WO2018074272A1 - 冷凍装置 - Google Patents

冷凍装置 Download PDF

Info

Publication number
WO2018074272A1
WO2018074272A1 PCT/JP2017/036527 JP2017036527W WO2018074272A1 WO 2018074272 A1 WO2018074272 A1 WO 2018074272A1 JP 2017036527 W JP2017036527 W JP 2017036527W WO 2018074272 A1 WO2018074272 A1 WO 2018074272A1
Authority
WO
WIPO (PCT)
Prior art keywords
refrigerant
cooling
cooling unit
defrosting
evaporator
Prior art date
Application number
PCT/JP2017/036527
Other languages
English (en)
French (fr)
Inventor
桑原 修
森 徹
對比地 亮佑
Original Assignee
パナソニックIpマネジメント株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by パナソニックIpマネジメント株式会社 filed Critical パナソニックIpマネジメント株式会社
Publication of WO2018074272A1 publication Critical patent/WO2018074272A1/ja

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B1/00Compression machines, plants or systems with non-reversible cycle
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B40/00Subcoolers, desuperheaters or superheaters
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B47/00Arrangements for preventing or removing deposits or corrosion, not provided for in another subclass
    • F25B47/02Defrosting cycles
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25DREFRIGERATORS; COLD ROOMS; ICE-BOXES; COOLING OR FREEZING APPARATUS NOT OTHERWISE PROVIDED FOR
    • F25D11/00Self-contained movable devices, e.g. domestic refrigerators
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25DREFRIGERATORS; COLD ROOMS; ICE-BOXES; COOLING OR FREEZING APPARATUS NOT OTHERWISE PROVIDED FOR
    • F25D21/00Defrosting; Preventing frosting; Removing condensed or defrost water
    • F25D21/06Removing frost

