WO2020013063A1 - プラント運転方法、制御装置及びプログラム - Google Patents

プラント運転方法、制御装置及びプログラム Download PDF

Info

Publication number
WO2020013063A1
WO2020013063A1 PCT/JP2019/026558 JP2019026558W WO2020013063A1 WO 2020013063 A1 WO2020013063 A1 WO 2020013063A1 JP 2019026558 W JP2019026558 W JP 2019026558W WO 2020013063 A1 WO2020013063 A1 WO 2020013063A1
Authority
WO
WIPO (PCT)
Prior art keywords
program
plant
temperature
performance
operating
Prior art date
Application number
PCT/JP2019/026558
Other languages
English (en)
French (fr)
Inventor
光大 竹中
Original Assignee
三菱日立パワーシステムズ株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 三菱日立パワーシステムズ株式会社 filed Critical 三菱日立パワーシステムズ株式会社
Priority to KR1020207034462A priority Critical patent/KR102568453B1/ko
Priority to US17/057,260 priority patent/US20210215105A1/en
Priority to DE112019003521.5T priority patent/DE112019003521T5/de
Priority to CN201980034050.2A priority patent/CN112154472A/zh
Publication of WO2020013063A1 publication Critical patent/WO2020013063A1/ja

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F02COMBUSTION ENGINES; HOT-GAS OR COMBUSTION-PRODUCT ENGINE PLANTS
    • F02CGAS-TURBINE PLANTS; AIR INTAKES FOR JET-PROPULSION PLANTS; CONTROLLING FUEL SUPPLY IN AIR-BREATHING JET-PROPULSION PLANTS
    • F02C9/00Controlling gas-turbine plants; Controlling fuel supply in air- breathing jet-propulsion plants
    • F02C9/26Control of fuel supply
    • F02C9/28Regulating systems responsive to plant or ambient parameters, e.g. temperature, pressure, rotor speed
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/04Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01DNON-POSITIVE DISPLACEMENT MACHINES OR ENGINES, e.g. STEAM TURBINES
    • F01D15/00Adaptations of machines or engines for special use; Combinations of engines with devices driven thereby
    • F01D15/10Adaptations for driving, or combinations with, electric generators
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F02COMBUSTION ENGINES; HOT-GAS OR COMBUSTION-PRODUCT ENGINE PLANTS
    • F02CGAS-TURBINE PLANTS; AIR INTAKES FOR JET-PROPULSION PLANTS; CONTROLLING FUEL SUPPLY IN AIR-BREATHING JET-PROPULSION PLANTS
    • F02C9/00Controlling gas-turbine plants; Controlling fuel supply in air- breathing jet-propulsion plants
    • F02C9/48Control of fuel supply conjointly with another control of the plant
    • F02C9/50Control of fuel supply conjointly with another control of the plant with control of working fluid flow
    • F02C9/54Control of fuel supply conjointly with another control of the plant with control of working fluid flow by throttling the working fluid, by adjusting vanes
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0637Strategic management or analysis, e.g. setting a goal or target of an organisation; Planning actions based on goals; Analysis or evaluation of effectiveness of goals
    • G06Q10/06375Prediction of business process outcome or impact based on a proposed change
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/20Administration of product repair or maintenance
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q30/00Commerce
    • G06Q30/02Marketing; Price estimation or determination; Fundraising
    • G06Q30/0283Price estimation or determination
    • G06Q30/0284Time or distance, e.g. usage of parking meters or taximeters
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/04Manufacturing
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F05INDEXING SCHEMES RELATING TO ENGINES OR PUMPS IN VARIOUS SUBCLASSES OF CLASSES F01-F04
    • F05DINDEXING SCHEME FOR ASPECTS RELATING TO NON-POSITIVE-DISPLACEMENT MACHINES OR ENGINES, GAS-TURBINES OR JET-PROPULSION PLANTS
    • F05D2230/00Manufacture
    • F05D2230/80Repairing, retrofitting or upgrading methods
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F05INDEXING SCHEMES RELATING TO ENGINES OR PUMPS IN VARIOUS SUBCLASSES OF CLASSES F01-F04
    • F05DINDEXING SCHEME FOR ASPECTS RELATING TO NON-POSITIVE-DISPLACEMENT MACHINES OR ENGINES, GAS-TURBINES OR JET-PROPULSION PLANTS
    • F05D2270/00Control
    • F05D2270/01Purpose of the control system
    • F05D2270/20Purpose of the control system to optimize the performance of a machine
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F05INDEXING SCHEMES RELATING TO ENGINES OR PUMPS IN VARIOUS SUBCLASSES OF CLASSES F01-F04
    • F05DINDEXING SCHEME FOR ASPECTS RELATING TO NON-POSITIVE-DISPLACEMENT MACHINES OR ENGINES, GAS-TURBINES OR JET-PROPULSION PLANTS
    • F05D2270/00Control
    • F05D2270/30Control parameters, e.g. input parameters
    • F05D2270/303Temperature
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F05INDEXING SCHEMES RELATING TO ENGINES OR PUMPS IN VARIOUS SUBCLASSES OF CLASSES F01-F04
    • F05DINDEXING SCHEME FOR ASPECTS RELATING TO NON-POSITIVE-DISPLACEMENT MACHINES OR ENGINES, GAS-TURBINES OR JET-PROPULSION PLANTS
    • F05D2270/00Control
    • F05D2270/70Type of control algorithm
    • F05D2270/708Type of control algorithm with comparison tables
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Definitions

