WO2018159703A1 - 熱源水制御方法及び熱源水制御装置 - Google Patents

熱源水制御方法及び熱源水制御装置 Download PDF

Info

Publication number
WO2018159703A1
WO2018159703A1 PCT/JP2018/007589 JP2018007589W WO2018159703A1 WO 2018159703 A1 WO2018159703 A1 WO 2018159703A1 JP 2018007589 W JP2018007589 W JP 2018007589W WO 2018159703 A1 WO2018159703 A1 WO 2018159703A1
Authority
WO
WIPO (PCT)
Prior art keywords
water supply
water
heat source
temperature
differential pressure
Prior art date
Application number
PCT/JP2018/007589
Other languages
English (en)
French (fr)
Inventor
徳臣 岡崎
山本 学
勇司 松本
誠二 築山
Original Assignee
東芝キヤリア株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 東芝キヤリア株式会社 filed Critical 東芝キヤリア株式会社
Priority to JP2019503078A priority Critical patent/JP6847198B2/ja
Publication of WO2018159703A1 publication Critical patent/WO2018159703A1/ja

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/30Control or safety arrangements for purposes related to the operation of the system, e.g. for safety or monitoring
    • F24F11/46Improving electric energy efficiency or saving
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/62Control or safety arrangements characterised by the type of control or by internal processing, e.g. using fuzzy logic, adaptive control or estimation of values
    • F24F11/63Electronic processing
    • F24F11/64Electronic processing using pre-stored data
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/70Control systems characterised by their outputs; Constructional details thereof
    • F24F11/80Control systems characterised by their outputs; Constructional details thereof for controlling the temperature of the supplied air
    • F24F11/83Control systems characterised by their outputs; Constructional details thereof for controlling the temperature of the supplied air by controlling the supply of heat-exchange fluids to heat-exchangers
    • F24F11/85Control systems characterised by their outputs; Constructional details thereof for controlling the temperature of the supplied air by controlling the supply of heat-exchange fluids to heat-exchangers using variable-flow pumps
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F5/00Air-conditioning systems or apparatus not covered by F24F1/00 or F24F3/00, e.g. using solar heat or combined with household units such as an oven or water heater
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05DSYSTEMS FOR CONTROLLING OR REGULATING NON-ELECTRIC VARIABLES
    • G05D16/00Control of fluid pressure
    • G05D16/20Control of fluid pressure characterised by the use of electric means
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/89Arrangement or mounting of control or safety devices

