WO2018083755A1 - 発電制御システム、発電制御装置、および、外部制御装置 - Google Patents

発電制御システム、発電制御装置、および、外部制御装置 Download PDF

Info

Publication number
WO2018083755A1
WO2018083755A1 PCT/JP2016/082589 JP2016082589W WO2018083755A1 WO 2018083755 A1 WO2018083755 A1 WO 2018083755A1 JP 2016082589 W JP2016082589 W JP 2016082589W WO 2018083755 A1 WO2018083755 A1 WO 2018083755A1
Authority
WO
WIPO (PCT)
Prior art keywords
power generation
generator
control device
unit
continuity
Prior art date
Application number
PCT/JP2016/082589
Other languages
English (en)
French (fr)
Inventor
敬佑 桂田
佐々木 潤也
将大 中嶋
Original Assignee
三菱電機株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 三菱電機株式会社 filed Critical 三菱電機株式会社
Priority to US16/342,007 priority Critical patent/US10924045B2/en
Priority to PCT/JP2016/082589 priority patent/WO2018083755A1/ja
Priority to EP16920583.8A priority patent/EP3537598A4/en
Priority to JP2018548501A priority patent/JP6710287B2/ja
Publication of WO2018083755A1 publication Critical patent/WO2018083755A1/ja

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J7/00Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
    • H02J7/14Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries for charging batteries from dynamo-electric generators driven at varying speed, e.g. on vehicle
    • H02J7/1423Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries for charging batteries from dynamo-electric generators driven at varying speed, e.g. on vehicle with multiple batteries
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J1/00Circuit arrangements for dc mains or dc distribution networks
    • H02J1/10Parallel operation of dc sources
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J7/00Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
    • H02J7/14Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries for charging batteries from dynamo-electric generators driven at varying speed, e.g. on vehicle
    • H02J7/143Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries for charging batteries from dynamo-electric generators driven at varying speed, e.g. on vehicle with multiple generators
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J7/00Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
    • H02J7/14Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries for charging batteries from dynamo-electric generators driven at varying speed, e.g. on vehicle
    • H02J7/16Regulation of the charging current or voltage by variation of field
    • H02J7/24Regulation of the charging current or voltage by variation of field using discharge tubes or semiconductor devices
    • H02J7/2434Regulation of the charging current or voltage by variation of field using discharge tubes or semiconductor devices with pulse modulation
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02PCONTROL OR REGULATION OF ELECTRIC MOTORS, ELECTRIC GENERATORS OR DYNAMO-ELECTRIC CONVERTERS; CONTROLLING TRANSFORMERS, REACTORS OR CHOKE COILS
    • H02P9/00Arrangements for controlling electric generators for the purpose of obtaining a desired output
    • H02P9/02Details of the control
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02PCONTROL OR REGULATION OF ELECTRIC MOTORS, ELECTRIC GENERATORS OR DYNAMO-ELECTRIC CONVERTERS; CONTROLLING TRANSFORMERS, REACTORS OR CHOKE COILS
    • H02P9/00Arrangements for controlling electric generators for the purpose of obtaining a desired output
    • H02P9/14Arrangements for controlling electric generators for the purpose of obtaining a desired output by variation of field
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02PCONTROL OR REGULATION OF ELECTRIC MOTORS, ELECTRIC GENERATORS OR DYNAMO-ELECTRIC CONVERTERS; CONTROLLING TRANSFORMERS, REACTORS OR CHOKE COILS
    • H02P9/00Arrangements for controlling electric generators for the purpose of obtaining a desired output
    • H02P9/14Arrangements for controlling electric generators for the purpose of obtaining a desired output by variation of field
    • H02P9/26Arrangements for controlling electric generators for the purpose of obtaining a desired output by variation of field using discharge tubes or semiconductor devices
    • H02P9/30Arrangements for controlling electric generators for the purpose of obtaining a desired output by variation of field using discharge tubes or semiconductor devices using semiconductor devices
    • H02P9/305Arrangements for controlling electric generators for the purpose of obtaining a desired output by variation of field using discharge tubes or semiconductor devices using semiconductor devices controlling voltage
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2310/00The network for supplying or distributing electric power characterised by its spatial reach or by the load
    • H02J2310/40The network being an on-board power network, i.e. within a vehicle
    • H02J2310/46The network being an on-board power network, i.e. within a vehicle for ICE-powered road vehicles
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02PCONTROL OR REGULATION OF ELECTRIC MOTORS, ELECTRIC GENERATORS OR DYNAMO-ELECTRIC CONVERTERS; CONTROLLING TRANSFORMERS, REACTORS OR CHOKE COILS
    • H02P2101/00Special adaptation of control arrangements for generators
    • H02P2101/45Special adaptation of control arrangements for generators for motor vehicles, e.g. car alternators
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T10/00Road transport of goods or passengers
    • Y02T10/60Other road transportation technologies with climate change mitigation effect
    • Y02T10/70Energy storage systems for electromobility, e.g. batteries
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T10/00Road transport of goods or passengers
    • Y02T10/80Technologies aiming to reduce greenhouse gasses emissions common to all road transportation technologies
    • Y02T10/92Energy efficient charging or discharging systems for batteries, ultracapacitors, supercapacitors or double-layer capacitors specially adapted for vehicles

