WO2014035001A1 - 전력 관리 방법 및 시스템 - Google Patents

전력 관리 방법 및 시스템 Download PDF

Info

Publication number
WO2014035001A1
WO2014035001A1 PCT/KR2012/009033 KR2012009033W WO2014035001A1 WO 2014035001 A1 WO2014035001 A1 WO 2014035001A1 KR 2012009033 W KR2012009033 W KR 2012009033W WO 2014035001 A1 WO2014035001 A1 WO 2014035001A1
Authority
WO
WIPO (PCT)
Prior art keywords
power
power consumption
battery
energy
past
Prior art date
Application number
PCT/KR2012/009033
Other languages
English (en)
French (fr)
Inventor
김재성
고형석
정재열
Original Assignee
에스케이씨앤씨 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 에스케이씨앤씨 주식회사 filed Critical 에스케이씨앤씨 주식회사
Publication of WO2014035001A1 publication Critical patent/WO2014035001A1/ko

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J9/00Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting
    • H02J9/04Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting in which the distribution system is disconnected from the normal source and connected to a standby source
    • H02J9/06Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting in which the distribution system is disconnected from the normal source and connected to a standby source with automatic change-over, e.g. UPS systems
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/003Load forecast, e.g. methods or systems for forecasting future load demand
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/28Arrangements for balancing of the load in a network by storage of energy
    • H02J3/32Arrangements for balancing of the load in a network by storage of energy using batteries with converting means
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • H02J3/381Dispersed generators
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • H02J3/46Controlling of the sharing of output between the generators, converters, or transformers
    • H02J3/466Scheduling the operation of the generators, e.g. connecting or disconnecting generators to meet a given demand
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2203/00Indexing scheme relating to details of circuit arrangements for AC mains or AC distribution networks
    • H02J2203/20Simulating, e g planning, reliability check, modelling or computer assisted design [CAD]
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2300/00Systems for supplying or distributing electric power characterised by decentralized, dispersed, or local generation
    • H02J2300/20The dispersed energy generation being of renewable origin
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B10/00Integration of renewable energy sources in buildings
    • Y02B10/70Hybrid systems, e.g. uninterruptible or back-up power supplies integrating renewable energies
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B70/00Technologies for an efficient end-user side electric power management and consumption
    • Y02B70/30Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
    • Y02B70/3225Demand response systems, e.g. load shedding, peak shaving
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E70/00Other energy conversion or management systems reducing GHG emissions
    • Y02E70/30Systems combining energy storage with energy generation of non-fossil origin
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems
    • Y04S20/222Demand response systems, e.g. load shedding, peak shaving
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S40/00Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them
    • Y04S40/20Information technology specific aspects, e.g. CAD, simulation, modelling, system security