  • the present invention relates to a plant operation method, a control device, and a program.
  • Priority is claimed on Japanese Patent Application No. 2018-129861, filed on July 9, 2018, the content of which is incorporated herein by reference.
  • Patent Literature 1 discloses, as a related technique, a technique of changing to a suitable set value of a control device after replacing with an upgraded part.
  • the upgraded parts are more expensive than the parts used before the upgrade. Therefore, when considering the introduction of upgraded parts into a plant, the customer must understand that the cost reduction and revenue increase due to the performance improvement after the introduction, but from the viewpoint of the initial cost at the time of introduction. May give up.
  • the object of the present invention is to provide a plant operation method, a control device, and a program that can solve the above problems.
  • a method for operating a plant includes the step of replacing a first component provided in a plant with a second component capable of operating the plant with higher performance than the first component.
  • the method includes an introduction step of introducing a second program for operating the plant, and a first switching step of switching between the first program and the second program.
  • a plant operating method includes a calculating step of calculating a billing amount based on switching between the first program and the second program. Is also good.
  • the plant operation method according to the second aspect has a specifying step of specifying an execution time at which the second program has been executed.
  • the charge amount may be calculated accordingly.
  • the first switching step is performed by a customer who is charged, and the calculation step is performed by the customer.
  • the charge amount may be calculated based on the switching between the first program and the second program in the first switching step.
  • the second method for switching the second program to the first program irrespective of whether or not the method is executed by the charged customer.
  • a switching step may be further provided.
  • the first switching step is executed by a charging administrator, and in the calculating step, The charge amount may be calculated based on the switching between the first program and the second program in the executed first switching step.
  • the second component is a component that can withstand higher temperatures than the first component.
  • switching to the second program is performed, and the second program operates the plant so that the temperature of the second component becomes high enough to withstand the second component. There may be.
  • the control device uses a second component capable of operating the plant with higher performance than the first component provided in the plant and is equal to or more than at the time of using the first component.
  • a storage unit for storing a first program for operating the plant at a first performance which is a performance of the first and a second program for operating the plant at a second performance which is a performance exceeding the first performance;
  • a switching unit that switches between the program and the second program.
  • a program causes a computer to execute the first part using a second part capable of operating the plant with higher performance than the first part provided in the plant.
  • switching logic for switching between two logics.
  • FIG. 1 is a diagram schematically illustrating a partial configuration of a turbine according to an embodiment of the present invention. It is a figure showing composition of a control device by one embodiment of the present invention.
  • FIG. 3 is a diagram illustrating a configuration of a control unit according to an embodiment of the present invention. It is a figure showing composition of a temperature limit control part by one embodiment of the present invention.
  • FIG. 1 is a diagram illustrating a configuration of a management device according to an embodiment of the present invention.
  • FIG. 4 is a diagram illustrating a first data table according to an embodiment of the present invention.
  • FIG. 4 is a diagram illustrating a relationship between an exhaust gas set temperature and a pressure ratio in a rated temperature control line according to an embodiment of the present invention.
  • FIG. 4 is a diagram illustrating a second data table according to an embodiment of the present invention.
  • FIG. 2 is a diagram illustrating a configuration of an IGV control unit according to an embodiment of the present invention.
  • FIG. 4 is a diagram showing a relationship between a gas turbine output and an IGV opening degree set value in one embodiment of the present invention.
  • FIG. 9 is a diagram illustrating a third data table according to an embodiment of the present invention.
  • FIG. 3 is a diagram illustrating a configuration of a control variable generation unit according to an embodiment of the present invention.
  • FIG. 3 is a diagram illustrating a relationship between an intake air temperature and a gas turbine output according to an embodiment of the present invention.
  • FIG. 11 is a diagram illustrating a fourth data table according to an embodiment of the present invention. It is a figure showing the processing flow of the plant operation system by one embodiment of the present invention.
  • FIG. 14 is a diagram illustrating a second data table according to another embodiment of the present invention. It is a figure showing the 5th data table in another embodiment of the present invention.
  • FIG. 11 is a diagram illustrating a configuration of a management device according to another embodiment of the present invention.
  • FIG. 2 is a schematic block diagram illustrating a configuration of a computer according to at least one embodiment.
  • the plant operation system 1 includes a gas turbine 2 and a control system 3.
  • the gas turbine 2 includes a compressor 10, a combustor 20, a turbine 30, a generator 50, and a rotor 60.
  • a rotor 60 penetrates the center of the compressor 10, the combustor 20, and the turbine 30.
  • the compressor 10, the turbine 30, and the generator 50 are connected by a rotor 60, and rotate integrally.
  • the generator 50 can generate electric power by this rotation.
  • the operation of the gas turbine 2 is controlled by the control system 3.
  • the gas turbine 2 has a cooling air supply line 70 that supplies cooling air from the compressor 10 to the turbine 30.
  • the cooling air supply line 70 is provided with a cooling air control valve 80.
  • the compressor 10 compresses the air A taken in from the air intake to generate compressed air A1.
  • the compressor 10 is provided with an inlet guide vane (IGV (Inlet Guide Vane), intake valve) 90 for adjusting the intake amount of the air A taken in from the air intake.
  • the inlet guide wing 90 includes a plurality of wing bodies 90a and an IGV operating section 90b for changing the wing angles of the plurality of wing bodies 90a.
  • the intake amount of the air A is adjusted by adjusting the opening degree of the inlet guide wing 90. Specifically, the opening angle of the inlet guide blade 90 is adjusted by adjusting the blade angle of the blade main body 90a by the IGV operating section 90b, and the intake amount of the air A is adjusted.
  • the opening degree of the inlet guide vane 90 increases, the amount of intake air A increases, and the pressure ratio of the compressor 10 increases.
  • the opening degree of the inlet guide vane 90 is small, the intake amount of the air A is small, and the pressure ratio of the compressor 10 is reduced.
  • FIG. 2 is a diagram schematically illustrating a configuration of a part of the turbine 30 in the gas turbine 2.
  • the turbine 30 includes a rotor 60, a plurality of stages of stationary blades 100, and a plurality of stages of moving blades 110.
  • the stationary blades 100 of each stage are attached to a casing 130.
  • the moving blades 110 of each stage are fixed to the outer periphery of the rotor 60.
  • the plurality of stages of stationary blades 100 and the plurality of stages of moving blades 110 are provided alternately in the axial direction of the rotor 60.
  • the casing 130 is provided with a split ring 120.
  • the split ring 120 is provided to be spaced radially outward from the bucket 110.
  • the stationary vane 100 and the split ring 120 are arranged apart from each other in the axial direction of the rotor 60.
  • the rotor 60 is rotatably supported at both ends in the axial direction by bearings (not shown), and is provided so as to be freely rotatable about the axis.
  • the drive shaft of the generator 50 is connected to the end of the rotor 60 on the compressor 10 side.
  • the generator 50 is provided coaxially with the turbine 30 and generates power by rotating the turbine 30.
  • the air A taken in from the air intake of the compressor 10 passes through the inside of the compressor 10 through the inlet guide vanes 90 and is compressed to become high-temperature and high-pressure compressed air A1.
  • Fuel F is supplied from the combustor 20 to the compressed air A1, and the compressed air A1 and the fuel F are mixed and burned, thereby generating a high-temperature and high-pressure combustion gas.
  • the high-temperature and high-pressure combustion gas generated in the combustor 20 passes through the inside of the turbine 30, so that the turbine 30 operates (rotates), rotates the rotor 60, and the generator 50 connected to the rotor 60. Drive.
  • the generator 50 performs power generation.
  • the combustion gas that has driven the turbine 30 recovers heat as exhaust gas and is released to the atmosphere.
  • the amount of cooling air supplied to the turbine 30 is reduced in order to improve the performance (for example, the output power, the power generation efficiency, and the reduction of gas emission such as NOx), and the combustor
  • An upgrade may be performed to increase the supply of compressed air supplied to 20.
  • components such as the moving blades and the stationary blades provided in the turbine 30 are made to be components capable of withstanding high temperatures (hereinafter, referred to as “high-temperature components”), and cooling is performed even with cooling air whose supply amount is reduced. A replacement is made for a possible one.
  • the gas turbine 2 is provided with a cabin pressure gauge 160, an intake state detector 170, a blade path thermometer 180, an exhaust gas thermometer 190, and a flow meter 200.
  • the cabin pressure gauge 160 is provided in a line through which the compressed air A1 flows from the compressor 10 to the combustor 20.
  • the cabin pressure gauge 160 is provided inside the cabin of the combustor 20, and measures the pressure of the compressed air A1 (compartment pressure).
  • the intake state detector 170 detects an intake temperature and an intake pressure of the air A taken into the compressor 10.
  • the blade path thermometer 180 is provided in a line through which exhaust gas discharged from the turbine 30 flows.
  • the blade path thermometer 180 measures the temperature of the exhaust gas that has passed through the last stage blade provided downstream of the turbine 30 in the flow direction of the exhaust gas.
  • the exhaust gas thermometer 190 is provided downstream of the blade path thermometer 180 and measures the temperature of the exhaust gas.
  • the flow meter 200 measures the flow rate of the cooling air flowing through the cooling air supply line 70.
  • the gas turbine 2 is provided with an output meter 210 for detecting the output (load) of the gas turbine 2. Then, signals measured by the cabin pressure gauge 160, the intake state detector 170, the blade path thermometer 180, the exhaust gas thermometer 190, the flow meter 200, and the output meter 210 are input to the control system 3.
  • the control system 3 includes a control device 40 and a management device 41 as shown in FIG.
  • the control device 40 is a device that controls the operation of the gas turbine 2.
  • the control device 40 is, for example, a device owned by the customer, and after performing a part upgrade, by introducing one of a plurality of programs that can be introduced by the customer, the performance according to the introduced program. Operates the plant.
  • the control device 40 includes a control unit 220, a storage unit 230, and a change unit 240 (an example of a switching unit).
  • the control unit 220 controls the inlet guide vane 90 and the fuel adjustment valve 150 based on the measurement results of the cabin pressure gauge 160, the intake state detector 170, the blade path thermometer 180, the exhaust gas thermometer 190, the flow meter 200, and the like. By controlling, the operation of the gas turbine 2 is controlled.
  • the control unit 220 controls the operation of the gas turbine 2 according to the output of the gas turbine 2 (output of the generator 50). Further, control unit 220 causes gas turbine 2 to perform a partial load operation and a full load operation.
  • the full load operation is an operation in which the output of the gas turbine 2 becomes the rated output.
  • the partial load operation is an operation in which the output of the gas turbine 2 is smaller than the rated output.
  • control unit 220 executes fuel control for controlling a fuel adjustment valve 150 provided in a fuel supply line 140 that supplies the fuel F to the combustor 20 in order to adjust the supply amount of the fuel F.
  • the fuel supply line 140 has a plurality of supply lines such as a main fuel supply line, a pilot fuel supply line, and a top hat fuel supply line.
  • the fuel regulating valve 150 is provided in each of the plurality of supply lines.
  • the opening of the fuel adjustment valve 150 can be individually controlled.
  • the control unit 220 controls the fuel adjustment valve 150 to adjust the supply amount and distribution of the fuel F supplied (injected) to the compressed air A1.
  • FIG. 4 is a diagram showing a configuration of the control unit 220.
  • the control unit 220 includes an exhaust gas temperature control unit 260, a combustion control unit 270, an IGV control unit 280, and a combustion load control unit 340, as shown in FIG.
  • the exhaust gas temperature controller 260 sets the relationship between the exhaust gas temperature and the pressure ratio so that the turbine inlet temperature maintains a predetermined temperature.
  • the exhaust gas temperature control section 260 includes a blade path temperature control section 350 and a temperature limit control section 360.
  • the blade path temperature measured by the blade path thermometer 180 is input to the blade path temperature control unit 350.
  • the blade path temperature control unit 350 generates a blade path temperature set value based on the blade path temperature and outputs it to the low value selection unit 250 described later.
  • the temperature limit control unit 360 includes a pressure in the vehicle interior of the compressor 10 measured by the vehicle interior pressure gauge 160 (vehicle interior pressure), an intake pressure measured by the intake state detector 170, and a measurement by the exhaust gas thermometer 190. The measured exhaust gas temperature is input. Temperature limit control section 360 outputs an exhaust gas temperature set value based on the input value.
  • FIG. 5 is a diagram showing a configuration of the temperature limit control unit 360.
  • the temperature limit control section 360 includes a controller 290d, a subtractor 320b, and a PI controller 330b.
  • the pressure ratio for calculating the exhaust gas temperature set value is input to the controller 290d.
  • the pressure ratio is the ratio between the cabin pressure and the intake pressure (compartment pressure / intake pressure).
  • the value of the pressure ratio input to the controller 290d is a value set as a target value for calculating the exhaust gas temperature set value.
  • the controller 290d calculates a set temperature of the exhaust gas with respect to the input pressure ratio (hereinafter referred to as “exhaust gas set temperature”) based on the input pressure ratio and the set temperature calculation function (second function). , To the subtractor 320b.
  • the set temperature calculation function will be described later.
  • the controller 290d outputs the calculated exhaust gas set temperature to a subtractor 320a provided in the IGV control unit 280 described later.
  • the management device 41 is a device provided by a sales company that sells upgraded parts to customers or a management company that manages a plant in response to a request from the sales company.
  • the program to be introduced by the control device 40 is specified, and the amount to be charged to the customer is calculated based on the contents of the contract between the seller and the customer and the specified program.
  • the management device 41 includes a program determination unit 440, a time identification unit 450, a storage unit 460, and a charge amount calculation unit 470.
  • the program determination unit 440 determines the type of the program introduced by the control device 40 after the component is upgraded.
  • the time specifying unit 450 specifies a time at which the program determined by the program determining unit 440 is introduced.
  • the Storage unit 460 stores data table TBL1.
  • the data table TBL1 is, for example, the data table shown in FIG. In the data table TBL1, as shown in FIG. 7, the customer name, the contract content between the seller and the customer, the type of parts applied, the type of program that can be installed, the installed program, and the program are installed.
  • 6 is a data table in which the introduction time and a billing amount calculation formula for calculating a billing amount are associated with each other.
  • the introduction time is specified for each program that can be introduced.
  • the billing amount calculation formula is a formula that differs for each contract content, and is a formula that determines one billing amount when the installed program and the introduction time of the program are determined.
  • FIG. 8 is a diagram showing the relationship between the pressure ratio and the exhaust gas set temperature.
  • the horizontal axis indicates the pressure ratio.
  • the vertical axis indicates the exhaust gas temperature.
  • the set temperature calculation function defines the relationship between the pressure ratio and the exhaust gas set temperature, as shown in FIG.
  • the set temperature calculation function is shown as rated temperature control lines T1 and T2.
  • the rated temperature control lines T1 and T2 indicate the temperature of the exhaust gas set so that the rated performance of the gas turbine 2 is obtained when the turbine inlet temperature reaches the rated value for a predetermined pressure ratio.
  • the rated performance is a performance at which the work efficiency of the gas turbine 2 is optimized when a predetermined load is applied from the generator 50 to the gas turbine 2.
  • the rated temperature control lines T1 and T2 are set such that the turbine inlet temperature does not exceed a preset upper limit temperature.
  • the exhaust gas set temperature decreases as the pressure ratio increases, as in rated temperature control lines T1 and T2 shown in FIG.
  • Points A to E in FIG. 8 indicate points on the operation line of the gas turbine 2.
  • Point A indicates the pressure ratio and the exhaust gas temperature when a load is applied to the gas turbine 2.
  • Point B shows the pressure ratio and the exhaust gas temperature when the entrance guide vane 90 starts to open.
  • the period from the point B to the point C is a control section in which the exhaust gas temperature becomes constant as the pressure ratio increases in the process of increasing the opening degree of the inlet guide vane 90.
  • the interval from the point C to the point D is a section in which the opening degree of the entrance guide vane 90 is increased, and at the point D, the entrance guide vane 90 is fully opened.
  • Point E is the pressure ratio and the exhaust gas temperature when the operation line reaches the rated temperature control line by increasing the load of the gas turbine 2 from point D toward 100%.
