WO2016067416A1 - 防護材設置方法及び防護材設置装置 - Google Patents

防護材設置方法及び防護材設置装置 Download PDF

Info

Publication number
WO2016067416A1
WO2016067416A1 PCT/JP2014/078930 JP2014078930W WO2016067416A1 WO 2016067416 A1 WO2016067416 A1 WO 2016067416A1 JP 2014078930 W JP2014078930 W JP 2014078930W WO 2016067416 A1 WO2016067416 A1 WO 2016067416A1
Authority
WO
WIPO (PCT)
Prior art keywords
protective material
material installation
protective
installation
linear member
Prior art date
Application number
PCT/JP2014/078930
Other languages
English (en)
French (fr)
Inventor
衛 長谷川
洋一 牧
Original Assignee
住友電気工業株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 住友電気工業株式会社 filed Critical 住友電気工業株式会社
Priority to PCT/JP2014/078930 priority Critical patent/WO2016067416A1/ja
Priority to JP2016556125A priority patent/JP6354852B2/ja
Priority to KR1020177011409A priority patent/KR102301261B1/ko
Priority to TW104116166A priority patent/TW201616752A/zh
Publication of WO2016067416A1 publication Critical patent/WO2016067416A1/ja
Priority to PH12017500779A priority patent/PH12017500779A1/en

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G9/00Installations of electric cables or lines in or on the ground or water
    • H02G9/02Installations of electric cables or lines in or on the ground or water laid directly in or on the ground, river-bed or sea-bottom; Coverings therefor, e.g. tile
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L1/00Laying or reclaiming pipes; Repairing or joining pipes on or under water
    • F16L1/12Laying or reclaiming pipes on or under water

