WO2017006668A1 - 電池監視装置 - Google Patents

電池監視装置 Download PDF

Info

Publication number
WO2017006668A1
WO2017006668A1 PCT/JP2016/066531 JP2016066531W WO2017006668A1 WO 2017006668 A1 WO2017006668 A1 WO 2017006668A1 JP 2016066531 W JP2016066531 W JP 2016066531W WO 2017006668 A1 WO2017006668 A1 WO 2017006668A1
Authority
WO
WIPO (PCT)
Prior art keywords
voltage
detection circuit
current
battery
circuit
Prior art date
Application number
PCT/JP2016/066531
Other languages
English (en)
French (fr)
Inventor
孝司 中澤
雅俊 小池
Original Assignee
日立オートモティブシステムズ株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 日立オートモティブシステムズ株式会社 filed Critical 日立オートモティブシステムズ株式会社
Priority to JP2017527126A priority Critical patent/JP6383496B2/ja
Publication of WO2017006668A1 publication Critical patent/WO2017006668A1/ja

Links

Images

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/36Arrangements for testing, measuring or monitoring the electrical condition of accumulators or electric batteries, e.g. capacity or state of charge [SoC]
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01MPROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY
    • H01M10/00Secondary cells; Manufacture thereof
    • H01M10/42Methods or arrangements for servicing or maintenance of secondary cells or secondary half-cells
    • H01M10/48Accumulators combined with arrangements for measuring, testing or indicating the condition of cells, e.g. the level or density of the electrolyte
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01MPROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY
    • H01M10/00Secondary cells; Manufacture thereof
    • H01M10/42Methods or arrangements for servicing or maintenance of secondary cells or secondary half-cells
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J7/00Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J7/00Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
    • H02J7/02Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries for charging batteries from ac mains by converters
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J7/00Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
    • H02J7/14Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries for charging batteries from dynamo-electric generators driven at varying speed, e.g. on vehicle
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02E60/10Energy storage using batteries

