WO2016132796A1 - 電力消費量推定装置、電力消費量推定方法およびプログラム - Google Patents

電力消費量推定装置、電力消費量推定方法およびプログラム Download PDF

Info

Publication number
WO2016132796A1
WO2016132796A1 PCT/JP2016/051410 JP2016051410W WO2016132796A1 WO 2016132796 A1 WO2016132796 A1 WO 2016132796A1 JP 2016051410 W JP2016051410 W JP 2016051410W WO 2016132796 A1 WO2016132796 A1 WO 2016132796A1
Authority
WO
WIPO (PCT)
Prior art keywords
power consumption
days
date
consumer
determination unit
Prior art date
Application number
PCT/JP2016/051410
Other languages
English (en)
French (fr)
Inventor
大輔 高島
耕治 工藤
仁之 矢野
泰久 東海
Original Assignee
日本電気株式会社
Necエンジニアリング株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 日本電気株式会社, Necエンジニアリング株式会社 filed Critical 日本電気株式会社
Priority to JP2016538147A priority Critical patent/JP6128624B2/ja
Priority to US15/546,881 priority patent/US10416211B2/en
Publication of WO2016132796A1 publication Critical patent/WO2016132796A1/ja

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/004Generation forecast, e.g. methods or systems for forecasting future energy generation
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R22/00Arrangements for measuring time integral of electric power or current, e.g. electricity meters
    • G01R22/06Arrangements for measuring time integral of electric power or current, e.g. electricity meters by electronic methods
    • G01R22/061Details of electronic electricity meters
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R22/00Arrangements for measuring time integral of electric power or current, e.g. electricity meters
    • G01R22/06Arrangements for measuring time integral of electric power or current, e.g. electricity meters by electronic methods
    • G01R22/061Details of electronic electricity meters
    • G01R22/063Details of electronic electricity meters related to remote communication
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R22/00Arrangements for measuring time integral of electric power or current, e.g. electricity meters
    • G01R22/06Arrangements for measuring time integral of electric power or current, e.g. electricity meters by electronic methods
    • G01R22/10Arrangements for measuring time integral of electric power or current, e.g. electricity meters by electronic methods using digital techniques
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01WMETEOROLOGY
    • G01W1/00Meteorology
    • G01W1/10Devices for predicting weather conditions
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/04Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2203/00Indexing scheme relating to details of circuit arrangements for AC mains or AC distribution networks
    • H02J2203/20Simulating, e g planning, reliability check, modelling or computer assisted design [CAD]
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2310/00The network for supplying or distributing electric power characterised by its spatial reach or by the load
    • H02J2310/10The network having a local or delimited stationary reach
    • H02J2310/12The local stationary network supplying a household or a building
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/12Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load
    • H02J3/14Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load by switching loads on to, or off from, network, e.g. progressively balanced loading
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B70/00Technologies for an efficient end-user side electric power management and consumption
    • Y02B70/30Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
    • Y02B70/3225Demand response systems, e.g. load shedding, peak shaving
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems
    • Y04S20/222Demand response systems, e.g. load shedding, peak shaving
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S40/00Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them
    • Y04S40/20Information technology specific aspects, e.g. CAD, simulation, modelling, system security

