WO2016175048A1 - 情報処理システム、情報処理方法、およびプログラム - Google Patents

情報処理システム、情報処理方法、およびプログラム Download PDF

Info

Publication number
WO2016175048A1
WO2016175048A1 PCT/JP2016/062071 JP2016062071W WO2016175048A1 WO 2016175048 A1 WO2016175048 A1 WO 2016175048A1 JP 2016062071 W JP2016062071 W JP 2016062071W WO 2016175048 A1 WO2016175048 A1 WO 2016175048A1
Authority
WO
WIPO (PCT)
Prior art keywords
consumer
power consumption
information
specific device
information processing
Prior art date
Application number
PCT/JP2016/062071
Other languages
English (en)
French (fr)
Inventor
奕凌 叶
一哲 深澤
Original Assignee
日本電気株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 日本電気株式会社 filed Critical 日本電気株式会社
Publication of WO2016175048A1 publication Critical patent/WO2016175048A1/ja

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F1/00Details not covered by groups G06F3/00 - G06F13/00 and G06F21/00
    • G06F1/26Power supply means, e.g. regulation thereof
    • G06F1/28Supervision thereof, e.g. detecting power-supply failure by out of limits supervision
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/12Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load
    • H02J3/14Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load by switching loads on to, or off from, network, e.g. progressively balanced loading
    • H02J3/144Demand-response operation of the power transmission or distribution network
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2310/00The network for supplying or distributing electric power characterised by its spatial reach or by the load
    • H02J2310/50The network for supplying or distributing electric power characterised by its spatial reach or by the load for selectively controlling the operation of the loads
    • H02J2310/56The network for supplying or distributing electric power characterised by its spatial reach or by the load for selectively controlling the operation of the loads characterised by the condition upon which the selective controlling is based
    • H02J2310/58The condition being electrical
    • H02J2310/60Limiting power consumption in the network or in one section of the network, e.g. load shedding or peak shaving
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B70/00Technologies for an efficient end-user side electric power management and consumption
    • Y02B70/30Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
    • Y02B70/3225Demand response systems, e.g. load shedding, peak shaving
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems
    • Y04S20/222Demand response systems, e.g. load shedding, peak shaving