Definitions

  • the present invention relates to a power management method and system, and more particularly, to a method and system for managing and operating power supplied through a power grid and renewable energy generation system.
  • Power generated by self-generation using renewable energy is stored in the battery and discharged to the load if necessary in the future, thereby reducing energy production costs and improving the efficiency of power operation.
  • a power operation plan is prepared to prevent power supply disruption during the planned outage and to seek economic power management.
  • the present invention has been made to solve the above problems, the object of the present invention is to predict the power consumption in the load and the production power in the renewable energy generation system power in accordance with the energy utilization measures prepared for planned outages In order to provide a power management method and system for operating.
  • Another object of the present invention is to predict the power consumption at the load and the production power in the renewable energy generation system even when the planned outage is not scheduled to establish a more economical energy utilization measures to operate the power
  • the present invention provides a management method and system.
  • a power management method comprising: estimating power consumption at a load; Predicting the production power in the renewable energy generation system; And operating the power according to the energy utilization measures prepared for the planned outage by referring to the predicted power consumption and the predicted power consumption when the planned outage is scheduled.
  • the power consumption predicting step may include obtaining past power consumption and recent power consumption; Calculating the comparison error with respect to the power consumption by comparing the obtained power consumption with the recent power consumption; And predicting future power consumption from past power consumption when the comparison error is within a threshold range.
  • the power consumption predicting step may include: compensating the past power consumption by adding or subtracting a compensation value to the past power consumption when the comparison error is outside the threshold range; And predicting future power consumption from the compensated past power consumption.
  • the production power prediction step may include: obtaining a past weather, a recent weather, and a weather forecast; Comparing past weather with recent weather to calculate a comparison error for the weather; And if the comparison error is within a critical range, predicting future power generation by reflecting a weather forecast in the past weather.
  • the power management method if the comparison error is out of the threshold range, the past weather compensation by adding or subtracting a compensation value to the past weather; And predicting future power generation by reflecting the weather forecast on the compensated past weather.
  • the power operation step if the planned outage, the step of identifying the remaining battery capacity; Calculating the required power during the planned outage with reference to the predicted power consumption; And supplying renewable energy to the load if the required power is smaller than the remaining battery level.
  • the power management method if the required power is more than the remaining battery capacity, calculating the required amount of charge of the battery; Calculating a predicted production power before the planned outage by referring to the predicted production power; And charging the battery with renewable energy if the required charge amount is smaller than the predicted production power before the planned outage, wherein the required charge amount includes: supplying power through the battery to consume power at the load during the planned outage. It may be the amount of charge to be charged more.
  • the power management method according to an embodiment of the present invention may further include supplying renewable energy to a load when a required charge amount is completed in the battery.
  • the power management method if the required charging amount is greater than the predicted production power before the planned outage, further comprising the step of charging the battery with renewable energy and energy supplied through the power grid;
  • the battery charge amount by the energy supplied from the electric power grid can be determined by subtracting the charge amount by the predicted production power before the planned outage from the required charge amount.
  • the power management method if the planned outage, the step of operating the power in accordance with the energy utilization measures established by creating a charge and discharge schedule of the battery; Can be.
  • the power management method if the discharge time according to the schedule does not arrive, the step of charging by supplying renewable energy to the load or to the battery; And when the discharge time according to the schedule arrives, supplying the stored energy and the renewable energy and the renewable energy to the load to the load.
  • the power management method by supplying the energy remaining in the supply phase to the power grid, selling the surplus power; may further include a.
  • the power management method after the power operation, determining whether an error occurred for at least one of the predicted power consumption and the expected production power; And if it is determined that an error has occurred, feeding back the error such that the influence of the error is reflected in performing at least one of the next power consumption prediction and the production power prediction.
  • the power management system predicts power consumption at a load, predicts production power at a renewable energy generation system, and predicts power consumption when a planned power failure is scheduled.
  • EMS Electronicgy Management System
  • ESS Electronicgy Storage System
  • the electric power is operated in accordance with the energy utilization measures in preparation for the planned outage by predicting the power consumption at the load and the generated power in the renewable energy generation system, it is possible to flexibly cope with the implementation of the planned outage Becomes possible.
  • the energy utilization measures are established by predicting the power consumption at the load and the production power at the renewable energy generation system, thereby pursuing more economical power operation.
  • the prediction method by the error compensation that compares the historical data and the recent data since the prediction method by the error compensation that compares the historical data and the recent data is applied, it also reflects the weather forecast, so that it is possible to accurately predict the power consumption and the production power even in an environment in which power consumption and meteorological changes fluctuate.
  • FIG. 1 is a view showing a power system to which the present invention is applicable
  • FIG. 2 is a flowchart provided to explain a power management method according to a preferred embodiment of the present invention
  • FIG. 3 is a flowchart provided in a detailed description of a process of collecting basic information necessary for power management in an EMS server
  • FIG. 5 is a flowchart provided in a detailed description of a production power prediction process in a renewable energy generation system
  • FIG. 6 is a flow chart provided in the detailed description of the power operation process according to the emergency energy utilization measures prepared for planned outages in the EMS server,
  • FIG. 8 is a detailed block diagram of the EMS server shown in FIG. 1.
  • FIG. 1 is a diagram showing a power system to which the present invention is applicable.
  • the power system to which the present invention is applicable includes a renewable energy generation system 110, a power load 120, an energy storage system (ESS) 130, a power grid 150, and an EMS (Energy).
  • Management System 160, power plant 170, power server 180 and weather server 190 are included.
  • a solid line represents a power line to which power moves
  • a dotted line represents a wired / wireless communication network.
  • Renewable energy generation system 110 is a power generation facility using renewable energy, such as solar, wind, tidal, biomass, and the like
  • power load 120 is a facility, such as homes, buildings, factories that consume power.
  • the ESS 130 charges the battery 140 to store energy and discharges the battery 140 to supply the stored energy to the power load 120 or the power grid 150, as shown in FIG. 1.
  • PCS power conditioning system
  • BMS battery management system
  • PCS 131 1) to supply the power load 120 or charge the battery 140, the energy supplied from the power plant 170 via the power grid 150, 2) from the renewable energy generation system 110 The supplied energy is supplied to the power load 120 or charged to the battery 140, and 3) the battery 140 is discharged to supply the stored energy to the power load 120 or the power grid 150 to perform power management.
  • Power management by the PCS 131 operates according to emergency energy utilization measures when planned power outages are planned, but otherwise operates according to economic energy utilization measures to seek profit using renewable energy while saving energy. In parallel.
  • the PCS 131 monitors and stores the power consumed by the power load 120 as data.
  • the BMS 132 is a system for managing the battery 140.
  • the BMS 132 senses the voltage, current, temperature, and the like of the battery 140 to control the charge / discharge amount of the battery 140 to an appropriate level, as well as to control the battery 140. Perform cell balancing and determine the remaining amount of the battery 140.
  • the BMS 132 protects the battery 140 through an emergency operation when a danger is detected.
  • the battery 140 functions as an energy store for storing energy by charging power supplied through the renewable energy generation system 110 or the power grid 150, and stores the stored energy through the power load 120 or the power grid ( It serves as an energy source to supply 150).
  • the power server 180 is a server operated by a power control station of a power supply organization that manages power generation, substation, transmission, and distribution, and operates a power supply.
  • the power server 180 controls / controls the power generation status by the power plant 170 and controls the power control station. It is in charge of spreading planned outages.
  • the meteorological server 190 is a server operated by the Korea Meteorological Agency, and the meteorological server 190 in the present power system functions as a server providing weather data and weather forecast data.
  • the EMS server 160 controls the PCS 131 of the ESS 130 to manage power management in the power system shown in FIG. To this end, the EMS server 160 predicts the power consumption at the power load 120, predicts the production power in the renewable energy generation system 110, and whether the planned power outage guided from the power server 180 Accordingly, the appropriate energy utilization measures are established and power is controlled by controlling the PCS 131 accordingly.
  • FIG. 2 is a flowchart provided to explain a power management method according to a preferred embodiment of the present invention.
  • the EMS server 160 collects basic information necessary for power management (S210).
  • the basic information collected in step S210 includes information necessary to predict power consumption and production power, establish energy utilization measures, and economically operate power.
  • step S210 refer to FIG. 3. It will be described later in detail.
  • the EMS server 160 estimates the power consumption at the power load 120 by using the same (S220).
  • the power consumption data of the past and the latest are used for the power consumption prediction in step S220, and the detailed description of the step S220 will be described later with reference to FIG. 4.
  • the EMS server 160 predicts the production power in the renewable energy generation system 110 by using the basic information collected in step S210 (S230). Historical and recent weather data and weather forecast data are used to predict power generation at step S230. A detailed description of step S230 will be described later with reference to FIG. 5.
  • the EMS server 160 determines whether a planned outage is scheduled (S240).
  • the planned outage may be due to maintenance of the electric power grid 150 or the electric power facility, as well as power supply and demand problems.
  • the EMS server 160 establishes emergency energy utilization measures to operate the power (S250). Detailed description of the step S250 will be described later in detail with reference to FIG. 6.
  • EMS server 160 establishes economic energy utilization measures to operate the power (S260). A detailed description of the step S260 will be described later in detail with reference to FIG. 7.
  • the EMS server 160 determines whether a prediction error for power consumption and production power has occurred (S270).
  • the prediction error in step S270 is calculated for each of power consumption and production power.
  • step S220' 1) comparing the 'predicted power consumption in step S220' and 'actual power consumption in step S250 or S260' to determine the occurrence of errors and the amount of generation, and 2) 'predicting power consumption in step S230' and ' The occurrence of errors and the amount of occurrence are determined by comparing the actual power generated at the step S250 or S260.
