WO2018188322A1 PCT/CN2017/108768 CN2017108768W WO2018188322A1 WO 2018188322 A1 WO2018188322 A1 WO 2018188322A1 CN 2017108768 W CN2017108768 W CN 2017108768W WO 2018188322 A1 WO2018188322 A1 WO 2018188322A1
Authority
WO
WIPO (PCT)
Prior art keywords
frame
platform
fixing plate
adsorption device
disposed
Prior art date
Application number
PCT/CN2017/108768
Other languages
English (en)
French (fr)
Inventor
唐合成
雷军龙
卢建芳
张兴国
张沪生
Original Assignee
广船国际有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 广船国际有限公司 filed Critical 广船国际有限公司
Publication of WO2018188322A1 publication Critical patent/WO2018188322A1/zh

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63CLAUNCHING, HAULING-OUT, OR DRY-DOCKING OF VESSELS; LIFE-SAVING IN WATER; EQUIPMENT FOR DWELLING OR WORKING UNDER WATER; MEANS FOR SALVAGING OR SEARCHING FOR UNDERWATER OBJECTS
    • B63C5/00Equipment usable both on slipways and in dry docks
    • B63C5/02Stagings; Scaffolding; Shores or struts
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63CLAUNCHING, HAULING-OUT, OR DRY-DOCKING OF VESSELS; LIFE-SAVING IN WATER; EQUIPMENT FOR DWELLING OR WORKING UNDER WATER; MEANS FOR SALVAGING OR SEARCHING FOR UNDERWATER OBJECTS
    • B63C5/00Equipment usable both on slipways and in dry docks
    • B63C5/02Stagings; Scaffolding; Shores or struts
    • B63C2005/025Stagings, or scaffolding, i.e. constructions providing temporary working platforms on slipways, in building or repair docks, or inside hulls

