 indicates a step of determining whether or not the variable COUNT is zero.
  • the variable COUNT is used as a flag indicating information of the past determination.
  • the fact that the variable COUNT is not zero means that the determination in step 1510 was not true in the past. It represents.
  • the variable COUNT may be initialized to zero at any time before the first execution of the example process 1400. Therefore, the first time step 1512 is executed, the determination is always true. If variable COUNT is zero, processing proceeds to step 1514; otherwise, processing proceeds to step 1516.
  • # 1514 indicates a step of estimating or detecting that the remaining amount of the aerosol source in both the storage unit 116A and the holding unit 130 is sufficient.
  • the estimation or detection in step 1514 will be described with reference to FIG.
  • 1700 shows several patterns 1702 to 1710 about transition of the average temperature of the load 132 during the power supply cycle when the temperature of the load 132 is stabilized.
  • C 1 in each pattern indicates a single power supply cycle (hereinafter, referred to as “first power supply cycle”), and c 2 indicates a single power supply cycle after the first power supply cycle (hereinafter, “second power supply cycle”). Power supply cycle ”).
  • the average temperature in the first feeding cycle c 1 is temperatures T 1 near shows a transition pattern average temperature is temperatures T 1 near the second feed cycle c 2.
  • the transition pattern 1702 in the even now in the past also indicates that the temperature of the load 132 is in a steady state at a temperature T 1 of the vicinity, this means that in even now in the past also, aerosol source in the holding unit 130 Corresponds to a sufficient remaining amount.
  • the transition pattern 1702 when the transition pattern 1702 appears, it can be determined that the remaining amount of the aerosol source in the holding unit 130 is sufficient both in the past and now. This determination indicates that the remaining amount of the aerosol source in the storage unit 116A is sufficient.
  • step 1514 is executed only when variable COUNT is zero.
  • the variable COUNT increases when the temperature of the load 132 has not been in the steady state due to the boiling point of the aerosol source in the past.
  • reaching the step 1514 means that the temperature of the load 132 has been in a steady state in the past due to the boiling point of the aerosol source or the like, that is, the transition pattern 1702 has appeared. Therefore, in step 1514, it is possible to estimate or detect that the remaining amount of the aerosol source in both the storage unit 116A and the holding unit 130 is sufficient.
  • $ 1516 indicates a step of initializing the variable COUNT to zero.
  • the variable COUNT which has become a value larger than 0 because the temperature of the load 132 was not in a steady state due to the boiling point of the aerosol source in the past, is initialized to zero in this step.
  • # 1518 indicates a step of estimating or detecting that the atomization speed of the aerosol source in the holding unit 130 exceeds the supply speed of the aerosol source from the storage unit 116A to the holding unit 130.
  • the estimation or detection in step 1518 will be described with reference to FIG. 17 again.
  • the average temperature in the second feeding cycle c 2 shows a transition pattern is temperatures T 1 near .
  • the transition pattern 1706 indicates that the remaining amount of the aerosol source in the holding unit 130 was not sufficient in the past, but is sufficient now.
  • Such a transition pattern 1706 appears when an imbalance occurs between the atomization speed of the aerosol source in the holding unit 130 and the supply speed of the aerosol source from the storage unit 116A to the holding unit 130.
  • the inhalation speed is large, and the atomization speed of the aerosol source in the holding unit 130 is held from the storage unit 116A. It is assumed that the supply speed of the aerosol source to the unit 130 is exceeded. As a result, when the aerosol source in the holding unit 130 is temporarily short, but the remaining amount of the aerosol source in the holding unit 130 is restored by the supply of the aerosol source after the inhalation by the user has once ended, the transition pattern 1706 will appear. Note that the transition pattern 1706 also appears when the interval between the user's intake and the next intake is short.
  • step 1518 is reached when the variable COUNT is not zero even though the temperature of the load 132 is in a steady state due to the boiling point of the aerosol source or the like.
  • the fact that the variable COUNT is not zero means that the temperature of the load 132 has not been in a steady state in the past due to the boiling point of the aerosol source or the like. That is, reaching step 1518 means that the transition pattern 1706 has appeared. Therefore, in step 1518, it is possible to estimate or detect that the atomization speed of the aerosol source in the holding unit 130 exceeds the supply speed of the aerosol source from the storage unit 116A to the holding unit 130.
  • Reference numeral 1520 denotes a step of determining whether the index ⁇ is smaller than the threshold ⁇ thre and whether the magnitude of the difference between the average value T ave and the second predetermined temperature T 2 is smaller than the threshold ⁇ thre . Note that the threshold value ⁇ thre in step 1510 and step 1520 may be the same or different.
  • the temperature of the load 132 may be in a steady state at a temperature 412 higher than the temperature 411 when the remaining amount of the aerosol source in the holding unit 130 is neither sufficient nor depleted. It is not fully understood why this phenomenon occurs, but it can be due to multiple factors. For example, as a factor that causes such a phenomenon, a partial depletion or shortage of the aerosol source in the holding unit 130 can be considered. Further, for example, a change in the components of the aerosol source can be considered as a factor that causes such a phenomenon.
  • the aerosol source is a mixed liquid
  • a difference in the boiling points of the liquids constituting the aerosol may be considered as a factor that causes such a phenomenon.
  • the temperature T 2 is such a temperature 412 and can be determined by experiments.
  • step 1520 the temperature of the load 132 is an example of a process for determining whether a steady state temperature T 2 as described above.
  • step 1522 If the index ⁇ is smaller than the threshold ⁇ thre and the magnitude of the difference between the average value T ave and the second predetermined temperature T 2 is smaller than the threshold T thre , the process proceeds to step 1522; Goes to step 1530.
  • Reference numeral 1522 denotes a step of determining whether or not the variable COUNT is equal to or greater than a threshold value COUNT thre .
  • COUNT thre may be one or more predetermined values. If variable COUNT is greater than or equal to threshold COUNT thre , the process proceeds to step 1524; otherwise, the process proceeds to step 1526.
  • # 1524 indicates a step of estimating or detecting that the aerosol source is insufficient in the holding unit 130.
  • the determination in step 1524 will be described with reference to FIG. 17 again.
  • the average temperature in the first feeding cycle c 1 is temperature T 2 vicinity shows a transition pattern average temperature is temperature T 2 near the second feed cycle c 2.
  • the transition pattern 1708 in the even now in the past have also shown that the temperature of the load 132 is in a steady state at a temperature T 2 vicinity. This means that the aerosol source in the holding unit 130 is not sufficient but has not been depleted in the past and the present.
  • the transition pattern 1708 when the transition pattern 1708 appears, it is determined that the remaining amount of the aerosol source in the holding unit 130 is not sufficient but not depleted in the past and now, for example, it is determined to be insufficient in design. Can be. In addition, when the transition pattern 1708 appears, the residual amount of the aerosol source in the storage unit 116A may be insufficient or exhausted in the past and present, but these are distinguished in design. Instead, it may be determined that the remaining amount of the aerosol source in the storage unit 116A is depleted or insufficient.
  • step 1524 is executed only when the variable COUNT is equal to or larger than the threshold value COUNT thre.
  • the variable COUNT is incremented by 1 in step 1526.
  • the determination of the temperature of the load 132 becomes a steady state at temperature T 2 in step 1520 has been performed at least COUNT thre times, i.e., even in the current in the past, a load 132 temperature is that it is in a steady state at a temperature T 2 vicinity, is that the transition pattern 1708 appeared. Therefore, in step 1524, it can be estimated or detected that the remaining amount of the aerosol source in the holding unit 130 is insufficient.
  • step 1524 it can be estimated or detected that the remaining amount of the aerosol source in the storage unit 116A is depleted or insufficient. In step 1524, without estimating or detecting the holding unit 130, it is estimated or detected that the remaining amount of the aerosol source in the storage unit 116 ⁇ / b> A is depleted or short of the storage unit 116 ⁇ / b> A and the holding unit 130. You may.
  • the number of power supply cycles from when the step 1524 is first reached to when the aerosol source in the holding unit 130 is actually depleted may be obtained in advance by an experiment, and the number of power supply cycles may be set as a predetermined number.
  • step 1524 it can be estimated or detected that the user of the aerosol generation device 100A performs the predetermined number of puffs, that is, after the predetermined number of power supply cycles have occurred, the remaining amount of the aerosol source in the holding unit 130 is depleted.
  • the transition pattern 1708 indicates a sign of exhaustion of the remaining amount of the aerosol source in the holding unit 130.
  • control unit 106 can be configured to suppress power supply to the load 132 after a predetermined number of power supply cycles or a power supply cycle less than the predetermined number of times occurs. In this way, it is not necessary to supply power to the load 132 in a state where a sufficient amount of aerosol cannot be generated or in a state where an aerosol having an intended flavor cannot be generated. In other words, when the remaining amount of the aerosol source in the holding unit 130 is depleted, the power supply to the load 132 does not need to be performed, so that the load 132 does not reach a high temperature.
  • $ 1526 indicates a step of incrementing the variable COUNT. This step allows the variable COUNT to be increased by one.
  • # 1528 indicates a step of making a determination that the determination on the state related to the aerosol source is suspended or that the latest determination is followed.
  • the determination in step 1528 will be described with reference to FIG. 17 again.
  • transition pattern 1704 when the transition pattern 1704 appears, as in the transition pattern 1706, an imbalance occurs between the atomization speed of the aerosol source in the holding unit 130 and the supply speed of the aerosol source from the storage unit 116A to the holding unit 130. That is, it is difficult to discriminate whether it should be determined that the remaining amount of the aerosol source in the storage unit 116A is insufficient, as in the transition pattern 1708. Therefore, when the transition pattern 1704 appears, a determination is made to suspend the determination or to follow a determination made in the past (including a determination to suspend the determination or follow a determination made in the past). It is possible to
  • step 1528 is executed only when variable COUNT is equal to or smaller than threshold value COUNT thre .
  • the judgment in step 1524 is made when the temperature of the load 132 falls close to the first predetermined temperature T 1 before the variable COUNT becomes larger than the threshold value COUNT thre.
  • the determination at 1518 will be made. In other words, when step 1528 is reached, it can be considered that the transition pattern 1704 has appeared. Therefore, in step 1528, it is possible to make a determination to suspend the determination or to follow a determination made in the past.
  • Reference numeral 1530 denotes a step of determining whether the index ⁇ is equal to or higher than the threshold ⁇ thre or whether the average temperature T ave is equal to or higher than a third predetermined temperature.
  • T 3 shows a third predetermined temperature.
  • Temperature T 3 is greater than the temperature T 2, may be a small temperature than the maximum temperature of the load 132 that may be reached when the aerosol source in the holding unit 130 has been exhausted, in which can be determined by experiment.
  • the temperature T 3 may be a 350 ° C..
  • # 1532 indicates a step of estimating or detecting that the remaining amount of the aerosol source in the holding unit 130 is depleted.
  • Step 1532 is executed when the index ⁇ is equal to or larger than the threshold ⁇ thre .
  • the index ⁇ basically increases when the number of power feedings exceeds a predetermined number.
  • the threshold ⁇ thre is set to a value larger than the standard deviation 1602 and equal to or smaller than the standard deviation 1612
  • the remaining amount of the aerosol source in the holding unit 130 may cause the load 132 to undergo discoloration due to burning or oxidation. It is possible to determine whether the state is about to occur for the first time.
  • the occurrence of discoloration due to burning, oxidation, or the like in the load 132 can be regarded as depletion of the remaining amount of the aerosol source in the holding unit 130. Therefore, by design, when the index ⁇ is equal to or larger than the threshold ⁇ thre , In some cases, it is possible to estimate or detect that the remaining amount of the aerosol source in the holding unit 130 has been depleted.
  • Step 1532 is also executed when the average temperature T ave is equal to or higher than the temperature T 3 .
  • the standard deviation 1612 of the temperature in the power supply cycle 604 tends to be smaller than the standard deviation of the temperature in the power supply cycle after the power supply cycle 604.
  • the standard deviation 1622 of the temperature in the power supply cycle 1606 is smaller than the standard deviation 1612 of the temperature in the power supply cycle 604. This is because when the aerosol source is completely depleted, the temperature increasing effect of the power supplied from the power supply 110 to the load 132 and the temperature decreasing effect of the air around the load 132 are balanced, and the temperature of the load 132 is relatively high. Probably because of the steady state.
  • the average temperature of the load 132 reaches near the maximum temperature of the load 132 that can be reached when the aerosol source in the holding unit 130 is depleted. It is presumed that it is. Therefore, even when the average temperature T ave is equal to or higher than the temperature T 3 , it is possible to estimate or detect that the remaining amount of the aerosol source in the holding unit 130 has been exhausted.
  • the average temperature of the load 132 in the past was a temperature T 2 vicinity
  • the average temperature T ave is determined that the temperature T 3 or more, the transition pattern 1710 appeared Will be.
  • the remaining amount of the aerosol source in the holding unit 130 When the remaining amount of the aerosol source in the holding unit 130 is depleted, it means that the supply of the aerosol source from the storage unit 116A to the holding unit 130 is not performed, that is, the remaining amount of the aerosol source in the storage unit 115A is depleted or It is a shortage. Therefore, in step 1532, the remaining amount of the aerosol source in the storage unit 116A may be depleted or insufficient, and the remaining amount of the aerosol source in the holding unit 130 may be estimated or detected as depleted.
  • step 1532 If it is determined that the index ⁇ is equal to or higher than the threshold ⁇ thre , or if the average temperature T ave is equal to or higher than the third predetermined temperature T 3 , the process proceeds to step 1532; Proceed to step 1534.
  • Step 1534 is a step to be reached when all the determinations in steps 1510, 1520 and 1530 are false. Similar to the determination in step 1528, the determination regarding the state related to the aerosol source is suspended or the latest determination is performed. It may be a step of determining that the vehicle is followed.
  • FIG. 18 is a flowchart of the second exemplary process 1800 executed in step 1402. Some of the steps included in the example process 1800 are the same as or similar to the steps included in the example process 1500, and therefore, steps that are not included in the example process 1800 will be described below.
  • step 1810 is a step similar to step 1510, except that the index ⁇ is smaller than the threshold ⁇ thre and the magnitude of the difference between the average value T ave and the first predetermined temperature T 1 is smaller than the threshold ⁇ thre
  • the process proceeds to step 1514, otherwise the process proceeds to step 1820.
  • the exemplary process 1800 if the temperature of the load 132 is determined to be a steady state at the boiling point, etc. T 1 of the aerosol source immediately, remaining amount of the aerosol source in both the reservoir 116A and the holding portion 130 is sufficiently Can be estimated or detected.
  • Step 1820 is a step similar to step 1520, except that the index ⁇ is smaller than the threshold ⁇ thre and the magnitude of the difference between the average value T ave and the second predetermined temperature T 2 is smaller than the threshold ⁇ thre. The only difference is that the process proceeds to step 1524. That is, according to the example process 1800, when it is determined that the temperature of the load 132 is in the steady state at the second temperature T2, it is immediately estimated or detected that at least the remaining amount of the aerosol source in the holding unit 130 is insufficient. be able to.
  • the former is different from the former in that the variable COUNT is used, and the latter is not using the variable COUNT.
  • the former is different from the former in that the first to fourth estimation or detection can be performed, while the latter cannot be performed in the second estimation or detection.
  • the example process 1500 using the variable COUNT takes time and effort to estimate or detect the state of at least one of the storage unit 116A and the holding unit 130, but can ensure its accuracy.
  • the state of at least one of the storage unit 116A and the holding unit 130 can be easily estimated or detected, but the accuracy is inferior to the example process 1500.

