WO2017130307A1 - 管理装置、及び、制御方法 - Google Patents

管理装置、及び、制御方法 Download PDF

Info

Publication number
WO2017130307A1
WO2017130307A1 PCT/JP2016/052246 JP2016052246W WO2017130307A1 WO 2017130307 A1 WO2017130307 A1 WO 2017130307A1 JP 2016052246 W JP2016052246 W JP 2016052246W WO 2017130307 A1 WO2017130307 A1 WO 2017130307A1
Authority
WO
WIPO (PCT)
Prior art keywords
power
pcs
power generation
amount
charging
Prior art date
Application number
PCT/JP2016/052246
Other languages
English (en)
French (fr)
Inventor
矢部 正明
雄喜 小川
聡司 峯澤
隆司 新井
奥村 明
Original Assignee
三菱電機株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 三菱電機株式会社 filed Critical 三菱電機株式会社
Priority to US15/759,262 priority Critical patent/US10700524B2/en
Priority to PCT/JP2016/052246 priority patent/WO2017130307A1/ja
Priority to EP16887894.0A priority patent/EP3410560B1/en
Priority to JP2017563442A priority patent/JP6430041B2/ja
Priority to CN201680068912.XA priority patent/CN108604820B/zh
Publication of WO2017130307A1 publication Critical patent/WO2017130307A1/ja

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L53/00Methods of charging batteries, specially adapted for electric vehicles; Charging stations or on-board charging equipment therefor; Exchange of energy storage elements in electric vehicles
    • B60L53/60Monitoring or controlling charging stations
    • B60L53/63Monitoring or controlling charging stations in response to network capacity
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L55/00Arrangements for supplying energy stored within a vehicle to a power network, i.e. vehicle-to-grid [V2G] arrangements
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/12Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load
    • H02J3/14Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load by switching loads on to, or off from, network, e.g. progressively balanced loading
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/28Arrangements for balancing of the load in a network by storage of energy
    • H02J3/32Arrangements for balancing of the load in a network by storage of energy using batteries with converting means
    • H02J3/322Arrangements for balancing of the load in a network by storage of energy using batteries with converting means the battery being on-board an electric or hybrid vehicle, e.g. vehicle to grid arrangements [V2G], power aggregation, use of the battery for network load balancing, coordinated or cooperative battery charging
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • H02J3/381Dispersed generators
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • H02J3/46Controlling of the sharing of output between the generators, converters, or transformers
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J7/00Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
    • H02J7/0068Battery or charger load switching, e.g. concurrent charging and load supply
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J7/00Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
    • H02J7/34Parallel operation in networks using both storage and other dc sources, e.g. providing buffering
    • H02J7/35Parallel operation in networks using both storage and other dc sources, e.g. providing buffering with light sensitive cells
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2300/00Systems for supplying or distributing electric power characterised by decentralized, dispersed, or local generation
    • H02J2300/20The dispersed energy generation being of renewable origin
    • H02J2300/22The renewable source being solar energy
    • H02J2300/24The renewable source being solar energy of photovoltaic origin
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2310/00The network for supplying or distributing electric power characterised by its spatial reach or by the load
    • H02J2310/10The network having a local or delimited stationary reach
    • H02J2310/12The local stationary network supplying a household or a building
    • H02J2310/14The load or loads being home appliances
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2310/00The network for supplying or distributing electric power characterised by its spatial reach or by the load
    • H02J2310/50The network for supplying or distributing electric power characterised by its spatial reach or by the load for selectively controlling the operation of the loads
    • H02J2310/56The network for supplying or distributing electric power characterised by its spatial reach or by the load for selectively controlling the operation of the loads characterised by the condition upon which the selective controlling is based
    • H02J2310/62The condition being non-electrical, e.g. temperature
    • H02J2310/64The condition being economic, e.g. tariff based load management
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B70/00Technologies for an efficient end-user side electric power management and consumption
    • Y02B70/30Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B70/00Technologies for an efficient end-user side electric power management and consumption
    • Y02B70/30Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
    • Y02B70/3225Demand response systems, e.g. load shedding, peak shaving
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy
    • Y02E10/56Power conversion systems, e.g. maximum power point trackers
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E70/00Other energy conversion or management systems reducing GHG emissions
    • Y02E70/30Systems combining energy storage with energy generation of non-fossil origin
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T10/00Road transport of goods or passengers
    • Y02T10/60Other road transportation technologies with climate change mitigation effect
    • Y02T10/70Energy storage systems for electromobility, e.g. batteries
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T10/00Road transport of goods or passengers
    • Y02T10/60Other road transportation technologies with climate change mitigation effect
    • Y02T10/7072Electromobility specific charging systems or methods for batteries, ultracapacitors, supercapacitors or double-layer capacitors
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T90/00Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02T90/10Technologies relating to charging of electric vehicles
    • Y02T90/12Electric charging stations
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T90/00Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02T90/10Technologies relating to charging of electric vehicles
    • Y02T90/16Information or communication technologies improving the operation of electric vehicles
    • Y02T90/167Systems integrating technologies related to power network operation and communication or information technologies for supporting the interoperability of electric or hybrid vehicles, i.e. smartgrids as interface for battery charging of electric vehicles [EV] or hybrid vehicles [HEV]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/12Monitoring or controlling equipment for energy generation units, e.g. distributed energy generation [DER] or load-side generation
    • Y04S10/126Monitoring or controlling equipment for energy generation units, e.g. distributed energy generation [DER] or load-side generation the energy generation units being or involving electric vehicles [EV] or hybrid vehicles [HEV], i.e. power aggregation of EV or HEV, vehicle to grid arrangements [V2G]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems
    • Y04S20/222Demand response systems, e.g. load shedding, peak shaving
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems
    • Y04S20/242Home appliances
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S30/00Systems supporting specific end-user applications in the sector of transportation
    • Y04S30/10Systems supporting the interoperability of electric or hybrid vehicles
    • Y04S30/14Details associated with the interoperability, e.g. vehicle recognition, authentication, identification or billing
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S50/00Market activities related to the operation of systems integrating technologies related to power network operation or related to communication or information technologies
    • Y04S50/10Energy trading, including energy flowing from end-user application to grid