Definitions

  • the present invention relates to a battery monitoring device.
  • An assembled battery in which a plurality of battery cells of a secondary battery such as a lithium ion secondary battery, a nickel metal hydride battery, or a lead battery are arranged in series and parallel is usually used together with a battery monitoring device.
  • the battery monitoring device detects the state of the battery by detecting the cell voltage of each battery cell constituting the assembled battery or detecting the current flowing through the battery cell. In order to know the deterioration state of the battery, the internal resistance of the battery cell may be detected. The internal resistance of the battery is obtained from the measured value of the battery cell voltage and the measured value of the energization current.
  • a current sensor and a voltage sensor are connected to a multiplexer, and one signal is selected by the multiplexer and output to the arithmetic unit via the analog-digital converter.
  • a circuit for performing a predetermined operation is known (for example, see Patent Document 1). However, Patent Document 1 does not show any mounting state of the circuit board.
  • the detection timing is caused by the difference in position between the sensor for measuring current and the sensor for measuring voltage on the circuit board. Deviation occurs.
  • the difference in detection timing due to the difference between the wiring length from the sensor for measuring current to the detection circuit and the wiring length from the sensor for measuring voltage to the detection circuit, in other words, the difference in resistance. Occurs.
  • the battery monitoring device of the present invention measures the current flowing through the battery pack, a voltage input circuit for inputting the highest potential and the lowest potential of the battery pack including a plurality of battery cells electrically connected in series.
  • a current input circuit for inputting an output of a current sensor provided in the first battery; a first voltage detection circuit for detecting a voltage of each of the plurality of battery cells; and a voltage of the assembled battery from the output of the voltage input circuit.
  • a circuit board on which the current detection circuit is mounted is mounted.
  • the second voltage detection circuit outputs the voltage input circuit more than the first voltage detection circuit and the current detection circuit. Near the output terminal of the current input circuit than the first voltage detection circuit and the second voltage detection circuit, respectively, and the voltage input circuit, the current input circuit, Is arranged closer to the second voltage detection circuit and the current detection circuit than to the first voltage detection circuit.
  • FIG. 4 is a schematic plan view of the battery monitoring device 2 in the mounted state shown in FIG. 3.
  • FIG. 3 is a block diagram of the electric vehicle drive device 100 containing 2nd Embodiment of the battery monitoring apparatus of this invention. It is 3rd Embodiment of the battery monitoring apparatus of this invention, and is a block diagram which shows an example of the example of arrangement
  • FIG. 1 is a block diagram of an electric vehicle drive device 100 including a first embodiment of a battery monitoring device 2 of the present invention.
  • the battery monitoring device 2 according to the present invention is a device that detects the battery state of the assembled battery 10 provided in the battery system 1 (also called a power storage device) and keeps the assembled battery 10 in an appropriate state.
  • the battery monitoring device 2 is applied to an electric vehicle drive device 100 on which the battery system 1 is mounted.
  • the electric vehicle drive device 100 is a rotating machine system that drives an electric vehicle such as a hybrid vehicle (HEV) or an electric vehicle (EV).
  • HEV hybrid vehicle
  • EV electric vehicle
  • the electric vehicle drive device 100 includes a battery system 1 including the battery monitoring device 2 and the assembled battery 10, a vehicle controller 30 that controls the entire vehicle, an inverter 40, a rotating electrical machine 50, and the like.
  • the battery system 1 is connected to the inverter 40 via relays 60 and 61.
  • the battery monitoring device 2 communicates with the inverter 40 and the host vehicle controller 30 via a CAN (ControllerCAArea Network) communication bus.
  • CAN ControllerCAArea Network
  • the rotating electrical machine 50 is driven by the electric power from the inverter 40.
  • discharge power is supplied from the battery system 1 to the rotating electrical machine 50 through the inverter 40, and an engine (not shown) is assisted by the driving force of the rotating electrical machine 50.
  • regenerative electric power from the rotating electrical machine 50 charges the assembled battery 10 provided in the battery system 1 through the inverter 40.
  • the inverter 40 includes a motor controller 41, and controls the DC-AC conversion and AC-DC conversion of the inverter 40, thereby performing drive control of the rotating electrical machine 50 and charge / discharge control of the assembled battery 10.
  • the battery system 1 includes an assembled battery 10 and a battery monitoring device 2.
  • the assembled battery 10 is configured by connecting a plurality of battery cells C (C (1) to C (N)) as a minimum unit in series.
  • the assembled battery 10 is configured by, for example, about 12 battery cells C connected in series, and is about 48V as a whole.
  • the number of battery cells C is small and the maximum voltage of the assembled battery 10 is low, no insulating element is inserted between the signal line and the control unit 24 described later. For this reason, GND of the whole battery monitoring apparatus 2 is made common.
  • the number of battery cells C constituting the assembled battery 10 is N, and in the following, when one of the N battery cells C (1) to C (N) is represented, the battery cell Sometimes called C.
  • the battery cell C which comprises the assembled battery 10 the lithium ion secondary battery which can be charged / discharged is used, for example.
  • the assembled battery 10 including the battery cell C of the example shown in FIG. 1 may have a configuration of a connection body formed by connecting a plurality of cell blocks grouped into a predetermined number of battery cells in series.
  • the first voltage measurement unit 21 described later connected to the grouped assembled battery 10 is also a plurality of grouped blocks.
  • the battery monitoring device 2 is a device that monitors the state of the assembled battery 10. An overcharge / discharge detection function that detects overcharge and overdischarge of each battery cell C of the assembled battery 10, and each battery cell C of the assembled battery 10. It has an internal resistance detection function for detecting internal resistance.
  • the battery monitoring device 2 includes a first voltage measurement unit 21, a total current voltage detection unit 400, a current measurement element 9, a control unit 24, and the like.
  • the total current voltage detection unit 400 includes a second voltage measurement unit 22, a current measurement unit 23, an AD conversion control unit 250, and a first calculation unit 405.
  • the 1st voltage measurement part 21 is a circuit which measures the voltage (henceforth a cell voltage) for every cell of battery cell C which constitutes assembled battery 10.
  • the first voltage measurement unit 21 includes a voltage input filter 21a and a first voltage detection circuit 21b.
  • the first voltage detection circuit 21b is a circuit that can measure the cell voltages of the battery cells C (1) to C (N).
  • the first voltage measurement unit 21 may be configured as an integrated circuit (IC).
  • 2nd voltage measurement part 22 is a circuit which measures the voltage (henceforth the total voltage Vt) of the N battery cells which comprise the assembled battery 10 whole.
  • the N battery cells C are labeled C (1), C (2),..., C (N-1), C (from the negative electrode side of the assembled battery 10 toward the positive electrode side of the assembled battery 10. N) are connected in series in order. Therefore, in the battery cell C (N), the positive electrode terminal of the assembled battery 10 has the highest voltage, and the negative electrode terminal of the battery cell C (1) has the lowest voltage of the assembled battery 10.
  • the second voltage input terminal 220 of the second voltage measuring unit 22 is connected to the positive electrode of the battery cell C (N).
  • the first voltage measurement unit 21 communicates with the balancing resistor and the balancing switch that perform the balancing operation of the cell voltages of the battery cells C (1) to C (N) and the control unit 24 to perform control.
  • the logic part to perform is provided.
  • a measurement signal (electric signal) is input from the current measuring element 9 to the current measuring unit 23 that measures the current flowing through the assembled battery 10.
  • the current measuring element 9 is an element that converts the magnitude of the current into an electric signal, and specifically includes a Hall element sensor, a shunt resistance element, and the like.
  • An electric signal corresponding to the magnitude of the current is output from the current measuring element 9, and the electric signal is measured by the current measuring unit 23.
  • the shunt resistance element is superior to the Hall element sensor in the following points. Since the shunt resistor element has a small offset current, the state of charge (SOC) of the assembled battery 10 can be measured with high accuracy. Further, since the shunt resistance element has a fast response characteristic (trackability of the voltage value with respect to the current change), if the measurement time constant of the current measuring unit 23 is increased, the time resolution can be increased accordingly. That is, it is excellent in that it is easy to achieve simultaneity of measurement. In the following, a configuration using a shunt resistor 9a as the current measuring element 9 will be exemplified.
  • the second voltage measurement unit 22 includes a second voltage input filter 22a and a second voltage detection circuit 22b.
