WO2017150140A1 - 端末装置、制御装置、サーバ、評価方法及びプログラム - Google Patents

端末装置、制御装置、サーバ、評価方法及びプログラム Download PDF

Info

Publication number
WO2017150140A1
WO2017150140A1 PCT/JP2017/004874 JP2017004874W WO2017150140A1 WO 2017150140 A1 WO2017150140 A1 WO 2017150140A1 JP 2017004874 W JP2017004874 W JP 2017004874W WO 2017150140 A1 WO2017150140 A1 WO 2017150140A1
Authority
WO
WIPO (PCT)
Prior art keywords
power
output
power output
output device
reliability
Prior art date
Application number
PCT/JP2017/004874
Other languages
English (en)
French (fr)
Inventor
南 幸一
木村 英和
Original Assignee
日本電気株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 日本電気株式会社 filed Critical 日本電気株式会社
Priority to US16/080,939 priority Critical patent/US11205903B2/en
Priority to JP2018502998A priority patent/JP6856063B2/ja
Publication of WO2017150140A1 publication Critical patent/WO2017150140A1/ja

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • H02J3/46Controlling of the sharing of output between the generators, converters, or transformers
    • H02J3/466Scheduling the operation of the generators, e.g. connecting or disconnecting generators to meet a given demand
    • H02J3/472For selectively connecting the AC sources in a particular order, e.g. sequential, alternating or subsets of sources
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • H02J13/00002Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by monitoring
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • H02J3/381Dispersed generators
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • H02J3/46Controlling of the sharing of output between the generators, converters, or transformers
    • H02J3/466Scheduling the operation of the generators, e.g. connecting or disconnecting generators to meet a given demand
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2203/00Indexing scheme relating to details of circuit arrangements for AC mains or AC distribution networks
    • H02J2203/20Simulating, e g planning, reliability check, modelling or computer assisted design [CAD]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E40/00Technologies for an efficient electrical power generation, transmission or distribution
    • Y02E40/70Smart grids as climate change mitigation technology in the energy generation sector
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/12Monitoring or controlling equipment for energy generation units, e.g. distributed energy generation [DER] or load-side generation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/30State monitoring, e.g. fault, temperature monitoring, insulator monitoring, corona discharge
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S40/00Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them
    • Y04S40/20Information technology specific aspects, e.g. CAD, simulation, modelling, system security