Definitions

  • the present invention relates to a power generation control system, a power generation control device, and an external control device, and in particular, a power generation control system, a power generation control device, and an external control device for controlling a vehicle AC generator driven by an internal combustion engine. It is about.
  • the power generation amount of each generator is unbalanced depending on the production variation of the power generation control voltage of each generator and the state of the charging line.
  • a generator with a high power generation has a short life.
  • Patent Document 1 For such a problem, for example, a power generation control device described in Patent Document 1 has been proposed.
  • two generators are provided in a vehicle system. One generator is a “main generator” and the other generator is a “subordinate generator”.
  • the conduction rate to the field coil of the “subordinate generator” is set to the same value as the conduction rate to the field coil of the “main generator”.
  • the power generation amount of the “main generator” and the power generation amount of the “subordinate generator” are made uniform, thereby suppressing the shortening of the generator life.
  • each control parameter of the power generation control device is set / changed from the external control device, and the control state of the generator is transmitted to the external control device.
  • the power generation control device described in Patent Document 1 is applied to such a power generation control device, the communication wiring for performing bidirectional communication, the dedicated terminal and the dedicated for equalizing the power generation amount of each generator Wiring is required. Therefore, there is a problem that the vehicle wiring cost is increased, and furthermore, there is a problem that it becomes impossible to maintain the balance of the power generation amount between the generators when the dedicated terminal is abnormal.
  • the present invention has been made to solve such a problem, and does not require a dedicated terminal and a dedicated wiring, and can generate a uniform amount of power generated between a plurality of generators.
  • An object is to obtain a device and an external control device.
  • the present invention provides a power generation control system for simultaneously driving a plurality of generators mounted on one internal combustion engine by the internal combustion engine, wherein the power generation control system generates power for controlling each of the generators.
  • a control device and an external control device connected to the power generation control device, and the power generation control device includes a field driver that controls energization of a field current to a field coil provided in each generator.
  • a voltage control unit that adjusts the generated voltage of each generator to a target voltage value by determining a continuity of the field coil based on an output voltage of each generator and controlling the field driver;
  • a continuity detection unit that detects a continuity of the field coil of each of the generators;
  • a first signal transmission unit that transmits the continuity detected by the continuity detection unit to the external control device; From the external control device, the power
  • a first signal receiving unit that receives a command value for limiting the conduction rate of the control unit, and the conduction rate determined by the voltage control unit based on the command value received by the first signal receiving unit.
  • a continuity limiting unit that limits the continuity so as to be less than or equal to the command value, and the external control device detects the field of each generator detected by the continuity detection unit from the power generation control device.
  • a second signal receiving unit that receives the conductivity of the magnetic coil, and an average value of the conductivity of the field coil of each of the generators received by the second signal receiving unit, the average value And a second signal transmission unit for transmitting the command value set by the continuity calculation unit to the power generation control device.
  • the continuity calculation unit is received by the second signal receiving unit. Based on the continuity of the field coil of each generator, the generator with the lowest continuity is set as a non-restricted generator, and the non-restricted generators are set as restricted.
  • the command value is transmitted via the second signal transmission unit only to the power generation control device connected to the generator to be restricted as a power generator.
  • the power generation control device of each generator transmits the continuity of the field coil of each generator to the external control device, and the external control device transmits the continuity of the field coil of each generator. Since the power generation control device calculates the command value for limiting the continuity of the field coil determined by the feedback control based on the average value, and transmits it to the power generation control device, The power generation amount of the plurality of generators can be prevented from becoming an unbalanced state without requiring special terminals and dedicated wiring, and the power generation amounts of the plurality of generators can be made uniform.
  • Embodiment 1 FIG.
  • a vehicle power generation control system (hereinafter simply referred to as a “power generation control system”) according to Embodiment 1 of the present invention will be described with reference to the drawings.
  • the power generation control system is a power generation control system for simultaneously driving a plurality of vehicle generators (hereinafter simply referred to as “generators”) mounted on one internal combustion engine in parallel by the internal combustion engine. It is.
  • FIG. 1 is a configuration diagram showing a configuration of a power generation control system according to the present embodiment.
  • the power generation control system includes a power generation control device 4 that controls the power generator 1 and an external control device 5 that is connected to the power generation control device 4.
  • the power generation control device 4 and the external control device 5 perform bidirectional communication.
  • FIG. 1 shows a case where the power generation control device 4 is built in the generator 1, the present embodiment is not limited to this case, and the power generation control device 4 is provided outside the generator 1. It may be done.
  • n generators 1 are provided. n is a positive integer. Further, when these generators 1 are distinguished and called, they are called generator 1-1, generator 1-2,..., Generator 1-n. Since these n generators basically have the same configuration and perform the same operation, the generator 1 will be mainly described as the generator 1 below. Description of other generators is omitted.
  • the generator 1 is connected to an internal combustion engine (not shown) mounted on the vehicle via a belt, and generates electric power by obtaining a driving force from the internal combustion engine.
  • the power generation control device 4 of the generator 1 performs field current control for intermittently energizing the field current to the field coil 101 provided in each generator 1, thereby generating the generated voltage of the generator 1. Adjust to the target voltage value.
  • the generator 1 includes a field coil 101 that generates a magnetic flux necessary for power generation, a stator coil 102 that generates an AC electromotive force by the magnetic flux and outputs AC power, and an AC output current generated in the stator coil 102 as a direct current. And a rectifier 103 that performs full-wave rectification.
  • the output terminal A of the rectifier 103 that is, the output terminal A of the generator 1 is connected to the positive terminal of the vehicle storage battery 2, the vehicle electrical load 3, and the power generation control device 4.
  • the field coil 101 is connected to the power generation control device 4.
  • the DC output current output from the generator 1 according to the field current control of the power generation control device 4 is supplied to the vehicle storage battery 2 and the vehicle electrical load 3.
  • the vehicle electrical load 3 refers to various electrical devices that are mounted on the vehicle and operate with electricity.
  • the power generation control device 4 mainly functions as a controller that limits the output voltage and output current of the generator 1 to a certain level.
  • the power generation control device 4 includes a field driver 401 that controls a field current supplied to the field coil 101, and a return diode 402 that recirculates the field current when the field driver 401 is in an OFF state.
  • the power generation control device 4 includes a comparator 406.
  • the comparator 406 takes as an input value a value obtained by dividing the output terminal voltage of the output terminal A of the generator 1 by the resistors 403 and 404.
  • the comparator 406 compares the reference value 405 that matches a preset target voltage value with the input value.
  • the comparator 406 outputs a low potential when the input value is lower than the reference value 405.
  • the output of the comparator 406 is input to one input terminal of the NOR circuit 407.
  • An output from the conductivity limiting unit 409 is input to the other input terminal of the NOR circuit 407.
  • the output of the conductivity limiting unit 409 is fixed at, for example, a low potential.
  • the NOR circuit 407 outputs a high potential.
  • the field driver 401 is turned on. Thereby, a field current is passed through the field coil 101 to increase the output voltage of the generator 1.
  • the comparator 406 when the input value is higher than the reference value 405, the comparator 406 outputs a high potential.
  • the NOR circuit 407 outputs the Low potential.
  • the field driver 401 When the output of the NOR circuit 407 is a low potential, the field driver 401 is turned off. Thereby, the field current to the field coil 101 is cut off, and the output voltage of the generator 1 is reduced.
  • the power generation control device 4 adjusts the amount of field current flowing through the field coil 101 so that the power generation voltage of the generator 1 becomes constant by repeating the above operation and performing PWM control of the field driver 401.
  • the resistors 403 and 404, the comparator 406, and the reference value 405 determine the continuity of the field coil 101 based on the output voltage of the generator 1 and control the field driver 401 to generate power.
  • the voltage control part which adjusts the power generation voltage of the machine 1 to a target voltage value is comprised.
  • the power generation control device 4 includes a communication unit 415 for performing bidirectional communication with the external control device 5.
  • Examples of the bidirectional communication method include LIN (Local Interconnect Network) communication using a communication protocol capable of bidirectional communication with a single wire.
  • the communication unit 415 includes, for example, a wiring for LIN communication.
  • the power generation control device 4 includes a signal reception unit 408 and a signal transmission unit 411 connected to the communication unit 415.
  • a continuity limiting unit 409 is connected to the signal receiving unit 408.
  • the signal transmission unit 411 is connected to a continuity rate detection unit 410.
  • the power generation control device 4 uses the signal receiving unit 408 to limit the field coil conductivity determined by the voltage control unit from the external control device 5 via the communication unit 415 (hereinafter referred to as “field duty”). For receiving a field duty limit command value.
  • the signal receiving unit 408 outputs the received field duty limit command value to the continuity limiting unit 409.
  • the conductivity limiting unit 409 performs D / A conversion on the field duty limit command value and outputs a PWM signal of the field duty corresponding to the field duty limit command value to the NOR circuit 407.
  • the NOR circuit 407 calculates a negative logical sum of the output of the comparator 406 and the output of the conductivity limiting unit 409, and drives the field driver 401 according to the negative logical sum.
  • the conductivity limiting unit 409 cooperates with the NOR circuit 407 to determine the conductivity determined by the voltage control unit based on the field duty limit command value received by the signal receiving unit 408 from the external control device 5. Is configured to limit the continuity so as to be less than or equal to the field duty limit command value.
  • the power generation control device 4 detects its own field duty value by the continuity detection unit 410 based on the output value from the NOR circuit 407.
  • the continuity detection unit 410 performs A / D conversion on the detected field duty and outputs it to the signal transmission unit 411.
  • the signal transmission unit 411 transmits the input field duty information to the external control device 5 via the communication unit 415.
  • the power generation control device 4 includes a power generation voltage detection unit 412, a rotation speed detection unit 413, and a power generation abnormality detection unit 414.
  • the generated voltage detection unit 412 and the rotation speed detection unit 413 are connected to the stator coil 102. Further, the output of the power generation voltage detection unit 412 and the output of the rotation speed detection unit 413 are transmitted to the power generation abnormality detection unit 414.
  • the generated voltage detector 412 detects the voltage value of the phase voltage signal of the stator coil 102.
  • the power generation voltage detection unit 412 performs A / D conversion on the detected voltage value and transmits the converted voltage value to the power generation abnormality detection unit 414.
  • the rotation speed detector 413 detects the frequency component of the phase voltage signal of the stator coil 102.
  • the rotation speed detection unit 413 performs A / D conversion on the detected frequency component and transmits the A / D conversion to the power generation abnormality detection unit 414.
  • the power generation abnormality detection unit 414 determines whether or not the generator 1 is in an overvoltage state based on the voltage value of the phase voltage signal received from the power generation voltage detection unit 412. The power generation abnormality detection unit 414 determines that the generator 1 is in an overvoltage state when the voltage value of the phase voltage signal is equal to or higher than a preset threshold voltage.
