WO2019200922A1 - Dispositif d'élimination de poussière électrostatique pour gaz de houille à haute température - Google Patents

Dispositif d'élimination de poussière électrostatique pour gaz de houille à haute température Download PDF

Info

Publication number
WO2019200922A1
WO2019200922A1 PCT/CN2018/117574 CN2018117574W WO2019200922A1 WO 2019200922 A1 WO2019200922 A1 WO 2019200922A1 CN 2018117574 W CN2018117574 W CN 2018117574W WO 2019200922 A1 WO2019200922 A1 WO 2019200922A1
Authority
WO
WIPO (PCT)
Prior art keywords
insulator
casing
gas
electrostatic precipitator
dust
Prior art date
Application number
PCT/CN2018/117574
Other languages
English (en)
Chinese (zh)
Inventor
方梦祥
陈泉霖
岑建孟
王勤辉
郑成航
高翔
骆仲泱
岑可法
Original Assignee
浙江大学
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 浙江大学 filed Critical 浙江大学
Publication of WO2019200922A1 publication Critical patent/WO2019200922A1/fr

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B03SEPARATION OF SOLID MATERIALS USING LIQUIDS OR USING PNEUMATIC TABLES OR JIGS; MAGNETIC OR ELECTROSTATIC SEPARATION OF SOLID MATERIALS FROM SOLID MATERIALS OR FLUIDS; SEPARATION BY HIGH-VOLTAGE ELECTRIC FIELDS
    • B03CMAGNETIC OR ELECTROSTATIC SEPARATION OF SOLID MATERIALS FROM SOLID MATERIALS OR FLUIDS; SEPARATION BY HIGH-VOLTAGE ELECTRIC FIELDS
    • B03C3/00Separating dispersed particles from gases or vapour, e.g. air, by electrostatic effect
    • B03C3/02Plant or installations having external electricity supply
    • B03C3/04Plant or installations having external electricity supply dry type
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B03SEPARATION OF SOLID MATERIALS USING LIQUIDS OR USING PNEUMATIC TABLES OR JIGS; MAGNETIC OR ELECTROSTATIC SEPARATION OF SOLID MATERIALS FROM SOLID MATERIALS OR FLUIDS; SEPARATION BY HIGH-VOLTAGE ELECTRIC FIELDS
    • B03CMAGNETIC OR ELECTROSTATIC SEPARATION OF SOLID MATERIALS FROM SOLID MATERIALS OR FLUIDS; SEPARATION BY HIGH-VOLTAGE ELECTRIC FIELDS
    • B03C3/00Separating dispersed particles from gases or vapour, e.g. air, by electrostatic effect
    • B03C3/34Constructional details or accessories or operation thereof
    • B03C3/66Applications of electricity supply techniques
    • B03C3/70Applications of electricity supply techniques insulating in electric separators
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B03SEPARATION OF SOLID MATERIALS USING LIQUIDS OR USING PNEUMATIC TABLES OR JIGS; MAGNETIC OR ELECTROSTATIC SEPARATION OF SOLID MATERIALS FROM SOLID MATERIALS OR FLUIDS; SEPARATION BY HIGH-VOLTAGE ELECTRIC FIELDS
    • B03CMAGNETIC OR ELECTROSTATIC SEPARATION OF SOLID MATERIALS FROM SOLID MATERIALS OR FLUIDS; SEPARATION BY HIGH-VOLTAGE ELECTRIC FIELDS
    • B03C3/00Separating dispersed particles from gases or vapour, e.g. air, by electrostatic effect
    • B03C3/34Constructional details or accessories or operation thereof
    • B03C3/74Cleaning the electrodes
    • B03C3/76Cleaning the electrodes by using a mechanical vibrator, e.g. rapping gear ; by using impact