Definitions

  • the present invention relates to a management apparatus and a control method that can effectively use electric power in a limited period in which electric power output from power generation facilities is limited.
  • HEMS Home Energy Management System
  • Patent Document 1 discloses a power storage type power generation capable of storing power from a power generation facility or a commercial power system (commercial power supply).
  • Patent Document 2 discloses an invention of a load control device that operates a load device using surplus power of a power generation device.
  • the supply and demand balance of the commercial power system may be disrupted due to the reverse power flow in which power is supplied from the customer where the power generation facility is introduced to the commercial power system.
  • the demand decreases significantly, and the supply increases as the power generation amount increases.
  • an electric power company plans a restriction period (time zone) in which the output from the power generation facility should be restricted, it creates restriction information including restriction contents (output upper limit) in the restriction period.
  • the electric power company provides the created restriction information to the power generation facility via the network. Then, the power generation facility suppresses the power generation amount so as not to exceed the output upper limit when the limit period comes in accordance with the provided limit information.
  • the reverse power flow is not reduced according to the instruction for suppressing the reverse power flow as described above, but the system voltage increases due to the actual reverse power flow, and the threshold voltage is set. When it reaches, it switches to charge operation.
  • the invention described in Patent Document 1 does not take into consideration that the restriction information is provided, and as such, the power cannot be suppressed even if the restriction period comes. As a result, in the invention described in Patent Document 1, it was not possible to effectively use power in the limited period.
  • the invention described in Patent Document 2 also refers to the case where power generation is regulated by a request from an electric power company. Nevertheless, since there is no specific description, it is unclear whether it is actually possible to effectively use power during the limited period.
  • surplus power is obtained on the assumption that the power actually generated by the solar cell (actual value of generated power) can be acquired. Absent. That is, in general facilities, power actually generated by a solar cell is not acquired for cost reduction. Therefore, it is difficult to grasp the surplus power (how much the power conditioner suppresses and outputs power). That is, in a general facility, electric power cannot be effectively used in the limited period.
  • the present invention has been made to solve the above-described problems, and a management device and a control method capable of effectively using power in a limited period in which power output from power generation equipment is limited
  • the purpose is to provide.
  • the management device provides: It is a management device that manages power generation equipment that outputs the power generated by the power generation module via a power conditioner, and power storage equipment that charges the power supplied from the power system or the power output from the power conditioner. And Control means is provided for controlling the power storage facility such that charging power increases in a limited period in which power output from the power conditioner is limited.
  • the present invention it is possible to effectively use power by appropriately increasing the charging power of the power storage facility during a limited period in which the power output from the power generation facility is limited.
  • FIG. 1 is a block diagram showing an example of the overall configuration of a home system 1 according to Embodiment 1 of the present invention.
  • the home system 1 is a so-called HEMS (Home Energy Management System) system that manages electric power used in the house H.
  • the home system 1 includes a PV (Photo Voltaics) panel 2, a PV-PCS (Photo Voltaics-Power Conditioning System) 3, an adapter 4, an EV-PCS (Electric Vehicle-Power Conditioning System) 5, and an EV (Electric Vehicle). ) 6, a power measuring device 7, a distribution board 8, a plurality of devices 9 (devices 9-1, 9-2,...), A management device 10, and a terminal device 11.
  • the home system 1 can communicate with the server 12 arranged outside the house H via the external wide area network N.
  • the server 12 stores restriction information 13 including a restriction period in which output from the PV-PCS 3 should be restricted.
  • the restriction information 13 is appropriately read from the PV-PCS 3 (adapter 4) or the management apparatus 10, for example. Details of the restriction information 13 will be described later.
  • PV panel 2 is a power generation module that generates power by receiving sunlight.
  • a case where the rated capacity (maximum generated power) of the PV panel 2 is 5 kW will be described as an example.
  • the PV panel 2 and the following PV-PCS 3 (adapter 4) constitute a power generation facility.
  • PV-PCS3 is a power conditioner for PV panel 2.
  • the PV-PCS 3 converts the electricity generated by the PV panel 2 from DC power to AC power, and supplies (outputs) it to the EV-PCS 5 via the power line D3.
  • the power supplied from the PV-PCS 3 can be reversely flowed (so-called power sale) to the commercial power system (commercial power source) PS via the EV-PCS 5.
  • the electric power supplied from the PV-PCS 3 is used for charging the EV 6 (storage battery 14) or used in the device 9 through the distribution board 8. Note that, in the limited period in which the output from the PV-PCS 3 is to be limited, the PV-PCS 3 adjusts the output active power (suppresses the output) by, for example, phase advance phase control.
  • the adapter 4 is a communication adapter that performs wireless communication as an example.
  • the adapter 4 is communicably connected to the management apparatus 10 via a wireless network (not shown) constructed in the house H.
  • a wireless network for example, communication conforming to a known communication standard such as Wi-Fi (registered trademark) or Wi-SUN (registered trademark) is performed.
  • the adapter 4 may be communicably connected to the server 12 via the wide area network N.
  • the PV-PCS 3 communicates with the management apparatus 10 through such an adapter 4.
  • the PV-PCS 3 receives the restriction information 13 sent from the management device 10 via the adapter 4.
  • the PV-PCS 3 (adapter 4) may directly access the server 12 and receive the restriction information 13 instead of from the management apparatus 10. In this way, when receiving the restriction information 13, the PV-PCS 3 suppresses output during the restriction period defined in the received restriction information 13.
  • the restriction information 13 will be described.
  • an output upper limit (up to what percentage of the rated capacity of the PV panel 2 can be output) in each time (time zone) is defined.
  • the output from 0 o'clock to 9 o'clock and from 15 o'clock to 24 o'clock is defined as 100% (that is, no limit).
  • the output from 9 o'clock to 11 o'clock, 11 o'clock to 13 o'clock, and 13 o'clock to 15 o'clock is specified as 40%.
  • the output may be defined as 0%.
  • Such a time zone in which the output is smaller than 100% is the limit period, and the output upper limit in the limit period is an upper limit value at which power can be output from the PV-PCS 3.
  • the restriction information 13 illustrated in FIG. 2A is an example and can be changed as appropriate. For example, instead of specifying the output upper limit by the ratio (%), the output upper limit may be specified by the power value (n [kW]).
  • the PV-PCS 3 sets the line Lp as the upper limit even if the PV panel 2 generates power as shown by the line La as shown in FIG. 2B, for example. , Output power.
  • the effective power output is adjusted by phase advance phase control, so that the upper limit value (line Lp) smaller than the power generated by the PV panel 2 is suppressed. Output power.
  • the PV-PCS 3 is in the situation where private consumption (power purchase) occurs during such a limited period. It is recognized that power can be output up to the amount consumed (when the amount of power generated by the PV panel 2 is sufficient). That is, as shown in Figure 2C, the backward flow P R in the linking point from C, and the power P G output from the PV-PCS3, the power P L that is home consumption, calculated by Equation 1 below. Note that self-consumption includes charging of the storage battery 14 of the EV 6 and power consumption in the device 9.
  • the transition of the power P L that is self-consumption is indicated by a chain line.
  • the transition of the generated power La generated by the PV panel 2 is indicated by a thin solid line.
  • the transition of the power P G output from the PV-PCS3 is indicated by a thick solid line.
  • the PV-PCS 3 has power up to 2 kW which is the upper limit value. and outputs the P G.
  • the power P L is equal to or exceeds the upper limit (time T1 ⁇ time T3), PV-PCS3 is increased to the same power value and the power P L and outputs the power P G.
  • the power P L is greater than the generated power La (at time T3 ⁇ 15), PV-PCS3 outputs power P G having the same power value and the generated power La.
  • the PV-PCS 3 shifts the phase so that the suppressed power generation amount Y1 becomes reactive power by phase advance phase control.
  • the own consumption is large time T2
  • the management device 10 simply obtains the suppressed power generation amount using the past power generation amount output from the PV-PCS 3.
  • EV-PCS5 is a power conditioner for EV6.
  • the EV-PCS 5 controls the charging and discharging of the storage battery 14 mounted on the EV 6.
  • the EV-PCS 5 supplies power from the commercial power system PS (power line D1) and PV-PCS3 (power line D3) to the storage battery 14 via the power line D4 when the storage battery 14 is charged. Further, the EV-PCS 5 supplies power from the storage battery 14 to the distribution board 8 via the power lines D4 and D2 when the storage battery 14 is discharged.
  • the EV-PCS 5 measures the value of power transmitted to the power lines D1, D3, and D4 at regular time intervals (as an example, every 30 seconds) in order to control charging and discharging.
  • the power line D1 is disposed between the commercial power system PS and the EV-PCS5
  • the power line D3 is disposed between the PV-PCS3 and the EV-PCS5
  • the power line D4 is disposed on the EV-PCS5.
  • EV6 EV-PCS 5
  • the EV-PCS 5 is connected to CT (Current Transformers) 1, 3, and 4 connected to the power lines D1, D3, and D4 via communication lines.
  • CT1, 3 and 4 are sensors for measuring an alternating current (the same applies to CT2 described later).
  • EV-PCS 5 measures the power value of power line D1 based on the measurement result of CT1.
  • EV-PCS 5 measures the power values of power lines D3 and D4 based on the measurement results of CT3 and 4.
  • the EV-PCS 5 is connected to the management apparatus 10 via a dedicated communication line L so as to be communicable.
  • the EV-PCS 5 transmits the measured power values of the power lines D1, D3, D4 to the management device 10 in response to a request from the management device 10, for example.
  • the EV-PCS 5 may communicate with the management apparatus 10 via the above-described wireless network built in the house H.
  • Such an EV-PCS 5 is controlled by the management apparatus 10 and is in one of the control states of manual operation, event operation, limited time cooperation operation, and plan operation, for example, as shown in FIG.
  • the limited-time cooperative operation is an operation that appropriately increases self-consumption in cooperation with the PV-PCS 3 during a limited period in which the output from the PV-PCS 3 should be limited.
  • the suppressed power generation amount is used for charging the storage battery 14 of the EV 6 to effectively utilize the generated power of the PV panel 2.
  • the details of the limited time cooperative operation will be described later together with the description of the management device 10.
  • control states are defined as manual operation, event operation, limited time linked operation, and plan operation in descending order of priority. That is, the priority is set higher in the order in which the user's intention is stronger. For this reason, for example, when an operation by the user is performed or a charge / discharge schedule arrives during the limited time linked operation, a transition is made to a high-priority control state such as manual operation or event operation. Specifically, as shown in the state transition diagram of FIG. 5, the EV-PCS 5 appropriately transitions the control state according to the event that has occurred.
  • EV 6 is an automobile equipped with a storage battery 14.
  • the storage battery 14 consists of a lithium ion secondary battery, for example (in addition, the kind of secondary battery is arbitrary).
  • the EV 6 and the EV-PCS 5 described above constitute a power storage facility.
  • a stationary storage battery may be used as the storage facility instead of the EV 6.
  • EV6 is connected to home system 1 (EV-PCS5) by a charging gun (not shown) (connection cable extending from power line D4).
  • the EV 6 can charge (accumulate) the storage battery 14 with the electric power supplied from the commercial power system PS and the PV-PCS 3 via the EV-PCS 5.
  • the EV 6 can also discharge power stored in the storage battery 14 and supply power to the device 9 via the EV-PCS 5 and the distribution board 8.
  • the charging gun is removed (disconnected from the home system 1), the drive system is operated using the electric power stored in the storage battery 14, and the EV 6 can run freely. It has become.
  • EV6 is not restricted to one, A plurality may be sufficient.
  • the power measuring device 7 measures the value of the power transmitted to the power line D2 of the house H at regular time intervals (for example, every 30 seconds).