Definitions

  • the present invention relates to a refrigeration apparatus for cooling a showcase or the like.
  • Patent Document 1 an apparatus that continuously performs a cooling operation with another cooler while a defrosting operation is performed with some coolers is known (for example, Patent Document 1).
  • Patent Document 1 a part of the liquid refrigerant once condensed is branched, and heat exchange and decompression are performed using a heat exchanger and an expansion valve, thereby specifying a high-temperature gas refrigerant. It is introduced into the evaporator and defrosted.
  • Patent Document 1 In order to continue the cooling operation with other coolers while the defrosting operation is performed in some coolers, in the case of Patent Document 1, it is necessary to newly provide a heat exchanger and an expansion valve. In addition, there is a problem that the configuration of the piping becomes complicated. Therefore, the present invention does not provide a new heat exchanger or expansion valve, and does not complicate the configuration of the piping, while cooling with other coolers during defrosting operation in some coolers. An object is to provide a refrigeration apparatus capable of continuing operation.
  • the present invention provides a refrigeration apparatus in which a plurality of cooling units each having an expansion valve and an evaporator are connected in parallel to a refrigerator unit, the downstream side of the evaporator of one cooling unit; It has a defrosting liquid pipe that connects the upstream side of the expansion valve of the other cooling unit, and while defrosting the evaporator of one cooling unit with the refrigerant heat at the outlet of the refrigerator unit, it is supercooled by this defrosting It is characterized in that a refrigerant processing operation is possible in which the obtained refrigerant is introduced into an evaporator of another cooling unit via a defrosting liquid pipe.
  • an inlet on-off valve is provided upstream of the expansion valve of the cooling unit, and an outlet on-off valve is provided downstream of the evaporator. And an outlet on / off valve and an inlet on / off valve and an expansion valve of another cooling unit are connected.
  • the present invention is characterized in that, in the refrigeration apparatus, at least one of the other cooling units simultaneously performs a cooling operation.
  • the present invention is characterized in that in the refrigeration apparatus, the cooling unit that performs the defrosting operation is subjected to transition control.
  • the present invention is characterized in that, in the refrigeration apparatus, the cooling unit that performs the refrigerant processing operation is subjected to transition control.
  • the present invention is characterized in that transition control is performed on the cooling unit that performs a defrosting operation, the cooling unit that performs a refrigerant processing operation, and the cooling unit that performs a cooling operation.
  • the present invention is characterized in that, in the above refrigerating apparatus, when the defrosting capability of the evaporator of the one cooling unit is insufficient, the outlet refrigerant pressure and the outlet refrigerant temperature of the refrigerator unit are increased.
  • a refrigerant process in which a plurality of cooling units are connected by a defrosting liquid pipe so that the refrigerant after defrosting is decompressed and evaporated to be introduced into a compressor without providing a new device. You can drive.
  • FIG. 1 is a diagram illustrating a refrigerant circuit of a refrigeration apparatus.
  • FIG. 2 is a diagram illustrating a refrigerant circuit of a cooling unit included in the refrigeration apparatus and a refrigerant flow in an operation mode V.
  • FIG. 3 is a diagram illustrating a transition example of the operation mode of the refrigeration apparatus.
  • FIG. 4 is a diagram illustrating a refrigerant flow in an operation mode I.
  • FIG. 5 is a diagram illustrating a refrigerant flow in an operation mode II.
  • FIG. 6 is a diagram showing a refrigerant flow in the operation mode III.
  • FIG. 7 is a diagram showing a refrigerant flow in an operation mode IV.
  • a first invention is a refrigeration apparatus in which a plurality of cooling units having an expansion valve and an evaporator are connected in parallel to a refrigerator unit, and the expansion of another cooling unit and the downstream side of the evaporator of one cooling unit.
  • a defrosting liquid pipe connecting the upstream side of the valve was introduced.
  • an inlet on-off valve is provided upstream of the expansion valve of the cooling unit, and an outlet on-off valve is provided downstream of the evaporator.
  • the defrosting liquid pipe connects between the evaporator and the outlet on / off valve of one cooling unit and between the inlet on / off valve and the expansion valve of the other cooling unit.
  • the refrigeration apparatus can control the inflow of the refrigerant into the defrosting liquid pipe by opening and closing the inlet on-off valve and the outlet on-off valve.
  • a third aspect of the present invention there are a plurality of the other cooling units, and at least one of the other cooling units simultaneously performs a cooling operation. As a result, the cooling operation can be performed simultaneously.
  • transition control is performed on the cooling unit that performs the defrosting operation. Thereby, all the cooling units can be defrosted in order.
  • transition control of the cooling unit that performs the refrigerant processing operation is performed. Thereby, all the cooling units can be operated in the refrigerant processing in order.
  • transition control is performed on the cooling unit that performs the defrosting operation, the cooling unit that performs the refrigerant processing operation, and the cooling unit that performs the cooling operation. Thereby, all the cooling units can be sequentially operated for defrosting, refrigerant treatment, and cooling.
  • the seventh invention relates to the outlet refrigerant pressure and the outlet refrigerant of the refrigerator unit when the defrosting capacity of the evaporator of the cooling unit is insufficient. It was possible to raise the temperature. For this reason, even under conditions such as a decrease in the outside air temperature, a refrigerant temperature sufficient for defrosting can be obtained.
  • FIG. 1 is a diagram showing a refrigerant circuit of the refrigeration apparatus 1 when there are four cooling units 3 (cooling units 3A to 3D).
  • the refrigeration apparatus 1 includes a refrigerator unit 10 and a plurality of cooling units 3 (four refrigeration showcases in the present embodiment).
  • a high-pressure pipe 4 extends from the refrigerator unit 10, and the high-pressure pipe 4 branches into four and is connected to each of the four cooling units 3 on a one-to-one basis. Yes.
  • FIG. 1 is a diagram showing a refrigerant circuit of the refrigeration apparatus 1 when there are four cooling units 3 (cooling units 3A to 3D).
  • the refrigeration apparatus 1 includes a refrigerator unit 10 and a plurality of cooling units 3 (four refrigeration showcases in the present embodiment).
  • a high-pressure pipe 4 extends from the refrigerator unit 10, and the high-pressure pipe 4 branches into four and is connected to each of the four cooling units 3 on a one-to-one basis. Yes.
  • FIG. 1 is a diagram showing a refrigerant circuit of
  • the low-pressure pipe 5 extends from the refrigerator unit 10, and similarly to the high-pressure pipe 4, the low-pressure pipe 5 branches into four and is connected to each of the four cooling units 3 on a one-to-one basis. ing. As described above, the cooling unit 3 is connected in parallel to the refrigerator unit 10 via the high-pressure pipe 4 and the low-pressure pipe 5 as shown in FIG.
  • the refrigeration apparatus 1 further includes a control device 100, which will be described later.
  • carbon dioxide refrigerant is used as the refrigerant, but the present invention is not limited to this, and various refrigerants can be used.
  • the refrigerator unit 10 includes a compressor 11 that performs a compression operation in two stages, a heat exchanger 12 for heat dissipation, and an oil separator 24.
  • This heat dissipation heat exchanger 12 releases the heat of the refrigerant passing through the inside to the outside.
  • a heat exchanger 12 for heat dissipation is connected to the compressor 11 via a refrigerant pipe 13.
  • the heat exchanger 12 for heat dissipation includes a gas cooler 14, an intercooler 15, and a blower fan 16. And having.
  • the compressor 11 is provided with a first suction port 20 and a first discharge port 21 in the first-stage compression mechanism, respectively, and a second suction port 22 and a second-stage compression mechanism in the second-stage compression mechanism.
  • a second discharge port 23 is provided.
  • the first suction port 20 of the compressor 11 sucks the refrigerant sent from the plurality of cooling units 3 through the refrigerant pipe 13 and compresses it to an intermediate pressure by the first-stage compression mechanism. Thus, it is provided to discharge from the first discharge port 21. Further, as shown in FIG.
  • the first discharge port 21 of the compressor 11 is connected to the inlet side of the intercooler 15 via the refrigerant pipe 17, and the outlet side of the intercooler 15 is connected via the refrigerant pipe 18.
  • the second suction port 22 of the compressor 11 is connected.
  • the second discharge port 23 of the compressor 11 is connected to an oil separator 24 via a refrigerant pipe 19, and the oil separator 24 is connected to the gas cooler 14 via a refrigerant pipe 28. Yes.
  • the oil separator 24 separates oil in the refrigerant, and the oil separator 24 is connected to an intermediate stage of the compressor 11 via an oil pipe 25.
  • the refrigerant discharged from the first discharge port 21 of the compressor 11 flows into the intercooler 15 through the refrigerant pipe 17 as shown in FIG.
  • the refrigerant flowing in is cooled by exchanging heat with the outside air by operating the blower fan 16 in the intercooler 15, and returned to the second suction port 22 of the compressor 11 through the refrigerant pipe 18.
