WO2018056505A1 - 부하관리 및 무정전 전력공급 기능을 가지는 에너지저장장치의 제어방법 및 제어시스템 - Google Patents

부하관리 및 무정전 전력공급 기능을 가지는 에너지저장장치의 제어방법 및 제어시스템 Download PDF

Info

Publication number
WO2018056505A1
WO2018056505A1 PCT/KR2016/013071 KR2016013071W WO2018056505A1 WO 2018056505 A1 WO2018056505 A1 WO 2018056505A1 KR 2016013071 W KR2016013071 W KR 2016013071W WO 2018056505 A1 WO2018056505 A1 WO 2018056505A1
Authority
WO
WIPO (PCT)
Prior art keywords
energy storage
storage device
capacity
load
charge
Prior art date
Application number
PCT/KR2016/013071
Other languages
English (en)
French (fr)
Inventor
조성민
임지훈
이성은
Original Assignee
한국전력공사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 한국전력공사 filed Critical 한국전력공사
Priority to US16/334,720 priority Critical patent/US10819138B2/en
Publication of WO2018056505A1 publication Critical patent/WO2018056505A1/ko

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J9/00Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting
    • H02J9/04Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting in which the distribution system is disconnected from the normal source and connected to a standby source
    • H02J9/06Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting in which the distribution system is disconnected from the normal source and connected to a standby source with automatic change-over, e.g. UPS systems
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/003Load forecast, e.g. methods or systems for forecasting future load demand
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/28Arrangements for balancing of the load in a network by storage of energy
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/28Arrangements for balancing of the load in a network by storage of energy
    • H02J3/32Arrangements for balancing of the load in a network by storage of energy using batteries with converting means
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J7/00Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
    • H02J7/0047Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries with monitoring or indicating devices or circuits
    • H02J7/0048Detection of remaining charge capacity or state of charge [SOC]
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J7/00Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
    • H02J7/0068Battery or charger load switching, e.g. concurrent charging and load supply
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J9/00Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting
    • H02J9/04Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting in which the distribution system is disconnected from the normal source and connected to a standby source
    • H02J9/06Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting in which the distribution system is disconnected from the normal source and connected to a standby source with automatic change-over, e.g. UPS systems
    • H02J9/062Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting in which the distribution system is disconnected from the normal source and connected to a standby source with automatic change-over, e.g. UPS systems for AC powered loads
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/14Energy storage units
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/12Energy storage units, uninterruptible power supply [UPS] systems or standby or emergency generators, e.g. in the last power distribution stages