  • the power line D2 is disposed between the EV-PCS 5 and the distribution board 8.
  • the power measuring device 7 is connected to the CT2 connected to the power line D2 via a communication line.
  • the power measuring device 7 measures the power value of the power line D2 based on the measurement result of CT2.
  • the power measuring device 7 includes a wireless communication interface, for example, and is communicably connected to the management device 10 via the above-described wireless network built in the house H.
  • the power measuring device 7 may be of a specification that is connected to such a wireless network via the adapter 4 in the same manner as the PV-PCS 3 described above.
  • the distribution board 8 distributes the power transmitted to the power line D2 to the devices 9. That is, the distribution board 8 distributes the power supplied via the power line D2 from the commercial power system PS (power line D1) or PV-PCS3 (power line D3) to the devices 9 connected to the power lines D5, D6,. To do.
  • the device 9 (devices 9-1, 9-2,...) Is an electric device such as an air conditioner, an illuminator, a floor heating system, a refrigerator, an IH (Induction Heating) cooker, a television, and a water heater. .. Are installed in the house H (including the site) and connected to power lines D5, D6,... Branched from the power line D2 by the distribution board 8.
  • the device 9 is communicably connected to the management device 10 via the above-described wireless network built in the house H.
  • the device 9 may be of a specification that is connected to such a wireless network via the adapter 4 in the same manner as the PV-PCS 3 described above.
  • the management device 10 is, for example, a HEMS controller.
  • the management apparatus 10 is installed in an appropriate place in the house H, and monitors the power consumed or generated in the house H, that is, the demand area. For example, the management device 10 generates a monitor screen including a numerical value and a graph representing the current value and cumulative value of power consumption and generated power, and causes the terminal device 11 to display the monitor screen.
  • the management apparatus 10 performs operation control and monitoring of the operation state of the PV-PCS 3, EV-PCS 5, and the device 9. Details of the management apparatus 10 will be described later.
  • the terminal device 11 is a portable device such as a smartphone or a tablet terminal including an input device such as a push button, a touch panel, and a touch pad, a display device such as an organic EL display and a liquid crystal display, and a communication interface.
  • the terminal device 11 is communicably connected to the management device 10 via the above-described wireless network constructed in the house H.
  • the terminal device 11 receives an operation from the user, and transmits information indicating the received operation content to the management device 10. Further, the terminal device 11 receives the information transmitted from the management device 10 and presented to the user, and displays the received information.
  • FIG. 6 is a block diagram illustrating an example of the configuration of the management apparatus 10.
  • the management device 10 includes an in-home communication unit 21, an out-of-home communication unit 22, a data storage unit 23, and a control unit 24.
  • the home communication unit 21 is a communication unit for connecting to the above-described wireless network built in the house H and connecting to the EV-PCS 5 via the dedicated line L, for example. That is, the in-home communication unit 21 communicates with the PV-PCS 3, EV-PCS 5, power measuring device 7, device 9, and terminal device 11 under the control of the control unit 24. For example, the in-home communication unit 21 transmits the restriction information 13 described above to the PV-PCS 3. The in-home communication unit 21 transmits a corresponding control command to the EV-PCS 5 in order to change (transition) the control state of the EV-PCS 5. Further, the in-home communication unit 21 receives the power information transmitted from the power measuring device 7. In addition, the in-home communication unit 21 transmits the screen data generated by the control unit 24 to the terminal device 11.
  • the outside communication unit 22 is a communication adapter for connecting to an external wide area network N, for example, and communicates with the external server 12 under the control of the control unit 24.
  • the out-of-home communication unit 22 receives the above-described restriction information 13 sent from the server 12.
  • the data storage unit 23 is composed of, for example, a non-volatile semiconductor memory, and stores the power information received from the power measurement device 7 and the restriction information 13 received from the server 12. In addition, the data storage unit 23 stores various data (standards) used for determination when changing (transitioning) the current control state (manual operation, event operation, limited-time linked operation, plan operation) in the EV-PCS 5 and the control state. Value and margin).
  • the data storage unit 23 also stores past power generation amount information output by the PV-PCS 3.
  • the data storage unit 23 stores the maximum value of the power generation amount output by the PV-PCS 3 in the past two weeks as the past actual power generation amount in each time zone (for example, in units of 30 minutes).
  • the control unit 24 sets the past actual power generation amount (maximum power generation amount) in the same time zone stored in the data storage unit 23 to the PV panel 2 when there is no output restriction (so-called PV output suppression). The amount of power generation is estimated, and the amount of self-consumption power is subtracted from the amount of power generation, and the suppressed power generation amount is simply obtained.
  • the output restriction is issued when it is predicted with high probability that it is clear and the amount of solar radiation is high, so the PV panel 2 during the restriction period generates power to the same level as the past actual power generation amount. This is because it can be regarded as.
  • the merit of using the maximum value in the past two weeks is that at least one sunny day is included in two weeks (it exists with a very high probability), and effective past actual power generation The quantity will always be remembered. In one week, it may happen that there is no clear day during the rainy season. Furthermore, since the season does not change significantly in the past two weeks, the power generation amount estimated using the past actual power generation amount is appropriate.
  • the data storage unit 23 stores device information that defines the hardware configuration of the home system 1. This device information includes, for example, control and monitoring of various hardware (PV-PCS3, EV-PCS5, EV6, power measuring device 7, device 9, and terminal device 11) connected to the home system 1. Necessary information (for example, setting information, reference value, margin, status) is included.
  • the data storage unit 23 also stores contract information representing a power sale contract that the user has with the electric power company.
  • the contract information includes, for example, information indicating that the power sale contract is surplus purchase or full quantity purchase.
  • the control unit 24 includes a CPU (Central Processing Unit), a ROM (Read Only Memory), and a RAM (Random Access Memory) (all not shown), and controls the entire management apparatus 10.
  • the control unit 24 controls the power storage facilities (EV-PCS5, EV6) so that the charging power increases in a limited period in which the power output from the PV-PCS3 is limited.
  • control unit 24 includes a power information collection unit 241, a restriction information acquisition unit 242, a power utilization control unit 243, an operation reception unit 244, and a display control unit 245.
  • These functions are realized by the CPU using the RAM as a work memory and appropriately executing various programs stored in the ROM (for example, a power utilization control process and a limited time cooperation control process described later), for example. Is done.
  • the power information collection unit 241 collects power information including the amount of power measured by the power measurement device 7. That is, the power information collection unit 241 collects the power consumption amount consumed by the device 9. In addition, the power information collection unit 241 collects the power values of the power lines D1, D3, and D4 measured by the EV-PCS 5.
  • the restriction information acquisition unit 242 acquires the restriction information 13 stored in the server 12 through the outside communication unit 22. That is, the restriction information acquisition unit 242 acquires the restriction information 13 as illustrated in FIG.
  • the power utilization control unit 243 controls the EV-PCS 5 to charge the EV6 (storage battery 14) with the suppressed power generation amount in order to effectively use the suppressed power generation amount. Specifically, the power utilization control unit 243 performs charging of the EV 6 when the following conditions 1 to 4 are all satisfied during the EV-PCS 5 limited-time cooperative operation.
  • Condition 1 requires that there is a target device (PV-PCS3, EV-PCS5, EV6) and that limited time cooperation control is permitted (execution setting is on). Specifically, 1a) PV-PCS3 is installed. 1b) The user's power sale contract is excessive purchase (not full purchase). 1c) The control execution setting is ON and the PV-PCS 3 suppresses the output. 1d) EV-PCS5 is installed. 1e) EV6 is connected to home system 1 (EV-PCS5). These are required as Condition 1.
  • Requirement 2 is that power purchase amount ⁇ ⁇ .
  • This ⁇ is a predetermined amount (a value close to 0 as an example).
  • a certain amount
  • charging EV6 increases the amount of electricity purchased, so EV6 is not charged.
  • plays a role as a margin for giving a time width to the power purchase amount and allowing temporary power purchase. This reduces the influence of measurement errors when determining whether to execute control.
  • Requirement 3 is that upper limit value + ⁇ ⁇ power generation amount.
  • This upper limit is the upper limit of the power that can be output by the PV-PCS 3 during the limit period (line Lp shown in FIG. 2B described above), and the rated capacity of the PV panel 2 is multiplied by the upper limit (%) of the limit information 13.
  • Value. ⁇ is a predetermined amount (a value close to 0 as an example). As a result, the EV 6 is not charged while the power generation amount from the PV-PCS 3 is small and less than the upper limit value + ⁇ . That is, ⁇ plays a role as a margin for suppressing unnecessary power purchase with respect to fluctuations in power generation amount and power consumption amount from the PV-PCS 3 in real time.
  • Condition 4 requires that the power generation amount of PV panel 2 (past actual power generation amount)> power consumption-power purchase allowable setting value + ⁇ . Since the power generation amount of the PV panel 2 is not acquired as described above, the past actual power generation amount is used.
  • the past actual power generation amount is, for example, the past actual power generation amount in the same time period among the past actual power generation amounts (maximum power generation amount in units of 30 minutes) stored in the data storage unit 23 in the past two weeks.
  • the power purchase allowable setting value is a value that determines how much power purchase is permitted when charging the EV 6 and can be arbitrarily set by the user.
  • is a predetermined amount (a value close to 0 as an example).
  • plays a role as a margin for assuming that the power generation amount of the PV panel 2 is smaller than the past actual power generation amount in order to tighten the activation condition of power purchase.
  • a comparison is made using a value obtained by subtracting the amount equivalent to the charging power of EV6 from the amount of power consumption.
  • the charging power of EV6 the power value of power line D4 measured by EV-PCS5 is used.
  • the EV 6 is not charged and the power is sold. May be performed. Therefore, in addition to the condition that the power consumption is equal to or greater than the upper limit value, EV6 is charged when all these conditions are satisfied.
  • the power utilization control unit 243 simply estimates the power generation amount of the PV panel 2 using the past actual power generation amount (maximum power generation amount in units of 30 minutes). This is because, as described above, the PV panel 2 during the restriction period can be regarded as generating power to the same extent as the past actual power generation amount (the output restriction is issued because it is clear and the amount of solar radiation is large. Is expected). That is, the power utilization control unit 243 simply obtains the suppressed power generation amount by subtracting the private power consumption amount from the past actual power generation amount in the same time zone stored in the data storage unit 23.
  • the power utilization control unit 243 instructs the EV-PCS 5 about the amount of charge in order to execute charging of the EV 6.
  • the power utilization control unit 243 sets Pa to a power purchase allowable setting value (a value that determines how much power purchase is permitted when charging the EV 6).
  • This Pa is a fixed value (for example, 0.5 kW), and is set to increase the purchase of electric power in order to charge the EV-PCS 5 with the EV 6. That is, by setting Pa, which is a value larger than 0, to the EV-PCS 5 power purchase allowable setting value, the EV-PCS 5 increases the charging power (charge amount) until the purchase of the Pa occurs. Charge the battery.