Definitions

  • the invention relates to a platform device for construction.
  • the existing construction platform has the following two methods: 1. The angled steel and the tripod are welded to the segmented part of the ship to form a support frame, and then the prepared platform is hoisted and welded to the support frame, when needed to be displaced to other When constructing the segmented part, it is necessary to disassemble the above-mentioned platform and support frame and repair the welded part. This method is not only costly, low in efficiency, but also has safety hazards; 2.
  • the construction platform in the prior art has the following defects: the disassembly and assembly work of the platform is low in efficiency, high in cost, large in repair work in the later stage, and there are potential safety hazards.
  • Another object of the present invention is to provide a platform apparatus which is highly efficient in disassembly and assembly and low in cost.
  • a further object of the present invention is to provide a platform device that has no damage to the area to be constructed, and no later Need to repair the work.
  • Yet another object of the present invention is to provide a platform device that reduces security risks.
  • a platform apparatus comprising a body and an adsorption device disposed on the body, wherein the body provides a support surface to support a constructor, and the adsorption device provides an adsorption force to adsorb the object to be constructed.
  • the body comprises a frame and a mesh plate disposed on the frame, and the adsorption device is disposed at a position below the frame.
  • the adsorption device is connected to the frame by a fixing plate, wherein the fixing plate is vertically connected to the lower side of the frame, and the adsorption device is detachably mounted on The fixing plate.
  • the fixing plate is welded to the frame, and/or the adsorption device is detachably connected to the fixing plate by bolts.
  • a reinforcing plate is further disposed between the fixing plate and the frame, wherein the fixing plate, the frame and the reinforcing plate are arranged in a triangle shape.
  • the adsorption device is disposed near a first side position of the frame, and one end of the reinforcing plate is connected to an end of the fixing plate away from the frame. The other end of the reinforcing plate is connected to a second side of the frame opposite to the first side.
  • the first side of the frame is convexly provided with a protection component, and the protection component comprises at least an exposed software component.
  • the protection assembly further includes a fixing groove disposed on the first side of the frame, and the soft body member is fixed in the fixing groove and outward Extend.
  • an armrest is connected upward on the second side of the frame, and one end of the armrest is provided with a belt buckle slide.
  • the adsorption device comprises an electric permanent magnet and a controller.
  • the invention has the beneficial effects that the adsorption device is adsorbed on the object to be constructed, instead of the traditional welding and fixing method, the structure is simple and reliable, the disassembly and assembly method is flexible, the efficiency is high, and the cost is low.
  • FIG. 1 is a top plan view of a platform apparatus provided by an example of the present invention.
  • Figure 2 is a cross-sectional view taken along line A-A of Figure 1.
  • Figure 3 is an enlarged schematic view of the portion B of Figure 2.
  • the platform apparatus of the present invention includes a body and an adsorption device 4 disposed on the body, wherein the body provides a support surface to support a constructor, and the adsorption device 4 provides an adsorption force to Adsorption is applied to the object 5.
  • the invention adopts the adsorption device 4 to adsorb to the object to be constructed 5, instead of the traditional welding and fixing method, the structure is simple and reliable, the disassembly and assembly method is flexible, the efficiency is high, and the cost is low.
  • the body includes a frame 1 and a mesh plate 2 disposed on the frame 1, and the adsorption device 4 is disposed at a lower position of the frame 1.
  • the adsorption device 4 is disposed at a position below the frame 1, the body can be attached to the object 5 to be constructed without affecting the walking and construction of the constructor.
  • the adsorption device 4 is disposed at a position below the frame 1 near the edge. The design is such that the installation distance can be shortened, and the adsorption of the adsorption device 4 and the object to be constructed 5 is more favorable.
  • the adsorption device 4 is connected to the frame 1 by a fixing plate 3, wherein the fixing plate 3 is vertically connected to the lower side of the frame 1, and the adsorption device 4 is detachably mounted on the frame Fixing plate 3.
  • the fixing plate 3 is welded to the frame 1, and the suction device 4 is detachably connected to the fixing plate 3 by bolts.
  • a reinforcing plate 6 is further disposed between the fixing plate 3 and the frame 1, wherein the fixing plate 3, the frame 1, and the reinforcing plate 6 are arranged in a triangle shape.
  • the triangular arrangement can enhance the strength of the structure.
  • the adsorption device 4 is disposed near the first side edge 11 of the frame 1, and one end of the reinforcing plate 6 is connected to an end of the fixing plate 3 away from the frame 1, the reinforcing plate 6 The other end is connected to the second side 12 of the frame 1 opposite to the first side edge 11 thereof. This is designed to enhance the structure on the entire force surface of the frame 1.
  • the first side 11 of the frame 1 is convexly provided with a protection component, the protection component including at least the exposed soft Body member 7.
  • the protection assembly further comprises a fixing groove 8 provided on the first side 11 of the frame 1, and the soft body member 7 is fixed in the fixing groove 8 and protrudes outward.
  • the fixing groove 8 adopts a dovetail groove
  • the soft body member 7 is a rubber body
  • one end of the soft body member 7 is pressed into the fixing groove 8, and the other end protrudes from the fixing groove 8, It is effectively protected by the construction object 5.
  • an adhesive is provided on the soft body member 7, and the connection reliability with the fixing groove 8 can be further enhanced.
  • an armrest 9 is connected upwardly on the second side 12 of the frame 1, and one end of the armrest 9 is provided with a belt buckle slide 10.
  • the adsorption device 4 includes an electric permanent magnet and a controller that, when needed, controls energization such that the electric permanent magnet adsorbs the object 5 to be applied.
  • the controller can control the electric permanent magnet to adsorb the object to be processed 5 within 2 seconds, and then the power can be disconnected, which has the advantage of quick installation.
  • the adsorption device 4 of the present invention may have two or more groups, and is distributed on the frame 1 according to actual needs.
  • each group of adsorption devices 4 may include two or more electric permanent magnets.
  • Each electric permanent magnet can be controlled by one controller, or a plurality of electric permanent magnets can share one controller.
  • the manufacturing method of the platform device of an example of the present invention is first assembled into a frame 1 by using a plurality of square tubes, and then the fixing plate 3 and the reinforcing plate 6 are respectively welded to the frame 1, and then the armrest 9 and the fixing groove 8 are respectively framed. 1 welding, the stencil 2 is laid on the frame 1 and spot welded, the whole sanding, painting, glue is applied to the soft body member 7, and then pressed into the fixing groove 8 by using a tool, and finally the electric permanent magnet is pressed. It can be submitted for use by bolting to the fixed plate 3 and connecting the control circuit.
  • the object to be constructed 5 is a ship.
  • the present invention is not limited thereto, and the solution of the present invention can also be applied to projects such as high-speed rail construction and bridge construction.