Definitions

  • the present invention relates to a method and system for controlling an energy storage device having a function of load management in addition to an uninterruptible power supply function.
  • ESS Energy Storage System
  • the storage of electrical energy is diversified into a technology that is converted to electrochemical energy such as battery technology and stored and physical energy such as a flywheel.
  • ESS ESS-to-everything ESS
  • UPS uninterrupted power supply
  • FIG. 1 shows a structure of an ESS capable of simultaneously performing such load management and UPS functions.
  • the ESS installed for the purpose of the UPS function is kept in a standby state until a power failure occurs in a charged state, so the frequency of use of the ESS is low.
  • the capacity of the UPS reaches 900 kW in order to handle 900 kW of the winter, but the ESS remains in a standby state until a power failure occurs.
  • the maximum power consumption is less than 500kW, so the 400kW ESS output is not a problem even if it is used for load management.
  • an ESS with a UPS function was able to easily estimate the load capacity to be supplied in the event of a power outage through information such as the power consumption pattern associated with the power supply, which is installed in the power supply of an important power facility such as a computer facility. .
  • the ESS functioning as a UPS increases the capacity that can be supplied, and the need for a reliable power supply has emerged, so that the ESS is installed in the power supply part of a building unit such as a building, a shopping mall, and a research institute.
  • the capacity of the load to be supplied by the controller is difficult to estimate and the error is likely to occur.
  • ESS using a lithium ion battery which is actively spreading recently, estimates the state of charge (SOC) of a battery by measuring a battery voltage by a battery management system.
  • the estimation of the state of charge includes some error because it is calculated assuming various battery characteristics. In addition to lithium-ion batteries, other ESS technologies also have errors in the estimation of the state of charge.
  • the ESS utilizing the lithium ion battery continuously decreases its chargeable / dischargeable capacity after performing a constant charge / charge operation according to the battery life characteristics.
  • the reduction of the chargeable and dischargeable capacity is determined according to the charging and discharging operation environment and the history of the battery, but the estimation of the capacity reduction according to this life also has not high accuracy.
  • the present invention has been made to solve the above-described problems, the present invention by establishing and verifying the operation plan of the reasonable ESS, load management and load management to allocate the capacity according to the UPS function and operate the energy storage device accordingly and It is an object of the present invention to provide a control method and a control system of an energy storage device having an uninterruptible power supply function.
  • a method for controlling an energy storage device having a load management and an uninterruptible power supply function Capacity) and load management to calculate the capacity available for load management, the energy storage device operation step of charging and discharging the energy storage device according to the operation plan established by the operation planning step and the energy storage device operation And re-establishing an operation plan according to the operation state of the energy storage device.
  • Prediction of power to be consumed in the load in the operation planning step is characterized by predicting by time series analysis of the power consumption record of the load.
  • the operation planning step may include calculating a load prediction error corresponding capacity corresponding to an error of power prediction to be consumed in the load.
  • the load prediction error corresponding capacity may be set differently according to the characteristics of the forecast date.
  • the operation planning step is characterized in that to calculate the capacity corresponding to the capacity reduction corresponding to the life of the energy storage device and the charge-discharge state error corresponding capacity.
  • the capacity except for the UPS capacity estimated from the rated capacity of the energy storage device, the load prediction error corresponding capacity, the capacity reduction corresponding capacity, and the charge / discharge state error response capacity can be used for the load management. It is characterized by calculating by a dose.
  • the charge / discharge operation plan of the energy storage device is calculated in consideration of the capacity available for the load management, the efficiency and the state of charge of the energy storage device. It is characterized by establishing.
  • the charge / discharge operation plan of the energy storage device may be selected as a charge / discharge operation for reducing a power charge of the load or a charge / discharge operation for reducing the peak load of the load.
  • the step of re-establishing the operation plan is compared with the state of charge of the energy storage device operated by the energy storage device operating step and the state of charge estimated in the operation planning step, if the difference is more than a certain size Characterized in that the operation plan is reestablished based on the state of charge of the operating energy storage device.
  • re-establishing the operation plan may include comparing the power consumption of the load in the operation of the energy storage device with the power to be consumed at the load predicted in the operation planning step. It is characterized by reestablishing an operation plan based on the power consumption of the load.
  • a method of controlling an energy storage device having a load management and an uninterruptible power supply function includes predicting power to be consumed by a load to provide energy capacity to be charged to the energy storage device for uninterruptible power supply in case of a power failure.
  • the capacity of the energy storage device by estimating the capacity of the UPS, estimating the load prediction error corresponding capacity corresponding to the error of the power prediction to be consumed by the load, and calculating the capacity reduction corresponding capacity according to the life of the energy storage device.
  • the operation capacity of the energy storage device is established by calculating the capacity except for the UPS capacity estimated from the capacity, the capacity corresponding to the load prediction error, the capacity corresponding to the decrease in capacity, and the capacity corresponding to the charge / discharge state error to be available for the load management. Characterized in that.
  • the control system of the energy storage device having a load management and uninterruptible power supply function by using the information of the load history database to predict the power consumed by the load for uninterrupted power supply in the event of a power failure
  • the energy storage according to the operation plan established by the energy storage system operation planning section for calculating the energy capacity (UPS capacity) to be charged to the energy storage device and the capacity available for load management, and the energy storage system operation planning section.
  • An energy storage device charge and discharge control unit for controlling charging and discharging of the device, and the energy storage device operation analysis unit for correcting information according to the operating state of the energy storage device operated by the control of the energy storage device charge and discharge control unit.
  • the energy storage device operation planning unit may predict power to be consumed by the load through a time series analysis of a power consumption record of the load.
  • the energy storage device operation planning unit may calculate a load prediction error corresponding capacity corresponding to an error of power prediction to be consumed by the load.
  • the load prediction error corresponding capacity may be set differently according to the characteristics of the forecast date.
  • the energy storage device operation plan establishment unit is characterized in that for calculating the capacity reduction response capacity and the charge-discharge state error response capacity according to the life of the energy storage device.
  • the energy storage device operation planning unit may include the capacity except for the UPS capacity estimated from the rated capacity of the energy storage device, the load prediction error corresponding capacity, the capacity reduction corresponding capacity, and the charge / discharge state error response capacity. It is characterized by calculating the usable capacity.
  • the energy storage device operation plan establishment unit charges and discharges the operation plan of the energy storage device in consideration of the capacity available for the load management and the efficiency and state of charge of the energy storage device. It is characterized by establishing.
  • the charging and discharging operation plan of the energy storage device may be selected as a charging and discharging operation for reducing a power charge of the load or a charging and discharging operation for reducing a peak load of the load.
  • the energy storage device operation analyzer may compare the state of charge of the energy storage device operated by the energy storage device charge / discharge control unit with the state of charge estimated by the energy storage device operation planning unit, and the difference may be greater than or equal to a predetermined size. In this case, it is characterized in that the state of charge of the operating energy storage device is stored in the load history database and the operation plan is reestablished.
  • the energy storage device operation analysis unit may compare the power consumption of the load controlled by the energy storage device charge / discharge control unit with the power to be consumed by the load predicted by the energy storage device operation planning unit, and the difference may be constant. When the size is greater than or equal to, the load prediction difference is stored in the load history database.
  • the control system of the energy storage device having a load management and an uninterruptible power supply function by using the information in the load history database to predict the power consumed by the load to store energy for uninterruptible power supply in the event of a power failure Estimate the energy capacity (UPS capacity) to be charged to the device, calculate the load prediction error corresponding capacity corresponding to the error of power prediction to be consumed by the load, and calculate the capacity reduction corresponding capacity according to the life of the energy storage device.