Definitions

  • Embodiments of the present invention relate to a heat source water control method and a heat source water control apparatus.
  • heat source water (cold water or hot water) generated by a heat source machine is used for air-conditioning equipment such as a plurality of air handling units (hereinafter referred to as “air han”), or for use side equipment such as industrial machines that require temperature management.
  • air han is a form of an air conditioner, and adjusts the temperature or humidity of air using heat source water supplied from an external heat source machine.
  • the air han has a heat exchanger that is a heat load on the use side and a blower, and blows air that has been heat-exchanged with the heat source water to the indoor unit installed in the air-conditioning target using the blower.
  • the heat source water supplied from the heat source unit to the airhane is heat-exchanged with air in the heat exchanger and then returned to the heat source unit.
  • the heat source unit is a water pressure that supplies the heat source water even if the load state of the use-side equipment changes. There are cases where control is performed to keep the water supply pressure constant.
  • the heat source unit is a control that keeps the water supply temperature constant even if the load state of the user side device changes in order to stabilize the water temperature of the heat source water (hereinafter referred to as “water supply temperature”) that is supplied to the user side device. May be performed.
  • the heat source device since the load state of the use side device cannot be detected by the heat source device, the heat source device may be operated with a certain margin in the water supply pressure or the water supply temperature. In this case, compared to the actual load state of the use side equipment, heat source water having a water supply pressure or water temperature that is higher than necessary is generated and supplied to generate more power than necessary.
  • the problem to be solved by the present invention is to provide a heat source water control method and a heat source water control apparatus capable of reducing power when generating and sending heat source water.
  • the heat source water control apparatus executes a water supply differential pressure acquisition step, an opening degree acquisition step, a target water supply differential pressure calculation step, and a water supply differential pressure control step.
  • the water supply differential pressure acquisition step acquires the water supply differential pressure of the heat source water that is supplied from the heat source unit to the plurality of usage-side heat loads.
  • the opening degree obtaining step obtains the opening degree of at least one valve from among the valves that are provided in the respective use side heat loads and adjust the supply amount of the heat source water supplied to the use side heat loads.
  • the target water supply differential pressure calculating step is a target of the water supply differential pressure for setting the opening to a target value based on the water supply differential pressure acquired in the water supply differential pressure acquisition step and the opening acquired in the opening acquisition step.
  • the target water supply differential pressure that is the value is calculated.
  • the water supply pressure control step controls the water supply differential pressure based on the maximum water supply differential pressure that is the maximum value among the target water supply differential pressures calculated in the target water supply differential pressure calculation step.
  • the figure which shows an example of the heat source water control system of embodiment The figure which shows an example of 1st Embodiment by the side of a load. The figure which shows an example of 2nd Embodiment by the side of a load. The figure which shows an example of a software structure of the heat source water control apparatus of embodiment. The figure which shows an example of the structure of the hardware of the heat-source water control apparatus of embodiment.
  • a heat source water control system 1 includes a central monitoring device 10 used as a heat source water control device, a heat source machine 12, a differential pressure gauge 13, a bypass valve 14, an outgoing water temperature sensor 15, a water meter 16, and a return water temperature sensor. 17. It has the air han 20, which is a use side device, a valve 21, a thermometer 22, and an indicating controller 23.
  • the heat source water control system 1 feeds the heat source water generated by the heat source device 12 to the plurality of air hans 20.
  • the two air hangers 20, that is, the air han 20 a and the air han 20 b are illustrated, but the number of the air hangers 20 may be three or more.
  • a valve 21, a thermometer 22, and an indicating controller 23 are installed for each air hanger 20.
  • the air han 20a is provided with a valve 21a, a thermometer 22a and an indicating controller 23a
  • the air han 20b is provided with a valve 21b, a thermometer 22b and an indicating controller 23b.
  • the heat source device 12 is, for example, a module type chilling unit including a refrigeration cycle apparatus and a primary side pump 123, and includes a plurality of modules 120, an MC (Main controller) 121, and a GC (Group controller) 122.
  • the MC 121 controls the water supply differential pressure of the heat source water supplied from the heat source machine 12.
  • the water supply differential pressure is a differential pressure measured by the differential pressure gauge 13 and the return water returned to the heat source machine.
  • the GC 122 controls the temperature of the heat source water sent from the heat source machine 12.
  • the module 120 has one primary pump 123 for three air heat exchangers.
  • the module 120 cools or heats the refrigerant by a compressor (not shown), and generates heat source water by heat exchange with water.
  • the water temperature of the generated heat source water is measured by the outgoing water temperature sensor 15.
  • the GC 122 instructs the module 120 on the temperature of the heat source water to be generated, based on the water supply temperature instructed by the central monitoring device 10 and the water temperature measured by the outgoing water temperature sensor 15.
  • the water temperature of the heat source water can be changed, for example, by changing the rotation speed or compression rate of a compressor that cools or heats the refrigerant. For example, in cooling, heat source water is cooled. When the water temperature of the heat source water is lowered during cooling, the power for driving the compressor increases. On the other hand, when the water temperature of the heat source water is raised during cooling, the power for driving the compressor can be reduced.
  • the GC 122 may instruct the water supply temperature of the heat source water, and the central monitoring apparatus 10 may collect information on the valve opening and transmit the information to the GC 122.
  • MC 121 controls the rotational speed of the primary pump 123 of the module 120 based on the water supply differential pressure instructed from the central monitoring device 10 and the differential pressure measured by the differential pressure gauge 13.
  • the primary side pump 123 is installed, and the amount of heat source water sent from the heat source unit 12 is the total amount of heat source water discharged from the primary side pump 123.
  • MC121 controls the rotation speed of the primary side pump 123 of each heat source machine 12.
  • FIG. For example, when the water supply differential pressure instructed from the central monitoring device 10 is low, the MC 121 decreases the discharge pressure by reducing the rotational speed of the primary pump 123.
  • the MC 121 increases the discharge pressure by increasing the rotation speed of the primary pump 123.
  • the MC 121 reduces the number of primary pumps 123 to reduce the amount of water supplied.
  • the MC 121 increases the number of primary pumps 123 to be operated to increase the water supply amount. Note that the MC 121 may operate a pump that keeps the water supply amount constant, or may operate a pump that makes the water supply differential pressure constant.
  • the differential pressure gauge 13 measures the differential pressure between the pressure of the heat source water (outbound water) sent from the heat source device 12 and the pressure of the heat source water (return water) returned to the heat source device 12.
  • the differential pressure measured by the differential pressure gauge 13 is referred to as “water supply differential pressure”.
  • the MC 121 controls the operation of the primary pump 123 based on the water supply differential pressure measured by the differential pressure gauge 13. In order to control the operation of the primary pump 123, the water supply differential pressure is measured in the vicinity of the inlet / outlet of the heat source water of the heat source unit 12.
  • the air hung 20 since the air hung 20 is installed at a location away from the heat source unit 12, a pressure drop is generated due to the piping resistance from the heat source unit 12 to the air hung 20.
  • the pressure drop to each air hanger 20 may differ depending on the piping resistance from the heat source unit 12 to the air hanger 20. For example, when the distance from the heat source unit 12 to the air hung 20a is short, the piping resistance from the heat source unit 12 to the air hung 20a is reduced, so the pressure drop of the heat source water supplied to the air hung 20a is reduced. On the other hand, when the distance from the heat source device 12 to the air hung 20b is long, the pressure drop increases because the pipe resistance increases. Therefore, the actual water pressure of the heat source water provided to each air hanger 20 is an estimated value.
  • the bypass valve 14 adjusts the flow rate of the bypass water flowing through the bypass pipe installed near the entrance and exit of the heat source water of the heat source unit 12.
  • the opening degree of the bypass valve 14 is increased, the flow rate of the bypass water increases and the water supply differential pressure decreases.
  • the opening degree of the bypass valve 14 is reduced, the flow rate of the bypass water is reduced and the drop in the water supply differential pressure is reduced.
  • the primary pump 123 is operated at a constant speed, a predetermined water flow rate is required to operate the pump. Even when the load of the air hung 20 is small and the amount of heat source water supplied to the air hung 20 is small, it is possible to secure the amount of water necessary for the operation of the primary pump 123 by the flow rate of the bypass water. Further, when the water supply differential pressure becomes too high, the water supply differential pressure can be reduced by increasing the opening degree of the bypass valve 14.
  • the incoming water temperature sensor 15 measures the water supply temperature of the heat source water that is supplied from the heat source unit 12 to the air han 20a and the air han 20b.
  • water supply temperature shall not change with piping etc. in the middle of water supply from the heat source machine 12 to the air hung 20. That is, the temperature of the heat source water sent from the heat source device 12 is assumed to be the same as the water temperature at the inlet of each air hanger 20.
  • the measured water supply temperature is input to the GC 122.
  • the water flow meter 16 measures the amount of heat source water fed from the heat source unit 12 to the air hanger 20.
  • the amount of water supply is the total amount of heat source water supplied to the plurality of air hans 20.
  • the measured water supply amount is input to the central monitoring apparatus 10 via the MC 121 and the GC 122.
  • the return water temperature sensor 17 measures the return water temperature of the heat source water returned from the air hanger 20 to the heat source unit 12. The difference between the water supply temperature and the return water temperature varies depending on the heat exchange amount in the air hanger 20. The measured return water temperature is input to the GC 122. The heat exchange amount in the air hanger 20 will be described later.
  • the air han 20 is a heat load on the heat source water, and is an air han, for example.
  • the valve 21 adjusts the flow rate of the heat source water supplied to the air hanger 20 according to the valve opening.
  • the thermometer 22 measures the temperature of the air hanger 20.
  • the thermometer 22 can be composed of one or more sensors.
  • the instruction controller 23 adjusts the valve opening degree of the valve 21 based on the temperature of the air hanger 20 measured by the thermometer 22.
  • the valve opening degree of the valve 21 is input to the central monitoring device 10 and also to the GC 122.
  • the valve 21 changes the flow rate by changing the valve opening.
  • the characteristic of the change in flow rate with respect to the change in valve opening is called the flow rate characteristic of the valve.
  • a valve for adjusting the flow rate a valve having a linear characteristic or an equal percentage characteristic is often used.
  • the linear characteristic is a flow characteristic in which the flow rate changes in proportion to the valve opening.
  • the equal percent characteristic is a characteristic in which the amount of change in the flow rate is the same as the flow rate before the change regardless of the position of the valve opening. That is, in the equal percentage characteristic, the rate of change of the flow rate is proportional to the flow rate.
  • the load side is a configuration on the air han 20 side that uses heat source water generated by the heat source unit 12.
  • the air han 20 includes a heat exchanger 201 and a blower 202 which are utilization side heat loads.
  • the air han 20 is an air han, for example.
  • the air han 20 includes both an external air conditioner and an air conditioner other than the external air conditioner.
  • the external air conditioner adjusts the outside air by heat exchange. In the air conditioner other than the external air conditioner and the external air conditioner, heat exchange characteristics described later are different.
  • the air han 20 includes an external air conditioner, and an air conditioner other than the external air conditioner is referred to as “CAV (Constant Air Volume)” or “VAV (Variable Air Volume)”.
  • CAV Constant Air Volume
  • VAV Very Air Volume
  • Heat source water is supplied to the heat exchanger 201.
  • a valve 21 is installed on the outlet side of the heat source water of the air hanger 20 to adjust the amount of heat source water.
  • the heat exchanger 201 exchanges heat between the heat source water and air.
  • the blower 202 blows the heat-exchanged air to the indoor unit.
  • the sensor 111 measures the valve opening degree of the valve 21.
  • the sensor 111 outputs a current of 4-20 mA based on the valve opening, for example.
  • the valve opening degree of the sensor 111 is output to the central monitoring device 10.
  • the central monitoring device 10 can acquire information on whether the valve 21 that has acquired the valve opening degree has linear characteristics or equal percent characteristics. For example, the central monitoring device 10 acquires and stores the flow rate characteristics of the valve 21 in advance.
  • Sensor 112 measures the inlet pressure of valve 21.
  • the sensor 112 outputs the measured inlet pressure to the central monitoring device 10.
  • the sensor 113 measures the outlet pressure of the valve 21.
  • the sensor 113 outputs the measured outlet pressure to the central monitoring device 10.
  • Sensor 114 measures the inlet temperature of the heat source water.
  • the sensor 115 measures the outlet temperature of the heat source water.
  • the sensor 116 measures the valve flow rate of the heat source water in the valve 21.
  • the inlet temperature is the temperature of the heat source water before heat exchange supplied to the heat exchanger 201.
  • the outlet temperature is the water temperature of the heat source water after heat exchange in the heat exchanger 201.
  • the amount of heat exchange in the heat exchanger 201 can be calculated from the water temperature difference between the inlet temperature and the outlet temperature and the valve flow rate.
  • the sensor 114 outputs the measured inlet temperature to the central monitoring device 10.
  • the sensor 115 outputs the measured inlet temperature to the central monitoring device 10.
  • the sensor 116 outputs the measured valve flow rate to the central monitoring device 10.
  • Sensor 221 and sensor 222 are examples of thermometer 22 in FIG. Moreover, the ventilation temperature PID controller 231 and the indoor temperature PID controller 232 are examples of the instruction controller 23 of FIG.
  • the sensor 221 measures the blowing temperature of the heat-exchanged air blown to the indoor unit. The sensor 221 outputs the measured blowing temperature to the blowing temperature PID controller 231.
  • the sensor 222 measures the suction temperature in the indoor unit of the air blown by heat exchange in the heat exchanger 201. The sensor 222 outputs the measured suction temperature to the room temperature PID controller 232.
  • the indoor temperature PID controller 232 calculates a target value of the blowing temperature based on the suction temperature measured by the sensor 222.
  • the room temperature PID controller 232 outputs the calculated target value of the blowing temperature to the blowing temperature PID controller 231.
  • the air temperature PID controller 231 adjusts the valve opening degree of the valve 21 based on the target value of the air temperature acquired from the indoor temperature PID controller 232 and the air temperature acquired from the sensor 221. By increasing the valve opening, the flow rate of the heat source water is increased, and the blowing temperature is changed as the heat exchange amount is increased.
  • the blast temperature changes in about 5 to 10 minutes due to heat exchange in the heat exchanger 201.
  • the suction temperature changes, for example, 30 to 60 minutes after the temperature and flow rate of the heat source water are changed in consideration of the heat capacity of the air in the air duct.
  • the air temperature acquired from the sensor 221 is used for adjusting the air temperature PID controller 231
  • the response speed by adjusting the opening degree of the valve 21 is improved, and the control is performed. It can be stabilized.
  • control of the central monitoring apparatus 10 which uses the valve opening degree mentioned later as an input value can be stabilized, and motive power can be reduced by preventing the overshoot of water supply differential pressure or water supply temperature.
  • a plurality of indoor units may be connected to one air hanger 20 and air after heat exchange may be blown.
  • the sensor 222 may be installed for each indoor unit.
  • the second embodiment on the load side is an embodiment different from the first embodiment on the load side in the method for adjusting the valve opening of the valve 21.
  • FIG. 3 the same components as those in FIG.
  • Sensor 114 measures the inlet temperature of the heat source water in the heat exchanger.
  • the sensor 115 measures the outlet temperature of the heat source water in the heat exchanger.
  • the sensor 116 measures the valve flow rate of the heat source water in the valve 21.
  • the sensor 114 outputs the measured inlet temperature to the central monitoring device 10 and the flow rate calculator 234.
  • the sensor 115 outputs the measured outlet temperature to the central monitoring device 10 and the flow rate calculator 234.
  • the sensor 116 outputs the measured valve flow rate to the central monitoring device 10 and the two-way valve flow rate PID controller 233.
  • the indoor temperature PID controller 232 calculates a target value of the exchange heat amount based on the suction temperature in the indoor unit acquired from the sensor 222. For example, when the difference between the set value of the indoor unit and the suction temperature is small during cooling, the indoor temperature PID controller 232 increases the target value of the exchange heat amount in order to lower the suction temperature.
  • the flow rate calculator 234 passes the valve 21 based on the target value of the exchange heat quantity acquired from the indoor temperature PID controller 232 and the water temperature difference between the inlet temperature acquired from the sensor 114 and the outlet temperature acquired from the sensor 115. The target value of is calculated.
  • the flow rate calculator 234 outputs the calculated target value of the flow rate of the valve 21 to the two-way valve flow rate PID controller 233.
  • the two-way valve flow rate PID controller 233 adjusts the valve opening degree of the valve 21 based on the valve flow rate acquired from the sensor 116 and the target value of the flow rate of the valve 21 acquired from the flow rate calculator 234.
  • the second embodiment on the load side measures the water temperature difference at the inlet and outlet of the heat source water in the heat exchanger instead of measuring the air blowing temperature of the air blown to the indoor unit measured in the first embodiment on the load side. This is different from the first embodiment on the load side.
  • the change in the water temperature difference at the inlet / outlet of the heat exchanger after changing the temperature and flow rate of the heat source water further improves the response speed compared to the air temperature. For this reason, the response speed by adjusting the opening degree of the valve 21 is improved, the control can be further stabilized, and the power can be further reduced by preventing the overshoot of the water supply differential pressure and the water supply temperature.
  • FIG. 3 as in FIG. 2, the case where there is one indoor unit is illustrated. However, even if a plurality of indoor units are connected to one air hanger 20 and air after heat exchange is blown. Good. When there are a plurality of indoor units, the sensor 222 may be installed for each indoor unit.
  • the central monitoring device 10 includes a water supply differential pressure acquisition unit 51, an opening degree acquisition unit 52, a valve differential pressure acquisition unit 53, a flow rate acquisition unit 54, a target water supply differential pressure calculation unit 61, a generated power calculation unit 62, and a water supply. It has functions of a power calculation unit 63, a water temperature difference calculation unit 64, a water supply amount calculation unit 65, a load factor calculation unit 66, a water supply temperature calculation unit 67, a power control unit 71, a water supply differential pressure control unit 72, and a water supply temperature control unit 73.
  • the water supply differential pressure acquisition unit 51 to the flow rate acquisition unit 54 are functions for acquiring predetermined information from the outside of the central monitoring device 10.
  • the target water supply differential pressure calculation unit 61 to the water supply temperature calculation unit 67 are functions for executing a predetermined calculation based on the acquired information.
  • the power control unit 71 to the water supply temperature control unit 73 are functions for executing control on the outside of the central monitoring apparatus 10 based on the acquired information or the executed calculation result. In the present embodiment, each of these functions will be described as being realized by executing software (program). That is, FIG. 4 has shown the one aspect
  • the water supply differential pressure acquisition unit 51 acquires the water supply differential pressure of the heat source water supplied from the heat source device 12 to the plurality of heat exchangers 201.
  • the water supply differential pressure acquisition unit 51 acquires the water supply differential pressure from the differential pressure gauge 13.
  • water supply differential pressure”, “opening”, “valve differential pressure”, and the like acquired in the central monitoring device 10 described below refers to information representing pressure and opening as electrical data.
  • water supply differential pressure” or “opening” is information obtained by converting pressure or percentage information into 4-20 mA current or 0-5 V voltage information. Such information can be acquired, for example, constantly or at predetermined time intervals. The acquired information can be stored in a storage unit (not shown).
  • the opening degree obtaining unit 52 obtains the opening degree of the valve 21.
  • the opening degree of the valve 21 is expressed as a percentage of 0 to 100%, for example.
  • the valve 21 is provided on the outlet side of the heat source water of the heat exchanger 201 of each air han 20.
  • the valve 21 adjusts the amount of heat source water supplied to the heat exchanger 201 according to the opening degree.
  • the opening degree acquisition unit 52 acquires the opening degree of at least one valve from the valves 21 provided in each heat exchanger. For example, when a plurality of air hans are installed and there are a plurality of heat exchangers 201, the opening degree acquiring unit 52 acquires the opening degrees of all the valves 21. Further, the opening degree obtaining unit 52 may obtain the opening degree of the valve 21 as a representative.
  • the opening degree obtaining unit 52 obtains the opening degree of one valve 21 among the valves 21 installed in each air han. Further, for example, the opening degree of only the valve 21 having the maximum opening degree may be acquired.
  • the valve differential pressure acquisition unit 53 acquires the differential pressure between the inlet and the outlet of the valve 21.
  • the valve differential pressure acquisition unit 53 acquires a differential pressure from the difference between the pressure at the inlet of the valve 21 acquired from the sensor 112 and the pressure at the outlet of the valve 21 acquired from the sensor 113.
  • the differential pressure varies depending on the opening degree of the valve 21 and the flow rate of the heat source water. For example, the differential pressure increases as the valve opening decreases or the heat source water flow increases.