  • the returned refrigerant is compressed by the compressor 11 to a required pressure by the second-stage compression mechanism, discharged from the second discharge port 23, and sent to the gas cooler 14 through the oil separator 24.
  • the oil separator 24 is configured to separate oil in the refrigerant and return the separated oil to the compressor 11 via the oil pipe 25.
  • a check valve 27 is provided in the middle of the refrigerant pipe 19 connected to the second discharge port 23 of the compressor 11.
  • the gas cooler 14 cools the refrigerant sent from the compressor 11 by exchanging heat with the outside air by the blower fan 16. However, since the carbon dioxide refrigerant is not condensed, it is in a supercritical state. It is designed to be sent as high-pressure gas.
  • an outlet service valve 30 for sending the refrigerant to the evaporator 7 of the cooling unit 3 is connected to the refrigerant pipe 29 on the outlet side of the gas cooler 14.
  • an inlet service valve 31 for returning the refrigerant from the evaporator 7 of the cooling unit 3 is connected to the refrigerant pipe 13 connected to the first suction port 20 of the compressor 11 as shown in FIG. Yes.
  • outlet service valve 30 is connected to the evaporators 7 of the plurality of cooling units 3 via expansion valves 8 as shown in FIG.
  • the outlet side of the evaporator 7 is connected to an inlet service valve 31 as shown in FIG.
  • FIG. 2 is a diagram showing details of the refrigerant circuit of the cooling unit 3 of FIG.
  • FIG. 2 is a diagram illustrating in detail the circuit corresponding to the outlet service valve 30, the evaporator 7, and the inlet service valve 31 in FIG. 1.
  • Each cooling unit 3 has an evaporator 7.
  • the upstream side of the evaporator 7 is connected to the high-pressure pipe 4 by a branch pipe 35 (branch pipes 35A to 35D).
  • the branch pipe 35 is provided with an inlet on-off valve 33 and an expansion valve 8 in order from the upstream side.
  • the downstream side of the evaporator 7 is connected to the low pressure pipe 5 by a branch pipe 36 (branch pipes 36A to 36D).
  • the branch pipe 36 is provided with an outlet opening / closing valve 34.
  • Each cooling unit 3 is provided with an internal heat exchanger 43 with the evaporator 7 interposed therebetween.
  • the internal heat exchanger 43 includes a first heat exchange unit 37 through which a refrigerant flows and a second heat exchange unit 38.
  • the first heat exchange unit 37 is provided between the inlet on-off valve 33 and the expansion valve 8, guides the refrigerant that has passed through the inlet on-off valve 33 to the internal heat exchanger 43, and then introduces the refrigerant into the expansion valve 8.
  • the second heat exchange unit 38 is provided between the evaporator 7 and the outlet opening / closing valve 34, guides the refrigerant that has passed through the evaporator 7 to the internal heat exchanger 43, and then introduces the refrigerant into the outlet opening / closing valve 34.
  • the internal heat exchanger 43 exchanges heat between the refrigerant flowing through the first heat exchange unit 37 and the refrigerant flowing through the second heat exchange unit 38.
  • the refrigerant in the first heat exchange unit 37 is cooled, and the refrigerant in the second heat exchange unit 38 is heated.
  • the cooling capacity of the evaporator 7 is increased as compared with the case where there is no internal heat exchanger.
  • the temperature of the refrigerant flowing through the branch pipe 36 increases, so that the branch pipe 36 is less likely to condense. Further, the cooling efficiency of the cooling unit 3 can be increased.
  • branch pipe 39 (branch pipes 39A to 39D) is connected between the inlet on-off valve 33 and the expansion valve 8 of each cooling unit 3, and the other end of each branch pipe 39 is connected to the defrosting liquid pipe 9. It is connected to the.
  • Each branch pipe 39 is provided with a check valve 40, and the refrigerant flows only from the defrosting liquid pipe 9 toward the evaporator 7.
  • branch pipe 41 (branch pipes 41A to 41D) is connected between the evaporator 7 and the outlet on / off valve 34 of each cooling unit 3, and the other end of each branch pipe 41 is connected to a defrosting liquid. Connected to tube 9.
  • Each branch pipe 41 is also provided with a check valve 42, and the refrigerant flows only from the evaporator 7 toward the defrosting liquid pipe 9.
  • the refrigeration apparatus 1 includes a control device 100 that controls the entire refrigeration apparatus 1.
  • This control device 100 controls the opening / closing of each inlet opening / closing valve 33 and each outlet opening / closing valve 34, the opening control of each expansion valve 8, the rotation control of the blower fan 16 for cooling the gas cooler 14, and the compressor 11 Perform pressure control.
  • the control device 100 may be provided in either the refrigerator unit 10 or the plurality of cooling units 3 or may be provided outside the refrigerator device 1.
  • FIG. 3 is a diagram illustrating a transition example of the operation mode of the refrigeration apparatus 1 in the present embodiment.
  • the control device 100 can operate the refrigeration apparatus 1 in five operation modes I to V.
  • the operation mode V all the cooling units 3 (cooling units 3A to 3D) are cooled.
  • the cooling unit 3A is in the defrosting operation
  • the cooling unit 3B is in the refrigerant processing operation
  • the cooling unit 3C is in the refrigerant processing operation
  • the cooling unit 3D is in the cooling operation.
  • the defrosting operation transitions to the cooling unit 3B, and hereinafter, the cooling unit 3C is the refrigerant processing operation, the cooling unit 3D is the refrigerant processing operation, and the cooling unit 3A is the cooling operation.
  • the defrosting operation transitions to the cooling unit 3C, and hereinafter, the cooling unit 3D is the refrigerant processing operation, the cooling unit 3A is the refrigerant processing operation, and the cooling unit 3B is the cooling operation.
  • the defrosting operation transitions to the cooling unit 3D, and thereafter, the cooling units 3A and 3B are operated as the refrigerant processing operation, and the cooling unit 3C is operated as the cooling operation.
  • rotation operation is controlled.
  • the operation modes I to V are one embodiment, and are not limited to this operation mode.
  • FIG. 2 is a diagram showing the refrigerant flow in the operation mode V in which all the cooling units 3 are cooled.
  • a pipe indicated by a thick line is a pipe through which a refrigerant flows
  • a pipe indicated by a thin line is a pipe through which no refrigerant flows.
  • Each expansion valve 8 has an opening degree at which the degree of superheat of the refrigerant at the outlet of the evaporator 7 can be controlled to a predetermined target value.
  • the high-temperature and high-pressure refrigerant discharged from the compressor 11 in the refrigerator unit 10 radiates heat to the outside air by the gas cooler 14, and then flows into the respective cooling units 3 through the high-pressure pipe 4.
  • the high-pressure refrigerant that has flowed into the cooling unit 3 flows into the expansion valve 8 via the inlet opening / closing valve 33.
  • the refrigerant is decompressed by the expansion valve 8 and flows into the evaporator 7 as a low-pressure refrigerant.
  • the low-pressure refrigerant flowing into the evaporator 7 exchanges heat with the air in the cooling unit 3.
  • the low-pressure refrigerant flows out of each cooling unit 3 through the outlet opening / closing valve 34, passes through the low-pressure pipe 5, and is sucked into the compressor 11 in the refrigerator unit 10 again.
  • the refrigeration apparatus 1 can cool the air in each cooling unit 3 by circulating the refrigerant.
  • the refrigerant flows through the first heat exchange unit 37 and the second heat exchange unit 38, the refrigerant flowing through the first heat exchange unit 37, and the refrigerant flowing through the second heat exchange unit 38 Exchange heat.
  • the refrigerant in the first heat exchange unit 37 is cooled, and the refrigerant in the second heat exchange unit 38 is heated.
  • the cooling capacity of the evaporator 7 is increased, the condensation of the branch pipe 36 is less likely, and the cooling efficiency of the cooling unit 3 can be increased.
  • frost gradually accumulates in each evaporator 7.
  • the cooling capacity of the refrigeration apparatus 1 is significantly reduced. For this reason, the defrost operation of any one of the cooling units 3 is performed.
  • the cooling unit 3 to be defrosted is changed in four operation modes I to V and is rotated.
  • one cooling unit 3A is defrosted, two cooling units 3B and 3C are subjected to a refrigerant processing operation, and the remaining cooling units 3D are cooled.
  • the refrigerant processing operation at this time can be said to be an aspect of the cooling operation.
  • the inlet on-off valve 33 is opened, but the outlet on-off valve 34 is closed. Further, the expansion valve 8 is fully opened, and the circulating refrigerant is not decompressed.
  • the high-pressure refrigerant supplied from the refrigerator unit 10 flows into the cooling unit 3 ⁇ / b> A during the defrosting operation, it flows into the evaporator 7 through the inlet opening / closing valve 33 and the expansion valve 8 without being depressurized.
  • the flowing refrigerant is supercooled by melting frost adhering to the evaporator 7.
  • the cooling unit 3A during the defrosting operation since the outlet on / off valve 34 is closed, the high-pressure refrigerant flowing out of the evaporator 7 flows into the defrosting liquid pipe 9 through the branch pipe 41. . Further, during the defrosting operation, since the outlet on-off valve 34 is closed, the heat exchange of the refrigerant by the internal heat exchanger 43 is not performed.
  • two cooling units 3B and 3C perform the refrigerant processing operation.
  • the inlet on-off valve 33 is closed and the outlet on-off valve 34 is opened.
  • the expansion valve 8 has an opening at which the degree of superheat of the refrigerant at the outlet of the evaporator 7 can be controlled to a predetermined target value.
  • the refrigerant from the refrigerator unit 10 does not flow in because the inlet opening / closing valve 33 is closed.
