WO2017221448A1 - 情報処理装置、情報処理方法およびプログラム - Google Patents
情報処理装置、情報処理方法およびプログラム Download PDFInfo
- Publication number
- WO2017221448A1 WO2017221448A1 PCT/JP2017/002320 JP2017002320W WO2017221448A1 WO 2017221448 A1 WO2017221448 A1 WO 2017221448A1 JP 2017002320 W JP2017002320 W JP 2017002320W WO 2017221448 A1 WO2017221448 A1 WO 2017221448A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- event
- amount
- plan
- asset management
- display
- Prior art date
Links
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q40/00—Finance; Insurance; Tax strategies; Processing of corporate or income taxes
- G06Q40/06—Asset management; Financial planning or analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F3/00—Input arrangements for transferring data to be processed into a form capable of being handled by the computer; Output arrangements for transferring data from processing unit to output unit, e.g. interface arrangements
- G06F3/14—Digital output to display device ; Cooperation and interconnection of the display device with other functional units
Definitions
- This disclosure relates to an information processing apparatus, an information processing method, and a program.
- robot advisors are widely available as a service related to asset management.
- the robot advisor is a service that asks a customer several questions, evaluates the risk appetite based on the answers to the questions, and advises a portfolio (a combination of financial products) that matches the risk appetite of the customer.
- a system for portfolio optimization is also described in Patent Document 1, for example.
- the present disclosure proposes a new and improved information processing apparatus, information processing method, and program capable of planning asset management in consideration of the occurrence of each event.
- an information processing apparatus including a control unit that creates an asset management plan for each event based on event information including a target amount and an achievement time for each event.
- a program for causing a computer to function as a control unit that creates an asset management plan for each event based on the setting for each event of the target amount and the achievement time.
- FIG. It is explanatory drawing which shows the preparation process of the accumulation plan by the logic 1.
- FIG. It is explanatory drawing which shows the preparation process of the accumulation plan by the logic 1.
- FIG. It is explanatory drawing which shows the preparation process of the accumulation plan by the logic 1.
- FIG. It is explanatory drawing which shows the preparation process of the accumulation plan by the logic 1.
- FIG. It is a flowchart which shows the preparation method of the accumulation plan by embodiment of this indication. It is a flowchart which shows the flow which creates an asset management plan from an accumulation plan.
- It is the block diagram which showed the hardware constitutions of the management server. It is explanatory drawing which shows the application example of the setting regarding a
- a plurality of constituent elements having substantially the same functional configuration may be distinguished by adding different alphabets after the same reference numeral.
- only the same reference numeral is given to each of the plurality of constituent elements.
- Embodiments of the present disclosure relate to an asset management system that provides an asset management plan for each customer of a financial institution. First, an outline of an asset management system according to an embodiment of the present disclosure will be described with reference to FIG.
- FIG. 1 is an explanatory diagram illustrating a configuration of an asset management system according to an embodiment of the present disclosure.
- the asset management system according to the embodiment of the present disclosure includes a customer terminal 10 and a management server 20.
- the customer terminal 10 is an information processing apparatus used by a customer and has a function of detecting an operation by the customer and a function of displaying a display screen.
- the customer terminal 10 and the management server 20 are connected via the communication network 12 as shown in FIG. 1, and the customer terminal 10 is received from the management server 20 via the communication network 12.
- Display a display screen and detect an operation performed by the customer on the display screen.
- the customer terminal 10 displays an information setting screen used for creating the asset management plan, detects an information setting operation on the setting screen, and sends the set information to the management server 20 via the communication network 12. Send.
- the communication network 12 is a wired or wireless transmission path for information transmitted from a device connected to the communication network 12.
- the communication network 12 may include a public line network such as the Internet, a telephone line network, a satellite communication network, various LANs including the Ethernet (registered trademark), a WAN (Wide Area Network), and the like.
- the communication network 12 may include a dedicated line network such as an IP-VPN (Internet Protocol-Virtual Private Network).
- the management server 20 is an information processing apparatus that creates an asset management plan for each customer and manages customer assets in accordance with the asset management plan. For example, the management server 20 transmits a setting screen for information used to create the asset management plan to the customer terminal 10, receives information set by the customer on the setting screen from the customer terminal 10, and based on the received information An asset management plan for the customer of the customer terminal 10 is created.
- the management server 20 manages the customer's assets by buying and selling financial products in accordance with the asset management plan based on the application from the customer.
- the management server 20 can generate a display screen showing the operation status of the customer's asset during the asset operation period, and transmit it to the customer terminal 10.
- the management server 20 may be provided as a function of a financial institution such as a bank and a securities company.
- Robot Advisor is known as a service related to asset management.
- the robot advisor is a service that asks a customer several questions, evaluates risk appetite based on answers to the questions, and advises a portfolio that matches the risk appetite of the customer.
- this robot advisor for example, as shown in FIG. 2, a portfolio composed of a combination of a plurality of financial products having different risk return characteristics can be easily formed.
- FIG. 3 is an explanatory diagram showing a specific example of expenses for an event.
- expenses for events include, for example, children's education costs, housing purchase costs, retirement funds, housing reform costs, children's marriage cost assistance, car replacement, and the like.
- the amount of expenditure, whether or not the time can be changed, whether or not the amount of expenditure can be changed, and the risk tolerance (how much unreasonable is allowed for the target amount) are different.
- the purchase time can be changed, and the amount of expenditure can also be changed by reviewing the purchased property. For this reason, it is acceptable if the amount of unsuccessful achievement of the target amount of the operation result is small.
- Robot Advisor does not consider such an event, so it is a vague asset management for which the asset management is unclear, and there is a risk that expenses will not be prepared for future events There is.
- this disclosure proposes a system for planning asset management that takes into account the occurrence of events.
- an asset management plan for each event is created, and asset management is performed in accordance with the asset management plan, so a portfolio for each event is created.
- FIG. 4 is an explanatory diagram illustrating a specific example of a portfolio created by the system according to the present disclosure.
- the portfolio is managed for each event such as an education cost, a house purchase cost, and a car replacement cost.
- these portfolios are virtual portfolios that are virtually managed in the master portfolio created in the customer's account. That is, the result of integrating each virtual portfolio is equal to the master portfolio. Since the risk tolerance differs for each event, as shown in FIG. 4, the ratio of each financial product constituting each virtual portfolio also differs.
- an asset management plan is created for each event, and a virtual portfolio for each event is managed, so that it is possible to realize asset management in consideration of the occurrence of each event.
- the configuration and function of the management server 20 according to the embodiment of the present disclosure will be sequentially described in detail.
- FIG. 5 is an explanatory diagram illustrating a configuration of the management server 20 according to the embodiment of the present disclosure.
- the management server 20 includes a communication unit 220, a storage unit 230, and a control unit 240.
- the communication unit 220 is an interface with an external device.
- the communication unit 220 transmits an event setting screen, a display screen showing the asset operation status, and the like to the customer terminal 10.
- the communication unit 220 functions as an acquisition unit that acquires information for each event such as a target amount and an achievement time set in the customer terminal 10 on the event setting screen from the customer terminal 10.
- the communication unit 220 also has a function of transmitting a buy order and a sell order for financial products to an external transaction device in accordance with control from the management unit 246 described later.
- the storage unit 230 mainly stores customer information, event information, asset management plan, and operation information.
- Customer information includes various information related to customers.
- customer information includes user profile (age, gender, occupation, family structure, residence, car ownership information, car purchase timing), income information (annual income, income, savings), expenditure information (living expenses, insurance, Loan, time deposit, shopping), investment information (current investment amount, monthly reserve amount, possible investment amount), behavior information (movement information, SNS information), and the like.
- Event information is information about each event set by the customer.
- the event information includes event contents (expenditure use), target amount, achievement timing, and risk tolerance (importance). Further, the event information may include information indicating the possibility of change in the achievement time or the possibility of change in the target amount.
- the asset management plan is information for each event indicating the initial investment amount for each financial product and the monthly reserve amount.
- the asset management plan may be information for each event indicating an initial investment amount and a monthly reserve amount in each financial product class, instead of individual financial products.
- the financial product class is a class classified by investment target or risk return characteristics such as emerging country government bonds, Japanese stocks, foreign bank claims and the like. Further, the asset management plan may include operation prediction information (expected operation result). Such an asset management plan is created by a plan creation unit 244 described later.
- Operation information is information indicating the current operation status of customer assets.
- the operation information includes the master portfolio and the virtual portfolio described with reference to FIG.
- the operation information may include information indicating the current possibility of achieving the target amount of each event and the time at which the target amount can be achieved.
- the control unit 240 controls the overall operation of the management server 20.
- the control unit 240 includes an estimation unit 241, a display control unit 242, a plan creation unit 244, a management unit 246, and a plan adjustment unit 248.
- the estimation unit 241 estimates an event that will occur in the future for the customer. For example, the estimation unit 241 may estimate an event that will occur in the future with reference to the customer's age or gender input by the customer. Moreover, the estimation part 241 may estimate the information regarding the target amount for every event, achievement time, and risk tolerance based on a prior setting. For example, information regarding the target amount and the achievement time may be set for each event together with the risk tolerance. The estimation unit 241 can estimate the target amount, the achievement time, and the risk tolerance corresponding to an event estimated to occur in the future with reference to the above-described information set in advance for each event.
- the estimation unit 241 may estimate an event that will occur in the future with reference to the customer information stored in the storage unit 230. For example, when the family structure included in the customer information indicates the presence of a child, the estimation unit 241 estimates the educational expenses for the child's university advancement as an event that occurs in the future. Then, the estimation unit 241 estimates the target amount and risk tolerance corresponding to the educational expenses with reference to information set in advance for each event. Further, when the age at the time when the child enters the university is set as the achievement time for the educational expenses, the estimation unit 241 calculates the difference between the age indicated by the customer information and the age at the time when the child enters the university. Thus, the achievement time may be estimated.
- the estimation unit 241 may estimate replacement of a vehicle as an event that will occur in the future from the ownership information of the vehicle included in the customer information. Then, the estimation unit 241 estimates the target amount and risk tolerance corresponding to the replacement of the car with reference to information set in advance for each event. In addition, when the replacement period is set in advance as the achievement time for the replacement of the automobile, the estimation unit 241 adds the replacement period to the purchase time of the automobile included in the customer information, thereby achieving the achievement period. May be estimated.
- the display control unit 242 generates a display screen for display on the customer terminal 10. For example, the display control unit 242 generates an event setting screen, a plan display screen showing an asset management plan, a display screen showing an asset management status, and the like. Each display screen will be described later in “3. Details of display control”.
- the plan creation unit 244 creates an asset management plan for each event based on the target amount, achievement time, and risk tolerance for each event set by the customer.
- the asset management plan is information for each event indicating the initial input amount to each financial product and the monthly reserve amount. Creation of an asset management plan by the plan creation unit 244 will be described in detail in “4. Creation of an asset management plan”.
- the management unit 246 manages customer assets in accordance with the asset management plan created by the plan creation unit 244. For example, the management unit 246 controls buying and selling orders to an external contract server according to the asset management plan. In addition, the management unit 246 creates and updates a virtual portfolio for each event.
- the plan adjustment unit 248 adjusts the initial asset management plan created by the plan creation unit 244 according to the actual asset management status. For example, the plan adjustment unit 248 creates a new asset management plan for each event based on the actual asset management status, and the initial investment amount for each financial product in the new asset management plan and the actual asset management status The difference with the asset value of each financial product is calculated as an adjustment value. Based on the adjustment value, the management unit 246 controls the sales order. This plan adjustment by the plan adjustment unit 248, that is, rebalancing will be described later in “5. Rebalancing”.
- Event setting screen The display control unit 242 generates a setting screen for the customer to set event information.
- an event selection screen and a goal setting screen will be described as specific examples of the event setting screen.
- FIG. 6 is an explanatory diagram showing a specific example of the event selection screen 400.
- the event selection screen 400 includes a progress display area 410, a gender input field 422, an age input field 424, event large category display units 431 to 436, a plan reading button 440, and goal setting. Button 450.
- the progress display area 410 shows each step until the creation of the asset management plan is completed and the current step.
- the progress display area 410 indicates “event selection”, “goal setting”, and “plan proposal” as steps until the creation of the asset management plan is completed. “Select event” marked with is the current step.
- the customer's gender is input, and in the age input field 424, the customer's age is input.
- Event large classification display sections 431 to 436 each correspond to a large classification of events.
- the event classification display unit 431 corresponds to “reward”
- the event classification display unit 432 corresponds to “pet”
- the event classification display unit 433 corresponds to “car, study abroad, marriage”
- the large classification display unit 434 corresponds to “house”
- the event large classification display unit 435 corresponds to “children”
- the event large classification display unit 436 corresponds to “in preparation for retirement or emergency”.
- the plan read button 440 is enabled when the customer has created an asset management plan by the function of the present disclosure in the past and the created asset management plan is saved.
- the display control unit 242 reads the created asset management plan and displays the created asset management plan.
- the goal setting button 450 is activated when at least one event is selected. In the example shown in FIG. 6, since no event is selected, the goal setting button 450 is not activated. When the activated goal setting button 450 is selected, the display control unit 242 generates a goal setting screen described later with reference to FIG.
- the display control section 242 displays a selection button for events belonging to the large classification corresponding to the selected event large classification display section. To do.
- FIG. 7 is an explanatory diagram showing a specific example of an event selection button.
- a selection button for events belonging to the major category “children” is displayed as shown in FIG.
- selection buttons a selection button 461 corresponding to “school”, a selection button 462 corresponding to “junior high school”, a selection button 463 corresponding to “university”, a selection button 464 corresponding to “study abroad”, A selection button 465 corresponding to “marriage” and a selection button 466 corresponding to “free setting” are shown.
- the customer can select one or a plurality of events by selecting one or a plurality of selection buttons from the selection buttons 461 to 466. Also. The customer can also select events belonging to different major classifications by sequentially selecting different event major classification display sections. The event selected by the customer is added to the event list 414 in the progress display area 410. When an event is selected by the customer, the goal setting button 450 is validated as shown in FIG.
- the display control unit 242 When the selection button 466 corresponding to “free setting” is selected by the customer, the display control unit 242 superimposes a window 470 for inputting an event name on the event selection screen 400 as shown in FIG. May be. With this configuration, the customer can set an event that is not included in the prepared event group.
- the selection button displayed when each event large classification display section is selected may be common to all customers or may be different for each customer.
- the estimation unit 241 estimates an event that will occur in the future for the customer based on the customer's gender input in the gender input field 422 and the customer's age input in the age input field 424, and display control is performed.
- the unit 242 may display a selection button corresponding to the estimated event.
- the estimation unit 241 may estimate an event that will occur in the future with respect to the customer based on the customer information. Good.
- the display control unit 242 When the goal setting button 450 is selected after an event is selected by the customer, the display control unit 242 generates a goal setting screen.
- FIG. 9 is an explanatory diagram showing a specific example of the goal setting screen 500.
- the goal setting screen 500 includes a progress display area 410, an achievement years display section 502, a target amount display section 504, goal setting areas 510 to 530, a save button 540, and a plan creation button. 550.
- the achievement year display section 502 displays the number of years until the latest achievement time among the achievement times of the goals of the respective events set in the goal setting areas 510 to 530.
- the target amount display unit 504 displays the total amount of the target amount of each event set in the goal setting areas 510 to 530.
- the goal setting areas 510 to 530 are areas for setting event information such as the target achievement time, target amount and risk tolerance of each event.
- the goal setting area 510 includes an achievement time input field 512, a target amount input field 514, and a slide bar 516 for setting a risk tolerance.
- values estimated by the estimation unit 241 are displayed, and the customer may correct the values as necessary. It should be noted that by selecting “Target amount guideline”, the target amount guideline is displayed.
- the goal setting area 520 corresponding to the study abroad expense includes an achievement time input field 522, an achievement time input field 522, and a slide bar 526, and a foreign currency target amount input field 528.
- the save button 540 is a button for saving the setting contents on the goal setting screen 500.
- the plan creation button 550 is a button for creating an asset management plan for each event. When the plan creation button 550 is selected, the plan creation unit 244 creates an asset management plan for each event based on the event information set on the goal setting screen 500, and the display control unit 242 creates the created asset management. Generate a plan display screen showing the plan.
- FIG. 10 is an explanatory diagram showing a specific example of the plan display screen 600.
- the plan display screen 600 includes a progress display area 410, an initial input amount display column 602, a reserve amount display column 604, a foreign currency reserve amount display column 606, a recalculation button 608, an event It includes an information display area 610, an initial allocation amount display field 612, a transition prediction display 614, a reserve display area 620, a foreign currency display area 630, a save button 640, and an application button 650.
- plan display screen 600 among the steps included in the progress display area 410, “plan proposal” is marked with a check C.
- the initial investment amount display column 602 displays the initial investment amount constituting the asset management plan.
- the reserve amount display column 604 displays a monthly reserve amount in a circle constituting the asset management plan.
- the foreign currency reserve display column 606 displays a monthly reserve amount in a foreign currency constituting the asset management plan.
- the values of the initial input amount display column 602, the reserve amount display column 604, and the foreign currency reserve amount display column 606 can be adjusted.
- the recalculate button 608 is selected, a plan is created with the adjusted values.
- the unit 244 recreates the asset management plan by recalculation.
- the event information display area 610 displays event information such as the target amount of the event, the achievement time, and the risk tolerance.
- event information such as the target amount of the event, the achievement time, and the risk tolerance.