Definitions

  • the present invention relates to a power consumption estimation device, a power consumption estimation method, and a program.
  • Patent Document 1 describes a demand response (hereinafter referred to as “DR”) that encourages consumers to adjust power demand as a technique for adjusting power demand to balance power demand and supply.
  • DR demand response
  • an incentive is given to a consumer who changes power demand (power consumption) according to a DR event (for example, a peak cut event).
  • Whether or not the customer has changed the power demand (power consumption) according to the DR event is determined based on the difference between the consumer's actual power consumption and the customer's baseline during the DR event execution time period. Is done.
  • the consumer's baseline is an estimated value of the consumer's power consumption when no DR event has occurred.
  • Patent Document 1 describes a baseline determination method that uses the maximum power consumption at the power suppression target time (DR event execution time zone) in the past several days as the baseline of the consumer.
  • Non-Patent Document 1 describes a baseline determination method (High X) in which the average value of the top X power consumptions among the power consumptions in the DR event execution time period in the past Y days is estimated as a consumer baseline. of Y method).
  • An object of the present invention is to provide a power consumption estimation device, a power consumption estimation method, and a program that can solve the above-described problems.
  • the power consumption estimation apparatus of the present invention uses a reception unit that receives a customer's power consumption on a plurality of past days, and uses a power consumption on a matching date within a predetermined range from a reference value among the plurality of days. And a determination unit for determining an estimated value of power consumption of the consumer.
  • the power consumption estimation method of the present invention receives a consumer's power consumption on a plurality of past days, and uses the power consumption on a matching date within a predetermined range from a reference value among the plurality of days, Determine an estimate of consumer power consumption.
  • the program of the present invention uses a reception procedure for receiving power consumption of a customer on a plurality of past days and a power consumption on a matching date within a predetermined range from a reference value among the plurality of days. And a determination procedure for determining an estimated value of power consumption of the consumer.
  • FIG. 1 is a diagram showing a control device A according to the first embodiment of the present invention.
  • FIG. 2 is a flowchart for explaining the operation of the first embodiment.
  • FIG. 3 is a diagram for explaining an example of step S202.
  • FIG. 4 is a diagram showing a control device B according to the second embodiment of the present invention.
  • FIG. 5 is a flowchart for explaining the operation of the second embodiment.
  • FIG. 6 is a diagram for explaining an example of step S503.
  • FIG. 7 is a diagram illustrating an example of the reception unit B1.
  • FIG. 8 is a diagram illustrating a control device C according to the third embodiment.
  • FIG. 9 is a flowchart for explaining the operation of the third embodiment.
  • FIG. 1 is a diagram showing a control device A according to the first embodiment of the present invention.
  • the control device A determines an estimated value (hereinafter referred to as “baseline”) of the consumer's power consumption on the day of the DR (demand response) event (for example, peak cut event).
  • the DR event is not limited to the peak cut event and can be changed as appropriate.
  • the DR event may be, for example, a GF (governor-free) event or an LFC (load frequency control) event.
  • FIG. 1 is a diagram showing a control device A according to the first embodiment of the present invention.
  • the control device A includes a receiving unit A1 and a determining unit A2.
  • the receiving unit A1 receives the power consumption of the consumer on a plurality of past days (hereinafter simply referred to as “a plurality of days”).
  • the consumer is, for example, each household or building.
  • the power consumption of the customer for the past 5 days is used as the power consumption of the customer for a plurality of days.
  • the power consumption of the customer on a plurality of days is not limited to the power consumption of the customer for the past five days, but may be the power consumption of the customer on the past two or more days.
  • the plurality of days do not include the implementation date of the DR event that prompts the consumer to adjust the power consumption.
  • a plurality of days are used to determine the baseline of the DR event implementation date, so that the determination of the baseline does not affect the result of the DR event.
  • a plurality of days are also weekdays
  • a plurality of days are also holidays. This is because the consumer's power consumption trend is generally different between weekdays and holidays, so the day of power consumption having the same tendency as the DR event implementation date is selected.
  • the reception unit A1 receives the power consumption of the consumer on a plurality of days from a measuring instrument (for example, a smart meter) that measures the power consumption of the consumer.
  • a measuring instrument for example, a smart meter
  • the receiving unit A1 receives a plurality of items from the management device. You may receive the power consumption of the consumer of the day.
  • the management device may store the power consumption by time for each measuring instrument (for example, smart meter), or may store the power consumption by time for each consumer acquired from the power company. In the present embodiment, it is assumed that the receiving unit A1 receives the power consumption of the consumer on multiple days from the management device.
  • zone is used as a power consumption of the consumer of several days.
  • the power consumption of the consumer for every hour shall be used as the power consumption of the consumer for a plurality of days.
  • the length of the time zone is not limited to 1 hour and can be changed as appropriate.
  • the determination unit A2 determines a baseline (estimated value of consumer's power consumption) using a power consumption amount on a matching day within a predetermined range from a reference value among a plurality of days. In the present embodiment, the determination unit A2 determines the baseline using the power consumption within the specific range ⁇ P from the maximum power consumption among the power consumptions of the consumers on a plurality of days.
  • the maximum power consumption among the power consumptions of consumers on a plurality of days is an example of a reference value.
  • the specific range ⁇ P is an example of a predetermined range.
  • the power consumption of consumers on a plurality of days is an example of a situation value representing the situation on a plurality of days.
  • FIG. 2 is a flowchart for explaining the operation of the present embodiment.
  • Receiving part A1 receives the power consumption of the consumer according to the time zone of a plurality of days from management equipment (Step S201). For example, the receiving unit A1 requests the power consumption of a customer for each time zone of a plurality of days from the management device, and the customer of each time zone of a plurality of days transmitted from the management device in response to the request. Receive power consumption. The receiving unit A1 may receive the power consumption of the consumer for each time zone of a plurality of days that the management device spontaneously transmits. The receiving unit A1 executes Step S201 at a predetermined time (for example, 17:00) on the day before the DR event implementation date.
  • a predetermined time for example, 17:00
  • receiving part A1 outputs the power consumption of the consumer according to the time zone of several days to determination part A2.
  • the determination unit A2 receives the power consumption of the consumers for each time zone on a plurality of days. Subsequently, the determination unit A2 uses the power consumption within the specific range ⁇ P from the maximum power consumption among the power consumptions of the consumers on a plurality of days, and performs the DR event implementation time on the DR event implementation date.
  • a baseline of the band is determined (step S202).
  • FIG. 3 is a diagram for explaining an example of step S202.
  • five days from 5 days before to 1 day before the DR event implementation date are used as a plurality of days. Assume that no DR event was held during these 5 days.
  • the DR event implementation time zone is a time zone from 11:00 to 14:00.
  • FIG. 3 shows the power consumption per hour in the DR implementation time period (11:00 to 14:00) of each day from 5 days before to 1 day before the DR event implementation date.
  • the determination unit A2 determines the maximum power consumption for each hour within the DR event implementation time period from the power consumption of 5 days from 5 days before to 1 day before the DR event implementation date. .
  • FIG. 3 shows the power consumption per hour in the DR implementation time period (11:00 to 14:00) of each day from 5 days before to 1 day before the DR event implementation date.
  • the determination unit A2 determines the maximum power consumption for each hour within the DR event implementation time period from the power consumption of 5 days from 5 days before to 1 day before the
  • the determination unit A2 determines the power consumption from 11:00 to 12:00 five days ago in this time zone (11) for 1 hour from 11:00 to 12:00 within the DR event implementation time zone. It is determined as the maximum power consumption at time to 12:00. In addition, the determination unit A2 determines the power consumption of 12:00 to 13:00 two days ago for this hour (12:00 to 13:00) for 1 hour from 12:00 to 13:00 within the DR event implementation time zone. Determined as maximum power consumption. In addition, the determination unit A2 determines the power consumption amount from 13:00 to 14:00 three days ago in this time zone (13:00 to 14:00) for 1 hour from 13:00 to 14:00 in the DR event implementation time zone. Determined as maximum power consumption.
  • the determination unit A2 calculates the average of the power consumption within a specific range ⁇ P (for example, 600 kWh) from the maximum power consumption in the hour for each hour in the DR event implementation time period. Determine as baseline.
  • ⁇ P for example, 600 kWh
  • the determination unit A2 performs the power consumption from 11:00 to 12:00 five days ago and from 11:00 to 12:00 three days ago for 11:00 to 12:00 within the DR event implementation time zone.
  • the average with the power consumption is determined as a baseline from 11:00 to 12:00 within the DR event implementation time zone. Note that the compliance dates for 11:00 to 12:00 within the DR event implementation period are 5 days and 3 days ago.
  • the decision unit A2 calculates the average of the power consumption from 12:00 to 13:00 two days ago and the power consumption from 12:00 to 13:00 five days ago for 12:00 to 13:00 within the DR event implementation time zone. Is determined as a baseline from 12:00 to 13:00 within the DR event implementation time period.
  • the conformity date for 12:00 to 13:00 within the DR event implementation time zone is 2 days ago and 5 days ago.
  • the determination unit A2 consumes power from 13:00 to 14:00 three days ago and from 13:00 to 14:00 four days ago and two days ago. Is determined as a baseline from 13:00 to 14:00 within the DR event implementation time period. Note that the compliance dates for 13:00 to 14:00 within the DR event implementation time are 3 days and 4 days ago.
  • the determination unit A2 outputs the baseline of the DR event implementation time zone on the DR event implementation date. For example, when the control device A is on the power company side, aggregator side, or PPS (Power Producer and Supplier: specific scale electric power company) side, the determination unit A2 sends the DR event implementation time to the consumer on the DR event implementation date. Outputs the band baseline. Further, when the control device A is on the customer side, the determination unit A2 outputs the baseline of the DR event implementation time zone on the DR event implementation date to the power company side, the aggregator side, or the PPS side. The receiving unit A1 and the determining unit A2 perform the above-described operation for each customer.
  • PPS Power Producer and Supplier: specific scale electric power company
  • receiving part A1 receives the power consumption of the consumer of several days.
  • the determination unit A2 determines the baseline using the power consumption within the specific range ⁇ P from the maximum power consumption among the power consumptions of the consumers on a plurality of days. For this reason, it becomes possible to determine a baseline using the power consumption of the day whose situation (power consumption) is similar to each other. Further, it becomes possible to determine the baseline without using the power consumption on the day when the situation is not similar. Therefore, it becomes possible to determine a baseline having high reliability.
  • the baseline is always determined using the maximum power consumption.
  • the baseline determined by the baseline determination method of the present embodiment corresponds to the peak power consumption.
  • a system that triggers a DR event during a power peak needs to determine a baseline at the peak. Therefore, this embodiment is compatible with a system that triggers a DR event at the time of power peak.
  • the power consumption of a plurality of days is the power consumption by time zone.
  • the determination unit A2 determines a baseline for each time zone by using the power consumption of that time zone on the matching date. For this reason, it becomes possible to determine a highly reliable baseline for each time period.
  • ⁇ Determining unit A2 determines the average value of power consumption during the time zone of the matching date as a baseline. For this reason, it becomes possible to easily determine the baseline using the power consumption of the time zone of the matching date.
  • the multiple days are non-implementation days for DR that encourage consumers to adjust their power consumption. Therefore, it becomes possible to determine the baseline without being affected by the DR event. Therefore, it becomes possible to determine a baseline having high reliability.
  • the power consumption of consumers on a plurality of days also serves as a situation value representing the situation on a plurality of days. For this reason, compared with the 2nd Embodiment mentioned later, the information content which a receiving part receives can be decreased. Moreover, since the power consumption of the consumer of several days functions also as a status value, the power consumption of the consumer of several days can be used effectively.
  • FIG. 4 is a diagram showing a control device B according to the second embodiment of the present invention.
  • the control device B includes a receiving unit B1 and a determining unit B2.
  • the receiving unit B1 receives the power consumption of consumers on a plurality of days and the temperatures on the plurality of days. It is generally known that temperature and power consumption are correlated.
  • the temperature is an example of information correlated with the power consumption.
  • the power consumption of the customer on a plurality of days received by the receiving unit B1 is the same as the power consumption of the customer on a plurality of days received by the receiving unit A1. Therefore, also in this embodiment, the power consumption of the consumer for each time zone (every hour) is used as the power consumption of the consumer on multiple days.
  • the method in which the receiving unit B1 receives the power consumption of consumers on a plurality of days is the same as the method in which the receiving unit A1 receives the power consumption of consumers on a plurality of days.
  • the receiving unit B1 receives the temperatures of a plurality of days from a device that stores the temperatures of the plurality of days. For example, when the device that stores the power consumption amounts of the consumers of a plurality of days also stores the temperatures of the plurality of days, the receiving unit B1 receives the temperatures of the plurality of days from the devices.
