WO2019117098A1 - 施工装置 - Google Patents

施工装置 Download PDF

Info

Publication number
WO2019117098A1
WO2019117098A1 PCT/JP2018/045362 JP2018045362W WO2019117098A1 WO 2019117098 A1 WO2019117098 A1 WO 2019117098A1 JP 2018045362 W JP2018045362 W JP 2018045362W WO 2019117098 A1 WO2019117098 A1 WO 2019117098A1
Authority
WO
WIPO (PCT)
Prior art keywords
construction
laying
magnetic marker
unit
drilling
Prior art date
Application number
PCT/JP2018/045362
Other languages
English (en)
French (fr)
Inventor
道治 山本
知彦 長尾
均 青山
雅嘉 藤谷
伸 竹内
英人 武石
大三 西山
Original Assignee
愛知製鋼株式会社
株式会社Nippo
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 愛知製鋼株式会社, 株式会社Nippo filed Critical 愛知製鋼株式会社
Priority to EP18888520.6A priority Critical patent/EP3725946A4/en
Priority to SG11202005373WA priority patent/SG11202005373WA/en
Priority to CN201880079571.5A priority patent/CN111448351B/zh
Priority to US16/770,653 priority patent/US11242659B2/en
Publication of WO2019117098A1 publication Critical patent/WO2019117098A1/ja

Links

Images

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05DSYSTEMS FOR CONTROLLING OR REGULATING NON-ELECTRIC VARIABLES
    • G05D1/00Control of position, course, altitude or attitude of land, water, air or space vehicles, e.g. using automatic pilots
    • G05D1/02Control of position or course in two dimensions
    • G05D1/021Control of position or course in two dimensions specially adapted to land vehicles
    • G05D1/0259Control of position or course in two dimensions specially adapted to land vehicles using magnetic or electromagnetic means
    • G05D1/0261Control of position or course in two dimensions specially adapted to land vehicles using magnetic or electromagnetic means using magnetic plots
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C23/00Auxiliary devices or arrangements for constructing, repairing, reconditioning, or taking-up road or like surfaces
    • E01C23/16Devices for marking-out, applying, or forming traffic or like markings on finished paving; Protecting fresh markings
    • E01C23/18Devices for marking-out, applying, or forming traffic or like markings on finished paving; Protecting fresh markings for applying prefabricated markings
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C23/00Auxiliary devices or arrangements for constructing, repairing, reconditioning, or taking-up road or like surfaces
    • E01C23/16Devices for marking-out, applying, or forming traffic or like markings on finished paving; Protecting fresh markings
    • E01C23/163Devices for marking-out, applying, or forming traffic or like markings on finished paving; Protecting fresh markings for marking-out the location of the markings; Guiding or steering devices for marking apparatus, e.g. sights
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01FADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
    • E01F9/00Arrangement of road signs or traffic signals; Arrangements for enforcing caution
    • E01F9/30Arrangements interacting with transmitters or receivers otherwise than by visible means, e.g. using radar reflectors or radio transmitters
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01FADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
    • E01F9/00Arrangement of road signs or traffic signals; Arrangements for enforcing caution
    • E01F9/50Road surface markings; Kerbs or road edgings, specially adapted for alerting road users
    • E01F9/506Road surface markings; Kerbs or road edgings, specially adapted for alerting road users characterised by the road surface marking material, e.g. comprising additives for improving friction or reflectivity; Methods of forming, installing or applying markings in, on or to road surfaces
    • E01F9/512Preformed road surface markings, e.g. of sheet material; Methods of applying preformed markings