  • the current measurement unit 23 includes a current input filter 23a and a current detection circuit 23b. That is, the second voltage input filter 22a included in the second voltage measurement unit 22 and the current input filter 23a included in the current measurement unit 23 are configured as separate filter circuits as illustrated in FIG. Yes. Thereby, it can be in a preferable state in which the characteristic frequency of the second voltage input filter 22a of the second voltage measurement unit 22 and the characteristic frequency of the current input filter 23a of the current measurement unit 23 are equal to each other.
  • the integrated circuit 25 includes a first calculation unit 405, an AD conversion control unit 250, a second voltage detection circuit 22b, and a current detection circuit 23b.
  • the second voltage detection circuit 22b and the current detection circuit 23b each receive a trigger signal from the AD conversion control unit 250 and start AD conversion.
  • the AD conversion control unit 250 generates a trigger signal so that the conversion timings of the second voltage detection circuit 22b and the current detection circuit 23b are equal to each other. In order to ensure the simultaneity of the conversion timing, it is preferable that the second voltage detection circuit 22b and the current detection circuit 23b are configured to start conversion with the same trigger signal.
  • the current detection circuit 23b and the second voltage detection circuit 22b are disposed adjacent to each other in the integrated circuit 25.
  • the current input filter 23a and the second voltage input filter 22a are formed outside the integrated circuit 25, and are respectively connected to the current detection circuit 23b built in the integrated circuit 25 and the second voltage detection circuit 22b built in the integrated circuit 25. It is connected. That is, the voltage input circuit for inputting the highest potential and the lowest potential of the assembled battery 10 is connected to the second voltage detection circuit 22b via the second voltage input filter 22a.
  • the current input circuit for inputting the current flowing through the assembled battery 10 is connected to the current detection circuit 23b via the current input filter 23a.
  • the current input filter 23a and the second voltage input filter 22a are disposed adjacent to each other. Thereby, when detecting the current value and the total voltage Vt, it is possible to reduce the detection timing shift caused by the position of the detection sensor and the wiring length from the detection sensor to each of the detection circuits 23b and 22b. This will be described later.
  • ⁇ type AD converter for the second voltage detection circuit 22b and the current detection circuit 23b.
  • ⁇ type AD converter highly accurate AD conversion can be performed.
  • the decimation filter of the ⁇ type AD converter is a decimation filter having the same characteristics in the second voltage detection circuit 22b and the current detection circuit 23b, so that the transfer functions of these two AD converters are mutually connected. Can be equal.
  • the control unit 24 performs overall control of the battery monitoring device 2, and performs, for example, operation control and state determination of the first voltage detection circuit.
  • the control unit 24 receives signals sent from the first voltage measurement unit 21 and the total current voltage detection unit 400, and uses the signal values to determine the internal resistances of the battery cells C (1) to C (N). Is detected.
  • the relays 60 and 61 have ON / OFF functions.
  • the current value and the voltage value detected at the same time by the second voltage measurement unit 22 and the current measurement unit 23 are averaged by a first calculation unit 405 built in the total current voltage detection unit 400, and IIR (Infinite Impulse Response), FFT (Fast Fourier Transform) and the like are performed. Since this calculation process takes time, the first calculation unit 405 occupies the calculation process. In addition, the calculation processing result of the voltage value and the current value also remains synchronized.
  • IIR Infinite Impulse Response
  • FFT Fast Fourier Transform
  • the second calculation unit 502 built in the control unit 24 has a battery capacity (SOC) based on the calculation result signal sent from the first calculation unit 405 and the cell voltage value signal sent from the first voltage measurement unit 21. A battery deterioration state (SOH) calculation process is performed.
  • SOC battery capacity
  • SOH battery deterioration state
  • the rotating electrical machine 50 operates as a generator, and regenerative power flows from the rotating electrical machine 50 (generator) to the inverter 40 and the assembled battery 10. For this reason, the charging current to the assembled battery 10 increases. Thus, in the battery system 1, the energization current to the assembled battery 10 changes with time.
  • the current value and the voltage value detected by the second voltage measurement unit 22 and the current measurement unit 23 are averaged, IIR, FFT by the first calculation unit 405 built in the total current voltage detection unit 400. Etc. are performed.
  • the detection timing of the current value detected by the current measuring unit 23 and the total voltage Vt detected by the second voltage measuring unit 22 is shifted, the accuracy of each calculation result is impaired.
  • FIG. 2 is a block diagram showing an example of an arrangement example of the components of the battery monitoring device 2 shown in FIG.
  • the integrated circuit 25 is a rectangular first microcomputer 25A
  • the control unit 24 is a rectangular second microcomputer 24A.
  • the first voltage detection circuit 21b is formed as a second integrated circuit, is connected to the second microcomputer 24A via a UART (Universal Asynchronous Receiver Transmitter) conversion circuit 35, and exchanges data with the second microcomputer 24A.
  • UART Universal Asynchronous Receiver Transmitter
  • the first microcomputer 25A includes a first calculation unit 405, an AD conversion control unit 250, a second voltage detection circuit 22b, and a current detection circuit 23b.
  • the first microcomputer 25A is connected to a current input filter 23a and a second voltage input filter 22a formed by resistors and capacitors, respectively.
  • the current input filter 23a and the second voltage input filter 22a have substantially the same filter constant.
  • a shunt resistor 9a which is a current measuring element 9 is connected to the current input filter 23a.
  • the high potential side and the low potential side of the shunt resistor 9a are connected to the first microcomputer 25A via the current input filter 23a, and a voltage proportional to the current generated by the resistance of the shunt resistor 9a is detected by the first microcomputer 25A.
  • the current flowing through the shunt resistor 9 a is the current flowing through the assembled battery 10. Further, the total voltage Vt of the assembled battery 10 is detected by the first microcomputer 25A via the second voltage input filter 22a.
  • the second microcomputer 24A is connected to a power supply circuit 31 and an EEPROM 32 that holds data necessary for calculation.
  • the second microcomputer 24A is connected to a temperature sensor connector 33 connected to a temperature sensor (not shown), a relay connector 34 to which relays 60 and 61 (see FIG. 1) are connected, and the like.
  • a power / communication connector 36 is connected to the power circuit 31.
  • the second microcomputer 24 ⁇ / b> A incorporates a power supply circuit 31 and a relay driving driver 37 in addition to the second arithmetic unit 502. In FIG. 1, the power supply circuit 31, the EEPROM 32, and the connectors 33, 34, and 36 are not shown.
  • FIG. 3 is a plan view showing an example of a mounting state of the battery monitoring device 2 shown in FIG.
  • FIG. 4 is a schematic plan view of the battery monitoring device 2 in the mounted state shown in FIG.
  • the battery monitoring device 2 includes a circuit board 70 and the following electronic elements / circuits mounted on the circuit board 70: a shunt resistor 9a, a current input filter 23a, a second voltage input filter 22a, a first microcomputer 25A, a first A voltage detection circuit 21b and a second microcomputer 24A are provided.
  • the battery monitoring device 2 may include other electronic elements / circuits. As shown in FIG. 1, the battery pack 10 is not included in the battery monitoring device 2.
  • the shunt resistor 9a is disposed on one side of a pair of short sides of the rectangular circuit board 70.
  • the shunt resistor 9 a is fixed to the circuit board 70 by two fastening members 71.
  • a current input filter 23a is disposed between the shunt resistor 9a and the first microcomputer 25A.
  • a second voltage input filter 22a is disposed adjacent to the current input filter 23a.
  • the first microcomputer 25A is disposed in the vicinity of the shunt resistor 9a, and the second microcomputer 24A is disposed at a substantially central portion of the circuit board 70 that is largely separated from the first microcomputer 25A.
  • the second microcomputer 24A includes an interface between the first voltage measurement unit 21 and the total current voltage detection unit 400, and includes a second calculation unit 502 that calculates a battery capacity (SOC) and a battery deterioration state (SOH). Further, as shown in FIG. 2, the second microcomputer 24A is connected with electronic elements and electronic circuits for performing various diagnoses including a temperature sensor. For this reason, it is preferable that the second microcomputer 24 ⁇ / b> A is disposed near the center of the circuit board 70 in terms of layout.
  • the first voltage detection circuit 21b is disposed between the second microcomputer 24A and the first microcomputer 25A. That is, the first voltage detection circuit 21b is connected to the side opposite to the side of the first microcomputer 25A where the current input filter 23a and the second voltage input filter 22a are arranged, from the opposite side. They are spaced apart.