  • the operation of the gas turbine 2 is controlled such that the turbine inlet temperature approaches the upper limit temperature and the exhaust gas temperature approaches the rated temperature control line.
  • the exhaust gas temperature is set higher than the rated temperature control line so that the exhaust gas temperature is not limited by the upper limit temperature of the rated temperature control line.
  • the operation of the gas turbine 2 is controlled such that the exhaust gas temperature becomes as low as possible. Therefore, the turbine inlet temperature when the gas turbine 2 performs the partial load operation is lower than the turbine inlet temperature when the gas turbine 2 performs the full load operation.
  • the rated temperature control line T1 indicated by a broken line in FIG. 8 shows an example of a set temperature calculation function used for a configuration before upgrading the components of the gas turbine 2.
  • a rated temperature control line T2 indicated by a solid line in FIG. 8 illustrates an example of a set temperature calculation function used for the configuration after the components of the gas turbine 2 have been upgraded.
  • the rise in the exhaust gas set temperature is the increase in the exhaust gas set temperature due to the decrease in the supply of cooling air, and the increase in the exhaust gas set temperature due to the increase in the pressure ratio. (A temperature control bias change amount).
  • FIG. 9 is a diagram showing the relationship between the set temperature of exhaust gas and the pressure ratio in the rated temperature control line.
  • FIG. 9 shows a comparison between the rated temperature control line T1 before the upgrade of the components of the gas turbine 2 and the rated temperature control line T2 after the upgrade of the components.
  • the horizontal axis shows the pressure ratio.
  • the vertical axis indicates the exhaust gas set temperature.
  • the temperature control bias change amount refers to the exhaust gas temperature for the same pressure ratio when the component of the gas turbine 2 is upgraded and the rated temperature control line T1 before the component upgrade changes to the rated temperature control line T2. It means the amount of change X.
  • FIG. 9 shows a comparison between the rated temperature control line T1 before the upgrade of the components of the gas turbine 2 and the rated temperature control line T2 after the upgrade of the components.
  • the horizontal axis shows the pressure ratio.
  • the vertical axis indicates the exhaust gas set temperature.
  • the temperature control bias change amount refers to the exhaust gas temperature for the same pressure ratio when
  • the pressure ratio at the operating point P1 is PR1
  • the exhaust gas set temperature is t1
  • the pressure ratio at the operating point P2 is PR2.
  • a point on the rated temperature control line T1 at the pressure ratio PR2 is P4, and an exhaust gas set temperature is t3.
  • a point determined by the pressure ratio PR2 and the exhaust gas set temperature t1 is defined as P3.
  • the rated temperature control line is a line that displays the relationship between the exhaust gas set temperature and the pressure ratio under the condition that the turbine inlet temperature is constant. The purpose is to monitor the exhaust gas temperature and manage the turbine inlet temperature. And In general, in the gas turbine 2, in the process in which the combustion gas thermally expands from the cabin pressure to the atmospheric pressure in the turbine 30, the combustion gas temperature decreases due to the thermal expansion. That is, the rated temperature control line is a line in which the set exhaust gas temperature decreases to the right as the pressure ratio increases under the condition that the turbine inlet temperature is constant.
  • the operating point of the gas turbine 2 is changed from the operating point P1 (pressure ratio PR1) on the rated temperature control line T1 before the component upgrade to the rated temperature after the component upgrade by the upgrade of the component of the gas turbine 2. It can be considered to move to the operating point P2 (pressure ratio PR2) on the adjustment line T2.
  • the points P2, P3, and P4 described above are all points on the pressure ratio PR2. Point P3 exists on line segment P2P4.
  • the operating point P1 before the parts upgrade is moved to the point P4 due to the upgrade of the parts, and the operating point P1 is moved from the point P4 to the operating point P4.
  • the process of moving to P2 it can be considered that there is an increase in exhaust gas temperature corresponding to the temperature control bias change amount X, and the operating point P2 is reached.
  • the temperature control bias change amount X is indicated by a line segment P2P4.
  • the line segment P2P4 is divided into a line segment P3P4 and a line segment P2P3, and the respective line segments are defined as variables X1 and X2.
  • a variable X1 corresponding to the increase in the decrease and a variable X2 corresponding to the increase in the temperature decrease that occurs in the process of decreasing the exhaust gas temperature due to the decrease in the supply amount of the cooling air can be described separately.
  • the variable X1 corresponds to the increase in the decrease in the exhaust gas temperature with the increase in the pressure ratio. That is, in FIG. 9, when the pressure ratio in the vehicle interior 29 increases from PR1 before the component upgrade to PR2 after the component upgrade, the exhaust gas temperature increases due to the thermal expansion of the combustion gas in the turbine 30 and the component upgrade. The temperature of the exhaust gas previously set decreases from t1 to t3.
  • the variable X1 is an increasing amount of the temperature decrease at which the exhaust gas temperature decreases, and corresponds to a correction amount for returning the exhaust gas temperature t3 to the exhaust gas temperature t1 before the component upgrade.
  • variable X2 corresponding to the decrease in the supply amount of the cooling air will be described.
  • the supply amount of the cooling air supplied to the components constituting the turbine 30 decreases. Therefore, the amount of cooling air discharged from each component to the combustion gas passage decreases, and the temperature of the combustion gas flowing through the combustion gas passage rises from the combustion gas temperature before the component is upgraded. Further, if the downstream component is upgraded, the amount of cooling air discharged from the upgraded component is reduced, and the downstream side component has a lower combustion gas temperature than before the component upgrade. Further rise.
  • the temperature of the exhaust gas finally discharged from the turbine 30 becomes higher than before the upgrade of the parts.
  • the process in which the combustion gas temperature rises as the supply amount of the cooling air decreases due to the upgrade of parts is indicated by the line segment P2P3 in FIG. 9 and can be regarded as a correction amount corresponding to the variable X2.
  • the correction amount for correcting the rated temperature control line T1 to the rated temperature control line T2 is the temperature control bias change amount X, that is, A correction amount (first correction value), which is an increase amount of a decrease in exhaust gas temperature with an increase in the pressure ratio corresponding to the variable X1, and a rise in exhaust gas temperature with a decrease in the supply amount of cooling air corresponding to the variable X2. It can be considered as an amount obtained by adding the correction amount (second correction value) that is the increase amount.
  • the rated temperature control line T2 is a line in which the pressure ratio is increased in the rated temperature control line T1 and the temperature control bias change amount is added.
  • the rated temperature control line T1 is shifted to the upper right. It is a line that has been translated.
  • the set temperature calculation function is not only the rated temperature control lines T1 and T2 shown in FIG. 8, but also the static air exchanged in the part upgrade in accordance with the supply amount of the cooling air after the part upgrade.
  • a plurality of pattern functions are set according to the parts and types of the wing 100, the moving blade 110, and the split ring 120.
  • the functions of the plurality of patterns are stored in the storage unit 230 as, for example, the data table TBL2 together with the functions used before the component upgrade.
  • the data table TBL2 is, for example, the data table shown in FIG. As shown in FIG. 10, the data table TBL2 includes, for each plant, before and after the upgrade, the types of components used, the programs that can be installed, and the functions FX that are set when the programs that can be installed are installed. Each contains information associated with it.
  • a program that can be introduced is prepared in advance, and the function FX is also updated when the program is updated in accordance with the upgrade of parts.
  • the programs that can be introduced after the upgrade are the programs 2 and 3.
  • the function FX2 used before the upgrade is applied, and when the program 3 is introduced, the function of the plant at the highest temperature allowed when the parts are upgraded is operated.
  • a function FX3 for setting performance is applied. However, fine adjustment is performed for each plant, and the function FX is adjusted as needed.
  • the data table TBL2 may be stored in an external storage device.
  • the controller 290d uses one of the functions in the data table TBL2 shown in FIG. 10 based on the contract between the seller and the customer.
  • the measured value of the exhaust gas temperature and the set exhaust gas temperature are input to the subtractor 320b.
  • the subtractor 320b generates a deviation ⁇ between the exhaust gas temperature and the exhaust gas set temperature, and outputs the deviation ⁇ to the PI controller 330b.
  • the deviation ⁇ is input to the PI controller 330b.
  • PI controller 330b outputs an exhaust gas temperature set value such that deviation ⁇ becomes zero. Therefore, the temperature limit control unit 360 determines whether the exhaust gas temperature (exhaust gas measurement temperature) measured by the exhaust gas thermometer 190 at the time of the static operation of the partial load operation or the full load operation is the set temperature indicated by the rated temperature control lines T1 and T2.
  • the feedback control of the operation of the gas turbine 2 is performed so that
  • the combustion control unit 270 includes a load limit control unit 370, a governor control unit 380, a fuel limit control unit 390, and a low value selection unit 250.
  • the gas turbine output of the gas turbine 2 is input to the load limit control unit 370 as the actual output value of the gas turbine 2.
  • Load limit control section 370 generates a fuel command value for commanding the supply amount (fuel flow rate) of fuel F supplied to combustor 20 so that the gas turbine output becomes a predetermined value.
  • Load limit control section 370 outputs the generated fuel command value to low value selection section 250.
  • the governor control unit 380 receives the gas turbine output and the rotation speed of the rotor 60.
  • the governor control unit 380 generates a fuel command value based on the gas turbine output and the rotation speed of the rotor 60 such that the rotation speed of the rotor 60 becomes a preset rotation speed.
  • the governor control unit 380 outputs the generated fuel command value to the low value selection unit 250.
  • the gas turbine output, the rotation speed of the rotor 60, and the cabin pressure are input to the fuel limit control unit 390.
  • the fuel limit control unit 390 controls the fuel command based on the gas turbine output, the rotation speed of the rotor 60, and the vehicle interior pressure so that the supply amount of the fuel F to the combustor 20 does not exceed a preset limit supply amount. Generate a value.
  • Fuel limit control section 390 outputs the generated fuel command value to low value selection section 250.
  • the low value selection unit 250 is the lowest among the fuel command values input from the blade path temperature control unit 350, the temperature limit control unit 360, the load limit control unit 370, the governor control unit 380, and the fuel limit control unit 390. Select the fuel command value that will be the value.
  • the low value selection unit 250 outputs the selected fuel command value to a fuel distribution control unit 430 described below.
  • the exhaust gas set temperature generated by the temperature limit control unit 360 is input to the IGV control unit 280. Further, the IGV control unit 280 receives the passenger compartment pressure, the blade path temperature, the exhaust gas temperature, the gas turbine output, and the intake air temperature. The IGV control unit 280 generates an IGV opening command value for controlling the opening of the entrance guide vane 90 based on these input values. IGV control section 280 outputs the generated IGV opening command value to IGV operating section 90b.
  • FIG. 11 is a diagram showing a configuration of the IGV control unit 280.
  • the IGV control unit 280 includes a controller 290a, an adder 300a, a controller 290b, a controller 290c, an adder 300b, a high value selection unit 310, a subtractor 320a, a PI controller 330a, and an adder 300c. Is provided.
  • Controller 290a generates a correction value for correcting the gas turbine output based on the intake air temperature, and outputs the correction value to adder 300a.
  • the gas turbine output and the correction value output from the controller 290a are input to the adder 300a.
  • Adder 300a calculates the corrected gas turbine output by adding the gas turbine output and the correction value, and outputs the corrected gas turbine output to controller 290b.
  • Controller 290b calculates an IGV opening set value for the input gas turbine output based on the gas turbine output and an IGV opening calculation function (first function), and outputs the set value to the adder 300c.
  • FIG. 12 is a diagram illustrating a relationship between the gas turbine output and the IGV opening degree set value.
  • the horizontal axis indicates the gas turbine output.
  • the vertical axis indicates the set value of the IGV opening.
  • the IGV opening calculation function is a function that defines the relationship between the gas turbine output and the IGV opening set value, and is represented by curves L1 and L2.
  • the IGV opening increases as the gas turbine output becomes larger than the outputs P1 and P2, and becomes constant after reaching the outputs P3 and P4.
  • the curves L1 and L2 are not limited to the mode shown in FIG. 12, and may include, for example, a period in which the IGV opening set value decreases in the process of increasing the gas turbine output.
  • a curve L1 shown by a broken line in FIG. 12 shows an example of an IGV opening calculation function used for a configuration before upgrading the components of the gas turbine 2.
  • a curve L2 indicated by a solid line in FIG. 12 shows an example of an IGV opening calculation function used for a configuration after a predetermined component has been upgraded for the gas turbine 2.
  • the IGV opening for the same gas turbine output is smaller than the curve L1 before the component upgrade.
  • the IGV opening calculation function is based on the curves L1 and L2 shown in FIG. 12, the supply amount of the cooling air after the upgrade of the parts, the stationary blade 100 which is replaced in the upgrade of the parts, and the dynamics.
  • a plurality of pattern functions are set according to the parts and types of the wing 110 and the split ring 120. These multiple pattern functions are stored in the storage unit 230 as, for example, the data table TBL3.
  • the data table TBL3 is, for example, the data table shown in FIG. As shown in FIG. 13, the data table TBL3 is similar to the data table TBL2 in that the types of components used, the programs that can be installed, and the programs that can be installed have been installed in each plant before and after the upgrade. Includes information associated with each of the set functions FX. A program that can be introduced is prepared in advance, and the function FX is also updated when the program is updated in accordance with the upgrade of parts.
  • the data table TBL3 may be stored in an external storage device.
  • the controller 290b uses one of the functions in the data table TBL3 shown in FIG. 13 based on the contract between the seller and the customer.
  • the cabin pressure is input to the controller 290c.
  • the controller 290c calculates a bias value of the blade path temperature based on the input vehicle interior pressure, and outputs the calculated bias value to the adder 300b.
  • This bias value is a value for correcting the measured value of the blade path temperature measured by the blade path thermometer 180.
  • the measured value of the blade path temperature measured by the blade path thermometer 180 and the bias value output from the controller 290c are input to the adder 300b.
  • the adder 300b calculates the blade path temperature by adding the measured value of the blade path temperature and the bias value, and outputs the calculated blade path temperature to the high value selection unit 310.
  • the high value selection section 310 receives the exhaust gas temperature measured by the exhaust gas thermometer 190 and the blade path temperature output from the adder 300b. High value selection section 310 selects the higher value (temperature) of the input exhaust gas temperature and blade path temperature and outputs the higher value to subtracter 320a.
  • the subtractor 320a receives the exhaust gas set temperature output from the controller 290d of the temperature limit controller 360 and the temperature output from the high value selector 310.
  • the subtractor 320a generates a deviation ⁇ between the temperature output from the high value selection unit 310 and the exhaust gas set temperature, and outputs the deviation ⁇ to the PI controller 330a.
  • the deviation ⁇ is input to the PI controller 330a.
  • PI controller 330a calculates a correction value of the IGV opening set value such that deviation ⁇ becomes zero, and outputs it to adder 300c.
  • the IGV opening set value output from the controller 290b and the correction value of the IGV opening set value output from the PI controller 330a are input to the adder 300c.
  • the adder 300c calculates the corrected IGV opening setting value by adding the input IGV opening setting value and the correction value, and outputs the corrected IGV opening setting value to the IGV operating unit 90b and a control variable generation unit 400 described later. .
  • the combustion load control unit 340 controls, for example, the ratio of fuel supplied to the plurality of fuel supply lines 140, as shown in FIG.
  • the combustion load control unit 340 includes a control variable generation unit 400 and a fuel distribution control unit 430.
  • the control variable generation unit 400 receives the gas turbine output, the intake air temperature, the IGV opening set value, and the intake pressure.
  • the control variable generation unit 400 generates a control variable corresponding to the turbine inlet temperature based on the input value, and outputs the control variable to the fuel distribution control unit 430.
  • the control variable is a value for calculating an opening degree command value of the combustion control valve 150 provided in each of the plurality of fuel supply lines 140.
  • the control variable is a dimensionless value of the temperature of the combustion gas flowing into the turbine 30 from the combustor 20 (turbine inlet temperature: T1T), and is a value corresponding to the turbine inlet temperature.
  • the control variable corresponding to the case where the turbine inlet temperature is the first reference temperature Ta in the case of the no-load operation is set to 0%, and the turbine inlet temperature is higher than the first reference temperature Ta.
  • the control variable when the temperature is Tb is set to 100%.
  • the first reference temperature Ta is set to about 700 ° C.
  • the second reference temperature Tb is set to about 1500 ° C.