Definitions

  • the present invention relates to a construction apparatus for laying a magnetic marker on a road.
  • a marker detection system for a vehicle which detects a magnetic marker laid on a road by a magnetic sensor attached to the vehicle (see, for example, Patent Document 1). According to such a marker detection system, it is possible to realize various types of driving support such as automatic steering control using lane markers and lane departure warning and automatic driving, for example.
  • the conventional magnetic marker has the following problems. For example, in order to realize driving assistance such as a lane departure warning, it is necessary to lay a large number of magnetic markers at relatively short intervals with high positional accuracy, so there is a problem that the construction cost tends to increase.
  • This invention is made in view of the said conventional problem, and it is going to provide the construction apparatus of the magnetic marker which can suppress construction cost by efficient construction.
  • the present invention is a construction apparatus for laying a magnetic marker on a road, wherein It has a working unit that provides the installation position of the magnetic marker, It is in the construction apparatus which can provide the installation position of a magnetic marker in multiple places which show predetermined relative physical relationship, without moving.
  • the construction apparatus of the present invention can provide the installation positions of the magnetic markers at a plurality of locations without moving. About the installation position of the magnetic marker of several places provided with a construction apparatus installed in any position, the precision of the relative positional relationship can be ensured comparatively easily. In setting the laying positions of the magnetic markers at a plurality of locations, the positioning of the construction apparatus may be performed only once. Therefore, according to the construction apparatus of this invention, the installation position of a magnetic marker can be provided efficiently and the suppression of construction cost is possible.
  • the installation apparatus of this invention is a useful apparatus which can suppress construction cost by efficient construction.
  • FIG. 2 is a diagram showing a magnetic marker in Example 1;
  • FIG. 2 is a top view of a construction carriage in Example 1;
  • FIG. 2 is a block diagram showing an electrical configuration for realizing inertial navigation in Embodiment 1.
  • FIG. Explanatory drawing of the identification method of a laying position in Example 1.
  • FIG. The top view of the construction truck in Example 2.
  • a construction apparatus for laying a magnetic marker on a road in addition to an apparatus for placing a magnetic marker on a road, for example, a hole for receiving a magnetic marker or a mark for specifying a laying position It may be a device that carries out preparatory work when laying a magnetic marker, such as being provided in It is not essential for the construction apparatus for laying the magnetic marker on the road to complete the laying of the magnetic marker. For example, even if the installation of the magnetic marker is not completed, if the operation of drilling the accommodation hole is performed, the position of the accommodation hole is determined as the installation position of the magnetic marker.
  • Example 1 This example is an example regarding the construction device which carries out the work for laying the magnetic marker 10 on the road. The contents will be described with reference to FIGS. 1 to 6.
  • Construction truck 2 of Drawing 1 is a construction device which provides a laying position of magnetic marker 10 (Drawing 2) on a road.
  • the construction truck 2 fixes the installation position of the magnetic marker 10 by forming an accommodation hole 108 for accommodating the magnetic marker 10 on the road surface 100S.
  • the construction truck 2 is provided with one drilling drill (an example of a working unit) 21 for drilling the housing hole 108, one each at the front and rear of the vehicle body 2B. According to this construction truck 2, it is possible to provide two accommodation holes 108 (laying positions) without moving.
  • the magnetic marker 10 to be installed is a small-sized marker in the form of a column having a diameter of 20 mm and a height of 28 mm.
  • the magnet of the magnetic marker 10 is a magnet whose magnetic flux density on the surface is 45 mT (milliTesla) and whose magnetic flux density reaching a height of 250 mm from the surface is about 8 ⁇ T.
  • the magnet which is an isotropic ferrite plastic magnet, is resistant to corrosion because the magnetic material is iron oxide, and it is not necessary to store it in a metal case or the like.
  • the magnetic marker 10 can be directly housed and laid in a relatively small housing hole 108 (FIG. 1) having, for example, a diameter of 25 to 30 mm and a depth of about 35 to 40 mm.
  • the construction truck 2 is a four-wheeled vehicle provided with two left and right driving wheels 281 on the front side of the vehicle body 2B and two left and right two free wheels 282 as shown in FIG.
  • the front left and right drive wheels 281 can be driven individually, and can change the direction of the construction truck 2 according to the difference in rotation.
  • the direction of the wheels can be freely changed according to the direction of the construction truck 2 on the rear side of the left and right free wheels 282.
  • bogie 2 the structure of 3 wheels may be sufficient and the structure of 6 wheels may be sufficient.
  • a handlebar 20 is provided which extends rearward beyond the rear drilling drill 21.
  • the worker can move the construction truck 2 by walking while pushing the handle 20.
  • the manual handle 20 is supported in a cantilever manner by an operation unit 201 having a sensor (not shown) for sensing the operation force of the operator's hands.
  • the drive wheel 281 is rotationally driven according to the operation force applied to the hand-pushing handle 20, whereby a proper assist force is generated. Therefore, the worker can move the construction truck 2 with a relatively light force.
  • a display panel (not shown) is attached to the operation unit 201 so that a worker can view it, and information such as the movement distance of the construction truck 2 is displayed.
  • a guide roller 280 is attached to the front side of the vehicle body 2B. If this guide roller 280 is used, for example, visual confirmation of whether or not the vehicle body 2B is along the target line is facilitated.
  • a load counter roller 285 for measuring the movement distance is attached to the rear side of the vehicle body 2B.
  • the construction truck 2 is, as shown in FIG. 1, a generator 251 using light oil as fuel, a drive cylinder 211 for driving the drilling drill 21 in the vertical direction, and a suction for collecting drilling debris, etc. A cleaner 252 and the like are provided.
  • the drilling drill 21 is driven by the drive cylinder 211 to advance and retract in the vertical direction, but is not displaced in the horizontal direction relative to the vehicle body 2B. That is, the position of the drilling drill 21 in the horizontal plane along the road surface 100S is held constant relative to the vehicle body 2B.
  • the front and rear drilling drills 21 are located on the center line CL (see FIG. 3) of the vehicle body 2B.
  • the front and rear drilling drills 21 are separated from each other by 1 m from the center CP of the vehicle body 2B in the front-rear direction along the center line CL (both spans D1 and D2 are 1 m). Therefore, the space
  • interval of the drilling drill 21 of back and front in the construction trolley 2 is span D 2 m.
  • the relative positional relationship between the front and rear drilling drills 21 with respect to the center CP of the vehicle body 2B is such that the front drilling drill 21 is 1 m forward of the center CP of the vehicle body 2B and the rear drilling drill 21 is the center of the vehicle body 2B. It is 1m behind CP.
  • the offset amount (OF1 and OF2 in FIGS. 1 and 3) representing this relative positional relationship is an example of calculation of the position information acquisition unit as a parameter representing the relative position of the drilling drill 21 with respect to the center CP of the vehicle body 2B.
  • the unit 30 (described later) is preset.
  • the construction truck 2 comprises a gyro compass unit (orientation information acquisition unit) 36 for measuring the direction (orientation) of the center line CL of the vehicle body 2B, an encoder 37 for detecting the amount of rotation of the load counter roller 285 as shown in FIG.
  • the arithmetic unit 30 is provided to obtain the drilling position of the housing hole 108 at which the magnetic marker 10 is laid.
  • the gyro compass unit 36 is a measurement device that measures the direction of the measurement target with respect to the true north which is the reference direction.
  • the gyro compass unit 36 implements the above measurement by utilizing the gyro effect that the rotation axis of the gyroscope held horizontally on the surface of the rotating earth is along the north and south.
  • the gyro compass unit 36 is installed such that the direction of the measurement target is along the center line CL of the vehicle body.
  • the gyro compass unit 36 measures the direction of the center line CL of the vehicle body 2B with respect to true north as a reference direction, and inputs direction information representing the direction to the arithmetic unit 30.
  • the arithmetic unit 30 includes an electronic circuit (not shown) including a central processing unit (CPU) for executing calculation processing, a read only memory (ROM) and a random access memory (RAM) for storing parameters and the like.
  • CPU central processing unit
  • ROM read only memory
  • RAM random access memory
  • Arithmetic unit 30 specifies the position (absolute position) of construction truck 2 during laying work using inertial navigation, thereby performing arithmetic processing for specifying the drilling position of accommodation hole 108 which will be the laying position.
  • Position information of the installation position is stored in the database 31 and accumulated as installation information of the magnetic marker 10.
  • the arithmetic unit 30 calculates the moving distance and relative position of the construction truck 2 based on the amount of rotation input from the encoder 37, the orientation of the center line CL input from the gyro compass unit 36, and the like.
