WO2018147680A1 - 흙막이 가시설 시공 구조 및 방법 - Google Patents

흙막이 가시설 시공 구조 및 방법 Download PDF

Info

Publication number
WO2018147680A1
WO2018147680A1 PCT/KR2018/001758 KR2018001758W WO2018147680A1 WO 2018147680 A1 WO2018147680 A1 WO 2018147680A1 KR 2018001758 W KR2018001758 W KR 2018001758W WO 2018147680 A1 WO2018147680 A1 WO 2018147680A1
Authority
WO
WIPO (PCT)
Prior art keywords
steel plate
plate body
ground
earth
reinforcing
Prior art date
Application number
PCT/KR2018/001758
Other languages
English (en)
French (fr)
Inventor
진영준
Original Assignee
진영준
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 진영준 filed Critical 진영준
Publication of WO2018147680A1 publication Critical patent/WO2018147680A1/ko

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/06Foundation trenches ditches or narrow shafts
    • E02D17/08Bordering or stiffening the sides of ditches trenches or narrow shafts for foundations
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2200/00Geometrical or physical properties
    • E02D2200/16Shapes
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0026Metals
    • E02D2300/0029Steel; Iron
    • E02D2300/0032Steel; Iron in sheet form, i.e. bent or deformed plate-material
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/20Miscellaneous comprising details of connection between elements