  • the valve differential pressure acquisition unit 53 is not limited to acquiring the valve differential pressure calculated from the inlet and outlet pressures of the valve 21 acquired from the sensors 112 and 113, and cannot detect the pressure due to a sensor failure or the like.
  • a predetermined set value may be recognized as the valve differential pressure.
  • the predetermined set value may be, for example, a value calculated based on the opening degree of the valve 21 and the detected flow rate of the flow meter.
  • the target water supply differential pressure calculation unit 61 sets the opening of the valve 21 to the target value based on the water supply differential pressure acquired by the water supply differential pressure acquisition unit 51 and the opening of the valve 21 acquired by the opening acquisition unit 52. Calculate the target water supply differential pressure.
  • the target water supply differential pressure is a target value of the water supply differential pressure acquired from the differential pressure gauge 13.
  • the target water supply differential pressure calculation unit 61 calculates the target water supply differential pressure in each valve when the opening degrees in the plurality of valves are acquired.
  • the target opening degree can be acquired from the instruction controller 23, for example. Note that the target water supply differential pressure calculation unit 61 may calculate the target water supply differential pressure at a predetermined target opening.
  • the water supply differential pressure control unit 72 controls the water supply differential pressure based on the maximum water supply differential pressure that is the maximum value among the target water supply differential pressure calculated by the target water supply differential pressure calculation unit 61.
  • the control of the water supply differential pressure can be controlled, for example, by changing the number of operating primary pumps 123, the number of rotations of the pumps, or the opening degree of the bypass valve 14.
  • the water supply differential pressure control unit 72 varies the number of rotations of a motor that drives the primary pump 123 by a transmission means such as an inverter.
  • the piping resistance in the piping path of the heat source water from the heat source unit 12 to the air hung 20 varies depending on each air hung 20.
  • the pipe resistance can be calculated based on the design drawing of the pipe path.
  • the calculated pipe resistance can be expressed as a pipe resistance curve, for example.
  • the piping resistance curve is calculated based on the piping distance or branching of the piping, the actual piping route includes piping joints and valves such as elbows and tees, so the calculated value and the measured value may deviate. There are many. Moreover, labor is required to perform detailed calculations. Therefore, when the measured value of the pipe resistance is larger than the calculated value, there is a possibility that sufficient water pressure cannot be obtained in the air hanger. On the other hand, when a margin is provided for the water supply differential pressure in the heat source unit 12, unnecessary power is required in the operation of the primary pump 123 or the like.
  • the target water supply differential pressure calculation unit 61 calculates the target water supply differential pressure based on the range ability of the valve and the flow rate characteristic of the valve.
  • the valve rangeability is the ratio of the maximum flow rate to the minimum flow rate that can be adjusted by the valve.
  • a valve having a high range ability has a wide control range in which the flow rate can be controlled.
  • the target water supply differential pressure is calculated for each flow rate characteristic of the valve.
  • the target water supply differential pressure calculation unit 61 first calculates the target differential pressure deviation d ⁇ PV by equation (1), and then calculates the target water supply differential pressure Ps by equation (2).
  • the target water supply differential pressure calculation unit 61 first calculates a target differential pressure deviation d ⁇ PV by equation (3), and then calculates a target water supply differential pressure Ps by equation (2).
  • the opening degree ⁇ and the valve differential pressure ⁇ PV in the valve 21 are acquired and the target water supply differential pressure Ps is calculated, the operation and the like of the primary pump 123 are controlled with the necessary and sufficient water supply differential pressure. Can do. Further, it is possible to prevent hunting of the pump rotation speed and the opening degree of the valve 21 due to excessive target water supply differential pressure. Further, since the flow rate characteristic and the range ability are fixed values common to the valve 21 type regardless of the diameter (size) of the valve 21, the target water supply differential pressure Ps can be easily calculated.
  • the generation power calculation unit 62 calculates generation power information indicating the relationship between the water supply temperature of the heat source water and the generation power for generating the heat source water.
  • the heat source unit 12 generates heat source water by cooling or heating the refrigerant compressed / conveyed by the compressor of the refrigeration cycle apparatus and exchanging heat with the heat source water, for example.
  • the generation power for generating the heat source water is determined by the temperature of the heat source water to be generated and the flow rate of the heat source water.
  • the generated power calculation unit 62 calculates generated power information indicating the relationship between the water supply temperature of the heat source water and the generated power for generating the heat source water, based on the heat source water generation capability prepared in advance in the heat source device 12.
  • the relationship between the water supply temperature and the generation power is the relationship between the water supply temperature and the generation power for generating the heat source water.
  • the rate of increase in generated power increases.
  • the water supply power calculation unit 63 calculates water supply power information indicating the relationship between the water supply temperature and the water supply power for supplying the heat source water.
  • the water supply power calculation unit 63 calculates the generated power information based on the maximum water supply differential pressure calculated by the target water supply differential pressure calculation unit and the change in the water supply amount required when the water supply temperature of the heat source water is changed. .
  • Water supply power can be obtained by the product of the water supply differential pressure and the water supply amount.
  • the amount of heat exchange from the heat source water to the air in the heat exchanger 201 is determined by the water temperature difference at the inlet / outlet of the heat exchanger 201 and the amount of heat source water supplied to the heat exchanger. For example, when performing control to keep the heat exchange amount constant, the amount of heat source water is decreased if the water temperature difference is increased, and the amount of heat source water is increased if the water temperature difference is decreased. Therefore, when the difference in the water supply temperature of the heat source water in the heat exchanger 201 determined by the water supply temperature becomes small, the amount of water supply increases and the water supply power increases.
  • the water supply power calculation unit 63 calculates the water supply power for the water supply temperature difference.
  • the horizontal axis is the water supply temperature and the vertical axis is the water supply power.
  • the ratio between the water supply temperature and the water supply power is such that the rate of decrease in the water supply power increases as the temperature difference of the heat source water to be supplied increases. Details of the water supply power calculation unit 63 will be described below.
  • the water supply power calculation unit 63 includes a water temperature difference calculation unit 64, a water supply amount calculation unit 65, and a load factor calculation unit 66.
  • the water temperature difference calculation unit 64 acquires the inlet temperature and the outlet temperature of the heat source water in each heat exchanger, and calculates the water temperature difference between the inlet temperature and the outlet temperature.
  • the inlet temperature of the heat source water in the heat exchanger can be obtained from the sensor 114.
  • the outlet temperature of the heat source water in the heat exchanger can be obtained from the sensor 115.
  • the water temperature difference calculation unit 64 calculates a water temperature difference from the acquired inlet temperature and outlet temperature.
  • the water temperature difference of the heat source water is proportional to the amount of heat exchange in the heat exchanger when the flow rate is constant.
  • the water temperature difference is inversely proportional to the flow rate when the heat exchange amount is constant.
  • the average water temperature difference of the plurality of heat exchangers may be calculated from the going-water temperature sensor 15 and the return water temperature sensor 17 and may be the water temperature difference of the heat exchanger.
  • the water supply amount calculation unit 65 Based on the characteristic information indicating the characteristics of the air han including the heat exchanger indicated by the change amount of the water temperature difference with respect to the change of the water temperature difference and the change amount of the water supply temperature of the heat source water, the water supply amount calculation unit 65 performs each heat exchange. Calculate the amount of change in the flow rate of the heat source water supplied to each heat exchanger when the amount of heat exchange in the heat exchanger is constant, and sum the amount of change in the flow rate in all heat exchangers to change the amount of water delivered Is calculated.
  • the characteristic information indicating the characteristics of the air han is prepared in advance.
  • the characteristic information is, for example, information represented by a graph in which the horizontal axis indicates the water temperature difference and the vertical axis indicates the amount of change in the water temperature difference.
  • the horizontal axis is selected based on the characteristic information, the amount of change in the temperature difference when the temperature of the heat source water changes by 1 ° C. can be obtained.
  • the specific example of the characteristic view by a water temperature difference is mentioned later.
  • the characteristic information is stored, for example, in a storage unit (not shown) of the central monitoring device 10 and read from the water supply amount calculation unit 65.
  • Water temperature difference is inversely proportional to the flow rate when the amount of heat exchange is constant. Therefore, when the water temperature difference is changed, when the change amount of the water temperature difference is changed, the flow rate is changed in proportion to the change amount.
  • the water supply amount calculation unit 65 calculates the water supply amount by summing the amount of change in flow rate with respect to the change in the water temperature difference in each heat exchanger.
  • the flow rate acquisition unit 54 acquires the flow rate of the heat source water supplied to each heat exchanger from the sensor 116.
  • the flow rate of the heat source water supplied to the heat exchanger is adjusted by the opening degree of the valve 21.
  • the load factor calculation unit 66 calculates the load factor of each heat exchanger based on the flow rate acquired by the flow rate acquisition unit 54 and the water temperature difference calculated by the water temperature difference calculation unit 64.
  • the load factor is an actual heat exchange amount when the maximum heat exchange amount capable of heat exchange in the heat exchanger 201 is 100%.
  • the amount of heat exchange in the heat exchanger can be determined by the product of the water temperature difference and the flow rate. When the flow rate is constant, the heat exchange amount increases as the water temperature difference increases, and decreases as the water temperature difference decreases.
  • the water supply amount calculation unit 65 includes characteristic information indicating the characteristics of the air handling unit including the heat factor indicated by the load factor calculated by the load factor calculation unit 66, and the change amount of the water temperature difference with respect to the change of the load factor, and the heat source Based on the amount of change in water supply temperature, calculate the amount of change in flow rate when the heat exchange amount in each heat exchanger is constant, and sum the amount of change in flow rate in all heat exchangers. The amount of change is calculated.
  • the characteristic information indicating the characteristics of the air han is prepared in advance.
  • the characteristic information is, for example, information represented by a graph with the load factor on the horizontal axis and the amount of change in the water temperature difference on the vertical axis.
  • the horizontal axis is selected based on the characteristic information, the amount of change in temperature difference when the temperature of the heat source water changes by 1 ° C. can be obtained at the load factor.
  • a specific example of the characteristic diagram based on the load factor will be described later.
  • the characteristic information is stored, for example, in a storage unit (not shown) of the central monitoring device 10 and read from the water supply amount calculation unit 65.
  • the load factor is proportional to the flow rate when the heat exchange amount is constant. Accordingly, when the load factor is changed, if the amount of change in the water temperature difference changes, the flow rate changes in inverse proportion to the amount of change.
  • the water supply amount calculation unit 65 calculates the water supply amount by summing the amount of change in flow rate with respect to the change in the water temperature difference in each heat exchanger.
  • the water supply temperature calculation unit 67 is based on the generated power information calculated by the generated power calculation unit 62 and the water supply power information calculated by the water supply power calculation unit 63, and the water supply temperature at which the sum of the generated power and the water supply power is minimized. Is calculated. In cooling, when the temperature of the heat source water decreases, the generation power required for cooling increases, while the water supply power decreases. In heating, when the temperature of the heat source water rises, the generation power required for heating increases, while the water supply power decreases. Therefore, when the generation power and the water supply power are summed, there is a water supply temperature at which the total value is minimum. The water supply temperature calculation unit 67 can calculate (select) the water supply temperature at which the total value is minimum by calculating the total value at each water supply temperature.
  • a water temperature having a water temperature difference lower than the lower limit value is not calculated as the water supply temperature.
  • the lower limit value based on the characteristic information indicating the characteristics of the air handling unit including the heat exchanger indicated by the change amount of the water temperature difference with respect to the change in the water temperature difference, and the water supply temperature calculated in the water supply temperature calculation unit Is calculated.
  • the lower limit value of the water temperature difference is the limit of the heat exchange capability of the heat exchanger 201. For this reason, the water supply temperature from which a water temperature difference becomes below a lower limit is excluded from calculation objects.
  • the water supply temperature calculation unit 67 does not calculate the water temperature higher than the outside air dew point temperature during cooling as the water supply temperature, and dew condensation does not occur at a water temperature higher than the outside air dew point temperature during cooling, so that the air cannot be dehumidified.
  • the water supply temperature calculation unit 67 may calculate a water supply temperature that is equal to or lower than a predetermined temperature with respect to the outside air dew point temperature during cooling.
  • the power control unit 71 controls the generation power and the water supply power of the heat source water based on the water supply temperature calculated by the water supply temperature calculation unit 67.
  • the power control unit 71 controls the temperature of the heat source water generated by the heat source machine 12 so that the total value of the generation power and the water supply power becomes the minimum.
  • the water supply temperature control unit 73 controls the water supply temperature of the heat source water by changing the rotation speed and compression rate of the compressor that cools or heats the refrigerant.
  • the power control unit 71 controls the water supply differential pressure at the water supply temperature in the water supply differential pressure control unit 72. Thereby, the power control unit 71 can control the heat source water that minimizes the total value of the generated power and the water supply power.
  • 62 water supply power calculation unit 63, water temperature difference calculation unit 64, water supply amount calculation unit 65, load factor calculation unit 66, water supply temperature calculation unit 67, power control unit 71, water supply differential pressure control unit 72, and water supply temperature control unit 73
  • each function is realized by software was explained.
  • the one or more functions of the central monitoring device 10 may be realized by hardware.
  • each function of the central monitoring device 10 may be implemented by dividing one function into a plurality of functions. Further, each of the above functions that the central monitoring apparatus 10 has may be implemented by integrating two or more functions into one function.
  • the central monitoring device 10 may be a device realized by a single casing or a system realized by a plurality of devices connected via a network or the like.
  • the central monitoring device 10 may be a device such as a server device, a notebook PC, a tablet PC, a PDA, or a smartphone, and is a virtual device such as a cloud service provided by a cloud computing system. May be.
  • one or more functions of the above functions of the central monitoring apparatus 10 may be realized in another apparatus. That is, the central monitoring apparatus 10 does not have to have all the functions described above, and may have some functions.
  • a part or all of the functions of the central monitoring apparatus 10 may be provided in the MC or GC.
  • a water supply differential pressure acquisition unit 51, an opening degree acquisition unit 52, a valve differential pressure acquisition unit 53, a flow rate acquisition unit 54, a target water supply differential pressure calculation unit 61, a generated power calculation unit 62, a water supply power calculation unit 63, a water temperature difference calculation Functions of the unit 64, the water supply amount calculation unit 65, the load factor calculation unit 66, the water supply temperature calculation unit 67, the power control unit 71, the water supply differential pressure control unit 72, the water supply temperature control unit 73, and the like are provided in the MC 121 and the GC 122. May be.
  • the flow rate characteristics of the valve 21 may be acquired and stored by the MC 121 or the GC 122 instead of the central monitoring device 10. Moreover, you may perform a part of operation
  • the heat source water control device in the present embodiment has been described as the central monitoring device 10, it may be a heat source water control device including at least one of MC and GC. That is, you may make MC and GC function as a heat source water control apparatus.
  • the central monitoring apparatus 10 includes a CPU 101, a RAM (Random Access Memory) 102, a ROM (Read Only Memory) 103, an HDD 104, an operation unit 105, a display unit 106, and a communication I / F (Interface) 107.
  • the central monitoring device 10 can be a general-purpose computer such as a desktop PC or a server device.
  • the central monitoring device 10 may be a control device dedicated to a heat source device, or an industrial control device such as a PLC (Programmable Logic Controller).
  • the central monitoring apparatus 10 may share hardware with MC121 or GC122.
  • the central monitoring apparatus 10 executes the heat source water control program described in FIG.
  • the CPU 101 controls the central monitoring apparatus 10 by executing an operator training program stored in the RAM 102, the ROM 103, or the HDD 104.
  • the heat source water control program is acquired from, for example, a recording medium that records the heat source water control program or a server that provides the program via a network, installed in the HDD 104, and stored in the RAM 102 so as to be readable from the CPU 101.
  • the operation unit 105 is, for example, a keyboard, a mouse, or a switch that enables an operation input by the operator of the central monitoring apparatus 10.
  • the display unit 106 has a display function for displaying information to an operator, for example, a liquid crystal display or a lamp. Note that the operation unit 105 and the display unit 106 may be, for example, a touch panel having an operation display function.
  • the communication I / F 107 controls communication with other devices via wireless LAN communication, wired LAN communication, infrared communication, short-range wireless communication, and the like.
  • the communication I / F 107 controls communication with the cloud server 91 via the PLC 124, the MC 121, the GC 122, or the network 9, for example.
  • the PLC 124 relays information on pressure acquired from the sensors 111 to 116, for example.
  • the cloud server 91 monitors or records the operation state of the central monitoring device 10.
  • FIGS. 6 to 10 are operations performed by the functions of the central monitoring apparatus 10 described with reference to FIG. 4, and can be realized by the CPU 101 executing the heat source water control program. Each operation will be described as being performed by the central monitoring apparatus 10.
  • the central monitoring apparatus 10 determines whether or not to start a target water supply differential pressure calculation operation (step S11). Whether or not to start the operation of calculating the target water supply differential pressure is determined by, for example, an instruction from the operator of the central monitoring apparatus 10 or an instruction from a timer set with a predetermined time interval. When it is determined that the calculation operation of the target water supply differential pressure is not started (step S11: NO), the central monitoring device 10 repeats the process of step S11 and waits for the start of the calculation operation.
  • step S11 when it is determined that the calculation operation of the target water supply differential pressure is started (step S11: YES), the central monitoring device 10 starts the operation of the water supply pump in the initial state (step S12).
  • the operation in the initial state is, for example, an operation under preset conditions such as the number of operating pumps, the number of rotations of the pump, and the opening of the valve.
  • step S13 the central monitoring apparatus 10 acquires the water supply differential pressure (step S13). Acquisition of the water supply differential pressure can be executed by the water supply differential pressure acquisition unit 51 acquiring the water supply differential pressure of the heat source water supplied from the heat source device 12 to the plurality of heat exchangers 201 from the differential pressure gauge 13.
  • the central monitoring apparatus 10 After executing the process of step S13, acquires the opening degree (step S14).
  • the opening degree can be acquired by the opening degree obtaining unit 52 obtaining the opening degree of the valve 21 provided on the outlet side of the heat source water of the heat exchanger 201 of each air hanger 20 from the sensor 111.
  • the opening degree acquisition unit 52 acquires the opening degree of at least one valve from the valves 21 provided in each heat exchanger.
  • the central monitoring apparatus 10 acquires the valve differential pressure (step S15).
  • the valve differential pressure can be acquired by the valve differential pressure acquisition unit 53 acquiring a differential pressure from the difference between the pressure at the inlet of the valve 21 acquired from the sensor 112 and the pressure at the outlet of the valve 21 acquired from the sensor 113. .
  • the predetermined set value may be recognized as the valve differential pressure. Good.
  • the predetermined set value may be, for example, a value determined in advance in a data table or the like, or a value calculated based on the opening degree of the valve 21 and the detected flow rate of the flow meter.
  • the central monitoring apparatus 10 calculates the target water supply differential pressure (step S16).
  • the target water supply differential pressure is calculated based on the water supply differential pressure acquired by the water supply differential pressure acquisition unit 51 and the opening degree of the valve 21 acquired by the opening degree acquisition unit 52. This can be executed by calculating the target water supply differential pressure.
  • the central monitoring apparatus 10 After executing the process of step S16, the central monitoring apparatus 10 stores the target water supply differential pressure (step S17).