  • the movement distance is calculated by multiplying the integrated value of the rotation amount detected by the encoder 37 by the diameter of the load counter roller 285 or the like.
  • the relative position is calculated by starting the movement from the reference position where the absolute position is specified in advance, and then integrating the instantaneous displacement amount (moving distance) along the direction of the center line CL measured by the gyro compass unit 36 it can.
  • a positioning point is set at the center CP of the vehicle body 2B, and this position is handled as the position of the construction truck 2.
  • a construction truck in addition to the construction truck 2 of FIG. 1 in which the housing hole 108 is bored, a construction truck (not shown) in which the magnetic marker 10 is disposed one by one in the housing hole 108 It implement
  • the construction truck for placement is a construction device for placing the magnetic marker 10 in the housing hole 108 and supplying paving material as an adhesive.
  • the construction truck for road surface finishing is a construction device for carrying out the work of smoothing the road surface 100S by scraping off excess paving material that rises from the periphery after the paving material supplied to the housing hole 108 is hardened.
  • a marking line ML (see FIG. 5), which is a target line on which the magnetic marker 10 is laid, is formed on the road surface 100S.
  • the marking line ML can be formed, for example, by a vehicle equipped with a dropper for marking ink, paint or the like. If this vehicle is allowed to travel along a travel path such as a lane to be constructed, a marking line ML, which is a target line for laying the magnetic marker 10, can be formed.
  • the work of drilling the accommodation hole 108 at which the magnetic marker 10 is to be laid can be performed.
  • the reference position When starting movement of the construction truck 2 to provide the installation site 10G along the road, it is necessary to specify in advance the initial position of the construction truck 2 as the reference position.
  • a method of specifying this reference position for example, there is a method of using a GPS device (not shown) which measures an absolute position in advance using a global positioning system (GPS, Global Positioning System).
  • GPS Global Positioning System
  • the absolute position of the center CP (FIG. 1, FIG. 3) of the vehicle body 2B can be measured by setting the GPS antenna to the center CP of the vehicle body 2B. It can be identified.
  • the reference position may be specified by surveying the absolute position of the center CP of the vehicle body 2B by triangulation using surveying devices (not shown) installed at two locations where absolute positions have already been identified.
  • the arithmetic unit 30 integrates the momentary displacement amount based on the rotation amount detected by the encoder 37 along the momentary orientation of the center line CL of the vehicle body 2B input from the gyro compass unit 36, thereby obtaining the reference position.
  • the relative position of the construction truck 2 with respect to is calculated.
  • the relative position calculated by the arithmetic unit 30 when the construction truck 2 carries out the laying operation for any of the laying points 10G is indicated by the arrow V.
  • Arithmetic unit 30 adds the relative position represented by arrow V to the reference position, thereby specifying the absolute position of center CP with respect to construction truck 2 in which the laying work is being performed.
  • the arithmetic unit 30 executes an operation of shifting the position along the direction of the center line CL of the vehicle body 2B measured by the gyro compass unit 36 as shown in FIG. 6 by the amount of this offset. According to this calculation, it is possible to specify the absolute positions of the front and rear drilling drills 21 with reference to the position of the center CP of the vehicle body 2B.
  • the absolute positions of the two accommodation holes 108 that is, the absolute position of the installation position 10F can be specified.
  • the positional information on the installation position 10F specified in this way is stored in the database 31 connected to the arithmetic unit 30, and is accumulated as the installation information of the magnetic marker 10.
  • the construction truck 2 of this example it is possible for the construction truck 2 of this example to provide the installation position 10F of the magnetic marker 10 in two places, without moving.
  • the space which makes the relative positional relationship of these two laying positions 10F is precisely matched with the span D of 2 m of drilling drills 21 before and behind with high accuracy, and the possibility of fluctuating every laying place 10G is reduced.
  • two laying positions 10F adjacent to each other at 2 m intervals can be efficiently provided at each laying point 10G.
  • the absolute position of the installation position 10F is specified by measuring the position of the construction truck 2 under implementation. . According to such construction, since it takes time and labor to measure the position with high accuracy and to position the construction truck 2 at a predetermined position with high accuracy, the laying work can be performed extremely efficiently. On the other hand, since the position of the construction truck 2 is measured while carrying out the laying work, highly accurate position information can be obtained for each laying position 10F.
  • the construction truck 2 of this example does not assume positioning by GPS, it can also cope with an environment such as in a tunnel where GPS radio waves can not be received.
  • it is preferable to set the reference position by positioning the absolute position of the construction truck 2 at an entrance where positioning of the absolute position can be performed by GPS.
  • the construction drill 2 may be a construction trolley of only 1 set.
  • the plurality of housing holes 108 may be drilled by moving the drilling drill 21 in a horizontal plane along the road surface 100S.
  • the construction truck provided with three or more drilling drills 21 may be used.
  • the drilling drills 21 may not be arranged in a straight line.
  • three drilling drills 21 may be provided to form a triangle.
  • the orientation of the triangle can be expressed, for example, by a deviation angle with respect to the reference orientation, for example, with respect to any side of the triangle or a bisector equally dividing the angle of any vertex.
  • position information representing the absolute position of each laying position 10F is stored in the database 31 and is stored as the laying information of the magnetic marker 10.
  • azimuth information indicating the direction of a line segment (an example of the arrangement shape) connecting the two laying positions 10F in each laying position 10G may be stored together.
  • the orientation of this line segment has a predetermined relationship with the orientation of the center line CL of the construction truck 2 (the vehicle body 2B) in the process of laying work (in this example, it is identical). It can be easily identified based on the orientation of the center line CL.
  • the direction (direction) of the line segment connecting the two laying positions 10F is known, the traveling direction of the vehicle passing through the two laying positions 10F etc. It can be detected high.
  • Example 2 This example is an example in which a GPS unit, which is an example of a position information acquisition unit, is added to the construction truck of the first embodiment.
  • the GPS unit 38 is a unit for receiving radio waves from GPS satellites and positioning an absolute position as shown in FIG.
  • the GPS unit 38 supports positioning by RTK (Real Time Kinematic) -GPS.
  • the GPS unit 38 performs baseline analysis using a signal received by a fixed station whose absolute position has been identified, whereby a base line vector from the fixed station to the GPS unit 38 can be specified and the absolute position can be determined with high accuracy It is.
  • RTK Real Time Kinematic
  • the construction truck 2 of this example is provided with one GPS unit 38 for measuring an absolute position, and two GPS antennas 381 are connected to the GPS unit 38.
  • the GPS unit 38 measures the absolute position of the installation point of each GPS antenna 381.
  • the GPS antennas 381 are respectively attached right above the front and rear drilling drills 21, the positions of the drilling drills 21 become positioning points.
  • two absolute positions measured by the GPS unit 38 are the positions where the accommodation holes 108 are bored and become the installation positions 10 F of the magnetic markers 10.
  • the installation position 10F of the magnetic marker 10 can be identified using the GPS in a situation where GPS radio waves can be received, and in a situation where the reception situation of GPS radio waves is insufficient
  • the installation position 10F of the magnetic marker 10 can be identified using inertial navigation. As described above, if the method of specifying the laying position is properly used, the laying operation of the magnetic marker 10 including the generation of the laying information of the magnetic marker 10 can be performed more efficiently regardless of the situation.
  • the GPS antenna 381 is mounted right above each of the two drilling drills 21 is illustrated, but the GPS antenna 381 is mounted only right above one of the drilling drills 21. Also good.
  • the absolute position of the other drilling drill 21 can be identified based on the absolute position of one drilling drill 21 determined by the GPS. For example, it is also possible to specify the absolute position of the other drilling drill 21 based on the absolute position of one drilling drill 21 by shifting the position along the orientation of the center line CL of the vehicle body 2B measured by the gyro compass unit. .
  • the other configurations and operational effects are the same as in the first embodiment.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Aviation & Aerospace Engineering (AREA)
  • Electromagnetism (AREA)
  • Radar, Positioning & Navigation (AREA)
  • Remote Sensing (AREA)
  • General Physics & Mathematics (AREA)
  • Automation & Control Theory (AREA)
  • Control Of Position, Course, Altitude, Or Attitude Of Moving Bodies (AREA)
  • Road Signs Or Road Markings (AREA)