Definitions

  • the present invention relates to a construction structure and method of earthquake temporary installation, and more specifically, using a steel plate as the earthen plate, by installing a reinforcement pile perpendicular to the rear center portion of the steel plate, which can withstand earth pressure and water pressure by the reinforcement pile
  • the present invention relates to a structure and method for constructing an earthquake temporary construction that can maintain a stable ground by having a strong rigidity.
  • excavation works are required to dig the ground to a certain depth in order to build the underground structure of the building, and for such excavation work, the clogging work and the order work to prevent the earth wall from collapsing by the surrounding earth pressure or water pressure. This must be preceded.
  • Temporary mudstone is made as a configuration to insert the mud plate into the H beam after piling (piling) the H beam to a certain depth in the ground before proceeding the excavation construction.
  • the earthen board inserted into the H-beam was used as a plurality of wood (earth plate) in the past, but recently, in order to have a recycling and ordering function, a steel sheet made of metal is used.
  • examples of using the earthen board as a metal include Patent Nos. 84,229 (name: installation method for earthquake structures), and Patent No. 882831 (name: Temporary earthen structure and its installation method).
  • the metal retaining plate is firmly provided with guide rails on the web surface of the H-beam or by bending both ends of the retaining plate so that both ends of the bent on the web surface of the H-beam are in close contact with each other. To be supported.
  • Patent Document 1 Domestic Patent Registration No. 10-0846229, earth block structure installation method.
  • Patent Document 2 Domestic Patent Registration No. 10-0882831, Temporary earth block structure and its installation method.
  • the present invention has been made to solve the above problems of the prior art, the object of the present invention is to use a steel plate as the earthen plate, by installing a reinforcement pile perpendicular to the rear central portion of the steel plate, earth pressure and
  • the present invention provides a structure and method for constructing an earthquake temporary structure that can maintain the ground stably by having a strong rigidity that can withstand water pressure.
  • the present invention is to provide a structure and method for constructing an earthquake tent construction that can further extend the spacing of the H beam by installing a reinforcement pile on the rear surface of the steel sheet, thereby saving and shortening the requirements and construction period of the H beam.
  • a construction method for constructing an earthquake clam including: inserting and installing a plurality of H beams at a predetermined depth and a predetermined interval in the ground; A steel sheet insertion step of inserting a steel sheet into the ground in the longitudinal direction of the H beam between the H beams inserted into the ground; And a ground excavation step of digging to a predetermined depth below the ground, wherein the steel sheet comprises: a steel plate body formed of a square; And a reinforcement pile installed vertically at the rear center portion of the steel plate body to provide rigidity that can stably respond to the earth pressure applied to the steel plate body, wherein the reinforcement pile is formed on both ends of the web and the web.
  • the reinforcement pile is formed to extend downward from the fixing part so as to protrude in a length of 1/3 to 1/2 with respect to the entire length of the upper and lower steel plate body to the lower portion of the steel plate body to install the earth plate in the lower portion of the steel plate body It is preferable that the earth plate mounting portion is formed.
  • the reinforcement pile further includes reinforcing pile fixing means for reinforcing the fixed state of the reinforcing pile welded to the steel plate body, wherein the reinforcing pile fixing means is installed to be positioned above the steel plate body, and the steel plate body and Forming through holes to penetrate the flange constituting the reinforcing pile, it is preferable to consist of a fixing bolt and a fixing nut installed to firmly fix the steel plate body and the flange through the through holes.
  • the earthquake tent construction structure of the present invention for achieving the above object, a plurality of H beam is inserted into the ground at a predetermined depth and a predetermined interval; And a steel plate inserted between two ends of the H beam to be fixed to the H beam to prevent the inflow of earth and sand, wherein the steel plate comprises: a steel plate body formed of a quadrangle to have a predetermined area; And a reinforcement pile installed vertically in the rear center portion of the steel plate body to provide rigidity that can stably respond to the earth pressure applied to the steel plate body, wherein the reinforcement piles include: a web and both ends of the web.
  • the lower end of the reinforcement pile is preferably formed to be inclined to have a sharp portion.
  • the reinforcing pile includes: a fixing part fixed by welding to be in surface contact with a rear center portion of the steel plate body; And a drawing portion extending upward from the fixing portion to protrude 30 to 70 cm into the upper portion of the steel plate body.
  • the reinforcing pile includes: a fixing part fixed by welding to be in surface contact with a rear center portion of the steel plate body; A drawing portion extending from the fixing portion to an upper portion to protrude 30 to 70 cm into the upper portion of the steel plate body; And a earth plate extending downward from the fixing part so as to protrude in a length of 1/3 to 1/2 with respect to the entire length of the steel plate body below the steel plate body so that the earth plate can be installed in the lower portion of the steel plate body. It is preferable that the installation portion.
  • the reinforcement pile further includes: reinforcing pile fixing means for reinforcing a fixed state of the reinforcing pile welded to the steel plate body; wherein the reinforcing pile fixing means is installed to be positioned above the steel plate body. It is preferable that the through-hole is formed so as to pass through the flange constituting the steel plate body and the reinforcement pile, and the fixing bolt and the fixing nut installed to firmly fix the steel plate body and the flange through the through-hole.
  • the present invention can prevent the earth and earth collapse during the excavation work, and at the same time there is an effect that can be stably supported by the stable stiffness corresponding to the earth pressure applied to the steel sheet to increase the stability.
  • the present invention increases the rigidity of the steel sheet by installing a reinforcement pile perpendicular to the rear center portion of the steel sheet to shorten the distance between the H-shaped piles and to maintain the ground more stably, thereby reducing the required number of H-shaped piles. It is economically effective, such as saving time and shortening construction period.
  • the present invention is provided by the upper end portion of the reinforcement pile installed perpendicular to the rear center portion of the steel sheet protruding from the steel sheet by pressing the steel sheet in the ground by the press-pull-out with the surrounding structure by vibration and It is possible to prevent the collapse of the ground, to prevent the generation of pollution and civil complaints due to noise, and also has an effect that can be easily drawn out by the drawing portion.
  • FIG. 1 is a perspective view showing the configuration according to the first embodiment of the steel sheet used in the construction and method of construction of the temporary wall construction according to the present invention
  • FIG. 2 is a view showing the steel plate of FIG. 1 viewed from the side;
  • FIG. 3 is a view showing an example in which the steel sheet shown in FIG. 1 is constructed from above;
  • FIG. 4 is a view showing an example in which the steel sheet shown in FIG.
  • FIG. 5 is a view showing an example in which the steel sheet shown in FIG.
  • Figure 6 is a perspective view showing a configuration according to a second embodiment of a steel sheet used in the construction and method of constructing temporary construction according to the present invention
  • FIG. 7 is a view illustrating an example in which the steel plate of FIG. 6 is constructed.
  • FIG. 8 is a view showing an example in which the steel sheet shown in FIG. 6 is constructed.
  • FIG. 1 is a perspective view showing the configuration according to the first embodiment of the steel sheet used in the construction and method of construction of the temporary wall construction according to the present invention
  • Figure 2 is a view showing the steel sheet shown in Figure 1 from the side
  • 3 is a view showing an example in which the steel sheet shown in FIG. 1 is constructed from above
  • FIG. 4 is a view showing an example in which the steel sheet shown in FIG. 1 is constructed from above
  • FIG. 6 is a perspective view showing the configuration according to the second embodiment of the steel sheet used in the construction structure and method of the earthquake temporary construction according to the present invention
  • Figure 7 is a steel sheet shown in FIG. An example is shown in front
  • FIG. 8 is a view showing an example in which the steel sheet shown in FIG. 6 is constructed from the back.
  • the present invention provides an H beam insertion step of inserting and installing a plurality of H beams at a predetermined depth and a predetermined distance in the ground, and the lengthwise direction of the H beam between the H beams inserted into the ground. It is preferable to perform the steel sheet insertion step of inserting the steel sheet into the underground, and the ground excavation step to excavate to a predetermined depth below the ground.
  • the present invention is a plurality of H beam 100 is inserted into the ground at a predetermined depth and a predetermined interval, and is inserted into the ground while both ends are fitted to the H beam 100 between the H beam 100. It is preferable to include a steel plate 200 to prevent the inflow of soil.
  • the steel sheet 200 is generally used to use a metal product, but if there is a substantially rigid, there is no limitation on its use and various materials may be used.
  • the steel plate 200 has a center width in the rear of the steel plate body 210 to give a rigidity capable of stably responding to the steel plate body 210 made of a square and the earth pressure applied to the steel plate body 210 It is preferable to include a reinforcement pile 220 is installed along the vertical.
  • the lower end portion of the reinforcing pile 220 is inclined downward from the outer end portion is preferably formed to have a sharp portion 221 end portion in contact with the steel plate body 210.
  • the reinforcement pile 220 is made of a H-beam shape having a web (220) and a pair of flanges (220b) provided at both ends of the web (220a), one of the flanges It is preferable to be formed vertically at the rear of the steel plate body 210 to be fixed by welding.
  • the reinforcement pile 220 is a fixed portion 222 is welded and fixed so as to be in surface contact with the rear center portion of the steel plate body 210, and extended from the fixing portion 222 to the upper portion of the steel plate body 210 It is preferable that the drawing portion 224 is formed to protrude.
  • the drawing portion 224 is formed by protruding the reinforcement pile 220 to the upper portion of the steel plate body 210, the protruding length is preferably installed to protrude about 30 ⁇ 70cm, which is a steel sheet It is sufficient if the length enough to be able to work (pressing, drawing, etc.) using the drawer when working with a presser, auger crane, press-injector (not shown), etc. used to press or draw inside the ground.
  • the reinforcement pile 220 is formed to extend downward from the fixing portion 222 so as to protrude to the lower portion of the steel plate body 210, the earth plate to install the earth plate 300 in the lower portion of the steel plate body 210 It is preferable that the installation part 226 is formed.
  • the length of the earth plate mounting portion 226 is formed to protrude by an appropriate length according to the number of the earth plate 300 is installed below the steel plate body 210, preferably in the length of the steel plate body 210 It may be formed to protrude downward by about 1/3 to 1/2 of the length.
  • the reinforcement pile fixing means 230 is the steel plate body ( It is installed to be positioned above the 210, the through-hole is formed to pass through the flange 220b constituting the steel plate body 210 and the reinforcement pile 220, the steel plate body 210 through the through hole And a fixing bolt 232 and a fixing nut 234 installed to firmly fix the flange 220b.
  • the reinforcing pile fixing means 230 may compensate for the disadvantage that the fixing force may be weak when the reinforcing pile 220 is fixed only by welding.
  • the earthquake temporary construction structure and method according to the present invention prevents the earth wall from falling down by earth pressure, water pressure, etc. and prevents the inflow of groundwater to smooth underground excavation construction. It is to make progress.
  • the present invention inserts the H-beam 100 in the underground to form a predetermined interval, and inserts the steel plate 200 between the inserted H-beam 100 to install the earthenware temporary installation in the underground. Under the process, when the temporary tent is installed, the underground excavation work is carried out to build the underground structure.
  • the steel plate 200 when the steel plate 200 is inserted and installed, the upper end portion of the reinforcement pile 220 installed perpendicular to the rear center portion of the steel plate body 210 to the drawing portion 224 protruding to the upper portion of the steel plate body 210
  • the steel sheet body 210 By pressing and pressing, the steel sheet body 210 can be easily inserted into the ground even if the area of the steel sheet body 210 is wide, thereby improving workability.
  • the drawing of the steel sheet may also be convenient by drawing by using the upper drawing portion 224 of the reinforcement pile 220 installed in the steel plate body 210.
  • the earth plate 300 may be installed to the lower end of the steel plate body 210 by the earth plate mounting portion 226 is formed so that the reinforcement pile 220 is protruded to the lower portion of the steel plate body 210.
  • the general earth plate 300 may be installed by using the earth plate installation unit 226 installed to protrude to the lower portion of the steel plate body 210. By doing so, it can make working convenience.
  • the reinforcement pile 220 is installed in the rear center portion of the steel plate body constituting the steel plate 200, the upper end portion of the reinforcement pile 220 protrudes to the upper portion of the steel plate body 210
  • the drawing portion 224 By providing the drawing portion 224, the insertion and drawing of the steel plate body 210 can be made convenient.
  • the earth plate mounting portion 226 to protrude the reinforcement pile 220 to the lower portion of the steel plate body 210 can be installed to the ordinary earth plate 300 to the lower end of the steel plate body 210,
  • the present invention enables the installation of the earth plate together with the steel sheet, thereby having the convenience of work.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