  • the storage of the target water supply differential pressure can be executed, for example, by the target water supply differential pressure calculation unit 61 storing the calculated target water supply differential pressure in the HDD 104 or the like.
  • step S18 the central monitoring apparatus 10 determines whether or not to finish calculating the target water supply differential pressure.
  • the determination of whether or not to end the calculation of the target water supply differential pressure may be ended, for example, when a predetermined time has elapsed from the start of the calculation of the target water supply differential pressure and the calculated numerical value becomes stable.
  • step S18: NO the central monitoring apparatus 10 returns to the process of step S13 and repeats the calculation of the target water supply differential pressure.
  • step S18: YES the central monitoring apparatus 10 ends the process shown in the slow chart.
  • the central monitoring device 10 determines whether or not to start the calculation operation of the water supply temperature (step S21). Whether or not to start the operation of calculating the water supply temperature is determined by, for example, an instruction from the operator of the central monitoring apparatus 10 or an instruction from a timer set with a predetermined time interval. When it is determined that the calculation operation of the water supply temperature is not started (step S21: NO), the central monitoring apparatus 10 repeats the process of step S21 and waits for the start of the calculation operation.
  • the central monitoring device 10 calculates the generated power (step S22).
  • the generation power can be calculated by the generation power calculation unit 62 calculating generation power information indicating the relationship between the water supply temperature of the heat source water and the generation power for generating the heat source water.
  • the generation power is determined by the temperature of the heat source water to be generated and the flow rate of the heat source water.
  • the generated power calculation unit 62 calculates generated power information indicating the relationship between the water supply temperature of the heat source water and the generated power for generating the heat source water, based on the heat source water generation capability prepared in advance in the heat source device 12.
  • the central monitoring apparatus 10 calculates water supply power (step S23).
  • the calculation of the water supply power can be executed by the water supply power calculation unit 63 calculating water supply power information indicating the relationship between the water supply temperature and the water supply power for supplying the heat source water.
  • the water supply power calculation unit 63 calculates the generated power information based on the maximum water supply differential pressure calculated by the target water supply differential pressure calculation unit and the change in the water supply amount required when the water supply temperature of the heat source water is changed. .
  • the central monitoring apparatus 10 calculates the water supply temperature (step S24).
  • the water supply temperature is calculated based on the generated power information calculated by the generated power calculation unit 62 and the generated power information calculated by the generated power calculation unit 63. This can be done by calculating the water supply temperature at which the minimum is reached.
  • the water supply temperature calculation unit 67 calculates (selects) the water supply temperature at which the total value is minimum by calculating the total value at each water supply temperature.
  • the central monitoring device 10 After executing the process of step S24, the central monitoring device 10 stores the water supply temperature (step S25).
  • the storage of the water supply temperature can be executed, for example, by the water supply temperature calculation unit 67 storing the calculated water supply temperature in the HDD 104 or the like.
  • the central monitoring device 10 determines whether or not to end the calculation of the water supply temperature (step S26).
  • the determination as to whether or not to end the calculation of the water supply temperature may be ended, for example, when a predetermined time has elapsed from the start of the calculation of the water supply temperature and the calculated numerical value has stabilized. If it is determined not to end the calculation of the water supply temperature (step S26: NO), the central monitoring apparatus 10 returns to the process of step S22 and repeats the calculation of the water supply temperature. On the other hand, when it is determined that the calculation of the water supply temperature is to be ended (step S26: YES), the central monitoring apparatus 10 ends the process shown in the slow chart.
  • the first example of the water supply amount calculation operation is the operation related to the calculation of the water supply amount using the water temperature difference and the water temperature difference change amount characteristic described above.
  • the central monitoring apparatus 10 determines whether or not to start the calculation operation of the water supply amount (step S31). Whether or not to start the operation of calculating the water supply amount is determined by, for example, an instruction from the operator of the central monitoring apparatus 10 or an instruction from a timer set with a predetermined time interval. When it is determined that the calculation operation of the water supply amount is not started (step S31: NO), the central monitoring apparatus 10 repeats the process of step S31 and waits for the start of the calculation operation.
  • the central monitoring device 10 calculates the water temperature difference (step S32).
  • the water temperature difference is calculated by the water temperature difference calculating unit 64 acquiring the inlet temperature and the outlet temperature of the heat source water in each heat exchanger, the inlet temperature acquired from the sensor 114, and the temperature of the outlet temperature acquired from the sensor 115. This can be done by calculating the water temperature difference from the difference.
  • the average water temperature difference of the plurality of heat exchangers may be calculated from the incoming water temperature sensor 15 and the return water temperature sensor 17 to obtain the water temperature difference of the heat exchanger.
  • the central monitoring apparatus 10 calculates the water supply amount (step S33).
  • the calculation of the water supply amount includes the characteristic information indicating the characteristics of the air han including the heat exchanger indicated by the change amount of the water temperature difference with respect to the change of the water temperature difference.
  • the amount of change in the flow rate of the heat source water supplied to each heat exchanger when the amount of heat exchange in each heat exchanger is made constant based on the amount of change in the water supply temperature of the heat source water is calculated. It can be performed by calculating the amount of change in the amount of water supplied by summing the amount of change in the flow rate in the heat exchanger.
  • the central monitoring apparatus 10 After executing the process of step S33, the central monitoring apparatus 10 stores the water supply amount (step S34).
  • the storage of the water supply amount can be executed, for example, when the water supply amount calculation unit 65 stores the calculated water supply amount in the HDD 104 or the like.
  • step S35 the central monitoring device 10 determines whether or not to end the calculation of the water supply amount.
  • the determination as to whether or not to end the calculation of the water supply amount may be ended when, for example, a predetermined time has elapsed from the start of the calculation of the water supply amount and the calculated numerical value has stabilized.
  • step S35: NO the central monitoring apparatus 10 returns to the process of step S32 and repeats the calculation of the water supply amount.
  • step S35 YES
  • the central monitoring apparatus 10 ends the process shown in the slow chart.
  • the second example of the water supply amount calculation operation is the operation related to the calculation of the water supply amount using the load factor and the water temperature difference change amount characteristic described above. Note that, in the second example of the water supply amount calculation operation, the same processes as those in the first example of the water supply amount calculation operation are denoted by the same step numbers and description thereof is omitted.
  • the central monitoring apparatus 10 calculates a load factor (step S41).
  • the load factor calculating unit 66 calculates the load factor of each heat exchanger based on the flow rate acquired by the flow rate acquiring unit 54 and the water temperature difference calculated by the water temperature difference calculating unit 64. Can be executed.
  • the central monitoring apparatus 10 calculates the amount of water supply (step S42).
  • the calculation of the water supply amount is indicated by the water supply amount calculating unit 65 by the load factor calculated by the load factor calculating unit 66 and the change amount of the water temperature difference with respect to the change of the load factor.
  • the amount of change in the flow rate when the amount of heat exchange in each heat exchanger is constant is calculated. This can be performed by calculating the amount of change in the amount of water supplied by summing the amount of change in the flow rate in all heat exchangers.
  • the water supply amount calculation unit 65 calculates the water supply amount by summing the amount of change in the flow rate with respect to the change in the water temperature difference in each heat exchanger.
  • the central monitoring apparatus 10 determines whether or not to start the power control operation (step S51).
  • Power control is control for generating and supplying heat source water so that power is minimized. Whether or not to start the power control operation is determined by, for example, an instruction from the operator of the central monitoring apparatus 10 or an instruction from a timer set with a predetermined time interval. If it is determined that the power control operation is not started (step S51: NO), the central monitoring apparatus 10 repeats the process of step S51 and waits for the start of the calculation operation.
  • step S51 when it is determined that the operation of the power control is started (step S51: YES), the central monitoring apparatus 10 acquires the water supply temperature (step S52). Acquisition of water supply temperature can be performed by acquiring the water supply temperature memorize
  • step S53 After executing the process of step S52, the central monitoring apparatus 10 acquires the water supply amount (step S53). Acquisition of the water supply amount can be executed by acquiring the water supply amount stored in the process of step S34.
  • step S54 the central monitoring apparatus 10 acquires the water supply differential pressure (step S54). Acquisition of the water supply differential pressure can be performed by acquiring the water supply differential pressure stored in the process of step S17.
  • the central monitoring apparatus 10 After executing the processing in step S54, the central monitoring apparatus 10 outputs the instruction values for the water supply temperature, the water supply amount, and the water supply differential pressure acquired in steps S52 to S54.
  • the central monitoring device 10 outputs an indication value of the water supply temperature to the GC 122.
  • the GC 122 controls the module 120 so that the water temperature measured by the outgoing water temperature sensor 15 becomes the instruction value based on the instruction value of the water supply temperature of the heat source water instructed from the central monitoring device 10.
  • the central monitoring apparatus 10 may further output an instruction value for the amount of water supplied to the GC 122.
  • the product of the water supply temperature and the water supply amount becomes a load for generating heat source water in the module 120.
  • the central monitoring device 10 outputs an instruction value for water supply differential pressure to the MC 121.
  • the MC 121 controls the primary pump 123 so that the differential pressure measured by the differential pressure gauge 13 becomes the indicated value based on the indicated value of the water supply differential pressure indicated by the central monitoring device 10.
  • MC121 controls the rotation speed of the primary side pump 123, and the opening degree of the bypass valve 14, for example.
  • the central monitoring device 10 may further output an instruction value for the amount of water supplied to the MC 121.
  • the MC 121 controls, for example, the number of primary pumps 123 (modules 120) that operate according to the indicated value of the water supply amount.
  • the central monitoring apparatus 10 determines whether or not to end the power control operation (step S56).
  • the determination as to whether or not to end the power control operation is made based on whether or not the operator of the central monitoring device 10 has been operated when the water supply of the heat source water is ended, for example.
  • the operation of the power control may be ended when switching to the operation of the conventional heat source machine 12 that does not perform power control, for example.
  • the central monitoring device 10 may output only the instruction value of the water supply differential pressure, for example. Good. In this case, the water supply temperature of the heat source water is operated at a constant value.
  • step S56: NO If it is determined that the power control operation is not terminated (step S56: NO), the central monitoring apparatus 10 returns to the process of step S52 and repeats the power control operation. On the other hand, when it is determined that the power control operation is to be ended (step S56: YES), the central monitoring apparatus 10 ends the processing shown in the slow chart.
  • the first characteristic information of the air hung according to the embodiment is the water temperature difference and the water temperature difference variation characteristic information in the air han described above.
  • FIG. 11A shows the CAV characteristic information when the air han is other than the external air conditioner and during cooling.
  • the horizontal axis represents the temperature difference (water temperature difference) at the inlet / outlet of the air han of the heat source water.
  • the vertical axis represents the amount of change in the temperature difference (water temperature difference) at the inlet / outlet of the airhan of the heat source water.
  • the water temperature difference is proportional to the amount of heat exchange. That is, FIG. 11A shows the amount of change in the heat exchange amount when the temperature of the heat source water is changed by 1 ° C. with respect to the heat exchange amount.
  • the amount of change in the water temperature difference increases as the water temperature difference decreases, and the amount of change does not change when the water temperature difference is a certain value or less.
  • FIG. 11A shows the CAV characteristic information when the air han is other than the external air conditioner and during cooling.
  • the horizontal axis represents the temperature difference (water temperature difference) at the inlet / outlet of the air han of the
  • 11A shows that the change amount becomes a constant value when the water temperature difference is about 11 ° C. or less. That is, when the water temperature difference is about 11 ° C. or less, even if the temperature of the heat source water is changed, the amount of change in the temperature difference due to heat exchange is the same, which is the limit of the performance of the heat exchanger.
  • the temperature difference should not be 11 ° C. or less.
  • FIG. 11B shows the characteristic information of the VAV in the case where the air han is other than the external air conditioner and is cooled. Further, FIG. 11C shows characteristic information during cooling when the air hanger is an external air conditioner. In FIGS. 11A, 11B, and 11C, the characteristic information of the air han during cooling is shown, but similar characteristic information is also prepared during heating.
  • the second characteristic information of the air han is the above-described load factor and water temperature difference variation characteristic information in the air han.
  • FIG. 12A shows the characteristic information of CAV when the air han is other than an external air conditioner and during cooling.
  • the horizontal axis represents the load factor of the air han.
  • the vertical axis represents the amount of change in the temperature difference (water temperature difference) at the inlet / outlet of the airhan of the heat source water.
  • the load factor is calculated by the load factor calculator 66. That is, the load factor is a numerical value of 0 (1%) to 1 (100%) calculated by the water temperature difference and the flow rate.
  • the amount of change in the heat exchange amount when the temperature of the heat source water is changed by 1 ° C. increases according to the load factor. In other words, the amount of change in the water temperature difference when the temperature of the heat source water is changed by 1 ° C. increases according to the load factor.
  • FIG. 12B shows the characteristic information of the VAV in the case where the air han is other than the external air conditioner and is cooled.
  • FIG. 12C shows characteristic information during cooling when the air hanger is an external air conditioner.
  • the characteristic information of the air han during cooling is shown, but similar characteristic information is also prepared during heating.
  • this embodiment is a heat source water control method, in which a heat source water control device acquires a water supply differential pressure in which heat source water is supplied from a heat source unit to a plurality of usage-side heat loads.
  • An opening degree obtaining step for obtaining an opening degree of at least one of the valves provided in each of the use side heat loads and adjusting a supply amount of heat source water supplied to the use side heat load; Based on the valve differential pressure acquisition step for acquiring the differential pressure between the inlet and outlet of the water, the water supply differential pressure acquired in the water supply differential pressure acquisition step, and the opening acquired in the opening acquisition step, the opening is set to the target value.
  • the target water supply differential pressure calculating step for calculating the target water supply differential pressure, which is the target value of the water supply differential pressure to achieve Based on the differential pressure, Performing a water differential pressure control step of controlling the water bottle pressure. Thereby, the motive power at the time of producing
  • the heat source water control device calculates the target water supply differential pressure based on the range ability of the valve and the flow rate characteristic of the valve in the target water supply differential pressure calculation step.
  • a common fixed value can be used in the valve type regardless of the diameter (size) of the valve, so that the target water supply differential pressure can be easily calculated.
  • the heat source water control device calculates generation power information indicating a relationship between the water supply temperature of the heat source water and the generation power for generating the heat source water
  • the water supply power calculation step for calculating the water supply power information indicating the relationship between the water supply temperature and the water supply power for supplying the heat source water, the generation power information calculated in the generation power calculation step, and the water supply power calculation step
  • a water supply temperature calculation step for calculating a water supply temperature at which the sum of the generated power and the water supply power is minimized, and based on the water supply temperature calculated in the water supply temperature calculation step, the generation power and the water supply power of the heat source water
  • a power control step for controlling.
  • the heat source water control method in the present embodiment is based on the maximum water supply differential pressure and the change in the amount of water required when the heat source water control apparatus changes the water supply temperature of the heat source water in the water supply power calculation step. Generated power information is calculated based on this. Thereby, the generated power information can be calculated.
  • the heat source water control device acquires the inlet temperature and the outlet temperature of the heat source water at each use-side heat load in the water supply power calculation step, and calculates the inlet temperature and the outlet temperature.
  • Water temperature difference calculation step for calculating the water temperature difference, characteristic information indicating the characteristics of the air handling unit including the use side heat load indicated by the change amount of the water temperature difference with respect to the change of the water temperature difference, and the change amount of the water supply temperature of the heat source water Based on the above, calculate the amount of change in the flow rate of the heat source water supplied to each user-side heat load when the heat exchange amount in each user-side heat load is constant, and change the flow rate in all user-side heat loads.
  • a water supply amount calculation step of calculating the change amount of the water supply amount by summing the amounts is further executed. Thereby, the water supply amount can be calculated.
  • the heat source water control device acquires the inlet temperature and the outlet temperature of the heat source water at each use-side heat load in the water supply power calculation step, and calculates the inlet temperature and the outlet temperature.
  • the water temperature difference calculation step for calculating the water temperature difference
  • the flow rate acquisition step for acquiring the flow rate of the heat source water supplied to each use side heat load
  • the flow rate acquired in the flow rate acquisition step and the water temperature difference calculation step
  • Load factor calculation step for calculating the load factor of each use-side thermal load based on the difference in water temperature, the load factor calculated in the load factor calculation step, and the usage indicated by the amount of change in the water temperature difference with respect to the change in the load factor
  • the amount of change in the flow rate when the amount of heat exchange is constant is calculated, and the amount of change in the amount of water is calculated by adding the amount of change in the
  • the heat source water control device does not calculate the water temperature having a water temperature difference lower than the lower limit value as the water supply temperature in the water supply temperature calculation step. Thereby, it is possible not to calculate the water supply temperature exceeding the capacity of the use side heat load.
  • the heat source water control device shows characteristics of the air handling unit including the use-side heat load indicated by the change amount of the water temperature difference with respect to the change of the water temperature difference in the water supply temperature calculation step.
  • a lower limit value is calculated based on the characteristic information and the water supply temperature calculated in the water supply temperature calculation step. Thereby, it is possible not to calculate the water supply temperature exceeding the capacity of the use side heat load.
  • the heat source water control device does not calculate the water temperature higher than the outside air dew point temperature during cooling as the water supply temperature in the water supply temperature calculation step. Thereby, it is possible not to calculate the water supply temperature at which dehumidification is impossible.
  • the heat source water control device shows characteristics of the air handling unit including the use-side heat load indicated by the change amount of the water temperature difference with respect to the change of the water temperature difference in the water supply temperature calculation step.
  • a lower limit value is calculated based on the characteristic information and the water supply temperature calculated in the water supply temperature calculation step. Thereby, water supply temperature can be stabilized and power can be reduced.
  • the heat source water control device is configured such that, in the opening degree acquisition step, the water temperature difference between the inlet temperature and the outlet temperature of the heat source water in the use side heat load, and the heat exchange amount in the use side heat load.
  • the opening degree adjusted based on is acquired. Thereby, water supply temperature can be stabilized and power can be reduced.
  • the heat source water control device controls water supply or generation of the heat source water by the heat source water control method described above. Thereby, the motive power at the time of producing
  • the heat source water control device includes a water supply differential pressure acquisition step, an opening degree acquisition step, a valve differential pressure acquisition step, and a target water supply differential pressure calculation step. And the power at the time of producing
  • the heat source water control system is described in which the heat source water is conveyed by the primary pump of the heat source unit and the flow rate is adjusted by the bypass valve provided in the bypass flow path.
  • a heat source water control system that does not have a bypass valve in the bypass pipe and adjusts the system flow rate with a secondary pump provided in a header or the like may be used.