Landscapes

  • Secondary Cells (AREA)
  • Medicinal Preparation (AREA)

Abstract

より早期に、エアロゾル源の枯渇又は不足の発生を判断することが可能なエアロゾル生成装置を提供する。 エアロゾル生成装置(100)は、エアロゾル源を貯留する貯留部(116A)又はエアロゾル源を保持するエアロゾル基材(116B)と、電源(110)からの給電による発熱でエアロゾル源を霧化する負荷(132)と、負荷(132)の温度に関連する値を出力するセンサ(112)と、制御部(106)と、を含む。制御部(106)は、エアロゾル生成要求に応じて負荷(132)へ前記電源(110)から給電して給電サイクルを実行し、単一の給電サイクルにおけるセンサ(112)の出力値の偏差に基づく指標に基づき、貯留部(116A)又はエアロゾル基材(116B)におけるエアロゾル源の枯渇又は不足の発生を判断するよう構成される。

Description

エアロゾル生成装置並びにこれを動作させる方法及びプログラム
 本開示は、ユーザが吸引するエアロゾルを生成するエアロゾル生成装置並びにこれを動作させる方法及びプログラムに関する。
 一般的な電子たばこ、加熱式たばこ、ネブライザーなどの、ユーザが吸引するエアロゾルを生成するためのエアロゾル生成装置においては、霧化されることでエアロゾルとなるエアロゾル源が不足しているときにユーザが吸引を行うと、ユーザに対して十分なエアロゾルを供給できない。加えて、電子たばこや加熱式たばこの場合、意図した香喫味を有するエアロゾルを生成できないという問題が生じ得る。
 この問題に対する解決策として、特許文献1には、給電初期のヒータ温度の上昇速度と閾値とに基づき、エアロゾル形成基質が空になったことを判定する技術が開示されている。特許文献2には、ヒータが動作していない間に、給電開始から所定の時間経過後のヒータ温度又は給電初期のヒータ温度の上昇速度に基づき、エアロゾル形成基材が空になったことを判定する技術が開示されている。特許文献3には、ウィックの抵抗値に基づき、ウィック内の液残量を検知する技術が開示されている。
 しかしながら、特許文献1又は2に記載された技術は、微小量に着目し、ノイズや誤差等の影響を受けないように閾値を設定する必要があるために、判定が遅くなる可能性がある。また、特許文献3には、ウィック内の液残量が空になったことの判定を早める手法については開示も示唆もされていない。
 また、特許文献1~3には、例えば、エアロゾル形成基材のタンクと、ウィックと、タンクからウィックへの経路とのうちのどの部分でエアロゾル源が不足するなどの問題が発生しているのか区別可能なように、タンク及びウィックの少なくとも一方の状態を推定又は検知するとの課題は開示も示唆もされていない。
国際公開第2012/085203号 国際公開第2017/084818号 国際公開第2017/021550号
 本開示は、上記の点に鑑みてなされたものである。
 本開示が解決しようとする第1の課題は、より早期に、エアロゾル源の枯渇又は不足の発生を判断することが可能なエアロゾル生成装置並びにそれを動作させる方法及びプログラムを提供することである。
 本開示が解決しようとする第2の課題は、エアロゾル源の貯留部及び保持部の少なくとも一方の状態を推定又は検知することが可能なエアロゾル生成装置並びにそれを動作させる方法及びプログラムを提供することである。
 上述した第1の課題を解決するため、本開示の実施形態によれば、エアロゾル源を貯留する貯留部又は前記エアロゾル源を保持するエアロゾル基材と、電源からの給電による発熱で前記エアロゾル源を霧化する負荷と、前記負荷の温度に関連する値を出力するセンサと、制御部と、を含み、前記制御部は、エアロゾル生成要求に応じて前記負荷へ前記電源から給電して給電サイクルを実行し、単一の前記給電サイクルにおける前記センサの出力値の偏差に基づく指標に基づき、前記貯留部又は前記エアロゾル基材における前記エアロゾル源の枯渇又は不足の発生を判断するよう構成される、エアロゾル生成装置が提供される。
 かかる実施形態によれば、単一の給電サイクルにおける負荷の温度の標準偏差や分散等に基づきエアロゾル源の枯渇又は不足を判断することができるために、より早期にエアロゾル源の枯渇又は不足の発生を検知することができる。
 一実施形態において、前記制御部は、前記指標と、前記枯渇又は前記不足の未発生時の単一の前記給電サイクルにおける前記センサの出力値の偏差に基づく指標との比較に基づき、前記枯渇又は前記不足の発生を判断するよう構成される。
 かかる実施形態によれば、エアロゾル源の枯渇又は不足発生時の負荷の温度の標準偏差や分散等を閾値として用いることができるために、エアロゾル源の枯渇又は不足の発生を高精度に検知することができる。
 一実施形態において、前記制御部は、単一の前記給電サイクルの開始時、単一の前記給電サイクルの終了時、単一の前記給電サイクル内の1以上の時点、及び、単一の前記給電サイクル内の一部の期間のうちの少なくとも1つにおける前記センサの出力値が、前記指標の導出に与える影響をゼロにするか又は低減するよう構成される。一実施形態において、前記制御部は、単一の前記給電サイクルの開始時、単一の前記給電サイクルの終了時、単一の前記給電サイクル内の1以上の時点、及び、単一の前記給電サイクル内の一部の期間のうちの少なくとも1つにおける前記負荷の温度を取得しないよう構成される。
 かかる実施形態によれば、室温の変化等によるノイズが混入したデータを負荷の温度の標準偏差や分散等の導出に用いるデータから外すことができるために、エアロゾル源の枯渇又は不足の発生時の温度揺らぎがノイズに埋もれなくなり、エアロゾル源の枯渇又は発生に関する検知精度を向上させることができる。
 一実施形態において、前記制御部は、単一の前記給電サイクルのうちの昇温期間と冷却期間の一方又は双方における前記センサの出力値が、前記指標の導出に与える影響をゼロにするか又は低減するよう構成される。
 一実施形態において、前記制御部は、単一の前記給電サイクルのうちの昇温期間と冷却期間の一方又は双方における前記負荷の温度を取得しないよう構成される。
 かかる実施形態によれば、昇温期間と冷却期間におけるデータを標準偏差や分散等の導出に用いるデータから外すことができるために、エアロゾル源の枯渇又は不足発生時の温度揺らぎが昇温期間や冷却期間の温度変化に埋もれなくなり、エアロゾル源の枯渇又は不足の発生に関する検知精度を向上させることができる。
 一実施形態において、前記制御部は、単一の前記給電サイクルを、第1フェーズと前記第1フェーズよりも時系列で後の第2フェーズを含む複数のフェーズに分け、前記第2フェーズのみにおける前記センサの出力値から導出される前記指標に基づき、前記枯渇又は前記不足の発生を判断するよう構成される。
 一実施形態において、前記制御部は、単一の前記給電サイクルを、第1フェーズと前記第1フェーズよりも時系列で後の第2フェーズを含む複数のフェーズに分け、前記第1フェーズにおける前記センサの出力値が前記指標の導出に与える影響を、前記第2フェーズにおける前記センサの出力値が前記指標の導出に与える影響より小さくするよう構成される。
 かかる実施形態によれば、給電サイクルにおいて取得した標本のうち後半部分のみに基づく負荷の標準偏差や分散等を利用してエアロゾル源の枯渇又は不足を判断できるために、保持部においてエアロゾル源が過剰である場合等の給電サイクル前半の例外的な温度揺らぎを拾いにくくなり、エアロゾル源の枯渇又は不足に関する検知精度を向上させることができる。
 一実施形態によれば、前記制御部は、単一の前記給電サイクルを、第1フェーズと前記第1フェーズより時系列で後の第2フェーズを含む複数のフェーズに分け、前記第1フェーズにおける前記センサの出力値から導出される前記指標である第1指標と、前記第2フェーズにおける前記センサの出力値から導出される前記指標である第2指標とを導出し、前記第2指標と前記第1指標との差分に基づき、前記枯渇又は前記不足の発生を判断するよう構成される。
 かかる実施形態によれば、給電サイクルにおいて取得したデータのうちの前半部分と後半部分の標準偏差や分散等の差分を利用してエアロゾル源の枯渇又は不足を判断できるために、保持部においてエアロゾル源が枯渇したときのみに発生する、給電サイクル後半における温度揺らぎが強調され、エアロゾル源の枯渇又は不足に関する検知精度を向上させることができる。
 一実施形態において、前記第1フェーズは、前記第2フェーズより短い。
 かかる実施形態によれば、給電サイクルにおいて取得したデータを、後半部分が長くなるように分割することができるために、給電サイクルにおける温度揺らぎが含まれない部分を除外し、エアロゾル源の枯渇又は不足に関する検知精度を向上させることができる。
 一実施形態において、前記制御部は、単一の前記給電サイクル内で、前記センサの出力値が定常状態に至った後の前記センサの出力値のうちの少なくとも一部から導出される前記指標に基づき、前記枯渇又は前記不足の発生を判断するよう構成される。
 かかる実施形態によれば、負荷の温度が定常状態に至った後に生じ得る温度揺らぎに焦点を絞った負荷の温度の標準偏差や分散等を利用してエアロゾル源の枯渇又は不足を判断することができるために、エアロゾル源の枯渇又は不足に関する検知精度を向上させることができる。
 一実施形態において、前記制御部は、単一の前記給電サイクルを、第1フェーズと前記第1フェーズより時系列で後の第2フェーズとを含む複数のフェーズに分け、前記第1フェーズにおける、前記センサの出力値から導出される前記指標と、前記センサの出力値と、前記センサの出力値の平均値とのうちの少なくとも1つに基づき、前記センサの出力値が定常状態に至ったか否かを判断するよう構成される。
 かかる実施形態によれば、負荷の温度が定常状態に至ったか否かを、負荷の温度の平均値、標準偏差や分散等に基づき判断できるために、専用のセンサやアルゴリズムが不要な簡便な方法で負荷の温度が定常状態に至ったか否かを判断することができる。
 一実施形態において、前記制御部は、前記指標と、単一の前記給電サイクルにおける前記センサの出力値又は前記センサの出力値の平均値とに基づき、前記枯渇又は前記不足の発生を判断するよう構成される。
 かかる実施形態によれば、負荷の温度の標準偏差や分散等に加えて平均温度を併用してエアロゾル源の枯渇又は不足を判断することができるために、エアロゾル源の枯渇又は不足に関する検知精度を向上させることができる。
 一実施形態において、前記制御部は、単一の前記給電サイクルにおける前記センサの出力値又は前記センサの出力値の平均値が前記エアロゾル源からエアロゾルが生成される温度より高い場合にのみ、前記枯渇又は前記不足の発生を検知するよう構成される。
 かかる実施形態によれば、負荷の平均温度がエアロゾル源の沸点等を超える場合のみエアロゾル源の枯渇又は不足を検知することができるために、例外的な温度揺らぎを拾いにくくなり、エアロゾル源の枯渇又は不足に関する検知精度を向上させることができる。
 また、本開示の実施形態によれば、エアロゾル生成装置の動作方法であって、前記エアロゾル生成装置は、エアロゾル源を貯留する貯留部又は前記エアロゾル源を保持するエアロゾル基材と、電源からの給電による発熱で前記エアロゾル源を霧化する負荷と、前記負荷の温度に関連する値を出力するセンサと、制御部と、を含み、前記方法は、前記制御部が、エアロゾル生成要求に応じて前記負荷へ前記電源から給電して給電サイクルを実行するステップと、単一の前記給電サイクルにおける前記センサの出力値の偏差に基づく指標に基づき、前記貯留部又は前記エアロゾル基材における前記エアロゾル源の枯渇又は不足の発生を判断するステップとを含む、方法が提供される。
 本開示の実施形態によれば、エアロゾル源を貯留する貯留部又は前記エアロゾル源を保持するエアロゾル基材と、電源からの給電による発熱で前記エアロゾル源を霧化する負荷と、前記負荷の温度に関連する値を出力するセンサと、制御部と、を含み、前記制御部は、エアロゾル生成要求に応じて前記負荷へ前記電源から給電して給電サイクルを実行し、単一の前記給電サイクルにおいて前記センサの出力値が定常状態に至った後の、前記センサの出力値の振舞いに基づき、前記貯留部又は前記エアロゾル基材における前記エアロゾル源の枯渇又は不足の発生を判断するよう構成される、エアロゾル生成装置が提供される。本開示の実施形態によれば、エアロゾル生成装置の動作方法であって、前記エアロゾル生成装置は、エアロゾル源を貯留する貯留部又は前記エアロゾル源を保持するエアロゾル基材と、電源からの給電による発熱で前記エアロゾル源を霧化する負荷と、前記負荷の温度に関連する値を出力するセンサと、制御部と、を含み、前記方法は、前記制御部が、エアロゾル生成要求に応じて前記負荷へ前記電源から給電して給電サイクルを実行するステップと、単一の前記給電サイクルにおいて前記センサの出力値が定常状態に至った後の、前記センサの出力値の振舞いに基づき、前記貯留部又は前記エアロゾル基材における前記エアロゾル源の枯渇又は不足の発生を判断するステップとを含む、方法が提供される。
 本開示の実施形態によれば、プロセッサにより実行されると、前記プロセッサに、上述した方法を実行させるプログラムが提供される。
 かかる実施形態によれば、単一の給電サイクルにおける負荷の温度の標準偏差や分散等に基づきエアロゾル源の枯渇又は不足を判断することができるために、より早期にエアロゾル源の枯渇又は不足の発生を検知することができる。
 上述した第2の課題を解決するため、本開示の実施形態によれば、エアロゾル源を貯留する貯留部と、電源からの給電による発熱で前記エアロゾル源を霧化する負荷と、前記貯留部が供給する前記エアロゾル源を前記負荷が加熱可能な態様で保持する保持部と、前記負荷の温度に関連する値を出力するセンサと、制御部とを含み、前記制御部は、エアロゾル生成要求に応じて前記負荷へ前記電源から給電して給電サイクルを実行し、少なくとも、単一の前記給電サイクルである第1給電サイクルにおける前記センサの出力値又は該出力値から導出される前記第1給電サイクルにおける前記負荷の温度の振る舞いに関する値である第1値と、前記第1給電サイクルより後の単一の前記給電サイクルである第2給電サイクルにおける前記センサの出力値又は該出力値から導出される前記第2給電サイクルにおける前記負荷の温度の振る舞いに関する値である第2値とに基づき、前記貯留部と前記保持部の少なくとも一方の状態を推定又は検知するよう構成されるエアロゾル生成装置が提供される。
 かかる実施形態によれば、過去と現在の負荷における温度挙動に基づき貯留部と保持部の状態を推定できるために、貯留部と保持部の状態を早期且つ正確に判断することができる。
 一実施形態において、前記制御部は、前記第1値と前記第2値の少なくとも一方において、前記負荷の温度が、前記エアロゾル源が飽和状態にある前記保持部からエアロゾルが生成される第1温度よりも高い第2温度で定常状態となったことを示す場合に、前記貯留部における前記エアロゾル源の残量と、前記保持部における前記エアロゾル源の残量と、前記保持部における前記エアロゾル源の霧化速度と前記貯留部から前記保持部への前記エアロゾル源の供給速度との関係とのうちの少なくとも1つを推定又は検知するよう構成される。
 かかる実施形態によれば、過去又は現在の給電サイクルにおける負荷の温度がエアロゾル源の沸点等より高い温度で落ち着くことを検知できるために、貯留部、保持部、貯留部と保持部の間の何れかで問題が生じていることを特定することができる。
 一実施形態において、前記制御部は、前記第1値において、前記負荷の温度が前記第2温度で定常状態となったことを示す場合に、前記貯留部における前記エアロゾル源の残量の不足又は枯渇と、前記保持部における前記エアロゾル源の霧化速度が前記貯留部から前記保持部への前記エアロゾル源の供給速度より大きいこととのうちの少なくとも1つを推定又は検知するよう構成される。
 かかる実施形態によれば、過去の給電サイクルにおける負荷の温度がエアロゾル源の沸点等より高い温度で落ち着くことを検知できるために、貯留部又は貯留部と保持部の間において問題が生じていることを特定することができる。
 一実施形態において、前記制御部は、前記第1値において、前記負荷の温度が前記第2温度で定常状態となったことを示し、且つ、前記第2値において、前記負荷の温度が前記第2温度で定常状態となったことを示す場合に、前記貯留部における前記エアロゾル源の残量の不足又は枯渇を推定又は検知するよう構成される。
 かかる実施形態によれば、過去及び現在の給電サイクルにおける負荷の温度がエアロゾル源の沸点等より高い温度で落ち着くことを検知できるために、貯留部において問題が生じていることを特定することができる。
 一実施形態において、前記制御部は、前記第1値において、前記負荷の温度が前記第2温度で定常状態となったことを示し、且つ、前記第2値において、前記負荷の温度が前記第1温度で定常状態となったことを示す場合に、前記保持部における前記エアロゾル源の霧化速度が前記貯留部から前記保持部への前記エアロゾル源の供給速度より大きいことを推定又は検知するよう構成される。
 かかる実施形態によれば、過去の給電サイクルにおける負荷の温度がエアロゾル源の沸点等より高い温度で落ち着き、現在の給電サイクルにおける負荷の温度がエアロゾル源の沸点等で落ち着くことを検知できるために、貯留部と保持部の間において問題が生じていることを特定することができる。
 一実施形態において、前記制御部は、前記第2値において、前記負荷の温度が前記第2温度で定常状態となったことを示す場合に、前記貯留部における前記エアロゾル源の残量が不足又は枯渇していると推定又は検知するよう構成される。
 かかる実施形態によれば、現在の給電サイクルにおける負荷の温度がエアロゾル源の沸点等より高い温度で落ち着くことを検知できるために、貯留部において問題が生じていることを特定することができる。
 一実施形態において、前記制御部は、前記第1値において、前記負荷の温度が前記第2温度で定常状態にあることを示し、且つ、前記第2値において、前記第2値の平均値と、前記第2値の偏差に基づく値とのうちの少なくとも1つが閾値より大きい場合に、前記貯留部における前記エアロゾル源の残量が不足又は枯渇しており、前記保持部における前記エアロゾル源の残量が枯渇していると推定又は検知するよう構成される。
 かかる実施形態によれば、過去の給電サイクルにおける負荷の温度がエアロゾル源の沸点等より高い温度で落ち着き、現在の給電サイクルにおける負荷の温度が暴れることを検知できるために、保持部におけるエアロゾル源の残量の枯渇を検知することができる。
 一実施形態において、前記制御部は、前記第2値において、前記負荷の温度が、前記エアロゾル源が飽和状態にある前記保持部からエアロゾルが生成される温度よりも高い温度で定常状態となったことを示す場合に、既定回数の前記給電サイクル後に前記保持部における前記エアロゾル源の残量が枯渇すると推定又は検知するよう構成される。
 かかる実施形態によれば、現在の給電サイクルにおける負荷の温度がエアロゾル源の沸点等より高い温度で落ち着くことを検知できるために、保持部におけるエアロゾル源の枯渇の予兆を検知することができる。
 一実施形態において、前記制御部は、前記第1値と前記第2値の双方において、前記負荷の温度が前記エアロゾル源からエアロゾルが生成される温度よりも高い温度で定常状態となったことを示す場合に、既定回数の前記給電サイクル後に前記保持部における前記エアロゾル源の残量が枯渇すると推定又は検知するよう構成される。
 かかる実施形態によれば、過去及び現在の給電サイクルにおける負荷の温度がエアロゾル源の沸点等より高い温度で落ち着くことを検知できるために、保持部におけるエアロゾル源の枯渇の予兆を検知することができる。
 一実施形態において、前記制御部は、前記第1給電サイクル又は前記第2給電サイクルにおける、前記センサの連続する出力値と、前記出力値の平均値と、前記出力値の偏差に基づく値とうちの少なくとも1つに基づき、前記第1値又は前記第2値が、前記負荷の温度が定常状態となったことを示すと判断するよう構成される。
 かかる実施形態によれば、負荷の温度が定常状態に至ったか否かを給電サイクル前半の負荷の温度の平均値、標準偏差や分散等に基づき判断することができるために、専用のセンサやアルゴリズムが不要な簡便な方法で負荷の温度が定常状態に至ったか否かを判断することができる。
 また、本開示の実施形態によれば、エアロゾル生成装置の動作方法であって、前記エアロゾル生成装置は、エアロゾル源を貯留する貯留部と、電源からの給電による発熱で前記エアロゾル源を霧化する負荷と、前記貯留部が供給する前記エアロゾル源を前記負荷が加熱可能な態様で保持する保持部と、前記負荷の温度に関連する値を出力するセンサと、制御部とを含み、前記方法は、前記制御部が、エアロゾル生成要求に応じて前記負荷へ前記電源から給電して給電サイクルを実行するステップと、少なくとも、単一の前記給電サイクルである第1給電サイクルにおける前記センサの出力値又は該出力値から導出される前記第1給電サイクルにおける前記負荷の温度の振る舞いに関する値である第1値と、前記第1給電サイクルより後の単一の前記給電サイクルである第2給電サイクルにおける前記センサの出力値又は該出力値から導出される前記第2給電サイクルにおける前記負荷の温度の振る舞いに関する値である第2出力値とに基づき、前記貯留部と前記保持部の少なくとも一方の状態を推定又は検知するステップとを含む、方法が提供される。
 本開示の実施形態によれば、エアロゾル源を貯留する貯留部と、電源からの給電による発熱で前記エアロゾル源を霧化する負荷と、前記貯留部が供給する前記エアロゾル源を前記負荷が加熱可能な態様で保持する保持部と、前記負荷の温度に関連する値を出力するセンサと、制御部と、を含み、前記制御部は、エアロゾル生成に対する要求に応じて前記負荷へ前記電源から給電して給電サイクルを実行し、前記センサの出力値に基づき、単一の前記給電サイクルにおける前記負荷の温度を導出し、複数の前記給電サイクルにおいて、前記負荷の温度が、前記エアロゾル源が飽和状態における前記保持部からエアロゾルが生成される温度よりも高い温度で定常状態にある場合に、前記貯留部における前記エアロゾル源の残量が不足若しくは枯渇していると推定若しくは検知するか、又は、既定回数の前記給電サイクル後に前記保持部における前記エアロゾル源の残量が枯渇すると推定若しくは検知するよう構成されるエアロゾル生成装置が提供される。