  • the temperature is an example of a situation value that represents the situation of a plurality of days. The situation value is not limited to the temperature and can be changed as appropriate.
  • the determination unit B2 determines a baseline by using the power consumption on a day having a temperature within a predetermined range (reference date) from a reference value among a plurality of days.
  • the reference value is, for example, the predicted temperature on the date of the baseline (the date on which power consumption is estimated; in this embodiment, the DR event implementation date).
  • the predicted maximum temperature on the day that is the subject of the baseline is used as the reference value.
  • FIG. 5 is a flowchart for explaining the operation of the present embodiment.
  • Receiving part B1 receives the power consumption of the consumer according to the time zone of each day of a plurality of days from a management device (Step S501).
  • the receiving unit B1 executes Step S501 at a predetermined time (for example, 17:00) on the day before the DR event implementation date.
  • the predetermined time is not limited to 17:00 and can be changed as appropriate.
  • the receiving unit B1 receives the temperature of each day of the plurality of days from the device that stores the temperature of each day of the plurality of days (step S502).
  • the receiving unit B1 requests the temperature of each day of the plurality of days from the device storing the temperature of each day of the plurality of days, and each of the plurality of days transmitted from the device in response to the request. Receive the temperature of the day.
  • the receiving unit B1 may receive the temperature of each day of a plurality of days spontaneously transmitted by a device that stores the temperature of each day of the plurality of days. Subsequently, the receiving unit B1 outputs the consumer's power consumption for each time zone of a plurality of days and the temperatures of the plurality of days to the determining unit B2.
  • the determination unit B2 accepts the power consumption of the consumer for each time zone of a plurality of days and the temperatures of the plurality of days.
  • the determination unit B2 receives the predicted maximum temperature of the next day.
  • the determination unit B2 receives the predicted maximum temperature of the next day from a temperature prediction site that predicts the temperature of the next day.
  • the determination unit B2 requests the predicted temperature of the next day from the temperature prediction site, and receives the predicted maximum temperature of the next day transmitted from the temperature prediction site in response to the request.
  • the determination unit B2 may receive the predicted maximum temperature on the next day that the temperature prediction site spontaneously transmits. Further, the determination unit B2 may obtain the predicted maximum temperature of the next day via the reception unit B1.
  • the determining unit B2 identifies a day having a maximum temperature within a predetermined range ⁇ T as a suitable date among a plurality of days with a difference from the predicted maximum temperature on the next day. Subsequently, the determination unit A2 determines the baseline of the DR event implementation time zone on the DR event implementation date using the power consumption on the adaptation date (step S503).
  • FIG. 6 is a diagram for explaining an example of step S503.
  • 5 days from 5 days before the DR event implementation date to 1 day before are used as a plurality of days. Assume that no DR event was held during these 5 days. Further, it is assumed that the DR event implementation time zone is a time zone from 11:00 to 14:00.
  • FIG. 6A is a diagram showing the relationship between the maximum temperature of each day from 5 days before to 1 day before the DR event implementation date, the predicted maximum temperature on the DR event implementation date, and the predetermined range ⁇ T.
  • FIG. 6B is a diagram showing the power consumption per hour in the DR event implementation time zone (11:00 to 14:00) of each day from 5 days before to 1 day before the DR event implementation date.
  • the predetermined range ⁇ T is not limited to ⁇ 1.5 degrees and can be changed as appropriate.
  • three days, five days ago, two days ago, and one day ago are selected as the matching dates.
  • the determination unit B2 determines the average of the power consumption for the hour on the matching date as the baseline for the hour. In the example shown in FIG.
  • the determination unit B2 calculates the average of the power consumption from 11:00 to 12:00 for each of 5 days ago, 2 days ago, and 1 day ago as the DR event implementation time zone on the DR event implementation date. It is determined as the baseline from 11:00 to 12:00. In addition, the decision unit B2 calculates the average of power consumption at 12:00 to 13:00 for each of 5 days ago, 2 days ago, and 1 day ago as a base for 12:00 to 13:00 within the DR event implementation time zone on the DR event implementation date. Decide as a line.
  • the decision unit B2 calculates the average of the power consumption at 13:00 to 14:00 for each of 5 days ago, 2 days ago, and 1 day ago as a base for 13:00 to 14:00 within the DR event implementation time zone on the DR event implementation date. Decide as a line.
  • the determination unit B2 outputs the baseline of the DR event implementation time zone on the DR event implementation date. For example, when the control device B is on the power company side, the aggregator side, or the PPS side, the determination unit B2 outputs the baseline of the DR event implementation time zone on the DR event implementation date to the consumer. When the control device B is on the customer side, the determination unit B2 outputs a baseline of the DR event implementation time zone on the DR event implementation date to the power company side, the aggregator side, or the PPS side.
  • the receiving unit B1 and the determining unit B2 perform the above-described operation for each customer.
  • receiving part B1 receives the power consumption of the consumer of several days, and the temperature of several days.
  • the determining unit B2 determines the baseline using the power consumption amount on the matching day having the maximum temperature that is different from the predicted maximum temperature on the DR event implementation date within the predetermined range ⁇ T among the plurality of days. For this reason, it becomes possible to determine the baseline using the power consumption on the matching date that is similar to the DR event implementation date. In addition, it becomes possible to determine the baseline without using the power consumption on the day whose situation is not similar to the DR event implementation date. Therefore, it becomes possible to determine a baseline having high reliability.
  • Patent Document 1 and Non-Patent Document 1 are intended only for suppressing power consumption at peak times such as when power is tight.
  • the baseline is always determined using the maximum power consumption.
  • the baseline is determined without preferentially using the maximum power consumption.
  • this embodiment is not limited to the case of suppressing the power consumption at the peak time such as when power is tight, but for example, in a situation where a large amount of regenerative energy such as PV (Photovoltaic: solar cell) with large output fluctuation is introduced It can respond to various DR events. Therefore, versatility is high.
  • PV Photovoltaic: solar cell
  • the predicted minimum temperature or the predicted average temperature on the DR event implementation date may be used instead of the predicted maximum temperature on the DR event implementation date.
  • the determination unit B2 determines that the difference from the expected minimum temperature on the DR event implementation date among a plurality of days is within a predetermined range.
  • a baseline is determined using the power consumption on the day with the lowest temperature that is within ⁇ T (applicable date).
  • the determination unit B2 determines that the difference from the expected average temperature on the DR event implementation date among a plurality of days is within a predetermined range ⁇ T.
  • the baseline is determined using the power consumption of the day having the average temperature within (the matching date).
  • the reference value is not limited to the predicted temperature and can be changed as appropriate. Information that correlates with power consumption may be used as the reference value.
  • the receiving unit B1 may receive information on the environment such as the temperature (expected maximum temperature, predicted minimum temperature, or predicted average temperature) from a device such as a customer side, and a database in which data on weather is accumulated. You may receive from DB (for example, DB of temperature prediction site).
  • the reception unit B1 includes a power amount reception unit B1a that receives the power consumption of consumers on a plurality of days, and a temperature reception unit B1b that receives a plurality of days of temperature. Also good.
  • the power amount reception unit B1a is an example of a first reception unit.
  • the temperature receiving unit B1b is an example of a second receiving unit.
  • the determination unit B2 may increase the predetermined range ⁇ T when the number of matching dates is less than the second threshold (the second threshold is an integer equal to or greater than 1). For example, the determination unit B2 may change the predetermined range ⁇ T so that the number of matching dates is equal to or greater than the second threshold. Further, the second threshold value may be appropriately changed at an arbitrary timing.
  • the third embodiment of the present invention is an embodiment in which the first embodiment and the second embodiment are combined.
  • the second embodiment for example, when the predicted maximum temperature on the day of the DR event is higher than the temperature obtained by adding the predetermined range ⁇ T to the highest temperature among the temperatures from 5 days ago to 1 day ago, there is no suitable date. End up.
  • the determination unit B2 when there is no matching date, the determination unit B2 outputs an error, for example. Therefore, in the third embodiment, first, the method shown in the second embodiment is performed, and when there is no suitable date, the method shown in the second embodiment is stopped and the method shown in the first embodiment is shown. Do the technique.
  • FIG. 8 is a diagram illustrating a control device C according to the third embodiment. In FIG.
  • the control device C includes a receiving unit B1 and a determining unit C2.
  • the determining unit C2 executes the function of the determining unit B2 described in the second embodiment, and when there is no matching date, the first embodiment The function of the determining unit A2 described is executed.
  • FIG. 9 is a flowchart for explaining the operation of the present embodiment.
  • Receiving part B1 receives the power consumption of the consumer according to the time zone of each day of a plurality of days from a management device (Step S501).
  • the receiving unit B1 executes Step S501 at a predetermined time (for example, 17:00) on the day before the DR event implementation date.
  • the predetermined time is not limited to 17:00 and can be changed as appropriate.
  • the receiving unit B1 receives the temperature of each day of the plurality of days from the device that stores the temperature of each day of the plurality of days (step S502).
  • the receiving unit B1 outputs the power consumption of the customer for each time zone of a plurality of days and the temperatures of the plurality of days to the determining unit C2.
  • the determination part C2 receives the power consumption of the consumer according to the time zone of several days, and the temperature of several days.
  • the determination unit C2 receives the predicted maximum temperature of the next day.
  • the determination unit A2 receives the predicted maximum temperature of the next day from a temperature prediction site that predicts the temperature of the next day.
  • the determination unit C2 determines whether or not there is a matching day, which is a day having a maximum temperature within the predetermined range ⁇ T in the difference between the predicted maximum temperature of the next day (step S2). S901).
  • the determination unit C2 determines the baseline of the DR event implementation time zone on the DR event implementation date using the power consumption on the adaptation date (step S902).
  • the processing in step S902 is the same as the processing in step S503 shown in FIG.
  • the determination unit C2 performs the DR event using the power consumption within the specific range ⁇ P from the maximum power consumption among the power consumptions of the consumers on a plurality of days.
  • the baseline of the DR event implementation time zone for the day is determined (step S903).
  • the processing in step S903 is the same as the processing in step S202 shown in FIG.
  • the determination unit C2 outputs the baseline of the DR event implementation time zone on the DR event implementation date. For example, when the control device C is on the power company side, the aggregator side, or the PPS side, the determination unit C2 outputs the baseline of the DR event implementation time zone on the DR event implementation date to the consumer. Further, when the control device C is on the customer side, the determination unit C2 outputs the baseline of the DR event implementation time zone on the DR event implementation date to the power company side, the aggregator side, or the PPS side.
  • the receiving unit B1 and the determining unit C2 perform the above-described operation for each customer.
  • a modification of this embodiment will be described.
  • a modification of the first embodiment may be applied to a portion corresponding to the first embodiment.
  • Each determination unit may determine a baseline by the above-described method for a time zone other than the DR event implementation time zone on the day of the DR event implementation.
  • each determination unit may determine a baseline different from the DR event implementation date instead of determining the baseline of the DR event implementation date (the date of the baseline). In this case, a day that is different from the DR event implementation date is the date to be subject to the baseline.
  • each determination unit may change the baseline once determined according to the actual value of the power consumption during the time before the DR event implementation time zone on the day of the DR event implementation. For example, if the DR event implementation time zone on the day of the DR event implementation is 11:00 to 14:00 and the actual value of power consumption is smaller than the baseline at 9 to 10 on the day of the DR event implementation, Lowers the baseline of the DR event hours.
  • each determination unit accepts the actual value of the power consumption of the consumer on the DR event implementation date, and provides information corresponding to the difference between the baseline and the actual value (for example, incentive information that varies depending on the difference). It may be output. The information is output to, for example, a consumer side device.
  • each determination unit accepts the actual value of the power consumption of the customer in the DR event implementation time zone on the DR event implementation date, and information according to the difference between the baseline of the time zone and the actual value (for example, Incentive information that varies according to the difference) may be output. Also in this case, the information is output to, for example, a consumer side device.
  • control devices A, B, and C may each be realized by a computer.
  • the computer reads and executes a program recorded on a computer-readable recording medium and executes a function possessed by any of the control devices A, B, and C.
  • the recording medium is, for example, a CD-ROM (Compact Disk Read Only Memory).
  • the recording medium is not limited to the CD-ROM and can be changed as appropriate.
  • the illustrated configuration is merely an example, and the present invention is not limited to the configuration.
  • this invention was demonstrated with reference to embodiment, this invention is not limited to the said embodiment.
  • Various modifications that can be understood by those skilled in the art can be made to the configuration and details of the present invention within the scope of the present invention. This application claims the priority on the basis of Japanese Patent Application No. 2015-030220 for which it applied on February 19, 2015, and takes in those the indications of all here.