  • the two detection terminals 81 and 82 of the shunt resistor 9a are connected to a current detection circuit 23b (see FIG. 1) built in the first microcomputer 25A via a current input filter 23a.
  • the current input filter 23a is formed in a substantially linear pattern between the detection terminals 81 and 82 of the shunt resistor 9a and the current detection circuit 23b, and the connection length between the detection terminals 81 and 82 and the current detection circuit 23b is the shortest. It is supposed to be.
  • the current input filter 23a and the current detection circuit 23b are connected by a connection portion 83 (see FIG. 4) on the side facing the shunt resistor 9a of the first microcomputer 25A.
  • the detection terminal 81 of the shunt resistor 9a is connected to the assembled battery 10, and the detection terminal 82 is connected to the GND by connection members such as a bus bar and a wire harness (not shown).
  • the second voltage input filter 22a is disposed between the shunt resistor 9a and the side facing the shunt resistor 9a of the first microcomputer 25A, adjacent to the current input filter 23a and substantially parallel to the current input filter 23a. ing.
  • the second voltage input filter 22a is connected to a second voltage detection circuit 22b (see FIG. 1) built in the first microcomputer 25A through a connecting portion 84 (see FIG. 4).
  • the connecting portion 84 is disposed on the same side as the side on which the connecting portion 83 of the rectangular first microcomputer 25A is disposed.
  • the battery cell C (N) of the assembled battery 10, that is, the positive electrode terminal having the highest potential, is connected to the second voltage input terminal 220 of the second voltage measuring unit 22 by a connection member such as a bus bar or a wire harness (not shown).
  • the current input filter 23a and the second voltage input filter 22a have substantially the same filter constant.
  • the current detection circuit 23b and the second voltage detection circuit 22b built in the first microcomputer 25A are disposed adjacent to each other.
  • the current input filter 23a and the second voltage input filter 22a are disposed adjacent to each other.
  • the characteristic frequencies of the current input filter 23a and the second voltage input filter 22a are equal to each other.
  • the length of the wiring connecting the detection terminals 81 and 82 of the shunt resistor 9a and the connection portion 83 is substantially equal to the length of the wiring connecting the second voltage input terminal 220 and the connection portion 84, and is almost the shortest. It becomes. Therefore, it is possible to reduce the difference in wiring length between the sensor for measuring the current and the sensor for measuring the voltage, in other words, the detection timing shift caused by the difference in resistance. Thereby, a more accurate battery state can be acquired.
  • Sensors for measuring the current are located at the detection terminals 81 and 82 of the shunt resistor 9a.
  • a sensor for measuring the voltage is located at the second voltage input terminal 220.
  • the case where the second voltage input terminal 220 is set to the first position shown in the embodiment and the second position rotated from the first position by a predetermined angle clockwise around the connection portion 84 is compared. To do. As described above, even when the setting position of the second voltage input terminal 220 is the second position, the length and shape of the wiring pattern between the second voltage input terminal 220 and the connection portion 84 are set to the first position.
  • the connecting member that connects the second voltage input terminal 220 and the positive electrode terminal having the highest potential of the battery pack 10 is used. Length and routing will be different. That is, even if the position of the sensor for measuring current and voltage is different, the detection timing is shifted.
  • the current input filter 23a and the second voltage input filter 22a are exemplified as a configuration arranged adjacent to each other. Although this is a preferred configuration, the present invention is not limited to this configuration.
  • the current input filter 23a and the second voltage input filter 22a may be configured to be disposed close to each other, for example, disposed on the same side of the first microcomputer 25A.
  • the current input filter 23a and the second voltage input filter 22a are exemplified as a configuration arranged between the shunt resistor 9a and the first microcomputer 25A.
  • at least one of the current input filter 23a and the second voltage input filter 22a can be arranged at a position different from that between the shunt resistor 9a and the first microcomputer 25A.
  • the second voltage input filter 22a and the current input filter 23a may be arranged closer to the second voltage input filter 22a and the current input filter 23a than the first voltage detection circuit 21b. By doing so, the current input filter 23a and the second voltage input filter 22a are arranged close to each other.
  • the second voltage detection circuit 22b is closer to the output terminal of the second voltage input filter 22a than the first voltage detection circuit 21b and the current detection circuit 23b, and the current detection circuit 23b is the second voltage.
  • the detection circuit 22b and the first voltage detection circuit 21b are disposed closer to the output terminal of the current input filter 23a than the detection circuit 22b and the first voltage detection circuit 21b.
  • the second voltage input filter 22a to which voltage is input and the current input filter 23a to which current is input are arranged closer to the second voltage detection circuit 22b and the current detection circuit 23b than the first voltage detection circuit 21b. Has been.
  • the second voltage input filter 22a to which voltage is input and the current input filter 23a to which current is input are disposed adjacent to each other, and the second voltage detection circuit 22b and the current detection circuit 23b are disposed adjacent to each other. Arranged. For this reason, it is possible to further reduce the detection timing shift caused by the difference between the position of the sensor for measuring the current and the position of the sensor for measuring the voltage.
  • the current input filter 23a and the second voltage input filter 22a have substantially the same filter constant, and the second voltage input filter 22a and the current input filter 23a are arranged close to each other. For this reason, the characteristic frequencies of the current input filter 23a and the second voltage input filter 22a can be made equal to each other.
  • FIG. 5 is a block diagram of an electric vehicle drive device 100 including the second embodiment of the battery monitoring device 2 of the present invention.
  • the first calculation unit 405 and the second calculation unit 502 illustrated in FIG. 1 are integrated as one calculation unit 503.
  • the integrated circuit 25 includes a current detection circuit 23b, a second voltage detection circuit 22b, and an AD conversion control unit 250. Unlike the first embodiment, the integrated circuit 25 does not include the first arithmetic unit 405.
  • the function of the first calculation unit 405 is included in the calculation unit 503 built in the control unit 24.
  • the calculation unit 503 of the control unit 24 performs calculation processing such as averaging, IIR, FFT, and the like based on the voltage value and the current value detected by the second voltage measurement unit 22 and the current measurement unit 23 and the above calculation. Based on the processing result and the signal of the cell voltage value sent from the first voltage measuring unit 21, the battery capacity (SOC) and the battery deterioration state (SOH) are calculated.
  • the second embodiment is the same as the first embodiment.
  • the difference between the detection timing of the current value and the voltage value is caused by the difference in the position of the detection sensor and the wiring length from the detection sensor to the detection circuit. Not affected. Therefore, also in the second embodiment, the same effects as in the first embodiment can be obtained.
  • FIG. 6 is a block diagram showing an example of the arrangement of the component parts according to the third embodiment of the battery monitoring apparatus of the present invention.
  • the second voltage input filter 22a is connected to a side adjacent to one side of the first microcomputer 25A to which the current input filter 23a is connected.
  • the current input filter 23a is connected to a current detection circuit 23b (see FIG. 1) built in the first microcomputer 25A on one side of the first microcomputer 25A facing the shunt resistor 9a.
  • the second voltage input filter 22a is connected to a second voltage detection circuit 22b (see FIG. 1) built in the first microcomputer 25A on the side adjacent to the one side in the first microcomputer 25A.
  • the second embodiment is the same as the first embodiment.
  • the current input filter 23a and the second voltage input filter 22a are disposed adjacent to each other. Further, the wiring pattern of the current input filter 23a and the wiring pattern of the second voltage input filter 22a can be made substantially the same length. Therefore, the third embodiment also has the same effect as the first embodiment.
  • the voltage input circuit for inputting the highest potential and the lowest potential of the assembled battery 10 is exemplified as the configuration connected to the second voltage detection circuit 22b via the second voltage input filter 22a.
  • the voltage input circuit may be directly connected to the second voltage detection circuit 22b without passing through the second voltage input filter 22a.
  • the current input circuit was illustrated as a structure connected to the current detection circuit 23b via the current input filter 23a.
  • the current input circuit may be directly connected to the current detection circuit 23b without going through the current input filter 23a.
  • the battery monitoring devices 2 shown in the first to third embodiments may be combined with each other.
  • the layout of the battery monitoring device 2 shown in FIG. 3 is merely an example, and can be arbitrarily changed.