  • the capacity excluding the UPS capacity estimated from the rated capacity of the energy storage device, the load prediction error response capacity, the capacity reduction response capacity, and the charge / discharge state error response capacity, is calculated as the capacity available for the load management. It is characterized by establishing an operation plan of the energy storage device.
  • the emergency generator of Korea is about 21,000MkW is installed, the load ratio of the installed load is about 50%, so when converted to the combined load management ESS according to the present invention 1,800GWh per year (about 10,000MW ESS for 6 months 1 day 1 Load management capacity) is secured.
  • 1 is a structure of an ESS capable of simultaneously performing general load management and UPS functions.
  • FIG. 2 illustrates an example of a maximum daily power consumption of a specific load.
  • FIG 3 illustrates a control system of an energy storage device having a load management and an uninterruptible power supply function according to an embodiment of the present invention.
  • FIG. 4 illustrates a control method of an energy storage device having a load management and an uninterruptible power supply function according to an embodiment of the present invention.
  • FIG. 5 is a load prediction result according to the example of FIG.
  • FIG. 6 illustrates a UPS function corresponding ESS capacity for each time zone based on the load prediction of FIG. 5.
  • FIG. 7 illustrates ESS allocation capacity for each time zone based on the load prediction of FIG. 5.
  • 8 and 9 are examples for each type of ESS charge and discharge plan.
  • FIG. 10 is a view illustrating the operation of the load prediction result ESS according to an embodiment of the present invention.
  • control method and control system of an energy storage device having a load management and an uninterruptible power supply function of the present invention rationally analyzes and predicts load characteristics, establishes an operation plan of an energy storage device (ESS), and overcomes errors in the plan. Control method and system that can be.
  • UPS uninterruptible power supply
  • load management functions it is essential to control charge and discharge by allocating capacity of ESS for each function. It is possible to use both UPS and load management functions successfully by establishing an operation plan and carrying out real-time charge / discharge control in consideration of errors, errors in estimation of the state of charge of the ESS, and capacity reduction according to the life of the ESS.
  • the control method of the ESS is to establish an operation plan, perform charge / discharge control according to the operation plan, and store operation records. Analyzing the records to correct and reestablish the operation plan.
  • load forecasting is performed on the basis of minutes or hours, one day or one week later, to calculate the energy capacity (hereinafter, UPS capacity) to be charged to the ESS for uninterruptible power supply in case of power failure.
  • UPS capacity the energy capacity
  • This load prediction can be performed through time series analysis of power consumption records, and the like, and allocates the spare capacity of the ESS against the load prediction error according to the load prediction method.
  • the spare capacity is allocated as a countermeasure against the insufficient capacity of the ESS to perform the UPS function.
  • the allocation of the spare capacity of the ESS in preparation for this error is set differently for each day such as weekdays and special days (holiday, holiday, etc.) to make more use of the capacity of the ESS.
  • the information on the load prediction error is recorded in the ESS operation performance database and reflected in the calculation of the spare capacity of the ESS against the load prediction error at regular intervals.
  • the charging state of the ESS is performed through various calculation processes depending on the type of the ESS.
  • the error against the state of charge calculation error including the error of the technology for measuring the voltage and current of the ESS, is also reflected in the operation plan of the ESS to allocate capacity.
  • the remaining capacity except for the UPS function capacity, the load prediction error response capacity, the capacity reduction response capacity according to the service life, and the state of charge calculation error is allocated as the capacity available for the load management.
  • the charge and discharge operation plan of the ESS is established in consideration of the load management capacity.
  • Charge / discharge operation plan is established considering the efficiency of ESS and state of charge.
  • the purpose of the charge / discharge operation of the ESS may be set by the user for the purpose of reducing the power bill, the purpose of reducing the maximum power consumption, and the like.
  • the difference between the state of charge measured in real time and the state of charge estimated from the operation plan is calculated.
  • the operation plan is based on the state of charge measured. Perform the rebuilding operation.
  • the operation when a difference in the power consumption of the load measured in the operation step and the power consumption estimated by the load prediction occurs more than a predetermined size, the operation to reestablish the operation plan by correcting the load prediction value.
  • FIG 3 illustrates a control system of an energy storage device having a load management and an uninterruptible power supply function according to an embodiment of the present invention.
  • FIG. 4 illustrates a control method of an energy storage device having a load management and an uninterruptible power supply function according to an embodiment of the present invention.
  • the ESS control system for simultaneously utilizing load management and uninterruptible power supply functions includes an ESS operation plan establishment unit 20 for establishing an ESS operation plan by using the load history database 10 information supplied with power.
  • the operational plan for the ESS is established one day before or one week before.
  • load prediction is performed using the information in the load history database (10) in order to establish the ESS operation plan for tomorrow by unit time (S11).
  • the load prediction error is estimated by dividing tomorrow into a general day having a low load prediction error and a special day having a high load prediction error (S12).
  • this load has the characteristic that the power consumption exceeds about 900kW in winter.
  • the ESS to perform the UPS function on this load must be larger than the maximum winter power (900 kW). Assuming the installation of an ESS of 1 MW / 1 MWh, this ESS will be less available during the winter months.
  • control method of ESS with load management and UPS function is as follows.
  • the load of the next day can be estimated as shown in FIG. If the load is estimated in this way, the energy capacity of the ESS required at the time of power failure is calculated. For example, based on the ESS supplying power for 10 minutes (set by the operator) in the event of a power outage, multiply the estimated load (kW) for each hour by 10/30 (16.67%) to obtain the energy required for that time. Calculate the amount.
  • the energy E_UPS required for the ESS for the UPS function according to the time zone is calculated by reflecting the hourly predicted load of FIG. 5, as shown in FIG. 6. This is the capacity that must be charged to the ESS to perform the UPS function at that time.
  • the ESS capacity for the load prediction error is estimated by using a predefined load prediction error value.
  • the reduction of the charge / discharge capacity due to the deterioration of the life of the ESS is estimated (S13) and reflected in the ESS operation plan.
  • the reduced ESS capacity (E_DET) due to deterioration may be estimated and calculated in the ESS facility, or may be estimated through analysis of the operational performance database. For example, if 1% of the total ESS's energy capacity is estimated to be reduced, 1% (10kWh) of the initial installed capacity of the ESS will be allocated as unusable and used for ESS operation planning.
  • the error about the charge state of the ESS is reflected in the capacity allocation (S14). If the ESS state of charge estimation has an error of up to ⁇ 3%, the capacity of 6% of the ESS rated capacity is set as the state of charge error estimation capacity (E_SOCE).
  • the remaining capacity excluding the capacity for performing the UPS function (E_UPS), load prediction error response capacity (E_FCE), capacity reduced by degradation (E_DET), and charging state estimated error response capacity (E_SOCE)
  • E_UPS load prediction error response capacity
  • E_FCE load prediction error response capacity
  • E_DET capacity reduced by degradation
  • E_SOCE charging state estimated error response capacity
  • E_DC load management available capacity
  • the available capacity for load management by time is checked to establish the charge / discharge operation plan of the ESS, and to store it in the ESS operation plan database (S16), and to determine whether an additional operation plan should be established (S17). ).
  • the charge / discharge plan of the ESS is selectively set and operated as a charge / discharge operation for reducing the power charge of the load as shown in FIG. 8 and a charge / discharge operation for reducing the peak load of the load as shown in FIG. 9.
  • the charging state is established by calculating the state of charge for each unit time in consideration of the efficiency of the ESS, and the efficiency used here is configured to be updated at regular intervals.
  • the ESS charge / discharge control unit 30 retrieves the operation plan from the database at the time when the ES operation is planned (S21) and transfers the charge to the ESS communication to perform charge / discharge control ( S22).
  • the ESS operation analysis unit 40 Re-establishes the ESS operation planning based on the current load (S25) and stores it in the database.
  • the load prediction error and the SOC estimation error are continuously recorded in the ESS operation performance database and used to estimate the ESS load prediction error value used by the ESS operation planning unit 20 at regular intervals, and the SOC estimation error is
  • the ESS operation plan is used to correct the efficiency value of the ESS, and the steps below S22 are again performed according to the cycle determined by the plan reestablished by the corrected information. It proceeds (S26).
  • control method and control system of the energy storage device having the load management and the uninterruptible power supply function reasonably estimates and corrects the ESS charging amount, thereby appropriately selecting the load management capacity and the UPS capacity and thus the ESS capacity.
  • the management of these resources enables economic and efficient use of energy.