Definitions

  • the present invention relates to an information processing system, an information processing method, and a program.
  • the power retailer makes a request for transmission and distribution to the power company where the customer is located, so that the demand amount of the consumer matches the supply amount from the power retailer in units of 30 minutes. It has an obligation of “the same amount for 30 minutes”. If this “(planned value) same amount for 30 minutes” does not match, the power retailer needs to pay an imbalance fee to the power transmission and distribution company. Payment of this imbalance fee is a major problem for power retailers.
  • a demand response that performs demand control is planned so that the demand amount of the consumer and the supply amount from the electric power retailer coincide. Then, if a demand response including the target value of the power consumption to be reduced in 30 minutes and the control content of the driving operation in 30 minutes after transmission or reception of demand control information is transmitted to each consumer, the power consumption of the consumer May be controlled, and the same amount may be achieved at the same time for 30 minutes.
  • Patent Document 1 An example of a power management apparatus is described in Patent Document 1.
  • the power management apparatus of Patent Literature 1 outputs a stop signal to a predetermined specific device to be forcibly stopped when the contract demand is exceeded. Then, reward points are given to the power receiving contractor according to the power saving request.
  • the power saving control device described in Patent Literature 2 causes a device equipped with a power saving function to execute a power saving function based on a set value.
  • the present invention has been made in view of the above circumstances, and an object of the present invention is to provide an information processing system, an information processing method, and an information processing system that facilitate use of a specific device while enabling planned power use by consumers. To provide a program.
  • the first aspect relates to an information processing system.
  • the information processing system according to the first aspect is An acquisition means for acquiring consumer power consumption information; Detection means for detecting the usage status of the specific device in the consumer, And a granting unit that grants an incentive corresponding to the usage status of the specific device to a consumer whose power consumption is reduced according to the demand control information.
  • the second aspect relates to an information processing method executed by at least one computer.
  • the information processing apparatus Get consumer power consumption information, Detecting the usage status of specific equipment in the consumer, Including providing an incentive corresponding to the usage status of the specific device to a consumer whose power consumption is reduced according to the demand control information.
  • a program for causing at least one computer to execute the method of the second aspect or a computer-readable recording medium recording such a program. May be.
  • This recording medium includes a non-transitory tangible medium.
  • the computer program includes computer program code that, when executed by a computer, causes the computer to perform the information processing method on the information processing apparatus.
  • a plurality of components are formed as a single member, and a single component is formed of a plurality of members. It may be that a certain component is a part of another component, a part of a certain component overlaps with a part of another component, or the like.
  • the plurality of procedures of the method and computer program of the present invention are not limited to being executed at different timings. For this reason, another procedure may occur during the execution of a certain procedure, or some or all of the execution timing of a certain procedure and the execution timing of another procedure may overlap.
  • FIG. 1 is a functional block diagram logically showing the configuration of the information processing system 1 according to the embodiment of the present invention.
  • the information processing system 1 includes an acquisition unit 102 that acquires consumer power consumption information, a determination unit 104 that determines whether or not power consumption has been reduced according to demand control information, and A detection unit 106 that detects a usage status of a specific device in a consumer, and a granting unit 108 that gives an incentive corresponding to the usage status of the specific device to a consumer whose power consumption is reduced according to demand control information. .
  • FIG. 2 is a diagram conceptually showing an example of the entire system configuration related to the information processing system 1 according to the embodiment of the present invention.
  • the information processing system 1 of the present invention is realized at least by a communication device or a server device 100 that communicates with a home device (for example, including an ECHONET Lite (registered trademark) authentication device).
  • a home device for example, including an ECHONET Lite (registered trademark) authentication device.
  • the device is a power-related device in the consumer of the information processing system 1 of the present invention, and includes various devices as shown in FIG.
  • the equipment includes a power-related device, for example, a photovoltaic power generation (PV: PhotoVoltaics) system 52, a load device 54, and a power storage system 56.
  • the device may also include a so-called HEMS (Home Energy Management System) 50.
  • the communication device is connected to a residential distribution board that distributes power to these devices of the consumer or a power measurement device that measures the power consumption of the devices in the customer's home.
  • the distribution board or the power measurement device may be included in the HEMS 50, and the communication device may be the HEMS 50.
  • the distribution board, the power measuring device, or the HEMS 50 may be connected to the server device 100 via a gateway (shown as GW (GateWay) in the figure) 51, or the HEMS 50 is connected to the server device 100. It may have a function. Further, the HEMS 50 and the gateway 51 may be a single device having the respective functions.
  • the HEMS 50 is described as an example of a communication device that realizes at least a part of the functions of the information processing system 1.
  • the communication device is not limited to the HEMS 50, and may be the gateway 51.
  • the power measuring device or distribution board having a communication function may be included.
  • the server device 100 is at least one of the electric power retailer server 30 and the cloud server 40.
  • the server device 100 is a server such as an operator that manufactures or sells a specific device (for example, a home appliance manufacturer or a home appliance mass retailer). It may be.
  • the specific device is a device whose power consumption is to be reduced based on the demand control information, or a device whose use is a condition for giving an incentive to a consumer.
  • the load device 54 includes, for example, a hot water heater (not shown), an ECHONET Lite certified device such as an air conditioner and a lighting device, other home appliances, or an electric vehicle (EV: Electric Vehicle, PHV: Plug-in). Hybrid Vehicle) etc.) 58 etc. are included.
  • the HEMS 50 is connected to power related devices such as the PV system 52, the load device 54, the power storage system 56, and the electric vehicle 58.
  • the HEMS 50 may include a power measurement device or may be included in a residential distribution board.
  • a CT Current Transformer
  • CT Current Transformer
  • the total total power consumption of a plurality of devices connected to the distribution board may be acquired by one CT or may be acquired by a plurality of CTs.
  • the HEMS 50 may have a function of transmitting information related to the measured power consumption of each device to the gateway 51 or the server device 100 by wireless communication.
  • Smart meter 10 is a watt-hour meter having a communication function.
  • the smart meter 10 is supplied to a consumer from an electric power company.
  • the watt-hour meter measures the amount of electric power supplied from an electric power company or an electric power retailer.
  • Information on the measured power consumption and the like is periodically transmitted from the smart meter 10 to the power company server 20 of the power company via a so-called A route.
  • a route communication method between the smart meter 10 and the power company server 20 is not particularly limited.
  • the mobile phone communication system can be used.
  • the smart meter 10 may transmit information such as power consumption to the gateway 51 via a so-called B route different from the A route.
  • the communication method of the B route between the smart meter 10 and the gateway 51 is not particularly limited.
  • a specific low power wireless method using a 920 MHz band for example, a communication method based on a communication standard such as WiSUN, or Zigbee ( A communication method of a wireless communication standard that operates on IEEE802.15.4 such as a registered trademark can be used.
  • the communication method among the devices such as the gateway 51, the HEMS 50, and the power-related device is not particularly limited.
  • the communication is based on a specific low power wireless method using the 920 MHz band, for example, a communication standard such as WiSUN.
  • a communication method of a wireless communication standard that operates on IEEE 802.15.4 such as a method or Zigbee (registered trademark) can be used.
  • each device including the gateway 51, the HEMS 50, and the power-related device may include a device that communicates according to the ECHONET Lite communication standard.
  • the gateway 51 receives the information acquired from the smart meter 10 or the HEMS 50 via the C route (network such as a public network) different from the A route and the B route, and the power retailer server 30 or the cloud server 40 (server device 100). ) Or the like, or the demand control information or the like is received from the power retailer server 30 or the cloud server 40 (server device 100) and transferred to the smart meter 10 or the HEMS 50.
  • the C route network such as a public network
  • the communication method between the gateway 51 and the power retailer server 30 or the cloud server 40 (server device 100) is not particularly limited.
  • a wireless communication method such as WiMAX (Worldwide Interoperability for Microwave Access), 3G, or LTE is used. Can be used.
  • the HEMS 50 acquires power consumption information from the smart meter 10 via the gateway 51. Further, the HEMS 50 communicates with the server device 100 via the gateway 51 and receives demand control information from the server device 100, for example.
  • the gateway 51 has a communication function of communicating with the smart meter 10, the HEMS 50, the PV system 52, the load device 54, the power storage system 56, or the server device 100, and corresponds to a communication method with each device or each device. It is assumed that the communication interface function unit (not shown) is provided. The gateway 51 performs a predetermined authentication procedure using the authentication information with each device, and can communicate with the device when authenticated.
  • the information processing system 1 of the present invention may have a plurality of forms as specific configuration examples, and is exemplified below, but is not limited thereto.
  • (A1) Configuration in which server device 100 realizes all functions In other words, server device 100 includes acquisition unit 102, determination unit 104, detection unit 106, and grant unit 108 in FIG.
  • HEMS 50 includes acquisition unit 102, determination unit 104, and The server device 100 includes at least one of the detection units 106, and the server device 100 includes at least the adding unit 108 illustrated in FIG.
  • the server device 100 includes the acquisition unit 102, the determination unit 104, the detection unit 106, and the provision unit 108 illustrated in FIG.
  • a configuration example of (a2) will be described later.
  • the acquisition unit 102 acquires power consumption information of a consumer from at least one of the smart meter 10 and the HEMS 50 (power measurement device or CT).
  • acquisition means that the device itself obtains data or information stored in another device or storage medium (active acquisition), for example, requests or inquires of another device. Receiving data, accessing and reading out other devices and storage media, etc., and inputting data or information output from other devices into the device (passive acquisition), for example, distribution (or , Transmission, push notification, etc.) and / or receiving received data or information. It also includes selecting and acquiring from received data or information, or selecting and receiving distributed data or information.
  • the power consumption information acquired by the acquisition unit 102 in this embodiment is used by the determination unit 104 to make a determination regarding power consumption reduction. It is also used to identify the devices that are in use. In this case, the timing and conditions at which the acquisition unit 102 acquires the current waveform are different from those described below, and will be described in detail in an embodiment described later.
  • the power consumption information acquired from the smart meter 10 includes, for example, at least one of an instantaneous power measurement value, an instantaneous current measurement value, and an instantaneous voltage measurement value. Moreover, you may acquire other information, such as a power consumption integrated value (30 minute value).
  • the acquisition unit 102 acquires power consumption information from the smart meter 10 via the gateway 51.
  • the acquisition unit 102 of the HEMS 50 acquires power consumption information from the smart meter 10 via the gateway 51.
  • the server device 100 may be connected to the power company server 20 via a network.
  • the acquisition unit 102 may acquire the power consumption information collected by the power company server 20 from the smart meter 10 via the A route from the power company server 20.
  • the gateway 51 or the HEMS 50 may receive power consumption information from the smart meter 10 periodically or at a predetermined date and time, and store information for a predetermined period, or in response to a request from the server device 100.
  • the power consumption information may be received from the smart meter 10 or a combination thereof.
  • the gateway 51 or the HEMS 50 may transmit the stored power consumption information to the server apparatus 100 for a specified period in response to a request from the server apparatus 100, or for each predetermined period. May be transmitted spontaneously to the server device 100, or a combination thereof.
  • timings at which the acquisition unit 102 acquires power consumption information (in this embodiment, the timing at which information is requested from the HEMS 50), which are exemplified below, but are not limited thereto. Further, at least two of the following may be combined.
  • B1 After demand control information to be described later is transmitted, it is collected at predetermined time intervals.
  • B2) Collect at predetermined time intervals during an event implementation period specified by demand control information described later.
  • B3) Collect periodically or at a predetermined date and time.
  • the predetermined time interval is not particularly limited, and is, for example, 30 seconds or 30 minutes. Also, during the collection period, the time interval may be fixed, may vary depending on conditions (for example, during and after a demand control event, or time zone, day of the week, season, etc.), or a combination of these But you can.
  • the acquisition unit 102 of the server apparatus 100 acquires power consumption information from the HEMS 50 (CT or each device) via the gateway 51 will be described.
  • the acquisition unit 102 may acquire, from the HEMS 50, measurement values related to overall power consumption that are measured by a distribution board (power measurement device) that distributes power to a plurality of devices, or the HEMS 50 may be used as an ECHONET Lite certified device. You may inquire through
  • the measurement value related to power consumption acquired from the HEMS 50 includes, for example, at least one measurement value of total current consumption, power, and voltage. Moreover, you may acquire other information, such as a power consumption integrated value (30 minute value).
  • the CT is connected to the distribution board, and the total current consumption of all the devices connected to the distribution board is measured by the CT.
  • the HEMS 50 includes an interface unit (not shown) that performs wireless communication with a power measurement device or CT using a specific low-power wireless system that uses a 920 MHz band.
  • the HEMS 50 is in a state where communication can be performed in advance by performing an authentication procedure for performing wireless communication with the power measurement device (or CT).
  • the acquisition unit 102 acquires power consumption information measured by the power measurement device or CT from the HEMS 50 via the gateway 51.
  • the communication route through which the acquisition unit 102 of the server apparatus 100 acquires power consumption information may be at least one of the following, but is not limited thereto. Further, at least two may be combined, and the route may be switched according to the device configuration and communication status.
  • C1 The acquisition unit 102 of the server device 100 acquires power consumption information from the power measurement device or CT via the HEMS 50 and the gateway 51.
  • C2 The acquisition unit 102 of the server apparatus 100 acquires power consumption information from the power measurement apparatus or CT via the gateway 51.
  • C3 The acquisition unit 102 of the server device 100 acquires power consumption information from the power measurement device or CT via the HEMS 50.
  • the acquisition unit 102 makes a request to the ECHONET Lite authentication device that communicates with the gateway 51, which is detected by the detection unit 106 described later, and acquires power consumption information via the gateway 51.
  • the gateway 51 or the HEMS 50 acquires power consumption information from a power measurement device or CT or an ECHONET Lite authentication device at a predetermined time interval, for example, periodically or within a predetermined period from a predetermined date and time. Time periods may be stored, power consumption information may be acquired from the power measurement device, CT, or ECHONET Lite authentication device in response to a request from the server device 100, or a combination thereof. Then, the gateway 51 or the HEMS 50 may transmit the stored power consumption information to the server apparatus 100 for a predetermined period in response to a request from the server apparatus 100, or for each predetermined period. May be transmitted spontaneously to the server device 100, or a combination thereof.
  • timings at which the acquisition unit 102 acquires power consumption information (in this embodiment, the timing at which information is requested from the HEMS 50), which are exemplified below, but are not limited thereto. Further, at least two of the following may be combined.
  • D1 After demand control information to be described later is transmitted, at least one predetermined period is acquired.
  • D2) Acquire at least one predetermined period within an event implementation period specified by demand control information described later.
  • D3 A predetermined period is acquired periodically or from a predetermined date and time. The length of the predetermined period may be fixed, or may vary according to conditions (for example, during and after a demand control event, or a time zone, day of the week, season, etc.), or a combination thereof.
  • the determination unit 104 determines whether the power consumption has been reduced according to the demand control information, based on the power consumption information acquired from the smart meter 10 or the HEMS 50 (CT or each device).
  • the demand control information is an event including a so-called demand response (DR).
  • DR demand response
  • Demand response is defined in the United States by the US Federal Energy Regulatory Commission (FERC (2011)) as follows.
  • FERC US Federal Energy Regulatory Commission
  • the demand control information is received by the smart meter 10 from the power company server 20 in FIG. 2 via the A route and transferred to the communication device via the B route, and from the power retailer server 30 or the cloud server 40. It is conceivable that the communication device or the user terminal of the customer receives via the C route. In this specification, it is assumed that the demand control information is transmitted from the power retailer server 30 or the cloud server 40 to the communication device or the user terminal of the consumer.
  • the demand control information is transmitted from the power retailer server 30 to the communication device or the user terminal of the customer via the C route. Alternatively, it may be transmitted from the cloud server 40 to the communication device or the user terminal upon receiving a request from the power retailer. The demand control information is notified to the consumer as a demand control event.
  • the electric power retailer transmits a demand response to the consumer every 30 minutes, for example, in order to achieve the same amount for 30 minutes.
  • the consumer Upon receiving the demand response, the consumer performs operations such as stopping the operation, switching to an operation mode in which power can be saved, or lowering the set temperature with respect to the device used by the consumer.
  • the determination unit 104 can know that the demand control information has been transmitted. On the other hand, when the power retailer server 30 or the cloud server 40 has a configuration different from that of the server device 100, the determination unit 104 is notified of demand control information from the power retailer server 30 or the cloud server 40 to the consumer. Information indicating that is acquired.
  • the demand control information includes at least an event implementation period (within a predetermined period after the demand response is transmitted or within a specified period), a reduction target value, an incentive when the target is achieved, a penalty when the target is not achieved, and an event target device, etc. Any one piece of information is included.
  • E1 Power consumption limit value The power consumption is kept lower than the limit value.
  • a plurality of limit values may be set.
  • E3) Reduction rate Shows the ratio to be reduced with respect to the normal or general average value of consumers.
  • the determination unit 104 transmits the demand control information to the customer's HEMS 50 or the gateway 51 or the user terminal of the customer, and after the transmission, within a predetermined period or an event implementation period indicated by the demand response, It is determined whether the power consumption of the consumer has been reduced.
  • User terminals include, for example, consumer mobile phones, smartphones, tablet terminals, personal computers, and the like.
  • the consumer may register an email address that can receive emails at the user terminal in the server device 100 in advance, and send the demand control information with the email address as the destination.
  • the demand control information received by the HEMS 50 or the gateway 51 is, for example, a display unit (not shown) included in the HEMS 50 or the gateway 51, or an IHD (In-Home Display) that is a user operation terminal that can communicate with the HEMS 50. ) (Not shown) or the like. The consumer can see these pieces of information and perform operations to stop the operation of the device or switch the operation mode to the power saving mode according to the demand control information.
  • Various criteria for determining whether or not power consumption has been reduced can be considered and are exemplified below, but are not limited thereto. Further, at least two of the following may be combined.
  • F1 The total power consumption of the consumer has been reduced by a predetermined value or more.
  • F2 The total power consumption of the consumer was suppressed within the target value within the predetermined period or the event implementation period.
  • F3 In the demand response event, the total power consumption amount of the consumer is the value (actual value or average value) of the past consumer power consumption in the same time period in another period or other day. In comparison, it was reduced by more than a predetermined ratio.
  • timing which the determination part 104 performs determination is illustrated below, it is not limited to these. Moreover, you may combine at least any two of the following.
  • G1 Determination after a predetermined time elapses after transmission of demand control information
  • g2 Determination at a predetermined time interval at least once during the event execution period specified by the demand control information
  • Event execution specified by the demand control information Determination at the end of the period (including before or after the end)
  • g4 Determination at any timing based on the history information of power consumption information
  • the detection part 106 detects the utilization condition of the specific apparatus in a consumer.
  • the specific device is a device whose power consumption is to be reduced based on the demand control information.
  • the devices that consume power such as the load device 54 or the electric vehicle 58 in FIG. Equipment.
  • the 2 also receives power from the power retailer server 30 by performing an operation of supplying power to the load device 54 or the electric vehicle 58 in accordance with the demand control information. Therefore, it may be included in a specific device.
  • the specific target may be the type of device (for example, “air conditioner” or “lighting”), the name of the manufacturer or sales company or store of the device, the model, model number, specification, product name, It may be the series name of the product, the brand of the product, the manufacturing or sales period of the equipment.
  • a device whose power consumption is predicted to be a predetermined value or more, or a device that is predicted to be a predetermined value or more from a past customer history or a general average value may be specified.
  • H1 Fixed in advance for each user (customer).
  • H2 In the server apparatus 100, it may be set or changed automatically or at any time according to conditions.
  • the conditions include, for example, at least one of a demand control event being performed and other times, a time condition such as a date, a period, a time zone, a day of the week, and a season, and a power consumption state. These conditions may be included in the demand control information, and may be set or changed according to the content of the demand control information.
  • a specific device specifically device
  • it is set or changed by e-mail or display to the user terminal or communication device (GW), or the setting or change content is notified to the customer. May be.
  • the usage status refers to, for example, whether or not a specific device has been registered, whether or not the specific device is being used, whether the specific device is operating or stopped, the operation mode of the specific device, It may include at least one of information such as power consumption information, a usage period of a specific device, a usage frequency of a specific device, and a use repeat count of the specific device, or at least two of these information may be combined.
  • timing which the detection part 106 detects the utilization condition of a specific apparatus is illustrated below, it is not limited to these. Moreover, you may combine at least any two of the following.
  • I1 When a consumer performs user registration of a specific device (i2) When demand control information is transmitted to the consumer (i3) At least once within an event implementation period indicated by the demand control information or at predetermined time intervals Multiple times (i4) regularly or at a predetermined date and time (i5) at least once in a predetermined period, or in a predetermined time zone, or multiple times at predetermined time intervals
  • the usage status of a specific device is detected by making an inquiry to an ECHONET Lite certified device. Details will be described in an embodiment described later.
  • J2 Using a device separation technique, the total power consumption is separated, each device is identified, and the specific device is detected from the identified devices. Details will be described in an embodiment described later.
  • J3 The server device 100 further includes a usage information acquisition unit that acquires usage information of the specific device of the consumer, and the detection unit 106 uses the specific device based on the usage information of the specific device at the consumer. Detect the situation. For example, when a consumer accesses a predetermined website and performs user registration of a specific device, the usage information acquisition unit acquires the registered user information.
  • the granting unit 108 gives an incentive corresponding to the usage status of the specific device to the consumer determined to have reduced power consumption according to the demand control information.
  • Incentive provision conditions are exemplified below, but are not limited thereto. Further, at least two of the following may be combined.
  • K1 For a consumer determined to have reduced power consumption according to demand control information, the consumer is using a specific device.
  • K2 Demand determined to have reduced power consumption according to demand control information. The power consumption of the specific device used by the consumer is reduced with respect to the house.
  • K3 The consumer who is determined to have reduced the power consumption according to the demand control information including the required reduction amount of power consumption.
  • the specific device is used, and the amount of power consumption of the customer exceeds the required reduction amount (k4)
  • the demand is determined for the customer who is determined to have reduced power consumption according to the demand control information.
  • At least one of the specific device used by the house has been stopped, the operation mode has been changed to the power saving mode, and the set temperature has been changed to a low level. It may be that the customer has changed the setting to reduce the power consumption of the fixed device. For example, if usage information obtained by user registration of a specific device by the user is used, it is possible to easily determine whether the incentive provision condition is satisfied.
  • the determination method of the incentive which the provision part 108 provides to a consumer is illustrated below, it is not limited to these. Further, at least two of the following may be combined.
  • (L1) An incentive corresponding to the grant condition is given to a consumer who satisfies the grant condition, and no incentive corresponding to the grant condition is given to a consumer who does not satisfy the grant condition.
  • (L2) The grant rate of the incentive given to the consumer that satisfies the grant condition is set higher than the grant rate of the incentive given to the customer that does not satisfy the grant condition. For example, the grant rate for the power consumption reduction amount of the specific device is set to double the grant rate for the power consumption reduction amount of the device other than the specific device.
  • (L3) The incentive provision rate is determined according to the ratio of the power consumption reduction amount.
  • the incentive determination method may be determined for each specific device. That is, when there are a plurality of specific devices such as an air conditioner or a fan, or even when there are a plurality of different model numbers or brands even in the same type of device (for example, an air conditioner), the incentive may be changed for each device. For example, a device with a new specific brand or model number may have a higher incentive than other devices.
  • the granting unit 108 adds points to a consumer who uses a prepaid system or a point system for adjusting the electricity rate when the power consumption is reduced according to the demand control information. At this time, the granting unit 108 changes the point increase rate according to the usage status of the specific device. For example, the granting unit 108 grants points to a customer who uses the specific device by doubling the points.
  • FIG. 3 is a block diagram illustrating a configuration example of the computer 60 that implements the server apparatus 100 of FIG.
  • the server device 100 is the power retailer server 30 or the cloud server 40.
  • the computer 60 includes a CPU (Central Processing Unit) 62, a memory 64, a program 80 that realizes at least a part of the components shown in FIG. 1 loaded in the memory 64, a storage 66 such as a hard disk that stores the program 80, and a network connection. Interface (I / F) 68 is provided. Each element of the computer 60 is connected to each other via a bus 69, and the CPU 62 controls the entire apparatus realized by the computer 60 together with each element.
  • CPU Central Processing Unit
  • FIG. 1 is realized by any combination of hardware and software of the computer 60 in FIG. It will be understood by those skilled in the art that there are various modifications to the implementation method and apparatus.
  • the functional block diagram showing the information processing system or each device of each embodiment to be described below shows a logical functional unit block, not a hardware unit configuration. Moreover, in each figure, about the structure of the part which is not related to the essence of this invention, it has abbreviate
  • the CPU 62 of the computer 60 in FIG. 3 reads out the program 80 stored in the storage 66 to the memory 64 and executes it, whereby each function of each unit in FIG. 1 of the information processing system 1 can be realized.
  • the information processing system 1 of the present invention may have a plurality of configuration examples, and the program 80 for realizing the information processing system 1 is executed by at least one computer 60.
  • the computer that executes each procedure of the program is different for each configuration example, and various forms may be considered as to which computer executes the procedure of the program.
  • each unit of the information processing system 1 in FIG. 1 is realized by the server device 100 in correspondence with the configuration (a1) described above.
  • power consumption is reduced according to a procedure for acquiring power consumption information of a consumer and demand control information in a computer 60 for realizing an information processing apparatus (the server apparatus 100 in this embodiment).
  • the procedure to determine whether or not the power consumption information has been used, the procedure to detect the usage status of the specific device in the consumer, the use of the specific device to the consumer determined to have reduced power consumption according to the demand control information It is described to execute a procedure for giving an incentive corresponding to the situation.
  • the computer program of this embodiment may be recorded on a computer-readable recording medium.
  • the recording medium is not particularly limited, and various forms can be considered.
  • the program may be loaded from a recording medium into a computer memory, or downloaded to a computer through a network and loaded into the memory.
  • the recording medium for recording the computer program 80 includes a medium that can be used by the non-transitory tangible computer 60, and a program code that can be read by the computer 60 is embedded in the medium.
  • the computer 60 is caused to execute the following control method for realizing the information processing apparatus (the server apparatus 100 in the present embodiment).
  • FIG. 4 is a flowchart showing an example of the operation of the information processing system 1 of the present embodiment.
  • a device that executes each procedure of the information processing method or a combination of devices differs for each configuration example.
  • Various forms of information processing methods are executed by the (computer).
  • the user performs user registration and the like for using the service of the information processing system 1 in advance, and performs communication connection settings between the server apparatus 100 and the HEMS 50.
  • the form of (m2) the same procedure as in (m1) is performed, and further, the application program for realizing the information processing system 1 is installed and activated in the HEMS, whereby the information processing method of the information processing system 1 is executed. Let the HEMS perform the procedure.
  • the form (m1) will be described.
  • the form (m2) will be described later.
  • the information processing method is an information processing method of the information processing apparatus (in this embodiment, the server apparatus 100), and is an information processing method executed by the computer 60 that implements the server apparatus 100. .