  • the set values of the first reference temperature Ta and the second reference temperature Tb are not limited to the above, and may be set to different values for each gas turbine 2, for example.
  • control variable (denoted as CLCSO) can be expressed by the following equation 1.
  • CLCSO 100 ⁇ (gas turbine output ⁇ Pa) / (Pb ⁇ Pa) (Equation 1)
  • Pa is the gas turbine output at the first reference temperature Ta
  • Pb is the gas turbine output at the second reference temperature Tb.
  • FIG. 14 is a diagram showing a configuration of the control variable generation unit 400.
  • the control variable generation unit 400 includes a controller 290e, a controller 290f, a divider 410a, a multiplier 420a, a multiplier 420b, a subtractor 320c, a subtractor 320d, and a divider 410b.
  • the intake air temperature and the IGV opening set value are input to the controllers 290e and 290f.
  • the controller 290e calculates the value of Pa based on the intake temperature and the IGV opening set value and the output calculation function, and outputs the value to the multiplier 420a.
  • the controller 290f calculates the value of Pb based on the intake air temperature and the IGV opening set value and the output calculation function, and outputs the value to the multiplier 420b.
  • the relationship between the gas turbine output and CLCSO differs depending on the IGV opening, the intake air temperature of the compressor 10, and the like. That is, when the gas turbine output is the same, the value of CLCSO decreases as the IGV opening increases. When the gas turbine output is the same, the value of CLCSO increases as the intake air temperature of the compressor 10 increases. For this reason, the controllers 290e and 290f calculate the values of Pa and Pb for each intake air temperature and for each IGV opening set value.
  • FIG. 15 is a diagram showing the relationship between the intake air temperature and the gas turbine output.
  • the horizontal axis indicates the intake air temperature.
  • the vertical axis indicates the gas turbine output.
  • the output calculation function defines a relationship among the IGV opening, the intake air temperature, and the gas turbine output. Therefore, as an aspect of the output calculation function used in the control variable generation unit 400, for example, a function that defines the relationship between the intake air temperature and the gas turbine output may be a set of functions provided for each IGV opening. A function that defines the relationship between the IGV opening and the gas turbine output may be a set of functions provided for each intake air temperature.
  • FIG. 15 is a diagram illustrating an example of a part of the output calculation function.
  • the relationship between the intake air temperature at the first reference temperature Ta and the gas turbine output for a predetermined IGV opening is indicated by straight lines S1 and S2. As shown by the straight lines S1 and S2, the gas turbine output in this case decreases as the intake air temperature increases.
  • the straight line S1 shown by the broken line in FIG. 15 shows an example of the output calculation function used for the configuration before the upgrade of the components of the gas turbine 2 is performed.
  • a straight line S2 indicated by a solid line in FIG. 15 illustrates an example of an output calculation function used for a configuration after performing a predetermined component upgrade on the gas turbine 2.
  • the straight line S2 after the component upgrade has a larger gas turbine output for the same intake air temperature than the straight line S1 before the component upgrade.
  • a function of a plurality of patterns is set according to the part and the type of the ring segment 120.
  • the data table TBL4 is, for example, the data table shown in FIG. As shown in FIG. 16, the data table TBL4 is similar to the data table TBL2 in that the types of components used, the programs that can be installed, and the programs that can be installed have been installed in each plant before and after the upgrade. Includes information associated with each of the set functions FX. A program that can be introduced is prepared in advance, and the function FX is also updated when the program is updated in accordance with the upgrade of parts.
  • the data table TBL4 may be stored in an external storage device. Controllers 290e and 290f are set based on the contract between the seller and the customer, so that a function corresponding to the IGV opening and the intake air temperature in data table TBL4 shown in FIG. 16 is used. .
  • the intake pressure is input to the divider 410a.
  • Divider 410a divides the intake pressure by the standard atmospheric pressure, and outputs an atmospheric pressure ratio (intake pressure / standard atmospheric pressure) as a result of the division to multipliers 420a and 420b.
  • the value of Pa output from the controller 290e and the atmospheric pressure ratio output from the divider 410a are input to the multiplier 420a.
  • the multiplier 420a multiplies the input values by each other, and outputs the result of the multiplication, the value of Pa in consideration of the atmospheric pressure ratio, to the subtractors 320c and 320d.
  • the value of Pb output from the controller 290f and the atmospheric pressure ratio output from the divider 410a are input to the multiplier 81e.
  • the multiplier 420b multiplies the input values by each other, and outputs the result of the multiplication, that is, the value of Pb in consideration of the atmospheric pressure ratio, to the subtractor 320d.
  • the value of Pa output from the multiplier 420a and the value of Pb output from the multiplier 420b are input to the subtractor 320d.
  • the subtractor 320d subtracts the value of Pa from the value of Pb (Pb-Pa: see equation 1).
  • the gas turbine output and the value of Pa obtained by the multiplier 420a are input to the subtractor 320c.
  • the subtractor 320c subtracts the value of Pa from the gas turbine output (gas turbine output-Pa: see equation 1).
  • the output value from the subtractor 320c and the output value from the subtractor 320d are input to the divider 410b.
  • Divider 410b divides the output value from subtractor 320c by the output value from subtractor 320d to calculate a control variable (see Equation 1), and outputs the control variable to fuel distribution control section 430.
  • the fuel command value output from the low value selection unit 250 and the control variable output from the divider 410b of the control variable generation unit 400 are input to the fuel distribution control unit 430.
  • the fuel distribution control unit 430 calculates an amount and a ratio of the fuel to be supplied to the plurality of fuel supply lines 140 based on the input fuel command values and control variables.
  • the fuel distribution control unit 430 sets the opening set value of the fuel adjustment valve 150 of each fuel supply line 140 based on the calculation result, and controls the opening of each fuel adjustment valve 150 based on the opening set value.
  • the storage unit 230 stores various programs and data related to the operation of the gas turbine 2.
  • the storage unit 230 stores data used in the control unit 220, such as the data tables TBL2, TBL3, and TBL4.
  • the changing unit 240 performs a setting temperature calculation function, an IGV, which is used for controlling the gas turbine 2 according to a program introduced based on the supply amount of the cooling air after the component upgrade and the type and location of the replaced component. Change the opening calculation function and the output calculation function.
  • the changing unit 240 selects a corresponding function in the data tables TBL2, TBL3, and TBL4 stored in the storage unit 230 according to the installed program, and changes to the selected function.
  • step S1 The customer replaces parts provided in the plant with high-temperature parts capable of operating the plant with higher performance than the parts.
  • the high-temperature component vendor writes a plurality of programs that can be introduced when the high-temperature component is replaced with the high-temperature component into the storage unit 230 of the control device 40 (step S2).
  • the customer introduces one of the installable programs as a program for operating the plant via the control device 40 (step S3).
  • the customer can arbitrarily change the program for operating the plant via the change unit 240 of the control device 40.
  • the control device 40 when introducing a program for improving the performance of the plant with respect to the program currently introduced by the customer, for example, the customer is charged according to the introduction time of the program.
  • the control device 40 specifies each function corresponding to the program in the data tables TBL2, TBL3, and TBL4, and sets the specified function (step S4). Further, when the program is introduced, the control device 40 transmits the customer name, the information indicating the type of the introduced program, and the information indicating the accumulated time from the start of the introduction at predetermined timings (for example, when the customer (Every time a program to be introduced is switched via the server 40).
  • the management device 41 receives, from the control device 40, information indicating the customer name, the type of the installed program, and information indicating the accumulated time from the start of the installation.
  • the program determination unit 440 specifies a program corresponding to the customer name received from the control device 40 and the information indicating the type of the introduced program in the data table TBL1 (Step S5).
  • the program determination unit 440 outputs the type of the specified program to the charge amount calculation unit 470.
  • the time specifying unit 450 specifies the introduction time indicating the introduced integration time of each program, based on the information indicating the type of the introduced program received from the control device 40 and the information indicating the integration time from the start of the introduction. (Step S6).
  • the time specifying unit 450 outputs the specified introduction time to the billing amount calculation unit 470.
  • the charge amount calculating unit 470 When receiving the information on the type of the program from the program determining unit 440 and the information on the introduction time from the time specifying unit 450, the charge amount calculating unit 470 is associated with the customer name received from the control device 40 in the data table TBL1. The charge amount calculation formula is specified (step S7). The charge amount calculation unit 470 calculates the charge amount by substituting the introduction time of each program into the specified charge amount calculation formula (step S8).
  • the plant operation system 1 As described above, the plant operation system 1 according to the embodiment of the present invention has been described.
  • components such as the moving blades and the stationary blades provided in the turbine 30 are replaced with upgraded components (high-temperature components) that can be cooled even with a reduced supply of cooling air.
  • the storage unit 230 stores, in addition to the first program for operating the plant used before the replacement with the upgraded parts, the second program (for example, the second program for operating the plant with performance equal to or higher than the performance before the replacement with the upgraded parts) After the replacement with the high-temperature parts, a program in which parameters set by the program are adjusted so that the performance of the plant is improved as compared with before the replacement is stored.
  • the changing unit 240 switches between the first program and the second program in the operation of the plant.
  • the performance of the plant can be suppressed, while the performance of the plant is reduced before the replacement with the upgraded parts. No lower than performance. Accordingly, by providing the upgraded parts to the customer at a low cost (for example, at the same price as the parts before replacement), the customer can reduce the initial cost.
  • the customer can easily increase the performance of the plant by switching the first program to the second program even after introducing the upgraded parts. As a result, customers are more likely to introduce upgraded parts into the plant.
  • the distributor can realize a plurality of different performances in the plant by switching the program. That is, the seller can respond to component replacement in various plants with one type of component.
  • the distributor can reduce the types of parts to be manufactured, reduce material costs, processing costs, inventory management costs, etc., and customers can actually upgrade upgraded parts at a lower price than the distributor. (E.g., at the same price as the parts before replacement), making it easier to introduce parts with improved reliability and performance.
  • the distributor can make a profit by switching from the first program to the second program, that is, by charging for improving the performance of the plant, and the customer can selectively improve the performance. And can be reduced at a cost corresponding to the performance improvement performance.
  • the data table TBL2 is a function for setting the performance of the plant when operating at the highest temperature allowed when the parts are upgraded, and the data table TBL2 before the parts are upgraded. It is described as including the function used in the above. However, in another embodiment of the present invention, the data table TBL2 performs the function for setting the performance of the plant when operating at the highest temperature allowed when the component upgrade is performed, and the component upgrade. In addition to the functions previously used, the performance between the plant operating at the highest temperature allowed by the component upgrade and the plant before the component upgrade is also determined. It may include a function to be realized.
  • the storage unit 230 stores a function for setting the performance of the plant when operating at the highest temperature allowed when the parts are upgraded, a function used before performing the parts upgrade, and a function for performing the upgrade.
  • the data table TBL2 is, for example, the data table shown in FIG. As shown in FIG. 18, the data table TBL2 includes, for each plant, before and after the upgrade, the types of components used, the programs that can be installed, and the functions FX that are set when the programs that can be installed are installed. Each contains information associated with it.
  • a program that can be introduced is prepared in advance, and the function FX is also updated when the program is updated in accordance with the upgrade of parts.
  • the programs that can be introduced after the upgrade are the programs 2, 3 and 6, and when the program 2 is introduced, the function FX2 used before the upgrade is applied and the program 3 is introduced.
  • the function FX3 for setting the performance of the plant when operating at the highest temperature allowed when the parts are upgraded is applied.
  • the program 6 is introduced, the above-mentioned rated temperature before the upgrade is applied.
  • the function obtained from the relationship between the control line T1 and the temperature control line T3 is applied. However, fine adjustment is performed for each plant, and the function FX is adjusted as needed.
  • the data table TBL2 may be stored in an external storage device.
  • the controller 290d uses one of the functions in the data table TBL2 shown in FIG. 18 based on the contract between the seller and the customer.
  • the data tables TBL2, TBL3, and TBL4 have been described as separate data tables. However, in another embodiment of the present invention, like a data table TBL5 shown in FIG. 19, a single data table in which data included in the data tables TBL2, TBL3, and TBL4 are integrated may be used.
  • the control device 40 is a device owned by the customer, and when a program for improving the performance of the plant is introduced into the program currently introduced by the customer, for example, The description has been made assuming that the fee is charged according to the introduction time of the program.
  • the management device 41 further controls the control unit 480 and the change unit 490 as shown in FIG.
  • the program may be capable of forcibly changing to a program for suppressing the performance of the plant regardless of the control by the control device 40.
  • the control device 40 has been described as a device owned by the customer, and determines the program to be introduced by the customer via the control device 40.
  • the control device 40 may be a device provided by a sales company that sells upgraded parts to customers or a management company that manages a plant at the request of the sales company.
  • the customer instructs a program to be introduced to a distributor or a management company having the control device 40.
  • the sales agency or the management company receiving the instruction may determine the program to be introduced via the control device 40.
  • the order of the processes may be changed within a range where an appropriate process is performed.
  • the storage units 230 and 460 and other storage devices may be provided anywhere as long as appropriate information is transmitted and received.
  • each of the storage units 230 and 460 and the other storage devices may exist in a plural number within a range in which appropriate information is transmitted and received, and may store data in a distributed manner.
  • FIG. 21 is a schematic block diagram illustrating a configuration of a computer according to at least one embodiment.
  • the computer 5 includes a CPU 6, a main memory 7, a storage 8, and an interface 9, as shown in FIG.
  • each of the above-described plant operation system 1, control device 40, management device 41, and other control devices is implemented in the computer 5.
  • each processing unit described above is stored in the storage 8 in the form of a program.
  • the CPU 6 reads out the program from the storage 8, expands it in the main memory 7, and executes the above-described processing according to the program. Further, the CPU 6 secures a storage area corresponding to each of the above-described storage units in the main memory 7 according to a program.
  • Examples of the storage 8 include a hard disk drive (HDD), a solid state drive (SSD), a magnetic disk, a magneto-optical disk, a CD-ROM (Compact Disc Read Only Memory), and a DVD-ROM (Digital Documentary Memory). And a semiconductor memory.
  • the storage 8 may be an internal medium directly connected to the bus of the computer 5 or an external medium connected to the computer 5 via the interface 9 or a communication line. When this program is distributed to the computer 5 via a communication line, the computer 5 that has received the program may load the program into the main memory 7 and execute the above processing.
  • storage 8 is a non-transitory tangible storage medium.
  • the program may implement a part of the functions described above. Further, the program may be a file that can realize the above-described functions in combination with a program already recorded in the computer system, that is, a so-called difference file (difference program).
  • difference file difference program
  • combustion control unit 280 ... IGV control unit 290a, 290b, 290c, 290d, 290e, 290f ... controllers 300a, 300b, 300c ... adder 310 ..High value selection units 320a, 320b, 320c, 320d... Subtractors 330a, 330b... PI controller 340... Combustion load control unit 350... Blade path temperature control unit 360.
  • Unit 370 load limit control unit 380 governor control unit 390 fuel limit control unit 400 control variable generation units 410a and 410b dividers 420a and 420b multiplier 430 ..Fuel distribution control section 440... Program determination section 450... Time specifying section 470... 1 ... Compressed air F ... Fuel L1, L2 ... Curves S1, S2 ... Lines T1, T2 ... Rated temperature control line Pa ... Gas turbine output Ta ... First reference temperature Tb: second reference temperature TBL1, TBL2, TBL3, TBL4, TBL5: data table