 本開示の実施形態によれば、エアロゾル生成装置の動作方法であって、前記エアロゾル生成装置は、エアロゾル源を貯留する貯留部と、電源からの給電による発熱で前記エアロゾル源を霧化する負荷と、前記貯留部が供給する前記エアロゾル源を前記負荷が加熱可能な態様で保持する保持部と、前記負荷の温度に関連する値を出力するセンサと、制御部と、を含み、前記方法は、前記制御部が、エアロゾル生成に対する要求に応じて前記負荷へ前記電源から給電して給電サイクルを実行するステップと、前記センサの出力値に基づき、単一の前記給電サイクルにおける前記負荷の温度を導出するステップと、複数の前記給電サイクルにおいて、前記負荷の温度が前記エアロゾル源からエアロゾルが生成される温度よりも高い温度で定常状態にある場合に、前記貯留部における前記エアロゾル源の残量が不足若しくは枯渇していると推定若しくは検知するか、又は、既定回数の前記給電サイクル後に前記保持部における前記エアロゾル源の残量が枯渇すると推定若しくは検知するステップとを含む、方法が提供される。
 本開示の実施形態によれば、エアロゾル源を貯留する貯留部と、電源からの給電による発熱で前記エアロゾル源を霧化する負荷と、前記貯留部が供給する前記エアロゾル源を前記負荷が加熱可能な態様で保持する保持部と、前記負荷又は前記貯留部の状態を出力するセンサと、制御部と、を含み、前記制御部は、前記センサの出力値が前記貯留部における前記エアロゾル源の残量の不足又は枯渇を示す一方で、前記保持部における前記エアロゾル源の残量の枯渇を示さない場合に、既定回数の前記給電サイクル後に前記保持部における前記エアロゾル源の残量が枯渇すると推定若しくは検知するか、又は、既定回数の前記給電サイクル後に前記負荷への給電を抑制するよう構成されるエアロゾル生成装置が提供される。
 本開示の実施形態によれば、エアロゾル生成装置の動作方法であって、前記エアロゾル生成装置は、エアロゾル源を貯留する貯留部と、電源からの給電による発熱で前記エアロゾル源を霧化する負荷と、前記貯留部が供給する前記エアロゾル源を前記負荷が加熱可能な態様で保持する保持部と、前記負荷又は前記貯留部の状態を出力するセンサと、制御部と、を含み、前記方法は、前記制御部が、前記センサの出力値が前記貯留部における前記エアロゾル源の残量の不足又は枯渇を示す一方で、前記保持部における前記エアロゾル源の残量の枯渇を示さない場合に、既定回数の前記給電サイクル後に前記保持部における前記エアロゾル源の残量が枯渇すると推定若しくは検知するか、又は、既定回数の前記給電サイクル後に前記負荷への給電を抑制するステップとを含む、方法が提供される。
 本開示の実施形態によれば、プロセッサにより実行されると、前記プロセッサに、上述した方法を実行させるプログラムが提供される。
 かかる実施形態によれば、過去と現在の負荷における温度挙動に基づき貯留部と保持部の状態を推定できるために、貯留部と保持部の状態を早期且つ正確に判断することができる。
本開示の一実施形態による、エアロゾル生成装置の構成の概略的なブロック図である。 本開示の一実施形態による、エアロゾル生成装置の構成の概略的なブロック図である。 本開示の一実施形態による、エアロゾル生成装置の一部に関する例示的な回路構成を示す図である。 本開示の一実施形態による、エアロゾル源の枯渇又は不足の発生を判断するための例示処理のフローチャートである。 本開示の一実施形態による、エアロゾル源の枯渇又は不足の発生を判断するための別の例示処理のフローチャートである。 各給電サイクルにおける、負荷の温度をプロットしたグラフである。 2つの給電サイクルにおける、負荷の温度をプロットしたグラフである。 2つの給電サイクルにおける、負荷の温度をプロットしたグラフである。 本開示の一実施形態による、エアロゾル源の枯渇又は不足について判定する第1例示処理のフローチャートである。 各給電サイクルについての、負荷の温度の標準偏差をプロットしたグラフである。 本開示の一実施形態による、エアロゾル源の枯渇又は不足について判定する第2例示処理のフローチャートである。 各給電サイクルについての、負荷の温度の標準偏差をプロットしたグラフである。 本開示の一実施形態による、エアロゾル源の枯渇又は不足について判定する第3例示処理のフローチャートである。 各給電サイクルについての、負荷の温度の標準偏差をプロットしたグラフである。 本開示の一実施形態による、エアロゾル源の枯渇又は不足について判定する第4例示処理のフローチャートである。 各給電サイクルについての、負荷の温度の標準偏差及び平均温度をプロットしたグラフである。 本開示の一実施形態による、エアロゾル源の枯渇又は不足について判定する第5例示処理のフローチャートである。 本開示の一実施形態による、エアロゾル源に係る状態を推定又は検知するための例示処理のフローチャートである。 本開示の一実施形態による、エアロゾル源に係る状態を推定又は検知する第1例示処理のフローチャートである。 各給電サイクルについての、負荷の温度の標準偏差をプロットしたグラフである。 給電サイクル間の平均温度の遷移ついての幾つかのパターンを表している。 本開示の一実施形態による、エアロゾル源に係る状態を推定又は検知する第2例示処理のフローチャートである。
  1 エアロゾル生成装置の概要
 図1Aは、本開示の一実施形態に係るエアロゾル生成装置100Aの構成の概略的なブロック図である。図1Aは、エアロゾル生成装置100Aが備える各コンポーネントを概略的且つ概念的に示すものであり、各コンポーネント及びエアロゾル生成装置100Aの厳密な配置、形状、寸法、位置関係等を示すものではないことに留意されたい。
 図1Aに示されるように、エアロゾル生成装置100Aは、第1の部材102(以下、「本体102」と呼ぶ)及び第2の部材104A(以下、「カートリッジ104A」と呼ぶ)を備える。図示されるように、一例として、本体102は、制御部106、通知部108、電源110、センサ112及びメモリ114を含んでもよい。エアロゾル生成装置100Aは、流量センサ、圧力センサ、電圧センサ、温度センサなどのセンサを有してもよく、本開示においてはこれらをまとめて「センサ112」とも呼ぶ。本体102はまた、後述する回路134を含んでもよい。一例として、カートリッジ104Aは、貯留部116A、霧化部118A、空気取込流路120、エアロゾル流路121、吸口部122、保持部130及び負荷132を含んでもよい。本体102内に含まれるコンポーネントの一部がカートリッジ104A内に含まれてもよい。カートリッジ104A内に含まれるコンポーネントの一部が本体102内に含まれてもよい。カートリッジ104Aは、本体102に対して着脱可能に構成されてもよい。あるいは、本体102及びカートリッジ104A内に含まれるすべてのコンポーネントが、本体102及びカートリッジ104Aに代えて、同一の筐体内に含まれてもよい。
 貯留部116Aは、エアロゾル源を収容するタンクとして構成されてもよい。この場合、エアロゾル源は、例えば、グリセリンやプロピレングリコールといった多価アルコール、水などの液体である。エアロゾル生成装置100Aが電子たばこである場合、貯留部116A内のエアロゾル源は、加熱することによって香喫味成分を放出するたばこ原料やたばこ原料由来の抽出物を含んでいてもよい。保持部130は、エアロゾル源を保持する。例えば、保持部130は、繊維状又は多孔質性の素材から構成され、繊維間の隙間や多孔質材料の細孔に液体としてのエアロゾル源を保持する。前述した繊維状又は多孔質性の素材には、例えばコットンやガラス繊維、またはたばこ原料などを用いることができる。エアロゾル生成装置100Aがネブライザー等の医療用吸入器である場合、エアロゾル源はまた、患者が吸入するための薬剤を含んでもよい。別の例として、貯留部116Aは、消費されたエアロゾル源を補充することができる構成を有してもよい。あるいは、貯留部116Aは、エアロゾル源が消費された際に貯留部116A自体を交換することができるように構成されてもよい。また、エアロゾル源は液体に限られるものではなく、固体でも良い。エアロゾル源が固体の場合の貯留部116Aは、空洞の容器であっても良い。
 霧化部118Aは、エアロゾル源を霧化してエアロゾルを生成するように構成される。センサ112によって吸引動作が検知されると、霧化部118Aはエアロゾルを生成する。例えば、保持部130は、貯留部116Aと霧化部118Aとを連結するように設けられる。この場合、保持部130の一部は貯留部116Aの内部に通じ、エアロゾル源と接触する。保持部130の他の一部は霧化部118Aへ延びる。なお、霧化部118Aへ延びた保持部130の他の一部は、霧化部118Aに収められてもよく、あるいは、霧化部118Aを通って再び貯留部116Aの内部に通じてもよい。エアロゾル源は、保持部130の毛細管効果によって貯留部116Aから霧化部118Aへと運ばれる。一例として、霧化部118Aは、電源110に電気的に接続された負荷132を含むヒータを備える。ヒータは、保持部130と接触又は近接するように配置される。吸引動作が検知されると、制御部106は、霧化部118Aのヒータを制御し、保持部130を通じて運ばれたエアロゾル源を加熱することによって当該エアロゾル源を霧化する。霧化部118Aには空気取込流路120が接続され、空気取込流路120はエアロゾル生成装置100Aの外部へ通じている。霧化部118Aにおいて生成されたエアロゾルは、空気取込流路120を介して取り込まれた空気と混合される。エアロゾルと空気の混合流体は、矢印124で示されるように、エアロゾル流路121へと送り出される。エアロゾル流路121は、霧化部118Aにおいて生成されたエアロゾルと空気との混合流体を吸口部122まで輸送するための管状構造を有する。
 吸口部122は、エアロゾル流路121の終端に位置し、エアロゾル流路121をエアロゾル生成装置100Aの外部に対して開放するように構成される。ユーザは、吸口部122を咥えて吸引することにより、エアロゾルを含んだ空気を口腔内へ取り込む。
 通知部108は、LEDなどの発光素子、ディスプレイ、スピーカ、バイブレータなどを含んでもよい。通知部108は、必要に応じて、発光、表示、発声、振動などによって、ユーザに対して何らかの通知を行うように構成される。
 電源110は、通知部108、センサ112、メモリ114、負荷132、回路134などのエアロゾル生成装置100Aの各コンポーネントに電力を供給する。電源110は、一次電池であるか、又は、エアロゾル生成装置100Aの所定のポート(図示せず)を介して外部電源に接続することにより充電することができる二次電池であってよい。電源110のみを本体102又はエアロゾル生成装置100Aから取り外すことができてもよく、新しい電源110と交換することができてもよい。また、本体102全体を新しい本体102と交換することによって電源110を新しい電源110と交換することができてもよい。
 センサ112は、回路134の全体又は特定の部分に印加される電圧の値、負荷132の抵抗値に関する値又は温度に関する値などを取得するために用いられる1つ又は複数のセンサを含んでもよい。センサ112は回路134に組み込まれてもよい。センサ112の機能が制御部106に組み込まれてもよい。センサ112はまた、空気取込流路120及び/又はエアロゾル流路121内の圧力の変動を検知する圧力センサ又は流量を検知する流量センサを含んでもよい。センサ112はまた、貯留部116Aなどのコンポーネントの重量を検知する重量センサを含んでもよい。センサ112はまた、エアロゾル生成装置100Aを用いたユーザによるパフの回数を計数するように構成されてもよい。センサ112はまた、霧化部118Aへの通電時間を積算するように構成されてもよい。センサ112はまた、貯留部116A内の液面の高さを検知するように構成されてもよい。センサ112はまた、電源110のSOC(State of Charge,充電状態)、電流積算値、電圧などを求める又は検知するように構成されてもよい。SOCは、電流積算法(クーロン・カウンティング法)やSOC-OCV(Open Circuit Voltage,開回路電圧)法等によって求められてもよい。センサ112はまた、ユーザが操作可能な操作ボタンなどであってもよい。
 制御部106は、マイクロプロセッサ又はマイクロコンピュータとして構成された電子回路モジュールであってもよい。制御部106は、メモリ114に格納されたコンピュータ実行可能命令に従ってエアロゾル生成装置100Aの動作を制御するように構成されてもよい。メモリ114は、ROM、RAM、フラッシュメモリなどの記憶媒体である。メモリ114には、上記のようなコンピュータ実行可能命令のほか、エアロゾル生成装置100Aの制御に必要な設定データ等が格納されてもよい。例えば、メモリ114は、通知部108の制御方法(発光、発声、振動等の態様等)、センサ112により取得及び/又は検知された値、霧化部118Aの加熱履歴等の様々なデータを格納してもよい。制御部106は、必要に応じてメモリ114からデータを読み出してエアロゾル生成装置100Aの制御に利用し、必要に応じてデータをメモリ114に格納する。
 図1Bは、本開示の一実施形態に係るエアロゾル生成装置100Bの構成の概略的なブロック図である。
 図示されるように、エアロゾル生成装置100Bは、図1Aのエアロゾル生成装置100Aと類似した構成を有する。但し、第2の部材104B(以下、「エアロゾル発生物品104B」又は「スティック104B」と呼ぶ)の構成は第1の部材104Aの構成とは異なっている。一例として、エアロゾル発生物品104Bは、エアロゾル基材116B、霧化部118B、空気取込流路120、エアロゾル流路121、吸口部122を含んでもよい。本体102内に含まれるコンポーネントの一部がエアロゾル発生物品104B内に含まれてもよい。エアロゾル発生物品104B内に含まれるコンポーネントの一部が本体102内に含まれてもよい。エアロゾル発生物品104Bは、本体102に対して挿抜可能に構成されてもよい。あるいは、本体102及びエアロゾル発生物品104B内に含まれるすべてのコンポーネントが、本体102及びエアロゾル発生物品104Bに代えて、同一の筐体内に含まれてもよい。
 エアロゾル基材116Bは、エアロゾル源を担持する固体として構成されてもよい。図1Aの貯留部116Aの場合と同様に、エアロゾル源は、例えば、グリセリンやプロピレングリコールといった多価アルコール、水などの液体であってもよい。エアロゾル基材116B内のエアロゾル源は、加熱することによって香喫味成分を放出するたばこ原料やたばこ原料由来の抽出物を含んでいてもよい。エアロゾル生成装置100Bがネブライザー等の医療用吸入器である場合、エアロゾル源はまた、患者が吸入するための薬剤を含んでもよい。エアロゾル基材116Bは、エアロゾル源が消費された際にエアロゾル基材116B自体を交換することができるように構成されてもよい。エアロゾル源は液体に限られるものではなく、固体でも良い。
 霧化部118Bは、エアロゾル源を霧化してエアロゾルを生成するように構成される。センサ112によって吸引動作が検知されると、霧化部118Bはエアロゾルを生成する。霧化部118Bは、電源110に電気的に接続された負荷を含むヒータ(図示せず)を備える。吸引動作が検知されると、制御部106は、霧化部118Bのヒータを制御し、エアロゾル基材116B内に担持されたエアロゾル源を加熱することによって当該エアロゾル源を霧化する。霧化部118Bには空気取込流路120が接続され、空気取込流路120はエアロゾル生成装置100Bの外部へ通じている。霧化部118Bにおいて生成されたエアロゾルは、空気取込流路120を介して取り込まれた空気と混合される。エアロゾルと空気の混合流体は、矢印124で示されるように、エアロゾル流路121へと送り出される。エアロゾル流路121は、霧化部118Bにおいて生成されたエアロゾルと空気との混合流体を吸口部122まで輸送するための管状構造を有する。
 制御部106は、本開示の実施形態に係るエアロゾル生成装置100A及び100B(以下、まとめて「エアロゾル生成装置100」とも呼ぶ)を様々な方法で制御するように構成される。
 図2は、本開示の一実施形態による、エアロゾル生成装置100の一部に関する例示的な回路構成を示す図である。
 図2に示す回路200は、電源110、制御部106、センサ112A乃至D(以下、まとめて「センサ112」とも呼ぶ)、負荷132(以下、「ヒータ抵抗」とも呼ぶ)、第1回路202、第2回路204、第1電界効果トランジスタ(FET)206を含むスイッチQ1、変換部208、第2FET210を含むスイッチQ2、抵抗212(以下、「シャント抵抗」とも呼ぶ)を備える。負荷132の電気抵抗値は温度に応じて変化する。シャント抵抗212は、負荷132と直列に接続され、既知の電気抵抗値を有する。シャント抵抗212の電気抵抗値は温度に対して不変であってもよい。シャント抵抗212は負荷132より大きな電気抵抗値を有する。実施形態に応じて、センサ112C、112Dは省略されてもよい。FETだけでなく、IGBT、コンタクタなどの様々な素子をスイッチQ1及びQ2として用いることができることは当業者にとって明らかであろう。また、スイッチQ1及びQ2は、同一の特性を有していることが好ましいが、そうでなくてもよい。従って、スイッチQ1及びQ2として用いるFET、IGBT、コンタクタ等は、同一の特性を有していることが好ましいが、そうでなくてもよい。
 変換部208は、例えばスイッチング・コンバータであり、FET214、ダイオード216、インダクタ218及びキャパシタ220を含み得る。変換部208が電源110の出力電圧を変換して、変換された出力電圧が回路全体に印加されるように、制御部106は変換部208を制御してもよい。ここで、変換部208は、制御部106による制御により、少なくともスイッチQ2がオン状態である間は、一定の電圧を出力するよう構成されていることが好ましい。また、変換部208は、制御部106による制御により、スイッチQ1がオン状態である間にも又は常に、一定の電圧を出力するように構成されていてもよい。なお、スイッチQ1がオン状態である間に制御部106による制御により変換部208が出力する一定の電圧と、スイッチQ2がオン状態である間に制御部106による制御により変換部208が出力する一定の電圧は、同じでもよいし異なっていてもよい。これらが異なる場合、スイッチQ1がオン状態である間に制御部106による制御により変換部208が出力する一定の電圧は、スイッチQ2がオン状態である間に制御部106による制御により変換部208が出力する一定の電圧より、高くてもよいし低くてもよい。かかる構成によれば、電圧及び電圧の測定時のパラメータが安定するため、エアロゾルの残量の推定精度が向上することになる。更に、変換部208は、制御部106による制御により、スイッチQ1のみがオン状態である間は、電源110の出力電圧が直接第1回路に印加されるように構成されていてもよい。なお、変換部208は必須のコンポーネントではなく、省略することも可能である。
 図1Aに示される回路134は、電源110と負荷132とを電気的に接続し、第1回路202及び第2回路204を含み得る。第1回路202及び第2回路204は、電源110及び負荷132に対して並列接続される。第1回路202はスイッチQ1を含み得る。第2回路204はスイッチQ2及び抵抗212(及び、オプションとして、センサ112D)を含み得る。第1回路202は第2回路204よりも小さい抵抗値を有してもよい。この例において、センサ112B及び112Dは電圧センサであり、それぞれ、負荷132及び抵抗212の両端の電位差(以下、「電圧」又は「電圧値」と呼ぶこともある。)を検知するように構成される。しかし、センサ112の構成はこれに限定されない。例えば、センサ112は電流センサであってもよく、負荷132及び/又は抵抗212を流れる電流の値を検知してもよい。
 図2において点線矢印で示すように、制御部106は、スイッチQ1、スイッチQ2等を制御することができ、センサ112により検知された値を取得することができる。制御部106は、スイッチQ1をオフ状態からオン状態に切り替えることにより第1回路202を機能させ、スイッチQ2をオフ状態からオン状態に切り替えることにより第2回路204を機能させるように構成されてもよい。制御部106は、スイッチQ1及びQ2を交互に切り替えることにより、第1回路202及び第2回路204を交互に機能させるように構成されてもよい。
 第1回路202はエアロゾル源の霧化に用いられる。スイッチQ1がオン状態に切り替えられて第1回路202が機能するとき、ヒータ(すなわち、ヒータ内の負荷132)に電力が供給され、負荷132は加熱される。負荷132の加熱により、霧化部118A内の保持部130に保持されているエアロゾル源(図1Bのエアロゾル生成装置100Bの場合、エアロゾル基材116Bに担持されたエアロゾル源)が霧化されてエアロゾルが生成される。
 第2回路204は、負荷132に印加される電圧の値、負荷132の抵抗値に関連する値、抵抗212に印加される電圧の値等を取得するために用いられる。一例として、図2に示すように、第2回路204に含まれるセンサ112B及び112Dが電圧センサである場合を考える。スイッチQ2がオンであり第2回路204が機能しているとき、電流はスイッチQ2、抵抗212及び負荷132を流れる。センサ112B及び112Dにより、それぞれ、負荷132に印加される電圧の値及び抵抗212に印加される電圧の値が得られる。また、センサ112Dにより取得された抵抗212に印加される電圧の値と、抵抗212の既知の抵抗値Rshuntとを用いて、負荷132を流れる電流の値を求めることができる。変換部208の出力電圧Voutと当該電流値とに基づいて、抵抗212及び負荷132の抵抗値の合計値を求めることができるので、当該合計値から既知の抵抗値Rshuntを差し引くことにより、負荷132の抵抗値RHTRを求めることができる。負荷132が温度に応じて抵抗値が変わる正又は負の温度係数特性を有している場合、予め知られている負荷132の抵抗値と温度との間の関係と、上述のようにして求められたと負荷132の抵抗値RHTRとに基づいて、負荷132の温度を推定することができる。抵抗212を流れる電流の値を用いて負荷132の抵抗値や温度を推定できることが当業者に理解されよう。この例における負荷132の抵抗値に関連する値は、負荷132の電圧値、電流値等を含み得る。センサ112B及び112Dの具体例は電圧センサに限定されず、電流センサ(例えば、ホール素子)などの他の素子を含み得る。
 センサ112Aは、電源110の出力電圧を検知する。センサ112Cは、変換部208の出力電圧を検知する。あるいは、変換部208の出力電圧は、予め定められた目標電圧であってもよい。これらの電圧は、回路全体に印加される電圧である。