Definitions

  • the invention belongs to the technical field of high temperature dust removal, and particularly relates to an electrostatic dust removal device for high temperature gas.
  • Coal-based polygeneration technology based on coal pyrolysis is an important technical means for efficient and clean coal utilization. Pyrolysis and gasification of coal with high volatile content in high temperature and anoxic environment can obtain gas, tar and Semi-coke, gas can be separated and purified to obtain high-quality gas fuel. The tar can obtain high-quality chemical products through further deep processing. The semi-coke can be directly used for combustion and power generation, so as to achieve clean utilization of coal graded conversion, which has broad application prospects.
  • the crude gas produced by pyrolysis gasification of coal contains a large amount of particulate matter such as fly ash and coal.
  • the tar obtained by direct condensation separation contains a large amount of particulate matter, which will have a great adverse effect on subsequent processing and utilization.
  • High-temperature pyrolysis gas has high temperature (600 ° C and above), gas composition mainly in reducing atmosphere (such as CH 4 , H 2 ), tar-containing (easy to condense below 400 ° C), etc. More difficult.
  • high temperature (above 400 °C) pyrolysis gas dedusting has not been well solved.
  • high-temperature dust removal technologies mainly include cyclone dust removal technology, ceramic/metal filtration dust removal technology, particle layer dust removal technology and electrostatic dust removal technology.
  • Cyclone dust collector has low dust removal efficiency for fine particles and can only be used as pretreatment equipment; ceramic/metal filter dust collector has high dust removal efficiency, but ceramic filter dust removal equipment has poor thermal shock and brittleness, and metal filter dust collector is easy to corrode at high temperature;
  • the layer dust collector faces the problems of large pressure loss, high energy consumption and difficulty in regenerating the working medium.
  • the electrostatic precipitator technology has the advantages of high dust removal efficiency, low pressure loss and large amount of flue gas treatment. It has been widely used in conventional coal-fired power plants. However, in the high-temperature pyrolysis gas environment, the following difficulties exist.
  • the discharge current is mainly composed of electron current, and the efficiency of particle charging is greatly reduced, thereby affecting dust removal efficiency;
  • the gap between the dizzying voltage and the breakdown voltage is reduced, which causes the electrostatic precipitator to be easily broken down during operation, which affects the stable operation of the precipitator.
  • the high temperature pyrolysis gas is rich in tar.
  • the insulator tends to adhere to tar and dust particles, especially the inner wall surface of the insulator, causing the insulator to creep up, affecting the stable operation of the dust collector; dust particles mixed with tar Adhesion is enhanced and adheres to the dust collecting plate, which makes it difficult to clean the dust, thus affecting the stable operation of the dust collector.
  • the object of the present invention is to provide an electrostatic precipitator for high temperature gas, which can effectively reduce the adhesion of tar and dust particles on the insulator and avoid creepage of the insulator.
  • An electrostatic precipitator for a high temperature gas comprising: a casing having a gas inlet and outlet, a ash hopper disposed at a lower portion of the casing, an electrode wire and a dust collecting plate disposed in the casing, and an insulating electrode wire and a casing Insulator, a hot air purging mechanism for purging the insulator, and a high voltage power source connected to the electrode line;
  • the insulator is in the shape of a hollow cylinder, the hollow structure of the insulator faces the inside of the casing, and the inner side of the bottom of the insulator is provided for Through the cylinder of the electrode wire, the side wall of the insulator is provided with a ventilation structure.
  • the temperature of the insulator can be controlled at 350-450 ° C to prevent condensation of tar on the surface and the inside of the insulator in the pyrolysis gas. Creepage, at the same time, can avoid the occurrence of leakage due to the deterioration of insulation performance due to excessive temperature.
  • the high temperature gas in the present invention includes pyrolysis gas, high temperature gasification gas, and the like.
  • the insulator in the invention is made of 99% corundum and is a high-purity corundum insulator for ensuring the insulation performance at high temperature and ensuring the insulation between the electrode wire and the casing; the insulation performance requirement of the high-purity corundum insulator is: volume resistivity Above room temperature exceeds 10 14 ⁇ cm, the Te value (temperature at which the volume resistivity drops to 1 M ⁇ cm) is greater than 1000 ° C.