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Economics (AREA)
  • Power Engineering (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • Tourism & Hospitality (AREA)
  • Health & Medical Sciences (AREA)
  • Marketing (AREA)
  • Theoretical Computer Science (AREA)
  • General Business, Economics & Management (AREA)
  • Environmental & Geological Engineering (AREA)
  • Game Theory and Decision Science (AREA)
  • Quality & Reliability (AREA)
  • Operations Research (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Development Economics (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Atmospheric Sciences (AREA)
  • Biodiversity & Conservation Biology (AREA)
  • Ecology (AREA)
  • Environmental Sciences (AREA)
  • Supply And Distribution Of Alternating Current (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

 電力消費量推定装置は、過去の複数の日における需要家の電力消費量を受信する受信部と、複数の日のうち基準値から所定範囲内の適合日における電力消費量を用いて、需要家の電力消費の推定値を決定する決定部と、を備える。

Description

電力消費量推定装置、電力消費量推定方法およびプログラム
 本発明は、電力消費量推定装置、電力消費量推定方法およびプログラムに関する。
 特許文献1には、電力の需給バランスをとるために電力の需要を調整する技術として、需要家に電力需要の調整を働きかけるデマンドレスポンス(以下「DR」と称する。)が記載されている。
 一般的に、DRイベント(例えば、ピークカットイベント)に従って電力需要(電力消費)を変化させた需要家には、インセンティブが付与される。
 需要家がDRイベントに従って電力需要(電力消費)を変化させたか否かは、DRイベント実行時間帯における、需要家の実際の電力消費量と、需要家のベースラインと、の差に基づいて決定される。ここで、需要家のベースラインとは、DRイベントが発生していない場合における需要家の電力消費量の推定値である。
 特許文献1には、需要家のベースラインとして、過去数日間での電力抑制対象時刻(DRイベント実行時間帯)における最大使用電力を用いるベースライン決定手法が記載されている。
 非特許文献1には、過去Y日間でのDRイベント実行時間帯における電力消費量のうち、上位X個の電力消費量の平均値を需要家のベースラインとして推定するベースライン決定手法(High X of Y手法)が記載されている。
国際公開第2014/073556号
山口順之、「デマンドレスポンスにおける需要家ベースライン選定に関する北米評価事情の調査」、電力中央研究所報告、電力中央研究所、平成25年4月、p.i-iv、1-14
 特許文献1や非特許文献1に記載のベースラインの決定方法では、天候などの影響により電力使用量が他の日より大きくなる特異日があった場合に、ベースラインの設定に、その特異日の影響を受けてしまうため、適切なベースラインを設定できないという課題があった。
 本発明の目的は、上記課題を解決可能な電力消費量推定装置、電力消費量推定方法およびプログラムを提供することである。
 本発明の電力消費量推定装置は、過去の複数の日における需要家の電力消費量を受信する受信部と、前記複数の日のうち基準値から所定範囲内の適合日における電力消費量を用いて、前記需要家の電力消費の推定値を決定する決定部と、を備える。
 本発明の電力消費量推定方法は、過去の複数の日における需要家の電力消費量を受信し、前記複数の日のうち基準値から所定範囲内の適合日における電力消費量を用いて、前記需要家の電力消費の推定値を決定する。
 本発明のプログラムは、コンピュータに、過去の複数の日における需要家の電力消費量を受信する受信手順と、前記複数の日のうち基準値から所定範囲内の適合日における電力消費量を用いて、前記需要家の電力消費の推定値を決定する決定手順と、を実行させる。
 本発明によれば、高い信頼性を有する電力消費の推定値を決定することが可能になる。
図1は、本発明の第1実施形態の制御装置Aを示した図である。 図2は、第1実施形態の動作を説明するためのフローチャートである。 図3は、ステップS202の一例を説明するための図である。 図4は、本発明の第2実施形態の制御装置Bを示した図である。 図5は、第2実施形態の動作を説明するためのフローチャートである。 図6は、ステップS503の一例を説明するための図である。 図7は、受信部B1の一例を示した図である。 図8は、第3実施形態の制御装置Cを示した図である。 図9は、第3実施形態の動作を説明するためのフローチャートである。
 以下、本発明の実施形態について図面を参照して説明する。
 (第1実施形態)
 図1は、本発明の第1実施形態の制御装置Aを示した図である。
 制御装置Aは、DR(デマンドレスポンス)イベント(例えば、ピークカットイベント)実施日における需要家の電力消費の推定値(以下「ベースライン」と称する)を決定する。
 DRイベントは、ピークカットイベントに限らず適宜変更可能である。DRイベントは、例えば、GF(governor-free:ガバナフリー)イベントでもよく、LFC(load frequency control:負荷周波数制御)イベントでもよい。
 図1は、本発明の第1実施形態の制御装置Aを示した図である。
 制御装置Aは、受信部A1と決定部A2とを含む。
 受信部A1は、過去の複数の日(以下、単に「複数の日」と称する)の需要家の電力消費量を受信する。
 需要家は、例えば、各家庭やビルである。
 本実施形態では、複数の日の需要家の電力消費量として、過去の5日分の需要家の電力消費量を用いる。複数の日の需要家の電力消費量は、過去の5日分の需要家の電力消費量に限らず、過去の2日以上の日の需要家の電力消費量であればよい。
 ここで、複数の日には、需要家に電力消費量の調整を促すDRイベントの実施日は含まない。これは、複数の日はDRイベント実施日のベースラインを決定するために使用されるため、ベースラインの決定にDRイベントの結果を影響させないためである。
 また、DRイベントの実施日が平日である場合には複数の日も平日とし、DRイベントの実施日が休日である場合には複数の日も休日とする。これは、需要家の電力消費の傾向が、一般的に平日と休日で異なるため、DRイベントの実施日と同じ傾向の電力消費を行った日を選択するためである。
 受信部A1は、例えば、複数の日の需要家の電力消費量を、需要家の電力消費量を計測する計測器(例えばスマートメータ)から受信する。なお、複数の日の需要家の電力消費量を記憶している管理機器(例えば、電力会社の機器、または、需要家側の機器)がある場合、受信部A1は、その管理機器から複数の日の需要家の電力消費量を受信してもよい。管理機器は、計測器(例えばスマートメータ)ごとに時刻別の電力消費量を記憶してもよく、電力会社から取得した需要家ごとに時刻別の電力消費量を記憶してもよい。
 本実施形態では、受信部A1は、管理機器から複数の日の需要家の電力消費量を受信するものとする。
 また、本実施形態では、複数の日の需要家の電力消費量として、時間帯別の需要家の電力消費量を用いる。以下では、複数の日の需要家の電力消費量として、1時間ごとの需要家の電力消費量を用いるものとする。なお、時間帯の長さは1時間に限らず適宜変更可能である。
 決定部A2は、複数の日のうち、基準値から所定範囲内の適合日における電力消費量を用いてベースライン(需要家の電力消費の推定値)を決定する。
 本実施形態では、決定部A2は、複数の日の需要家の電力消費量のうち、その中の最大電力消費量から特定範囲ΔP内の電力消費量を用いて、ベースラインを決定する。
 複数の日の需要家の電力消費量の中の最大電力消費量は、基準値の一例である。特定範囲ΔPは、所定範囲の一例である。複数の日の需要家の電力消費量は、複数の日の状況を表す状況値の一例である。
 次に、本実施形態の動作を説明する。
 図2は、本実施形態の動作を説明するためのフローチャートである。
 受信部A1は、管理機器から、複数の日の時間帯別の需要家の電力消費量を受信する(ステップS201)。例えば、受信部A1は、管理機器に複数の日の時間帯別の需要家の電力消費量を要求し、その要求に応じて管理機器から送信された複数の日の時間帯別の需要家の電力消費量を受信する。受信部A1は、管理機器が自発的に送信する複数の日の時間帯別の需要家の電力消費量を受信してもよい。
 受信部A1は、DRイベント実施日の前日の所定時刻(例えば、17時)にステップS201を実行する。ここで、所定時刻は17時に限らず適宜変更可能である。
 続いて、受信部A1は、複数の日の時間帯別の需要家の電力消費量を決定部A2に出力する。
 決定部A2は、複数の日の時間帯別の需要家の電力消費量を受け付ける。
 続いて、決定部A2は、複数の日の需要家の電力消費量のうち、その中の最大電力消費量から特定範囲ΔP内の電力消費量を用いて、DRイベント実施日におけるDRイベント実施時間帯のベースラインを決定する(ステップS202)。
 図3は、ステップS202の一例を説明するための図である。
 図3では、複数の日として、DRイベント実施日の5日前から1日前までの5日を用いている。この5日の間、DRイベントは実施されなかったとする。また、DRイベント実施時間帯は11時~14時までの時間帯とする。
 図3では、DRイベント実施日の5日前から1日前までの各日のDR実施時間帯(11時~14時)における1時間ごとの消費電力量が示されている。
 決定部A2は、DRイベント実施日の5日前から1日前までの5日の電力消費量の中から、DRイベント実施時間帯内の1時間ごとに、その時間帯における最大電力消費量を決定する。