  • the information processing apparatus acquires the power consumption information of the consumer (step S101), and whether or not the power consumption is reduced according to the demand control information. Is determined based on the power consumption information (step S105), the usage status of the specific device in the consumer is detected (step S103), and the usage status of the specific device is determined for the consumer whose power consumption has been reduced according to the demand control information. Including an incentive corresponding to (step S107).
  • a demand response is transmitted from a power retailer to a consumer.
  • the power retailer transmits a demand response to the consumer every 30 minutes, thereby achieving the same amount for 30 minutes.
  • the demand response is transmitted to the user terminal of the customer by e-mail, for example.
  • the email includes information such as the duration of the power consumption reduction event, the target value for reduction, and the name of the specific device that is the target for doubling the incentive grant rate (for example, air conditioner manufactured by Company A, brand name: BBB) And The customer sees this e-mail and reduces the power consumption of the specific equipment (air conditioner manufactured by Company A, brand name: BBB) that is the target of doubling the incentive grant rate during the event implementation period or in the eco mode. Perform an operation to change to a mode that can be used.
  • the specific equipment air conditioner manufactured by Company A, brand name: BBB
  • a specific device When a specific device is set or changed according to conditions, it is set or changed by e-mail or display to a user terminal or a communication device (GW), or the setting or change content is notified to a customer. Also good. Further, even when the specific device is fixed and there is no change, the customer may be notified by e-mail. At this time, the name or the like of the specific device may or may not be included in the mail.
  • GW communication device
  • the acquisition part 102 acquires the power consumption information of a consumer from the smart meter 10, for example (step S101). Specifically, the acquisition unit 102 receives the power consumption information collected by the gateway 51 from the smart meter 10 via the B route via the C route.
  • the detection unit 106 detects the usage status of the specific device in the consumer (step S103).
  • the specific device may be specified by the demand control information or may be determined in advance.
  • the specific device may be fixedly set in advance for each user (customer), and in the server device 100, a time condition (for example, during a demand control event and other times, or a time zone, a day of the week, It may be set or changed automatically or at any time according to the season) or the power consumption.
  • the specific device is a company-made air conditioner, brand name: BBB.
  • step S105 determines whether power consumption was reduced according to demand control information based on power consumption information.
  • the provision part 108 provides the incentive corresponding to the utilization condition of a specific apparatus with respect to the consumer by which power consumption was reduced according to demand control information (YES of step S105) (step S107). For consumers who have not reduced power consumption according to the demand control information (NO in step S105), no incentive is given and the process is terminated.
  • step S107 for example, the above conditions (k1) to (k4) are used for granting incentives according to the usage status of the specific device.
  • the granting unit 108 gives an incentive that is twice the incentive grant rate due to the successful reduction of the specific device to that of the device other than the specific device. For example, even if another customer achieves the same reduction target value, if the specific device is not used, the incentive is given as it is.
  • step S105 various conditions can be further added as described above.
  • whether or not the power consumption of the specific device can be reduced and whether or not the reduction target value can be achieved may be used as conditions.
  • step S101 may be performed at the timing described above.
  • step S101 and step S103 may be reversed.
  • the acquisition process of the power consumption information by the acquisition unit 102 in step S101 may be performed at the timing described above, and may be performed at least before the determination process of whether or not the power consumption has been reduced in step S105.
  • the detection process of the usage status of the specific device by the detection unit 106 in step S103 may be performed at the timing described above, and at least before the processing for providing an incentive corresponding to the usage status of the specific device in step S107. Good.
  • the power consumption information of the consumer is acquired by the acquisition unit 102. And it is in a consumer by the detection part 106.
  • FIG. The usage status of a specific device is detected.
  • an incentive corresponding to the usage status of the specific device is given by the granting unit 108 to the consumer determined by the determining unit 104 that the power consumption has been reduced according to the demand control information.
  • the information processing system 1 of the present embodiment in accordance with demand response or the like, among consumers who have reduced power consumption, there is an incentive corresponding to the usage status for consumers who use a specific device. Since it is granted, use of a specific device to which an incentive is given is promoted. In this way, the configuration in which an incentive is given depending on the usage status of the specific device has the effect that it promotes the use of the specific device, that is, the purchase to the consumer and also increases the number of sales of the specific device. Play.
  • the demand amount of the consumer and the supply amount from the power retailer can be calculated in units of 30 minutes to the power company. It is obliged to match the same amount for 30 minutes. If this “(planned value) same amount for 30 minutes” does not match, the power retailer needs to pay an imbalance fee to the power transmission and distribution company. Payment of this imbalance fee is a major problem for power retailers.
  • a demand response that performs demand control is planned so that the demand amount of the consumer and the supply amount from the electric power retailer coincide. Then, if a demand response including the target value of the power consumption to be reduced in 30 minutes and the control content of the driving operation in 30 minutes after transmission or reception of demand control information is transmitted to each consumer, the power consumption of the consumer May be controlled, and the same amount may be achieved at the same time for 30 minutes.
  • the same amount can be achieved for 30 minutes by giving an incentive corresponding to the usage status of a specific device to a consumer who has reduced power consumption in accordance with a demand response. There is also an effect that the sex can be increased.
  • the information processing system 1 according to the second exemplary embodiment of the present invention has a configuration in which an ECHONET Lite authentication device used by a customer is inquired to detect the usage status of a specific device.
  • FIG. 5 is a functional block diagram logically showing the configuration of the information processing system 1 according to the embodiment of the present invention.
  • the information processing system 1 of the present embodiment has the configuration of the configuration example (a2) described in the above embodiment.
  • the HEMS 50 or the gateway 51 has at least a function (acquisition unit 102 and detection unit 106) for exchanging with an ECHONET Lite authentication device, detecting a specific device, and acquiring information.
  • acquisition unit 102 and detection unit 106 for exchanging with an ECHONET Lite authentication device, detecting a specific device, and acquiring information.
  • determination unit 104 and the granting unit 108 are included in the server device 200.
  • the HEMS 50 includes the acquisition unit 102 and the detection unit 106 similar to those in FIG. 1, and the server device 200 includes the determination unit 104 and the grant unit 108 similar to those in FIG.
  • the configuration of the present embodiment can be combined with at least one other embodiment of the present invention as long as there is no problem.
  • the detection unit 106 detects the usage status of a specific device by making an inquiry to the ECHONET Lite authentication device.
  • the detection unit 106 makes an inquiry to an ECHONET Lite-authenticated device owned or used by a consumer, acquires device information, and detects the usage status of a specific device.
  • the device information that the detection unit 106 acquires from the ECHONET Lite authenticated device is exemplified below, but is not limited thereto. Further, at least two of the following may be combined.
  • the detection unit 106 detects that the specific device is used or information on the specific device being used based on the acquired information on the device. Furthermore, the power consumption information of the specific device may be acquired and used to determine whether or not the granting condition in the granting unit 108 is satisfied.
  • An ECHONET Lite authentication procedure is performed via the HEMS 50 or the gateway 51 (hereinafter also referred to as a communication device) to acquire information on the ECHONET Lite authenticated device.
  • An ECHONET Lite authenticated device already communicating with the communication device is inquired according to the ECHONET Lite protocol, and device information (manufacturer, model, model, serial number, operating status, power consumption information, etc.) is acquired.
  • device information manufactured by the user in the server apparatus 100 or the HEMS 50 for the ECHONET Lite authentication device owned or used is acquired.
  • the acquisition unit 102 acquires power consumption information from the smart meter 10 or the distribution board (in this embodiment, included in the HEMS 50), and also the ECHONET detected by the detection unit 106, as in the above embodiment.
  • the power consumption information of each device may be obtained by inquiring the power consumption information of each device from the Lite authentication device according to the ECHONET Lite protocol.
  • the detecting unit 106 makes an inquiry to the ECHONET Lite authenticated device using the ECHONET Lite communication protocol, and detects the usage status of the specific device.
  • the same effects as those of the above-described embodiment are obtained, and further, the device information is acquired by inquiring the ECHONET Lite authentication device to detect the usage status of the specific device. Therefore, a specific device can be detected more efficiently.
  • the information processing system 1 separates a waveform from the time series data of the total consumption current (or voltage) measured by a distribution board (CT), a smart meter, or the like using a device separation technique.
  • the device is specified, the power consumption information of each device is acquired, and the usage status of the specific device is detected.
  • FIG. 6 is a functional block diagram logically showing the configuration of the information processing system 1 according to the embodiment of the present invention.
  • the information processing system 1 of the present embodiment has the configuration of the configuration example (a1) described in the above embodiment.
  • the server device 300 includes an acquisition unit 302, a determination unit 104, a detection unit 306, and a grant unit 108.
  • the configuration of the present embodiment can be combined with at least one other embodiment of the present invention as long as there is no problem.
  • the power consumption information acquired by the acquisition unit 302 includes time-series data regarding the overall power consumption in a plurality of devices.
  • the detection unit 306 detects the usage status of the specific device by separating the time-series data of the specific device from the time-series data.
  • the acquisition unit 302 acquires the values measured by the smart meter 10 or the distribution board (or CT).
  • the gateway 51 connected to the B route is used.
  • the power measuring device does not pass through the gateway 51 or the HEMS 50. You may transmit to the server apparatus 100.
  • the acquisition unit 302 acquires time-series data of measurement values related to power consumption measured by the watt-hour meter (smart meter 10). For example, it is assumed that the HEMS 50 has already performed an authentication procedure for wireless communication with the smart meter 10 via the B route, and is ready to communicate.
  • the acquisition part 302 acquires the information of the measured value regarding the power consumption measured by the smart meter 10 from the smart meter 10 via the B route at predetermined time intervals. For example, if data can be acquired at intervals of about 20 seconds to 10 seconds, a feature amount that can identify a device can be extracted from the time-series data. However, the time interval for acquiring information is not limited to this. It may be an interval of several seconds or less.
  • the time interval can be changed as appropriate, and the time interval may be changed according to a predetermined collection period or information type. What is necessary is just to set a time interval so that the feature quantity which can distinguish an apparatus can be extracted from time series data, and the load to the smart meter 10 does not become excessive.
  • the method for setting (changing) the time interval is not particularly limited, and may be set by a user operation using the user interface of the HEMS 50, or the setting is received on a predetermined web page, and the server sends the received content to the HEMS 50. It may be set via the HEMS 50 program (firmware), or may be changed by an instruction from the server via the network.
  • the measured value related to power consumption acquired from the smart meter 10 includes, for example, at least one of an instantaneous power measurement value, an instantaneous current measurement value, and an instantaneous voltage measurement value. Moreover, you may acquire other information, such as a power consumption integrated value (30 minute value).
  • the acquisition unit 302 may acquire information (data measured regarding power consumption) collected from the smart meter 10 via the A route by the power company server 20 from the power company server 20.
  • the acquisition unit 302 requests the smart meter 10 to transmit necessary data (for example, instantaneous power measurement values) at predetermined time intervals, collects data for a predetermined period, accumulates it with time information, and stores time-series data. And The acquisition unit 302 acquires data for a period during which at least a feature amount that can identify a device can be extracted from time-series data. Further, the predetermined period may not be a continuous period, and may be data of a plurality of periods. In addition, depending on the type of device, the feature may be noticeable in the time zone. If the type of device is known in advance, data for a predetermined period including at least the time zone in which the feature of the device can be detected May be obtained.
  • necessary data for example, instantaneous power measurement values
  • the data accumulated in the smart meter 10 may be acquired collectively for a predetermined period, or the instantaneous value is periodically sent from the HEMS 50 to the smart meter 10 via the gateway 51 (for example, every 20 seconds). ), The HEMS 50 or the gateway 51 may accumulate a predetermined period.
  • the acquisition unit 302 or the detection unit 306 Since the time-series data acquired from the smart meter 10 is an instantaneous value for each time, at least one of the acquisition unit 302 or the detection unit 306 generates waveform data of the measurement value based on the instantaneous measurement value and the time information. It may be generated.
  • the acquisition unit 302 may acquire measurement value information related to power consumption from the smart meter 10, or acquire measurement value information related to power consumption from the power measurement device as described below. It ’s okay.
  • the acquisition unit 302 acquires, as time series data, measurement waveform data of measurement values related to overall power consumption measured by a distribution board (power measurement device) that distributes power to a plurality of devices.
  • the measurement value related to the power consumption acquired from the distribution board (power measurement device) includes, for example, at least one measurement value of total current consumption, power, and voltage.
  • a CT is connected to the distribution board, and a current waveform of the total current consumption of a plurality of devices connected to the distribution board is acquired by CT.
  • the HEMS 50 includes an interface unit (not shown) that performs wireless communication with a power measurement device or CT using a specific low-power wireless system that uses a 920 MHz band.
  • the HEMS 50 is in a state where communication can be performed in advance by performing an authentication procedure for performing wireless communication with the power measurement device (or CT).
  • the acquisition part 302 acquires the current waveform of a predetermined period from an electric power measurement apparatus or CT, and uses it as time series data.
  • the power measurement device or CT may have a configuration capable of holding time-series data for a predetermined period. In that case, the power measurement device or CT may transmit the time-series data for a predetermined period accumulated when the request from the HEMS 50 is received to the HEMS 50, or for a predetermined period after the request is made. The data may be transmitted to the HEMS 50 after the power measurement device accumulates the data.
  • the predetermined period may not be a continuous period, and may be data of a plurality of periods. Further, it may be requested by specifying time series data in a certain time zone. Alternatively, time series data for a predetermined period may be extracted from acquired data for a certain period.
  • the power measuring device or CT does not have a configuration for holding the total current consumption
  • the total current consumption value is stored in the HEMS 50 while sampling from the power measuring device or CT for a predetermined period. May be sent.
  • the acquisition unit 302 may acquire time-series data that is measurement waveform data of power consumption from the smart meter 10 or may be acquired from a power measurement device (or CT).
  • the detection part 306 specifies at least 1 specific apparatus by extracting a feature-value from the time series data measured regarding electric power consumption using an apparatus isolation
  • the detection unit 306 can specify not only the type of equipment such as an air conditioner and a television but also the model number of the equipment.
  • the “model number of the device” is information for specifying the model of the device, and may be called by other names.
  • the “equipment model number” is information different from information for identifying individual products called a production number, a product number, a product serial number, or the like.
  • a current sensor such as a CT may be placed for each branch breaker to obtain the power consumption of each device, or a smart tap may be placed between each device and an outlet to reduce the power consumption of each device. You may get it.
  • the branch of the distribution board is divided into, for example, a plurality (for example, 4 to 6)), a CT is provided for each branch, the current consumption of each branch is obtained, and at least one power supplied from each branch is obtained.
  • the detecting unit 306 calculates an estimated value of power consumption of at least one specific device based on time-series data acquired from the smart meter 10 or the power measurement device.
  • the detection unit 306 identifies at least one device from the time-series data using the device separation technology, and the detection unit 306 determines the power consumption for each device. An estimate is calculated.
  • the detection unit 306 can specify a device using a device separation technique and can detect a specific device. And since the estimated value of the power consumption for every apparatus is computed by the detection part 306, a specific apparatus can be detected efficiently.
  • the information processing system 1 according to the fourth embodiment is different from the above embodiment in that the information processing system 1 further includes a configuration for correcting the power consumption information of each device obtained in the above embodiment based on the measurement value of the smart meter. To do.
  • the configuration of the present embodiment can be combined with at least one other embodiment of the present invention as long as there is no problem.
  • FIG. 7 is a functional block diagram logically showing the configuration of the information processing system 1 according to the embodiment of the present invention.
  • the information processing system 1 of the present embodiment has the configuration of the configuration example (a1) described in the above embodiment.
  • the server device 400 includes an acquisition unit 402, a determination unit 104, a detection unit 306, and a grant unit 408.
  • the configuration of the present embodiment can be combined with at least one other embodiment of the present invention as long as there is no problem.
  • the acquisition unit 402 acquires a measured value of power consumption from the smart meter 10.
  • the granting unit 408 corrects the power consumption information acquired by the acquiring unit 402 from, for example, the HEMS 50 (CT or each device) based on the measured value of power consumption acquired from the smart meter 10, and grants it to the consumer. Determine incentives.
  • the power consumption information corrected by the granting unit 408 based on the power consumption measurement value acquired from the smart meter 10 may not be limited to the HEMS 50 (CT or each device) as described above.
  • Measured values such as current consumption measured by the power measurement device (CT) or power consumption information acquired from ECHONET Lite certified devices may contain errors.
  • meter reading data such as power consumption measured by the smart meter 10 is the reference data for the same amount for 30 minutes, so the power consumption obtained from the power measurement device (CT) measurement value or ECHONET Lite certified device The information is corrected with the meter reading data of the smart meter 10.
  • the measured value of the power measuring device (CT) and the power consumption information acquired from the ECHONET-Lite certified device are corrected by the measured value of the smart meter 10, so that an incentive to be given to the consumer is provided.
  • high-accuracy information can be used, so that appropriate assignment processing can be performed.
  • the accuracy of power consumption information used to determine the demand response to achieve the same amount for 30 minutes can be increased, so the error rate can be reduced. .
  • FIG. 8 is a functional block diagram logically showing the configuration of the information processing system 1 according to the embodiment of the present invention.
  • the information processing system 1 of the present embodiment has the configuration of the configuration example (a1) described in the above embodiment.
  • the HEMS 550 includes the acquisition unit 102 and the detection unit 106 similar to those in the above-described embodiment of FIG. 5, and further includes an output unit 552.
  • the server device 500 has the same configuration as that of the above embodiment of FIG. 5, and further includes a determination unit 104 and a detection unit 106.
  • the output unit 552 outputs that the specific device is used for the consumer or information on the specific device being used.
  • timings at which the output unit 552 outputs information There are various timings at which the output unit 552 outputs information. Examples of the timing are as follows, but are not limited thereto. Further, at least two of the following may be combined. (P1) When a customer starts using a specific device, or before and after (p2) after receiving demand control information (p3) Periodically or at a predetermined date and time (p4) When requested by the server device 300 ( p5) When an output instruction by a user operation using the operation unit (not shown) of the HEMS 550 is received
  • the information that is output is that the customer is using a specific device or information on the specific device being used.
  • the information on the specific device being used includes at least information by which the detection unit 106 can identify the device used by the consumer. For example, it may be the type of device (for example, “air conditioner” or “lighting”), the name of the manufacturer, sales company or store of the device, or the model, model number, specification, product name, It contains at least one of information such as the series name, product brand, device manufacture or purchase date.
  • the output destination of the output unit 552 is, for example, the server device 500, the display unit of the HEMS 550, a user terminal, or the like, but is not limited thereto.
  • the output unit 552 may acquire the above information from the ECHONET Lite authentication device and transfer it to the server device 500.
  • the HEMS 550 includes the output unit 552.
  • a user terminal of a consumer may have the function of the output unit 552. That is, by using the user terminal to access the server device 500 and performing a registration operation of necessary information, it is possible to specify that the specific device is used or information on the specific device being used.
  • the granting unit 108 determines the usage status of the specific device. It is efficient because it can be used for processing.
  • the information processing system according to the sixth embodiment has the minimum configuration of the information processing system of the present invention.
  • the information processing system of the present embodiment includes an acquisition unit 102, a detection unit 106, and a grant unit 108 that are the same as those of the information processing system of FIG.
  • the acquisition unit 102 acquires consumer power consumption information.
  • the detection part 106 detects the utilization condition of the specific apparatus in a consumer.
  • the granting unit 108 gives an incentive corresponding to the usage status of the specific device to the consumer whose power consumption has been reduced according to the demand control information.
  • the information processing system 1 of the present invention may have a plurality of configuration examples, and the program 80 (FIG. 3) for realizing the information processing system 1 is executed by at least one computer 60 (FIG. 3).
  • the computer that executes each procedure of the program is different for each configuration example, and various forms may be considered as to which computer executes the procedure of the program.
  • each unit of the information processing system 1 is realized by the server device 100 (FIG. 2) in correspondence with the configuration (a1) described above.
  • the computer program of the present embodiment is a procedure for acquiring power consumption information of a consumer in a computer 60 (FIG. 3) for realizing an information processing apparatus (in the present embodiment, the server apparatus 100 in FIG. 2).
  • the procedure for detecting the usage status of a specific device and the procedure for giving an incentive corresponding to the usage status of a specific device to a consumer who has been determined to have reduced power consumption according to demand control information Has been In order to execute the procedure for detecting the usage status of a specific device and the procedure for giving an incentive corresponding to the usage status of a specific device to a consumer who has been determined to have reduced power consumption according to demand control information Has been.
  • the information processing method according to the embodiment of the present invention is an information processing method of the information processing apparatus (the server apparatus 100 in FIG. 2 in the present embodiment), and the computer 60 (FIG. 3) that implements the server apparatus 100. Is an information processing method executed by the method.
  • the information processing method of this embodiment includes step S101, step S103, and step S107 similar to the flowchart of the above-described embodiment of FIG.
  • the information processing apparatus acquires the power consumption information of the consumer (step S101 in FIG. 4), and the usage status of the specific device in the consumer. Is detected (step S103 in FIG. 4), and an incentive corresponding to the usage status of the specific device is given to the consumer whose power consumption is reduced according to the demand control information (step S107 in FIG. 4).
  • the power consumption information of the consumer is acquired by the acquisition unit 102. And it is in a consumer by the detection part 106.
  • FIG. The usage status of a specific device is detected.
  • the incentive corresponding to the utilization condition of a specific apparatus is provided by the provision part 108 with respect to the consumer by which power consumption was reduced according to demand control information.
  • the information processing system 1 of the present embodiment in accordance with demand response or the like, among consumers who have reduced power consumption, there is an incentive corresponding to the usage status for a consumer who uses a specific device. Since it is granted, use of a specific device to which an incentive is given is promoted. In this way, the configuration in which an incentive is given depending on the usage status of the specific device has the effect that it promotes the use of the specific device, that is, the purchase to the consumer and also increases the number of sales of the specific device. Play.
  • the HEMS 50 that has received the demand control information may be configured to control the operation of each device in accordance with the instruction content included in the demand control information.
  • the demand control information may include a command for controlling the operation of each device, and the HEMS 50 may issue a control command to the corresponding device.
  • Information processing device Get consumer power consumption information, Detecting the usage status of specific equipment in the consumer, Give an incentive corresponding to the usage status of the specific device to a consumer who has reduced power consumption according to the demand control information.
  • Information processing method 2.
  • the information processing apparatus is Detect the usage status of the specific device by making an inquiry to the ECHONET Lite certified device. 1.
  • Information processing method described in 1. 3.
  • the acquired power consumption information includes time-series data relating to overall power consumption in a plurality of devices, The information processing apparatus is By detecting the time series data of the specific device from the time series data, the usage status of the specific device is detected. 1. Or 2. Information processing method described in 1. 4).
  • the information processing apparatus is Obtaining usage information of the specific device of the consumer; Based on usage information of the specific device in the consumer, the usage status of the specific device is detected. 1. To 3. The information processing method as described in any one. 5. The information processing apparatus is Incentive is given to the consumer using the specific device, 1. To 4. The information processing method as described in any one. 6). The information processing apparatus is Incentive is given to the consumer whose power consumption of the specific device is reduced, 1. To 5. The information processing method as described in any one. 7). The demand control information includes a required reduction amount of the power consumption, The information processing apparatus is Giving an incentive to the consumer whose power consumption reduction amount exceeds the required reduction amount; 1. To 6. The information processing method as described in any one. 8).
  • the information processing apparatus is For a consumer that satisfies the conditions for the grant, an incentive corresponding to the condition for the grant is granted, and for a consumer that does not satisfy the conditions for the grant, an incentive corresponding to the condition for the grant is not granted, 5.
  • the information processing apparatus is Granting the incentive to be granted to consumers who satisfy the conditions for granting is higher than the granting rate for incentives to be given to consumers who do not satisfy the conditions for granting, and granting the incentives, 5.
  • the information processing apparatus is Get power consumption measurements from watt-hour meters, Correcting the acquired power consumption information based on the measured value of the power consumption acquired from the watt-hour meter, and determining the incentive to be given to the consumer; 1. To 9. The information processing method as described in any one. 11. The information processing apparatus is For the consumer, using the specific device, or outputting information of the specific device being used, 1. To 10. The information processing method as described in any one. 12 When a plurality of different devices are the specific device, the incentive varies depending on the model number and type of the device. 1. To 11. The information processing method as described in any one.
  • Procedure to obtain consumer power consumption information A procedure for detecting the usage status of the specific device in the consumer, A program for causing a consumer who has reduced power consumption according to demand control information to execute a procedure for providing an incentive corresponding to the usage status of the specific device.
  • Procedure to detect the usage status of the specific device by inquiring ECHONET Lite certified device To further cause the computer to execute 13.
  • the program described in. 15 The acquired power consumption information includes time-series data relating to overall power consumption in a plurality of devices, A procedure for detecting the usage status of the specific device by separating the time-series data of the specific device from the time-series data; To further cause the computer to execute 13. Or 14.
  • the demand control information includes a required reduction amount of the power consumption, A step of giving an incentive to the customer whose power consumption reduction amount exceeds the required reduction amount; To further cause the computer to execute 13. To 18. The program as described in any one. 20.
  • an incentive corresponding to the conditions for the grant is not granted, and an incentive corresponding to the conditions for the grant is granted to a consumer who satisfies the conditions for the grant. procedure, 17. is further executed by the computer.
  • a step of granting the incentive by setting a grant rate of an incentive to be granted to a consumer that satisfies the condition of grant to be higher than a grant rate of an incentive to be granted to a consumer that does not satisfy the condition of grant, 17. is further executed by the computer.
  • the incentive varies depending on the model number and type of the device. 13 To 23.
  • a detecting means for detecting a usage status of a specific device in a consumer for detecting a usage status of a specific device in a consumer; And a granting unit that grants an incentive corresponding to the usage status of the specific device to a consumer whose power consumption is reduced in accordance with demand control information.
  • the usage status of the specific device detected by the detection means is detected by inquiring an ECHONET Lite certified device, 25. Server described in. 27.
  • the detection means detects the usage status of the specific device by separating time-series data of the specific device from time-series data related to overall power consumption in a plurality of devices. 25. Or 26. Server described in. 28.
  • usage information acquisition means for acquiring usage information of the specific device of the consumer;
  • the detection means detects the usage status of the specific device based on usage information of the specific device in the consumer. 25. To 27.
  • the granting means grants an incentive to the consumer who uses the specific device; 25. To 28.
  • the granting unit gives an incentive to the consumer whose power consumption of the specific device is reduced. To 29.
  • the demand control information includes a required reduction amount of the power consumption,
  • the granting unit grants an incentive to the consumer whose power consumption reduction amount exceeds the required reduction amount; 25. To 30.
  • the granting unit gives an incentive corresponding to the granting condition to a consumer that satisfies the granting condition, and corresponds to the granting condition for a consumer that does not satisfy the granting condition. No incentives, 29. To 31.
  • the granting unit is configured to increase an incentive grant rate to be granted to a consumer who satisfies the grant condition higher than an incentive grant rate to be granted to a customer who does not satisfy the grant condition. 29. To 32.
  • the granting unit corrects the power consumption information of the consumer acquired from a device other than the watt hour meter based on the measured value of the power consumption acquired from the watt hour meter, and gives the incentive to the consumer.