- the display of the asset management plan for the study abroad expense is selected, and the event information about the study abroad expense is displayed in the event information display area 610.
- the initial allocation amount display field 612 displays the initial investment amount allocated to the event among the total initial investment amounts.
- the initial investment amount allocated to the study abroad fee is 0 yen.
- the transition prediction display 614 displays a prediction of how the asset will transition in accordance with the created asset management plan.
- the transition prediction display 614 includes an upward deflection line indicated by a broken line and a downward deflection line indicated by a one-dot chain line in addition to an expected value line indicated by a solid line in FIG. With this configuration, the customer can easily grasp the risk and return for each event in asset management according to the asset management plan.
- the transition prediction display 614 may include a predicted value (in the example illustrated in FIG. 10, four years and three months) when the target is achieved when the asset transition is up.
- the accumulation display area 620 includes a display indicating the monthly accumulation amount allocated to the event and the allocation of the accumulation to each financial product or each financial product class. When the monthly reserve amount or the allocation of the reserve varies depending on the period, the monthly reserve amount and the allocation of the reserve are displayed for each period.
- Foreign currency display area 630 includes a display showing the target amount of foreign currency and the monthly reserve amount.
- the display control unit 242 When another event is selected in the event list 414 on the plan display screen 600, the display control unit 242 generates a plan display screen 600 that displays the asset management plan of the other event. Further, when “all plans” is selected in the progress display area 410, the display control unit 242 displays the integration result of the asset management plans of all events.
- FIG. 11 is an explanatory diagram showing a specific example of a plan display screen 601 for displaying the integration results of asset management plans for all events.
- the plan display screen 601 includes a progress display area 410, an initial input amount display field 602, a reserve amount display field 604, a foreign currency reserve amount display field 606, a recalculation button 608, and a save.
- a button 640, an application button 650, an overall transition prediction display 660, an overall reserve display area 670, and an overall foreign currency display area 680 are included.
- the overall transition prediction display 660 includes an upward line indicated by a broken line and a downward line indicated by a one-dot chain line in addition to an expected value line indicated by a solid line, as in the event-specific plan display screen 600. With this configuration, the customer can easily grasp the overall risk and return in asset management according to the asset management plan.
- the total reserve display area 670 includes a display indicating the total amount of the monthly reserve and the distribution of the reserve to each financial product or each financial product class. If the total amount of funding or the allocation of funding varies from period to period, the total amount of funding and the distribution of funding are displayed for each period.
- the total foreign currency display area 680 includes a display showing the total target amount of the foreign currency and the total accumulated amount of each month.
- the save button 640 When the save button 640 is selected on the plan display screen 600 or the plan display screen 601 described above, the asset management plan is saved.
- the application button 650 When the application button 650 is selected, the display control unit 242 generates a purchase application screen for applying for purchase of a financial product in accordance with the asset management plan.
- FIG. 12 is an explanatory diagram showing a specific example of the purchase application screen 700.
- the purchase application screen 700 includes an initial input amount display 710 for each financial product, an initial input total amount display 712, a monthly reserve amount display 720 for each financial product, and a sum of monthly reserve amounts.
- a display 722, an account opening button 731, a yen periodic application button 732, an assembly periodic application button 733, an investment trust application button 734, and a save button 740 are included.
- a web page for opening an account is displayed.
- the yen periodic application button 732 is selected, a web page for applying for a yen fixed deposit is displayed, and the assembly periodic application button 733 is selected. Then, a Web page for applying for an assembly time deposit is displayed, and when an investment trust application button 734 is selected, a Web page for applying for an investment trust is displayed.
- the save button 740 is selected, the asset management plan is saved.
- the customer can accurately grasp the breakdown of the initial input amount and the monthly reserve amount for each financial product by using the purchase application screen 700. It is also possible to easily transition to a web page for applying for financial products.
- the display control unit 242 After starting asset management in accordance with the asset management plan, the display control unit 242 generates an operation status display screen showing the actual asset management status.
- FIG. 13 is an explanatory diagram showing a specific example of the operation status display screen 800.
- the operation status display screen 800 includes an event information display area 810, an initial allocation amount display column 812, an asset transition display 814, a reserve display area 820, and a foreign currency display area 830.
- the event information display area 810, the initial allocation amount display field 812, the reserve display area 820, and the foreign currency display area 830 are the event information display area 610, the initial allocation amount display field 612, and the reserve display area 620 described with reference to FIG. And the foreign currency display area 630.
- the asset transition display 814 includes a line L indicating the transition of the assets accumulated for the event, in addition to the line of the expected value and the line indicating the fluctuation range. By comparing the line L with the expected value line, the customer can easily grasp whether or not the operation status is smooth. Note that the asset transition display 814 may include a display indicating the possibility of achieving the target amount at the current time.
- the display control unit 242 generates, as the operation status display screen 800, a display screen indicating the operation status for each event described with reference to FIG. 13, and a display screen indicating the operation status in the whole (master portfolio). It is also possible to generate a display indicating
- the display control unit 242 operates an operational status display screen on which a display 840 for proposing rebalancing of the asset management plan is superimposed as shown in FIG. 801 may be generated.
- the plan adjustment unit 248 calculates the rebalance content (adjustment value). Then, the display control unit 242 generates a rebalance screen including the content of the rebalance calculated by the plan adjustment unit 248.
- a specific example of the rebalance screen will be described with reference to FIG.
- FIG. 15 is an explanatory diagram showing a specific example of the rebalance screen 850.
- the rebalance screen 850 includes a current status display 860 indicating the current asset management status, a rebalance display 870 indicating the content of rebalance, a result display 880 indicating the result of rebalance, and an execution button 892.
- the current status display 860 indicates the amount of accumulation up to the present, the achievement level at the present time with respect to the final target amount, and the progress toward the current assumption for each event.
- the rebalance display 870 indicates the amount of asset adjustment for each event and the amount of purchase and sale of each financial product.
- the progress of event 1 is 82%, while the progress of event 2 is 150%. Balance is shown.
- asset movement may involve buying and selling of financial products, such as selling financial products accumulated for the source event, purchasing new financial products, and assigning new financial products to the destination event.
- the rebalance display 870 may include a display showing the trading volume of each financial product as shown in FIG.
- the result display 880 shows what result is obtained as the asset status for each event when rebalancing is executed.
- the progress of event 1 after rebalancing is 100%, and the progress of event 2 after rebalancing is 127.5%.
- the plan adjustment unit 248 executes the rebalance of the contents shown on the rebalance screen 850.
- the detail adjustment button 894 is selected, the display control unit 242 generates a screen for the customer to adjust the content of the rebalance.
- the cancel button 896 is selected, the display control unit 242 generates the screen displayed before the rebalance screen 850 again.
- the customer's load is reduced compared to the case where the customer himself / herself calculates the content of the rebalance.
- the customer can confirm the content of rebalancing and the result of rebalancing before executing the rebalancing, it is possible to appropriately determine whether or not to perform the rebalancing.
- FIG. 16 is an explanatory diagram showing a specific example of the adjustment screen 900.
- the adjustment screen 900 includes a progress display area 410, goal setting areas 510 to 530, an initial input amount display field 902, a reserve amount display field 904, a foreign currency reserve amount display field 906, A recalculation button 908, a save button 940, and a plan display button 950 are included.
- the initial investment amount display column 602 displays the initial investment amount that constitutes the asset management plan created by the plan creation unit 244.
- the reserve amount display column 604 displays a monthly reserve amount in a circle constituting the asset management plan.
- the foreign currency reserve display column 606 displays a monthly reserve amount in a foreign currency constituting the asset management plan.
- the save button 940 is a button for saving the setting contents on the adjustment screen 900.
- the plan display button 950 is a button for displaying a more specific plan display screen 600.
- the plan creation unit 244 recreates the asset management plan, and displays the initial input amount display column 902, the reserve amount display column 904, and the foreign currency reserve amount display column 906. The amount of money is updated. Further, the customer can adjust the initial investment amount or the reserve amount in the initial investment amount display column 902 or the reserve amount display column 904.
- the plan creation unit 244 recreates the asset management plan, and displays the initial investment amount display column 902, the reserve amount display column 904, or the foreign currency reserve amount display column.
- the amount of 906 is updated.
- the adjustment screen 900 it is possible for the customer to match the initial input amount and the reserve amount with his / her sense. Therefore, it is possible to display an asset management plan that matches the customer's feelings on the plan display screen 600.
- the goal setting areas 510 to 530 include a display of an initial investment amount allocated to a corresponding event and a monthly reserve amount. In the display, the initial investment allocation amount and the monthly reserve amount for each event are adjusted. It may be possible. With this configuration, the customer can adjust the asset management plan in more detail.
- Each of goal setting areas 510 to 530 may include a recalculation button. In this case, the customer can easily adjust the target amount, achievement time or risk tolerance of a certain event, and repeatedly select the recalculation button.
- the customer does not purchase the asset management plan created by the plan creation unit 244 but temporarily stores the asset management plan and terminates the use of the system of the present disclosure. Thereafter, when the customer accesses the system of the present disclosure, the display control unit 242 may display the stored asset management plan. With this configuration, it is possible to reduce the trouble for the customer to set event information and the like again.
- the display control unit 242 may generate a display screen indicating what asset status has been obtained. Good.
- the display screen shows how the assets are managed when asset management in accordance with the asset management plan is started at the time of creation of the asset management plan, like the operation status display screen 800 described with reference to FIG. You may include the display which shows whether it changed.
- FIG. 17 is an explanatory diagram showing the basic concept of a method for creating a certain asset management plan.
- the plan creation unit 244 first determines the worst case guaranteed amount (the lower limit amount to be secured) according to the risk tolerance set for the event. Then, the plan creation unit 244 considers the balance with other events, and the principal guarantee type financial product and the risk type financial product so that the lower limit amount is secured by the principal guarantee type financial product. Determine allocation of initial investment and reserve. The allocation of the initial investment amount and the reserve amount of the principal guarantee type financial product and the risk type financial product determined here is also referred to as a reserve plan.
- plan creation unit 244 calculates the investment yield necessary to achieve the target amount of the event based on the allocation of the initial investment amount and the reserve amount, and the portfolio configuration (financial product of the financial product) for realizing the investment yield.
- the combination and distribution are determined based on, for example, modern portfolio theory. As a result, it is also possible to predict the asset swing in actual operation.
- the plan creation unit 244 can create an asset management plan from a state where the initial input amount and the reserve amount are not specified.
- a logic hereinafter referred to as logic 1 used for determining a reserve plan when a reserve amount is designated will be described.
- FIG. 18 is an explanatory diagram showing the concept of the reserve amount for each event for each period.
- a reserve is allocated to all the events, and the period from the achievement time of the event 1 to the achievement time of the event 2 (t 2 -T 1 ) is allocated to event 2 to event n, and only for event n during the period from the time when event n-1 is reached to the time when event n is reached (t n -t n-1 ) Gold is allocated.
- i n is shown in FIG. 18 is a reserve amount at the time of the start of operation to the event n, i all is the whole of the reserve amount.
- the creation of the accumulation plan by the logic 1 will be specifically described.
- FIGS. 19 to 23 are explanatory diagrams showing the creation process of the accumulated plan by the logic 1.
- the plan creation unit 244 assigns the event n with the latest achievement time for the period (t n ⁇ t n ⁇ 1 ). Specifically, the plan creation unit 244 identifies the minimum achievement rate R n (value of 0 or more and 1 or less) corresponding to the risk tolerance of the event n, and as shown in FIG. 19, the period (t n ⁇ With respect to t n-1 ), the total accumulated amount i all is allocated to the principal guarantee type financial product and the risk type financial product at a ratio of (1: 1 ⁇ R n ).
- the accumulated amount N n of the accumulated amount allocated to the principal guarantee type financial product for the event n is (t n ⁇ t n ⁇ 1 ) i all / It is expressed as (2-Rn).
- the plan creation unit 244 calculates a reserve amount to be allocated to the principal guarantee type financial product for the event n in the period (t n-1 ). Specifically, the plan creation unit 244 calculates the lower limit amount G nmin by multiplying the target amount of event n by the minimum achievement rate R n , and calculates G nmin ⁇ N n as shown in FIG. , The accumulated amount M n of the reserve amount to be allocated to the principal guarantee type financial product for the event n in the period (t n ⁇ 1 ) is calculated.
- the plan creation unit 244 calculates the monthly reserve amount i n1 to be allocated to the principal guarantee type financial product for the event n in the period (t n ⁇ 1 ) by calculating M n / (t n ⁇ 1 ). calculate.
- the difference between the accumulated amount allocated to the principal-guaranteed financial product for event n and the target amount for event n in the above method is assigned to the risk-type financial product for event n. It will be more than the accumulated amount of accumulated funds. That is, the accumulated amount of the reserve amount allocated to event n can be a value less than the target amount of event n.
- the shortage relative to the target amount is expected to be compensated by the increase in assets due to the investment yield. Rather, taking into account the increase in assets due to investment yields, a difference is provided between the accumulated amount allocated to event n and the target amount for event n.
- the plan creation unit 244 assigns the reserve amount for the event n-1 and explains the allocation for the event n.
- the total accumulated amount i all in is replaced with (i all ⁇ i n ).
- the plan creation unit 244 derives a funded plan up to the event 2 by recursively repeating the process up to the assignment for the event 2.
- the plan creation unit 244 determines the total accumulated amount i by subtracting the reserve amount i 2 ⁇ i n from all, can be calculated reserve amount i 1 for event 1. Then, the plan creation unit 244 specifies the minimum achievement rate R 1 (value of 0 or more and 1 or less) corresponding to the risk tolerance of the event 1 for the reserve amount i 1 , and as shown in FIG. 1 is divided into a principal guarantee type financial product and a risk type financial product at a ratio of (1: 1-R 1 ). Therefore, the period integration value N 1 of the reserve amount is distributed to financial instruments principal guaranteed for event 1 at (t 1) is expressed as (t 1) i 1 / ( 2-R 1).
- the plan creation unit 244 calculates the lower limit amount G 1min by multiplying the target amount of event 1 by the minimum achievement rate R 1 , and as shown in FIG. 23, the difference M 1 between G 1min and N 1 is calculated as follows: Calculated as the initial amount of principal-guaranteed financial product for event 1.
- FIG. 24 is a flowchart illustrating a method for creating a funded plan according to an embodiment of the present disclosure.
- the plan creation unit 244 calculates the monthly reserve amount when the initial investment amount is 0 yen. Calculate (S308).
- the plan creation unit 244 may execute the logic 1 by applying various values as the monthly reserve amount, and calculate the reserve amount with an initial investment amount of 0 yen as a solution.
- the plan creation unit 244 may calculate a monthly reserve amount when the initial investment amount is 0 yen by executing Logic 1 in the reverse direction with the initial investment amount being 0 yen.
- the monthly reserve amount when the initial investment amount is 0 yen is the maximum reserve amount within the settable reserve amount range.
- the plan creation unit 244 calculates the minimum value (minimum reserve amount) of the monthly reserve amount (S312). For example, the plan creation unit 244 calculates a monthly reserve amount when the target amount of the event with the earliest achievement time is the initial investment amount. Specifically, the logic 1 may be executed by applying various values as the monthly reserve amount, and the reserve amount at which the initial investment amount becomes the target amount may be calculated as a solution. Alternatively, the plan creation unit 244 may calculate a monthly reserve amount when the initial investment amount is the target amount by executing Logic 1 in the reverse direction with the initial investment amount as the target amount.
- plan creation unit 244 does not use the target amount of the event with the earliest achievement time, but reserves the monthly amount when a predetermined ratio (for example, 40%) of the total amount of the target amount of each event is the initial input amount May be calculated.
- a predetermined ratio for example, 40%
- the plan creation unit 244 selects a monthly reserve amount within a range between the maximum reserve amount calculated in S308 and the minimum reserve amount calculated in S312 (S316), and the selected monthly reserve amount is stored in the logic 1.
- the initial investment amount is calculated, and a reserve plan for each event is created (S318).
- the plan creation unit 244 creates an accumulation plan when the initial investment amount is the changed amount (S324). ).
- the plan creation unit 244 calculates the initial investment amount by applying the changed reserve amount to the logic 1, and for each event. An accumulation plan is created (S328).
- the plan creation unit 244 determines the initial investment amount and the accumulation plan (S332).
- plan creation unit 244 creates an asset management plan for each event indicating the initial investment amount and the monthly reserve amount for each financial product based on the determined initial investment amount and the accumulated plan.
- FIG. 25 is a flowchart showing a flow of creating an asset management plan from a funded plan.
- the plan creation unit 244 creates an asset management plan by performing the processes shown in S340 and S350 for each event.
- the plan creation unit 244 applies the funded plan, the target amount, and the lower limit amount (the amount secured by the principal-guaranteed financial asset) to the logic 2 to obtain the investment yield for achieving the target amount.
- the investment yield calculated by the plan creation unit 244 may be an investment yield obtained with a risk-type financial product.
- the achievement of the target amount in the above may be that an asset after tax obtained by selling a financial product achieves the target amount.
- the plan creation unit 244 creates a portfolio and asset management plan for realizing the investment yield calculated in S340 according to the logic 3 (S350). For example, according to the logic 3, the plan creation unit 244 determines, for example, the modern yield from known information such as expected yield, expected risk and correlation with other financial product classes for each financial product, and the operational yield calculated in S340. A portfolio of financial products (combination of financial products and allocation of each financial product) is created using portfolio theory.