Definitions

  • the present invention relates to a protective material installation method and a protective material installation device.
  • submarine cables have been used as infrastructure for power transmission and communication between remote islands.
  • protective material By installing protective material on the submarine cable, damage caused by contact with fishing gear or fishing rods of the fishing boat can be prevented.
  • the present invention has been made in view of the above, and an object thereof is to provide a protective material installation method capable of accurately installing a protective material on an installation provided on the seabed.
  • a protective material installation method for installing a protective material on an installation provided on the sea floor, the linear member attaching step of attaching a linear member to the protective material, A protective material attaching step for attaching the protective material to the protective material installation device, a hanging step for hanging the protective material installation device in the sea, and the protective material installation device so that the linear member is suspended from the protective material; A monitoring step of capturing an image including the linear member with an imaging device provided to monitor the sea, a descending step of lowering the protective material installation tool until the linear member reaches the seabed, and A moving step of moving the protective material installation tool so that the protective material is positioned on the installation; and lowering the protective material installation tool to install the protective material on the installation; and The protective material installation device Having a setting step removed from.
  • a protective material installation method capable of accurately installing a protective material on an installation provided on the seabed.
  • FIG. (1) which illustrates a mode that a crushing stone for protection is installed by a protection material installation method concerning an embodiment.
  • a figure (2) which illustrates a mode that a crushing stone for protection is installed with a protection material installation method concerning an embodiment.
  • FIG. (3) which illustrates a mode that the crushed stone bag for protection is installed by the protective material installation method which concerns on embodiment.
  • FIG. (4) which illustrates a mode that the crushed stone for protection is installed by the protective material installation method which concerns on embodiment.
  • FIG. (5) which illustrates a mode that the protective crushed stone bag is installed by the protective material installation method which concerns on embodiment.
  • Drawing 1 is a figure for explaining an outline of a protection material installation method concerning an embodiment.
  • the submarine cable installed on the seabed 30 by the protective material installation device 100 provided on the work boat 10 that sails on the sea surface 20.
  • a protective crushed stone bag 120 as a protective material is installed on 40.
  • the work boat 10 has a crane 11 that suspends the protective material installation device 100 in the sea.
  • the protective material installation device 100 places the protective crushed bag 120 on the submarine cable 40 over the sea surface 20. Moving.
  • the protective material installation device 100 includes a protective material installation instrument 110, a protective crushed stone bag 120, a winch 150, a chain 130, and an exploration device 140.
  • the protective material laid bag 100 is suspended from the work ship 10 and is placed on the submarine cable 40. 120 is installed. The configuration of each part of the protective material installation device 100 will be described later.
  • the submarine cable 40 is an example of an installation, for example, a cable that is laid on the seabed and used for power transmission or communication.
  • the submarine cable 40 is protected from damage due to, for example, contact with fishing gear or fishing rods of a fishing boat, etc., by installing a plurality of protective crushed stone bags 120 on top.
  • the submarine cable 40 is fixed to the seabed 30 by a protective crushed bag 120 so as not to move due to the influence of tidal currents, for example, and is protected from damage due to contact with rocks and the like.
  • FIG. 2 is a diagram illustrating a schematic configuration of the protective material installation device 100 according to the embodiment.
  • the protective material installation device 100 includes a protective material installation tool 110, a protective crushed bag 120, a chain 130, a probe 140, and a winch 150.
  • the protective material installation device 110 is, for example, a columnar member, and moves up and down in the sea when the wire 151 is wound or fed out by the winch 150 installed in the work boat 10.
  • the protective crushed stone bag 120 is detachably attached to the detachable portion 111, and is suspended in the sea together with the protective crushed stone bag 120.
  • the protective material installation instrument 110 is provided with lighting 112 that illuminates the sea and the sea floor at both ends.
  • the protective crushed stone bag is an example of a protective material, and includes a net bag body 121 and a filling material 122 wrapped in the net bag body 121.
  • the net bag body 121 is formed using, for example, a synthetic fiber and has a size of 1 m to 8 m when installed on the seabed 30.
  • the filling material 122 is made of, for example, crushed stone whose specific gravity is heavier than seawater. For example, 8t of filling material 122 is put in the net bag body 121 so that the protective crushed stone bag 120 does not move under the influence of a tidal current or the like on the seabed 30.
  • the protective crushed bag 120 can protect the submarine cable 40, the material, size, weight, and the like used for the net bag body 121 and the filling material 122 may be different from those of the present embodiment.
  • the chain 130 is an example of a linear member, and is attached to the bottom of the protective crushed stone bag 120 via a connecting member 131 so as to be suspended from the protective crushed stone bag 120 attached to the protective material installing instrument 110. Yes.
  • the chain 130 is used for confirming the distance between the protective crushed bag 120 and the seabed 30 and the positional relationship between the protective crushed bag 120 and the submarine cable 40 when the protective material installation device 110 is lowered.
  • the chain 130 has a total length of 3 m, for example, and is colored in a different color for each predetermined length (for example, 1 m). You can check the distance.
  • the connecting member 131 that connects the protective crushed stone bag 120 and the chain 130 is, for example, a polypropylene rope, and is cut when the chain 130 is entangled in the sea and is removed together with the entangled chain 130.
  • the chain 130 is attached to the protective crushed stone bag 120 via the connecting member 131, so that the chain 130 can be easily replaced or repaired in the case of entanglement.
  • the chain 130 may be provided with a sandbag or the like as a weight, for example, at the end opposite to the protective crushed stone bag 120 so that the posture in the sea is maintained.