  • the power generation abnormality detection unit 414 determines whether the generator 1 is in a no power generation state based on the voltage value of the phase voltage signal received from the power generation voltage detection unit 412 and the frequency component of the phase voltage signal received from the rotation speed detection unit 413. Determine whether or not. When the frequency of the phase voltage signal is equal to or higher than the power generation start rotation speed of the generator 1 and the voltage value of the phase voltage signal is less than the threshold voltage, the power generation abnormality detection unit 414 is in the no power generation state. Is determined.
  • the power generation abnormality detection unit 414 outputs power generation abnormality information to the signal transmission unit 411 when the power generation abnormality state of the generator 1 is detected.
  • the power generation abnormality information includes the unique identification information ID of the power generator 1 in order to indicate which power generator 1 has the abnormality. Further, type information for indicating the type of abnormality is also included in the power generation abnormality information.
  • the signal transmission unit 411 transmits the power generation abnormality information to the external control device 5 via the communication unit 415.
  • the external control device 5 performs a calculation related to the electrical conductivity of the generator 1 based on a signal receiving unit 501 that receives a signal from the power generation control device 4 and a signal received by the signal receiving unit 501.
  • a continuity calculation unit 502 and a signal transmission unit 503 that transmits a signal to the power generation control device 4 are provided.
  • the external control device 5 receives the field duty information and the power generation abnormality information from each power generation control device 4 of the n generators 1 by the signal receiving unit 501.
  • the signal receiving unit 501 outputs the received field duty information and power generation abnormality information to the continuity calculating unit 502.
  • the continuity calculation unit 502 Based on the field duty information of each generator 1 received by the signal receiver 501, the continuity calculation unit 502 obtains an average value of the field duty of each field coil 101, and based on the average value, the field duty Set the limit command value.
  • the signal transmission unit 503 transmits the field duty limit command value to the power generation control device 4.
  • the continuity of the generator corresponding to the power generation abnormality information is calculated when the average value of the field duty is calculated by the continuity calculation unit 502. Calculate by excluding rate.
  • the signal receiving unit of the power generation control device 4 is a receiving device, and the signal transmitting unit is a transmitting device.
  • the functions of the unit 411, the power generation voltage detection unit 412, the rotation speed detection unit 413, and the power generation abnormality detection unit 414 are realized by a processing circuit. That is, the power generation control device 4 includes a processing circuit for realizing these functions. Even if the processing circuit is dedicated hardware, a CPU that executes a program stored in a memory (Central Processing Unit, central processing unit, processing unit, arithmetic unit, microprocessor, microcomputer, processor, DSP) It may be.
  • a memory Central Processing Unit, central processing unit, processing unit, arithmetic unit, microprocessor, microcomputer, processor, D
  • the processing circuit is, for example, a single circuit, a composite circuit, a programmed processor, a parallel programmed processor, an ASIC, an FPGA, or a combination thereof.
  • the functions of each unit of the detection unit 412, the rotation speed detection unit 413, and the power generation abnormality detection unit 414 may be realized by a processing circuit, or the functions of the respective units may be collectively realized by a processing circuit.
  • the processing circuit When the processing circuit is a CPU, the functions of the above-described units are realized by software, firmware, or a combination of software and firmware.
  • Software and firmware are described as programs and stored in a memory.
  • the processing circuit reads out and executes the program stored in the memory, thereby realizing the function of each unit. That is, the power generation control device includes a memory for storing a program in which each step embodying the function of each unit is executed as a result when executed by the processing circuit. Moreover, it can be said that these programs make a computer execute the procedure and method of each part.
  • the memory corresponds to, for example, a nonvolatile or volatile semiconductor memory such as RAM, ROM, flash memory, EPROM, or EEPROM, a magnetic disk, a flexible disk, an optical disk, a compact disk, a mini disk, a DVD, or the like. To do.
  • a nonvolatile or volatile semiconductor memory such as RAM, ROM, flash memory, EPROM, or EEPROM, a magnetic disk, a flexible disk, an optical disk, a compact disk, a mini disk, a DVD, or the like.
  • the continuity detection unit 410, the generated voltage detection unit 412, and the rotation speed detection unit 413 have their functions realized by a processing circuit as dedicated hardware, or the processing circuit reads a program stored in a memory. This function can be realized by executing the command.
  • the generated voltage detection unit 412 may be configured by a voltage sensor or a combination of a voltage sensor and software.
  • the rotation speed detection unit 413 may be composed of a rotation sensor such as a resolver, or may be composed of a combination of a rotation sensor and software.
  • the processing circuit can realize the above functions by hardware, software, firmware, or a combination thereof.
  • the signal reception unit 501 is a reception device
  • the signal transmission unit 503 is a transmission device.
  • the function of the conductivity calculating unit 502 of the external control device 5 is realized by a processing circuit. That is, the external control device 5 includes a processing circuit for realizing the function of the conductivity calculating unit 502. Even if the processing circuit is dedicated hardware, a CPU that executes a program stored in a memory (Central Processing Unit, central processing unit, processing unit, arithmetic unit, microprocessor, microcomputer, processor, DSP) It may be.
  • a memory Central Processing Unit, central processing unit, processing unit, arithmetic unit, microprocessor, microcomputer, processor, DSP
  • processing circuit is dedicated hardware and the case where the processing circuit is a CPU are the same as those of the power generation control device 4 described above, and therefore the description thereof is omitted here, and the function of the conductivity calculating unit 502 is also described. May be partially realized by dedicated hardware and partially realized by software or firmware.
  • FIG. 2 is a flowchart showing a processing flow of the continuity calculation unit 502 of the external control device 5.
  • step S1 the continuity calculation unit 502 receives field duty information from each power generation control device 4 of each of the n generators 1, and stores it in a memory (not shown) provided in the external control device 5. Specifically, as shown in step S1-1, the value of the field duty received from the power generation control device 4 of the generator 1-1 is stored in the memory address “Duty_generator 1”. Similarly, the value of the field duty received from the power generation control device 4 of the generator 1-2 is stored in the memory address “Duty_generator 2”. This is repeated, and as shown in step S1-n, the value of the field duty received from the power generation control device 4 of the generator 1-n is stored in the memory address “Duty_generator n”.
  • step S2 the continuity calculating unit 502 divides the sum of the field duties of all the generators 1 stored in the memory by the total number n of the generators 1 to obtain the current field duty. The average value is calculated. The conductivity calculating unit 502 stores the calculated average value in the memory address “Duty_ave”.
  • step S3 the continuity calculation unit 502 compares the field duty values of the generators 1 stored in the memory to determine which generator 1 has the smallest field duty. Since the field duty is in a proportional relationship with the power generation amount of the generator 1, it can be estimated that the field duty is the smallest and the power generation amount is also the smallest.
  • the continuity calculation unit 502 transmits the same value as the calculated average value to the power generation control device 4 of the generator 1 other than the generator 1 with the smallest field duty via the signal transmission unit 503. A field duty limit command value is transmitted.
  • the continuity calculation unit 502 does not transmit the field duty limit command value to the power generation control device 4 of the generator 1 having the smallest field duty, and keeps it in an unrestricted state.
  • Step S3 will be described more specifically.
  • step S3-1-1 first, it is determined whether “Duty_generator 1” of the generator 1-1 is minimum. As a result of the determination, if “Duty_generator 1” of the generator 1-1 is minimum, the process proceeds to the next step, and it is determined whether “Duty_generator 2” of the generator 1-2 is minimum. On the other hand, if “Duty_generator 1” of the generator 1-1 is not minimum as a result of the determination, the power generation control device 4 of the generator 1-1 is instructed to generate power as shown in step S3-1-2.
  • the field duty limit command value is transmitted so as to perform control to set the field duty of the machine 1-1 to “Duty_ave”. This is repeated in order for each generator, and finally, as shown in step S3-n-1, it is determined whether “Duty_generator n” of the generator 1-n is minimum. As a result of the determination, if so, the flow of FIG. 2 is terminated as it is. On the other hand, as a result of the determination, if not, as shown in step S3-n-2, the field duty of the generator 1-n is set to “Duty_ave” with respect to the generator control device 4 of the generator 1-n. The field duty limit command value is transmitted so as to perform control.
  • the reason why the field duty limit command value is not transmitted to all the generators 1 in step S3 will be described. It is assumed that the field duty limit command value is transmitted to all n generators 1. At this time, for example, when the load amount of the vehicle electrical load 3 increases rapidly, the power generation amount temporarily becomes insufficient. As a result, a voltage drop of the vehicle storage battery 2 is caused, which may affect the entire vehicle system. Therefore, in the present embodiment, the generator 1 with the smallest field duty is not set to be limited by the field duty limit command value, so that even when the load amount of the vehicle electrical load 3 increases rapidly, Since the generator 1 having the smallest field duty can cope with an increase in the amount of power generation, a voltage drop of the vehicle storage battery 2 can be avoided.
  • 3A and 3B show the PWM signal states of the field driver 401 when the power generation control device 4 of the generator 1 receives the field duty limit command value from the external control device 5.
  • FIG. in FIGS. 3A and 3B the case where the duty is 100% is fixed to the high potential.
  • 3A shows a case where the field duty of the comparator 406 is lower than the field duty limit command value
  • FIG. 3B shows a case where the field duty of the comparator 406 is equal to or greater than the field duty limit command value. ing.
  • the horizontal axis indicates time
  • the vertical axis indicates the output of the comparator 406, the output of the conductivity limiting unit 409, the output of the NOR circuit 407, and the ON of the field driver 401 in order from the top. / OFF state.
  • the comparator 406 outputs a low potential when the input value corresponding to the output terminal voltage of the generator 1 is lower than the reference value 405 indicating the target voltage value.
  • the comparator 406 outputs a high potential when the input value corresponding to the output terminal voltage of the generator 1 is equal to or higher than the reference value 405 indicating the target voltage value.
  • the conductivity limiting unit 409 outputs a pulse signal corresponding to the field duty limit command value input from the external control device 5 via the signal receiving unit 408.
  • the output of the NOR circuit 407 becomes a high potential when the output of the comparator 406 is a low potential and the output of the continuity limiting unit 409 is a low potential.
  • the field driver 401 is turned on.
  • the power generation control device 4 makes the field duty from the external control device 5 with respect to the output of the comparator 406.
  • the maximum duty of the field driver 401 is limited by the limit command value.
  • the field duty limit command value is a limit of the maximum value only. Is determined by the output of the comparator 406, the generated voltage of the generator 1 does not exceed the target voltage value, and the stability of the vehicle power supply system is ensured.
  • FIG. 4 shows the communication time chart. As shown in FIG. 4, the bidirectional communication is performed at a preset communication cycle. The communication cycle is shown as communication cycles # 1, # 2,... In FIG.
  • “information” indicated by reference numeral 4001 includes field duty information and power generation abnormality information of the generator 1.
  • the “calculation” indicated by reference numeral 4002 indicates that the continuity calculation unit 502 of the external control device 5 is performing the calculation shown in the flow of FIG.
  • a “command” indicated by reference numeral 4003 indicates a field duty limit command value transmitted from the external control device 5 to the power generation control device 4.
  • “information” from the power generation control device 4 of each of the n generators 1 is received by the external control device 5, and “calculation” is performed in the external control device 5.
  • the “command” is transmitted from the external control device 5 to the power generation control device 4.
  • the timing of signal reception from the power generation control device 4 of the generator 1 and the timing of signal transmission to the power generation control device 4 of the generator 1 are set in advance.