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Business, Economics & Management (AREA)
  • Emergency Management (AREA)
  • Charge And Discharge Circuits For Batteries Or The Like (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

본 발명은 부하에서 소모될 전력을 예측하여 정전 발생시 무정전 전력공급을 위해 에너지저장장치에 충전되어야 하는 에너지 용량(UPS 용량) 및 부하관리에 사용 가능한 용량을 산정하는 운영계획 수립단계, 상기 운영계획 수립단계에 의해 수립된 운영계획에 따라서 상기 에너지저장장치를 운영하는 에너지저장장치 운영단계 및 상기 에너지저장장치 운영단계에 의한 상기 에너지저장장치의 운영 상태에 따라 운영계획을 재수립하는 단계를 포함하는 부하관리 및 무정전 전력공급 기능을 가지는 에너지저장장치의 제어방법과 그에 관련된 제어시스템으로서, 본 발명에 의하면, 합리적인 에너지저장장치의 운영계획을 수립하고 검증함으로써 부하관리 및 UPS 기능에 따른 용량을 할당하여 그에 따라 에너지저장장치를 운영할 수 있게 한다.

Description

부하관리 및 무정전 전력공급 기능을 가지는 에너지저장장치의 제어방법 및 제어시스템
본 발명은 무정전 전력공급 기능 이외에 부하관리의 기능도 가지는 에너지저장장치를 제어하는 방법 및 시스템에 관한 것이다.
에너지저장장치(Energy Storage System, 이하 ESS)는 전기에너지를 충전하고 필요한 시점에 에너지를 방전하여 전력 사용을 유연하게 하는 설비이다.
전기에너지의 저장은 배터리 기술과 같이 전기화학 에너지로 변환되어 저장되는 기술 및 플라이휠과 같이 물리적 에너지로 저장되는 기술 등으로 다양하다.
ESS의 가장 일반적인 사용 목적은 정전에 대비한 무정전 전력공급(Uninterrupted power Supply, 이하 UPS)과 부하의 피크 저감 및 전력요금 절감을 위한 부하관리(Demand Control)가 대표적이다.
도 1은 그러한 부하관리 및 UPS 기능을 동시에 수행 가능한 ESS의 구조를 나타낸다.
UPS 기능을 목적으로 설치된 ESS는 충전 상태로 정전이 발생하기 전까지는 대기 상태를 유지하기 때문에 ESS의 사용빈도가 낮다.
도 2와 같은 일별 최대소비전력 특성을 갖는 부하에 UPS를 설치하면 동계의 900kW에 달하는 부하를 감당하기 위해 UPS의 설비용량은 900kW에 달하지만, 정전이 발생하기 전까지는 ESS는 대기상태를 유지하고, 동계를 제외한 기간에는 최대소비전력이 500kW 미만이므로 400kW의 ESS 출력은 부하관리 용도로 사용해도 문제가 되지 않는다.
따라서, ESS의 활용성을 높이기 위해 최근에는 정전이 발생하기 전에는 부하관리 용도로 사용하여 전력요금 및 피크 부하를 감소시키는 기능을 동시에 수행 가능하도록 개발되고 있다.
이렇게 부하관리 기능과 UPS 기능을 동시에 활용하려면, 정전 시에 UPS 기능을 동작하는 ESS의 에너지 용량과 부하관리 기능을 활용되는 ESS의 에너지 용량을 할당해야 한다.
이러한 할당이 적절히 이루어지지 않으면 정전 시 무정전 전력공급기능(UPS기능)을 수행할 수가 없거나 또는 활용 가능한 ESS의 용량이 남아 있음에도 활용하지 못하게 된다.
현재 개발된 부하관리 및 UPS 겸용 ESS는 사용자가 사전에 ESS의 용량을 UPS 기능 용량과 부하관리 용량으로 이분하여 설정하고 운영하도록 되어 있다.
그런데, 부하는 계속적으로 특성이 변동하므로 이렇게 사전에 용량을 할당하여 설정하는 것은 UPS 기능을 수행하면서도 부하의 상태에 따라서 가능한 여유용량을 활용하여 부하관리를 수행할 수 있는 장점을 갖기 어렵고, UPS와 부하관리용 ESS를 각각 설치하는 것과 다름이 없다.
일반적으로, UPS 기능을 가지는 ESS는 전산설비 등과 같이 중요한 전력설비의 전력공급 부분에 설치되어 연계된 중요 전력설비 소비 패턴 등의 정보를 통해 정전 발생시 공급해야 하는 부하의 용량이 간단하게 산정이 가능하였다.
하지만, 최근에는 UPS 기능을 하는 ESS가 공급 가능한 용량이 증가되고, 신뢰성 있는 전력공급에 대한 필요성이 대두되어 빌딩, 상가, 연구소와 같은 건물 단위의 전력공급 부분에도 설치되어 있기 때문에, ESS가 UPS 기능으로 공급해야 하는 부하의 용량은 쉽게 산정하기 어렵고 오차의 발생 가능성 또한 높다.
따라서, 대용량 ESS의 용량을 기능별로 할당하는 것은 어려운 문제가 된다.
한편, 최근 활발히 확산되고 있는 리튬이온 배터리를 활용한 ESS는 배터리관리시스템(Battery Management System)이 배터리 전압을 측정하여 배터리의 충전상태(State Of Charge, SOC)를 추정한다.
이러한 충전상태의 추정은 다양한 배터리 특성을 가정하여 계산되기 때문에 어느 정도의 오차를 포함하고 있다. 리튬이온 배터리뿐만 아니라 다른 ESS 기술 역시 충전상태의 추정에서 오차가 존재하게 된다.
그리고, 리튬이온 배터리를 활용한 ESS는 배터리 수명 특성에 따라서 일정한 충장전 동작 수행 후에는 충방전 가능한 용량이 계속적으로 감소한다. 이러한 충방전 가능한 용량의 감소는 그 배터리의 충방전 동작 환경 및 이력 등에 따라서 결정되나, 이 수명에 따른 용량감소의 추정 역시 높지 않은 정확도를 갖는다.
이상의 배경기술에 기재된 사항은 발명의 배경에 대한 이해를 돕기 위한 것으로서, 이 기술이 속하는 분야에서 통상의 지식을 가진 자에게 이미 알려진 종래기술이 아닌 사항을 포함할 수 있다.
본 발명은 상술한 문제점을 해결하고자 안출된 것으로서, 본 발명은 합리적인 ESS의 운영계획을 수립하고 검증함으로써 부하관리 및 UPS 기능에 따른 용량을 할당하여 그에 따라 에너지저장장치를 운영할 수 있는 부하관리 및 무정전 전력공급 기능을 가지는 에너지저장장치의 제어방법 및 제어시스템을 제공하는 데 그 목적이 있다.
본 발명의 일 관점에 의한 부하관리 및 무정전 전력공급 기능을 가지는 에너지저장장치의 제어방법은, 부하에서 소모될 전력을 예측하여 정전 발생시 무정전 전력공급을 위해 에너지저장장치에 충전되어야 하는 에너지 용량(UPS 용량) 및 부하관리에 사용 가능한 용량을 산정하는 운영계획 수립단계, 상기 운영계획 수립단계에 의해 수립된 운영계획에 따라서 상기 에너지저장장치를 충방전 운영하는 에너지저장장치 운영단계 및 상기 에너지저장장치 운영단계에 의한 상기 에너지저장장치의 운영 상태에 따라 운영계획을 재수립하는 단계를 포함한다.
상기 운영계획 수립단계에서의 상기 부하에서 소모될 전력의 예측은 상기 부하의 전력소비 기록의 시계열적 분석에 의해 예측하는 것을 특징으로 한다.
그리고, 상기 운영계획 수립단계는 상기 부하에서 소모될 전력 예측의 오차에 대응하는 부하예측오차 대응용량을 산정하는 것을 특징으로 한다.
상기 부하예측오차 대응용량은 예측일의 특성에 따라 달리 설정하는 것을 특징으로 한다.
또한, 상기 운영계획수립단계는 상기 에너지저장장치의 수명에 따른 용량 감소 대응용량과 충방전 상태 오차 대응용량을 산정하는 것을 특징으로 한다.
이러한 상기 운영계획 수립단계는 상기 에너지저장장치의 정격 용량에서 추정된 상기 UPS 용량과 상기 부하예측오차 대응용량, 상기 용량감소 대응용량 및 충방전 상태 오차 대응용량을 제외한 용량을 상기 부하관리에 사용 가능한 용량으로 산정하는 것을 특징으로 한다.
그리고, 상기 운영계획 수립단계에 의해 상기 부하관리에 사용 가능한 용량이 산정되면, 상기 부하관리에 사용 가능한 용량 및 상기 에너지저장장치의 효율과 충전 상태를 고려하여 상기 에너지저장장치의 충방전 운영계획을 수립하는 것을 특징으로 한다.
상기 에너지저장장치의 충방전 운영계획은 상기 부하의 전력요금 저감을 위한 충방전 동작 또는 상기 부하의 피크 부하를 저감하기 위한 충방전 동작으로 선택 가능한 것을 특징으로 한다.
한편, 상기 운영계획을 재수립하는 단계는 상기 에너지저장장치 운영단계에 의해 운영되는 상기 에너지저장장치의 충전상태를 상기 운영계획 수립단계에서 추정된 충전 상태와 비교하여, 차이가 일정 크기 이상이 되면 상기 운영되는 에너지저장장치의 충전상태를 기반으로 운영계획을 재수립하는 것을 특징으로 한다.
또는, 상기 운영계획을 재수립하는 단계는 상기 에너지저장장치 운영단계에서의 상기 부하의 전력 소비량이 상기 운영계획 수립단계에서 예측한 부하에서 소모될 전력과 비교하여, 차이가 일정 크기 이상이 되면 상기 부하의 전력 소비량을 기반으로 운영계획을 재수립하는 것을 특징으로 한다.