Abstract

電圧値と電流値を検出するタイミングのずれを低減し、より正確な電池の状態を取得する。回路基板上において、第2電圧検出回路22bは第1電圧検出回路21bおよび電流検出回路23bよりも電圧入力回路の出力端の近くに、電流検出回路23bは第2電圧検出回路22bおよび第1電圧検出回路21bよりも電流入力回路の出力端の近くに、それぞれに配置され、電圧入力回路と電流入力回路とは、第1電圧検出回路21bよりも第2電圧検出回路22bおよび電流検出回路23bに近接して配置されている。

Description

電池監視装置
 本発明は、電池監視装置に関する。
 リチウムイオン2次電池やニッケル水素電池、鉛電池などの2次電池の電池セルを複数個直並列して構成した組電池は、通常、電池監視装置とともに用いられる。電池監視装置は、組電池を構成する各電池セルのセル電圧を検出したり、電池セルに流れる電流を検出したりすることで、電池の状態を検出する。電池の劣化状態を知るために、電池セルの内部抵抗を検知することもある。電池の内部抵抗は、電池セルの電圧の測定値と通電電流の測定値とから求まる。
 電池の状態を高精度に検出できる電池監視回路として、電流センサと電圧センサとをマルチプレクサに接続し、マルチプレクサにより1つの信号を選択してアナログデジタル変換器を介して演算部に出力し、演算部にて所定の演算を行う回路が知られている(例えば、特許文献1参照)。しかし、特許文献1には、回路基板の実装状態は何ら示されていない。
国際公開WO2010/106588号公報
 回路基板に電流および電圧を計測するためのセンサおよび演算部を実装する場合、回路基板上における電流を計測するためのセンサと電圧を計測するためのセンサの位置の差に起因して検出タイミングのずれが生じる。また、電流を計測するためのセンサから検出回路までの配線長と、電圧を計測するためのセンサから検出回路までの配線長の差、換言すれば、抵抗の差に起因して検出タイミングのずれが生じる。
 本発明の電池監視装置は、電気的に直列に接続された複数の電池セルを備えた組電池の最高電位と最低電位とを入力する電圧入力回路と、前記組電池に流れる電流を計測するために設けられた電流センサの出力を入力する電流入力回路と、複数の前記電池セルのそれぞれの電圧を検出する第1電圧検出回路と、前記電圧入力回路の出力から前記組電池の電圧を検出する第2電圧検出回路と、前記電流入力回路の出力から前記組電池の電流を検出する電流検出回路と、前記電圧入力回路、前記電流入力回路、前記第1電圧検出回路、前記第2電圧検出回路および前記電流検出回路を実装した回路基板と、を有し、前記回路基板上において、前記第2電圧検出回路は前記第1電圧検出回路および前記電流検出回路よりも前記電圧入力回路の出力端の近くに、前記電流検出回路は前記第1電圧検出回路および前記第2電圧検出回路よりも前記電流入力回路の出力端の近くに、それぞれに配置され、前記電圧入力回路と前記電流入力回路とは、前記第1電圧検出回路よりも前記第2電圧検出回路および前記電流検出回路に近接して配置されている。
 本発明によれば、より正確な電池の状態を取得することができる。
本発明の電池監視装置2の第1の実施形態を含む電動車両駆動装置100のブロック図である。 図1に示される電池監視装置2の構成部品の配置例の一例を示すブロック図である。 図2に示される電池監視装置2の実装状態の一例を示す平面図である。 図3に示される実装状態の電池監視装置2の模式的平面図である。 本発明の電池監視装置の第2の実施形態を含む電動車両駆動装置100のブロック図である。 本発明の電池監視装置の第3の実施形態であり、その構成部品の配置例の一例を示すブロック図である。
 以下、図1~図4を参照して本発明の電池監視装置の第1の実施形態を説明する。
 図1は、本発明の電池監視装置2の第1の実施形態を含む電動車両駆動装置100のブロック図である。
 本発明に係る電池監視装置2は、電池システム1(蓄電装置とも呼ばれる)に設けられた組電池10の電池状態を検出し、組電池10を適切な状態に保つ装置である。図1に示されるように、電池監視装置2は、電池システム1を搭載する電動車両駆動装置100に適用される。なお、電動車両駆動装置100は、ハイブリッド自動車(HEV)や電気自動車(EV)などの電動車両を駆動する回転機システムである。
 電動車両駆動装置100は、電池監視装置2および組電池10等を備える電池システム1、車両全体の制御を行う車両コントローラ30、インバータ40、回転電機50等を備えている。電池システム1はリレー60、61を介してインバータ40に接続されている。電池監視装置2は、インバータ40及び上位の車両コントローラ30との通信を、CAN(Controller Area Network)の通信バスを介して行う。
 回転電機50はインバータ40からの電力により駆動される。車両の発進および加速時には、電池システム1から放電電力がインバータ40を通じて回転電機50に供給され、回転電機50の駆動力によりエンジン(不図示)をアシストする。車両停止および減速時には、回転電機50からの回生電力がインバータ40を通じて電池システム1に設けられた組電池10を充電する。インバータ40は、モータコントローラ41を内蔵し、インバータ40のDC-AC変換およびAC-DC変換を制御することによって、回転電機50の駆動制御並びに組電池10の充放電制御を行う。
 電池システム1は、組電池10、電池監視装置2を備えている。組電池10は、最小単位である電池セルC(C(1)~C(N))が複数直列に接続されて構成されている。組電池10は、例えば、12個程度の電池セルCが直列接続されて構成され、全体として48V程度となる。本実施形態の電池システム1では、電池セルCの数量が少なく、組電池10の最高電圧は低いので、信号ラインと後述する制御部24との間に絶縁素子は挿入されていない。このため、電池監視装置2全体のGNDは共通とされている。しかし、組電池10を構成する電池セルCの数量を多くして最高電圧を、例えば、数百V程度の高電圧にした場合には、信号ラインと制御部24との間に絶縁素子を挿入する構成としてもよい。
 以下の説明では、組電池10を構成する電池セルCの個数をNとし、以下では、N個の電池セルC(1)~C(N)の一つを代表して表す場合には電池セルCのように呼ぶ場合がある。組電池10を構成する電池セルCとしては、例えば充放電可能なリチウムイオン二次電池が用いられる。図1に示す例の電池セルCを備える組電池10は、所定数の電池セルにグループ化された複数のセルブロックを、直列に接続して成る接続体の構成としてもよい。この場合、グループ化された組電池10に接続される、後述する第1電圧計測部21も複数のグループ化されたブロックとなる。
(電池監視装置2の構成)
 電池監視装置2は、組電池10の状態を監視する装置であり、組電池10の各電池セルCの過充電および過放電を検出する過充放電検出機能、組電池10の各電池セルCの内部抵抗を検知する内部抵抗検出機能等を有する。電池監視装置2は、第1電圧計測部21、電流総電圧検出部400、電流計測素子9、制御部24等を内蔵する。電流総電圧検出部400は第2電圧計測部22、電流計測部23、AD変換制御部250、第一演算部405を内蔵する。
 第1電圧計測部21は、組電池10を構成する電池セルCのセル毎の電圧(以下、セル電圧と呼ぶ)を計測する回路である。第1電圧計測部21は、電圧入力フィルタ21aと第1電圧検出回路21bとを備えている。第1電圧検出回路21bは、電池セルC(1)~C(N)の各セル電圧を計測できる回路である。第1電圧計測部21は、集積回路(IC)として構成されたものを用いてもよい。
 第2電圧計測部22は、組電池10を構成するN個の電池セル全体の電圧(以下では総電圧Vtと呼ぶ)を計測する回路である。N個の電池セルCは、組電池10の負極側から組電池10の正極側に向かって、符号C(1)、C(2)、・・・・、C(N-1)、C(N)の順に直列に接続されて配列されている。従って、電池セルC(N)は、組電池10の正極端子が最高電圧であり、電池セルC(1)の負極端子が組電池10の最低電圧となっている。第2電圧計測部22の第2電圧入力端子220は、電池セルC(N)の正極に接続されている。図示は省略したが、第1電圧計測部21は、各電池セルC(1)~C(N)のセル電圧のバランシング動作を行うバランシング抵抗とバランシングスイッチ、制御部24と通信を行って制御を行うロジック部を備えている。
 組電池10に流れる電流を計測する電流計測部23には、電流計測素子9から計測信号(電気信号)が入力される。電流計測素子9は、電流の大きさを電気信号に変換する素子であり、具体的には、ホール素子センサやシャント抵抗素子などがある。電流計測素子9からは電流の大きさに対応した電気信号が出力され、その電気信号は電流計測部23で計測される。
 シャント抵抗素子は以下の点で、ホール素子センサに比べて優れている。シャント抵抗素子はオフセット電流が小さいので、組電池10の充電状態(SOC)を高精度に計測することができる。また、シャント抵抗素子は応答特性(電流変化に対する電圧値の追従性)が速いので、電流計測部23の測定時定数を速くすれば、それに応じて時間分解能を高くすることができる。すなわち、計測の同時性を達成しやすいという点で優れている。
 以下では、電流計測素子9としてシャント抵抗9aを用いた構成として例示する。
 第2電圧計測部22は第2電圧入力フィルタ22a及び第2電圧検出回路22bを備えている。電流計測部23は電流入力フィルタ23a及び電流検出回路23bを備えている。つまり、第2電圧計測部22が備える第2電圧入力フィルタ22aと電流計測部23が備える電流入力フィルタ23aとは、後述する図2にも図示されるように、別のフィルタ回路として構成されている。これにより、第2電圧計測部22の第2電圧入力フィルタ22aの特性周波数と、電流計測部23の電流入力フィルタ23aの特性周波数とが、互いに等しくなるような好ましい状態にすることができる。