Abstract

熱源水制御方法は、熱源水制御装置が、送水差圧取得ステップと、開度取得ステップと、目標送水差圧算出ステップと、送水差圧制御ステップとを実行する。送水差圧取得ステップは、熱源機から複数の利用側熱負荷に対して送水される熱源水の送水差圧を取得する。開度取得ステップは、それぞれの利用側熱負荷に設けられ、利用側熱負荷に供給される熱源水の供給量を調節するバルブの中から少なくとも1つのバルブの開度を取得する。目標送水差圧算出ステップは、取得された送水差圧と、取得された開度とに基づき、開度を目標値にするための送水差圧の目標値である目標送水差圧を算出する。送水差圧制御ステップは、算出された目標送水差圧の中で最大値となる最大送水差圧に基づき、送水差圧を制御する。

Description

熱源水制御方法及び熱源水制御装置
 本発明の実施形態は、熱源水制御方法及び熱源水制御装置に関する。
 従来、熱源機で生成された熱源水(冷水あるいは温水)を複数のエアハンドリングユニット(以下、「エアハン」という。)のような空調機器や温度管理を必要とする産業機械等の利用側機器にポンプで送水する熱源システムがある。エアハンは空気調和機の一形態であって、外部の熱源機から供給される熱源水を用いて、空気の温度又は湿度を調節する。エアハンは、利用側熱負荷である熱交換器と送風機とを有し、熱源水と熱交換された空気を空調対象に設置された室内機に対して送風機で送風する。熱源機からエアハンに供給された熱源水は、熱交換器において空気と熱交換された後、熱源機に還流される。
 エアハンの負荷状態は、外気温や室内機の稼働状況等によって変化するため、エアハンで熱交換された熱源水が熱源機に還流されたときの水温や流量はエアハンの負荷状態によって変化する。熱源機は、エアハン等の利用側機器に送水する熱源水の水量(以下、「送水量」という。)を安定させるために、利用側機器の負荷状態が変化しても熱源水を送水する水圧である送水圧を一定に保つ制御を行う場合がある。また、熱源機は、利用側機器に送水する熱源水の水温(以下、「送水温度」という。)を安定させるために、利用側機器の負荷状態が変化しても送水温度を一定に保つ制御を行う場合がある。
 しかし、利用側機器の負荷状態は、熱源機において検知することができないため、熱源機は、送水圧や送水温度にある程度の余裕を持って運転する場合がある。この場合、利用側機器の実際の負荷状態に比べて必要以上の送水圧や送水温度の熱源水を生成して送水し、必要以上の動力を発生させていた。
特開2008-224182号公報 特開2014-066389号公報 特開平11-063631号公報 特開2003-262384号公報
 本発明が解決しようとする課題は、熱源水を生成して送水するときの動力を削減することができる、熱源水制御方法及び熱源水制御装置を提供することである。
 実施形態の熱源水制御方法は、熱源水制御装置が、送水差圧取得ステップと、開度取得ステップと、目標送水差圧算出ステップと、送水差圧制御ステップとを実行する。送水差圧取得ステップは、熱源機から複数の利用側熱負荷に対して送水される熱源水の送水差圧を取得する。開度取得ステップは、それぞれの利用側熱負荷に設けられ、利用側熱負荷に供給される熱源水の供給量を調節するバルブの中から少なくとも1つのバルブの開度を取得する。目標送水差圧算出ステップは、送水差圧取得ステップにおいて取得された送水差圧と、開度取得ステップにおいて取得された開度とに基づき、開度を目標値にするための送水差圧の目標値である目標送水差圧を算出する。送水圧制御ステップは、目標送水差圧算出ステップにおいて算出された目標送水差圧の中で最大値となる最大送水差圧に基づき、送水差圧を制御する。
実施形態の熱源水制御システムの一例を示す図。 負荷側の第1実施形態の一例を示す図。 負荷側の第2実施形態の一例を示す図。 実施形態の熱源水制御装置のソフトウェアの構成の一例を示す図。 実施形態の熱源水制御装置のハードウェアの構成の一例を示す図。 実施形態の熱源水制御装置における目標水圧算出動作の一例を示すフローチャート。 実施形態の熱源水制御装置における送水温度算出動作の一例を示すフローチャート。 実施形態の熱源水制御装置における送水量算出動作の第1の例を示すフローチャート。 実施形態の熱源水制御装置における送水量算出動作の第2の例を示すフローチャート。 実施形態の熱源水制御装置における動力制御動作の一例を示すフローチャート。 実施形態のエアハンの第1の特性情報の一例を示す図。 実施形態のエアハンの第1の特性情報の一例を示す図。 実施形態のエアハンの第1の特性情報の一例を示す図。 実施形態のエアハンの第2の特性情報の一例を示す図。 実施形態のエアハンの第2の特性情報の一例を示す図。 実施形態のエアハンの第2の特性情報の一例を示す図。
 以下、実施形態の熱源水制御方法及び熱源水制御装置を、図面を参照して説明する。なお、以下に示す各図において、同一構成については同一の符号を付す。
 先ず、図1を用いて、実施形態の熱源水制御システムの一例を説明する。
 図1において、熱源水制御システム1は、熱源水制御装置として使用される中央監視装置10、熱源機12、差圧計13、バイパス弁14、往水温度センサ15、水量計16、還水温度センサ17、利用側機器であるエアハン20、バルブ21、温度計22、指示調節計23を有する。熱源水制御システム1は、複数のエアハン20に対して熱源機12で生成した熱源水を送水する。図1では、エアハン20aとエアハン20bの2台のエアハン20を図示しているが、エアハン20の台数は3台以上であってもよい。バルブ21、温度計22及び指示調節計23は、それぞれのエアハン20毎に設置されている。エアハン20aには、バルブ21a、温度計22a及び指示調節計23aが設置され、エアハン20bには、バルブ21b、温度計22b及び指示調節計23bが設置されている。
 熱源機12は、例えば、冷凍サイクル装置と一次側ポンプ123を備えたモジュールタイプチリングユニットであって、複数のモジュール120、MC(Main controller)121、GC(Group controller)122を有する。MC121は、熱源機12から送水される熱源水の送水差圧を制御する。送水差圧は、差圧計13で測定される、熱源機から送水される往水と熱源機に還流される還水の差圧である。GC122は、熱源機12から送水される熱源水の水温を制御する。モジュール120は、3台の空気熱交換機に対して1台の一次側ポンプ123を有する。モジュール120は、図示しないコンプレッサによって冷媒を冷却又は加熱して、水との熱交換によって熱源水を生成する。生成する熱源水の水温は、往水温度センサ15において測定される。
 GC122は、中央監視装置10から指示された熱源水の送水温度と往水温度センサ15において測定された水温に基づき、モジュール120に対して、生成する熱源水の水温を指示する。熱源水の水温は、例えば、冷媒を冷却又は加熱するコンプレッサの回転数や圧縮率を変更することにより、変更することができる。例えば、冷房においては、熱源水を冷却する。冷房において熱源水の水温を低くすると、コンプレッサを駆動する動力が増加する。一方、冷房において熱源水の水温を高くするとコンプレッサを駆動する動力を減少させることができる。ここで、熱源水の送水温度を指示するのはGC122とし、中央監視装置10は、バルブ開度の情報を収集しGC122への情報送信を行うようにしてもよい。
 MC121は、中央監視装置10から指示された熱源水の送水差圧と差圧計13において測定された差圧に基づき、モジュール120の一次側ポンプ123の回転数を制御する。図1は、複数のモジュール120において、それぞれ一次側ポンプ123が設置され、熱源機12から送水される熱源水の水量は、それぞれ一次側ポンプ123から吐出される熱源水の水量の合計となる。MC121は、熱源機12のそれぞれ一次側ポンプ123の回転数を制御する。例えば、中央監視装置10から指示された熱源水の送水差圧が低い場合、MC121は、一次側ポンプ123の回転数を下げて吐出圧を小さくする。一方、指示された送水差圧が高い場合、MC121は、一次側ポンプ123の回転数を上げて吐出圧を大きくする。また、中央監視装置10から指示された熱源水の送水量が小さい場合、MC121は、一次側ポンプ123の運転台数を減らして送水量を小さくする。一方、指示された送水量が大きい場合、MC121は、一次側ポンプ123の運転台数を増やして送水量を大きくする。なお、MC121は、送水量を一定にさせるポンプの運転をしたり、送水差圧を一定にするポンプの運転をしたりしてもよい。
 差圧計13は、熱源機12から送水される熱源水(往水)の圧力と、熱源機12に還流される熱源水(還水)の圧力の差圧を測定する。差圧計13で測定される差圧を「送水差圧」という。上述の通り、MC121は差圧計13で測定された送水差圧に基づき一次側ポンプ123の運転を制御する。一次側ポンプ123の運転を制御するために、送水差圧は熱源機12の熱源水の出入口付近において測定される。一方、エアハン20は、熱源機12から離れた場所に設置されるため、熱源機12からエアハン20までの配管抵抗によって圧力低下が発生する。それぞれのエアハン20までの圧力低下は、熱源機12からエアハン20までの配管抵抗によって異なる場合がある。例えば、熱源機12からエアハン20aまでの距離が短い場合、熱源機12からエアハン20aまでの配管抵抗が小さくなるためエアハン20aの供給される熱源水の圧力低下が小さくなる。一方、熱源機12からエアハン20bまでの距離が長い場合、配管抵抗が大きくなるため圧力低下が大きくなる。したがって、それぞれのエアハン20に提供される熱源水の実際の水圧は推定値となる。
 バイパス弁14は、熱源機12の熱源水の出入口付近において設置されるバイパス配管に流れるバイパス水の流量を調整する。バイパス弁14の開度を大きくするとバイパス水の流量が増加して送水差圧が低下する。一方、バイパス弁14の開度を小さくするとバイパス水の流量が減少して送水差圧の低下が小さくなる。例えば、一次側ポンプ123を定速で運転する場合、ポンプを運転するためには所定の通水量が必要となる。エアハン20の負荷が小さく、エアハン20に供給される熱源水の水量が少ない場合であっても、バイパス水の流量によって一次側ポンプ123の運転に必要な通水量を確保することが可能となる。また、送水差圧が高くなり過ぎた場合、バイパス弁14の開度を増加させることにより、送水差圧を低下させることができる。
 往水温度センサ15は、熱源機12からエアハン20a及びエアハン20bに送水する熱源水の送水温度を計測する。なお、送水温度は、熱源機12からエアハン20に送水される途中の配管等で変化しないものとする。すなわち、熱源機12から送水される熱源水の水温は、それぞれのエアハン20の入口における水温と同じであるものとする。計測された送水温度は、GC122に入力される。
 水量計16は、熱源機12からエアハン20に送水された熱源水の送水量を計測する。送水量は、複数のエアハン20に送水された熱源水の水量の合計である。計測された送水量は、MC121およびGC122を経由して中央監視装置10に入力される。
 還水温度センサ17は、エアハン20から熱源機12に還流される熱源水の還水温度を計測する。送水温度と還水温度の差は、エアハン20における熱交換量によって変化する。計測された還水温度は、GC122に入力される。エアハン20における熱交換量については後述する。エアハン20は、熱源水に対する熱負荷であり、例えばエアハンである。
 バルブ21は、エアハン20に供給する熱源水の流量をバルブ開度によって調節する。温度計22は、エアハン20の温度を計測する。温度計22は、1又は複数のセンサによって構成することができる。指示調節計23は、温度計22で計測されたエアハン20の温度に基づき、バルブ21のバルブ開度を調節する。バルブ21のバルブ開度は、中央監視装置10に入力されるとともにGC122にも入力される。
 バルブ21は、バルブ開度の変化によって流量を変化させる。バルブ開度の変化に対する流量の変化の特性をバルブの流量特性という。流量を調節するバルブにおいては、リニア特性あるいはイコールパーセント特性のバルブが用いられる場合が多い。リニア特性とは、バルブ開度に比例して流量が変化する流量特性である。イコールパーセント特性とは、バルブ開度がどの位置で変化しても、流量の変化量が変化前の流量と同じになる特性である。すなわち、イコールパーセント特性においては、流量の変化率が流量に比例する。
 <負荷側の第1実施形態>
 次に、図2を用いて、負荷側の第1実施形態の一例を説明する。負荷側とは、熱源機12で生成された熱源水を利用するエアハン20側の構成である。
 図2において、エアハン20は、利用側熱負荷である熱交換器201と送風機202を有する。エアハン20は、例えば、エアハンである。エアハン20は、外調機と外調機以外の空調機のいずれも含む。外調機は、熱交換によって外気を調整する。外調機と外調機以外の空調機では、後述する熱交換の特性が異なる。以下の説明では、エアハン20には、外調機を含み、外調機以外の空調機を「CAV(Constant Air Volume)」又は「VAV(Variable Air Volume)」という。CAVは、室温等の条件が変わっても一定風量を維持する。VAVは、室温等の条件によって風量を可変とする。
 熱交換器201には熱源水が供給される。エアハン20の熱源水の出口側には、バルブ21が設置され、熱源水の水量を調節する。熱交換器201は、熱源水と空気を熱交換する。送風機202は、熱交換された空気を室内機に送風する。
 センサ111は、バルブ21のバルブ開度を計測する。センサ111は、例えば、バルブ開度に基づき、4-20mAの電流を出力する。センサ111のバルブ開度は、中央監視装置10に出力される。なお、中央監視装置10は、バルブ開度を取得したバルブ21が、リニア特性であるのか、あるいはイコールパーセント特性であるのかの情報を取得できるものとする。例えば、中央監視装置10は、バルブ21の流量特性を予め取得して記憶しておく。
 センサ112は、バルブ21の入口圧を計測する。センサ112は、計測した入口圧を中央監視装置10に出力する。センサ113は、バルブ21の出口圧を計測する。センサ113は、計測した出口圧を中央監視装置10に出力する。
 センサ114は、熱源水の入口温度を計測する。センサ115は、熱源水の出口温度を計測する。また、センサ116は、バルブ21における熱源水のバルブ流量を計測する。入口温度は、熱交換器201に供給される熱交換前の熱源水の水温である。出口温度は、熱交換器201において熱交換された後の熱源水の水温である。熱交換器201における熱交換量は、入口温度と出口温度の水温差とバルブ流量によって算出することができる。センサ114は、計測した入口温度を中央監視装置10に出力する。センサ115は、計測した入口温度を中央監視装置10に出力する。センサ116は、計測したバルブ流量を中央監視装置10に出力する。
 センサ221及びセンサ222は、図1の温度計22の一例である。また、送風温度PID調節計231及び室内温度PID調節計232は、図1の指示調節計23の一例である。センサ221は、室内機に送風する熱交換された空気の送風温度を計測する。センサ221は、計測した送風温度を送風温度PID調節計231に出力する。センサ222は、熱交換器201において熱交換されて送風された空気の、室内機における吸込温度を計測する。センサ222は、計測した吸込温度を室内温度PID調節計232に出力する。
 室内温度PID調節計232は、センサ222において計測された吸込温度に基づき、送風温度の目標値を算出する。室内温度PID調節計232は、算出した送風温度の目標値を送風温度PID調節計231に出力する。送風温度PID調節計231は、室内温度PID調節計232から取得した送風温度の目標値と、センサ221から取得した送風温度とに基づき、バルブ21のバルブ開度を調節する。バルブ開度を大きくすることにより、熱源水の流量が増加して、熱交換量の増加に伴い送風温度が変化する。
 熱源水の温度や流量を変化させると、熱交換器201における熱交換によって、例えば5~10分程度で送風温度が変化する。一方、吸込温度が変化するのは、送風ダクトにおける空気の熱容量を考慮すると、熱源水の温度や流量を変化させてから、例えば30~60分後となる。負荷側の第1実施形態においては、センサ221から取得した送風温度を送風温度PID調節計231の調節に使用しているため、バルブ21の開度の調節による応答速度が向上して、制御を安定させることができる。これにより、後述するバルブ開度を入力値とする中央監視装置10の制御を安定させることができ、送水差圧や送水温度のオーバーシュートを防止することで動力を削減することができる。
 なお、図2においては、室内機が1台の場合を図示したが、1台のエアハン20に対して複数の室内機が接続されて熱交換後の空気が送風されてもよい。室内機が複数台の場合、センサ222は、室内機毎に設置されてもよい。
 <負荷側の第2実施形態>
 次に、図3を用いて、負荷側の第2実施形態の一例を説明する。負荷側の第2実施形態は、バルブ21のバルブ開度の調節方法において、負荷側の第1実施形態と異なる実施形態である。図3において、図2と同じ構成については同じ符号を付して説明を省略する。
 センサ114は、熱交換器における熱源水の入口温度を計測する。センサ115は、熱交換器における熱源水の出口温度を計測する。また、センサ116は、バルブ21における熱源水のバルブ流量を計測する。センサ114は、計測した入口温度を中央監視装置10と流量演算器234に出力する。センサ115は、計測した出口温度を中央監視装置10と流量演算器234に出力する。センサ116は、計測したバルブ流量を中央監視装置10と2方弁流量PID調節計233に出力する。
 室内温度PID調節計232は、センサ222から取得した室内機における吸込温度に基づき、交換熱量の目標値を算出する。例えば、室内温度PID調節計232は、冷房時に室内機の設定値と吸込温度の差が小さい場合、吸込温度を下げるため、交換熱量の目標値を大きくする。
 流量演算器234は、室内温度PID調節計232から取得した交換熱量の目標値と、センサ114から取得した入口温度とセンサ115から取得した出口温度の水温差とに基づき、バルブ21を通過する流量の目標値を算出する。流量演算器234は、算出したバルブ21の流量の目標値を2方弁流量PID調節計233に出力する。2方弁流量PID調節計233は、センサ116から取得したバルブ流量と、流量演算器234から取得したバルブ21の流量の目標値に基づき、バルブ21のバルブ開度を調節する。
 負荷側の第2実施形態は、負荷側の第1実施形態において測定した室内機に送風する空気の送風温度を測定する代わりに、熱交換器における熱源水の出入口の水温差を計測している点で負荷側の第1実施形態と異なる。熱源水の温度や流量を変化させてからの熱交換器の出入口の水温差の変化は、送風温度に比べてさらに応答速度が向上する。このため、バルブ21の開度の調節による応答速度が向上して、制御をさらに安定させることができ、送水差圧や送水温度のオーバーシュートを防止することで動力をさらに削減することができる。
 なお、図3においても図2と同様に、室内機が1台の場合を図示したが、1台のエアハン20に対して複数の室内機が接続されて熱交換後の空気が送風されてもよい。室内機が複数台の場合、センサ222は、室内機毎に設置されてもよい。
 次に、図4を用いて、実施形態の熱源水制御装置のソフトウェアの構成を説明する。
 図4において、中央監視装置10は、送水差圧取得部51、開度取得部52、バルブ差圧取得部53、流量取得部54、目標送水差圧算出部61、生成動力算出部62、送水動力算出部63、水温差算出部64、送水量算出部65、負荷率算出部66、送水温度算出部67、動力制御部71、送水差圧制御部72及び送水温度制御部73の機能を有する。
 送水差圧取得部51~流量取得部54は、中央監視装置10の外部から所定の情報を取得する機能である。目標送水差圧算出部61~送水温度算出部67は、取得された情報に基づき、所定の演算を実行する機能である。また、動力制御部71~送水温度制御部73は、取得された情報又は実行された演算結果に基づき、中央監視装置10の外部に対して制御を実行する機能である。本実施形態において、これらの各機能は、ソフトウェア(プログラム)を実行することにより実現されるものとして説明する。すなわち、図4は、熱源水制御処理を実行する熱源水制御プログラムの一態様を示している。
 送水差圧取得部51は、熱源機12から複数の熱交換器201に対して送水される熱源水の送水差圧を取得する。送水差圧取得部51は、差圧計13から送水差圧を取得する。なお、以下で説明する中央監視装置10において取得される「送水差圧」、「開度」、又は「バルブ差圧」等は、圧力や開度を電気データとして表した情報のことを言う。例えば、「送水差圧」あるいは「開度」は、圧力あるいは百分率の情報を4-20mAの電流や0-5Vの電圧の情報に変換した情報である。これらの情報の取得は、例えば、常時、又は所定の時間間隔で取得することができる。取得したこれらの情報は、図示しない記憶部に記憶することができる。