본 발명의 다른 일 관점에 의한 부하관리 및 무정전 전력공급 기능을 가지는 에너지저장장치의 제어방법은, 부하에서 소모될 전력을 예측하여 정전 발생시 무정전 전력공급을 위해 에너지저장장치에 충전되어야 하는 에너지 용량(UPS 용량)을 추정하고, 상기 부하에서 소모될 전력 예측의 오차에 대응하는 부하예측오차 대응용량을 산정하고, 상기 에너지저장장치의 수명에 따른 용량 감소 대응용량을 산정하여, 상기 에너지저장장치의 정격용량에서 추정된 상기 UPS 용량과 상기 부하예측오차 대응용량, 상기 용량감소 대응용량 및 충방전 상태 오차 대응용량을 제외한 용량을 상기 부하관리에 사용 가능한 용량으로 산정하여 상기 에너지저장장치의 운영계획을 수립하는 것을 특징으로 한다.
다음으로, 본 발명의 일 관점에 의한 부하관리 및 무정전 전력공급 기능을 가지는 에너지저장장치의 제어시스템은, 부하이력 데이터베이스의 정보를 활용하여 부하에서 소모될 전력을 예측하여 정전 발생시 무정전 전력공급을 위해 에너지저장장치에 충전되어야 하는 에너지 용량(UPS 용량) 및 부하관리에 사용 가능한 용량을 산정하는 에너지저장장치 운영계획 수립부, 상기 에너지저장장치 운영계획 수립부에 의해 수립된 운영계획에 따라서 상기 에너지저장장치의 충방전을 제어하는 에너지저장장치 충방전 제어부 및 상기 에너지저장장치 충방전 제어부의 제어에 의해 운영되는 상기 에너지저장장치의 운영 상태에 따른 정보를 보정하는 상기 에너지저장장치 운영 분석부를 포함한다.
상기 에너지저장장치 운영계획 수립부는 상기 부하의 전력소비 기록의 시계열적 분석을 통해 상기 부하에서 소모될 전력을 예측하는 것을 특징으로 한다.
그리고, 상기 에너지저장장치 운영계획 수립부는 상기 부하에서 소모될 전력 예측의 오차에 대응하는 부하예측오차 대응용량을 산정하는 것을 특징으로 한다.
상기 부하예측오차 대응용량은 예측일의 특성에 따라 달리 설정하는 것을 특징으로 한다.
또한, 상기 에너지저장장치 운영계획 수립부는 상기 에너지저장장치의 수명에 따른 용량 감소 대응용량과 충방전 상태 오차 대응용량을 산정하는 것을 특징으로 한다.
이러한 상기 에너지저장장치 운영계획 수립부는 상기 에너지저장장치의 정격용량에서 추정된 상기 UPS 용량과 상기 부하예측오차 대응용량, 상기 용량감소 대응용량 및 충방전 상태 오차 대응용량을 제외한 용량을 상기 부하관리에 사용 가능한 용량으로 산정하는 것을 특징으로 한다.
한편, 상기 에너지저장장치 운영계획 수립부는 상기 부하관리에 사용 가능한 용량이 산정되면, 상기 부하관리에 사용 가능한 용량 및 상기 에너지저장장치의 효율과 충전 상태를 고려하여 상기 에너지저장장치의 충방전 운영계획을 수립하는 것을 특징으로 한다.
그리고, 상기 에너지저장장치의 충방전 운영계획은 상기 부하의 전력요금 저감을 위한 충방전 동작 또는 상기 부하의 피크 부하를 저감하기 위한 충방전 동작으로 선택 가능한 것을 특징으로 한다.
또한, 상기 에너지저장장치 운영 분석부는 상기 에너지저장장치 충방전 제어부에 의해 운영된 상기 에너지저장장치의 충전상태를 상기 에너지저장장치 운영계획 수립부에서 추정된 충전 상태와 비교하여, 차이가 일정 크기 이상이 되면 상기 운영되는 에너지저장장치의 충전상태를 상기 부하이력 데이터베이스에 저장하고 운영계획을 재수립하는 것을 특징으로 한다.
또는, 상기 에너지저장장치 운영 분석부는 상기 에너지저장장치 충방전 제어부에 의해 제어 운영된 상기 부하의 전력 소비량이 상기 에너지저장장치 운영계획 수립부에서 예측한 부하에서 소모될 전력과 비교하여, 차이가 일정 크기 이상이 되면 상기 부하예측 차이를 상기 부하이력 데이터베이스에 저장하는 것을 특징으로 한다.
본 발명의 다른 일 관점에 의한 부하관리 및 무정전 전력공급 기능을 가지는 에너지저장장치의 제어시스템은, 부하이력 데이터베이스의 정보를 활용하여 부하에서 소모될 전력을 예측하여 정전 발생시 무정전 전력공급을 위해 에너지저장장치에 충전되어야 하는 에너지 용량(UPS 용량)을 추정하고, 상기 부하에서 소모될 전력 예측의 오차에 대응하는 부하예측오차 대응용량을 산정하고, 상기 에너지저장장치의 수명에 따른 용량 감소 대응용량을 산정하여, 상기 에너지저장장치의 정격용량에서 추정된 상기 UPS 용량과 상기 부하예측오차 대응용량, 상기 용량감소 대응용량 및 충방전 상태 오차 대응용량을 제외한 용량을 상기 부하관리에 사용 가능한 용량으로 산정하여 상기 에너지저장장치의 운영계획을 수립하는 것을 특징으로 한다.
본 발명의 부하관리 및 무정전 전력공급 기능을 가지는 에너지저장장치의 제어방법 및 제어시스템에 의하면, UPS용 ESS의 활용되지 않는 용량을 활용하여 부하관리에 적용함으로써 ESS의 경제성을 증대시킨다.
또한, 대용량 UPS용 ESS의 용량 할당 계산에서 오차를 발생시키는 요소들에 대한 대응방안을 확보함으로써 보다 신뢰성 있게 ESS를 운영할 수가 있다.
그리고, 비상발전기에도 부하관리 기능을 추가하여 ESS의 경제성 증대가 가능하다.
즉, 한국의 비상발전기는 약 21,000MkW가 설치되어 있으며, 설치된 부하의 부하율은 50% 정도이므로 본 발명에 의한 부하관리 겸용 ESS로 전환되면 연간 1,800GWh(6개월간 약 10,000MW의 ESS가 1일 1시간 동작으로 가정)의 부하관리 용량이 확보된다.
SMP 차액으로 부하관리의 경제성을 간략히 추정하면, 연간 1,800억원에 해당하는 부하관리 용량이 확보되는 것이다.(100원/kWh로 가정)
도 1은 일반적인 부하관리 및 UPS 기능을 동시에 수행 가능한 ESS의 구조이다.
도 2는 특정 부하의 일별 최대 소비전력에 관한 예시이다.
도 3은 본 발명의 일 실시예에 의한 부하관리 및 무정전 전력공급 기능을 가지는 에너지저장장치의 제어시스템을 도시한 것이다.
도 4는 본 발명의 일 실시예에 의한 부하관리 및 무정전 전력공급 기능을 가지는 에너지저장장치의 제어방법을 도시한 것이다.
도 5는 도 2의 예시에 따른 부하예측 결과이다.
도 6은 도 5의 부하예측을 기반으로 한 시간대별 UPS 기능 대응 ESS 용량을 도시한 것이다.
도 7은 도 5의 부하예측을 기반으로 한 시간대별 ESS 할당 용량을 도시한 것이다.
도 8 및 도 9는 ESS 충방전 계획의 유형별 예시이다.
도 10은 본 발명의 일 실시예에 의한 부하 예측 결과 ESS의 운영에 관해 도시한 것이다.
본 발명과 본 발명의 동작상의 이점 및 본 발명의 실시에 의하여 달성되는 목적을 충분히 이해하기 위해서는 본 발명의 바람직한 실시 예를 예시하는 첨부 도면 및 첨부 도면에 기재된 내용을 참조하여야만 한다.
본 발명의 바람직한 실시 예를 설명함에 있어서, 본 발명의 요지를 불필요하게 흐릴 수 있는 공지의 기술이나 반복적인 설명은 그 설명을 줄이거나 생략하기로 한다.
본 발명의 부하관리 및 무정전 전력공급 기능을 가지는 에너지저장장치의 제어방법 및 제어시스템은 부하의 특성을 합리적으로 분석, 예측하여 에너지저장장치(ESS)의 운영계획을 수립하고, 계획의 오차를 극복할 수 있는 제어방법 및 시스템이다.
즉, 무정전 전력공급기능(UPS)과 부하관리 기능을 모두 수행하기 위해서, 기능별로 ESS의 용량을 할당하여 충방전을 제어하는 것이 핵심적인 기술이며, 이를 위해서 전력을 소비하는 부하예측과 이 예측의 오차, ESS의 충전상태 추정의 오차, ESS의 수명에 따른 용량 저감 등을 모두 고려하여 운영 계획을 수립하고 실시간 충방전 제어를 수행함으로써 UPS 기능과 부하관리 기능을 모두 성공적으로 활용할 수 있게 한다.
이하에서, 본 발명에 의한 부하관리 및 무정전 전력공급 기능을 가지는 에너지저장장치의 제어방법 및 제어시스템의 기술적 원리를 살펴보고, 보다 구체적인 실시예를 후술하기로 한다.
하나의 에너지저장장치(ESS)를 UPS 기능과 부하관리 기능 겸용으로 사용하기 위해서 ESS의 제어방법은 운영계획을 수립하는 단계, 운영계획에 따라 충방전 제어를 수행하며 운영기록을 저장하는 단계, 운영 기록을 분석하여 운영계획을 보정하여 재수립하는 단계를 포함한다.
운영계획을 수립하는 단계에서 수분 또는 시간 단위로, 하루 후 또는 일주일 후까지의 부하예측을 수행하여 정전 발생시 무정전 전력공급을 위해 ESS에 충전되어야 하는 에너지 용량(이하, UPS 용량)을 산정한다.
이 부하예측은 전력소비 기록의 시계열 분석 등을 통해 수행할 수 있으며, 부하예측 방법에 따라서 부하예측 오차에 대비한 ESS의 여유 용량을 할당한다.
즉, 예상보다 높은 부하가 발생하게 되면 UPS 기능을 수행하기 위해 ESS에 충전된 용량이 부족한 것에 대한 대비책으로 여유 용량을 할당한다.
이 오차에 대비한 ESS의 여유 용량의 할당은 평일과 특수일(명절, 연휴 등) 등 일자별로 다르게 설정하여 ESS의 용량을 더욱 활용 가능하도록 한다.
또한, 이 부하예측 오차에 대한 정보는 ESS 운영실적 데이터베이스에 기록하여 일정 주기별로 부하예측 오차에 대비한 ESS의 여유 용량 계산에 반영한다.
ESS의 충전상태는 ESS의 종류에 따라서 다양한 연산과정을 통하여 수행된다.
이 연산과정에서 ESS의 전압 및 전류 등을 측정하는 기술의 오차를 포함한 충전상태 연산 오차 등에 대비한 오차 또한 ESS의 운영계획에 반영하여 용량을 할당한다.