  • the communication unit 415 can prevent occurrence of a collision between the reception signal and the transmission signal.
  • this communication cycle is an update cycle of the field duty limit command value.
  • FIG. 5 shows an example of the power generation amount transition of each generator 1 when the power generation amount balance control between the generators 1 is performed based on the field duty limit command value of the external control device 5.
  • FIG. 5 shows an operation when three generators 1 are operated in parallel.
  • three generators 1 are shown as a generator a, a generator b, and a generator c, respectively.
  • the initial state of the field duty indicating the power generation amount of each of the generators a, b, c is as follows: generator a: 90%, generator b: 80%, generator c : 10%.
  • the field duty limit command value is 60%.
  • the external control device 5 Since the field a Duty of the generator a is not minimum, the external control device 5 transmits “60%” as the field duty limit command value to the generator a. Similarly, since the field Duty of the generator b is not minimum, the external control device 5 transmits “60%” as the field duty limit command value to the generator b. On the other hand, since the field duty of the generator c is the minimum value, the external control device 5 does not transmit the field duty limit command value to the generator c, so that the generator c is in an unlimited state.
  • the generators a and b are limited by the field duty limit command value. Therefore, as shown in FIG. 5B, the field duty of the generator a and the generator b is 60%. Become.
  • the surplus power generation amount that the generator a and the generator b are responsible for is assumed to be the generator c. That is, the power generation amount (field duty value) of the generator c is 30% which is the difference between the initial value of the generator a and the field duty limit command value, and the initial value of the generator b and the field duty limit command. It will bear 50% in total with 20% which is the difference from the value. As a result, the field Duty of the generator c is 60% by adding the above 50% to the initial value of 10%. In this way, the unbalance of the power generation amount of each generator a, b, c is improved.
  • FIG. 6 shows an example of power generation amount transition when the load amount of the vehicle electrical load 3 increases rapidly.
  • FIG. 6 shows the operation when three generators 1 are operated in parallel, as in FIG. In FIG. 6, similarly to FIG. 5, three generators 1 are shown as a generator a, a generator b, and a generator c, respectively.
  • FIG. 6 as shown in FIG. 6 (a), as an initial state of each of the generators a, b, c, the generator a and the generator b are transmitted from the external control device 5 as field duty limit command values. It is assumed that “60%” is received. On the other hand, since the field duty value was the minimum at the time of the previous average calculation, the generator c is set to an unlimited state with respect to the field duty. Now, as shown in FIG. 5B, the unbalance of the power generation amount of each of the generators a, b, c is improved, and the field duty of the generators a, b, c is all reduced to 60%. It's all there.
  • the generator c Since only the generator c is responsible for the increase in power generation, it is temporarily unbalanced. That is, the generator a is 60%, the generator b is 60%, and the generator c is 90%. However, in the next update cycle, the average value of the field duty increases to “70%”, and the field duty of the generator c becomes no minimum. Therefore, the field duty limit command value “70%” is transmitted from the external control device 5 to the generator c. On the other hand, the generator a and the generator b are in an unrestricted state because the field duty is minimum. As a result, as shown in FIG. 6C, the power generation amount of the generators a and b increases, the power generation amount of the generator c decreases, and the power generation amount between the generators a, b, and c. This imbalance is also corrected.
  • FIG. 7 shows an exception to FIG. 5 and FIG. In FIG.5 and FIG.6, the three generators 1 showed the example of the same structure.
  • FIG. 7 shows a case where the field Duty of the generator a is constantly higher than the other generators b and c.
  • FIG. 7 also shows the operation when three generators 1 are operated in parallel, as in FIGS. 5 and 6.
  • three generators 1 are shown as a generator a, a generator b, and a generator c, respectively.
  • the initial values of the field duty of each of the generators a, b, c are as follows: generator a: 60%, generator b: 40%, generator c: 20%. To do. At this time, the average value of the field duty is 40%, and the field duty limit command value is also “40%”.
  • the generator c is in an unlimited state because the field duty is the smallest.
  • the generator a and the generator b are in a state of receiving the field duty limit command value “40%” from the external control device 5.
  • the unbalance of the power generation amount between the generators a, b, and c is also corrected.
  • the generator a and the generator b are in a state of restriction, so as shown in FIG.
  • the generator c is responsible.
  • the field duty of the generator c is increased by 60% to 100%.
  • FIG. 8 shows a flowchart of control in a modification of the first embodiment as a method for suppressing such an increase / decrease in unstable field duty. Further, FIG. 9 shows the transition of the field duty of each generator in that case.
  • the flow in the modification of FIG. 8 may be performed.
  • step S3A is performed instead of step S3 in FIG. That is, steps S1 and S2 in FIG. 8 are the same as steps S1 and S2 in FIG.
  • Step S3A in FIG. 8 is basically the same as step S3 in FIG. 2, but in FIG. 8, instead of steps S3-1-2 and S3-n-2 in FIG. 2, step S3-1 is performed.
  • -2A and S3-n-2A are different.
  • the value of the field duty limit command value from the external control device 5 is the same value as the average value Duty_ave.
  • the value of the field duty limit command value from the external control device 5 is preset with respect to the average value Duty_ave.
  • the added value ⁇ is the added value.
  • the generator c is in an unlimited state because the field duty is minimum.
  • the generator a and the generator b receive the field duty limit command value “50%” from the external control device 5 as shown in FIG. As a result, the field duty of the generator a is reduced by 10% to 50%, the field duty of the generator b is 40% as it is, and the field duty of the generator c is increased by 10% to 30%.
  • the generator c when the load amount of the vehicle electrical load 3 is increased rapidly by, for example, 60% of the field duty, the generator c is mainly responsible for the sudden increase.
  • the generator b since the generator b also has a surplus of 10% with respect to the field duty limit command value, it is possible to share the rapidly increased load between the generator b and the generator c.
  • the generator b is responsible for 10%
  • the generator b and the generator c are in an unrestricted state because the field duty is minimum.
  • the generator c receives a field duty limit command value “70%” from the external control device 5.
  • the amount of change in the field duty value of the generator c at the time of transition from FIG. 9C to FIG. 9D is 10%.
  • the amount of change in the field duty value of the generator a at the time of transition from FIG. 9C to FIG. 9D is
  • 10%.
  • the change amount of the field duty value of the generator a at the time of transition from FIG. 7C to FIG. 7D is
  • 40%.
  • FIG. 10 shows a flowchart of the operation of the continuity calculating unit 502 when the external control device 5 receives power generation abnormality information from the power generation control device 4.
  • step S1A is performed in FIG. 10 instead of step S1 in FIG. Therefore, since step S2 and step S3A are the same as those in FIG. 8, the description thereof is omitted here.
  • step S1A in FIG. 10 differs from step S1 in FIG. 8 in that step S1-1-1 and step S1-1-2 are added in step S1A in FIG.
  • step S ⁇ b> 1 ⁇ / b> A the continuity calculation unit 502 confirms whether or not power generation abnormality information has been received from the generator 1 for the n generators 1.
  • the continuity calculation unit 502 prohibits the field duty value of the power generator 1 from being stored in the memory and the field in step S2. Do not count the total number of generators when averaging duty values.
  • Step S1A will be specifically described.
  • the continuity calculation unit 502 confirms whether or not power generation abnormality information has been received from the generator 1-1 for the generator 1-1. If the generator 1-1 has transmitted power generation abnormality information, the process proceeds to step S1-1-2, and if not, the process proceeds to step S1-1.
  • the continuity calculation unit 502 prohibits storing the field duty value of the generator 1-1 in the memory, and performs the averaging of the field duty value in step S2. 1 is subtracted from the current total number of generators 1 so as not to count the total number of generators.
  • the continuity calculation unit 502 stores the field duty value of the generator 1-1 in the memory.
  • step S3A is basically the same as step S3A in FIG. 8, but in FIG. 10, the generator 1 outputting the power generation abnormality information in step S1A is as described above.
  • the external control device 5 since the field duty value is not stored in the memory, the external control device 5 is not subject to restriction, and is disconnected from the restriction subject. As a result, it is possible to continue the state where the power generation amount is balanced for the power generators other than the power generator in the power generation abnormal state.
  • the generator in the no power generation state has a field duty value of 0%, and the information is averaged.
  • the average value of the field duty value becomes low and the field duty value of the normal generator other than the non-power generation state is high. Therefore, the external control device 5 is limited only to the generator in the normal power generation state. I will spend. Therefore, there is a possibility that the voltage of the vehicle storage battery 2 may be lowered due to insufficient power generation as a whole with respect to the power generation request of the vehicle. For this reason, in the present embodiment, the normal state is maintained as the behavior of the power generator other than the power generator in which the power generation is abnormal by disconnecting the power generator in the power generation abnormal state from the restriction target.
  • FIG. 10 shows an example in which step S1A is applied to FIG. 8, it is needless to say that step S1A may be applied to FIG. 2 without being limited to that case.
  • the power generation control device 4 of the generator 1 determines the field duty by the NOR circuit 407, so the power generation amount of the generator 1 is unbalanced. As a vehicle power supply system, there is no abnormality such as overvoltage.
  • the generator 1 may be in a no power generation state.
  • a low voltage detection unit 420 may be provided to detect that the field duty limit command value is fixed at 0%.
  • the same value as the input value of the comparator 406 is input to the low voltage detection unit 420. That is, the low voltage detection unit 420 receives a value obtained by dividing the output terminal voltage of the generator 1 by the resistors 403 and 404.
  • the low voltage detection unit 420 detects that the output terminal A of the generator has become a voltage lower than a preset lower limit threshold based on the value, low voltage information for notifying the low voltage is provided. Output to the conductivity limiting unit 409.
  • the lower threshold for low voltage detection is set to the lower limit of the voltage range in which the auxiliary equipment including the external control voltage can operate normally on the set vehicle power supply system.
  • the continuity limiting unit 409 invalidates the field duty limit command value from the external control device 5 (fixes the output signal Low potential), and the signal of the comparator 406 Only by this, the field driver 401 is controlled.
  • the low voltage detection unit 420 constitutes a command abnormality detection unit that detects that the field duty limit command value from the external control device 5 is abnormal.
  • the return condition for validating the field duty limit command value is when the low voltage detection unit 420 no longer detects a low voltage and the field duty limit command value exceeds a preset threshold value. Then, the field duty limit command value is validated again to return to the power generation amount balance control.
  • the field duty limit command value of the continuity calculating unit 502 of the external control device 5 a case where the field duty limit command value cannot be received by the power generation control device 4 is conceivable.
  • the field generation duty determined by the comparator 406 is not performed in the power generation control device 4 without being limited by the continuity limiting unit 409.
  • the field driver 401 is driven.
  • the power generation control device 4 of each generator 1 transmits the field duty of the field coil 101 of each generator 1 to the external control device 5, and the external control device 5 An average value of the field duty is obtained, and a field duty limit command value for restricting the field duty of the field coil 101 determined by the power generation control device 4 is obtained based on the average value.
  • the power generation control device 4 limits the power generation amount of each generator 1 in accordance with the field duty limit command value. Can be made uniform.
  • the continuity calculation unit 502 of the external control device 5 has the field duty minimum based on the field duty of the field coil 101 of each generator 1 received by the signal receiving unit 501.
  • the generators 1 are designated as “non-restricted generators”, and the generators 1 other than “non-restricted generators” are designated as “restricted generators”.
  • the field duty limit command value is transmitted only to the control device 4 via the signal transmission unit 503. As described above, in the present embodiment, by setting no limit on the generator having the smallest field duty, the generator having the smallest field duty even when the electric load of the vehicle rapidly increases. However, it is possible to avoid the voltage drop of the vehicle storage battery 2.