  • the shape of the insulator is a hollow cylinder having a diameter of more than 300 mm and a height of more than 500 mm, and the thickness of the insulator wall is greater than 10 mm.
  • the ventilation structure is a venting hole, and 4-16 holes are arranged on the side wall of the insulator, and the aperture is 10-50 mm. It is further preferred to open a hole in the middle portion of the side wall of the insulator.
  • the length of the cylinder is greater than 600 mm.
  • the cylindrical hollow is used to pass through the electrode wire, and its wall thickness can be greater than 5 mm, and the structure of the cylinder can extend the creepage distance.
  • the hot air purging mechanism of the present invention comprises a sleeve, a gas supply pipe connecting the sleeve and a gas electric heater; the sleeve is mounted on the casing and sleeved outside the insulator.
  • the hot air purging mechanism is used for the insulation and purging of the insulator to prevent the tar in the pyrolysis gas from condensing on the surface of the insulator to cause creepage, and at the same time avoid leakage such as leakage due to excessive temperature.
  • the hot air purge wind speed at the ventilating structure of the insulator is controlled to be 0.5-5 m/s by controlling the gas electric heater, and the temperature of the insulator is controlled at 350-450 °C.
  • the hot air in the hot air purging mechanism is made of steam or hot gas (the same as the oil-free gas component in the electrostatic precipitator).
  • the hot gas component of the hot air purging mechanism cannot contain oxygen, and it is prevented from mixing with the gas in the electrostatic precipitator under high temperature and exploding.
  • a cavity is formed between the sleeve and the side wall of the insulator such that the air supply tube and the cavity are in communication with the venting structure.
  • the structure is arranged such that the purged hot gas can sequentially pass through the air supply pipe, the cavity and the ventilation structure, and enter the inner side of the insulator to prevent the tar in the pyrolysis gas from condensing inside the insulator and causing creepage.
  • a sealing gasket is provided at the side wall seal of the sleeve and the insulator.
  • the middle of the casing is a hollow cylinder, and the two ends of the hollow cylinder are respectively a conical gas inlet and a gas outlet.
  • the electrostatic precipitator adopts a cylindrical outer casing to prevent deformation caused by high temperature thermal expansion.
  • the cylindrical outer casing has the advantages of pressure resistance, explosion proof and more uniform temperature field.
  • the gas inlet and the gas outlet are tapered in shape to facilitate control of the amount of gas in and out.
  • the high-temperature dust-containing pyrolysis gas has a flow rate of 0.8-1.5 m/s in the device, ensuring a high migration rate of the dust particles in the device, and the residence time of the dust-containing gas in the device is 8-15 s. Ensure that dust particles are fully removed.
  • the gas inlet and the gas outlet are respectively provided with baffles to ensure uniform flow of gas within the device.
  • the outer side of the casing is provided with a heating mechanism and a heat insulating layer.
  • the heating mechanism can adopt electric heating or hot gas heating.
  • the temperature in the casing is controlled to be 400-600 ° C, which is used to prevent the tar from condensing in the casing due to the low temperature, resulting in cohesiveness.
  • the accumulation of ash, while preventing the temperature from being too high, causes the housing to be unstable during discharge and operation.
  • the material of the insulation layer is rock wool board with a thickness of 150-200mm, and the outside temperature of the control insulation layer is not higher than 50 °C.
  • the hot gas is an inert gas such as hot nitrogen or hot flue gas, which can provide heating and heat preservation for the electrostatic precipitator, and can also serve as a sealing layer to avoid electrostatic precipitator.
  • the internal gas is in contact with the outside air and an explosion occurs.
  • said high voltage power source is a switchable polarity high voltage DC power source.
  • the supply voltage of the switchable polarity high voltage DC power supply can be 50-200kV.
  • a non-electron negative atmosphere CH 4 , H 2 , N 2
  • the use of a positive-voltage high-voltage power source has the advantages of high dust removal efficiency and low energy consumption; in the gas component, an electronegative gas (water vapor, CO 2 )
  • the use of a negative-voltage high-voltage power supply is more efficient in dust removal.
  • the device can switch the polarity high-voltage DC power supply, which can effectively deal with the problem of unstable operation and low dust removal efficiency caused by the change of pyrolysis gas composition.
  • a plurality of dust collecting plates are disposed in the casing, and the dust collecting plates are disposed in parallel in the airflow direction of the casing; the electrode wires are disposed between adjacent dust collecting plates.