- the plan creation unit 244 subdivides the reserve amount of the risk-type financial product, the reserve amount of the principal guarantee-type financial product, and the initial investment amount in the reserve plan according to the distribution indicated by the portfolio, thereby Create an asset management plan that shows the initial input to the product class and the monthly reserve.
- the display control unit 242 When the processing of S340 and S350 is completed for all events and the asset management plan for all events is created, the display control unit 242 generates a plan display screen showing the asset management plan for each event (S360).
- the plan display screen is transmitted to the customer terminal 10, and the plan display screen is displayed on the customer terminal 10, so what kind of asset management the customer should perform for each event in order to achieve the target amount of each event. We can grasp concretely whether it is good.
- a model may be used in which the total sum of accumulated amounts for event 1 to event n-1 decreases linearly with time in period t n-1 .
- a model may be used in which a reserve amount is assigned only to event 1 at the start of operation, and a reserve amount assigned to other events increases with the passage of time.
- a model may be used in which the total sum of accumulated amounts for event 1 to event n-1 decreases nonlinearly with time in period t n-1 .
- the management server 20 includes a plan adjustment unit 248 that rebalances the asset management plan according to the actual asset management status.
- a plan adjustment unit 248 that rebalances the asset management plan according to the actual asset management status.
- the plan adjustment unit 248 specifies the period Tnew until the achievement time of each event by subtracting the elapsed time from the start time of asset management from the period Torig until the achievement time of each event at the start time of asset management. To do.
- the plan adjustment unit 248 applies the sum of the market value of all financial products as the initial input, applies the monthly reserve in the original asset management plan as the monthly reserve, and conforms to Logic 1. Create a funded plan for each event in the same way. Thereafter, the plan adjustment unit 248 achieves the target amount by applying the funded plan, the target amount, and the lower limit amount (the amount secured by the principal-guaranteed financial asset) to the logic 2 in accordance with the logic 2 described above. Yield for each event.
- A1n is the initial investment amount of the financial product as a whole).
- the plan adjustment unit 248 plans the purchase of the difference between Pn and Po for the financial product for a financial product for which Pn exceeds Po, and the Pn for the financial product for the financial product for which Pn is less than Po. Plan to sell the difference between Po and Po. Thereby, the initial investment amount for each event in the new funding plan is obtained.
- an initial investment amount is preferentially allocated to an event whose achievement time is the latest.
- the plan adjustment unit 248 allocates the current market value of each asset to each event according to the target amount of each event and the remaining period length until the achievement time, and distributes the target amount and distribution of each event.
- the above-described rebalancing may be performed using the difference from the asset as a new target amount for each event.
- the plan adjustment unit 248 may distribute the current market value evaluation amount of each asset to each event according to the ratio of (target amount / remaining period length) of each event. With this configuration, it is possible to suppress the degree of change in the portfolio configuration of each event.
- the plan adjustment unit 248 may perform the above rebalancing when the possibility of achieving the target is equal to or less than the threshold value, or when the possibility that the achievement of the target is advanced is less than a set value. .
- the plan adjustment unit 248 may propose changes such as a reserve amount, an achievement timing, a target amount, or a risk tolerance.
- the plan adjustment unit 248 may perform the proposal or rebalancing based on customer information, price information, currency exchange information, and the like.
- the customer information may include information acquired from the outside, such as bank deposit information, credit card usage information, EC site usage information, and public institution information.
- FIG. 29 is a block diagram showing a hardware configuration of the management server 20.
- the management server 20 includes a CPU (Central Processing Unit) 201, a ROM (Read Only Memory) 202, a RAM (Random Access Memory) 203, and a host bus 204.
- the management server 20 includes a bridge 205, an external bus 206, an interface 207, an input device 208, an output device 210, a storage device (HDD) 211, a drive 212, and a communication device 215.
- a CPU Central Processing Unit
- ROM Read Only Memory
- RAM Random Access Memory
- the CPU 201 functions as an arithmetic processing unit and a control unit, and controls the overall operation in the management server 20 according to various programs. Further, the CPU 201 may be a microprocessor.
- the ROM 202 stores programs used by the CPU 201, calculation parameters, and the like.
- the RAM 203 temporarily stores programs used in the execution of the CPU 201, parameters that change as appropriate during the execution, and the like. These are connected to each other by a host bus 204 including a CPU bus.
- Each function of the control unit 240 is realized by the cooperation of the CPU 201, the ROM 202, and the RAM 203.
- the host bus 204 is connected to an external bus 206 such as a PCI (Peripheral Component Interconnect / Interface) bus via a bridge 205.
- an external bus 206 such as a PCI (Peripheral Component Interconnect / Interface) bus
- PCI Peripheral Component Interconnect / Interface
- the host bus 204, the bridge 205, and the external bus 206 are not necessarily configured separately, and these functions may be mounted on one bus.
- the input device 208 includes input means for a user to input information, such as a mouse, keyboard, touch panel, button, microphone, switch, and lever, and an input control circuit that generates an input signal based on the input by the user and outputs the input signal to the CPU 201. Etc.
- the user of the management server 20 can input various data and instruct processing operations to the management server 20 by operating the input device 208.
- the output device 210 includes, for example, a display device such as a CRT (Cathode Ray Tube) display device, a liquid crystal display (LCD) device, an OLED (Organic Light Emitting Diode) device, and a lamp. Furthermore, the output device 210 includes an audio output device such as a speaker and headphones. The output device 210 outputs reproduced content, for example. Specifically, the display device displays various information such as reproduced video data as text or images. On the other hand, the audio output device converts reproduced audio data or the like into audio and outputs it.
- a display device such as a CRT (Cathode Ray Tube) display device, a liquid crystal display (LCD) device, an OLED (Organic Light Emitting Diode) device, and a lamp.
- the output device 210 includes an audio output device such as a speaker and headphones.
- the output device 210 outputs reproduced content, for example. Specifically, the display device displays various information such as reproduced video data as text or images
- the storage device 211 is a data storage device configured as an example of the storage unit 230 of the management server 20 according to the present embodiment.
- the storage device 211 may include a storage medium, a recording device that records data on the storage medium, a reading device that reads data from the storage medium, a deletion device that deletes data recorded on the storage medium, and the like.
- the storage device 211 is composed of, for example, an HDD (Hard Disk Drive).
- the storage device 211 drives a hard disk and stores programs executed by the CPU 201 and various data.
- the drive 212 is a storage medium reader / writer, and is built in or externally attached to the management server 20.
- the drive 212 reads information recorded on a removable storage medium 24 such as a mounted magnetic disk, optical disk, magneto-optical disk, or semiconductor memory, and outputs it to the RAM 203.
- the drive 212 can also write information to the removable storage medium 24.
- the communication device 215 is a communication interface configured with, for example, a communication device for connecting to the communication network 12.
- the function of the communication unit 220 is realized by the communication device 215.
- the hardware configuration of the management server 20 has been described with reference to FIG. 29.
- the hardware of the customer terminal 10 can be configured substantially the same as the management server 20, the customer terminal 10 Description of the hardware configuration is omitted.
- an asset management plan is created for each event, and a virtual portfolio for each event is managed, so that asset management that realizes the occurrence of each event is realized. It is possible.
- the plan creation unit 244 creates an accumulation plan based on the initial investment amount or the accumulation amount for each event set by the customer. According to such a configuration, it is possible to create a funded plan in which the customer's intention is more precisely reflected.
- the plan adjustment unit 248 may have a function for proposing a change in the reserve amount after the start of asset management. For example, the plan adjustment unit 248 may propose a change in the reserve based on a change in the customer's income information or expenditure information. In addition, the plan adjustment unit 248 may propose a change in the reserve amount when the operation status is low and the achievability is reduced as a whole. Furthermore, the plan adjustment unit 248 proposes an increase in the reserve when it is determined that the profit can be expected from the normal time, and proposes a decrease in the reserve when it is determined that the profit cannot be expected. Good.
- the management unit 246 may distribute the accumulation and return in excess of the target amount to asset management for other events. Or, when the asset of an event reaches the target amount of the event, the management unit 246 may sell the financial product of the event when the target amount is achieved, or the scheduled achievement time has come At that time, the financial product of the event may be sold.
- the display control unit 242 When an asset of an event reaches the target amount of the event, the display control unit 242 generates a display screen indicating the achievement of the target, and the communication unit 220 transmits a display screen indicating the achievement of the target to the customer terminal 10. May be.
- the display control unit 242 may generate a warning screen.
- the management unit 246 determines profits by selling a part of the risk-type financial products and guarantees the principal with the funds obtained by the sale. You may buy more types of financial products.
- the management unit 246 may detect the risk event occurrence timing, and the display control unit 242 may generate a display screen that advises to increase the cash position before the risk event occurrence timing arrives.
- the display control unit 242 may generate a display screen that induces a reduction in the ratio of risk-type financial products as the scheduled achievement time approaches.
- the display control unit 242 may generate a display of an integrated portfolio in which a master portfolio of a plurality of customers or a virtual portfolio for each event is integrated. According to this configuration, for example, it is possible to create an integrated portfolio that indicates the asset management status of the entire family.
- the plan coordinator 248 creates a new funded plan for the new event. May be.
- the plan adjustment unit 248 may assign a reserve amount for a new event from a reserve amount for another event according to a target amount or achievement time for the new event. For example, the plan adjustment unit 248 preferentially selects, as other events, events with high possibility of achieving the goal as the other events, and does not select events with low risk tolerance as the other events.
- the plan adjustment unit 248 may propose an increase in the accumulated amount and a change in the target amount or the achievement time of each event. .
- the plan adjustment unit 248 sets the risk allocated to the asset assigned to the event to be deleted. It may be preferentially assigned to other events with a low degree or events with a low possibility of achieving the goal. When there is an event in which the possibility of achieving the target becomes very high by the replacement, the plan adjustment unit 248 may propose a portfolio configuration with a low risk for the event.
- FIG. 30 is an explanatory diagram showing an application example of setting related to risk.
- the horizontal axis corresponds to the ratio of principal-guaranteed financial products
- the vertical axis corresponds to the operational policy for risk-type financial products.
- a low risk tolerance typically corresponds to a high ratio of principal-guaranteed financial products as shown in FIG. 30, and a conservative operation of risk-type financial products.
- a high risk tolerance typically corresponds to a low ratio of principal-guaranteed financial products and ambitious operation of risk-type financial products as shown in FIG.
- the standard risk tolerance such as a customer who wants an ambitious operation of a risk-type financial product while hoping for a high ratio of principal-guaranteed financial products. Customers with hopes that do not fall into the high and low are also assumed. Therefore, it is possible for the customer to make detailed settings related to risk on the setting screen as shown in FIG. 30, and the plan creation unit 244 may create an asset management plan according to the detailed settings related to risk. With this configuration, it is possible to create an asset management plan that reflects the customer's wishes more precisely.
- the example of the screen for detailed setting relating to risk is not limited to the example of FIG. 30.
- a slide bar for setting the ratio of the principal guarantee type financial product and the operation policy of the risk type financial product A screen including a slide bar for setting the screen may be provided.
- the plan display screen 600 described with reference to FIG. 10 may display a settable initial investment amount width and a settable reserve amount width.
- the width of the initial investment amount that can be set may be, for example, a width between 0 yen and the target amount of the event that comes first.
- the settable reserve width may be a width between the minimum reserve amount and the maximum reserve amount described with reference to FIG. With this configuration, the customer can grasp the amount that can be set in the initial input amount display field 602 and the reserve amount display field 604.
- a settable initial investment amount width and a settable reserve amount width may be displayed.
- each step in the processing of the management server 20 in this specification does not necessarily have to be processed in time series in the order described as a flowchart.
- each step in the processing of the management server 20 may be processed in an order different from the order described as the flowchart, or may be processed in parallel.
- a control unit that creates an asset management plan for each event based on event information including the target amount and achievement time for each event An information processing apparatus comprising: (2) The information processing apparatus according to (1), wherein the control unit generates a plan display screen indicating an asset management plan for each event. (3) The information display apparatus according to (2), wherein the plan display screen for one event includes a display indicating an initial investment amount for the event and a reserve amount for each unit period. (4) The information display apparatus according to (3), wherein the plan display screen for the one event includes a display indicating allocation of funds to each financial product or each financial product class.
- plan display screen for the one event includes a transition prediction display indicating a prediction of how the asset transitions in accordance with the created asset management plan. Processing equipment.
- the transition prediction display includes a display indicating a fluctuation range of the asset predicted by the operation according to the asset management plan.
- plan display screen includes a display area of an initial total investment amount and a reserve amount for each unit period according to the asset management plan.
- the control unit In the display area of the initial investment total and the reserve amount, it is possible to change the initial investment total and the reserve amount, The control unit generates a plan display screen showing an asset management plan recreated based on the changed initial investment amount or the reserve amount when the initial investment amount or the reserve amount is changed.
- the information processing apparatus according to (7).
- the controller is Generate a setting display to set the amount of principal-guaranteed financial assets and the management policy for risk-type financial products, The information processing according to (2), wherein the asset management plan is created further based on an amount of the principal guarantee type financial asset set in the setting display and an operation policy for the risk type financial product. apparatus.
- the information processing apparatus according to any one of (2) to (9), wherein the control unit generates a setting screen for the event information.
- the control unit estimates an event that occurs with respect to a customer, or a target amount and an achievement time corresponding to the event based on customer information, and generates a setting screen for the event information including an estimation result, (10) The information processing apparatus described in 1. (12)
- the event information setting screen is the information processing apparatus according to (10) or (11), including a risk tolerance setting area for each event. (13) The information processing apparatus according to any one of (2) to (12), wherein the control unit generates an operation status screen indicating an actual asset operation status for each event.
- the information processing apparatus according to (13) or (14), wherein the operation status screen includes a display indicating an actual transition of assets assigned to each event.
- the controller is Obtain the event information including risk tolerance for each event, Based on the event information including the risk tolerance, the initial investment amount and the reserve amount for each of the principal guarantee type financial product and the risk type financial product are planned for each event.
- the information processing apparatus according to any one of claims.
- the controller is The initial investment of the principal-guaranteed financial product so that an asset with a lower limit amount obtained by multiplying the target amount of one event by a ratio corresponding to the risk tolerance is obtained with the principal-guaranteed financial product Plan the amount and reserve, Planning the initial investment amount and the reserve amount of the risk-type financial product so that an amount less than the difference between the target amount of the one event and the lower limit amount is allocated to the risk-type financial product, (16) The information processing apparatus described in 1. (18) The information according to any one of (1) to (17), wherein the control unit calculates an adjustment value of distribution of each financial product based on an asset management status at a time after the creation of the asset management plan. Processing equipment.