  • the PV-PCS 3 increases and outputs power so that the amount of purchased and sold power (reverse power flow P R in FIG. 2C) converges to zero. Then, since there is no power purchase, the EV-PCS 5 charges EV6 by increasing the charging power until power purchase of Pa occurs again. By repeating these steps, the self-consumption including the charging power of EV6 increases to the power generation amount of panel 2, and PV-PCS3 does not suppress the output (without generating the suppressed power generation amount). Will output the generated power. Then, the EV-PCS 5 can utilize the amount that would otherwise be the suppressed power generation amount for charging the EV 6 (storage battery 14).
  • the control time constant of the PV-PCS 3 is long, for example, several tens of seconds or more, it takes a long time to stabilize the control state.
  • a fixed value (Pa) to the power purchase allowable setting value of EV-PCS5
  • the suppressed power generation amount is efficiently utilized even in the control state of PV-PCS3 having a long control time constant. It becomes possible.
  • the operation accepting unit 244 accepts operation data in response to a user's operation using the terminal device 11 (for example, various operations on the EV-PCS 5).
  • the display control unit 245 generates various screen data to be supplied to the terminal device 11. For example, the display control unit 245 generates operation screen data for operating the EV-PCS 5. Such screen data is transmitted to the terminal device 11 by the home communication unit 21.
  • FIG. 7 is a flowchart illustrating an example of the power utilization control process executed by the control unit 24.
  • FIG. 8 is a flowchart illustrating an example of a limited time cooperation control process (subroutine).
  • the control unit 24 determines whether or not the PV-PCS 3 is present (is installed) (step S101). That is, the control unit 24 determines whether or not the home system 1 has a power generation facility. As an example, the control unit 24 determines the presence / absence of the PV-PCS 3 from the device information stored in the data storage unit 23. When determining that there is no PV-PCS 3 (step S101; No), the control unit 24 ends the power utilization control process as it is.
  • step S101 when it is determined that there is the PV-PCS 3 (step S101; Yes), the control unit 24 determines whether or not the power sale contract is a surplus purchase (step S102). That is, the control unit 24 determines whether or not the power sale contract concluded between the user and the electric power company is surplus purchase. As an example, the control unit 24 determines whether or not the power sale contract is a surplus purchase from the contract information stored in the data storage unit 23. When determining that the power sale contract is not excessive purchase (step S102; No), the control unit 24 ends the power utilization control process as it is.
  • the control unit 24 determines whether or not the limited-time cooperation control is permitted during the limited period (Ste S103). For example, the control unit 24 compares the restriction information 13 stored in the data storage unit 23 with the current date and time to determine whether or not the restriction period has come. Further, the control unit 24 determines whether or not the limited time cooperation control is permitted from the device information (setting information of the EV-PCS 5) stored in the data storage unit 23. If the control unit 24 determines that the time limit is not reached or the time-restricted cooperative control is not permitted (step S103; No), the power utilization control process ends.
  • step S104 determines whether or not the home system 1 has a charging facility. As an example, the control unit 24 determines the presence / absence of the EV-PCS 5 from the device information stored in the data storage unit 23. When determining that there is no EV-PCS 5 (step S104; No), the control unit 24 ends the power utilization control process as it is.
  • step S104 when it is determined that the EV-PCS 5 exists (step S104; Yes), the control unit 24 determines whether the EV 6 is connected (step S105). That is, the control unit 24 determines whether or not the EV 6 is connected to the home system 1 (EV-PCS 5) with a charging gun (not shown). As an example, the control unit 24 determines whether the EV 6 is being connected from the device information (EV 6 status) stored in the data storage unit 23. When determining that the EV 6 is not connected (No at Step S105), the control unit 24 ends the power utilization control process as it is.
  • step S105 when it is determined that the EV 6 is connected (step S105; Yes), the control unit 24 executes a limited time cooperation control process (step S106).
  • step S106 the details of the limited time cooperation control process will be described with reference to FIG.
  • the control unit 24 determines whether or not the power purchase amount ⁇ ⁇ (step S201).
  • is a predetermined amount (a value close to 0 as an example), and plays a role as a margin for allowing a temporary power purchase by giving a time width to the power purchase amount. If the control unit 24 determines that the power purchase amount ⁇ ⁇ is not satisfied (the power purchase amount is greater than ⁇ ) (step S201; No), the control unit 24 proceeds to a process of step S209 described later.
  • the control unit 24 determines whether or not the upper limit value + ⁇ ⁇ the power generation amount is satisfied (step S202).
  • the upper limit value is the upper limit of the power that can be output by the PV-PCS 3 during the limit period, and is obtained from the limit information 13 described above (line Lp shown in FIG. 2B).
  • is a predetermined constant amount (a value close to 0 as an example), in order to suppress unnecessary power purchase against fluctuations in power generation amount and power consumption amount from the PV-PCS 3 in real time. Plays a role as a margin. If the control unit 24 determines that the upper limit value + ⁇ ⁇ the amount of power generation is not satisfied (the power generation amount is less than the upper limit value + ⁇ ) (step S202; No), the control unit 24 proceeds to step S209 described later.
  • step S202 when it is determined that the upper limit value + ⁇ ⁇ the power generation amount (step S202; Yes), the control unit 24 determines whether the control state of the EV-PCS 5 is a plan operation or a limited time cooperative operation (step). S203). That is, the control unit 24 determines whether the EV-PCS 5 is currently controlled by the plan operation or the limited time cooperation operation. If the control unit 24 determines that the control state of the EV-PCS 5 is not the plan operation or the limited time linked operation (manual operation or event operation) (step S203; No), the control unit 24 proceeds to step S209 described later.
  • the control unit 24 determines that the past actual power generation amount> the power consumption amount ⁇ the power purchase allowable setting value + ⁇ . Is determined (step S204).
  • the past actual power generation amount is, for example, the past actual power generation amount in the same time period among the past actual power generation amount (maximum power generation amount in 30 minute units) in the past two weeks stored in the data storage unit 23.
  • the power purchase allowable setting value is a value that defines how much power purchase is permitted when charging the EV 6 (storage battery 14), and can be arbitrarily set by the user.
  • is a predetermined amount (a value close to 0 as an example), and it is assumed that the power generation amount is smaller than the actual value (the past maximum power generation amount) in order to tighten the activation condition of power purchase. It plays a role as a margin.
  • the control unit 24 determines that the past actual power generation amount> the power consumption amount ⁇ the power purchase allowable setting value + ⁇ is not satisfied (the past actual power generation amount is equal to or less than the power consumption amount ⁇ the power purchase allowable setting value + ⁇ ) (step S204; No). Then, the process proceeds to step S209 described later.
  • step S204 when it is determined that the past actual power generation amount> the power consumption amount ⁇ the power purchase allowable setting value + ⁇ (step S204; Yes), the control unit 24 sets the control state of the EV-PCS 5 to the limited time linked operation (step S204). S205). That is, if the current control state is a plan operation, the control unit 24 changes to a limited time cooperative operation, and if the current control state is a limited time cooperative operation, the control unit 24 maintains it.
  • the control unit 24 sets Pa to the power purchase allowable setting value of the EV-PCS 5 (step S206).
  • This Pa is a fixed value (for example, 0.5 kW), and is set to increase the charging of the EV 6 (storage battery 14) with respect to the EV-PCS 5.
  • the control unit 24 turns on the power purchase setting when the EV-PCS 5 is restricted (step S207). By turning on the power purchase setting at the time of restriction, the EV-PCS 5 increases the amount of charge until power purchase occurs and charges the EV 6.
  • the control unit 24 sets the operation mode of the EV-PCS 5 to “EV charging” (step S208). That is, the control unit 24 instructs the EV-PCS 5 to perform a charging operation. Then, the control unit 24 finishes the limited time cooperation control process.
  • the EV-PCS 5 instructed to perform the charging operation increases the charging power until the purchase of the Pa set in step S206 occurs, and charges the EV 6.
  • the PV-PCS 3 increases and outputs power so that the amount of purchased and sold power (reverse power flow P R in FIG. 2C) converges to zero.
  • the EV-PCS 5 charges EV6 by increasing the charging power until power purchase of Pa occurs again.
  • self-consumption including the charging power of the EV 6 increases to the power generation amount of the panel 2 (past actual power generation amount).
  • EV-PCS 5 increases the charging power along the alternate long and short dash line Lb, and EV6 Charge the battery. Then, the PV-PCS 3 outputs the electric power generated by the PV panel 2 along the generated power La without suppressing the output (without generating the suppressed power generation amount). In other words, the EV-PCS 5 can utilize the amount that would otherwise be the suppressed power generation amount for charging the EV 6 (storage battery 14).
  • the control unit 24 determines whether the control state of the EV-PCS 5 is the cooperation operation at the time of restriction. It is determined whether or not (step S209). That is, the control unit 24 determines whether the EV-PCS 5 is currently charging the EV 6 at the time of restriction. If the control unit 24 determines that the control state of the EV-PCS 5 is not the limited-time cooperative operation (step S209; No), the limited-time cooperative control process ends.
  • control unit 24 turns off the power purchase setting at the time of restriction of the EV-PCS 5 (step S210). ). By turning off the power purchase setting at the time of restriction, the EV-PCS finishes charging the EV 6 at the time of restriction.
  • the control unit 24 sets the EV-PCS 5 control state to the plan operation (step S211). That is, the control unit 24 changes the control state of the EV-PCS 5 from the limited time linked operation to the plan operation.
  • the charging power of the power storage facility (EV-PCS5) is appropriately increased in the limited period in which the power output from the power generation facility (PV-PCS3) is limited.
  • the power can be used effectively.
  • the amount can be estimated and used for charging the EV6 (storage battery 14) by the EV-PCS5. Thereby, the cost of a system can be held down appropriately.
  • control unit 24 simply subtracts the private power consumption (for example, the power measured by the power measuring device 7) from the past actual power generation (the past actual power generation during the same time period), and simply reduces the suppressed power generation.
  • the above-described ⁇ (margin for assuming the power generation amount to be smaller than the actual value) may be further subtracted.
  • the control unit 24 converts the obtained suppressed power generation amount into a charge amount corresponding to the W value, and instructs the EV-PCS 5 to charge the charge amount.
  • the charge amount of EV6 can be adjusted according to the suppressed power generation amount, the suppressed power generation amount can be utilized more efficiently.
  • control unit 24 is characterized by planning a charging / discharging schedule of the EV 6 for the EV-PCS 5 based on the restriction information 13. Specifically, as shown below, a charging / discharging schedule is planned so that EV6 (storage battery 14) can be charged during the limited period.
  • the control unit 24 discharges the EV 6 and secures a capacity capable of charging the storage battery 14 before the limit period arrives. Further, the user is prompted to use the EV 6 on the day before the limit period arrives, and the remaining amount of the storage battery 14 is reduced. In addition, charging using the midnight time zone is stopped at night the day before the limit period arrives. You may plan about the capacity
  • minimum power sale mode an operation mode in which surplus charging is performed
  • the home system 1 has been described as an example, but the present invention can be similarly applied to, for example, a building system arranged in a building.
  • the management apparatus 10 may be arranged outside the house H.
  • the server 12 illustrated in FIG. 1 may function as the management device 10.
  • the electric power can be effectively utilized by appropriately increasing the charging power of the power storage facility (EV-PCS5) in the limited period.
  • the exclusive management apparatus 10 was used was demonstrated in the said embodiment, by applying the operation program which prescribes
  • Such a program distribution method is arbitrary.
  • a CD-ROM Compact Disk Read-Only Memory
  • DVD Digital Versatile Disk
  • MO Magnetic Optical Disk
  • a memory card etc.
  • a computer It may be stored in a recording medium and distributed, or distributed via a communication network such as the Internet.
  • the present invention can be employed in a management apparatus and a control method that can effectively use power in a limited period in which power output from the power generation facility is limited.