  • the dust collecting plate adopts a C-shaped dust collecting electrode plate, and the dust collecting plate is rolled by a steel plate of 1.5-10 mm, the width is 350-850 mm, and the dust collecting electrode is formed by splicing a plurality of C-shaped dust collecting plates.
  • the C-shaped dust collecting plate has a large dust-covered area, which is beneficial for reducing the secondary dust of the dust.
  • the spacing of the adjacent dust collecting plates is 400-800mm, and the wide dust collecting pole spacing is used to improve the breakdown voltage, thereby adopting a higher power supply voltage and improving the dust removing efficiency.
  • the electrode wire is a light round wire having a diameter of 2-5 mm, and the spacing of adjacent electrode wires is 400-900 mm. The use of a light round wire is beneficial to increase the breakdown voltage, thereby improving dust removal efficiency and operational stability.
  • the dust collecting plate is hung in the casing, and a high frequency rapping mechanism is arranged at the bottom thereof to prevent the dust from being blocked due to agglomeration.
  • the top of the electrode line is provided with a high-frequency rapping mechanism for preventing dust from sticking on the high-voltage electrode line, causing the corona line to be enlarged, affecting the dust removal efficiency and stable operation.
  • a baffle is disposed between the casing and the outermost dust collecting plate.
  • the baffle is used to reduce the proportion of dust-laden gas passing through the airflow, thereby improving the overall dust removal efficiency.
  • the ash hopper is disposed at the lower portion of the casing for collecting dust.
  • the number of ash hoppers can be selected according to actual working conditions, preferably 1 to 10.
  • the ash bucket is provided with a high frequency oscillating mechanism. It can prevent dust from being clogged due to agglomeration.
  • a baffle is disposed in the ash hopper.
  • the baffle is used to reduce the proportion of dust-laden gas passing through the airflow, thereby improving the overall dust removal efficiency.
  • the outer periphery of the ash hopper is provided with a heat insulating mechanism and a ash hopper insulation layer to prevent tar from condensing in the ash hopper.
  • the material of the casing, the ash hopper, the electrode wire and the dust collecting plate of the device can be made of heat-resistant alloy steel or 310S stainless steel to achieve stable operation under high temperature conditions of 800 ° C.
  • the electrostatic precipitator for high-temperature gas in the present invention can effectively reduce the adhesion of tar and dust particles on the insulator by avoiding the creepage of the insulator by improving the structure of the insulator.
  • the electrostatic precipitator for high temperature gas in the present invention can be applied to high temperature coal pyrolysis gas purification, and is used for particle trapping of oily dusty gas generated by coal pyrolysis. It not only can form a stable discharge in a high-temperature reducing atmosphere, but also can achieve stable operation under high temperature conditions of 400-600 ° C and effectively capture particulate matter in the pyrolysis gas.
  • the electrostatic precipitator for high temperature gas in the present invention can improve the energy of the system by capturing the particulate matter in the pyrolysis gas of the high temperature coal to purify the gas, improve the quality of the subsequent condensed tar and other gasification products, and the like. Utilization efficiency; in addition, the equipment operating resistance is less than 600Pa.
  • FIG. 1 is a schematic structural view of an electrostatic precipitator for a high temperature pyrolysis gas
  • Figure 2 is a left side view of an electrostatic precipitator for high temperature pyrolysis gas
  • Figure 3 is an enlarged view of the area A in Figure 1;
  • FIG. 4 is a schematic structural view of an insulator
  • Figure 5 is a schematic view showing the structure of the B-B surface of Figure 4.
  • An electrostatic precipitator for high temperature pyrolysis gas as shown in FIGS. 1 and 2, comprising: a casing 1 having a gas inlet and outlet, an ash hopper 3 disposed at a lower portion of the casing 1, and an electrode wire disposed in the casing 1 101 and a dust collecting plate 102, an insulator 2 for insulating the electrode wire 101 and the casing 1, a hot air purging mechanism for purging the insulator 2, and a high voltage power source 4 connected to the electrode wire 101.
  • the middle of the casing 1 is a hollow cylinder, and the two ends of the hollow cylinder are respectively a tapered gas inlet 104 and a gas outlet 105.
  • the electrostatic precipitator adopts a cylindrical outer casing to prevent deformation caused by high temperature thermal expansion.
  • the cylindrical outer casing has the advantages of pressure resistance, explosion proof and more uniform temperature field.
  • the gas inlet 104 and the gas outlet 105 are tapered in shape to facilitate control of the amount of gas in and out.