  開度取得部52は、バルブ21の開度を取得する。バルブ21の開度は、例えば0-100%の百分率であらわされる。バルブ21は、それぞれのエアハン20の熱交換器201の熱源水の出口側に設けられる。バルブ21は、開度によって熱交換器201に供給する熱源水の水量を調節する。開度取得部52は、それぞれの熱交換器に設けられたバルブ21の中から少なくとも1つのバルブの開度を取得する。例えば、エアハンが複数設置されて、熱交換器201が複数ある場合、開度取得部52は、全てのバルブ21の開度を取得する。また、開度取得部52は、代表となるバルブ21の開度を取得してもよい。例えば、負荷状態が近似しているエアハンが複数存在する場合、開度取得部52は、それぞれのエアハンに設置されたバルブ21の中の1つのバルブ21の開度を取得する。また、例えば、複数のバルブ21の内、開度が最大となっているもののみの開度を取得してもよい。
 バルブ差圧取得部53は、バルブ21の入口と出口の差圧を取得する。バルブ差圧取得部53は、センサ112から取得したバルブ21の入口の圧力とセンサ113から取得したバルブ21の出口の圧力の差から差圧を取得する。差圧は、バルブ21の開度と熱源水の流量によって変化する。例えば、バルブ開度が小さい程又は熱源水の流量が大きい程差圧が大きくなる。ここで、バルブ差圧取得部53は、センサ112およびセンサ113から取得したバルブ21の入口および出口の圧力から算出したバルブ差圧を取得するものに限らず、センサの故障等で圧力を検出できない場合は所定の設定値をバルブ差圧として認識してもよい。この所定の設定値とは、例えば、バルブ21の開度と流量計の検知流量に基づいて算出される値でもよい。
 目標送水差圧算出部61は、送水差圧取得部51において取得された送水差圧と、開度取得部52において取得されたバルブ21の開度とに基づき、バルブ21の開度を目標値にするための目標送水差圧を算出する。目標送水差圧は、差圧計13から取得される送水差圧の目標値である。目標送水差圧算出部61は、複数のバルブにおける開度を取得したときには、それぞれのバルブにおける目標送水差圧を算出する。目標開度は、例えば、指示調節計23から取得することができる。なお、目標送水差圧算出部61は、予め定められた目標開度において目標送水差圧を算出してもよい。
 送水差圧制御部72は、目標送水差圧算出部61において算出された目標送水差圧の中で最大値となる最大送水差圧に基づき、送水差圧を制御する。送水差圧の制御は、例えば、一次側ポンプ123の運転台数、ポンプの回転数、又はバイパス弁14の開度を可変とすることにより制御することができる。送水差圧制御部72は、例えば、一次側ポンプ123を駆動するモータの回転数をインバータ等の変速手段によって可変する。
 熱源機12からエアハン20までの熱源水の配管経路における配管抵抗は、それぞれのエアハン20によって異なる。配管抵抗は、配管経路の設計図に基づき計算することができる。計算された配管抵抗は、例えば配管抵抗曲線として表すことができる。それぞれのエアハンにおける配管抵抗曲線を予め用意することにより、熱源水の流量が変化したときの熱源機12からエアハン20までの圧力損失を得ることができるので、熱源機12から送水するときの目標送水差圧を算出することができる。しかし、配管抵抗曲線を配管距離や配管の分岐等により計算しても、実際の配管経路には、エルボやティー等の配管継手やバルブを含むため、計算値と実測値が乖離してしまう場合が多い。また、詳細な計算をするには労力を要する。したがって、配管抵抗の実測値が計算値に比べて大きくなる場合、エアハンにおいて十分な水圧を得られないおそれがある。一方、熱源機12における送水差圧に余裕を持たせた場合、一次側ポンプ123の運転等において不必要な動力が必要となる。
 次に、目標送水差圧算出部61における目標送水差圧の算出方法を説明する。目標送水差圧算出部61は、バルブのレンジアビリティとバルブの流量特性とにさらに基づき目標送水差圧を算出する。
 バルブのレンジアビリティとは、バルブが調節できる最大流量と最小流量の比である。レンジアビリティが高いバルブは、流量を制御できる制御範囲が広くなる。目標送水差圧をバルブの流量特性毎に算出する。
 <流量特性がイコールパーセント特性である場合>
 目標送水差圧算出部61は、先ず、目標差圧偏差dΔPVを式(1)で算出し、次に、目標送水差圧Psを式(2)で算出する。
 dΔPV=ΔPV{ρ2(σ-σs)-1} ・・・式(1)
 (但し、ρ:レンジアビリティ、σ:開度、σs:目標開度、ΔPV:バルブ差圧)
 Ps=P+dΔPV ・・・式(2)
 (但し、P:前回計算で設定された目標送水差圧Ps)
 <流量特性がリニア特性である場合>
 目標送水差圧算出部61は、先ず、目標差圧偏差dΔPVを式(3)で算出し、次に、目標送水差圧Psを式(2)で算出する。
 dΔPV=ΔPV[〔{1/ρ+(1-1/ρ)σ}/{1/ρ+(1-1/ρ)σs}〕―1]
 ・・・式(3)
 (但し、ρ:レンジアビリティ、σ:開度、σs:目標開度、ΔPV:バルブ差圧)
 Ps=P+dΔPV ・・・式(2)
 (但し、P:前回計算で設定された目標送水差圧Ps)
 本実施形態においては、バルブ21における開度σとバルブ差圧ΔPVを取得して目標送水差圧Psを算出するので、必要十分な送水差圧で一次側ポンプ123の運転等の制御をすることができる。また、目標送水差圧の行き過ぎによるポンプ回転数やバルブ21の開度のハンチングを防止することができる。また、流量特性及びレンジアビリティは、バルブ21の口径(サイズ)に関係なくバルブ21の型式で共通の固定値であるため、目標送水差圧Psの算出が容易になる。
 生成動力算出部62は、熱源水の送水温度と熱源水を生成するための生成動力との関係を示す生成動力情報を算出する。熱源機12は、例えば、冷凍サイクル装置のコンプレッサによって圧縮/搬送された冷媒を冷却又は加熱して熱源水と熱交換することにより、熱源水を生成する。熱源水を生成するための生成動力は、生成する熱源水の温度と熱源水の流量によって定められる。例えば、冷房においては、熱源水の温度を低くするには熱源水の顕熱の変化が大きくなるので冷却した冷媒からの熱交換量を増加させるために冷媒の冷却が必要となり、生成動力を増加させる。一方、冷房において、熱源水の温度を高くすると熱源水の顕熱の変化が小さくなり生成動力が減少する。生成動力算出部62は、熱源機12において予め用意された熱源水の生成能力に基づき、熱源水の送水温度と熱源水を生成するための生成動力との関係を示す生成動力情報を算出する。送水温度と熱源水を生成するための生成動力との関係は、例えば、横軸を送水温度、縦軸を生成動力とした場合、送水温度と生成動力との関係は、生成する熱源水の顕熱の量の増加に応じて生成動力の増加の割合が大きくなる。
 送水動力算出部63は、送水温度と熱源水を送水するための送水動力との関係を示す送水動力情報を算出する。送水動力算出部63は、目標送水差圧算出部において算出された最大送水差圧と、熱源水の送水温度を変化させたときに必要となる送水量の変化とに基づき生成動力情報を算出する。
 送水動力は、送水差圧と送水量の積によって求めることができる。上述の通り、熱源水から熱交換器201において空気に熱交換される熱交換量は、熱交換器201の出入口における水温差と熱交換器に供給される熱源水の水量によって決定される。例えば、熱交換量を一定にする制御を行う場合、水温差が大きくなれば熱源水の水量を減少させ、水温差が小さくなれば熱源水の水量を増加させる。したがって、送水温度によって決定される熱交換器201における熱源水の送水温度差が小さくなると送水量が増加して、送水動力が増加する。一方、送水温度差が大きくなると送水量が減少し、送水動力が減少する。例えば、横軸を送水温度、縦軸を送水動力とした場合、送水温度と送水動力との関係は、送水する熱源水の温度差の増加に応じて送水動力の減少の割合が大きくなる。送水動力算出部63の詳細を以下に説明する。
 送水動力算出部63は、水温差算出部64、送水量算出部65及び負荷率算出部66を有する。
 水温差算出部64は、それぞれの熱交換器における熱源水の入口温度と出口温度を取得して、入口温度と出口温度の水温差を算出する。熱交換器における熱源水の入口温度は、センサ114から取得することができる。熱交換器における熱源水の出口温度は、センサ115から取得することができる。水温差算出部64は、取得した入口温度と出口温度から水温差を算出する。上述の通り、熱源水の水温差は、流量一定の場合、熱交換器における熱交換量に比例する。一方、水温差は、熱交換量が一定の場合、流量に反比例する。ここで、上記の他にも、往水温度センサ15と還水温度センサ17から複数の熱交換器の平均水温差を算出し、熱交換器の水温差としてもよい。
 <水温差-水温差変化量特性を利用した送水量の算出>
 送水量算出部65は、水温差の変化に対する水温差の変化量で示される熱交換器を含むエアハンの特性を示す特性情報と、熱源水の送水温度の変化量とに基づき、それぞれの熱交換器における熱交換量を一定にしたときのそれぞれの熱交換器に供給される熱源水の流量の変化量を算出し、全ての熱交換器における流量の変化量を合計して送水量の変化量を算出する。
 エアハンの特性を示す特性情報は、予め用意されている。特性情報は、例えば、水温差を横軸、水温差の変化量を縦軸にしたグラフで表される情報である。特性情報に基づき、横軸を選択すると、その温度差において、熱源水の温度が1℃変化したときの温度差の変化量を求めることができる。なお、水温差による特性図の具体例は後述する。特性情報は、例えば中央監視装置10の図示しない記憶部に記憶されて、送水量算出部65から読出される。
 水温差は、熱交換量が一定の場合、流量に反比例する。したがって、水温差を変化させた場合、水温差の変化量が変わると、変化量に比例して流量が変化する。送水量算出部65は、それぞれの熱交換器における、水温差の変化に対する流量の変化量を合計し、送水量を算出する。
 <負荷率-水温差変化量特性を利用した送水量の算出>
 流量取得部54は、それぞれの熱交換器に供給される熱源水の流量をセンサ116から取得する。熱交換器に供給される熱源水の流量は、バルブ21の開度によって調節される。
 負荷率算出部66は、流量取得部54において取得された流量と、水温差算出部64において算出された水温差に基づき、それぞれの熱交換器の負荷率を算出する。負荷率とは、熱交換器201において熱交換可能な最大熱交換量を100%とした場合の実際の熱交換量である。熱交換器における熱交換量は、水温差と流量の積によって求めることができる。熱交換量は、流量が一定の場合、水温差が大きくなる程大きくなり、水温差が小さくなる程小さくなる。
 送水量算出部65は、負荷率算出部66において算出された負荷率と、負荷率の変化に対する水温差の変化量で示される熱交換器を含むエアハンドリングユニットの特性を示す特性情報と、熱源水の送水温度の変化量とに基づき、それぞれの熱交換器における熱交換量を一定にしたときの流量の変化量を算出し、全ての熱交換器における流量の変化量を合計して送水量の変化量を算出する。
 エアハンの特性を示す特性情報は、予め用意されている。特性情報は、例えば、負荷率を横軸、水温差の変化量を縦軸にしたグラフで表される情報である。特性情報に基づき、横軸を選択すると、その負荷率において、熱源水の温度が1℃変化したときの温度差の変化量を求めることができる。なお、負荷率による特性図の具体例は後述する。特性情報は、例えば中央監視装置10の図示しない記憶部に記憶されて、送水量算出部65から読出される。
 負荷率は、熱交換量が一定の場合、流量に比例する。したがって、負荷率を変化させた場合、水温差の変化量が変わると、変化量に反比例して流量が変化する。送水量算出部65は、それぞれの熱交換器における、水温差の変化に対する流量の変化量を合計し、送水量を算出する。
 送水温度算出部67は、生成動力算出部62において算出された生成動力情報と、送水動力算出部63において算出された送水動力情報とに基づき、生成動力と送水動力の合計が最小となる送水温度を算出する。冷房において、熱源水の温度が低下すると冷却に要する生成動力は増加し、一方、送水動力は減少する。暖房において、熱源水の温度が上昇すると加熱に要する生成動力は増加し、一方、送水動力は減少する。したがって、生成動力と送水動力を合計した場合、合計値が最小となる送水温度が存在する。送水温度算出部67は、それぞれの送水温度における合計値を算出することにより、合計値が最小となる送水温度を算出(選択)することができる。
 送水温度算出部67において、水温差が下限値より低い水温を前記送水温度として算出しない。送水温度算出部67において、水温差の変化に対する水温差の変化量で示される熱交換器を含むエアハンドリングユニットの特性を示す特性情報と、送水温度算出部において算出された送水温度に基づき下限値を算出する。水温差の変化量で示される熱交換器を含むエアハンドリングユニットの特性を示す特性情報において、水温差の下限値は、熱交換器201の熱交換能力の限界である。このため、水温差が下限値以下となる送水温度を算出対象から除外する。
 また、送水温度算出部67は、冷房時における外気露点温度より高い水温を送水温度として算出しない、冷房時における外気露点温度より高い水温においては、結露が発生しないため、空気の除湿ができない。なお、送水温度算出部67は、冷房時における外気露点温度に対して所定の温度以下の送水温度を算出するようにしてもよい。
 動力制御部71は、送水温度算出部67において算出された送水温度に基づき、熱源水の生成動力と送水動力とを制御する。動力制御部71は、送水温度制御部73において、熱源機12で生成する熱源水の温度を生成動力と送水動力の合計値が最小となる送水温度になるように制御する。送水温度制御部73は、冷媒を冷却又は加熱するコンプレッサの回転数や圧縮率を変更することにより、熱源水の送水温度を制御する。
 また、動力制御部71は、送水差圧制御部72において、送水温度における熱源水の送水差圧を制御する。これにより、動力制御部71は、生成動力と送水動力の合計値を最小にした熱源水の制御をすることが可能となる。
 なお、図4においては、中央監視装置10が有する、送水差圧取得部51、開度取得部52、バルブ差圧取得部53、流量取得部54、目標送水差圧算出部61、生成動力算出部62、送水動力算出部63、水温差算出部64、送水量算出部65、負荷率算出部66、送水温度算出部67、動力制御部71、送水差圧制御部72及び送水温度制御部73の各機能がソフトウェアによって実現される場合を説明した。しかし、中央監視装置10が有する上記1つ以上の機能は、ハードウェアによって実現されるものであっても良い。
 また、中央監視装置10が有する上記各機能は、1つの機能を複数の機能に分割して実施してもよい。また、中央監視装置10が有する上記各機能は、2つ以上の機能を1つの機能に集約して実施してもよい。
 また、中央監視装置10は、1つの筐体によって実現される装置であっても、ネットワーク等を介して接続された複数の装置から実現されるシステムであってもよい。例えば、中央監視装置10は、サーバ装置、ノート型PC、タブレット型PC、PDA、又はスマートフォン等の装置であってもよく、クラウドコンピューティングシステムによって提供されるクラウドサービス等、仮想的な装置であってもよい。
 また、中央監視装置10の上記各機能の1以上の機能を他の装置において実現するようにしてもよい。すなわち、中央監視装置10は上記全ての機能を有している必要はなく、一部の機能を有するものであってもよい。
 また、中央監視装置10の一部機能または全部機能がMCやGCに設けられてもよい。例えば、送水差圧取得部51、開度取得部52、バルブ差圧取得部53、流量取得部54、目標送水差圧算出部61、生成動力算出部62、送水動力算出部63、水温差算出部64、送水量算出部65、負荷率算出部66、送水温度算出部67、動力制御部71、送水差圧制御部72及び送水温度制御部73等の機能は、MC121とGC122に設けられていてもよい。また、中央監視装置10ではなく、MC121またはGC122により、バルブ21の流量特性を取得し記憶してもよい。また、MC121やGC122に備えられている制御機能を用いて熱源制御システムの動作の一部を行ってもよい。これにより、中央監視装置10の機能を必要以上に拡大することなく、システム全体の動作を良好に行うことができる。
 また、本実施形態における熱源水制御装置は中央監視装置10として説明しているが、MCやGCの少なくとも何れか一方を含めて熱源水制御装置としてもよい。すなわち、MCやGCを熱源水制御装置として機能させてもよい。
 次に、図5を用いて、実施形態の中央監視装置10のハードウェアの構成を説明する。
 図5において、中央監視装置10は、CPU101、RAM(Random Access Memory)102、ROM(Read Only Memory)103、HDD104、操作部105、表示部106、及び通信I/F(Interface)107を有する。
 中央監視装置10には、デスクトップ型PC、サーバ装置等の汎用のコンピュータを用いることができる。また、中央監視装置10には、熱源機専用の制御装置、又はPLC(Programmable Logic Controller)等の産業用制御機器を用いてもよい。また、中央監視装置10は、MC121又はGC122とハードウェアを共用するものであってもよい。中央監視装置10は、図4で説明した熱源水制御プログラムを実行する。
 CPU101は、RAM102、ROM103又はHDD104に記憶された作業者育成プログラムを実行することにより、中央監視装置10の制御を行う。熱源水制御プログラムは、例えば、熱源水制御プログラムを記録した記録媒体、又はネットワークを介してプログラムを提供するサーバ等から取得されて、HDD104にインストールされ、RAM102にCPU101から読出し可能に記憶される。
 操作部105は、中央監視装置10のオペレータによる操作入力を可能にする、例えば、キーボード、マウス、又はスイッチ等である。表示部106は、オペレータに情報を表示する表示機能を有する、例えば、液晶ディスプレイ、又はランプ等である。なお、操作部105及び表示部106は、操作表示機能を有する、例えばタッチパネル等であってもよい。
 通信I/F107は、無線LAN通信、有線LAN通信、赤外線通信、近距離無線通信等を介して他の装置との通信を制御する。通信I/F107は、例えば、PLC124、MC121、GC122、又はネットワーク9を介したクラウドサーバ91との通信を制御する。PLC124は、例えばセンサ111~センサ116から取得する圧力の情報等を中継する。クラウドサーバ91は、例えば、中央監視装置10の運転状態をモニタし又は記録する。
 次に、図6を用いて、実施形態の中央監視装置10における目標水圧算出動作を説明する。なお、図6から図10において図示するフローチャートの動作は、図4において説明した中央監視装置10の各機能による動作であって、CPU101が熱源水制御プログラムを実行することによって実現することができる。各動作は中央監視装置10が実行するものとして説明する。
 図6において、中央監視装置10は、目標送水差圧の算出動作を開始するか否かを判断する(ステップS11)。目標送水差圧の算出動作を開始するか否かは、例えば、中央監視装置10のオペレータによる指示、所定の時間間隔が設定されたタイマから指示等があったか否かで判断される。目標送水差圧の算出動作を開始しないと判断した場合(ステップS11:NO)、中央監視装置10は、ステップS11の処理を繰返して算出動作の開始を待機する。
 一方、目標送水差圧の算出動作を開始すると判断した場合(ステップS11:YES)、中央監視装置10は、初期状態における送水ポンプの運転を開始する(ステップS12)。初期状態における運転とは、例えば、予め設定された、ポンプの稼働台数、ポンプの回転数、バルブの開度等の条件における運転である。
 ステップS12の処理を実行した後、中央監視装置10は、送水差圧を取得する(ステップS13)。送水差圧の取得は、送水差圧取得部51が、熱源機12から複数の熱交換器201に対して送水される熱源水の送水差圧を差圧計13から取得することにより実行できる。
 ステップS13の処理を実行した後、中央監視装置10は、開度を取得する(ステップS14)。開度の取得は、開度取得部52が、それぞれのエアハン20の熱交換器201の熱源水の出口側に設けられたバルブ21の開度をセンサ111から取得することにより実行できる。開度取得部52は、それぞれの熱交換器に設けられたバルブ21の中から少なくとも1つのバルブの開度を取得する。
 ステップS14の処理を実行した後、中央監視装置10は、バルブ差圧を取得する(ステップS15)。バルブ差圧の取得は、バルブ差圧取得部53が、センサ112から取得したバルブ21の入口の圧力とセンサ113から取得したバルブ21の出口の圧力の差から差圧を取得することにより実行できる。
 なお、センサ112、113の故障やセンサそのものを設置していない場合等の要因で、バルブ21の入口または出口での圧力計測ができない場合は、所定の設定値をバルブ差圧として認識してもよい。この所定の設定値は例えば、データテーブル等であらかじめ定められた値や、バルブ21の開度と流量計の検知流量に基づいて算出される値でもよい。