본 발명의 목적은 흙막이판으로 강판을 사용하되, 강판의 후면 중앙부위에 수직하게 보강파일을 설치하여, 보강파일에 의해 토압 및 수압을 견딜 수 있는 강한 강성을 갖게 함으로서 지반을 안정적으로 유지시킬 수 있게 한 흙막이 가시설 시공 구조 및 방법을 제공한다. 이러한 본 발명은 지중에 일정 깊이와 일정 간격으로 복수의 H빔을 삽입 설치하는 H빔 삽입단계; 지중 내부에 삽입된 상기 H빔들 사이에 상기 H빔의 길이 방향으로 강판을 지중 내부에 삽입하는 강판 삽입단계; 및 지면 아래로 일정 깊이로 굴착하는 지면 굴착단계;를 포함하되, 상기 강판은: 사각형으로 이루어진 강판본체; 및 상기 강판본체에 가해지는 토압에 안정적으로 대응할 수 있는 강성을 부여하도록 상기 강판본체의 후면 중앙부에 수직하게 설치된 보강파일;로 이루어지되, 상기 보강파일은: 웨브(web)와 상기 웨브의 양단에 구비된 한 쌍의 플랜지를 구비하는 H빔 형상으로 이루어지되, 상기 보강파일의 하단 끝단부는 첨예부를 갖도록 경사지게 형성되고, 어느 하나의 플랜지가 상기 강판본체의 후면에 면접촉 되도록 용접되어 고정되는 고정부; 및 상기 고정부로부터 상부로 연장되어 상기 강판본체의 상부로 30~70cm 돌출되도록 형성되는 인발부;로 이루어지는 것이 바람직하다.