그리고, ESS의 수명에 따른 용량 감소를 전체 ESS의 용량에서 차감하여 운영계획에 반영한다.
상기 설명한 ESS의 용량 중 UPS 기능 용량, 부하예측오차 대응용량, 수명에 따른 용량감소 대응용량 및 충전 상태 연산 오차를 제외한 나머지 잔여 용량이 부하관리에 사용 가능한 용량으로 할당된다.
ESS의 단위시간별 용량할당이 완료되면, 부하관리 용량을 고려하여 ESS의 충방전 운영 계획을 수립하는 단계를 수행한다.
충방전 운영계획은 ESS의 효율과 충전상태를 고려하여 수립된다.
ESS의 충방전 동작의 목적은 전력요금을 감소시키기 위한 목적, 최대전력소비를 저감시키기 위한 목적 등으로 사용자에 의해서 설정될 수 있다.
운영계획에 따라서 ESS의 운영을 수행하는 단계에서는 실시간으로 측정된 충전상태와 운영계획에서 추정된 충전상태의 차이를 연산하고, 이 차이가 일정 크기 이상이 되면 측정된 충전상태를 기반으로 운영계획을 재수립하는 동작을 수행한다.
또한, 운영단계에서 측정된 부하의 전력소비량이 부하예측으로 추정된 전력소비량과 일정 크기 이상의 차이가 발생하면, 부하 예측값을 보정하여 운영계획을 재수립하는 동작을 수행하게 된다.
도 3은 본 발명의 일 실시예에 의한 부하관리 및 무정전 전력공급 기능을 가지는 에너지저장장치의 제어시스템을 도시한 것이다.
도 4는 본 발명의 일 실시예에 의한 부하관리 및 무정전 전력공급 기능을 가지는 에너지저장장치의 제어방법을 도시한 것이다.
이하, 도 3 및 도 4를 참조하여 본 발명의 구체적인 실시예를 살펴보기로 한다.
부하관리 및 무정전 전력공급 기능을 동시에 활용하기 위한 ESS의 제어시스템은 전력을 공급받는 부하이력 데이터베이스(10) 정보를 활용하여, ESS의 운영계획을 수립하는 ESS 운영계획 수립부(20)와, 이 운영계획에 따라서 ESS를 제어하는 충방전 제어부(30), 그리고 ESS의 운영실적을 분석하여 ESS 운영계획 수립에 활용되는 정보를 보정하는 ESS 운영 분석부(40)를 포함한다.
ESS의 운영계획은 하루 전 또는 일주일 전에 수립한다.
하루 전 운영계획 수립단계를 예를 들어 설명하면, 내일의 ESS 운영계획을 단위시간별로 수립하기 위해서 부하이력 데이터베이스(10)의 정보를 활용하여 부하예측을 수행한다(S11).
부하 예측 단계(S11)에서 부하예측의 오차를 가늠하기 위해서 내일을 부하예측 오차가 낮은 일반일과 부하예측 오차가 높은 특수일로 구분하여 부하예측 오차를 추정한다(S12).
도 2와 같이 일별 최대전력소비 특징을 갖는 부하를 예로 설명하면, 이 부하는 동계에는 전력소비가 약 900kW를 넘어서는 특성을 갖는다.
그러므로, 이 부하에 UPS 기능을 수행하기 위한 ESS는 동계 최대전력(900kW)보다 큰 용량이어야 한다. 1MW/1MWh의 ESS를 설치한다고 가정하면, 이 ESS는 동계를 제외한 기간 동안에는 활용성이 낮아진다.
이 부하를 예시로 하여 부하관리 및 UPS 기능을 갖는 ESS의 제어방법을 설명하면 다음과 같다.
하계 어느 날 부하예측을 수행하면, 도 5와 같이 다음 날의 부하를 추정할 수가 있다. 이렇게 부하가 추정되면, 해당 시간에 정전 발생시에 필요한 ESS의 에너지 용량을 계산한다. 예를 들어, 정전 발생시 ESS가 10분간(운영자에 의한 설정값) 전력을 공급하는 것을 기준으로 계산하면, 각 시간별 예측된 부하량(kW)에 10/30(16.67%)을 곱하여 해당 시간에 필요한 에너지양을 계산한다.
도 5의 시간별 예측부하를 반영하여 시간대별 UPS 기능을 위한 ESS에 필요한 에너지(E_UPS)를 계산하면 도 6과 같이 나타난다. 이 용량은 해당 시간에 UPS 기능을 수행하기 위해 ESS에 반드시 충전되어 있어야 하는 용량을 의미한다.
부하를 예측한 날이 부하예측 오차가 높은 특수일인지 아닌지를 고려하여 사전에 정의된 부하예측 오차 값을 활용하여 부하예측 오차에 대응하기 위한 ESS 용량을 추정한다.
예를 들어, 부하를 예측한 내일이 일반일이면 부하예측오차 ±5%를 고려하여 시간별로 할당된 UPS 기능 대응 ESS 에너지 용량에 10%를 부하예측 오차 대응 용량(E_FCE)으로 할당하는 것이다.
다음 단계로, ESS의 수명 열화로 인한 충방전 가능용량의 감소를 추정하여(S13) ESS 운영계획에 반영한다.
열화로 인해 감소된 ESS 용량(E_DET)은 ESS 설비에서 추정되어 계산될 수도 있고, 운영실적 데이터베이스의 분석을 통하여 추정될 수도 있다. 예를 들어, 전체 ESS의 에너지 용량에서 1%가 감소한 것으로 추정되면, ESS의 초기 설치 용량의 1%(10kWh)가 사용이 불가능한 것으로 할당하여 ESS 운영계획 수립에 활용한다.
다음으로, ESS 충전상태에 대한 오차를 용량할당에 반영한다(S14). ESS 충전상태 추정이 최대 ±3%의 오차를 갖는다면, ESS 정격용량에 대하여 6%의 용량을 충전상태 추정 오차 대응 용량(E_SOCE)으로 설정한다.
이에 따라, ESS의 정격용량에서 UPS 기능을 수행하기 위한 용량(E_UPS)과 부하예측 오차 대응 용량(E_FCE), 열화에 의해 저감된 용량(E_DET), 충전상태 추정 오차 대응용량(E_SOCE)를 제외한 나머지 용량이 부하관리 가용 용량(E_DC)으로 할당된다(S15).
[수학식 1]
Figure PCTKR2016013071-appb-I000001
본 예시에 의해 산정된 시간대별 ESS 용량 할당은 도 7과 같이 정리된다.
ESS 운영계획 수립단계에서 마지막으로 시간대별 부하관리 가용용량을 확인하여 ESS의 충방전 운영계획을 수립하여 ESS 운영계획 데이터베이스에 저장하고(S16), 운영계획을 추가로 수립하여야 하는지를 판단하게 된다(S17).
ESS의 충방전 계획은 도 8와 같이 부하의 전력요금 저감을 위한 충방전 동작과 도 9과 같이 부하의 피크부하를 저감하기 위한 충방전 동작으로 선택적으로 설정하여 운영하게 된다.
ESS 충방전 동작 계획수립에서 ESS의 효율을 고려하여 단위시간별로 충전상태를 계산하여 충방전 계획을 수립하고, 여기서 활용된 효율은 일정 주기별로 갱신 가능하도록 구성된다.
그리고, ESS 운영계획이 데이터베이스에 저장된 상태에서 도 10과 같이 ESS 충방전 제어부(30)는 ES 운영이 계획된 시점에서 운영계획을 데이터베이스에서 불러들여(S21) ESS 통신으로 전달하여 충방전 제어를 수행(S22)하게 된다.
ESS의 충방전 동작에서 현재의 부하량이 ESS 운영계획 수립에서 사용된 예측된 부하량과 일정 크기(e1) 이상의 차이를 가지는지를 판단하여(S23), e1 이상의 차이를 가지면, ESS 운영분석부(40)는 현재의 부하량을 기준으로 ESS 운영계획 수립을 다시 수행하여(S25) 데이터베이스에 저장한다.
또한, ESS 충방전 계획에서 추정한 ESS의 충전상태의 값과 현재의 충전상태의 값이 일정 크기(e2) 이상의 차이를 가지는지를 판단하여(S24), e2 이상의 차이인 경우, ESS 운영분석부(40)는 현재의 충전상태를 기준으로 ESS 운영계획 수립을 다시 수립하여(S25) 데이터베이스에 저장한다.
그리고, ESS의 운영 실적 데이터베이스에 이 부하예측오차와 SOC 추정오차는 계속적으로 기록되어 일정주기마다 ESS 운영계획 수립부(20)에서 사용하는 ESS 부하예측 오차값을 추정하는데 활용하고, SOC 추정오차는 ESS 운영계획 수립부(20)에서 충방전 계획을 수립하는 과정에서 ESS의 효율값을 보정하는 데 활용하게 되며, 보정된 정보에 의해 재수립된 계획에 의해 정해진 주기에 따라 S22 이하의 단계가 다시 진행된다(S26).
이상과 같이 본 발명에 의한 부하관리 및 무정전 전력공급 기능을 가지는 에너지저장장치의 제어방법 및 제어시스템은 ESS 충전량을 합리적으로 추정하고 보정함으로써, 그에 따라 부하관리 용량 및 UPS 용량을 적절히 선택하여 ESS 용량을 관리하기 때문에 경제적이고 효율적인 에너지 이용이 가능하게 한다.
이상과 같은 본 발명은 예시된 도면을 참조하여 설명되었지만, 기재된 실시 예에 한정되는 것이 아니고, 본 발명의 사상 및 범위를 벗어나지 않고 다양하게 수정 및 변형될 수 있음은 이 기술의 분야에서 통상의 지식을 가진 자에게 자명하다. 따라서 그러한 수정 예 또는 변형 예들은 본 발명의 특허청구범위에 속한다 하여야 할 것이며, 본 발명의 권리범위는 첨부된 특허청구범위에 기초하여 해석되어야 할 것이다.
* 부호의 설명
10 : 부하이력 데이터베이스
20 : ESS 운영계획 수립부
30 : ESS 충방전 제어부
40 : ESS 운영 분석부
S11 : 부하예측 수행
S12 : 부하예측 오차 추정
S13 : ESS 용량감소 추정
S14 : SOC 오차 추정
S15 : 시간대별 ESS 용량 할당
S16 : ESS 충방전 계획 저장
S17 : 추가 운영계획 수립필요 판단
S21 : ESS 운영계획 불러오기
S22 : ESS 충방전 수행
S23 : 부하예측 오차 판단
S24 : 계획 SOC 오차 판단
S25 : 추가 운영계획 수립
S26 : 일정 주기 동작 반복