  • step S270 the EMS server 160 feeds back the error generation amount so that the influence of the error is reflected in the next power consumption prediction and production power prediction (S280).
  • step S280 it is possible to pursue the accuracy of the next prediction.
  • FIG. 3 is a flowchart provided in a detailed description of a process of collecting basic information necessary for power management in the EMS server 160.
  • the EMS server 160 obtains and stores past power consumption data and recent power consumption data at the power load 120 from the PCS 131 (S211 and S212).
  • the EMS server 160 obtains and stores past weather data, recent weather data, and weather forecast data from the weather server 190 (S213 to S215).
  • the EMS server 160 obtains and stores information on the planned outage information, the basic charge / discharge schedule, and the hourly power price from the power server 180 (S216 to S218).
  • Planned outage information includes information on planned outages and scheduled dates.
  • FIG. 4 is a flowchart provided to a detailed description of a power consumption prediction process in the power load 120.
  • the EMS server 160 In order to estimate power consumption, the EMS server 160 first reads past power consumption data and recent power consumption data acquired / stored in steps S211 and S212 of FIG. 3 (S221 to S222).
  • the "past” power consumption data is the power consumption data of "2001-2011 (10 years)", and the “recent” power consumption data of the "May 2012” It is power consumption data, and it is assumed that "prediction” power consumption is power consumption of "June 2012".
  • the EMS server 160 calculates a comparison error with respect to power consumption by comparing the past power consumption data read with the latest power consumption data (S223). For example, in step S223, a comparison error may be calculated by comparing the average power consumption in May of 2001 to 2011 with the power consumption of May 2012.
  • the EMS server 160 predicts the future power consumption from the past power consumption data (S225). For example, if the comparison error is determined to be within 3% (critical error) in step S224, in step S225 EMS server 160 is the 'consumption of June 2012 from the average power consumption in June of 2001-2011' Power 'can be predicted.
  • the EMS server 160 compensates the past power consumption by adding or subtracting a compensation value to the past power consumption data (S226).
  • step S224 If the comparison error is out of the critical range in step S224, the recent power consumption is inconsistent with the past power consumption. Therefore, the previous power consumption is compensated for in step S226 so as to converge to the recent power consumption to some extent.
  • the past power consumption compensation in step S226 is performed on all past power consumption data. In other words, the compensation for the past power consumption in the step S226 is performed on the '2001-2011 total power consumption data', not '2001-2011 power consumption data'.
  • step S226 the EMS server 160 adds or subtracts the compensation value to the '2001-2011 total power consumption data' to consume the past Compensates for power.
  • the compensation value is added to the past power consumption, and when the past power consumption is larger than the recent power consumption, the compensation value is subtracted from the past power consumption, and the past power consumption is the latest power consumption. Converge to.
  • step S223 the comparison error calculated in step S223 is outside the threshold range (S224-N)
  • step S226 the compensation by step S226 is performed once more.
  • the EMS server 160 predicts the future power consumption from the compensated past power consumption data (S225).
  • step S225 EMS server 160 predicts the 'power consumption in June 2012' from the 'average power consumption in June of 2001-2011' compensated by the comparison error is added or subtracted.
  • the power consumption prediction is described as being performed on a “month” basis, but this is only an example for convenience of description. Power consumption prediction can be made in units of "weeks”, “days”, “hours”, and “minutes” as necessary.
  • 5 is a flowchart provided in the detailed description of the prediction process for the production power in the renewable energy generation system 110.
  • the EMS server 160 In order to predict power generation, the EMS server 160 first reads past weather data, recent weather data, and weather forecast data acquired / stored in steps S213 to S215 of FIG. 2 (S231 to S233).
  • “past” weather data is the temperature / wind data for "2001-2011 (10 years)” and “last” weather data is the temperature / wind data for "May 2012”.
  • Weather “forecast” is the weather (sunny, cloudy, rain, snow) of "June 2012”
  • “forecast” production power is assumed to be the production power of "June 2012”.
  • the EMS server 160 compares the read past weather data with the latest weather data, and calculates a comparison error with respect to the weather data (S234).
  • a comparison error may be calculated by comparing the average temperature / wind speed in May of 2001 to 2011 with the temperature / wind speed in May 2012.
  • the EMS server 160 reflects the weather forecast in the past weather data to predict the future production power (S236).
  • step S236 EMS server 160 calculates the power that can be produced at the average temperature / wind speed in June of 2001-2011 It is possible to predict the 'production power in June 2012' by reflecting the weather by the post-weather forecast.
  • the power that can be produced is subtracted, and in the case of wind power, wind speed In this small case, the production power can be subtracted.
  • EMS server 160 compensates the past weather data by adding or subtracting a compensation value to the past weather data (S237).
  • step S235 If the comparison error is out of the critical range in step S235, the recent weather is too different from the past weather. Therefore, the past weather data is compensated for in step S237 to converge to the latest weather data to some extent.
  • the historical weather data compensation in step S237 is performed on all the past weather data. In other words, the historical weather data compensation in step S237 is performed on 'all weather data from 2001 to 2011' rather than 'weather data from May 2001 to 2011'.
  • step S237 the EMS server 160 adds or subtracts the compensation value to the '2001-2011 overall weather data' to add historical weather data. To compensate.
  • the compensation value is added to the past temperature / wind speed. If the past temperature / wind speed is larger than the recent temperature / wind speed, the compensation value is reduced by the past temperature / wind speed, Converge temperature / wind speed to recent temperature / wind speed.
  • step S237 is performed once more.
  • the EMS server 160 reflects the weather forecast to the compensated past weather data to predict the future production power (S236).
  • step S235 EMS server 160 in step S236 is compensated by the comparison error is added and compensated 'June 2001-2011 average temperature / wind speed value' After calculating the power available for production, the forecasted 'June 2012 production power' will be reflected by the weather forecast.
  • the production power prediction has been described as being performed in "month”, but this is only an example for convenience of description. Power generation forecasts can also be made in weeks, days, hours or minutes, as needed.
  • FIG. 6 is a flowchart provided to the detailed description of the power operation process according to the emergency energy utilization measures in preparation for the planned outage in the EMS server 160.
  • the EMS server 160 determines the remaining amount of the battery 140 (S251).
  • the remaining battery level at step S251 may be determined by the EMS server 160 receiving information on the remaining battery capacity of the battery 140 calculated by the BMS 132 of the ESS 130.
  • the EMS server 160 calculates the required power during the planned power outage by referring to the power consumption predicted in step S220 (S252), and calculates the required power calculated in step S252 and the battery 140 identified in step S251. The remaining amount is compared (S253).
  • step S253 If it is determined in step S253 that the required power is smaller than the remaining amount of the battery 140 (S253-Y), the EMS server 160 is the renewable energy generated by the renewable energy generation system 110 to the power load 120 The PCS 131 of the ESS 130 is controlled to be supplied (S254).
  • the renewable energy generated by the renewable energy generation system 110 is transferred to the power load 120. ) To consume everything.
  • step S253 determines whether the required power is more than the remaining amount of the battery 140 (S253-N). If it is determined in step S253 that the required power is more than the remaining amount of the battery 140 (S253-N), the EMS server 160 calculates the required charging amount of the battery 140 (S255).
  • the required charge amount refers to a charge amount to be further charged to the battery 140 in order to supply the battery 140 with power to be consumed by the power load 120 during the planned power outage.
  • the required charge amount can be calculated by subtracting the remaining amount of the battery 140 from the required power.
  • the EMS server 160 calculates the predicted production power before the planned outage by referring to the production power predicted in step S230 (S256), and the required charge amount calculated in step S255 and before the planned outage calculated in step S256. The predicted production power is compared (S257).
  • step S257 If it is determined in step S257 that the required charge amount is smaller than the predicted production power before the planned outage (S257-Y), the EMS server 160 is a renewable energy generated by the renewable energy generation system 110, the battery 140 is The PCS 131 of the ESS 130 is controlled to be charged (S258).
  • the EMS server 160 may control the PCS 131 so that renewable energy is supplied to the power load 120.
  • the EMS server 160 is a renewable energy and power grid 150 generated by the renewable energy generation system 110.
  • the PCS 131 of the ESS 130 is controlled so that the battery 140 is charged with the energy supplied through the battery 140 (S259).
  • the amount of charge by energy supplied from the power grid 150 is preferably determined by subtracting the amount of charge required by the predicted production power before the planned outage from the required amount of charge.
  • FIG. 7 is a flowchart provided to a detailed description of the power operation process according to the economic energy utilization measures in the EMS server 160 when the planned outage is not scheduled.
  • the EMS server 160 As shown in FIG. 7, if it is determined that a planned power failure is not scheduled (S240 -N), the EMS server 160 generates a charge / discharge schedule for the battery 140 (S261). The charge / discharge schedule generated in step S261 is transferred from the EMS server 160 to the PCS 131 of the ESS 130.
  • the charge / discharge schedule in step S261 is based on the basic charge / discharge schedule obtained by the EMS server 160 through step S217 of FIG. 3, and the power consumption predicted in step S220 of FIG. 2 and in step S230 of FIG. 2. It can be generated by referring to the predicted production power.
  • the PCS 131 loads the renewable energy generated by the renewable energy generation system 110 into the power load 120. Or supply to the battery 140 to charge (S263).
  • step S261 when the discharge time according to the charge / discharge schedule generated in step S261 arrives (S262-Y), the PCS 131 is charged in the battery 140 and stored in the renewable energy generation system 110. The new renewable energy is supplied to the power load 120 (S264).
  • the PCS 131 supplies the energy remaining in the step S264 to the power grid 150 to obtain a profit from the surplus power sale (S265).
  • the EMS server 160 includes a communication unit 161, a processor 162, and a storage unit 163.
  • the communication unit 161 establishes and maintains a communication connection with the PCS 131, the power server 180, and the virtual server 190, and transmits and receives information.
  • the processor 162 uses the information obtained through the communication unit 161 to estimate the power consumption at the power load 120 and to predict the production power at the renewable energy generation system 110.
  • the processor 162 establishes an appropriate energy utilization measure according to the planned outage guided by the power server 180 and controls the PCS 131 accordingly to operate the power.
  • the storage unit 163 is a storage medium in which information obtained through the communication unit 161 is stored and information predicted / calculated by the processor 162 is stored.
  • the technical idea of the present invention can be applied to a computer-readable recording medium containing a computer program for performing the functions of the apparatus and method according to the present embodiment.
  • the technical idea according to various embodiments of the present disclosure may be implemented in the form of computer readable codes recorded on a computer readable recording medium.
  • the computer-readable recording medium can be any data storage device that can be read by a computer and can store data.
  • the computer-readable recording medium may be a ROM, a RAM, a CD-ROM, a magnetic tape, a floppy disk, an optical disk, a hard disk drive, or the like.
  • the computer-readable code or program stored in the computer-readable recording medium may be transmitted through a network connected between the computers.