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • Economics (AREA)
  • Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • General Business, Economics & Management (AREA)
  • Marketing (AREA)
  • General Physics & Mathematics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Tourism & Hospitality (AREA)
  • Development Economics (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Chemical & Material Sciences (AREA)
  • Game Theory and Decision Science (AREA)
  • Combustion & Propulsion (AREA)
  • Health & Medical Sciences (AREA)
  • Educational Administration (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Primary Health Care (AREA)
  • General Health & Medical Sciences (AREA)
  • Manufacturing & Machinery (AREA)
  • Accounting & Taxation (AREA)
  • Finance (AREA)
  • Fluid Mechanics (AREA)
  • Water Supply & Treatment (AREA)
  • Public Health (AREA)
  • Control Of Turbines (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

プラント運転方法は、プラントに設けられる第1の部品を、前記第1の部品より高い性能で前記プラントを稼働可能な第2の部品に交換する交換ステップ、前記第2の部品を用いて前記第1の部品使用時と同等以上の性能である第1性能で前記プラントを運転させる第1プログラムと、前記第1性能以上の性能である第2性能で前記プラントを運転させる第2プログラムとを導入する導入ステップ、前記第1プログラムと前記第2プログラムとを切り替える切替ステップ、を有する。

Description

プラント運転方法、制御装置及びプログラム
 本発明は、プラント運転方法、制御装置及びプログラムに関する。
 本願は、2018年7月9日に日本に出願された特願2018-129861号について優先権を主張し、その内容をここに援用する。
 ガスタービンなどを備えるプラントでは、プラントの性能を向上させるために、アップグレードされた部品に交換される場合がある。
 特許文献1には、関連する技術として、アップグレードされた部品へ交換した後に適した制御装置の設定値に変更する技術が記載されている。
特開2017-096155号公報
 ところで、一般的に、アップグレードされた部品は、アップグレード前に使用している部品に比べて高価である。そのため、アップグレードされた部品をプラントに導入することを検討する場合に、顧客は、導入後の性能向上による低コスト化および収入増は理解していても、導入時の初期費用の観点から導入を断念することがある。
 本発明は、上記の課題を解決することのできるプラント運転方法、制御装置及びプログラムを提供することを目的としている。
 本発明の第1の態様によれば、プラント運転方法は、プラントに設けられる第1の部品を、前記第1の部品より高い性能で前記プラントを稼働可能な第2の部品に交換する交換ステップ、前記第2の部品を用いて前記第1の部品使用時と同等以上の性能である第1性能で前記プラントを運転させる第1プログラムと、前記第1性能を超える性能である第2性能で前記プラントを運転させる第2プログラムとを導入する導入ステップ、前記第1プログラムと前記第2プログラムとを切り替える第1切替ステップ、を有する。
 本発明の第2の態様によれば、第1の態様によるプラント運転方法は、前記第1プログラムと前記第2プログラムとの切り替えに基づいて課金額を算出する算出ステップ、を有するものであってもよい。
 本発明の第3の態様によれば、第2の態様によるプラント運転方法は、前記第2プログラムが実行された実行時間を特定する特定ステップ、を有し、前記算出ステップにおいて、前記実行時間に応じた前記課金額を算出するものであってもよい。
 本発明の第4の態様によれば、第2の態様または第3の態様におけるプラント運転方法において、前記第1切替ステップは、課金される顧客によって実行され、前記算出ステップにおいて、当該顧客によって実行された前記第1切替ステップにおける前記第1プログラムと前記第2プログラムとの切り替えに基づいて課金額を算出するものであってもよい。
 本発明の第5の態様によれば、第4の態様におけるプラント運転方法は、前記課金される顧客によって実行されるか否かに関わらず、前記第2プログラムを前記第1プログラムに切り替える第2切替ステップ、をさらに有するものであってもよい。
 本発明の第6の態様によれば、第2の態様または第3の態様におけるプラント運転方法において、前記第1切替ステップは、課金する管理者によって実行され、前記算出ステップにおいて、当該管理者によって実行された前記第1切替ステップにおける前記第1プログラムと前記第2プログラムとの切り替えに基づいて課金額を算出するものであってもよい。
 本発明の第7の態様によれば、第1の態様から第6の態様の何れか1つのプラント運転方法において、前記第2の部品は、前記第1の部品よりも高温に耐え得る部品であり、前記第1切替ステップにおいて、前記第2プログラムに切り替え、当該第2プログラムは、当該第2の部品の温度が当該第2の部品の耐え得る高温となるように前記プラントを運転するものであってもよい。
 本発明の第8の態様によれば、制御装置は、プラントに設けられる第1の部品より高い性能で前記プラントを稼働可能な第2の部品を用いて前記第1の部品使用時と同等以上の性能である第1性能で前記プラントを運転させる第1プログラムと、前記第1性能を超える性能である第2性能で前記プラントを運転させる第2プログラムとを記憶する記憶部と、前記第1プログラムと前記第2プログラムとを切り替える切替部と、を備える。
 本発明の第9の態様によれば、プログラムは、コンピュータに、プラントに設けられる第1の部品より高い性能で前記プラントを稼働可能な第2の部品を用いて前記第1の部品使用時と同等以上の性能である第1性能で前記プラントを運転させる第1ロジックと、前記第1性能を超える性能である第2性能で前記プラントを運転させる第2ロジックと、前記第1ロジックと前記第2ロジックとを切り替える切替ロジックと、を実行させる。
 本発明の実施形態によるプラント運転方法、制御装置及びプログラムによれば、アップグレードされた部品をプラントに導入しやすい機会を顧客に提供することができる。
本発明の一実施形態によるプラント運転システムの構成を示す図である。 本発明の一実施形態によるタービンの一部の構成を模式的に示す図である。 本発明の一実施形態による制御装置の構成を示す図である。 本発明の一実施形態による制御部の構成を示す図である。 本発明の一実施形態による温度リミット制御部の構成を示す図である。 本発明の一実施形態による管理装置の構成を示す図である。 本発明の一実施形態における第1のデータテーブルを示す図である。 本発明の一実施形態における圧力比と排ガス温度上限値との関係を示す図である。 本発明の一実施形態における定格温調ラインの排ガス設定温度と圧力比の関係を示す図である。 本発明の一実施形態における第2のデータテーブルを示す図である。 本発明の一実施形態によるIGV制御部の構成を示す図である。 本発明の一実施形態におけるガスタービン出力とIGV開度設定値との関係を示す図である。 本発明の一実施形態における第3のデータテーブルを示す図である。 本発明の一実施形態による制御変数生成部の構成を示す図である。 本発明の一実施形態における吸気温度とガスタービン出力との関係を示す図である。 本発明の一実施形態における第4のデータテーブルを示す図である。 本発明の一実施形態によるプラント運転システムの処理フローを示す図である。 本発明の別の実施形態における第2のデータテーブルを示す図である。 本発明の別の実施形態における第5のデータテーブルを示す図である。 本発明の別の実施形態における管理装置の構成を示す図である。 少なくとも1つの実施形態に係るコンピュータの構成を示す概略ブロック図である。
<実施形態>
 以下、図面を参照しながら実施形態について詳しく説明する。
 本発明の一実施形態によるプラント運転システム1の構成について説明する。
 プラント運転システム1は、ガスタービン2を構成する一部の部品をアップグレードした部品に交換した場合に、交換前の第1ソフトウェアと、第1ソフトウェアとは異なり交換後の部品の性能を引き出すことのできる第2ソフトウェアとを導入し、顧客のニーズに応じて第1ソフトウェアと第2ソフトウェアとを切り替えるガスタービンである。また、プラント運転システム1は、第1ソフトウェアと第2ソフトウェアとの切り替えを記録し、その切り替えに応じた顧客への課金を算出するガスタービンである。プラント運転システム1は、ガスタービン2、制御システム3を備える。
 ガスタービン2は、図1に示すように、圧縮機10、燃焼器20、タービン30、発電機50、ロータ60を備える。
 圧縮機10、燃焼器20およびタービン30の中心部には、ロータ60が貫通して設けられる。圧縮機10、タービン30及び発電機50は、ロータ60によって連結され、一体となって回転する。発電機50は、この回転によって発電することができる。ガスタービン2の動作は、制御システム3によって制御される。
 ガスタービン2は、圧縮機10からタービン30に冷却用空気を供給する冷却用空気供給ライン70を有する。冷却用空気供給ライン70には、冷却用空気制御弁80が設けられる。
 圧縮機10は、空気取入口から取り込んだ空気Aを圧縮して圧縮空気A1を生成する。圧縮機10には、空気取入口から取り込む空気Aの吸気量を調整する入口案内翼(IGV(Inlet Guide Vane)、吸気弁)90が設けられる。
 入口案内翼90は、複数の翼本体90aと、複数の翼本体90aの翼角度を変更するためのIGV作動部90bとを備える。入口案内翼90は、その開度が調整されることで、空気Aの吸気量が調整される。具体的に、IGV作動部90bにより翼本体90aの翼角度が調整されることで、入口案内翼90の開度が調整され、空気Aの吸気量を調整する。入口案内翼90は、その開度が大きくなる場合、空気Aの吸気量が多くなり、圧縮機10の圧力比が増加する。また、入口案内翼90は、その開度が小さくなる場合、空気Aの吸気量が少なくなり、圧縮機10の圧力比が低下する。
 燃焼器20は、圧縮機10で圧縮された圧縮空気A1に対して燃料Fを供給する。燃焼器20は、圧縮空気A1と燃料Fとを混合して燃焼することで、燃焼ガスを生成する。タービン30は、燃焼器20で生成された燃焼ガスによって回転する。図2は、ガスタービン2のうちタービン30の一部の構成を模式的に示す図である。タービン30は、図2に示すように、ロータ60、複数段の静翼100、複数段の動翼110を備える。各段の静翼100は、ケーシング130に取り付けられている。各段の動翼110は、ロータ60の外周に固定される。複数段の静翼100と複数段の動翼110は、ロータ60の軸方向に交互に設けられる。また、ケーシング130には、分割環120が設けられる。分割環120は、動翼110に対して径方向の外側に離間して設けられる。静翼100及び分割環120は、ロータ60の軸方向に離間して配置されている。
 ロータ60は、軸方向の両端部が図示しない軸受部により回転自在に支持され、軸心を中心として自在に回転できるように設けられる。そして、ロータ60の圧縮機10側の端部には、発電機50の駆動軸が連結される。発電機50は、タービン30と同軸上に設けられ、タービン30が回転することで発電する。
 したがって、圧縮機10の空気取入口から取り込まれた空気Aは、入口案内翼90を経て圧縮機10の内部を通過して圧縮されることで高温・高圧の圧縮空気A1となる。この圧縮空気A1に対して燃焼器20から燃料Fが供給され、圧縮空気A1と燃料Fとが混合され燃焼することで、高温・高圧の燃焼ガスが生成される。そして、燃焼器20で生成された高温・高圧の燃焼ガスがタービン30の内部を通過することにより、タービン30は作動(回転)し、ロータ60を回転させ、ロータ60に連結された発電機50を駆動させる。これにより、発電機50は、発電を行う。このときタービン30を駆動した燃焼ガスは、排ガスとして熱を回収し、大気に放出される。
 このガスタービン2においては、性能(例えば、出力電力量、発電効率、Noxなどの気体排出の低減など)を向上させるため、タービン30に供給される冷却用空気の供給量を低減させ、燃焼器20に供給する圧縮空気の供給量を増加させるアップグレードが行われることがある。このアップグレードを行う場合、タービン30に設けられる動翼や静翼等の部品を高温に耐え得る部品(以下、「高温部品」と記載)とし、供給量が減少した冷却用空気であっても冷却可能なものに交換することが行われる。
 上記のガスタービン2のアップグレードでは、例えば静翼100、動翼110及び分割環120等、タービン30を構成する部品を交換する場合がある。本実施形態では、ガスタービン2のアップグレードを行う場合、タービン30を構成する部品のうち、第1段及び第2段の静翼100と、第1段及び第2段の動翼110とを新たな部品に交換する場合を例に挙げて説明する。なお、部品の交換対象については、これに限定するものではなく、他の組み合わせで部品を交換してもよい。
 また、図1に示すように、上記ガスタービン2には、車室圧力計160、吸気状態検出器170、ブレードパス温度計180、排ガス温度計190及び流量計200が設けられる。車室圧力計160は、圧縮機10から燃焼器20に向けて圧縮空気A1が流通するラインに設けられる。具体的に、車室圧力計160は、燃焼器20の車室内部に設けられ、圧縮空気A1の圧力(車室圧力)を計測する。吸気状態検出器170は、圧縮機10に取り込まれる空気Aの吸気温度と吸気圧力とを検出する。ブレードパス温度計180は、タービン30から排出される排ガスが流通するラインに設けられる。ブレードパス温度計180は、タービン30の排ガスの流れ方向の下流側に設けられる最終段のブレードを通過した排ガスの温度を計測する。排ガス温度計190は、ブレードパス温度計180の下流側に設けられ、排ガスの温度を計測する。流量計200は、冷却用空気供給ライン70を流れる冷却用空気の流量を計測する。さらに、ガスタービン2には、ガスタービン2の出力(負荷)を検出するための出力計210が設けられる。そして、車室圧力計160、吸気状態検出器170、ブレードパス温度計180、排ガス温度計190、流量計200及び出力計210により計測された信号が、制御システム3に入力される。
 制御システム3は、図1に示すように、制御装置40、管理装置41を備える。
 制御装置40は、ガスタービン2の動作を制御する装置である。制御装置40は、例えば、顧客が所有する装置であり、部品のアップグレードを行って以降、顧客が導入可能な複数のプログラムの中から1つを導入することによって、その導入したプログラムに応じた性能でプラントが運転される。制御装置40は、図3に示すように、制御部220、記憶部230、変更部240(切替部の一例)を備える。制御部220は、車室圧力計160、吸気状態検出器170、ブレードパス温度計180、排ガス温度計190及び流量計200等の計測結果に基づいて、入口案内翼90及び燃料調整弁150等を制御することによって、ガスタービン2の運転を制御する。また、制御部220は、ガスタービン2の出力(発電機50の出力)に応じて、ガスタービン2の運転を制御する。また、制御部220は、ガスタービン2に対して部分負荷運転と、全負荷運転とを行わせる。全負荷運転は、ガスタービン2の出力が定格出力となる運転である。部分負荷運転は、ガスタービン2の出力が定格出力よりも小さい出力となる運転である。
 また、制御部220は、燃料Fの供給量を調整するために、燃焼器20へ向けて燃料Fを供給する燃料供給ライン140に設けられる燃料調整弁150を制御する燃料制御を実行している。燃料供給ライン140は、例えばメイン燃料供給ライン、パイロット燃料供給ライン、トップハット燃料供給ライン等の複数の供給ラインを有している。燃料調整弁150は、複数の供給ラインのそれぞれに設けられる。燃料調整弁150は、個別に開度を制御可能である。制御部220は、燃料調整弁150を制御することで、圧縮空気A1に対して供給(噴射)する燃料Fの供給量及びその配分を調整する。
 図4は、制御部220の構成を示す図である。制御部220は、図4に示すように、排ガス温度制御部260、燃焼制御部270、IGV制御部280、燃焼負荷制御部340とを備える。
 排ガス温度制御部260は、タービン入口温度が、所定温度を維持するように排ガス温度と圧力比の関係を設定する。排ガス温度制御部260は、ブレードパス温度制御部350、温度リミット制御部360を備える。ブレードパス温度制御部350には、ブレードパス温度計180によって計測されたブレードパス温度が入力される。ブレードパス温度制御部350は、ブレードパス温度に基づいてブレードパス温度設定値を生成し、後述の低値選択部250に出力する。
 温度リミット制御部360には、車室圧力計160によって計測された圧縮機10の車室内部の圧力(車室圧力)、吸気状態検出器170によって計測された吸気圧力、排ガス温度計190によって測定された排ガス温度の測定値、が入力される。温度リミット制御部360は、入力値に基づいて、排ガス温度設定値を出力する。
 図5は、温度リミット制御部360の構成を示す図である。図5に示すように、温度リミット制御部360は、制御器290d、減算器320b、PI制御器330bを備える。制御器290dには、排ガス温度設定値を算出するための圧力比が入力される。圧力比は、車室圧力と吸気圧力との比(車室圧力/吸気圧力)である。制御器290dに入力される圧力比の値は、排ガス温度設定値を算出するために目標値として設定された値である。制御器290dは、入力された圧力比と、設定温度算出関数(第2関数)とに基づいて、入力された圧力比に対する排ガスの設定温度(以下、「排ガス設定温度」と記載)を算出し、減算器320bに出力する。なお、設定温度算出関数については、後述する。また、制御器290dは、算出した排ガス設定温度を、後述のIGV制御部280に設けられる減算器320aに出力する。
 管理装置41は、アップグレードされた部品を顧客に販売する販売元、または、販売元からの依頼によってプラントを管理する管理会社が備える装置である。制御装置40によって導入されるプログラムを特定し、販売元と顧客との間の契約内容と、特定したプログラムとに基づいて、顧客に対して課金する課金額を算出する。管理装置41は、図6に示すように、プログラム判定部440、時間特定部450、記憶部460、課金額算出部470を備える。プログラム判定部440は、部品がアップグレードされて以降、制御装置40が導入したプログラムの種類を判定する。時間特定部450は、プログラム判定部440が判定したプログラムが導入される時間を特定する。記憶部460は、データテーブルTBL1を記憶する。データテーブルTBL1は、例えば、図7に示すデータテーブルである。データテーブルTBL1は、図7に示すように、顧客名、販売元と顧客との間の契約内容、適用されている部品の種類、導入可能なプログラムの種類、導入済みのプログラム、プログラムが導入された導入時間、及び、課金額を算出するための課金額算出式を関連付けたデータテーブルである。導入時間は、導入可能なプログラムごとに特定される。課金額算出式は、契約内容ごとに異なる式であり、導入済みのプログラムとそのプログラムの導入時間とが定まると1つの課金額が定まる式である。
 ここで、設定温度算出関数について説明する。図8は、圧力比と排ガス設定温度との関係を示す図である。図8において、横軸は圧力比を示す。また、図8において、縦軸は排ガス温度を示す。設定温度算出関数は、図8に示すように、圧力比と排ガス設定温度との関係を規定するものである。図8に示す例では、設定温度算出関数は、定格温調ラインT1、T2として示される。定格温調ラインT1、T2は、所定の圧力比に対して、タービン入口温度が定格値に達した場合に、ガスタービン2の定格性能が得られるように設定された排ガスの温度を示す。なお、定格性能とは、発電機50からガスタービン2に所定の負荷が与えられたときに、ガスタービン2の仕事効率が最適となる性能である。また、定格温調ラインT1、T2は、タービン入口温度が予め設定された上限温度を超えないように設定される。排ガス設定温度は、図8に示される定格温調ラインT1、T2のように、圧力比が大きくなるにつれて低下している。