Claims (24)

  1. 부하에서 소모될 전력을 예측하여 정전 발생시 무정전 전력공급을 위해 에너지저장장치에 충전되어야 하는 에너지 용량(UPS 용량) 및 부하관리에 사용 가능한 용량을 산정하는 운영계획 수립단계;
    상기 운영계획 수립단계에 의해 수립된 운영계획에 따라서 상기 에너지저장장치를 운영하는 에너지저장장치 운영단계; 및
    상기 에너지저장장치 운영단계에 의한 상기 에너지저장장치의 운영 상태에 따라 운영계획을 재수립하는 단계를 포함하는,
    부하관리 및 무정전 전력공급 기능을 가지는 에너지저장장치의 제어방법.
  2. 청구항 1에 있어서,
    상기 운영계획 수립단계에서의 상기 부하에서 소모될 전력의 예측은 상기 부하의 전력소비 기록의 시계열적 분석에 의해 예측하는 것을 특징으로 하는,
    부하관리 및 무정전 전력공급 기능을 가지는 에너지저장장치의 제어방법.
  3. 청구항 2에 있어서,
    상기 운영계획 수립단계는 상기 부하에서 소모될 전력 예측의 오차에 대응하는 부하예측오차 대응용량을 산정하는 것을 특징으로 하는,
    부하관리 및 무정전 전력공급 기능을 가지는 에너지저장장치의 제어방법.
  4. 청구항 3에 있어서,
    상기 부하예측오차 대응용량은 예측일의 특성에 따라 달리 설정하는 것을 특징으로 하는,
    부하관리 및 무정전 전력공급 기능을 가지는 에너지저장장치의 제어방법.
  5. 청구항 3에 있어서,
    상기 운영계획수립단계는 상기 에너지저장장치의 수명에 따른 용량 감소 대응용량을 산정하는 것을 특징으로 하는,
    부하관리 및 무정전 전력공급 기능을 가지는 에너지저장장치의 제어방법.
  6. 청구항 5에 있어서,
    상기 운영계획수립단계는 상기 에너지저장장치의 충전상태 추정 오차에 대응하는 용량을 산정하는 것을 특징으로 하는,
    부하관리 및 무정전 전력공급 기능을 가지는 에너지저장장치의 제어방법.
  7. 청구항 6에 있어서,
    상기 운영계획 수립단계는 상기 에너지저장장치의 정격용량에서 추정된 상기 UPS 용량과 상기 부하예측오차 대응용량, 상기 용량감소 대응용량 및 상기 충전상태 오차 대응용량을 제외한 용량을 상기 부하관리에 사용 가능한 용량으로 산정하는 것을 특징으로 하는,
    부하관리 및 무정전 전력공급 기능을 가지는 에너지저장장치의 제어방법.
  8. 청구항 7에 있어서,
    상기 운영계획 수립단계에 의해 상기 부하관리에 사용 가능한 용량이 산정되면, 상기 부하관리에 사용 가능한 용량 및 상기 에너지저장장치의 효율과 충전 상태를 고려하여 상기 에너지저장장치의 충방전 운영계획을 수립하는 것을 특징으로 하는,
    부하관리 및 무정전 전력공급 기능을 가지는 에너지저장장치의 제어방법.
  9. 청구항 8에 있어서,
    상기 에너지저장장치의 충방전 운영계획은 상기 부하의 전력요금 저감을 위한 충방전 동작 또는 상기 부하의 피크 부하를 저감하기 위한 충방전 동작으로 선택 가능한 것을 특징으로 하는,
    부하관리 및 무정전 전력공급 기능을 가지는 에너지저장장치의 제어방법.
  10. 청구항 8에 있어서,
    상기 운영계획을 재수립하는 단계는 상기 에너지저장장치 운영단계에 의해 운영되는 상기 에너지저장장치의 충전상태를 상기 운영계획 수립단계에서 추정된 충전 상태와 비교하여, 차이가 일정 크기 이상이 되면 상기 운영되는 에너지저장장치의 충전상태를 기반으로 운영계획을 재수립하는 것을 특징으로 하는,
    부하관리 및 무정전 전력공급 기능을 가지는 에너지저장장치의 제어방법.
  11. 청구항 8에 있어서,
    상기 운영계획을 재수립하는 단계는 상기 에너지저장장치 운영단계에서의 상기 부하의 전력 소비량이 상기 운영계획 수립단계에서 예측한 부하에서 소모될 전력과 비교하여, 차이가 일정 크기 이상이 되면 상기 부하의 전력 소비량을 기반으로 운영계획을 재수립하는 것을 특징으로 하는,
    부하관리 및 무정전 전력공급 기능을 가지는 에너지저장장치의 제어방법.
  12. 부하에서 소모될 전력을 예측하여 정전 발생시 무정전 전력공급을 위해 에너지저장장치에 충전되어야 하는 에너지 용량(UPS 용량)을 추정하고, 상기 부하에서 소모될 전력 예측의 오차에 대응하는 부하예측오차 대응용량을 산정하고, 상기 에너지저장장치의 수명에 따른 용량 감소 대응용량을 산정하고, 상기 에너지저장장치의 충전상태 추정 오차 대응용량을 산정하여, 상기 에너지저장장치의 정격용량에서 추정된 상기 UPS 용량과 상기 부하예측오차 대응용량, 상기 용량감소 대응용량 및 충전상태 오차 대응용량을 제외한 용량을 상기 부하관리에 사용 가능한 용량으로 산정하여 상기 에너지저장장치의 운영계획을 수립하는 것을 특징으로 하는 부하관리 및 무정전 전력공급 기능을 가지는 에너지저장장치의 제어방법.
  13. 부하이력 데이터베이스의 정보를 활용하여 부하에서 소모될 전력을 예측하여 정전 발생시 무정전 전력공급을 위해 에너지저장장치에 충전되어야 하는 에너지 용량(UPS 용량) 및 부하관리에 사용 가능한 용량을 산정하는 에너지저장장치 운영계획 수립부;
    상기 에너지저장장치 운영계획 수립부에 의해 수립된 운영계획에 따라서 상기 에너지저장장치의 충방전을 제어하는 에너지저장장치 충방전 제어부; 및
    상기 에너지저장장치 충방전 제어부의 제어에 의해 운영되는 상기 에너지저장장치의 운영 상태에 따른 정보를 보정하는 상기 에너지저장장치 운영 분석부를 포함하는,
    부하관리 및 무정전 전력공급 기능을 가지는 에너지저장장치의 제어시스템.
  14. 청구항 13에 있어서,
    상기 에너지저장장치 운영계획 수립부는 상기 부하의 전력소비 기록의 시계열적 분석을 통해 상기 부하에서 소모될 전력을 예측하는 것을 특징으로 하는,
    부하관리 및 무정전 전력공급 기능을 가지는 에너지저장장치의 제어시스템.
  15. 청구항 14에 있어서,
    상기 에너지저장장치 운영계획 수립부는 상기 부하에서 소모될 전력 예측의 오차에 대응하는 부하예측오차 대응용량을 산정하는 것을 특징으로 하는,
    부하관리 및 무정전 전력공급 기능을 가지는 에너지저장장치의 제어시스템.
  16. 청구항 15에 있어서,
    상기 부하예측오차 대응용량은 예측일의 특성에 따라 달리 설정하는 것을 특징으로 하는,
    부하관리 및 무정전 전력공급 기능을 가지는 에너지저장장치의 제어시스템.
  17. 청구항 15에 있어서,
    상기 에너지저장장치 운영계획 수립부는 상기 에너지저장장치의 수명에 따른 용량 감소 대응용량을 산정하는 것을 특징으로 하는,
    부하관리 및 무정전 전력공급 기능을 가지는 에너지저장장치의 제어시스템.
  18. 청구항 17에 있어서,
    상기 에너지저장장치 운영계획 수립부는 상기 에너지저장장치의 충전상태 추정 오차에 대응하는 용량을 산정하는 것을 특징으로 하는,
    부하관리 및 무정전 전력공급 기능을 가지는 에너지저장장치의 제어시스템.
  19. 청구항 18에 있어서,
    상기 에너지저장장치 운영계획 수립부는 상기 에너지저장장치의 정격용량에서 추정된 상기 UPS 용량과 상기 부하예측오차 대응용량, 상기 용량감소 대응용량 및 상기 충전상태 오차 대응용량을 제외한 용량을 상기 부하관리에 사용 가능한 용량으로 산정하는 것을 특징으로 하는,
    부하관리 및 무정전 전력공급 기능을 가지는 에너지저장장치의 제어시스템.
  20. 청구항 19에 있어서,
    상기 에너지저장장치 운영계획 수립부는 상기 부하관리에 사용 가능한 용량이 산정되면, 상기 부하관리에 사용 가능한 용량 및 상기 에너지저장장치의 효율과 충전 상태를 고려하여 상기 에너지저장장치의 충방전 운영계획을 수립하는 것을 특징으로 하는,
    부하관리 및 무정전 전력공급 기능을 가지는 에너지저장장치의 제어시스템.
  21. 청구항 20에 있어서,
    상기 에너지저장장치의 충방전 운영계획은 상기 부하의 전력요금 저감을 위한 충방전 동작 또는 상기 부하의 피크 부하를 저감하기 위한 충방전 동작으로 선택 가능한 것을 특징으로 하는,
    부하관리 및 무정전 전력공급 기능을 가지는 에너지저장장치의 제어시스템.
  22. 청구항 20에 있어서,
    상기 에너지저장장치 운영 분석부는 상기 에너지저장장치 충방전 제어부에 의해 운영된 상기 에너지저장장치의 충전상태를 상기 에너지저장장치 운영계획 수립부에서 추정된 충전 상태와 비교하여, 차이가 일정 크기 이상이 되면 상기 운영되는 에너지저장장치의 충전상태를 상기 부하이력 데이터베이스에 저장하고 운영계획을 재수립하는 것을 특징으로 하는,
    부하관리 및 무정전 전력공급 기능을 가지는 에너지저장장치의 제어시스템.
  23. 청구항 20에 있어서,
    상기 에너지저장장치 운영 분석부는 상기 에너지저장장치 충방전 제어부에 의해 제어 운영된 상기 부하의 전력 소비량이 상기 에너지저장장치 운영계획 수립부에서 예측한 부하에서 소모될 전력과 비교하여, 차이가 일정 크기 이상이 되면 상기 부하예측 차이를 상기 부하이력 데이터베이스에 저장하는 것을 특징으로 하는,
    부하관리 및 무정전 전력공급 기능을 가지는 에너지저장장치의 제어시스템.
  24. 부하이력 데이터베이스의 정보를 활용하여 부하에서 소모될 전력을 예측하여 정전 발생시 무정전 전력공급을 위해 에너지저장장치에 충전되어야 하는 에너지 용량(UPS 용량)을 추정하고, 상기 부하에서 소모될 전력 예측의 오차에 대응하는 부하예측오차 대응용량을 산정하고, 상기 에너지저장장치의 수명에 따른 용량 감소 대응용량을 산정하여, 상기 에너지저장장치의 충전상태 추정 오차에 대응하는 용량을 산정하여, 상기 에너지저장장치의 정격용량 중 추정된 상기 UPS 용량과 상기 부하예측오차 대응용량, 상기 용량감소 대응용량 및 충방전 상태 오차 대응용량을 제외한 용량을 상기 부하관리에 사용 가능한 용량으로 산정하여 상기 에너지저장장치의 운영계획을 수립하는 것을 특징으로 하는 부하관리 및 무정전 전력공급 기능을 가지는 에너지저장장치의 제어시스템.
PCT/KR2016/013071 2016-09-26 2016-11-14 부하관리 및 무정전 전력공급 기능을 가지는 에너지저장장치의 제어방법 및 제어시스템 WO2018056505A1 (ko)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US16/334,720 US10819138B2 (en) 2016-09-26 2016-11-14 Control method and control system for energy storage system having demand control and uninterrupted power supply functions