Description

흙막이 가시설 시공 구조 및 방법
본 발명은 흙막이 가시설 시공 구조 및 방법에 관한 것으로, 더욱 상세하게는 흙막이판으로 강판을 사용하되, 강판의 후면 중앙부위에 수직하게 보강파일을 설치하여, 보강파일에 의해 토압 및 수압을 견딜 수 있는 강한 강성을 갖게 함으로서 지반을 안정적으로 유지시킬 수 있게 한 흙막이 가시설 시공 구조 및 방법에 관한 것이다.
일반적으로, 건축물의 지하 구조물을 구축하기 위해서는 지면을 일정 깊이로 파는 굴착 공사가 반드시 필요하게 되며, 이러한 굴착 공사를 위해서는 주위의 토압이나 수압에 의해 흙벽이 무너져 내리는 것을 방지하기 위한 흙막이 작업과 차수 작업이 선행되어야만 한다.
이러한 흙막이와 차수를 위해서 수행하게 되는 작업이 가설 흙막이 설치작업이다.
가설 흙막이는 굴착 공사를 진행하기에 앞서 지중에 일정 깊이로 H빔을 일정 간격으로 파일링(piling)을 수행한 후, H빔으로 흙막이판이 삽입되도록 하는 구성으로서 이루어진다.
이때, H빔으로 삽입되는 흙막이판을 과거에는 복수개의 목재(토류판)로서 사용하였으나, 최근에는 재활용 및 차수 기능을 갖도록 하기 위해서 금속제의 강판을 사용하도록 하고 있다.
이와 같이 흙막이판을 금속제로서 사용하는 사례로서 등록특허 제846229호(명칭:흙막이 구조물 설치방법)와 등록특허 제882831호(명칭:가설 흙막이 구조물 및 그 설치방법) 등이 있다.
이러한 선등록발명들에서 금속제의 흙막이판은 H빔의 웨브(web)면으로 가이드레일을 구비시키거나 흙막이판의 양단부를 절곡시켜 H빔의 웨브면에 절곡된 양단부가 각각 밀착되도록 함에 의해서 견고하게 지지되도록 하고 있다.
그러나 종래의 흙막이 구조에서는 굴착 공사를 수행 중 토압 및 수압이 흙막이판에 가해지게 되면 비록 흙막이판이 금속제의 강판으로 이루어졌다 하더라도 토압 및 수압을 견디지 못하고 흙막이판을 변형시키게 되므로 지반을 안정적으로 유지시키지 못하게 되는 문제가 있다.
또한, 굴착이 수행된 내부로 토사나 지하수가 다량 유입되는 폐단과 함께 H형 파일간 간격을 단축시켜야만 흙막이판의 변형을 방지할 수가 있으므로 공사비를 증가시키게 되는 문제가 있다.
[선행기술문헌]
[특허문헌]
(특허문헌 1) 국내 특허 등록번호 10-0846229호, 흙막이 구조물 설치방법.
(특허문헌 2) 국내 특허 등록번호 10-0882831호, 가설 흙막이 구조물 및 그 설치방법.
본 발명은 상기한 종래 기술의 문제점을 해결하기 위하여 안출된 것으로서, 본 발명의 목적은 흙막이판으로 강판을 사용하되, 강판의 후면 중앙부위에 수직하게 보강파일을 설치하여, 보강파일에 의해 토압 및 수압을 견딜 수 있는 강한 강성을 갖게 함으로서 지반을 안정적으로 유지시킬 수 있게 한 흙막이 가시설 시공 구조 및 방법을 제공하는데 있다.
또한, 본 발명은 강판의 후면에 보강파일을 설치함에 의해 H빔의 간격을 보다 연장시킬 수 있어 H빔의 소요량 및 시공 기간을 절약 및 단축시킬 수 있는 흙막이 가시설 시공 구조 및 방법을 제공하는데 있다.
상기 목적을 달성하기 위한 본 발명의 흙막이 가시설 시공 방법은, 지중에 일정 깊이와 일정 간격으로 복수의 H빔을 삽입 설치하는 H빔 삽입단계; 지중 내부에 삽입된 상기 H빔들 사이에 상기 H빔의 길이 방향으로 강판을 지중 내부에 삽입하는 강판 삽입단계; 및 지면 아래로 일정 깊이로 굴착하는 지면 굴착단계;를 포함하되, 상기 강판은: 사각형으로 이루어진 강판본체; 및 상기 강판본체에 가해지는 토압에 안정적으로 대응할 수 있는 강성을 부여하도록 상기 강판본체의 후면 중앙부에 수직하게 설치된 보강파일;로 이루어지되, 상기 보강파일은: 웨브(web)와 상기 웨브의 양단에 구비된 한 쌍의 플랜지를 구비하는 H빔 형상으로 이루어지되, 상기 보강파일의 하단 끝단부는 첨예부를 갖도록 경사지게 형성되고, 어느 하나의 플랜지가 상기 강판본체의 후면에 면접촉 되도록 용접되어 고정되는 고정부; 및 상기 고정부로부터 상부로 연장되어 상기 강판본체의 상부로 30~70cm 돌출되도록 형성되는 인발부;로 이루어지는 것이 바람직하다.
상기 보강파일은 상기 강판본체의 하부로 강판본체의 상하 전 길이에 대하여 1/3~1/2의 길이로 돌출되도록 상기 고정부로부터 하부로 연장되게 형성되어 상기 강판본체의 하부에 토류판들을 설치할 수 있도록 하는 토류판 설치부가 형성되는 것이 바람직하다.
상기 보강파일은 상기 강판본체에 용접 고정되는 보강파일의 고정상태를 보강하도록 하는 보강파일 고정수단을 더 포함하되, 상기 보강파일 고정수단은 상기 강판본체의 상부에 위치되도록 설치되되, 상기 강판본체와 상기 보강파일을 구성하는 플랜지를 관통하도록 관통공을 형성하고, 상기 관통공을 통해 상기 강판본체와 플랜지를 견고하게 고정하도록 설치한 고정볼트와 고정너트로 이루어지는 것이 바람직하다.
상기 목적을 달성하기 위한 본 발명의 흙막이 가시설 시공 구조는, 지중에 일정 깊이와 일정 간격으로 삽입 설치되는 복수의 H빔; 및 상기 H빔의 사이에서 양단이 H빔에 고정되도록 지중에 삽입 설치되어 토사의 유입이 방지하는 강판;을 포함하고, 상기 강판은: 소정 면적을 갖도록 사각형으로 이루어진 강판본체; 및 상기 강판본체에 가해지는 토압에 안정적으로 대응할 수 있는 강성을 부여하도록 상기 강판본체의 후면 중앙부에 수직하게 설치된 보강파일;을 포함하되, 상기 보강파일은: 웨브(web)와 상기 웨브의 양단에 구비된 한 쌍의 플랜지를 구비하는 H빔 형상으로 이루어지고, 어느 하나의 플랜지가 상기 강판본체의 후면에 면접촉 되도록 용접되어 고정되되, 상기 보강파일의 하단 끝단부는 첨예부를 갖도록 경사지게 형성되는 것이 바람직하다.