 図3に示した例では、決定部A2は、DRイベント実施時間帯内の11時~12時の1時間については、5日前の11時~12時の電力消費量を、この時間帯(11時~12時)における最大電力消費量として決定する。
 また、決定部A2は、DRイベント実施時間帯内の12時~13時の1時間については、2日前の12時~13時の電力消費量を、この時間帯(12時~13時)における最大電力消費量として決定する。
 また、決定部A2は、DRイベント実施時間帯内の13時~14時の1時間については、3日前の13時~14時の電力消費量を、この時間帯(13時~14時)における最大電力消費量として決定する。
 続いて、決定部A2は、DRイベント実施時間帯内の1時間ごとに、その時間帯における最大電力消費量から特定範囲ΔP(例えば600kWh)内である電力消費量の平均を、その1時間のベースラインとして決定する。
 図3に示した例では、決定部A2は、DRイベント実施時間帯内の11時~12時については、5日前の11時~12時の電力消費量と3日前の11時~12時の電力消費量との平均を、DRイベント実施時間帯内の11時~12時のベースラインとして決定する。なお、DRイベント実施時間帯内の11時~12時についての適合日は、5日前と3日前である。
 また、決定部A2は、DRイベント実施時間帯内の12時~13時については、2日前の12時~13時の電力消費量と5日前の12時~13時の電力消費量との平均を、DRイベント実施時間帯内の12時~13時のベースラインとして決定する。なお、DRイベント実施時間帯内の12時~13時についての適合日は、2日前と5日前である。
 また、決定部A2は、DRイベント実施時間帯内の13時~14時については、3日前の13時~14時の電力消費量と4日前および2日前の13時~14時の電力消費量との平均を、DRイベント実施時間帯内の13時~14時のベースラインとして決定する。なお、DRイベント実施時間帯内の13時~14時についての適合日は、3日前と4日前である。
 続いて、決定部A2は、DRイベント実施日のDRイベント実施時間帯のベースラインを出力する。
 例えば、制御装置Aが、電力会社側、アグリゲータ側またはPPS(Power Producer and Supplier:特定規模電気事業者)側にある場合、決定部A2は、需要家に、DRイベント実施日のDRイベント実施時間帯のベースラインを出力する。
 また、制御装置Aが需要家側にある場合、決定部A2は、電力会社側、アグリゲータ側またはPPS側に、DRイベント実施日のDRイベント実施時間帯のベースラインを出力する。
 受信部A1と決定部A2は、上述した動作を需要家ごとに実行する。
 次に、本実施形態の効果を説明する。
 本実施形態によれば、受信部A1は、複数の日の需要家の電力消費量を受信する。決定部A2は、複数の日の需要家の電力消費量のうち、その中の最大電力消費量から特定範囲ΔP内の電力消費量を用いて、ベースラインを決定する。
 このため、互いに状況(電力消費量)が似ている日の電力消費量を用いてベースラインを決定することが可能になる。また、状況が似ていない日の電力消費量を用いることなくベースラインを決定することが可能になる。したがって、高い信頼性を有するベースラインを決定することが可能になる。
 また、本実施形態のベースライン決定手法では、必ず最大電力消費量を用いてベースラインを決定する。このため、本実施形態のベースライン決定手法で決定されたベースラインは、ピーク時の電力消費量に対応する可能性が高い。電力ピーク時にDRイベントを発動するシステムでは、ピーク時のベースラインを決定する必要がある。よって、本実施形態は、電力ピーク時にDRイベントを発動するシステムとの相性がよい。
 複数の日の電力消費量は、時間帯別の電力消費量である。決定部A2は、時間帯単位で、適合日のその時間帯の電力消費量を用いてベースラインを決定する。
 このため、時間帯ごとに、高い信頼性を有するベースラインを決定することが可能になる。
 決定部A2は、適合日の時間帯の電力消費量の平均値をベースラインとして決定する。このため、適合日の時間帯の電力消費量を用いてベースラインを容易に決定することが可能になる。
 複数の日は、需要家に電力消費量の調整を促すDRの非実施日である。
 このため、DRイベントの影響を受けずにベースラインを決定することが可能になる。よって、高い信頼性を有するベースラインを決定することが可能になる。
 本実施形態では、複数の日の需要家の電力消費量が、複数の日の状況を表す状況値を兼ねる。
 このため、後述する第2実施形態に比べて、受信部が受信する情報量を少なくできる。また、複数の日の需要家の電力消費量が状況値としても機能するので、複数の日の需要家の電力消費量を有効に使用できる。
 次に、本実施形態の変形例を説明する。
 決定部A2は、特定範囲ΔPを時間帯に応じて変更してもよい。
 また、決定部A2は、最大電力消費量から特定範囲ΔP内である電力消費量の個数(=適合日の日数)が第1閾値(第1閾値は1以上の整数である)よりも少ない場合、特定範囲ΔPを大きくしてもよい。例えば、決定部A2は、最大電力消費量から特定範囲ΔP内である電力消費量の個数(=適合日の日数)が第1閾値以上になるように特定範囲ΔPを変更してもよい。また、第1閾値は任意のタイミングで適宜変更してもよい。
 (第2実施形態)
 第1実施形態では、複数の日の状況を表す状況値として、複数の日の需要家の電力消費量を用いた。これに対して、第2実施形態では、複数の日の状況を表す状況値として、複数の日の各々の気温を用いる。
 図4は、本発明の第2実施形態の制御装置Bを示した図である。
 制御装置Bは、受信部B1と決定部B2とを含む。
 受信部B1は、複数の日の需要家の電力消費量と、複数の日の気温を受信する。なお、気温と電力消費量が相関することは、一般的に知られている。気温は、電力消費量と相関する情報の一例である。
 受信部B1が受信する複数の日の需要家の電力消費量は、受信部A1が受信する複数の日の需要家の電力消費量と同様である。よって、本実施形態でも、複数の日の需要家の電力消費量として、時間帯別(1時間ごと)の需要家の電力消費量を用いる。
 受信部B1が複数の日の需要家の電力消費量を受信する手法は、受信部A1が複数の日の需要家の電力消費量を受信する手法と同様である。
 受信部B1は、複数の日の気温を、複数の日の気温を記憶している機器から受信する。例えば、複数の日の需要家の電力消費量を記憶している機器が、複数の日の気温も記憶している場合、受信部B1は、その機器から複数の日の気温を受信する。
 気温は、複数の日の状況を表す状況値の一例である。状況値は、気温に限らず適宜変更可能である。
 決定部B2は、複数の日のうち基準値から所定範囲内の気温を有する日(適合日)の電力消費量を用いて、ベースラインを決定する。
 基準値は、例えば、ベースラインの対象となる日(電力消費が推定される日;本実施形態では、DRイベント実施日)の予想気温である。本実施形態では、基準値として、ベースラインの対象となる日の予想最高気温を用いる。
 次に、本実施形態の動作を説明する。
 図5は、本実施形態の動作を説明するためのフローチャートである。
 受信部B1は、管理機器から、複数の日の各日の時間帯別の需要家の電力消費量を受信する(ステップS501)。受信部B1は、DRイベント実施日の前日の所定時刻(例えば、17時)に、ステップS501を実行する。所定時刻は17時に限らず適宜変更可能である。
 続いて、受信部B1は、複数の日の各日の気温を記憶している機器から、複数の日の各日の気温を受信する(ステップS502)。例えば、受信部B1は、複数の日の各日の気温を記憶している機器に複数の日の各日の気温を要求し、その要求に応じて該機器から送信された複数の日の各日の気温を受信する。受信部B1は、複数の日の各日の気温を記憶している機器が自発的に送信する複数の日の各日の気温を受信してもよい。
 続いて、受信部B1は、複数の日の時間帯別の需要家の電力消費量と、複数の日の気温を、決定部B2に出力する。
 決定部B2は、複数の日の時間帯別の需要家の電力消費量と複数の日の気温とを受け付ける。
 続いて、決定部B2は、翌日の予想最高気温を受信する。例えば、決定部B2は、翌日の気温を予測する気温予測サイトから翌日の予想最高気温を受信する。例えば、決定部B2は、気温予測サイトに翌日の予想最高気温を要求し、その要求に応じて気温予測サイトから送信された翌日の予想最高気温を受信する。決定部B2は、気温予測サイトが自発的に送信する翌日の予想最高気温を受信してもよい。また、決定部B2は、受信部B1を介して翌日の予想最高気温を入手してもよい。
 続いて、決定部B2は、複数の日のうち、翌日の予想最高気温との差が所定範囲ΔT内の最高気温を有する日を、適合日として特定する。
 続いて、決定部A2は、適合日の電力消費量を用いて、DRイベント実施日におけるDRイベント実施時間帯のベースラインを決定する(ステップS503)。
 図6は、ステップS503の一例を説明するための図である。
 図6では、複数の日として、DRイベント実施日の5日前から1日前までの5日を用いている。この5日の間、DRイベントは実施されなかったとする。また、DRイベント実施時間帯は11時~14時までの時間帯であるとする。
 図6(a)は、DRイベント実施日の5日前から1日前までの各日の最高気温と、DRイベント実施日の予想最高気温と、所定範囲ΔTと、の関係を示した図である。
 図6(b)は、DRイベント実施日の5日前から1日前までの各日のDRイベント実施時間帯(11時~14時)での1時間ごとの消費電力量を示した図である。
 決定部B2は、DRイベント実施日の5日前から1日前までの5日の中から、DRイベント実施日の予想最高気温との差が所定範囲ΔT(例えば、ΔT=±1.5度)内である最高気温を有する日を、適合日として選択する。所定範囲ΔTは±1.5度に限らず適宜変更可能である。
 図6(a)に示した例では、5日前と2日前と1日前との3日が、適合日として選択される。
 続いて、決定部B2は、DRイベント実施時間帯内の1時間ごとに、適合日のその1時間の電力消費量の平均をその1時間のベースラインとして決定する。
 図6(b)に示した例では、決定部B2は、5日前と2日前と1日前の各々の11時~12時の電力消費量の平均を、DRイベント実施日のDRイベント実施時間帯内の11時~12時のベースラインとして決定する。
 また、決定部B2は、5日前と2日前と1日前の各々の12時~13時の電力消費量の平均を、DRイベント実施日のDRイベント実施時間帯内の12時~13時のベースラインとして決定する。