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Control Of Eletrric Generators (AREA)

Abstract

各発電機1の発電制御装置4が、各発電機1の界磁コイル101の導通率を外部制御装置5に送信し、外部制御装置5が当該導通率の平均値を求めて、当該平均値に基づいて、発電制御装置4が決定した界磁コイル101の導通率を制限するための界磁Duty制限命令値を求めて、当該界磁Duty制限命令値を発電制御装置4に送信することで、発電制御装置4において、各発電機1の発電量を当該命令値で制限するため、各発電機1間の発電量が均一になる。

Description

発電制御システム、発電制御装置、および、外部制御装置
 本発明は、発電制御システム、発電制御装置、および、外部制御装置に関し、特に、内燃機関によって駆動される車両用交流発電機を制御するための発電制御システム、発電制御装置、および、外部制御装置に関するものである。
 1つの内燃機関に対して複数台の発電機を搭載する車両システムにおいて、各発電機の発電制御電圧の製造バラつき及び充電線の状態によって、各発電機の発電量にアンバランスが生じ、定常的に発電量の高い発電機が短寿命化するという課題があった。
 このような課題に対して、例えば、特許文献1に記載の発電制御装置が提案されている。特許文献1では、車両システムに2つの発電機が設けられている。一方の発電機を「主発電機」とし、他方の発電機を「従属発電機」とする。「従属発電機」の界磁コイルへの導通率は、「主発電機」の界磁コイルへの導通率と同値に設定されている。これにより、「主発電機」の発電量と「従属発電機」の発電量とを均一にして、発電機の短寿命化を抑制している。
国際公開第2012/029104号
 特許文献1に記載のような発電制御装置の場合、主発電機と従属発電機との両方において、界磁コイルの導通率情報を共有する専用端子と、各端子間を接続する専用配線とが必要である。
 ところで、近年、外部制御装置と双方向通信を行うための機能を備えた車両の発電制御装置が増加している。そのような発電制御装置においては、発電制御装置の各制御パラメータを外部制御装置から設定/変更し、かつ、発電機の制御状態を外部制御装置へ送信する。このような発電制御装置に特許文献1に記載の発電制御装置を適用した場合、双方向通信を行うための通信配線と、各発電機の発電量を均一化するための上記の専用端子及び専用配線とが、必要となる。そのため、車両配線コストの増加という課題があり、さらには、専用端子の異常時には、各発電機間の発電量のバランスの維持が出来なくなるという課題があった。
 この発明は、かかる課題を解決するためになされたものであり、専用端子および専用配線を必要とせず、複数の発電機間の発電量を均一にすることが可能な、発電制御システム、発電制御装置、および、外部制御装置を得ることを目的とする。
 本発明は、1つの内燃機関に搭載された複数の発電機を、前記内燃機関により同時に駆動するための発電制御システムであって、前記発電制御システムは、各前記発電機を制御するための発電制御装置と、前記発電制御装置に接続された外部制御装置とを備え、前記発電制御装置は、各前記発電機に設けられた界磁コイルへの界磁電流の通電を制御する界磁ドライバと、各前記発電機の出力電圧に基づいて前記界磁コイルの導通率を決定して前記界磁ドライバを制御することで、各前記発電機の発電電圧を目標電圧値に調整する電圧制御部と、各前記発電機の前記界磁コイルの導通率を検出する導通率検出部と、前記導通率検出部で検出された前記導通率を前記外部制御装置に送信する第1の信号送信部と、前記外部制御装置から、前記電圧制御部の前記導通率を制限する命令値を受信する第1の信号受信部と、前記第1の信号受信部で受信した前記命令値に基づいて、前記電圧制御部が決定した前記導通率を前記命令値以下にするように前記導通率に制限を加える導通率制限部とを備え、前記外部制御装置は、前記発電制御装置から、前記導通率検出部で検出した各前記発電機の前記界磁コイルの前記導通率を受信する第2の信号受信部と、前記第2の信号受信部で受信した各前記発電機の前記界磁コイルの前記導通率の平均値を求め、前記平均値に基づいて、前記命令値を設定する導通率演算部と、前記導通率演算部が設定した前記命令値を、前記発電制御装置に送信する第2の信号送信部とを備え、前記外部制御装置の前記導通率演算部は、前記第2の信号受信部で受信した各前記発電機の前記界磁コイルの前記導通率に基づいて、前記導通率が最小の発電機を制限対象外の発電機とし、前記制限対象外の発電機以外の前記発電機を制限対象の発電機として、前記制限対象の発電機に接続された前記発電制御装置に対してのみ、前記第2の信号送信部を介して、前記命令値を送信する、発電制御システムである。
 本発明の発電制御システムによれば、各発電機の発電制御装置が各発電機の界磁コイルの導通率を外部制御装置に送信し、外部制御装置が各発電機の界磁コイルの導通率の平均値を求めて、当該平均値に基づいて、発電制御装置がフィードバック制御で決定した界磁コイルの導通率を制限するための命令値を求めて発電制御装置に送信するようにしたので、専用端子および専用配線などを特に必要とせずに、複数の発電機の発電量がアンバランス状態になることを防止でき、複数の発電機の発電量を均一にすることができる。
本発明の実施の形態1に係る車両用発電制御システムの構成を示した構成図である。 本発明の実施の形態1に係る車両用発電制御システムに設けられた外部制御装置の動作を示したフローチャートである。 本発明の実施の形態1に係る車両発電制御システムに設けられた発電制御装置の界磁ドライバのPWM信号状態を示したタイムチャートである。 本発明の実施の形態1に係る車両発電制御システムに設けられた発電制御装置の界磁ドライバのPWM信号状態を示したタイムチャートである。 本発明の実施の形態1に係る車両用発電制御システムに設けられた外部制御装置の送受信のタイミングを示したタイムチャートである。 本発明の実施の形態1に係る車両用発電制御システムで制御した各発電機の発電量の推移を示した図である。 本発明の実施の形態1に係る車両用発電制御システムで制御した各発電機の発電量の推移を示した図である。 本発明の実施の形態1に係る車両用発電制御システムで制御した各発電機の発電量の推移の例外を示した図である。 本発明の実施の形態1に係る車両用発電制御システムに設けられた外部制御装置の動作の変形例を示したフローチャートである。 本発明の実施の形態1に係る車両用発電制御システムが図8のフローチャートに基づいて制御した場合の各発電機の発電量の推移を示した図である。 本発明の実施の形態1に係る車両用発電制御システムに設けられた外部制御装置の動作を示したフローチャートである。 本発明の実施の形態1に係る車両用発電制御システムの構成の変形例を示した構成図である。
 実施の形態1.
 以下、図面に基づき、本発明の実施の形態1に係る車両用発電制御システム(以下、単に「発電制御システム」という)について説明する。
 本実施の形態に係る発電制御システムは、1つの内燃機関に搭載された複数の車両用発電機(以下、単に「発電機」という)を、当該内燃機関により同時に並列駆動させるための発電制御システムである。
 図1は、本実施の形態に係る発電制御システムの構成を示した構成図である。図1に示すように、発電制御システムは、発電機1を制御する発電制御装置4と、発電制御装置4に接続された外部制御装置5とを備えている。発電制御装置4と外部制御装置5とは、双方向通信を行う。図1においては、発電制御装置4が、発電機1に内蔵されている場合を示しているが、本実施の形態はこの場合に限られず、発電制御装置4は、発電機1の外部に設けられていてもよい。
 また、図1においては、図の簡略化のために、発電機1として1つの発電機のみが示されているが、実際には、複数の発電機が搭載されている。以下では、n個の発電機1が設けられているとする。nは、正の整数である。また、それらの発電機1を区別して呼ぶ場合には、発電機1-1,発電機1-2,・・・,発電機1-nと呼ぶこととする。また、これらのn個の発電機は、基本的に、すべて、同じ構成を有し、同じ動作を行うため、以下では、発電機1として、主に発電機1-1についての説明を行い、他の発電機については、説明を省略する。
 発電機1は、車両に搭載された図示しない内燃機関に対してベルトを介して接続され、内燃機関により駆動力を得ることによって発電を行う。発電機1の発電制御装置4は、各発電機1に設けられた界磁コイル101に対して界磁電流を断続的に通電する界磁電流制御を行うことにより、発電機1の発電電圧を目標電圧値に調整する。
 発電機1は、発電に必要な磁束を発生させる界磁コイル101と、当該磁束により交流起電力を発生させて交流電力を出力するステータコイル102と、ステータコイル102に発生した交流出力電流を直流へ変換するために全波整流を行う整流器103とを備えている。
 整流器103の出力端A、すなわち、発電機1の出力端Aは、車両蓄電池2の正端子、車両電気負荷3、および、発電制御装置4に接続されている。また、界磁コイル101は、発電制御装置4に接続されている。こうして、発電制御装置4の界磁電流制御に従って発電機1から出力される直流出力電流は、車両蓄電池2や車両電気負荷3に供給される。なお、車両電気負荷3とは、車両に搭載され、電気で動作する各種の電気機器のことである。
 発電制御装置4は、主に、発電機1の出力電圧及び出力電流を一定に制限する制御器として機能する。
 発電制御装置4は、界磁コイル101に給電する界磁電流を制御する界磁ドライバ401と、界磁ドライバ401がOFF状態の時に界磁電流を還流させる還流ダイオード402とを備える。
 また、発電制御装置4は、比較器406を備えている。比較器406は、発電機1の出力端Aの出力端電圧を抵抗403と404で分圧した値を入力値とする。比較器406は、予め設定された目標電圧値に一致する基準値405と当該入力値との比較を行う。
 比較器406は、入力値が基準値405よりも低い場合には、Low電位を出力する。比較器406の出力は、NOR回路407の一方の入力端子に入力される。NOR回路407の他方の入力端子には、導通率制限部409からの出力が入力される。いま、導通率制限部409の出力を、例えば、Low電位に固定したと仮定する。このとき、比較器406からLow電位が出力されると、NOR回路407はHigh電位を出力する。NOR回路407の出力がHigh電位の場合、界磁ドライバ401はON状態となる。これにより、界磁コイル101へ界磁電流が通電され、発電機1の出力電圧を増加させる。
 一方、比較器406は、入力値が基準値405よりも高い場合には、High電位を出力する。ここで、導通率制限部409の出力をLow電位に固定したと仮定すると、NOR回路407はLow電位を出力する。NOR回路407の出力がLow電位の場合、界磁ドライバ401はOFF状態となる。これにより、界磁コイル101への界磁電流は遮断され、発電機1の出力電圧を減少させる。
 発電制御装置4は、上記動作を繰り返し、界磁ドライバ401をPWM制御することで、発電機1の発電電圧が一定となるように、界磁コイル101に流れる界磁電流量を調整している。
 ここで、抵抗403,404、比較器406、および、基準値405は、発電機1の出力電圧に基づいて界磁コイル101の導通率を決定して界磁ドライバ401を制御することで、発電機1の発電電圧を目標電圧値に調整する電圧制御部を構成している。
 また、発電制御装置4は、外部制御装置5との双方向通信を行うための通信部415を備える。双方向通信方式としては、例えば、1本の配線で双方向通信が可能な通信プロトコルを用いたLIN(Local Interconnect Network)通信が挙げられる。従って、通信部415は、例えば、LIN通信用の配線から構成される。
 さらに、発電制御装置4は、通信部415に接続された信号受信部408及び信号送信部411を備える。信号受信部408には、導通率制限部409が接続されている。信号送信部411には、導通率検出部410が接続されている。
 発電制御装置4は、信号受信部408により、通信部415を介して、外部制御装置5から、電圧制御部が決定した界磁コイルの導通率(以下、「界磁Duty」という)を制限するための界磁Duty制限命令値を受信する。信号受信部408は、受信した界磁Duty制限命令値を導通率制限部409に出力する。導通率制限部409は、界磁Duty制限命令値をD/A変換し、当該界磁Duty制限命令値に応じた界磁DutyのPWM信号を、NOR回路407へ出力する。NOR回路407は、比較器406の出力と導通率制限部409の出力との否定論理和を求めて、当該否定論理和に従って界磁ドライバ401を駆動する。
 このように、導通率制限部409は、NOR回路407と協働して、外部制御装置5から信号受信部408で受信した界磁Duty制限命令値に基づいて、電圧制御部が決定した導通率を界磁Duty制限命令値以下にするように、当該導通率に制限を加える導通率制限部を構成している。
 また、発電制御装置4は、NOR回路407からの出力値に基づいて、自身の界磁Duty値を導通率検出部410で検出する。導通率検出部410は、検出した界磁DutyをA/D変換して、信号送信部411へ出力する。信号送信部411は、入力された界磁Duty情報を、通信部415を介して、外部制御装置5に送信する。
 さらに、発電制御装置4は、発電電圧検知部412と、回転速度検知部413と、発電異常検知部414とを備えている。発電電圧検知部412と回転速度検知部413とは、ステータコイル102に接続されている。また、発電電圧検知部412の出力及び回転速度検知部413の出力は、発電異常検知部414に送信される。
 発電電圧検知部412は、ステータコイル102の相電圧信号の電圧値を検知する。発電電圧検知部412は、検知した電圧値をA/D変換して、発電異常検知部414へ送信する。
 また、回転速度検知部413は、ステータコイル102の相電圧信号の周波数数成分を検知する。回転速度検知部413は、検知した周波数成分をA/D変換して、発電異常検知部414へ送信する。
 発電異常検知部414は、発電電圧検知部412から受信した相電圧信号の電圧値に基づいて、発電機1が過電圧状態か否かを判定する。発電異常検知部414は、相電圧信号の電圧値が、予め設定された閾値電圧以上の場合に、発電機1が過電圧状態であると判定する。
 また、発電異常検知部414は、発電電圧検知部412から受信した相電圧信号の電圧値および回転速度検知部413から受信した相電圧信号の周波数成分に基づいて、発電機1が無発電状態か否かを判定する。発電異常検知部414は、相電圧信号の周波数が発電機1の発電開始回転速度以上で、かつ、相電圧信号の電圧値が上記閾値電圧未満の場合に、発電機1が無発電状態であると判定する。
 以下では、発電機1が過電圧状態、および、発電機1が無発電状態の場合を、まとめて、発電機1の発電異常状態と呼ぶ。
 発電異常検知部414は、発電機1の発電異常状態を検知した場合、信号送信部411に、発電異常情報を出力する。発電異常情報には、どの発電機1で異常が発生したかを示すために、発電機1の固有識別情報IDが含まれている。また、異常の種別を示すための種別情報も発電異常情報に含まれる。信号送信部411は、当該発電異常情報を、通信部415を介して、外部制御装置5に送信する。