상기 보강파일은: 상기 강판본체의 후면 중앙부에 면접촉 되도록 용접되어 고정되는 고정부; 및 상기 고정부로부터 상부로 연장되어 상기 강판본체의 상부로 30~70cm 돌출되도록 형성되는 인발부;로 이루어지는 것이 바람직하다.
상기 보강파일은: 상기 강판본체의 후면 중앙부에 면접촉 되도록 용접되어 고정되는 고정부; 상기 고정부로부터 상부로 연장되어 상기 강판본체의 상부로 30~70cm 돌출되도록 형성되는 인발부; 및 상기 고정부로부터 하부로 연장되어 상기 강판본체의 하부로 강판본체의 상하 전 길이에 대하여 1/3~1/2의 길이로 돌출되도록 형성되어 상기 강판본체의 하부에 토류판들을 설치할 수 있도록 하는 토류판 설치부;로 이루어지는 것이 바람직하다.
상기 보강파일은: 상기 강판본체에 용접 고정되는 보강파일의 고정상태를 보강하도록 하는 보강파일 고정수단;을 더 포함하되, 상기 보강파일 고정수단은: 상기 강판본체의 상부에 위치되도록 설치되되, 상기 강판본체와 상기 보강파일을 구성하는 플랜지를 관통하도록 관통공을 형성하고, 상기 관통공을 통해 상기 강판본체와 플랜지를 견고하게 고정하도록 설치한 고정볼트와 고정너트;로 이루어지는 것이 바람직하다.
본 발명에 따른 흙막이 가시설 시공 구조 및 방법에 의하면, 흙막이판으로 강판을 사용하되, 강판의 후면 중앙부위에 수직하게 보강파일을 설치하여, 보강파일에 의해 토압 및 수압을 견딜 수 있는 강한 강성을 갖게 함으로서 지반을 안정적으로 유지시킬 수 있는 효과가 있다. 즉, 본 발명은 굴착 공사 시 토사 붕괴 등을 방지할 수가 있는 동시에 강판에 가해지는 토압에 대응하는 안정적인 강성으로 인해 안정적으로 지지함으로써 안정성을 증대시킬 수 있는 효과가 있다.
또한, 본 발명은 강판의 후면 중앙부위에 수직하게 보강파일이 설치됨에 의해 강판의 강성을 증대시켜 H형 파일간 간격을 보다 단축시키면서도 보다 안정되게 지반을 유지할 수 있음으로 H형 파일의 소요 갯수를 절감시킴과 동시에 시공 기간을 단축시킬 수 있는 등 경제적으로 효과가 있다.
특히, 본 발명은 강판의 후면 중앙부위에 수직하게 설치되는 보강파일의 상단부를 강판으로부터 돌출되게 인발부를 구비함에 의해 압입인발기로 강판을 지중 내부에 눌러 박을 수 있음으로 진동에 의한 주변 구조물 및 지반의 붕괴 방지가 가능하고, 소음으로 인한 공해 및 민원 등의 발생을 방지할 수 있고, 또 인발부에 의해 강판을 쉽게 인발할 수 있는 효과가 있다.
도 1은 본 발명에 따른 흙막이 가시설 시공 구조 및 방법에 이용되는 강판의 제1실시예에 따른 구성을 나타낸 사시도이고,
도 2는 도 1표시의 강판을 측면에서 보아 도시한 도면이고,
도 3은 도 1표시의 강판이 시공된 예를 위에서 보아 도시한 도면이고,
도 4는 도 1표시의 강판이 시공된 예를 앞에서 보아 도시한 도면이고,
도 5는 도 1표시의 강판이 시공된 예를 뒤에서 보아 도시한 도면이고,
도 6은 본 발명에 따른 흙막이 가시설 시공 구조 및 방법에 이용되는 강판의 제2 실시예에 따른 구성을 나타낸 사시도이고,
도 7은 도 6표시의 강판이 시공된 예를 앞에서 보아 도시한 도면이고,
도 8은 도 6표시의 강판이 시공된 예를 뒤에서 보아 도시한 도면이다.
이하에서는, 첨부된 도면을 참고하여 본 발명에 따른 바람직한 실시예를 보다 상세하게 설명하기로 한다.
본 발명의 설명에 앞서, 이하의 특정한 구조 내지 기능적 설명들은 단지 본 발명의 개념에 따른 실시예를 설명하기 위한 목적으로 예시된 것으로, 본 발명의 개념에 따른 실시예들은 다양한 형태로 실시될 수 있으며, 본 명세서에 설명된 실시예들에 한정되는 것으로 해석되어서는 아니된다.
또한, 본 발명의 개념에 따른 실시예는 다양한 변경을 가할 수 있고 여러 가지 형태를 가질 수 있으므로, 특정 실시예들을 도면에 예시하고 본 명세서에 상세하게 설명하고자 한다. 그러나, 이는 본 발명의 개념에 따른 실시예들을 특정한 개시 형태에 한정하려는 것이 아니며, 본 발명의 사상 및 기술 범위에 포함되는 모든 변경물, 균등물 내지 대체물을 포함하는 것으로 이해되어야 한다.
첨부된 도 1은 본 발명에 따른 흙막이 가시설 시공 구조 및 방법에 이용되는 강판의 제1실시예에 따른 구성을 나타낸 사시도이고, 도 2는 도 1표시의 강판을 측면에서 보아 도시한 도면이고, 도 3은 도 1표시의 강판이 시공된 예를 위에서 보아 도시한 도면이고, 도 4는 도 1표시의 강판이 시공된 예를 앞에서 보아 도시한 도면이고, 도 5는 도 1표시의 강판이 시공된 예를 뒤에서 보아 도시한 도면이고, 도 6은 본 발명에 따른 흙막이 가시설 시공 구조 및 방법에 이용되는 강판의 제2 실시예에 따른 구성을 나타낸 사시도이고, 도 7은 도 6표시의 강판이 시공된 예를 앞에서 보아 도시한 도면이고, 도 8은 도 6표시의 강판이 시공된 예를 뒤에서 보아 도시한 도면이다.
이들 도면에 도시되어 있는 바와 같이, 본 발명은 지중에 일정 깊이와 일정 간격으로 복수의 H빔을 삽입 설치하는 H빔 삽입단계와, 지중 내부에 삽입된 상기 H빔들 사이에 상기 H빔의 길이 방향으로 강판을 지중 내부에 삽입하는 강판 삽입단계와, 지면 아래로 일정 깊이로 굴착하는 지면 굴착단계를 포함하여 수행되는 것이 바람직하다.
또한, 본 발명은 지중에 일정 깊이와 일정 간격으로 삽입 설치되는 복수의 H빔(100)과, 상기 H빔(100)의 사이에서 양단이 H빔(100)에 끼워지도록 하면서 지중에 삽입 설치되어 토사의 유입이 방지되도록 하는 강판(200)을 포함하여 구성되는 것이 바람직하다.
이때, 상기 강판(200)은 금속재 제품을 이용하는 것이 일반적이나, 실질적으로 강성이 있는 것이라면 그 사용에 제한은 없으며 다양한 재료가 사용될 수 있다.