Abstract

一种平台装置,包括本体和设置于所述本体上的吸附装置(4),其中,所述本体提供支撑面以支撑施工者,所述吸附装置(4)提供吸附力以吸附被施工对象(5)。通过采用吸附装置(4)吸附于被施工对象(5),替代传统的焊接固定方式,结构简单可靠,拆装方式灵活可变,效率高、成本低。

Description

一种平台装置 技术领域
本发明涉及一种施工用平台装置。
背景技术
在建造建筑物或大型设备时,通常需要搭建施工平台。例如,在船舶建造过程中,施工时需要搭设平台,由于船舶需要分段建造,当分段移位翻身时,平台需要拆卸重新安装。现有的施工平台具有以下两种做法:1、采用角钢、三角架焊接于船舶的分段部位上形成支撑架,然后将制作好的平台吊装并焊接于支撑架上,当需要移位至其他分段部位施工时,需要对上述的平台及支撑架进行拆卸,并对焊接部位进行修复工作,此做法不仅成本高、效率低,也具有安全隐患;2、选择长钢管用锁扣连接紧固,再铺上走网板(或者脚手架),由于长管较重在传递过程中容易出现事故,所以一般船厂单位不选用该方案,该方案多适用于工地建筑,而且工地搭设时多使用竹竿代替长钢管来搭设,比较轻便、经济,但也容易造成倒塌事故。
综上所述,现有技术中的施工平台存在以下缺陷:平台的拆装工作效率低、成本高、后期修复工作量大、存在安全隐患。
发明内容
本发明的一个目的是提出一种平台装置,其结构简单、可靠,便于制作。
本发明的另一个目的是提出一种平台装置,其拆装效率高、成本低。
本发明的再一个目的是提出一种平台装置,对被施工区域无损伤,后期无 需修复工作。
本发明的又一个目的是提出一种平台装置,可减小安全隐患。
为达此目的,本发明采用以下技术方案:
提供一种平台装置,包括本体和设置于所述本体上的吸附装置,其中,所述本体提供支撑面以支撑施工者,所述吸附装置提供吸附力以吸附被施工对象。
作为所述的平台装置的一种优选技术方案,所述本体包括框架及设置于所述框架上的网板,所述吸附装置设置于所述框架的下方位置。
作为所述的平台装置的一种优选技术方案,所述吸附装置通过固定板与所述框架连接,其中,所述固定板垂直连接于所述框架的下方,所述吸附装置可拆卸的装于所述固定板上。
作为所述的平台装置的一种优选技术方案,所述固定板与所述框架焊接,和/或,所述吸附装置通过螺栓与所述固定板可拆卸式的连接。
作为所述的平台装置的一种优选技术方案,所述固定板与所述框架之间还设置有加强板,其中,所述固定板、所述框架、所述加强板三者呈三角形布置。
作为所述的平台装置的一种优选技术方案,所述吸附装置设置于靠近所述框架的第一侧边位置,所述加强板的一端连接于所述固定板远离所述框架的一端,所述加强板的另一端连接于所述框架的与所述第一侧边相对设置的第二侧边上。
作为所述的平台装置的一种优选技术方案,所述框架的所述第一侧边上凸出设置有保护组件,所述保护组件至少包括外露的软体部件。
作为所述的平台装置的一种优选技术方案,所述保护组件还包括设置于所述框架的所述第一侧边上的固定槽,所述软体部件固定于所述固定槽内并向外伸出。
作为所述的平台装置的一种优选技术方案,于所述框架的所述第二侧边向上连接有扶手,所述扶手的一端设置安全带挂扣滑道。
作为所述的平台装置的一种优选技术方案,所述吸附装置包括电永磁铁和控制器。
本发明的有益效果:通过采用吸附装置吸附于被施工对象,替代传统的焊接固定方式,结构简单可靠,拆装方式灵活可变,效率高、成本低。
附图说明
图1是本发明一示例提供的平台装置的俯视示意图。
图2是图1中A-A向剖视示意图。
图3是图2中B处放大示意图。
图中:
1、框架;11、第一侧边;12、第二侧边;2、网板;3、固定板;4、吸附装置;5、被施工对象;6、加强板;7、软体部件;8、固定槽;9、扶手;10、滑道。
具体实施方式
为使本发明解决的技术问题、采用的技术方案和达到的技术效果更加清楚,下面将结合附图对本发明实施例的技术方案作进一步的详细描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域技术人员在没有作出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。