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Business, Economics & Management (AREA)
  • Theoretical Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Health & Medical Sciences (AREA)
  • Economics (AREA)
  • General Physics & Mathematics (AREA)
  • Public Health (AREA)
  • Marketing (AREA)
  • Primary Health Care (AREA)
  • Strategic Management (AREA)
  • Tourism & Hospitality (AREA)
  • Human Resources & Organizations (AREA)
  • General Business, Economics & Management (AREA)
  • General Health & Medical Sciences (AREA)
  • Water Supply & Treatment (AREA)
  • General Engineering & Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

 情報処理システム(1)は、需要家の消費電力情報を取得する取得部と、需要家における、特定機器の利用状況を検出する検出部と、需要制御情報に従い消費電力を削減した需要家に対し、特定機器の利用状況に対応するインセンティブを付与する付与部と、を備える。

Description

情報処理システム、情報処理方法、およびプログラム
 本発明は、情報処理システム、情報処理方法、およびプログラムに関する。
 電力小売事業者は、需要家の所在する電力会社に送配電を依頼している関係から、電力会社に対して30分単位で需要家の需要量と電力小売事業者からの供給量を一致させる「30分同時同量」の義務を負っている。この「(計画値)30分同時同量」が一致しない場合、電力小売事業者は送配電事業者にインバランス料金を支払う必要がある。このインバランス料金の支払いが、電力小売事業者にとって大きな問題となっている。
 そこで、需要家の需要量と、電力小売事業者からの供給量が一致するように、需要制御を行うデマンドレスポンスを計画する。そして、各需要家に30分間における削減する電力消費量の目標値や、需要制御情報送信後または受信後30分間における運転動作の制御内容を含むデマンドレスポンスを送信すれば、需要家の消費電力量を制御することができ、30分同時同量を達成できる可能性がある。
 電力管理装置の一例が特許文献1に記載されている。特許文献1の電力管理装置は、契約デマンドを超えている場合に、予め定められた強制停止対象の特定機器に対して、停止信号を出力する。そして、節電要求に応じた受電契約者に報酬ポイントを付与する。
 特許文献2に記載の節電制御装置は、節電機能を搭載している機器に対し、設定値にもとに節電機能を実行させる。
特開2015-19517号公報 特開平11-305889号公報
 しかしながら、上記文献に記載の技術では、予め決められた強制停止対象の特定機器に対して、契約デマンドを超えている場合に、停止信号を出力して強制的に機器を停止させているので、デマンドレスポンス受信時に、ユーザの意向に沿わない機器が強制的に停止されてしまう可能性もあり、ユーザにとって不都合な場合があった。
 本発明は上記事情に鑑みてなされたものであり、その目的とするところは、需要家の計画的な電力使用を可能としつつ、特定機器の利用を促進する情報処理システム、情報処理方法、およびプログラムを提供することにある。
 本発明の各側面では、上述した課題を解決するために、それぞれ以下の構成を採用する。
 第一の側面は、情報処理システムに関する。
 第一の側面に係る情報処理システムは、
 需要家の消費電力情報を取得する取得手段と、
 前記需要家における、特定機器の利用状況を検出する検出手段と、
 需要制御情報に従い消費電力を削減した需要家に対し、前記特定機器の利用状況に対応するインセンティブを付与する付与手段と、を有する。
 第二の側面は、少なくとも1つのコンピュータにより実行される情報処理方法に関する。
 第二の側面に係る情報処理方法は、情報処理装置が、
 需要家の消費電力情報を取得し、
 前記需要家における、特定機器の利用状況を検出し、
 需要制御情報に従い消費電力を削減した需要家に対し、前記特定機器の利用状況に対応するインセンティブを付与する、ことを含む。
 なお、本発明の他の側面としては、上記第二の側面の方法を少なくとも1つのコンピュータに実行させるプログラムであってもよいし、このようなプログラムを記録したコンピュータが読み取り可能な記録媒体であってもよい。この記録媒体は、非一時的な有形の媒体を含む。
 このコンピュータプログラムは、コンピュータにより実行されたとき、コンピュータに、情報処理装置上で、その情報処理方法を実施させるコンピュータプログラムコードを含む。
 なお、以上の構成要素の任意の組合せ、本発明の表現を方法、装置、システム、記録媒体、コンピュータプログラムなどの間で変換したものもまた、本発明の態様として有効である。
 また、本発明の各種の構成要素は、必ずしも個々に独立した存在である必要はなく、複数の構成要素が一個の部材として形成されていること、一つの構成要素が複数の部材で形成されていること、ある構成要素が他の構成要素の一部であること、ある構成要素の一部と他の構成要素の一部とが重複していること、等でもよい。
 また、本発明の方法およびコンピュータプログラムには複数の手順を順番に記載してあるが、その記載の順番は複数の手順を実行する順番を限定するものではない。このため、本発明の方法およびコンピュータプログラムを実施するときには、その複数の手順の順番は内容的に支障のない範囲で変更することができる。
 さらに、本発明の方法およびコンピュータプログラムの複数の手順は個々に相違するタイミングで実行されることに限定されない。このため、ある手順の実行中に他の手順が発生すること、ある手順の実行タイミングと他の手順の実行タイミングとの一部ないし全部が重複していること、等でもよい。
 上記各側面によれば、需要家の計画的な電力使用を可能としつつ、特定機器の利用を促進する情報処理システム、情報処理方法、およびプログラムを提供することができる。
 上述した目的、およびその他の目的、特徴および利点は、以下に述べる好適な実施の形態、およびそれに付随する以下の図面によってさらに明らかになる。
本発明の実施の形態に係る情報処理システムの構成を論理的に示す機能ブロック図である。 本発明の実施の形態に係る情報処理システムに関係するシステム全体構成例を概念的に示す図である。 図2の本実施形態の情報処理システムのサーバ装置を実現するコンピュータの構成例を示すブロック図である。 本実施形態の情報処理システムの動作の一例を示すフローチャートである。 本発明の実施の形態に係る情報処理システムの構成を論理的に示す機能ブロック図である。 本発明の実施の形態に係る情報処理システムの構成を論理的に示す機能ブロック図である。 本発明の実施の形態に係る情報処理システムの構成を論理的に示す機能ブロック図である。 本発明の実施の形態に係る情報処理システムの構成を論理的に示す機能ブロック図である。
 以下、本発明の実施の形態について、図面を用いて説明する。尚、すべての図面において、同様な構成要素には同様の符号を付し、適宜説明を省略する。
(第1の実施の形態)
 本発明の第1の実施の形態に係る情報処理システム、情報処理方法およびプログラムについて、以下説明する。
 図1は、本発明の実施の形態に係る情報処理システム1の構成を論理的に示す機能ブロック図である。
 本発明において、情報処理システム1は、需要家の消費電力情報を取得する取得部102と、需要制御情報に従い消費電力が削減されたか否かを消費電力情報に基づいて判定する判定部104と、需要家における、特定機器の利用状況を検出する検出部106と、需要制御情報に従い消費電力を削減した需要家に対し、特定機器の利用状況に対応するインセンティブを付与する付与部108と、を備える。
 図2は、本発明の実施の形態に係る情報処理システム1に関係するシステム全体構成例を概念的に示す図である。
 本発明の情報処理システム1は、たとえば、宅内の機器(たとえば、ECHONET Lite(登録商標)認証機器を含む)と通信する通信装置またはサーバ装置100によって少なくとも実現される。
 本発明において、機器とは、本発明の情報処理システム1の需要家における電力関連装置であり、図2に示すように、様々な機器が含まれる。当該機器には、電力関連装置、たとえば、太陽光発電(PV:PhotoVoltaics)システム52、負荷装置54、および蓄電システム56が含まれる。また、機器は、所謂、HEMS(Home Energy Management System:住宅向けエネルギー管理システム)50も含んでもよい。
 通信装置は、需要家のこれらの機器に電力を配電する住宅用分電盤または、需要家の宅内の機器の消費電力を測定する電力測定装置に接続される。分電盤または電力測定装置は、HEMS50に含まれてもよく、通信装置はHEMS50でもよい。また、分電盤、電力測定装置、またはHEMS50は、ゲートウェイ(図中、GW(GateWay)と示す)51を介して、サーバ装置100に接続してもよいし、HEMS50がサーバ装置100に接続する機能を有してもよい。また、HEMS50とゲートウェイ51は、それぞれの機能が備わった1つの装置であってもよい。
 本実施形態では、情報処理システム1の機能の少なくとも一部を実現する通信装置としてHEMS50を例に説明するが、上述したように、通信装置は、HEMS50に限らず、ゲートウェイ51でもよいし、あるいは、通信機能を有する電力測定装置または分電盤に含まれてもよい。
 サーバ装置100は、電力小売事業者サーバ30およびクラウドサーバ40の少なくともいずれか1つとするが、たとえば、特定機器を製造または販売する事業者(たとえば、家電メーカー、家電製品量販店等)等のサーバであってもよい。特定機器とは、本発明で、需要制御情報により消費電力の削減対象となる機器、または、その利用等が需要家へのインセンティブの付与条件となる機器等である。
 負荷装置54は、たとえば、図示されない、給湯器(不図示)、および、エアコン、照明機器等のECHONET Lite認証機器、その他の家電製品、あるいは、電気自動車(EV:Electric Vehicle、PHV:Plug-in Hybrid Vehicle)など)58等が含まれる。
 HEMS50は、PVシステム52、負荷装置54、蓄電システム56、および電気自動車58等の電力関連装置に接続される。上述したように、HEMS50は、電力測定装置を含んでもよく、住宅用分電盤に含まれてもよい。また、電力測定装置または分電盤には、たとえば、CT(Current Transformer:変流器)が接続される。CTにより、分電盤に接続される複数機器(図2では、PVシステム52、負荷装置54、蓄電システム56、および電気自動車58等)全体の総消費電流の電流波形が取得される。分電盤に接続される複数機器の全体の総消費電力は、1つのCTにより取得してもいいし、複数のCTにより取得してもよい。
 HEMS50は、計測された各機器の電力使用量に関する情報を無線通信でゲートウェイ51またはサーバ装置100に送信する機能を有してもよい。
 スマートメーター10は、通信機能を有する電力量計である。たとえば、スマートメーター10は、電力会社から需要家に供給される。電力量計は、電力会社または電力小売事業者から供給される電力の消費量を計測する。計測された消費電力量等に情報は、スマートメーター10から電力会社の電力会社サーバ20に、所謂Aルートを介して定期的に送信される。
 スマートメーター10と電力会社サーバ20間のAルートの通信方法は、特に限定されないが、たとえば、920MHz帯を使用する特定小電力無線方式、または、3G(3rd Generation)やLTE(Long Term Evolution)等の携帯電話通信方式を利用することができる。
 さらに、スマートメーター10は、Aルートとは別の所謂Bルートを介して、ゲートウェイ51に消費電力量などの情報を送信してもよい。このスマートメーター10とゲートウェイ51間のBルートの通信方法は、特に限定されないが、たとえば、920MHz帯を使用する特定小電力無線方式、たとえば、WiSUN等の通信規格に基づく通信方式、または、Zigbee(登録商標)等のIEEE802.15.4上で動作する無線通信規格の通信方式を利用することができる。
 また、ゲートウェイ51、HEMS50、および電力関連装置等の各機器の間の通信方式は、特に限定されないが、たとえば、920MHz帯を使用する特定小電力無線方式、たとえば、WiSUN等の通信規格に基づく通信方式、または、Zigbee(登録商標)等のIEEE802.15.4上で動作する無線通信規格の通信方式を利用することができる。
 本実施形態では、ゲートウェイ51、HEMS50、および電力関連装置を含む各機器は、ECHONET Lite通信規格に従って通信するものを含んでもよい。
 ゲートウェイ51は、スマートメーター10またはHEMS50から取得した情報を、AルートとBルートとは異なるCルート(公衆回線網等のネットワーク)を介して電力小売事業者サーバ30またはクラウドサーバ40(サーバ装置100)等に転送したり、あるいは、電力小売事業者サーバ30またはクラウドサーバ40(サーバ装置100)から需要制御情報等を受信し、スマートメーター10またはHEMS50に転送したりする。
 ゲートウェイ51と電力小売事業者サーバ30またはクラウドサーバ40(サーバ装置100)間の通信方式は、特に限定されないが、たとえば、WiMAX(Worldwide Interoperability for Microwave Access)、3G、またはLTE等の無線通信方式を使用できる。
 言い換えれば、HEMS50は、ゲートウェイ51を介して、スマートメーター10から消費電力情報を取得する。さらに、HEMS50は、ゲートウェイ51を介してサーバ装置100と通信し、たとえば、サーバ装置100から需要制御情報を受信する。
 ゲートウェイ51は、スマートメーター10、HEMS50、PVシステム52、負荷装置54、蓄電システム56、またはサーバ装置100と通信する通信機能を有しているものとし、各機器または各装置との通信方式に対応した通信インタフェース機能部(不図示)を備えているものとする。
 ゲートウェイ51は、各機器と認証情報を用いて所定の認証手続きを行い、認証された場合に、当該機器と通信することができる。
 本発明の情報処理システム1は、具体的な構成例として複数の形態が考えられ、以下に例示されるがこれらに限定されるものではない。
(a1)サーバ装置100が全ての機能を実現する構成
 すなわち、サーバ装置100が、図1の取得部102、判定部104、検出部106、および付与部108を有する。
(a2)HEMS50が、特定機器とのやり取りに関連する機能を実現し、サーバ装置100が、少なくともインセンティブ付与に関する機能を実現する構成
 たとえば、HEMS50が、図1の取得部102、判定部104、および検出部106のうち少なくともいずれか1つを有し、サーバ装置100が、図1の付与部108を少なくとも有する。
 本実施形態では、(a1)の構成例について説明する。すなわち、本実施形態において、サーバ装置100は、図1の取得部102と、判定部104と、検出部106と、付与部108と、を備える。
 (a2)の構成例については、後述する。
 図1に戻り、取得部102は、スマートメーター10およびHEMS50(電力測定装置またはCT)の少なくともいずれか一つから、需要家の消費電力情報を取得する。
 本明細書において、「取得」とは、自装置が他の装置や記憶媒体に格納されているデータまたは情報を取りに行くこと(能動的な取得)、たとえば、他の装置にリクエストまたは問い合わせして受信すること、他の装置や記憶媒体にアクセスして読み出すこと等、および、自装置に他の装置から出力されるデータまたは情報を入力すること(受動的な取得)、たとえば、配信(または、送信、プッシュ通知等)されるデータまたは情報を受信すること等、の少なくともいずれか一方を含む。また、受信したデータまたは情報の中から選択して取得すること、または、配信されたデータまたは情報を選択して受信することも含む。
 また、本実施形態で取得部102が取得する消費電力情報は、判定部104が消費電力の削減に関する判定を行うのに使用されるが、後述する実施形態では、機器分離技術により需要家が利用している機器の特定にも利用される。この場合、取得部102が電流波形を取得するタイミングや条件は以下に説明するものとは異なるので、後述する実施形態で詳細に説明する。
 まず、サーバ装置100の取得部102が、ゲートウェイ51を介してスマートメーター10から消費電力情報を取得する場合について説明する。
 スマートメーター10から取得される消費電力情報は、たとえば、瞬時電力計測値、瞬時電流計測値、および瞬時電圧計測値の少なくとも一つを含む。また、消費電力積算値(30分値)等、他の情報を取得してもよい。
 本実施形態では、取得部102は、ゲートウェイ51を介してスマートメーター10から消費電力情報を取得する。他の構成例(a2)の場合は、HEMS50の取得部102が、ゲートウェイ51を介してスマートメーター10から消費電力情報を取得する。
 また、図2には示していないが、サーバ装置100は、電力会社サーバ20とネットワークを介して接続されてもよい。電力会社サーバ20がスマートメーター10からAルート経由で収集した消費電力情報を、取得部102が電力会社サーバ20から取得してもよい。
 ゲートウェイ51またはHEMS50は、たとえば、定期的または予め定められた日時にスマートメーター10から消費電力情報を受信し、所定期間分の情報を記憶してもよいし、サーバ装置100からのリクエストに応じてスマートメーター10から消費電力情報を受信してもよいし、これらの組み合わせでもよい。そして、ゲートウェイ51またはHEMS50は、記憶している消費電力情報を、サーバ装置100からのリクエストに応じて、指定された期間分、サーバ装置100に送信してもよいし、予め定められた期間毎にサーバ装置100に自発的に送信してもよいし、これらの組み合わせでもよい。
 取得部102が消費電力情報を取得するタイミング(本実施形態では、HEMS50に情報をリクエストするタイミングとなる)は様々考えられ、以下に例示されるが、これらに限定されない。また、以下の少なくとも2つを組み合わせてもよい。
(b1)後述する需要制御情報が送信された後、所定時間間隔で収集する。
(b2)後述する需要制御情報で指定されるイベント実施期間に、所定時間間隔で収集する。
(b3)定期的、または所定の日時に収集する。
 所定時間間隔は、特に限定されないが、たとえば、30秒、または30分等である。また、収集期間中に、時間間隔は固定でもよいし、条件(たとえば、需要制御イベント実施中とそれ以外、または時間帯、曜日、季節等)に応じて変動してもよいし、これらの組み合わせでもよい。
 次に、サーバ装置100の取得部102が、ゲートウェイ51を介してHEMS50(CTまたは各機器)から消費電力情報を取得する場合について説明する。