  • the spacecraft 140 is a remotely operated unmanned spacecraft (Remotely Operated Vehicle) (ROV) that can be remotely operated by an operator on the work boat 10 and move in the sea.
  • ROV Remote Operated Vehicle
  • the spacecraft 140 is placed in a cage 142 that is connected to the protective material installation device 110 by a rope 143 so as not to be swept away by tidal currents or the like in the sea.
  • the spacecraft 140 is equipped with an underwater camera 141 as an imaging device, and moves in the sea to take an image including the protective crushed bag 120, the chain 130, the seabed 30, the seabed cable 40, and the like.
  • the operator can confirm the distance between the protective crushed bag 120 and the seabed 30 and the positional relationship between the protective crushed bag 120 and the seabed cable 40 based on an image taken by the underwater camera 141 of the spacecraft 140.
  • the winch 150 is an example of an elevating unit, and is provided on the work boat 10 to raise or lower the protective material installation device 110 in the sea by winding or unwinding the wire 151.
  • the winch 150 unwinds the protective material installation tool 110 suspended in the sea by the crane 11 of the work boat 10 with the protective crushed stone bag 120 attached thereto and lowers it to the seabed 30.
  • the winch 150 winds up the protective material installation tool 110 from which the protective crushed stone bag 120 is removed on the seabed 30 to the work ship 10 by winding the wire 151.
  • the protective material installation device 100 has the above-described configuration, and the protective material installation instrument 110 is suspended in the sea together with the protective crushed stone bag 120, and the protective crushed stone bag 120 is installed on the submarine cable 40.
  • FIG. 3 is a diagram illustrating a flowchart of the protective material installation method according to the embodiment.
  • FIG. 4A to FIG. 4E are diagrams illustrating a state in which the protective crushed stone bag 120 is installed by the protective material installation method according to the embodiment.
  • step S101 when installing the protective crushed bag 120 on the submarine cable 40, first, in step S101, the chain 130 is attached to the bottom of the protective crushed bag 120 via the connecting member 131. It is done. Next, in Step S102, the protective crushed stone bag 120 is attached to the protective material installing device 110.
  • step S103 the protective material installation tool 110 is suspended in the sea by the crane 11 of the work boat 10.
  • the protective material installation instrument 110 suspended in the sea by the crane 11 is removed from the crane 11 and suspended from the winch 150 provided in the work boat 10 in the sea as shown in FIG. 4A.
  • step S104 the underwater camera 141 of the spacecraft 140 images the sea, and the operator lowers the protective material installation device 110 while monitoring the sea using the image captured by the underwater camera 141. At this time, the operator remotely operates the exploration device 140 so that the distance between the crushed stone bag 120 for protection and the seabed 30 can be confirmed from an image taken by the underwater camera 141.
  • step S105 the protective material installation tool 110 is suspended until the chain 130 suspended from the bottom of the protective crushed stone bag 120 reaches the seabed 30. While viewing the image taken by the underwater camera 141, the operator lowers the protective material installation device 110 until the chain 130 reaches the seabed 30, as shown in FIG. 4B. The worker waits until the behavior of the protective material installation instrument 110 is stabilized in a state where the descending is temporarily stopped. Note that the worker may appropriately stop and wait until the chain 130 reaches the seabed 30 so that the behavior of the protective material installing device 110 is stabilized.
  • step S106 the protective material installation device 110 is moved so as to be positioned on the submarine cable 40. While checking the position of the chain 130 in the image photographed by the underwater camera 141, the operator moves the protective crushed bag 120 on the submarine cable 40 as shown in FIG. 4C. The work vessel 10 is operated to move the protective material installation tool 110.
  • step S107 the protective material installation device 110 is lowered, and the protective crushed stone bag 120 is removed from the protective material installation device 110 and installed on the submarine cable 40. While viewing the image taken by the underwater camera 141, the worker lowers the protective material installation tool 110 and places the protective crushed stone bag 120 on the submarine cable 40 as shown in FIG. 4D. In addition, the operator remotely operates the attaching / detaching portion 111 of the protective material installation tool 110 with the protective crushed stone bag 120 bottomed, and removes (or separates) the protective crushed stone bag 120 from the protective material installation tool 110. It is installed on the submarine cable 40.
  • step S108 the protective material installation device 110 is lifted and collected by the work boat 10.
  • the protective material installation tool 110 from which the protective crushed stone bag 120 has been removed is pulled up to the vicinity of the sea surface 20 by the winch 150 and is collected by the work boat 10 by the crane 11.
  • the installation of the protective crush bags 120 is repeatedly performed by the above-described method, and a plurality of protective crush bags 120 are installed on the submarine cable 40.
  • the submarine cable 40 is protected from damage due to, for example, contact with fishing gear, fishing rods, and the like of a fishing boat by installing a plurality of protective crushed stone bags 120 on top.
  • a plurality of protective crushed stone bags 120 on top.
  • the protective crushed stone bag 120 it is protected from damage caused by contact with rocks or the like without being washed away by, for example, a tidal current.
  • the protective material is not limited to the protective crushed stone bag 120 described above, and a plurality of block materials 161 made of concrete, for example, are connected in a mat shape by wires 162 as shown in FIG.
  • the protective mat 160 may be used.
  • the protection mat 160 has chains 130 attached thereto at two locations via connecting members 131 and is suspended from the protection material installation tool 110. Even when the protective mat 160 is used as the protective material, it is installed on the submarine cable 40 in the same manner as the protective crushed stone bag 120 by the protective material installation method shown in FIG.
  • the underwater camera 141 of the spacecraft 140 can be monitored in the sea. Further, by checking the chain 130 provided at the bottom of the protective crushed bag 120 with the underwater camera 141, the distance between the protective crushed bag 120 and the seabed 30, the distance between the protective crushed bag 120 and the submarine cable 40, and so on. The positional relationship can be easily grasped. Therefore, in the protective material installation method and the protective material installation device 100 according to the present embodiment, the protective material such as the protective crushed stone bag 120 is accurately installed on the installation such as the submarine cable 40 provided on the seabed 30. can do.