 また、図8における点Aから点Eは、ガスタービン2の運転ライン上の点を示している。点Aは、ガスタービン2に負荷を投入するときの圧力比及び排ガス温度を示している。点Bは、入口案内翼90を開き始めるときの圧力比及び排ガス温度を示している。点Bから点Cまでの間は、入口案内翼90の開度が増加する過程で、圧力比の増加に対して排ガス温度が一定となる制御区間である。点Cから点Dまでの間は、入口案内翼90の開度を増加させる区間であり、点Dで入口案内翼90が全開となる。点Eは、点Dからガスタービン2の負荷を100%に向けて上げることにより、運転ラインが定格温調ラインに達した場合の圧力比及び排ガス温度である。ガスタービン2が全負荷運転を行う場合、タービン入口温度が上限温度付近に達するように、排ガス温度が定格温調ライン付近となるように、ガスタービン2の運転は制御される。また、ガスタービン2が部分負荷運転を行う場合、負荷変動に対するガスタービン出力の応答性を確保するために、例えば排ガス温度が定格温調ラインの上限温度によって制限されないように、定格温調ラインよりも低い排ガス温度となるように、ガスタービン2の運転は制御される。このため、ガスタービン2が部分負荷運転を行う場合のタービン入口温度は、ガスタービン2が全負荷運転を行う場合のタービン入口温度に比べて低い。
 なお、図8において破線で示される定格温調ラインT1は、ガスタービン2の部品のアップグレードを行う前の構成に対して用いられる設定温度算出関数の例を示している。また、図8において実線で示される定格温調ラインT2は、ガスタービン2の部品のアップグレードを行った後の構成に対して用いられる設定温度算出関数の例を示している。ガスタービン2の部品のアップグレードにより、冷却用空気の供給量が減少し、車室29内の圧力比が増加する。このため、部品のアップグレード後の定格温調ラインT2は、部品のアップグレード前の定格温調ラインT1に比べて、点Eにおける圧力比及び排ガス設定温度が上昇している。この排ガス設定温度の上昇分は、定格温調ラインT1に対して圧力比を上昇させた場合において、冷却用空気の供給量減少による排ガス設定温度の上昇分と、圧力比の上昇による排ガス設定温度の低下分との和(温調バイアス変化量)として求めることができる。
 ここで、温調バイアス変化量の具体的な算出方法について、図9を用いて以下に説明する。図9は、定格温調ラインの排ガス設定温度と圧力比の関係を示す図である。図9は、ガスタービン2の部品のアップグレード前の定格温調ラインT1と部品のアップグレード後の定格温調ラインT2との比較を示している。図9において、横軸は圧力比を示す。また、図9において、縦軸は排ガス設定温度を示す。ここで、温調バイアス変化量とは、ガスタービン2の部品をアップグレードした結果、部品のアップグレード前の定格温調ラインT1が定格温調ラインT2に変化した場合、同一の圧力比に対する排ガス温度の変化量Xを意味する。図9において、部品のアップグレード前の定格温調ラインT1上の運転点をP1とし、部品のアップグレード後の運転点がP2に移動したとする。また、運転点P1における圧力比をPR1、排ガス設定温度をt1とし、運転点P2における圧力比をPR2とする。また、圧力比PR2における定格温調ラインT1上の点をP4とし、排ガス設定温度をt3とする。圧力比PR2及び排ガス設定温度t1で定まる点をP3とする。
 定格温調ラインは、タービン入口温度が一定であることを条件として、排ガス設定温度と圧力比の関係を表示するラインであり、排ガス温度を監視することにより、タービン入口温度を管理することを目的としている。一般的に、ガスタービン2では、タービン30において燃焼ガスが車室圧から大気圧まで熱膨張する過程で、その熱膨張によって燃焼ガス温度は低下する。すなわち、定格温調ラインは、タービン入口温度が一定の条件下で、圧力比の増加とともに排ガス設定温度が右下がりに低下するラインとなる。
 前述したように、ガスタービン2の部品をアップグレードした場合、冷却用空気の供給量が減少することにより、車室29内の圧力比が上昇する。したがって、車室29内の圧力比が高ければ、熱膨張による排ガス温度が低下する割合は大きくなる。図9において、ガスタービン2の部品のアップグレードにより、ガスタービン2の運転点は、部品のアップグレード前の定格温調ラインT1上の運転点P1(圧力比PR1)から、部品のアップグレード後の定格温調ラインT2上の運転点P2(圧力比PR2)へ移動すると考えることができる。前述した点P2、P3、P4は、いずれも圧力比PR2上の点である。点P3は、線分P2P4上に存在する。
 図9に示すように、ガスタービン2の部品のアップグレードにより、便宜上、部品のアップグレード前の運転点P1は、部品のアップグレードにより圧力比が増加して、点P4に移動し、点P4から運転点P2に移動する過程で、温調バイアス変化量Xに相当する排ガス温度の増加があり、運転点P2に達すると考えることができる。
 圧力比がPR2である場合、温調バイアス変化量Xは、線分P2P4で示される。ここで、線分P2P4を、線分P3P4と線分P2P3とに区分けし、それぞれの線分を変数X1、X2と定める。この場合、温調バイアス変化量Xは、式〔X=X1+X2〕によって算出できる。すなわち、ガスタービン2の部品のアップグレードにより、運転点がP1からP2に変わる過程における温調バイアス変化量Xは、便宜上、燃焼ガスの圧力比が増加して、排ガス温度が低下する過程で生ずる温度低下の増加分に相当する変数X1と、冷却用空気の供給量の減少に伴い排ガス温度が低下する過程に生ずる温度低下の増加分に相当する変数X2と、に区分けして説明できる。
 ガスタービン2の部品のアップグレードにより、車室29内の圧力比がPR1からPR2に増加した場合、タービン30での熱膨張により、排ガスの温度低下が部品のアップグレード前より大きくなる。変数X1は、圧力比の増加に伴う排ガス温度の低下の増加分に相当する。すなわち、図9において、車室29内の圧力比が部品のアップグレード前のPR1から部品のアップグレード後のPR2に増加した場合、タービン30での燃焼ガスの熱膨張により、排ガス温度は、部品のアップグレード前の排ガス設定温度t1からt3に低下する。変数X1は、排ガス温度が低下する温度低下の増加量であり、排ガス温度t3を部品のアップグレード前の排ガス温度t1に戻すための補正量に相当する。点P3と点P4の温度差X1は、式〔X1=t1-t3〕で算出される。
 次に、冷却用空気の供給量の減少に対応する変数X2について説明する。ガスタービン2の部品のアップグレードにより、タービン30を構成する部品に供給される冷却空気の供給量が低下する。そのため、各部品から燃焼ガス流路に排出される冷却空気量が減少し、燃焼ガス流路を流れる燃焼ガスの温度は、部品のアップグレード前の燃焼ガス温度より上昇する。更に、その下流側の部品が部品のアップグレードされた場合、このアップグレードされた部品から排出される冷却空気量が低下して、その下流側の部品の下流側の燃焼ガス温度が部品のアップグレード前より更に上昇する。このような手順を繰り返して、最終的にタービン30から排出される排ガス温度が、部品のアップグレード前より上昇する。部品のアップグレードによる冷却用空気の供給量の低減に伴い燃焼ガス温度が上昇する過程は、図9において線分P2P3で示され、変数X2に相当する補正量と捉えることができる。
 運転点が、点P1から点P4を経て点P3に移動するときの圧力比の増加に伴う熱膨張による排ガス温度が低下する過程と、点P3から点P2に移動するときの冷却用空気の供給量の低減に伴う排ガス温度が増加する過程は、同時並行で進行する。そのため、実際の運転点の変化は、点P1から点P2への変化として捉えられる。したがって、ガスタービン2の部品のアップグレードにより、運転点がP1からP2に移動したときに、定格温調ラインT1を定格温調ラインT2に修正する補正量は、温調バイアス変化量X、すなわち、変数X1に相当する圧力比の増加に伴う排ガス温度の低下の増加量である補正量(第1補正値)と、変数X2に相当する冷却用空気の供給量の低下に伴う排ガス温度の上昇の増加量である補正量(第2補正値)とを加算した量と考えることができる。
 したがって、定格温調ラインT2は、定格温調ラインT1において圧力比を上昇させ、温調バイアス変化量を加算した状態のラインとなっており、図9において、定格温調ラインT1を右上方向に平行移動させたラインとなっている。なお、設定温度算出関数については、図8に示された定格温調ラインT1、T2のほか、部品のアップグレード後の冷却用空気の供給量に応じて、また、部品のアップグレードにおいて交換される静翼100、動翼110及び分割環120の部位及び種類に応じて、複数パターンの関数が設定される。これら複数パターンの関数は、タービン入口温度が一定であることを条件を用いて設定される関数であり、部品のアップグレードを行った場合にプラントにおける冷却用空気の供給量を最も抑えたときの性能、すなわち、部品のアップグレードを行った場合に許される最も高温で運転したときのプラントの性能に設定するための関数である。これら複数パターンの関数は、部品のアップグレードを行う前に使用していた関数とともに、例えばデータテーブルTBL2として記憶部230が記憶する。データテーブルTBL2は、例えば、図10に示すデータテーブルである。データテーブルTBL2は、図10に示すように、各プラントについて、アップグレードの前後それぞれにおいて、使用されている部品の種類、導入可能なプログラム、導入可能なプログラムを導入した場合の設定される関数FXのそれぞれが関連付けられた情報を含む。導入可能なプログラムは、予め用意されており、部品のアップグレードに伴いプログラムを更新した場合に関数FXも更新される。例えば、プラントAについて、アップグレード後に導入可能なプログラムは、プログラム2または3である。プログラム2を導入した場合には、アップグレード前に使用されていた関数FX2が適用され、プログラム3を導入した場合には、部品のアップグレードを行った場合に許される最も高温で運転したときのプラントの性能に設定するための関数FX3が適用される。ただし、プラント毎に微調整が行われ、必要に応じて関数FXも調整される。なお、データテーブルTBL2は、外部の記憶装置が記憶するものであってもよい。制御器290dは、販売元と顧客との間の契約内容に基づいて、図10に示すデータテーブルTBL2の中の関数の1つを用いる。
 また、図5に示すように、減算器320bには、排ガス温度の測定値と、排ガス設定温度とが入力される。減算器320bは、排ガス温度と排ガス設定温度との偏差△を生成し、PI制御器330bに出力する。PI制御器330bには、偏差△が入力される。PI制御器330bは、偏差△がゼロとなるような排ガス温度設定値を出力する。したがって、温度リミット制御部360は、部分負荷運転または全負荷運転の静定時において、排ガス温度計190により計測された排ガス温度(排ガス計測温度)が、定格温調ラインT1、T2で示される設定温度となるように、ガスタービン2の運転をフィードバック制御する。
 また、図4に示すように、燃焼制御部270は、ロードリミット制御部370、ガバナ制御部380、燃料リミット制御部390、低値選択部250を備える。ロードリミット制御部370には、ガスタービン2の実出力値としてガスタービン2のガスタービン出力が入力される。ロードリミット制御部370は、ガスタービン出力が所定の値となるように、燃焼器20に供給される燃料Fの供給量(燃料流量)を指令する燃料指令値を生成する。ロードリミット制御部370は、生成した燃料指令値を低値選択部250に出力する。
 ガバナ制御部380には、ガスタービン出力と、ロータ60の回転速度とが入力される。ガバナ制御部380は、ロータ60の回転速度が予め設定された設定回転速度となるように、ガスタービン出力及びロータ60の回転速度に基づいて、燃料指令値を生成する。ガバナ制御部380は、生成した燃料指令値を低値選択部250に出力する。
 燃料リミット制御部390には、ガスタービン出力と、ロータ60の回転速度と、車室圧力とが入力される。燃料リミット制御部390は、燃焼器20への燃料Fの供給量が予め設定された制限供給量を超えないように、ガスタービン出力、ロータ60の回転速度及び車室圧力に基づいて、燃料指令値を生成する。燃料リミット制御部390は、生成した燃料指令値を低値選択部250に出力する。
 低値選択部250は、上記のブレードパス温度制御部350、温度リミット制御部360、ロードリミット制御部370、ガバナ制御部380及び燃料リミット制御部390から入力された燃料指令値のうち、最も低い値となる燃料指令値を選択する。低値選択部250は、選択した燃料指令値を、後述の燃料配分制御部430に出力する。
 IGV制御部280には、温度リミット制御部360で生成される排ガス設定温度が入力される。また、IGV制御部280には、車室圧力と、ブレードパス温度と、排ガス温度と、ガスタービン出力と、吸気温度とが入力される。IGV制御部280は、これらの入力値に基づいて、入口案内翼90の開度を制御するIGV開度指令値を生成する。IGV制御部280は、生成したIGV開度指令値をIGV作動部90bに出力する。
 図11は、IGV制御部280の構成を示す図である。図11に示すように、IGV制御部280は、制御器290a、加算器300a、制御器290b、制御器290c、加算器300b、高値選択部310、減算器320a、PI制御器330a、加算器300cを備える。
 制御器290aには、吸気温度が入力される。制御器290aは、吸気温度に基づいてガスタービン出力を補正するための補正値を生成し、加算器300aに出力する。加算器300aには、ガスタービン出力と、制御器290aから出力された補正値とが入力される。加算器300aは、ガスタービン出力と補正値とを加算して補正後のガスタービン出力を算出し、制御器290bに出力する。
 制御器290bには、加算器300aから出力されたガスタービン出力が入力される。制御器290bは、ガスタービン出力と、IGV開度算出関数(第1関数)とに基づいて、入力されたガスタービン出力に対するIGV開度設定値を算出し、加算器300cに出力する。
 ここで、IGV開度算出関数について説明する。図12は、ガスタービン出力とIGV開度設定値との関係を示す図である。図12において、横軸はガスタービン出力を示す。また、図12において、縦軸はIGV開度設定値を示す。IGV開度算出関数は、図12に示すように、ガスタービン出力とIGV開度設定値との関係を規定する関数であり、曲線L1、L2によって表される。曲線L1、L2が示すように、IGV開度は、ガスタービン出力が出力P1、P2よりも大きくなるにつれて増加し、出力P3、P4に到達した後、一定となる。なお、曲線L1、L2は、図12に示す態様に限定されるものではなく、例えばガスタービン出力が大きくなる過程でIGV開度設定値が減少する期間を含んでもよい。
 なお、図12において破線で示される曲線L1は、ガスタービン2の部品のアップグレードを行う前の構成に対して用いられるIGV開度算出関数の例を示している。また、図12において実線で示される曲線L2は、ガスタービン2に対して所定の部品のアップグレードを行った後の構成に対して用いられるIGV開度算出関数の例を示している。部品のアップグレード後の曲線L2は、ガスタービン出力が出力P1から出力P4の間では、部品のアップグレード前の曲線L1に比べて、同一のガスタービン出力に対するIGV開度が小さい。なお、IGV開度算出関数については、図12に示す曲線L1、L2のほか、部品のアップグレード後の冷却用空気の供給量に応じて、また、部品のアップグレードにおいて交換される静翼100、動翼110及び分割環120の部位及び種類に応じて、複数パターンの関数が設定される。これら複数パターンの関数は、例えばデータテーブルTBL3として記憶部230が記憶する。データテーブルTBL3は、例えば、図13に示すデータテーブルである。データテーブルTBL3は、図13に示すように、データテーブルTBL2と同様に、各プラントについて、アップグレードの前後それぞれにおいて、使用されている部品の種類、導入可能なプログラム、導入可能なプログラムを導入した場合の設定される関数FXのそれぞれが関連付けられた情報を含む。導入可能なプログラムは、予め用意されており、部品のアップグレードに伴いプログラムを更新した場合に関数FXも更新される。なお、データテーブルTBL3は、外部の記憶装置が記憶するものであってもよい。制御器290bは、販売元と顧客との間の契約内容に基づいて、図13に示すデータテーブルTBL3の中の関数の1つを用いる。
 また、図11に示すように、制御器290cには、車室圧力が入力される。制御器290cは、入力された車室圧力に基づいてブレードパス温度のバイアス値を算出し、加算器300bに出力する。このバイアス値は、ブレードパス温度計180によって測定されたブレードパス温度の測定値を補正する値である。
 加算器300bには、ブレードパス温度計180によって測定されたブレードパス温度の測定値と、制御器290cから出力されたバイアス値とが入力される。加算器300bは、ブレードパス温度の測定値とバイアス値とを加算してブレードパス温度を算出し、高値選択部310に出力する。
 高値選択部310には、排ガス温度計190によって測定された排ガス温度と、加算器300bから出力されたブレードパス温度とが入力される。高値選択部310は、入力された排ガス温度及びブレードパス温度のうち高い方の値(温度)を選択し、減算器320aに出力する。
 減算器320aには、温度リミット制御部360の制御器290dから出力された排ガス設定温度と、高値選択部310から出力された温度とが入力される。減算器320aは、高値選択部310から出力された温度と排ガス設定温度との偏差△を生成し、PI制御器330aに出力する。PI制御器330aには、偏差△が入力される。PI制御器330aは、偏差△がゼロとなるようなIGV開度設定値の補正値を算出し、加算器300cに出力する。
 加算器300cには、制御器290bから出力されたIGV開度設定値と、PI制御器330aから出力されたIGV開度設定値の補正値とが入力される。加算器300cは、入力されたIGV開度設定値と補正値とを加算して補正後のIGV開度設定値を算出し、IGV作動部90bと、後述の制御変数生成部400とに出力する。
 燃焼負荷制御部340は、図4に示すように、例えば複数の燃料供給ライン140に供給する燃料の比率を制御する。燃焼負荷制御部340は、制御変数生成部400、燃料配分制御部430を備える。
 制御変数生成部400には、ガスタービン出力と、吸気温度と、IGV開度設定値と、吸気圧力とが入力される。制御変数生成部400は、入力値に基づいてタービン入口温度に相当する制御変数を生成し、燃料配分制御部430に出力する。当該制御変数は、複数の燃料供給ライン140のそれぞれに設けられた燃焼制御弁150の開度指令値を算出するための値である。制御変数は、燃焼器20からタービン30に流入する燃焼ガスの温度(タービン入口温度:T1T)を無次元化した値であり、タービン入口温度に対応した値である。
 ここで、制御変数を算出する手順を説明する。以下の説明では、タービン入口温度が、無負荷運転の場合の第1基準温度Taである場合に対応する制御変数を0%とし、タービン入口温度が第1基準温度Taよりも高温の第2基準温度Tbである場合の制御変数を100%とする。なお、第1基準温度Taとしては、700℃程度に設定されているものとする。また、第2基準温度Tbとしては、1500℃程度に設定されているものとする。なお、第1基準温度Ta及び第2基準温度Tbの設定値については、上記に限定するものではなく、例えばガスタービン2毎に異なる値に設定することができる。
 制御変数(CLCSOと表記)は、以下の式1で表すことができる。
 CLCSO=100×(ガスタービン出力-Pa)/(Pb-Pa)   …(式1)
 但し、Paは第1基準温度Taにおけるガスタービン出力であり、Pbは第2基準温度Tbにおけるガスタービン出力である。
 図14は、制御変数生成部400の構成を示す図である。制御変数生成部400は、図14に示すように、制御器290e、制御器290f、除算器410a、乗算器420a、乗算器420b、減算器320c、減算器320d、除算器410bを備える。
 制御器290e及び290fには、吸気温度とIGV開度設定値とが入力される。制御器290eは、吸気温度及びIGV開度設定値と、出力算出関数とに基づいてPaの値を算出し、乗算器420aに出力する。また、制御器290fは、吸気温度及びIGV開度設定値と、出力算出関数とに基づいてPbの値を算出し、乗算器420bに出力する。