 負荷132の温度がTHTRであるときの負荷132の抵抗値RHTRは、以下のように表すことができる。
 RHTR(THTR)=(VHTR×Rshunt)/(VBatt-VHTR)   (1)
 ここで、VBattは回路全体に印加される電圧である。変換部208を用いない場合、VBattは電源110の出力電圧である。変換部208を用いる場合、VBattは変換部208の出力電圧Vout又は目標電圧に該当する。VHTRはヒータに印加される電圧である。VHTRに代えて、シャント抵抗212に印加される電圧を用いてもよい。
 なお、エアロゾル生成装置100Aが含む回路は、上述したセンサのうちの少なくとも1つに代えて又は加えて、負荷132の温度に対応した値を直接出力する温度センサを含んでいてもよい。
  2 エアロゾル源の枯渇又は不足の発生を判断するための処理
 以下に説明する処理については、制御部106がすべてのステップを実行するものとして説明を行う。しかしながら、一部のステップがエアロゾル生成装置100の別のコンポーネントによって実行されてもよいことに留意されたい。
  2-1 処理の概要
 図3Aは、本開示の一実施形態による、エアロゾル源の枯渇又は不足の発生を判断するための例示処理300のフローチャートである。
 なお、本開示において、エアロゾル源の残量が「枯渇」しているとは、エアロゾル源の残量がゼロ又はほぼゼロである状態を意味している。
 また、本開示において、エアロゾル源の残量が「不足」しているとは、エアロゾル源の残量が十分ではないが枯渇はしていない状態を意味していてもよい。又は、エアロゾル源の残量が瞬時的なエアロゾル生成には十分ではあるが、継続的なエアロゾル生成には不十分な状態を意味していても良い。
 エアロゾル基材116B又は保持部130(以下、「保持部等」という。)においてエアロゾル源が飽和状態にあるときには、負荷132の温度は、エアロゾル源の沸点やエアロゾル源の蒸発によりエアロゾルの生成が生じる温度(以下、「沸点等」という。)で定常状態となる。ここで、保持部等においてエアロゾル源が飽和状態ではないが、その残量が一定量以上ある場合にも、負荷132の温度は沸点等で定常状態となる。本開示において保持部等についてエアロゾル源の残量が「十分」であるとは、保持部等におけるエアロゾル源の残量が当該一定量以上であるか、又は、保持部等におけるエアロゾル源の残量が、負荷132の温度が沸点等で定常状態となる程度である状態(飽和状態を含む)を意味している。なお、後者の場合、保持部等におけるエアロゾル源の具体的な残量を特定する必要はないことに留意されたい。また、エアロゾル源の沸点とエアロゾルの生成が生じる温度とは、エアロゾル源が単一の組成の液体である場合には一致する。一方で、エアロゾル源が混合液である場合には、ラウールの法則で求めた理論的な混合液体の沸点をエアロゾルの生成が生じる温度に見做してもよいし、エアロゾル源の沸騰によってエアロゾルが生成される温度を実験で求めてもよい。
 更に、貯留部116Aにおけるエアロゾル源の残量が一定量未満である場合には、原則的には、貯留部116Aから保持部130へのエアロゾル源の供給がなされなくなる(極めて少量のエアロゾル源が供給されることや、エアロゾル生成装置100を傾けたり、振ったりすることによって多少の供給がなされることはある)。本開示において貯留部116Aについてエアロゾル源の残量が「十分」であるとは、貯留部116Aにおけるエアロゾル源の残量が当該一定量以上あるか、又は、保持部130におけるエアロゾル源を飽和状態に若しくはエアロゾル源の残量を上記一定量以上にする供給が可能な程度である状態を意味している。なお、後者の場合、負荷132の温度が沸点等で定常状態となっていることによって貯留部116Aにおけるエアロゾル源の残量が十分であることを推定できるために、貯留部116Aにおけるエアロゾル源の具体的な残量を特定する必要はないことに留意されたい。
 302は、エアロゾルの生成が要求されたかを判定するステップを示している。例えば、圧力センサ、流量センサ等から得られた情報に基づき、制御部106がユーザによる吸引開始を検知した場合に、エアロゾルの生成が要求されたと判定してよい。より詳細には、例えば、制御部106は、圧力センサの出力値即ち圧力が所定の閾値を下回った場合に、ユーザによる吸引開始が検知されたと判定することができる。また、例えば、制御部106は、流量センサの出力値即ち流量又は流速が所定の閾値を越えた場合に、ユーザによる吸引開始が検知されたと判定することができる。かかる判定手法においては、ユーザの感覚に合ったエアロゾル生成が可能なため、流量センサは特に好適である。あるいは、制御部106は、これらのセンサの出力値が連続的に変化し始めた場合、ユーザによる吸引開始が検知されたと判定してもよい。あるいは、制御部106は、エアロゾルの生成を開始するためのボタンが押されたことなどに基づいて、ユーザによる吸引開始が検知されたと判定してもよい。あるいは、制御部106は、圧力センサ又は流量センサから得られた情報とボタンの押下の双方に基づいて、ユーザによる吸引開始が検知されたと判定してもよい。
 エアロゾルの生成が要求されたと判定された場合、処理はステップ304に進み、そうでない場合、処理はステップ302に戻る。
 304は、スイッチQ1をオン状態にするステップを示している。このステップの実行により、負荷132にスイッチQ1を介して電流が流れ、負荷132が発熱することになる。
 306は、スイッチQ1をオフ状態にし、スイッチQ2をオン状態にするステップを示している。このステップの実行により、シャント抵抗212及び負荷132にスイッチQ2を介して電流が流れることになる。
 308は、センサの出力値を取得するステップを示している。このセンサは、負荷132の温度に関連する値を出力するものであればどのようなものであってもよく、例えば、センサ112B及び112Dのうちの一方又は双方であってよい。
 310は、スイッチQ2をオフ状態にするステップを示している。
 312は、ステップ308において取得した出力値に基づくデータを記憶するステップを示している。
 「ステップ308において取得した出力値に基づくデータ」は、ステップ308において取得した出力値そのものであってもよいし、ステップ308において取得した出力値から導出された値であってもよい。「出力値から導出された値」は、例えば、出力値が電圧センサ112Dからの電圧値である場合に、当該電圧値から導出した負荷132の抵抗値であってよい。「出力値から導出された値」は、例えば、出力値が電圧センサ112Dからの電圧値である場合に、電圧センサ112Dからの複数の電圧値を取得し、その平均値や当該平均値から導出された値であってよい。
 ステップ312において、データは、記憶された順序が分かる態様で記憶される必要がある。好ましくは、データは、元となる出力値を取得した時刻に関連付けて記憶することができる。時刻は、相対時刻、例えば、ステップ302においてエアロゾルの生成が要求されたと判定された時刻を基準とした相対時刻であってよい。なお、ステップ304から後述するステップ314を経てステップ304へと戻るループに要する時間が既知であれば、データを単に記憶された順序が分かる態様で記憶したとしても、各データに関連付けられた相対時刻を事後的に推定することができることに留意されたい。時刻は、上述した相対時刻に代えて、現在の時刻である絶対時刻であってよい。
 314は、エアロゾルの生成が要求されていないかを判定するステップを示している。例えば、圧力センサ、流量センサ等から得られた情報に基づき、制御部106がユーザによる吸引終了を検知した場合に、エアロゾルの生成が要求されていないと判定してよい。ここで、例えば、制御部106は、圧力センサの出力値即ち圧力が所定の閾値を越えた場合に、ユーザによる吸引終了が検知されたと、換言すればエアロゾルの生成が要求されていないと判定することができる。また、例えば、制御部106は、流量センサの出力値即ち流量又は流速が0でありうる所定の閾値を下回った場合に、ユーザによる吸引終了が検知されたと、換言すればエアロゾルの生成が要求されていないと判定することができる。なお、この閾値は、ステップ302における閾値より大きくても、当該閾値と等しくても、当該閾値より小さくてもよい。あるいは、制御部106は、エアロゾルの生成を開始するためのボタンが離されたことなどに基づいて、ユーザによる吸引終了が検知された、換言すれば、エアロゾルの生成が要求されていないと判定してもよい。あるいは、制御部106は、エアロゾルの生成を開始するためのボタンが押下されてから、所定時間が経過するなどの所定の条件が満たされたら、ユーザによる吸引終了が検知されたと、換言すればエアロゾルの生成が要求されていないと判定してもよい。
 エアロゾルの生成が要求されていないと判定された場合、処理はステップ316に進み、そうでない場合、処理はステップ304に戻る。
 316は、ステップ312において記憶したデータに対し、所定の部分のデータを除外するなどの整形を施すステップを示している。なお、「所定の部分」は、例えば、負荷132についての昇温期間や冷却期間に相当する部分であってよい。即ち、ステップ316によれば、昇温期間や冷却期間に相当する部分を除外した整形済みデータを、後述するステップ318において用いることができる。
 ここで、図4Aを参照して、負荷132の温度変化について説明する。
 図4Aは、各給電サイクルにおける、負荷132の温度を各時刻でプロットしたグラフ400である。以下、各時刻でプロットされた温度である温度の時間変化のことを温度プロファイルという。グラフ400の横軸は、ステップ302においてエアロゾルの生成が要求されたと判定した時刻を基準とした相対時刻を表し、縦軸は負荷132の温度を表している。なお、時刻407は、ステップ314においてエアロゾルの要求が生成されていないと判定した時刻に相当する。各温度プロファイルは各給電サイクルに対応する。
 1つの給電サイクルは、エアロゾルの生成が要求されたことに応答して負荷132への連続的又は断続的な実質的な給電が開始されてから、エアロゾルの生成が要求されなくなるまで又はエアロゾルの生成が要求されなくなったことに応答して負荷132への実質的な給電が終了するまでの期間を1つ含む期間である。
 従って、1つの給電サイクルは、ステップ302においてエアロゾルの生成が要求されたと判定されてから、ステップ314においてエアロゾルの生成が要求されていないと判定されるまでの期間であってよい。1つの給電サイクルは、以下の説明では、ステップ302においてエアロゾルの生成が要求されたと判定された時刻である時刻405から開始するものと仮定しているが、これに限定されるわけではない。1つの給電サイクルは、例えば、ステップ302においてエアロゾルの生成が要求されたと判定される前に開始してもよい。
 また、厳密には、ステップ302においてエアロゾルの生成が要求されたと判定された時刻と、負荷132への実質的な給電が開始される時刻とは相違する。1つの給電サイクルは、ステップ302においてエアロゾルの生成が要求された後の、負荷132への実質的な給電が開始されたとき、例えば、負荷132への所定の閾値(0を含む)より大きな給電、電力量の供給、電流の供給若しくは電圧の印加が実際になされたとき又はその前に開始してもよい。
 また、1つの給電サイクルは、ステップ302においてエアロゾルの生成が要求されたと判定されてから、次にステップ302においてエアロゾルの生成が要求されたと判定されるまでの期間であってもよい。
 なお、各給電サイクルの長さは、異なっていてもよいし、同じであってもよい。1つの給電サイクルは、エアロゾル生成装置100のユーザの1回の吸気(パフ)によって生じ得るから、1パフとしても参照される。
 402は、例示の昇温期間を示している。昇温期間は、負荷132の温度上昇が開始してから温度変化が安定するか又は所定の温度に達するまでの期間である。負荷132の温度変化が安定したか否かは、負荷132の温度の時間微分値や前回の温度と今回の温度の差分などに基づいて判断されてもよい。グラフ400において、昇温期間は、ステップ302においてエアロゾルの生成が要求されたと判定された時刻である時刻405から、十分な余裕をみて時刻406までの期間であるものと仮定している。
 昇温期間は、事前にグラフ400のようなグラフを作成したうえで、人手により求めた期間であってよい。この場合は各給電サイクルにおいて、昇温期間の長さは一定になることに留意されたい。あるいは、昇温期間は、制御部106が任意の手法で負荷132の温度上昇が開始した時刻と温度変化が安定した時刻とを決定することにより決定された期間であってよい。例えば、制御部106は、ステップ302においてエアロゾルの生成が要求されたと判定した時刻を前者の時刻として決定し、負荷132の温度上昇率(単位時間当たりの上昇温度)が所定の閾値以下になった時刻若しくは連続して所定の回数所定の閾値以下となった時刻を後者の時刻として決定することができる。または、前回取得した負荷132の温度と今回取得した負荷132の温度の差分が所定の閾値以下になった時刻を、後者の時刻として決定してもよい。または、直近で取得した負荷132の複数の温度の標準偏差や分散が所定の閾値以下になった時刻を、後者の時刻として決定してもよい。これらの場合は各給電サイクルにおいて、昇温期間の長さは、カートリッジ104Aやエアロゾル発生物品104Bの個体差や雰囲気温度などの種々の条件によって、変わり得ることに留意されたい。
 404は、例示の冷却期間の一部を示している。冷却期間は、負荷132の温度低下が開始してから温度変化が安定するか又は所定の温度に達するまでの期間であってよい。また、冷却期間は、次の給電サイクル又は昇温期間が開始するときに終了してもよい。グラフ400において、冷却期間は、ステップ314においてエアロゾルの生成が要求されていないと判定された時刻である時刻407から開始するものと仮定している。
 冷却期間は、事前にグラフ400のようなグラフを作成したうえで、人手により求めた期間であってよい。この場合は各給電サイクルにおいて、冷却期間の長さは一定になることに留意されたい。あるいは、冷却期間は、制御部106が任意の手法で負荷132の温度低下が開始した時刻と温度変化が所定の温度に達した時刻とを決定することにより決定された期間であってよい。例えば、制御部106は、ステップ314においてエアロゾルの生成が要求されていないと判定した時刻を前者の時刻として決定し、負荷132の温度が所定の閾値以下になった時刻若しくは連続して所定の回数所定の閾値以下となった時刻を後者の時刻として決定することができる。または、前回取得した負荷132の温度と今回取得した負荷132の温度の差分が所定の閾値以下になった時刻を、後者の時刻として決定してもよい。または、直近で取得した負荷132の複数の温度の標準偏差や分散が所定の閾値以下になった時刻を、後者の時刻として決定してもよい。これらの場合は各給電サイクルにおいて、冷却期間の長さは、カートリッジ104Aやエアロゾル発生物品104Bの個体差や雰囲気温度などの種々の条件によって、変わり得ることに留意されたい。
 例示処理300においては、ステップ314においてエアロゾルの生成が要求されていないと判定された後にデータが記憶されることはないが、本開示におけるエアロゾル源の枯渇又は不足を判定するための処理は、ステップ314に相当するステップにおいてエアロゾルの生成が要求されていないと判定された後にもセンサの出力値を取得しデータを記憶する別の処理を排除するわけではない。従って、そのような別の例において、ステップ316に相当するステップにおける「所定の部分」は、冷却期間を含んでいてもよい。
 また、ステップ316における「所定の部分」は、給電サイクルの開始時、給電サイクルの終了時、給電サイクルの任意の1以上の時点、給電サイクル内の任意の一部の期間のうちの一以上に相当する部分であってよい。従って、ステップ316によれば、例えば、給電サイクルの開始時に相当するデータを含むが、その直後のデータを含まないデータを、後述するステップ318において用いることができる。また、前述した給電サイクル内の任意の一部の期間のうちの一以上に相当する部分は、給電サイクルの開始時や給電サイクルの終了時を含んでいてもよい。この場合、給電サイクルの開始時から所定の期間及び/又は給電サイクルの終了時から遡る所定の期間が、「所定の部分」に該当し得る。
 318は、ステップ316において一部が除外されたデータに基づき、エアロゾル源の枯渇又は不足について判定するステップを示している。なお、以下、「データに基づく」は、データの少なくとも一部に基づくことを含む。
 図3Bは、本開示の一実施形態による、エアロゾル源の枯渇又は不足の発生を判断するための別の例示処理320のフローチャートである。例示処理320が含む一部のステップは例示処理300が含むステップと同一であるため、以下、例示処理300に含まれないステップについて説明する。
 322は、ステップ308において取得したセンサの出力値に基づくデータを記憶すべきかを判定するステップを示している。データとして記憶すべきと判定した場合、処理はステップ312に進み、そうでない場合、処理はステップ314に進む。
 ステップ322においては、ステップ308において取得したセンサの出力値が、ステップ316に関して上述した所定の部分に相当するものである場合に、データとして記憶すべきでないと判定することができる。即ち、ステップ322によれば、昇温期間や冷却期間等に相当するデータを、予め、ステップ312において記憶しないようにすることができる。これにより、メモリ114の記憶容量が少なくて済むため、エアロゾル生成装置100のコスト・重量・サイズを小さくすることができる。また、例示処理ではステップ316が不要になるため、ステップ324におけるエアロゾル源の枯渇又は不足についての判定がより高速に行える。
 324は、ステップ312において記憶したデータに基づき、エアロゾル源の枯渇又は不足について判定するステップを示している。
  2-2 エアロゾル源の枯渇又は不足の発生を判断する第1例示処理
 図5は、ステップ318又は324において実行される第1の例示処理500のフローチャートである。
 502は、ステップ308において取得されたセンサの出力値の偏差に基づく指標を計算するステップを示している。「偏差に基づく指標」は、例えば、標準偏差や分散であってよい。
 ステップ502は、ステップ316又はステップ322によって一部が除外されたセンサの出力値に基づくデータ(以下、「計算用データ」という。)に基づき、上記指標を計算するステップである。ここで、上記指標は、計算用データそのものから計算しても、計算用データから導出される値から計算してもよい。
 従って、例えば、ステップ308において記憶したデータがセンサの出力値そのものである場合に、計算用データ即ち出力値の標準偏差は、明らかに、「センサの出力値の偏差に基づく指標」である。
 また、例えば、センサが電圧値を出力し、ステップ308において当該電圧値から導出された負荷132の抵抗値をデータとして記憶した場合に、計算用データ即ち当該抵抗値から導出される負荷132の温度値の統計的な性質は、センサが出力した電圧値と同一であるから、そのような負荷132の温度値の標準偏差は、結局のところ、「センサの出力値の偏差に基づく指標」である。
 従って、センサの出力値の偏差に基づく指標は、各給電サイクルにおけるセンサの出力値のみから導出される各種物理量の偏差に基づく指標であってよく、換言すれば、単一の給電サイクルから生成可能な偏差に基づく指標であってよい。
 504は、ステップ502において計算された指標が、所定の閾値以上であるかを判定するステップを示している。ステップ502において計算された指標が、所定の閾値以上である場合、処理はステップ506に進み、そうでない場合、処理は終了する。なお、ステップ502において計算された指標が、例えば標準偏差のように計算用データのばらつきが大きいほど大きな値を示す場合、ステップ504では指標が閾値以上か否かを判定すればよい。一方、ステップ502において計算された指標が、計算用データのばらつきが大きいほど小さな値を示す場合、ステップ504では指標が閾値以下か否かを判定すればよい点に留意されたい。
 506は、貯留部116A又はエアロゾル基材116B(以下、「貯留部等」という。)におけるエアロゾル源の枯渇又は不足が発生したと判断するステップを示している。
 ここで、図4B及び図6を参照して、例示処理500におけるエアロゾル源の枯渇又は不足の判定について説明する。
 図4Bは、グラフ400に含まれる温度プロファイルのうち、保持部等におけるエアロゾル源の残量が十分であるときの給電サイクルの温度プロファイル422と、十分でないときの温度プロファイル424とをプロットしたグラフ420を表している。特に、温度プロファイル424に対応する給電サイクルは、負荷132に初めて焦げや酸化などを原因とする変色が生じたこと目視で確認した給電サイクルであり、この給電サイクルの途中で、保持部等におけるエアロゾル源の残量は枯渇したということである。
 これに関し、図1Aの構成の場合について検討すると、貯留部116Aにおいてエアロゾル源の残量が十分である場合には、保持部130におけるエアロゾル源の残量も十分となる。しかしながら、貯留部116Aにおいてエアロゾル源の残量が不足すると、供給が滞り、保持部130におけるエアロゾル源の残量は枯渇又は不足することになる。特に、貯留部116Aにおいてエアロゾル源の残量が枯渇すると、供給が完全にストップするため、保持部130におけるエアロゾル源の残量は枯渇することになる。逆に言うと、保持部130におけるエアロゾル源の残量が枯渇したとき、貯留部116Aにおけるエアロゾル源の残量は枯渇又は不足している。
 また、図1Bの構成の場合について検討すると、上述したように、温度プロファイル424に対応する給電サイクルにおいて、エアロゾル基材116Bにおけるエアロゾル源の残量は枯渇する。
 従って、温度プロファイル424に対応する給電サイクルにおいて、貯留部等におけるエアロゾル源の残量は、枯渇又は不足している。
 温度プロファイル422と温度プロファイル424を見比べると、保持部等におけるエアロゾル源の残量が枯渇する給電サイクルに対応した温度プロファイル424の方が、負荷132の温度の揺らぎが大きくなっていることが分かるであろう。後述する例示処理500では、標準偏差などを用いて、この負荷132の温度の揺らぎを評価する。ところで、昇温期間や冷却期間における極端に低い負荷132の温度が、標準偏差を導出する際の標本に含まれると、標準偏差の値を大きく変えてしまう。従って、標準偏差を用いて負荷132の温度揺らぎを正確に評価するためには、前述したステップ316やステップ322の処理が重要であることが理解されるであろう。