 ステップS15の処理を実行した後、中央監視装置10は、目標送水差圧を算出する(ステップS16)。目標送水差圧の算出は、目標送水差圧算出部61が、送水差圧取得部51において取得された送水差圧と、開度取得部52において取得されたバルブ21の開度とに基づき、目標送水差圧を算出することにより実行できる。
 ステップS16の処理を実行した後、中央監視装置10は、目標送水差圧を記憶する(ステップS17)。目標送水差圧の記憶は、例えば、目標送水差圧算出部61が、算出した目標送水差圧をHDD104等に記憶することにより実行できる。
 ステップS17の処理を実行した後、中央監視装置10は、目標送水差圧の算出を終了するか否かを判断する(ステップS18)。目標送水差圧の算出を終了するか否かの判断は、例えば、目標送水差圧の算出開始から所定の時間が経過して、算出される数値が安定したときに終了してもよい。目標送水差圧の算出を終了しないと判断した場合(ステップS18:NO)、中央監視装置10は、ステップS13の処理に戻り、目標送水差圧の算出を繰返す。一方、目標送水差圧の算出を終了すると判断した場合(ステップS18:YES)、中央監視装置10は、スローチャートで示した処理を終了する。
 次に、図7を用いて、実施形態の中央監視装置10における送水温度算出動作を説明する。
 図7において、中央監視装置10は、送水温度の算出動作を開始するか否かを判断する(ステップS21)。送水温度の算出動作を開始するか否かは、例えば、中央監視装置10のオペレータによる指示、所定の時間間隔が設定されたタイマから指示等があったか否かで判断される。送水温度の算出動作を開始しないと判断した場合(ステップS21:NO)、中央監視装置10は、ステップS21の処理を繰返して算出動作の開始を待機する。
 一方、送水温度の算出動作を開始すると判断した場合(ステップS21:YES)、中央監視装置10は、生成動力を算出する(ステップS22)。生成動力の算出は、生成動力算出部62が、熱源水の送水温度と熱源水を生成するための生成動力との関係を示す生成動力情報を算出することにより実行できる。生成動力は、生成する熱源水の温度と熱源水の流量によって定められる。生成動力算出部62は、熱源機12において予め用意された熱源水の生成能力に基づき、熱源水の送水温度と熱源水を生成するための生成動力との関係を示す生成動力情報を算出する。
 ステップS22の処理を実行した後、中央監視装置10は、送水動力を算出する(ステップS23)。送水動力の算出は、送水動力算出部63が、送水温度と熱源水を送水するための送水動力との関係を示す送水動力情報を算出することにより実行できる。送水動力算出部63は、目標送水差圧算出部において算出された最大送水差圧と、熱源水の送水温度を変化させたときに必要となる送水量の変化とに基づき生成動力情報を算出する。
 ステップS23の処理を実行した後、中央監視装置10は、送水温度を算出する(ステップS24)。送水温度の算出は、送水温度算出部67が、生成動力算出部62において算出された生成動力情報と、送水動力算出部63において算出された送水動力情報とに基づき、生成動力と送水動力の合計が最小となる送水温度を算出することにより実行できる。送水温度算出部67は、それぞれの送水温度における合計値を算出することにより、合計値が最小となる送水温度を算出(選択)する。
 ステップS24の処理を実行した後、中央監視装置10は、送水温度を記憶する(ステップS25)。送水温度の記憶は、例えば、送水温度算出部67が、算出した送水温度をHDD104等に記憶することにより実行できる。
 ステップS25の処理を実行した後、中央監視装置10は、送水温度の算出を終了するか否かを判断する(ステップS26)。送水温度の算出を終了するか否かの判断は、例えば、送水温度の算出開始から所定の時間が経過して、算出される数値が安定したときに終了してもよい。送水温度の算出を終了しないと判断した場合(ステップS26:NO)、中央監視装置10は、ステップS22の処理に戻り、送水温度の算出を繰返す。一方、送水温度の算出を終了すると判断した場合(ステップS26:YES)、中央監視装置10は、スローチャートで示した処理を終了する。
 次に、図8を用いて、実施形態の熱源水制御装置における送水量算出動作の第1の例を説明する。送水量算出動作の第1の例は、上述した、水温差と水温差変化量特性を利用した送水量の算出に係る動作である。
 図8において、中央監視装置10は、送水量の算出動作を開始するか否かを判断する(ステップS31)。送水量の算出動作を開始するか否かは、例えば、中央監視装置10のオペレータによる指示、所定の時間間隔が設定されたタイマから指示等があったか否かで判断される。送水量の算出動作を開始しないと判断した場合(ステップS31:NO)、中央監視装置10は、ステップS31の処理を繰返して算出動作の開始を待機する。
 一方、送水量の算出動作を開始すると判断した場合(ステップS31:YES)、中央監視装置10は、水温差を算出する(ステップS32)。水温差の算出は、水温差算出部64が、それぞれの熱交換器における熱源水の入口温度と出口温度を取得して、センサ114から取得した入口温度と、センサ115から取得した出口温度の温度差から水温差を算出することにより実行できる。ここで、上記の他にも、 往水温度センサ15と還水温度センサ17から複数の熱交換器の平均水温差を算出し、熱交換器の水温差としてもよい。
 ステップS32の処理を実行した後、中央監視装置10は、送水量を算出する(ステップS33)。送水量算出動作の第1の例において、送水量の算出は、送水量算出部65が、水温差の変化に対する水温差の変化量で示される熱交換器を含むエアハンの特性を示す特性情報と、熱源水の送水温度の変化量とに基づき、それぞれの熱交換器における熱交換量を一定にしたときのそれぞれの熱交換器に供給される熱源水の流量の変化量を算出し、全ての熱交換器における流量の変化量を合計して送水量の変化量を算出することにより実行できる。
 ステップS33の処理を実行した後、中央監視装置10は、送水量を記憶する(ステップS34)。送水量の記憶は、例えば、送水量算出部65が、算出した送水量をHDD104等に記憶することにより実行できる。
 ステップS34の処理を実行した後、中央監視装置10は、送水量の算出を終了するか否かを判断する(ステップS35)。送水量の算出を終了するか否かの判断は、例えば、送水量の算出開始から所定の時間が経過して、算出される数値が安定したときに終了してもよい。送水量の算出を終了しないと判断した場合(ステップS35:NO)、中央監視装置10は、ステップS32の処理に戻り、送水量の算出を繰返す。一方、送水量の算出を終了すると判断した場合(ステップS35:YES)、中央監視装置10は、スローチャートで示した処理を終了する。
 次に、図9を用いて、実施形態の熱源水制御装置における送水量算出動作の第2の例を説明する。送水量算出動作の第2の例は、上述した、負荷率と水温差変化量特性を利用した送水量の算出に係る動作である。なお、送水量算出動作の第2の例において、送水量算出動作の第1の例と同じ処理は、同じステップ番号を付して説明を省略する。
 図9において、ステップS32の処理を実行した後、中央監視装置10は、負荷率を算出する(ステップS41)。負荷率の算出は、負荷率算出部66が、流量取得部54において取得された流量と、水温差算出部64において算出された水温差に基づき、それぞれの熱交換器の負荷率を算出することにより実行できる。
 ステップS41の処理を実行した後、中央監視装置10は、送水量を算出する(ステップS42)。送水量算出動作の第2の例において、送水量の算出は、送水量算出部65が、負荷率算出部66において算出された負荷率と、負荷率の変化に対する水温差の変化量で示される熱交換器を含むエアハンドリングユニットの特性を示す特性情報と、熱源水の送水温度の変化量とに基づき、それぞれの熱交換器における熱交換量を一定にしたときの流量の変化量を算出し、全ての熱交換器における流量の変化量を合計して送水量の変化量を算出することにより実行できる。送水量算出部65は、それぞれの熱交換器における、水温差の変化に対する流量の変化量を合計し、送水量を算出する。
 次に、図10を用いて、実施形態の熱源水制御装置における動力制御動作を説明する。
 図10において、中央監視装置10は、動力制御の動作を開始するか否かを判断する(ステップS51)。動力制御とは、動力が最小になるように熱源水を生成して送水するための制御である。動力制御の動作を開始するか否かは、例えば、中央監視装置10のオペレータによる指示、所定の時間間隔が設定されたタイマから指示等があったか否かで判断される。動力制御の動作を開始しないと判断した場合(ステップS51:NO)、中央監視装置10は、ステップS51の処理を繰返して算出動作の開始を待機する。
 一方、動力制御の動作を開始すると判断した場合(ステップS51:YES)、中央監視装置10は、送水温度を取得する(ステップS52)。送水温度の取得は、ステップS25の処理で記憶された送水温度を取得することにより実行することができる。
 ステップS52の処理を実行した後、中央監視装置10は、送水量を取得する(ステップS53)。送水量の取得は、ステップS34の処理で記憶された送水量を取得することにより実行することができる。
 ステップS53の処理を実行した後、中央監視装置10は、送水差圧を取得する(ステップS54)。送水差圧の取得は、ステップS17の処理で記憶された送水差圧を取得することにより実行することができる。
 ステップS54の処理を実行した後、中央監視装置10は、ステップS52~ステップS54において取得した、送水温度、送水量、送水差圧の指示値を出力する。
 中央監視装置10は、GC122に対して、送水温度の指示値を出力する。GC122は、中央監視装置10から指示された熱源水の送水温度の指示値に基づき、往水温度センサ15において測定される水温が指示値になるようにモジュール120を制御する。なお、中央監視装置10は、GC122に対してさらに送水量の指示値を出力するようにしてもよい。送水温度と送水量の積がモジュール120における熱源水生成の負荷となる。
 また、中央監視装置10は、MC121に対して、送水差圧の指示値を出力する。MC121は、中央監視装置10から指示された熱源水の送水差圧の指示値に基づき、差圧計13において測定される差圧が指示値になるように一次側ポンプ123を制御する。MC121は、例えば、一次側ポンプ123の回転数、バイパス弁14の開度を制御する。なお、中央監視装置10は、MC121に対してさらに送水量の指示値を出力するようにしてもよい。MC121は、例えば、送水量の指示値に合せて稼働する一次側ポンプ123(モジュール120)の台数を制御する。
 ステップS55の処理を実行した後、中央監視装置10は、動力制御の動作を終了するか否かを判断する(ステップS56)。動力制御の動作を終了するか否かの判断は、例えば、熱源水の送水を終了するときに中央監視装置10のオペレータの操作が行われたか否かで判断する。動力制御の動作は、例えば、動力制御をしない、従来の熱源機12の運転に切替えるときに終了してもよい。なお、本実施形態では、送水温度、送水量、及び送水差圧の全てを制御する場合を示したが、中央監視装置10は、例えば、送水差圧の指示値のみを出力するようにしてもよい。この場合、熱源水の送水温度は一定値で運転される。
 動力制御の動作を終了しないと判断した場合(ステップS56:NO)、中央監視装置10は、ステップS52の処理に戻り、動力制御の動作を繰返す。一方、動力制御の動作を終了すると判断した場合(ステップS56:YES)、中央監視装置10は、スローチャートで示した処理を終了する。
 次に、図11を用いて、実施形態のエアハンの第1の特性情報を説明する。エアハンの第1の特性情報は、上述の、エアハンにおける水温差と水温差変化量特性情報である。
 図11Aは、エアハンが、外調機以外の場合であって、冷房時におけるCAVの特性情報である。横軸は、熱源水のエアハンの出入口の温度差(水温差)である。縦軸は、熱源水のエアハンの出入口の温度差(水温差)の変化量である。水温差は、熱交換量に比例する。すなわち、図11Aは、熱交換量に対する、熱源水の温度を1℃変化させたときの熱交換量の変化量を示している。水温差の変化量は、水温差が小さくなるにつれて大きくなり、水温差が一定値以下においては、変化量が変わらなくなる。図11Aにおいては、水温差が約11℃以下で変化量が一定値となることを示している。すなわち、水温差が約11℃以下の場合、熱源水の温度を変更しても熱交換による温度差の変化量が同じとなるため、熱交換器の性能の限界となる。冷房時におけるCAVにおいて熱源水の送水水温を算出する場合、温度差が11℃以下にならないようにする。
 図11Bは、エアハンが、外調機以外の場合であって、冷房時におけるVAVの特性情報である。また、図11Cは、エアハンが、外調機の場合の冷房時における特性情報である。なお、図11A、図11B及び図11Cにおいては、冷房時におけるエアハンの特性情報を示したが、暖房時においても同様の特性情報が用意されている。
 次に、図12を用いて、実施形態のエアハンの第2の特性情報を説明する。エアハンの第2の特性情報は、上述の、エアハンにおける負荷率と水温差変化量特性情報である。
 図12Aは、エアハンが、外調機以外の場合であって、冷房時におけるCAVの特性情報である。横軸は、エアハンの負荷率である。縦軸は、熱源水のエアハンの出入口の温度差(水温差)の変化量である。負荷率は、負荷率算出部66によって算出される。すなわち、負荷率は、水温差と流量によって算出される0(1%)~1(100%)の数値である。熱源水の温度を1℃変化させたときの熱交換量の変化量は、負荷率に応じて増加する。換言すれば、熱源水の温度を1℃変化させたときの水温差の変化量は、負荷率に応じて増加する。
 図12Bは、エアハンが、外調機以外の場合であって、冷房時におけるVAVの特性情報である。また、図12Cは、エアハンが、外調機の場合の冷房時における特性情報である。なお、図12A、図12B及び図12Cにおいては、冷房時におけるエアハンの特性情報を示したが、暖房時においても同様の特性情報が用意されている。
 以上のように、本実施形態は、熱源水制御方法は、熱源水制御装置が、熱源機から複数の利用側熱負荷に対して送水される熱源水の送水差圧を取得する送水差圧取得ステップと、それぞれの利用側熱負荷に設けられ、利用側熱負荷に供給される熱源水の供給量を調節するバルブの中から少なくとも1つのバルブの開度を取得する開度取得ステップと、バルブの入口と出口の差圧を取得するバルブ差圧取得ステップと、送水差圧取得ステップにおいて取得された送水差圧と、開度取得ステップにおいて取得された開度とに基づき、開度を目標値にするための送水差圧の目標値である目標送水差圧を算出する目標送水差圧算出ステップと、目標送水差圧算出ステップにおいて算出された目標送水差圧の中で最大値となる最大送水差圧に基づき、送水差圧を制御する送水差圧制御ステップとを実行する。これにより、熱源水を生成して送水するときの動力を削減することができる。
 また、本実施形態における熱源水制御方法は、熱源水制御装置が、目標送水差圧算出ステップにおいて、バルブのレンジアビリティとバルブの流量特性とにさらに基づき、目標送水差圧を算出する。これにより、バルブの口径(サイズ)に関係ないバルブの型式で共通の固定値を用いることができるので、目標送水差圧の算出が容易になる。
 また、本実施形態における熱源水制御方法は、熱源水制御装置が、熱源水の送水温度と熱源水を生成するための生成動力との関係を示す生成動力情報を算出する生成動力算出ステップと、送水温度と熱源水を送水するための送水動力との関係を示す送水動力情報を算出する送水動力算出ステップと、生成動力算出ステップにおいて算出された生成動力情報と、送水動力算出ステップにおいて算出された送水動力情報とに基づき、生成動力と送水動力の合計が最小となる送水温度を算出する送水温度算出ステップと、送水温度算出ステップにおいて算出された送水温度に基づき、熱源水の生成動力と送水動力とを制御する、動力制御ステップとをさらに実行する。これにより、熱源水の生成動力と送水動力を低減させることができる。
 また、本実施形態における熱源水制御方法は、熱源水制御装置が、送水動力算出ステップにおいて、最大送水差圧と、熱源水の送水温度を変化させたときに必要となる送水量の変化とに基づき生成動力情報を算出する。これにより、生成動力情報を算出することができる。
 また、本実施形態における熱源水制御方法は、熱源水制御装置が、送水動力算出ステップにおいて、それぞれの利用側熱負荷における熱源水の入口温度と出口温度を取得して、入口温度と出口温度の水温差を算出する水温差算出ステップと、水温差の変化に対する水温差の変化量で示される利用側熱負荷を含むエアハンドリングユニットの特性を示す特性情報と、熱源水の送水温度の変化量とに基づき、それぞれの利用側熱負荷における熱交換量を一定にしたときのそれぞれの利用側熱負荷に供給される熱源水の流量の変化量を算出し、全ての利用側熱負荷における流量の変化量を合計して送水量の変化量を算出する、送水量算出ステップをさらに実行する。これにより、送水量を算出することができる。
 また、本実施形態における熱源水制御方法は、熱源水制御装置が、送水動力算出ステップにおいて、それぞれの利用側熱負荷における熱源水の入口温度と出口温度を取得して、入口温度と出口温度の水温差を算出する水温差算出ステップと、それぞれの利用側熱負荷に供給される熱源水の流量を取得する流量取得ステップと、流量取得ステップにおいて取得された流量と、水温差算出ステップにおいて算出された水温差に基づき、それぞれの利用側熱負荷の負荷率を算出する負荷率算出ステップと、負荷率算出ステップにおいて算出された負荷率と、負荷率の変化に対する水温差の変化量で示される利用側熱負荷を含むエアハンドリングユニットの特性を示す特性情報と、熱源水の送水温度の変化量とに基づき、それぞれの利用側熱負荷における熱交換量を一定にしたときの流量の変化量を算出し、全ての利用側熱負荷における流量の変化量を合計して送水量の変化量を算出する、送水量算出ステップをさらに実行する。これにより、送水量を算出することができる。
 また、本実施形態における熱源水制御方法は、熱源水制御装置が、送水温度算出ステップにおいて、水温差が下限値より低い水温を送水温度として算出しない。これにより、利用側熱負荷の能力を超えた送水温度を算出しないようにすることができる。
 また、本実施形態における熱源水制御方法は、熱源水制御装置が、送水温度算出ステップにおいて、水温差の変化に対する水温差の変化量で示される利用側熱負荷を含むエアハンドリングユニットの特性を示す特性情報と、送水温度算出ステップにおいて算出された送水温度に基づき下限値を算出する。これにより、利用側熱負荷の能力を超えた送水温度を算出しないようにすることができる。
 また、本実施形態における熱源水制御方法は、熱源水制御装置が、送水温度算出ステップにおいて、冷房時における外気露点温度より高い水温を送水温度として算出しない。これにより、除湿ができない送水温度を算出しないようにすることができる。
 また、本実施形態における熱源水制御方法は、熱源水制御装置が、送水温度算出ステップにおいて、水温差の変化に対する水温差の変化量で示される利用側熱負荷を含むエアハンドリングユニットの特性を示す特性情報と、送水温度算出ステップにおいて算出された送水温度に基づき下限値を算出する。これにより、送水温度を安定させて動力を低減させることができる。
 また、本実施形態における熱源水制御方法は、熱源水制御装置が、開度取得ステップにおいて、利用側熱負荷における熱源水の入口温度と出口温度の水温差と、利用側熱負荷における熱交換量に基づき調節される開度を取得する。これにより、送水温度を安定させて動力を低減させることができる。
 また、本実施形態は、熱源水制御装置は、上述した熱源水制御方法により熱源水の送水又は生成を制御する。これにより、熱源水を生成して送水するときの動力を削減することができる。
 以上説明した少なくともひとつの実施形態によれば、熱源水制御方法は、熱源水制御装置が、送水差圧取得ステップと、開度取得ステップと、バルブ差圧取得ステップと、目標送水差圧算出ステップと、送水差圧制御ステップとを実行することにより、熱源水を生成して送水するときの動力を削減することができる。
 本発明のいくつかの実施形態を説明したが、これらの実施形態は、例として提示したものであり、発明の範囲を限定することは意図していない。
 例えば、上記実施形態では、熱源機の一次側ポンプにより熱源水を搬送し、バイパス流路に設けられたバイパス弁による流量調節を行う熱源水制御システムについて説明したが、この形態に限らない。例えば、バイパス配管にバイパス弁を有さず、ヘッダ等に設けられた二次側ポンプとでシステム流量を調節する熱源水制御システムであってもよい。
 これら実施形態は、その他の様々な形態で実施されることが可能であり、発明の要旨を逸脱しない範囲で、種々の省略、置き換え、変更を行うことができる。これら実施形態やその変形は、発明の範囲や要旨に含まれると同様に、特許請求の範囲に記載された発明とその均等の範囲に含まれるものである。