 取得部102は、複数の機器に電力を配電する分電盤(電力測定装置)で計測される、全体の電力消費に関する計測値をHEMS50から取得してもよいし、ECHONET Lite認証機器にHEMS50を介して問い合わせて取得してもよい。
 HEMS50から取得する電力消費に関する計測値は、たとえば、総消費電流、電力、および電圧の少なくともいずれか一つの計測値を含む。また、消費電力積算値(30分値)等、他の情報を取得してもよい。
 上述したように、分電盤には、CTが接続され、CTにより、分電盤に接続される複数機器全体の総消費電流が計測される。たとえば、HEMS50は、電力測定装置またはCTと920MHz帯を使用する特定小電力無線方式で無線通信するインタフェース部(不図示)を有する。本実施形態では、HEMS50は、電力測定装置(またはCT)との無線通信を行うための認証手続きを予め行い、通信できる状態となっているものとする。
 そして、取得部102は、電力測定装置またはCTで計測された消費電力情報をHEMS50からゲートウェイ51を介して取得する。サーバ装置100の取得部102が消費電力量情報を取得する通信ルートは、以下の少なくともいずれか一つが考えられるが、これらに限定されない。また、少なくとも2つを組み合わせてもよく、機器構成や通信状況に応じて、ルートを切り替えてもよい。
(c1)サーバ装置100の取得部102が、電力測定装置またはCTから、HEMS50と、ゲートウェイ51を経由して、消費電力量情報を取得する。
(c2)サーバ装置100の取得部102が、電力測定装置またはCTから、ゲートウェイ51を経由して、消費電力量情報を取得する。
(c3)サーバ装置100の取得部102が、電力測定装置またはCTから、HEMS50を経由して、消費電力量情報を取得する。
 あるいは、取得部102は、後述する検出部106により検出される、ゲートウェイ51と通信するECHONET Lite認証機器にリクエストして消費電力情報を、ゲートウェイ51を介して取得する。
 まず、ゲートウェイ51またはHEMS50は、たとえば、定期的または予め定められた日時から所定期間内に、所定の時間間隔で電力測定装置またはCT、あるいは、ECHONET Lite認証機器から消費電力情報を取得し、所定期間分を記憶してもよいし、サーバ装置100からのリクエストに応じて電力測定装置またはCT、あるいは、ECHONET Lite認証機器から消費電力情報を取得してもよいし、これらの組み合わせでもよい。そして、ゲートウェイ51またはHEMS50は、記憶している消費電力情報を、サーバ装置100からのリクエストに応じて、所定された期間分、サーバ装置100に送信してもよいし、予め定められた期間毎にサーバ装置100に自発的に送信してもよいし、これらの組み合わせでもよい。
 取得部102が消費電力情報を取得するタイミング(本実施形態では、HEMS50に情報をリクエストするタイミングとなる)は様々考えられ、以下に例示されるが、これらに限定されない。また、以下の少なくとも2つを組み合わせてもよい。
(d1)後述する需要制御情報を送信された後、少なくとも1つの所定期間分を取得する。
(d2)後述する需要制御情報で指定されるイベント実施期間内の少なくとも1つの所定期間分を取得する。
(d3)定期的または所定の日時から所定期間分を取得する。
 所定期間の長さは固定でもよいし、条件(たとえば、需要制御イベント実施中とそれ以外、または時間帯、曜日、季節等)に応じて変動してもよいし、これらの組み合わせでもよい。
 判定部104は、スマートメーター10やHEMS50(CTまたは各機器)から取得した消費電力情報に基づいて、需要制御情報に従い消費電力が削減されたか否かを判定する。
 需要制御情報とは、所謂、デマンドレスポンス(Demand Response:DR)含むイベントである。デマンドレスポンスとは、米国では以下の通り米国連邦エネルギー規制委員会(Assessment of Demand Response & Advanced Metering, FERC (Federal Energy Regulatory Commission:) (2011))で定義されている。デマンドレスポンスとは、「卸市場価格の高騰時または系統信頼性の低下時において、電気料金価格の設定またはインセンティブの支払に応じて、需要家側が電力の使用を抑制するよう電力消費パターンを変換させること」を指す。
 以下、本明細書では、需要制御情報は、デマンドレスポンスとも呼ぶ。
 需要制御情報は、図2の電力会社サーバ20からAルートを介してスマートメーター10が受信し、Bルートを介して通信装置に転送される場合と、電力小売事業者サーバ30またはクラウドサーバ40からCルートを介して通信装置または需要家のユーザ端末が受信する場合が考えられる。
 本明細書では、需要制御情報は、電力小売事業者サーバ30またはクラウドサーバ40から、通信装置または需要家のユーザ端末に送信されるものとする。
 本実施形態において、需要制御情報は、電力小売事業者サーバ30からCルートを介して通信装置または需要家のユーザ端末に送信される。あるいは、電力小売事業者から要請を受けてクラウドサーバ40から通信装置またはユーザ端末に送信されてもよい。また、需要制御情報は、需要家に需要制御イベントとして通知されるものとする。
 上述したように、電力小売事業者は、30分同時同量を達成するために、たとえば、30分おきに需要家に対してデマンドレスポンスを送信する。需要家はデマンドレスポンスを受けて、需要家が利用している機器に対して、運転を停止させたり、節電可能な動作モードに切り替えたり、設定温度を低くしたりする操作を行う。
 電力小売事業者サーバ30またはクラウドサーバ40がサーバ装置100である場合は、需要制御情報が送信されたことを判定部104は知ることができる。一方、電力小売事業者サーバ30またはクラウドサーバ40が、サーバ装置100と異なる構成の場合は、判定部104は、電力小売事業者サーバ30またはクラウドサーバ40から需要制御情報が需要家に通知されたことを示す情報を取得するものとする。
 需要制御情報は、イベントの実施期間(デマンドレスポンス送信後、所定期間内、または、指定期間内)、削減目標値、目標達成時のインセンティブ、目標未達成時のペナルティ、およびイベント対象機器等の少なくともいずれか1つの情報が含まれる。
 また、削減目標値は、以下に例示されるが、これらに限定されない。また、以下の少なくともいずれか2つを組み合わせてもよい。
(e1)消費電力量制限値
 消費電力量を制限値より低く抑える。制限値は複数設定されてもよい。
(e2)電力量削減値
 需要家の平常時または一般的な平均値から削減すべき最低値を示す。
(e3)削減率
 需要家の平常時または一般的な平均値に対し、削減すべき比率を示す。
 判定部104は、需要制御情報を需要家のHEMS50またはゲートウェイ51、あるいは、需要家のユーザ端末に送信し、送信後、予め定められた期間内、または、デマンドレスポンスが示すイベント実施期間内に、需要家の消費電力が削減されたか否かを判定する。
 ユーザ端末とは、たとえば、需要家の携帯電話機、スマートフォン、タブレット端末、パーソナルコンピュータ等を含む。需要家は、ユーザ端末でメールを受信可能なメールアドレスを事前にサーバ装置100に登録し、需要制御情報を、メールアドレスを宛先として送信してもよい。
 また、HEMS50またはゲートウェイ51が受信した需要制御情報は、たとえば、HEMS50またはゲートウェイ51が有する表示部(不図示)、または、HEMS50と通信可能なユーザ操作端末であるIHD(In-Home Display:宅内ディスプレイ)(不図示)等に表示させてもよい。需要家はこれらの情報を見て、需要制御情報に従って機器の動作を停止させたり、運転モードを節電モードに切り替えたりする操作を行うことができる。
 消費電力が削減されたか否かの判定基準は様々考えられ、以下に例示されるが、これらに限定されない。また、以下の少なくとも2つを組み合わせてもよい。
(f1)需要家の総消費電力量が所定値以上、削減された。
(f2)需要家の総消費電力量が、所定期間内またはイベント実施期間内、目標値以内に抑えられた。
(f3)需要家の総消費電力量が、デマンドレスポンスイベント中、他の期間または他日の同時間帯の過去の需要家の消費電力量の値(実際の値、または平均値でもよい)に比較して、所定の割合以上、削減された。
 また、判定部104が判定を行うタイミングは、以下に例示されるが、これらに限定されない。また、以下の少なくともいずれか2つを組み合わせてもよい。
(g1)需要制御情報を送信後から所定時間経過後に判定
(g2)需要制御情報で指定したイベント実施期間中、少なくとも1回、所定の時間間隔で判定
(g3)需要制御情報で指定したイベント実施期間終了時(終了前または終了後も含む)に判定
(g4)消費電力情報の履歴情報を元に、任意のタイミングで判定
 検出部106は、需要家における、特定機器の利用状況を検出する。
 特定機器とは、需要制御情報に基づいて消費電力を削減する対象となる機器であり、図2の負荷装置54または電気自動車58など、電力を消費する機器のうち、下記に示す特定対象となる機器である。
 また、図2のPVシステム52、または蓄電システム56の電力関連装置についても、需要制御情報に従い、負荷装置54または電気自動車58に給電する動作を行うことで、電力小売事業者サーバ30から受電して消費する電力を削減できるので、特定機器に含まれてよい。
 特定対象は、機器の種類(たとえば、「エアコン」や「照明」等)でもよいし、機器の製造事業者または販売会社や店舗の名称でもよいし、機器の型式、型番、仕様、製品名、製品のシリーズ名、製品のブランド、機器の製造または販売期間でもよい。あるいは、消費電力量が、所定値以上となると予測される機器、または、過去の需要家の履歴または一般的な平均値から所定値以上となると予測される機器を特定対象としてもよい。
 特定機器(特定対象の機器)の設定方法は、以下に例示されるが、これらに限定されない。
(h1)ユーザ(需要家)毎に予め固定的に設定される。
(h2)サーバ装置100において、条件に応じて、自動的にまたは随時、設定または変更されてもよい。
 ここで、条件とは、たとえば、需要制御イベント実施中とそれ以外、または日時、期間、時間帯、曜日、季節等の時間的な条件、および、電力消費の状況の少なくともいずれかを含む。これらの条件は、需要制御情報に含まれていてもよく、需要制御情報の内容に従って、設定または変更されてもよい。特定機器(特定対象の機器)が設定または変更された場合、ユーザ端末や通信装置(GW)へのメールや表示等により設定または変更されたこと、あるいは、設定または変更内容が、需要家に通知されてもよい。
 利用状況とは、たとえば、特定機器のユーザ登録がなされているか否か、特定機器が利用されているか否か、特定機器が動作しているか停止しているか、特定機器の動作モード、特定機器の消費電力情報、特定機器の利用期間、特定機器の利用頻度、特定機器の利用リピート回数等の情報の少なくともいずれか1つを含んでよいし、これらの情報の少なくとも2つを組み合わせてもよい。
 検出部106が特定機器の利用状況を検出するタイミングは、以下に例示されるが、これらに限定されない。また、以下の少なくともいずれか2つを組み合わせてもよい。
(i1)需要家が特定機器のユーザ登録を行った時
(i2)需要制御情報が需要家に送信された時
(i3)需要制御情報が示すイベント実施期間内で少なくとも1回または所定時間間隔毎の複数回
(i4)定期的または所定の日時
(i5)所定期間、または所定の時間帯で少なくとも1回または所定時間間隔毎の複数回
 検出部106が特定機器の利用状況を検出する方法は以下に例示されるが、これらに限定されない。また、以下の少なくともいずれか2つを組み合わせてもよい。
(j1)ECHONET Lite認証機器に問い合わせることにより特定機器の利用状況を検出する。詳細については後述する実施形態で説明する。
(j2)機器分離技術を用いて、総消費電力量を分離し、各機器を特定し、特定された機器の中から特定機器を検出する。詳細については後述する実施形態で説明する。
(j3)サーバ装置100が、さらに、需要家の特定機器の利用情報を取得する利用情報取得部を有し、検出部106が需要家における、特定機器の利用情報に基づいて、特定機器の利用状況を検出する。
 たとえば、需要家が、所定のウェブサイトにアクセスして、特定機器のユーザ登録を行うと、その登録ユーザ情報を利用情報取得部が取得する。
 付与部108は、需要制御情報に従い消費電力を削減したと判定された需要家に対し、特定機器の利用状況に対応するインセンティブを付与する。
 インセンティブの付与条件は、以下に例示されるが、これらに限定されない。また、以下の少なくとも2つを組み合わせてもよい。
(k1)需要制御情報に従い消費電力を削減したと判定された需要家に対し、当該需要家が特定機器を利用していること
(k2)需要制御情報に従い消費電力を削減したと判定された需要家に対し、当該需要家が利用している特定機器の消費電力が削減されていること
(k3)消費電力の要求削減量を含む需要制御情報に従い消費電力を削減したと判定された需要家が特定機器を利用しており、さらに当該需要家の消費電力の削減量が要求削減量を超えていること
(k4)需要制御情報に従い消費電力を削減したと判定された需要家に対し、当該需要家が利用している特定機器について、動作が停止されたこと、動作モードが節電モードに変更されたこと、および設定温度が低く変更されたこと、のうち少なくともいずれか1つ
 すなわち、特定機器の消費電力が削減できる設定に需要家が変更したことであってもよい。
 たとえば、上記ユーザによる特定機器のユーザ登録による利用情報を用いれば、インセンティブの付与条件を満たしているかの判断を簡単に行うことができる。
 付与部108が需要家に付与するインセンティブの決定方法は、以下に例示されるが、これらに限定されない。また、以下の少なくとも2つを組み合わせてもよい。
(l1)付与条件を満たした需要家に対し、当該付与条件に対応するインセンティブを付与し、当該付与条件を満たさない需要家に対しては、当該付与条件に対応するインセンティブは付与しない。
(l2)付与条件を満たした需要家に対して付与するインセンティブの付与率を、当該付与条件を満たさない需要家に対して付与するインセンティブの付与率より高くする。
 たとえば、特定機器の消費電力の削減量に対する付与率を、特定機器以外の機器の消費電力の削減量に対する付与率の2倍とする等。
(l3)消費電力の削減量に対する割合に応じて、インセンティブの付与率を決定する。
 インセンティブの決定方法は、特定機器毎に決定してもよい。つまり、特定機器がエアコンや扇風機など複数ある場合や、同じ種類の機器(たとえばエアコン)においても、複数の異なる型番やブランドがある場合、それぞれの機器ごとにインセンティブを変更してもよい。
 たとえば、特定のブランドや、型番が新しい機器ほど、それ以外の機器に比べてインセンティブを高く設定してもよい。
 インセンティブは、ポイント付与、サービス、電気料金の割引、ユーザに設定されるステージのレベルアップ等、様々考えられ、特に限定されない。また、プリペイド方式、またはポイント制での電力料金の精算を利用している需要家に対しても、需要制御情報に従い消費電力を削減した場合に、付与部108は、ポイントを付加する。このとき、付与部108は、特定機器の利用状況に応じて、ポイントの増加率を変える。たとえば、付与部108は、特定機器を利用している需要家にポイントを2倍にして付与する。
 図3は、図2のサーバ装置100を実現するコンピュータ60の構成例を示すブロック図である。本実施形態では、サーバ装置100は、電力小売事業者サーバ30またはクラウドサーバ40である。
 コンピュータ60は、CPU(Central Processing Unit)62、メモリ64、メモリ64にロードされた図1の構成要素の少なくとも一部を実現するプログラム80、そのプログラム80を格納するハードディスクなどのストレージ66、ネットワーク接続用インタフェース(I/F)68を備える。コンピュータ60の各要素は、バス69を介して互いに接続され、CPU62により各要素とともにコンピュータ60が実現する装置全体が制御される。
 図1の本実施形態の情報処理システム1の各構成要素は、図3のコンピュータ60のハードウェアとソフトウェアの任意の組合せによって実現される。そして、その実現方法、装置にはいろいろな変形例があることは、当業者には理解されるところである。以下説明する各実施形態の情報処理システム、または、各装置を示す機能ブロック図は、ハードウェア単位の構成ではなく、論理的な機能単位のブロックを示している。また、各図において、本発明の本質に関わらない部分の構成については省略してあり、図示されていない。
 図3のコンピュータ60のCPU62が、ストレージ66に記憶されるプログラム80をメモリ64に読み出して実行することにより、情報処理システム1の図1の各ユニットの各機能を実現することができる。
 上述したように、本発明の情報処理システム1は複数の構成例が考えられ、少なくとも1つのコンピュータ60によって情報処理システム1を実現するプログラム80が実行される。構成例毎にプログラムの各手順を実行するコンピュータが異なり、いずれのコンピュータによってプログラムの各手順を実行するかは、様々な形態が考えられる。
 本実施形態では、上述した(a1)の構成に対応し、図1の情報処理システム1の各ユニットがサーバ装置100によって実現されるものとする。
 本実施形態のコンピュータプログラムは、情報処理装置(本実施形態では、サーバ装置100)を実現させるためのコンピュータ60に、需要家の消費電力情報を取得する手順、需要制御情報に従い消費電力が削減されたか否かを消費電力情報に基づいて判定する手順、需要家における、特定機器の利用状況を検出する手順、需要制御情報に従い消費電力を削減したと判定された需要家に対し、特定機器の利用状況に対応するインセンティブを付与する手順、を実行させるように記述されている。
 本実施形態のコンピュータプログラムは、コンピュータで読み取り可能な記録媒体に記録されてもよい。記録媒体は特に限定されず、様々な形態のものが考えられる。また、プログラムは、記録媒体からコンピュータのメモリにロードされてもよいし、ネットワークを通じてコンピュータにダウンロードされ、メモリにロードされてもよい。
 コンピュータプログラム80を記録する記録媒体は、非一時的な有形のコンピュータ60が使用可能な媒体を含み、その媒体に、コンピュータ60が読み取り可能なプログラムコードが埋め込まれる。コンピュータプログラム80が、コンピュータ60上で実行されたとき、コンピュータ60に、情報処理装置(本実施形態では、サーバ装置100)を実現する以下の制御方法を実行させる。
 このように構成された本実施形態の情報処理システム1の情報処理方法について、以下説明する。
 図4は、本実施形態の情報処理システム1の動作の一例を示すフローチャートである。
 上述したように、本発明の情報処理システム1は複数の構成例が考えられるため、構成例毎に情報処理方法の各手順を実行する装置(コンピュータ)、または装置の組み合わせが異なり、いずれの装置(コンピュータ)によって情報処理方法の各手順を実行するかは、様々な形態が考えられる。
(m1)サーバ装置の情報処理方法であり、サーバ装置100を実現するコンピュータ60により実行される情報処理方法