  • the gas inlet 104 and the gas outlet 105 are provided with an inlet baffle 106 and an outlet baffle 107, respectively, to ensure uniform flow of gas within the device.
  • the high-temperature dust-containing pyrolysis gas has a flow rate of 0.8-1.5m/s in the device, ensuring a high migration rate of dust particles in the device, and the residence time of the dust-containing pyrolysis gas in the device is 8-15s, ensuring dust particles. Can be fully removed.
  • a heating mechanism 109 and an insulating layer 110 are provided on the outer side of the casing 1.
  • the heating mechanism 109 can be electrically heated or heated by hot gas.
  • the temperature in the casing 1 is controlled to be 400-600 ° C, and the temperature is too low to cause the tar to condense in the casing 1 . , causing cohesive ash accumulation, while preventing the temperature from being too high, resulting in instability of the casing 1 during discharge and operation.
  • the material of the heat insulating layer 110 is rock wool board with a thickness of 150-200 mm, and the temperature outside the control heat insulating layer 110 is not higher than 50 °C.
  • a plurality of dust collecting plates 102 are disposed in the casing 1 , and the dust collecting plate 102 is hung in the casing 1 through the fixing frame 103 , and a high frequency rapping mechanism 108 is disposed at the bottom thereof to prevent the dust from being blocked due to agglomeration.
  • the dust collecting plate 102 is arranged in parallel in the air flow direction of the casing 1, and the dust collecting plate 102 is formed by a C-shaped dust collecting electrode plate, which is rolled by a steel plate of 1.5-10 mm, has a width of 350-850 mm, and the dust collecting electrode 102 is composed of a plurality of pieces. C-shaped dust collecting plates are spliced together.
  • the C-shaped dust collecting plate has a large dust-covered area, which is beneficial for reducing the secondary dust of the dust.
  • the spacing of the adjacent dust collecting plates 102 is 400-800 mm, and the wide dust collecting pole spacing is adopted, which is advantageous for increasing the breakdown voltage, thereby adopting a higher power supply voltage and improving the dust removing efficiency.
  • a first spoiler 111 is disposed between the casing 1 and the outermost dust collecting plate 102.
  • the first spoiler 111 is used to reduce the proportion of the dust-containing gas passing through the airflow bypass, thereby improving the overall dust removal efficiency.
  • the electrode line 101 is disposed between the adjacent dust collecting plates 102.
  • the electrode line 101 is a light round line having a diameter of 2-5 mm, and the spacing of the adjacent electrode lines 101 is 400-900 mm.
  • the use of a light round wire is beneficial to increase the breakdown voltage, thereby improving dust removal efficiency and operational stability.
  • a high-frequency rapping mechanism (not shown) is disposed on the top of the electrode wire 101 for preventing dust from sticking on the high-voltage electrode wire 101, causing the corona wire to be enlarged, affecting dust removal efficiency and stable operation.
  • the electrode wire 101 is in communication with the high voltage power source 4 through the electric wire 401.
  • the high voltage power supply 4 is a switchable polarity high voltage DC power supply.
  • the supply voltage of the switchable polarity high voltage DC power supply can be 50-200kV.
  • a non-electron negative atmosphere CH 4 , H 2 , N 2
  • the use of a positive-voltage high-voltage power source has the advantages of high dust removal efficiency and low energy consumption; in the gas component, an electronegative gas (water vapor, CO 2 )
  • the use of a negative-voltage high-voltage power supply is more efficient in dust removal.
  • the device can switch the polarity high-voltage DC power supply, which can effectively deal with the problem of unstable operation and low dust removal efficiency caused by the change of pyrolysis gas composition.
  • the insulator 2 is made of 99% corundum and is a high-purity corundum insulator for ensuring insulation at high temperatures and ensuring insulation between the electrode wire 101 and the casing 1; high-purity corundum insulator insulation
  • the performance requirements are as follows: the volume resistivity exceeds 10 14 ⁇ cm at normal temperature, and the Te value (temperature at which the volume resistivity drops to 1 M ⁇ cm) is greater than 1000 °C.
  • the insulator 2 is in the form of a hollow cylinder having a diameter of more than 300 mm, a height of more than 500 mm, and a thickness of the insulator wall of more than 10 mm.
  • the hollow structure 203 of the insulator 2 faces the inside of the casing 1.
  • the inner side of the bottom of the insulator 2 is provided with a cylinder 201 having a length of more than 600 mm and a wall thickness of more than 5 mm.
  • the structure of the cylinder can extend the creepage distance.
  • the cylinder 201 is provided with a through hole 202 for passing through the electrode wire 101, and four vent holes 205 are distributed in the middle portion of the side wall of the insulator 2, and the hole diameter may be 10-50 mm.