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Transportation (AREA)
  • Mechanical Engineering (AREA)
  • Supply And Distribution Of Alternating Current (AREA)
  • Charge And Discharge Circuits For Batteries Or The Like (AREA)

Abstract

PV-PCS(3)は、PVパネル(2)が発電した電力を出力する。EV-PCS(5)は、商用電力系統(PS)から供給された電力またはPV-PCS(3)から出力された電力をEV(6)に充電する。PV-PCS(3)は、直接または間接的にサーバ(12)から制限情報(13)を受信する。そして、PV-PCS(3)から出力する電力が制限される制限期間において、管理装置(10)は、簡易的に推定したPVパネル(2)の発電量から抑制発電量を求め、この抑制発電量を上限として、充電電力が増加するようにPV-PCS(3)を制御する。

Description

管理装置、及び、制御方法
 本発明は、発電設備から出力する電力が制限される制限期間において、電力を有効に活用できる管理装置、及び、制御方法に関する。
 近年、太陽光発電に代表される発電設備が導入されたホームシステム(一例として、HEMS:Home Energy Management System)が普及している。このホームシステムでは、一般家庭の電力を適切に管理できるようになっている。
 また、ホームシステムでは、電気自動車や据え置き型の蓄電池といった蓄電設備が導入されている場合も多い。これら発電設備と蓄電設備とが導入されたホームシステムの先行技術として、例えば、特許文献1には、発電設備または商用電力系統(商用電源)からの電力を貯蔵できるようにした電力貯蔵型の発電システムの発明が開示されている。また、特許文献2には、発電装置の余剰電力を用いて負荷機器を稼働させる負荷制御装置の発明が開示されている。
特許第5738212号公報 特開2013-110951号公報
 ところで、発電設備が導入された需要家から商用電力系統へ電力が供給される逆潮流により、商用電力系統の需給バランスが崩れることがある。例えば、快晴の休日には、需要が大幅に減少するとともに、発電量の増加に伴い供給が増加する。
 そこで、商用電力系統の需給バランスを保つために、電気事業者が需要家に対して時間を指定して逆潮流の抑制(制限)を予め指示するための制度の整備が進められている。例えば、2014年には日本の資源エネルギー庁から、太陽光発電に対する出力制御ルールが公示されている。この出力制御ルールは、発電設備の発電量を調整して、商用電力系統への売電を抑えるものである。
 具体的な運用の一例として、電気事業者は、発電設備からの出力を制限すべき制限期間(時間帯)を計画すると、その制限期間における制限内容(出力上限)を含む制限情報を作成する。電気事業者は、作成した制限情報を、ネットワークを介して、発電設備に提供する。そして、発電設備は、提供された制限情報に沿って、制限期間が到来すると、出力上限を超えないように発電量を抑制する。
 しかしながら、特許文献1に記載された発明では、上述のような逆潮流を抑制するための指示に応じて逆潮流を減少させるものではなく、実際の逆潮流により系統電圧が上昇し、閾値電圧に達した場合に、充電運転に切り替えるものである。つまり、特許文献1に記載された発明では、制限情報が提供されることを何ら考慮していないため、そのままでは、制限期間が到来しても、電力を抑制することができない。その結果、特許文献1に記載された発明では、制限期間において、電力を有効に活用することができなかった。
 一方、特許文献2に記載された発明では、電力会社からの要請により発電が規制される場合についても言及している。それでも、具体的な記載がないため、実際に、制限期間において、電力を有効に活用することが可能であるのか不明である。また、そもそも、特許文献2に記載された発明では、太陽電池で実際に生成されている電力(発電電力の実績値)が取得できることを前提として余剰電力を求めているが、一般的とは言えない。つまり、一般的な設備では、コスト削減のため、太陽電池で実際に生成されている電力を取得していない。そのため、余剰電力(パワーコンディショナがどのくらい抑制して電力を出力しているのか)について、把握することが困難となっている。すなわち、一般的な設備では、制限期間において、電力を有効に活用することができなかった。
 本発明は、上記のような問題点を解決するためになされたもので、発電設備から出力する電力が制限される制限期間において、電力を有効に活用することのできる管理装置、及び、制御方法を提供することを目的とする。
 上記目的を達成するために、本発明に係る管理装置は、
 発電モジュールが発電した電力をパワーコンディショナを介して出力する発電設備と、電力系統から供給された電力または前記パワーコンディショナから出力された電力を充電する蓄電設備と、を管理する管理装置であって、
 前記パワーコンディショナから出力する電力が制限される制限期間において、充電電力が増加するように前記蓄電設備を制御する制御手段を備える。
 本発明によれば、発電設備から出力する電力が制限される制限期間において、蓄電設備の充電電力を適宜増加させることで、電力を有効に活用することができる。
本発明の実施形態1に係るホームシステムの全体構成の一例を示すブロック図である。 制限情報の一例を説明するための模式図である。 制限期間を説明するための模式図である。 逆潮流を説明するための模式図である。 制限期間における発電量と消費電力量との関係を説明するための模式図である。 EV-PCSにおける各制御状態を説明するための模式図である。 EV-PCSにおける各制御状態の関係を説明するための状態遷移図である。 管理装置の構成の一例を示すブロック図である。 本発明の実施形態1に係る電力活用制御処理の一例を示すフローチャートである。 制限時連携制御処理(サブルーチン)の一例を示すフローチャートである。 充電電力を増加させる様子を説明するための模式図である。
 以下、本発明の実施形態について、図面を参照しながら詳細に説明する。なお、図中同一または相当部分には同一符号を付す。以下では、具体例として、本発明がホームシステムに適用される場合について説明するが、例えば、ビルシステムについても同様に本発明を適用することができる。すなわち、以下に説明する実施形態は説明のためのものであり、本発明の範囲を制限するものではない。従って、当業者であればこれらの各要素または全要素をこれと均等なものに置換した実施形態を採用することが可能であるが、これらの実施形態も本発明の範囲に含まれる。
(実施形態1)
 図1は、本発明の実施形態1に係るホームシステム1の全体構成の一例を示すブロック図である。このホームシステム1は、家屋H内で使用される電力の管理を行う、いわゆる、HEMS(Home Energy Management System)と呼ばれるシステムである。ホームシステム1は、PV(Photo Voltaics)パネル2と、PV-PCS(Photo Voltaics - Power Conditioning System)3と、アダプタ4と、EV-PCS(Electric Vehicle - Power Conditioning System)5と、EV(Electric Vehicle)6と、電力測定装置7と、分電盤8と、複数の機器9(機器9-1,9-2,…)と、管理装置10と、端末装置11と、を備えている。
 また、ホームシステム1は、外部の広域ネットワークNを介して、家屋H外に配置されたサーバ12と通信可能となっている。このサーバ12は、PV-PCS3からの出力を制限すべき制限期間を含む制限情報13を記憶している。この制限情報13は、例えば、PV-PCS3(アダプタ4)または管理装置10から適宜読み出される。なお、制限情報13の詳細については、後述する。
 PVパネル2は、太陽光を受けて発電を行う発電モジュールである。以下では、PVパネル2の定格容量(最大発電電力)が、一例として、5kWである場合について説明する。また、このPVパネル2と、以下のPV-PCS3(アダプタ4)とが発電設備を構成する。
 PV-PCS3は、PVパネル2用のパワーコンディショナである。PV-PCS3は、PVパネル2が発電した電気を直流電力から交流電力に変換し、電力線D3を介してEV-PCS5に供給(出力)する。このようにPV-PCS3から供給された電力は、EV-PCS5を介して、商用電力系統(商用電源)PSに逆潮流(いわゆる売電)することが可能となっている。この他にも、PV-PCS3から供給された電力は、EV6(蓄電池14)への充電に使用され、または、分電盤8を通じて機器9にて使用される。なお、PV-PCS3からの出力を制限すべき制限期間において、PV-PCS3は、例えば、進相位相制御により、出力される有効電力を調整する(出力を抑制する)。
 アダプタ4は、一例として、無線通信を行う通信アダプタである。アダプタ4は、家屋H内に構築された無線ネットワーク(図示せず)を介して、管理装置10と通信可能に接続する。この無線ネットワークでは、例えば、Wi-Fi(登録商標)やWi-SUN(登録商標)といった周知の通信規格に則った通信が行われる。なお、アダプタ4は、広域ネットワークNを介して、サーバ12と通信可能に接続してもよい。
 このようなアダプタ4を介して、PV-PCS3は、管理装置10と通信を行う。例えば、PV-PCS3は、管理装置10から送られる制限情報13を、アダプタ4を介して受信する。なお、PV-PCS3(アダプタ4)は、管理装置10からではなく、直接、サーバ12にアクセスし、制限情報13を受信するようにしてもよい。このようにして、制限情報13を受信すると、PV-PCS3は、受信した制限情報13に規定されている制限期間において、出力を抑制する。以下、制限情報13について、説明する。
 制限情報13には、例えば、図2Aに示すように、各時間(時間帯)における出力上限(PVパネル2の定格容量のうち何%まで出力できるか)が定められている。この例の場合、0時~9時、及び、15時~24時の出力が100%(つまり、制限なし)と規定されている。また、9時~11時、11時~13時、及び、13時~15時の出力が40%と規定されている。なお、この他にも、時間帯によっては、出力が0%と規定されている場合もあり得る。このような、出力が100%よりも小さい時間帯が制限期間となり、その制限期間における出力上限が、PV-PCS3から電力を出力できる上限値となる。なお、図2Aに示す制限情報13は、一例であり、適宜変更可能である。例えば、出力上限を割合(%)で規定する代わりに、電力値(n[kW])で規定するようにしてもよい。
 このような制限情報13をアダプタ4を介して受信すると、PV-PCS3は、例えば、図2Bに示すように、PVパネル2が線Laに示すように発電しても、線Lpを上限値として、電力を出力する。つまり、制限期間(9時~15時)において、進相位相制御により、出力される有効電力を調整することで、PVパネル2が発電した電力よりも少ない上限値(線Lp)まで抑制して電力を出力する。
 なお、ユーザと電気事業者との間の売電契約が、余剰買取であれば、このような制限期間中に自家消費(買電)が発生している状況において、PV-PCS3は、その自家消費分まで(PVパネル2の発電量が足りている場合)、電力を出力できることが認められている。つまり、図2Cに示すように、連系点Cにおける逆潮流PRは、PV-PCS3から出力される電力PGと、自家消費される電力PLとから、以下の式1により求まる。なお、自家消費には、EV6の蓄電池14への充電や、機器9での電力消費が含まれる。
 PR = PG - PL ・・・(式1)
 そして、PV-PCS3は、電力PR>0の場合に、上限値(線Lp)まで抑制した電力を出力する。一方、電力PR≦0であれば、電力PR=0に収束するまで電力を増やして出力することができる。
 具体的に図3を参照して説明する。図3では、自家消費される電力PLの推移を、一点鎖線にて示している。また、PVパネル2にて発電される発電電力Laの推移を、細い実線にて示している。そして、PV-PCS3から出力される電力PGの推移を、太い実線にて示している。つまり、制限期間(9時~15時)において、電力PLが上限値(線Lp)を下回っている時間帯(9時~時刻T1)では、PV-PCS3は、上限値となる2kWまで電力PGを出力する。その後、電力PLが上限値を上回ると(時刻T1~時刻T3)、PV-PCS3は、電力PLと同じ電力値まで増加させて電力PGを出力する。なお、電力PLが発電電力Laを上回ると(時刻T3~15時)、PV-PCS3は、発電電力Laと同じ電力値の電力PGを出力する。
 より詳細に説明すると、時刻T1において、PVパネル2の発電電力のうち、上限値と等しい電力PGまで出力され、残りが抑制発電量Y1となる。つまり、PV-PCS3は、進相位相制御により、抑制発電量Y1が無効電力となるように位相をずらして出力する。このように、自家消費が少ない時刻T1では、発電電力に占める抑制発電量Y1の割合が高いため、発電電力が有効に活用されているとは言えない。一方、自家消費が多い時刻T2では、その自家消費分まで電力PGを出力しており、発電電力に占める抑制発電量Y2の割合が低いため、発電電力がより有効に活用されていると言える。
 すなわち、制限期間中に抑制発電量が生じている状況では、その抑制発電量分まで消費電力を増やせることになる。そして、抑制発電量を少なくすることで、PVパネル2の発電電力を有効に活用することができる。それでも、一般的なPV-PCS3では、このような抑制発電量を外部から把握することが困難となっている。また、PVパネル2の発電電力やPVパネル2付近の日射量なども、コスト削減のため、一般的なPV-PCS3では、取得していない。そのため、後述するように、管理装置10は、PV-PCS3から出力された過去の発電量を用いて、簡易的に抑制発電量を求めている。
 図1に戻って、EV-PCS5は、EV6用のパワーコンディショナである。EV-PCS5は、EV6に搭載されている蓄電池14の充電及び放電について制御を行う。EV-PCS5は、蓄電池14の充電時には、商用電力系統PS(電力線D1)やPV-PCS3(電力線D3)からの電力を電力線D4を介して蓄電池14に供給する。また、EV-PCS5は、蓄電池14の放電時には、蓄電池14からの電力を電力線D4,D2を介して分電盤8に供給する。
 EV-PCS5は、充電及び放電の制御を行うため、一定時間毎に(一例として、30秒毎に)、電力線D1,D3,D4にそれぞれを送電される電力の値を測定する。電力線D1は、商用電力系統PSとEV-PCS5との間に配設され、また、電力線D3は、PV-PCS3とEV-PCS5との間に配設され、そして、電力線D4は、EV-PCS5とEV6との間に配設されている。
 EV-PCS5は、電力線D1,D3,D4にそれぞれ接続されたCT(Current Transformer)1,3,4と通信線を介して接続される。CT1,3,4は、交流電流を測定するセンサである(後述するCT2についても同様)。EV-PCS5は、CT1の測定結果に基づいて電力線D1の電力値を測定する。同様に、EV-PCS5は、CT3,4の測定結果に基づいて電力線D3,D4の電力値を測定する。