图1是本发明一示例提供的平台装置的俯视示意图。图2是图1中A-A向 剖视示意图。图3是图2中B处放大示意图。请参考图1-3所示,本发明的平台装置包括本体和设置于所述本体上的吸附装置4,其中,所述本体提供支撑面以支撑施工者,所述吸附装置4提供吸附力以吸附被施工对象5。本发明通过采用吸附装置4吸附于被施工对象5,替代传统的焊接固定方式,结构简单可靠,拆装方式灵活可变,效率高、成本低。
具体地,本体包括框架1及设置于所述框架1上的网板2,所述吸附装置4设置于所述框架1的下方位置。通过将吸附装置4设置于所述框架1的下方位置,既能很好的将本体连接于被施工对象5,又不影响施工者的行走和施工。优选地,吸附装置4设置于所述框架1的下方靠近边缘的位置。如此设计,可缩短安装距离,更有利于吸附装置4与被施工对象5的吸附。
作为本发明的一个示例,吸附装置4通过固定板3与所述框架1连接,其中,所述固定板3垂直连接于所述框架1的下方,所述吸附装置4可拆卸的装于所述固定板3上。通过所述设计,可以便于吸附装置4的更换工作。优选地,固定板3与框架1焊接,吸附装置4通过螺栓与固定板3可拆卸式的连接。
为了进一步加强平台的结构强度和可靠性,固定板3与框架1之间还设置有加强板6,其中,固定板3、框架1、加强板6三者呈三角形布置。通过所述设计,三角形布置可增强结构的强度。更加优选地,吸附装置4设置于靠近所述框架1的第一侧边11位置,所述加强板6的一端连接于所述固定板3远离所述框架1的一端,所述加强板6的另一端连接于所述框架1的与其第一侧边11相对设置的第二侧边12上。如此设计,可使得在框架1整个受力面上的结构得以加强。
为了在拆装平台装置时更好的保护被施工对象5,于本发明的示例中,所述框架1的第一侧边11上凸出设置有保护组件,所述保护组件至少包括外露的软 体部件7。通过设置带有软体部件7的保护组件,可以在拆装平台装置时,很好的保护被施工对象5的外观面不受破坏和损伤,例如对被施工对象5的面漆层保护。优选地,保护组件还包括设置于所述框架1的第一侧边11上的固定槽8,所述软体部件7固定于所述固定槽8内并向外伸出。本发明的示例中,固定槽8采用燕尾槽,所述软体部件7采用橡胶体,所述软体部件7的一端被压于所述固定槽8内,另一端伸出所述固定槽8,对被施工对象5进行有效保护。优选地,于所述软体部件7上设置粘接胶,可以进一步加强与固定槽8的连接可靠性。
为了进一步提高使用安全性,于框架1的第二侧边12向上连接有扶手9,所述扶手9的一端设置安全带挂扣滑道10。
于本发明示例中,吸附装置4包括电永磁铁和控制器,当需要使用时,控制器控制通电使得电永磁铁吸附被施工对象5。控制器可控制电永磁铁在2秒内吸附被加工对象5,然后便可断开电源,具有快速安装的优点。
本发明的吸附装置4可以有两组或两组以上,根据实际需要分布于所述框架1上。其中,每组吸附装置4可以包括两个或者两个以上的电永磁铁。每个电永磁铁可由一个控制器控制,也可以多个电永磁铁共用一个控制器。
本发明的一示例的平台装置的制作方法:首先采用多个方管组装制作成框架1,然后将固定板3、加强板6分别与框架1焊接,再将扶手9、固定槽8分别与框架1焊接,将网板2铺于所述框架1上并点焊,整个打砂、油漆,于软体部件7上涂覆胶水,然后使用工具将其压入固定槽8内,最后将电永磁铁通过螺栓连接于固定板3上,并接好控制线路即可提交使用。
本发明的示例中,被施工对象5为船舶。当然,本发明对此并不作限制,本发明的方案同样可以适用于高铁建设、桥梁建设等项目。
以上结合具体实施例描述了本发明的技术原理。这些描述只是为了解释本 发明的原理,而不能以任何方式解释为对本发明保护范围的限制。基于此处的解释,本领域的技术人员不需要付出创造性的劳动即可联想到本发明的其它具体实施方式,这些方式都将落入本发明的保护范围之内。