- management server 10 customer terminal 12 communication network 20 management server 220 communication unit 230 storage unit 240 control unit 241 estimation unit 242 display control unit 244 plan creation unit 246 management unit 248 plan adjustment unit
Landscapes
- Engineering & Computer Science (AREA)
- Business, Economics & Management (AREA)
- Theoretical Computer Science (AREA)
- Accounting & Taxation (AREA)
- Development Economics (AREA)
- Finance (AREA)
- General Physics & Mathematics (AREA)
- Physics & Mathematics (AREA)
- Marketing (AREA)
- Economics (AREA)
- Human Resources & Organizations (AREA)
- Strategic Management (AREA)
- Technology Law (AREA)
- Operations Research (AREA)
- General Business, Economics & Management (AREA)
- Game Theory and Decision Science (AREA)
- Entrepreneurship & Innovation (AREA)
- Human Computer Interaction (AREA)
- General Engineering & Computer Science (AREA)
- Financial Or Insurance-Related Operations Such As Payment And Settlement (AREA)
Abstract
【課題】各イベントの発生を意識した資産運用を計画する。 【解決手段】イベントごとの目標額および達成時期を含むイベント情報に基づき、各イベントのための資産運用計画を作成する制御部、を備える、情報処理装置。
Description
本開示は、情報処理装置、情報処理方法およびプログラムに関する。
近日、資産運用に関するサービスとして、ロボットアドバイザーが広く提供されている。ロボットアドバイザーは、顧客に幾つかの質問をし、質問に対する回答からリスク選好度を評価し、顧客のリスク選好度にマッチしたポートフォリオ(金融商品の組合わせ)をアドバイスするサービスである。また、ポートフォリオの最適化のためのシステムについては、例えば特許文献1にも記載されている。
人生には、住宅購入、子供の進学、自動車の買い替えなど、出費を伴う様々なイベントがある。しかし、上記のロボットアドバイザーでは、各イベントに向けた資産運用は提案されない。
そこで、本開示では、各イベントの発生を意識した資産運用を計画することが可能な、新規かつ改良された情報処理装置、情報処理方法およびプログラムを提案する。
本開示によれば、イベントごとの目標額および達成時期を含むイベント情報に基づき、各イベントのための資産運用計画を作成する制御部、を備える、情報処理装置が提供される。
また、本開示によれば、目標額および達成時期のイベントごとの設定を取得することと、イベントごとの前記設定に基づき、各イベントのための資産運用計画をプロセッサが作成することと、を含む、情報処理方法が提供される。
また、本開示によれば、コンピュータを、目標額および達成時期のイベントごとの設定に基づき、各イベントのための資産運用計画を作成する制御部、として機能させるための、プログラムが提供される。
以上説明したように本開示によれば、各イベントの発生を意識した資産運用を計画することができる。
なお、上記の効果は必ずしも限定的なものではなく、上記の効果とともに、または上記の効果に代えて、本明細書に示されたいずれかの効果、または本明細書から把握され得る他の効果が奏されてもよい。
以下に添付図面を参照しながら、本開示の好適な実施の形態について詳細に説明する。なお、本明細書及び図面において、実質的に同一の機能構成を有する構成要素については、同一の符号を付することにより重複説明を省略する。
また、本明細書及び図面において、実質的に同一の機能構成を有する複数の構成要素を、同一の符号の後に異なるアルファベットを付して区別する場合もある。ただし、実質的に同一の機能構成を有する複数の構成要素の各々を特に区別する必要がない場合、複数の構成要素の各々に同一符号のみを付する。
また、以下に示す項目順序に従って本開示を説明する。
1.資産管理システムの概要
2.管理サーバの構成
3.表示制御の詳細
4.資産運用計画の作成
5.リバランス
6.ハードウェア構成
7.むすび
1.資産管理システムの概要
2.管理サーバの構成
3.表示制御の詳細
4.資産運用計画の作成
5.リバランス
6.ハードウェア構成
7.むすび
<1.資産管理システムの概要>
本開示の実施形態は、金融機関の各顧客に向けた資産運用計画を提供する資産管理システムに関する。まず、図1を参照し、本開示の実施形態による資産管理システムの概要を説明する。
本開示の実施形態は、金融機関の各顧客に向けた資産運用計画を提供する資産管理システムに関する。まず、図1を参照し、本開示の実施形態による資産管理システムの概要を説明する。
図1は、本開示の実施形態による資産管理システムの構成を示す説明図である。図1に示したように、本開示の実施形態による資産管理システムは、顧客端末10と、管理サーバ20と、を有する。
顧客端末10は、顧客によって利用される情報処理装置であって、顧客による操作を検出する機能、および表示画面を表示する機能を有する。本実施形態においては、顧客端末10と管理サーバ20とは図1に示したように通信網12を介して接続されており、顧客端末10は、管理サーバ20から通信網12を介して受信される表示画面を表示し、当該表示画面において顧客により行われる操作を検出する。例えば、顧客端末10は、資産運用計画の作成に用いられる情報の設定画面を表示し、当該設定画面において情報の設定操作を検出し、設定された情報を管理サーバ20に通信網12を介して送信する。
なお、通信網12は、通信網12に接続されている装置から送信される情報の有線、または無線の伝送路である。例えば、通信網12は、インターネット、電話回線網、衛星通信網などの公衆回線網や、Ethernet(登録商標)を含む各種のLAN(Local Area Network)、WAN(Wide Area Network)などを含んでもよい。また、通信網12は、IP-VPN(Internet Protocol-Virtual Private Network)などの専用回線網を含んでもよい。
管理サーバ20は、各顧客に向けた資産運用計画を作成し、当該資産運用計画に沿って顧客の資産を管理する情報処理装置である。例えば、管理サーバ20は、資産運用計画の作成に用いられる情報の設定画面を顧客端末10に送信し、当該設定画面において顧客により設定された情報を顧客端末10から受信し、受信した情報に基づいて顧客端末10の顧客に向けた資産運用計画を作成する。そして、管理サーバ20は、顧客からの申込みに基づき、資産運用計画に沿って金融商品の売買を行うことにより、顧客の資産を管理する。また、管理サーバ20は、資産の運用期間中に、顧客の資産の運用状況を示す表示画面を生成し、顧客端末10に送信することも可能である。なお、当該管理サーバ20は、銀行および証券会社などの金融機関の一機能として提供されてもよい。
ところで、資産運用に関するサービスとして、ロボットアドバイザーが知られている。ロボットアドバイザーは、顧客に幾つかの質問をし、質問に対する回答からリスク選好度を評価し、顧客のリスク選好度にマッチしたポートフォリオをアドバイスするサービスである。このロボットアドバイザーによれば、例えば図2に示すように、リスクリターン特性が異なる複数の金融商品の組み合わせからなるポートフォリオが簡易に形成され得る。
一方、人生には、出費を伴う様々なイベント(ライフイベント)がある。図3は、イベントのための出費の具体例を示す説明図である。図3に示したように、イベントのための出費として、子供の教育費、住宅購入費、老後資金、住宅リフォーム費、子供の結婚費用援助、自動車の買換え、などが一例として挙げられる。そして、イベントごとに、支出額、時期の変更の可否、支出額の変更の可否およびリスク許容度(目標額に対してどの程度の未達が許容されるか)が異なる。例えば、住宅購入については、購入時期の変更は可能であり、購入物件の見直しにより支出額も変更可能であり、このため、運用結果の目標額に対する未達分がわずかであれば許容できる。
しかし、上記のロボットアドバイザーによる資産運用は、このようなイベントが考慮されていないので、何のための資産運用か不明確な漠然とした資産運用であり、今後発生するイベントでの出費が準備されない恐れがある。
そこで、本開示では、イベントの発生を意識した資産運用を計画するシステムを提案する。本開示によるシステムでは、イベントごとの資産運用計画が作成され、当該資産運用計画に沿った資産運用が行われるので、イベントごとのポートフォリオが作成される。
図4は、本開示によるシステムで作成されるポートフォリオの具体例を示す説明図である。本開示においては、図4に示したように、教育費、住宅購入費および自動車の買換費などのイベントごとにポートフォリオが管理される。ただし、これらのポートフォリオは、顧客の口座に作成されるマスターポートフォリオの中で仮想的に管理されるバーチャルポートフォリオである。すなわち、各バーチャルポートフォリオを統合した結果は、マスターポートフォリオに等しい。なお、イベントごとにリスク許容度が異なるので、図4に示したように、各バーチャルポートフォリオを構成する各金融商品の割合も異なる。
このように、本開示によれば、イベントごとに資産運用計画が作成され、また、イベントごとのバーチャルポートフォリオが管理されるので、各イベントの発生を意識した資産運用を実現することが可能である。以下、このような本開示の実施形態による管理サーバ20の構成および機能を順次詳細に説明する。
<2.管理サーバの構成>
図5は、本開示の実施形態による管理サーバ20の構成を示す説明図である。図5に示したように、本開示の実施形態による管理サーバ20は、通信部220と、記憶部230と、制御部240と、を備える。
図5は、本開示の実施形態による管理サーバ20の構成を示す説明図である。図5に示したように、本開示の実施形態による管理サーバ20は、通信部220と、記憶部230と、制御部240と、を備える。
(通信部)
通信部220は、外部装置とのインタフェースである。例えば、通信部220は、イベントの設定画面、資産運用状況を示す表示画面などを顧客端末10へ送信する。また、通信部220は、イベントの設定画面において顧客端末10において設定された目標額および達成時期などのイベントごとの情報を顧客端末10から取得する取得部として機能する。さらに、通信部220は、後述する管理部246からの制御に従い、金融商品の買い注文および売り注文を外部の取引装置に送信する機能も有する。
通信部220は、外部装置とのインタフェースである。例えば、通信部220は、イベントの設定画面、資産運用状況を示す表示画面などを顧客端末10へ送信する。また、通信部220は、イベントの設定画面において顧客端末10において設定された目標額および達成時期などのイベントごとの情報を顧客端末10から取得する取得部として機能する。さらに、通信部220は、後述する管理部246からの制御に従い、金融商品の買い注文および売り注文を外部の取引装置に送信する機能も有する。
(記憶部)
記憶部230は、主に、顧客情報、イベント情報、資産運用計画および運用情報を記憶する。
記憶部230は、主に、顧客情報、イベント情報、資産運用計画および運用情報を記憶する。
顧客情報は、顧客に関する多様な情報を含む。例えば、顧客情報としては、ユーザのプロフィール(年齢、性別、職業、家族構成、住居、自動車の所有情報、自動車の購入時期)、収入情報(年収、所得、貯蓄)、支出情報(生活費、保険、ローン、定期預金、ショッピング)、投資情報(現在の投資額、毎月の積立額、投資可能額)、および行動情報(移動情報、SNS情報)などが挙げられる。
イベント情報は、顧客により設定された各イベントの情報である。イベント情報としては、イベント内容(支出用途)、目標額、達成時期およびリスク許容度(重要度)が挙げられる。また、イベント情報は、達成時期の変動可能性または目標額の変動可能性を示す情報を含んでもよい。
資産運用計画は、各金融商品への初期投入額および毎月の積立額を示すイベントごとの情報である。なお、資産運用計画は、個別の金融商品でなく、各金融商品クラスへの初期投入額および毎月の積立額を示すイベントごとの情報であってもよい。金融商品クラスは、例えば、新興国国債、日本株式、外国銀行債権など、投資対象またはリスクリターン特性によって分類されるクラスである。また、資産運用計画は、運用予測情報(期待される運用成果)を含んでもよい。このような資産運用計画は、後述する計画作成部244により作成される。
運用情報は、顧客の資産の現在の運用状況を示す情報である。運用情報は、図4を参照して説明したマスターポートフォリオおよび仮想ポートフォリオを含む。また、運用情報は、各イベントの目標額の現時点での達成可能性、達成可能時期を示す情報を含んでもよい。
(制御部)
制御部240は、管理サーバ20の動作全般を制御する。特に、本実施形態による制御部240は、図5に示したように、推定部241と、表示制御部242と、計画作成部244と、管理部246と、計画調整部248と、を備える。
制御部240は、管理サーバ20の動作全般を制御する。特に、本実施形態による制御部240は、図5に示したように、推定部241と、表示制御部242と、計画作成部244と、管理部246と、計画調整部248と、を備える。
推定部241は、顧客について将来発生するであろうイベントを推定する。例えば、推定部241は、顧客によって入力された顧客の年齢または性別を参照して将来発生するイベントを推定してもよい。また、推定部241は、事前の設定に基づき、イベントごとの目標額、達成時期およびリスク許容度に関する情報を推定してもよい。例えば、各イベントには、リスク許容度と共に、目標額および達成時期に関する情報が設定されていてもよい。推定部241は、将来発生すると推定されたイベントに対応する目標額、達成時期およびリスク許容度を、イベントごとに事前に設定された上記の情報を参照して推定することができる。
なお、推定部241は、記憶部230に記憶されている顧客情報を参照して将来発生するイベントを推定してもよい。例えば、推定部241は、顧客情報に含まれる家族構成が子供の存在を示す場合、将来発生するイベントとして、子供の大学進学のための教育費を推定する。そして、推定部241は、教育費に対応する目標金額、リスク許容度を、イベントごとに事前に設定されている情報を参照して推定する。また、教育費についての達成時期として子供の大学進学時の年齢が設定されている場合、推定部241は、顧客情報が示す子供の年齢と上記子供の大学進学時の年齢の差分を演算することにより、達成時期を推定してもよい。
また、推定部241は、顧客情報に含まれる自動車の所有情報から、将来発生するイベントとして自動車の買換えを推定してもよい。そして、推定部241は、自動車の買換えに対応する目標金額、リスク許容度を、イベントごとに事前に設定されている情報を参照して推定する。また、自動車の買換えについての達成時期として買換え周期が事前に設定されている場合、推定部241は、顧客情報に含まれる自動車の購入時期に上記買換え周期を加算することにより、達成時期を推定してもよい。
表示制御部242は、顧客端末10における表示のための表示画面を生成する。例えば、表示制御部242は、イベントの設定画面、資産運用計画を示す計画表示画面および資産運用状況を示す表示画面などを生成する。各表示画面については、「3.表示制御の詳細」において後述する。
計画作成部244は、顧客により設定されたイベントごとの目標額、達成時期およびリスク許容度に基づき、各イベントのための資産運用計画を作成する。資産運用計画は、各金融商品への初期投入額および毎月の積立額を示すイベントごとの情報である。計画作成部244による資産運用計画の作成については、「4.資産運用計画の作成」において詳細に説明する。
管理部246は、計画作成部244により作成された資産運用計画に沿って顧客の資産を管理する。例えば、管理部246は、外部の約定サーバへの売買注文を資産運用計画に沿って制御する。また、管理部246は、イベントごとのバーチャルポートフォリオの作成、更新を行う。
計画調整部248は、計画作成部244により作成された当初の資産運用計画を、実際の資産運用状況に応じて調整する。例えば、計画調整部248は、実際の資産運用状況に基づき各イベントのための新たな資産運用計画を作成し、新たな資産運用計画における各金融商品への初期投入額と、実際の資産運用状況における各金融商品の資産価値との差分を、調整値として算出する。当該調整値に基づき、管理部246が売買注文を制御する。この計画調整部248による計画の調整、すなわちリバランスについては、「5.リバランス」において後述する。
<3.表示制御の詳細>
以上、本開示の実施形態による管理サーバ20の構成を説明した。続いて、管理サーバ20の表示制御部242が生成する多様な表示画面の具体例を説明する。
以上、本開示の実施形態による管理サーバ20の構成を説明した。続いて、管理サーバ20の表示制御部242が生成する多様な表示画面の具体例を説明する。
(イベントの設定画面)
表示制御部242は、顧客がイベント情報を設定するための設定画面を生成する。以下、イベントの設定画面の具体例として、イベント選択画面およびゴール設定画面を説明する。
表示制御部242は、顧客がイベント情報を設定するための設定画面を生成する。以下、イベントの設定画面の具体例として、イベント選択画面およびゴール設定画面を説明する。
図6は、イベント選択画面400の具体例を示す説明図である。図6に示したように、イベント選択画面400は、進捗表示領域410と、性別入力欄422と、年齢入力欄424と、イベント大分類表示部431~436と、プラン読込みボタン440と、ゴール設定ボタン450と、を含む。
進捗表示領域410は、資産運用計画の作成が終了するまでの各ステップと、現在のステップを示す。図6に示した例では、進捗表示領域410は、資産運用計画の作成が終了するまでの各ステップとして「イベントの選択」、「ゴールの設定」および「プランのご提案」を示し、チェックCが付されている「イベントの選択」が現在のステップである。
性別入力欄422には顧客の性別が入力され、年齢入力欄424には顧客の年齢が入力される。
イベント大分類表示部431~436は、各々、イベントの大分類に対応する。例えば、イベント大分類表示部431は「ご褒美」に対応し、イベント大分類表示部432は「ペット」に対応し、イベント大分類表示部433は「車、留学、結婚」に対応し、イベント大分類表示部434は「お家」に対応し、イベント大分類表示部435は「お子様」に対応し、イベント大分類表示部436は「リタイヤや万が一に備えて」に対応する。
プラン読込みボタン440は、過去に顧客が本開示の機能により資産運用計画を作成したことがあり、作成済の資産運用計画が保存されている場合に、有効化される。有効化されているプラン読込みボタン440が選択されると、表示制御部242は、作成済の資産運用計画を読込み、作成済の資産運用計画を表示する。
ゴール設定ボタン450は、少なくとも1つのイベントが選択された場合に有効化される。図6に示した例では、イベントが選択されていないので、ゴール設定ボタン450は有効化されていない。有効化されているゴール設定ボタン450が選択されると、表示制御部242は、図9を参照して後述するゴール設定画面を生成する。
このようなイベント選択画面400において、顧客がいずれかのイベント大分類表示部を選択すると、表示制御部242は、選択されたイベント大分類表示部に対応する大分類に属するイベントの選択ボタンを表示する。
図7は、イベントの選択ボタンの具体例を示す説明図である。例えば「お子様」に対応するイベント大分類表示部435が顧客により選択されると、図7に示したように、「お子様」の大分類に属するイベントの選択ボタンが表示される。図7には、選択ボタンとして、「塾」に対応する選択ボタン461、「中高校」に対応する選択ボタン462、「大学」に対応する選択ボタン463、「留学」に対応する選択ボタン464、「結婚」に対応する選択ボタン465、および「自由設定」に対応する選択ボタン466、が示されている。