 給電サイクルは、複数のフェーズを含むことができる。ここで、各フェーズの長さは、同一であっても異なっていてもよい。また、フェーズ同士は、少なくとも一部が重なっていてもよい。なお、複数のフェーズのうちの一部のフェーズが、上述した昇温期間及び冷却期間の一方又は双方に相当すると考えてもよい。432は、複数のフェーズのうちのフェーズである第1フェーズの例を示している。434は、複数のフェーズのうちのフェーズであって第1フェーズよりも時系列で後の第2フェーズの例を示している。なお、グラフ420において第1フェーズ432と第2フェーズ434とは隣接しているが、第1フェーズ432と第2フェーズ434との間に1以上のフェーズが存在してもよい。また、第1フェーズ432と第2フェーズ434とは、少なくとも一部が重なっていてもよい。図4Bでは、第1フェーズ432及び第2フェーズ434は、それぞれ、時刻435(この例では、図4Aにおける時刻406と同一である)から時刻436までの期間及び時刻436から時刻437(この例では、図4Aにおける時刻407と同一である)までの期間であるものと仮定している。
 図6は、各給電サイクルについての、計算用データに基づく負荷132の温度の標準偏差を各給電サイクルでプロットしたグラフ600である。以下、各給電サイクルでプロットされた標準偏差を標準偏差プロファイルという。グラフ600の横軸は給電サイクルの回数を表し、グラフ600の縦軸は負荷132の温度の標準偏差を表している。602及び604は、それぞれ、図4Bにおける温度プロファイル422及び424に対応する給電サイクルを示している。612は、第1フェーズ432及び第2フェーズ434の双方に相当する計算用データから導出される標準偏差プロファイルを示している。614は、第1フェーズ432と第2フェーズ434とのうち、第2フェーズ434のみに相当する計算用データから導出される標準偏差プロファイルを示している。
 各標準偏差プロファイルについて検討すると、給電サイクル604における温度の標準偏差は、それより前の給電サイクルのうちの最大の温度の標準偏差即ち給電サイクル602における標準偏差より大きい。前述した通り、給電サイクル604は、保持部等におけるエアロゾル源の残量が枯渇する給電サイクルであり、温度プロファイル424に対応する。また、給電サイクル604よりも前の給電サイクルは、保持部等におけるエアロゾル源の残量が十分であるか、又は、十分ではないが枯渇はしない時の温度プロファイルに対応する。前述した通り、保持部等におけるエアロゾル源の残量が十分な状態では、負荷132の温度は、エアロゾル源の沸点等で定常状態となる。同様に、保持部等におけるエアロゾル源の残量が十分ではないが枯渇はしていない状態でも、負荷132の温度は定常状態となる(3-2節にて後述する)。従って、給電サイクル604よりも前の給電サイクルでは、温度の標準偏差は、小さな値を示す傾向がある。一方、給電サイクル604のように、保持部等におけるエアロゾル源の残量が枯渇する給電サイクルでは、保持部等の全体又は局所においてエアロゾル源が極めて少ない状態となる。つまり、保持部等におけるエアロゾル源の分布に応じて、負荷132において温度のムラが生じる。この温度のムラが負荷132の温度を揺らがせるため、給電サイクル604では、温度の標準偏差は、大きな値を示すと考えられる。なお、給電サイクル604よりも後の給電サイクルでは、エアロゾル源が負荷132の冷媒として機能しない点や、負荷132の変色が更に進行する点などによって、負荷132の温度の標準偏差はさらに大きなものになると考えられる。
このことは、ステップ504における所定の閾値を、貯留部等におけるエアロゾル源が枯渇又は不足しているときの給電サイクル(保持部等におけるエアロゾル源が枯渇する給電サイクル)における温度の標準偏差以下(例えば、給電サイクル604における温度の標準偏差)、且つ、そうでないときの給電サイクルにおける最大の温度の標準偏差(例えば、給電サイクル602における温度の標準偏差)より大きい値とすることで、ステップ506において、貯留部等におけるエアロゾル源の枯渇又は不足が発生していると判断し得ることを意味している。
 また、標準偏差プロファイル612と614とを対比すると、後者についての給電サイクル602における標準偏差と給電サイクル604における標準偏差との差624は、前者についての給電サイクル602における標準偏差と給電サイクル604における標準偏差との差622よりも大きい。このことは、標準偏差プロファイル614、即ち、第1フェーズ432と第2フェーズ434とのうち、第2フェーズ434のみに相当する計算用データから導出される標準偏差プロファイルの方が、貯留部等におけるエアロゾル源が枯渇又は不足しているときとしていないときとの差が大きいことを意味している。従って、標準偏差を導出する計算用データの部分を適切に設定することにより、ノイズ等の影響を受けにくいより適切な閾値をステップ504において設定することが可能となる。
なお、給電サイクル602における温度の標準偏差が比較的大きな値を示すことは、例えばエアロゾル生成装置100を長時間放置したことで、保持部等におけるエアロゾル源の量が過剰になり、温度プロファイルの初期において負荷132の温度が上がりにくくなったことなどから説明できる。
  2-3 エアロゾル源の枯渇又は不足の発生を判断する第2例示処理
 図7は、ステップ318又は324において実行される第2の例示処理700のフローチャートである。例示処理700が含む一部のステップは例示処理500が含むステップと同一であるため、以下、例示処理500に含まれないステップについて説明する。
 702及び704は、それぞれ、ステップ308において取得されたセンサの出力値から導出される、偏差に基づく第1指標及び第2指標を計算するステップを示している。ステップ702及び704は、偏差に基づく指標を導出する計算用データを除き、ステップ502と同様のステップである。図4Bを再度参照すると、ステップ702において第1指標を導出するための計算用データは、第1フェーズ432に相当する計算用データであってよく、ステップ704において第2指標を導出するための計算用データは、第2フェーズに434相当する計算用データであってよい。
 706及び708は、それぞれ、第1指標と第2指標の差を計算するステップ及び計算された差が閾値以上かを判定するステップを示している。なお、この例では、第1指標及び第2指標は、計算用データのばらつきが大きいほど大きな値を示すものであり、第1指標と第2指標の差は、第2指標から第1指標を減算することにより計算されるものと仮定している。第1指標及び第2指標として計算用データのばらつきが大きいほど小さな値を示すものを用いる場合や、第1指標と第2指標の差を第1指標から第2指標を減算することにより計算する場合、ステップ708では、計算された差が閾値未満か否かを判定すればよい点に留意されたい。
 ここで、図8を参照して、例示処理700におけるエアロゾル源の枯渇又は不足の判定について説明する。
 図8は、各給電サイクルについての、計算用データから導出される負荷132の温度の標準偏差をプロットしたグラフ800であり、グラフ600と同様のものである。但し、814は、第2指標から第1指標を減算することにより得られた標準偏差プロファイルを示している。
 標準偏差プロファイル612と814とを対比すると、後者についての給電サイクル602における標準偏差と給電サイクル604における標準偏差との差824は、前者についての給電サイクル602における標準偏差と給電サイクル604における標準偏差との差822よりも大きい。即ち、貯留部等におけるエアロゾル源が枯渇又は不足しているときの給電サイクル(保持部等におけるエアロゾル源が枯渇する給電サイクル)における温度の標準偏差と、そうでないときの給電サイクルにおける最大の温度の標準偏差との差がより大きくなるように第1指標及び第2指標を導出することにより、ノイズ等の影響を受けにくいより適切な閾値をステップ708において設定することが可能となる。
 標準偏差プロファイル612に比べて、標準偏差プロファイル814の方が、給電サイクル602における標準偏差と給電サイクル604における標準偏差の差が大きくなる事象は次のように説明できる。給電サイクル602においては、エアロゾル生成装置100を長時間放置したことによって温度プロファイルの初期で負荷132の温度が上がりにくいものの、温度プロファイルの中期以降で負荷132の温度は沸点等で定常状態に落ち着くためだと考えられる。つまり、給電サイクル602においては、加熱プロファイルの中期以降の標準偏差が小さいため、後者に相当する第2指標から前者に相当する第1指標を減算したものは、小さな値を示しやすい。一方の給電サイクル604においては、当該サイクルの途中で保持部等におけるエアロゾル源の残量が枯渇するため、負荷132の温度が揺らぎやすい。つまり、給電サイクル604においては、加熱プロファイルの中期以降の標準偏差が大きい。従って、後者に相当する第2指標から前者に相当する第1指標を減算したものは、大きな値を示しやすい。
  2-4 エアロゾル源の枯渇又は不足の発生を判断する第3例示処理
 図9は、ステップ318又は324において実行される第3の例示処理900のフローチャートである。例示処理900が含む一部のステップは例示処理500又は700が含むステップと同一であるため、以下、例示処理500又は700に含まれないステップについて説明する。
 902は、第1指標が第1閾値未満かを判定するステップを示している。このステップは、第1指標を導出したデータのばらつきが小さいか、即ち、負荷132の温度が定常状態であるかを判定することを目的とするものである。第1指標が第1閾値未満である場合、処理はステップ704に進み、そうでない場合、処理は終了する。
 904は、第2指標が第2閾値以上かを判定するステップを示している。このステップは、第2指標を導出したデータのばらつきが大きいかを判定することを目的とするものである。ここで、第2閾値は、第1閾値と等しい場合もあるし、異なる場合もある。第2指標が第2閾値以上である場合、処理はステップ506に進み、そうでない場合、処理は終了する。
 なお、この例では、第1指標及び第2指標は、計算用データのばらつきが大きいほど大きな値を示すものと仮定している。第1指標及び第2指標として計算用データのばらつきが大きいほど小さな値を示すものを用いる場合には、ステップ902において第1指標が第1閾値以上であるか否かを判定し、ステップ904において第2指標未満であるか否かを判定すればよい点に留意されたい。
 ここで、図10を参照して、例示処理900におけるエアロゾル源の枯渇又は不足の判定について説明する。
 図10は、各給電サイクルについての、計算用データから導出される負荷132の温度の標準偏差をプロットしたグラフ1000であり、グラフ600と同様のものである。但し、1012は、第1フェーズである時刻435から時刻436までの期間(図4Bを参照)に相当する計算用データから導出される温度プロファイルを示している。なお、例示処理900に係る以下の説明では、第2フェーズは時刻436から時刻437までの期間(図4Bを参照)であるものと仮定している。従って、標準偏差プロファイル1012及び614の各点は、それぞれ、ステップ702及び704において判定される第1指標及び第2指標に相当する。
 標準偏差プロファイル1012と614とを対比すると、給電サイクル604において、前者の標準偏差1022は後者の標準偏差1024より小さくなっている。言い換えると、貯留部等におけるエアロゾル源が枯渇又は不足しているときの給電サイクル(保持部等におけるエアロゾル源が枯渇する給電サイクル)において、負荷132の温度の前半部分のばらつきは小さいが、後半部分のばらつきは大きいということである。一方、給電サイクル602において、前者の標準偏差1032は後者の標準偏差1034よりも大きい。これは、給電サイクル602では温度プロファイルの初期で負荷132の温度が上がりにくく定常状態とならないものの、温度プロファイルの中期以降で負荷132の温度は沸点等で定常状態に落ち着くために、負荷132の温度の前半部分のばらつきは大きいが、後半部分のばらつきは小さいためだと考えられる。
 例示処理900によれば、この特徴を利用して、センサの出力値が定常状態に至った後の当該出力値の少なくとも一部から導出される第2指標を用いることにより、誤った判定がなされる可能性を低減することができる。
 なお、センサの出力値が定常状態に至ったかは、単純に、センサの出力値が所定時間所定の範囲に収まっているか、又は、センサの出力値の所定時間の平均値と所定の値との差が所定の大きさ以下であるかによって判定することもできる。この点について詳述すると、保持部等におけるエアロゾル源の残量が十分である場合には、負荷132の温度は沸点等近傍に収束し、微視的にわずかな上下動を示しつつ、定常状態になる。後述するが、保持部等におけるエアロゾル源の残量が十分ではないが枯渇していない場合にも、負荷の温度は定常状態になる。従って、センサの出力が定常状態になった場合、センサの出力値は所定の範囲に収まるし、その平均値も所定の値に近づくことになる。従って、例示処理900におけるステップ902における判定は、センサの出力値及びその平均値の一方又は双方に基づくものであってもよいし、それらと第1指標に基づく判定とを組み合わせてもよい。
 また、ステップ902及び904における第1閾値及び第2閾値は、貯留部等におけるエアロゾル源の残量が枯渇又は不足しているときの給電サイクル(保持部等におけるエアロゾル源が枯渇する給電サイクル)における負荷132の温度の前半部分の標準偏差と後半部分の標準偏差との間、例えば、図10における標準偏差1022と標準偏差1024の間の値であってよい。
  2-5 エアロゾル源の枯渇又は不足の発生を判断する第4例示処理
 図11は、ステップ318又は324において実行される第4の例示処理1100のフローチャートである。例示処理1100が含む一部のステップは例示処理500が含むステップと同一であるため、以下、例示処理500に含まれないステップについて説明する。
 1102、計算用データに基づき、負荷132の温度の平均値を計算するステップを示している。
 1104は、ステップ504と類似のステップを示している。但し、ステップ504における「閾値」は、ステップ1104における「第1閾値」であり、また、計算された指標が第1閾値以上である場合、処理はステップ1106に進む点が相違する。なお、この例では、指標は、計算用データのばらつきが大きいほど大きな値を示すものと仮定している。指標として計算用データのばらつきが大きいほど小さな値を示すものを用いる場合には、このステップにおいて指標が第1閾値未満であるか否かを判定すればよい点に留意されたい。
 1106は、ステップ1102において計算された平均値は第2閾値以上かを判定するステップを示している。計算された平均値が第2閾値以上である場合、処理はステップ506に進み、そうでない場合、処理は終了する。
 ここで、図12を参照して、例示処理1100におけるエアロゾル源の枯渇又は不足の判定について説明する。
 図12は、各給電サイクルについての、計算用データから導出される負荷132の温度の標準偏差及び平均温度を各給電サイクルでプロットしたグラフ1200であり、グラフ600と同様のものである。但し、1216は、時刻436から時刻437までの期間(図4Bを参照)に相当する計算用データから導出される平均温度を示している。以下、各給電サイクルでプロットした平均温度を平均温度プロファイルという。
 平均温度プロファイル1216について検討すると、給電サイクル604における平均温度は、それより前の給電サイクルのうちの最大の平均温度である給電サイクル即ち給電サイクル1206における平均温度より大きい。言い換えると、貯留部等におけるエアロゾル源が枯渇又は不足しているときの給電サイクル(保持部等におけるエアロゾル源が枯渇する給電サイクル)における平均温度は、そうでないときの給電サイクルにおける平均温度よりも大きい。この特徴を利用して、貯留部等におけるエアロゾル源の枯渇又は不足の判定に平均温度を追加で用いることにより、誤った判定がなされる可能性を低減することができる。なお、ステップ1106における第2閾値は、貯留部等におけるエアロゾル源が枯渇又は不足しているときの給電サイクル(保持部等におけるエアロゾル源が枯渇する給電サイクル)における平均温度以下、且つ、そうでないときの最大の平均温度より大きい値であってよい。
 なお、貯留部等におけるエアロゾル源が枯渇又は不足しているときの給電サイクル(保持部等におけるエアロゾル源が枯渇する給電サイクル)における平均温度が比較的高い値を示す理由は、エアロゾル源を構成する混合溶液のうち沸点の低いものから優先的に霧化される点や、エアロゾル源による負荷132の冷却効果が薄れる点などから説明できる。
  2-6 エアロゾル源の枯渇又は不足の発生を判断する第5例示処理
 図13は、ステップ318又は324において実行される第5の例示処理1300のフローチャートである。例示処理1300が含む一部のステップは例示処理500及び700が含むステップと同一であるため、以下、例示処理500及び700に含まれないステップについて説明する。
 1302は、指標計算条件を初期化するステップを示している。指標計算条件は、ステップ702及び704において第1指標及び第2指標を導出するデータを指定するものである。
 ここで、図4Cを参照して、指標計算条件の初期化について説明する。図4Cに表されたグラフは、図4Bのものと同一である。
 例示処理1300においては、計算用データをある時刻を基準(以下、「分割時刻」という。)として2つの部分に分け、前半部分に相当する計算用データから第1指標を、後半部分に相当する計算用データから第2指標を導出することができる。従って、ステップ1302は、例えば、時刻440によって分割される前半部分(第1フェーズに相当し得る)442に相当する計算用データから第1指標が、後半部分(第2フェーズに相当し得る)444に相当する計算用データから第2指標が導出されるように、指標計算条件を初期化することができる。ここで、初期化に係る後半部分444は、短い方が好ましい。これは後述するように、保持部等においてエアロゾル源が枯渇する給電サイクルのみに起き得る加熱プロファイルの中期以降の負荷132の温度の揺らぎが、観測しやすくなるためである。
 1304は、ステップ706において計算された差が閾値以上であるかを判定するステップを示している。計算された差が閾値以上である場合、処理はステップ506に進み、そうでない場合、処理はステップ1306に進む。
 1306は、指標計算条件が更新可能かを判定するステップを示している。指標計算条件が更新可能と判定された場合、処理は指標計算条件を更新するステップ1308に進み、そうでない場合、処理は終了する。
 ここで、図4Cを再度参照して、指標計算条件の更新について説明する。
 指標計算条件の更新は、例えば、分割時刻をより前に移動させることであってよい。例えば、更新によって、分割時刻を時刻440から時刻450に変更し、次のステップ702及び704においては、前半部分452に相当する計算用データから第1指標が、後半部分454に相当する計算用データから第2指標が導出されるようにすることができる。このようにすることで、次のステップ702及び704においては、時系列でより前の計算用データから第1指標が、より後の計算用データから第2指標が計算されるようにすることができる。分割時刻の移動の量は、更新ごとに一定であっても異なっていてもよい。
 なお、指標計算条件が更新可能であるかの判定は、所定の回数ステップ1308を実行したか、分割時刻が所定の時刻に到達したか、前半部分の長さが所定の長さ以下となったか等、任意の手法で判定してよい。
 偏差に基づく指標は、当該指標を計算する計算用データの部分に応じて変化する。前述した通り、保持部等においてエアロゾル源が枯渇する給電サイクルでは、加熱プロファイルの中期以降における負荷132の温度が揺らぎやすい。指標計算条件を徐々に更新すれば、第2指標を計算するための負荷132の温度(標本)が徐々に増える。よって、中期以降の負荷132の温度の揺らぎに着目しながら、貯留部等においてエアロゾル源の枯渇又は不足が発生しているか否かを判断できる。従って、例示処理1300によれば、計算用データを変化させながら偏差に基づく指標を計算することにより、誤った判定がなされる可能性を低減することができる。
  3 エアロゾル源に係る状態を推定又は検知するための処理
 以下に説明する処理については、制御部106がすべてのステップを実行するものとして説明を行う。しかしながら、一部のステップがエアロゾル生成装置100の別のコンポーネントによって実行されてもよいことに留意されたい。
  3-1 処理の概要
 図14は、本開示の一実施形態による、貯留部116Aと保持部130の少なくとも一方の状態を推定又は検知するための例示処理1400のフローチャートである。例示処理1400が含む一部のステップは例示処理300が含むステップと同一であるため、以下、例示処理300に含まれないステップについて説明する。
 1402は、ステップ312において記憶されたデータに基づき、貯留部116Aと保持部130の少なくとも一方の状態を推定又は検知するステップを示している。
  3-2 エアロゾル源に係る状態を推定又は検知する第1例示処理
 図15は、ステップ1402において実行される第1の例示処理1500のフローチャートである。
 1502は、ステップ312において記憶されたデータに基づき、ステップ308において取得されたセンサの出力値の偏差に基づく指標σを計算するステップを示している。
 なお、ステップ308におけるセンサは、負荷132の温度に関連する値を出力するものであるから、この指標σは、負荷132の温度の振る舞いに関する値の一例である。
 1504は、ステップ312において記憶されたデータに基づき、負荷132の温度の平均値Taveを計算するステップを示している。
 1510は、指標σが閾値σthreより小さく、且つ、平均値Taveと第1の所定の温度T1の差の大きさが閾値Δthre未満であるかを判定するステップを示している。