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Business, Economics & Management (AREA)
  • Emergency Management (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

전력 관리 방법 및 시스템이 제공된다. 본 본 발명의 실시예에 따른 전력 관리 방법은, 부하에서의 소비전력을 예측하고, 신재생 에너지 발전 시스템에서의 생산전력을 예측하며, 계획정전이 예정되어 있는 경우 예측된 소비전력과 예측된 생산전력을 참조하여 수립한 계획정전에 대비한 에너지 활용 대책에 따라 전력을 운용한다. 이에 의해, 계획정전 시행에도 유연한 대처가 가능해진다.

Description

전력 관리 방법 및 시스템
본 발명은 전력 관리 방법 및 시스템에 관한 것으로, 더욱 상세하게는 전력망과 신재생 에너지 발전 시스템을 통해 공급되는 전력을 관리하여 운용하는 방법 및 시스템에 관한 것이다.
신재생 에너지를 이용한 자가 발전으로 생성한 전력을 배터리에 저장하고, 향후 필요시 부하에 방전함으로, 에너지 생산비용 절감과 함께 전력 운용의 효율성을 도모하고 있다.
하지만, 이와 같이 배터리를 에너지 저장원으로 이용한 전력 운용은, 배터리 잔량을 기반으로 수행되고 있어, 주변 환경이나 정책의 변화에 의한 탄력적인 전력 운용이 불가능하다.
특히, 2011년 동일본 대지진 이후, 원자력 운용에 대한 의문성으로 원자력 발전의 중지로 인해 일본에서는 지역적으로 계획정전을 실시하고 있으며, 전원 공급 상황이 원활하지 않은 국가(예를 들면, 동남아, 중국 등)의 산업용 전력에 대해서도 계획정전이 실시되고 있다.
이에 따라, 계획정전이 고지된 경우 이를 대비한 전력 운용 방안을 통해 계획정전 동안에도 전력 공급에 차질이 없도록 함은 물론 경제적인 전력 운용을 함께 아우르기 위한 방안의 모색이 요청된다.
사전의 철저한 전력 운용 계획 없이 필요한 전력을 준비하지 못한 상태에서 계획정전이 시작되는 경우, 경제적 손실이 유발되는데, 특히 산업 설비의 경우 그 손실액은 매우 크기 때문이다.
본 발명은 상기와 같은 문제점을 해결하기 위하여 안출된 것으로서, 본 발명의 목적은, 부하에서의 소비전력과 신재생 에너지 발전 시스템에서의 생산전력을 예측하여 계획정전에 대비한 에너지 활용 대책에 따라 전력을 운용하기 위한 전력 관리 방법 및 시스템을 제공함에 있다.
또한, 본 발명의 다른 목적은, 계획정전이 예정되지 않은 경우에도 부하에서의 소비전력과 신재생 에너지 발전 시스템에서의 생산전력을 예측하여 보다 경제적인 에너지 활용 대책을 수립하여 전력을 운용하기 위한 전력 관리 방법 및 시스템을 제공함에 있다.
상기 목적을 달성하기 위한 본 발명의 일 실시예에 따른, 전력 관리 방법은, 부하에서의 소비전력을 예측하는 단계; 신재생 에너지 발전 시스템에서의 생산전력을 예측하는 단계; 및 계획정전이 예정되어 있는 경우, 예측된 소비전력과 예측된 생산전력을 참조하여 수립한 계획정전에 대비한 에너지 활용 대책에 따라 전력을 운용하는 단계;를 포함한다.
그리고, 소비전력 예측단계는, 과거 소비전력 및 최근 소비전력을 획득하는 단계; 획득된 과거 소비전력과 최근 소비전력을 비교하여, 소비전력에 대한 비교 오차를 산출하는 단계; 및 비교 오차가 임계 범위 이내이면, 과거 소비전력으로부터 향후 소비전력을 예측하는 단계;를 포함할 수 있다.
또한, 소비전력 예측단계는, 비교 오차가 임계 범위 밖이면, 과거 소비전력에 보상치를 가감하여 과거 소비전력을 보상하는 단계; 및 보상된 과거 소비전력으로부터 향후 소비전력을 예측하는 단계;를 더 포함할 수 있다.
그리고, 생산전력 예측단계는, 과거 기상, 최근 기상 및 기상 예보를 획득하는 단계; 과거 기상과 최근 기상을 비교하여, 기상에 대한 비교 오차를 산출하는 단계; 및 비교 오차가 임계 범위 이내이면, 과거 기상에 기상 예보를 반영하여 향후 생산전력을 예측하는 단계;를 포함할 수 있다.
또한, 본 발명의 일 실시예에 따른 전력 관리 방법은, 비교 오차가 임계 범위 밖이면, 과거 기상에 보상치를 가감하여 과거 기상을 보상하는 단계; 및 보상된 과거 기상에 기상 예보를 반영하여 향후 생산전력을 예측하는 단계;를 더 포함할 수 있다.
그리고, 전력 운용 단계는, 계획정전이 예정되어 있는 경우, 배터리 잔량을 파악하는 단계; 예측된 소비전력을 참고하여, 계획정전 동안의 필요 전력을 산출하는 단계; 및 필요 전력이 배터리 잔량 보다 작으면, 신재생 에너지를 부하에 공급하는 단계;를 포함할 수 있다.
또한, 본 발명의 일 실시예에 따른 전력 관리 방법은, 필요 전력이 배터리 잔량 이상이면, 배터리의 필요 충전량을 산출하는 단계; 예측된 생산전력을 참고하여, 계획정전 전까지의 예측 생산전력을 산출하는 단계; 및 필요 충전량이 계획정전 전까지의 예측 생산전력 보다 작으면, 신재생 에너지로 배터리를 충전하는 단계;를 더 포함하고, 필요 충전량은, 계획정전 동안에 부하에서 소비할 전력을 배터리를 통해 공급하기 위해 배터리에 더 충전하여야 하는 충전량일 수 있다.
그리고, 본 발명의 일 실시예에 따른 전력 관리 방법은, 배터리에 필요 충전량이 충전 완료되면, 신재생 에너지를 부하로 공급하는 단계;를 더 포함할 수 있다.
또한, 본 발명의 일 실시예에 따른 전력 관리 방법은, 필요 충전량이 계획정전 전까지의 예측 생산전력 보다 크면, 신재생 에너지와 전력망을 통해 공급되는 에너지로 배터리를 충전하는 단계;를 더 포함하고, 전력망에서 공급되는 에너지에 의한 배터리 충전량은, 필요 충전량에서 계획정전 전까지의 예측 생산전력에 의한 충전량을 감산한 양으로 결정할 수 있다.
그리고, 전력망을 통해 에너지를 공급받는 시기는, 시간대별 전력공급 가격이 상이한 경우 전력공급자의 전력 가격이 가장 낮은 시간대로 결정할 수 있다.
또한, 본 발명의 일 실시예에 따른 전력 관리 방법은, 계획정전이 예정되어 있지 않은 경우, 배터리의 충전과 방전 스케쥴을 생성하여 수립한 에너지 활용 대책에 따라 전력을 운용하는 단계;를 더 포함할 수 있다.
그리고, 본 발명의 일 실시예에 따른 전력 관리 방법은, 스케쥴에 따른 방전 시간이 도래하지 않았으면, 신재생 에너지를 부하에 공급하거나 배터리에 공급하여 충전하는 단계; 및 스케쥴에 따른 방전 시간이 도래하면, 배터리에 충전되어 저장된 에너지와 신재생 에너지를 부하에 공급하는 단계;를 더 포함할 수 있다.
또한, 본 발명의 일 실시예에 따른 전력 관리 방법은, 공급단계에서 남는 에너지를 전력망에 공급하여, 잉여 전력을 판매하는 단계;를 더 포함할 수 있다.
그리고, 본 발명의 일 실시예에 따른 전력 관리 방법은, 전력 운용 이후, 예측된 소비전력과 예측된 생산전력 중 적어도 하나에 대한 오차가 발생 되었는지 판단하는 단계; 및 오차가 발생한 것으로 판단되면, 다음 소비전력 예측 및 생산전력 예측 중 적어도 하나를 수행함에 있어 오차의 영향이 반영되도록 오차를 피드백하는 단계;를 더 포함할 수 있다.
한편, 본 발명의 다른 실시예에 따른, 전력 관리 시스템은, 부하에서의 소비전력을 예측하고, 신재생 에너지 발전 시스템에서의 생산전력을 예측하며, 계획정전이 예정되어 있는 경우 예측된 소비전력과 예측된 생산전력을 참조하여 계획정전에 대비한 에너지 활용 대책을 수립하는 EMS(Energy Management System); 및 EMS에서 수립한 에너지 활용 대책에 따라 전력을 운용하는 ESS(Energy Storage System);를 포함한다.
이상 설명한 바와 같이, 본 발명에 따르면, 부하에서의 소비전력과 신재생 에너지 발전 시스템에서의 생산전력을 예측하여 계획정전에 대비한 에너지 활용 대책에 따라 전력을 운용하기 때문에, 계획정전 시행에도 유연한 대처가 가능해진다.
또한, 계획정전이 예정되지 않은 경우에도 부하에서의 소비전력과 신재생 에너지 발전 시스템에서의 생산전력을 예측하여 에너지 활용 대책을 수립하므로, 보다 경제적인 전력 운용을 추구할 수 있다.
뿐만 아니라, 신재생 에너지의 생산에 중요 요소로 작용하는 기상정보를 이용하여 신재생 에너지의 생산량을 예측하므로, 비교적 정확한 전력생산 예측이 가능하다.
아울러, 과거 데이터와 최근 데이터를 비교한 오차 보상에 의한 예측 기법이 적용되므로 기상 예보까지 반영하므로, 전력소비와 기상변화가 급변동하는 환경에서도 소비전력과 생산전력 예측을 비교적 정확하게 할 수 있게 된다.
도 1은 본 발명이 적용가능한 전력 계통을 도시한 도면,
도 2는 본 발명의 바람직한 실시예에 따른 전력 관리 방법의 설명에 제공되는 흐름도,
도 3은 EMS 서버에서 전력 관리를 위해 필요한 기초 정보들을 수집하는 과정의 상세한 설명에 제공되는 흐름도,
도 4는 전력 부하에서의 소비전력 예측 과정의 상세한 설명에 제공되는 흐름도,
도 5는 신재생 에너지 발전 시스템에서의 생산전력 예측 과정의 상세한 설명에 제공되는 흐름도,
도 6은 EMS 서버에서 계획정전에 대비한 비상 에너지 활용 대책에 따른 전력 운용 과정의 상세한 설명에 제공되는 흐름도,
도 7은 계획정전이 예정되어 있지 않은 경우 EMS 서버에서의 경제적 에너지 활용 대책에 따른 전력 운용 과정의 상세한 설명에 제공되는 흐름도, 그리고,
도 8은, 도 1에 도시된 EMS 서버의 상세 블럭도이다.
이하에서는 도면을 참조하여 본 발명을 보다 상세하게 설명한다.
1. 전력 계통
도 1은 본 발명이 적용가능한 전력 계통을 도시한 도면이다. 도 1에 도시된 바와 같이, 본 발명이 적용가능한 전력 계통에는, 신재생 에너지 발전 시스템(110), 전력 부하(120), ESS(Energy Storage System)(130), 전력망(150), EMS(Energy Management System) 서버(160), 발전소(170), 전력 서버(180) 및 기상 서버(190)가 포함된다. 한편, 도 1에서 각 구성들을 연결한 선들 중 실선은 전력이 이동하는 전력선을 나타내고, 점선은 유/무선 통신망을 나타낸다.
신재생 에너지 발전 시스템(110)은 태양광, 풍력, 조력, 바이오 매스 등과 같은 신재생 에너지를 이용한 발전 설비이고, 전력 부하(120)는 전력을 소비하는 가정, 빌딩, 공장 등의 시설이다.
ESS(130)는 배터리(140)를 충전하여 에너지를 저장하고, 배터리(140)를 방전시켜 저장된 에너지를 전력 부하(120)나 전력망(150)으로 공급하는 설비로, 도 1에 도시된 바와 같이 PCS(Power Conditioning System)(131), BMS(Battery Management System)(132) 및 배터리(140)를 포함한다.