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Laying Of Electric Cables Or Lines Outside (AREA)
  • Foundations (AREA)
  • Telescopes (AREA)
  • Electric Cable Installation (AREA)

Abstract

【課題】海底に設けられている設置物上に正確に防護材を設置することが可能な防護材設置方法を提供すること。 【解決手段】海底に設けられている設置物の上に防護材を設置する防護材設置方法であって、前記防護材に線状部材を取り付ける線状部材取付工程と、前記線状部材が前記防護材から吊り下げられるように、前記防護材を防護材設置器具に取り付ける防護材取付工程と、前記防護材設置器具を海中に吊り降ろす吊り降ろし工程と、前記防護材設置器具に設けられている撮像装置で前記線状部材を含む画像を撮像して海中を監視する監視工程と、前記線状部材が海底に到達するまで前記防護材設置器具を下降させる下降工程と、前記設置物の上に前記防護材が位置するように、前記防護材設置器具を移動させる移動工程と、前記防護材設置器具を下降させて前記防護材を前記設置物の上に設置し、前記防護材を前記防護材設置器具から取り外す設置工程と、を有する防護材設置方法。

Description

防護材設置方法及び防護材設置装置
 本発明は、防護材設置方法及び防護材設置装置に関する。
 従来から、例えば離島間での送電や通信のインフラとして、海底ケーブルが用いられている。海底ケーブルは、防護材が上に設置されることで、漁船の漁具や錨等との接触等による損傷が防がれる。
 ここで、防護材の設置において、潮流等の影響により防護材を海底ケーブル上に正確に誘導して設置するのが困難な場合がある。また、大水深に海底ケーブルが設置されている場合には、より潮流の影響を受けやすく、目視確認も困難になるため、防護材を正確に設置するのはさらに困難になる。
 そこで、防護材を所望の位置に設置するために、潜水して音波を用いて海底までの深度や作業船との距離等を測定する曳航体や、GPS測位装置及びGPS方位センサ等を用いて防護材設置位置を特定する方法が提案されている(例えば、特許文献1参照)。
特開2011-139629号公報
 しかしながら、特許文献1に係る方法では、曳航体による音波を用いた深度測定や作業船との距離及び方位の測定、GPSを用いた位置計測等に誤差が含まれるため、防護材を海底ケーブル上に正確に設置できない可能性がある。
 本発明は上記に鑑みてなされたものであって、海底に設けられている設置物上に正確に防護材を設置することが可能な防護材設置方法を提供することを目的とする。
 本発明の一態様によれば、海底に設けられている設置物の上に防護材を設置する防護材設置方法であって、前記防護材に線状部材を取り付ける線状部材取付工程と、前記線状部材が前記防護材から吊り下げられるように、前記防護材を防護材設置器具に取り付ける防護材取付工程と、前記防護材設置器具を海中に吊り降ろす吊り降ろし工程と、前記防護材設置器具に設けられている撮像装置で前記線状部材を含む画像を撮像して海中を監視する監視工程と、前記線状部材が海底に到達するまで前記防護材設置器具を下降させる下降工程と、前記設置物の上に前記防護材が位置するように、前記防護材設置器具を移動させる移動工程と、前記防護材設置器具を下降させて前記防護材を前記設置物の上に設置し、前記防護材を前記防護材設置器具から取り外す設置工程と、を有する。
 本発明の実施形態によれば、海底に設けられている設置物上に正確に防護材を設置することが可能な防護材設置方法が提供される。
実施形態に係る防護材設置方法の概略を説明するための図である。 実施形態に係る防護材設置装置の概略構成を例示する図である。 実施形態に係る防護材設置方法のフローチャートを例示する図である。 実施形態に係る防護材設置方法により防護用砕石袋が設置される様子を例示する図(1)である。 実施形態に係る防護材設置方法により防護用砕石袋が設置される様子を例示する図(2)である。 実施形態に係る防護材設置方法により防護用砕石袋が設置される様子を例示する図(3)である。 実施形態に係る防護材設置方法により防護用砕石袋が設置される様子を例示する図(4)である。 実施形態に係る防護材設置方法により防護用砕石袋が設置される様子を例示する図(5)である。 実施形態に係るコンクリートマットを例示する図である。