 また、EV-PCS5は、専用の通信線Lを介して、管理装置10と通信可能に接続する。EV-PCS5は、例えば、管理装置10からの要求に応答して、測定した電力線D1,D3,D4の電力値を管理装置10に送信する。なお、EV-PCS5は、家屋H内に構築された上述の無線ネットワークを介して、管理装置10と通信してもよい。
 このようなEV-PCS5は、管理装置10に制御され、例えば図4に示すように、手動運転、イベント運転、制限時連携運転、及び、プラン運転のうち、何れかの制御状態となる。なお、制限時連携運転とは、PV-PCS3からの出力を制限すべき制限期間において、PV-PCS3と連携して自家消費を適切に増加させる運転である。つまり、制限期間中に抑制発電量が生じる状況において、その抑制発電量をEV6の蓄電池14への充電に使用して、PVパネル2の発電電力を有効に活用する運転である。なお、制限時連携運転の詳細は、管理装置10の説明とともに後述する。
 これらの制御状態は、優先度が高い順に、手動運転,イベント運転,制限時連携運転,プラン運転と、定められている。つまり、ユーザの意思が強く働く順に、優先度が高く設定されている。そのため、例えば、制限時連携運転中に、ユーザによる操作が行われたり、充放電のスケジュールが到来すると、手動運転やイベント運転といった優先度の高い制御状態へと遷移する。具体的にEV-PCS5は、図5の状態遷移図に示すように、発生した事象に応じて制御状態を適宜遷移させる。
 図1に戻って、EV6は、蓄電池14を搭載した自動車である。蓄電池14は、例えば、リチウムイオン二次電池からなる(なお、二次電池の種類は任意である)。このEV6と、上述したEV-PCS5とが蓄電設備を構成する。なお、蓄電設備は、EV6の代わりに、例えば、据え置き型の蓄電池を用いるようにしてもよい。
 EV6は、図示せぬ充電ガン(電力線D4から延びた接続ケーブル)により、ホームシステム1(EV-PCS5)に接続される。そして、EV6は、EV-PCS5を介して、商用電力系統PSやPV-PCS3から供給される電力を蓄電池14に充電(蓄電)することが可能となっている。また、EV6は、蓄電池14に蓄えられた電力を放電し、EV-PCS5及び分電盤8を介して、機器9に電力を供給することも可能となっている。
 また、EV6は、自動車として活用される際には、充電ガンが外され(ホームシステム1から切り離され)、蓄電池14に蓄えられた電力を使用して駆動系を動作させ、自由に走行可能となっている。なお、EV6は、1台に限られず、複数台であってもよい。
 電力測定装置7は、一定時間毎に(一例として、30秒毎に)、家屋Hの電力線D2に送電される電力の値を測定する。電力線D2は、EV-PCS5と分電盤8との間に配設されている。電力測定装置7は、電力線D2に接続されたCT2と通信線を介して接続される。電力測定装置7は、CT2の測定結果に基づいて電力線D2の電力値を測定する。
 また、電力測定装置7は、例えば、無線通信インタフェースを備え、家屋H内に構築された上述の無線ネットワークを介して、管理装置10と通信可能に接続する。なお、電力測定装置7は、上述したPV-PCS3と同様に、アダプタ4を介して、このような無線ネットワークに接続される仕様であってもよい。
 分電盤8は、電力線D2に送電される電力を機器9に分配する。つまり、分電盤8は、商用電力系統PS(電力線D1)やPV-PCS3(電力線D3)から電力線D2を介して供給される電力を、電力線D5,D6,…に接続された機器9へ分配する。
 機器9(機器9-1,9-2,…)は、例えば、エアコン、照明器、床暖房システム、冷蔵庫、IH(Induction Heating)調理器、テレビ、給湯機などの電気機器である。機器9-1,9-2,…は、家屋H(敷地も含む)内に設置され、電力線D2から分電盤8により分岐された電力線D5,D6,…にそれぞれ接続されている。機器9は、家屋H内に構築された上述の無線ネットワークを介して、管理装置10と通信可能に接続する。なお、機器9は、上述したPV-PCS3と同様に、アダプタ4を介して、このような無線ネットワークに接続される仕様であってもよい。
 管理装置10は、例えば、HEMSコントローラである。管理装置10は、家屋H内の適切な場所に設置され、家屋H、すなわち、需要地において消費や発電される電力の監視を行う。例えば、管理装置10は、消費電力や発電電力の現在値や累積値を表す数値やグラフを含んだモニタ画面を生成して、端末装置11に表示させる。また、管理装置10は、PV-PCS3、EV-PCS5、及び、機器9の動作制御や動作状態の監視などを行う。管理装置10の詳細については後述する。
 端末装置11は、押しボタン、タッチパネル、タッチパッドなどの入力デバイスと、有機ELディスプレイ、液晶ディスプレイなどの表示デバイスと、通信インタフェースとを備えた、例えば、スマートフォンやタブレット端末などの携帯機器である。端末装置11は、家屋H内に構築された上述の無線ネットワークを介して、管理装置10と通信可能に接続する。例えば、端末装置11は、ユーザからの操作を受け付け、受け付けた操作内容を示す情報を管理装置10に送信する。また、端末装置11は、管理装置10から送信された、ユーザに提示するための情報を受信し、受信した情報を表示する。
 以下、図6を参照して、管理装置10の詳細について説明する。図6は、管理装置10の構成の一例を示すブロック図である。図示するように、管理装置10は、宅内通信部21と、宅外通信部22と、データ記憶部23と、制御部24とを備える。
 宅内通信部21は、例えば、家屋H内に構築された上述の無線ネットワークに接続するため、また、専用線Lを介してEV-PCS5と接続するための通信ユニットである。つまり、宅内通信部21は、制御部24による制御の下、PV-PCS3、EV-PCS5、電力測定装置7、機器9、及び、端末装置11との通信を行う。例えば、宅内通信部21は、PV-PCS3に上述した制限情報13を送信する。また、宅内通信部21は、EV-PCS5の制御状態を変更(遷移)するために、EV-PCS5に対して対応する制御コマンドを送信する。更に、宅内通信部21は、電力測定装置7から送られる電力情報を受信する。この他にも宅内通信部21は、制御部24が生成した画面データを端末装置11に送信する。
 宅外通信部22は、例えば、外部の広域ネットワークNに接続するための通信アダプタであり、制御部24による制御の下、外部のサーバ12との通信を行う。例えば、宅外通信部22は、サーバ12から送られる上述した制限情報13を受信する。
 データ記憶部23は、例えば、不揮発性の半導体メモリで構成され、電力測定装置7から受信した電力情報、及び、サーバ12から受信した制限情報13を記憶する。また、データ記憶部23は、EV-PCS5における現在の制御状態(手動運転,イベント運転,制限時連携運転,プラン運転)や、制御状態を変更(遷移)する際の判定に用いる各種データ(基準値やマージンなど)も記憶する。
 また、データ記憶部23は、PV-PCS3が出力した過去の発電量情報も記憶する。例えば、データ記憶部23は、各時間帯(一例として、30分単位)で、過去2週間におけるPV-PCS3が出力した発電量の最大値を過去実績発電量として記憶する。後述するように、制御部24は、データ記憶部23に記憶されている同じ時間帯における過去実績発電量(最大発電量)を、出力制限(いわゆるPV出力抑制)がなかった場合におけるPVパネル2の発電量と推定し、そこから自家消費電力量を差し引いて、簡易的に抑制発電量を求める。これは、そもそも出力制限が発せられるのは、快晴で日射量が多い旨が高確率で予想される場合であるので、制限期間中におけるPVパネル2は、過去実績発電量と同程度まで発電していると見なせるためである。なお、過去2週間における最大値を利用するメリットとして、2週間のうちに、晴れの日が少なくとも1日は含まれている(極めて高い確率で存在する)ことが挙げられ、有効な過去実績発電量が、常に記憶され続けることになる。なお、1週間だと、梅雨時に晴れの日が全くないことも十分に起こり得る。更に、過去2週間であれば、季節が大きく変わることもないため、過去実績発電量を利用して推定する発電量が適切となる。
 また、データ記憶部23は、ホームシステム1のハードウェア構成を規定する機器情報を記憶する。この機器情報には、例えば、ホームシステム1に接続された各種のハードウェア(PV-PCS3,EV-PCS5,EV6,電力測定装置7,機器9,端末装置11)を、制御や監視するために必要な情報(一例として、設定情報、基準値、マージン、及び、ステータスなど)が含まれている。この他にも、データ記憶部23は、ユーザが電気事業者と結んでいる売電契約を表す契約情報も記憶している。この契約情報には、例えば、売電契約が余剰買取や全量買取であることを示す情報が含まれている。
 制御部24は、CPU(Central Processing Unit),ROM(Read Only Memory),RAM(Random Access Memory)を備え(何れも図示せず)、管理装置10全体を制御する。例えば、制御部24は、PV-PCS3から出力する電力が制限される制限期間において、充電電力が増加するように蓄電設備(EV-PCS5,EV6)を制御する。
 制御部24は、機能的には、電力情報収集部241と、制限情報取得部242と、電力活用制御部243と、操作受付部244と、表示制御部245とを備える。これらの機能は、CPUが、RAMをワークメモリとして用い、例えば、ROMに記憶されている各種プログラム(例えば、後述する電力活用制御処理や制限時連携制御処理のプログラム)を適宜実行することにより実現される。
 電力情報収集部241は、電力測定装置7にて測定された電力量を含む電力情報を収集する。つまり、電力情報収集部241は、機器9が消費する消費電力量を収集する。この他にも電力情報収集部241は、EV-PCS5にて計測された電力線D1,D3,D4の電力値を収集する。
 制限情報取得部242は、サーバ12が記憶する制限情報13を宅外通信部22を通じて取得する。つまり、制限情報取得部242は、上述した図2Aに示すような制限情報13をサーバ12から取得する。
 電力活用制御部243は、制限期間において、抑制発電量を有効に活用するために、EV-PCS5を制御して、抑制発電量をEV6(蓄電池14)へ充電させる。具体的に電力活用制御部243は、EV-PCS5の制限時連携運転時において、以下の条件1~4が全て成立した際に、EV6の充電を実行する。
 条件1では、対象機器(PV-PCS3,EV-PCS5,EV6)があり、制限時連携制御が許可されている(実行設定がオンである)ことが要求される。具体的には、1a)PV-PCS3が設置されていること。1b)ユーザの売電契約が余剰買取である(全量買取でない)こと。1c)制御の実行設定がオンであり、かつ、PV-PCS3が出力を抑制していること。1d)EV-PCS5が設置されていること。1e)EV6がホームシステム1(EV-PCS5)に接続されていること。これらが条件1として要求されている。
 条件2では、買電量≦αであることが要求される。このαは、予め定められた一定量(一例として0に近い値)である。これにより、買電量が一定量(α)より大きい場合では、EV6の充電を行うと買電量が増えることになるため、EV6の充電は実行しない。つまり、αは、買電量に時間幅を持たせ、一時的な買電を許容するためのマージンとしての役割を果たしている。これにより、制御を実行するかどうかの判断時に、計測誤差による影響を小さくしている。
 条件3では、上限値+β≦発電量であることが要求される。この上限値は、制限期間においてPV-PCS3が出力できる電力の上限(上述した図2Bに示す線Lp)であり、PVパネル2の定格容量に、制限情報13の上限値(%)を乗じた値である。また、βは、予め定められた一定量(一例として0に近い値)である。これにより、PV-PCS3からの発電量が少なく、上限値+β未満である間は、EV6の充電は実行しない。つまり、βは、PV-PCS3からの発電量や消費電力量が実時間で変動することに対する、不要な買電を抑制するためのマージンとしての役割を果たしている。
 条件4では、PVパネル2の発電量(過去実績発電量)>消費電力量-買電許容設定値+γであることが要求される。このPVパネル2の発電量は、上述したように取得していないため、過去実績発電量を用いる。過去実績発電量は、例えば、データ記憶部23に記憶された過去2週間における過去実績発電量(30分単位の最大発電量)のうち、同じ時間帯の過去実績発電量である。また、買電許容設定値は、EV6の充電を行う際に、どの程度までの買電を許容するのかを定めた値であり、ユーザにより任意に設定可能となっている。また、γは、予め定められた一定量(一例として0に近い値)である。つまり、γは、買電の発動条件を厳しくすべく、PVパネル2の発電量を過去実績発電量より少なめに仮定するためのマージンとしての役割を果たしている。なお、EV6が充電動作中である場合は、消費電力量からEV6の充電電力相当分を減算した値を用いて比較する。EV6の充電電力は、EV-PCS5にて計測された電力線D4の電力値を用いる。なお、EV6の充電電力を、電力測定装置7が測定するようにしてもよい。また、制限期間において、売電可能であるとき(一例として、消費電力量が上限値より少ない状態、あるいは、売電がすでに発生している状態)では、EV6の充電を行わずに、売電を行うようにしてもよい。そのため、消費電力量が上限値以上であることも条件に加え、これら全ての条件が成立した際に、EV6の充電を実行する。
 また、電力活用制御部243は、過去実績発電量(30分単位の最大発電量)を用いて、簡易的にPVパネル2の発電量を推定する。これは、上述したように、制限期間中におけるPVパネル2は、過去実績発電量と同程度まで発電していると見なせるためである(出力制限が発せられるのは、快晴で日射量が多い旨が予想されることが前提となる)。つまり、電力活用制御部243は、データ記憶部23に記憶されている同じ時間帯における過去実績発電量から自家消費電力量を差し引いて、簡易的に抑制発電量を求める。
 電力活用制御部243は、EV6の充電を実行するために、EV-PCS5へ充電量の指示を行う。例えば、電力活用制御部243は、買電許容設定値(EV6の充電を行う際に、どの程度までの買電を許容するかを定めた値)に、Paを設定する。このPaは、固定値(一例として0.5kW)であり、EV-PCS5に対して、EV6の充電を行うために、買電を増加させるために設定される。つまり、0より大きい値であるPaをEV-PCS5の買電許容設定値にセットすることで、EV-PCS5は、そのPaの買電が生じるまで充電電力(充電量)を増加させて、EV6へ充電を行う。これに追従して、PV-PCS3は、売買電力量(図2Cの逆潮流PR)が0に収束するように電力を増やして出力する。すると、買電がなくなるため、EV-PCS5は、再びPaの買電が生じるまで充電電力を増加させて、EV6の充電を行う。これらを繰り返すことで、EV6の充電電力を含めた自家消費がパネル2の発電量まで増加し、PV-PCS3は、出力を抑制することなく(抑制発電量を生じさせることなく)、PVパネル2が発電した電力分を出力することになる。そして、EV-PCS5は、本来であれば抑制発電量となる分を、EV6(蓄電池14)への充電に活用することができる。