Claims (12)

  1.  熱源水制御装置が、
     熱源機から複数の利用側熱負荷に対して送水される熱源水の送水差圧を取得する送水差圧取得ステップと、
     それぞれの利用側熱負荷に設けられ、前記利用側熱負荷に供給される前記熱源水の供給量を調節するバルブの中から少なくとも1つのバルブの開度を取得する開度取得ステップと、
     前記送水差圧取得ステップにおいて取得された前記送水差圧と、前記開度取得ステップにおいて取得された前記開度とに基づき、前記開度を目標値にするための前記送水差圧の目標値である目標送水差圧を算出する目標送水差圧算出ステップと、
     前記目標送水差圧算出ステップにおいて算出された前記目標送水差圧の中で最大値となる最大送水差圧に基づき、前記送水差圧を制御する送水差圧制御ステップと
     を実行する、熱源水制御方法。
  2.  前記熱源水制御装置が、前記バルブの入口における熱源水の圧力と、前記バルブの出口における熱源水の圧力との差であるバルブ差圧を取得するバルブ差圧取得ステップをさらに有し、
     前記目標送水差圧算出ステップにおいて、前記バルブのレンジアビリティと前記バルブの流量特性と前記バルブ差圧とにさらに基づき、前記目標送水差圧を算出する、請求項1に記載の熱源水制御方法。
  3.  前記熱源水制御装置が、
     前記熱源水の送水温度と前記熱源水を生成するための生成動力との関係を示す生成動力情報を算出する生成動力算出ステップと、
     前記送水温度と前記熱源水を送水するための送水動力との関係を示す送水動力情報を算出する送水動力算出ステップと、
     前記生成動力算出ステップにおいて算出された生成動力情報と、前記送水動力算出ステップにおいて算出された送水動力情報とに基づき、前記生成動力と前記送水動力の合計が最小となる前記送水温度を算出する送水温度算出ステップと、
     前記送水温度算出ステップにおいて算出された前記送水温度に基づき、前記熱源水の生成動力と送水動力とを制御する、動力制御ステップと
     をさらに実行する、請求項1又は2に記載の熱源水制御方法。
  4.  前記熱源水制御装置が、
     前記送水動力算出ステップにおいて、前記最大送水差圧と、前記熱源水の送水温度を変化させたときに必要となる送水量の変化とに基づき前記生成動力情報を算出する、請求項3に記載の熱源水制御方法。
  5.  前記熱源水制御装置が、前記送水動力算出ステップにおいて、
     それぞれの前記利用側熱負荷における前記熱源水の入口温度と出口温度を取得して、前記入口温度と前記出口温度の水温差を算出する水温差算出ステップと、
     前記水温差の変化に対する前記水温差の変化量で示される前記利用側熱負荷を含む利用側機器の特性を示す特性情報と、前記熱源水の送水温度の変化量とに基づき、それぞれの前記利用側熱負荷における熱交換量を一定にしたときのそれぞれの前記利用側熱負荷に供給される前記熱源水の流量の変化量を算出し、全ての前記利用側熱負荷における前記流量の変化量を合計して前記送水量の変化量を算出する、送水量算出ステップをさらに実行する、請求項4に記載の熱源水制御方法。
  6.  前記熱源水制御装置が、前記送水動力算出ステップにおいて、
     それぞれの前記利用側熱負荷における前記熱源水の入口温度と出口温度を取得して、前記入口温度と前記出口温度の水温差を算出する水温差算出ステップと、
     それぞれの前記利用側熱負荷に供給される前記熱源水の流量を取得する流量取得ステップと、
     前記流量取得ステップにおいて取得された前記流量と、前記水温差算出ステップにおいて算出された前記水温差に基づき、それぞれの前記利用側熱負荷の負荷率を算出する負荷率算出ステップと、
     前記負荷率算出ステップにおいて算出された前記負荷率と、負荷率の変化に対する前記水温差の変化量で示される前記利用側熱負荷を含む利用側機器の特性を示す特性情報と、前記熱源水の送水温度の変化量とに基づき、それぞれの前記利用側熱負荷における熱交換量を一定にしたときの前記流量の変化量を算出し、全ての前記利用側熱負荷における前記流量の変化量を合計して前記送水量の変化量を算出する、送水量算出ステップをさらに実行する、請求項4に記載の熱源水制御方法。
  7.  前記熱源水制御装置が、
     前記送水温度算出ステップにおいて、前記水温差が下限値より低い水温を前記送水温度として算出しない、請求項5又は6に記載の熱源水制御方法。
  8.  前記熱源水制御装置が、
     前記送水温度算出ステップにおいて、
     前記水温差の変化に対する前記水温差の変化量で示される前記利用側機器の特性を示す特性情報と、前記送水温度算出ステップにおいて算出された送水温度に基づき前記下限値を算出する、請求項7に記載の熱源水制御方法。
  9.  前記熱源水制御装置が、
     前記送水温度算出ステップにおいて、冷房時における外気露点温度より高い水温を前記送水温度として算出しない、請求項3から8のいずれか一項に記載の熱源水制御方法。
  10.  前記熱源水制御装置が、
     前記開度取得ステップにおいて、前記利用側熱負荷で熱交換されて室内機に送風される空気の送風温度に基づき調節される前記開度を取得する、請求項1から9のいずれか一項に記載の熱源水制御方法。
  11.  前記熱源水制御装置が、
     前記開度取得ステップにおいて、前記利用側熱負荷における前記熱源水の入口温度と出口温度の水温差と、前記利用側熱負荷における熱交換量に基づき調節される前記開度を取得する、請求項1から10のいずれか一項に記載の熱源水制御方法。
  12.  請求項1から11のいずれか一項に記載の熱源水制御方法により前記熱源水の送水又は生成を制御する、熱源水制御装置。
PCT/JP2018/007589 2017-03-02 2018-02-28 熱源水制御方法及び熱源水制御装置 WO2018159703A1 (ja)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2019503078A JP6847198B2 (ja) 2017-03-02 2018-02-28 熱源水制御方法及び熱源水制御装置

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2017039904 2017-03-02
JP2017-039904 2017-03-02

Publications (1)

Publication Number Publication Date
WO2018159703A1 true WO2018159703A1 (ja) 2018-09-07

Family

ID=63370348

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2018/007589 WO2018159703A1 (ja) 2017-03-02 2018-02-28 熱源水制御方法及び熱源水制御装置

Country Status (2)

Country Link
JP (2) JP6847198B2 (ja)
WO (1) WO2018159703A1 (ja)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110749025A (zh) * 2019-10-29 2020-02-04 珠海格力电器股份有限公司 空调整机功率的确定方法及装置
CN110779171A (zh) * 2019-10-31 2020-02-11 广东海悟科技有限公司 空气源热泵机组控制方法、电子设备、计算机可读存储介质

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112611141B (zh) * 2020-12-24 2021-11-02 上海能誉科技股份有限公司 一种制冷主机的节能控制方法、系统和计算机可读存储介质

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002213802A (ja) * 2001-01-22 2002-07-31 Yokogawa Electric Corp 空調システム
JP2003262384A (ja) * 2002-03-08 2003-09-19 Yamatake Corp 空調熱源システムおよび空調熱源システムの制御方法
JP2009236465A (ja) * 2008-03-28 2009-10-15 Yamatake Corp 送水圧制御システムおよび送水圧制御方法
JP2010270967A (ja) * 2009-05-21 2010-12-02 Hitachi Building Systems Co Ltd 空調システム、空調システムの制御方法及び制御装置
JP2013204833A (ja) * 2012-03-27 2013-10-07 Sanki Eng Co Ltd 熱媒体配管システム

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1163631A (ja) * 1997-08-28 1999-03-05 Yamatake Honeywell Co Ltd 送水温度制御装置
JP4829818B2 (ja) * 2007-03-15 2011-12-07 新日本空調株式会社 1ポンプ方式熱源設備の運転制御方法
US9903601B2 (en) 2009-10-27 2018-02-27 Mitsubishi Electric Corporation Air-conditioning apparatus
JP5537253B2 (ja) 2010-05-14 2014-07-02 東京瓦斯株式会社 送水制御システム及びその制御方法
JP5926660B2 (ja) * 2012-09-25 2016-05-25 アズビル株式会社 冷温水循環ポンプの回転数制御システムおよび方法
JP6100523B2 (ja) 2012-12-28 2017-03-22 株式会社Nttファシリティーズ 冷水循環システム
CN104089328B (zh) 2013-04-01 2018-10-12 开利公司 空调系统以及对空调系统进行控制的方法
JP2017101907A (ja) 2015-12-04 2017-06-08 株式会社東芝 空調制御装置、空調制御方法、空調制御プログラム、及び空調制御システム

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002213802A (ja) * 2001-01-22 2002-07-31 Yokogawa Electric Corp 空調システム
JP2003262384A (ja) * 2002-03-08 2003-09-19 Yamatake Corp 空調熱源システムおよび空調熱源システムの制御方法
JP2009236465A (ja) * 2008-03-28 2009-10-15 Yamatake Corp 送水圧制御システムおよび送水圧制御方法
JP2010270967A (ja) * 2009-05-21 2010-12-02 Hitachi Building Systems Co Ltd 空調システム、空調システムの制御方法及び制御装置
JP2013204833A (ja) * 2012-03-27 2013-10-07 Sanki Eng Co Ltd 熱媒体配管システム

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110749025A (zh) * 2019-10-29 2020-02-04 珠海格力电器股份有限公司 空调整机功率的确定方法及装置
CN110779171A (zh) * 2019-10-31 2020-02-11 广东海悟科技有限公司 空气源热泵机组控制方法、电子设备、计算机可读存储介质
CN110779171B (zh) * 2019-10-31 2021-11-05 广东海悟科技有限公司 空气源热泵机组控制方法、电子设备、计算机可读存储介质

Also Published As

Publication number Publication date
JP7004791B2 (ja) 2022-02-04
JPWO2018159703A1 (ja) 2019-11-14
JP6847198B2 (ja) 2021-03-24
JP2021036197A (ja) 2021-03-04

Similar Documents

Publication Publication Date Title
JP7004791B2 (ja) 熱源水制御方法及び熱源水制御装置
US10900684B2 (en) Thermostat and method for an environmental control system for HVAC system of a building
US20190032945A1 (en) Central plant control system with setpoints modification based on physical constraints
US10174963B2 (en) Smart building HVAC energy management system
WO2012060218A1 (ja) サーバ室管理用の空調システムおよび空調制御方法
CN101646911A (zh) 风冷式冷却器系统运行的优化
US20200340704A1 (en) Zoning system for air conditioning (hvac) equipment
JP2010156494A (ja) 負荷処理バランス設定装置
JP2007127321A (ja) 冷凍機の冷水負荷率制御装置
JP2012233689A (ja) 制御装置、制御方法及びプログラム
JP2012037159A (ja) 空気調和機の制御装置および冷凍装置の制御装置
CN108291734B (zh) 用于操作热能交换机的方法和系统
JP2011089679A (ja) 空気調和機の制御装置、冷凍装置の制御装置
JP6854896B2 (ja) 空気調和システム、空気調和装置、運転制御方法およびプログラム
US20240053077A1 (en) Systems and methods for humidity control in an air conditioning system
JP2018109459A (ja) 空調システム用の制御装置、空調システム
JP2017053507A (ja) 空調システム、空調システムに用いる制御装置、プログラム
JP6126020B2 (ja) 推定値導出方法、推定値導出装置、および、プログラム
JP2013015314A (ja) 空調システム、空調制御装置、および空調制御用プログラム
JP2017003135A (ja) 熱源設備及び熱源設備制御方法
JP6890727B1 (ja) 空気調和システムおよび制御方法
CN204787041U (zh) 一种冷水机组的智能控制系统
JP7394574B2 (ja) 空気調和設備の中央監視装置および空気調和設備の状況の表示方法
JP2016044833A (ja) 熱媒体循環システム
JP5940608B2 (ja) 熱媒体循環システム

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 18761453

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2019503078

Country of ref document: JP

Kind code of ref document: A

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 18761453

Country of ref document: EP

Kind code of ref document: A1