(m2)サーバ装置およびHEMSの情報処理方法であり、サーバ装置を実現するコンピュータ、およびHEMSを実現するコンピュータにより実行される情報処理方法
 (m1)の形態では、ユーザは、事前に本情報処理システム1のサービスを利用するためのユーザ登録などを行い、サーバ装置100とHEMS50との通信接続設定を行っておく。
 (m2)の形態では、(m1)と同様な手続きを行うとともに、さらに、HEMSに本情報処理システム1を実現するアプリケーションプログラムをインストールし、起動することで、情報処理システム1の情報処理方法の手順をHEMSに実行させる。
 本実施形態では、(m1)の形態について説明する。(m2)の形態について、後述する。
 本発明の実施の形態に係る情報処理方法は、情報処理装置(本実施形態では、サーバ装置100)の情報処理方法であり、サーバ装置100を実現するコンピュータ60により実行される情報処理方法である。
 本実施形態の情報処理方法は、情報処理装置(本実施形態では、サーバ装置100)が、需要家の消費電力情報を取得し(ステップS101)、需要制御情報に従い消費電力が削減されたか否かを消費電力情報に基づいて判定し(ステップS105)、需要家における、特定機器の利用状況を検出し(ステップS103)、需要制御情報に従い消費電力を削減した需要家に対し、特定機器の利用状況に対応するインセンティブを付与する(ステップS107)、ことを含む。
 より詳細に以下に説明する。まず、図4の処理手順がサーバ装置100によって実行されるとき、たとえば、電力小売事業者から需要家に対し、デマンドレスポンスの送信が行われるものとする。たとえば、電力小売事業者は、需要家に30分毎にデマンドレスポンスを送信することで、30分同時同量を達成させる。デマンドレスポンスは、たとえば、需要家のユーザ端末にメールで送信される。
 メールには、消費電力削減イベントの実施期間、削減目標値、インセンティブの付与率倍増対象となる特定機器の名称等の情報(たとえば、A社製エアコン、ブランド名:BBB)が記載されているものとする。需要家はこのメールを見て、インセンティブの付与率倍増の対象となる特定機器(A社製エアコン、ブランド名:BBB)の動作をイベント実施期間の間、停止またはエコモード等の消費電力を削減できるモードに変更させる操作を行う。
 これにより、需要家宅において、イベント実施期間の間、特定機器であるA社製エアコン、ブランド名:BBBが停止されたことで、その期間の総消費電力量が削減され、削減目標値をクリアできたものとする。
 特定機器が条件に応じて設定または変更される場合、ユーザ端末や通信装置(GW)へのメールや表示等により設定または変更されたこと、あるいは、設定または変更内容が、需要家に通知されてもよい。また、特定機器が固定の場合で、変更がない場合でも、メールで需要家に通知されてもよい。このとき、メールには、特定機器の名称などは含まれも、含まれなくてもいずれでもよい。
 このときの情報処理システム1の動作について、以下詳細に説明する。
 まず、取得部102が需要家の消費電力情報を、たとえば、スマートメーター10から取得する(ステップS101)。具体的には、取得部102は、ゲートウェイ51がスマートメーター10からBルート介して収集した消費電力情報を、Cルートを介して受信する。
 次に、検出部106が、需要家における、特定機器の利用状況を検出する(ステップS103)。なお、特定機器は、需要制御情報で指定されてもよいし、予め定められていてもよい。特定機器は、ユーザ(需要家)毎に予め固定的に設定されていてもよいし、サーバ装置100において、時間的な条件(たとえば、需要制御イベント実施中とそれ以外、または時間帯、曜日、季節等)や消費電力の状況に応じて、自動的にまたは随時、設定または変更されてもよい。上述した例では、特定機器は社製エアコン、ブランド名:BBBである。
 そして、判定部104が、需要制御情報に従い消費電力が削減されたか否かを消費電力情報に基づいて判定する(ステップS105)。そして、需要制御情報に従い消費電力が削減された需要家に対し(ステップS105のYES)、付与部108が、特定機器の利用状況に対応するインセンティブを付与する(ステップS107)。需要制御情報に従った消費電力の削減がなされなかった需要家に対し(ステップS105のNO)、インセンティブを付与せず、本処理を終了する。ステップS107では、特定機器の利用状況に応じたインセンティブの付与に関しては、たとえば、上記(k1)~(k4)を条件とする。
 ここでは、需要家は特定機器の社製エアコン、ブランド名:BBBの動作を停止したことで、特定機器が利用されていて、かつ、特定機器の消費電力量が削減でき、かつ、削減目標値が達成されているので(ステップS105のYES)、付与部108により、特定機器の削減成功によるインセンティブの付与率が特定機器を以外の機器の倍のインセンティブが付与される。たとえば、他の需要家が同じ削減目標値を達成したとしても、特定機器を利用していない場合は、インセンティブはそのまま付与される。
 ステップS105の判定については、上述したように様々な条件をさらに追加できる。上記の例では、特定機器の消費電力を削減できたか否か、削減目標値を達成できたか否かを条件としてもよい。
 図4のフローチャートの手順は一例であり、これに限定されない。たとえば、ステップS101の消費電力情報の取得処理は、上述したタイミングで行われてよい。ステップS101とステップS103の順序は逆でもよい。ステップS101の取得部102による消費電力情報の取得処理は、上述したタイミングで行われてよく、少なくともステップS105で消費電力が削減されたか否かの判定処理より前であればよい。また、ステップS103の検出部106による特定機器の利用状況の検出処理は、上述したタイミングで行われてよく、少なくともステップS107で特定機器の利用状況に対応するインセンティブを付与する処理より前であればよい。
 以上説明したように、本実施形態の情報処理システム1において、まず、取得部102により需要家の消費電力情報が取得される。そして、検出部106により、需要家における。特定機器の利用状況が検出される。そして、需要制御情報に従い消費電力が削減されたと判定部104により判定された需要家に対し、付与部108により特定機器の利用状況に対応する、インセンティブが付与される。
 このように、本実施形態の情報処理システム1によれば、デマンドレスポンス等に従って、消費電力を削減した需要家のうち、特定機器を利用している需要家に対し、利用状況に対応するインセンティブが付与されるので、インセンティブが付与される特定機器の利用が促進される。このように、特定機器の利用状況によってインセンティブが付与される構成により、特定機器の利用、すなわち、購入を需要家に促すとともに、特定機器の販売数を増大させるための宣伝にもなるという効果を奏する。
 また、特定機器に消費電力の削減効率のよいものを指定すれば、効率よく消費電力の削減を促すことができ、計画的な電力消費を実現できる。
 また、電力小売事業者は、需要家の所在する電力会社に送配電を依頼している関係から、電力会社に対して30分単位で需要家の需要量と電力小売事業者からの供給量を一致させる「30分同時同量」の義務を負っている。この「(計画値)30分同時同量」が一致しない場合、電力小売事業者は送配電事業者にインバランス料金を支払う必要がある。このインバランス料金の支払いが、電力小売事業者にとって大きな問題となっている。
 そこで、需要家の需要量と、電力小売事業者からの供給量が一致するように、需要制御を行うデマンドレスポンスを計画する。そして、各需要家に30分間における削減する電力消費量の目標値や、需要制御情報送信後または受信後30分間における運転動作の制御内容を含むデマンドレスポンスを送信すれば、需要家の消費電力量を制御することができ、30分同時同量を達成できる可能性がある。
 したがって、本実施形態のサーバ装置100によれば、デマンドレスポンスに従って消費電力を削減した需要家に対し、特定機器の利用状況に対応するインセンティブを付与することで、30分同時同量が達成できる可能性を高くすることができるという効果も奏する。
(第2の実施の形態)
 本発明の第2の実施の形態に係る情報処理システム1は、需要家が利用しているECHONET Lite認証機器に問い合わせて、特定機器の利用状況を検出する構成を有する。
 図5は、本発明の実施の形態に係る情報処理システム1の構成を論理的に示す機能ブロック図である。
 本実施形態の情報処理システム1は、上記実施形態で説明した構成例(a2)の構成となる。
 本実施形態では、ECHONET Lite認証機器とやり取りを行い、特定機器を検出し、情報を取得する機能(取得部102と検出部106)をHEMS50またはゲートウェイ51が少なくとも有するものとして説明する。判定部104と、付与部108は、サーバ装置200が有するものとする。
 図5の例では、HEMS50が、図1と同様な取得部102、および検出部106を有し、サーバ装置200が、図1と同様な判定部104、および付与部108を有する。
 本実施形態の構成は、本発明の少なくとも1つの他の実施形態と支障のない範囲で組み合わせることができる。
 本実施形態において、検出部106は、ECHONET Lite認証機器に問い合わせることにより特定機器の利用状況を検出する。
 詳細には、検出部106は、需要家が所有または利用しているECHONET Lite認証機器に問い合わせて、機器の情報を取得し、特定機器の利用状況を検出する。
 検出部106がECHONET Lite認証機器から取得する機器の情報は、以下に例示されるが、これらに限定されない。また、以下の少なくとも2つを組み合わせてもよい。
(n1)ECHONET Lite認証機器が特定機器か否かを判別するのに使用できる情報
 たとえば、機器の種類(たとえば、「エアコン」や「照明」等)、機器の製造事業者の名称、機器の型式、型番、仕様、製品名、製品のシリーズ名、製品のブランド、機器の製造または販売期間等の情報を含む。
(n2)ECHONET Lite認証機器の消費電力情報
 検出部106は、取得した機器の情報に基づいて、特定機器が利用されていること、または、利用されている特定機器の情報を検出する。さらに、その特定機器の消費電力情報を取得し、付与部108における付与条件を満たすか否かの判別に利用してもよい。
 検出部106における特定機器の検出方法は、以下に例示されるが、これらに限定されない。また、以下の少なくとも2つを組み合わせてもよい。
(o1)HEMS50またはゲートウェイ51(以後、通信装置とも呼ぶ)を介してECHONET Lite認証手続きを行い、ECHONET Lite認証機器の情報を取得する。
(o2)通信装置と既に通信しているECHONET Lite認証機器に対し、ECHONET Liteプロトコルに従って問い合わせ、機器情報(メーカー、機種、型式、製造番号、動作状況、消費電力情報等)を取得する。
(o3)所有または利用しているECHONET Lite認証機器についてサーバ装置100またはHEMS50にユーザによりユーザ登録された情報を取得する。
 なお、取得部102は、上記実施形態と同様に、スマートメーター10または分電盤(本実施形態では、HEMS50に含まれる)から消費電力情報を取得するとともに、さらに、検出部106が検出したECHONET Lite認証機器から各機器の消費電力情報をECHONET Liteプロトコルに従って問い合わせ、機器毎の消費電力情報を取得してもよい。
 本実施形態において、検出部106により、ECHONET Lite認証機器にECHONET Lite通信プロトコルを用いて問い合わせて特定機器の利用状況が検出される。
 このように、本実施形態の情報処理システム1によれば、上記実施形態と同様な効果を奏するとともに、さらにECHONET Lite認証機器に問い合わせることにより機器情報を取得して特定機器の利用状況を検出することができるので、より効率よく特定機器を検出できる。
(第3の実施の形態)
 第3の実施の形態に係る情報処理システム1は、分電盤(CT)やスマートメーター等において計測された総消費電流(または電圧)の時系列データから機器分離技術を用いて波形を分離して機器を特定し、各機器の消費電力情報を取得し、特定機器の利用状況を検出する構成を有する。
 図6は、本発明の実施の形態に係る情報処理システム1の構成を論理的に示す機能ブロック図である。
 本実施形態の情報処理システム1は、上記実施形態で説明した構成例(a1)の構成となる。
 本実施形態において、サーバ装置300は、取得部302と、判定部104と、検出部306と、付与部108と、を有する。
 本実施形態の構成は、本発明の少なくとも1つの他の実施形態と支障のない範囲で組み合わせることができる。
 本実施形態のサーバ装置300において、取得部302により取得される消費電力情報が、複数の機器における全体の電力消費に関する時系列データを含む。
 検出部306は、時系列データから特定機器の時系列データを分離することにより、特定機器の利用状況を検出する。
 本実施形態において、取得部302により、スマートメーター10または分電盤(またしCT)で計測された取得する。
 スマートメーター10からデータを取得する際は、Bルート接続するゲートウェイ51を用いるが、電力測定装置(CT、分電盤)から取得する場合は、ゲートウェイ51やHEMS50を介せずに電力測定装置からサーバ装置100に送信してもよい。
 まず、スマートメーター10からデータを取得する場合について説明する。
 取得部302は、電力量計(スマートメーター10)で計測される電力消費に関する計測値の時系列データを取得する。
 たとえば、HEMS50は、スマートメーター10とBルートで無線通信するための認証手続きを予め行い、通信できる状態となっているものとする。
 そして、取得部302は、スマートメーター10から、所定の時間間隔で、Bルート経由で、スマートメーター10で計測された、電力消費に関する計測値の情報を取得する。情報を取得する時間間隔は、たとえば、20秒~10秒程度の間隔でデータを取得できれば、その時系列データから機器を判別できる特徴量を抽出できるが、これに限定されず、これより長くてもよいし、数秒またはそれ以下の間隔でもよい。
 また、時間間隔は適宜変更することができ、所定の収集期間または情報の種類に応じて時間間隔を変えてもよい。時系列データから機器を判別可能な特徴量が抽出でき、かつ、スマートメーター10への負荷が過多にならない程度に時間間隔を設定すればよい。時間間隔の設定(変更)方法は特に限定されず、HEMS50のユーザインタフェースを用いたユーザ操作により設定できてもよいし、所定のウェブページで設定を受け付け、受け付けた内容をサーバがHEMS50にネットワークを介して設定してもよいし、HEMS50のプログラム(ファームウェア)のバージョンアップ、または、サーバからのネットワークを介しての指示等により変更できてもよい。
 スマートメーター10から取得する電力消費に関する計測値は、たとえば、瞬時電力計測値、瞬時電流計測値、および瞬時電圧計測値の少なくとも一つを含む。また、消費電力積算値(30分値)等、他の情報を取得してもよい。なお、取得部302は、スマートメーター10から電力会社サーバ20がAルート経由で収集した情報(電力消費に関し計測されたデータ)を電力会社サーバ20から取得してもよい。
 取得部302は、所定の時間間隔でスマートメーター10に対し、必要なデータ(たとえば、瞬時電力計測値)の送信をリクエストし、所定期間のデータを収集し、時刻情報とともに蓄積して時系列データとする。取得部302は、時系列データから、少なくとも機器を判別できる特徴量が抽出できる期間分のデータを取得する。また、所定期間は、連続した期間でなくてもよく、複数の期間のデータであってもよい。また、機器の種類によっては、時間帯で特徴が顕著となる場合もあり、予め機器の種類が分かっている場合等には、この機器の特徴が少なくとも検出できる時間帯を含んだ所定期間のデータを取得してもよい。
 時系列データは、スマートメーター10で蓄積されているものを一括して所定期間分取得してもよいし、HEMS50からゲートウェイ51を介してスマートメーター10に瞬時値を定期的(たとえば、20秒毎)にリクエストして都度取得し、HEMS50またはゲートウェイ51が所定期間分を蓄積してもよい。
 スマートメーター10から取得された時系列データは、時刻毎の瞬時値であるため、取得部302または検出部306の少なくともいずれかで、瞬時計測値とその時刻情報を元に計測値の波形データを生成してもよい。
 上記に記載したように、取得部302はスマートメーター10から電力消費に関する計測値の情報を取得してもいいし、以下に説明するように電力測定装置から電力消費に関する計測値の情報を取得してもいい。
 次に、電力測定装置からデータを取得する場合について説明する。
 取得部302は、複数の機器に電力を配電する分電盤(電力測定装置)で計測される、全体の電力消費に関する計測値の計測波形データを時系列データとして取得する。分電盤(電力測定装置)から取得する電力消費に関する計測値は、たとえば、総消費電流、電力、および電圧の少なくともいずれか一つの計測値を含む。
 たとえば、上述したように、分電盤には、CTが接続され、CTにより、分電盤に接続される複数機器全体の総消費電流の電流波形が取得される。たとえば、HEMS50は、電力測定装置またはCTと920MHz帯を使用する特定小電力無線方式で無線通信するインタフェース部(不図示)を有する。本実施形態では、HEMS50は、電力測定装置(またはCT)との無線通信を行うための認証手続きを予め行い、通信できる状態となっているものとする。
 そして、取得部302は、電力測定装置またはCTから、所定期間の電流波形を取得し、時系列データとする。
 電力測定装置またはCTは、所定期間分の時系列データを保持できる構成を有してもよい。その場合は、電力測定装置またはCTが、HEMS50からのリクエストを受信した時点で蓄積されている所定期間分の時系列データをHEMS50に送信してもよいし、または、リクエストされてから所定期間分のデータを電力測定装置が蓄積した後、HEMS50に送信してもよい。
 また、上述したように、所定期間は、連続した期間でなくてもよく、複数の期間のデータであってもよい。また、或る時間帯の時系列データを指定して、リクエストしてもよい。または、ある期間分、取得したデータから所定期間分の時系列データを抽出してもよい。また、電力測定装置またはCTが総消費電流を保持する構成を有していない場合は、HEMS50からのリクエストを受信した後、電力測定装置またはCTから所定期間、サンプリングしながらHEMS50に総消費電流値が送信されてもよい。
 取得部302は、消費電力の計測波形データである時系列データをスマートメーター10から取得してもよいし、電力測定装置(またはCT)からでも取得してもよい。そして、検出部306は、機器分離技術を用いて、電力消費に関し計測された時系列データから特徴量を抽出し、機器固有の特徴量と比較することで、少なくとも1つの特定機器を特定する。検出部306は、たとえば、エアコン、テレビ等の機器の種類だけでなく、機器の型番まで特定することができる。ここで「機器の型番」とは、機器の機種を特定する情報であり、他の呼び方で呼ばれる場合も有り得る。「機器の型番」は、製造番号や製品番号や製品シリアル番号等と呼ばれる個々の製品を識別する情報とは異なる情報である。
 なお上記のように、分電盤から取得した電流波形の時系列データから機器分離を用いて各機器に関する消費電力情報を取得する方法以外にも、他の方法で取得してもよい。