 なお、PV-PCS3の制御時定数が、例えば、数十秒以上と長い場合、制御状態が安定するまでに長時間を要してしまう。これに対して、EV-PCS5の買電許容設定値に、固定値(Pa)をセットすることで、制御時定数が長いPV-PCS3の制御状態の中でも、効率的に抑制発電量を活用することが可能となる。
 操作受付部244は、端末装置11を使用するユーザの操作(例えば、EV-PCS5に対する各種操作)に応じて、その操作データを受け付ける。
 表示制御部245は、端末装置11に供給するための種々の画面データを生成する。例えば、表示制御部245は、EV-PCS5を操作するための操作画面データを生成する。このような画面データは、宅内通信部21により、端末装置11に送信される。
 以下、本発明の実施形態1に係る管理装置10(制御部24)の動作について、図7,8を参照して説明する。図7は、制御部24が実行する電力活用制御処理の一例を示すフローチャートである。また、図8は、制限時連携制御処理(サブルーチン)の一例を示すフローチャートである。
 図7に示すように、制御部24は、PV-PCS3があるか(設置されているか)否かを判別する(ステップS101)。すなわち、制御部24は、ホームシステム1において、発電設備が備わっているかどうかを判別する。一例として、制御部24は、データ記憶部23に記憶されている機器情報から、PV-PCS3の有無を判別する。制御部24は、PV-PCS3がないと判別すると(ステップS101;No)、そのまま電力活用制御処理を終える。
 一方、PV-PCS3があると判別した場合(ステップS101;Yes)に、制御部24は、売電契約が余剰買取であるか否かを判別する(ステップS102)。すなわち、制御部24は、ユーザと電気事業者との間で締結している売電契約が、余剰買取であるかどうかを判別する。一例として、制御部24は、データ記憶部23に記憶されている契約情報から、売電契約が余剰買取であるかどうかを判別する。制御部24は、売電契約が余剰買取でないと判別すると(ステップS102;No)、そのまま電力活用制御処理を終える。
 一方、売電契約が余剰買取であると判別した場合(ステップS102;Yes)に、制御部24は、制限期間中であり、かつ、制限時連携制御が許可されているか否かを判別する(ステップS103)。例えば、制御部24は、データ記憶部23に記憶された制限情報13と現在日時とを比較して、制限期間が到来しているかどうかを判別する。また、制御部24は、データ記憶部23に記憶された機器情報(EV-PCS5の設定情報)から、制限時連携制御が許可されているかどうかを判別する。制御部24は、制限期間が到来していない、または、制限時連携制御が許可されていないと判別すると(ステップS103;No)、そのまま電力活用制御処理を終える。
 一方、制限期間中であり、かつ、制限時連携制御が許可されていると判別した場合(ステップS103;Yes)に、制御部24は、EV-PCS5があるか(設置されているか)否かを判別する(ステップS104)。すなわち、制御部24は、ホームシステム1において、充電設備が備わっているかどうかを判別する。一例として、制御部24は、データ記憶部23に記憶されている機器情報から、EV-PCS5の有無を判別する。制御部24は、EV-PCS5がないと判別すると(ステップS104;No)、そのまま電力活用制御処理を終える。
 一方、EV-PCS5があると判別した場合(ステップS104;Yes)に、制御部24は、EV6が接続中であるか否かを判別する(ステップS105)。すなわち、制御部24は、EV6が図示せぬ充電ガンによって、ホームシステム1(EV-PCS5)と接続中であるかどうかを判別する。一例として、制御部24は、データ記憶部23に記憶された機器情報(EV6のステータス)から、EV6が接続中であるかどうかを判別する。制御部24は、EV6が接続中でないと判別すると(ステップS105;No)、そのまま電力活用制御処理を終える。
 一方、EV6が接続中であると判別した場合(ステップS105;Yes)に、制御部24は、制限時連携制御処理を実行する(ステップS106)。以下、この制限時連携制御処理の詳細を、図8を参照して説明する。
 図8に示すように、制御部24は、買電量≦αであるか否かを判別する(ステップS201)。このαは、予め定められた一定量(一例として0に近い値)であり、買電量に時間幅を持たせ、一時的な買電を許容するためのマージンとしての役割を果たしている。制御部24は、買電量≦αでない(買電量がαより大きい)と判別すると(ステップS201;No)、後述するステップS209に処理を進める。
 一方、買電量≦αであると判別した場合(ステップS201;Yes)に、制御部24は、上限値+β≦発電量であるか否かを判別する(ステップS202)。なお、上限値は、制限期間においてPV-PCS3が出力できる電力の上限であり、上述した制限情報13により求まる(図2Bに示す線Lp)。また、βは、予め定められた一定量(一例として0に近い値)であり、PV-PCS3からの発電量や消費電力量が実時間で変動することに対する、不要な買電を抑制するためのマージンとしての役割を果たしている。制御部24は、上限値+β≦発電量でない(発電量が上限値+βより少ない)と判別すると(ステップS202;No)、後述するステップS209に処理を進める。
 一方、上限値+β≦発電量であると判別した場合(ステップS202;Yes)、制御部24は、EV-PCS5の制御状態が、プラン運転または制限時連携運転であるか否を判別する(ステップS203)。つまり、制御部24は、現在、EV-PCS5を、プラン運転または制限時連携運転で制御しているかどうかを判別する。制御部24は、EV-PCS5の制御状態が、プラン運転または制限時連携運転でない(手動運転またはイベント運転である)と判別すると(ステップS203;No)、後述するステップS209に処理を進める。
 一方、EV-PCS5の制御状態が、プラン運転または制限時連携運転であると判別した場合(ステップS203;Yes)、制御部24は、過去実績発電量>消費電力量-買電許容設定値+γである否かを判別する(ステップS204)。なお、過去実績発電量は、例えば、データ記憶部23に記憶された過去2週間における過去実績発電量(30分単位の最大発電量)のうち、同じ時間帯の過去実績発電量である。また、買電許容設定値は、EV6(蓄電池14)への充電を行う際に、どの程度までの買電を許容するかを定めた値であり、ユーザにより任意に設定可能となっている。また、γは、予め定められた一定量(一例として0に近い値)であり、買電の発動条件を厳しくすべく、発電量を実績値(過去最大発電量)より少なめに仮定するためのマージンとしての役割を果たしている。制御部24は、過去実績発電量>消費電力量-買電許容設定値+γでない(過去実績発電量が消費電力量-買電許容設定値+γ以下である)と判別すると(ステップS204;No)、後述するステップS209に処理を進める。
 一方、過去実績発電量>消費電力量-買電許容設定値+γであると判別した場合(ステップS204;Yes)、制御部24は、EV-PCS5の制御状態を制限時連携運転にする(ステップS205)。つまり、制御部24は、現在の制御状態がプラン運転であれば、制限時連携運転に変更し、また、現在の制御状態が制限時連携運転であれば、そのまま維持する。
 制御部24は、EV-PCS5の買電許容設定値にPaを設定する(ステップS206)。このPaは、固定値(一例として0.5kW)であり、EV-PCS5に対して、EV6(蓄電池14)への充電を増加させるために設定される。
 制御部24は、EV-PCS5の制限時の買電設定をオンにする(ステップS207)。制限時の買電設定をオンにすることで、EV-PCS5は、買電が生じるまで充電量を増加させて、EV6への充電を行うことになる。
 制御部24は、EV-PCS5の動作モードを「EV充電」にする(ステップS208)。つまり、制御部24は、EV-PCS5に対して、充電動作を指示する。そして、制御部24は、制限時連携制御処理を終える。
 充電動作を指示されたEV-PCS5は、ステップS206にて設定されたPaの買電が生じるまで充電電力を増加させて、EV6へ充電を行う。これに追従して、PV-PCS3は、売買電力量(図2Cの逆潮流PR)が0に収束するように電力を増やして出力する。すると、買電がなくなるため、EV-PCS5は、再びPaの買電が生じるまで充電電力を増加させて、EV6の充電を行う。これらを繰り返すことで、EV6の充電電力を含めた自家消費がパネル2の発電量(過去実績発電量)まで増加する。
 具体的に説明すると、図9に示すように、例えば、点Cにて制限時連携制御処理を開始した場合、EV-PCS5は、一点鎖線Lbに沿うように、充電電力を増加させて、EV6の充電を行う。そして、PV-PCS3は、出力を抑制することなく(抑制発電量を生じさせることなく)、発電電力Laに沿って、PVパネル2が発電した電力分を出力することになる。すなわち、EV-PCS5は、本来であれば抑制発電量となる分を、EV6(蓄電池14)への充電に活用することができる。
 図8に戻って、上述したステップS201~S204の何れかでNo(制限時判定が不成立)と判定されると、制御部24は、EV-PCS5の制御状態が、制限時連携運転であるか否を判別する(ステップS209)。つまり、制御部24は、現在、EV-PCS5が制限時におけるEV6の充電を行っているかどうかを判別する。制御部24は、EV-PCS5の制御状態が、制限時連携運転でないと判別すると(ステップS209;No)、制限時連携制御処理を終える。
 一方、EV-PCS5の制御状態が、制限時連携運転であると判別した場合(ステップS209;Yes)に、制御部24は、EV-PCS5の制限時の買電設定をオフにする(ステップS210)。制限時の買電設定をオフにすることで、EV-PCSは、制限時におけるEV6の充電を終える。
 制御部24は、EV-PCS5の制御状態をプラン運転にする(ステップS211)。つまり、制御部24は、EV-PCS5の制御状態を制限時連携運転からプラン運転に変更する。
 このような電力活用制御処理(制限時連携制御処理)によって、発電設備(PV-PCS3)から出力する電力が制限される制限期間において、蓄電設備(EV-PCS5)の充電電力を適宜増加させることで、電力を有効に活用することができる。特に、PV-PCS3の抑制発電量を外部から把握することが困難な状況や、PVパネル2の発電電力やPVパネル2付近の日射量などが取得できない状況であっても、簡易的に抑制発電量を推定し、EV-PCS5によるEV6(蓄電池14)への充電に活用することができる。これにより、システムのコストを適切に抑えることができる。
(実施形態1の変形例)
 上記の実施形態1では、制御部24(電力活用制御部243)が、EV-PCS5へ充電量の指示を行う際に、買電許容設定値にPaを設定する場合について説明したが、簡易的に求めた抑制発電量を用いて、直接充電量を指示してもよい。
 例えば、制御部24は、過去実績発電量(同じ時間帯の過去実績発電量)から自家消費電力量(例えば、電力測定装置7が計測した電力量)を差し引いて、簡易的に抑制発電量を求める。この際、上述したγ(発電量を実績値より少なめに仮定するためのマージン)を更に差し引いてもよい。制御部24は、求めた抑制発電量をW値相当の充電量に変換し、その充電量分の充電をEV-PCS5に指示する。
 この場合、抑制発電量に合わせて、EV6の充電量を調整可能となるため、より効率的に抑制発電量を活用することができる。
(他の実施形態)
 上記の実施形態1では、制限期間においてEV-PCS5を制御する場合について説明したが、制限期間が開始する前に、適切にEV-PCS5を制御してもよい。以下、本発明の他の実施形態について簡単に説明する。
 他の実施形態では、制御部24は、制限情報13に基づいて、EV-PCS5に対して、EV6の充放電スケジュールを計画することを特徴としている。具体的には、以下に示すように、制限期間中にEV6(蓄電池14)が充電可能となるように、充放電スケジュールを計画する。
 例えば、制御部24は、制限期間の到来前に、EV6を放電させ、蓄電池14に充電可能な容量を確保する。また、制限期間が到来する前日に、ユーザにEV6の使用を促し、蓄電池14の残量を減らす。また、制限期間が到来する前日夜間に、深夜時間帯を利用した充電を停止する。これら事前に放電や消費させる容量、あるいは、充電を制限する容量については、単位時間(一例として、30分)当たりの発電量予測や、消費電力量予測などを用いて、計画してもよい。この他にも、制御部24は、制限期間の到来に合わせて、EV-PCS5の動作モードを「売電最小モード」(余剰充電を行う動作モード)にセットしてもよい。
 この場合、制限期間中にEV6が満充電で充電できなくなるといった事態を回避することができる。つまり、制限情報13に基づいて、充放電スケジュールを適切に計画することで、制限期間中に、EV6の充電を必ず行えるようになる。これにより、制限期間に生じる抑制発電量を、確実にEV6(蓄電池14)への充電に活用することができる。
 上記の実施形態では、ホームシステム1を一例として説明したが、例えば、ビルに配置されるビルシステムにも、同様に適用可能である。
 上記の実施形態では、管理装置10が家屋H内に配置された場合について説明したが、管理装置10を家屋H外に配置するようにしてもよい。例えば、図1に示すサーバ12を管理装置10として機能させてもよい。この場合も、制限期間において、蓄電設備(EV-PCS5)の充電電力を適宜増加させることで、電力を有効に活用することができる。
 また、上記実施形態では、専用の管理装置10を用いる場合について説明したが、管理装置10の動作を規定する動作プログラムを既存のパーソナルコンピュータや情報端末機器などに適用することで、当該パーソナルコンピュータを本発明に係る管理装置10として機能させることも可能である。
 また、このようなプログラムの配布方法は任意であり、例えば、CD-ROM(Compact Disk Read-Only Memory)、DVD(Digital Versatile Disk)、MO(Magneto Optical Disk)、メモリカードなどのコンピュータ読み取り可能な記録媒体に格納して配布してもよいし、インターネットといった通信ネットワークを介して配布してもよい。
 本発明は、広義の精神と範囲を逸脱することなく、様々な実施形態及び変形が可能とされるものである。また、上述した実施形態は、本発明を説明するためのものであり、本発明の範囲を限定するものではない。つまり、本発明の範囲は、実施形態ではなく、請求の範囲によって示される。そして、請求の範囲内及びそれと同等の発明の意義の範囲内で施される様々な変形が、本発明の範囲内と見なされる。
 本発明は、発電設備から出力する電力が制限される制限期間において、電力を有効に活用できる管理装置、及び、制御方法に採用され得る。
1 ホームシステム、2 PVパネル、3 PV-PCS、4 アダプタ、5 EV-PCS、6 EV、7 電力測定装置、8 分電盤、9 機器、10 管理装置、11 端末装置、12 サーバ、13 制限情報、14 蓄電池、21 宅内通信部、22 宅外通信部、23 データ記憶部、24 制御部、241 電力情報収集部、242 制限情報取得部、243 電力活用制御部、244 操作受付部、245 表示制御部