Definitions

  • the present invention relates to a terminal device, a control device, a server, an evaluation method, and a program.
  • Various power output devices eg, storage batteries, power generation devices, etc.
  • HEMS Home Energy Management System
  • the electric power company received information on the manufacturer name, model name, rated capacity, rated power, etc. of each device from the manufacturer of each power output device, and conducted an examination based on the interconnection regulations for each device. . After such examination, each device is connected to a power distribution network, and each device has been used for service operations such as demand response.
  • Patent Document 1 discloses a battery management device that manages one or a plurality of storage batteries, and calculates an SOC reliability that is an index representing the reliability of the calculated SOC (State Of Charge) of the storage battery.
  • a battery management device is disclosed that includes a calculation unit and an SOC reliability determination unit that determines whether or not the SOC calculated based on the calculation result by the SOC reliability calculation unit can be trusted.
  • any one parameter of the number of cycles in which charging / discharging is one cycle, elapsed time, SOH (State Of Health), and accumulated charge / discharge amount is accumulated. Then, the SOC reliability calculation unit calculates the SOC reliability based on the accumulated parameters.
  • Patent Document 2 shows a charging / discharging unit that is connected to an in-vehicle storage battery and charges or discharges the in-vehicle storage battery, identification information for each type of in-vehicle storage battery, and predetermined characteristics of the corresponding type of in-vehicle storage battery.
  • Storage means for storing the characteristic information in association with each other, information acquisition means for acquiring the target identification information that is identification information of the target in-vehicle storage battery connected to the charging / discharging means, and characteristic information stored in the storage means
  • a charge / discharge control device includes charge / discharge control means for performing charge control or discharge control on charge / discharge means based on target characteristic information associated with target identification information.
  • a power output device with inferior or degraded quality for example, when the actual output falls below the specified output value even if the output operation is performed in accordance with the output request specifying the output value (W) from the power company There is. When such a situation occurs, it may become difficult to operate a service such as demand response.
  • Patent Document 1 evaluates SOH, that is, a kind of direct current characteristic.
  • the technique described in Patent Document 1 cannot evaluate the output performance, that is, the performance of the power conditioner.
  • the technique described in Patent Document 2 also does not disclose means for solving the above problem.
  • This invention makes it a subject to provide the means to solve the said problem.
  • Attribute information receiving means for receiving attribute information of the power output device from a power output device having a function of outputting power;
  • Output condition transmission means for transmitting the output condition determined according to the attribute information to the power output device;
  • Processing result receiving means for receiving a processing result obtained by performing predetermined processing on output waveform data when the power output device outputs power according to the output condition;
  • a control device having evaluation means for calculating reliability of the power output performance of the power output device based on the processing result and the output condition.
  • a server having the control device is provided.
  • the server may be a server in a cloud or the like (so-called cloud server).
  • Attribute information receiving means for receiving attribute information of the power output device from a power output device having a function of outputting power; Output condition transmission means for transmitting the output condition determined according to the attribute information to the power output device; Output data receiving means for receiving output waveform data when the power output device outputs power according to the output condition;
  • a terminal device comprising: an evaluation unit that calculates reliability of the power output performance of the power output device based on the output waveform data and the output condition.
  • Computer An attribute information receiving step of receiving attribute information of the power output device from a power output device having a function of outputting power; An output condition transmission step of transmitting an output condition determined according to the attribute information to the power output device; A processing result receiving step for receiving a processing result obtained by performing a predetermined processing on output waveform data when the power output device outputs power according to the output condition; An evaluation step for calculating the reliability of the power output performance of the power output device based on the processing result and the output condition; An evaluation method for performing is provided.
  • Computer An attribute information receiving step of receiving attribute information of the power output device from a power output device having a function of outputting power; An output condition transmission step of transmitting an output condition determined according to the attribute information to the power output device; An output data receiving step of receiving output waveform data when the power output device outputs power according to the output condition; Based on the output waveform data and the output condition, an evaluation step for calculating the reliability of the power output performance of the power output device; An evaluation method for performing is provided.
  • Computer Attribute information receiving means for receiving attribute information of the power output device from a power output device having a function of outputting power;
  • An output condition transmitting means for transmitting an output condition determined according to the attribute information to the power output device;
  • Processing result receiving means for receiving a processing result obtained by performing predetermined processing on output waveform data when the power output device outputs power in accordance with the output condition;
  • Evaluation means for calculating the reliability of the power output performance of the power output device based on the processing result and the output condition;
  • Computer Attribute information receiving means for receiving attribute information of the power output device from a power output device having a function of outputting power;
  • An output condition transmitting means for transmitting an output condition determined according to the attribute information to the power output device;
  • Output data receiving means for receiving output waveform data when the power output device outputs power in accordance with the output conditions;
  • Evaluation means for calculating the reliability of the power output performance of the power output device based on the output waveform data and the output conditions;
  • a technique for evaluating the output performance of a power output device connected to a distribution network is realized.
  • Each unit included in the apparatus of the present embodiment is stored in a CPU (Central Processing Unit), a memory, a program loaded into the memory, a storage unit such as a hard disk storing the program (from the stage of shipping the apparatus in advance).
  • a storage unit such as a hard disk storing the program (from the stage of shipping the apparatus in advance).
  • storage media such as CDs (Compact Discs) and programs downloaded from servers on the Internet can also be stored.) Realized by any combination of hardware and software, centering on the network connection interface Is done. It will be understood by those skilled in the art that there are various modifications to the implementation method and apparatus.
  • FIG. 1 is a block diagram illustrating the hardware configuration of the apparatus according to the present embodiment.
  • the apparatus includes a processor 1A, a memory 2A, an input / output interface 3A, a peripheral circuit 4A, and a bus 5A.
  • the peripheral circuit includes various modules.
  • the bus 5A is a data transmission path through which the processor 1A, the memory 2A, the peripheral circuit 4A, and the input / output interface 3A transmit / receive data to / from each other.
  • the processor 1A is an arithmetic processing device such as a CPU (Central Processing Unit) or a GPU (Graphics Processing Unit).
  • the memory 2A is a memory such as a RAM (Random Access Memory) or a ROM (Read Only Memory).
  • the input / output interface 3A includes an interface for acquiring information from an external device, an external server, an external sensor, and the like.
  • the processor 1A issues a command to each module and performs a calculation based on the calculation result.
  • reception means that the device itself retrieves data or information stored in another device or storage medium (active reception), for example, requests or inquires of another device. Receiving, accessing and reading other devices and storage media, etc., and inputting data or information output from other devices to the device (passive reception), for example, distribution (or , Transmission, push notification, etc.) and / or receiving received data or information. It also includes selecting and acquiring from received data or information, or selecting and receiving distributed data or information.
  • the management system includes a server (control device) 10, a terminal device 20, and a power output device 30.
  • the server 10 and the terminal device 20 are connected to a network 40 such as the Internet, and can transmit and receive information to and from each other.
  • the terminal device 20 and the power output device 30 are connected by wire and / or wireless so that information can be transmitted and received according to an arbitrary communication standard.
  • the power output device 30 has a function of outputting power and supplying power to the distribution network.
  • the power output device 30 may have a function of receiving power from the distribution network and storing energy.
  • Examples of the power output device 30 include, but are not limited to, a storage battery and a power generation device (for example, a power generation device that generates power using natural energy).
  • Each power output device 30 is managed by, for example, a power generation company or a general user.
  • the terminal device 20 has functions of controlling the operation of the power output device 30 and collecting information from the power output device 30 and transmitting the information to the server 10. As illustrated, one terminal device 20 may be installed corresponding to one power output device 30, or one terminal device 20 may be installed corresponding to a plurality of power output devices 30. Further, the terminal device 20 and the power output device 30 may be physically integrated or may be configured separately.
  • the server 10 is managed by an electric power company.
  • the server 10 can control the operation of the power output device 30 via the terminal device 20 and execute a service such as a demand response.
  • the server 10 makes an output request (a power supply request to the distribution network) specifying the output value (W) to the terminal device 20.
  • the terminal device 20 controls the subordinate power output device 30 to output in response to the output request.
  • the management system of the present embodiment has means for evaluating the power output performance of the power output device 30.
  • the server 10 and the terminal device 20 can realize output according to the output request from the server 10 by controlling the operation of each power output device 30 based on the evaluation result.
  • the configuration of each apparatus will be described in detail.
  • FIG. 3 shows an example of a functional block diagram of the management system of this embodiment.
  • the terminal device 20 includes an input unit 21, a calculation unit 22, an output unit 23, and a storage unit 24.
  • the input unit 21 receives data input.
  • the calculation unit 22 performs predetermined calculation processing.
  • the output unit 23 outputs data.
  • the storage unit 24 stores data. Specific processing performed by each unit of the terminal device 20 is appropriately performed when the configuration of the server 10 is described below.
  • the server 10 includes an input unit 11, a calculation unit 12, an output unit 13, and a storage unit 14.
  • the input unit 11 accepts data input.
  • the calculation unit 12 performs predetermined calculation processing.
  • the output unit 13 outputs data.
  • the storage unit 14 stores data.
  • the input unit 11 includes an attribute information receiving unit 15 and a processing result receiving unit 16.
  • the calculation unit 12 includes an evaluation unit 17.
  • the output unit 13 includes an output condition transmission unit 18.
  • the attribute information receiving unit 15 receives the attribute information of the own device (the power output device 30) from the power output device 30.
  • the attribute information receiving unit 15 receives attribute information from the power output device 30 via the terminal device 20.
  • the attribute information includes, for example, the manufacturer (manufacturer), model name, date of manufacture, and the like. Such attribute information is registered in advance in each power output device 30. Then, the power output device 30 transmits attribute information to the terminal device 20 at a predetermined timing.
  • the terminal device 20 transmits the received attribute information to the server 10 (output unit 23).
  • the power output device 30 when the power output device 30 is newly connected to the power distribution network, the power output device 30 and an arbitrary terminal device 20 can communicate with each other as a preparation for the connection. Further, the power output device 30 is set as a control target of the terminal device 20. With such preparation, the terminal device 20 can control the operation of the power output device 30.
  • the controlled operation includes power output from the power conditioner included in the power output device 30 to the distribution network, power intake from the distribution network to the power conditioner, and the like.
  • the timing for transmitting attribute information from the power output apparatus 30 to the terminal apparatus 20 is a matter of design.
  • the power output device 30 may transmit attribute information to the terminal device 20 at an arbitrary timing after the setting as the control target is completed.
  • the power output device 30 may transmit attribute information of the own device to the terminal device 20 in accordance with a predetermined operation on the terminal device 20 or the power output device 30 by the operator.
  • the terminal device 20 may request attribute information from the power output device 30 at a predetermined timing after the completion of the setting as the control target. Then, the power output apparatus 30 may transmit the attribute information of the own apparatus to the terminal apparatus 20 in response to the request.
  • Attribute information transmission is not limited to when the power output apparatus 30 is newly connected to the distribution network.
  • the power output device 30 after being connected to the power distribution network, the power output device 30 sends its own device to the terminal device 20 at a predetermined timing periodically (eg, once a year, once every three months, etc.).
  • the attribute information may be transmitted.
  • the output condition transmitting unit 18 transmits the output condition determined according to the attribute information received by the attribute information receiving unit 15 to the power output device 30 via the terminal device 20.
  • the power output apparatus 30 performs a power output operation (test operation) in accordance with the output conditions. Then, the output performance of the power output device 30 is evaluated based on the output condition and the output result of the power output device 30 according to the output condition.
  • the storage unit 14 holds a plurality of output conditions in advance. Then, the calculation unit 12 searches the storage unit 14 using the attribute information transmitted from the terminal device 20 as a key, and corresponds to the received attribute information from among a plurality of output conditions held in the storage unit 14 in advance. The output condition to be extracted is taken out. The output condition transmission unit 18 transmits the output condition thus extracted by the calculation unit 12 to the power output device 30 via the terminal device 20.
  • FIG. 4 and FIG. 5 schematically show an example of information stored in the storage unit 14.
  • FIG. 4 shows output condition information in which details of a plurality of output conditions are registered.
  • the output condition ID identifier
  • active power reactive power
  • voltage voltage
  • frequency frequency
  • each value specified value
  • FIG. 5 is information in which the model name of the power output device 30 and the ID of the output condition applied to each are associated with each other.
  • One output condition may be applied to only one power output device 30 or may be applied to a plurality of power output devices 30.
  • the output condition can be determined according to, for example, the capability of the power conditioner of the power output device 30. In such a case, the same output condition is applied to the plurality of power output devices 30 having the same or equivalent power conditioner.
  • the processing result receiving unit 16 receives a processing result obtained by performing a predetermined process on the output waveform data when the power output device 30 outputs power in accordance with the output condition.
  • the processing result receiving unit 16 receives a processing result from the terminal device 20.
  • the power output device 30 that has received the output condition performs a power output operation (test operation) according to the output condition. In other words, the power output device 30 performs an output operation so that power is output at a designated value for each of one or more items determined by the output conditions.
  • the terminal device 20 receives the output waveform data when the power output device 30 outputs power in accordance with the output conditions (input unit 21). Specifically, the terminal device 20 receives AC waveform data (eg, current waveform data) output from the power conditioner of the power output device 30. For example, the terminal device 20 receives the AC waveform data from a measurement sensor installed at an arbitrary position where the AC waveform data can be measured. Note that the power conditioner to which the terminal device 20 and the power output device 30 are connected is connected to the same power line. For this reason, the terminal device 20 may receive the output waveform (AC waveform data) output from the power conditioner.
  • AC waveform data eg, current waveform data
  • the terminal device 20 performs a predetermined calculation process on the received AC waveform data (calculation unit 22). As a result of this arithmetic processing, values (measured values) such as active power, reactive power, voltage, frequency, and lamp are obtained. The terminal device 20 transmits these values as processing results to the server 10 (output unit 23).
  • the evaluation unit 17 evaluates the power output performance of the power output device 30 based on the processing result and the output condition.
  • the evaluation unit 17 calculates the reliability of the power output performance of the power output device 30 based on the processing result and the output condition. In other words, the reliability is evaluated based on whether or not the output can be performed according to the specified value, and how much the output deviates from the specified value.
  • the evaluation method will be described.
  • FIG. 6 schematically shows an example of reference information.
  • an allowable range of output results of each of one or a plurality of power output devices 30 to which the output condition is applied is defined in association with one output condition. Reference information as shown in FIG. 6 is prepared for each output condition.
  • the evaluation unit 17 confirms whether the measured value of each item indicated by the processing result is included in the allowable range corresponding to the output condition and the power output device 30 (type name thereof) (see FIG. 6). If included, the evaluation unit 17 evaluates that the power output device 30 can output as specified. On the other hand, if not included, the evaluation unit 17 evaluates that the power output apparatus 30 cannot output the specified value.
  • the measured values of all of a plurality of items are included in the allowable range, or the measured values of a predetermined number or more or a predetermined ratio of the plurality of items are included in the allowable range.
  • a guideline reliability
  • the reliability of the power output apparatus 30 that is evaluated to be able to output according to the designated value can be “1”. .
  • the evaluation unit 17 confirms whether or not the above-described “measured values of each item indicated by the processing result are included in an allowable range corresponding to the output condition and the power output device 30.
  • the output unit 13 transmits the evaluation result (reliability) by the evaluation unit 17 to the terminal device 20. Thereby, the terminal device 20 can know the output performance of the power output device 30 to be controlled.
  • the storage unit 24 of the terminal device 20 can store the output performance of the power output device 30 to be controlled. Note that the evaluation result by the evaluation unit 17 may be stored in the storage unit 14 of the server 10.
  • the output unit 13 may not transmit the evaluation result by the evaluation unit 17 to the terminal device 20.
  • the evaluation result by the evaluation unit 17 is stored in the storage unit 14 of the server 10.
  • the server 10 may periodically evaluate the power output performance of the power output device 30 (calculate reliability) in response to receiving the attribute information.
  • the server 10 and the terminal device 20 can detect a decrease in power output performance due to deterioration over time and a decrease in output performance due to some trouble such as a failure.
  • the storage unit 14 may accumulate the past evaluation results of each power output device 30 in association with the evaluation timing. And the evaluation part 17 may evaluate the power output performance of the power output device 30 using the past evaluation result.
  • machine learning is performed using teacher data in which an elapsed time from an arbitrary timing (eg, the first evaluation timing) and an evaluation result (reliability) at that timing are associated with each other, and at an arbitrary timing
  • a prediction model of the evaluation result may be generated.
  • the evaluation part 17 may estimate the evaluation result in the next evaluation timing using the said prediction model.
  • the evaluation unit 17 may calculate the current evaluation result of the power output apparatus 30 based on the estimated result of the estimated next evaluation timing and the evaluation result based on the newly received processing result. For example, an average value of these two evaluation results may be used as the evaluation result.
  • the power output apparatus 30 transmits the attribute information of the own apparatus to the predetermined terminal apparatus 20 at an arbitrary timing (S101).
  • the terminal device 20 transmits the received attribute information to the server 10 (S102).
  • the server 10 determines a predetermined output condition based on the content of the attribute information (S103). For example, based on the information shown in FIGS. 4 and 5, the output condition corresponding to the model name of the power output device 30 included in the received attribute information is determined. In the output condition, a value of at least one item among active power, reactive power, voltage, frequency, and lamp is specified.
  • the server 10 transmits the determined output condition to the terminal device 20 (S104). Then, the terminal device 20 transmits the received output condition to the power output device 30 (S105).
  • the power output apparatus 30 performs a power output operation (test operation) in accordance with the received output conditions (S106).
  • the terminal device 20 measures the output of the power test operation in S106 and obtains output waveform data (AC waveform data) (S107).
  • the terminal device 20 performs a predetermined process on the received output waveform data, and calculates a value of a predetermined item (S108).
  • a measured value of at least one item among active power, reactive power, voltage, frequency, and lamp is calculated.
  • the terminal device 20 transmits the calculated value as a processing result to the server 10 (S109).
  • the server 10 evaluates the power output performance of the power output device 30 based on the received processing result (S110). Specifically, the server 10 calculates the reliability of the power output apparatus 30 by the method described above. Although not shown, the server 10 may store the calculated reliability in association with the power output apparatus 30 (storage unit 14).
  • the server 10 transmits the evaluation result (reliability) to the terminal device 20 (S111).
  • the terminal device 20 stores the evaluation result (reliability) in association with the power output device 30 (S112) (storage unit 24).
  • the terminal device 20 may calculate the power output performance of one or more power output devices 30 to be controlled as a whole and report it to the server 10. . That is, when the terminal device 20 controls a plurality of power output devices 30, the terminal device 20 may calculate the reliability of the plurality of power output devices 30 as a whole.
  • the power output performance of one power output device 30 to be controlled or the power output performance of the entire plurality of power output devices 30 to be controlled can be considered as the power output performance that can be processed by the terminal device 20.
  • the server 10 stores the received information in association with each terminal device 20 (storage unit 14).
  • the terminal device 20 may calculate the sum of the rated outputs (W) of one or more power output devices 30 to be controlled, the sum of the capacities, and the like, and report them to the server 10.
  • the example has “reliability transmission processing from the server 10 to the terminal device 20 (S111)” and “reliability storage processing to the terminal device 20 (S112)” that existed in the example of FIG. This is different in that it has no “reliability storage process in server 10 (S511)”. Others are the same as the example of FIG.
  • the terminal device 20 manages (stores) the reliability of the one or more power output devices 30 to be controlled.
  • the server 10 manages (stores) the reliability of one or more power output devices 30 to be controlled.
  • the server 10 may manage (store) the reliability of the power output device 30.
  • the server 10 and the terminal device 20 can evaluate and grasp the power output performance (reliability) of the power output device 30 connected to the distribution network. By performing a service such as a demand response using the power output apparatus 30 based on the reliability, the quality of the service can be maintained.
  • the terminal device 20 performs predetermined processing on the output waveform data to calculate values (measured values) of active power, reactive power, voltage, frequency, lamp, etc., and these values are used as processing results.
  • the terminal device 20 may perform AD conversion (predetermined processing) on the output waveform data and transmit the result (digital waveform data) to the server 10.
  • the digital waveform data received by the server 10 may be analyzed to calculate values (measured values) such as active power, reactive power, voltage, frequency, and lamp. This assumption is the same in all the following embodiments.
  • the management system of this embodiment is different from that of the first embodiment in that the terminal device 20 evaluates the power output performance of the power output device 30.
  • the overall image of the management system of this embodiment is the same as that of the first embodiment.
  • FIG. 9 shows an example of a functional block diagram of the management system of this embodiment.
  • the server 10 includes an input unit 11, a calculation unit 12, an output unit 13, and a storage unit 14.
  • the input unit 11 accepts data input.
  • the calculation unit 12 performs predetermined calculation processing.
  • the output unit 13 outputs data.
  • the storage unit 14 stores data. Specific processing performed by each unit of the server 10 is appropriately performed when the configuration of the terminal device 20 is described below.
  • the terminal device 20 includes an input unit 21, a calculation unit 22, an output unit 23, and a storage unit 24.
  • the input unit 21 receives data input.
  • the calculation unit 22 performs predetermined calculation processing.
  • the output unit 23 outputs data.
  • the storage unit 24 stores data.
  • the input unit 21 includes an attribute information receiving unit 25 and an output data receiving unit 26.
  • the calculation unit 22 includes an evaluation unit 27.
  • the output unit 23 includes an output condition transmission unit 28.
  • the attribute information receiving unit 25 receives the attribute information of the own device (the power output device 30) from the power output device 30.
  • the configuration in which the terminal device 20 receives the attribute information from the power output device 30 is the same as in the first embodiment.
  • the terminal device 20 transmits the attribute information received from the power output device 30 to the server 10. Then, the server 10 determines an output condition according to the attribute information and transmits it to the terminal device 20. The terminal device 20 receives the output condition transmitted from the server 10. These processes are the same as those in the first embodiment.
  • the output condition transmitting unit 28 transmits the output condition determined according to the attribute information received by the attribute information receiving unit 25 to the power output apparatus 30 that has transmitted the attribute information.
  • the output data receiving unit 26 receives the output waveform data when the power output device 30 performs the power output operation (test operation) according to the output conditions. Specifically, the output data receiving unit 26 receives AC waveform data output from the power conditioner of the power output device 30. For example, the output data receiving unit 26 receives the waveform data from a measurement sensor installed at an arbitrary position where the AC waveform data can be measured.