 つまり分岐するブレーカーごとにCTなどの電流センサーをそれぞれ配置して、各機器の消費電力を取得してもよいし、各機器とコンセントとの間にスマートタップを配置して各機器の消費電力を取得してもよい。また、分電盤の分岐をたとえば、複数(たとえば、4~6個)に分けて、分岐毎にCTを設けて各分岐の消費電流を取得し、各分岐から電力供給されている少なくとも一つの機器について、分岐毎に機器分離を行ってもよい。
 検出部306は、スマートメーター10または電力測定装置から取得した時系列データに基づいて、少なくとも一つの特定機器の消費電力の推定値を算出する。
 以上、説明したように、本実施形態の情報処理システム1において、検出部306により時系列データから機器分離技術を用いて、少なくとも1つの機器が特定され、検出部306により機器毎の消費電力の推定値が算出される。
 本実施形態の情報処理システム1によれば、検出部306により、機器分離技術を用いて機器を特定でき、特定機器を検出できる。そして検出部306により機器毎の消費電力の推定値が算出されるので、効率よく特定機器を検出することができる。
(第4の実施の形態)
 第4の実施の形態に係る情報処理システム1は、上記実施形態で求めた各機器の消費電力情報を、スマートメーターの計測値に基づいて、補正する構成をさらに有する点で上記実施形態と相違する。本実施形態の構成は、本発明の少なくとも1つの他の実施形態と支障のない範囲で組み合わせることができる。
 図7は、本発明の実施の形態に係る情報処理システム1の構成を論理的に示す機能ブロック図である。
 本実施形態の情報処理システム1は、上記実施形態で説明した構成例(a1)の構成となる。
 本実施形態において、サーバ装置400は、取得部402と、判定部104と、検出部306と、付与部408と、を有する。
 本実施形態の構成は、本発明の少なくとも1つの他の実施形態と支障のない範囲で組み合わせることができる。
 本実施形態の情報処理システム1において、取得部402は、スマートメーター10から消費電力の計測値を取得する。付与部408は、たとえばHEMS50(CTまたは各機器)等から取得部402が取得した前記消費電力情報を、スマートメーター10から取得された消費電力の計測値に基づいて補正し、需要家に付与するインセンティブを決定する。
 なお、付与部408がスマートメーター10から取得された消費電力の計測値に基づいて補正する消費電力情報は上記のようなHEMS50(CTまたは各機器)と限らなくてもよい。
 電力測定装置(CT)で計測された消費電流などの計測値、または、ECHONET Lite認証機器から取得される消費電力情報は、誤差が含まれる場合がある。一方、スマートメーター10で計測される消費電力などの検針データが、30分同時同量の基準となるデータであるので、電力測定装置(CT)の計測値またはECHONET Lite認証機器から取得した消費電力情報をスマートメーター10の検針データで補正する。
 このように、本実施形態によれば、電力測定装置(CT)の計測値やECHONET Lite認証機器から取得した消費電力情報をスマートメーター10の計測値で補正するので、需要家に付与するインセンティブを限定する際に、高精度の情報を使用できるので、適切な付与処理を行うことができる。電力小売事業者にあっては、30分同時同量を達成するためのデマンドレスポンスを決定する際に使用する消費電力情報の精度を上げることができるので、誤差の発生割合を低くすることができる。
(第5の実施の形態)
 第5の実施の形態に係る情報処理システム1は、上記実施形態とは、需要家について、特定機器の利用情報を出力する構成を有する点で相違する。
 図8は、本発明の実施の形態に係る情報処理システム1の構成を論理的に示す機能ブロック図である。
 本実施形態の情報処理システム1は、上記実施形態で説明した構成例(a1)の構成となる。
 HEMS550が、図5の上記実施形態と同様な取得部102と、検出部106を有するとともに、さらに、出力部552を有する。サーバ装置500は、図5の上記実施形態と同様な構成を有するとともに、さらに、判定部104と、検出部106とを有する。
 本実施形態の情報処理システム1のHEMS550において、出力部552は、需要家について、特定機器を利用していること、または、利用されている特定機器の情報を出力する。
 出力部552が情報を出力するタイミングは様々考えられ、以下に例示されるが、これらに限定されない。また、以下の少なくとも2つを組み合わせもよい。
(p1)特定機器の利用を需要家が開始した時、またはその前後
(p2)需要制御情報を受信した後
(p3)定期的、または所定の日時
(p4)サーバ装置300からリクエストされた時
(p5)HEMS550の操作部(不図示)を用いたユーザ操作による出力指示を受け付けた時
 出力される情報は、需要家について、特定機器を利用していること、または、利用されている特定機器の情報である。利用されている特定機器の情報は、検出部106により需要家が利用している機器を特定できる情報をすくなくとも含む。たとえば、機器の種類(たとえば、「エアコン」や「照明」等)でもよいし、機器の製造事業者または販売会社や店舗の名称でもよいし、機器の型式、型番、仕様、製品名、製品のシリーズ名、製品のブランド、機器の製造または購入時期等の情報の少なくとも1つを含む。
 出力部552の出力先は、たとえば、サーバ装置500、HEMS550の表示部、ユーザ端末等であるが、これらに限定されない。
 出力部552は、たとえば、ECHONET Lite認証機器に上記情報を取得して、サーバ装置500に転送してもよい。また、図8では、HEMS550が出力部552を備える構成としているが、他の例では、需要家のユーザ端末が出力部552の機能を有してもよい。すなわち、ユーザ端末を用いてサーバ装置500にアクセスし、必要な情報の登録操作を行うことで特定機器を利用していること、または利用されている特定機器の情報を指定できる。
 この構成によれば、サーバ装置500に需要家が利用している特定機器の情報または需要家が特定機器を利用していることを通知できるので、付与部108において、特定機器の利用状況の判定処理に使用できるので効率がよい。
(第6の実施の形態)
 第6の実施の形態に係る情報処理システムは、本発明の情報処理システムの最小構成を有する。
 本実施形態の情報処理システムは、図1の情報処理システムと同様な取得部102と、検出部106と、付与部108と、を備える。
 本実施形態の情報処理システムにおいて、取得部102(図1)は、需要家の消費電力情報を取得する。検出部106(図1)は、需要家における、特定機器の利用状況を検出する。付与部108(図1)は、需要制御情報に従い消費電力を削減した需要家に対し、特定機器の利用状況に対応するインセンティブを付与する。
 上述したように、本発明の情報処理システム1は複数の構成例が考えられ、少なくとも1つのコンピュータ60(図3)によって情報処理システム1を実現するプログラム80(図3)が実行される。構成例毎にプログラムの各手順を実行するコンピュータが異なり、いずれのコンピュータによってプログラムの各手順を実行するかは、様々な形態が考えられる。
 本実施形態では、上述した(a1)の構成に対応し、情報処理システム1の各ユニットがサーバ装置100(図2)によって実現されるものとする。
 本実施形態のコンピュータプログラムは、情報処理装置(本実施形態では、図2のサーバ装置100)を実現させるためのコンピュータ60(図3)に、需要家の消費電力情報を取得する手順、需要家における、特定機器の利用状況を検出する手順、需要制御情報に従い消費電力を削減したと判定された需要家に対し、特定機器の利用状況に対応するインセンティブを付与する手順、を実行させるように記述されている。
 また、本発明の実施の形態に係る情報処理方法は、情報処理装置(本実施形態では、図2のサーバ装置100)の情報処理方法であり、サーバ装置100を実現するコンピュータ60(図3)により実行される情報処理方法である。
 本実施形態の情報処理方法は、図4の上記実施形態のフローチャートと同様なステップS101と、ステップS103と、ステップS107とを含む。
 本実施形態の情報処理方法は、情報処理装置(本実施形態では、サーバ装置100)が、需要家の消費電力情報を取得し(図4のステップS101)、需要家における、特定機器の利用状況を検出し(図4のステップS103)、需要制御情報に従い消費電力を削減した需要家に対し、特定機器の利用状況に対応するインセンティブを付与する(図4のステップS107)、ことを含む。
 本実施形態の情報処理システム1において、まず、取得部102により需要家の消費電力情報が取得される。そして、検出部106により、需要家における。特定機器の利用状況が検出される。そして、需要制御情報に従い消費電力が削減された需要家に対し、付与部108により特定機器の利用状況に対応する、インセンティブが付与される。
 このように、本実施形態の情報処理システム1によれば、デマンドレスポンス等に従って、消費電力を削減した需要家のうち、特定機器を利用している需要家に対し、利用状況に対応するインセンティブが付与されるので、インセンティブが付与される特定機器の利用が促進される。このように、特定機器の利用状況によってインセンティブが付与される構成により、特定機器の利用、すなわち、購入を需要家に促すとともに、特定機器の販売数を増大させるための宣伝にもなるという効果を奏する。
 以上、図面を参照して本発明の実施形態について述べたが、これらは本発明の例示であり、上記以外の様々な構成を採用することもできる。
 たとえば、上記実施形態では、需要制御情報を需要家が確認して、機器の動作を停止したり、動作モードを節電モードに切り替えたりする操作を行う構成について説明した。他の実施形態では、需要制御情報を受信したHEMS50が、需要制御情報に含まれる指示内容に従って各機器の動作を制御する構成としてもよい。あるいは、需要制御情報に、各機器の動作を制御するコマンドが含まれていてもよく、HEMS50が制御コマンドを該当機器に対して発行してもよい。
 以上、実施形態および実施例を参照して本願発明を説明したが、本願発明は上記実施形態および実施例に限定されるものではない。本願発明の構成や詳細には、本願発明のスコープ内で当業者が理解し得る様々な変更をすることができる。
 なお、本発明において利用者(需要家)に関する情報を取得、利用する場合は、これを適法に行うものとする。
 以下、参考形態の例を付記する。
1. 情報処理装置が、
 需要家の消費電力情報を取得し、
 前記需要家における、特定機器の利用状況を検出し、
 需要制御情報に従い消費電力を削減した需要家に対し、前記特定機器の利用状況に対応するインセンティブを付与する、
情報処理方法。
2. 前記情報処理装置が、
 ECHONET Lite認証機器に問い合わせることにより前記特定機器の利用状況を検出する、
 1.に記載の情報処理方法。
3. 取得される前記消費電力情報が、複数の機器における全体の電力消費に関する時系列データを含み、
 前記情報処理装置が、
  前記時系列データから前記特定機器の時系列データを分離することにより、前記特定機器の利用状況を検出する、
 1.または2.に記載の情報処理方法。
4. 前記情報処理装置が、
 前記需要家の前記特定機器の利用情報を取得し、
 前記需要家における、前記特定機器の利用情報に基づいて、前記特定機器の前記利用状況を検出する、
 1.から3.いずれか1つに記載の情報処理方法。
5. 前記情報処理装置が、
 前記特定機器を利用している前記需要家にインセンティブを付与する、
 1.から4.いずれか1つに記載の情報処理方法。
6. 前記情報処理装置が、
 前記特定機器の前記消費電力が削減されている前記需要家にインセンティブを付与する、
 1.から5.いずれか1つに記載の情報処理方法。
7. 前記需要制御情報は、前記消費電力の要求削減量を含み、
 前記情報処理装置が、
 前記消費電力の削減量が前記要求削減量を超えている前記需要家にインセンティブを付与する、
 1.から6.いずれか1つに記載の情報処理方法。
8. 前記情報処理装置が、
 前記付与の条件を満たした需要家に対し、当該付与の条件に対応するインセンティブを付与し、前記付与の条件を満たさない需要家に対しては、当該付与の条件に対応するインセンティブを付与しない、
 5.から7.いずれか1つに記載の情報処理方法。
9. 前記情報処理装置が、
 前記付与の条件を満たした需要家に対して付与するインセンティブの付与率を、当該付与の条件を満たさない需要家に対して付与するインセンティブの付与率より高くして、前記インセンティブを付与する、
 5.から8.いずれか1つに記載の情報処理方法。
10. 前記情報処理装置が、
 電力量計から消費電力の計測値を取得し、
 取得された前記消費電力情報を、前記電力量計から取得された前記消費電力の計測値に基づいて補正し、前記需要家に付与する前記インセンティブを決定する、
 1.から9.いずれか1つに記載の情報処理方法。
11. 前記情報処理装置が、
 前記需要家について、前記特定機器を利用していること、または、利用されている前記特定機器の情報を出力する、
 1.から10.いずれか1つに記載の情報処理方法。
12. 複数の異なる機器が前記特定機器である場合、前記機器の型番や種類に応じてインセンティブが異なる、
 1.から11.いずれか1つに記載の情報処理方法。
13. コンピュータに、
 需要家の消費電力情報を取得する手順、
 前記需要家における、特定機器の利用状況を検出する手順、
 需要制御情報に従い消費電力を削減した需要家に対し、前記特定機器の利用状況に対応するインセンティブを付与する手順、を実行させるためのプログラム。
14. ECHONET Lite認証機器に問い合わせることにより前記特定機器の利用状況を検出する手順、
 をさらにコンピュータに実行させるための、13.に記載のプログラム。
15. 取得される前記消費電力情報が、複数の機器における全体の電力消費に関する時系列データを含み、
 前記時系列データから前記特定機器の時系列データを分離することにより、前記特定機器の利用状況を検出する手順、
 をさらにコンピュータに実行させるための、13.または14.に記載のプログラム。
16. 前記需要家の前記特定機器の利用情報を取得する手順、
 前記需要家における、前記特定機器の利用情報に基づいて、前記特定機器の前記利用状況を検出する手順、
 をさらにコンピュータに実行させるための、13.から15.いずれか1つに記載のプログラム。
17. 前記特定機器を利用している前記需要家にインセンティブを付与する手順、
 をさらにコンピュータに実行させるための、13.から16.いずれか1つに記載のプログラム。
18. 前記特定機器の前記消費電力が削減されている前記需要家にインセンティブを付与する手順、
 をさらにコンピュータに実行させるための、13.から17.いずれか1つに記載のプログラム。
19. 前記需要制御情報は、前記消費電力の要求削減量を含み、
 前記消費電力の削減量が前記要求削減量を超えている前記需要家にインセンティブを付与する手順、
 をさらにコンピュータに実行させるための、13.から18.いずれか1つに記載のプログラム。
20. 前記付与の条件を満たさない需要家に対しては、当該付与の条件に対応するインセンティブを付与せず、当該付与の条件を満たした需要家に対し、当該付与の条件に対応するインセンティブを付与する手順、
 をさらにコンピュータに実行させるための、17.から19.いずれか1つに記載のプログラム。
21. 前記付与の条件を満たした需要家に対して付与するインセンティブの付与率を、当該付与の条件を満たさない需要家に対して付与するインセンティブの付与率より高くして、前記インセンティブを付与する手順、
 をさらにコンピュータに実行させるための、17.から20.いずれか1つに記載のプログラム。
22. 電力量計から消費電力の計測値を取得する手順、
 取得された前記消費電力情報を、前記電力量計から取得された前記消費電力の計測値に基づいて補正し、前記需要家に付与する前記インセンティブを決定する手順、
 をさらにコンピュータに実行させるための、13.から21.いずれか1つに記載のプログラム。
23. 前記需要家について、前記特定機器を利用していること、または、利用されている前記特定機器の情報を出力する手順、
 をさらにコンピュータに実行させるための、13.から22.いずれか1つに記載のプログラム。
24. 複数の異なる機器が前記特定機器である場合、前記機器の型番や種類に応じてインセンティブが異なる、
 13.から23.いずれか1つに記載のプログラム。
25. 需要家における、特定機器の利用状況を検出する検出手段と、
 需要制御情報に従い消費電力を削減した需要家に対し、前記特定機器の利用状況に対応するインセンティブを付与する付与手段と、を備えるサーバ。
26. 前記検出手段が検出する前記特定機器の利用状況は、ECHONET Lite認証機器に問い合わせることにより検出される、
 25.に記載のサーバ。
27. 前記検出手段は、複数の機器における全体の電力消費に関する時系列データから前記特定機器の時系列データを分離することにより、前記特定機器の利用状況を検出する、
 25.または26.に記載のサーバ。
28. 前記需要家の前記特定機器の利用情報を取得する利用情報取得手段をさらに備え、
 前記検出手段は、前記需要家における、前記特定機器の利用情報に基づいて、前記特定機器の前記利用状況を検出する、
 25.から27.いずれか1つに記載のサーバ。
29. 前記付与手段は、前記特定機器を利用している前記需要家にインセンティブを付与する、25.から28.いずれか1つに記載のサーバ。
30. 前記付与手段は、前記特定機器の前記消費電力が削減されている前記需要家にインセンティブを付与する25.から29.いずれか1つに記載のサーバ。
31. 前記需要制御情報は、前記消費電力の要求削減量を含み、
 前記付与手段は、前記消費電力の削減量が前記要求削減量を超えている前記需要家にインセンティブを付与する、
 25.から30.いずれか1つに記載のサーバ。
32. 前記付与手段は、前記付与の条件を満たした需要家に対し、当該付与の条件に対応するインセンティブを付与し、当該付与の条件を満たさない需要家に対しては、当該付与の条件に対応するインセンティブを付与しない、
 29.から31.いずれか1つに記載のサーバ。
33. 前記付与手段は、前記付与の条件を満たした需要家に対して付与するインセンティブの付与率を、当該付与の条件を満たさない需要家に対して付与するインセンティブの付与率より高くする、
 29.から32.いずれか1つに記載のサーバ。
34. 前記付与手段は、電力量計以外の機器から取得された前記需要家の消費電力情報を、電力量計から取得された消費電力の計測値に基づいて補正し、前記需要家に付与する前記インセンティブを決定する、
 25.から33.いずれか1つに記載のサーバ。
35. 前記需要家について、前記特定機器を利用していること、または、利用されている前記特定機器の情報を取得する機器情報取得手段をさらに備える、
 25.から34.いずれか1つに記載のサーバ。
36. 複数の異なる機器が前記特定機器である場合、前記機器の型番や種類に応じてインセンティブが異なる、
 25.から35.いずれか1つに記載のサーバ。
 この出願は、2015年4月28日に出願された日本出願特願2015-091504号を基礎とする優先権を主張し、その開示の全てをここに取り込む。