  • the high-pressure refrigerant discharged from the cooling unit 3A during the defrosting operation flows into the cooling units 3B and 3C during the refrigerant treatment operation through the branch pipes 39B and 39C after passing through the defrosting liquid pipe 9. Will come.
  • the high-pressure refrigerant that has flowed into the cooling units 3B and 3C during the refrigerant processing operation is decompressed by the expansion valve 8 and flows into the evaporator 7 as low-pressure refrigerant.
  • the low-pressure refrigerant flowing into the evaporator 7 exchanges heat with the air in the cooling units 3B and 3C.
  • the low-pressure refrigerant flows out of the cooling units 3B and 3C through the opened outlet opening / closing valve 34, passes through the low-pressure pipe 5, and is sucked into the compressor 11 in the refrigerator unit 10 again. Even during the refrigerant processing operation, the inlet on-off valve 33 is closed, so that heat exchange of the refrigerant by the internal heat exchanger 43 is not performed.
  • the refrigerant supercooled along with the defrosting passes through the defrosting liquid pipe 9 and the cooling unit 3B in the refrigerant processing operation. It flows into 3C. Since the refrigerant that has flowed in is changed from the high pressure state to the low pressure state by the cooling units 3B and 3C during the refrigerant processing operation, the refrigerant can be sucked into the compressor 11 in the refrigerator unit 10 again.
  • the remaining cooling unit 3D is in the cooling operation.
  • the inlet on / off valve 33 and the outlet on / off valves 34 are opened.
  • the expansion valve 8 has an opening degree at which the degree of superheat of the refrigerant at the outlet of the evaporator 7 can be controlled to a predetermined target value.
  • the high-temperature and high-pressure refrigerant discharged from the compressor 11 in the refrigerator unit 10 radiates heat to the outside air by the gas cooler 14, and then flows into the cooling unit 3D through the high-pressure pipe 4.
  • the high-pressure refrigerant that has flowed into the cooling unit 3 ⁇ / b> D flows into the expansion valve 8 through the inlet opening / closing valve 33.
  • the refrigerant is decompressed by the expansion valve 8 and flows into the evaporator 7 as a low-pressure refrigerant.
  • the low-pressure refrigerant flowing into the evaporator 7 exchanges heat with the air in the cooling unit 3.
  • the low-pressure refrigerant flows out of each cooling unit 3 through the outlet opening / closing valve 34, passes through the low-pressure pipe 5, and is sucked into the compressor 11 in the refrigerator unit 10 again.
  • the refrigerant flows through the first heat exchange unit 37 and the second heat exchange unit 38, the refrigerant flowing through the first heat exchange unit 37, and the refrigerant flowing through the second heat exchange unit 38. And heat exchange.
  • the refrigerant in the first heat exchange unit 37 is cooled, and the refrigerant in the second heat exchange unit 38 is heated. For this reason, the cooling capacity of the evaporator 7 is increased, the condensation of the branch pipe 36 is less likely, and the cooling efficiency of the cooling unit 3 can be increased.
  • the operation mode II, the operation mode III, and the operation mode IV are switched in this order.
  • the switching of the operation mode is not limited to a predetermined time, and may be based on a change in the refrigerant temperature at the outlet of the evaporator 7.
  • the mode is switched to the operation mode II.
  • the mode is switched to the operation mode III. Similarly, the switching may be performed in the order of operation mode III and operation mode IV.
  • FIG. 5 is a diagram showing a refrigerant flow in the operation mode II.
  • a pipe indicated by a thick line is a pipe through which a refrigerant flows
  • a pipe indicated by a thin line is a pipe through which no refrigerant flows.
  • the two cooling units 3C and 3D are the refrigerant processing operation
  • the remaining cooling units 3A are the cooling operation.
  • the inlet on-off valve 33 is opened, but the outlet on-off valve 34 is closed. Further, the expansion valve 8 is fully opened, and the circulating refrigerant is not decompressed.
  • the inlet on-off valve 33 is closed and the outlet on-off valve 34 is opened.
  • the expansion valve 8 has an opening at which the degree of superheat of the refrigerant at the outlet of the evaporator 7 can be controlled to a predetermined target value.
  • the inlet on-off valve 33 and the outlet on-off valves 34 are opened.
  • the expansion valve 8 has an opening degree at which the degree of superheat of the refrigerant at the outlet of the evaporator 7 can be controlled to a predetermined target value.
  • the refrigerant flows through the pipe indicated by the thick line in FIG.
  • FIG. 6 is a diagram showing a refrigerant flow in the operation mode III.
  • a pipe indicated by a thick line is a pipe through which a refrigerant flows
  • a pipe indicated by a thin line is a pipe through which no refrigerant flows.
  • the two cooling units 3A and 3D are the refrigerant processing operation
  • the remaining cooling units 3B are the cooling operation.
  • the inlet on-off valve 33 is opened, but the outlet on-off valve 34 is closed. Further, the expansion valve 8 is fully opened, and the circulating refrigerant is not decompressed.
  • the inlet on-off valve 33 is closed and the outlet on-off valve 34 is opened.
  • the expansion valve 8 has an opening at which the degree of superheat of the refrigerant at the outlet of the evaporator 7 can be controlled to a predetermined target value.
  • the cooling unit 3B designated for the cooling operation the inlet on-off valve 33 and the outlet on-off valves 34 are opened.
  • the expansion valve 8 has an opening degree at which the degree of superheat of the refrigerant at the outlet of the evaporator 7 can be controlled to a predetermined target value.
  • operation mode III the refrigerant flows through the pipe indicated by the thick line in FIG.
  • FIG. 7 is a diagram showing a refrigerant flow in the operation mode IV.
  • a pipe indicated by a thick line is a pipe through which a refrigerant flows
  • a pipe indicated by a thin line is a pipe through which no refrigerant flows.
  • the two cooling units 3A and 3B are the refrigerant processing operation
  • the remaining cooling units 3C are the cooling operation.
  • the inlet on-off valve 33 is opened, but the outlet on-off valve 34 is closed. Further, the expansion valve 8 is fully opened, and the circulating refrigerant is not decompressed.
  • the inlet on-off valve 33 is closed and the outlet on-off valve 34 is opened.
  • the expansion valve 8 has an opening at which the degree of superheat of the refrigerant at the outlet of the evaporator 7 can be controlled to a predetermined target value.
  • the cooling unit 3C designated for the cooling operation the inlet on-off valve 33 and the outlet on-off valves 34 are opened.
  • the expansion valve 8 has an opening degree at which the degree of superheat of the refrigerant at the outlet of the evaporator 7 can be controlled to a predetermined target value.
  • operation mode IV the refrigerant flows through the pipe indicated by the thick line in FIG.
  • the defrosting operation is performed one by one, and at the same time, the other two are performing the refrigerant processing operation and the remaining one is performing the cooling operation. It is set in advance by the control device 100. Under this setting, the four cooling units 3 can perform defrosting in order. In addition, during the transition of the defrosting operation, the remaining one is designated to perform the cooling operation. For this reason, the refrigeration apparatus 1 in the present embodiment can have the cooling unit 3 that performs the defrosting operation, the cooling unit 3 that performs the refrigerant processing operation, and the cooling unit 3 that performs the cooling operation at the same time.
  • At least one of the plurality of cooling units 3 When at least one of the plurality of cooling units 3 is in the defrosting operation, at least one other unit must perform the refrigerant processing operation, but the other cooling units 3 can perform the cooling operation. Is possible.
  • one unit performs the refrigerant treatment operation while one unit is defrosting. For example, while one cooling unit 3A is performing the defrosting, the cooling unit 3B is subjected to the refrigerant treatment operation, and the remaining two units are operated.
  • the cooling units 3C and 3D may be cooled.
  • control device 100 is used to specify that the rotation speed increase of the compressor 11 and the rotation of the blower fan 16 included in the gas cooler 14 are suppressed. This makes it possible to obtain a refrigerant that maintains sufficient pressure and temperature for defrosting.
  • the inlet opening / closing valve 33 is provided upstream of the expansion valve 8 of the cooling unit 3 and the outlet opening / closing valve 34 is provided downstream of the evaporator 7.
  • the defrosting liquid pipe 9 connects between the evaporator 7 and the outlet on / off valve 34 of one cooling unit 3 and between the inlet on / off valve 33 and the expansion valve 8 of the other cooling unit 3. Yes. Accordingly, the refrigeration apparatus 1 can control the inflow of the refrigerant into the defrosting liquid pipe 9 by opening and closing the inlet opening / closing valve 33 and the outlet opening / closing valve 34.
  • the control device 100 arbitrarily selects, in advance, one that performs a defrosting operation, one that performs a refrigerant treatment, and one that performs a cooling operation among a plurality of cooling units 3.
  • the plurality of cooling units 3 can perform defrosting operation, liquid refrigerant processing operation, and cooling operation by turns.
  • the refrigeration apparatus 1 can have another cooling unit 3 that performs a cooling operation or a liquid refrigerant processing operation simultaneously with the cooling unit 3 that performs a defrosting operation.
  • the number of the cooling units 3 is four.
  • the cooling unit 3 cools the refrigeration showcase, but is not limited thereto, and may be a refrigerated showcase, a freezer, or a refrigerated warehouse.
  • the carbon dioxide refrigerant is used as the refrigerant, but the invention is not limited to this, and various refrigerants can be used.
  • the refrigerator unit 10 includes a compressor and a condenser.