  • the evaluation unit 27 evaluates the power output performance of the power output device 30 based on the output waveform data received by the output data receiving unit 26 and the output conditions (calculation of reliability).
  • the evaluation unit 27 performs predetermined processing on the output waveform data, and calculates values (measured values) such as active power, reactive power, voltage, frequency, and lamp. Then, the output unit 23 transmits these values to the server 10 as processing results.
  • the calculation unit 12 of the server 10 evaluates whether or not the power output device 30 can output the specified value based on the processing result and the output condition.
  • An example of the evaluation method is as described in the first embodiment.
  • the output unit 13 of the server 10 transmits the evaluation result to the terminal device 20.
  • “transmission of processing results from the terminal device 20 to the server 10” “evaluation of whether or not the power output device 30 can be output as specified by the server 10” and “evaluation from the server 10 to the terminal device 20” “Transmission of results” is not necessary.
  • the power output apparatus 30 transmits the attribute information of the own apparatus to the predetermined terminal apparatus 20 at an arbitrary timing (S201).
  • the terminal device 20 transmits the received attribute information to the server 10 (S202).
  • the server 10 determines a predetermined output condition based on the content of the attribute information (S203). For example, based on the information shown in FIGS. 4 and 5, the output condition corresponding to the model name of the power output device 30 included in the received attribute information is determined. In the output condition, a value of at least one item among active power, reactive power, voltage, frequency, and lamp is specified.
  • the server 10 transmits the determined output condition to the terminal device 20 (S204). Then, the terminal device 20 transmits the received output condition to the power output device 30 (S205).
  • the power output apparatus 30 performs a power output operation in accordance with the received output condition (S206).
  • the terminal device 20 measures the output during the power output operation of S206, and obtains output waveform data (AC waveform data) (S207).
  • the terminal device 20 performs a predetermined process on the received output waveform data, and calculates a value of a predetermined item (S208).
  • a measured value of at least one item among active power, reactive power, voltage, frequency, and lamp is calculated.
  • the terminal device 20 may calculate the power output performance of one or more power output devices 30 to be controlled and report it to the server 10. That is, when the terminal device 20 controls a plurality of power output devices 30, the terminal device 20 may calculate the reliability of the plurality of power output devices 30 as a whole.
  • the power output performance of one power output device 30 to be controlled or the power output performance of the entire plurality of power output devices 30 to be controlled can be considered as the power output performance that can be processed by the terminal device 20.
  • the server 10 stores the received information in association with each terminal device 20 (storage unit 14). This process is as described in the first embodiment.
  • the terminal device 20 may transmit the reliability to the server 10 in association with the power output device 30. Then, the server 10 may store the reliability in association with the power output device 30. In this case, the storage process in S210 may or may not be performed.
  • the terminal device 20 calculates the reliability of the power output device 30. For this reason, the inconvenience that load concentrates on the server 10 can be reduced.
  • FIG. 3 An example of a functional block diagram of the management system of this embodiment is shown in FIG. 3 or FIG.
  • the calculation unit 22 of the terminal device 20 is different from the first and second embodiments in that it includes an allocation unit (not shown).
  • an allocation unit not shown
  • the input unit 21 receives a power output request from the server 10.
  • output power M W
  • output time hour, minute, etc.
  • output time zone for example, from 15:00 to 16:00 on February 10, 2016
  • the calculation unit 22 determines the power output device 30 that outputs power in response to the output request from among the plurality of power output devices 30 to be controlled. Moreover, the calculating part 22 determines the control content (output power (W), the time slot
  • the calculation unit 22 determines the power output device 30 with higher reliability as the power output device 30 that preferentially outputs power (transmits a control signal). That is, the calculation unit 22 determines the power output device 30 having a relatively high reliability as compared with the other power output devices 30 as the power output device 30 that transmits the control signal. “Reliability is relatively high compared to other power output devices 30” means that the reliability is higher than a statistical value (eg, average value, median value) of reliability of a plurality of registered power output devices 30. It may mean.
  • the input unit 21 may receive state information (eg, SOC or the like) from each of the plurality of power output devices 30 to be controlled.
  • the input unit 21 may receive controllable information corresponding to each of the plurality of power output devices 30 to be controlled.
  • the controllable information includes a maximum power (W) that can be controlled on the terminal device 20 side, a controllable maximum power amount (Wh), a controllable time zone, and the like.
  • W maximum power
  • Wh controllable maximum power amount
  • controllable time zone a controllable time zone
  • the maximum power amount (Wh) that can be controlled on the terminal device 20 side is the sum of the maximum power amounts (Wh) of each of the plurality of power output devices 30. There may be.
  • the controllable information is determined by an administrator of each power output device 30 and transmitted to the terminal device 20 and the power output device 30.
  • the arithmetic unit 22 performs the determination process using at least one of the state information and the controllable information of each power output device 30 in addition to the reliability of each power output device 30. Also good. Also in this case, the calculation unit 22 determines the power output device 30 having higher reliability as the power output device 30 that outputs power (transmits a control signal) with priority.
  • the terminal device 20 is requested to output “3 kW, 1 hour (from 16:00 to 17:00 on February 10, 2016)”.
  • the calculation unit 22 causes the second power output device 30 having the highest reliability to output power preferentially.
  • the second power output device 30 is fully utilized, and the control content to be output in “2 kW, 1 hour (from 16:00 on February 10, 2016 to 17:00)” is determined.
  • the control content to be output to the third power output device 30 having the next highest reliability that is, “1 kW, 1 hour (February 10, 2016 from 16:00 to 17:00)” is determined.
  • the control of the first power output device 30 having the lowest reliability is unnecessary, and the first power output device 30 is not allowed to output.
  • the burden ratio of the power output device 30 with high reliability is increased.
  • the burden ratio of each power output device 30 may be determined in accordance with the reliability ratio (eg, the output is prorated by the reliability ratio). In the case of the above example, for example, 80% of 3 kW is output to the second power output device 30, 15% of 3 kW is output to the third power output device 30, and 3 kW is output to the first power output device 30. 5% may be output.
  • each power output device 30 depending on the current state (SOC, etc.) of each power output device 30 and the controllable content (eg, controllable maximum power (W), controllable maximum power amount (Wh), etc.) May be in a state where each power output device 30 cannot process the amount allocated to each power output device 30.
  • the maximum possible power is “2 kW”, which exceeds this amount. When such a part that cannot be processed occurs, the part may be allocated to the power output apparatus 30 having the next highest reliability.
  • the output unit 23 outputs each control content (output power (W), time zone to be output, etc.) determined by the calculation unit 22 to each of the power output devices 30 determined to output power by the calculation unit 22. Including control signals.
  • the power output device 30 outputs power in accordance with the received control signal (supplies power to the distribution network).
  • the server 10 transmits a power output request to the terminal device 20 (S301).
  • the output power M (W), the output time T (minute), and the like are determined by the output request.
  • the server 10 associates each terminal device 20 with the processing described in the first and second embodiments, and adds the total rated output and the total capacity of the power output devices 30 to be controlled by each terminal device 20. And the like, the content of the output request transmitted to each terminal device 20 can be determined using the information. That is, it is determined so as not to exceed the total of the rated output and the total of the capacity.
  • the server 10 sends, from each terminal device 20, the total free capacity of one or more controlled power output devices 30 of each terminal device 20, the total controllable maximum power, and the maximum controllable power. A total amount etc. may be received.
  • the terminal device 20 can calculate these pieces of information based on the state information (e.g., SOC) and controllable information.
  • the server 10 may determine the content of the output request
  • the terminal device 20 When receiving the output request, the terminal device 20 performs allocation processing (S302). Specifically, the terminal device 20 determines a power output device 30 that outputs power in response to the output request from among a plurality of power output devices 30 to be controlled. Moreover, the terminal device 20 determines the control content (output power (W), the time slot
  • the output power M ⁇ m (W), the output time T (minutes), and the like are determined for the second power output device 30, and the output power m (W) is determined for the third power output device 30. ), Output time T (minutes), and the like are determined. Then, the first power output device 30 does not output.
  • the terminal device 20 gives the control content (output power (W), time zone to be output, etc.) determined corresponding to each power output device 30 to each power output device 30 determined to output power. Including the control signal (S303, S304). In FIG. 11, control signals are transmitted to the second and third power output devices 30.
  • W output power
  • S303, S304 control signal
  • the power output device 30 that has received the control signal outputs power in accordance with the control signal (S305, S306).
  • the power output device 30 with high reliability that is, power with high ability to output according to specified values (values such as active power, reactive power, voltage, frequency, and lamp). It is possible to cause the output device 30 to preferentially perform output processing in response to a power output request. In such a case, output as requested can be expected. As a result, the reliability of services such as demand response is improved.
  • the power output device 30 with high reliability is used preferentially, and the burden on the power output device 30 is increased. Therefore, a predetermined incentive may be given to the power output apparatus 30 that outputs power.
  • the management system of the present embodiment is based on the configuration of the third embodiment, and differs in the control content determination method that the calculation unit 22 (allocation unit) determines according to each power output device 30.
  • FIG. 3 An example of a functional block diagram of the management system of this embodiment is shown in FIG. 3 or FIG. Similar to the third embodiment, the calculation unit 22 of the terminal device 20 differs from the first and second embodiments in that it includes an allocation unit (not shown). Hereinafter, differences from the third embodiment will be described.
  • the calculation unit 22 determines a power output device 30 that outputs power in response to an output request from the server 10 among the plurality of power output devices 30 to be controlled. Moreover, the calculating part 22 determines the control content (output power (W), the time slot
  • the computing unit 22 determines the power output device 30 with higher reliability as the power output device 30 that preferentially transmits a control signal (outputs power), as in the third embodiment.
  • the calculation unit 22 can determine the control content using the state information and controllable information described in the third embodiment. Also in this case, the calculation unit 22 determines the power output device 30 having higher reliability as the power output device 30 that preferentially transmits a control signal (outputs power).
  • the calculation unit 22 allocates M (W) of power to a plurality of power output devices 30 that transmit control signals. Thereafter, the calculation unit 22 calculates corrected power (W) obtained by correcting the power (W) allocated to each power output device 30 with reliability.
  • the output unit 23 transmits a control signal to be output with corrected power (W) to each power output device 30.
  • the terminal device 20 is requested to output “3 kW, 1 hour (from 16:00 to 17:00 on February 10, 2016)”.
  • the calculation unit 22 causes the second power output device 30 having the highest reliability to output power preferentially.
  • the second power output device 30 is fully utilized and the control content to be output in “2 kW, 1 hour (from 16:00 to 17:00 on February 10, 2016)” is determined.
  • the control content to be output to the third power output device 30 with the next highest reliability that is, “1 kW, 1 hour (February 10, 2016, 16:00 to 17:00)” is determined.
  • the control of the first power output device 30 having the lowest reliability is unnecessary, and the first power output device 30 is not allowed to output.
  • the calculation unit 22 corrects the power allocated to each power output device 30. Specifically, a value obtained by multiplying the allocated power (W) by the reciprocal of the reliability is calculated as corrected power (W). In this case, the smaller the reliability, the larger the corrected value.
  • the reliability of the second power output device 30 is “1.0”. Therefore, the corrected power is “2 kW”. On the other hand, the reliability of the third power output device 30 is “0.9”. For this reason, the corrected power is “1.1 kW”.
  • this allocation method is merely an example, and is not limited thereto.
  • the power output device 30 outputs power according to the received control signal (supplies power to the distribution network).
  • the server 10 transmits a power output request to the terminal device 20 (S401).
  • the output power M (W), the output time T (minute), and the like are determined by the output request.
  • the server 10 associates each terminal device 20 with the processing described in the first and second embodiments, and adds the total rated output and the total capacity of the power output devices 30 to be controlled by each terminal device 20. And the like, the content of the output request transmitted to each terminal device 20 can be determined using the information. That is, it is determined so as not to exceed the total of the rated output and the total of the capacity.
  • the server 10 sends, from each terminal device 20, the total free capacity of one or more controlled power output devices 30 of each terminal device 20, the total controllable maximum power, and the maximum controllable power. A total amount etc. may be received.
  • the terminal device 20 can calculate these pieces of information based on the state information (e.g., SOC) and controllable information.
  • the server 10 may determine the content of the output request
  • the terminal device 20 When receiving the output request, the terminal device 20 performs allocation processing (S402). Specifically, the terminal device 20 outputs the power in response to the output request from among the plurality of power output devices 30 to be controlled, or the output power M (W) indicated by the output request. Determine the allocation of Here, the output power M ⁇ m (W), the output time T (minutes), and the like are determined for the second power output device 30, and the output power m (W) is determined for the third power output device 30. ), Output time T (minutes), and the like are determined. Then, the first power output device 30 does not output.
  • the terminal device 20 calculates corrected power (W) obtained by multiplying the output power allocated to each power output device 30 by the reciprocal of the reliability of each power output device 30.
  • the terminal device 20 controls the power content determined for each power output device 30 (corrected power (W), time zone for output, etc.) for each power output device 30 determined to output power. (S403, S404). In FIG. 12, control signals are transmitted to the second and third power output apparatuses 30.
  • the power output apparatus 30 that has received the control signal outputs power in accordance with the control signal (S405, S406).
  • a control signal for outputting the power allocated to each power output device 30 with the corrected power (W) obtained by correcting the power allocated to each power output device 30 with the reliability of each power output device 30 is transmitted to each power output device 30. be able to. Then, each power output device 30 can output power according to the control signal.
  • FIG. 3 An example of a functional block diagram of the management system of this embodiment is shown in FIG. 3 or FIG.
  • the calculation unit 12 of the server 10 is different from the first and second embodiments in that it includes an allocation unit (not shown).
  • an allocation unit not shown
  • the input unit 11 receives an output request for predetermined power allocated to a predetermined terminal device 20.
  • output power M W
  • output time hour, minute, etc.
  • output time zone for example, from 15:00 to 16:00 on February 10, 2016
  • the server 10 associates each terminal device 20 with the processing described in the first and second embodiments, and adds the total rated output and the total capacity of the power output devices 30 to be controlled by each terminal device 20. And the like, the content of the output request transmitted to each terminal device 20 can be determined using the information. That is, it is determined so as not to exceed the total of the rated output and the total of the capacity.
  • the server 10 sends, from each terminal device 20, the total free capacity of one or more controlled power output devices 30 of each terminal device 20, the total controllable maximum power, and the maximum controllable power. A total amount etc. may be received.
  • the terminal device 20 can calculate these pieces of information based on the state information (e.g., SOC) and controllable information.
  • the server 10 may determine the content of the output request
  • the storage unit 14 stores a correspondence relationship between each terminal device 20 and the power output device 30 to be controlled by each terminal device 20.
  • the calculation unit 12 (allocation unit) specifies a plurality of power output devices 30 to be controlled by each terminal device 20 based on the correspondence relationship. Then, the power output device 30 that outputs power in response to the output request is determined from among the plurality of specified power output devices 30. Moreover, the calculating part 12 determines the control content (output power (W), the time zone to output, etc.) with respect to each power output device 30 determined to output electric power.
  • W output power
  • calculation unit 12 may calculate the corrected power (W) by the same process as the calculation unit 22 (allocation unit) described in the fourth embodiment.
  • the output unit 13 sends each control content (output power (W) or corrected) determined by the calculation unit 12 to each of the power output devices 30 determined to output power by the calculation unit 12 via the terminal device 20. Output power (W), time zone for output, etc.) are transmitted.
  • the power output device 30 outputs power in accordance with the received control signal (supplies power to the distribution network).
  • the server 10 receives a power output request assigned to each terminal device 20. Thereafter, the server 10 stores a plurality of control targets of each terminal device 20 based on “correspondence between each terminal device 20 and the power output device 30 to be controlled by each terminal device 20” stored in the storage unit 14. The power output device 30 is identified. Then, the power output device 30 that outputs power in response to the output request is determined from among the plurality of specified power output devices 30. Moreover, the calculating part 12 determines the control content (corrected electric power (W), the time slot
  • W corrected electric power
  • the server 10 transmits the control contents (corrected power (W), time zone for output, etc.) of each power output device 30 determined to output power to the terminal device 20 (S601).
  • the terminal device 20 Based on the received information, the terminal device 20 transmits a control signal that is output to the predetermined power output device 30 in accordance with the control content indicated by the received information (S602 and S603). In FIG. 13, control signals are transmitted to the second and third power output devices 30.
  • each power output device 30 that has received the control signal outputs power in accordance with the received control signal (S604 and S605).
  • the server 10 may transmit an output request assigned to the terminal device 20 to the first terminal device 20.
  • the first terminal device 20 performs the allocation process (S302 in FIG. 11 and S402 in FIG. 12) as described in the third and fourth embodiments, and sends a plurality of control signals according to the processing result. Transmit to the power output device 30.
  • the server 10 controls the power output device 30 to be controlled by the second terminal device 20 as described in the present embodiment.
  • the control content for each may be determined and transmitted to the second terminal device 20.
  • the second terminal device 20 outputs a control signal to be output according to the control content received from the server 10 to the predetermined power output device 30 based on the information received from the server 10. Transmit (S602 and S603 in FIG. 13).
  • Attribute information receiving means for receiving attribute information of the power output device from a power output device having a function of outputting power;
  • Output condition transmission means for transmitting the output condition determined according to the attribute information to the power output device;
  • Processing result receiving means for receiving a processing result obtained by performing predetermined processing on output waveform data when the power output device outputs power according to the output condition;
  • a control device comprising: an evaluation unit that calculates a reliability of the power output performance of the power output device based on the processing result and the output condition.
  • the output waveform data is AC waveform data
  • the processing result receiving means is a control for receiving at least one measurement value among active power, reactive power, voltage, frequency and amount of change in power within a predetermined time after performing predetermined processing on the AC waveform data. apparatus. 4).
  • the said evaluation means is a control apparatus which calculates reliability based on how much the said process result diverges from the said designated value. 5.
  • the control apparatus which further has an output means which transmits the said reliability of the said power output apparatus of the control object to the terminal device which controls operation
  • Allocating means for determining the power output device that outputs power in response to an output request based on the reliability corresponding to each power output device; Output means for transmitting a control signal to the power output device; Control device. 7).
  • the control device according to 6, The assigning means is a control device that determines the power output device having a relatively high reliability as compared with other power output devices as the power output device that transmits the control signal. 8).
  • the assigning unit is a control device that determines the power output device that transmits the control signal in order from the power output device having the highest reliability. 9.
  • the control device according to 6, The assigning means is a control device that increases the assigned output as the power output device with higher reliability. 10. 6.
  • the control device is a control device that determines the power output device that transmits the control signal based on at least one of state information and controllable information of the power output device in addition to the reliability. 11. 6. The control device according to 6, The allocating unit calculates corrected power obtained by correcting the power based on the reliability for each power output device, with respect to the power allocated to each of the power output devices, The said output means is a control apparatus which transmits the control signal regarding the said corrected electric power to the said electric power output apparatus. 12 6. The control device according to 6, The control unit that calculates the corrected power corrected so that the power increases as the reliability for each power output device decreases with respect to the power allocated to each of the power output devices. 13. 6.
  • the control device When the allocation unit requests a plurality of power output devices to output a total of M (W), the allocation unit allocates M (W) power to the plurality of power output devices that transmit the output request, and the power output Calculate corrected power (W) obtained by correcting the power (W) allocated to each device with the reliability,
  • the said output means is a control apparatus which transmits the control signal of the said electric power after correction
  • Attribute information receiving means for receiving attribute information of the power output device from a power output device having a function of outputting power; Output condition transmission means for transmitting the output condition determined according to the attribute information to the power output device; Output data receiving means for receiving output waveform data when the power output device outputs power according to the output condition;
  • a terminal device comprising: an evaluation unit that calculates reliability of the power output performance of the power output device based on the output waveform data and the output condition. 16. 15. The terminal device according to 15, In the output condition, a terminal device in which a value of at least one item among active power, reactive power, voltage, frequency, and amount of change in power within a predetermined time is specified. 17.
  • the output data receiving means receives AC waveform data as output waveform data, The output means transmits at least one measurement value among active power, reactive power, voltage, frequency, and amount of change in power within a predetermined time as the processing result. 18. 15. The terminal device according to 15, For each of the output conditions, a specified value of output is determined corresponding to each of the items, The evaluation unit is a terminal device that calculates reliability based on how far the processing result deviates from the specified value. 19.
  • the allocation unit determines the power output device having relatively high reliability as compared with other power output devices as the power output device that transmits the control signal.
  • the allocation unit is a terminal device that determines the power output device that transmits the control signal in order from the power output device with the highest reliability. 22.
  • the allocation means is a terminal device that increases the output allocated to the power output device with higher reliability. 23.
  • the allocation unit is a terminal device that determines the power output device that transmits the control signal based on at least one of state information and controllable information for each power output device in addition to the reliability.
  • the allocating unit calculates corrected power obtained by correcting the power based on the reliability for each power output device, with respect to the power allocated to each of the power output devices,
  • the output means is a terminal device that transmits a control signal related to the corrected power. 25.
  • the allocating unit allocates M (W) of power to the plurality of power output devices that transmit the control signal, and assigns the power to each of the power output devices. Calculate corrected power (W) obtained by correcting the allocated power (W) with the reliability, The terminal device that transmits the control signal to be output with the corrected power (W) to the power output device. 27.
  • Computer Attribute information receiving means for receiving attribute information of the power output device from a power output device having a function of outputting power;
  • An output condition transmitting means for transmitting an output condition determined according to the attribute information to the power output device;
  • Processing result receiving means for receiving a processing result obtained by performing predetermined processing on output waveform data when the power output device outputs power in accordance with the output condition;
  • Evaluation means for calculating the reliability of the power output performance of the power output device based on the processing result and the output condition; Program to function as. 30.
  • Computer Attribute information receiving means for receiving attribute information of the power output device from a power output device having a function of outputting power;
  • An output condition transmitting means for transmitting an output condition determined according to the attribute information to the power output device;
  • Output data receiving means for receiving output waveform data when the power output device outputs power in accordance with the output conditions;
  • Evaluation means for calculating the reliability of the power output performance of the power output device based on the output waveform data and the output conditions; Program to function as.