  • the temperature of the insulator 2 can be controlled at 350-450 ° C to prevent the tar in the pyrolysis gas from condensing on the surface and the inside of the insulator 2 to cause climbing. At the same time, it is possible to avoid leakage or the like caused by a decrease in insulation performance due to an excessive temperature.
  • the hot air purging mechanism includes a sleeve 501, an air supply pipe 502 that communicates with the sleeve 501, and a gas electric heater 5.
  • the sleeve 501 is mounted on the housing 1 and sleeved outside the insulator 2.
  • the hot air purging mechanism is used for the heat preservation and purging of the insulator 2 to prevent the tar in the pyrolysis gas from condensing on the surface of the insulator 2 to cause creepage, and to avoid leakage due to a decrease in insulation performance due to excessive temperature.
  • the hot air purge wind speed at the vent 205 of the insulator is controlled to 0.5 - 5 m/s, and the temperature of the insulator 2 is controlled at 350 - 450 °C.
  • a cavity 206 is formed between the sleeve 501 and the side wall of the insulator 2, and the air supply pipe 502 is connected to the air inlet hole 503 of the sleeve 501, so that the air supply pipe 502 and the cavity 206 communicate with the air vent 205.
  • the structure is arranged such that the purged hot gas can sequentially pass through the supply air 502, the cavity 206 and the venting opening 205, and enter the inside of the insulator 2 to prevent the tar in the pyrolysis gas from condensing inside the insulator 2 to cause creepage.
  • a sealing gasket 204 is provided at the side wall seal of the sleeve 501 and the insulator 2.
  • the ash hopper 3 is disposed at the lower portion of the casing 1 for collecting dust, and the dust is discharged by opening the ash discharging valve 301.
  • the number of ash hoppers 3 can be selected according to actual working conditions, and is three in this embodiment.
  • the ash bucket 3 can also be provided with a high-frequency oscillating mechanism (not shown) to prevent clogging of dust due to agglomeration.
  • a second spoiler 303 is disposed in the hopper 3, and the second spoiler 303 is used to reduce the proportion of the dust-containing gas passing through the airflow, thereby improving the overall dust removal efficiency.
  • the periphery of the hopper 3 is also provided with a heat insulating mechanism (not shown) and a ash insulation layer 302 to prevent tar from condensing in the hopper 3.
  • the gas inlet 104, the inlet deflector 106, the electrode wire 101, the dust collecting plate 102, the casing 1, the ash hopper 3, the gas outlet 105, and the outlet deflector 107 in the components of the electrostatic precipitator are all made of a heat resistant alloy. Steel or 310S stainless steel, able to withstand long-term stability at 800 °C.
  • the high-temperature oil-containing dust-containing pyrolysis gas enters the inside of the casing 1 of the device after passing through the gas inlet 104 and the inlet baffle 106, and the electrode wire 102 and the casing 1 are insulated by the high-purity corundum insulator 2, and the insulator 2
  • the outer sleeve is provided with a hot air purging mechanism, and the wind speed of purging the hot air at the vent 205 of the insulator 2 is controlled to 0.5-5 m/s by the operation of the hot air purging mechanism, and the surface temperature of the insulator is controlled at 350-450 ° C, Prevent the tar in the pyrolysis gas from condensing on the surface of the insulator 2 to cause creepage, and at the same time avoid the occurrence of leakage due to the deterioration of the insulation performance due to excessive temperature.
  • the electrode line 101 is connected with a switchable polarity high voltage DC power source for forming a high voltage electric field and a corona discharge between the electrode line 101 and the dust collecting plate 102.
  • a switchable polarity high voltage DC power source for forming a high voltage electric field and a corona discharge between the electrode line 101 and the dust collecting plate 102.
  • the dust particles in the high temperature gas are taken.
  • the upper charge is applied to the dust collecting plate 102 under the action of the electric field force.
  • the high-frequency rapping mechanism 108 performs rapping to cause the dust to fall off the dust collecting plate 102, and falls into the ash hopper 3.
  • the ash discharging valve 301 is opened to discharge the dust. Waiting for the next processing and utilization; the purified gas enters the downstream process through the gas outlet 105 and the outlet deflector 107.
  • the invention can fully capture fine particles in the oily dusty pyrolysis gas at high temperature, ensure the purity of the tar during the subsequent condensation preparation of the tar, and the quality of the gas. It can achieve 95% dust removal efficiency at 600 °C, 98% dust removal efficiency at 400 °C, and the running resistance of the device is less than 600Pa.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Electrostatic Separation (AREA)