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Mechanical Engineering (AREA)
  • Thermal Sciences (AREA)
  • General Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Defrosting Systems (AREA)
  • Devices That Are Associated With Refrigeration Equipment (AREA)

Abstract

除霜によって化した冷媒を、除霜用液管を介して他の冷却ユニットに導入し、蒸発させる冷凍装置を提供することを目的とする。 膨張弁及び蒸発器を有する複数台の冷却ユニットを、冷凍機ユニットに並列に接続した冷凍装置において、一の冷却ユニットの蒸発器の下流側と、他の冷却ユニットの膨張弁の上流側とを接続する除霜用液管を有し、一の冷却ユニットの蒸発器を冷凍機ユニット出口の冷媒熱で除霜しつつ、この除霜により過冷却された冷媒を、除霜用液管を介して、他の冷却ユニットの蒸発器に導入する冷媒処理運転を可能とする。

Description

冷凍装置
 本発明は、ショーケース等を冷却する冷凍装置に関する。
 従来、複数のショーケースを接続した冷凍装置において、一部の冷却器において除霜運転をしている間も、他の冷却器で冷却運転を継続して行う装置が知られている(例えば、特許文献1参照)。特許文献1における除霜運転では、一度凝縮した液冷媒の一部を分岐させ、熱交換器や膨張弁を用いて熱交換と減圧を行うことによって、高温のガス冷媒とした上で、指定した蒸発器に導入し、除霜を行っている。
特開2013-137123号公報
 しかしながら、一部の冷却器において除霜運転をしている間も、他の冷却器で冷却運転を継続するためには、特許文献1の場合、新たに熱交換器や膨張弁を設ける必要があり、しかも、配管の構成が複雑化してしまうという問題がある。
 そこで、本発明は、新たな熱交換器や膨張弁を設けず、配管の構成の複雑化もせずに、一部の冷却器において除霜運転をしている間も、他の冷却器で冷却運転を継続することができる冷凍装置を提供することを目的とする。
 なお、この明細書には、2016年10月19日付けで日本国に出願された日本国特許出願・出願2016-205479の全ての内容が含まれる。
 上記目的を達成するために、本発明は、膨張弁及び蒸発器を有する複数台の冷却ユニットを、冷凍機ユニットに並列に接続した冷凍装置において、一の冷却ユニットの蒸発器の下流側と、他の冷却ユニットの膨張弁の上流側とを接続する除霜用液管を有し、一の冷却ユニットの蒸発器を冷凍機ユニット出口の冷媒熱で除霜しつつ、この除霜により過冷却された冷媒を、除霜用液管を介して、他の冷却ユニットの蒸発器に導入する冷媒処理運転を可能としたことを特徴とする。
 本発明は、上記冷凍装置において、前記冷却ユニットの膨張弁の上流に入口開閉弁を設けると共に、蒸発器の下流に出口開閉弁を設け、前記除霜用液管は、一の冷却ユニットの蒸発器及び出口開閉弁の間と、他の冷却ユニットの入口開閉弁及び膨張弁の間と、を接続したことを特徴とする。
 本発明は、上記冷凍装置において、前記他の冷却ユニットの内、少なくとも一台が同時に冷却運転を行なうことを特徴とする。
 本発明は、上記冷凍装置において、除霜運転する前記冷却ユニットが遷移制御されることを特徴とする。
 本発明は、上記冷凍装置において、冷媒処理運転する前記冷却ユニットが遷移制御されることを特徴とする。
 本発明は、上記冷凍装置において、除霜運転する前記冷却ユニット、冷媒処理運転する前記冷却ユニット、並びに、冷却運転する前記冷却ユニットが、遷移制御されることを特徴とする。
 本発明は、上記冷凍装置において、前記一の冷却ユニットの蒸発器の除霜能力が不足する場合に、前記冷凍機ユニットの出口冷媒圧力や出口冷媒温度を上昇させることを特徴とする。
 本発明によれば、複数の冷却ユニットを除霜用液管によって接続することにより、新たな装置を設けることなく、除霜後の冷媒を減圧し、蒸発させて圧縮機へと導入する冷媒処理運転をさせることができる。
図1は、冷凍装置の冷媒回路を示す図。 図2は、冷凍装置が有する冷却ユニットの冷媒回路及び運転モードVにおける冷媒の流れを示す図。 図3は、冷凍装置の動作モードの遷移例を表した図。 図4は、運転モードIにおける冷媒の流れを示す図。 図5は、運転モードIIにおける冷媒の流れを示す図。 図6は、運転モードIIIにおける冷媒の流れを示す図。 図7は、運転モードIVにおける冷媒の流れを示す図。
 第一の発明は、膨張弁及び蒸発器を有する複数台の冷却ユニットを、冷凍機ユニットに並列に接続した冷凍装置において、一の冷却ユニットの蒸発器の下流側と、他の冷却ユニットの膨張弁の上流側とを接続する除霜用液管を導入した。これによって、一の冷却ユニットの蒸発器を冷凍機ユニット出口の冷媒熱で除霜しつつ、この除霜により過冷却された冷媒を、除霜用液管を介して、他の冷却ユニットの蒸発器に導入する冷媒処理運転が可能となった。このため、この除霜用液管によって、一台の冷却ユニット3における除霜により過冷却された冷媒を、減圧し、他の冷却ユニットの蒸発器に流入させて蒸発させたうえで圧縮機へと導入することができる。
 第二の発明は、特に、第一の発明の冷凍装置において、冷却ユニットの膨張弁の上流に入口開閉弁を設けると共に、蒸発器の下流に出口開閉弁を設けた。これによって、除霜用液管は、一の冷却ユニットの蒸発器及び出口開閉弁の間と、他の冷却ユニットの入口開閉弁及び膨張弁の間と、を接続するものとなった。このため、冷凍装置は、入口開閉弁及び、出口開閉弁の開閉によって、冷媒の除霜用液管への流入を制御することができる。
 第三の発明は、前記他の冷却ユニットが複数台あり、前記他の冷却ユニットの内、少なくとも一台が同時に冷却運転を行なう。これによって、冷却運転を同時に行うことが可能となった。
 第四の発明は、除霜運転する冷却ユニットが遷移制御される。これによって、すべての冷却ユニットを順に除霜運転できる。
 第五の発明は、冷媒処理運転する冷却ユニットが遷移制御される。これによって、すべての冷却ユニットを順に冷媒処理運転できる。
 第六の発明は、除霜運転する冷却ユニット、冷媒処理運転する冷却ユニット、並びに、冷却運転する冷却ユニットが、遷移制御される。これによって、すべての冷却ユニットを順に除霜運転、冷媒処理運転、冷却運転できる。
 第七の発明は、特に、第一から第六のいずれか一つの発明の冷凍装置において、冷却ユニットの蒸発器の除霜能力が不足する場合に、前記冷凍機ユニットの出口冷媒圧力や出口冷媒温度を上昇させることを可能とした。このため、外気温の低下等の状況下にあっても、除霜に十分な冷媒温度を得ることができる。
 以下、図面を参照して本発明の実施形態について説明する。
 図1は、冷却ユニット3(冷却ユニット3A~3D)が四台の場合における、冷凍装置1の冷媒回路を示す図である。
 冷凍装置1は、図1に示すように、冷凍機ユニット10と、複数台の冷却ユニット3(本実施形態においては四台の冷凍ショーケース)を有する。冷凍機ユニット10からは、図1に示すように、高圧管4が伸びており、この高圧管4は、四つに分岐して四台の冷却ユニット3のそれぞれに、一対一で接続されている。冷凍機ユニット10からは、図1に示すように、低圧管5も延びており、高圧管4と同様に、四つに分岐して四台の冷却ユニット3のそれぞれに、一対一で接続されている。この様に、冷却ユニット3は、図1に示すように、高圧管4、及び低圧管5を介して、冷凍機ユニット10に並列に接続されている。
 冷凍装置1は、更に制御装置100を備えるが、この制御装置100については、後に説明する。
 なお、本実施形態においては、冷媒として二酸化炭素冷媒を用いているが、これに限定されるものではなく、種々の冷媒を用いることができる。
 冷凍機ユニット10は、図1に示すように、二段で圧縮動作される圧縮機11と、放熱用熱交換器12と、オイルセパレータ24を備える。この放熱用熱交換器12は、内部を通過する冷媒の熱を外部に放出する。圧縮機11には、図1に示すように、放熱用熱交換器12が冷媒配管13を介して接続されており、放熱用熱交換器12は、ガスクーラ14と、インタクーラ15と、送風ファン16と、を有する。
 圧縮機11には、図1に示すように、それぞれ一段目の圧縮機構における第一吸入口20および第一吐出口21が設けられており、二段目の圧縮機構における第二吸入口22および第二吐出口23が設けられている。
 圧縮機11の第一吸入口20は、図1に示すように、複数台の冷却ユニット3から送られる冷媒を、冷媒配管13を介して吸入し、一段目の圧縮機構により、中間圧力に圧縮して第一吐出口21から吐出するように設けられている。また、圧縮機11の第一吐出口21は、図1に示すように、冷媒配管17を介してインタクーラ15の入口側に接続されており、インタクーラ15の出口側は、冷媒配管18を介して圧縮機11の第二吸入口22に接続されている。
 圧縮機11の第二吐出口23は、図1に示すように、冷媒配管19を介してオイルセパレータ24に接続されており、オイルセパレータ24は、冷媒配管28を介してガスクーラ14に接続されている。オイルセパレータ24は、図1に示すように、冷媒中のオイルを分離するものであり、オイルセパレータ24は、オイル管25を介して圧縮機11の中間段にそれぞれ接続されている。
 圧縮機11の第一吐出口21から吐出された冷媒は、図1に示すように、冷媒配管17を介してインタクーラ15に流入する。流入した冷媒は、インタクーラ15において、送風ファン16を動作させることにより外気と熱交換して冷却され、冷媒配管18を介して圧縮機11の第二吸入口22に戻される。そして、戻された冷媒は、圧縮機11で二段目の圧縮機構により、必要な圧力に圧縮して第二吐出口23から吐出され、オイルセパレータ24を介してガスクーラ14に送られるように構成されている。