 集積回路25は第一演算部405、AD変換制御部250、第2電圧検出回路22b、電流検出回路23bを内蔵する。第2電圧検出回路22bおよび電流検出回路23bは、それぞれAD変換制御部250からのトリガ信号を受けてAD変換を開始する。AD変換制御部250は、第2電圧検出回路22bおよび電流検出回路23bの変換タイミングが互いに等しくなるようにトリガ信号を発生する。変換タイミングの同時性を確保するためには、第2電圧検出回路22bおよび電流検出回路23bが同一のトリガ信号で変換を開始するように構成することが好ましい。
 電流検出回路23bと第2電圧検出回路22bとは、集積回路25内において、隣接して配置されている。電流入力フィルタ23aおよび第2電圧入力フィルタ22aは、集積回路25の外部に形成され、それぞれ、集積回路25に内蔵された電流検出回路23bおよび集積回路25に内蔵された第2電圧検出回路22bに接続されている。つまり、組電池10の最高電位と最低電位とを入力する電圧入力回路は、第2電圧入力フィルタ22aを介して第2電圧検出回路22bに接続されている。また、組電池10に流れる電流を入力する電流入力回路は、電流入力フィルタ23aを介して電流検出回路23bに接続されている。電流入力フィルタ23aと第2電圧入力フィルタ22aとは相互に隣接して配置されている。これにより、電流値および総電圧Vtを検出する際、検出センサの位置および検出センサから各検出回路23b、22bまでの配線長に起因して生じる検出タイミングのずれを低減することができる。このことについては、後述する。
 第2電圧検出回路22bおよび電流検出回路23bに、ΔΣ型のAD変換器を用いることが好ましい。ΔΣ型のAD変換器を用いることにより、高精度なAD変換を行うことが可能となる。
 さらに好ましくは、ΔΣ型のAD変換器のデシメーション・フィルタを第2電圧検出回路22bと電流検出回路23bとで同じ特性のデシメーション・フィルタとすることで、これら2つのAD変換器の伝達関数を互いに等しくすることができる。
 制御部24は電池監視装置2の全体の制御を行うものであり、例えば、第1電圧検出回路の動作制御や状態判定などを行う。制御部24は、第1電圧計測部21、電流総電圧検出部400のそれぞれから送られる信号を受け取り、それらの信号値を用いて、各電池セルC(1)~C(N)の内部抵抗を検知する。また、リレー60、61のON、OFF機能を有する場合もある。
 第2電圧計測部22及び電流計測部23で同時性を持って検出された電流値と電圧値は電流総電圧検出部400に内蔵される第一演算部405にて平均化、IIR(Infinite Impulse Response)、FFT(Fast Fourier Transform)等の演算処理が行われる。この演算処理は時間がかかる為、第一演算部405で占有して行われる。また、電圧値と電流値の演算処理結果も同時性を保ったままとなる。
 制御部24に内蔵される第二演算部502は第一演算部405から送られる演算処理結果の信号と第1電圧計測部21から送られるセル電圧値の信号に基づいて電池容量(SOC)、電池劣化状態(SOH)の演算処理が行われる。
(電流変化に対する計測時刻ズレの説明)
 電池システム1における組電池10の通電電流の時間変化の、計測時刻ズレへの影響について説明する。図1に示す電動車両(HEV)においては、電動車両の走行状態に応じて回転電機50の出力トルクが時間的に変動する。例えば、回転電機50によるエンジンのアシストが必要になると、回転電機50の出力トルクが増加するため、それに応じてインバータ40の出力電力が増加する。そして、インバータ40への入力電流、すなわち、組電池10の通電電流も増加する。逆に、電動車両が回生ブレーキを使用して回生状態になると、回転電機50が発電機として動作して、回生電力が回転電機50(発電機)からインバータ40、そして組電池10へと流れる。このため、組電池10への充電電流が増加する。このように、電池システム1においては、組電池10への通電電流が時間変化をする。
 上述したように、第2電圧計測部22及び電流計測部23で検出された電流値と電圧値は、電流総電圧検出部400に内蔵される第一演算部405にて平均化、IIR、FFT等の演算処理が行われる。ここで、電流計測部23で検出する電流値と第2電圧計測部22で検出する総電圧Vtとの検出タイミングにずれが生じると、上記の各演算結果の精度が損なわれる。
(電池監視装置2の実装構造)
 図2は、図1に示される電池監視装置2の構成部品の配置例の一例を示すブロック図である。
 図2に示すように、集積回路25は、矩形形状の第一マイコン25Aとされ、制御部24は、矩形形状の第二マイコン24Aとされている。第1電圧検出回路21bは、第2の集積回路として形成されおり、UART(Universal Asynchronous Receiver Transmitter)変換回路35を介して第二マイコン24Aと接続され、第二マイコン24Aとデータの交換を行う。
 第一マイコン25Aには、第一演算部405、AD変換制御部250、第2電圧検出回路22b、電流検出回路23bが内蔵されている。第一マイコン25Aには、それぞれ、抵抗とコンデンサにより形成された、電流入力フィルタ23aおよび第2電圧入力フィルタ22aが接続されている。電流入力フィルタ23aと第2電圧入力フィルタ22aとは、フィルタ定数がほぼ同じにされている。電流計測素子9であるシャント抵抗9aが、電流入力フィルタ23aに接続されている。シャント抵抗9aの高電位側および低電位側が電流入力フィルタ23aを介して第一マイコン25Aに接続され、シャント抵抗9aの抵抗分で発生する電流に比例した電圧が第一マイコン25Aで検出される。シャント抵抗9aに流れる電流は、組電池10に流れる電流である。また、組電池10の総電圧Vtが、第2電圧入力フィルタ22aを介して第一マイコン25Aで検出される。
 第二マイコン24Aには、電源回路31および演算時に必要なデータ等が保持されるEEPROM32が接続されている。また、第二マイコン24Aには、不図示の温度センサに接続される温度センサ用コネクタ33、リレー60、61(図1参照)が接続されるリレー用コネクタ34等が接続されている。電源回路31には、電源・通信用コネクタ36が接続されている。第二マイコン24Aには、第二演算部502の他、図4に示されるように、電源回路31およびリレー駆動用ドライバ37が内蔵されている。なお、図1では、電源回路31、EEPROM32および各コネクタ33、34、36は、図示を省略されている。
 図3は、図2に示される電池監視装置2の実装状態の一例を示す平面図である。また、図4は、図3に示される実装状態の電池監視装置2の模式的平面図である。
 電池監視装置2は、回路基板70と、回路基板70に実装された以下の電子素子/回路、すなわち、シャント抵抗9a、電流入力フィルタ23a、第2電圧入力フィルタ22a、第一マイコン25A、第1電圧検出回路21b、および第二マイコン24A等を備えている。電池監視装置2は、これ以外の電子素子/回路を備えていてもよい。図1に示されるように、組電池10は、電池監視装置2には含まれていない。
 シャント抵抗9aは、矩形形状の回路基板70の一対の短辺の一方側に配置されている。シャント抵抗9aは、2つの締結部材71により、回路基板70に固定されている。シャント抵抗9aと第一マイコン25Aとの間に電流入力フィルタ23aが配置されている。電流入力フィルタ23aに隣接して、第2電圧入力フィルタ22aが配置されている。第一マイコン25Aは、シャント抵抗9aに近接して配置され、第二マイコン24Aは、第一マイコン25Aから大きく離間した回路基板70のほぼ中央部に配置されている。第二マイコン24Aは、第1電圧計測部21と電流総電圧検出部400とのインタフェースを備え、電池容量(SOC)および電池劣化状態(SOH)を演算する第二演算部502を内蔵する。また、第二マイコン24Aには、図2に図示されるように、温度センサを含む種々の診断を行うための電子素子や電子回路が接続される。このため、レイアウト上、第二マイコン24Aを回路基板70の中央部付近に配置することが好ましい。
 第1電圧検出回路21bは、第二マイコン24Aと第一マイコン25Aとの間に配置されている。つまり、第1電圧検出回路21bは、電流入力フィルタ23aと第2電圧入力フィルタ22aとが配置された第一マイコン25Aの側辺とは反対側の側辺側に、該反対側の側辺から離間して配置されている。
 シャント抵抗9aの2つの検出端子81、82は、電流入力フィルタ23aを介して第一マイコン25Aに内蔵された電流検出回路23b(図1参照)に接続されている。電流入力フィルタ23aは、シャント抵抗9aの検出端子81、82と電流検出回路23bとの間にほぼ直線状にパターン形成され、検出端子81、82と電流検出回路23bとの接続長さが最短となるようにされている。電流入力フィルタ23aと電流検出回路23bとは、第一マイコン25Aのシャント抵抗9aに対面する側辺側の接続部83(図4参照)で接続されている。シャント抵抗9aの検出端子81は組電池10に、検出端子82はGNDに、それぞれ、不図示のバスバーやワイヤハーネス等の接続部材により接続される。