Abstract

電力を出力する機能を有する電力出力装置(30)から電力出力装置(30)の属性情報を受信する属性情報受信部(15)と、属性情報に応じて決定された出力条件を電力出力装置(30)に送信する出力条件送信部(18)と、電力出力装置(30)が出力条件に従い電力を出力した際の出力波形データに対して所定の処理を行った処理結果を受信する解析結果受信部(16)と、処理結果及び出力条件に基づき、電力出力装置(30)の電力出力性能の信頼度を算出する評価部(17)と、を有するサーバ(10)。

Description

端末装置、制御装置、サーバ、評価方法及びプログラム
 本発明は、端末装置、制御装置、サーバ、評価方法及びプログラムに関する。
 需要家側にある各種電力出力装置(例:蓄電池、発電装置等)は、HEMS(Home Energy Management System)や分電盤等のデバイスを経由して配電網に接続されている。電力会社は、各種電力出力装置の製造元から、各装置の製造元名、型名、定格容量、定格電力等に関する情報の提供を受け、連系規定に準拠した審査を各装置に対して行っていた。そして、このような審査を経た後に各装置を配電網に接続し、各装置をデマンドレスポンス等のサービス運用に利用してきた。
 関連する技術が、特許文献1及び2に開示されている。
 特許文献1には、1つ又は複数の蓄電池を管理するバッテリ管理装置であって、蓄電池の算出されたSOC(State Of Charge)の信頼度を表す指標であるSOC信頼度を算出するSOC信頼度算出部と、SOC信頼度算出部による算出結果に基づいて算出されたSOCを信頼できるか否かを判定するSOC信頼度判定部と、を有するバッテリ管理装置が開示されている。当該発明では、充放電を1サイクルとするサイクル数、経過時間、SOH(State Of Health)及び充放電積算量のいずれか1つのパラメータが蓄積される。そして、SOC信頼度算出部は、蓄積されたパラメータに基づきSOC信頼度を算出する。
 特許文献2には、車載蓄電池が接続され、当該車載蓄電池に対して充電又は放電を行う充放電手段と、複数種別の車載蓄電池毎の識別情報と、該当種別の車載蓄電池の所定の特性を示す特性情報を対応付けて記憶する記憶手段と、充放電手段に接続された対象車載蓄電池の識別情報である対象識別情報を外部から取得する情報取得手段と、記憶手段に記憶されている特性情報のうち対象識別情報に対応付けられている対象特性情報に基づいて、充放電手段に対して充電制御又は放電制御を実行する充放電制御手段と、を備える充放電制御装置が開示されている。
特開2013-29445号公報 特開2012-253976号公報
 今後、配電網に接続する電力出力装置が急増すると、全ての電力出力装置に対して上述のような審査(連系規定に準拠した審査等)を行うことが物理的に困難になると予想される。当該審査を経ずに配電網に接続可能となると、品質が劣悪である電力出力装置までも配電網に接続可能となる。また、電力出力装置の長期の使用により、品質が劣化する。このような品質が劣化した電力出力装置も、配電網に接続された状態となり得る。
 品質が劣悪又は劣化等している電力出力装置は、例えば、電力会社からの出力値(W)を指定した出力要請に従い出力動作を行っても、実際の出力が指定された出力値を下回る場合がある。このような状況が発生すると、デマンドレスポンス等のサービスの運用が困難になり得る。
 特許文献1に記載の技術は、SOH、すなわち一種の直流特性を評価している。しかし、特許文献1に記載の技術は、出力性能、すなわちパワーコンディショナーの性能評価を行うことができない。特許文献2に記載の技術も、上記問題を解決する手段を開示していない。
 本発明は、上記問題を解決する手段を提供することを課題とする。
 本発明によれば、
 電力を出力する機能を有する電力出力装置から前記電力出力装置の属性情報を受信する属性情報受信手段と、
 前記属性情報に応じて決定された出力条件を前記電力出力装置に送信する出力条件送信手段と、
 前記電力出力装置が前記出力条件に従い電力を出力した際の出力波形データに対して所定の処理を行った処理結果を受信する処理結果受信手段と、
 前記処理結果及び前記出力条件に基づき、前記電力出力装置の電力出力性能の信頼度を算出する評価手段と、を有する制御装置が提供される。
 本発明によれば、前記制御装置を有するサーバが提供される。サーバは、例えばクラウドなどにおけるサーバ(いわゆるクラウドサーバ)であってもよい。
 また、本発明によれば、
 電力を出力する機能を有する電力出力装置から前記電力出力装置の属性情報を受信する属性情報受信手段と、
 前記属性情報に応じて決定された出力条件を前記電力出力装置に送信する出力条件送信手段と、
 前記電力出力装置が前記出力条件に従い電力を出力した際の出力波形データを受信する出力データ受信手段と、
 前記出力波形データ及び前記出力条件に基づき、前記電力出力装置の電力出力性能の信頼度を算出する評価手段と、を有する端末装置が提供される。
 また、本発明によれば、
 コンピュータが、
 電力を出力する機能を有する電力出力装置から前記電力出力装置の属性情報を受信する属性情報受信工程と、
 前記属性情報に応じて決定された出力条件を前記電力出力装置に送信する出力条件送信工程と、
 前記電力出力装置が前記出力条件に従い電力を出力した際の出力波形データに対して所定の処理を行った処理結果を受信する処理結果受信工程と、
 前記処理結果及び前記出力条件に基づき、前記電力出力装置の電力出力性能の信頼度を算出する評価工程と、
を実行する評価方法が提供される。
 また、本発明によれば、
 コンピュータが、
 電力を出力する機能を有する電力出力装置から前記電力出力装置の属性情報を受信する属性情報受信工程と、
 前記属性情報に応じて決定された出力条件を前記電力出力装置に送信する出力条件送信工程と、
 前記電力出力装置が前記出力条件に従い電力を出力した際の出力波形データを受信する出力データ受信工程と、
 前記出力波形データ及び前記出力条件に基づき、前記電力出力装置の電力出力性能の信頼度を算出する評価工程と、
を実行する評価方法が提供される。
 また、本発明によれば、
 コンピュータを、
 電力を出力する機能を有する電力出力装置から前記電力出力装置の属性情報を受信する属性情報受信手段、
 前記属性情報に応じて決定された出力条件を前記電力出力装置に送信する出力条件送信手段、
 前記電力出力装置が前記出力条件に従い電力を出力した際の出力波形データに対して所定の処理を行った処理結果を受信する処理結果受信手段、
 前記処理結果及び前記出力条件に基づき、前記電力出力装置の電力出力性能の信頼度を算出する評価手段、
として機能させるプログラムが提供される。
 また、本発明によれば、
 コンピュータを、
 電力を出力する機能を有する電力出力装置から前記電力出力装置の属性情報を受信する属性情報受信手段、
 前記属性情報に応じて決定された出力条件を前記電力出力装置に送信する出力条件送信手段、
 前記電力出力装置が前記出力条件に従い電力を出力した際の出力波形データを受信する出力データ受信手段、
 前記出力波形データ及び前記出力条件に基づき、前記電力出力装置の電力出力性能の信頼度を算出する評価手段、
として機能させるプログラムが提供される。
 本発明によれば、配電網に接続される電力出力装置の出力性能を評価する技術が実現される。
 上述した目的、およびその他の目的、特徴および利点は、以下に述べる好適な実施の形態、およびそれに付随する以下の図面によってさらに明らかになる。
本実施形態の装置のハードウエア構成の一例を概念的に示す図である。 本実施形態の管理システムの全体像を説明するための図である。 本実施形態の管理システムの機能ブロック図の一例である。 本実施形態のサーバが管理する情報の一例を模式的に示す図である。 本実施形態のサーバが管理する情報の一例を模式的に示す図である。 本実施形態のサーバが管理する情報の一例を模式的に示す図である。 本実施形態の管理システムの処理の流れの一例を示すシーケンス図である。 本実施形態の管理システムの処理の流れの一例を示すシーケンス図である。 本実施形態の管理システムの機能ブロック図の一例である。 本実施形態の管理システムの処理の流れの一例を示すシーケンス図である。 本実施形態の管理システムの処理の流れの一例を示すシーケンス図である。 本実施形態の管理システムの処理の流れの一例を示すシーケンス図である。 本実施形態の管理システムの処理の流れの一例を示すシーケンス図である。
 まず、本実施形態の装置(端末装置、サーバ)のハードウエア構成の一例について説明する。本実施形態の装置が備える各部は、任意のコンピュータのCPU(Central Processing Unit)、メモリ、メモリにロードされるプログラム、そのプログラムを格納するハードディスク等の記憶ユニット(あらかじめ装置を出荷する段階から格納されているプログラムのほか、CD(Compact Disc)等の記憶媒体やインターネット上のサーバ等からダウンロードされたプログラムをも格納できる)、ネットワーク接続用インターフェイスを中心にハードウエアとソフトウエアの任意の組合せによって実現される。そして、その実現方法、装置にはいろいろな変形例があることは、当業者には理解されるところである。
 図1は、本実施形態の装置のハードウエア構成を例示するブロック図である。図1に示すように、装置は、プロセッサ1A、メモリ2A、入出力インターフェイス3A、周辺回路4A、バス5Aを有する。周辺回路には、様々なモジュールが含まれる。
 バス5Aは、プロセッサ1A、メモリ2A、周辺回路4A及び入出力インターフェイス3Aが相互にデータを送受信するためのデータ伝送路である。プロセッサ1Aは、例えばCPU(Central Processing Unit) やGPU(Graphics Processing Unit)などの演算処理装置である。メモリ2Aは、例えばRAM(Random Access Memory)やROM(Read Only Memory)などのメモリである。入出力インターフェイス3Aは、外部装置、外部サーバ、外部センサー等から情報を取得するためのインターフェイスなどを含む。プロセッサ1Aは、各モジュールに指令を出し、それらの演算結果をもとに演算を行う。
 本明細書において、「受信」とは、自装置が他の装置や記憶媒体に格納されているデータまたは情報を取りに行くこと(能動的な受信)、たとえば、他の装置にリクエストまたは問い合わせして受信すること、他の装置や記憶媒体にアクセスして読み出すこと等、および、自装置に他の装置から出力されるデータまたは情報を入力すること(受動的な受信)、たとえば、配信(または、送信、プッシュ通知等)されるデータまたは情報を受信すること等、の少なくともいずれか一方を含む。また、受信したデータまたは情報の中から選択して取得すること、または、配信されたデータまたは情報を選択して受信することも含む。
 以下、本実施の形態について説明する。なお、以下の実施形態の説明において利用する機能ブロック図は、ハードウエア単位の構成ではなく、機能単位のブロックを示している。これらの図においては、各装置は1つの機器により実現されるよう記載されているが、その実現手段はこれに限定されない。すなわち、物理的に分かれた構成であっても、論理的に分かれた構成であっても構わない。なお、同一の構成要素には同一の符号を付し、適宜説明を省略する。
<第1の実施形態>
 まず、図2を用いて、本実施形態の管理システムの全体像を説明する。図示するように、管理システムは、サーバ(制御装置)10と、端末装置20と、電力出力装置30とを有する。図示するように、サーバ10及び端末装置20はインターネット等のネットワーク40に繋がっており、互いに情報の送受信が可能となっている。また、端末装置20及び電力出力装置30間は、有線及び/又は無線で接続し、任意の通信規格で情報の送受信が可能となっている。
 電力出力装置30は、電力を出力し、配電網に電力を供給する機能を有する。電力出力装置30は、配電網から電力の供給を受け、エネルギーを蓄積する機能を有してもよい。電力出力装置30は、例えば、蓄電池や発電装置(例:自然エネルギーを用いて発電する発電装置)等が該当するが、これらに限定されない。各電力出力装置30は、例えば電力発電事業者や一般ユーザに管理される。
 端末装置20は、電力出力装置30の動作を制御したり、電力出力装置30から情報を収集してサーバ10に送信したりする機能を有する。図示するように、1つの電力出力装置30に対応して1つの端末装置20が設置されてもよいし、複数の電力出力装置30に対応して1つの端末装置20が設置されてもよい。また、端末装置20及び電力出力装置30は物理的に一体となって構成されてもよいし、分かれて構成されてもよい。
 サーバ10は、電力会社により管理される。サーバ10は、端末装置20を介して電力出力装置30の動作を制御し、デマンドレスポンス等のサービスを実行することができる。例えば、サーバ10は、端末装置20に対して、出力値(W)を指定した出力要請(配電網への電力供給要請)を行う。端末装置20は、配下の電力出力装置30を制御し、当該出力要請に応じた出力を行わせる。
 本実施形態の管理システムは、電力出力装置30の電力出力性能を評価する手段を有する。サーバ10及び端末装置20は、当該評価結果に基づき各電力出力装置30の動作を制御することで、サーバ10からの出力要請に準じた出力を実現できるようになる。以下、各装置の構成を詳細に説明する。
 図3に、本実施形態の管理システムの機能ブロック図の一例を示す。図示するように、端末装置20は、入力部21と、演算部22と、出力部23と、記憶部24とを有する。入力部21は、データの入力を受付ける。演算部22は、所定の演算処理を行う。出力部23は、データを出力する。記憶部24は、データを記憶する。端末装置20の各部が行う具体的な処理は、以下のサーバ10の構成の説明時に適宜行う。
 サーバ10は、入力部11と、演算部12と、出力部13と、記憶部14とを有する。入力部11は、データの入力を受付ける。演算部12は、所定の演算処理を行う。出力部13は、データを出力する。記憶部14は、データを記憶する。入力部11は、属性情報受信部15と、処理結果受信部16とを有する。演算部12は、評価部17を有する。出力部13は、出力条件送信部18を有する。
 属性情報受信部15は、電力出力装置30から自装置(当該電力出力装置30)の属性情報を受信する。属性情報受信部15は、端末装置20を介して、電力出力装置30から属性情報を受信する。属性情報は、例えば、製造元(製造メーカ)、型名、製造年月日等を含む。予め、各電力出力装置30にこのような属性情報が登録されている。そして、電力出力装置30は、所定のタイミングで、端末装置20に属性情報を送信する。端末装置20は、電力出力装置30から属性情報を受信すると(入力部21)、受信した属性情報をサーバ10に送信する(出力部23)。
 例えば、電力出力装置30を配電網に新たに接続する際、そのための準備として、電力出力装置30と任意の端末装置20とを互いに通信可能にする。また、当該電力出力装置30を当該端末装置20の制御対象として設定する。このような準備により、端末装置20は、当該電力出力装置30の動作を制御可能となる。制御される動作は、電力出力装置30が備えるパワーコンディショナーから配電網への電力出力や、配電網から上記パワーコンディショナーへの電力取込等である。
 電力出力装置30から端末装置20に属性情報を送信するタイミングは設計的事項である。例えば、上記制御対象としての設定が完了した後、任意のタイミングで、電力出力装置30は端末装置20に属性情報を送信してもよい。例えば、オペレータによる端末装置20や電力出力装置30への所定の操作に応じて、電力出力装置30は端末装置20に自装置の属性情報を送信してもよい。その他、上記制御対象としての設定の完了に応じ、その後の所定のタイミングで、端末装置20が電力出力装置30に属性情報を要求してもよい。そして、電力出力装置30は当該要求に応じて端末装置20に自装置の属性情報を送信してもよい。
 属性情報の送信は、電力出力装置30を配電網に新たに接続する際に限定されない。例えば、配電網に接続された後、定期的に(例:1年に1回、3カ月に1回等)、予め定められた所定のタイミングで、電力出力装置30は端末装置20に自装置の属性情報を送信してもよい。
 出力条件送信部18は、属性情報受信部15が受信した属性情報に応じて決定された出力条件を、端末装置20を介して電力出力装置30に送信する。