 また、決定部B2は、5日前と2日前と1日前の各々の13時~14時の電力消費量の平均を、DRイベント実施日のDRイベント実施時間帯内の13時~14時のベースラインとして決定する。
 続いて、決定部B2は、DRイベント実施日のDRイベント実施時間帯のベースラインを出力する。
 例えば、制御装置Bが、電力会社側、アグリゲータ側またはPPS側にある場合、決定部B2は、需要家に、DRイベント実施日のDRイベント実施時間帯のベースラインを出力する。
 また、制御装置Bが需要家側にある場合、決定部B2は、電力会社側、アグリゲータ側またはPPS側に、DRイベント実施日のDRイベント実施時間帯のベースラインを出力する。
 受信部B1と決定部B2は、上述した動作を需要家ごとに実行する。
 次に、本実施形態の効果を説明する。
 本実施形態では、受信部B1は、複数の日の需要家の電力消費量と、複数の日の気温と、を受信する。決定部B2は、複数の日のうちDRイベント実施日の予想最高気温との差が所定範囲ΔT内である最高気温を有する適合日の電力消費量を用いてベースラインを決定する。
 このため、DRイベント実施日と状況が似ている適合日の電力消費量を用いてベースラインを決定することが可能になる。また、DRイベント実施日と状況が似ていない日の電力消費量を用いることなくベースラインを決定することが可能になる。したがって、高い信頼性を有するベースラインを決定することが可能になる。
 また、特許文献1や非特許文献1に記載された技術は、電力逼迫時などのピーク時の電力消費量を抑制させることのみを対象としている。このため、特許文献1に記載のベースライン決定手法や非特許文献1に記載のベースライン決定手法では、必ず最大電力消費量を用いてベースラインを決定している。
 これに対して、本実施形態のベースライン決定手法では、最大電力消費量を優先的に使用することなくベースラインを決定する。このため、本実施形態は、電力逼迫時などのピーク時の電力消費量を抑制させる場合に限らず、例えば出力変動が大きいPV(Photovoltaic:太陽電池)などの再生エネルギーを多く導入した状況下での様々なDRイベントに対応できる。そのため、汎用性が高い。
 次に、本実施形態の変形例を説明する。
 基準値として、DRイベント実施日の予想最高気温の代わりに、DRイベント実施日の予想最低気温または予想平均気温を用いてもよい。
 DRイベント実施日の予想最高気温の代わりに、DRイベント実施日の予想最低気温が用いられた場合、決定部B2は、複数の日のうちDRイベント実施日の予想最低気温との差が所定範囲ΔT内である最低気温を有する日(適合日)の電力消費量を用いてベースラインを決定する。
 DRイベント実施日の予想最高気温の代わりに、DRイベント実施日の予想平均気温を用いた場合、決定部B2は、複数の日のうちDRイベント実施日の予想平均気温との差が所定範囲ΔT内である平均気温を有する日(適合日)の電力消費量を用いてベースラインを決定する。
 なお、基準値は、予想気温に限らず適宜変更可能である。基準値としては、電力消費量と相関する情報を用いればよい。
 また、受信部B1は、気温(予想最高気温や予想最低気温や予想平均気温)などの環境に関する情報を、需要家側などの機器から受信してもよく、気象に関するデータが蓄積されているデータベースDB(例えば気温予測サイトのDB)などから受信してもよい。
 受信部B1は、図7に示したように、複数の日の需要家の電力消費量を受信する電力量受信部B1aと、複数の日の気温を受信する気温受信部B1bと、を備えてもよい。電力量受信部B1aは、第1受信部の一例ある。気温受信部B1bは、第2受信部の一例である。
 決定部B2は、適合日の数が第2閾値(第2閾値は1以上の整数である)よりも少ない場合、所定範囲ΔTを大きくしてもよい。例えば、決定部B2は、適合日の数が第2閾値以上になるように所定範囲ΔTを変更してもよい。また、第2閾値は任意のタイミングで適宜変更してもよい。
 (第3実施形態)
 本発明の第3実施形態は、第1実施形態と第2実施形態とを組み合わせた実施形態である。
 第2実施形態では、例えば、DRイベント実施日の予想最高気温が、5日前から1日前の気温の中の最高気温に所定範囲ΔTを加算した気温よりも高い場合、適合日が存在しなくなってしまう。ここで、第2実施形態について補足すると、適合日が存在しない場合、決定部B2は、例えばエラーを出力する。
 そこで、第3実施形態は、まず、第2実施形態に示した手法を行い、その際に適合日が存在しない場合、第2実施形態に示した手法を止めて、第1実施形態に示した手法を行う。
 図8は、第3実施形態の制御装置Cを示した図である。図8において、図4に示したものと同一構成のものには同一符号を付与している。以下、第3実施形態について、図4に示した構成と異なる点を中心に説明する。
 制御装置Cは、受信部B1と決定部C2とを含む
 決定部C2は、第2実施形態で説明した決定部B2が有する機能を実行し、適合日が存在しない場合は、第1実施形態で説明した決定部A2が有する機能を実行する。
 次に、本実施形態の動作を説明する。
 図9は、本実施形態の動作を説明するためのフローチャートである。図9において、図5に示した処理と同様の処理には同一符号を付してある。
 受信部B1は、管理機器から、複数の日の各日の時間帯別の需要家の電力消費量を受信する(ステップS501)。受信部B1は、DRイベント実施日の前日の所定時刻(例えば、17時)に、ステップS501を実行する。所定時刻は17時に限らず適宜変更可能である。
 続いて、受信部B1は、複数の日の各日の気温を記憶している機器から、複数の日の各日の気温を受信する(ステップS502)。
 続いて、受信部B1は、複数の日の時間帯別の需要家の電力消費量と、複数の日の気温を、決定部C2に出力する。
 決定部C2は、複数の日の時間帯別の需要家の電力消費量と複数の日の気温とを受け付ける。
 続いて、決定部C2は、翌日の予想最高気温を受信する。例えば、決定部A2は、翌日の気温を予測する気温予測サイトから翌日の予想最高気温を受信する。
 続いて、決定部C2は、複数の日の中に、翌日の予想最高気温との差が所定範囲ΔT内の最高気温を有する日である適合日が、存在するか否かを判定する(ステップS901)。
 適合日が存在する場合、決定部C2は、適合日の電力消費量を用いて、DRイベント実施日におけるDRイベント実施時間帯のベースラインを決定する(ステップS902)。
 ステップS902での処理は、図5に示したステップS503での処理と同様である。
 一方、適合日が存在しない場合、決定部C2は、複数の日の需要家の電力消費量のうち、その中の最大電力消費量から特定範囲ΔP内の電力消費量を用いて、DRイベント実施日におけるDRイベント実施時間帯のベースラインを決定する(ステップS903)。
 ステップS903での処理は、図2に示したステップS202での処理と同様である。
 ステップS902またはS903に続いて、決定部C2は、DRイベント実施日のDRイベント実施時間帯のベースラインを出力する。
 例えば、制御装置Cが、電力会社側、アグリゲータ側またはPPS側にある場合、決定部C2は、需要家に、DRイベント実施日のDRイベント実施時間帯のベースラインを出力する。
 また、制御装置Cが需要家側にある場合、決定部C2は、電力会社側、アグリゲータ側またはPPS側に、DRイベント実施日のDRイベント実施時間帯のベースラインを出力する。
 受信部B1と決定部C2は、上述した動作を需要家ごとに実行する。
 次に、本実施形態の効果を説明する。
 本実施形態によれば、適合日が存在しない場合でも、高い信頼性を有するベースラインを決定することが可能になる。
 次に、本実施形態の変形例を説明する。
 本実施形態のうち、第1実施形態に対応する部分については、第1実施形態の変形例を適用してもよい。また、本実施形態のうち、第2実施形態に対応する部分については、第2実施形態の変形例を適用してもよい。
 次に、各実施形態に共通する変形例を説明する。
 各決定部は、DRイベント実施当日におけるDRイベント実施時間帯以外の時間帯についても、上述した手法でベースラインを決定してもよい。
 また、各決定部は、DRイベント実施当日(ベースラインの対象となる日)のベースラインを決定する代わりに、DRイベント実施日と異なる日のベースラインを決定してもよい。この場合、DRイベント実施日と異なる日が、ベースラインの対象となる日となる。
 さらに、各決定部は、一度決定したベースラインを、DRイベント実施当日におけるDRイベント実施時間帯の前の時間の電力消費量の実績値に応じて変更してもよい。
 例えば、DRイベント実施当日のDRイベント実施時間帯が11時~14時であり、DRイベント実施当日の9時~10時において、電力消費量の実績値がベースラインよりも小さい場合、各決定部は、DRイベント実施時間帯のベースラインを下げる。
 また、各決定部は、DRイベント実施日における需要家の電力消費量の実績値を受け付け、ベースラインとその実績値との差に応じた情報(例えば、差に応じて変動するインセンティブ情報)を出力してもよい。その情報は、例えば、需要家側の機器に出力される。
 また、各決定部は、DRイベント実施日におけるDRイベント実施時間帯の需要家の電力消費量の実績値を受け付け、その時間帯のベースラインとその実績値との差に応じた情報(例えば、差に応じて変動するインセンティブ情報)を出力してもよい。この場合も、その情報は、例えば、需要家側の機器に出力される。
 上記実施形態において、制御装置A、BおよびCは、それぞれコンピュータによって実現してもよい。この場合、コンピュータは、コンピュータで読み取り可能な記録媒体に記録されたプログラムを読込み実行して、制御装置A、BおよびCのいずれか有する機能を実行する。記録媒体は、例えば、CD-ROM(Compact Disk Read Only Memory)である。記録媒体は、CD-ROMに限らず適宜変更可能である。
 以上説明した各実施形態において、図示した構成は単なる一例であって、本発明はその構成に限定されるものではない。
 また、本願発明について実施形態を参照して説明したが、本願発明は上記実施形態に限定されものではない。本願発明の構成や詳細は本願発明のスコープ内で当業者が理解し得る様々な変更が可能である。
 この出願は、2015年 2月19日に出願された特願2015-030220号を基礎とする優先権を主張し、その開示の全てをここに取り込む。
 A、B、C  制御装置
 A1、B1  受信部
 A2、B2、C2  決定部
 B1a  電力消費量受信部
 B1b  気温受信部