 指標σが閾値σthreより小さいかの判定について説明すると、指標σが小さいことは、ステップ308におけるセンサの出力値のばらつきが小さいことを意味し、従って、負荷132の温度が安定していることを意味する。
 ここで、図16を参照して、センサの出力値のばらつきが小さいことについて説明する。図16は、各給電サイクルについての、計算用データから導出される負荷132の温度の標準偏差をプロットしたグラフ1600であり、グラフ600と同様のものである。グラフ1600によれば、負荷132に初めて焦げや酸化などを原因とする変色が生じたことを目視で確認した給電サイクル604における温度の標準偏差1612は、それより前の給電サイクルのうちの最大の標準偏差即ち給電サイクル602における標準偏差1602より大きい。従って、閾値σthreを標準偏差1602より大きく標準偏差1612以下の値に設定すれば、負荷132に初めて焦げや酸化などを原因とする変色が生じる寸前の給電サイクルにおいて、σ<σthreは偽となり、よってステップ1510における判定は偽となる。
 図15に戻ると、温度T1は、保持部130においてエアロゾル源の残量が十分であるときに、負荷132が達する温度、即ち、エアロゾル源の沸点等である。図4Aを再度参照すると、411はそのような温度T1を示している。例えば、エアロゾル源がプロピレングリコールである場合、温度T1は200℃であってよい。なお、温度T1は、実験により定めることができる。ここで、保持部130においてエアロゾル源の残量が十分でない場合には、電源110から供給されるエネルギーの全てがエアロゾル源の霧化に用いられないため、負荷132の平均温度Taveは温度T1を上回ることが分かっている。
 即ち、ステップ1510は、負荷132の温度が、エアロゾル源の沸点等T1で定常状態となったかを判定する処理の一例である。なお、負荷132の温度がある温度で定常状態となったかは、単純に、センサの出力値が所定時間、当該ある温度を含む所定の範囲の温度に対応した所定の範囲に収まっているか、又は、センサの出力値の所定時間の平均値と、当該ある温度に対応する所定の値との差が所定の大きさ以下であるかによって判定することもできる。
 指標σが閾値σthreより小さく、且つ、平均値Taveと第1の所定の温度T1の差の大きさが閾値Tthre未満である場合、処理はステップ1512に進み、そうでない場合、処理はステップ1520に進む。
 1512は、変数COUNTがゼロであるかを判定するステップを示している。変数COUNTは、後述するように、過去の判定の情報を表すフラグとして用いられるものであり、簡潔に言えば、変数COUNTがゼロでないことは、過去においてステップ1510における判定が真でなかったことを表すものである。なお、変数COUNTは、例示処理1400を初めて実行する前の任意の時点においてゼロに初期化されていてよい。従って、ステップ1512が初めて実行されたとき、判定は必ず真となる。変数COUNTがゼロである場合、処理はステップ1514に進み、そうでない場合、処理はステップ1516に進む。
 1514は、貯留部116A及び保持部130の双方におけるエアロゾル源の残量は十分であると推定又は検知するステップを示している。ここで、図17を参照して、ステップ1514における推定又は検知について説明する。
 1700は、負荷132の温度が安定した場合の、給電サイクル間の負荷132の平均温度の遷移ついての幾つかのパターン1702~1710を表している。各パターンにおけるc1は、ある単一の給電サイクル(以下、「第1給電サイクル」という。)を示し、c2は、第1給電サイクルより後の単一の給電サイクル(以下、「第2給電サイクル」という。)を示している。
 1702は、第1給電サイクルc1における平均温度が温度T1近傍であり、第2給電サイクルc2における平均温度も温度T1近傍である遷移パターンを示している。言い換えると、遷移パターン1702は、過去においても現在においても、負荷132の温度が温度T1近傍で定常状態であることを示し、このことは、過去においても現在においても、保持部130におけるエアロゾル源の残量が十分であることに対応する。
 従って、遷移パターン1702が現れたときには、過去においても現在においても、保持部130におけるエアロゾル源の残量は十分であると判断することができる。この判断がなされたことは、貯留部116Aにおいてエアロゾル源の残量が十分であることの推定となる。
 図15に戻ると、ステップ1514は、変数COUNTがゼロであるときのみ実行される。後述するが、変数COUNTは、過去に負荷132の温度がエアロゾル源の沸点等で定常状態でなかった場合に増加する。言い換えると、ステップ1514に到達したということは、過去においても負荷132の温度がエアロゾル源の沸点等で定常状態であったということであり、即ち、遷移パターン1702が現れたということである。従って、ステップ1514においては、貯留部116A及び保持部130の双方におけるエアロゾル源の残量が十分であると推定又は検知可能である。
 1516は、変数COUNTをゼロに初期化するステップを示している。過去に負荷132の温度がエアロゾル源の沸点等で定常状態でなかったため0より大きな値となった変数COUNTは、このステップでゼロに初期化される。
 1518は、保持部130におけるエアロゾル源の霧化速度が、貯留部116Aから保持部130へのエアロゾル源の供給速度を上回っていると推定又は検知するステップを示している。ここで、図17を再度参照して、ステップ1518における推定又は検知について説明する。
 1706は、第1給電サイクルc1における平均温度が温度T1よりも高い温度T2近傍である一方で、第2給電サイクルc2における平均温度は温度T1近傍である遷移パターンを示している。言い換えると、遷移パターン1706は、保持部130におけるエアロゾル源の残量が過去においては十分でなかったが、現在においては十分であることを示している。このような遷移パターン1706は、保持部130におけるエアロゾル源の霧化速度と、貯留部116Aから保持部130へのエアロゾル源の供給速度との不均衡が生じた場合に現れる。例えば、ユーザの吸気速度に応じて電源110から負荷132へ供給する電力を調整するエアロゾル生成装置100の場合、吸気速度が大きく、保持部130におけるエアロゾル源の霧化速度が、貯留部116Aから保持部130へのエアロゾル源の供給速度を上回ってしまうことが想定される。これにより、保持部130におけるエアロゾル源が一時的に不足したが、当該ユーザによる吸気が一旦終了した後のエアロゾル源の供給によって保持部130におけるエアロゾル源の残量が回復した場合には、遷移パターン1706が現れることになる。なお、ユーザが吸気してから次の吸気をするまでの間隔が短い場合にも、同様に遷移パターン1706が現れることになる。
 図15に戻ると、ステップ1518は、負荷132の温度がエアロゾル源の沸点等で定常状態となっているにもかかわらず、変数COUNTがゼロでない場合に達するものである。変数COUNTがゼロでないことは、過去において、負荷132の温度がエアロゾル源の沸点等で定常状態となっていなかったことを意味する。即ち、ステップ1518に到達したということは、遷移パターン1706が現れたということである。従って、ステップ1518においては、保持部130におけるエアロゾル源の霧化速度が、貯留部116Aから保持部130へのエアロゾル源の供給速度を上回っていると推定又は検知することが可能である。
 1520は、指標σが閾値σthreより小さく、且つ、平均値Taveと第2の所定の温度T2の差の大きさが閾値Δthre未満であるかを判定するステップを示している。なお、ステップ1510とステップ1520における閾値Δthreは、同一であっても異なっていてもよい。
 ここで、図4Aを再度参照して、温度T2について説明する。出願人は、保持部130におけるエアロゾル源の残量が十分でもなければ枯渇もしていない場合に、温度411より高い温度412において、負荷132の温度が定常状態となるときがあることを見出した。このような現象がなぜ起きるのかについて完全には解明されていないが、複合的な要因による可能性がある。例えば、このような現象が起きる要因として、保持部130におけるエアロゾル源の部分的な枯渇又は不足が考えられる。また、例えば、このような現象が起きる要因として、エアロゾル源の成分の変化が考えられる。更に、エアロゾル源が混合液である場合には、例えば、このような現象が起きる要因として、エアロゾルを構成する液体の沸点の相違(沸点の低い液体から優先的に霧化される)が考えられる。温度T2は、このような温度412であり、実験により定めることができるものである。
 即ち、ステップ1520は、負荷132の温度が、上記のような温度T2で定常状態となったかを判定する処理の一例である。
 指標σが閾値σthreより小さく、且つ、平均値Taveと第2の所定の温度T2の差の大きさが閾値Tthre未満である場合、処理はステップ1522に進み、そうでない場合、処理はステップ1530に進む。
 1522は、変数COUNTが閾値COUNTthre以上かを判定するステップを示している。COUNTthreは1以上の所定の値であってよい。変数COUNTが閾値COUNTthre以上である場合、処理はステップ1524に進み、そうでない場合、処理はステップ1526に進む。
 1524は、保持部130においてエアロゾル源が不足したと推定又は検知するステップを示している。ここで、図17を再度参照して、ステップ1524における判断について説明する。
 1708は、第1給電サイクルc1における平均温度が温度T2近傍であり、第2給電サイクルc2における平均温度も温度T2近傍である遷移パターンを示している。言い換えると、遷移パターン1708は、過去においても現在においても、負荷132の温度が温度T2近傍で定常状態であることを示している。このことは、過去においても現在においても、保持部130におけるエアロゾル源が十分ではないが枯渇はしていないことを意味している。
 従って、遷移パターン1708が現れたときには、過去においても現在においても、保持部130におけるエアロゾル源の残量は十分ではないが枯渇はしていない、例えば、設計上、不足していると判断することができる。また、遷移パターン1708が現れたときには、過去においても現在においても、貯留部116Aにおけるエアロゾル源の残量は不足している場合と枯渇している場合とがあるが、設計上、両者を区別せずに、貯留部116Aにおけるエアロゾル源の残量は枯渇又は不足していると判断してよい。
 図15に戻ると、ステップ1524は、変数COUNTが閾値COUNTthre以上であるときのみ実行され、後述するが、変数COUNTはステップ1526において1だけインクリメントされる。言い換えると、ステップ1524に到達したということは、ステップ1520における負荷132の温度が温度T2で定常状態となったとの判定が少なくともCOUNTthre回なされた、即ち、過去においても現在においても、負荷132の温度が温度T2近傍で定常状態であるということであり、遷移パターン1708が現れたということである。従って、ステップ1524においては、保持部130におけるエアロゾル源の残量が不足していると推定又は検知可能である。また、ステップ1524においては、貯留部116Aにおけるエアロゾル源の残量が枯渇又は不足しているとも推定又は検知可能である。なお、ステップ1524においては、保持部130について推定又は検知せずに、貯留部116Aと保持部130とのうち、貯留部116Aにおけるエアロゾル源の残量が枯渇又は不足していると推定又は検知してもよい。
 更に、ステップ1524に最初に到達したときから、実際に保持部130におけるエアロゾル源が枯渇するまでの給電サイクル数を実験により予め求め、当該給電サイクル数を既定回数として設定してもよい。ステップ1524においては、エアロゾル生成装置100Aのユーザが当該既定回数のパフを行う即ち当該既定回数の給電サイクルが生じた後に、保持部130におけるエアロゾル源の残量が枯渇すると推定又は検知可能である。換言すれば、遷移パターン1708は、保持部130におけるエアロゾル源の残量の枯渇の予兆を示している。また、ステップ1524が実行された場合、制御部106は、既定回数又は既定回数よりも少ない給電サイクルが生じた後に、負荷132への給電を抑制するように構成することができる。このようにすれば、十分な量のエアロゾルを生成できない状態や、意図した香喫味を有するエアロゾルを生成できない状態において、負荷132への給電を行わずに済む。換言すれば、保持部130におけるエアロゾル源の残量が枯渇した状態において、負荷132への給電を行わずに済むため、負荷132が高温にならない。
 1526は、変数COUNTをインクリメントするステップを示している。このステップにより、変数COUNTは1だけ増加することができる。
 1528は、エアロゾル源に係る状態についての判断を保留するか、直近の判断を踏襲するとの判断を行うステップを示している。ここで、図17を再度参照して、ステップ1528における判断について説明する。
 1704は、第1給電サイクルc1における平均温度が温度T1近傍である一方で、第2給電サイクルc2における平均温度は温度T2近傍である遷移パターンを示している。ここで第2給電サイクルc2を第1給電サイクルとみなし(以降、みなし第1給電サイクルとも呼ぶ)、みなし第1給電サイクルより後の給電サイクルを第2給電サイクルとみなすと(以降、みなし第2給電サイクルとも呼ぶ)、みなし第2給電サイクルにおいて、負荷132の平均温度が温度T1に下がれば実質的に遷移パターン1706が現れたことになり、温度T2であれば実質的に遷移パターン1708が現れたことになる。言い換えると、遷移パターン1704が現れた場合、遷移パターン1706のように、保持部130におけるエアロゾル源の霧化速度と、貯留部116Aから保持部130へのエアロゾル源の供給速度との不均衡が生じていると判断すべきなのか、遷移パターン1708のように、貯留部116Aにおけるエアロゾル源の残量が不足していると判断すべきなのかを区別困難であるということである。従って、遷移パターン1704が現れたときには、判断を保留するか、又は、過去になされた判断(判断を保留するか、過去になされた判断を踏襲するという判断を含む。)を踏襲するという判断をすることが可能である。
 図15に戻ると、ステップ1528は、変数COUNTが閾値COUNTthre以下であるときのみ実行される。ここで、変数COUNTが閾値COUNTthreより大きくなったときにはステップ1524における判断が、変数COUNTが閾値COUNTthreより大きくなる前に負荷132の温度が第1の所定の温度T1近傍に下がったときにはステップ1518における判断がなされることになる。言い換えると、ステップ1528に到達した場合には、遷移パターン1704が現れたものとみなすことが可能である。従って、ステップ1528においては、判断を保留するか、又は、過去になされた判断を踏襲するという判断をすることが可能である。
 1530は、指標σが閾値σthre以上であるか、又は、平均温度Taveが第3の所定の温度以上かを判定するステップを示している。図17を再度参照すると、T3は、第3の所定の温度を示している。温度T3は、温度T2より大きく、保持部130におけるエアロゾル源が枯渇したときに到達し得る負荷132の最大温度より小さい温度であってよく、実験により定めることができるものである。例えば、温度T3は350℃であってよい。
 1532は、保持部130におけるエアロゾル源の残量が枯渇していると推定又は検知するステップを示している。
 ステップ1532は、指標σが閾値σthre以上である場合に実行される。図16を再度参照すると、指標σは、給電回数が所定回数を超えると、原則的には増加する。特に、上述したように閾値σthreを標準偏差1602より大きく標準偏差1612以下の値に設定すれば、保持部130におけるエアロゾル源の残量が、負荷132に焦げや酸化などを原因とする変色が初めて生じる寸前の状態であるかを判定可能である。ここで、負荷132に焦げや酸化などを原因とする変色が生じたことは、保持部130におけるエアロゾル源の残量の枯渇とみなすことができるから、設計上、指標σが閾値σthre以上である場合には、保持部130におけるエアロゾル源の残量は枯渇したと推定又は検知することが可能である。
 また、ステップ1532は、平均温度Taveが温度T3以上である場合にも実行される。図16を再度参照すると、給電サイクル604における温度の標準偏差1612は、給電サイクル604より後の給電サイクルにおける温度の標準偏差よりも小さい傾向にある。しかしながら、給電サイクル1606における温度の標準偏差1622は、給電サイクル604における温度の標準偏差1612よりも小さい。これは、エアロゾル源が完全に枯渇することで、電源110から負荷132に給電される電力よる昇温作用と、負荷132の周囲の空気による降温作用が釣り合い、負荷132の温度が比較的高温で定常状態になっているためだと考えられる。
ところで、給電サイクル1606においては、給電サイクル604から時間が経過しているために、負荷132の平均温度は、保持部130におけるエアロゾル源が枯渇したときに到達し得る負荷132の最大温度近くに達しているものと推測される。従って、平均温度Taveが温度T3以上である場合にも、保持部130におけるエアロゾル源の残量は枯渇したと推定又は検知することが可能である。なお、図17を参照すると、過去における負荷132の平均温度が温度T2近傍であった場合には、平均温度Taveが温度T3以上であると判定されたとき、遷移パターン1710が現れたことになる。
 保持部130におけるエアロゾル源の残量が枯渇した場合、貯留部116Aから保持部130へのエアロゾル源の供給がなされていないということであり、つまり、貯留部115Aにおけるエアロゾル源の残量は枯渇又は不足しているということである。従って、ステップ1532においては、貯留部116Aにおけるエアロゾル源の残量は枯渇又は不足しており、保持部130におけるエアロゾル源の残量は枯渇していると推定又は検知してよい。
 指標σが閾値σthre以上であると判定するか、又は、平均温度Taveが第3の所定の温度T3以上であると判定した場合、処理はステップ1532に進む、そうでない場合、処理はステップ1534に進む。
 1534は、ステップ1510、1520及び1530の何れの判定も偽である場合に到達するステップであり、ステップ1528における判断と同様に、エアロゾル源に係る状態についての判断を保留するか、直近の判断を踏襲するとの判断を行うステップであってよい。
  3-3 エアロゾル源に係る状態を推定又は検知する第2例示処理
 図18は、ステップ1402において実行される第2の例示処理1800のフローチャートである。例示処理1800が含む一部のステップは例示処理1500が含むステップと同一または類似であるため、以下、例示処理1800に含まれないステップについて説明する。
 1810は、ステップ1510と類似のステップであるが、指標σが閾値σthreより小さく、且つ、平均値Taveと第1の所定の温度T1の差の大きさが閾値Δthre未満である場合に、処理がステップ1514に進み、そうでない場合、処理がステップ1820に進む点のみ相違する。即ち、例示処理1800によれば、負荷132の温度がエアロゾル源の沸点等T1において定常状態であると判定した場合、直ちに、貯留部116A及び保持部130の双方におけるエアロゾル源の残量は十分であると推定又は検知することができる。
 1820は、ステップ1520と類似のステップであるが、指標σが閾値σthreより小さく、且つ、平均値Taveと第2の所定の温度T2の差の大きさが閾値Δthre未満である場合に、処理がステップ1524に進む点のみ相違する。即ち、例示処理1800によれば、負荷132の温度が第温度T2において定常状態であると判定した場合、直ちに、少なくとも保持部130におけるエアロゾル源の残量が不足していると推定又は検知することができる。
 例示処理1500と例示処理1800を比較すると、前者では変数COUNTを用いている点に対し、後者では変数COUNTを用いていない点が相違する。また、前者では第1から第4の推定又は検知が行える点に対し、前者では第2の推定又は検知が行えない点が相違する。変数COUNTを用いる例示処理1500は、貯留部116Aと保持部130の少なくとも一方の状態を推定又は検知に手間が掛かるものの、その精度を担保できる。一方の例示処理1800は、貯留部116Aと保持部130の少なくとも一方の状態を推定又は検知を簡便に行えるものの、精度は例示処理1500に劣る。
  4 おわりに
 上述の説明において、本開示の実施形態は、エアロゾル生成装置及びエアロゾル生成装置を動作させる方法として説明された。しかし、本開示が、プロセッサにより実行されると当該プロセッサに当該方法を実行させるプログラム、又は当該プログラムを格納したコンピュータ読み取り可能な記憶媒体として実施され得ることが理解されよう。
 以上、本開示の実施形態が説明されたが、これらが例示にすぎず、本開示の範囲を限定するものではないことが理解されるべきである。本開示の趣旨及び範囲から逸脱することなく、実施形態の変更、追加、改良などを適宜行うことができることが理解されるべきである。本開示の範囲は、上述した実施形態のいずれによっても限定されるべきではなく、特許請求の範囲及びその均等物によってのみ規定されるべきである。
 100A、100B…エアロゾル生成装置、102…本体、104A…カートリッジ、104B…エアロゾル発生物品、106…制御部、108…通知部、110…電源、112A~112D…センサ、114…メモリ、116A…貯留部、116B…エアロゾル基材、118A、118B…霧化部、120…空気取込流路、121…エアロゾル流路、122…吸口部、130…保持部、132…負荷、134…回路、202…第1回路、204…第2回路、206、210、214…FET、208…変換部、212…抵抗、216…ダイオード、218…インダクタ、220…キャパシタ、402…昇温期間、404…冷却期間、411…温度T1、412…温度T2、422、424…負荷の温度プロファイル、432、442、452…第1フェーズ、434、444、454…第2フェーズ、440,450…分割時刻、612、614、814…負荷の温度の標準偏差プロファイル、1216…負荷の平均温度プロファイル、1702、1704、1706、1708、1710…遷移パターン