顧客は、選択ボタン461~選択ボタン466のうちから、1または複数の選択ボタンを選択することにより、1または複数のイベントを選択することができる。また。顧客は、順次に異なるイベント大分類表示部を選択することにより、異なる大分類に属するイベントを選択することも可能である。顧客により選択されたイベントは、進捗表示領域410のイベント一覧414に追加される。また、顧客によりイベントが選択されると、図7に示したようにゴール設定ボタン450が有効化される。
なお、「自由設定」に対応する選択ボタン466が顧客により選択された場合、表示制御部242は、図8に示すように、イベント名を入力するためのウィンドウ470をイベント選択画面400に重畳させてもよい。かかる構成により、顧客は、用意されているイベント群に含まれないイベントも設定することが可能である。
また、各イベント大分類表示部が選択された際に表示される選択ボタンは、全ての顧客に共通であってもよいし、顧客ごとに異なってもよい。例えば、推定部241が性別入力欄422に入力された顧客の性別、および年齢入力欄424に入力された顧客の年齢に基づいて推定部241が当該顧客に関して将来発生するイベントを推定し、表示制御部242は推定されたイベントに対応する選択ボタンを表示してもよい。また、記憶部230に当該顧客の家族構成や保険の加入状況などを示す顧客情報が記憶されている場合、推定部241は当該顧客情報に基づいて当該顧客に関して将来発生するイベントを推定してもよい。
顧客によりイベントが選択された後にゴール設定ボタン450が選択されると、表示制御部242はゴール設定画面を生成する。
図9は、ゴール設定画面500の具体例を示す説明図である。図9に示したように、ゴール設定画面500は、進捗表示領域410と、達成年数表示部502と、目標額表示部504と、ゴール設定領域510~530と、保存ボタン540と、プラン作成ボタン550と、を含む。
ゴール設定画面500においては、進捗表示領域410に含まれる各ステップのうちで、「ゴールの設定」にチェックCが付される。
達成年数表示部502は、ゴール設定領域510~530において設定された各イベントの目標の達成時期のうちで、最も遅い達成時期が到来するまでの年数を表示する。目標額表示部504は、ゴール設定領域510~530において設定された各イベントの目標額の合計金額を表示する。
ゴール設定領域510~530は、各イベントの目標の達成時期、目標額およびリスク許容度などのイベント情報を設定するための領域である。例えば、ゴール設定領域510は、達成時期の入力欄512、目標額の入力欄514、およびリスク許容度を設定するためのスライドバー516を含む。達成時期の入力欄512、目標額の入力欄514には、推定部241により推定された値が表示され、当該値を顧客が必要に応じて修正してもよい。なお、「目標額の目安」を選択することにより、目標額の目安が表示される。また、留学費用に対応するゴール設定領域520は、達成時期の入力欄522、達成時期の入力欄522およびスライドバー526に加え、外貨の目標額の入力欄528を含む。
保存ボタン540は、ゴール設定画面500における設定内容を保存するためのボタンである。プラン作成ボタン550は、各イベントのための資産運用計画を作成するためのボタンである。プラン作成ボタン550が選択されると、ゴール設定画面500で設定されたイベント情報に基づき計画作成部244が各イベントのための資産運用計画を作成し、表示制御部242が、作成された資産運用計画を示す計画表示画面を生成する。
(計画表示画面)
図10は、計画表示画面600の具体例を示す説明図である。図10に示したように、計画表示画面600は、進捗表示領域410と、初期投入額表示欄602と、積立額表示欄604と、外貨積立額表示欄606と、再計算ボタン608と、イベント情報表示領域610と、初期割当額表示欄612と、推移予測表示614と、積立表示領域620と、外貨表示領域630と、保存ボタン640と、申込みボタン650と、を含む。
図10は、計画表示画面600の具体例を示す説明図である。図10に示したように、計画表示画面600は、進捗表示領域410と、初期投入額表示欄602と、積立額表示欄604と、外貨積立額表示欄606と、再計算ボタン608と、イベント情報表示領域610と、初期割当額表示欄612と、推移予測表示614と、積立表示領域620と、外貨表示領域630と、保存ボタン640と、申込みボタン650と、を含む。
計画表示画面600においては、進捗表示領域410に含まれる各ステップのうちで、「プランのご提案」にチェックCが付される。
初期投入額表示欄602は、資産運用計画を構成する初期投入額を表示する。積立額表示欄604は、資産運用計画を構成する円での毎月の積立額を表示する。外貨積立額表示欄606は、資産運用計画を構成する外貨での毎月の積立額を表示する。計画表示画面600において、初期投入額表示欄602、積立額表示欄604および外貨積立額表示欄606の値を調整可能であり、再計算ボタン608が選択されると、調整された値で計画作成部244が資産運用計画を再計算により再作成する。
イベント情報表示領域610は、イベントの目標額、達成時期およびリスク許容度のなどのイベント情報を表示する。図10では、留学費用の資産運用計画の表示が選択されており、イベント情報表示領域610では、留学費用についてのイベント情報が示されている。
初期割当額表示欄612は、全体の初期投入額のうちで、イベントに割当てられている初期投入額を表示する。図10に示した例では、留学費用に割当てられる初期投入額は0円である。
推移予測表示614は、作成された資産運用計画に沿って資産がどのように推移するかの予測を表示する。推移予測表示614は、図10において実線で示した期待値のラインに加え、破線で示した上振れのライン、一点鎖線で示した下振れのラインを含む。かかる構成により、顧客は、資産運用計画に沿った資産運用でのイベント別のリスク、リターンを容易に把握することが可能である。なお、推移予測表示614は、資産推移が上振れした場合に目標が達成される時期の予測値(図10に示した例では、4年3ヵ月)を含んでもよい。
積立表示領域620は、イベントに割当てられている毎月の積立額、および各金融商品または各金融商品クラスへの積立の配分を示す表示を含む。毎月の積立額または積立の配分が期間によって異なる場合、毎月の積立額および積立の配分が期間ごとに表示される。外貨表示領域630は、外貨の目標額および毎月の積立額を示す表示を含む。
表示制御部242は、計画表示画面600のイベント一覧414において他のイベントが選択されると、他のイベントの資産運用計画を表示する計画表示画面600を生成する。また、表示制御部242は、進捗表示領域410において「すべてのプラン」が選択されると、全てのイベントの資産運用計画の統合結果を表示する。
図11は、全てのイベントの資産運用計画の統合結果を表示する計画表示画面601の具体例を示す説明図である。図11に示したように、計画表示画面601は、進捗表示領域410と、初期投入額表示欄602と、積立額表示欄604と、外貨積立額表示欄606と、再計算ボタン608と、保存ボタン640と、申込みボタン650と、全体推移予測表示660と、全体積立表示領域670と、全体外貨表示領域680と、を含む。
全体推移予測表示660は、イベント別の計画表示画面600と同様に、実線で示した期待値のラインに加え、破線で示した上振れのライン、一点鎖線で示した下振れのラインを含む。かかる構成により、顧客は、資産運用計画に沿った資産運用での全体のリスク、リターンを容易に把握することが可能である。
全体積立表示領域670は、毎月の積立額の総額および各金融商品または各金融商品クラスへの積立の配分を示す表示を含む。積立額の総額または積立の配分が期間によって異なる場合、積立額の総額および積立の配分が期間ごとに表示される。全体外貨表示領域680は、外貨の全体の目標額および毎月の積立額の総額を示す表示を含む。
上述した計画表示画面600または計画表示画面601において保存ボタン640が選択されると、資産運用計画が保存される。また、申込みボタン650が選択されると、表示制御部242は、資産運用計画に沿った金融商品の購入を申し込むための購入申込画面を生成する。
(購入申込画面)
図12は、購入申込画面700の具体例を示す説明図である。図12に示したように、購入申込画面700は、金融商品別の初期投入額表示710と、初期投入総額表示712と、金融商品別の毎月の積立額表示720と、毎月の積立額の合計表示722と、口座開設ボタン731と、円定期申込みボタン732と、組み立て定期申込みボタン733と、投資信託申込みボタン734と、保存ボタン740と、を含む。
図12は、購入申込画面700の具体例を示す説明図である。図12に示したように、購入申込画面700は、金融商品別の初期投入額表示710と、初期投入総額表示712と、金融商品別の毎月の積立額表示720と、毎月の積立額の合計表示722と、口座開設ボタン731と、円定期申込みボタン732と、組み立て定期申込みボタン733と、投資信託申込みボタン734と、保存ボタン740と、を含む。
口座開設ボタン731が選択されると口座開設のためのWebページが表示され、円定期申込みボタン732が選択されると円定期預金を申し込むためのWebページが表示され、組み立て定期申込みボタン733が選択されると組み立て定期預金を申し込むためのWebページが表示され、投資信託申込みボタン734が選択されると投信信託を申し込むためのWebページが表示される。保存ボタン740が選択されると資産運用計画が保存される。
顧客は、この購入申込画面700により、初期投入額および毎月の積立額の、金融商品別の内訳を正確に把握することが可能である。また、金融商品を申し込むためのWebページに容易に遷移することが可能である。
(運用状況表示画面)
資産運用計画に沿った資産運用を開始した後、表示制御部242は、実際の資産運用状況を示す運用状況表示画面を生成する。
資産運用計画に沿った資産運用を開始した後、表示制御部242は、実際の資産運用状況を示す運用状況表示画面を生成する。
図13は、運用状況表示画面800の具体例を示す説明図である。図13に示したように、運用状況表示画面800は、イベント情報表示領域810と、初期割当額表示欄812と、資産推移表示814と、積立表示領域820と、外貨表示領域830と、を含む。イベント情報表示領域810、初期割当額表示欄812、積立表示領域820、および外貨表示領域830は、図10を参照して説明したイベント情報表示領域610、初期割当額表示欄612、積立表示領域620、および外貨表示領域630に概ね対応する。
資産推移表示814は、期待値のライン、振れ幅を示すラインに加え、イベントについて積み立てられた資産の推移を示すラインLを含む。顧客は、ラインLと期待値のラインを比較することにより、運用状況が順調であるか否かを容易に把握することが可能である。なお、資産推移表示814は、現時点での目標額の達成可能性を示す表示を含んでもよい。
表示制御部242は、運用状況表示画面800として、図13を参照して説明したイベント別の運用状況を示す表示画面を生成すること、および、全体(マスターポートフォリオ)での運用状況を示す表示画面を示す表示を生成することも可能である。
ところで、各イベントについて購入される金融商品、または金融商品の配分は異なるので、各イベントについての運用状況には差が出て来る。例えば、現在の時価評価額が期待値ラインを上回るイベントがある一方で、現在の時価評価額が期待値ラインを下回るイベントも出てき得る。このような場合、ある観点によれば、各イベントの運用状況が平滑化されることが望ましい。
そこで、表示制御部242は、例えば各イベントの運用状況のバラつきが判定基準を上回った場合、図14に示すように、資産運用計画のリバランスを提案する表示840が重畳された運用状況表示画面801を生成してもよい。
運用状況表示画面801において、表示840に含まれる検討ボタン842が選択されると、計画調整部248がリバランスの内容(調整値)を算出する。そして、表示制御部242は、計画調整部248により算出されたリバランスの内容を含むリバランス画面を生成する。以下、図15を参照して、リバランス画面の具体例を説明する。
(リバランス画面)
図15は、リバランス画面850の具体例を示す説明図である。図15に示したように、リバランス画面850は、現在の資産運用状況を示す現在状況表示860、リバランスの内容を示すリバランス表示870、リバランスの結果を示す結果表示880、実行ボタン892、詳細調整ボタン894およびキャンセルボタン896を含む。
図15は、リバランス画面850の具体例を示す説明図である。図15に示したように、リバランス画面850は、現在の資産運用状況を示す現在状況表示860、リバランスの内容を示すリバランス表示870、リバランスの結果を示す結果表示880、実行ボタン892、詳細調整ボタン894およびキャンセルボタン896を含む。
現在状況表示860は、各イベントについて、現在までの積み上がり額、最終の目標額に対する現時点での達成度、および現時点想定に対する進捗を示す。
リバランス表示870は、イベントごとの資産の調整量、および各金融商品の売買量を示す。図15に示した例では、図15に示した例では、イベント1の進捗が82%である一方、イベント2の進捗が150%であるので、イベント2からイベント1への資産移動を伴うリバランスが示されている。なお、資産移動は、移動元イベントについて積上げられた金融商品の売却、新たな金融商品の購入、移動先イベントへの新たな金融商品の割当て、のように、金融商品の売買を伴い得る。このため、リバランス表示870は、図15に示したように各金融商品の売買量を示す表示を含んでもよい。
結果表示880は、リバランスが実行された場合に各イベントについての資産状況としてどのような結果が得られるかを示す。図15に示した例では、リバランス後のイベント1の進捗が100%であり、リバランス後のイベント2の進捗が127.5%である。
実行ボタン892が選択されると、リバランス画面850に示された内容のリバランスを計画調整部248が実行する。詳細調整ボタン894が選択されると、表示制御部242は、リバランスの内容を顧客が調整するための画面を生成する。キャンセルボタン896が選択されると、表示制御部242は、リバランス画面850の前に表示されていた画面を再度生成する。
このように、本実施形態によれば、リバランスの具体的な内容がシステム側から提案されるので、顧客自身がリバランスの内容を算出するケースと比較して、顧客の負荷が軽減される。また、顧客は、リバランスの実行前に、リバランスの内容およびリバランスの結果を確認できるので、リバランスを実行するか否かを適切に判断することが可能となる。
(応用例1)
上記では、図9を参照して説明したゴール設定画面500の次に、図10などを参照して説明した計画表示画面600が表示される例を説明した。しかし、ゴール設定画面500と計画表示画面600の間に、以下に説明する調整画面900が表示されてもよい。
上記では、図9を参照して説明したゴール設定画面500の次に、図10などを参照して説明した計画表示画面600が表示される例を説明した。しかし、ゴール設定画面500と計画表示画面600の間に、以下に説明する調整画面900が表示されてもよい。
図16は、調整画面900の具体例を示す説明図である。図16に示したように、調整画面900は、進捗表示領域410と、ゴール設定領域510~530と、初期投入額表示欄902と、積立額表示欄904と、外貨積立額表示欄906と、再計算ボタン908と、保存ボタン940と、プラン表示ボタン950と、を含む。
調整画面900においては、進捗表示領域410に含まれる各ステップのうちで、「プランのご提案、調整」にチェックCが付される。
初期投入額表示欄602は、計画作成部244により作成された資産運用計画を構成する初期投入額を表示する。積立額表示欄604は、資産運用計画を構成する円での毎月の積立額を表示する。外貨積立額表示欄606は、資産運用計画を構成する外貨での毎月の積立額を表示する。保存ボタン940は、調整画面900における設定内容を保存するためのボタンである。プラン表示ボタン950は、より具体的な計画表示画面600を表示するためのボタンである。
顧客は、ゴール設定領域510~530において、例えば各イベントの目標額または達成時期を調整することができる。目標額または達成時期の調整後に顧客が再計算ボタン908を選択すると、計画作成部244が資産運用計画を再作成し、初期投入額表示欄902、積立額表示欄904および外貨積立額表示欄906の金額が更新される。また、顧客は、初期投入額表示欄902または積立額表示欄904において、初期投入額または積立額を調整することができる。初期投入額または積立額の調整後に顧客が再計算ボタン908を選択すると、計画作成部244が資産運用計画を再作成し、初期投入額表示欄902、積立額表示欄904または外貨積立額表示欄906の金額が更新される。
かかる構成によれば、調整画面900において、初期投入額および積立額を顧客が自分の感覚に合わせることが可能である。従って、計画表示画面600において、顧客の感覚に合った資産運用計画を表示することが可能となる。
なお、ゴール設定領域510~530は、対応するイベントへの初期投入額の割当額および毎月の積立額の表示を含み、当該表示においてイベントごとの初期投入額の割当額および毎月の積立額が調整可能であってもよい。かかる構成により、顧客は、より詳細に資産運用計画を調整することが可能となる。また、ゴール設定領域510~530の各々が再計算ボタンを含んでもよい。この場合、顧客は、あるイベントの目標額、達成時期またはリスク許容度の調整と、再計算ボタンの選択の繰り返しを、より簡易に行うことが可能となる。
(応用例2)
顧客は、計画作成部244により作成された資産運用計画の購入に至らず、資産運用計画を保存して本開示のシステムの利用を一旦終了する場合もある。その後、顧客が本開示のシステムにアクセスした場合、表示制御部242は、保存されている資産運用計画を表示してもよい。かかる構成により、顧客が再度イベント情報などを設定する手間が削減される。
顧客は、計画作成部244により作成された資産運用計画の購入に至らず、資産運用計画を保存して本開示のシステムの利用を一旦終了する場合もある。その後、顧客が本開示のシステムにアクセスした場合、表示制御部242は、保存されている資産運用計画を表示してもよい。かかる構成により、顧客が再度イベント情報などを設定する手間が削減される。
さらに、表示制御部242は、仮に資産運用計画の作成時点で資産運用計画に沿った資産運用を開始していたとしたら、どのような資産状況が得られていたかを示す表示画面を生成してもよい。当該表示画面は、図13を参照して説明した運用状況表示画面800のように、仮に資産運用計画の作成時点で資産運用計画に沿った資産運用を開始していた場合に資産がどのように推移したかを示す表示を含んでもよい。
当該表示画面で資産運用計画の有用性を顧客に示すことにより、資産運用計画に沿った資産運用の申込み意欲を喚起することが可能である。
<4.資産運用計画の作成>
以上、表示制御部242が生成する多様な表示画面の具体例を説明した。続いて、資産運用計画の作成方法を説明する。なお、資産運用計画の作成方法は多様に考えられ、以下に説明する資産運用計画の作成方法は、多様に考えられる資産運用計画の作成方法の一例であることに理解されたい。
以上、表示制御部242が生成する多様な表示画面の具体例を説明した。続いて、資産運用計画の作成方法を説明する。なお、資産運用計画の作成方法は多様に考えられ、以下に説明する資産運用計画の作成方法は、多様に考えられる資産運用計画の作成方法の一例であることに理解されたい。
(基本概念)
図17は、ある資産運用計画の作成方法の基本概念を示す説明図である。計画作成部244は、まず、イベントについて設定されたリスク許容度に応じて、最悪ケースの保証額(確保されるべき下限金額)を決定する。そして、計画作成部244は、他のイベントとのバランスも考慮した上で、下限金額が元本保証型の金融商品で確保されるよう、元本保証型の金融商品およびリスク型の金融商品の初期投入額および積立額の割当てを決定する。ここで決定される元本保証型の金融商品およびリスク型の金融商品の初期投入額および積立額の割当てを、積立プランとも称する。
図17は、ある資産運用計画の作成方法の基本概念を示す説明図である。計画作成部244は、まず、イベントについて設定されたリスク許容度に応じて、最悪ケースの保証額(確保されるべき下限金額)を決定する。そして、計画作成部244は、他のイベントとのバランスも考慮した上で、下限金額が元本保証型の金融商品で確保されるよう、元本保証型の金融商品およびリスク型の金融商品の初期投入額および積立額の割当てを決定する。ここで決定される元本保証型の金融商品およびリスク型の金融商品の初期投入額および積立額の割当てを、積立プランとも称する。