Abstract

L'invention concerne un dispositif d'élimination de poussière électrostatique pour gaz de houille à haute température, comprenant : une coque (1) pourvue d'une entrée de gaz (104) et d'une sortie de gaz (105), des trémies à poussière (3) disposées au niveau de la partie inférieure de la coque (1), des fils d'électrode (101) et des plaques d'électrode de collecte de poussière (102) disposées dans la coque (1), des isolants (2) pour isoler les fils d'électrode (101) et la coque (1), un mécanisme de purge de gaz chaud pour purger les isolants (2), et une alimentation électrique haute puissance (4) connectée aux fils d'électrode (101) ; et l'isolant (2) à la forme d'un cylindre creux, la structure creuse de l'isolant (2) fait face à l'intérieur de la coque (1), un cylindre (201) utilisé pour pénétrer à travers le fil d'électrode (101) est disposé d'un côté interne du fond de l'isolant (2), et une structure de ventilation est disposée sur une paroi latérale de l'isolant (2). Grâce à ce dispositif, l'huile de goudron et les particules de poussière adhérant à l'isolant (2) peuvent être efficacement réduites, ce qui permet d'éviter le glissement de l'isolant (2).
PCT/CN2018/117574 2018-04-19 2018-11-27 Dispositif d'élimination de poussière électrostatique pour gaz de houille à haute température WO2019200922A1 (fr)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201810352753.7 2018-04-19
CN201810352753.7A CN108435424A (zh) 2018-04-19 2018-04-19 一种用于高温煤气的静电除尘装置

Publications (1)

Publication Number Publication Date
WO2019200922A1 true WO2019200922A1 (fr) 2019-10-24

Family

ID=63200987

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2018/117574 WO2019200922A1 (fr) 2018-04-19 2018-11-27 Dispositif d'élimination de poussière électrostatique pour gaz de houille à haute température

Country Status (2)

Country Link
CN (1) CN108435424A (fr)
WO (1) WO2019200922A1 (fr)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20230086015A (ko) * 2021-12-07 2023-06-15 주식회사성원기업 선박용 전기집진기의 에어 공급 시스템

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108435424A (zh) * 2018-04-19 2018-08-24 浙江大学 一种用于高温煤气的静电除尘装置
CN109158212B (zh) * 2018-10-08 2024-04-26 浙江大学 自持式宽温高密封性除尘装置及工艺
WO2021090595A1 (fr) * 2019-11-05 2021-05-14 富士電機株式会社 Précipitateur électrostatique
CN111068917B (zh) * 2019-11-18 2022-12-02 昆明理工大学 针对碳热还原炉烟气干式中高温分级电滤除尘的方法与装置
CN111004651B (zh) * 2019-11-27 2021-01-22 中信重工工程技术有限责任公司 一种对含焦油高温煤气的除尘装置
CN114985108A (zh) * 2022-05-23 2022-09-02 西安西矿环保科技有限公司 高温电除尘器

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20110032646A (ko) * 2009-09-23 2011-03-30 한국기계연구원 전극봉 절연 고정구조가 구비된 전기집진장치
CN104001622A (zh) * 2014-05-08 2014-08-27 浙江大学 高温静电除尘系统
CN105251615A (zh) * 2015-11-12 2016-01-20 国电科学技术研究院 一种用于湿式电除尘器绝缘子室的双螺旋空气密封装置
CN205084886U (zh) * 2015-10-29 2016-03-16 福建龙净环保股份有限公司 一种绝缘子及其封盖
CN106733184A (zh) * 2016-12-23 2017-05-31 北京国电富通科技发展有限责任公司 一种绝缘密封装置及包括其的湿式电除尘器
CN108435424A (zh) * 2018-04-19 2018-08-24 浙江大学 一种用于高温煤气的静电除尘装置
CN208082697U (zh) * 2018-04-19 2018-11-13 浙江大学 一种用于高温煤气的静电除尘装置