 出力条件では、例えば、有効電力、無効電力、電圧、周波数及び所定時間内における電力の変化量(ランプ)の中の少なくとも1つの項目の値(指定値)が指定されている。詳細は以下で説明するが、電力出力装置30は、当該出力条件に従い、電力の出力動作(テスト動作)を行う。そして、当該出力条件と、当該出力条件に従った電力出力装置30の出力結果とに基づき、電力出力装置30の出力性能が評価される。
 本実施形態では、記憶部14が、複数の出力条件を予め保持している。そして、演算部12は、端末装置20から送信されてきた属性情報をキーとして記憶部14を検索し、記憶部14に予め保持されている複数の出力条件の中から、受信した属性情報に対応する出力条件を取り出す。出力条件送信部18は、このようにして演算部12により取り出された出力条件を、端末装置20を介して電力出力装置30に送信する。
 ここで、図4及び図5に、記憶部14が記憶する情報の一例を模式的に示す。図4は、複数の出力条件の詳細が登録された出力条件情報である。出力条件ID(identifier)に対応付けて、有効電力、無効電力、電圧、周波数及びランプ各々の値(指定値)が対応付けられている。
 図5は、電力出力装置30の型名と、各々に適用される出力条件のIDとを互いに対応付けた情報である。なお、1つの出力条件は1つの電力出力装置30のみに適用されてもよいし、複数の電力出力装置30に適用されてもよい。出力条件は、例えば、電力出力装置30のパワーコンディショナーの能力に応じたものとすることができる。かかる場合、同じ又は同等の能力のパワーコンディショナーを備える複数の電力出力装置30に対して、同じ出力条件が適用されることとなる。
 図3に戻り、処理結果受信部16は、電力出力装置30が出力条件に従い電力を出力した際の出力波形データに対して所定の処理を行った処理結果を受信する。処理結果受信部16は、端末装置20から処理結果を受信する。
 出力条件を受信した電力出力装置30は、出力条件に従った電力の出力動作(テスト動作)を行う。すなわち、電力出力装置30は、出力条件で定められている1つ又は複数の項目各々の指定値で電力を出力するよう、出力動作を行う。
 すると、端末装置20は、電力出力装置30が出力条件に従い電力を出力した際の出力波形データを受信する(入力部21)。具体的には、端末装置20は、電力出力装置30のパワーコンディショナーから出力された交流波形データ(例:電流波形データ)を受信する。例えば、端末装置20は、当該交流波形データを測定可能な任意の位置に設置された測定センサーから、上記交流波形データを受信する。なお、端末装置20と電力出力装置30が接続するパワーコンディショナーとは同じ電力線に接続されている。このため、端末装置20はパワーコンディショナーから出力される出力波形(交流波形データ)を受信してもよい。
 その後、端末装置20は、受信した交流波形データに対して所定の演算処理を行う(演算部22)。この演算処理の結果、有効電力、無効電力、電圧、周波数、ランプ等の値(測定値)が得られる。端末装置20は、これらの値を処理結果として、サーバ10に送信する(出力部23)。
 評価部17は、処理結果及び出力条件に基づき、電力出力装置30の電力出力性能を評価する。評価部17は、処理結果及び出力条件に基づき、電力出力装置30の電力出力性能の信頼度を算出する。すなわち、指定値通りに出力できるか否か、指定値からどの程度乖離するかの目安等に基づき、信頼度を評価する。以下、評価方法の一例を説明する。
 例えば、サーバ10は、出力条件ごとに、正常な(劣化、故障などしていない)電力出力装置30が出力条件に従い電力の出力動作を行った場合、各項目の値(測定値)がどの程度の範囲に収まるかを示した参照情報を保持しておいてもよい(記憶部14)。図6に参照情報の一例を模式的に示す。図では、1つの出力条件に対応付けて、その出力条件を適用される1つまたは複数の電力出力装置30各々の出力結果の許容範囲が定義されている。図6に示すような参照情報が、出力条件ごとに用意される。
 評価部17は、処理結果で示される各項目の測定値が、出力条件及び電力出力装置30(の型名)に対応した許容範囲内に含まれているか確認する(図6参照)。含まれている場合、評価部17は、その電力出力装置30は指定値通りに出力できると評価する。一方、含まれていない場合、評価部17は、その電力出力装置30は指定値通りに出力できないと評価する。
 ここでの含まれている場合とは、複数の項目全ての測定値が許容範囲内に含まれる場合や、複数の項目の中の所定数以上又は所定割合以上の測定値が許容範囲内に含まれる場合等と定義できる。
 指定値通りに出力できないと評価した場合、評価部17は、指定値からどの程度乖離するかの目安(信頼度)を算出してもよい。例えば、評価部17は、項目ごとに、信頼度(=(測定値)/(指定値))を算出してもよい。そして、評価部17は、複数の項目ごとに算出した信頼度の統計値(例:平均値、最大値、最小値、最頻値、中央値等)を、その電力出力装置30の信頼度としてもよい。例えば、有効電力、無効電力、電圧及びランプの中の少なくとも2つの項目の信頼度の統計値を、その電力出力装置30の信頼度としてもよい。これは、電力出力装置30に指定値を与えた場合、出力は、指定値と信頼度との積程度まで、指定値から乖離する(値が低下する)可能性があることを示す。
 なお、信頼度=(測定値)/(指定値)の式で信頼度を算出する場合、指定値通りに出力できると評価された電力出力装置30の信頼度は「1」とすることができる。
 評価部17による評価処理の変形例として、評価部17は、上述した「処理結果で示される各項目の測定値が出力条件及び電力出力装置30に対応した許容範囲内に含まれているか確認する処理」を行わず、すべての電力出力装置30に対して、信頼度=(測定値)/(指定値)の式を用いた上記手法で信頼度を算出してもよい。
 出力部13は、評価部17による評価結果(信頼度)を端末装置20に送信する。これにより、端末装置20は、制御対象の電力出力装置30の出力性能を知ることができる。端末装置20の記憶部24は、制御対象の電力出力装置30の出力性能を記憶することができる。なお、評価部17による評価結果は、サーバ10の記憶部14に記憶されてもよい。
 他の例として、出力部13は、評価部17による評価結果を端末装置20に送信しなくてもよい。この場合、評価部17による評価結果は、サーバ10の記憶部14に記憶される。
 なお、電力出力装置30が、配電網に接続された後、定期的に(例:1年に1回、3カ月に1回等)、予め定められた所定のタイミングで、自装置の属性情報を送信する場合、サーバ10は、属性情報の受信に応じて、定期的に、電力出力装置30の電力出力性能を評価(信頼度を算出)してもよい。これにより、経年劣化による電力出力性能の低下や、故障などの何らかのトラブルによる出力性能の低下を、サーバ10や端末装置20で検知することが可能となる。
 配電網に接続後も繰り返し電力出力性能の評価が行なわれる例の場合、記憶部14は、各電力出力装置30の過去の評価結果を、評価タイミングと対応付けて蓄積してもよい。そして、評価部17は、過去の評価結果を利用して、電力出力装置30の電力出力性能を評価してもよい。
 例えば、任意のタイミング(例:一番最初の評価タイミング)からの経過時間と、そのタイミングでの評価結果(信頼度)とを対応付けた教師データを用いて機械学習を行い、任意のタイミングでの評価結果の予測モデルを生成してもよい。そして、評価部17は、当該予測モデルを用いて、次回の評価タイミングでの評価結果を推定してもよい。その後、評価部17は、推定した次回の評価タイミングの評価結果と、今回新たに受信された処理結果に基づく評価結果とに基づき、電力出力装置30の今回の評価結果を算出してもよい。例えば、これら2つの評価結果の平均値を評価結果としてもよい。
 次に、図7のシーケンス図を用いて、本実施形態の管理システムの処理の流れの一例を説明する。
 まず、電力出力装置30は、任意のタイミングで、自装置の属性情報を所定の端末装置20に送信する(S101)。端末装置20は、受信した属性情報をサーバ10に送信する(S102)。
 サーバ10は、属性情報を受信すると、属性情報の内容に基づき、所定の出力条件を決定する(S103)。例えば、図4及び図5に示す情報に基づき、受信した属性情報に含まれる電力出力装置30の型名に対応した出力条件を決定する。出力条件では、有効電力、無効電力、電圧、周波数及びランプの中の少なくとも1つの項目の値が指定されている。
 その後、サーバ10は、決定した出力条件を端末装置20に送信する(S104)。すると、端末装置20は、受信した出力条件を電力出力装置30に送信する(S105)。
 その後、電力出力装置30は、受信した出力条件に従い、電力の出力動作(テスト動作)を行う(S106)。端末装置20は、S106の電力のテスト動作の出力を測定し、出力波形データ(交流波形データ)を得る(S107)。次いで、端末装置20は、受信した出力波形データに対して所定の処理を行い、所定項目の値を算出する(S108)。ここでは、有効電力、無効電力、電圧、周波数及びランプの中の少なくとも1つの項目の測定値が算出される。
 その後、端末装置20は、算出した値を処理結果として、サーバ10に送信する(S109)。サーバ10は、受信した処理結果に基づき、電力出力装置30の電力出力性能を評価する(S110)。具体的には、サーバ10は、上述の方法で電力出力装置30の信頼度を算出する。図示しないが、サーバ10は、算出した信頼度を、電力出力装置30に対応付けて記憶してもよい(記憶部14)。
 その後、サーバ10は、評価結果(信頼度)を端末装置20に送信する(S111)。端末装置20は、評価結果(信頼度)を、電力出力装置30に対応付けて記憶する(S112)(記憶部24)。
 図示しないが、評価結果(信頼度)を受信した後、端末装置20は、制御対象の1つ又は複数の電力出力装置30全体での電力出力性能を算出し、サーバ10に報告してもよい。すなわち、端末装置20が複数の電力出力装置30を制御する場合、端末装置20は複数の電力出力装置30全体での信頼度を算出してもよい。制御対象の1つの電力出力装置30の電力出力性能又は制御対象の複数の電力出力装置30全体での電力出力性能は、端末装置20で処理できる電力出力性能と考えることができる。この場合、サーバ10は、各端末装置20に対応付けて、受信した情報を記憶する(記憶部14)。
 例えば、端末装置20は、制御対象の1つ又は複数の電力出力装置30の定格出力(W)の合計や、容量の合計等を算出し、サーバ10に報告してもよい。なお、定格出力(W)の合計は、「指定値通りに出力できると評価された電力出力装置30の定格出力(W)」と、「指定値通りに出力できないと評価された電力出力装置30の定格出力(W)に上記信頼度(=(測定値)/(指定値))を掛けた値」との合計として求めてもよい。
 次に、図8のシーケンス図を用いて、本実施形態の管理システムの処理の流れの他の一例を説明する。当該例は、図7の例で存在した「サーバ10から端末装置20への信頼度の送信処理(S111)」、及び、「端末装置20への信頼度の記憶処理(S112)」を有さない点、また、「サーバ10への信頼度の記憶処理(S511)」を有する点で相違する。その他は、図7の例と同様である。
 図7の例の場合、端末装置20が、制御対象の1つ又は複数の電力出力装置30の信頼度を管理(記憶)する。図8の例の場合、サーバ10が、制御対象の1つ又は複数の電力出力装置30の信頼度を管理(記憶)する。なお、図7の例の場合、端末装置20に加えて、サーバ10も、電力出力装置30の信頼度を管理(記憶)してもよい。
 以上説明した本実施形態によれば、サーバ10及び端末装置20は、配電網に接続されている電力出力装置30の電力出力性能(信頼度)を評価し、把握することができる。この信頼度に基づき、当該電力出力装置30を用いたデマンドレスポンスなどのサービスを行うことで、当該サービスの品質を保つことができる。
 なお、上述した、信頼度=(測定値)/(指定値)の式はあくまで一例であり、これに準じた式を採用することもできる。
 また、ここでは、端末装置20が出力波形データに対して所定の処理を行って有効電力、無効電力、電圧、周波数、ランプ等の値(測定値)を算出し、これらの値を処理結果としてサーバ10に送信する例を説明した。変形例として、端末装置20は、出力波形データに対してAD変換(所定の処理)を行い、その結果(デジタル波形データ)をサーバ10に送信してもよい。そして、サーバ10が受信したデジタル波形データを解析し、有効電力、無効電力、電圧、周波数、ランプ等の値(測定値)を算出してもよい。当該前提は、以下のすべての実施形態において同様である。
<第2の実施形態>
 本実施形態の管理システムは、電力出力装置30の電力出力性能の評価を端末装置20が行う点で、第1の実施形態と異なる。本実施形態の管理システムの全体像は、第1の実施形態と同様である。
 図9に、本実施形態の管理システムの機能ブロック図の一例を示す。図示するように、サーバ10は、入力部11と、演算部12と、出力部13と、記憶部14とを有する。入力部11は、データの入力を受付ける。演算部12は、所定の演算処理を行う。出力部13は、データを出力する。記憶部14は、データを記憶する。サーバ10の各部が行う具体的な処理は、以下の端末装置20の構成の説明時に適宜行う。
 端末装置20は、入力部21と、演算部22と、出力部23と、記憶部24とを有する。入力部21は、データの入力を受付ける。演算部22は、所定の演算処理を行う。出力部23は、データを出力する。記憶部24は、データを記憶する。入力部21は、属性情報受信部25と、出力データ受信部26とを有する。演算部22は、評価部27を有する。出力部23は、出力条件送信部28を有する。
 属性情報受信部25は、電力出力装置30から自装置(該電力出力装置30)の属性情報を受信する。端末装置20が電力出力装置30から属性情報を受信する構成は、第1の実施形態と同様である。
 端末装置20は、電力出力装置30から受信した属性情報を、サーバ10に送信する。すると、サーバ10は、属性情報に応じた出力条件を決定し、端末装置20に送信する。そして、端末装置20は、サーバ10から送信されてきた出力条件を受信する。これらの処理は、第1の実施形態と同様である。
 出力条件送信部28は、属性情報受信部25が受信した属性情報に応じて決定された出力条件を、当該属性情報を送信してきた電力出力装置30に送信する。
 出力データ受信部26は、電力出力装置30が出力条件に従った電力の出力動作(テスト動作)を行った際の出力波形データを受信する。具体的には、出力データ受信部26は、電力出力装置30のパワーコンディショナーから出力された交流波形データを受信する。例えば、出力データ受信部26は、当該交流波形データを測定可能な任意の位置に設置された測定センサーから、上記波形データを受信する。
 評価部27は、出力データ受信部26が受信した出力波形データ、及び、出力条件に基づき、電力出力装置30の電力出力性能を評価する(信頼度の算出)。
 まず、評価部27は、出力波形データに対して所定の処理を行い、有効電力、無効電力、電圧、周波数、ランプ等の値(測定値)を算出する。すると、出力部23は、これらの値を処理結果として、サーバ10に送信する。
 サーバ10の演算部12は、処理結果及び出力条件に基づき、電力出力装置30が指定値通りに出力できるか否かを評価する。当該評価方法の一例は、第1の実施形態で説明した通りである。
 そして、サーバ10の出力部13は、その評価結果を端末装置20に送信する。サーバ10から受信した評価結果が、その電力出力装置30は指定値通りに出力できるという評価結果である場合、評価部27は、その電力出力装置30の信頼度を「1(=100%)」として決定する。
 一方、サーバ10から受信した評価結果が、その電力出力装置30は指定値通りに出力できないという評価結果である場合、評価部27は、指定値からどの程度乖離するかの目安(信頼度)を算出する。例えば、評価部27は、信頼度=(測定値)/(指定値)の式に基づき信頼度を算出する。
 なお、評価処理の変形例として、評価部27は、すべての電力出力装置30に対して、信頼度=(測定値)/(指定値)の式を用いた上記手法で信頼度を算出してもよい。この場合、「端末装置20からサーバ10への処理結果の送信」、「サーバ10による電力出力装置30が指定値通りに出力できるか否かの評価」及び「サーバ10から端末装置20への評価結果の送信」は不要となる。
 次に、図10のシーケンス図を用いて、本実施形態の管理システムの処理の流れの一例を説明する。ここでは、上記変形例の処理の流れの一例を説明する。
 まず、電力出力装置30は、任意のタイミングで、自装置の属性情報を所定の端末装置20に送信する(S201)。端末装置20は、受信した属性情報をサーバ10に送信する(S202)。