さらに、計画作成部244は、初期投入額および積立額の割当てに基づき、イベントの目標額を達成するために必要な運用利回りを算出し、当該運用利回りを実現するためのポートフォリオ構成(金融商品の組合わせと配分)を例えばモダンポートフォリオ理論に基づいて決定する。これにより、実際の運用における資産の振れ幅を予測することも可能である。
(ロジック1)
計画作成部244は、初期投入額および積立額の指定が無い状態から資産運用計画を作成することが可能である。その作成方法の説明の容易な理解のために、まず、積立額の指定がある場合に積立プランの決定のために用いられるロジック(以下、ロジック1)を説明する。
計画作成部244は、初期投入額および積立額の指定が無い状態から資産運用計画を作成することが可能である。その作成方法の説明の容易な理解のために、まず、積立額の指定がある場合に積立プランの決定のために用いられるロジック(以下、ロジック1)を説明する。
図18は、各イベントのための期間ごとの積立額の概念を示す説明図である。図18に示したように、イベント1の達成時期が到来するまでの期間t1には全てのイベントに積立金が割り当てられ、イベント1の達成時期からイベント2の達成時期までの期間(t2-t1)にはイベント2~イベントnに積立金が割り当てられ、イベントn-1の達成時期からイベントnの達成時期までの期間(tn-tn-1)にはイベントnにのみ積立金が割り当てられる。なお、図18におけるinはイベントnへの運用開始時の積立額であり、iallは全体の積立額である。以下、ロジック1による積立プランの作成について具体的に説明する。
-イベントnの積立プラン
図19~図23は、ロジック1による積立プランの作成過程を示す説明図である。まず、計画作成部244は、達成時期が最も遅いイベントnの、期間(tn-tn-1)についての割当てを行う。具体的には、計画作成部244は、イベントnのリスク許容度に対応する最低達成率Rn(0以上1以下の値)を特定し、図19に示したように、期間(tn-tn-1)について、全体の積立額iallを(1:1-Rn)の比率で元本保証型の金融商品とリスク型の金融商品に振り分ける。よって、上記期間(tn-tn-1)においてイベントnのために元本保証型の金融商品に振り分けられる積立額の積算額Nnは、(tn-tn-1)iall/(2-Rn)と表現される。
図19~図23は、ロジック1による積立プランの作成過程を示す説明図である。まず、計画作成部244は、達成時期が最も遅いイベントnの、期間(tn-tn-1)についての割当てを行う。具体的には、計画作成部244は、イベントnのリスク許容度に対応する最低達成率Rn(0以上1以下の値)を特定し、図19に示したように、期間(tn-tn-1)について、全体の積立額iallを(1:1-Rn)の比率で元本保証型の金融商品とリスク型の金融商品に振り分ける。よって、上記期間(tn-tn-1)においてイベントnのために元本保証型の金融商品に振り分けられる積立額の積算額Nnは、(tn-tn-1)iall/(2-Rn)と表現される。
次に、計画作成部244は、期間(tn-1)においてイベントnのために元本保証型の金融商品に割当てる積立額を算出する。具体的には、計画作成部244は、イベントnの目標金額に最低達成率Rnを乗じることによって下限金額Gnminを算出し、図20に示したように、Gnmin-Nnの演算により、期間(tn-1)にイベントnのために元本保証型の金融商品に割当てるべき積立額の積算額Mnを算出する。そして、計画作成部244は、Mn/(tn-1)の演算により、期間(tn-1)においてイベントnのために元本保証型の金融商品に割当てる毎月の積立額in1を算出する。
さらに、計画作成部244は、期間(tn-1)においてイベントnのためにリスク型の金融商品に割当てる積立額in2を算出する。具体的には、計画作成部244は、図21に示したように、(in1:in2)=(Rn:1-Rn)となるように、期間(tn-1)においてイベントnのためにリスク型の金融商品に割当てる積立額in2を算出する。このため、期間(tn-1)におけるイベントnのための積立額の総和inが(in1+in2)の演算により求まる。ここまでの処理で、イベントnのための積立プランの導出が終了する。
ここで、上記の方法でイベントnのために元本保証型の金融商品に割当てられる積立額の積算額とイベントnの目標額との差分は、イベントnのためにリスク型の金融商品に割当てられる積立額の積算額以上となる。すなわち、イベントnに割当てられる積立額の積算額は、イベントnの目標額未満の値となり得る。しかし、積み立てられた資産は運用利回りによる利益を受けるので、目標額に対する不足分は運用利回りによる資産増加により補填されることが期待される。むしろ、運用利回りによる資産増加をみこし、イベントnに割当てられる積立額の積算額とイベントnの目標金額にあえて差分が設けられる。
-イベントn-1からイベント2までの積立プラン
続いて、計画作成部244は、図22に示したように、イベントn-1のための積立額の割当てを、イベントnのための割当ての説明における全体の積立額iallを(iall-in)と読み替えた処理により、実行する。さらに、計画作成部244は、当該処理をイベント2のための割当てまで再帰的に繰り返すことにより、イベント2までの積立プランを導出する。
続いて、計画作成部244は、図22に示したように、イベントn-1のための積立額の割当てを、イベントnのための割当ての説明における全体の積立額iallを(iall-in)と読み替えた処理により、実行する。さらに、計画作成部244は、当該処理をイベント2のための割当てまで再帰的に繰り返すことにより、イベント2までの積立プランを導出する。
-イベント1の積立プラン
イベント2までの積立プランの導出により、イベント2~イベントnの各々のための積立額i2~inが特定されるので、計画作成部244は、全体の積立額iallから積立額i2~inを減算することにより、イベント1のための積立額i1を算出できる。そして、計画作成部244は、積立額i1をイベント1のリスク許容度に対応する最低達成率R1(0以上1以下の値)を特定し、図23に示したように、積立額i1を(1:1-R1)の比率で元本保証型の金融商品とリスク型の金融商品に振り分ける。よって、期間(t1)においてイベント1のために元本保証型の金融商品に振り分けられる積立額の積算額N1は、(t1)i1/(2-R1)と表現される。
イベント2までの積立プランの導出により、イベント2~イベントnの各々のための積立額i2~inが特定されるので、計画作成部244は、全体の積立額iallから積立額i2~inを減算することにより、イベント1のための積立額i1を算出できる。そして、計画作成部244は、積立額i1をイベント1のリスク許容度に対応する最低達成率R1(0以上1以下の値)を特定し、図23に示したように、積立額i1を(1:1-R1)の比率で元本保証型の金融商品とリスク型の金融商品に振り分ける。よって、期間(t1)においてイベント1のために元本保証型の金融商品に振り分けられる積立額の積算額N1は、(t1)i1/(2-R1)と表現される。
そして、計画作成部244は、イベント1の目標額に最低達成率R1を乗じることにより下限金額G1minを算出し、図23に示したように、G1minとN1の差分M1を、イベント1のための元本保証型の金融商品の初期投入額として算出する。
さらに、計画作成部244は、イベント1のためのリスク型の金融商品の初期投入額Pを算出する。具体的には、(M1:P)=(R1:1-R1)となるように、リスク型の金融商品の初期投入額Pを算出する。これにより、イベント1の積立プランの導出も終了する。
(動作フロー)
以上、本開示の実施形態による資産運用計画の作成方法の理解のために、積立額の指定がある場合の積立プランの作成方法を説明した。続いて、初期投入額および積立額の指定が無い状態から積立プランおよび資産運用計画を作成する本実施形態による動作の流れを説明する。
以上、本開示の実施形態による資産運用計画の作成方法の理解のために、積立額の指定がある場合の積立プランの作成方法を説明した。続いて、初期投入額および積立額の指定が無い状態から積立プランおよび資産運用計画を作成する本実施形態による動作の流れを説明する。
図24は、本開示の実施形態による積立プランの作成方法を示すフローチャートである。図24に示したように、まず、通信部220により顧客端末10からイベント情報が取得されると(S304)、計画作成部244は、初期投入額が0円である場合の毎月の積立額を算出する(S308)。例えば、計画作成部244は、毎月の積立額として多様な値を適用してロジック1を実行し、初期投入額が0円となる積立額を解として算出してもよい。または、計画作成部244は、初期投入額を0円としてロジック1を逆方向に実行することにより、初期投入額が0円である場合の毎月の積立額を算出してもよい。なお、初期投入額が0円である場合の毎月の積立額は、設定可能な積立額の範囲内での最大積立額である。
また、計画作成部244は、毎月の積立額の最小値(最小積立額)を算出する(S312)。例えば、計画作成部244は、達成時期が最も早いイベントの目標額が初期投入額である場合の毎月の積立額を算出する。具体的には、毎月の積立額として多様な値を適用してロジック1を実行し、初期投入額が上記目標額となる積立額を解として算出してもよい。または、計画作成部244は、初期投入額を上記目標額としてロジック1を逆方向に実行することにより、初期投入額が上記目標額である場合の毎月の積立額を算出してもよい。なお、計画作成部244は、達成時期が最も早いイベントの目標額でなく、各イベントの目標額の合計額の所定の割合(例えば、4割)が初期投入額である場合の毎月の積立額を算出してもよい。
そして、計画作成部244は、S308で算出した最大積立額とS312で算出した最小積立額の間の範囲内で毎月の積立額を選択し(S316)、選択した毎月の積立額をロジック1に適用することにより、初期投入額を算出し、各イベントの積立プランを作成する(S318)。
その後、S316において選択された毎月の積立額およびS318において算出された初期投入額が顧客に送信され、顧客により毎月の積立額および初期投入額が確認される。ここで、顧客により初期投入額の変更操作が行われると(S320/初期投入額の変更)、計画作成部244は、初期投入額が変更後の金額である場合の積立プランを作成する(S324)。一方、顧客により積立額の変更操作が行われると(S320/積立額の変更)、計画作成部244は、変更後の積立額をロジック1に適用して初期投入額を算出し、各イベントの積立プランを作成する(S328)。積立額および初期投入額のいずれも変更されなかった場合、計画作成部244は、初期投入額および積立プランを決定する(S332)。
続いて、計画作成部244は、決定した初期投入額および積立プランに基づき、各金融商品への初期投入額および毎月の積立額を示す資産運用計画をイベントごとに作成する。
図25は、積立プランから資産運用計画を作成する流れを示すフローチャートである。計画作成部244は、イベントごとに、S340およびS350に示す処理を行うことにより、資産運用計画を作成する。
すなわち、計画作成部244は、積立プラン、目標額、および下限金額(元本保証型の金融資産で確保される金額)をロジック2に適用することにより、目標額の達成のための運用利回りを算出する(S340)。例えば、計画作成部244は、ロジック2に従い、目標額に対する下限金額の不足分と、リスク型の金融商品に割当てられる積立額の積算額との関係から、目標額の達成のための運用利回りを算出する。なお、計画作成部244により算出される運用利回りは、リスク型の金融商品で得られる運用利回りであってもよい。また、上記における目標額の達成は、金融商品の売却により得られる税引後の資産が目標額を達成することであってもよい。
続いて、計画作成部244は、S340において算出した運用利回りを実現するためのポートフォリオおよび資産運用計画をロジック3に従って作成する(S350)。例えば、計画作成部244は、ロジック3に従い、各金融商品についての期待利回り、期待リスク、および他の金融商品クラスとの相関などの既知の情報と、S340で算出された運用利回りから、例えばモダンポートフォリオ理論を用いて金融商品のポートフォリオ(金融商品の組み合わせ、および各金融商品の配分)を作成する。
そして、計画作成部244は、積立プランにおけるリスク型の金融商品の積立額、元本保証型の金融商品の積立額、および初期投入額を、ポートフォリオの示す配分に従って細分化することにより、各金融商品クラスへの初期投入額および毎月の積立額を示す資産運用計画を作成する。
全てのイベントについてS340およびS350の処理が終了し、全てのイベントの資産運用計画が作成されると、表示制御部242は、各イベントの資産運用計画を示す計画表示画面を生成する(S360)。当該計画表示画面が顧客端末10に送信され、顧客端末10において計画表示画面が表示されることにより、顧客は、各イベントの目標額の達成のためにイベントごとにどのような資産運用をすれば良いかを具体的に把握することができる。
(変形例)
図18には、積立プランを作成するためのモデルとして、イベントn-1の達成時期が到来するまでの期間tn-1にわたって、イベント1~イベントn-1のための積立額の総和が一定である例を示したが、積立プランを作成するためのモデルはかかる例に限定されない。
図18には、積立プランを作成するためのモデルとして、イベントn-1の達成時期が到来するまでの期間tn-1にわたって、イベント1~イベントn-1のための積立額の総和が一定である例を示したが、積立プランを作成するためのモデルはかかる例に限定されない。
例えば、図26に示したように、期間tn-1においてイベント1~イベントn-1のための積立額の総和が時間の経過と共に線形的に減少するモデルが利用されてもよい。また、図27に示したように、運用開始時にはイベント1にのみ積立額が割り当てられ、時間の経過と共に他のイベントに割当てられる積立額が増加するモデルが利用されてもよい。また、図28に示したように、期間tn-1においてイベント1~イベントn-1のための積立額の総和が時間の経過と共に非線形的に減少するモデルが利用されてもよい。
<5.リバランス>
上述した資産運用計画に従って資産を運用している間、金融市場の相場の変動により、各イベントのための積上げ資産が期待通りに推移しない場合もある。このため、管理サーバ20は、実際の資産運用状況に応じて資産運用計画をリバランスする計画調整部248を有する。以下、計画調整部248によるリバランスの方法を説明する。
上述した資産運用計画に従って資産を運用している間、金融市場の相場の変動により、各イベントのための積上げ資産が期待通りに推移しない場合もある。このため、管理サーバ20は、実際の資産運用状況に応じて資産運用計画をリバランスする計画調整部248を有する。以下、計画調整部248によるリバランスの方法を説明する。
(1)
まず、計画調整部248は、資産運用の開始時点における各イベントの達成時期までの期間Torigから、資産運用の開始時点からの経過時間を減じることにより、各イベントの達成時期までの期間Tnewを特定する。
まず、計画調整部248は、資産運用の開始時点における各イベントの達成時期までの期間Torigから、資産運用の開始時点からの経過時間を減じることにより、各イベントの達成時期までの期間Tnewを特定する。
(2)
そして、計画調整部248は、初期投入額として全ての金融商品の時価評価額の合計を適用し、毎月の積立額として当初の資産運用計画における毎月の積立額を適用して、ロジック1に準じた方法で各イベントの積立プランを作成する。その後、計画調整部248は、上述したロジック2に従い、積立プラン、目標額、および下限金額(元本保証型の金融資産で確保される金額)をロジック2に適用することにより、目標額の達成のための運用利回りをイベントごとに算出する。
そして、計画調整部248は、初期投入額として全ての金融商品の時価評価額の合計を適用し、毎月の積立額として当初の資産運用計画における毎月の積立額を適用して、ロジック1に準じた方法で各イベントの積立プランを作成する。その後、計画調整部248は、上述したロジック2に従い、積立プラン、目標額、および下限金額(元本保証型の金融資産で確保される金額)をロジック2に適用することにより、目標額の達成のための運用利回りをイベントごとに算出する。
(3)
計画調整部248は、算出した運用利回りを実現するための初期投入額の各金融商品への新たな配分をイベントごとに算出し、全体での金融商品ごとの初期投入額(Pn=a1n,a2n・・・(a1、a2は、各金融商品に対応する。a1nは、全体での金融商品への初期投入額である。)を算出する。
計画調整部248は、算出した運用利回りを実現するための初期投入額の各金融商品への新たな配分をイベントごとに算出し、全体での金融商品ごとの初期投入額(Pn=a1n,a2n・・・(a1、a2は、各金融商品に対応する。a1nは、全体での金融商品への初期投入額である。)を算出する。
(4)
さらに、計画調整部248は、(3)で算出した全体での金融商品ごとの初期投入額と、現在のマスターポートフォリオにおける各金融商品の時価評価額(Po=a1o,a2o・・・との差分を、金融商品ごとに算出する。
さらに、計画調整部248は、(3)で算出した全体での金融商品ごとの初期投入額と、現在のマスターポートフォリオにおける各金融商品の時価評価額(Po=a1o,a2o・・・との差分を、金融商品ごとに算出する。
(5)
そして、計画調整部248は、PnがPoを上回る金融商品については、当該金融商品についてのPnとPoの差分の購入を計画し、PnがPoを下回る金融商品については、当該金融商品についてのPnとPoの差分の売却を計画する。これにより、新たな積立プランにおける各イベントへの初期投入額が得られる。
そして、計画調整部248は、PnがPoを上回る金融商品については、当該金融商品についてのPnとPoの差分の購入を計画し、PnがPoを下回る金融商品については、当該金融商品についてのPnとPoの差分の売却を計画する。これにより、新たな積立プランにおける各イベントへの初期投入額が得られる。
このように、イベント別のバーチャルポートフォリオ上でなく、マスターポートフォリオ上でリバランスを行うことにより、金融商品の実際の売買量、および売買に伴う手数料の発生を抑制することが可能である。
(補足)
なお、(2)においては毎月の積立額として当初の資産運用計画における毎月の積立額が適用され、運用利回りが変更される例を説明したが、運用利回りとして当初の資産運用計画における運用利回りが適用され、毎月の積立額が変更されてもよい。
なお、(2)においては毎月の積立額として当初の資産運用計画における毎月の積立額が適用され、運用利回りが変更される例を説明したが、運用利回りとして当初の資産運用計画における運用利回りが適用され、毎月の積立額が変更されてもよい。
また、上述したリバランスの方法では、達成時期が直近であるイベントに優先的に初期投入額が割り当てられることになる。これを避けるために、計画調整部248は、各イベントの目標額と達成時期までの残り期間長に応じて、現在の資産の時価評価額を各イベントに配分し、各イベントの目標額と配分された資産との差分を各イベントの新たな目標額として、上述したリバランスを行ってもよい。例えば、計画調整部248は、各イベントの(目標額/残り期間長)の比に応じて、現在の資産の時価評価額を各イベントに配分してもよい。かかる構成により、各イベントのポートフォリオ構成の変化の程度を抑制することが可能となる。
また、計画調整部248は、目標の達成可能性が閾値以下となった場合、または目標の達成が前倒しされる可能性が設定値未満となった場合に、上記のリバランスを行ってもよい。また、上記では金融商品の売買を伴うリバランスを説明したが、計画調整部248は、積立額、達成時期、目標額またはリスク許容度などの変更を提案してもよい。計画調整部248は、上記提案またはリバランスを、顧客情報、物価情報および為替情報などに基づいて行ってもよい。顧客情報は、銀行の預金情報、クレジットカード使用情報、ECサイトの利用情報および公共機関情報など、外部から取得された情報を含んでもよい。
<6.ハードウェア構成>
以上、本開示の実施形態を説明した。上述した資産運用計画の作成やリバランスなどの情報処理は、ソフトウェアと、以下に説明する管理サーバ20のハードウェアとの協働により実現される。
以上、本開示の実施形態を説明した。上述した資産運用計画の作成やリバランスなどの情報処理は、ソフトウェアと、以下に説明する管理サーバ20のハードウェアとの協働により実現される。