또한, 상기 강판(200)은 사각형으로 이루어진 강판본체(210)와, 상기 강판본체(210)에 가해지는 토압에 안정적으로 대응할 수 있는 강성을 부여하도록 상기 강판본체(210)의 후면에서 폭 중앙을 따라 수직하게 설치되는 보강파일(220)을 포함하여 이루어지는 것이 바람직하다.
이때, 상기 보강파일(220)의 하단 끝단부는 외측단부로부터 하향 경사지도록 하여 강판본체(210)에 접하게 되는 단부가 첨예부(221)를 갖도록 형성하는 것이 바람직하다.
또한, 상기 보강파일(220)은 웨브(web)(220a)와 상기 웨브(220a)의 양단에 구비되는 한 쌍의 플랜지(220b)를 구비하는 H빔 형상으로 이루어지고, 어느 하나의 플랜지는 상기 강판본체(210)의 후면에서 수직하게 형성되어 용접에 의해 고정되도록 하는 것이 바람직하다.
이러한 상기 보강파일(220)은 강판본체(210)의 후면 중앙부에 면접촉 되도록 용접되어 고정되는 고정부(222)와, 상기 고정부(222)로부터 상부로 연장되어 상기 강판본체(210)의 상부로 돌출되도록 형성되는 인발부(224)로 이루어지는 것이 바람직하다.
이때, 상기 인발부(224)는 상기 강판본체(210)의 상부로 보강파일(220)을 돌출시켜 형성하는 것으로, 그 돌출되는 길이는 대략 30~70cm 정도 돌출되도록 설치되는 것이 바람직하며, 이는 강판을 지중 내부에 눌러 박거나 인발하기 위해 사용하는 항타기, 오거크레인, 압입인발기(미도시) 등으로 작업시 상기 인발부를 이용한 작업(압입, 인발 등)이 가능할 수 있는 정도의 길이이면 충분하다.
또한, 상기 보강파일(220)은 강판본체(210)의 하부로 돌출되도록 고정부(222)로부터 하부로 연장되게 형성되어 상기 강판본체(210)의 하부에 토류판(300)들을 설치할 수 있도록 하는 토류판 설치부(226)가 형성되는 것이 바람직하다.
이때, 상기 토류판 설치부(226)의 길이는 상기 강판본체(210)의 하부로 설치되는 토류판(300)들의 개수에 따라 적절한 길이만큼 돌출되도록 형성되는데, 바람직하게는 강판본체(210)의 길이에 대하여 1/3~1/2 정도의 길이만큼 하향 돌출되도록 형성하는 것이 좋다.
한편, 상기 강판(200)에 용접 고정되는 보강파일(220)의 고정상태를 보강하도록 보강파일 고정수단(230)을 더 구비하는 것이 바람직하며, 상기 보강파일 고정수단(230)은 상기 강판본체(210)의 상부에 위치되도록 설치되고, 상기 강판본체(210)와 상기 보강파일(220)을 구성하는 플랜지(220b)를 관통하도록 관통공을 형성하고, 상기 관통공을 통해 상기 강판본체(210)와 플랜지(220b)를 견고하게 고정하도록 설치한 고정볼트(232)와 고정너트(234)로 이루어지는 것이 바람직하다.
이러한 보강파일 고정수단(230)은 상기 보강파일(220)을 용접으로만 고정할 경우 그 고정력이 약할 수 있는 단점을 보완하여 줄 수 있다.
본 발명에 따른 흙막이 가시설 시공 구조 및 방법은 지중 내부에 지하구조물을 구축하고자 하는 경우에 하는 굴착 공사에서 토압, 수압 등에 의해 흙벽이 무너져 내리는 것을 방지하고 지하수의 유입을 방지하여 지하 굴착 공사가 원활하게 진행될 수 있도록 하는 것이다.
본 발명은 일정 간격을 이루도록 지중 내부에 H빔(100)을 삽입하고, 삽입된 H빔(100)들의 사이에 강판(200)을 삽입하여 지중 내부에 흙막이 가시설을 설치한다. 본 과정을 거쳐 흙막이 가시설이 설치되면 지하 구조물의 구축을 위한 지하 굴착 공사가 진행된다.
한편, 상기 강판(200)을 삽입 설치할 때에는 강판본체(210)의 후면 중앙부위에 수직하게 설치된 보강파일(220)의 상단부분이 상기 강판본체(210)의 상부로 돌출된 인발부(224)를 이용하여 눌러 박음으로서, 상기 강판본체(210)의 면적이 넓어도 지중에 쉽게 삽입 설치할 수 있어 작업성을 향상시킬 수 있다.
또한, 상기 강판(200)의 해체시에는 상기 강판본체(210)에 설치되는 보강파일(220)의 상단 인발부(224)를 이용하여 인발함으로서 강판의 인발 역시 편리하게 할 수 있다.
한편, 상기 보강파일(220)이 강판본체(210)의 하부로 돌출되도록 설치되어 형성되는 토류판 설치부(226)에 의해 상기 강판본체(210)의 하단으로 토류판(300)들을 설치할 수 있다.
예컨대, 상기 강판본체(210)의 길이가 현장 여건에 따라 정확하게 맞지 않을 경우 상기 강판본체(210)의 하부로 돌출되도록 설치되는 토류판 설치부(226)를 이용하여 통상의 토류판(300)들을 설치할 수 있음으로서 작업의 편의성을 갖게 할 수 있다.
본 발명에 따르면, 상기 강판(200)을 구성하는 강판본체(210)의 후면 중앙부위에 보강파일(220)을 설치하되, 상기 보강파일(220)의 상단부를 강판본체(210)의 상부로 돌출되게 하여 인발부(224)를 구비함으로서 강판본체(210)의 삽입 및 인발을 편리하게 할 수 있다.
또한, 상기 강판본체(210)의 하부로 보강파일(220)을 돌출되게 하여 토류판 설치부(226)를 구비함에 의해 강판본체(210)의 하단으로 통상의 토류판(300)들을 설치할 수 있음으로, 본 발명은 강판과 함께 토류판의 설치를 가능하게 하여 작업의 편의성을 갖는다.
이상에서와 같은 기술적 구성에 의해 본 발명의 기술적 과제가 달성되는 것이며, 비록 한정된 실시예와 도면에 의해 설명되었으나 여기에 한정되지 않고 본 발명이 속하는 기술분야에서 통상의 지식을 가진 자에 의해 본 발명의 기술사상과 아래에 기재될 특허청구범위의 균등범위 내에서 다양한 수정 및 변형이 가능한 것임은 물론이다.
[부호의 설명]
100 - H빔 200 - 강판
210 - 강판본체 220 - 보강파일
222 - 고정부 224 - 인발부
226 - 토류판 설치부 230 - 고정수단