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN205761778U (zh) * 2016-05-12 2016-12-07 保定美田环保设备科技有限公司 一种湿式电除尘器阴极吊杆
CN107051730B (zh) * 2017-04-16 2018-04-17 襄阳九鼎昊天环保设备有限公司 一种超洁净净化用电捕焦油器

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20110032646A (ko) * 2009-09-23 2011-03-30 한국기계연구원 전극봉 절연 고정구조가 구비된 전기집진장치
CN104001622A (zh) * 2014-05-08 2014-08-27 浙江大学 高温静电除尘系统
CN205084886U (zh) * 2015-10-29 2016-03-16 福建龙净环保股份有限公司 一种绝缘子及其封盖
CN105251615A (zh) * 2015-11-12 2016-01-20 国电科学技术研究院 一种用于湿式电除尘器绝缘子室的双螺旋空气密封装置
CN106733184A (zh) * 2016-12-23 2017-05-31 北京国电富通科技发展有限责任公司 一种绝缘密封装置及包括其的湿式电除尘器
CN108435424A (zh) * 2018-04-19 2018-08-24 浙江大学 一种用于高温煤气的静电除尘装置
CN208082697U (zh) * 2018-04-19 2018-11-13 浙江大学 一种用于高温煤气的静电除尘装置

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20230086015A (ko) * 2021-12-07 2023-06-15 주식회사성원기업 선박용 전기집진기의 에어 공급 시스템
KR102656491B1 (ko) 2021-12-07 2024-04-12 주식회사성원기업 선박용 전기집진기의 에어 공급 시스템

Also Published As

Publication number Publication date
CN108435424A (zh) 2018-08-24

Similar Documents

Publication Publication Date Title
WO2019200922A1 (fr) Dispositif d'élimination de poussière électrostatique pour gaz de houille à haute température
CN101274305B (zh) 一种袋式集尘极电除尘装置
WO2007016872A1 (fr) Dispositif de precipitation electrostatique presentant une efficacite elevee
CN207170010U (zh) 一种转炉炼钢静电除尘系统
CN103447153A (zh) 电除尘器
CN105149092B (zh) 一种用于导电粉尘的除尘方法
CN101550466A (zh) 转炉煤气高温袋式除尘系统
TW201020020A (en) Method for scrubbing a flue gas of a metallurgical plant and flue gas scrubbing apparatus
CN104001622A (zh) 高温静电除尘系统
CN202666644U (zh) 节水低能耗烟气干湿复合除尘脱硫系统
CN200974040Y (zh) 烧结机机头工艺除尘用新型高效电除尘器
CN105861020B (zh) 生物质热解气液化处理系统
CN201200848Y (zh) 电袋复合式除尘器
CN201176445Y (zh) 转炉煤气高温袋式除尘装置
CN208082697U (zh) 一种用于高温煤气的静电除尘装置
CN202238319U (zh) 新型静电除尘器
CN101337148B (zh) 大型电袋复合型除尘器
CN211274055U (zh) 火化机尾气处理设备
CN105327578B (zh) 一种含尘气体净化方法
CN105505478B (zh) 一种电旋风流光电晕生物质气化粗燃气净化装置与方法
CN207238262U (zh) 一种高效的双核心模块双区高压静电式除尘杀菌装置
CN101838716A (zh) 一种转炉煤气高温除尘的工艺方法及装置
CN213977762U (zh) 一种转炉一次干法除尘放散烟气超低排放净化处理系统
CN203803646U (zh) 一种高温静电除尘系统
CN207102910U (zh) 一种电除尘器

Legal Events

Date Code Title Description
DPE2 Request for preliminary examination filed before expiration of 19th month from priority date (pct application filed from 20040101)
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 18915646

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 18915646

Country of ref document: EP

Kind code of ref document: A1