PCS(131)는, 1) 전력망(150)을 통해 발전소(170)로부터 공급되는 에너지를 전력 부하(120)에 공급하거나 배터리(140)에 충전, 2) 신재생 에너지 발전 시스템(110)으로부터 공급되는 에너지를 전력 부하(120)에 공급하거나 배터리(140)에 충전, 3) 배터리(140)를 방전시켜 저장된 에너지를 전력 부하(120)나 전력망(150)에 공급하여, 전력 관리를 수행한다.
PCS(131)에 의한 전력 관리는, 계획정전이 예정되어 있는 경우에는 비상 에너지 활용 대책에 따라 운용되지만, 그 외의 경우에는 경제적 에너지 활용 대책에 따라 운용되어 에너지 절감과 함께 신재생 에너지를 이용한 수익 추구를 병행한다.
또한, PCS(131)는 전력 부하(120)에서 소비되는 전력을 모니터링하여 데이터로 저장하여 보유한다.
BMS(132)는 배터리(140)를 관리하기 위한 시스템으로, 배터리의 전압, 전류, 온도 등을 감지하여 배터리(140)의 충/방전량을 적정 수준으로 제어함은 물론, 배터리(140)의 셀 밸런싱을 수행하고 배터리(140)의 잔량을 파악한다. 또한, BMS(132)는 위험이 감지되는 경우 비상 동작을 통해 배터리(140)를 보호한다.
배터리(140)는 신재생 에너지 발전 시스템(110)이나 전력망(150)을 통해 공급되는 전력을 충전하여 에너지를 저장하는 에너지 저장소의 기능과, 방전을 통해 저장된 에너지를 전력 부하(120)나 전력망(150)에 공급하는 에너지원으로 기능한다.
전력 서버(180)는 발전/변전/송전/배전 등을 관리하여 전력 공급을 운용하는 전력 공급 기관의 전력 관제소에서 운용하는 서버로, 발전소(170)에 의한 발전 현황을 관제/통제하고, 전력 관제소에서 수립한 계획정전을 전파하는 기능을 담당한다.
기상 서버(190)는 기상청에서 운용하는 서버로, 본 전력 계통에서 기상 서버(190)는 기상 데이터와 기상 예보 데이터를 제공하는 서버로 기능하다.
EMS 서버(160)는 ESS(130)의 PCS(131)를 제어하여 도 1에 도시된 전력 계통에서의 전력 관리를 관장한다. 이를 위해, EMS 서버(160)는 전력 부하(120)에서의 소비전력을 예측하고, 신재생 에너지 발전 시스템(110)에서의 생산전력을 예측하며, 전력 서버(180)로부터 안내되는 계획정전 여부에 따라 적합한 에너지 활용 대책을 수립하고 그에 따라 PCS(131)를 제어하여 전력을 운용한다.
2. 전력 관리 방법
이하에서, 도 1에 도시된 전력 계통에 적용가능한 전력 관리 방법에 대해 도 2를 참조하여 상세히 설명한다. 도 2는 본 발명의 바람직한 실시예에 따른 전력 관리 방법의 설명에 제공되는 흐름도이다.
도 2에 도시된 바와 같이, 먼저 EMS 서버(160)는 전력 관리를 위해 필요한 기초 정보들을 수집한다(S210). S210단계에서 수집되는 기초 정보들은, 소비전력과 생산전력을 예측하고, 에너지 활용 대책을 수립하며, 전력 운용을 경제적으로 하기 위해 필요한 정보들이 포함되는데, S210단계에 대한 상세한 설명은 도 3을 참조하여 상세히 후술한다.
기초 정보들이 수집되면, EMS 서버(160)는 이를 이용하여 전력 부하(120)에서의 소비전력을 예측한다(S220). S220단계에서의 소비전력 예측에는 과거와 최근의 소비전력 데이터가 이용되는데, S220단계에 대한 상세한 설명은 도 4를 참조하여 상세히 후술한다.
다음, EMS 서버(160)는 S210단계에서 수집한 기초 정보들을 이용하여 신재생 에너지 발전 시스템(110)에서의 생산전력을 예측한다(S230). S230단계에서의 생산전력 예측에는 과거와 최근의 기상 데이터와 기상 예보 데이터가 이용되는데, S230단계에 대한 상세한 설명은 도 5를 참조하여 상세히 후술한다.
이후, EMS 서버(160)는 계획정전이 예정되어 있는지 판단한다(S240). 계획정전은, 전력망(150)이나 전력 설비에 대한 유지 보수는 물론, 전력 수급상의 문제로 인해 예정될 수 있다.
계획정전이 예정되어 있는 것으로 판단되면(S240-Y), EMS 서버(160)는 비상 에너지 활용 대책을 수립하여 전력을 운용한다(S250). S250단계에 대한 상세한 설명은 도 6을 참조하여 상세히 후술한다.
한편, 계획정전이 예정되어 있지 않은 것으로 판단되면(S240-N), EMS 서버(160)는 경제적 에너지 활용 대책을 수립하여 전력을 운용한다(S260). S260단계에 대한 상세한 설명은 도 7을 참조하여 상세히 후술한다.
에너지 활용 대책에 따라 전력 운용이 이루어지고 난 후, EMS 서버(160)는 소비전력과 생산전력에 대한 예측 오차가 발생되었는지 판단한다(S270). S270단계에서의 예측 오차는 소비전력과 생산전력 각각에 대해 산출된다.
즉, 1) 'S220단계에서의 소비전력 예측'과 'S250단계 또는 S260단계에서의 실제 소비전력'을 비교하여 오차 발생 및 발생량을 판단하고, 2) 'S230단계에서의 생산전력 예측'과 'S250단계 또는 S260단계에서의 실제 생산전력'을 비교하여 오차 발생 및 발생량을 판단하게 된다.
S270단계에서 예측 오차가 발생한 것으로 판단되면(S270-Y), EMS 서버(160)는 오차 발생량을 피드백하여 다음 소비전력 예측과 생산전력 예측에 오차의 영향이 반영되도록 한다(S280). S270단계와 S280단계에 의해 다음 번 예측에 대한 정확성을 추구할 수 있다.
3. 기초 정보 수집
이하에서는, 도 2의 S210단계에 대해 도 3을 참조하여 상세히 설명한다. 도 3은 EMS 서버(160)에서 전력 관리를 위해 필요한 기초 정보들을 수집하는 과정의 상세한 설명에 제공되는 흐름도이다.
도 3에 도시된 바와 같이, 먼저 EMS 서버(160)는 PCS(131)로부터 전력 부하(120)에서의 과거 소비전력 데이터와 최근 소비전력 데이터를 획득하여 저장한다(S211 및 S212).
또한, EMS 서버(160)는 기상 서버(190)로부터 과거 기상 데이터, 최근 기상 데이터 및 기상 예보 데이터를 획득하여 저장한다(S213 내지 S215).
그리고, EMS 서버(160)는 전력 서버(180)로부터 계획정전 정보, 기초 충/방전 스케쥴 및 시간별 전력 가격에 대한 정보를 획득하여 저장한다(S216 내지 S218). 계획정전 정보에는 계획정전 여부와 예정 일시에 대한 정보가 포함된다.
4. 소비전력 예측
이하에서는, 도 2의 S220단계에 대해 도 4를 참조하여 상세히 설명한다. 도 4는 전력 부하(120)에서의 소비전력 예측 과정의 상세한 설명에 제공되는 흐름도이다.
소비전력 예측을 위해, 먼저 EMS 서버(160)는 도 3의 S211단계 및 S212단계에서 획득/저장된 과거 소비전력 데이터 및 최근 소비전력 데이터를 읽어들인다(S221 내지 S222).
기준 날짜 생성의 이해와 설명의 편의를 위해, "과거" 소비전력 데이터는 "2001년~2011년(10년간)"의 소비전력 데이터이고, "최근" 소비전력 데이터는 "2012년 5월"의 소비전력 데이터이며, "예측" 소비전력은 "2012년 6월"의 소비전력인 것을 상정한다.
EMS 서버(160)는 읽어들인 과거 소비전력 데이터와 최근 소비전력 데이터를 비교하여, 소비전력에 대한 비교 오차를 산출한다(S223). 예를 들어, S223단계에서는 '2001년~2011년의 5월 소비전력 평균치'와 '2012년 5월의 소비전력'를 비교하여 비교 오차를 산출할 수 있다.
S223단계에서 계산된 비교 오차가 임계 범위 이내이면(S224-Y), EMS 서버(160)는 과거 소비전력 데이터로부터 향후 소비전력을 예측한다(S225). 예를 들어, S224단계에서 비교 오차가 3%(임계 오차) 이내로 판단되면, S225단계에서 EMS 서버(160)는 '2001년~2011년의 6월 소비전력 평균치'로부터 '2012년 6월의 소비전력'을 예측할 수 있는 것이다.
반면, S223단계에서 산출된 비교 오차가 임계 범위 밖이면(S224-N), EMS 서버(160)는 과거 소비전력 데이터에 보상치를 가감하여 과거 소비전력을 보상한다(S226).
S224단계에서 비교 오차가 임계 범위 밖인 경우는, 최근 소비전력이 과거 소비전력과 용인할 수 없을 정도로 차이를 보이는 경우이다. 따라서, 최근 소비전력에 어느 정도 수렴하도록 S226단계에서 과거 소비전력을 보상한다.
S226단계에서의 과거 소비전력 보상은 과거 소비전력 데이터 전부에 대해 수행된다. 즉, S226단계에서의 과거 소비전력을 보상은 '2001년~2011년의 5월 소비전력 데이터'가 아닌 '2001년~2011년 전체의 소비전력 데이터'에 대해 수행된다.
따라서, S224단계에서 비교 오차가 3%(임계 오차)를 넘는 것으로 판단되면, S226단계에서 EMS 서버(160)는 '2001년~2011년 전체의 소비전력 데이터'에 보상치를 가산 또는 감산하여 과거 소비전력을 보상한다.
구체적으로, 과거 소비전력이 최근 소비전력 보다 작은 경우에는 과거 소비전력에 보상치를 가산하고, 과거 소비전력이 최근 소비전력 보다 큰 경우에는 과거 소비전력에 보상치를 감산하여, 과거 소비전력을 최근 소비전력에 수렴시킨다.
이후, S223단계부터 재수행되는데, 그럼에도 불구하고 S223단계에서 산출된 비교 오차가 임계 범위 밖이면(S224-N), S226단계에 의한 보상이 한 번 더 수행된다.
반면, 과거 소비전력 보상에 의해 비교 오차가 임계 범위 이내가 되면(S224-Y), EMS 서버(160)는 보상된 과거 소비전력 데이터로부터 향후 소비전력을 예측한다(S225).
S225단계에서 EMS 서버(160)는 비교 오차가 가감되어 보상된 '2001년~2011년의 6월 소비전력 평균치'로부터 '2012년 6월의 소비전력'를 예측한다.
위 실시예에서 소비전력 예측은 "월" 단위로 수행되는 것으로 설명하였으나, 이는 설명의 편의를 위해 든 일 예에 불과하다. 소비전력 예측은 필요에 따라, "주", "일", "시", "분" 단위로도 가능하다.
5. 생산전력 예측
이하에서는, 도 2의 S230단계에 대해 도 5를 참조하여 상세히 설명한다. 도 5는 신재생 에너지 발전 시스템(110)에서의 생산전력에 대한 예측 과정의 상세한 설명에 제공되는 흐름도이다.
생산전력 예측을 위해, 먼저 EMS 서버(160)는 도 2의 S213단계 내지 S215단계에서 취득/저장된 과거 기상 데이터, 최근 기상 데이터 및 기상 예보 데이터를 읽어들인다(S231 내지 S233).
이해와 설명의 편의를 위해, "과거" 기상 데이터는 "2001년~2011년(10년간)"의 기온/풍속 데이터이고, "최근" 기상 데이터는 "2012년 5월"의 기온/풍속 데이터이며, 기상 "예보"는 "2012년 6월"의 날씨(맑음, 흐림, 비, 눈)이고, "예측" 생산전력은 "2012년 6월"의 생산전력인 것을 상정한다.
EMS 서버(160)는 읽어들인 과거 기상 데이터와 최근 기상 데이터를 비교하여, 기상 데이터에 대한 비교 오차를 산출한다(S234). 예를 들어, S234단계에서는 '2001년~2011년의 5월 기온/풍속 평균치'와 '2012년 5월의 기온/풍속'을 비교하여 비교 오차를 산출할 수 있다.