 サーバ10は、属性情報を受信すると、属性情報の内容に基づき、所定の出力条件を決定する(S203)。例えば、図4及び図5に示す情報に基づき、受信した属性情報に含まれる電力出力装置30の型名に対応した出力条件を決定する。出力条件では、有効電力、無効電力、電圧、周波数及びランプの中の少なくとも1つの項目の値が指定されている。
 その後、サーバ10は、決定した出力条件を端末装置20に送信する(S204)。すると、端末装置20は、受信した出力条件を電力出力装置30に送信する(S205)。
 その後、電力出力装置30は、受信した出力条件に従い、電力出力動作を行う(S206)。端末装置20は、S206の電力出力動作時の出力を測定し、出力波形データ(交流波形データ)を得る(S207)。次いで、端末装置20は、受信した出力波形データに対して所定の処理を行い、所定項目の値を算出する(S208)。ここでは、有効電力、無効電力、電圧、周波数及びランプの中の少なくとも1つの項目の測定値が算出される。
 その後、端末装置20は、算出した値及び出力条件に基づき、電力出力装置30の電力出力性能(信頼度)を評価する(S209)。具体的には、端末装置20は、信頼度=(測定値)/(指定値)の式を用いて信頼度を算出する。その後、端末装置20は、信頼度を、電力出力装置30に対応付けて記憶する(S210)。
 なお、図示しないが、S209の後、端末装置20は、制御対象の1つ又は複数の電力出力装置30全体での電力出力性能を算出し、サーバ10に報告してもよい。すなわち、端末装置20が複数の電力出力装置30を制御する場合、端末装置20は複数の電力出力装置30全体での信頼度を算出してもよい。制御対象の1つの電力出力装置30の電力出力性能又は制御対象の複数の電力出力装置30全体での電力出力性能は、端末装置20で処理できる電力出力性能と考えることができる。この場合、サーバ10は、各端末装置20に対応付けて、受信した情報を記憶する(記憶部14)。当該処理は、第1の実施形態で説明した通りである。
 また、図示しないが、端末装置20は、電力出力装置30に対応付けて信頼度をサーバ10に送信してもよい。そして、サーバ10が、電力出力装置30に対応付けて信頼度を記憶してもよい。この場合、S210の記憶処理はあってもよいし、なくてもよい。
 以上、説明した本実施形態によれば、第1の実施形態と同様な作用効果を実現できる。また、本実施形態によれば、端末装置20が電力出力装置30の信頼度を算出する。このため、サーバ10に負荷が集中する不都合を軽減できる。
<第3の実施形態>
 本実施形態では、第1及び第2の実施形態で説明した処理により、電力出力装置30の信頼度が端末装置20に記憶されていることを前提とする。そして、当該前提のもと、当該信頼度を用いた出力制御処理を説明する。
 本実施形態の管理システムの機能ブロック図の一例は、図3又は図9で示される。端末装置20の演算部22は、割当部(不図示)を有する点で、第1及び第2の実施形態と異なる。以下、第1及び第2の実施形態と異なる点を説明する。
 入力部21は、サーバ10から、電力の出力要請を受信する。出力要請では、出力電力M(W)、出力時間(時間、分等)、出力する時間帯(例:2016年2月10日15時00分から16時00分まで)等が定められる。
 演算部22(割当部)は、制御対象の複数の電力出力装置30の中から、上記出力要請に応じて電力を出力させる電力出力装置30を決定する。また、演算部22は、電力を出力させると決定した電力出力装置30各々に対する制御内容(出力電力(W)、出力させる時間帯等)を決定する。
 演算部22は、信頼度がより高い電力出力装置30を、優先的に、電力を出力させる(制御信号を送信する)電力出力装置30として決定する。すなわち、演算部22は、他の電力出力装置30と比べて相対的に信頼度が高い電力出力装置30を、制御信号を送信する電力出力装置30として決定する。「他の電力出力装置30と比べて相対的に信頼度が高い」とは、登録されている複数の電力出力装置30の信頼度の統計値(例:平均値、中央値)より高いことを意味してもよい。
 なお、入力部21は、制御対象の複数の電力出力装置30各々から状態情報(例:SOC等)を受信してもよい。その他、入力部21は、制御対象の複数の電力出力装置30各々に対応する制御可能情報を受信してもよい。制御可能情報は、端末装置20側で制御可能な最大電力(W)、制御可能な最大電力量(Wh)、及び、制御可能な時間帯等が定められる。なお、端末装置20が複数の電力出力装置30を制御する場合、端末装置20側で制御可能な最大電力(W)は、複数の電力出力装置30各々の最大電力(W)の合計であってもよい。また、端末装置20が複数の電力出力装置30を制御する場合、端末装置20側で制御可能な最大電力量(Wh)は、複数の電力出力装置30各々の最大電力量(Wh)の合計であってもよい。当該制御可能情報は、電力出力装置30各々の管理者により決定され、端末装置20や電力出力装置30に送信される。
 そして、演算部22は、各電力出力装置30の信頼度に加えて、各電力出力装置30の上記状態情報及び上記制御可能情報の中の少なくとも一つを利用して、上記決定処理を行ってもよい。この場合も、演算部22は、信頼度がより高い電力出力装置30を、優先的に、電力を出力させる(制御信号を送信する)電力出力装置30として決定する。
 ここで、上記決定処理の具体例を示す。例えば、ある端末装置20の制御対象として、第1乃至第3の電力出力装置30があったとする。各々の詳細は以下の通りであり、端末装置20に与えられているとする。
「第1の電力出力装置30」
信頼度:0.8
制御可能な最大電力:2kW
制御可能な最大電力量:4kWh
制御可能な時間帯:常時
現在の空き容量:5kWh
「第2の電力出力装置30」
信頼度:1.0
制御可能な最大電力:2kW
制御可能な最大電力量:2.5kWh
制御可能な時間帯:常時
現在の空き容量:3kWh
「第3の電力出力装置30」
信頼度:0.9
制御可能な最大電力:3kW
制御可能な最大電力量:3kWh
制御可能な時間帯:常時
現在の空き容量:4kWh
 そして、上記端末装置20に対して、「3kW、1時間(2016年2月10日16時から17時)」の出力要請があったとする。
 この場合、演算部22は、優先的に、信頼度が最も高い第2の電力出力装置30に電力を出力させる。ここでは、第2の電力出力装置30をフルで活用し、「2kW、1時間(2016年2月10日16時から17時)」で出力させる制御内容を決定する。そして、次に信頼度が高い第3の電力出力装置30に、残り分、すなわち「1kW、1時間(2016年2月10日16時から17時)」で出力させる制御内容を決定する。この場合、最も信頼度が低い第1の電力出力装置30の制御は不要であり、第1の電力出力装置30には出力させない。
 なお、ここでは、信頼度が高い方から順にフルで活用する例を説明したが、この割り振り方はあくまで一例であり、これに限定されない。
 例えば、信頼度の順位に応じた負担割合を決定してもよい。この場合、信頼度が高い電力出力装置30の負担割合を大きくする。一例として、各電力出力装置30の負担割合を信頼度の比率に応じて決定してもよい(例:出力を信頼度の比率で按分)。上記例の場合、例えば、第2の電力出力装置30に3kWの80%分を出力させ、第3の電力出力装置30に3kWの15%分を出力させ、第1の電力出力装置30に3kWの5%分を出力させてもよい。
 なお、この例の場合、各電力出力装置30の現在の状態(SOC等)や、制御可能な内容(例:制御可能な最大電力(W)、制御可能な最大電力量(Wh)等)によっては、各電力出力装置30に割り振った分を各電力出力装置30が処理できない状態となる可能性がある。例えば、上記例の場合、第2の電力出力装置30に2.4kW(=3kW×80%)で1時間の出力をさせることになるが、上述の通り、第2の電力出力装置30で制御可能な最大電力は「2kW」であり、この分を超えている。このような処理できない分が発生した場合、その分を、次に信頼度が高い電力出力装置30に割り振ることとしてもよい。
 出力部23は、演算部22により電力を出力させると決定された電力出力装置30各々に対して、演算部22が決定した各々の制御内容(出力電力(W)、出力させる時間帯等)を含む制御信号を送信する。電力出力装置30は、受信した制御信号に従い、電力を出力する(配電網に電力を供給する)。
 次に、図11のシーケンス図を用いて、本実施形態の管理システムの処理の流れの一例を説明する。
 まず、サーバ10は、端末装置20に電力の出力要請を送信する(S301)。図示する例では、出力要請で、出力電力M(W)及び出力時間T(分)等が定められている。
 なお、サーバ10は、第1及び第2の実施形態で説明した処理により、各端末装置20に対応付けて、各端末装置20の制御対象の電力出力装置30の定格出力の合計や容量の合計等を記憶している場合、当該情報を用いて、各端末装置20に送信する出力要請の内容を決定することができる。すなわち、定格出力の合計や容量の合計を超えないように決定する。
 その他、サーバ10は、各端末装置20から、各端末装置20の1つ又は複数の制御対象の電力出力装置30の空き容量の合計や、制御可能な最大電力の合計や、制御可能な最大電力量の合計等を受信してもよい。端末装置20は、上記状態情報(例:SOC等)や制御可能情報等に基づきこれらの情報を算出することができる。そして、サーバ10は、これらの情報を用いて、各端末装置20に送信する出力要請の内容を決定してもよい。すなわち、空き容量の合計、制御可能な最大電力の合計、制御可能な最大電力量の合計等を超えないように決定する。
 端末装置20は、出力要請を受信すると、割当処理を行う(S302)。具体的には、端末装置20は、制御対象の複数の電力出力装置30の中から、上記出力要請に応じて電力を出力させる電力出力装置30を決定する。また、端末装置20は、電力を出力させると決定した電力出力装置30各々に対する制御内容(出力電力(W)、出力させる時間帯等)を決定する。ここでは、第2の電力出力装置30に対して、出力電力M-m(W)、出力時間T(分)等が決定され、第3の電力出力装置30に対して、出力電力m(W)、出力時間T(分)等が決定されている。そして、第1の電力出力装置30には出力させない。
 その後、端末装置20は、電力を出力させると決定した電力出力装置30各々に対して、各電力出力装置30に対応して決定した制御内容(出力電力(W)、出力させる時間帯等)を含む制御信号を送信する(S303、S304)。図11では、第2及び第3の電力出力装置30に制御信号が送信されている。
 その後、制御信号を受信した電力出力装置30は、制御信号に従い、電力を出力する(S305、S306)。
 以上、説明した本実施形態によれば、信頼度の高い電力出力装置30、すなわち、指定された値(有効電力、無効電力、電圧、周波数、ランプ等の値)通りに出力する能力の高い電力出力装置30に対して、優先的に、電力の出力要請に応じた出力処理を行わせることができる。かかる場合、出力要請通りの出力が期待できる。結果、デマンドレスポンス等のサービスの信頼度が向上する。
 ところで、本実施形態の場合、信頼度の高い電力出力装置30が優先的に利用されることになり、このような電力出力装置30の負担が大きくなってしまう。そこで、電力を出力させた電力出力装置30に対して、所定のインセンティブを与えてもよい。
<第4の実施形態>
 本実施形態の管理システムは、第3の実施形態の構成を基本とし、演算部22(割当部)が各電力出力装置30に応じて決定する制御内容の決定方法において異なる。
 本実施形態の管理システムの機能ブロック図の一例は、図3又は図9で示される。第3の実施形態同様、端末装置20の演算部22は割当部(不図示)を有する点で、第1及び第2の実施形態と異なる。以下、第3の実施形態と異なる点を説明する。
 演算部22(割当部)は、制御対象の複数の電力出力装置30の中から、サーバ10からの出力要請に応じて電力を出力させる電力出力装置30を決定する。また、演算部22は、電力を出力させると決定した電力出力装置30各々に対する制御内容(出力電力(W)、出力させる時間帯等)を決定する。
 演算部22は、第3の実施形態同様、信頼度がより高い電力出力装置30を、優先的に、制御信号を送信する(電力を出力させる)電力出力装置30として決定する。
 また、演算部22は、信頼度に加えて、第3の実施形態で説明した状態情報や制御可能情報を利用して、制御内容を決定することができる。この場合も、演算部22は、信頼度がより高い電力出力装置30を、優先的に、制御信号を送信する(電力を出力させる)電力出力装置30として決定する。
 演算部22は、サーバ10からM(W)の出力要請があった場合、制御信号を送信する複数の電力出力装置30にM(W)分の電力を割り振る。その後、演算部22は、電力出力装置30各々に割り振った電力(W)を信頼度で補正した補正後電力(W)を算出する。
 そして、出力部23は、補正後電力(W)で出力させる制御信号を各電力出力装置30に送信する。
 ここで、補正後電力(W)を決定する処理の具体例を示す。例えば、ある端末装置20の制御対象として、第1乃至第3の電力出力装置30があったとする。各々の詳細は、以下の通りとする。
「第1の電力出力装置30」
信頼度:0.8
制御可能な最大電力:2kW
制御可能な最大電力量:4kWh
制御可能な時間帯:常時
現在の空き容量:5kWh
「第2の電力出力装置30」
信頼度:1.0
制御可能な最大電力:2kW
制御可能な最大電力量:2.5kWh
制御可能な時間帯:常時
現在の空き容量:3kWh
「第3の電力出力装置30」
信頼度:0.9
制御可能な最大電力:3kW
制御可能な最大電力量:3kWh
制御可能な時間帯:常時
現在の空き容量:4kWh
 そして、上記端末装置20に対して、「3kW、1時間(2016年2月10日16時から17時)」の出力要請があったとする。
 この場合、演算部22は、優先的に、信頼度が最も高い第2の電力出力装置30に電力を出力させる。ここでは、第2の電力出力装置30をフルで活用し、「2kW、1時間(2016年2月10日16時から17時)」で出力させる制御内容を決定したとする。そして、次に信頼度が高い第3の電力出力装置30に、残り分、すなわち「1kW、1時間(2016年2月10日16時から17時)」で出力させる制御内容を決定したとする。この場合、最も信頼度が低い第1の電力出力装置30の制御は不要であり、第1の電力出力装置30には出力させない。
 その後、演算部22は、各電力出力装置30に割り振った電力を補正する。具体的には、割り振った電力(W)に信頼度の逆数を掛けた値を、補正後電力(W)として算出する。この場合、信頼度が小さい程、補正後の値は大きくなる。
 第2の電力出力装置30は、信頼度が「1.0」である。このため、補正後電力は「2kW」となる。一方、第3の電力出力装置30は、信頼度が「0.9」である。このため、補正後電力は「1.1kW」となる。
 なお、ここでは、信頼度が高い方から順にフルで活用する例を説明したが、第3の実施形態同様、この割り振り方はあくまで一例であり、これに限定されない。
 電力出力装置30は、受信した制御信号に従い、電力を出力する(配電網に電力を供給する)。
 次に、図12のシーケンス図を用いて、本実施形態の管理システムの処理の流れの一例を説明する。
 まず、サーバ10は、端末装置20に電力の出力要請を送信する(S401)。図示する例では、出力要請で、出力電力M(W)及び出力時間T(分)等が定められている。
 なお、サーバ10は、第1及び第2の実施形態で説明した処理により、各端末装置20に対応付けて、各端末装置20の制御対象の電力出力装置30の定格出力の合計や容量の合計等を記憶している場合、当該情報を用いて、各端末装置20に送信する出力要請の内容を決定することができる。すなわち、定格出力の合計や容量の合計を超えないように決定する。
 その他、サーバ10は、各端末装置20から、各端末装置20の1つ又は複数の制御対象の電力出力装置30の空き容量の合計や、制御可能な最大電力の合計や、制御可能な最大電力量の合計等を受信してもよい。端末装置20は、上記状態情報(例:SOC等)や制御可能情報等に基づきこれらの情報を算出することができる。そして、サーバ10は、これらの情報を用いて、各端末装置20に送信する出力要請の内容を決定してもよい。すなわち、空き容量の合計、制御可能な最大電力の合計、制御可能な最大電力量の合計等を超えないように決定する。