Claims (18)

  1.  エアロゾル源を貯留する貯留部又は前記エアロゾル源を保持するエアロゾル基材と、
     電源からの給電による発熱で前記エアロゾル源を霧化する負荷と、
     前記負荷の温度に関連する値を出力するセンサと、
     制御部と、
    を含み、
     前記制御部は、
      エアロゾル生成要求に応じて前記負荷へ前記電源から給電して給電サイクルを実行し、
      単一の前記給電サイクルにおける前記センサの出力値の偏差に基づく指標に基づき、前記貯留部又は前記エアロゾル基材における前記エアロゾル源の枯渇又は不足の発生を判断する
    よう構成される、
    エアロゾル生成装置。
  2.  前記制御部は、前記指標と、前記枯渇又は前記不足の未発生時の単一の前記給電サイクルにおける前記センサの出力値の偏差に基づく指標との比較に基づき、前記枯渇又は前記不足の発生を判断する
    よう構成される、
    請求項1に記載のエアロゾル生成装置。
  3.  前記制御部は、
      単一の前記給電サイクルの開始時、単一の前記給電サイクルの終了時、単一の前記給電サイクル内の1以上の時点、及び、単一の前記給電サイクル内の一部の期間のうちの少なくとも1つにおける前記センサの出力値が、前記指標の導出に与える影響をゼロにするか又は低減するよう構成される、
    請求項1又は2に記載のエアロゾル生成装置。
  4.  前記制御部は、
      単一の前記給電サイクルの開始時、単一の前記給電サイクルの終了時、単一の前記給電サイクル内の1以上の時点、及び、単一の前記給電サイクル内の一部の期間のうちの少なくとも1つにおける前記負荷の温度を取得しない
    よう構成される、
    請求項1又は2に記載のエアロゾル生成装置。
  5.  前記制御部は、
      単一の前記給電サイクルのうちの昇温期間と冷却期間の一方又は双方における前記センサの出力値が、前記指標の導出に与える影響をゼロにするか又は低減する
    よう構成される、
    請求項1又は2に記載のエアロゾル生成装置。
  6.  前記制御部は、
      単一の前記給電サイクルのうちの昇温期間と冷却期間の一方又は双方における前記負荷の温度を取得しない
    よう構成される、
    請求項1又は2に記載のエアロゾル生成装置。
  7.  前記制御部は、
      単一の前記給電サイクルを、第1フェーズと前記第1フェーズよりも時系列で後の第2フェーズを含む複数のフェーズに分け、
      前記第2フェーズのみにおける前記センサの出力値から導出される前記指標に基づき、前記枯渇又は前記不足の発生を判断する
    よう構成される、
    請求項1から6のうちのいずれか1項に記載のエアロゾル生成装置。
  8.  前記制御部は、
      単一の前記給電サイクルを、第1フェーズと前記第1フェーズよりも時系列で後の第2フェーズを含む複数のフェーズに分け、
      前記第1フェーズにおける前記センサの出力値が前記指標の導出に与える影響を、前記第2フェーズにおける前記センサの出力値が前記指標の導出に与える影響より小さくする
    よう構成される、
    請求項1から6のうちのいずれか1項に記載のエアロゾル生成装置。
  9.  前記制御部は、
      単一の前記給電サイクルを、第1フェーズと前記第1フェーズより時系列で後の第2フェーズを含む複数のフェーズに分け、
      前記第1フェーズにおける前記センサの出力値から導出される前記指標である第1指標と、前記第2フェーズにおける前記センサの出力値から導出される前記指標である第2指標とを導出し、
      前記第2指標と前記第1指標との差分に基づき、前記枯渇又は前記不足の発生を判断する
    よう構成される、
    請求項1から6のうちのいずれか1項に記載のエアロゾル生成装置。
  10.  前記第1フェーズは、前記第2フェーズより短い、
    請求項7から9のいずれか1項に記載のエアロゾル生成装置。
  11.  前記制御部は、
      単一の前記給電サイクル内で、前記センサの出力値が定常状態に至った後の前記センサの出力値のうちの少なくとも一部から導出される前記指標に基づき、前記枯渇又は前記不足の発生を判断する
    よう構成される、
    請求項1に記載のエアロゾル生成装置。
  12.  前記制御部は、
      単一の前記給電サイクルを、第1フェーズと前記第1フェーズより時系列で後の第2フェーズとを含む複数のフェーズに分け、
      前記第1フェーズにおける、前記センサの出力値から導出される前記指標と、前記センサの出力値と、前記センサの出力値の平均値とのうちの少なくとも1つに基づき、前記センサの出力値が定常状態に至ったか否かを判断する
    よう構成される、
    請求項11に記載のエアロゾル生成装置。
  13.  前記制御部は、前記指標と、単一の前記給電サイクルにおける前記センサの出力値又は前記センサの出力値の平均値とに基づき、前記枯渇又は前記不足の発生を判断するよう構成される、
    請求項1から12のいずれか1項に記載のエアロゾル生成装置。
  14.  前記制御部は、単一の前記給電サイクルにおける前記センサの出力値又は前記センサの出力値の平均値が前記エアロゾル源からエアロゾルが生成される温度より高い場合にのみ、前記枯渇又は前記不足の発生を検知するよう構成される、
    請求項13に記載のエアロゾル生成装置。
  15.  エアロゾル生成装置の動作方法であって、前記エアロゾル生成装置は、
     エアロゾル源を貯留する貯留部又は前記エアロゾル源を保持するエアロゾル基材と、
     電源からの給電による発熱で前記エアロゾル源を霧化する負荷と、
     前記負荷の温度に関連する値を出力するセンサと、
     制御部と、
    を含み、前記方法は、前記制御部が、
     エアロゾル生成要求に応じて前記負荷へ前記電源から給電して給電サイクルを実行するステップと、
     単一の前記給電サイクルにおける前記センサの出力値の偏差に基づく指標に基づき、前記貯留部又は前記エアロゾル基材における前記エアロゾル源の枯渇又は不足の発生を判断するステップと
    を含む、方法。
  16.  エアロゾル源を貯留する貯留部又は前記エアロゾル源を保持するエアロゾル基材と、
     電源からの給電による発熱で前記エアロゾル源を霧化する負荷と、
     前記負荷の温度に関連する値を出力するセンサと、
     制御部と、
    を含み、
     前記制御部は、
      エアロゾル生成要求に応じて前記負荷へ前記電源から給電して給電サイクルを実行し、
      単一の前記給電サイクルにおいて前記センサの出力値が定常状態に至った後の、前記センサの出力値の振舞いに基づき、前記貯留部又は前記エアロゾル基材における前記エアロゾル源の枯渇又は不足の発生を判断する
    よう構成される、
    エアロゾル生成装置。
  17.  エアロゾル生成装置の動作方法であって、前記エアロゾル生成装置は、
     エアロゾル源を貯留する貯留部又は前記エアロゾル源を保持するエアロゾル基材と、
     電源からの給電による発熱で前記エアロゾル源を霧化する負荷と、
     前記負荷の温度に関連する値を出力するセンサと、
     制御部と、
    を含み、前記方法は、前記制御部が、
     エアロゾル生成要求に応じて前記負荷へ前記電源から給電して給電サイクルを実行するステップと、
     単一の前記給電サイクルにおいて前記センサの出力値が定常状態に至った後の、前記センサの出力値の振舞いに基づき、前記貯留部又は前記エアロゾル基材における前記エアロゾル源の枯渇又は不足の発生を判断するステップと
    を含む、方法。
  18.  プロセッサにより実行されると、前記プロセッサに、請求項15又は17に記載の方法を実行させるプログラム。
PCT/JP2018/028365 2018-07-30 2018-07-30 エアロゾル生成装置並びにこれを動作させる方法及びプログラム WO2020026287A1 (ja)