Claims (6)

  1.  発電モジュールが発電した電力をパワーコンディショナを介して出力する発電設備と、電力系統から供給された電力または前記パワーコンディショナから出力された電力を充電する蓄電設備と、を管理する管理装置であって、
     前記パワーコンディショナから出力する電力が制限される制限期間において、充電電力が増加するように前記蓄電設備を制御する制御手段を備える、管理装置。
  2.  前記制御手段は、予め定められた買電許容量を前記蓄電設備に設定することで、前記蓄電設備が前記買電許容量まで充電電力を増加させ、追従する前記パワーコンディショナが電力を増加させる動作を繰り返すことで、充電電力が自動的に増加するように前記蓄電設備を制御する、
     請求項1に記載の管理装置。
  3.  前記パワーコンディショナから出力された発電量のうち、過去一定期間における時間帯別の最大値を記憶する記憶手段を更に備え、
     前記制御手段は、前記記憶手段に記憶された対象の最大値から現在の消費電力量を差し引いて抑制発電量を求め、当該抑制発電量を上限として、充電電力が増加するように前記蓄電設備を制御する、
     請求項1に記載の管理装置。
  4.  前記制御手段は、前記抑制発電量に応じた充電量を指定することで、充電電力が増加するように前記蓄電設備を制御する、
     請求項3に記載の管理装置。
  5.  前記制御手段は、前記制限期間が開始する前に、前記蓄電設備の充電量が減少するように、前記蓄電設備を制御する、
     請求項1に記載の管理装置。
  6.  発電モジュールが発電した電力をパワーコンディショナを介して出力する発電設備と、電力系統から供給された電力または前記パワーコンディショナから出力された電力を充電する蓄電設備と、を管理する管理装置の制御方法であって、
     前記パワーコンディショナから出力する電力が制限される制限期間において、充電電力が増加するように前記蓄電設備を制御する制御ステップを備える、制御方法。
PCT/JP2016/052246 2016-01-27 2016-01-27 管理装置、及び、制御方法 WO2017130307A1 (ja)

Priority Applications (5)

Application Number Priority Date Filing Date Title
US15/759,262 US10700524B2 (en) 2016-01-27 2016-01-27 Management device and control method
PCT/JP2016/052246 WO2017130307A1 (ja) 2016-01-27 2016-01-27 管理装置、及び、制御方法
EP16887894.0A EP3410560B1 (en) 2016-01-27 2016-01-27 Management device and control method
JP2017563442A JP6430041B2 (ja) 2016-01-27 2016-01-27 管理装置、及び、制御方法
CN201680068912.XA CN108604820B (zh) 2016-01-27 2016-01-27 管理装置和控制方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2016/052246 WO2017130307A1 (ja) 2016-01-27 2016-01-27 管理装置、及び、制御方法

Publications (1)

Publication Number Publication Date
WO2017130307A1 true WO2017130307A1 (ja) 2017-08-03

Family

ID=59397844

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2016/052246 WO2017130307A1 (ja) 2016-01-27 2016-01-27 管理装置、及び、制御方法

Country Status (5)

Country Link
US (1) US10700524B2 (ja)
EP (1) EP3410560B1 (ja)
JP (1) JP6430041B2 (ja)
CN (1) CN108604820B (ja)
WO (1) WO2017130307A1 (ja)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2018152997A (ja) * 2017-03-13 2018-09-27 オムロン株式会社 パワーコンディショナ及びスイッチ制御装置
JP2019047612A (ja) * 2017-08-31 2019-03-22 京セラ株式会社 太陽光発電装置および太陽光発電装置の制御方法
JP2019161912A (ja) * 2018-03-14 2019-09-19 株式会社カネカ 電力供給システム
JP2020095424A (ja) * 2018-12-12 2020-06-18 富士通株式会社 電力管理方法、電力管理システムおよび電力管理プログラム
JP2021027748A (ja) * 2019-08-07 2021-02-22 積水化学工業株式会社 電力管理装置、電力管理方法、及びプログラム

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102018132645A1 (de) * 2018-12-18 2020-06-18 Sma Solar Technology Ag Verfahren zur steuerung einer elektrischen anlage mit einer mehrzahl von elektrischen geräten, steuerungseinheit und elektrische anlage mit einer derartigen steuerungseinheit
CN111082505B (zh) * 2019-11-20 2021-05-14 国网江苏省电力有限公司南通供电分公司 一种基于电动汽车与储能电池协同调度的能量管理方法
CN111245018B (zh) * 2020-03-09 2021-08-17 特变电工西安电气科技有限公司 一种微电网并网联络线限功率控制方法及装置
CN112677805A (zh) * 2020-12-22 2021-04-20 格力电器(武汉)有限公司 充电控制方法、装置、设备和充电系统
CN113238504A (zh) * 2021-05-13 2021-08-10 上海采日能源科技有限公司 电池储能控制系统及方法

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004135454A (ja) * 2002-10-11 2004-04-30 Sharp Corp 複数の分散電源の出力抑制方法および分散電源管理システム
WO2011162025A1 (ja) * 2010-06-22 2011-12-29 シャープ株式会社 直流配電システム
JP2012139019A (ja) * 2010-12-27 2012-07-19 Noritz Corp パワーコンディショナ
JP2015119356A (ja) * 2013-12-18 2015-06-25 京セラ株式会社 電力制御装置、機器制御装置、及び方法

Family Cites Families (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2007014424A1 (en) * 2005-08-03 2007-02-08 Centre For Appropriate Technology Inc An electrical power distribution and control system
JP5877346B2 (ja) 2011-10-24 2016-03-08 パナソニックIpマネジメント株式会社 負荷制御装置、プログラム、負荷制御システム
JP5891455B2 (ja) * 2011-12-20 2016-03-23 パナソニックIpマネジメント株式会社 電力計測装置、電力計測システム、電力計測方法及びプログラム
JP5738212B2 (ja) * 2012-02-20 2015-06-17 三菱重工業株式会社 電力貯蔵型の発電システム
JP5625005B2 (ja) 2012-02-27 2014-11-12 株式会社日立製作所 独立型電力供給システム
JP5800771B2 (ja) * 2012-08-10 2015-10-28 株式会社日立パワーソリューションズ 風力発電システム、風力発電制御装置および風力発電制御方法
JP6203016B2 (ja) * 2013-11-28 2017-09-27 三菱電機株式会社 太陽光発電システム
US10381832B2 (en) * 2015-06-08 2019-08-13 Kyocera Corporation Power conversion apparatus, power management apparatus, and power management method
JP6557153B2 (ja) 2016-01-08 2019-08-07 シャープ株式会社 電力管理装置

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004135454A (ja) * 2002-10-11 2004-04-30 Sharp Corp 複数の分散電源の出力抑制方法および分散電源管理システム
WO2011162025A1 (ja) * 2010-06-22 2011-12-29 シャープ株式会社 直流配電システム
JP2012139019A (ja) * 2010-12-27 2012-07-19 Noritz Corp パワーコンディショナ
JP2015119356A (ja) * 2013-12-18 2015-06-25 京セラ株式会社 電力制御装置、機器制御装置、及び方法

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See also references of EP3410560A4 *

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2018152997A (ja) * 2017-03-13 2018-09-27 オムロン株式会社 パワーコンディショナ及びスイッチ制御装置
JP2019047612A (ja) * 2017-08-31 2019-03-22 京セラ株式会社 太陽光発電装置および太陽光発電装置の制御方法
JP2019161912A (ja) * 2018-03-14 2019-09-19 株式会社カネカ 電力供給システム
JP2020095424A (ja) * 2018-12-12 2020-06-18 富士通株式会社 電力管理方法、電力管理システムおよび電力管理プログラム
JP7230476B2 (ja) 2018-12-12 2023-03-01 富士通株式会社 電力管理方法、電力管理システムおよび電力管理プログラム
JP2021027748A (ja) * 2019-08-07 2021-02-22 積水化学工業株式会社 電力管理装置、電力管理方法、及びプログラム
JP7339808B2 (ja) 2019-08-07 2023-09-06 積水化学工業株式会社 電力管理装置、電力管理方法、及びプログラム

Also Published As

Publication number Publication date
EP3410560A4 (en) 2018-12-19
JPWO2017130307A1 (ja) 2018-04-12
CN108604820B (zh) 2022-04-08
CN108604820A (zh) 2018-09-28
US10700524B2 (en) 2020-06-30
EP3410560B1 (en) 2022-03-09
US20180254636A1 (en) 2018-09-06
JP6430041B2 (ja) 2018-11-28
EP3410560A1 (en) 2018-12-05

Similar Documents

Publication Publication Date Title
JP6430041B2 (ja) 管理装置、及び、制御方法
US10135248B2 (en) Control apparatus, control system, control method, and recording medium for controlling devices to charge or discharge electricity storage apparatus
EP3118962A1 (en) Storage battery sharing system, information processing device, storage battery sharing method, and recording medium recording storage battery sharing program
US9620990B2 (en) Electricity supply management device
EP3389162A1 (en) Power control device, operation plan planning method, and program
US20120229077A1 (en) Electric power supply system and method for controlling electric power discharge
JP6426922B2 (ja) 電力システム、御装置及び充放電制御方法
JP5938701B2 (ja) 電力制御装置、電力制御方法、プログラム、電力制御システム
JP2011083082A (ja) 蓄電システム
EP2849302B1 (en) Energy management device, energy management method and program
JP5165042B2 (ja) 系統電力安定化システム、系統電力安定化方法、及び充放電器
WO2016129034A1 (ja) 制御装置、制御システム、制御方法、及び、プログラム
WO2016071957A1 (ja) 制御装置、機器制御システム、機器制御方法及びプログラム
WO2017109947A1 (ja) 制御装置、給湯機の制御方法及びプログラム
JP6625181B2 (ja) 管理装置、及び、制御方法
JP6820677B2 (ja) 電力管理装置及びプログラム
JPWO2018047415A1 (ja) 蓄電装置及び電源システム
JP6246091B2 (ja) 電力供給システム
JP2019118211A (ja) 制御指令システム
JP2019047612A (ja) 太陽光発電装置および太陽光発電装置の制御方法
JPH07274394A (ja) デマンド監視による機器の制御システム
JP7037353B2 (ja) 制御指令システム
JP2012060829A (ja) 電力供給システム、及び電力供給方法
WO2016071960A1 (ja) 制御装置、機器制御方法及びプログラム
JP7423977B2 (ja) 電力管理システム、電力管理装置、電力管理方法及びプログラム

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 16887894

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2017563442

Country of ref document: JP

Kind code of ref document: A

WWE Wipo information: entry into national phase

Ref document number: 15759262

Country of ref document: US

NENP Non-entry into the national phase

Ref country code: DE