 端末装置20は、出力要請を受信すると、割当処理を行う(S402)。具体的には、端末装置20は、制御対象の複数の電力出力装置30の中から、上記出力要請に応じて電力を出力させる電力出力装置30や、出力要請で示される出力電力M(W)の割り振り等を決定する。ここでは、第2の電力出力装置30に対して、出力電力M-m(W)、出力時間T(分)等が決定され、第3の電力出力装置30に対して、出力電力m(W)、出力時間T(分)等が決定されている。そして、第1の電力出力装置30には出力させない。
 その後、端末装置20は、各電力出力装置30に割り振った出力電力に、各電力出力装置30の信頼度の逆数を掛けた補正後電力(W)を算出する。
 その後、端末装置20は、電力を出力させると決定した電力出力装置30各々に対して、各電力出力装置30に対応して決定した制御内容(補正後電力(W)、出力させる時間帯等)を含む制御信号を送信する(S403、S404)。図12では、第2及び第3の電力出力装置30に制御信号が送信されている。
 その後、制御信号を受信した電力出力装置30は、制御信号に従い、電力を出力する(S405、S406)。
 以上、説明した本実施形態によれば、第3の実施形態と同様の作用効果を実現できる。また、本実施形態の場合、各電力出力装置30に割り振った電力を各電力出力装置30の信頼度で補正した補正後電力(W)で出力させる制御信号を、各電力出力装置30に送信することができる。そして、各電力出力装置30に、当該制御信号に従った電力の出力を行わせることができる。
 かかる場合、制御信号で指定した電力よりも実際の出力が低くなる電力出力装置30に対して、その分多く見積もった補正後電力での出力を指示することができる。これにより、信頼度が低い電力出力装置30においても、所望の出力を実現可能となる。結果、デマンドレスポンス等のサービスの信頼度が向上する。
<第5の実施形態>
 本実施形態では、第1及び第2の実施形態で説明した処理により、電力出力装置30の信頼度がサーバ10に記憶されていることを前提とする。そして、当該前提のもと、当該信頼度を用いた出力制御処理を説明する。
 本実施形態の管理システムの機能ブロック図の一例は、図3又は図9で示される。サーバ10の演算部12は、割当部(不図示)を有する点で、第1及び第2の実施形態と異なる。以下、第1及び第2の実施形態と異なる点を説明する。
 入力部11は、所定の端末装置20に割り当てられた所定電力の出力要請を受信する。出力要請では、出力電力M(W)、出力時間(時間、分等)、出力する時間帯(例:2016年2月10日15時00分から16時00分まで)等が定められる。
 なお、サーバ10は、第1及び第2の実施形態で説明した処理により、各端末装置20に対応付けて、各端末装置20の制御対象の電力出力装置30の定格出力の合計や容量の合計等を記憶している場合、当該情報を用いて、各端末装置20に送信する出力要請の内容を決定することができる。すなわち、定格出力の合計や容量の合計を超えないように決定する。
 その他、サーバ10は、各端末装置20から、各端末装置20の1つ又は複数の制御対象の電力出力装置30の空き容量の合計や、制御可能な最大電力の合計や、制御可能な最大電力量の合計等を受信してもよい。端末装置20は、上記状態情報(例:SOC等)や制御可能情報等に基づきこれらの情報を算出することができる。そして、サーバ10は、これらの情報を用いて、各端末装置20に送信する出力要請の内容を決定してもよい。すなわち、空き容量の合計、制御可能な最大電力の合計、制御可能な最大電力量の合計等を超えないように決定する。
 記憶部14には、各端末装置20と、各端末装置20の制御対象の電力出力装置30との対応関係が記憶されている。
 演算部12(割当部)は、上記対応関係に基づき、各端末装置20の制御対象の複数の電力出力装置30を特定する。そして、特定した複数の電力出力装置30の中から、上記出力要請に応じて電力を出力させる電力出力装置30を決定する。また、演算部12は、電力を出力させると決定した電力出力装置30各々に対する制御内容(出力電力(W)、出力させる時間帯等)を決定する。演算部12によるこれらの処理は、第3の実施形態で説明した演算部22(割当部)と同様の処理で実現される。演算部12は、第3の実施形態で説明した通り、各電力出力装置30の信頼度に加えて、各電力出力装置30の状態情報及び制御可能情報の中の少なくとも一つを利用して、決定処理を行ってもよい。
 また、演算部12は、第4の実施形態で説明した演算部22(割当部)と同様の処理で、補正後電力(W)を算出してもよい。
 出力部13は、端末装置20を介して、演算部12により電力を出力させると決定された電力出力装置30各々に、演算部12が決定した各々の制御内容(出力電力(W)又は補正後出力電力(W)、出力させる時間帯等)を送信する。電力出力装置30は、受信した制御信号に従い、電力を出力する(配電網に電力を供給する)。
 次に、図13のシーケンス図を用いて、本実施形態の管理システムの処理の流れの一例を説明する。ここでは、補正後電力(W)を算出し、送信する処理を説明する。
 まず、サーバ10は、各端末装置20に割り当てられた電力の出力要請を受信する。その後、サーバ10は、記憶部14に記憶されている「各端末装置20と、各端末装置20の制御対象の電力出力装置30との対応関係」に基づき、各端末装置20の制御対象の複数の電力出力装置30を特定する。そして、特定した複数の電力出力装置30の中から、上記出力要請に応じて電力を出力させる電力出力装置30を決定する。また、演算部12は、電力を出力させると決定した電力出力装置30各々に対する制御内容(補正後電力(W)、出力させる時間帯等)を決定する。
 その後、サーバ10は、電力を出力させると決定した電力出力装置30各々の制御内容(補正後電力(W)、出力させる時間帯等)を、端末装置20に送信する(S601)。端末装置20は、受信した情報に基づき、所定の電力出力装置30に受信した情報で示される制御内容通りで出力させる制御信号を送信する(S602及びS603)。図13では、第2及び第3の電力出力装置30に制御信号が送信されている。
 その後、制御信号を受信した各電力出力装置30は、受信した制御信号に従い、電力を出力する(S604及びS605)。
 以上説明した本実施形態によれば、第3及び第4の実施形態と同様な作用効果を実現できる。
 なお、第3乃至第5の実施形態の構成を組み合わせてもよい。すなわち、サーバ10は、第1の端末装置20に対して、その端末装置20に割り当てられた出力要請を送信してもよい。この場合、第1の端末装置20は、第3及び第4の実施形態で説明したように割当処理(図11のS302、図12のS402)を行い、処理結果に応じた制御信号を複数の電力出力装置30に送信する。
 その一方で、サーバ10は、第1の端末装置20と異なる第2の端末装置20に対しては、本実施形態で説明したように、第2の端末装置20の制御対象の電力出力装置30各々に対する制御内容を決定し、第2の端末装置20に送信してもよい。この場合、第2の端末装置20は、本実施形態で説明したように、サーバ10から受信した情報に基づき、所定の電力出力装置30にサーバ10から受信した制御内容通りで出力させる制御信号を送信する(図13のS602及びS603)。
 当該変形例においても、第3及び第4の実施形態と同様な作用効果を実現できる。また、すべての制御内容をサーバ10で決定するのでなく、一部をサーバ10で決定し、他の一部を端末装置20で決定することとできるので、サーバ10への処理負担の集中を軽減できる。
 以下、参考形態の例を付記する。
1. 電力を出力する機能を有する電力出力装置から前記電力出力装置の属性情報を受信する属性情報受信手段と、
 前記属性情報に応じて決定された出力条件を前記電力出力装置に送信する出力条件送信手段と、
 前記電力出力装置が前記出力条件に従い電力を出力した際の出力波形データに対して所定の処理を行った処理結果を受信する処理結果受信手段と、
 前記処理結果及び前記出力条件に基づき、前記電力出力装置の電力出力性能の信頼度を算出する評価手段と、を有する制御装置。
2. 1に記載の制御装置において、
 前記出力条件では、有効電力、無効電力、電圧、周波数及び所定時間内における電力の変化量の中の少なくとも1つの項目の値が指定されている制御装置。
3. 1または2に記載の制御装置において、
 前記出力波形データは交流波形データであり、
 前記処理結果受信手段は、前記交流波形データに対して所定の処理を行った有効電力、無効電力、電圧、周波数及び所定時間内における電力の変化量の中の少なくとも1つの測定値を受信する制御装置。
4. 2に記載の制御装置において、
 前記出力条件ごとに、前記項目各々に対応して出力の指定値が定められており、
 前記評価手段は、前記処理結果が前記指定値とどの程度乖離しているかに基づいて信頼度を算出する制御装置。
5. 1から4のいずれかに記載の制御装置において、
 1つ又は複数の前記電力出力装置の動作を制御する端末装置に、制御対象の前記電力出力装置の前記信頼度を送信する出力手段をさらに有する制御装置。
6. 1から5のいずれかに記載の制御装置において、
 前記電力出力装置ごとに対応する前記信頼度に基づいて、出力要請に応じて電力を出力する前記電力出力装置を決定する割当手段と、
 前記電力出力装置に制御信号を送信する出力手段と、
を有する制御装置。
7. 6に記載の制御装置において、
 前記割当手段は、他の前記電力出力装置と比べて相対的に前記信頼度が高い前記電力出力装置を、前記制御信号を送信する前記電力出力装置として決定する制御装置。
8. 6に記載の制御装置において、
 前記割当手段は、前記信頼度の高い前記電力出力装置から順に、前記制御信号を送信する前記電力出力装置として決定する制御装置。
9. 6に記載の制御装置において、
 前記割当手段は、前記信頼度の高い前記電力出力装置ほど割り当てる出力を多くする制御装置。
10. 6に記載の制御装置において、
 前記割当手段は、前記信頼度に加えて、前記電力出力装置の状態情報及び制御可能情報の少なくとも一方に基づいて、前記制御信号を送信する前記電力出力装置を決定する制御装置。
11. 6に記載の制御装置において、
 前記割当手段は、前記電力出力装置各々に割り振った電力に対して、前記電力出力装置ごとの前記信頼度に基づいて前記電力を補正した補正後電力を算出し、
 前記出力手段は、前記補正後電力に関する制御信号を前記電力出力装置に送信する制御装置。
12. 6に記載の制御装置において、
 前記割当手段は、前記電力出力装置各々に割り振った電力に対して、前記電力出力装置ごとの前記信頼度が小さいほど、前記電力が大きくなるように補正した前記補正後電力を算出する制御装置。
13. 6に記載の制御装置において、
 前記割当手段は、複数の前記電力出力装置に合計M(W)の出力を要請する場合、前記出力要請を送信する複数の前記電力出力装置にM(W)分の電力を割り振り、前記電力出力装置各々に割り振った電力(W)を前記信頼度で補正した補正後電力(W)を算出し、
 前記出力手段は、前記補正後電力(W)の制御信号を送信する制御装置。
14. 1から13のいずれかに記載の制御装置を有するサーバ。
15. 電力を出力する機能を有する電力出力装置から前記電力出力装置の属性情報を受信する属性情報受信手段と、
 前記属性情報に応じて決定された出力条件を前記電力出力装置に送信する出力条件送信手段と、
 前記電力出力装置が前記出力条件に従い電力を出力した際の出力波形データを受信する出力データ受信手段と、
 前記出力波形データ及び前記出力条件に基づき、前記電力出力装置の電力出力性能の信頼度を算出する評価手段と、を有する端末装置。
16. 15に記載の端末装置において、
 前記出力条件では、有効電力、無効電力、電圧、周波数及び所定時間内における電力の変化量の中の少なくとも1つの項目の値が指定されている端末装置。
17. 15又は16に記載の端末装置において、
 前記出力データ受信手段は、出力波形データとして交流波形データを受信し、
 前記出力手段は、前記処理結果として有効電力、無効電力、電圧、周波数及び所定時間内における電力の変化量の中の少なくとも1つの測定値を送信する端末装置。
18. 15に記載の端末装置において、
 前記出力条件ごとに、前記項目各々に対応して出力の指定値が定められており、
 前記評価手段は、前記処理結果が前記指定値とどの程度乖離しているかに基づいて信頼度を算出する端末装置。
19. 15から18のいずれかに記載の端末装置において、
 前記電力出力装置ごとに対応する前記信頼度に基づいて、制御信号を出力要請に応じて電力を出力する前記電力出力装置を決定する割当手段と
 前記電力出力装置に制御信号を送信する出力手段と、を有する端末装置。
20. 19に記載の端末装置において、
 前記割当手段は、他の前記電力出力装置と比べて相対的に前記信頼度が高い前記電力出力装置を、前記制御信号を送信する前記電力出力装置として決定する端末装置。
21. 19に記載の端末装置において、
 前記割当手段は、前記信頼度の高い前記電力出力装置から順に前記制御信号を送信する前記電力出力装置として決定する端末装置。
22. 19に記載の端末装置において、
 前記割当手段は、前記信頼度の高い前記電力出力装置ほど割り当てる出力を多くする端末装置。
23. 19に記載の端末装置において、
 前記割当手段は、前記信頼度に加えて、前記電力出力装置ごとの状態情報及び制御可能情報の少なくとも一方に基づいて、前記制御信号を送信する前記電力出力装置を決定する端末装置。
24. 19に記載の端末装置において、
 前記割当手段は、前記電力出力装置各々に割り振った電力に対して、前記電力出力装置ごとの前記信頼度に基づいて前記電力を補正した補正後電力を算出し、
 前記出力手段は、前記補正後電力に関する制御信号を送信する端末装置。
25. 19に記載の端末装置において、
 前記割当手段は、前記電力出力装置各々に割り振った電力に対して、前記電力出力装置ごとの前記信頼度が小さいほど、前記電力が大きくなるように補正した前記補正後電力を算出する端末装置。
26. 19に記載の端末装置において、
 前記割当手段は、制御装置からM(W)の前記出力要請があった場合、前記制御信号を送信する複数の前記電力出力装置にM(W)分の電力を割り振り、前記電力出力装置各々に割り振った電力(W)を前記信頼度で補正した補正後電力(W)を算出し、
 前記出力手段は、前記補正後電力(W)で出力させる前記制御信号を前記電力出力装置に送信する端末装置。
27. コンピュータが、
 電力を出力する機能を有する電力出力装置から前記電力出力装置の属性情報を受信する属性情報受信工程と、
 前記属性情報に応じて決定された出力条件を前記電力出力装置に送信する出力条件送信工程と、
 前記電力出力装置が前記出力条件に従い電力を出力した際の出力波形データに対して所定の処理を行った処理結果を受信する処理結果受信工程と、
 前記処理結果及び前記出力条件に基づき、前記電力出力装置の電力出力性能の信頼度を算出する評価工程と、
を実行する評価方法。
28. コンピュータが、
 電力を出力する機能を有する電力出力装置から前記電力出力装置の属性情報を受信する属性情報受信工程と、
 前記属性情報に応じて決定された出力条件を前記電力出力装置に送信する出力条件送信工程と、
 前記電力出力装置が前記出力条件に従い電力を出力した際の出力波形データを受信する出力データ受信工程と、
 前記出力波形データ及び前記出力条件に基づき、前記電力出力装置の電力出力性能の信頼度を算出する評価工程と、
を実行する評価方法。
29. コンピュータを、
 電力を出力する機能を有する電力出力装置から前記電力出力装置の属性情報を受信する属性情報受信手段、
 前記属性情報に応じて決定された出力条件を前記電力出力装置に送信する出力条件送信手段、
 前記電力出力装置が前記出力条件に従い電力を出力した際の出力波形データに対して所定の処理を行った処理結果を受信する処理結果受信手段、
 前記処理結果及び前記出力条件に基づき、前記電力出力装置の電力出力性能の信頼度を算出する評価手段、
として機能させるプログラム。
30. コンピュータを、
 電力を出力する機能を有する電力出力装置から前記電力出力装置の属性情報を受信する属性情報受信手段、
 前記属性情報に応じて決定された出力条件を前記電力出力装置に送信する出力条件送信手段、
 前記電力出力装置が前記出力条件に従い電力を出力した際の出力波形データを受信する出力データ受信手段、
 前記出力波形データ及び前記出力条件に基づき、前記電力出力装置の電力出力性能の信頼度を算出する評価手段、
として機能させるプログラム。
 この出願は、2016年3月4日に出願された日本出願特願2016-042202号を基礎とする優先権を主張し、その開示の全てをここに取り込む。