 以下、図面を参照して発明を実施するための形態について説明する。各図面において、同一構成部分には同一符号を付し、重複した説明を省略する場合がある。
 (防護材設置方法の概略)
 図1は、実施形態に係る防護材設置方法の概略を説明するための図である。
 本実施形態に係る防護材設置方法では、図1に示されるように、海面20の上を航行する作業船10に設けられている防護材設置装置100によって、海底30に設置されている海底ケーブル40の上に防護材としての防護用砕石袋120が設置される。
 作業船10は、防護材設置装置100を海中に吊り降ろすクレーン11を有し、防護材設置装置100により防護用砕石袋120が海底ケーブル40の上に設置されるように、海面20の上を移動する。
 防護材設置装置100は、防護材設置器具110、防護用砕石袋120、ウィンチ150、チェーン130、探査機140を有し、作業船10から吊り降ろされて海底ケーブル40の上に防護用砕石袋120を設置する。防護材設置装置100の各部の構成については後述する。
 海底ケーブル40は、設置物の一例であり、例えば海底に布設されて送電や通信等に用いられるケーブルである。海底ケーブル40は、複数の防護用砕石袋120が上に設置されることで、例えば漁船の漁具や錨等との接触等による損傷から防護される。また、海底ケーブル40は、防護用砕石袋120により、例えば潮流の影響で移動しないように海底30に固定され、岩石等との接触等による損傷から防護される。
 (防護材設置装置の構成)
 図2は、実施形態に係る防護材設置装置100の概略構成を例示する図である。
 図2に示されるように、防護材設置装置100は、防護材設置器具110、防護用砕石袋120、チェーン130、探査機140、ウィンチ150を有する。
 防護材設置器具110は、例えば柱状の部材であり、作業船10に設置されているウィンチ150によってワイヤ151が巻き取られる又は繰り出されることで、海中を昇降する。防護材設置器具110は、着脱部111に防護用砕石袋120が着脱可能に取り付けられ、防護用砕石袋120と共に海中に吊り降ろされる。また、防護材設置器具110は、海中及び海底を照らす照明112が両端に設けられている。
 防護用砕石袋は、防護材の一例であり、網袋体121と、網袋体121に包まれる中詰材122とで構成されている。網袋体121は、例えば合成繊維からなる糸を用いて、例えば海底30に設置された状態での大きさが1m~8mになるように形成される。中詰材122は、例えば比重が海水よりも重い砕石等で構成される。防護用砕石袋120は、海底30で潮流等の影響を受けて動くことがないように、例えば8tの中詰材122が網袋体121に入れられる。なお、防護用砕石袋120は、海底ケーブル40を防護可能であれば、網袋体121及び中詰材122に用いられる材料、大きさ及び重量等は本実施形態と異なってもよい。
 チェーン130は、線状部材の一例であり、防護材設置器具110に取り付けられた防護用砕石袋120から吊り下げられるように、防護用砕石袋120の底部に連結部材131を介して取り付けられている。
 チェーン130は、防護材設置器具110を降下させる際に、防護用砕石袋120と海底30との距離や、防護用砕石袋120と海底ケーブル40との位置関係の確認に用いられる。チェーン130は、例えば全長3mで、所定の長さ(例えば、1m)ごとに異なる色に着色されており、海底30との接触部分の色から、防護用砕石袋120と海底30又は海底ケーブル40との距離を確認できるようになっている。
 防護用砕石袋120とチェーン130とを連結する連結部材131は、例えばポリプロピレンロープであり、海中でチェーン130が絡まった場合に切断され、絡まったチェーン130と共に除去される。このように、チェーン130が連結部材131を介して防護用砕石袋120に取り付けられることで、絡まった場合等におけるチェーン130の交換又は修復作業を容易に行うことが可能になっている。
 また、チェーン130は、海中での姿勢が保たれるように、防護用砕石袋120とは反対側の端部に、例えば土嚢等が錘として設けられてもよい。