Claims (6)

  1. 지중에 일정 깊이와 일정 간격으로 복수의 H빔을 삽입 설치하는 H빔 삽입단계;
    지중에 삽입된 상기 H빔들 사이에 상기 H빔의 길이 방향으로 강판을 지중에 삽입되도록 하는 강판 삽입단계; 및
    지면 아래로 일정 깊이로 굴착하는 지면 굴착단계;
    로서 수행되도록 하며,
    지중에 삽입되는 상기 강판은,
    사각형으로 이루어진 강판본체; 및
    상기 강판본체에 가해지는 토압에 안정적으로 대응할 수 있는 강성을 부여하도록 상기 강판본체의 후면에서 폭 중앙을 따라 수직하게 설치되는 보강파일;
    로 이루어지고,
    상기 보강파일은,
    웨브(web)와 상기 웨브의 양단에 구비되는 한 쌍의 플랜지를 구비하는 H빔 형상으로 이루어지되,
    상기 보강파일의 하단 끝단부는 외측단부로부터 하향 경사지도록 하여 강판본체(210)에 접하게 되는 단부가 첨예부를 갖도록 형성하고,
    어느 하나의 플랜지가 상기 강판본체의 후면에 면접촉되어 용접에 의해 고정되도록 하는 고정부와 상기 고정부로부터 상부로 연장되어 상기 강판본체의 상부로 30~70cm 돌출되도록 형성되는 인발부로서 이루어지는 구성을 특징으로 하는 흙막이 가시설 시공 방법.
  2. 제1항에 있어서,
    상기 보강파일은 상기 강판본체의 하부로 강판본체의 상하 전 길이에 대하여 1/3~1/2의 길이로 돌출되도록 상기 고정부로부터 하부로 연장되게 형성되어 상기 강판본체의 하부에 토류판들을 설치할 수 있도록 하는 토류판 설치부가 형성된 것을 특징으로 하는 흙막이 가시설 시공 방법.
  3. 제1항에 있어서,
    상기 보강파일은 상기 강판본체에 용접 고정되는 보강파일의 고정상태를 보강하도록 하는 보강파일 고정수단을 더 포함하되,
    상기 보강파일 고정수단은 상기 강판본체의 상부에 위치되도록 설치되되, 상기 강판본체와 상기 보강파일을 구성하는 플랜지를 관통하도록 관통공을 형성하고, 상기 관통공을 통해 상기 강판본체와 플랜지를 견고하게 고정하도록 설치한 고정볼트와 고정너트로 이루어진 것을 특징으로 하는 흙막이 가시설 시공 방법.
  4. 지중에 일정 깊이와 일정 간격으로 삽입 설치되도록 하는 복수의 H빔; 및
    상기 H빔의 사이에서 양단이 H빔에 고정되도록 지중에 삽입 설치되어 토사의 유입이 방지되도록 하는 강판;
    으로 이루어지고,
    상기 강판은,
    소정 면적을 갖도록 사각형으로 이루어지는 강판본체와,
    상기 강판본체에 가해지는 토압에 안정적으로 대응할 수 있는 강성을 부여하도록 상기 강판본체의 후면에서 폭 중앙을 따라 수직하게 설치되는 보강파일로 이루어지며,
    상기 보강파일은,
    웨브(web)와 상기 웨브의 양단에 구비되는 한 쌍의 플랜지를 구비하는 H빔 형상으로 이루어지는 어느 하나의 플랜지는 상기 강판본체의 후면에 면접촉되어 용접에 의해 고정되도록 하여 고정부를 이루고, 상기 고정부로부터 상부로 연장되게 하여 상기 강판본체의 상부로 30~70cm 돌출되도록 인발부를 형성하며, 상기 고정부의 하단 끝단부는 외측단부로부터 하향 경사지도록 하여 강판본체(210)에 접하게 되는 단부가 첨예부를 갖도록 형성하는 구성을 특징으로 하는 흙막이 가시설 시공 구조.
  5. 제4항에 있어서,
    상기 보강파일의 고정부는 상기 강판본체의 하부로 상기 강관본체의 길이에 대하여 1/3~1/2의 길이로 하향 돌출되도록 하고, 하향 돌출되는 상기 강판본체의 하부에는 토류판들이 설치되도록 토류판 설치부를 형성하는 흙막이 가시설 시공 구조.
  6. 제4항에 있어서,
    상기 보강파일은:
    상기 강판본체에 용접 고정되는 보강파일의 고정상태를 보강하도록 하는 보강파일 고정수단;을 더 포함하되,
    상기 보강파일 고정수단은:
    상기 강판본체의 상부에 위치되도록 설치되되,
    상기 강판본체와 상기 보강파일을 구성하는 플랜지를 관통하도록 관통공을 형성하고, 상기 관통공을 통해 상기 강판본체와 플랜지를 견고하게 고정하도록 설치한 고정볼트와 고정너트;로 이루어진 것을 특징으로 하는 흙막이 가시설 시공 구조.
PCT/KR2018/001758 2017-02-10 2018-02-09 흙막이 가시설 시공 구조 및 방법 WO2018147680A1 (ko)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
KR1020170018841A KR101809006B1 (ko) 2017-02-10 2017-02-10 흙막이 가시설 시공 구조 및 방법
KR10-2017-0018841 2017-02-10