Claims (10)

  1. 一种平台装置,其特征在于,包括本体和设置于所述本体上的吸附装置,其中,所述本体提供支撑面以支撑施工者,所述吸附装置提供吸附力以吸附被施工对象。
  2. 根据权利要求1所述的平台装置,其特征在于,所述本体包括框架及设置于所述框架上的网板,所述吸附装置设置于所述框架的下方位置。
  3. 根据权利要求2所述的平台装置,其特征在于,所述吸附装置通过固定板与所述框架连接,其中,所述固定板垂直连接于所述框架的下方,所述吸附装置可拆卸的装于所述固定板上。
  4. 根据权利要求3所述的平台装置,其特征在于,所述固定板与所述框架焊接,和/或,所述吸附装置通过螺栓与所述固定板可拆卸式的连接。
  5. 根据权利要求3所述的平台装置,其特征在于,所述固定板与所述框架之间还设置有加强板,其中,所述固定板、所述框架、所述加强板三者呈三角形布置。
  6. 根据权利要求5所述的平台装置,其特征在于,所述吸附装置设置于靠近所述框架的第一侧边位置,所述加强板的一端连接于所述固定板远离所述框架的一端,所述加强板的另一端连接于所述框架的与所述第一侧边相对设置的第二侧边上。
  7. 根据权利要求6所述的平台装置,其特征在于,所述框架的所述第一侧边上凸出设置有保护组件,所述保护组件至少包括外露的软体部件。
  8. 根据权利要求7所述的平台装置,其特征在于,所述保护组件还包括设置于所述框架的所述第一侧边上的固定槽,所述软体部件固定于所述固定槽内并向外伸出。
  9. 根据权利要求6所述的平台装置,其特征在于,于所述框架的所述第二 侧边向上连接有扶手,所述扶手的一端设置安全带挂扣滑道。
  10. 根据权利要求1至9之一所述的平台装置,其特征在于,所述吸附装置包括电永磁铁和控制器。
PCT/CN2017/108768 2017-04-11 2017-10-31 一种平台装置 WO2018188322A1 (zh)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201710232759.6A CN106892067B (zh) 2017-04-11 2017-04-11 一种平台装置
CN201710232759.6 2017-04-11

Publications (1)

Publication Number Publication Date
WO2018188322A1 true WO2018188322A1 (zh) 2018-10-18

Family

ID=59196198

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2017/108768 WO2018188322A1 (zh) 2017-04-11 2017-10-31 一种平台装置

Country Status (2)

Country Link
CN (1) CN106892067B (zh)
WO (1) WO2018188322A1 (zh)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106828825A (zh) * 2017-04-11 2017-06-13 广船国际有限公司 一种平台装置
CN107672761A (zh) * 2017-10-25 2018-02-09 台山市东扩钢构有限公司 一种船用脚手架
CN107757842B (zh) * 2017-10-25 2019-12-03 台山市东扩钢构有限公司 一种可定位的脚手架
CN107747398B (zh) * 2017-10-25 2019-10-18 台山市东扩钢构有限公司 一种用于脚手架上的防摇晃结构
CN107600361A (zh) * 2017-10-25 2018-01-19 台山市东扩钢构有限公司 一种悬挂式的船用脚手架

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3837428A (en) * 1973-06-27 1974-09-24 L Gish Safety scaffold with electromagnets
GB2351116A (en) * 1999-04-16 2000-12-20 W & R Lewis Ltd Access scaffolding, scaffolding devices and method
CN101439757A (zh) * 2008-10-24 2009-05-27 武汉理工大学 修造船大型高空作业平台
KR20100058306A (ko) * 2008-11-24 2010-06-03 에스티엑스조선해양 주식회사 분리형 러더 치구대
KR20110002977U (ko) * 2009-09-17 2011-03-23 주식회사 현대미포조선 곤도라의 선체 외판 부착장치
CN203412273U (zh) * 2013-08-14 2014-01-29 洪绮君 储槽全圆周轨道式的升降工作平台
CN203638060U (zh) * 2013-12-03 2014-06-11 浙江东海岸船业有限公司 舱壁式升降脚手架工装
KR20150008720A (ko) * 2013-07-15 2015-01-23 대우조선해양 주식회사 고소 작업용 워크스테이션
CN204960278U (zh) * 2015-08-29 2016-01-13 北京东豪建设集团有限公司 一种电磁吸附吊篮
CN106828825A (zh) * 2017-04-11 2017-06-13 广船国际有限公司 一种平台装置