Claims (15)

  1.  需要家の消費電力情報を取得する取得手段と、
     前記需要家における、特定機器の利用状況を検出する検出手段と、
     需要制御情報に従い消費電力を削減した需要家に対し、前記特定機器の利用状況に対応するインセンティブを付与する付与手段と、
     を備える情報処理システム。
  2.  前記検出手段は、ECHONET Lite認証機器に問い合わせることにより前記特定機器の利用状況を検出する請求項1に記載の情報処理システム。
  3.  前記取得手段により取得される前記消費電力情報が、複数の機器における全体の電力消費に関する時系列データを含み、
     前記検出手段は、前記時系列データから前記特定機器の時系列データを分離することにより、前記特定機器の利用状況を検出する請求項1または2に記載の情報処理システム。
  4.  前記需要家の前記特定機器の利用情報を取得する利用情報取得手段をさらに備え、
     前記検出手段は、前記需要家における、前記特定機器の利用情報に基づいて、前記特定機器の前記利用状況を検出する請求項1から3いずれか1項に記載の情報処理システム。
  5.  前記付与手段は、前記特定機器を利用している前記需要家にインセンティブを付与する請求項1から4いずれか1項に記載の情報処理システム。
  6.  前記付与手段は、前記特定機器の前記消費電力が削減されている前記需要家にインセンティブを付与する請求項1から5いずれか1項に記載の情報処理システム。
  7.  前記需要制御情報は、前記消費電力の要求削減量を含み、
     前記付与手段は、前記消費電力の削減量が前記要求削減量を超えている前記需要家にインセンティブを付与する請求項1から6いずれか1項に記載の情報処理システム。
  8.  前記付与手段は、前記付与の条件を満たした需要家に対し、当該付与の条件に対応するインセンティブを付与し、当該付与の条件を満たさない需要家に対しては、当該付与の条件に対応するインセンティブを付与しない請求項5から7いずれか1項に記載の情報処理システム。
  9.  前記付与手段は、前記付与の条件を満たした需要家に対して付与するインセンティブの付与率を、当該付与の条件を満たさない需要家に対して付与するインセンティブの付与率より高くする請求項5から8いずれか1項に記載の情報処理システム。
  10.  前記取得手段は、さらに、電力量計から消費電力の計測値を取得し、
     前記付与手段は、前記取得手段により取得された前記消費電力情報を、前記電力量計から取得された前記消費電力の計測値に基づいて補正し、前記需要家に付与する前記インセンティブを決定する請求項1から9いずれか1項に記載の情報処理システム。
  11.  前記需要家について、前記特定機器を利用していること、または、利用されている前記特定機器の情報を出力する出力手段をさらに備える、
     請求項1から10いずれか1項に記載の情報処理システム。
  12.  複数の異なる機器が前記特定機器である場合、前記機器の型番や種類に応じてインセンティブが異なる請求項1から11いずれか1項に記載の情報処理システム。
  13.  需要家における、特定機器の利用状況を検出する検出手段と、
     需要制御情報に従い消費電力を削減した需要家に対し、前記特定機器の利用状況に対応するインセンティブを付与する付与手段と、を備えるサーバ。
  14.  情報処理装置が、
     需要家の消費電力情報を取得し、
     前記需要家における、特定機器の利用状況を検出し、
     需要制御情報に従い消費電力を削減した需要家に対し、前記特定機器の利用状況に対応するインセンティブを付与する、
    情報処理方法。
  15.  コンピュータに、
     需要家の消費電力情報を取得する手順、
     前記需要家における、特定機器の利用状況を検出する手順、
     需要制御情報に従い消費電力を削減した需要家に対し、前記特定機器の利用状況に対応するインセンティブを付与する手順、
    を実行させるためのプログラム。
PCT/JP2016/062071 2015-04-28 2016-04-15 情報処理システム、情報処理方法、およびプログラム WO2016175048A1 (ja)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2015-091504 2015-04-28
JP2015091504 2015-04-28

Publications (1)

Publication Number Publication Date
WO2016175048A1 true WO2016175048A1 (ja) 2016-11-03

Family

ID=57199702

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2016/062071 WO2016175048A1 (ja) 2015-04-28 2016-04-15 情報処理システム、情報処理方法、およびプログラム

Country Status (1)

Country Link
WO (1) WO2016175048A1 (ja)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN118066666A (zh) * 2024-04-18 2024-05-24 宁波奥克斯电气股份有限公司 一种空调器与国网系统互通的控制方法、装置和空调器

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2013131148A (ja) * 2011-12-22 2013-07-04 Daiwa House Industry Co Ltd エネルギー管理システム及び管理装置
JP2014071600A (ja) * 2012-09-28 2014-04-21 Daiwa House Industry Co Ltd エネルギー料金表示システム及びエネルギー料金表示方法
WO2014171104A1 (ja) * 2013-04-15 2014-10-23 パナソニック インテレクチュアル プロパティ コーポレーション オブ アメリカ 情報提示方法、情報提示システム、プログラム、及び記録媒体
JP2014202542A (ja) * 2013-04-02 2014-10-27 パナソニック株式会社 計測装置

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2013131148A (ja) * 2011-12-22 2013-07-04 Daiwa House Industry Co Ltd エネルギー管理システム及び管理装置
JP2014071600A (ja) * 2012-09-28 2014-04-21 Daiwa House Industry Co Ltd エネルギー料金表示システム及びエネルギー料金表示方法
JP2014202542A (ja) * 2013-04-02 2014-10-27 パナソニック株式会社 計測装置
WO2014171104A1 (ja) * 2013-04-15 2014-10-23 パナソニック インテレクチュアル プロパティ コーポレーション オブ アメリカ 情報提示方法、情報提示システム、プログラム、及び記録媒体

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN118066666A (zh) * 2024-04-18 2024-05-24 宁波奥克斯电气股份有限公司 一种空调器与国网系统互通的控制方法、装置和空调器

Similar Documents

Publication Publication Date Title
JP5324579B2 (ja) 据置電力販売方法、仮想電気事業体、および電力取得方法
JP5807073B2 (ja) 一つ以上の電気施設から供給される電力の消費量を能動管理するための方法及び装置
US7123994B2 (en) Power consumption management method
Chen et al. A communication-based appliance scheduling scheme for consumer-premise energy management systems
US8896461B2 (en) Distributed meter data management
JP6068590B2 (ja) サブアグリゲータシステム
CA2762387A1 (en) Systems and method for determining carbon credits utilizing two-way devices that report power usage data
WO2013192432A1 (en) Method and apparatus for actively managing electric power over an electric power grid
CA2878904A1 (en) Method and apparatus for actively managing electric power supply for an electric power grid
WO2013025565A1 (en) Customizable dynamic resource regulating devices and methods
JP6786814B2 (ja) 情報処理装置、情報処理方法、およびプログラム
JP5928916B2 (ja) 行動管理装置、行動管理方法およびプログラム
JP6668592B2 (ja) 管理装置、および通信装置
JP2014155389A (ja) 電力需給管理装置及び電力需給管理方法
WO2016175048A1 (ja) 情報処理システム、情報処理方法、およびプログラム
JP6074843B2 (ja) コントローラ
JP5638104B2 (ja) 電気料金算出装置及び方法
WO2016152699A1 (ja) 情報処理システム、情報処理方法、およびプログラム
WO2017119281A1 (ja) 情報処理装置、情報処理方法、およびプログラム
JP2013058046A (ja) 電気料金算出装置及び方法
JP6385599B2 (ja) エネルギー管理装置、電力情報表示方法及びプログラム
WO2017018530A1 (ja) 情報処理システム、情報処理方法、およびプログラム
Zhang et al. Distributor “time value” pricing framework to schedule distributed energy resources
WO2016021429A1 (ja) 制御装置、制御方法、及びプログラム
WO2017126435A1 (ja) 情報処理装置、情報処理方法、およびプログラム

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 16786325

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 16786325

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: JP