Publications (1)

Publication Number Publication Date
WO2018147680A1 true WO2018147680A1 (ko) 2018-08-16

Family

ID=60954218

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/KR2018/001758 WO2018147680A1 (ko) 2017-02-10 2018-02-09 흙막이 가시설 시공 구조 및 방법

Country Status (2)

Country Link
KR (1) KR101809006B1 (ko)
WO (1) WO2018147680A1 (ko)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111118994A (zh) * 2019-11-04 2020-05-08 中铁二院工程集团有限责任公司 一种土质地基路肩桩板墙大变形快速抢修加固结构及施工方法

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110565643A (zh) * 2019-10-10 2019-12-13 武汉市汉阳市政建设集团有限公司 一种电动可往复拉森钢板桩桩间土清除装置
KR102309753B1 (ko) 2021-03-12 2021-10-07 최경철 철판 벽체 차수 구조 및 시공방법

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0415627U (ko) * 1990-05-28 1992-02-07
JP2009249885A (ja) * 2008-04-04 2009-10-29 Nippon Steel Corp 既設の鋼矢板の補強方法及び構造、既設の鋼矢板の補強用部材
KR101182820B1 (ko) * 2012-06-04 2012-09-13 윤종혁 관로공사용 자립식 흙막이 패널
KR20130046061A (ko) * 2011-10-27 2013-05-07 유진지오 주식회사 흙막이 가시설 벽체 및 그 시공방법
JP2014163107A (ja) * 2013-02-25 2014-09-08 Takenaka Komuten Co Ltd 山留壁

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0415627U (ko) * 1990-05-28 1992-02-07
JP2009249885A (ja) * 2008-04-04 2009-10-29 Nippon Steel Corp 既設の鋼矢板の補強方法及び構造、既設の鋼矢板の補強用部材
KR20130046061A (ko) * 2011-10-27 2013-05-07 유진지오 주식회사 흙막이 가시설 벽체 및 그 시공방법
KR101182820B1 (ko) * 2012-06-04 2012-09-13 윤종혁 관로공사용 자립식 흙막이 패널
JP2014163107A (ja) * 2013-02-25 2014-09-08 Takenaka Komuten Co Ltd 山留壁

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111118994A (zh) * 2019-11-04 2020-05-08 中铁二院工程集团有限责任公司 一种土质地基路肩桩板墙大变形快速抢修加固结构及施工方法

Also Published As

Publication number Publication date
KR101809006B1 (ko) 2017-12-14

Similar Documents

Publication Publication Date Title
WO2017048056A1 (ko) 가시설용 차수식 흙막이 구조체와 그 시공방법
WO2010068013A2 (ko) 상하수도 공사에 적합한 저심도용 간이 흙막이 구조물
WO2018147680A1 (ko) 흙막이 가시설 시공 구조 및 방법
WO2010019014A2 (ko) 의자형 자립식 흙막이벽의 시공방법
KR100977206B1 (ko) 연속으로 직선 및 곡선 구간에 깊이, 폭 조절이 가능한흙막이 벽체 구조 및 그 설치 공법
WO2012044091A2 (ko) 지하 구조물 구축장치 및 공법
WO2015009124A1 (ko) 흙막이 가시설 공사의 버팀보 연결구조
WO2010068014A2 (ko) 상하수도 공사에 적합한 고심도용 간이 흙막이 구조물
KR20190132771A (ko) 보강 구조물을 구비한 프리스트레스 빔 및 이를 사용한 가설 흙막이 공법
KR101103909B1 (ko) 토류벽체 지지용 띠장재
KR100744192B1 (ko) 관로공사용 간이 흙막이 구조물
WO2024075920A1 (ko) 가이드브라켓과 지지브라켓을 이용한 엄지말뚝 및 이를 이용한 흙막이 가시설 시공방법
WO2024039010A1 (ko) 가이드브라켓과 지반앵커를 이용한 엄지말뚝 및 이를 이용한 흙막이 가시설 시공방법
WO2024053817A1 (ko) 깊은 굴착의 단계별 지보를 위한 가이드브라켓과 지반앵커를 이용한 흙막이 가시설 및 이의 시공방법
WO2016195364A1 (ko) 수직갱 모듈 및 이를 이용한 수직갱 시공방법
KR100477195B1 (ko) 프리스트레스에 의한 흙막이 공법용 단띠장재
WO2015009126A1 (ko) 흙막이 가시설 공사용 휘어짐 방지 버팀보
KR20090101993A (ko) 흙막이 구조물 설치방법
WO2013022194A1 (ko) 지중 벽체 시공방법
CN213538985U (zh) 一种地铁基坑围护支撑装置
CN205046560U (zh) 筋式托架
KR20120088627A (ko) 벤딩 복원하중을 이용한 흙막이 가시설용 말뚝 및 이를 이용한 흙막이 가시설 시공방법
KR200258921Y1 (ko) 흙막이용 벽체 패널의 설치구조
WO2015020257A1 (ko) 지중 구조물 시공방법
KR200369479Y1 (ko) 흙막이용 패널

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 18751095

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 18751095

Country of ref document: EP

Kind code of ref document: A1