 図1に示すように、外部制御装置5は、発電制御装置4からの信号を受信する信号受信部501と、信号受信部501が受信した信号に基づいて発電機1の導通率に関する演算を行う導通率演算部502と、発電制御装置4に対して信号を送信する信号送信部503とを備えている。
 外部制御装置5は、信号受信部501により、n個の発電機1の各発電制御装置4から、界磁Duty情報及び発電異常情報を受信する。信号受信部501は、受信した界磁Duty情報及び発電異常情報を、導通率演算部502へ出力する。導通率演算部502は、信号受信部501で受信した各発電機1の界磁Duty情報に基づいて、各界磁コイル101の界磁Dutyの平均値を求め、当該平均値に基づいて界磁Duty制限命令値を設定する。信号送信部503は、界磁Duty制限命令値を発電制御装置4に送信する。
 また、外部制御装置5は、発電制御装置4から発電異常情報を受信した場合、導通率演算部502による界磁Dutyの平均値の演算のときに、当該発電異常情報に対応する発電機の導通率を除外して演算を行う。
 なお、ここで、発電制御装置4と外部制御装置5とのハードウェア構成について説明する。
 発電制御装置4の信号受信部は受信装置であり、信号送信部は送信装置である。発電制御装置4の界磁ドライバ401、還流ダイオード402、抵抗403,404、基準値405、比較器406、NOR回路407、信号受信部408、導通率制限部409、導通率検出部410、信号送信部411、発電電圧検知部412、回転速度検知部413、発電異常検知部414の各機能は、処理回路により実現される。すなわち、発電制御装置4は、これらの機能を実現するための処理回路を備える。処理回路は、専用のハードウェアであっても、メモリに格納されるプログラムを実行するCPU(Central Processing Unit、中央処理装置、処理装置、演算装置、マイクロプロセッサ、マイクロコンピュータ、プロセッサ、DSPともいう)であってもよい。
 処理回路が専用のハードウェアである場合、処理回路は、例えば、単一回路、複合回路、プログラム化したプロセッサー、並列プログラム化したプロセッサー、ASIC、FPGA、またはこれらを組み合わせたものが該当する。界磁ドライバ401、還流ダイオード402、抵抗403,404、基準値405、比較器406、NOR回路407、信号受信部408、導通率制限部409、導通率検出部410、信号送信部411、発電電圧検知部412、回転速度検知部413、発電異常検知部414の各部の機能それぞれを処理回路で実現してもよいし、各部の機能をまとめて処理回路で実現してもよい。
 処理回路がCPUの場合、上記各部の機能は、ソフトウェア、ファームウェア、またはソフトウェアとファームウェアとの組み合わせにより実現される。ソフトウェアやファームウェアはプログラムとして記述され、メモリに格納される。処理回路は、メモリに記憶されたプログラムを読み出して実行することにより、各部の機能を実現する。すなわち、発電制御装置は、処理回路により実行されるときに、各部の機能を具現する各ステップが結果的に実行されることになるプログラムを格納するためのメモリを備える。また、これらのプログラムは、各部の手順や方法をコンピュータに実行させるものであるともいえる。ここで、メモリとは、例えば、RAM、ROM、フラッシュメモリー、EPROM、EEPROM等の、不揮発性または揮発性の半導体メモリや、磁気ディスク、フレキシブルディスク、光ディスク、コンパクトディスク、ミニディスク、DVD等が該当する。
 なお、上記各部の各機能について、一部を専用のハードウェアで実現し、一部をソフトウェアまたはファームウェアで実現するようにしてもよい。例えば、導通率検出部410、発電電圧検知部412、回転速度検知部413については専用のハードウェアとしての処理回路でその機能を実現するか、あるいは、処理回路がメモリに格納されたプログラムを読み出して実行することによってその機能を実現することが可能である。さらに、発電電圧検知部412は電圧センサから構成してもよく、電圧センサとソフトウェアとの組み合わせから構成してもよい。同様に、回転速度検知部413はレゾルバ等の回転センサから構成してもよく、回転センサとソフトウェアとの組み合わせから構成してもよい。
 このように、処理回路は、ハードウェア、ソフトウェア、ファームウェア、またはこれらの組み合わせによって、上述の各機能を実現することができる。
 外部制御装置5についても、発電制御装置4と同様に、信号受信部501は受信装置であり、信号送信部503は送信装置である。外部制御装置5の導通率演算部502の機能は、処理回路により実現される。すなわち、外部制御装置5は、導通率演算部502の機能を実現するための処理回路を備える。処理回路は、専用のハードウェアであっても、メモリに格納されるプログラムを実行するCPU(Central Processing Unit、中央処理装置、処理装置、演算装置、マイクロプロセッサ、マイクロコンピュータ、プロセッサ、DSPともいう)であってもよい。処理回路が専用のハードウェアである場合も、処理回路がCPUの場合も、上記の発電制御装置4と同様であるため、ここでは、その説明を省略する、また、導通率演算部502の機能について、一部を専用のハードウェアで実現し、一部をソフトウェアまたはファームウェアで実現するようにしてもよい。
 次に、動作について説明する。図2は、外部制御装置5の導通率演算部502の処理の流れを示したフローチャートである。
 ステップS1では、導通率演算部502は、n個の各発電機1の各発電制御装置4から界磁Duty情報を受信し、外部制御装置5に設けられた図示しないメモリ内に格納する。具体的には、ステップS1-1に示すように、発電機1-1の発電制御装置4から受信した界磁Dutyの値を、メモリのアドレス「Duty_発電機1」に記憶する。同様に、発電機1-2の発電制御装置4から受信した界磁Dutyの値を、メモリのアドレス「Duty_発電機2」に記憶する。これを繰り返し、ステップS1-nに示すように、発電機1-nの発電制御装置4から受信した界磁Dutyの値を、メモリのアドレス「Duty_発電機n」に記憶する。
 次に、ステップS2で、導通率演算部502は、メモリに格納された全ての発電機1の界磁Dutyの合算値を、発電機1の総数nで除算して、現在の界磁Dutyの平均値を算出する。導通率演算部502は、算出した平均値を、メモリのアドレス「Duty_ave」に格納する。
 次に、ステップS3で、導通率演算部502は、メモリに格納された各発電機1の界磁Dutyの値を比較し、どの発電機1の界磁Dutyが最小かを判定する。界磁Dutyは発電機1の発電量と比例関係にあるため、界磁Dutyが一番小さいということは、発電量も一番小さいと推測可能である。次に、導通率演算部502は、界磁Dutyが最小の発電機1以外の他の発電機1の発電制御装置4に対して、信号送信部503を介して、算出した平均値と同値の界磁Duty制限命令値を送信する。一方、導通率演算部502は、界磁Dutyが最小の発電機1の発電制御装置4に対しては、界磁Duty制限命令値を送信せずに、無制限状態にしておく。
 ステップS3について、さらに具体的に説明する。ステップS3においては、具体的には、ステップS3-1-1に示すように、まず、発電機1-1の「Duty_発電機1」が最小かを判定する。判定の結果、発電機1-1の「Duty_発電機1」が最小であれば、次のステップに進み、発電機1-2の「Duty_発電機2」が最小かを判定する。一方、判定の結果、発電機1-1の「Duty_発電機1」が最小でなければ、ステップS3-1-2に示すように、発電機1-1の発電制御装置4に対して、発電機1-1の界磁Dutyを「Duty_ave」にする制御を行うように、界磁Duty制限命令値を送信する。これを各発電機に関して順に繰り返しいき、最後に、ステップS3-n-1に示すように、発電機1-nの「Duty_発電機n」が最小かを判定する。判定の結果、そうであれば、そのまま、図2のフローを終了させる。一方、判定の結果、そうでなければ、ステップS3-n-2に示すように、発電機1-nの発電制御装置4に対して、発電機1-nの界磁Dutyを「Duty_ave」にする制御を行うように、界磁Duty制限命令値を送信する。
 ここで、ステップS3において、全ての発電機1に界磁Duty制限命令値を送信しない理由について説明する。仮に、n個の全ての発電機1に界磁Duty制限命令値を送信したと仮定する。このとき、例えば、車両電気負荷3の負荷量が急増した場合、一時的に発電量不足となる。その結果、車両蓄電池2の電圧降下を招き、車両システム全体に影響を及ぼす可能性がある。そこで、本実施の形態では、界磁Dutyが最小の発電機1には、界磁Duty制限命令値による制限を設定しないでおくことで、車両電気負荷3の負荷量が急増した場合においても、界磁Dutyが最小の発電機1が発電量増加に対応可能であるため、車両蓄電池2の電圧降下を回避することができる。
 次に、発電制御装置4が、外部制御装置5から、界磁Duty制限命令値を受信した場合の動作について説明する。
 図3A及び図3Bに、発電機1の発電制御装置4が、外部制御装置5から、界磁Duty制限命令値を受信した場合の界磁ドライバ401のPWM信号状態を示す。図3A及び図3Bにおいては、Duty100%の場合を、High電位固定としている。図3Aが、比較器406の界磁Dutyが、界磁Duty制限命令値を下回る場合を示し、図3Bが、比較器406の界磁Dutyが、界磁Duty制限命令値以上である場合を示している。図3A及び図3Bにおいて、横軸は時間を示し、縦軸は、上から順に、比較器406の出力、導通率制限部409の出力、NOR回路407の出力、および、界磁ドライバ401のON/OFF状態を示す。
 上述したように、比較器406は、発電機1の出力端電圧に応じた入力値が、目標電圧値を示す基準値405よりも低い場合は、Low電位を出力する。また、比較器406は、発電機1の出力端電圧に応じた入力値が、目標電圧値を示す基準値405以上の場合は、High電位を出力する。導通率制限部409は、信号受信部408を介して外部制御装置5から入力された界磁Duty制限命令値に応じたパルス信号を出力する。NOR回路407の出力は、比較器406の出力がLow電位で、かつ、導通率制限部409の出力がLow電位の場合に、High電位となる。また、NOR回路407の出力がHigh電位の場合に、界磁ドライバ401はONする。
 図3Aに示すように、比較器406の界磁Dutyが、界磁Duty制限命令値を下回る場合、発電制御装置4は、比較器406の出力に対して、外部制御装置5からの界磁Duty制限命令値によって、界磁ドライバ401の最大Dutyが制限されている状態となる。
 これに対して、図3Bに示すように、比較器406の界磁Dutyが、界磁Duty制限命令値以上の場合、界磁Duty制限命令値はあくまでの最大値の制限であり、発電機1の界磁Dutyは、比較器406の出力によって決定されるため、発電機1の発電電圧が目標電圧値を超えることはなく、車両電源システムとしての安定性も確保される。
 また、外部制御装置5の導通率演算部502における、図2のステップS2の平均値の格納、並びに、界磁Duty制限命令値の更新は、発電制御装置4と外部制御装置5との間の双方向通信のタイミングに従って行われる。図4に、その通信タイムチャートを示す。双方向通信は、図4に示すように、予め設定された通信周期で行われる。当該通信周期を、図4においては、通信周期#1,#2,・・・として示す。
 また、図4において、符号4001で示される「情報」には、発電機1の界磁Duty情報と発電異常情報とが含まれる。また、符号4002で示される「演算」は、外部制御装置5の導通率演算部502が図2のフローで示される演算を行っていることを示す。また、符号4003で示される「命令」は、外部制御装置5から発電制御装置4に送信される界磁Duty制限命令値を示す。図4に示されるように、各通信周期において、まず、n個の各発電機1の発電制御装置4からの「情報」が外部制御装置5で受信され、外部制御装置5において「演算」が行われ、外部制御装置5から発電制御装置4へ「命令」が送信される。このように、外部制御装置5において、発電機1の発電制御装置4からの信号の受信のタイミングと、発電機1の発電制御装置4への信号の送信のタイミングとを、予め設定しておくことで、通信部415において、受信信号と送信信号との衝突の発生を未然に防ぐことができる。また、この通信周期で、界磁Duty制限命令値が新たに演算されるので、この通信周期は、界磁Duty制限命令値の更新周期となる。
 図5に、外部制御装置5の界磁Duty制限命令値に基づいて発電機1間の発電量バランス制御を実施した場合の各発電機1の発電量推移の一例について示す。図5は、発電機1を3台並列に運転した場合の動作を示している。図5において、3台の発電機1を、それぞれ、発電機a、発電機b、発電機cとして示す。
 図5(a)に示すように、各発電機a,b,cの発電量を示す界磁Dutyの初期状態を、それぞれ、発電機a:90%、発電機b:80%、発電機c:10%とする。
 このとき、各発電機の界磁Dutyの合計値は90%+80%+10%=180%となり、平均値は60%となる。したがって、界磁Duty制限命令値は、60%となる。
 発電機aは界磁Dutyが最小ではないため、外部制御装置5は、発電機aに対して、界磁Duty制限命令値として「60%」を送信する。発電機bも同じく界磁Dutyが最小でないため、外部制御装置5は、発電機bに対して、界磁Duty制限命令値として「60%」を送信する。一方、発電機cは、界磁Dutyが最小値のため、外部制御装置5は、発電機cには界磁Duty制限命令値を送信しないので、発電機cは無制限状態となる。
 これにより、発電機a及びbは、界磁Duty制限命令値による制限がかかった状態のため、図5(b)に示すように、発電機aおよび発電機bの界磁Dutyは60%となる。
 車両の発電要求量を一定とすると、発電機aと発電機bとが担っていた余剰発電量は発電機cが担うこととなる。すなわち、発電機cの発電量(界磁Duty値)は、発電機aの初期値と界磁Duty制限命令値との差分である30%と、発電機bの初期値と界磁Duty制限命令値との差分である20%との、合計50%を担うこととなる。その結果、発電機cの界磁Dutyは、初期値10%に上記の50%が加算されて、60%となる。こうして、各発電機a,b,cの発電量のアンバランスが改善される。
 次に、図6に、車両電気負荷3の負荷量が急増した場合の発電量推移の例について示す。図6は、図5と同様に、発電機1を3台並列に運転した場合の動作を示している。図6において、図5と同様に、3台の発電機1を、それぞれ、発電機a、発電機b、発電機cとして示す。
 図6においては、図6(a)に示すように、各発電機a,b,cの初期状態として、発電機aと発電機bとが、外部制御装置5から界磁Duty制限命令値として「60%」を受信している状態とする。一方、発電機cは、前回の平均演算時に界磁Duty値が最小だったため、界磁Dutyに関し、無制限状態とする。いま、図5(b)で示したように、各発電機a,b,cの発電量のアンバランスが改善されて、発電機a,b,cの界磁Dutyは、すべて、60%に揃っている。
 このとき、車両電気負荷3の負荷量が急増した場合を考える。発電機aとbは外部制御装置からの界磁Duty制限命令値によって界磁Dutyを制限中のため、負荷量が急増した場合においても、界磁Dutyを増加させることはできない。一方、発電機cは、無制限状態のため、図6(b)に示すように、界磁Dutyが急増する。