 オイルセパレータ24は、図1に示すように、冷媒中のオイルを分離し、この分離したオイルは、オイル管25を介して圧縮機11にそれぞれ戻されるように構成されている。
 また、圧縮機11の第二吐出口23に接続される冷媒配管19の中途部には、図1に示すように、逆止弁27が設けられている。
 ガスクーラ14は、図1に示すように、圧縮機11から送られた冷媒を送風ファン16によって外気と熱交換させて冷却するものであるが、二酸化炭素冷媒は、凝縮しないので、超臨界状態で高圧の気体のまま送られるようになっている。
 ガスクーラ14の出口側の冷媒配管29には、図1に示すように、冷却ユニット3の蒸発器7に冷媒を送るための出口サービスバルブ30が接続されている。一方、圧縮機11の第一吸入口20に接続される冷媒配管13には、図1に示すように、冷却ユニット3の蒸発器7からの冷媒が戻るための入口サービスバルブ31が接続されている。
 また、出口サービスバルブ30には、図1に示すように、複数の冷却ユニット3の蒸発器7がそれぞれ膨張弁8を介して接続されている。蒸発器7の出口側は、図1に示すように、入口サービスバルブ31に接続されている。
 図2は、図1の冷却ユニット3の冷媒回路の詳細を示す図である。この図2は、図1において、出口サービスバルブ30から、蒸発器7を経て、入口サービスバルブ31までに相当する回路について、詳しく描いた図である。
 各冷却ユニット3は、蒸発器7を有する。蒸発器7の上流側は、図2に示すように、分岐配管35(分岐配管35A~35D)によって、高圧管4に接続されている。この分岐配管35には、上流側から順に、入口開閉弁33と、膨張弁8と、が設けられている。また、蒸発器7の下流側は、分岐配管36(分岐配管36A~36D)によって、低圧管5に接続されている。この分岐配管36には、出口開閉弁34が設けられている。
 各冷却ユニット3には、蒸発器7を挟んで内部熱交換器43が設けられている。内部熱交換器43は、図2に示すように、冷媒が流れる第一熱交換部37と、第二熱交換部38を備えている。第一熱交換部37は、入口開閉弁33から膨張弁8までの間に設けられ、入口開閉弁33を経た冷媒を内部熱交換器43に導き、その後に、膨張弁8に導入させる。第二熱交換部38は、蒸発器7から出口開閉弁34までの間に設けられ、蒸発器7を経た冷媒を内部熱交換器43に導き、その後に、出口開閉弁34に導入させる。内部熱交換器43は、第一熱交換部37内を流れる冷媒と、第二熱交換部38内を流れる冷媒とを熱交換させる。これによって、第一熱交換部37内の冷媒は、冷却され、第二熱交換部38内の冷媒は、加熱される。このため、蒸発器7は、内部熱交換器が無い場合より冷却能力が増大する。これによって、分岐配管36を流れる冷媒温度が上がるため、分岐配管36は、結露しにくくなる。また、冷却ユニット3の冷却効率を高めることができる。
 各冷却ユニット3の入口開閉弁33と膨張弁8との間には、分岐配管39(分岐配管39A~39D)の一端が接続され、各分岐配管39の他端は、除霜用液管9に接続されている。各分岐配管39には、逆止弁40が設けられており、除霜用液管9から蒸発器7へ向けてのみ冷媒が流れる。
 また、各冷却ユニット3の蒸発器7と出口開閉弁34との間には、分岐配管41(分岐配管41A~41D)の一端が接続され、各分岐配管41の他端は、除霜用液管9に接続されている。各分岐配管41においても、逆止弁42が設けられており、蒸発器7から除霜用液管9へ向けてのみ冷媒が流れる。
 冷凍装置1は、冷凍装置1全体を制御する制御装置100を備える。この制御装置100は、各入口開閉弁33及び、各出口開閉弁34の開閉制御や、各膨張弁8の開度制御、ガスクーラ14を冷却するための送風ファン16の回転制御、圧縮機11の圧力制御等を行う。なお、制御装置100は冷凍機ユニット10または複数の冷却ユニット3のいずれかに設けられていても良いし、冷凍装置1の外部に設けられていても良い。
 図3は、本実施形態における冷凍装置1の動作モードの遷移例を表した図である。
 制御装置100は、図3に示すように、冷凍装置1を5つの運転モードI~運転モードVで運転可能である。
 運転モードVでは、すべての冷却ユニット3(冷却ユニット3A~3D)が冷却運転される。運転モードIでは、冷却ユニット3Aが除霜運転中に、冷却ユニット3Bが冷媒処理運転、冷却ユニット3Cが冷媒処理運転、冷却ユニット3Dが冷却運転される。運転モードIIでは、除霜運転が冷却ユニット3Bに遷移し、以下、冷却ユニット3Cが冷媒処理運転、冷却ユニット3Dが冷媒処理運転、冷却ユニット3Aが冷却運転される。運転モードIIIでは、除霜運転が冷却ユニット3Cに遷移し、以下、冷却ユニット3Dが冷媒処理運転、冷却ユニット3Aが冷媒処理運転、冷却ユニット3Bが冷却運転される。運転モードIVでは、除霜運転が冷却ユニット3Dに遷移し、以下、冷却ユニット3A、3Bが冷媒処理運転、冷却ユニット3Cが冷却運転される。
 運転モードI~運転モードVは、ローテーション運転制御される。運転モードI~運転モードVは、一実施形態であり、この運転モードに限定されない。
 以下、本実施形態における冷凍装置1の動作について説明する。
 図2は、すべての冷却ユニット3を冷却運転させる運転モードVにおける冷媒の流れを示す図である。図2に示す回路の内、太線で示された配管は、冷媒が流通する配管であり、細線で示された配管は、冷媒が流通しない配管である。
 まず、すべての冷却ユニット3が冷却運転の場合、図2に示すように、複数の冷却ユニット3の各入口開閉弁33及び、各出口開閉弁34は、すべて開かれている。また、各膨張弁8は、蒸発器7の出口における、冷媒の過熱度を所定の目標値に制御できる開度となっている。
 冷凍機ユニット10内の圧縮機11から吐出した高温高圧の冷媒は、ガスクーラ14で外気に放熱した後、高圧管4を通って、各冷却ユニット3へと流入する。冷却ユニット3に流入した高圧の冷媒は、入口開閉弁33を介して膨張弁8に流入する。冷媒は、この膨張弁8によって減圧され、低圧冷媒となって蒸発器7に流入する。蒸発器7に流入した低圧冷媒は、冷却ユニット3内の空気と熱交換をする。この後、低圧の冷媒は、出口開閉弁34を介して各冷却ユニット3から流出し、低圧管5を通って、再び冷凍機ユニット10内の圧縮機11に吸入される。このようにして、冷凍装置1は、冷媒の循環によって各冷却ユニット3内の空気を冷却することができる。
 この冷却運転においては、第一熱交換部37と、第二熱交換部38とに冷媒が流れ、第一熱交換部37内を流れる冷媒と、第二熱交換部38内を流れる冷媒とが熱交換をする。これによって、第一熱交換部37内の冷媒は、冷却され、第二熱交換部38内の冷媒は、加熱される。このため、蒸発器7は、冷却能力が増大し、分岐配管36は、結露しにくくなり、冷却ユニット3の冷却効率を高めることができる。
 それでも冷却運転をある程度の時間継続すると、各蒸発器7には霜が徐々に堆積する。一定量以上の霜が堆積すると、冷凍装置1の冷却能力は、著しく低下する。このため、いずれかの冷却ユニット3の除霜運転を行う。除霜運転される冷却ユニット3は、4つの運転モードI~運転モードVで遷移し、ローテーション運転される。
 図4の運転モードIでは、一台の冷却ユニット3Aを除霜運転し、二台の冷却ユニット3B、3Cを冷媒処理運転し、残りの冷却ユニット3Dを冷却運転させる。この時の冷媒処理運転は、冷却運転の一態様と言える。
 この時、指定された冷却ユニット3Aにおいては、図4に示すように、入口開閉弁33は開かれているが、出口開閉弁34は閉ざされる。また、膨張弁8は、全開となっており、流通する冷媒は、減圧されない。
 冷凍機ユニット10から供給される高圧の冷媒は、除霜運転時の冷却ユニット3Aに流入すると、入口開閉弁33、及び膨張弁8を介して、減圧されずに蒸発器7へと流れ込む。流れ込んだ冷媒は、蒸発器7に付着した霜を溶かすことによって過冷却される。除霜運転中の冷却ユニット3Aにおいては、出口開閉弁34は閉ざされているので、蒸発器7から流出した高圧状態の冷媒は、分岐配管41を通って除霜用液管9へと流入する。
 また、除霜運転時は、出口開閉弁34が閉ざされているため、内部熱交換器43による冷媒の熱交換は行われない。
 複数の冷却ユニット3のうち、二台の冷却ユニット3B、3Cが、冷媒処理運転を行う。冷媒処理運転を指定された冷却ユニット3B、3Cにおいては、図4に示すように、入口開閉弁33は閉ざされ、出口開閉弁34は開かれる。膨張弁8は、冷却運転時と同様に、蒸発器7の出口における、冷媒の過熱度を所定の目標値に制御できる開度となっている。
 冷媒処理運転中の冷却ユニット3B、3Cにおいては、入口開閉弁33が閉ざされているため、冷凍機ユニット10からの冷媒は、流入しない。冷媒処理運転中の冷却ユニット3B、3Cには、除霜運転中の冷却ユニット3Aから排出された高圧の冷媒が、除霜用液管9を経た後、分岐配管39B、39Cを通って流入してくることとなる。
 冷媒処理運転中の冷却ユニット3B、3Cに流入した高圧の冷媒は、膨張弁8によって減圧され、低圧冷媒となって蒸発器7に流入する。蒸発器7に流入した低圧冷媒は、冷却ユニット3B、3C内の空気と熱交換をする。この低圧の冷媒は、開かれている出口開閉弁34を介して冷却ユニット3B、3Cから流出し、低圧管5を通って、再び冷凍機ユニット10内の圧縮機11に吸入される。
 また、冷媒処理運転時においても、入口開閉弁33が閉ざされているため、内部熱交換器43による冷媒の熱交換は行われない。