S234단계에서 계산된 비교 오차가 임계 범위 이내이면(S235-Y), EMS 서버(160)는 과거 기상 데이터에 기상 예보를 반영하여 향후 생산전력을 예측한다(S236).
예를 들어, S235단계에서 비교 오차가 3%(임계 오차) 이내로 판단되면, S236단계에서 EMS 서버(160)는 '2001년~2011년의 6월 기온/풍속 평균치'에서 생산 가능한 전력을 산출한 후 기상 예보에 의한 날씨를 반영하여 '2012년 6월의 생산전력'을 예측할 수 있는 것이다.
기상 예보에 의한 날씨를 반영한다 함은, 산출된 생산 가능한 전력을 날씨에 따라 조정함을 의미하는데, 태양광 발전의 경우 날씨가 맑음이 아닌 경우 생산 가능한 전력은 감산 처리하고, 풍력 발전의 경우 풍속이 작은 경우 생산 가능한 전력을 감산처리 한다.
반면, S234단계에서 산출된 비교 오차가 임계 범위 밖이면(S235-N), EMS 서버(160)는 과거 기상 데이터에 보상치를 가감하여 과거 기상 데이터를 보상한다(S237).
S235단계에서 비교 오차가 임계 범위 밖인 경우는, 최근 기상이 과거 기상과 용인할 수 없을 정도로 차이를 보이는 경우이다. 따라서, 최근 기상 데이터에 어느 정도 수렴하도록 S237단계에서 과거 기상 데이터를 보상한다.
S237단계에서의 과거 기상 데이터 보상은 과거 기상 데이터 전부에 대해 수행된다. 즉, S237단계에서의 과거 기상 데이터 보상은 '2001년~2011년의 5월 기상 데이터'가 아닌 '2001년~2011년 전체의 기상 데이터'에 대해 수행된다.
따라서, S235단계에서 비교 오차가 3%(임계 오차)를 넘는 것으로 판단되면, S237단계에서 EMS 서버(160)는 '2001년~2011년 전체의 기상 데이터'에 보상치를 가산 또는 감산하여 과거 기상 데이터를 보상한다.
구체적으로, 과거 기온/풍속이 최근 기온/풍속 보다 작은 경우에는 과거 기온/풍속에 보상치를 가산하고, 과거 기온/풍속이 최근 기온/풍속 보다 큰 경우에는 과거 기온/풍속에 보상치를 감산하여, 과거 기온/풍속을 최근 기온/풍속에 수렴시킨다.
이후, S234단계부터 재수행되는데, 그럼에도 불구하고 S235단계에서 산출된 비교 오차가 임계 범위 밖이면(S235-N), S237단계에 의한 보상이 한 번 더 수행된다.
반면, 과거 기상 데이터 보상에 의해 비교 오차가 임계 범위 이내가 되면(S235-Y), EMS 서버(160)는 보상된 과거 기상 데이터에 기상 예보를 반영하여 향후 생산전력을 예측한다(S236).
예를 들어, S235단계에서 비교 오차가 3%(임계 오차) 이내로 판단되면, S236단계에서 EMS 서버(160)는 비교 오차가 가감되어 보상된 '2001년~2011년의 6월 기온/풍속 평균치'에서 생산 가능한 전력을 산출한 후 기상 예보에 의한 날씨를 반영하여 '2012년 6월의 생산전력'을 예측하게 되는 것이다.
위 실시예에서 생산전력 예측은 "월" 단위로 수행되는 것으로 설명하였으나, 이는 설명의 편의를 위해 든 일 예에 불과하다. 생산전력 예측은 필요에 따라, "주", "일", "시", "분" 단위로도 가능하다.
6. 비상 에너지 활용 대책에 따른 전력 운용
이하에서는, 도 2의 S250단계에 대해 도 6을 참조하여 상세히 설명한다. 도 6은 EMS 서버(160)에서 계획정전에 대비한 비상 에너지 활용 대책에 따른 전력 운용 과정의 상세한 설명에 제공되는 흐름도이다.
도 6에 도시된 바와 같이, 계획정전이 예정되어 있는 것으로 판단되면(S240-Y), EMS 서버(160)는 배터리(140)의 잔량을 파악한다(S251). S251단계에서의 배터리 잔량은, EMS 서버(160)가 ESS(130)의 BMS(132)에 의해 계산된 배터리(140)의 잔량에 대한 정보를 수신하여 파악 가능하다.
한편, EMS 서버(160)는, S220단계에서 예측된 소비전력을 참고하여 계획정전 동안의 필요 전력을 산출하고(S252), S252단계에서 산출된 필요 전력과 S251단계에서 파악된 배터리(140)의 잔량을 비교한다(S253).
S253단계에서 필요 전력이 배터리(140)의 잔량 보다 작은 것으로 판단되면(S253-Y), EMS 서버(160)는 신재생 에너지 발전 시스템(110)에서 생성되는 신재생 에너지가 전력 부하(120)로 공급되도록 ESS(130)의 PCS(131)를 제어한다(S254).
필요 전력이 배터리(140)의 잔량 보다 작은 경우는, 계획정전 동안의 필요 전력이 배터리(140)에 모두 확보되어 있으므로, 신재생 에너지 발전 시스템(110)에서 생성되는 신재생 에너지를 전력 부하(120)에서 모두 소모시키는 것이다.
반면, S253단계에서 필요 전력이 배터리(140)의 잔량 이상인 것으로 판단되면(S253-N), EMS 서버(160)는 배터리(140)의 필요 충전량을 산출한다(S255).
필요 충전량이란, 계획정전 동안에 전력 부하(120)에서 소비할 전력을 배터리(140)를 통해 공급하기 위해, 배터리(140)에 더 충전하여야 하는 충전량을 의미한다. 필요 충전량은, 필요 전력으로부터 배터리(140)의 잔량을 감산하여 산출가능하다.
또한, EMS 서버(160)는 S230단계에서 예측된 생산전력을 참고하여, 계획정전 전까지의 예측 생산전력을 산출하고(S256), S255단계에서 산출된 필요 충전량과 S256단계에서 산출한 계획정전 전까지의 예측 생산전력을 비교한다(S257).
S257단계에서 필요 충전량이 계획정전 전까지의 예측 생산전력 보다 작은 것으로 판단되면(S257-Y), EMS 서버(160)는 신재생 에너지 발전 시스템(110)에서 생성되는 신재생 에너지로 배터리(140)가 충전되도록 ESS(130)의 PCS(131)를 제어한다(S258).
S258단계를 수행하여 배터리(140)에 필요 충전량이 충전 완료된 경우, EMS 서버(160)는 신재생 에너지가 전력 부하(120)에 공급되도록 PCS(131)를 제어할 수 있다.
반면, S257단계에서 필요 충전량이 계획정전 전까지의 예측 생산전력 이상인 것으로 판단되면(S257-N), EMS 서버(160)는 신재생 에너지 발전 시스템(110)에서 생성되는 신재생 에너지와 전력망(150)을 통해 공급되는 에너지로 배터리(140)가 충전되도록 ESS(130)의 PCS(131)를 제어한다(S259).
S259단계에서 전력망(150)에서 공급되는 에너지에 의한 충전량은, '필요 충전량'에서 '계획정전 전까지의 예측 생산전력에 의한 충전량'을 감산한 양으로 결정하여 운용함 바람직하다.
더 나아가, 전력망(150)을 통해 에너지를 공급받는 시기는, 도 3의 S218단계를 통해 획득/저장된 시간별 전력 가격을 참고하여 전력 가격이 가장 낮은 시간대로 결정하여 운용함이 더욱 바람직하다.
7. 경제적 에너지 활용 대책에 따른 전력 운용
이하에서는, 도 2의 S260단계에 대해 도 7을 참조하여 상세히 설명한다. 도 7은 계획정전이 예정되어 있지 않은 경우 EMS 서버(160)에서의 경제적 에너지 활용 대책에 따른 전력 운용 과정의 상세한 설명에 제공되는 흐름도이다.
도 7에 도시된 바와 같이, 계획정전이 예정되어 있지 않은 것으로 판단되면(S240-N), EMS 서버(160)는 배터리(140)에 대한 충/방전 스케쥴을 생성한다(S261). S261단계에서 생성된 충/방전 스케쥴은 EMS 서버(160)로부터 ESS(130)의 PCS(131)로 전달된다.
S261단계에서의 충/방전 스케쥴은, EMS 서버(160)가 도 3의 S217단계를 통해 획득한 기초 충/방전 스케쥴을 기준으로 도 2의 S220단계에서 예측된 소비전력과 도 2의 S230단계에서 예측된 생산전력을 참고하여 생성할 수 있다.
이후, S261단계에서 생성한 충/방전 스케쥴에 따른 방전 시간이 도래하지 않은 경우(S262-N), PCS(131)는 신재생 에너지 발전 시스템(110)에서 생성되는 신재생 에너지를 전력 부하(120)에 공급하거나 배터리(140)에 공급하여 충전한다(S263).
반면, S261단계에서 생성한 충/방전 스케쥴에 따른 방전 시간이 도래한 경우(S262-Y), PCS(131)는 배터리(140)에 충전되어 저장된 에너지와 신재생 에너지 발전 시스템(110)에서 생성되는 신재생 에너지를 전력 부하(120)에 공급한다(S264).
이때, PCS(131)는 S264단계에서 남는 에너지를 전력망(150)에 공급하여, 잉여 전력 판매에 의한 수익을 획득한다(S265).
8. EMS 서버
도 8은, 도 1에 도시된 EMS 서버(160)의 상세 블럭도이다. 도 8에 도시된 바와 같이, EMS 서버(160)는 통신부(161), 프로세서(162) 및 저장부(163)를 구비한다.
통신부(161)는 PCS(131), 전력 서버(180) 및 가상 서버(190)와 통신 연결을 설정하고 유지하여, 정보를 전달하고 전달받는다.
프로세서(162)는 통신부(161)를 통해 획득한 정보들을 이용하여, 전력 부하(120)에서의 소비전력을 예측하고, 신재생 에너지 발전 시스템(110)에서의 생산전력을 예측한다.
또한, 프로세서(162)는 전력 서버(180)로부터 안내되는 계획정전 여부에 따라 적합한 에너지 활용 대책을 수립하고 그에 따라 PCS(131)를 제어하여 전력을 운용한다.
저장부(163)는 통신부(161)를 통해 획득한 정보가 저장되고, 프로세서(162)에 의해 예측/산출된 정보들이 저장되는 저장매체이다.
한편, 본 실시예에 따른 장치와 방법의 기능을 수행하게 하는 컴퓨터 프로그램을 수록한 컴퓨터로 읽을 수 있는 기록매체에도 본 발명의 기술적 사상이 적용될 수 있음은 물론이다. 또한, 본 발명의 다양한 실시예에 따른 기술적 사상은 컴퓨터로 읽을 수 있는 기록매체에 기록된 컴퓨터로 읽을 수 있는 코드 형태로 구현될 수도 있다. 컴퓨터로 읽을 수 있는 기록매체는 컴퓨터에 의해 읽을 수 있고 데이터를 저장할 수 있는 어떤 데이터 저장 장치이더라도 가능하다. 예를 들어, 컴퓨터로 읽을 수 있는 기록매체는 ROM, RAM, CD-ROM, 자기 테이프, 플로피 디스크, 광디스크, 하드 디스크 드라이브, 등이 될 수 있음은 물론이다. 또한, 컴퓨터로 읽을 수 있는 기록매체에 저장된 컴퓨터로 읽을 수 있는 코드 또는 프로그램은 컴퓨터간에 연결된 네트워크를 통해 전송될 수도 있다.
또한, 이상에서는 본 발명의 바람직한 실시예에 대하여 도시하고 설명하였지만, 본 발명은 상술한 특정의 실시예에 한정되지 아니하며, 청구범위에서 청구하는 본 발명의 요지를 벗어남이 없이 당해 발명이 속하는 기술분야에서 통상의 지식을 가진자에 의해 다양한 변형실시가 가능한 것은 물론이고, 이러한 변형실시들은 본 발명의 기술적 사상이나 전망으로부터 개별적으로 이해되어져서는 안될 것이다.