 発電機cのみが発電量増加分を担うため、一時的にアンバランス状態となる。すなわち、発電機a:60%、発電機b:60%、発電機c:90%となっている。しかしながら、次の更新周期において、界磁Dutyの平均値は増加して「70%」となり、かつ、発電機cの界磁Dutyが最小でなくなる。そのため、発電機cに対して、外部制御装置5から界磁Duty制限命令値「70%」が送信される。一方、発電機aと発電機bとは、界磁Dutyが最小であるため、無制限状態となる。その結果、図6(c)に示されるように、発電機aと発電機bの発電量が増加し、発電機cの発電量が減少して、発電機a,b,c間の発電量のアンバランスも是正される。
 次に、図5及び図6に対する例外的な一例を、図7に示す。図5及び図6においては、3台の発電機1が同一の構成の例を示していた。一方、図7においては、発電機aの界磁Dutyが、他の発電機b,cに比べて、定常的に高い場合について示している。
 図7においても、図5及び図6と同様に、発電機1を3台並列に運転した場合の動作を示している。図7において、3台の発電機1を、それぞれ、発電機a、発電機b、発電機cとして示す。
 図7(a)に示すように、各発電機a,b,cの界磁Dutyの初期値を、それぞれ、発電機a:60%、発電機b:40%、発電機c:20%とする。このとき、界磁Dutyの平均値は40%となり、界磁Duty制限命令値も「40%」となる。
 発電機cは、界磁Dutyが一番小さいため、無制限状態となる。一方、発電機aと発電機bとは、外部制御装置5から、界磁Duty制限命令値「40%」を受けた状態となる。その結果、図7(b)に示すように、発電機a,b,c間の発電量のアンバランスも是正される。
 このとき、車両電気負荷3の負荷量が急増した場合には、発電機aと発電機bとは制限がかかった状態のため、図7(c)に示すように、負荷量の増加分は発電機cが担う。図7(c)では、発電機cの界磁Dutyが、60%増えて、100%となっている。
 次の更新周期で、各発電機a,b,cの界磁Dutyの平均値は、(40%+40%+100%)÷3=180%÷3=60%となる。発電機aと発電機bとは界磁Dutyが最小であるため、発電機cが外部制御装置5から界磁Duty制限命令値「60%」を受信する。このとき、発電機cの前回の界磁Duty値100%と界磁Duty制限命令値60%との差分40%は、定常的に界磁Dutyが高い発電機aが担うことになる。その結果、図7(d)に示すように、発電機aの界磁Dutyが、現在値40%に差分40%が加算されて、80%へ急増する可能性がある。そのため、各発電機a,b,cの界磁Dutyが、増減を繰り返す不安定な状態になる可能性がある。
 このような不安定な界磁Dutyの増減を抑制する方法として、本実施の形態1の変形例における制御のフローチャートを、図8に示す。また、その場合の各発電機の界磁Dutyの推移を図9に示す。各発電機の発電量にバラつきが無い場合には図2のフローの処理で全く問題がないが、各発電機の製造バラつきまたは充電線状態のバラつき等により、発電機間で発電量にバラつきが生じる場合には、図8の変形例におけるフローを実施すればよい。
 図8と図2との相違点は、図8においては、図2のステップS3の代わりに、ステップS3Aを行う点である。すなわち、図8のステップS1及びS2は、図2のステップS1及びS2と同じであるため、ここでは、説明を省略する。図8のステップS3Aも、基本的に、図2のステップS3と同様であるが、図8においては、図2のステップS3-1-2,S3-n-2の代わりに、ステップS3-1-2A,S3-n-2Aを行う点が異なる。図2においては、図2のステップS3-1-2,S3-n-2に示されるように、外部制御装置5からの界磁Duty制限命令値の値が平均値Duty_aveと同値であった。しかしながら、図8においては、ステップS3-1-2A,S3-n-2Aに示されるように、外部制御装置5からの界磁Duty制限命令値の値が、平均値Duty_aveに対して、予め設定された加算値αが加算された値となっている。
 このように、図8においては、外部制御装置5が、各発電機1の界磁Duty情報を受信して、それらの平均値を求めた後、当該平均値に加算値αを加算した値を界磁Duty制限命令値としている。
 図8のフローの動作を、図9を用いて説明する。図9の例では、図9(a)に示すように、各発電機a,b,cの初期値を、図7と同様に、発電機a:60%、発電機b:40%、発電機c:20%とする。
 各発電機a,b,cの界磁Dutyの平均値は40%となり、加算値αを10%とすると、界磁Duty制限命令値は、40%+10%=50%となる。発電機cは、界磁Dutyが最小であるため、無制限状態となる。一方、発電機aと発電機bとは、図9(b)に示すように、外部制御装置5から、界磁Duty制限命令値「50%」を受ける。その結果、発電機aの界磁Dutyは10%減って50%となり、発電機bの界磁Dutyはそのまま40%で、発電機cの界磁Dutyが10%増えて30%となる。
 このとき、図9(c)に示すように、車両電気負荷3の負荷量が例えば界磁Duty60%分だけ急増した場合、当該急増分は発電機cが主に担うことになる。しかしながら、発電機bも界磁Duty制限命令値に対して10%の余力があるため、急増した負荷を発電機bと発電機cとで分担することが可能である。具体的には、発電機bが10%担い、発電機cが60%-10%=50%担う。その結果、発電機cの界磁Dutyは、30%+50%=80%となる。
 次の更新周期で、各発電機a,b,cの界磁Dutyの平均値は60%となる。そのため、界磁Duty制限命令値は、当該平均値に加算値α「10%」を加算して、60%+10%=70%となる。発電機bと発電機cとは、界磁Dutyが最小であるため、無制限状態となる。一方、発電機cは、外部制御装置5から、界磁Duty制限命令値「70%」を受ける。
 発電機cにおいては、図9(c)に示すように、前回の界磁Duty値が80%のため、界磁Duty制限命令値との差分が10%となる。従って、図9(c)から図9(d)への移行時における、発電機cの界磁Duty値の変化量は、10%である。一方、図7においては、図7(c)から図7(d)への移行時における、発電機cの界磁Duty値の変化量は、100%-60%=40%である。すなわち、図9の変化量の方が、図7の変化量よりも小さい。また、界磁Dutyが定常的に高い発電機aにおいても、図9の界磁Duty値の変化量の方が、図7の変化量よりも小さい。すなわち、図9(c)から図9(d)への移行時における、発電機aの界磁Duty値の変化量は、|50%-60%|=10%である。一方、図7においては、図7(c)から図7(d)への移行時における、発電機aの界磁Duty値の変化量は、|40%-80%|=40%である。このように、界磁Dutyが定常的に高い発電機aにおいても、図9の界磁Duty値の変化量の方が、図7の変化量よりも小さいことがわかる。
 このように、本実施の形態に図8に記載のフローを適用することで、図9に示すように、複数の発電機の中の1つの発電機が定常的に界磁Dutyが高い場合においても、各発電機の界磁Dutyの急激な変化を軽減することが可能である。なお、加算値αの値は、上記の説明においては、10%としたが、その場合に限らず、任意の値に適宜決定すればよい。また、図2のフローから図8のフローへの切り替えは、単に、外部制御装置5における導通率演算部502の動作プログラムの切り替えだけでよいため、発電制御装置4及び外部制御装置5における構成を変更する必要はないので、容易に切り替え可能である。
 次に、図10に、外部制御装置5が発電制御装置4から発電異常情報を受信した場合の導通率演算部502の動作のフローチャートを示す。図10と図8との相違点は、図8のステップS1の代わりに、図10においてはステップS1Aを行う点である。従って、ステップS2とステップS3Aについては、図8と同じであるため、ここでは、その説明を省略する。
 また、図10のステップS1Aと図8のステップS1との相違点は、図10のステップS1Aにおいては、ステップS1-1-1およびステップS1-1-2が追加されている点である。
 図10においては、ステップS1Aにおいて、導通率演算部502は、n個の発電機1に関し、発電機1からの発電異常情報の受信の有無を確認する。発電異常情報を送信している発電機1があった場合には、導通率演算部502は、当該発電機1の界磁Duty値をメモリに格納することを禁止するとともに、ステップS2における界磁Duty値の平均化を行う際の発電機の総数にカウントしないようにする。
 ステップS1Aについて、具体的に説明する。まず、導通率演算部502は、ステップS1-1-1において、発電機1-1に関し、発電機1-1からの発電異常情報の受信の有無を確認する。発電機1-1が発電異常情報を送信していた場合には、ステップS1-1-2に進み、そうでなければ、ステップS1-1に進む。ステップS1-1-2では、導通率演算部502は、発電機1-1の界磁Duty値をメモリに格納することを禁止するとともに、ステップS2における界磁Duty値の平均化を行う際の発電機の総数にカウントしないように、現在の発電機1の総数から1を減算する。一方、ステップS1-1では、導通率演算部502は、発電機1-1の界磁Duty値をメモリに格納する。これらの動作を、n個の発電機1に対して順に行う。
 なお、ステップS3Aについては、基本的に、図8のステップS3Aと同じであるが、図10においては、上記のステップS1Aにおいて、発電異常情報を出力している発電機1については、上述のように、界磁Duty値がメモリに格納されていないため、外部制御装置5の制限対象とならず、制限対象から解列された状態にする。その結果、発電異常状態となった発電機以外の発電機については、発電量がバランスされた状態を継続可能となる。
 もし、発電機が発電異常状態のまま、その発電機を発電制御システムの対象に組み込んでしまった場合、無発電状態の発電機は、界磁Duty値が0%となり、その情報を平均化処理に組み込むと、界磁Duty値の平均値が低くなるとともに、無発電状態以外の正常な発電機の界磁Duty値が高いため、外部制御装置5は、正常な発電状態の発電機にのみ制限をかけてしまう。よって、車両の発電要求に対して、全体の発電量が足りずに、車両蓄電池2の電圧低下を招く恐れがある。そのため、本実施の形態においては、発電異常状態となった発電機を、制限対象から解列することで、発電異常となった発電機以外の発電機の挙動として正常な状態が保持される。
 また、発電機1の発電異常状態は、前述の図4に示した通信周期毎に検知しているため、発電異常状態の発電機1が復帰した場合には、次の更新周期から、すぐに、発電制御システムの対象に復帰させることも可能である。
 なお、図10は、図8にステップS1Aを適用させた例を示しているが、その場合に限らず、図2にステップS1Aを適用させてもよいことが言うまでもない。
 次に、外部制御装置5の導通率演算部502の演算処理が異常となった場合について説明する。外部制御装置5の導通率演算部502の演算処理が異常となった場合に想定される異常モードとしては、界磁Duty制限命令値が100%固定となる場合と、界磁Duty制限命令値が0%固定になる場合が考えられる。
 界磁Duty制限命令値が100%となった場合、発電機1の発電制御装置4は、NOR回路407によって、界磁Dutyを決定するため、発電機1の発電量はアンバランスとなるが、車両電源システムとして、過電圧等の異常となることはない。
 一方、界磁Duty制限命令値が0%固定の場合は、発電機1としては無発電状態となる可能性がある。
 そこで、本実施の形態において、例えば、図11に示すように、界磁Duty制限命令値が0%固定となったことを検知するために、低電圧検知部420を設けるようにしてもよい。低電圧検知部420には、比較器406の入力値と同じ値が入力される。すなわち、低電圧検知部420には、発電機1の出力端電圧が抵抗403と404で分圧された値が入力される。低電圧検知部420は、当該値に基づいて、発電機の出力端Aが予め設定された下限閾値よりも低電圧となったことを検知した場合に、当該低電圧を通知する低電圧情報を導通率制限部409へ出力する。
 低電圧検知のための下限閾値としては、設定車両電源システム上、外部制御電圧を含む補機等が正常に動作可能な電圧範囲の下限値に設定しておく。
 導通率制限部409は、低電圧検知部420から低電圧情報を受信した場合、外部制御装置5からの界磁Duty制限命令値を無効化し(出力信号Low電位固定とし)、比較器406の信号のみによって、界磁ドライバ401を制御する。
 このことにより、外部制御装置5からの界磁Duty制限命令値が異常であったとしても、車両電源システムとして、低電圧状態となることを抑制することが可能である。なお、以上のように、低電圧検知部420は、外部制御装置5からの界磁Duty制限命令値が異常であることを検知する命令異常検知部を構成している。
 また、界磁Duty制限命令値を有効とする復帰条件としては、低電圧検知部420が低電圧を検知しなくなり、かつ、界磁Duty制限命令値が予め設定された閾値以上となった場合に、界磁Duty制限命令値を再び有効化し、発電量バランス制御に復帰させる。
 また、外部制御装置5の導通率演算部502の界磁Duty制限命令値の異常モードの他の例として、発電制御装置4において界磁Duty制限命令値が受信できない場合が考えられる。発電制御装置4において、信号受信部408により界磁Duty制限命令値が受信できない場合には、発電制御装置4において、導通率制限部409による制限は行わず、比較器406で決定した界磁Dutyにより、界磁ドライバ401を駆動するようにする。
 以上のように、本実施の形態においては、各発電機1の発電制御装置4が、各発電機1の界磁コイル101の界磁Dutyを外部制御装置5に送信し、外部制御装置5が当該界磁Dutyの平均値を求めて、当該平均値に基づいて、発電制御装置4が決定した界磁コイル101の界磁Dutyを制限するための界磁Duty制限命令値を求めて、当該界磁Duty制限命令値を発電制御装置4に送信することで、発電制御装置4において、各発電機1の発電量を当該界磁Duty制限命令値に従って制限するため、各発電機1間の発電量を均一にすることができる。
 さらに、本実施の形態においては、外部制御装置5の導通率演算部502が、信号受信部501で受信した各発電機1の界磁コイル101の界磁Dutyに基づいて、界磁Dutyが最小の発電機1を「制限対象外の発電機」とし、「制限対象外の発電機」以外の発電機1を「制限対象の発電機」として、「制限対象の発電機」に接続された発電制御装置4に対してのみ、信号送信部503を介して、界磁Duty制限命令値を送信する。このように、本実施の形態においては、界磁Dutyが最小の発電機には制限を設定しないでおくことで、車両の電気負荷量が急増した場合においても、界磁Dutyが最小の発電機が発電量の増加に対応可能であるため、車両蓄電池2の電圧降下を回避することができる。
 1 発電機、2 車両蓄電池、3 車両電気負荷、4 発電制御装置、5 外部制御装置、101 界磁コイル、102 ステータコイル、103 整流器、401 界磁ドライバ、402 還流ダイオード、403,404 抵抗、405 基準値、406 比較器、407 NOR回路、408 信号受信部、409 導通率制限部、410 導通率検出部、411 信号送信部、412 発電電圧検知部、413 回転速度検知部、414 発電異常検知部、415 通信部、420 低電圧検知部、501 信号受信部、502 導通率演算部、503 信号送信部。