図29は、管理サーバ20のハードウェア構成を示したブロック図である。管理サーバ20は、CPU(Central Processing Unit)201と、ROM(Read Only Memory)202と、RAM(Random Access Memory)203と、ホストバス204と、を備える。また、管理サーバ20は、ブリッジ205と、外部バス206と、インタフェース207と、入力装置208と、出力装置210と、ストレージ装置(HDD)211と、ドライブ212と、通信装置215とを備える。
CPU201は、演算処理装置および制御装置として機能し、各種プログラムに従って管理サーバ20内の動作全般を制御する。また、CPU201は、マイクロプロセッサであってもよい。ROM202は、CPU201が使用するプログラムや演算パラメータ等を記憶する。RAM203は、CPU201の実行において使用するプログラムや、その実行において適宜変化するパラメータ等を一時記憶する。これらはCPUバスなどから構成されるホストバス204により相互に接続されている。当該CPU201、ROM202およびRAM203の協働により、制御部240の各機能が実現される。
ホストバス204は、ブリッジ205を介して、PCI(Peripheral Component Interconnect/Interface)バスなどの外部バス206に接続されている。なお、必ずしもホストバス204、ブリッジ205および外部バス206を分離構成する必要はなく、1つのバスにこれらの機能を実装してもよい。
入力装置208は、マウス、キーボード、タッチパネル、ボタン、マイクロフォン、スイッチおよびレバーなどユーザが情報を入力するための入力手段と、ユーザによる入力に基づいて入力信号を生成し、CPU201に出力する入力制御回路などから構成されている。管理サーバ20のユーザは、該入力装置208を操作することにより、管理サーバ20に対して各種のデータを入力したり処理動作を指示したりすることができる。
出力装置210は、例えば、CRT(Cathode Ray Tube)ディスプレイ装置、液晶ディスプレイ(LCD)装置、OLED(Organic Light Emitting Diode)装置およびランプなどの表示装置を含む。さらに、出力装置210は、スピーカおよびヘッドホンなどの音声出力装置を含む。出力装置210は、例えば、再生されたコンテンツを出力する。具体的には、表示装置は再生された映像データ等の各種情報をテキストまたはイメージで表示する。一方、音声出力装置は、再生された音声データ等を音声に変換して出力する。
ストレージ装置211は、本実施形態にかかる管理サーバ20の記憶部230の一例として構成されたデータ格納用の装置である。ストレージ装置211は、記憶媒体、記憶媒体にデータを記録する記録装置、記憶媒体からデータを読み出す読出し装置および記憶媒体に記録されたデータを削除する削除装置などを含んでもよい。ストレージ装置211は、例えば、HDD(Hard Disk Drive)で構成される。このストレージ装置211は、ハードディスクを駆動し、CPU201が実行するプログラムや各種データを格納する。
ドライブ212は、記憶媒体用リーダライタであり、管理サーバ20に内蔵、あるいは外付けされる。ドライブ212は、装着されている磁気ディスク、光ディスク、光磁気ディスク、または半導体メモリ等のリムーバブル記憶媒体24に記録されている情報を読み出して、RAM203に出力する。また、ドライブ212は、リムーバブル記憶媒体24に情報を書き込むこともできる。
通信装置215は、例えば、通信網12に接続するための通信デバイス等で構成された通信インタフェースである。当該通信装置215により、通信部220の機能が実現される。
なお、上記では図29を参照して管理サーバ20のハードウェア構成について説明したが、顧客端末10のハードウェアは管理サーバ20と実質的に同一に構成することが可能であるため、顧客端末10のハードウェア構成の説明を省略する。
<7.むすび>
以上説明したように、本開示の実施形態によれば、イベントごとに資産運用計画が作成され、また、イベントごとのバーチャルポートフォリオが管理されるので、各イベントの発生を意識した資産運用を実現することが可能である。
以上説明したように、本開示の実施形態によれば、イベントごとに資産運用計画が作成され、また、イベントごとのバーチャルポートフォリオが管理されるので、各イベントの発生を意識した資産運用を実現することが可能である。
なお、添付図面を参照しながら本開示の好適な実施形態について詳細に説明したが、本開示の技術的範囲はかかる例に限定されない。本開示の技術分野における通常の知識を有する者であれば、特許請求の範囲に記載された技術的思想の範疇内において、各種の変更例または修正例に想到し得ることは明らかであり、これらについても、当然に本開示の技術的範囲に属するものと了解される。
例えば、上記では、積立プランの作成において顧客が初期投入額の総和または積立額の総和を設定できる例を説明したが、顧客は、積立プランの作成において各イベントのための初期投入額または積立額を設定してもよい。この場合、計画作成部244は、顧客により設定された各イベントのための初期投入額または積立額に基づいて積立プランを作成する。かかる構成によれば、顧客の意思がよりきめ細かに反映された積立プランを作成することが可能である。
また、計画調整部248は、資産運用の開始後に、積立額の変更を提案する機能を有してもよい。例えば、計画調整部248は、顧客の収入情報または支出情報の変化に基づき、積立額の変更を提案してもよい。また、計画調整部248は、運用状況が低調であり達成可能性が全体的に低下している場合、積立額の変更を提案してもよい。さらに、計画調整部248は、通常時よりも利益が望めると判断される場合には積立額の増額を提案し、利益が望めないと判断された場合には積立額の減額を提案してもよい。
また、管理部246は、あるイベントの資産が当該イベントの目標額に達した場合、目標額を上回る分の積立およびリターンを他のイベントのための資産運用に振り分けてもよい。または、管理部246は、あるイベントの資産が当該イベントの目標額に達した場合、目標額が達成された時点で当該イベントの金融商品を売却してもよいし、予定された達成時期が到来した時点で当該イベントの金融商品を売却してもよい。なお、あるイベントの資産が当該イベントの目標額に達した場合、表示制御部242が目標達成を示す表示画面を生成し、通信部220が当該目標達成を示す表示画面を顧客端末10に送信してもよい。一方、予定された達成時期に目標が達成されない可能性が所定値を上回った場合、表示制御部242は、警告画面を生成してもよい。
また、管理部246は、資産運用の進捗が期待値のラインを上回っている場合、リスク型の金融商品の一部を売却することにより利益を確定し、売却により得られた資金により元本保証型の金融商品を買い増してもよい。また、管理部246はリスクイベント発生タイミングを検出し、表示制御部242は、リスクイベント発生タイミングの到来前にキャッシュポジションを高めることをアドバイスする表示画面を生成してもよい。また、表示制御部242は、予定された達成時期が近づくにつれてリスク型の金融商品の割合を減らすことを誘導する表示画面を生成してもよい。
また、表示制御部242は、複数の顧客のマスターポートフォリオ、またはイベントごとのバーチャルポートフォリオが統合された統合ポートフォリオの表示を生成してもよい。かかる構成によれば、例えば家族全体での資産運用状況を示す統合ポートフォリオを作成することが可能である。
また、資産運用計画に沿った資産運用が行われている間に、顧客により新たなイベントの追加が希望された場合、計画調整部248は、新たなイベントのための積立プランを新規に作成してもよい。この場合、計画調整部248は、新たなイベントについての目標額や達成時期に応じて、他のイベントのための積立額から新たなイベントのための積立額を割り当ててもよい。例えば、計画調整部248は、他のイベントとして、目標の達成可能性が高いイベントを優先的に上記の他のイベントとして選択し、リスク許容度の低いイベントは上記の他のイベントとして選択しない。なお、新たなイベントの追加により、各イベントの目標の達成可能性が大きく低下する場合、計画調整部248は、積立額の増加、各イベントの目標額または達成時期の変更を提案してもよい。
また、資産運用計画に沿った資産運用が行われている間に、顧客により既存のイベントの削除が希望された場合、計画調整部248は、削除されるイベントに割当てられた資産を、リスク許容度が低い他のイベント、または目標の達成可能性が低いイベントに優先的に付け替えてもよい。当該付け替えによって目標の達成可能性が非常に高くなるイベントがある場合、計画調整部248は、当該イベントについてリスクが低いポートフォリオ構成を提案してもよい。
また、上記では、リスク許容度が最悪ケースの保証額(下限金額)に対応する例を説明したが、リスク許容度に関してさらに詳細な設定を行うことも可能である。以下、図30を参照して、リスクに関する設定の応用例を説明する。
図30は、リスクに関する設定の応用例を示す説明図である。図30において、横軸は元本保証型の金融商品の比率に対応し、縦軸はリスク型の金融商品の運用方針に対応する。低いリスク許容度は、標準的には、図30に示したように元本保証型の金融商品の高い比率、およびリスク型の金融商品の保守的な運用に対応する。また、高いリスク許容度は、標準的には、図30に示したように元本保証型の金融商品の低い比率、およびリスク型の金融商品の野心的な運用に対応する。
しかし、図30のプロットPに示したように、元本保証型の金融商品の高い比率を望みつつ、リスク型の金融商品の野心的な運用を望む顧客のように、標準的なリスク許容度の高低に当てはまらない希望を持つ顧客も想定される。そこで、図30に示したような設定画面において顧客がリスクに関する詳細な設定を行うことを可能とし、計画作成部244は、リスクに関する詳細な設定に従って資産運用計画を作成してもよい。かかる構成により、顧客の希望がよりきめ細かに反映された資産運用計画を作成することが可能となる。
なお、リスクに関する詳細な設定のための画面例は図30の例に限定されず、例えば、元本保証型の金融商品の比率を設定するためのスライドバー、およびリスク型の金融商品の運用方針を設定するためのスライドバーを含む画面が提供されてもよい。
また、図10を参照して説明した計画表示画面600は、設定可能な初期投入額の幅、および設定可能な積立額の幅を表示してもよい。設定可能な初期投入額の幅は、例えば、0円と、最初に到来するイベントの目標額との間の幅であってもよい。また、設定可能な積立額の幅は、図24を参照して説明した最小積立額と最大積立額の間の幅であってもよい。かかる構成により、顧客は、初期投入額表示欄602および積立額表示欄604において設定可能な金額を把握することが可能である。図16を参照して説明した調整画面900においても同様に、設定可能な初期投入額の幅、および設定可能な積立額の幅が表示されてもよい。
また、本明細書の管理サーバ20の処理における各ステップは、必ずしもフローチャートとして記載された順序に沿って時系列に処理する必要はない。例えば、管理サーバ20の処理における各ステップは、フローチャートとして記載した順序と異なる順序で処理されても、並列的に処理されてもよい。
また、管理サーバ20に内蔵されるCPU201、ROM202およびRAM203などのハードウェアに、上述した管理サーバ20の各構成と同等の機能を発揮させるためのコンピュータプログラムも作成可能である。また、該コンピュータプログラムを記憶させた記憶媒体も提供される。
また、本明細書に記載された効果は、あくまで説明的または例示的なものであって限定的ではない。つまり、本開示に係る技術は、上記の効果とともに、または上記の効果に代えて、本明細書の記載から当業者には明らかな他の効果を奏しうる。
また、以下のような構成も本開示の技術的範囲に属する。
(1)
イベントごとの目標額および達成時期を含むイベント情報に基づき、各イベントのための資産運用計画を作成する制御部、
を備える、情報処理装置。
(2)
前記制御部は、前記各イベントのための資産運用計画を示す計画表示画面を生成する、前記(1)に記載の情報処理装置。
(3)
1のイベントについての計画表示画面は、当該イベントのための初期投入額および単位期間ごとの積立額を示す表示を含む、前記(2)に記載の情報処理装置。
(4)
前記1のイベントについての計画表示画面は、各金融商品または各金融商品クラスへの積立の配分を示す表示を含む、前記(3)に記載の情報処理装置。
(5)
前記1のイベントについての計画表示画面は、作成された資産運用計画に沿って資産がどのように推移するかの予測を示す推移予測表示を含む、前記(3)または(4)に記載の情報処理装置。
(6)
前記推移予測表示は、資産運用計画に沿った運用で予測される資産の振れ幅を示す表示を含む、前記(5)に記載の情報処理装置。
(7)
前記計画表示画面は、前記資産運用計画による初期投入総額および単位期間ごとの積立額の表示エリアを含む、前記(2)~(6)のいずれか一項に記載の情報処理装置。
(8)
前記初期投入総額および前記積立額の表示エリアにおいては前記初期投入総額および前記積立額の変更操作が可能であり、
前記制御部は、前記初期投入総額または前記積立額の変更操作が行われると、変更後の初期投入総額または積立額に基づいて再作成された資産運用計画を示す計画表示画面を生成する、前記(7)に記載の情報処理装置。
(9)
前記制御部は、
元本保証型の金融資産の量、およびリスク型の金融商品での運用方針を設定するための設定表示を生成し、
前記設定表示において設定された前記元本保証型の金融資産の量、および前記リスク型の金融商品での運用方針にさらに基づいて前記資産運用計画を作成する、前記(2)に記載の情報処理装置。
(10)
前記制御部は、前記イベント情報の設定画面を生成する、前記(2)~(9)のいずれか一項に記載の情報処理装置。
(11)
前記制御部は、顧客に関して発生するイベント、または当該イベントに対応する目標額および達成時期を顧客情報に基づいて推定し、推定の結果を含む前記イベント情報の設定画面を生成する、前記(10)に記載の情報処理装置。
(12)
前記イベント情報の設定画面は、イベントごとのリスク許容度の設定エリアを含む、前記(10)または(11)に記載の情報処理装置。
(13)
前記制御部は、各イベントについての実際の資産運用状況を示す運用状況画面を生成する、前記(2)~(12)のいずれか一項に記載の情報処理装置。
(14)
前記運用状況画面は、各イベントに割当てられている各金融商品または各金融商品クラスの資産の配分を示す表示を含む、前記(13)に記載の情報処理装置。
(15)
前記運用状況画面は、各イベントに割当てられている資産の実際の推移を示す表示を含む、前記(13)または(14)に記載の情報処理装置。
(16)
前記制御部は、
イベントごとのリスク許容度を含む前記イベント情報を取得し、
リスク許容度を含む前記イベント情報に基づき、元本保証型の金融商品およびリスク型の金融商品の各々への初期投入額および積立額をイベントごとに計画する、前記(1)~(15)のいずれか一項に記載の情報処理装置。
(17)
前記制御部は、
1のイベントの目標額に前記リスク許容度に応じた割合を乗じて得られる下限金額の資産が前記元本保証型の金融商品で得られるように、前記元本保証型の金融商品の初期投入額および積立額を計画し、
前記1のイベントの目標額と前記下限金額の差分未満の金額が前記リスク型の金融商品に割当てられるように、前記リスク型の金融商品の初期投入額および積立額を計画する、前記(16)に記載の情報処理装置。
(18)
前記制御部は、前記資産運用計画の作成後の時点における資産運用状況に基づき、各金融商品の配分の調整値を算出する、前記(1)~(17)のいずれか一項に記載の情報処理装置。
(19)
目標額および達成時期のイベントごとの設定を取得することと、
イベントごとの前記設定に基づき、各イベントのための資産運用計画をプロセッサが作成することと、
を含む、情報処理方法。
(20)
コンピュータを、
目標額および達成時期のイベントごとの設定に基づき、各イベントのための資産運用計画を作成する制御部、
として機能させるための、プログラム。
(1)
イベントごとの目標額および達成時期を含むイベント情報に基づき、各イベントのための資産運用計画を作成する制御部、
を備える、情報処理装置。
(2)
前記制御部は、前記各イベントのための資産運用計画を示す計画表示画面を生成する、前記(1)に記載の情報処理装置。
(3)
1のイベントについての計画表示画面は、当該イベントのための初期投入額および単位期間ごとの積立額を示す表示を含む、前記(2)に記載の情報処理装置。
(4)
前記1のイベントについての計画表示画面は、各金融商品または各金融商品クラスへの積立の配分を示す表示を含む、前記(3)に記載の情報処理装置。
(5)
前記1のイベントについての計画表示画面は、作成された資産運用計画に沿って資産がどのように推移するかの予測を示す推移予測表示を含む、前記(3)または(4)に記載の情報処理装置。
(6)
前記推移予測表示は、資産運用計画に沿った運用で予測される資産の振れ幅を示す表示を含む、前記(5)に記載の情報処理装置。
(7)
前記計画表示画面は、前記資産運用計画による初期投入総額および単位期間ごとの積立額の表示エリアを含む、前記(2)~(6)のいずれか一項に記載の情報処理装置。
(8)
前記初期投入総額および前記積立額の表示エリアにおいては前記初期投入総額および前記積立額の変更操作が可能であり、
前記制御部は、前記初期投入総額または前記積立額の変更操作が行われると、変更後の初期投入総額または積立額に基づいて再作成された資産運用計画を示す計画表示画面を生成する、前記(7)に記載の情報処理装置。
(9)
前記制御部は、
元本保証型の金融資産の量、およびリスク型の金融商品での運用方針を設定するための設定表示を生成し、
前記設定表示において設定された前記元本保証型の金融資産の量、および前記リスク型の金融商品での運用方針にさらに基づいて前記資産運用計画を作成する、前記(2)に記載の情報処理装置。
(10)
前記制御部は、前記イベント情報の設定画面を生成する、前記(2)~(9)のいずれか一項に記載の情報処理装置。
(11)
前記制御部は、顧客に関して発生するイベント、または当該イベントに対応する目標額および達成時期を顧客情報に基づいて推定し、推定の結果を含む前記イベント情報の設定画面を生成する、前記(10)に記載の情報処理装置。
(12)
前記イベント情報の設定画面は、イベントごとのリスク許容度の設定エリアを含む、前記(10)または(11)に記載の情報処理装置。
(13)
前記制御部は、各イベントについての実際の資産運用状況を示す運用状況画面を生成する、前記(2)~(12)のいずれか一項に記載の情報処理装置。
(14)
前記運用状況画面は、各イベントに割当てられている各金融商品または各金融商品クラスの資産の配分を示す表示を含む、前記(13)に記載の情報処理装置。
(15)
前記運用状況画面は、各イベントに割当てられている資産の実際の推移を示す表示を含む、前記(13)または(14)に記載の情報処理装置。
(16)
前記制御部は、
イベントごとのリスク許容度を含む前記イベント情報を取得し、
リスク許容度を含む前記イベント情報に基づき、元本保証型の金融商品およびリスク型の金融商品の各々への初期投入額および積立額をイベントごとに計画する、前記(1)~(15)のいずれか一項に記載の情報処理装置。
(17)
前記制御部は、
1のイベントの目標額に前記リスク許容度に応じた割合を乗じて得られる下限金額の資産が前記元本保証型の金融商品で得られるように、前記元本保証型の金融商品の初期投入額および積立額を計画し、
前記1のイベントの目標額と前記下限金額の差分未満の金額が前記リスク型の金融商品に割当てられるように、前記リスク型の金融商品の初期投入額および積立額を計画する、前記(16)に記載の情報処理装置。
(18)
前記制御部は、前記資産運用計画の作成後の時点における資産運用状況に基づき、各金融商品の配分の調整値を算出する、前記(1)~(17)のいずれか一項に記載の情報処理装置。
(19)
目標額および達成時期のイベントごとの設定を取得することと、
イベントごとの前記設定に基づき、各イベントのための資産運用計画をプロセッサが作成することと、
を含む、情報処理方法。
(20)
コンピュータを、
目標額および達成時期のイベントごとの設定に基づき、各イベントのための資産運用計画を作成する制御部、
として機能させるための、プログラム。
10 顧客端末
12 通信網
20 管理サーバ
220 通信部
230 記憶部
240 制御部
241 推定部
242 表示制御部
244 計画作成部
246 管理部
248 計画調整部
12 通信網