Claims (15)

  1. 부하에서의 소비전력을 예측하는 단계;
    신재생 에너지 발전 시스템에서의 생산전력을 예측하는 단계; 및
    계획정전이 예정되어 있는 경우, 예측된 소비전력과 예측된 생산전력을 참조하여 수립한 계획정전에 대비한 에너지 활용 대책에 따라 전력을 운용하는 단계;를 포함하는 것을 특징으로 하는 전력 관리 방법.
  2. 제 1항에 있어서,
    소비전력 예측단계는,
    과거 소비전력 및 최근 소비전력을 획득하는 단계;
    획득된 과거 소비전력과 최근 소비전력을 비교하여, 소비전력에 대한 비교 오차를 산출하는 단계; 및
    비교 오차가 임계 범위 이내이면, 과거 소비전력으로부터 향후 소비전력을 예측하는 단계;를 포함하는 것을 특징으로 하는 전력 관리 방법.
  3. 제 2항에 있어서,
    소비전력 예측단계는,
    비교 오차가 임계 범위 밖이면, 과거 소비전력에 보상치를 가감하여 과거 소비전력을 보상하는 단계; 및
    보상된 과거 소비전력으로부터 향후 소비전력을 예측하는 단계;를 더 포함하는 것을 특징으로 하는 전력 관리 방법.
  4. 제 1항에 있어서,
    생산전력 예측단계는,
    과거 기상, 최근 기상 및 기상 예보를 획득하는 단계;
    과거 기상과 최근 기상을 비교하여, 기상에 대한 비교 오차를 산출하는 단계; 및
    비교 오차가 임계 범위 이내이면, 과거 기상에 기상 예보를 반영하여 향후 생산전력을 예측하는 단계;를 포함하는 것을 특징으로 하는 전력 관리 방법.
  5. 제 4항에 있어서,
    비교 오차가 임계 범위 밖이면, 과거 기상에 보상치를 가감하여 과거 기상을 보상하는 단계; 및
    보상된 과거 기상에 기상 예보를 반영하여 향후 생산전력을 예측하는 단계;를 더 포함하는 것을 특징으로 하는 전력 관리 방법.
  6. 제 1항에 있어서,
    전력 운용 단계는,
    계획정전이 예정되어 있는 경우, 배터리 잔량을 파악하는 단계;
    예측된 소비전력을 참고하여, 계획정전 동안의 필요 전력을 산출하는 단계; 및
    필요 전력이 배터리 잔량 보다 작으면, 신재생 에너지를 부하에 공급하는 단계;를 포함하는 것을 특징으로 하는 전력 관리 방법.
  7. 제 6항에 있어서,
    필요 전력이 배터리 잔량 이상이면, 배터리의 필요 충전량을 산출하는 단계;
    예측된 생산전력을 참고하여, 계획정전 전까지의 예측 생산전력을 산출하는 단계; 및
    필요 충전량이 계획정전 전까지의 예측 생산전력 보다 작으면, 신재생 에너지로 배터리를 충전하는 단계;를 더 포함하고,
    필요 충전량은,
    계획정전 동안에 부하에서 소비할 전력을 배터리를 통해 공급하기 위해 배터리에 더 충전하여야 하는 충전량인 것을 특징으로 하는 전력 관리 방법.
  8. 제 7항에 있어서,
    배터리에 필요 충전량이 충전 완료되면, 신재생 에너지를 부하로 공급하는 단계;를 더 포함하는 것을 특징으로 하는 전력 관리 방법.
  9. 제 7항에 있어서,
    필요 충전량이 계획정전 전까지의 예측 생산전력 보다 크면, 신재생 에너지와 전력망을 통해 공급되는 에너지로 배터리를 충전하는 단계;를 더 포함하고,
    전력망에서 공급되는 에너지에 의한 배터리 충전량은,
    필요 충전량에서 계획정전 전까지의 예측 생산전력에 의한 충전량을 감산한 양으로 결정하는 것을 특징으로 하는 전력 관리 방법.
  10. 제 9항에 있어서,
    전력망을 통해 에너지를 공급받는 시기는,
    전력 가격이 가장 낮은 시간대로 결정하는 것을 특징으로 하는 전력 관리 방법.
  11. 제 1항에 있어서,
    계획정전이 예정되어 있지 않은 경우, 배터리의 충전과 방전 스케쥴을 생성하여 수립한 에너지 활용 대책에 따라 전력을 운용하는 단계;를 더 포함하는 것을 특징으로 하는 전력 관리 방법.
  12. 제 11항에 있어서,
    스케쥴에 따른 방전 시간이 도래하지 않았으면, 신재생 에너지를 부하에 공급하거나 배터리에 공급하여 충전하는 단계; 및
    스케쥴에 따른 방전 시간이 도래하면, 배터리에 충전되어 저장된 에너지와 신재생 에너지를 부하에 공급하는 단계;를 더 포함하는 것을 특징으로 하는 전력 관리 방법.
  13. 제 12항에 있어서,
    공급단계에서 남는 에너지를 전력망에 공급하여, 잉여 전력을 판매하는 단계;를 더 포함하는 것을 특징으로 하는 전력 관리 방법.
  14. 제 11항에 있어서,
    전력 운용 이후, 예측된 소비전력과 예측된 생산전력 중 적어도 하나에 대한 오차가 발생 되었는지 판단하는 단계; 및
    오차가 발생한 것으로 판단되면, 다음 소비전력 예측 및 생산전력 예측 중 적어도 하나를 수행함에 있어 오차의 영향이 반영되도록 오차를 피드백하는 단계;를 더 포함하는 것을 특징으로 하는 전력 관리 방법.
  15. 부하에서의 소비전력을 예측하고, 신재생 에너지 발전 시스템에서의 생산전력을 예측하며, 계획정전이 예정되어 있는 경우 예측된 소비전력과 예측된 생산전력을 참조하여 계획정전에 대비한 에너지 활용 대책을 수립하는 EMS(Energy Management System); 및
    EMS에서 수립한 에너지 활용 대책에 따라 전력을 운용하는 ESS(Energy Storage System);를 포함하는 것을 특징으로 하는 전력 관리 시스템.
PCT/KR2012/009033 2012-08-31 2012-10-31 전력 관리 방법 및 시스템 WO2014035001A1 (ko)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
KR10-2012-0096748 2012-08-31
KR1020120096748A KR101357394B1 (ko) 2012-08-31 2012-08-31 전력 관리 방법 및 시스템