 この様に、少なくとも一台の冷却ユニット3Aが除霜運転中である場合、除霜に伴って過冷却された冷媒は、除霜用液管9を通って冷媒処理運転中の冷却ユニット3B、3Cへと流入する。流入した冷媒は、この冷媒処理運転中の冷却ユニット3B、3Cにより、高圧状態から低圧状態へと変化するため、再び冷凍機ユニット10内の圧縮機11に吸入されることが可能となる。
 図3の運転モードIでは、残りの冷却ユニット3Dが冷却運転である。冷却ユニット3Dでは、図4に示すように、入口開閉弁33及び、各出口開閉弁34は、開かれている。また、膨張弁8は、蒸発器7の出口における、冷媒の過熱度を所定の目標値に制御できる開度となっている。
 冷凍機ユニット10内の圧縮機11から吐出した高温高圧の冷媒は、ガスクーラ14で外気に放熱した後、高圧管4を通って、冷却ユニット3Dへと流入する。冷却ユニット3Dに流入した高圧の冷媒は、入口開閉弁33を介して膨張弁8に流入する。冷媒は、この膨張弁8によって減圧され、低圧冷媒となって蒸発器7に流入する。蒸発器7に流入した低圧冷媒は、冷却ユニット3内の空気と熱交換をする。この後、低圧の冷媒は、出口開閉弁34を介して各冷却ユニット3から流出し、低圧管5を通って、再び冷凍機ユニット10内の圧縮機11に吸入される。
 この場合、冷却ユニット3Dでは、第一熱交換部37と、第二熱交換部38とに冷媒が流れ、第一熱交換部37内を流れる冷媒と、第二熱交換部38内を流れる冷媒とが熱交換する。これによって、第一熱交換部37内の冷媒は、冷却され、第二熱交換部38内の冷媒は、加熱される。このため、蒸発器7は、冷却能力が増大し、分岐配管36は、結露しにくくなり、冷却ユニット3の冷却効率を高めることができる。
 図3の運転モードIにおいて、所定時間運転すると、運転モードII、運転モードIII、運転モードIV、の順に切換り遷移する。なお、運転モードの切換りは、所定時間に限らず、蒸発器7の出口の冷媒温度の変化によるものでもよい。例えば、運転モードIにおいて、除霜運転を行っている冷却ユニット3Aが有する蒸発器7の出口の冷媒温度などにより除霜の終了が検知された場合に、運転モードIIへと切り替わる。運転モードIIにおいても、除霜運転を行っている冷却ユニット3Bが有する蒸発器7の出口の冷媒温度などにより除霜の終了が検知された場合に、運転モードIIIへと切り替わる。以下同様に、運転モードIII、運転モードIV、の順に切換り遷移するとしてもよい。
 図5は、運転モードIIにおける冷媒の流れを示す図である。図5に示す回路の内、太線で示された配管は、冷媒が流通する配管であり、細線で示された配管は、冷媒が流通しない配管である。
 運転モードIIにおいては、図3に示すように、一台の冷却ユニット3Bが除霜運転中に、二台の冷却ユニット3C、3Dが冷媒処理運転、残りの冷却ユニット3Aが冷却運転である。この時、指定された冷却ユニット3Bにおいては、図5に示すように、入口開閉弁33は開かれているが、出口開閉弁34は閉ざされる。また、膨張弁8は、全開となっており、流通する冷媒は、減圧されない。
 冷媒処理運転を指定された冷却ユニット3C、3Dにおいては、入口開閉弁33は閉ざされ、出口開閉弁34は開かれる。膨張弁8は、冷却運転時と同様に、蒸発器7の出口における、冷媒の過熱度を所定の目標値に制御できる開度となっている。
 冷却運転を指定された冷却ユニット3Aにおいては、入口開閉弁33及び、各出口開閉弁34は、開かれている。また、膨張弁8は、蒸発器7の出口における、冷媒の過熱度を所定の目標値に制御できる開度となっている。
 運転モードIIでは、図5に太線で示す配管を冷媒が流れる。
 図6は、運転モードIIIにおける冷媒の流れを示す図である。図6に示す回路の内、太線で示された配管は、冷媒が流通する配管であり、細線で示された配管は、冷媒が流通しない配管である。
 運転モードIIIにおいては、図3に示すように、一台の冷却ユニット3Cが除霜運転中に、二台の冷却ユニット3A、3Dが冷媒処理運転、残りの冷却ユニット3Bが冷却運転である。この時、指定された冷却ユニット3Cにおいては、図6に示すように、入口開閉弁33は開かれているが、出口開閉弁34は閉ざされる。また、膨張弁8は、全開となっており、流通する冷媒は、減圧されない。
 冷媒処理運転を指定された冷却ユニット3A、3Dにおいては、入口開閉弁33は閉ざされ、出口開閉弁34は開かれる。膨張弁8は、冷却運転時と同様に、蒸発器7の出口における、冷媒の過熱度を所定の目標値に制御できる開度となっている。
 冷却運転を指定された冷却ユニット3Bにおいては、入口開閉弁33及び、各出口開閉弁34は、開かれている。また、膨張弁8は、蒸発器7の出口における、冷媒の過熱度を所定の目標値に制御できる開度となっている。
 運転モードIIIでは、図6に太線で示す配管を冷媒が流れる。
  図7は、運転モードIVにおける冷媒の流れを示す図である。図7に示す回路の内、太線で示された配管は、冷媒が流通する配管であり、細線で示された配管は、冷媒が流通しない配管である。
 運転モードIVにおいては、図3に示すように、一台の冷却ユニット3Dが除霜運転中に、二台の冷却ユニット3A、3Bが冷媒処理運転、残りの冷却ユニット3Cが冷却運転である。この時、指定された冷却ユニット3Dにおいては、図7に示すように、入口開閉弁33は開かれているが、出口開閉弁34は閉ざされる。また、膨張弁8は、全開となっており、流通する冷媒は、減圧されない。
 冷媒処理運転を指定された冷却ユニット3A、3Bにおいては、入口開閉弁33は閉ざされ、出口開閉弁34は開かれる。膨張弁8は、冷却運転時と同様に、蒸発器7の出口における、冷媒の過熱度を所定の目標値に制御できる開度となっている。
 冷却運転を指定された冷却ユニット3Cにおいては、入口開閉弁33及び、各出口開閉弁34は、開かれている。また、膨張弁8は、蒸発器7の出口における、冷媒の過熱度を所定の目標値に制御できる開度となっている。
 運転モードIVでは、図7に太線で示す配管を冷媒が流れる。
 図3に示す例においては、各運転モードI~IVにおいて、除霜運転は、一台ずつ行い、同時に他の二台が冷媒処理運転、残りの一台が冷却運転を行うが、運転ローテーションは制御装置100によってあらかじめ設定されている。この設定の下、四台の冷却ユニット3は、順番に除霜を行うことができる。また、この除霜運転の遷移の間、残りの一台は、冷却運転を行う指定がされている。このため、本実施形態における冷凍装置1は、除霜運転を行う冷却ユニット3と、冷媒処理運転を行なう冷却ユニット3と、冷却運転を行う冷却ユニット3とを同時に有することができる。
 複数の冷却ユニット3の内、少なくとも一台が除霜運転中の場合、この他の少なくとも一台は冷媒処理運転を行わなければならないが、これら以外の冷却ユニット3は、冷却運転を行うことが可能である。
 この実施形態では、一台が除霜中に二台が冷媒処理運転を行うとしたが、例えば一台の冷却ユニット3Aが除霜中、冷却ユニット3Bを冷媒処理運転し、残りの二台の冷却ユニット3C、3Dを冷却運転しても良い。
 また、外気温が比較的低い場合、除霜運転の際に、除霜に十分な温度の冷媒が得られないことがある。この様な時には、制御装置100を用いて、圧縮機11の回転数上昇や、ガスクーラ14の有する送風ファン16の回転を抑制するように指定する。これによって、除霜に十分な圧力や、温度を保つ冷媒を得ることが可能となる。
 以上説明したように、本発明を適用した実施形態によれば、複数台の冷却ユニット3を冷凍機ユニット10に並列に接続した冷凍装置1において、一台の冷却ユニット3と、他の冷却ユニット3とを接続する除霜用液管9を導入した。この除霜用液管9によって、一台の冷却ユニット3における除霜により過冷却された冷媒を、他の冷却ユニット3の蒸発器7に流入させ、低圧冷媒にしたうえで圧縮機11へと導入することができる。
 また、本発明を適用した実施形態によれば、冷却ユニット3の膨張弁8の上流に入口開閉弁33を設けると共に、蒸発器7の下流に出口開閉弁34を設けている。除霜用液管9は、一台の冷却ユニット3の蒸発器7、及び出口開閉弁34の間と、他の冷却ユニット3の入口開閉弁33及び膨張弁8の間と、を接続している。これによって、冷凍装置1は、入口開閉弁33及び、出口開閉弁34の開閉によって、冷媒の除霜用液管9への流入を制御することができる。
 また、本発明を適用した実施形態によれば、制御装置100によって、複数台の冷却ユニット3の内、除霜運転を行うものと、冷媒処理を行うもの、冷却運転を行うものをあらかじめ任意に設定することができる。これによって、複数台の冷却ユニット3は、交替で除霜運転、液冷媒処理運転、及び冷却運転を行うことができる。さらに、冷凍装置1は、除霜運転を行う冷却ユニット3と同時に、冷却運転、または液冷媒処理運転を行う他の冷却ユニット3を有することができる。
 また、本発明を適用した実施形態によれば、外気温が低い場合などにおいても、圧縮機11の回転数上昇や、ガスクーラ14の有する送風ファン16の回転を制御することにより、除霜に十分な圧力、及び温度の冷媒を得ることができる。
 なお、上述した実施形態は、あくまでも本発明の一態様の例示であり、本発明の要旨の範囲において任意に変形、及び応用が可能である。
 例えば、上述した実施形態では、冷却ユニット3を四台としたが、これに限らず、二台以上であれば何台でも並列可能である。
 また例えば、上述した実施形態では、冷却ユニット3が冷却するものは、冷凍ショーケースとしたが、これに限らず、冷蔵ショーケースや、冷凍庫、冷蔵倉庫であっても良い。
 また例えば、上述した実施形態では、冷媒として二酸化炭素冷媒を用いているが、これに限定されるものではなく、種々の冷媒を用いることができる。凝縮可能な冷媒を用いる場合、冷凍機ユニット10は、圧縮機と、凝縮器と、を有する。
 1 冷凍装置
 3A、3B、3C、3D 冷却ユニット
 7 蒸発器
 8 膨張弁
 9 除霜用液管
 10 冷凍機ユニット
 33 入口開閉弁
 34 出口開閉弁