 ガスタービン出力とCLCSOとの関係は、IGV開度及び圧縮機10の吸気温度等によって異なる。つまり、ガスタービン出力が同一の場合、CLCSOの値はIGV開度が大きくなるに従って小さくなる。また、ガスタービン出力が同一の場合、CLCSOの値は圧縮機10の吸気温度が高くなるに従って大きくなる。このため、制御器290e、290fは、吸気温度毎、及びIGV開度設定値毎にPa及びPbの値を算出する。
 ここで、出力算出関数について説明する。図15は、吸気温度とガスタービン出力との関係を示す図である。図15において、横軸は吸気温度を示す。また、図15において、縦軸はガスタービン出力を示す。出力算出関数は、IGV開度と、吸気温度と、ガスタービン出力との関係を規定するものである。したがって、制御変数生成部400で用いられる出力算出関数の態様としては、例えば吸気温度とガスタービン出力との関係を規定した関数がIGV開度毎に設けられた関数の集合であってもよいし、IGV開度とガスタービン出力との関係を規定した関数が吸気温度毎に設けられた関数の集合であってもよい。図15は、出力算出関数の一部の例を示す図である。図15では、所定のIGV開度について、第1基準温度Taにおける吸気温度とガスタービン出力との関係が直線S1、S2で示されている。直線S1、S2が示すように、この場合のガスタービン出力は、吸気温度が高くなるにしたがって低下する。
 なお、図15において破線で示される直線S1は、ガスタービン2の部品のアップグレードを行う前の構成に対して用いられる出力算出関数の例を示している。また、図15において実線で示される直線S2は、ガスタービン2に対して所定の部品のアップグレードを行った後の構成に対して用いられる出力算出関数の例を示している。部品のアップグレード後の直線S2は、部品のアップグレード前の直線S1に比べて、同一の吸気温度に対するガスタービン出力が大きい。なお、出力算出関数については、図15に示す直線S1、S2のほか、部品のアップグレード後の冷却用空気の供給量に応じて、また、部品のアップグレードにおいて交換される静翼100、動翼110及び分割環120の部位及び種類に応じて、複数パターンの関数が設定される。これら複数パターンの関数は、例えばデータテーブルTBL4として記憶部230が記憶する。データテーブルTBL4は、例えば、図16に示すデータテーブルである。データテーブルTBL4は、図16に示すように、データテーブルTBL2と同様に、各プラントについて、アップグレードの前後それぞれにおいて、使用されている部品の種類、導入可能なプログラム、導入可能なプログラムを導入した場合の設定される関数FXのそれぞれが関連付けられた情報を含む。導入可能なプログラムは、予め用意されており、部品のアップグレードに伴いプログラムを更新した場合に関数FXも更新される。なお、データテーブルTBL4は、外部の記憶装置が記憶するものであってもよい。制御器290e及び290fは、販売元と顧客との間の契約内容に基づいて、図16に示すデータテーブルTBL4の中それぞれIGV開度と及び吸気温度に応じた関数が用いられるように設定される。
 除算器410aには、吸気圧力が入力される。除算器410aは、吸気圧力を標準大気圧で除算し、除算結果である大気圧比(吸気圧力/標準大気圧)を乗算器420a及び420bに出力する。
 乗算器420aには、制御器290eから出力されたPaの値と、除算器410aから出力された大気圧比とが入力される。乗算器420aは、入力された各値同士を乗算し、乗算結果である、大気圧比を考慮したPaの値を減算器320c及び320dへ出力する。乗算器81eには、制御器290fから出力されたPbの値と、除算器410aから出力された大気圧比とが入力される。乗算器420bは、入力された値同士を乗算し、乗算結果である、大気圧比を考慮したPbの値を減算器320dへ出力する。
 減算器320dには、乗算器420aから出力されたPaの値と、乗算器420bから出力されたPbの値とが入力される。減算器320dは、Pbの値からPaの値を減算する(Pb-Pa:式1参照)。減算器320cには、ガスタービン出力と、乗算器420aで求めたPaの値とが入力される。減算器320cは、ガスタービン出力からPaの値を減算する(ガスタービン出力-Pa:式1参照)。
 除算器410bには、減算器320cからの出力値と減算器320dからの出力値とが入力される。除算器410bは、減算器320cからの出力値を減算器320dからの出力値で除算して制御変数を算出し(式1参照)、当該制御変数を燃料配分制御部430に出力する。
 また、図4に示すように、燃料配分制御部430には、低値選択部250から出力された燃料指令値と、制御変数生成部400の除算器410bから出力された制御変数とが入力される。燃料配分制御部430は、入力された燃料指令値及び制御変数に基づいて複数の燃料供給ライン140に供給する燃料の分量及び比率を算出する。燃料配分制御部430は、算出結果に基づいて各燃料供給ライン140の燃料調整弁150の開度設定値を設定し、開度設定値に基づいて各燃料調整弁150の開度を制御する。
 記憶部230は、ガスタービン2の運転に関する各種プログラムやデータ等を記憶する。記憶部230は、例えば、データテーブルTBL2、TBL3、TBL4等、制御部220において用いられるデータを記憶する。変更部240は、部品のアップグレード後の冷却用空気の供給量及び交換された部品の種類及び部位に基づいて導入されたプログラムに応じて、ガスタービン2の制御に用いられる設定温度算出関数、IGV開度算出関数及び出力算出関数を変更する。変更部240は、各関数を変更する場合、導入されたプログラムに応じて記憶部230に記憶されたデータテーブルTBL2、TBL3、TBL4における対応する関数を選択し、その選択した関数に変更する。
 次に、本発明の一実施形態によるプラント運転システム1の処理について図17を用いて説明する。
 ここでは、プラントにおいて部品をアップグレードし、顧客が導入プログラムを切り替える場合のプラント運転システム1の処理について説明する。
 顧客は、プラントに設けられる部品をその部品より高い性能でプラントを稼働可能な高温部品に交換する(ステップS1)。高温部品の販売元は、高温部品に交換した場合に導入可能な複数のプログラムを制御装置40の記憶部230に書き込む(ステップS2)。顧客は、制御装置40を介して、導入可能な複数のプログラムのうちの1つをプラントを運転させるプログラムとして導入する(ステップS3)。なお、顧客は、制御装置40の変更部240を介して、プラントを運転させるプログラムを任意に変更することができる。このとき、顧客が現在導入しているプログラムに対してプラントの性能を向上させるプログラムを導入する場合には、例えばそのプログラムの導入時間に応じて課金する。制御装置40は、顧客によって決定されたプログラムを導入すると、データテーブルTBL2、TBL3及びTBL4においてそのプログラムに応じた各関数を特定し、特定した関数を設定する(ステップS4)。また、プログラムが導入されると、制御装置40は、顧客名、導入したプログラムの種類を示す情報、及び、導入開始からの積算時間を示す情報を、所定のタイミングごと(例えば、顧客が制御装置40を介して導入するプログラムを切り替えるごと)に管理装置41に送信する。
 管理装置41は、顧客名、導入したプログラムの種類を示す情報、及び、導入開始からの積算時間を示す情報を制御装置40から受信する。プログラム判定部440は、データテーブルTBL1において、制御装置40から受信した顧客名、及び、導入したプログラムの種類を示す情報に対応するプログラムを特定する(ステップS5)。プログラム判定部440は、特定したプログラムの種類を課金額算出部470に出力する。時間特定部450は、制御装置40から受信した導入したプログラムの種類を示す情報、及び、導入開始からの積算時間を示す情報に基づいて、各プログラムの導入された積算時間を示す導入時間を特定する(ステップS6)。時間特定部450は、特定した導入時間を課金額算出部470に出力する。
 課金額算出部470は、プログラム判定部440からプログラムの種類の情報を受け、時間特定部450から導入時間の情報を受けると、データテーブルTBL1において制御装置40から受けた顧客名に関連付けられている課金額算出式を特定する(ステップS7)。課金額算出部470は、特定した課金額算出式に、各プログラムの導入時間を代入し、課金額を算出する(ステップS8)。
 以上、本発明の一実施形態によるプラント運転システム1について説明した。
 プラント運転システム1において、タービン30に設けられる動翼や静翼等の部品を供給量が減少した冷却用空気であっても冷却可能なアップグレードした部品(高温部品)に交換する。記憶部230は、アップグレードした部品に交換する前に使用しているプラントを運転させる第1プログラムに加えて、アップグレードした部品に交換する前の性能以上の性能でプラントを運転させる第2プログラム(例えば、高温部品に交換した後、プラントの性能が交換前よりも向上するようにプログラムによって設定されるパラメータを調整した場合のプログラム)を記憶する。変更部240(切替部の一例)は、プラントの運転において、第1プログラムと第2プログラムとを切り替える。
 こうすることにより、部品をアップグレードした部品に交換して、第1プログラムでプラントを運転する場合に、プラントの性能を抑えることができ、一方でプラントの性能は、アップグレードした部品に交換する前の性能より低くはならない。
 したがって、販売元がアップグレードした部品を安価に(例えば、交換前の部品と同等の価格で)顧客に提供することで、顧客は、初期費用を抑えることができる。また、顧客は、アップグレードした部品の導入後にも、第1プログラムを第2プログラムに切り替えることで、プラントの性能を容易にアップさせることもできる。その結果、顧客は、プラントにアップグレードした部品を導入しやすくなる。
 また、販売元は、プログラムを切り替えることで、プラントにおいて異なる複数の性能を実現することができる。つまり、販売元は、1種類の部品でさまざまなプラントにおける部品交換に対応することができる。その結果、販売元は、製造する部品の種類を低減することができ、材料費、加工費、在庫管理費などを削減することができ、顧客は、実際にアップグレードした部品を販売元より安価に(例えば、交換前の部品と同等の価格で)提供され、信頼性や性能の向上した部品が導入しやすくなる。また、販売元は、第1プログラムを第2プログラムに切り替えること、すなわち、プラントの性能を向上させることに対して課金することで、利益を上げることができ、顧客は、選択的に性能を向上させることができ、性能を向上させた実績に応じた支出で抑えることができる。また、顧客は電力市場の需要に応じて多く運転する時期としない時期があり、アップグレードした部品を購入してしまった後に運転機会が少ないと初期投資を回収できないリスクがあるが、本発明の使用時間に応じた課金式を採用すれば投資未回収となるリスクも小さくできる。
 よって、顧客と販売元との間でいわゆる「WIN-WIN」の関係を築くことができる。
 なお、本発明の一実施形態において、データテーブルTBL2は、部品のアップグレードを行った場合に許される最も高温で運転したときのプラントの性能に設定するための関数、及び、部品のアップグレードを行う前に使用していた関数を含むものとして説明した。しかしながら、本発明の別の実施形態では、データテーブルTBL2は、部品のアップグレードを行った場合に許される最も高温で運転したときのプラントの性能に設定するための関数、及び、部品のアップグレードを行う前に使用していた関数に加えて、さらに、部品のアップグレードを行った場合に許される最も高温で運転したときのプラントの性能と部品のアップグレードを行う前のプラントの性能との間の性能を実現する関数を含むものであってもよい。
 例えば、図9に示したアップグレード後定格温調ラインT2とアップグレード前定格温調ラインT1との間の任意の温調ラインT3(図示せず)を想定し、アップグレード後定格温調ラインT2とアップグレード前定格温調ラインT1との関係から部品のアップグレードを行った場合に許される最も高温で運転したときのプラントの性能に設定するための関数を設定した方法と同様の方法を用いて、アップグレード前定格温調ラインT1と温調ラインT3との関係から関数を求める。そして、記憶部230は、部品のアップグレードを行った場合に許される最も高温で運転したときのプラントの性能に設定するための関数、部品のアップグレードを行う前に使用していた関数、及び、アップグレード前定格温調ラインT1と温調ラインT3との関係から求めた関数を含む、データテーブルTBL2を記憶すればよい。アップグレード前定格温調ラインT1と温調ラインT3との関係から求めた関数を適用した場合、部品のアップグレードを行った場合に許される最も高温で運転したときのプラントの性能に設定するための関数を適用した場合に得られる性能と、部品のアップグレードを行う前に使用していた関数を適用した場合に得られる性能との中間の性能が得られる。データテーブルTBL2は、例えば、図18に示すデータテーブルである。データテーブルTBL2は、図18に示すように、各プラントについて、アップグレードの前後それぞれにおいて、使用されている部品の種類、導入可能なプログラム、導入可能なプログラムを導入した場合の設定される関数FXのそれぞれが関連付けられた情報を含む。導入可能なプログラムは、予め用意されており、部品のアップグレードに伴いプログラムを更新した場合に関数FXも更新される。例えば、プラントAについて、アップグレード後に導入可能なプログラムは、プログラム2、3または6であり、プログラム2を導入した場合には、アップグレード前に使用されていた関数FX2が適用され、プログラム3を導入した場合には、部品のアップグレードを行った場合に許される最も高温で運転したときのプラントの性能に設定するための関数FX3が適用され、プログラム6を導入した場合には、上述のアップグレード前定格温調ラインT1と温調ラインT3との関係から求めた関数が適用される。ただし、プラント毎に微調整が行われ、必要に応じて関数FXも調整される。なお、データテーブルTBL2は、外部の記憶装置が記憶するものであってもよい。制御器290dは、販売元と顧客との間の契約内容に基づいて、図18に示すデータテーブルTBL2の中の関数の1つを用いる。
 なお、本発明の一実施形態では、データテーブルTBL2、TBL3、TBL4を別々のデータテーブルとして説明した。しかしながら、本発明の別の実施形態では、図19に示すデータテーブルTBL5のように、データテーブルTBL2、TBL3、TBL4に含まれるデータを統合した1つのデータテーブルであってもよい。
 なお、本発明の一実施形態では、制御装置40は、顧客が所有する装置であり、顧客が現在導入しているプログラムに対してプラントの性能を向上させるプログラムを導入する場合には、例えばそのプログラムの導入時間に応じて課金するものとして説明した。しかしながら、顧客がプラントの性能を向上させるプログラムを導入したにも関わらず、課金に同意しない場合には、例えば、管理装置41は、図20に示すように、さらに制御部480、変更部490を備え、制御装置40による制御に関わらず、強制的にプラントの性能を抑えるプログラムに変更できるものであってもよい。
 なお、本発明の一実施形態では、制御装置40は、顧客が所有する装置であり、顧客が制御装置40を介して導入するプログラムを決定するものとして説明した。しかしながら、制御装置40は、アップグレードされた部品を顧客に販売する販売元、または、販売元からの依頼によってプラントを管理する管理会社が備える装置であってもよい。この場合、顧客がその制御装置40を備える販売元または管理会社に導入するプログラムを指示する。その指示を受けた販売元または管理会社は、制御装置40を介して導入するプログラムを決定すればよい。
 なお、本発明の実施形態における処理は、適切な処理が行われる範囲において、処理の順番が入れ替わってもよい。
 本発明の実施形態における記憶部230、460、その他の記憶装置のそれぞれは、適切な情報の送受信が行われる範囲においてどこに備えられていてもよい。また、記憶部230、460、その他の記憶装置のそれぞれは、適切な情報の送受信が行われる範囲において複数存在しデータを分散して記憶していてもよい。
 本発明の実施形態について説明したが、上述のプラント運転システム1、制御装置40、管理装置41、その他の制御装置は内部に、コンピュータシステムを有していてもよい。そして、上述した処理の過程は、プログラムの形式でコンピュータが読み取り可能な記録媒体に記憶されており、このプログラムをコンピュータが読み出して実行することによって、上記処理が行われる。コンピュータの具体例を以下に示す。
 図21は、少なくとも1つの実施形態に係るコンピュータの構成を示す概略ブロック図である。
 コンピュータ5は、図21に示すように、CPU6、メインメモリ7、ストレージ8、インターフェース9を備える。
 例えば、上述のプラント運転システム1、制御装置40、管理装置41、その他の制御装置のそれぞれは、コンピュータ5に実装される。そして、上述した各処理部の動作は、プログラムの形式でストレージ8に記憶されている。CPU6は、プログラムをストレージ8から読み出してメインメモリ7に展開し、当該プログラムに従って上記処理を実行する。また、CPU6は、プログラムに従って、上述した各記憶部に対応する記憶領域をメインメモリ7に確保する。
 ストレージ8の例としては、HDD(Hard Disk Drive)、SSD(Solid State Drive)、磁気ディスク、光磁気ディスク、CD-ROM(Compact Disc Read Only Memory)、DVD-ROM(Digital Versatile Disc Read Only Memory)、半導体メモリ等が挙げられる。ストレージ8は、コンピュータ5のバスに直接接続された内部メディアであってもよいし、インターフェース9または通信回線を介してコンピュータ5に接続される外部メディアであってもよい。また、このプログラムが通信回線によってコンピュータ5に配信される場合、配信を受けたコンピュータ5が当該プログラムをメインメモリ7に展開し、上記処理を実行してもよい。少なくとも1つの実施形態において、ストレージ8は、一時的でない有形の記憶媒体である。
 また、上記プログラムは、前述した機能の一部を実現してもよい。さらに、上記プログラムは、前述した機能をコンピュータシステムにすでに記録されているプログラムとの組み合わせで実現できるファイル、いわゆる差分ファイル(差分プログラム)であってもよい。
 本発明のいくつかの実施形態を説明したが、これらの実施形態は、例であり、発明の範囲を限定しない。これらの実施形態は、発明の要旨を逸脱しない範囲で、種々の追加、省略、置き換え、変更を行ってよい。
 本発明の実施形態によるプラント運転方法、制御装置及びプログラムによれば、アップグレードされた部品をプラントに導入しやすい機会を顧客に提供することができる。
1・・・プラント運転システム
2・・・ガスタービン
3・・・制御システム
5・・・コンピュータ
6・・・CPU
7・・・メインメモリ
8・・・ストレージ
9・・・インターフェース
10・・・圧縮機
20・・・燃焼器
30・・・タービン
40・・・制御装置
41・・・管理装置
50・・・発電機
60・・・ロータ
70・・・冷却用空気供給ライン
80・・・冷却用空気制御弁
90・・・入口案内翼
90a・・・翼本体
90b・・・IGV作動部
100・・・静翼
110・・・動翼
120・・・分割環
130・・・ケーシング
140・・・燃料供給ライン
150・・・燃料調整弁、燃焼制御弁
160・・・車室圧力計
170・・・吸気状態検出器
180・・・ブレードパス温度計
190・・・排ガス温度計
200・・・流量計
210・・・出力計
220、480・・・制御部
230、460・・・記憶部
240、490・・・変更部
250・・・低値選択部
260・・・排ガス温度制御部
270・・・燃焼制御部
280・・・IGV制御部
290a,290b,290c,290d,290e,290f・・・制御器
300a,300b,300c・・・加算器
310・・・高値選択部
320a,320b,320c,320d・・・減算器
330a,330b・・・PI制御器
340・・・燃焼負荷制御部
350・・・ブレードパス温度制御部
360・・・温度リミット制御部
370・・・ロードリミット制御部
380・・・ガバナ制御部
390・・・燃料リミット制御部
400・・・制御変数生成部
410a,410b・・・除算器
420a,420b・・・乗算器
430・・・燃料配分制御部
440・・・プログラム判定部
450・・・時間特定部
470・・・課金額算出部
A・・・空気
A1・・・圧縮空気
F・・・燃料
L1,L2・・・曲線
S1,S2・・・直線
T1,T2・・・定格温調ライン
Pa・・・ガスタービン出力
Ta・・・第1基準温度
Tb・・・第2基準温度
TBL1、TBL2、TBL3、TBL4、TBL5・・・データテーブル