20 管理サーバ
220 通信部
230 記憶部
240 制御部
241 推定部
242 表示制御部
244 計画作成部
246 管理部
248 計画調整部
Claims (20)
- イベントごとの目標額および達成時期を含むイベント情報に基づき、各イベントのための資産運用計画を作成する制御部、
を備える、情報処理装置。 - 前記制御部は、前記各イベントのための資産運用計画を示す計画表示画面を生成する、請求項1に記載の情報処理装置。
- 1のイベントについての計画表示画面は、当該イベントのための初期投入額および単位期間ごとの積立額を示す表示を含む、請求項2に記載の情報処理装置。
- 前記1のイベントについての計画表示画面は、各金融商品または各金融商品クラスへの積立の配分を示す表示を含む、請求項3に記載の情報処理装置。
- 前記1のイベントについての計画表示画面は、作成された資産運用計画に沿って資産がどのように推移するかの予測を示す推移予測表示を含む、請求項3に記載の情報処理装置。
- 前記推移予測表示は、資産運用計画に沿った運用で予測される資産の振れ幅を示す表示を含む、請求項5に記載の情報処理装置。
- 前記計画表示画面は、前記資産運用計画による初期投入総額および単位期間ごとの積立額の表示エリアを含む、請求項2に記載の情報処理装置。
- 前記初期投入総額および前記積立額の表示エリアにおいては前記初期投入総額および前記積立額の変更操作が可能であり、
前記制御部は、前記初期投入総額または前記積立額の変更操作が行われると、変更後の初期投入総額または積立額に基づいて再作成された資産運用計画を示す計画表示画面を生成する、請求項7に記載の情報処理装置。 - 前記制御部は、
元本保証型の金融資産の量、およびリスク型の金融商品での運用方針を設定するための設定表示を生成し、
前記設定表示において設定された前記元本保証型の金融資産の量、および前記リスク型の金融商品での運用方針にさらに基づいて前記資産運用計画を作成する、請求項2に記載の情報処理装置。 - 前記制御部は、前記イベント情報の設定画面を生成する、請求項2に記載の情報処理装置。
- 前記制御部は、顧客に関して発生するイベント、または当該イベントに対応する目標額および達成時期を顧客情報に基づいて推定し、推定の結果を含む前記イベント情報の設定画面を生成する、請求項10に記載の情報処理装置。
- 前記イベント情報の設定画面は、イベントごとのリスク許容度の設定エリアを含む、請求項10に記載の情報処理装置。
- 前記制御部は、各イベントについての実際の資産運用状況を示す運用状況画面を生成する、請求項2に記載の情報処理装置。
- 前記運用状況画面は、各イベントに割当てられている各金融商品または各金融商品クラスの資産の配分を示す表示を含む、請求項13に記載の情報処理装置。
- 前記運用状況画面は、各イベントに割当てられている資産の実際の推移を示す表示を含む、請求項13に記載の情報処理装置。
- 前記制御部は、
イベントごとのリスク許容度を含む前記イベント情報を取得し、
リスク許容度を含む前記イベント情報に基づき、元本保証型の金融商品およびリスク型の金融商品の各々への初期投入額および積立額をイベントごとに計画する、請求項1に記載の情報処理装置。 - 前記制御部は、
1のイベントの目標額に前記リスク許容度に応じた割合を乗じて得られる下限金額の資産が前記元本保証型の金融商品で得られるように、前記元本保証型の金融商品の初期投入額および積立額を計画し、
前記1のイベントの目標額と前記下限金額の差分未満の金額が前記リスク型の金融商品に割当てられるように、前記リスク型の金融商品の初期投入額および積立額を計画する、請求項16に記載の情報処理装置。 - 前記制御部は、前記資産運用計画の作成後の時点における資産運用状況に基づき、各金融商品の配分の調整値を算出する、請求項1に記載の情報処理装置。
- 目標額および達成時期のイベントごとの設定を取得することと、
イベントごとの前記設定に基づき、各イベントのための資産運用計画をプロセッサが作成することと、
を含む、情報処理方法。 - コンピュータを、
目標額および達成時期のイベントごとの設定に基づき、各イベントのための資産運用計画を作成する制御部、
として機能させるための、プログラム。
Priority Applications (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US16/307,279 US20190347733A1 (en) | 2016-06-21 | 2017-01-24 | Information processing apparatus, information processing method, and program |
CN201780037278.8A CN109328369A (zh) | 2016-06-21 | 2017-01-24 | 信息处理设备、信息处理方法以及程序 |
JP2018523290A JP6911849B2 (ja) | 2016-06-21 | 2017-01-24 | 情報処理装置、情報処理方法およびプログラム |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US201662352805P | 2016-06-21 | 2016-06-21 | |
US62/352805 | 2016-06-21 |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2017221448A1 true WO2017221448A1 (ja) | 2017-12-28 |
Family
ID=60784640
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/JP2017/002320 WO2017221448A1 (ja) | 2016-06-21 | 2017-01-24 | 情報処理装置、情報処理方法およびプログラム |
Country Status (4)
Country | Link |
---|---|
US (1) | US20190347733A1 (ja) |
JP (1) | JP6911849B2 (ja) |
CN (1) | CN109328369A (ja) |
WO (1) | WO2017221448A1 (ja) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2019160154A (ja) * | 2018-03-16 | 2019-09-19 | ヤフー株式会社 | 情報処理装置、情報処理方法、およびプログラム |
WO2020007155A1 (zh) * | 2018-07-02 | 2020-01-09 | 阿里巴巴集团控股有限公司 | 数据展示方法、装置和用户端 |
JP2022003483A (ja) * | 2020-06-23 | 2022-01-11 | 楽天グループ株式会社 | 予測損益表示システム、予測損益表示方法、及びプログラム |
JP7171955B1 (ja) | 2022-03-22 | 2022-11-15 | 株式会社モニクル | 複数の金融商品及び/または制度を提案する方法 |
Families Citing this family (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US11132749B1 (en) | 2017-07-27 | 2021-09-28 | StreetShares, Inc. | User interface with moveable, arrangeable, multi-sided color-coded tiles |
US11250396B2 (en) * | 2017-09-22 | 2022-02-15 | Nam C. Quach | System and method for providing an action-based donation platform |
US20210350426A1 (en) | 2020-05-07 | 2021-11-11 | Nowcasting.ai, Inc. | Architecture for data processing and user experience to provide decision support |
CN113377821B (zh) * | 2021-06-09 | 2024-06-07 | 深圳前海微众银行股份有限公司 | 组合比例获取方法、设备、介质及程序产品 |
CN117649117B (zh) * | 2024-01-30 | 2024-05-07 | 浙江数洋科技有限公司 | 处置方案的确定方法、装置以及计算机设备 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002041804A (ja) * | 2000-05-15 | 2002-02-08 | Idea Works:Kk | 投資アドバイスシステム及び投資アドバイスの表示方法 |
JP2003223555A (ja) * | 2001-11-21 | 2003-08-08 | Daiwa Securities Group Inc | ポートフォリオ構築支援装置およびプログラム |
JP2009059205A (ja) * | 2007-08-31 | 2009-03-19 | Daiwa Securities Group Inc | ポートフォリオ構築支援装置、ポートフォリオ構築支援方法およびプログラム |
JP2015125531A (ja) * | 2013-12-26 | 2015-07-06 | 株式会社日本総合研究所 | 未来通帳表示システム、表示方法及び表示プログラム |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20050027632A1 (en) * | 2003-07-31 | 2005-02-03 | Ubs Financial Services, Inc. | Financial investment advice system and method |
US7769664B2 (en) * | 2007-05-10 | 2010-08-03 | George Egan | Guaranteed principal investment system, product and method |
CN101916424A (zh) * | 2009-07-07 | 2010-12-15 | 北京国脉精英理财顾问有限公司 | 家庭理财体检服务模式和系统 |
CN102236869A (zh) * | 2010-04-20 | 2011-11-09 | 中国工商银行股份有限公司 | 一种银行委托资产风险实时监控系统 |
CN102236870A (zh) * | 2010-04-26 | 2011-11-09 | 上海无花果信息科技有限公司 | 一种用于获得稳定回报的数量化多因子投资组合控制方法 |
CN104574190A (zh) * | 2015-01-30 | 2015-04-29 | 中国农业银行股份有限公司 | 信息处理方法及装置 |
-
2017
- 2017-01-24 JP JP2018523290A patent/JP6911849B2/ja active Active
- 2017-01-24 CN CN201780037278.8A patent/CN109328369A/zh active Pending
- 2017-01-24 WO PCT/JP2017/002320 patent/WO2017221448A1/ja active Application Filing
- 2017-01-24 US US16/307,279 patent/US20190347733A1/en not_active Abandoned
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002041804A (ja) * | 2000-05-15 | 2002-02-08 | Idea Works:Kk | 投資アドバイスシステム及び投資アドバイスの表示方法 |
JP2003223555A (ja) * | 2001-11-21 | 2003-08-08 | Daiwa Securities Group Inc | ポートフォリオ構築支援装置およびプログラム |
JP2009059205A (ja) * | 2007-08-31 | 2009-03-19 | Daiwa Securities Group Inc | ポートフォリオ構築支援装置、ポートフォリオ構築支援方法およびプログラム |
JP2015125531A (ja) * | 2013-12-26 | 2015-07-06 | 株式会社日本総合研究所 | 未来通帳表示システム、表示方法及び表示プログラム |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2019160154A (ja) * | 2018-03-16 | 2019-09-19 | ヤフー株式会社 | 情報処理装置、情報処理方法、およびプログラム |
JP7036634B2 (ja) | 2018-03-16 | 2022-03-15 | ヤフー株式会社 | 情報処理装置、情報処理方法、およびプログラム |
WO2020007155A1 (zh) * | 2018-07-02 | 2020-01-09 | 阿里巴巴集团控股有限公司 | 数据展示方法、装置和用户端 |
TWI779189B (zh) * | 2018-07-02 | 2022-10-01 | 大陸商螞蟻財富(上海)金融信息服務有限公司 | 資料展示方法、裝置和用戶端 |
JP2022003483A (ja) * | 2020-06-23 | 2022-01-11 | 楽天グループ株式会社 | 予測損益表示システム、予測損益表示方法、及びプログラム |
JP7198241B2 (ja) | 2020-06-23 | 2022-12-28 | 楽天グループ株式会社 | 予測損益表示システム、予測損益表示方法、及びプログラム |
JP7171955B1 (ja) | 2022-03-22 | 2022-11-15 | 株式会社モニクル | 複数の金融商品及び/または制度を提案する方法 |
JP2023139437A (ja) * | 2022-03-22 | 2023-10-04 | 株式会社モニクル | 複数の金融商品及び/または制度を提案する方法 |
JP2023140268A (ja) * | 2022-03-22 | 2023-10-04 | 株式会社モニクル | 複数の金融商品及び/または制度を提案する方法 |
Also Published As
Publication number | Publication date |
---|---|
US20190347733A1 (en) | 2019-11-14 |
JP6911849B2 (ja) | 2021-07-28 |
CN109328369A (zh) | 2019-02-12 |
JPWO2017221448A1 (ja) | 2019-04-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2017221448A1 (ja) | 情報処理装置、情報処理方法およびプログラム | |
US8620788B2 (en) | System and method for dynamic financial account management | |
US12118440B2 (en) | Automated order execution based on user preference settings utilizing a neural network prediction model | |
JP7280320B2 (ja) | 資産運用・債務返済シミュレーション生成装置、プログラム及び方法 | |
US7421408B2 (en) | Personal or family financial accounting and management system | |
US20080114703A1 (en) | Method and tool for retirement income management | |
AU2013221926A1 (en) | Methods and systems for consumer lending | |
CA3135912C (en) | System and method for generating indicators derived from simulated projections incorporating financial goals | |
JP6682688B1 (ja) | 情報処理方法、情報処理装置、プログラム、及び情報処理端末 | |
US11170438B1 (en) | Intelligent item financing | |
JP6740435B1 (ja) | 情報処理方法、情報処理装置、プログラム、及び情報処理端末 | |
US20210358062A1 (en) | System and method for on-demand ownership management | |
US20210158439A1 (en) | Method for Optimizing Usage Savings in Financial Accounts | |
Illanes et al. | Competition, asymmetric information, and the annuity puzzle: Evidence from a government-run exchange in chile | |
JP6772350B1 (ja) | 情報処理方法、情報処理装置、プログラム、及び情報処理端末 | |
JP7053077B1 (ja) | シングルユーザアクションによる意思決定を支援するための方法及びシステム | |
US11514516B2 (en) | Banking operation support system, banking operation support method, and banking operation support program | |
KR20040075195A (ko) | 고객의 생활 패턴 분석을 통한 금융 컨설팅 방법 및시스템, 및 컴퓨터 판독 가능한 기록 매체 | |
US20200320554A1 (en) | Method for predicting future seller product values for determining investor capital contributions | |
CN116128646A (zh) | 用于行使资源权益的方法及装置、计算设备、存储介质 | |
Götze et al. | Discounted cash flow methods | |
US10672000B1 (en) | Bypass system | |
WO2022263900A1 (en) | System and method for on-demand ownership management | |
JP2024061995A (ja) | ライフイベント型金融商品情報出力装置 | |
Favreault et al. | The Retirement Project An Urban Institute Issue Focus |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
ENP | Entry into the national phase |
Ref document number: 2018523290 Country of ref document: JP Kind code of ref document: A |
|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 17814920 Country of ref document: EP Kind code of ref document: A1 |
|
NENP | Non-entry into the national phase |
Ref country code: DE |
|
122 | Ep: pct application non-entry in european phase |
Ref document number: 17814920 Country of ref document: EP Kind code of ref document: A1 |