Abstract

車両側の運転支援制御を実現するために磁気マーカを道路に敷設するための施工台車(2)は、磁気マーカの敷設位置となる収容穴(108)を路面(100S)に穿設する穿孔ドリル(21)を車体(2B)の前後に有しており、いずれかの位置に停車した状態で移動することなく所定間隔の2箇所に収容穴(108)を穿設可能であり、敷設位置をなすこの2箇所の収容穴(108)の間隔の精度を高めるために施工台車(2)の位置合わせ等を実行する必要がなく効率的な敷設作業を実施できる。

Description

施工装置
 本発明は、道路に磁気マーカを敷設するための施工装置に関する。
 従来、車両に取り付けた磁気センサにより道路に敷設された磁気マーカを検出する車両用のマーカ検出システムが知られている(例えば、特許文献1参照。)。このようなマーカ検出システムによれば、例えば車線に沿って敷設された磁気マーカを利用する自動操舵制御や車線逸脱警報や自動運転などの各種の運転支援を実現できる。
特開2005-202478号公報
 しかしながら、前記従来の磁気マーカについては、次のような問題がある。例えば車線逸脱警報等の運転支援を実現するためには比較的短い間隔で多数の磁気マーカを位置精度高く敷設する必要があるため、施工コストが上昇し易いという問題がある。
 本発明は、前記従来の問題点に鑑みてなされたものであり、効率的な施工により施工コストを抑制できる磁気マーカの施工装置を提供しようとするものである。
 本発明は、道路に磁気マーカを敷設するための施工装置であって、
 磁気マーカの敷設位置を設ける作業ユニットを備え、
 移動することなく所定の相対的な位置関係を呈する複数箇所に磁気マーカの敷設位置を設けることが可能である施工装置にある。
 本発明の施工装置は、移動することなく複数箇所に磁気マーカの敷設位置を設けることが可能である。いずれかの位置に施工装置を設置したまま設けられる複数箇所の磁気マーカの敷設位置については、その相対的な位置関係の精度を比較的容易に確保できる。この複数箇所の磁気マーカの敷設位置を設けるに当たって、施工装置の位置合わせは一度だけで良い。したがって、本発明の施工装置によれば、効率良く磁気マーカの敷設位置を設けることができ、施工コストの抑制が可能である。
 このように本発明の施工装置は、効率的な施工により施工コストを抑制できる有用な装置である。
実施例1における、施工台車による敷設作業の説明図。 実施例1における、磁気マーカを示す図。 実施例1における、施工台車の上面図。 実施例1における、慣性航法を実現するための電気的な構成を示すブロック図。 実施例1における、磁気マーカの敷設仕様の説明図。 実施例1における、敷設位置の特定方法の説明図。 実施例2における、施工台車の上面図。
 本発明において磁気マーカを道路に敷設するための施工装置としては、磁気マーカを道路に配置する装置のほか、例えば磁気マーカの収容穴を穿設したり、敷設位置を特定するための印を路面に設ける等、磁気マーカを敷設する際の準備作業などを担う装置であっても良い。磁気マーカを道路に敷設するための施工装置が、磁気マーカの敷設を完了することは必須ではない。例えば、磁気マーカの敷設が完了しなくても収容穴を穿設する作業を実施すれば、その収容穴の位置が磁気マーカの敷設位置として確定する。
 本発明の実施の形態につき、以下の実施例を用いて具体的に説明する。
(実施例1)
 本例は、磁気マーカ10を道路に敷設するための作業を実施する施工装置に関する例である。この内容について、図1~図6を用いて説明する。
 図1の施工台車2は、道路に磁気マーカ10(図2)の敷設位置を設ける施工装置である。この施工台車2は、磁気マーカ10を収容するための収容穴108を路面100Sに穿設することにより磁気マーカ10の敷設位置を確定させる。施工台車2は、収容穴108を穿設するための穿孔ドリル(作業ユニットの一例)21を車体2Bの前後に1基ずつ備えている。この施工台車2によれば、移動することなく2箇所の収容穴108(敷設位置)を設けることが可能である。
 ここで、施工対象の磁気マーカ10は、図2のごとく、直径20mm、高さ28mmの柱状をなす小型のマーカである。磁気マーカ10をなす磁石は、磁性材料である酸化鉄の磁粉を基材である高分子材料中に分散させた等方性フェライトプラスチックマグネットであり、最大エネルギー積(BHmax)=6.4kJ/mという特性を備えている。
 磁気マーカ10の磁石は、表面の磁束密度が45mT(ミリテスラ)であって、表面からの高さ250mmに到達する磁束密度が8μT程度の磁石である。等方性フェライトプラスチックマグネットである磁石は磁性材料が酸化鉄であるため腐食に強く、金属製のケース等に収容する必要がない。磁気マーカ10は、例えば直径25~30mm、深さ35~40mm程度の比較的小さい収容穴108(図1)に直接、収容して敷設可能である。
 施工台車2は、図1のごとく、車体2Bの前側に左右2輪の駆動輪281、後ろ側に左右2輪の自在車輪282を備える4輪車である。前側の左右の駆動輪281は、個別に駆動可能であり、回転差に応じて施工台車2の向きを変更できる。後ろ側の左右の自在車輪282は、施工台車2の向きに応じて車輪の方向を自在に変更可能である。なお、施工台車2の車輪の構成としては、3輪の構成であっても良く、6輪の構成であっても良い。
 施工台車2の車体2Bの後部には、後ろ側の穿孔ドリル21を越えて後方に延びる手押しハンドル20が設けられている。作業員は、手押しハンドル20を押しながら歩くことで施工台車2を移動できる。手押しハンドル20は、作業員の両手の操作力を感知するための図示しないセンサを備える操作ユニット201により片持ちで支持されている。この手押しハンドル20に作用する操作力に応じて駆動輪281が回転駆動され、これにより適度なアシスト力が発生する。そのため、作業員は比較的軽い力で施工台車2を移動できる。操作ユニット201には、作業員が目視できるように表示パネル(図示略)が取り付けられ、施工台車2の移動距離などの情報が表示される。
 車体2Bの前側には、ガイドローラ280が取り付けられている。このガイドローラ280を利用すれば、例えば目標とするラインに車体2Bが沿っているか否かの目視確認が容易になる。車体2Bの後ろ側には、移動距離を計測するためのロードカウンターローラ285が取り付けられている。
 施工台車2は、図1のごとく、上記の前後の穿孔ドリル21のほか、軽油を燃料とする発電機251、穿孔ドリル21を鉛直方向に駆動する駆動シリンダ211、穿孔屑等を集塵する吸引クリーナ252等を備えている。穿孔ドリル21は、駆動シリンダ211により駆動されて鉛直方向に進退する一方、車体2Bに相対して水平方向に変位することはない。つまり、路面100Sに沿う水平面内における穿孔ドリル21の位置は、車体2Bに相対して一定に保持されている。前後の穿孔ドリル21は、車体2Bの中心線CL(図3参照。)上に位置している。前後の穿孔ドリル21は、車体2Bの中心CPから1mずつ中心線CLに沿って前後方向に離れて位置している(スパンD1、D2が共に1m)。したがって、施工台車2における前後の穿孔ドリル21の間隔はスパンD=2mとなっている。