Publications (1)

Publication Number Publication Date
WO2014035001A1 true WO2014035001A1 (ko) 2014-03-06

Family

ID=50183789

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/KR2012/009033 WO2014035001A1 (ko) 2012-08-31 2012-10-31 전력 관리 방법 및 시스템

Country Status (2)

Country Link
KR (1) KR101357394B1 (ko)
WO (1) WO2014035001A1 (ko)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117578446A (zh) * 2023-11-27 2024-02-20 云南电网有限责任公司德宏供电局 基于组合预测模型的网供负荷预测方法、系统及可读介质

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101736717B1 (ko) * 2015-12-28 2017-05-17 연세대학교 산학협력단 에너지 저장 장치 및 그의 제어 방법
KR101783599B1 (ko) * 2016-06-02 2017-10-10 충북대학교 산학협력단 패턴 분석을 활용한 부하 분산을 위한 전력 소비량 제어 기반 수요·공급 관리 시스템
KR101962539B1 (ko) * 2017-07-06 2019-03-26 두산중공업 주식회사 수요전력 예측 방법 및 장치, 이를 기반으로 한 ess 충/방전 제어 장치 및 방법
KR102051192B1 (ko) 2017-09-29 2019-12-03 주식회사 포스코아이씨티 수요전력 예측을 이용한 전력피크 저감시스템 및 방법
KR102235183B1 (ko) 2018-12-28 2021-04-01 주식회사 포스코아이씨티 피크저감기능 및 tou기능을 수행하는 전력관리시스템 및 그 동작방법

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000261980A (ja) * 1999-03-10 2000-09-22 Sumitomo Electric Ind Ltd 電源電力供給システム
JP2002152976A (ja) * 2000-11-13 2002-05-24 Sharp Corp 分散電源電力供給システム
JP2005278337A (ja) * 2004-03-25 2005-10-06 Osaka Gas Co Ltd 電力供給システム
KR100987562B1 (ko) * 2008-07-30 2010-10-12 한국전력공사 주택용 직류전원 공급 및 관리 시스템 및 그 방법

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000261980A (ja) * 1999-03-10 2000-09-22 Sumitomo Electric Ind Ltd 電源電力供給システム
JP2002152976A (ja) * 2000-11-13 2002-05-24 Sharp Corp 分散電源電力供給システム
JP2005278337A (ja) * 2004-03-25 2005-10-06 Osaka Gas Co Ltd 電力供給システム
KR100987562B1 (ko) * 2008-07-30 2010-10-12 한국전력공사 주택용 직류전원 공급 및 관리 시스템 및 그 방법

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117578446A (zh) * 2023-11-27 2024-02-20 云南电网有限责任公司德宏供电局 基于组合预测模型的网供负荷预测方法、系统及可读介质
CN117578446B (zh) * 2023-11-27 2024-05-10 云南电网有限责任公司德宏供电局 基于组合预测模型的网供负荷预测方法、系统及可读介质

Also Published As

Publication number Publication date
KR101357394B1 (ko) 2014-02-12

Similar Documents

Publication Publication Date Title
WO2019225834A1 (ko) 에너지 저장 장치와 태양광 발전을 이용한 전력 공급 제어 시스템 및 방법
WO2014035001A1 (ko) 전력 관리 방법 및 시스템
WO2017142241A1 (ko) 신재생 에너지 연계형 ess의 전력 관리 방법
WO2018074651A1 (ko) 마이크로그리드용 에너지 저장 장치에 대한 운영 장치 및 방법
WO2018056505A1 (ko) 부하관리 및 무정전 전력공급 기능을 가지는 에너지저장장치의 제어방법 및 제어시스템
WO2021100956A1 (ko) 산업단지 마이크로그리드 내 중소 업체의 re100 참여를 위한 가상발전소 운영 시스템 및 방법
WO2011065775A2 (en) Network system and method of controlling network system
WO2017116084A1 (ko) 전력 공급 제어방법 및 시스템
WO2022163994A1 (ko) 지역 단위 재생 에너지 통합 관제 시스템
WO2018199659A1 (ko) 변전소 자산 관리 방법
WO2021141242A1 (ko) 최적 조류 계산 방법 및 시스템
WO2021187673A1 (ko) 전력 수요공급 관리 장치 및 그 방법
US20230387684A1 (en) Method and system for operation and usage of battery energy storage in a power grid
WO2020130366A1 (ko) 전력 그리드 제어 장치 및 시스템
WO2017159982A1 (ko) 마이크로그리드 운영 시스템 및 방법
WO2020013619A1 (ko) 전력계통 신뢰도 지수를 토대로 한 변전소 자산 관리 방법 및 장치
WO2014104829A1 (ko) 전력 부하 예측 방법 및 이러한 방법을 수행하는 장치
WO2020256056A1 (ja) 自己託送システム及び自己託送方法
WO2020256055A1 (ja) 自己託送システム及び自己託送方法
JP7513529B2 (ja) 電力制御システムおよび電力制御方法
WO2024010131A1 (ko) 디지털트윈 기반 마이크로그리드 운영 방법
JP2023071748A (ja) 需要側装置及び発電側装置
WO2017146243A1 (ja) 電力管理サーバ、電力管理システム、及び電力管理方法
CN115622100A (zh) 一种使用光伏储能电池的企业用电分配监测系统及方法
WO2021132759A1 (ko) 이종 분산 자원과 연계된 에너지 저장 장치의 지능형 운전 방법 및 장치

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 12883875

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 12883875

Country of ref document: EP

Kind code of ref document: A1