 第2電圧入力フィルタ22aは、シャント抵抗9aと第一マイコン25Aのシャント抵抗9aに対面する側辺との間に、電流入力フィルタ23aに隣接して、該電流入力フィルタ23aにほぼ平行に配置されている。第2電圧入力フィルタ22aは、第一マイコン25Aに内蔵された第2電圧検出回路22b(図1参照)に接続部84(図4参照)で接続されている。接続部84は、矩形形状の第一マイコン25Aの接続部83が配置された側辺と同じ側辺に配置されている。第2電圧計測部22の第2電圧入力端子220には、組電池10の電池セルC(N)、すなわち、最高電位の正極端子が、不図示のバスバーやワイヤハーネス等の接続部材により接続される。
 上述したように、電流入力フィルタ23aと第2電圧入力フィルタ22aとは、フィルタ定数がほぼ同じにされている。また、第一マイコン25Aに内蔵された電流検出回路23bと第2電圧検出回路22bとは隣接して配置されている。さらに、電流入力フィルタ23aと第2電圧入力フィルタ22aとは隣接して配置されている。このため、電流入力フィルタ23aと第2電圧入力フィルタ22aの特性周波数が互いに等しくなる。また、シャント抵抗9aの検出端子81、82と接続部83とを接続する配線の長さと、第2電圧入力端子220と接続部84とを接続する配線の長さとがほぼ等しく、且つ、ほぼ最短となる。従って、電流を計測するためのセンサと電圧を計測するためのセンサとの配線長の差、換言すれば、抵抗の差に起因する検出タイミングのずれを低減することができる。これにより、より正確な電池の状態を取得することができる。
 また、電流を計測するためのセンサの位置と、電圧を計測するためのセンサの位置に起因して生じる検出タイミングのずれを低減することができる。このことについて、理解を容易にするために付言する。電流を計測するためのセンサは、シャント抵抗9aの検出端子81、82に位置する。また、電圧を計測するためのセンサは、第2電圧入力端子220に位置する。ここで、第2電圧入力端子220が、実施形態に示す第1の位置と、この第1の位置から接続部84を中心として時計方向に所定角度回転した第2の位置に設定した場合を対比する。このように、第2電圧入力端子220の設定位置が、第2の位置の場合においても、第2電圧入力端子220と接続部84との間の配線パターンの長さや形状を第1の位置の場合と同一とすることはできる。しかし、第2電圧入力端子220の設定位置は、第1の位置と第2の位置とでは異なるため、第2電圧入力端子220と組電池10の最高電位の正極端子とを接続する接続部材の長さや引き回しは、異なるものとなる。つまり、電流および電圧を計測するためのセンサの位置が異なることによっても、検出タイミングにずれが生じる。
 なお、上記実施形態では、電流入力フィルタ23aと第2電圧入力フィルタ22aとが隣接して配置された構成として例示した。これは好ましい構成ではあるが、本発明は、この構成に特定されるものではない。電流入力フィルタ23aと第2電圧入力フィルタ22aとは、例えば、第一マイコン25Aの同一の側辺側に配置される等、相互に近接して配置される構成であればよい。
 上記実施形態では、電流入力フィルタ23aと第2電圧入力フィルタ22aとを、シャント抵抗9aと第一マイコン25Aとの間に配置した構成として例示した。しかし、図3に図示された電池監視装置2において、シャント抵抗9aを90度回転し、第一マイコン25Aの上方に配置することも可能である。このような構造においては、電流入力フィルタ23aおよび第2電圧入力フィルタ22aの少なくとも一方は、シャント抵抗9aと第一マイコン25Aとの間とは異なる位置に配置することが可能となる。要は、第2電圧入力フィルタ22aと電流入力フィルタ23aとは、第1電圧検出回路21bよりも第2電圧入力フィルタ22aおよび電流入力フィルタ23aに近接して配置されているようにすればよい。このようにすることにより、電流入力フィルタ23aと第2電圧入力フィルタ22aとは、近接して配置されることになる。
 上記第1の実施形態によれば下記の効果を奏する。
(1)回路基板70上において、第2電圧検出回路22bは第1電圧検出回路21bおよび電流検出回路23bよりも第2電圧入力フィルタ22aの出力端の近くに、電流検出回路23bは第2電圧検出回路22bおよび第1電圧検出回路21bよりも電流入力フィルタ23aの出力端の近くに、それぞれに配置されている。また、電圧が入力される第2電圧入力フィルタ22aと電流が入力される電流入力フィルタ23aとは、第1電圧検出回路21bよりも第2電圧検出回路22bおよび電流検出回路23bに近接して配置されている。このため、第2電圧検出回路22bと第2電圧入力端子220とを接続する配線長と、電流検出回路23bと電流計測素子9の検出端子81、82を接続する配線長との差に起因して発生する検出タイミングのずれを低減することができる。また、電流を計測するためのセンサの位置と電圧を計測するためのセンサの位置との差に起因する検出タイミングのずれを低減することができる。これにより、より正確な電池の状態を取得することができる。
(2)電圧が入力される第2電圧入力フィルタ22aと電流が入力される電流入力フィルタ23aとを隣接して配置し、かつ、第2電圧検出回路22bと電流検出回路23bとを隣接して配置した。このため、電流を計測するためのセンサの位置と電圧を計測するためのセンサとの位置の差に起因して発生する検出タイミングのずれを、さらに、低減することができる。
(3)電流入力フィルタ23aと第2電圧入力フィルタ22aとは、フィルタ定数がほぼ同じにされ、かつ、第2電圧入力フィルタ22aと電流入力フィルタ23aとが近接して配置されている。このため、電流入力フィルタ23aと第2電圧入力フィルタ22aの特性周波数を互いに等しくすることができる。
-第2の実施形態-
 図5は、本発明の電池監視装置2の第2の実施形態を含む電動車両駆動装置100のブロック図である。
 第2の実施形態の電池監視装置2では、図1に示された第一演算部405と第二演算部502が、演算部503として1つに統合されている。
 集積回路25には、電流検出回路23b、第2電圧検出回路22bおよびAD変換制御部250が内蔵されている。実施形態1とは異なり、集積回路25には第一演算部405は内蔵されていない。第一演算部405の機能は、制御部24に内蔵された演算部503が有している。
 すなわち、制御部24の演算部503は、第2電圧計測部22及び電流計測部23で検出された電圧値と電流値に基づいて、平均化、IIR、FFT等の演算処理を行うと共に上記演算処理結果と第1電圧計測部21から送られるセル電圧値の信号に基づいて電池容量(SOC)、電池劣化状態(SOH)の演算処理を行う。
 上記以外は、第1の実施形態と同様である。
 電流値と電圧値の検出タイミングのずれは、検出用のセンサの位置および検出用のセンサから検出用回路までの配線長の差により生じるものであって、演算処理の実行時間の長さには影響されない。
 従って、第2の実施形態においても、第1の実施形態と同様な効果を奏する。
-第3の実施形態-
 図6は、本発明の電池監視装置の第3の実施形態であり、その構成部品の配置例の一例を示すブロック図である。
 第3の実施形態では、第2電圧入力フィルタ22aは、電流入力フィルタ23aが接続された第一マイコン25Aの一側辺に隣接する側辺に接続されている。
 電流入力フィルタ23aは、第1の実施形態と同様、シャント抵抗9aに対面する第一マイコン25Aの一側辺において第一マイコン25Aに内蔵された電流検出回路23b(図1参照)に接続されている。第2電圧入力フィルタ22aは、第一マイコン25Aにおける上記一側辺に隣接する側辺において第一マイコン25Aに内蔵された第2電圧検出回路22b(図1参照)に接続されている。
 上記以外は、第1の実施形態と同様である。
 上記構成においても、電流入力フィルタ23aと第2電圧入力フィルタ22aとは隣接して配置されている。また、電流入力フィルタ23aの配線パターンと第2電圧入力フィルタ22aの配線パターンとを、ほぼ同じ長さにすることができる。
 従って、第3の実施形態においても、第1の実施形態と同様な効果を奏する。
 なお、上記実施形態においては、組電池10の最高電位と最低電位とを入力する電圧入力回路を、第2電圧入力フィルタ22aを介して第2電圧検出回路22bに接続した構成として例示した。しかし、電圧入力回路を、第2電圧入力フィルタ22aを介することなく、直接、第2電圧検出回路22bに接続するようにしてもよい。
 また、上記実施形態においては、電流入力回路を、電流入力フィルタ23aを介して電流検出回路23bに接続した構成として例示した。しかし、電流入力回路を、電流入力フィルタ23aを介することなく、直接、電流検出回路23bに接続するようにしてもよい。
 第1~第3の実施形態に示す電池監視装置2は、相互に組み合わせてもよい。図3に示す電池監視装置2のレイアウトは、単なる一例であって、任意に変更することができる。
 上記では、種々の実施の形態および変形例を説明したが、本発明はこれらの内容に限定されるものではない。本発明の技術的思想の範囲内で考えられるその他の態様も本発明の範囲内に含まれる。
  9   電流計測素子(電流センサ)
  9a  シャント抵抗(電流センサ)
 10   組電池
 21   第1電圧計測部
 21b  第1電圧検出回路(第2の集積回路)
 22   第2電圧計測部
 22a  第2電圧入力フィルタ
 22b  第2電圧検出回路
 23   電流計測部
 23a  電流入力フィルタ
 23b  電流検出回路
 24   制御部(第2の集積回路)
 24A  第二マイコン
 25   集積回路(第1の集積回路)
 25A  第一マイコン(第1の集積回路)
 70   回路基板
 405  第一演算部
 502  第二演算部
 503  演算部
 C    電池セル
 