Claims (8)

  1.  1つの内燃機関に搭載された複数の発電機を、前記内燃機関により同時に駆動するための発電制御システムであって、
     前記発電制御システムは、
     各前記発電機を制御するための発電制御装置と、
     前記発電制御装置に接続された外部制御装置と
     を備え、
     前記発電制御装置は、
     各前記発電機に設けられた界磁コイルへの界磁電流の通電を制御する界磁ドライバと、
     各前記発電機の出力電圧に基づいて前記界磁コイルの導通率を決定して前記界磁ドライバを制御することで、各前記発電機の発電電圧を目標電圧値に調整する電圧制御部と、
     各前記発電機の前記界磁コイルの導通率を検出する導通率検出部と、
     前記導通率検出部で検出された前記導通率を前記外部制御装置に送信する第1の信号送信部と、
     前記外部制御装置から、前記電圧制御部の前記導通率を制限する命令値を受信する第1の信号受信部と、
     前記第1の信号受信部で受信した前記命令値に基づいて、前記電圧制御部が決定した前記導通率を前記命令値以下にするように前記導通率に制限を加える導通率制限部と
     を備え、
     前記外部制御装置は、
     前記発電制御装置から、前記導通率検出部で検出した各前記発電機の前記界磁コイルの前記導通率を受信する第2の信号受信部と、
     前記第2の信号受信部で受信した各前記発電機の前記界磁コイルの前記導通率の平均値を求め、前記平均値に基づいて、前記命令値を設定する導通率演算部と、
     前記導通率演算部が設定した前記命令値を、前記発電制御装置に送信する第2の信号送信部と
     を備え、
     前記外部制御装置の前記導通率演算部は、前記第2の信号受信部で受信した各前記発電機の前記界磁コイルの前記導通率に基づいて、前記導通率が最小の発電機を制限対象外の発電機とし、前記制限対象外の発電機以外の前記発電機を制限対象の発電機として、前記制限対象の発電機に接続された前記発電制御装置に対してのみ、前記第2の信号送信部を介して、前記命令値を送信する、
     発電制御システム。
  2.  前記外部制御装置の前記導通率演算部は、前記命令値を、前記平均値と同じ値に設定する、
     請求項1に記載の発電制御システム。
  3.  前記外部制御装置の前記導通率演算部は、前記命令値を、前記平均値に対して予め設定された加算値を加算した値に設定する、
     請求項1に記載の発電制御システム。
  4.  前記発電制御装置は、
     各前記発電機に設けられたステータコイルの相電圧および周波数の少なくともいずれか一方に基づいて、各前記発電機が発電異常状態か否かを判定して、発電異常状態の発電機が有った場合には、当該発電機の発電異常状態を通知する発電異常情報を出力する発電異常検知部
     をさらに備え、
     前記外部制御装置は、前記発電異常検知部からの前記発電異常情報を前記第1の信号送信部を介して受信した場合に、前記導通率演算部により前記導通率の前記平均値の演算を行うときに前記発電異常情報に対応する発電機の導通率を除外して前記平均値の演算を行うとともに、前記発電異常情報に対応する発電機を前記制限対象の発電機から除外する、
     請求項1から3までのいずれか1項に記載の発電制御システム。
  5.  前記発電制御装置は、前記外部制御装置から前記命令値を受信しない場合に、前記導通率制限部による前記導通率の制限を行わずに、前記電圧制御部が決定した前記導通率に基づいて前記界磁ドライバを制御する、
     請求項1から4までのいずれか1項に記載の発電制御システム。
  6.  前記発電制御装置は、
     前記外部制御装置からの前記命令値が異常であることを検知する命令異常検知部
     をさらに備え、
     前記命令異常検知部が、前記外部制御装置からの前記命令値の異常を検知した場合に、前記導通率制限部による前記導通率の制限を行わずに、前記電圧制御部が決定した前記導通率に基づいて前記界磁ドライバを制御する、
     請求項1から5までのいずれか1項に記載の発電制御システム。
  7.  発電機に接続され、前記発電機を制御する発電制御装置であって、
     前記発電機は、他の発電機とともに1つの内燃機関に搭載され、前記内燃機関により他の発電機と同時に駆動されるものであって、
     前記発電制御装置は、
     前記発電機に設けられた界磁コイルへの界磁電流の通電を制御する界磁ドライバと、
     前記発電機の出力電圧に基づいて前記界磁コイルの導通率を決定して前記界磁ドライバを制御することで、各前記発電機の発電電圧を目標電圧値に調整する電圧制御部と、
     前記発電機の前記界磁コイルの導通率を検出する導通率検出部と、
     前記導通率検出部で検出された前記導通率を外部に送信する信号送信部と、
     前記信号送信部から外部に送信した前記導通率の平均値に基づいて設定される前記電圧制御部の前記導通率を制限する命令値を外部から受信する信号受信部と、
     前記信号受信部で受信した前記命令値に基づいて、前記電圧制御部が決定した前記導通率を前記命令値以下にするように前記導通率に制限を加える導通率制限部と
     を備えた、
     発電制御装置。
  8.  発電機を制御する発電制御装置に接続されて用いられる外部制御装置であって、
     前記発電機は複数個設置され、前記複数個の前記発電機は1つの内燃機関に搭載され、前記内燃機関により同時に駆動されるものであって、
     前記外部制御装置は、
     前記発電制御装置から各前記発電機の界磁コイルの導通率を受信する信号受信部と、
     前記信号受信部で受信した各前記発電機の前記界磁コイルの前記導通率の平均値を求めて、前記発電制御装置が決定した前記界磁コイルの導通率を制限するための命令値を前記平均値に基づいて設定する導通率演算部と、
     前記導通率演算部で求めた前記命令値を、前記発電制御装置に送信する信号送信部と
     を備え、
     前記導通率演算部は、前記信号受信部で受信した各前記発電機の前記界磁コイルの前記導通率に基づいて、前記導通率が最小の発電機を制限対象外の発電機とし、前記制限対象外の発電機以外の前記発電機を制限対象の発電機として、前記制限対象の発電機に接続された前記発電制御装置に対してのみ、前記信号送信部を介して、前記命令値を送信する、
     外部制御装置。
PCT/JP2016/082589 2016-11-02 2016-11-02 発電制御システム、発電制御装置、および、外部制御装置 WO2018083755A1 (ja)

Priority Applications (4)

Application Number Priority Date Filing Date Title
US16/342,007 US10924045B2 (en) 2016-11-02 2016-11-02 Power generation control system, power generation control device, and external control device
PCT/JP2016/082589 WO2018083755A1 (ja) 2016-11-02 2016-11-02 発電制御システム、発電制御装置、および、外部制御装置
EP16920583.8A EP3537598A4 (en) 2016-11-02 2016-11-02 POWER GENERATION CONTROL SYSTEM, POWER GENERATION CONTROL DEVICE AND EXTERNAL CONTROL DEVICE
JP2018548501A JP6710287B2 (ja) 2016-11-02 2016-11-02 発電制御システム、発電制御装置、および、外部制御装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2016/082589 WO2018083755A1 (ja) 2016-11-02 2016-11-02 発電制御システム、発電制御装置、および、外部制御装置

Publications (1)

Publication Number Publication Date
WO2018083755A1 true WO2018083755A1 (ja) 2018-05-11

Family

ID=62075893

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2016/082589 WO2018083755A1 (ja) 2016-11-02 2016-11-02 発電制御システム、発電制御装置、および、外部制御装置

Country Status (4)

Country Link
US (1) US10924045B2 (ja)
EP (1) EP3537598A4 (ja)
JP (1) JP6710287B2 (ja)
WO (1) WO2018083755A1 (ja)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2758996C1 (ru) * 2020-12-29 2021-11-08 Публичное акционерное общество "ОДК - Уфимское моторостроительное производственное объединение" (ПАО "ОДК-УМПО") Способ управления трехфазным синхронным генератором

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20060208709A1 (en) * 2005-03-17 2006-09-21 Herbert Labitzke Method and device for providing the supply voltage for the loads of a vehicle on-board electrical system, using a plurality of generators
JP2009213222A (ja) * 2008-03-03 2009-09-17 Mitsubishi Electric Corp 車両用発電制御装置
JP2014230310A (ja) * 2013-05-20 2014-12-08 株式会社デンソー 車両用発電装置
WO2016079800A1 (ja) * 2014-11-18 2016-05-26 三菱電機株式会社 発電機システム、発電機制御装置および発電機システムの発電バランス制御方法

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3997984B2 (ja) * 2003-12-08 2007-10-24 株式会社デンソー 車両用発電制御装置
US7298056B2 (en) * 2005-08-31 2007-11-20 Integrated Power Technology Corporation Turbine-integrated hydrofoil
EP2613436B1 (en) 2010-08-30 2020-04-01 Mitsubishi Electric Corporation Power generation controller
US9467080B2 (en) * 2014-08-13 2016-10-11 Kohler, Co. Protective functions for parallel generators

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20060208709A1 (en) * 2005-03-17 2006-09-21 Herbert Labitzke Method and device for providing the supply voltage for the loads of a vehicle on-board electrical system, using a plurality of generators
JP2009213222A (ja) * 2008-03-03 2009-09-17 Mitsubishi Electric Corp 車両用発電制御装置
JP2014230310A (ja) * 2013-05-20 2014-12-08 株式会社デンソー 車両用発電装置
WO2016079800A1 (ja) * 2014-11-18 2016-05-26 三菱電機株式会社 発電機システム、発電機制御装置および発電機システムの発電バランス制御方法

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See also references of EP3537598A4 *

Also Published As

Publication number Publication date
EP3537598A1 (en) 2019-09-11
JP6710287B2 (ja) 2020-06-17
US20190253011A1 (en) 2019-08-15
JPWO2018083755A1 (ja) 2019-02-21
US10924045B2 (en) 2021-02-16
EP3537598A4 (en) 2019-11-27

Similar Documents

Publication Publication Date Title
US8547071B2 (en) Rotary electric machine improved to carry out load-dump protection
JP3889758B2 (ja) ステアリング制御装置
CN100568704C (zh) 用于控制洗衣机中的电动机的装置和方法
JP4017637B2 (ja) 車両用発電機の制御装置
US10079491B2 (en) Dispersed power supply system and power conditioner
US9122259B2 (en) Multi-axis motor driving system and motor driving apparatus
JP5434873B2 (ja) 車両用回転電機
JP2019198139A (ja) 電力変換器の制御回路
KR101511698B1 (ko) 설치형 충전 시스템
JP5478190B2 (ja) Dcdcコンバータシステム
KR20170125699A (ko) 모터 회생의 관리
WO2018083755A1 (ja) 発電制御システム、発電制御装置、および、外部制御装置
US11984723B2 (en) Multi-mode power supply system
JP5955209B2 (ja) 電力変換システムの故障検知装置
JP2007205687A (ja) 空気調和機の電源システム
JPWO2015125214A1 (ja) モータ制御装置及びモータ制御方法
JP2014165983A (ja) 車両用回転電機
JP5253073B2 (ja) Dc/dcコンバータ及び電源システム
JP6218966B2 (ja) 発電機システム、発電機制御装置および発電機システムの発電バランス制御方法
JP2010167991A (ja) 電子制御ユニット、励磁電流制御方法
JP7370775B2 (ja) 電力変換装置、および電力変換装置の制御方法
JP6340913B2 (ja) 制御装置及び制御方法
US10374509B2 (en) Control circuit for power converter
JP5383919B2 (ja) 発電制御装置
JP7278231B2 (ja) 電動機駆動装置及び状態検出方法

Legal Events

Date Code Title Description
ENP Entry into the national phase

Ref document number: 2018548501

Country of ref document: JP

Kind code of ref document: A

121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 16920583

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

ENP Entry into the national phase

Ref document number: 2016920583

Country of ref document: EP

Effective date: 20190603