Claims (22)

  1.  過去の複数の日における需要家の電力消費量を受信する受信部と、
     前記複数の日のうち基準値から所定範囲内の適合日における電力消費量を用いて、前記需要家の電力消費の推定値を決定する決定部と、を備える電力消費量推定装置。
  2.  前記複数の日の電力消費量は、時間帯別の電力消費量であり、
     前記決定部は、前記適合日における前記時間帯ごとの電力消費量を用いて当該時間帯における前記電力消費の推定値を決定する請求項1に記載の電力消費量推定装置。
  3.  前記決定部は、前記適合日の前記時間帯における電力消費量の平均値を前記時間帯における電力消費の推定値として決定する請求項2に記載の電力消費量推定装置。
  4.  前記基準値は、前記複数の日における前記時間帯ごとの電力消費量の中の最大電力消費量である請求項2または3に記載の電力消費量推定装置。
  5.  前記決定部は、前記複数の日における前記時間帯ごとの電力消費量が前記基準値の所定の範囲内である日を前記適合日とする請求項4に記載の電力消費量推定装置。
  6.  前記時間帯ごとに設定された前記適合日における電力消費量の平均値を電力消費の推定値として決定する請求項5に記載に電力消費量推定装置。
  7.  前記基準値は、電力消費の推定の対象となる日の予想気温である請求項1に記載の電力消費量推定装置。
  8.  前記決定部は、前記複数の日における気温が前記基準値の所定の範囲内である日を前記適合日とする請求項7に記載の電力消費量推定装置。
  9.  前記適合日における時間帯ごとの電力消費量の平均値を電力消費の推定値として決定する請求項8に記載に電力消費量推定装置。
  10.  前記受信部は、前記複数の日の気温を受信する請求項8または9に記載の電力消費量推定装置。
  11.  前記受信部は、前記複数の日の需要家の電力消費量を受信する第1受信部と、前記複数の日の気温を受信する第2受信部と、を備える請求項10に記載の電力消費量推定装置。
  12.  前記予想気温は、予想最高気温または予想最低気温または予想平均気温である請求項7から11のいずれか1項に記載の電力消費量推定装置。
  13.  前記決定部は、前記適合日が存在しない場合には、前記複数の日における電力消費量の中の最大電力消費量から特定範囲内の前記電力消費量を用いて、電力消費の推定値を決定する請求項7から12のいずれか1項に記載の電力消費量推定装置。
  14.  前記決定部は、前記所定範囲を時間帯に応じて変更する請求項1から13のいずれか1項に記載の電力消費量推定装置。
  15.  前記決定部は、前記需要家ごとに前記電力消費の推定値を出力する請求項1から14のいずれか1項に記載の電力消費量推定装置。
  16.  前記決定部は、前記電力消費の推定値と、前記電力消費の推定の対象となる日における前記需要家の電力消費量の実績と、の差に応じた情報を出力する請求項1から14のいずれか1項に記載の電力消費量推定装置。
  17.  前記複数の日は、前記需要家に電力消費量の調整を促すデマンドレスポンスの非実施日である請求項1から16のいずれか1項に記載の電力消費量推定装置。
  18.  前記電力消費の推定の対象となる日が平日の場合、前記複数の日は平日である請求項1から17のいずれか1項に記載の電力消費量推定装置。
  19.  前記電力消費の推定の対象となる日が祝日の場合、前記複数の日は祝日である請求項1から18のいずれか1項に記載の電力消費量推定装置。
  20.  前記決定部は、前記適合日が所定の閾値以上となるように前記基準値からの所定の範囲を決定する請求項1から19のいずれか1項に記載の電力消費量推定装置。
  21.  過去の複数の日における需要家の電力消費量を受信し、
     前記複数の日のうち基準値から所定範囲内の適合日における電力消費量を用いて、前記需要家の電力消費の推定値を決定する電力消費量推定方法。
  22.  コンピュータに、
     過去の複数の日における需要家の電力消費量を受信する受信手順と、
     前記複数の日のうち基準値から所定範囲内の適合日における電力消費量を用いて、前記需要家の電力消費の推定値を決定する決定手順と、を実行させるためのプログラム。
     