Priority Applications (5)

Application Number Priority Date Filing Date Title
JP2020533890A JP6994115B2 (ja) 2018-07-30 2018-07-30 エアロゾル生成装置並びにこれを動作させる方法及びプログラム
PCT/JP2018/028365 WO2020026287A1 (ja) 2018-07-30 2018-07-30 エアロゾル生成装置並びにこれを動作させる方法及びプログラム
CN201880096193.1A CN112512354A (zh) 2018-07-30 2018-07-30 气雾剂生成装置和使其动作的方法及程序
EP18928750.1A EP3831227A4 (en) 2018-07-30 2018-07-30 AEROSOL GENERATING DEVICE AND PROCEDURE AND PROGRAM FOR THEIR OPERATION
US17/161,661 US20210177063A1 (en) 2018-07-30 2021-01-29 Aerosol generating device and method and program for operating this

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2018/028365 WO2020026287A1 (ja) 2018-07-30 2018-07-30 エアロゾル生成装置並びにこれを動作させる方法及びプログラム

Related Child Applications (1)

Application Number Title Priority Date Filing Date
US17/161,661 Continuation US20210177063A1 (en) 2018-07-30 2021-01-29 Aerosol generating device and method and program for operating this

Publications (1)

Publication Number Publication Date
WO2020026287A1 true WO2020026287A1 (ja) 2020-02-06

Family

ID=69231144

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2018/028365 WO2020026287A1 (ja) 2018-07-30 2018-07-30 エアロゾル生成装置並びにこれを動作させる方法及びプログラム

Country Status (5)

Country Link
US (1) US20210177063A1 (ja)
EP (1) EP3831227A4 (ja)
JP (1) JP6994115B2 (ja)
CN (1) CN112512354A (ja)
WO (1) WO2020026287A1 (ja)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2012085203A1 (en) 2010-12-24 2012-06-28 Philip Morris Products Sa An aerosol generating system having means for determining depletion of a liquid substrate
JP2014530632A (ja) * 2011-10-27 2014-11-20 フィリップ・モーリス・プロダクツ・ソシエテ・アノニム エアロゾル生成が改善されたエアロゾル発生システム
WO2017021550A1 (en) 2015-08-06 2017-02-09 Philip Morris Products S.A. Method for measuring a vapor precursor level in a cartomizer
WO2017084818A1 (en) 2015-11-17 2017-05-26 Philip Morris Products S.A. Aerosol-generating system with self-activated electric heater
JP2018514191A (ja) * 2015-03-26 2018-06-07 フィリップ・モーリス・プロダクツ・ソシエテ・アノニム ヒーター管理

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2468116A1 (en) * 2010-12-24 2012-06-27 Philip Morris Products S.A. An aerosol generating system having means for handling consumption of a liquid substrate
WO2017024477A1 (zh) * 2015-08-10 2017-02-16 惠州市吉瑞科技有限公司深圳分公司 一种检测电子烟中烟油是否耗尽的方法和一种电子烟
PL3487326T3 (pl) * 2016-07-25 2022-01-17 Philip Morris Products S.A. Zarządzanie ogrzewaczem

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2012085203A1 (en) 2010-12-24 2012-06-28 Philip Morris Products Sa An aerosol generating system having means for determining depletion of a liquid substrate
JP2014501105A (ja) * 2010-12-24 2014-01-20 フィリップ・モーリス・プロダクツ・ソシエテ・アノニム 液体基質の減少判定手段を有するエアロゾル生成システム
JP2014530632A (ja) * 2011-10-27 2014-11-20 フィリップ・モーリス・プロダクツ・ソシエテ・アノニム エアロゾル生成が改善されたエアロゾル発生システム
JP2018514191A (ja) * 2015-03-26 2018-06-07 フィリップ・モーリス・プロダクツ・ソシエテ・アノニム ヒーター管理
WO2017021550A1 (en) 2015-08-06 2017-02-09 Philip Morris Products S.A. Method for measuring a vapor precursor level in a cartomizer
WO2017084818A1 (en) 2015-11-17 2017-05-26 Philip Morris Products S.A. Aerosol-generating system with self-activated electric heater

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See also references of EP3831227A4

Also Published As

Publication number Publication date
JPWO2020026287A1 (ja) 2021-05-13
EP3831227A1 (en) 2021-06-09
EP3831227A4 (en) 2021-08-04
CN112512354A (zh) 2021-03-16
JP6994115B2 (ja) 2022-01-14
US20210177063A1 (en) 2021-06-17

Similar Documents

Publication Publication Date Title
JP2021129571A (ja) エアロゾル生成装置
JP6792907B2 (ja) エアロゾル生成装置並びにこれを動作させる方法及びプログラム
KR102443306B1 (ko) 에어로졸 생성 장치 및 이를 동작시키는 방법 및 프로그램
CN113349435B (zh) 气溶胶吸入器的电源单元和气溶胶吸入器
JP2020195298A (ja) エアロゾル吸引器、エアロゾル吸引器用の制御装置、エアロゾル吸引器の制御方法及びプログラム
KR102242831B1 (ko) 에어로졸 흡인기, 이것용의 제어 장치, 이것의 제어 방법 및 이것용의 제어 장치의 동작 방법
KR102225227B1 (ko) 에어로졸 흡인기, 이것용의 제어 장치, 이것의 제어 방법 및 이것용의 제어 장치의 동작 방법
WO2020026288A1 (ja) エアロゾル生成装置並びにこれを動作させる方法及びプログラム
JP2020171252A (ja) エアロゾル吸引器用の制御装置、エアロゾル吸引器の制御方法、プログラム及びエアロゾル吸引器
JP6795271B2 (ja) エアロゾル生成装置並びにこれを動作させる方法及びプログラム
JP6869436B2 (ja) エアロゾル生成装置並びにこれを動作させる方法及びプログラム
JP6919088B1 (ja) エアロゾル生成装置並びにこれを動作させる方法及びプログラム
JP2021036881A (ja) エアロゾル生成装置並びにこれを動作させる方法及びプログラム
JP6636198B1 (ja) エアロゾル吸引器用の制御装置、エアロゾル吸引器の制御方法、プログラム及びエアロゾル吸引器
WO2020026287A1 (ja) エアロゾル生成装置並びにこれを動作させる方法及びプログラム
JP6695470B1 (ja) エアロゾル吸引器用の制御装置、エアロゾル吸引器の制御方法、プログラム及びエアロゾル吸引器
TW202007291A (zh) 霧氣產生裝置以及使該裝置動作之方法及程式
TW202007290A (zh) 霧氣產生裝置以及使該裝置動作之方法及程式

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 18928750

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2020533890

Country of ref document: JP

Kind code of ref document: A

NENP Non-entry into the national phase

Ref country code: DE

ENP Entry into the national phase

Ref document number: 2018928750

Country of ref document: EP

Effective date: 20210301