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
KR10-2016-0123432 2016-09-26
KR1020160123432A KR101860638B1 (ko) 2016-09-26 2016-09-26 부하관리 및 무정전 전력공급 기능을 가지는 에너지저장장치의 제어방법 및 제어시스템

Publications (1)

Publication Number Publication Date
WO2018056505A1 true WO2018056505A1 (ko) 2018-03-29

Family

ID=61690875

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/KR2016/013071 WO2018056505A1 (ko) 2016-09-26 2016-11-14 부하관리 및 무정전 전력공급 기능을 가지는 에너지저장장치의 제어방법 및 제어시스템

Country Status (3)

Country Link
US (1) US10819138B2 (ko)
KR (1) KR101860638B1 (ko)
WO (1) WO2018056505A1 (ko)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101904846B1 (ko) * 2016-12-09 2018-10-10 효성중공업 주식회사 Ess 최적 효율 운영방법
US11923681B2 (en) * 2018-03-16 2024-03-05 Total Solar International System, device, and method for off-grid microgrids management
KR102227084B1 (ko) 2018-12-28 2021-03-15 한밭대학교 산학협력단 머신러닝 기반 신재생에너지 제어용 에너지저장장치 용량산정 방법
KR102235667B1 (ko) * 2019-01-16 2021-04-02 한국에너지기술연구원 에너지 비용 절감을 위한 에너지 저장 시스템, 전력 제어 장치 및 전력 제어 방법
US11394231B2 (en) * 2019-02-01 2022-07-19 Moser Energy Systems Hybrid generator system and method of operation and control
US20220416567A1 (en) * 2021-05-28 2022-12-29 Vertiv Corporation Ups overload time remaining calculation based on an adaptive minimum envelope filter
US11662794B2 (en) * 2021-09-17 2023-05-30 Lenovo (United States) Inc. Using a predicted workload to improve preparedness of backup power source

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20070080666A1 (en) * 2005-10-10 2007-04-12 General Electric Company Methods and apparatus for coupling an energy storage system to a variable energy supply system
KR101322617B1 (ko) * 2013-07-30 2013-10-29 이화전기공업 주식회사 배터리를 구비한 무정전전원장치의 에너지저장시스템 및 그 운전방법
KR101445738B1 (ko) * 2013-04-30 2014-11-03 주식회사 케이디파워 전력 사용량 데이터베이스를 이용하여 전기에너지 저장량을 조정하는 전력저장 장치 및 그 운영 방법
US20160197519A1 (en) * 2012-04-04 2016-07-07 Ihi Inc. Energy storage modeling and control
US20160224088A1 (en) * 2013-09-30 2016-08-04 Hewlett-Packard Development Company, Lp Selectively-enabled back-up power

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7389159B2 (en) * 2006-03-09 2008-06-17 Lennox Manufacturing Inc Control algorithm for backup power system
KR101605475B1 (ko) 2014-02-19 2016-03-22 세방전지(주) 무정전 전원기능을 갖는 계통연계형 대용량 에너지저장시스템
KR20160028880A (ko) 2014-09-04 2016-03-14 박민철 수요 예측을 통한 ess의 운영방법
JP2016116401A (ja) * 2014-12-17 2016-06-23 株式会社ピューズ 電力負荷平準化装置

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20070080666A1 (en) * 2005-10-10 2007-04-12 General Electric Company Methods and apparatus for coupling an energy storage system to a variable energy supply system
US20160197519A1 (en) * 2012-04-04 2016-07-07 Ihi Inc. Energy storage modeling and control
KR101445738B1 (ko) * 2013-04-30 2014-11-03 주식회사 케이디파워 전력 사용량 데이터베이스를 이용하여 전기에너지 저장량을 조정하는 전력저장 장치 및 그 운영 방법
KR101322617B1 (ko) * 2013-07-30 2013-10-29 이화전기공업 주식회사 배터리를 구비한 무정전전원장치의 에너지저장시스템 및 그 운전방법
US20160224088A1 (en) * 2013-09-30 2016-08-04 Hewlett-Packard Development Company, Lp Selectively-enabled back-up power

Also Published As

Publication number Publication date
KR101860638B1 (ko) 2018-07-05
US10819138B2 (en) 2020-10-27
KR20180033890A (ko) 2018-04-04
US20190267809A1 (en) 2019-08-29

Similar Documents

Publication Publication Date Title
WO2018056505A1 (ko) 부하관리 및 무정전 전력공급 기능을 가지는 에너지저장장치의 제어방법 및 제어시스템
EP3547491B1 (en) Systems and methods for managing batteries in a battery exchange station
WO2019225834A1 (ko) 에너지 저장 장치와 태양광 발전을 이용한 전력 공급 제어 시스템 및 방법
WO2019172527A1 (ko) Soc-ocv 프로파일 추정 방법 및 장치
US9225186B2 (en) Method and device for controlling charge of battery
WO2015102396A1 (ko) 에너지 저장 시스템에서 전력 분배 방법 및 장치
WO2018074651A1 (ko) 마이크로그리드용 에너지 저장 장치에 대한 운영 장치 및 방법
WO2019098722A1 (ko) 배터리 저항 추정 장치 및 방법
WO2018026096A1 (ko) 배터리 팩 및 이를 포함하는 에너지 저장 시스템
WO2017116084A1 (ko) 전력 공급 제어방법 및 시스템
WO2013176379A1 (ko) 배터리팩의 배터리 유닛 노후화 시스템 및 방법
WO2014035001A1 (ko) 전력 관리 방법 및 시스템
WO2022149958A1 (ko) 배터리 제어 장치, 배터리 시스템, 전원 공급 시스템 및 배터리 제어 방법
WO2018131874A1 (ko) 에너지 절약 및 빠른 셀 밸런싱이 가능한 충전 제어 장치 및 방법
WO2021049905A1 (ko) 배터리 상태 측정 방법 및 배터리 관리 시스템
WO2021040306A1 (ko) 배터리 soh 예측 방법 및 이를 적용한 배터리 팩
WO2021034066A1 (ko) 무정전 전원 공급 기능을 가지는 전력 충방전 장치 및 이를 포함하는 에너지 저장 시스템
JP3927848B2 (ja) 分散型電力貯蔵システム
JPS59139828A (ja) 端末装置用予備電源の監視方式
KR101490802B1 (ko) 셀 단위 충전장치
WO2021132759A1 (ko) 이종 분산 자원과 연계된 에너지 저장 장치의 지능형 운전 방법 및 장치
JP4319477B2 (ja) 蓄電池監視システム
WO2015105213A1 (ko) 최대전력을 고려한 수용가 측면 에너지 저장시스템 및 그 제어방법
WO2024122993A1 (ko) 전기차 배터리팩을 재사용한 ess를 포함하는 이동형 전기차 충전 시스템 및 그에 따른 전기차 충전 서비스 제공 관리 방법
WO2023113248A1 (ko) 이종 배터리의 연계를 위한 전력 변환 시스템 기반의 에너지 저장 시스템을 운용하는 전력 운용 장치에서 수행되는 전력 운용 방법 및 전력 운용 장치

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 16916878

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 16916878

Country of ref document: EP

Kind code of ref document: A1