PCT/JP2016/051410 2015-02-19 2016-01-19 電力消費量推定装置、電力消費量推定方法およびプログラム WO2016132796A1 (ja)

Priority Applications (2)

Application Number Priority Date Filing Date Title
JP2016538147A JP6128624B2 (ja) 2015-02-19 2016-01-19 電力消費量推定装置、電力消費量推定方法およびプログラム
US15/546,881 US10416211B2 (en) 2015-02-19 2016-01-19 Apparatus for estimating power consumption, method of estimating power consumption, and program

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2015-030220 2015-02-19
JP2015030220 2015-02-19

Publications (1)

Publication Number Publication Date
WO2016132796A1 true WO2016132796A1 (ja) 2016-08-25

Family

ID=56688917

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2016/051410 WO2016132796A1 (ja) 2015-02-19 2016-01-19 電力消費量推定装置、電力消費量推定方法およびプログラム

Country Status (3)

Country Link
US (1) US10416211B2 (ja)
JP (1) JP6128624B2 (ja)
WO (1) WO2016132796A1 (ja)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2018088241A (ja) * 2016-11-18 2018-06-07 パナソニック株式会社 節電制御方法、節電制御システム及びプログラム
JP2018157649A (ja) * 2017-03-16 2018-10-04 東邦瓦斯株式会社 ネガワット算出方法およびネガワット算出プログラム

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7288189B2 (ja) * 2019-05-29 2023-06-07 富士通株式会社 ジョブ電力予測プログラム、ジョブ電力予測方法、およびジョブ電力予測装置

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11346438A (ja) * 1998-06-01 1999-12-14 Fuji Electric Co Ltd 電力需要量予測方法
JP2000270473A (ja) * 1999-03-15 2000-09-29 Fuji Electric Co Ltd 電力需要量予測方法
JP2012196028A (ja) * 2011-03-16 2012-10-11 Mitsubishi Electric Corp 電力マネジメントシステム
JP2014075851A (ja) * 2012-10-02 2014-04-24 Tokyo Gas Co Ltd エネルギー消費量予測システムおよび電力消費量予測方法
JP2014131477A (ja) * 2010-06-30 2014-07-10 Sanyo Electric Co Ltd 充放電制御装置、充電池システム、及び充放電制御方法
JP2014168315A (ja) * 2013-01-30 2014-09-11 Sekisui Chem Co Ltd 地域内電力需給制御システム

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3224641B2 (ja) 1993-07-27 2001-11-05 中部電力株式会社 最大電力需要予測方法
JP2000276460A (ja) 1999-03-24 2000-10-06 Fuji Electric Co Ltd 電力需要量予測方法
JP5618501B2 (ja) 2009-07-14 2014-11-05 株式会社東芝 需要予測装置、プログラムおよび記録媒体
JP5981313B2 (ja) 2012-11-09 2016-08-31 株式会社東芝 電力抑制型蓄電蓄熱最適化装置、最適化方法及び最適化プログラム
JP6079215B2 (ja) 2012-12-21 2017-02-15 富士電機株式会社 電力需要予測装置、プログラム

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11346438A (ja) * 1998-06-01 1999-12-14 Fuji Electric Co Ltd 電力需要量予測方法
JP2000270473A (ja) * 1999-03-15 2000-09-29 Fuji Electric Co Ltd 電力需要量予測方法
JP2014131477A (ja) * 2010-06-30 2014-07-10 Sanyo Electric Co Ltd 充放電制御装置、充電池システム、及び充放電制御方法
JP2012196028A (ja) * 2011-03-16 2012-10-11 Mitsubishi Electric Corp 電力マネジメントシステム
JP2014075851A (ja) * 2012-10-02 2014-04-24 Tokyo Gas Co Ltd エネルギー消費量予測システムおよび電力消費量予測方法
JP2014168315A (ja) * 2013-01-30 2014-09-11 Sekisui Chem Co Ltd 地域内電力需給制御システム

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2018088241A (ja) * 2016-11-18 2018-06-07 パナソニック株式会社 節電制御方法、節電制御システム及びプログラム
JP2018157649A (ja) * 2017-03-16 2018-10-04 東邦瓦斯株式会社 ネガワット算出方法およびネガワット算出プログラム

Also Published As

Publication number Publication date
JP6128624B2 (ja) 2017-05-17
US20180275176A1 (en) 2018-09-27
JPWO2016132796A1 (ja) 2017-04-27
US10416211B2 (en) 2019-09-17

Similar Documents

Publication Publication Date Title
US20150371151A1 (en) Energy infrastructure sensor data rectification using regression models
JP6402731B2 (ja) 電力需給予測システム、電力需給予測方法および電力需給予測プログラム
JP5259761B2 (ja) データ変換装置、及びプログラム
JP2007020314A (ja) 電力需給予測システム
JP6128624B2 (ja) 電力消費量推定装置、電力消費量推定方法およびプログラム
US10380706B2 (en) Equipment management apparatus
JP2012205385A (ja) 予備力計算装置およびその方法、コンピュータプログラム
US9829209B2 (en) Integrated demand control method and integrated demand control device
JPWO2016158899A1 (ja) 制御装置、機器制御装置および制御システム
US10311387B2 (en) Remote energy management to control household electrical appliances based on electricity pricing
JP2017034797A (ja) ベースライン負荷推定装置及びベースライン負荷推定プログラム
JP7372727B2 (ja) 系統運用者側コンピュータ、発電事業者側コンピュータ、電力システム、制御方法及びプログラム
JP5920023B2 (ja) 情報処理装置、情報処理方法、情報処理システムおよび情報処理プログラム
JP2018165859A (ja) 予測装置、予測方法および予測プログラム
US20130173500A1 (en) Electronic power meter and method for storing data thereof
JP2019097327A (ja) 電力需要予測装置、電力需要予測方法およびプログラム
JP7366352B2 (ja) 発電制御装置、発電制御方法、発電制御プログラム及び発電システム
JP2017028897A (ja) 電力需要誘導装置、プログラム
WO2017183232A1 (ja) 制御装置、制御システム、制御方法及びプログラム
JP5818089B2 (ja) 需要電力制御装置および需要電力制御方法
WO2015050182A1 (ja) デマンド予測装置及びデマンド予測方法
JP6213166B2 (ja) 未知パラメータ推定方法、未知パラメータプログラム及び未知パラメータ推定装置
WO2019150662A1 (ja) 処理装置、処理方法及びプログラム
JP2016127622A (ja) 電力需要予測システム
JP2015006078A (ja) 電力供給管理システム

Legal Events

Date Code Title Description
ENP Entry into the national phase

Ref document number: 2016538147

Country of ref document: JP

Kind code of ref document: A

121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 16752185

Country of ref document: EP

Kind code of ref document: A1

WWE Wipo information: entry into national phase

Ref document number: 15546881

Country of ref document: US

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 16752185

Country of ref document: EP

Kind code of ref document: A1