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN204626929U (zh) * 2015-05-21 2015-09-09 余建文 附着式升降脚手架
CN205476402U (zh) * 2016-03-10 2016-08-17 江苏工程职业技术学院 一种爬壁机器人脚手架系统
CN205574234U (zh) * 2016-04-20 2016-09-14 中船黄埔文冲船舶有限公司 一种辅助船体立缝施工用作业平台架
CN205769988U (zh) * 2016-05-16 2016-12-07 江苏新扬子造船有限公司 悬挂平台
CN205713036U (zh) * 2016-05-30 2016-11-23 中交一公局第五工程有限公司 高墩翻模施工平台
CN206679224U (zh) * 2017-04-11 2017-11-28 广船国际有限公司 一种平台装置

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3837428A (en) * 1973-06-27 1974-09-24 L Gish Safety scaffold with electromagnets
GB2351116A (en) * 1999-04-16 2000-12-20 W & R Lewis Ltd Access scaffolding, scaffolding devices and method
CN101439757A (zh) * 2008-10-24 2009-05-27 武汉理工大学 修造船大型高空作业平台
KR20100058306A (ko) * 2008-11-24 2010-06-03 에스티엑스조선해양 주식회사 분리형 러더 치구대
KR20110002977U (ko) * 2009-09-17 2011-03-23 주식회사 현대미포조선 곤도라의 선체 외판 부착장치
KR20150008720A (ko) * 2013-07-15 2015-01-23 대우조선해양 주식회사 고소 작업용 워크스테이션
CN203412273U (zh) * 2013-08-14 2014-01-29 洪绮君 储槽全圆周轨道式的升降工作平台
CN203638060U (zh) * 2013-12-03 2014-06-11 浙江东海岸船业有限公司 舱壁式升降脚手架工装
CN204960278U (zh) * 2015-08-29 2016-01-13 北京东豪建设集团有限公司 一种电磁吸附吊篮
CN106828825A (zh) * 2017-04-11 2017-06-13 广船国际有限公司 一种平台装置

Also Published As

Publication number Publication date
CN106892067A (zh) 2017-06-27
CN106892067B (zh) 2019-04-09

Similar Documents

Publication Publication Date Title
WO2018188322A1 (zh) 一种平台装置
JP3205385U (ja) ソーラーパネル設置用プラットフォーム
US9938733B2 (en) Wire rope tension grid improvements
CN106828825A (zh) 一种平台装置
JP6018691B1 (ja) 橋梁構造物における吊足場の架設方法及びフロート付き吊足場
JP2011140859A (ja) 作業用足場装置及び躯体作業方法並びに躯体仮設構台提供方法
WO2019119873A1 (zh) 空调出风口结构安装方法及空调出风口安装结构
CN104389415B (zh) 脚手架
CN207029495U (zh) 一种平台装置
CN105133918A (zh) 车顶旅行帐篷
KR101816700B1 (ko) 현수 비계용 발판연설 장치 및 방법
CN106275436A (zh) 具有自断功能的传感器安装装置及其安装方法
KR101707037B1 (ko) 조립식 시스템 비계와 그 설치 방법
CN209179488U (zh) 梁模板结构及梁模板支撑系统
JP2004068523A (ja) 組立建材の無足場施工方法
CN206211471U (zh) 施工现场临电架设系统
JP3462576B2 (ja) 外装仕上げ用パネルの狭空間施工方法及び装置
CN219755578U (zh) 一种快速拼装的风管
CN104775608A (zh) 一种用于特殊层高部位的集成式升降平台附着装置
CN205256606U (zh) 一种组合式船用辅助平台
CN204590565U (zh) 脚手板及应用该脚手板搭设的脚手架
CN220396755U (zh) 一种防滑性能高的组装吊架
CN109025029B (zh) 平面吊顶及安装方法
CN113770677B (zh) 一种大型飞机机身内部装配使用的工作平台
KR101532034B1 (ko) 포터블 장비를 서포트하는 장치

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 17905154

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 17905154

Country of ref document: EP

Kind code of ref document: A1