Claims (9)

  1.  プラントに設けられる第1の部品を、前記第1の部品より高い性能で前記プラントを稼働可能な第2の部品に交換する交換ステップ、
     前記第2の部品を用いて前記第1の部品使用時と同等以上の性能である第1性能で前記プラントを運転させる第1プログラムと、前記第1性能を超える性能である第2性能で前記プラントを運転させる第2プログラムとを導入する導入ステップ、
     前記第1プログラムと前記第2プログラムとを切り替える第1切替ステップ、
     を有するプラント運転方法。
  2.  前記第1プログラムと前記第2プログラムとの切り替えに基づいて課金額を算出する算出ステップ、
     を有する請求項1に記載のプラント運転方法。
  3.  前記第2プログラムが実行された実行時間を特定する特定ステップ、
     を有し、
     前記算出ステップにおいて、
     前記実行時間に応じた前記課金額を算出する、
     請求項2に記載のプラント運転方法。
  4.  前記第1切替ステップは、
     課金される顧客によって実行され、
     前記算出ステップにおいて、
     当該顧客によって実行された前記第1切替ステップにおける前記第1プログラムと前記第2プログラムとの切り替えに基づいて課金額を算出する
     請求項2または請求項3に記載のプラント運転方法。
  5.  前記課金される顧客によって実行されるか否かに関わらず、前記第2プログラムを前記第1プログラムに切り替える第2切替ステップ、
     をさらに有する請求項4に記載のプラント運転方法。
  6.  前記第1切替ステップは、
     課金する管理者によって実行され、
     前記算出ステップにおいて、
     当該管理者によって実行された前記第1切替ステップにおける前記第1プログラムと前記第2プログラムとの切り替えに基づいて課金額を算出する
     請求項2または請求項3に記載のプラント運転方法。
  7.  前記第2の部品は、
     前記第1の部品よりも高温に耐え得る部品であり、
     前記第1切替ステップにおいて、
     前記第2プログラムに切り替え、
     当該第2プログラムは、
     当該第2の部品の温度が当該第2の部品の耐え得る高温となるように前記プラントを運転する、
     請求項1から請求項6の何れか一項に記載のプラント運転方法。
  8.  プラントに設けられる第1の部品より高い性能で前記プラントを稼働可能な第2の部品を用いて前記第1の部品使用時と同等以上の性能である第1性能で前記プラントを運転させる第1プログラムと、前記第1性能を超える性能である第2性能で前記プラントを運転させる第2プログラムとを記憶する記憶部と、
     前記第1プログラムと前記第2プログラムとを切り替える切替部と、
     を備える制御装置。
  9.  コンピュータに、
     プラントに設けられる第1の部品より高い性能で前記プラントを稼働可能な第2の部品を用いて前記第1の部品使用時と同等以上の性能である第1性能で前記プラントを運転させる第1ロジックと、
     前記第1性能を超える性能である第2性能で前記プラントを運転させる第2ロジックと、
     前記第1ロジックと前記第2ロジックとを切り替える切替ロジックと、
     を実行させるプログラム。
PCT/JP2019/026558 2018-07-09 2019-07-04 プラント運転方法、制御装置及びプログラム WO2020013063A1 (ja)

Priority Applications (4)

Application Number Priority Date Filing Date Title
KR1020207034462A KR102568453B1 (ko) 2018-07-09 2019-07-04 플랜트 운전 방법, 제어 장치 및 프로그램
US17/057,260 US20210215105A1 (en) 2018-07-09 2019-07-04 Plant operation method, control device, and program
DE112019003521.5T DE112019003521T5 (de) 2018-07-09 2019-07-04 Anlagenbetriebsverfahren, Steuervorrichtung und Programm
CN201980034050.2A CN112154472A (zh) 2018-07-09 2019-07-04 成套设备运行方法、控制装置及程序

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2018-129861 2018-07-09
JP2018129861A JP7206063B2 (ja) 2018-07-09 2018-07-09 プラント運転方法、制御装置及びプログラム

Publications (1)

Publication Number Publication Date
WO2020013063A1 true WO2020013063A1 (ja) 2020-01-16

Family

ID=69141671

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2019/026558 WO2020013063A1 (ja) 2018-07-09 2019-07-04 プラント運転方法、制御装置及びプログラム

Country Status (6)

Country Link
US (1) US20210215105A1 (ja)
JP (1) JP7206063B2 (ja)
KR (1) KR102568453B1 (ja)
CN (1) CN112154472A (ja)
DE (1) DE112019003521T5 (ja)
WO (1) WO2020013063A1 (ja)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2023014776A (ja) * 2021-07-19 2023-01-31 株式会社日立製作所 営業支援システム及び営業支援方法
WO2023095191A1 (ja) * 2021-11-24 2023-06-01 ファナック株式会社 情報処理装置、及びコンピュータが読み取り可能な記憶媒体

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008243073A (ja) * 2007-03-28 2008-10-09 Hitachi Ltd プラント制御システム
JP2017096155A (ja) * 2015-11-24 2017-06-01 三菱日立パワーシステムズ株式会社 ガスタービンの運転制御方法、改装方法、及びガスタービン制御装置の設定変更方法

Family Cites Families (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2700289A1 (de) * 1977-01-05 1978-07-06 Bayer Ag Substituierte phenylcarbamoyl-2- pyrazoline, verfahren zu ihrer herstellung und ihre verwendung als insektizide
JP2004062708A (ja) * 2002-07-31 2004-02-26 Hitachi Ltd プラント制御システム,プラント制御方法及びプラント情報提供方法
US9754000B2 (en) * 2012-12-21 2017-09-05 Sap Se Integration scenario for master data with software-as-a-service system
EP3699834A1 (en) * 2014-07-31 2020-08-26 Growing Energy Labs Inc. Predicting and optimizing energy storage lifetime performance with adaptive automation control software
US10669959B2 (en) * 2014-09-02 2020-06-02 Mitsubishi Hitachi Power Systems, Ltd. Control device, system, control method, power control device, gas turbine, and power control method
CN106797396A (zh) * 2014-09-29 2017-05-31 莱恩斯特里姆技术有限公司 用于状态机的应用商店
WO2017000950A1 (en) * 2015-06-30 2017-01-05 Vestas Wind Systems A/S Methods and systems for generating wind turbine control schedules
EP3317523B1 (en) * 2015-06-30 2020-09-23 Vestas Wind Systems A/S Methods and systems for generating wind turbine control schedules
JP2017020421A (ja) * 2015-07-10 2017-01-26 株式会社東芝 タービン部品の補修方法およびタービン部品
WO2019134980A1 (en) * 2018-01-05 2019-07-11 Laterpay Ag Method for context-based selection and activation of applications on a mobile device

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008243073A (ja) * 2007-03-28 2008-10-09 Hitachi Ltd プラント制御システム
JP2017096155A (ja) * 2015-11-24 2017-06-01 三菱日立パワーシステムズ株式会社 ガスタービンの運転制御方法、改装方法、及びガスタービン制御装置の設定変更方法

Also Published As

Publication number Publication date
KR20210002694A (ko) 2021-01-08
CN112154472A (zh) 2020-12-29
DE112019003521T5 (de) 2021-03-25
JP7206063B2 (ja) 2023-01-17
US20210215105A1 (en) 2021-07-15
KR102568453B1 (ko) 2023-08-18
JP2020009166A (ja) 2020-01-16

Similar Documents

Publication Publication Date Title
EP3354880B1 (en) Gas turbine upgrade method
JP5662697B2 (ja) ガスタービンの制御及び運転に関する方法
US8843293B2 (en) Method for controlling a gas turbine in a power plant and power plant for carrying out the method
EP2937522B1 (en) Control of a gas turbine engine
US20130152601A1 (en) Controller
US20090222187A1 (en) Gas turbine engine controls for minimizing combustion dynamics and emissions
WO2020013063A1 (ja) プラント運転方法、制御装置及びプログラム
US10458342B2 (en) System and method for controlling operation of a gas turbine based power plant
JP2007315396A (ja) 能動間隙制御においてブレード先端間隙劣化を補償する方法
JP2017044115A (ja) 燃料制御装置、燃焼器、ガスタービン、制御方法及びプログラム
US10371064B2 (en) Method and system to increase gas turbine engine durability
WO2016035416A1 (ja) 制御装置、システム及び制御方法、並びに動力制御装置、ガスタービン及び動力制御方法
US20110146288A1 (en) Method of controlling a fuel flow to a turbomachine
JP2019120138A (ja) 制御装置、ガスタービン、制御方法及びプログラム
CN105909389A (zh) 双轴式燃气轮机以及其控制装置与控制方法
US10221777B2 (en) Gas turbine combustion control device and combustion control method and program therefor
US20200291857A1 (en) Systems and methods for operating a turbine engine
JP6267087B2 (ja) 動力制御装置、ガスタービン及び動力制御方法
US10344615B2 (en) Method and system for schedule predictive lead compensation
JP2023044719A (ja) タービン出口マッハ数サロゲートを利用した非モデルベース制御のためのシステムおよび方法
Nordlund et al. Advanced SGT6-5000F Development
Pelagotti Technology Evolution of LNG Refrigerant Turbocompressors
Deen et al. Comparison of ASME PTC-46 Performance Test Correction Factors as Estimated in a Project Proposal Phase to Those Determined During Project Implementation
Schwarz et al. Clearance control method for gas turbine engine
Saadatmand et al. Industrial Application of Gas Turbines Committee

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 19833453

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 20207034462

Country of ref document: KR

Kind code of ref document: A

122 Ep: pct application non-entry in european phase

Ref document number: 19833453

Country of ref document: EP

Kind code of ref document: A1