 なお、車体2Bの中心CPに対する前後の穿孔ドリル21の相対的な位置関係は、前側の穿孔ドリル21が車体2Bの中心CPの1m前方であると共に、後ろ側の穿孔ドリル21が車体2Bの中心CPの1m後方となっている。この相対的な位置関係を表すオフセット量(図1及び図3中のOF1、OF2)は、車体2Bの中心CPに対する穿孔ドリル21の相対位置を表すパラメータとして、位置情報取得ユニットの一例をなす演算ユニット30(後述)に予め設定されている。
 施工台車2は、図4のごとく、車体2Bの中心線CLの方位(向き)を計測するジャイロコンパスユニット(方位情報取得ユニット)36、上記のロードカウンターローラ285の回転量を検出するエンコーダ37、磁気マーカ10の敷設位置となる収容穴108の穿設位置を求める演算ユニット30を備えている。
 ジャイロコンパスユニット36は、基準方位となる真北に対して計測対象の方位を計測する計測装置である。このジャイロコンパスユニット36は、自転する地球の表面で水平に保持されたジャイロスコープの回転軸が南北に沿うというジャイロ効果を利用して上記の計測を実現する。施工台車2では、計測対象の方位が車体の中心線CLに沿うようにジャイロコンパスユニット36が設置されている。ジャイロコンパスユニット36は、基準方位としての真北に対して車体2Bの中心線CLの方位を計測し、その方位を表す方位情報を演算ユニット30に入力する。
 演算ユニット30(図4)は、計算処理を実行するCPU(Central Processing Unit)や、パラメータ等を記憶するROM(Read Only Memory)・RAM(Random Access Memory)等を含む電子回路(図示略)を備えている。演算ユニット30は、慣性航法を利用して敷設作業中の施工台車2の位置(絶対位置)を特定し、これにより、敷設位置となる収容穴108の穿設位置を特定するための演算処理を実行する。敷設位置の位置情報は、データベース31に格納されて磁気マーカ10の敷設情報として蓄積される。
 演算ユニット30は、エンコーダ37から入力された回転量や、ジャイロコンパスユニット36から入力された中心線CLの方位等に基づき、施工台車2の移動距離や相対位置を演算する。移動距離は、エンコーダ37が検出する回転量の積算値に対してロードカウンターローラ285の直径等を乗じて演算される。相対位置は、予め絶対位置を特定済みの基準位置から移動を開始した後、瞬間的な変位量(移動距離)をジャイロコンパスユニット36が計測する中心線CLの方位に沿って積算することで演算できる。なお、本例では、車体2Bの中心CPに測位箇所を設定し、この位置を施工台車2の位置として取り扱っている。
 ここで、磁気マーカ10の敷設作業は、収容穴108を穿設する図1の施工台車2のほか、収容穴108に1個ずつ磁気マーカ10を配置する施工台車(図示略)や、磁気マーカ10の配置後に路面100Sの仕上げを行う施工台車(図示略)等を利用して実施される。配置用の施工台車は、収容穴108に磁気マーカ10を配置し、接着材としての舗装材料を供給するための施工装置である。路面仕上げ用の施工台車は、収容穴108に供給された舗装材料が硬化した後、周囲から盛り上がる余分な舗装材料を削り取って路面100Sを平滑にする作業を実施する施工装置である。
 次に、以上のような構成の施工台車2による磁気マーカ10の敷設作業の内容を説明する。
 磁気マーカ10の敷設作業を実施するに当たっては、準備として、磁気マーカ10を敷設する目標ラインであるマーキングラインML(図5参照。)を路面100Sに形成する。マーキングラインMLは、例えば、マーキング用のインクやペンキ等の滴下装置を装備する車両等により形成できる。施工対象の車線などの走行路に沿ってこの車両を走行させれば、磁気マーカ10を敷設する目標ラインであるマーキングラインMLを形成できる。
 上記のマーキングラインMLに沿わせて作業員が施工台車2を手押し操作することで、磁気マーカ10の敷設位置となる収容穴108を穿設する作業を実施できる。例えば前記表示パネルが表示する移動距離が10m増える毎に施工台車2を停止させると良い。停止させる毎に穿孔ドリル21や駆動シリンダ211を動作させれば、図5のように、マーキングラインMLに沿ってスパンS2=10mの間隔で敷設箇所10Gを設けることができる。このとき、施工台車2の停止中に前後の穿孔ドリル21等をそれぞれ動作させると良い。この場合には、施工台車2を移動することなく、穿孔ドリル21のスパンDと一致するスパンS1=2mで隣り合う収容穴108(敷設位置10F)を2箇所ずつ、各敷設箇所10Gに穿設できる。
 道路に沿って敷設箇所10Gを設けるために施工台車2の移動を開始する際、基準位置となる施工台車2の初期位置を予め特定しておく必要がある。この基準位置の特定方法としては、例えば予め全地球測位システム(GPS、Global Positioning System)を利用して絶対位置を測位するGPS装置(図示略)を利用する方法がある。GPS電波を受信可能な環境であれば、車体2Bの中心CPにGPSアンテナをセットすることで車体2Bの中心CP(図1、図3)の絶対位置を測位でき、この絶対位置を基準位置として特定できる。また例えば、絶対位置が特定済みの2箇所に設置された測量装置(図示略)を利用する三角測量により車体2Bの中心CPの絶対位置を測量して基準位置を特定することも良い。
 施工台車2の移動中では、上記のように絶対位置が特定された初期位置を基準位置として、相対位置の演算が繰り返し実行される。演算ユニット30は、ジャイロコンパスユニット36から入力された車体2Bの中心線CLの時々刻々の方位に沿って、エンコーダ37が検出する回転量に基づく時々刻々の変位量を積算することで、基準位置に対する施工台車2の相対位置を演算する。
 図6では、何れかの敷設箇所10Gについて施工台車2が敷設作業を実施する際に演算ユニット30が算出する相対位置を、矢印Vにより示している。演算ユニット30は、この矢印Vで表される相対位置を基準位置に足し合わせることで、敷設作業を実施中の施工台車2について中心CPの絶対位置を特定する。
 上記の通り、演算ユニット30には、車体2Bの中心CPに対する穿孔ドリル21のオフセット量(図6中のOF1=1m、OF2=1m)など穿孔ドリル21の配置を表すパラメータが予め設定されている。演算ユニット30は、このオフセット量の分だけ、図6のごとく、ジャイロコンパスユニット36が計測した車体2Bの中心線CLの方位に沿って位置をずらす演算を実行する。この演算によれば、車体2Bの中心CPの位置を基準として、前後の穿孔ドリル21の絶対位置を特定できる。各穿孔ドリル21の絶対位置を特定できれば、2箇所の収容穴108の絶対位置、すなわち敷設位置10Fの絶対位置の特定が可能になる。そして、このように特定された敷設位置10Fの位置情報は、演算ユニット30に接続されたデータベース31に格納されて磁気マーカ10の敷設情報として蓄積される。