Claims (7)

  1.  膨張弁及び蒸発器を有する複数台の冷却ユニットを、冷凍機ユニットに並列に接続した冷凍装置において、
     一の冷却ユニットの蒸発器の下流側と、他の冷却ユニットの膨張弁の上流側とを接続する除霜用液管を有し、一の冷却ユニットの蒸発器を冷凍機ユニット出口の冷媒熱で除霜しつつ、この除霜により過冷却された冷媒を、前記除霜用液管を介して、他の冷却ユニットの蒸発器に導入する冷媒処理運転を可能としたことを特徴とする冷凍装置。
  2.  前記冷却ユニットの膨張弁の上流に入口開閉弁を設けると共に、蒸発器の下流に出口開閉弁を設け、前記除霜用液管は、一の冷却ユニットの蒸発器及び出口開閉弁の間と、他の冷却ユニットの入口開閉弁及び膨張弁の間と、を接続したことを特徴とする請求項1に記載の冷凍装置。
  3.  前記他の冷却ユニットが複数台あり、前記他の冷却ユニットの内、少なくとも一台が同時に冷却運転を行なうことを特徴とする請求項1または2に記載の冷凍装置。
  4.  除霜運転する冷却ユニットが遷移制御されることを特徴とする請求項1ないし3のいずれか一項に記載の冷凍装置。
  5.  冷媒処理運転する冷却ユニットが遷移制御されることを特徴とする請求項1ないし3のいずれか一項に記載の冷凍装置。
  6.  除霜運転する冷却ユニット、冷媒処理運転する冷却ユニット、並びに、冷却運転する冷却ユニットが、遷移制御されることを特徴とする請求項1ないし3のいずれか一項に記載の冷凍装置。
  7.  前記一の冷却ユニットの蒸発器の除霜能力が不足する場合に、前記冷凍機ユニットの出口冷媒圧力や出口冷媒温度を上昇させることを特徴とする請求項1ないし6のいずれか一項に記載の冷凍装置。
PCT/JP2017/036527 2016-10-19 2017-10-06 冷凍装置 WO2018074272A1 (ja)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2016205479A JP2018066514A (ja) 2016-10-19 2016-10-19 冷凍装置
JP2016-205479 2016-10-19

Publications (1)

Publication Number Publication Date
WO2018074272A1 true WO2018074272A1 (ja) 2018-04-26

Family

ID=62018620

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2017/036527 WO2018074272A1 (ja) 2016-10-19 2017-10-06 冷凍装置

Country Status (2)

Country Link
JP (1) JP2018066514A (ja)
WO (1) WO2018074272A1 (ja)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111536725A (zh) * 2020-05-26 2020-08-14 广东省现代农业装备研究所 一种利用专用蒸发器蒸发融霜制冷剂的融霜方法及装置

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS542557A (en) * 1977-06-08 1979-01-10 Toshiba Corp Refrigerating apparatus
JPS59210269A (ja) * 1983-05-13 1984-11-28 三菱電機株式会社 冷却装置
JPH01210790A (ja) * 1988-02-19 1989-08-24 Sanyo Electric Co Ltd 冷却運転装置
JPH03129274A (ja) * 1989-10-13 1991-06-03 Matsushita Refrig Co Ltd 多室型空気調和機
JPH05296614A (ja) * 1992-04-24 1993-11-09 Hitachi Ltd 冷凍装置の除霜制御方式
JPH05296615A (ja) * 1992-04-24 1993-11-09 Hitachi Ltd 冷凍装置の除霜方式
JP2012013363A (ja) * 2010-07-02 2012-01-19 Panasonic Corp 空気調和機

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS542557A (en) * 1977-06-08 1979-01-10 Toshiba Corp Refrigerating apparatus
JPS59210269A (ja) * 1983-05-13 1984-11-28 三菱電機株式会社 冷却装置
JPH01210790A (ja) * 1988-02-19 1989-08-24 Sanyo Electric Co Ltd 冷却運転装置
JPH03129274A (ja) * 1989-10-13 1991-06-03 Matsushita Refrig Co Ltd 多室型空気調和機
JPH05296614A (ja) * 1992-04-24 1993-11-09 Hitachi Ltd 冷凍装置の除霜制御方式
JPH05296615A (ja) * 1992-04-24 1993-11-09 Hitachi Ltd 冷凍装置の除霜方式
JP2012013363A (ja) * 2010-07-02 2012-01-19 Panasonic Corp 空気調和機

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111536725A (zh) * 2020-05-26 2020-08-14 广东省现代农业装备研究所 一种利用专用蒸发器蒸发融霜制冷剂的融霜方法及装置

Also Published As

Publication number Publication date
JP2018066514A (ja) 2018-04-26

Similar Documents

Publication Publication Date Title
CN113375398B (zh) 冰箱及其控制方法
US10415861B2 (en) Refrigeration cycle apparatus
JP2013210159A (ja) 冷凍装置
JP6160725B1 (ja) 冷凍装置
KR102370565B1 (ko) 냉장고
JP2012504221A (ja) プルダウン時における容量の増加
JP2009079863A (ja) 冷凍装置
JP5237157B2 (ja) 空気熱源ターボヒートポンプ
JP7189423B2 (ja) 冷凍サイクル装置
WO2018074272A1 (ja) 冷凍装置
KR101796565B1 (ko) 냉장, 냉동 및 급냉 보관 장치
KR20120053381A (ko) 냉동 사이클 장치
WO2018074370A1 (ja) 冷凍システムおよび室内ユニット
JP6692082B2 (ja) 冷凍システムおよび冷凍装置
JP2007100987A (ja) 冷凍システム
EP3480533A1 (en) Refrigeration device
JP2010014343A (ja) 冷凍装置
JP6173360B2 (ja) 冷凍装置
KR20180056854A (ko) 압축기의 흡입온도 조절이 가능한 고용량 급속 냉각 초저온 냉동기
EP2781863A2 (en) Method for controlling refrigerator
JP6354209B2 (ja) 冷凍装置
JP7229256B2 (ja) 冷凍装置および熱源側ユニット
JP5982773B2 (ja) 冷凍装置
JP2016014490A (ja) 冷凍システム
JP2014119233A (ja) コンテナ用冷凍装置

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 17861717

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 17861717

Country of ref document: EP

Kind code of ref document: A1