Claims (7)

  1.  電気的に直列に接続された複数の電池セルを備えた組電池の最高電位と最低電位とを入力する電圧入力回路と、
     前記組電池に流れる電流を計測するために設けられた電流センサの出力を入力する電流入力回路と、
     複数の前記電池セルのそれぞれの電圧を検出する第1電圧検出回路と、
     前記電圧入力回路の出力から前記組電池の電圧を検出する第2電圧検出回路と、
     前記電流入力回路の出力から前記組電池の電流を検出する電流検出回路と、
     前記電圧入力回路、前記電流入力回路、前記第1電圧検出回路、前記第2電圧検出回路および前記電流検出回路を実装した回路基板と、を有し、
     前記回路基板上において、前記第2電圧検出回路は前記第1電圧検出回路および前記電流検出回路よりも前記電圧入力回路の出力端の近くに、前記電流検出回路は前記第1電圧検出回路および前記第2電圧検出回路よりも前記電流入力回路の出力端の近くに、それぞれに配置され、
     前記電圧入力回路と前記電流入力回路とは、前記第1電圧検出回路よりも前記第2電圧検出回路および前記電流検出回路に近接して配置されている、電池監視装置。
  2.  請求項1に記載の電池監視装置において、
     前記第2電圧検出回路と前記電流検出回路は隣接して配置されている、電池監視装置。
  3.  請求項1に記載の電池監視装置において、
     さらに、前記電流入力回路と前記電流検出回路とを接続する電流入力フィルタ、および前記電圧入力回路と前記第2電圧検出回路とを接続する第2電圧入力フィルタを備える、電池監視装置。
  4.  請求項3に記載の電池監視装置において、
     前記電流入力フィルタと前記電圧入力フィルタとは、隣接して配置されている、電池監視装置。
  5.  請求項1に記載の電池監視装置において、
     前記第2電圧検出回路および前記電流検出回路は、第1の集積回路として形成され、前記第1電圧検出回路は、第2の集積回路として形成されている、電池監視装置。
  6.  請求項5に記載の電池監視装置において、
     さらに、制御部を備え、
     前記第1の集積回路は、前記電流検出回路で検出された電流値および前記第2電圧検出回路で検出された電圧値に基づいて、前記組電池の総電圧を演算する第一演算部を有し、前記制御部は、前記第一演算部から送られる演算結果および前記第1電圧検出回路から送られる前記電池セルそれぞれの電圧値に基づいて、電池容量を演算する第二演算部を有する、電池監視装置。
  7.  請求項5に記載の電池監視装置において、
     さらに、制御部を備え、
     前記制御部は、前記電流検出回路で検出された電流値および前記第2電圧検出回路で検出された電圧値に基づいて、前記組電池の総電圧を演算すると共に、前記第1電圧検出回路から送られる前記電池セルそれぞれの電圧値に基づいて、電池容量を演算する演算部を有する、電池監視装置。
     
     
PCT/JP2016/066531 2015-07-08 2016-06-03 電池監視装置 WO2017006668A1 (ja)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2017527126A JP6383496B2 (ja) 2015-07-08 2016-06-03 電池監視装置

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2015-137078 2015-07-08
JP2015137078 2015-07-08

Publications (1)

Publication Number Publication Date
WO2017006668A1 true WO2017006668A1 (ja) 2017-01-12

Family

ID=57685510

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2016/066531 WO2017006668A1 (ja) 2015-07-08 2016-06-03 電池監視装置

Country Status (2)

Country Link
JP (1) JP6383496B2 (ja)
WO (1) WO2017006668A1 (ja)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2019213344A (ja) * 2018-06-05 2019-12-12 パナソニックIpマネジメント株式会社 車載充電器

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6837033B2 (ja) * 2018-06-27 2021-03-03 矢崎総業株式会社 電池モジュール

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008312391A (ja) * 2007-06-15 2008-12-25 Hitachi Vehicle Energy Ltd 電池制御装置

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5787997B2 (ja) * 2011-05-31 2015-09-30 日立オートモティブシステムズ株式会社 電池システム監視装置

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008312391A (ja) * 2007-06-15 2008-12-25 Hitachi Vehicle Energy Ltd 電池制御装置

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2019213344A (ja) * 2018-06-05 2019-12-12 パナソニックIpマネジメント株式会社 車載充電器

Also Published As

Publication number Publication date
JPWO2017006668A1 (ja) 2018-01-25
JP6383496B2 (ja) 2018-08-29

Similar Documents

Publication Publication Date Title
CN110018349B (zh) 接地故障检测装置
JP6312508B2 (ja) 電池監視装置、電池システムおよび電動車両駆動装置
JP6023312B2 (ja) 電池システム監視装置
JP2017070024A (ja) 電池監視装置
US20110049977A1 (en) Safety and performance optimized controls for large scale electric vehicle battery systems
JP6706688B2 (ja) 電池制御装置
CN107889526B (zh) 电池系统监视装置
US20110050278A1 (en) System for and method of virtual simultaneous sampling with a single adc core
US10120033B2 (en) Battery sensor and battery monitoring system
JP5996017B2 (ja) 電圧検出回路
JP6383496B2 (ja) 電池監視装置
JP2018197708A (ja) 電流計測回路の故障判断装置
WO2015186421A1 (ja) バッテリ状態測定装置及びそれを備えたバッテリ
US11500028B2 (en) Detection device
WO2021246225A1 (ja) 漏電検出装置
JP7467337B2 (ja) 集積回路、電池監視装置、及び、電池監視システム
JP2015102336A (ja) 電池監視装置
JP7107707B2 (ja) 電池監視装置及び電池監視方法
CN110350257B (zh) 用于机动车的电池系统和机动车
CN109923429B (zh) 带电流传感器的双电压电池和用于双电压电池的校准方法
Tarle et al. Design of a battery management system for formula Student electric race vehicle
JP2020190529A (ja) 電圧計測回路
WO2018047725A1 (ja) 検出回路及び蓄電パック
CN113557440B (zh) 电池装置和电流传感器诊断方法
EP3901640A1 (en) Apparatus for measuring insulation resistance

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 16821139

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2017527126

Country of ref document: JP

Kind code of ref document: A

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 16821139

Country of ref document: EP

Kind code of ref document: A1