 以上のように、本例の施工台車2は、移動することなく2箇所に磁気マーカ10の敷設位置10Fを設けることが可能である。この2箇所の敷設位置10Fの相対的な位置関係をなす間隔は、前後の穿孔ドリル21のスパンD=2mに精度高く一致しており、敷設箇所10G毎に変動するおそれが少なくなっている。
 施工台車2によれば、各敷設箇所10Gにおいて、2m間隔で隣り合う2箇所の敷設位置10Fを効率良く設けることができる。2m間隔で隣り合う2箇所の敷設位置10Fを設けるに当たって、2mの間隔を精度高く実現するための施工台車2の位置合わせや測量等を実施する必要がない。したがって、施工台車2を利用すれば、各敷設箇所10Gにおいて、効率良く2箇所の敷設位置10Fを精度高く設けることができ、施工コストを抑制できる。
 また本例では、作業員による目視等により10m毎の敷設箇所10Gを設けている一方、敷設作業を実施中の施工台車2の位置を測位することで敷設位置10Fの絶対位置を特定している。このような施工によれば、位置を高精度に測量したり所定の位置に施工台車2を精度高く位置合わせする等の手間がかからないので、極めて効率良く敷設作業を実施できる。一方、敷設作業を実施中に施工台車2の位置を測位するので、各敷設位置10Fについて精度の高い位置情報を取得できる。
 本例の施工台車2は、GPSによる測位を前提としないので、GPS電波を受信できないトンネル内などの環境にも対応可能である。例えばトンネルの場合であれば、GPSによる絶対位置の測位が可能な出入口で施工台車2の絶対位置を測位することにより上記の基準位置を設定すると良い。
 前後に穿孔ドリル21を備え、移動することなく2箇所の収容穴108を穿設できる施工台車2を例示したが、穿孔ドリル21が1基のみの施工台車であっても良い。この場合には、路面100Sに沿う水平面内で穿孔ドリル21を移動させることで複数の収容穴108を穿設可能とすると良い。また、穿孔ドリル21を3基以上備える施工台車であっても良い。この場合、各穿孔ドリル21が一直線上に配列されていなくても良い。例えば三角形が形成されるように3基の穿孔ドリル21を設けることも良い。この場合には、車体2Bの中心線CLの方位の特定により、この3基の穿孔ドリル21が穿設する3つの敷設位置の配置形状をなす三角形の向きを特定できる。三角形の向きは、例えば三角形のいずれかの辺、あるいはいずれかの頂点の角度を等分する2等分線などについて、基準となる方位に対するずれ角により表現できる。
 本例では、各敷設位置10Fの絶対位置を表す位置情報をデータベース31に格納し、磁気マーカ10の敷設情報として蓄積する構成を例示している。各敷設位置10Fの位置情報に加えて、各敷設箇所10Gにおける2箇所の敷設位置10Fを結ぶ線分(配置形状の一例)の向きを表す方位情報を併せて格納しても良い。この線分の方位は、敷設作業を実施中の施工台車2(車体2B)の中心線CLの方位と所定の関係を呈するため(本例では一致している。)、ジャイロコンパスユニット36が計測する中心線CLの方位に基づいて容易に特定できる。磁気マーカ10が敷設された道路の運用において、2箇所の敷設位置10Fを結ぶ線分の方位(向き)が分かっていれば、この2箇所の敷設位置10Fを通過する車両の進行方向等を精度高く検出できる。
(実施例2)
 本例は、実施例1の施工台車について、位置情報取得ユニットの一例をなすGPSユニットを追加した例である。この内容について、図7を参照して説明する。
 GPSユニット38は、図7のごとく、GPS衛星からの電波を受信して絶対位置を測位するユニットである。このGPSユニット38は、RTK(RealTime Kinematic)-GPSによる測位に対応している。GPSユニット38は、絶対位置が特定された固定局が受信した信号を利用する基線解析を実行し、これにより固定局からGPSユニット38に至る基線ベクトルを特定して高精度に絶対位置を測位可能である。
 本例の施工台車2は、絶対位置を測位するGPSユニット38を1台備えている一方、このGPSユニット38にはGPSアンテナ381が2つ接続されている。GPSユニット38は、各GPSアンテナ381の設置箇所の絶対位置を測位する。本例では、前後の穿孔ドリル21の真上にそれぞれGPSアンテナ381を取り付けてあるため、各穿孔ドリル21の位置が測位箇所となる。この施工台車2は、GPSユニット38が測位する2箇所の絶対位置が、収容穴108の穿設位置であり磁気マーカ10の敷設位置10Fとなる。
 本例の施工台車2であれば、GPS電波が受信できる状況ではGPSを利用して磁気マーカ10の敷設位置10Fを特定でき、GPS電波の受信状況が不十分な状況では実施例1のように慣性航法を利用して磁気マーカ10の敷設位置10Fを特定できる。このように敷設位置の特定方法を使い分ければ、状況によらず、磁気マーカ10の敷設情報の生成を含む磁気マーカ10の敷設作業を一層効率良く実施できる。
 なお、実施例2では、2基の穿孔ドリル21のそれぞれ真上にGPSアンテナ381を取り付けた例を例示したが、どちらか一方の穿孔ドリル21の真上にのみGPSアンテナ381が取り付けられていても良い。この場合、GPSが測位した一方の穿孔ドリル21の絶対位置に基づき、他方の穿孔ドリル21の絶対位置を特定可能である。例えば、ジャイロコンパスユニットが計測する車体2Bの中心線CLの方位に沿って位置をずらすことで、一方の穿孔ドリル21の絶対位置に基づいて他方の穿孔ドリル21の絶対位置を特定することも良い。
 なお、その他の構成及び作用効果については実施例1と同様である。
 以上、実施例のごとく本発明の具体例を詳細に説明したが、これらの具体例は、特許請求の範囲に包含される技術の一例を開示しているにすぎない。言うまでもなく、具体例の構成や数値等によって、特許請求の範囲が限定的に解釈されるべきではない。特許請求の範囲は、公知技術や当業者の知識等を利用して上記具体例を多様に変形、変更あるいは適宜組み合わせた技術を包含している。
 10 磁気マーカ
 10F 敷設位置
 10G 敷設箇所
 108 収容穴
 2 施工台車(施工装置)
 2B 車体
 20 手押しハンドル
 21 穿孔ドリル(作業ユニット)
 285 ロードカウンターローラ
 30 演算ユニット(位置情報取得ユニット)
 31 データベース
 36 ジャイロコンパスユニット(方位情報取得ユニット)
 37 エンコーダ
 38 GPSユニット(位置情報取得ユニット)
 381 GPSアンテナ