Claims (30)

  1.  電力を出力する機能を有する電力出力装置から前記電力出力装置の属性情報を受信する属性情報受信手段と、
     前記属性情報に応じて決定された出力条件を前記電力出力装置に送信する出力条件送信手段と、
     前記電力出力装置が前記出力条件に従い電力を出力した際の出力波形データに対して所定の処理を行った処理結果を受信する処理結果受信手段と、
     前記処理結果及び前記出力条件に基づき、前記電力出力装置の電力出力性能の信頼度を算出する評価手段と、を有する制御装置。
  2.  請求項1に記載の制御装置において、
     前記出力条件では、有効電力、無効電力、電圧、周波数及び所定時間内における電力の変化量の中の少なくとも1つの項目の値が指定されている制御装置。
  3.  請求項1または2に記載の制御装置において、
     前記出力波形データは交流波形データであり、
     前記処理結果受信手段は、前記交流波形データに対して所定の処理を行った有効電力、無効電力、電圧、周波数及び所定時間内における電力の変化量の中の少なくとも1つの測定値を受信する制御装置。
  4.  請求項2に記載の制御装置において、
     前記出力条件ごとに、前記項目各々に対応して出力の指定値が定められており、
     前記評価手段は、前記処理結果が前記指定値とどの程度乖離しているかに基づいて信頼度を算出する制御装置。
  5.  請求項1から4のいずれか1項に記載の制御装置において、
     1つ又は複数の前記電力出力装置の動作を制御する端末装置に、制御対象の前記電力出力装置の前記信頼度を送信する出力手段をさらに有する制御装置。
  6.  請求項1から5のいずれか1項に記載の制御装置において、
     前記電力出力装置ごとに対応する前記信頼度に基づいて、出力要請に応じて電力を出力する前記電力出力装置を決定する割当手段と、
     前記電力出力装置に制御信号を送信する出力手段と、
    を有する制御装置。
  7.  請求項6に記載の制御装置において、
     前記割当手段は、他の前記電力出力装置と比べて相対的に前記信頼度が高い前記電力出力装置を、前記制御信号を送信する前記電力出力装置として決定する制御装置。
  8.  請求項6に記載の制御装置において、
     前記割当手段は、前記信頼度の高い前記電力出力装置から順に、前記制御信号を送信する前記電力出力装置として決定する制御装置。
  9.  請求項6に記載の制御装置において、
     前記割当手段は、前記信頼度の高い前記電力出力装置ほど割り当てる出力を多くする制御装置。
  10.  請求項6に記載の制御装置において、
     前記割当手段は、前記信頼度に加えて、前記電力出力装置の状態情報及び制御可能情報の少なくとも一方に基づいて、前記制御信号を送信する前記電力出力装置を決定する制御装置。
  11.  請求項6に記載の制御装置において、
     前記割当手段は、前記電力出力装置各々に割り振った電力に対して、前記電力出力装置ごとの前記信頼度に基づいて前記電力を補正した補正後電力を算出し、
     前記出力手段は、前記補正後電力に関する制御信号を前記電力出力装置に送信する制御装置。
  12.  請求項6に記載の制御装置において、
     前記割当手段は、前記電力出力装置各々に割り振った電力に対して、前記電力出力装置ごとの前記信頼度が小さいほど、前記電力が大きくなるように補正した前記補正後電力を算出する制御装置。
  13.  請求項6に記載の制御装置において、
     前記割当手段は、複数の前記電力出力装置に合計M(W)の出力を要請する場合、前記出力要請を送信する複数の前記電力出力装置にM(W)分の電力を割り振り、前記電力出力装置各々に割り振った電力(W)を前記信頼度で補正した補正後電力(W)を算出し、
     前記出力手段は、前記補正後電力(W)の制御信号を送信する制御装置。
  14.  請求項1から13のいずれか1項に記載の制御装置を有するサーバ。
  15.  電力を出力する機能を有する電力出力装置から前記電力出力装置の属性情報を受信する属性情報受信手段と、
     前記属性情報に応じて決定された出力条件を前記電力出力装置に送信する出力条件送信手段と、
     前記電力出力装置が前記出力条件に従い電力を出力した際の出力波形データを受信する出力データ受信手段と、
     前記出力波形データ及び前記出力条件に基づき、前記電力出力装置の電力出力性能の信頼度を算出する評価手段と、を有する端末装置。
  16.  請求項15に記載の端末装置において、
     前記出力条件では、有効電力、無効電力、電圧、周波数及び所定時間内における電力の変化量の中の少なくとも1つの項目の値が指定されている端末装置。
  17.  請求項15又は16に記載の端末装置において、
     前記出力データ受信手段は、出力波形データとして交流波形データを受信し、
     有効電力、無効電力、電圧、周波数及び所定時間内における電力の変化量の中の少なくとも1つの測定値を出力する出力手段をさらに有する端末装置。
  18.  請求項15に記載の端末装置において、
     前記出力条件ごとに、前記項目各々に対応して出力の指定値が定められており、
     前記評価手段は、前記処理結果が前記指定値とどの程度乖離しているかに基づいて信頼度を算出する端末装置。
  19.  請求項15から18のいずれか1項に記載の端末装置において、
     前記電力出力装置ごとに対応する前記信頼度に基づいて、制御信号を出力要請に応じて電力を出力する前記電力出力装置を決定する割当手段と、
     前記電力出力装置に制御信号を送信する出力手段と、を有する端末装置。
  20.  請求項19に記載の端末装置において、
     前記割当手段は、他の前記電力出力装置と比べて相対的に前記信頼度が高い前記電力出力装置を、前記制御信号を送信する前記電力出力装置として決定する端末装置。
  21.  請求項19に記載の端末装置において、
     前記割当手段は、前記信頼度の高い前記電力出力装置から順に前記制御信号を送信する前記電力出力装置として決定する端末装置。
  22.  請求項19に記載の端末装置において、
     前記割当手段は、前記信頼度の高い前記電力出力装置ほど割り当てる出力を多くする端末装置。
  23.  請求項19に記載の端末装置において、
     前記割当手段は、前記信頼度に加えて、前記電力出力装置ごとの状態情報及び制御可能情報の少なくとも一方に基づいて、前記制御信号を送信する前記電力出力装置を決定する端末装置。
  24.  請求項19に記載の端末装置において、
     前記割当手段は、前記電力出力装置各々に割り振った電力に対して、前記電力出力装置ごとの前記信頼度に基づいて前記電力を補正した補正後電力を算出し、
     前記出力手段は、前記補正後電力に関する制御信号を送信する端末装置。
  25.  請求項19に記載の端末装置において、
     前記割当手段は、前記電力出力装置各々に割り振った電力に対して、前記電力出力装置ごとの前記信頼度が小さいほど、前記電力が大きくなるように補正した前記補正後電力を算出する端末装置。
  26.  請求項19に記載の端末装置において、
     前記割当手段は、制御装置からM(W)の前記出力要請があった場合、前記制御信号を送信する複数の前記電力出力装置にM(W)分の電力を割り振り、前記電力出力装置各々に割り振った電力(W)を前記信頼度で補正した補正後電力(W)を算出し、
     前記出力手段は、前記補正後電力(W)で出力させる前記制御信号を前記電力出力装置に送信する端末装置。
  27.  コンピュータが、
     電力を出力する機能を有する電力出力装置から前記電力出力装置の属性情報を受信する属性情報受信工程と、
     前記属性情報に応じて決定された出力条件を前記電力出力装置に送信する出力条件送信工程と、
     前記電力出力装置が前記出力条件に従い電力を出力した際の出力波形データに対して所定の処理を行った処理結果を受信する処理結果受信工程と、
     前記処理結果及び前記出力条件に基づき、前記電力出力装置の電力出力性能の信頼度を算出する評価工程と、
    を実行する評価方法。
  28.  コンピュータが、
     電力を出力する機能を有する電力出力装置から前記電力出力装置の属性情報を受信する属性情報受信工程と、
     前記属性情報に応じて決定された出力条件を前記電力出力装置に送信する出力条件送信工程と、
     前記電力出力装置が前記出力条件に従い電力を出力した際の出力波形データを受信する出力データ受信工程と、
     前記出力波形データ及び前記出力条件に基づき、前記電力出力装置の電力出力性能の信頼度を算出する評価工程と、
    を実行する評価方法。
  29.  コンピュータを、
     電力を出力する機能を有する電力出力装置から前記電力出力装置の属性情報を受信する属性情報受信手段、
     前記属性情報に応じて決定された出力条件を前記電力出力装置に送信する出力条件送信手段、
     前記電力出力装置が前記出力条件に従い電力を出力した際の出力波形データに対して所定の処理を行った処理結果を受信する処理結果受信手段、
     前記処理結果及び前記出力条件に基づき、前記電力出力装置の電力出力性能の信頼度を算出する評価手段、
    として機能させるプログラム。
  30.  コンピュータを、
     電力を出力する機能を有する電力出力装置から前記電力出力装置の属性情報を受信する属性情報受信手段、
     前記属性情報に応じて決定された出力条件を前記電力出力装置に送信する出力条件送信手段、
     前記電力出力装置が前記出力条件に従い電力を出力した際の出力波形データを受信する出力データ受信手段、
     前記出力波形データ及び前記出力条件に基づき、前記電力出力装置の電力出力性能の信頼度を算出する評価手段、
    として機能させるプログラム。
PCT/JP2017/004874 2016-03-04 2017-02-10 端末装置、制御装置、サーバ、評価方法及びプログラム WO2017150140A1 (ja)

Priority Applications (2)

Application Number Priority Date Filing Date Title
US16/080,939 US11205903B2 (en) 2016-03-04 2017-02-10 Apparatus, evaluation method, and non-transitory storage medium
JP2018502998A JP6856063B2 (ja) 2016-03-04 2017-02-10 端末装置、制御装置、サーバ、評価方法及びプログラム

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2016042202 2016-03-04
JP2016-042202 2016-03-04

Publications (1)

Publication Number Publication Date
WO2017150140A1 true WO2017150140A1 (ja) 2017-09-08

Family

ID=59742779

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2017/004874 WO2017150140A1 (ja) 2016-03-04 2017-02-10 端末装置、制御装置、サーバ、評価方法及びプログラム

Country Status (3)

Country Link
US (1) US11205903B2 (ja)
JP (1) JP6856063B2 (ja)
WO (1) WO2017150140A1 (ja)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7088294B2 (ja) * 2018-09-19 2022-06-21 株式会社安川電機 電力変換システム、電力変換装置のipアドレス送信方法、及びプログラム

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004273316A (ja) * 2003-03-10 2004-09-30 Japan Research Institute Ltd 電力供給システム
WO2012056581A1 (ja) * 2010-10-29 2012-05-03 株式会社日立製作所 エネルギ供給装置の稼働能力管理システム
JP2013192401A (ja) * 2012-03-14 2013-09-26 Toshiba Corp 電力需給制御装置

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5895839B2 (ja) * 2010-04-26 2016-03-30 日本電気株式会社 二次電池状態管理システム、充電器、二次電池状態管理方法及び電気特性測定方法
JP2012253976A (ja) 2011-06-06 2012-12-20 Shimizu Corp 充放電制御装置、充放電制御方法、プログラム
JP2013029445A (ja) 2011-07-29 2013-02-07 Sanyo Electric Co Ltd バッテリ管理装置及び電力供給システム

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004273316A (ja) * 2003-03-10 2004-09-30 Japan Research Institute Ltd 電力供給システム
WO2012056581A1 (ja) * 2010-10-29 2012-05-03 株式会社日立製作所 エネルギ供給装置の稼働能力管理システム
JP2013192401A (ja) * 2012-03-14 2013-09-26 Toshiba Corp 電力需給制御装置

Also Published As

Publication number Publication date
JP6856063B2 (ja) 2021-04-07
US11205903B2 (en) 2021-12-21
US20210203167A1 (en) 2021-07-01
JPWO2017150140A1 (ja) 2018-12-27

Similar Documents

Publication Publication Date Title
EP2985857B1 (en) Storage battery management system and storage battery management method
US9184601B2 (en) Charge-discharge control device, charge-discharge monitoring device, charge-discharge control system, and computer program product
JP5606484B2 (ja) 充放電制御装置、充放電制御システム及び充放電制御プログラム
US20140052308A1 (en) Frequency regulation method
US11949269B2 (en) Management server, management system, and management method
JP6699719B2 (ja) 制御装置、発電制御装置、制御方法、システム、及び、プログラム
US20170338653A1 (en) Demand control apparatus, group generation apparatus, and group generation method
WO2017150140A1 (ja) 端末装置、制御装置、サーバ、評価方法及びプログラム
WO2024083027A1 (zh) 能量块并联通讯方法及装置
EP3584873A1 (en) Determination device, determination method, and program
JP5617918B2 (ja) 電力需給システムおよび電力需給方法
US20230356615A1 (en) Method and system for allocating charging resources to electric vehicles
JP2018093573A (ja) 蓄電池制御装置、蓄電池制御システム、蓄電池制御方法、及び、プログラム
JP6835063B2 (ja) 端末装置、制御装置、サーバ、評価方法及びプログラム
CN113013507A (zh) 二次电池管理装置及其方法、非暂时性的记录介质
JP6836949B2 (ja) サーバ装置
JP7024869B2 (ja) 判定装置、判定方法及びプログラム
CN109522118A (zh) 一种业务处理方法、装置、服务器及可读存储介质
JP2019041550A (ja) 蓄電池制御装置および蓄電池制御方法
US11977426B2 (en) Control apparatus, control method and program
JP2017011938A (ja) グリッド制御装置、グリッド制御システム及びグリッド制御プログラム
WO2019230600A1 (ja) 電力制御方法、プログラム、電力制御システム、及び電力管理システム
US20220382351A1 (en) Control apparatus, control method and program
JP2023181752A (ja) 電源システム、電源制御装置の制御方法及びプログラム
JPWO2018150631A1 (ja) 判定装置、判定方法及びプログラム

Legal Events

Date Code Title Description
ENP Entry into the national phase

Ref document number: 2018502998

Country of ref document: JP

Kind code of ref document: A

NENP Non-entry into the national phase

Ref country code: DE

121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 17759611

Country of ref document: EP

Kind code of ref document: A1

122 Ep: pct application non-entry in european phase

Ref document number: 17759611

Country of ref document: EP

Kind code of ref document: A1