Claims (4)

  1.  道路に磁気マーカを敷設するための施工装置であって、
     磁気マーカの敷設位置を設ける作業ユニットを備え、
     移動することなく所定の相対的な位置関係を呈する複数箇所に磁気マーカの敷設位置を設けることが可能である施工装置。
  2.  請求項1において、前記施工装置は、前記作業ユニットを複数備えており、該施工装置では、前記複数箇所の磁気マーカの敷設位置毎に前記作業ユニットが配置されている施工装置。
  3.  請求項1又は2において、前記施工装置には、前記作業ユニットとの相対的な位置関係が特定されている測位箇所が設けられており、該測位箇所の位置情報を取得するための位置情報取得ユニットを備える施工装置。
  4.  請求項1~3のいずれか1項において、前記複数箇所の磁気マーカの敷設位置の配置形状の向きを特定するための方位情報を取得する方位情報取得ユニットを含む施工装置。
PCT/JP2018/045362 2017-12-12 2018-12-10 施工装置 WO2019117098A1 (ja)

Priority Applications (4)

Application Number Priority Date Filing Date Title
EP18888520.6A EP3725946A4 (en) 2017-12-12 2018-12-10 CONSTRUCTION DEVICE
SG11202005373WA SG11202005373WA (en) 2017-12-12 2018-12-10 Installation device
CN201880079571.5A CN111448351B (zh) 2017-12-12 2018-12-10 施工装置、施工方法以及施工系统
US16/770,653 US11242659B2 (en) 2017-12-12 2018-12-10 Installation device

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2017-237529 2017-12-12
JP2017237529A JP6920975B2 (ja) 2017-12-12 2017-12-12 施工装置、施工方法、及び施工システム

Publications (1)

Publication Number Publication Date
WO2019117098A1 true WO2019117098A1 (ja) 2019-06-20

Family

ID=66820337

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2018/045362 WO2019117098A1 (ja) 2017-12-12 2018-12-10 施工装置

Country Status (6)

Country Link
US (1) US11242659B2 (ja)
EP (1) EP3725946A4 (ja)
JP (1) JP6920975B2 (ja)
CN (1) CN111448351B (ja)
SG (1) SG11202005373WA (ja)
WO (1) WO2019117098A1 (ja)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6965815B2 (ja) * 2018-04-12 2021-11-10 愛知製鋼株式会社 マーカ検出システム、及びマーカ検出システムの運用方法
CN112921780A (zh) * 2021-03-02 2021-06-08 武汉理工大学 一种智能化二维交通标线喷涂装置

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10181691A (ja) * 1996-12-24 1998-07-07 Mitsubishi Heavy Ind Ltd 定点保持制御装置
JP2000212922A (ja) * 1999-01-22 2000-08-02 Aichi Steel Works Ltd 磁気マ―カの施工治具
JP2000355914A (ja) * 1999-06-15 2000-12-26 Kajima Corp 高度道路交通システム対応道路のレーンマーカーの施工方法
JP2001303525A (ja) * 2000-04-24 2001-10-31 Kajima Road Co Ltd 磁気埋設物敷設装置
JP2003253665A (ja) * 2002-02-27 2003-09-10 Takenaka Doboku Co Ltd 地盤改良処理機のワイヤー式掘削精度制御装置
JP2005202478A (ja) 2004-01-13 2005-07-28 Denso Corp 車両用自動走行システム
JP2008025163A (ja) * 2006-07-20 2008-02-07 Enzan Kobo:Kk 削岩機搭載台車における穿孔位置決め制御方法及び建設機械におけるブーム位置決め制御方法
US20150294566A1 (en) * 2014-04-15 2015-10-15 Tomorrow's Transportation Today Trip planning and management methods for an intelligent transit system with electronic guided buses
JP2017141623A (ja) * 2016-02-12 2017-08-17 愛知製鋼株式会社 磁気マーカの施工方法
JP2017141596A (ja) * 2016-02-10 2017-08-17 愛知製鋼株式会社 磁気マーカの施工方法及び作業車両

Family Cites Families (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1188112B (de) * 1960-09-10 1965-03-04 Gino Eigenmann Fahrbare Vorrichtung zum mechanischen Verlegen mindestens eines Markierungsstreifensaus Kunststoff auf Strassendecken u. dgl.
FR2412652A1 (fr) * 1977-12-20 1979-07-20 Eigenmann Ludwig Procede et machine pour la formation de signalisation sur des surfaces routieres
DE3018693A1 (de) * 1980-05-16 1981-11-26 H. Debuschewitz GmbH & Co KG, 5000 Köln Vorrichtung zum verbinden von markierelementen auf eine fahrbahnoberflaeche und markierelement
AT391626B (de) * 1988-04-25 1990-11-12 Kniesel Ulrich Vorrichtung zum versetzen von markierungsduebeln fuer bodenmarkierungen od. dgl.
JP3520765B2 (ja) * 1998-04-28 2004-04-19 株式会社デンソー 車両案内用タグを用いた車線変更管理システム
KR101133172B1 (ko) * 2010-11-02 2012-04-06 한국철도기술연구원 자석마커 절대위치를 이용한 주행차량 절대방위 추정시스템 및 방법
US10301783B2 (en) * 2012-01-17 2019-05-28 LimnTech LLC Roadway maintenance striping control system
EP3415691A4 (en) * 2016-02-10 2019-10-09 Aichi Steel Corporation METHOD FOR INSTALLING A MAGNETIC MARKER AND WORKING VEHICLE SYSTEM
JP6195040B1 (ja) * 2016-02-16 2017-09-13 愛知製鋼株式会社 作業車両システム及び磁気マーカの作業方法
EP3451310B1 (en) * 2016-04-28 2020-10-28 Aichi Steel Corporation Driving assistance system
CN109661563B (zh) * 2016-06-03 2023-09-01 爱知制钢株式会社 位置捕捉方法及系统
CN105822226A (zh) * 2016-06-08 2016-08-03 上海力阳道路加固科技股份有限公司 一种高效道路钻孔车
EP3605487A4 (en) * 2017-03-28 2020-10-07 Aichi Steel Corporation MARKER SYSTEM
JP7005943B2 (ja) * 2017-06-06 2022-01-24 愛知製鋼株式会社 マーカシステム及び運用方法
DE102017215932B3 (de) * 2017-09-11 2019-02-28 Audi Ag Verfahren zur Ermittlung einer Positionsinformation eines Kraftfahrzeugs und Kraftfahrzeug
JP7091668B2 (ja) * 2018-01-16 2022-06-28 愛知製鋼株式会社 運転支援システム

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10181691A (ja) * 1996-12-24 1998-07-07 Mitsubishi Heavy Ind Ltd 定点保持制御装置
JP2000212922A (ja) * 1999-01-22 2000-08-02 Aichi Steel Works Ltd 磁気マ―カの施工治具
JP2000355914A (ja) * 1999-06-15 2000-12-26 Kajima Corp 高度道路交通システム対応道路のレーンマーカーの施工方法
JP2001303525A (ja) * 2000-04-24 2001-10-31 Kajima Road Co Ltd 磁気埋設物敷設装置
JP2003253665A (ja) * 2002-02-27 2003-09-10 Takenaka Doboku Co Ltd 地盤改良処理機のワイヤー式掘削精度制御装置
JP2005202478A (ja) 2004-01-13 2005-07-28 Denso Corp 車両用自動走行システム
JP2008025163A (ja) * 2006-07-20 2008-02-07 Enzan Kobo:Kk 削岩機搭載台車における穿孔位置決め制御方法及び建設機械におけるブーム位置決め制御方法
US20150294566A1 (en) * 2014-04-15 2015-10-15 Tomorrow's Transportation Today Trip planning and management methods for an intelligent transit system with electronic guided buses
JP2017141596A (ja) * 2016-02-10 2017-08-17 愛知製鋼株式会社 磁気マーカの施工方法及び作業車両
JP2017141623A (ja) * 2016-02-12 2017-08-17 愛知製鋼株式会社 磁気マーカの施工方法

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See also references of EP3725946A4

Also Published As

Publication number Publication date
SG11202005373WA (en) 2020-07-29
US11242659B2 (en) 2022-02-08
CN111448351B (zh) 2021-12-21
JP6920975B2 (ja) 2021-08-18
CN111448351A (zh) 2020-07-24
JP2019105067A (ja) 2019-06-27
EP3725946A4 (en) 2021-07-07
EP3725946A1 (en) 2020-10-21
US20210172133A1 (en) 2021-06-10

Similar Documents

Publication Publication Date Title
CN110402311B (zh) 磁性标识器的施工方法及作业系统
US10007270B2 (en) Referenced vehicle control system
CN110419067B (zh) 标识器系统
CN111527265B (zh) 标识器施工方法以及标识器施工系统
FI125464B (en) Arrangement and method for positioning the machine
JP6828643B2 (ja) 位置捕捉システム及び位置捕捉方法
CN110709906B (zh) 标识器系统及运用方法
JP6946695B2 (ja) マーカシステム
EP3885080B1 (en) A method for interactively providing waypoints to a mobile robot for use in the marking of a geometric figure on a ground surface
WO2019117098A1 (ja) 施工装置
CA2864903C (en) Apparatus for aligning drilling machines
JP7417132B2 (ja) 地図データの生成方法
US10422211B2 (en) Apparatus for aligning drilling machines
SE508190C2 (sv) Förfarande och anordning för att bestämma läget för ett verktyg hos en arbetsmaskin

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 18888520

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

ENP Entry into the national phase

Ref document number: 2018888520

Country of ref document: EP

Effective date: 20200713