 探査機140は、作業船10にいる作業者により遠隔操作されて海中を移動することができる遠隔操作無人探査機(Remotely Operated Vehicle;ROV)である。探査機140は、海中で潮流等により流されることがないように、ロープ143で防護材設置器具110に連結されているケージ142に入れられている。
 探査機140は、撮像装置としての水中カメラ141が搭載され、海中を移動して防護用砕石袋120、チェーン130、海底30及び海底ケーブル40等を含む画像を撮影する。作業者は、探査機140の水中カメラ141によって撮影された画像に基づいて、防護用砕石袋120と海底30との距離や、防護用砕石袋120と海底ケーブル40との位置関係を確認できる。
 ウィンチ150は、昇降手段の一例であり、作業船10に設けられて、ワイヤ151を巻き取る又は繰り出すことで、防護材設置器具110を海中で昇降させる。ウィンチ150は、防護用砕石袋120が取り付けられた状態で作業船10のクレーン11によって海中に吊り降ろされる防護材設置器具110を、ワイヤ151を繰り出して海底30まで下降させる。また、ウィンチ150は、海底30で防護用砕石袋120が取り外された防護材設置器具110を、ワイヤ151を巻き取って作業船10まで引き揚げる。
 防護材設置装置100は、上記した構成を有し、防護材設置器具110が防護用砕石袋120と共に海中に吊り降ろされ、海底ケーブル40の上に防護用砕石袋120を設置する。
 (防護材設置方法)
 次に、実施形態に係る防護材設置方法について説明する。図3は、実施形態に係る防護材設置方法のフローチャートを例示する図である。また、図4Aから図4Eは、実施形態に係る防護材設置方法により防護用砕石袋120が設置される様子を例示する図である。
 図3に示されるように、海底ケーブル40の上に防護用砕石袋120を設置する場合には、まずステップS101にて、防護用砕石袋120の底部に連結部材131を介してチェーン130が取り付けられる。次に、ステップS102にて、防護材設置器具110に防護用砕石袋120が取り付けられる。
 続いてステップS103にて、作業船10のクレーン11によって防護材設置器具110が海中に吊り降ろされる。クレーン11によって海中に吊り降ろされた防護材設置器具110は、クレーン11から外され、図4Aに示されるように、作業船10に設けられているウィンチ150から海中に吊り降ろされる。
 ステップS104では、探査機140の水中カメラ141が海中を撮影し、作業者は水中カメラ141によって撮影された画像で海中を監視しながら防護材設置器具110を下降させる。このとき、作業者は、水中カメラ141によって撮影される画像で防護用砕石袋120と海底30との距離等を確認できるように、探査機140を遠隔操作して適宜移動させる。
 ステップS105では、防護用砕石袋120の底部から吊り下げられているチェーン130が海底30に到達するまで、防護材設置器具110が吊り降ろされる。作業者は、水中カメラ141によって撮影される画像を見ながら、図4Bに示されるように、チェーン130が海底30に到達するまで防護材設置器具110を下降させる。作業者は、下降を一旦停止させた状態で、防護材設置器具110の挙動が安定するまで待機する。なお、作業者は、チェーン130が海底30に到達するまでの間に、防護材設置器具110の挙動が安定するように、適宜下降停止して待機してもよい。
 ステップS106では、防護材設置器具110が海底ケーブル40の上に位置するように移動される。作業者は、水中カメラ141によって撮影される画像におけるチェーン130の位置を確認しながら、図4Cに示されるように、防護用砕石袋120が海底ケーブル40の上に位置するように、移動手段としての作業船10を操縦して、防護材設置器具110を移動させる。
 ステップS107では、防護材設置器具110が降下し、防護用砕石袋120が防護材設置器具110から取り外されて海底ケーブル40の上に設置される。作業者は、水中カメラ141によって撮影される画像を見ながら、図4Dに示されるように、防護材設置器具110を下降させて防護用砕石袋120を海底ケーブル40の上に着底させる。また、作業者は、防護用砕石袋120が着底した状態で、防護材設置器具110の着脱部111を遠隔操作し、防護用砕石袋120を防護材設置器具110から取り外し(若しくは切り離し)て海底ケーブル40の上に設置する。
 最後にステップS108では、防護材設置器具110が引き揚げられて作業船10に回収される。防護用砕石袋120が取り外された防護材設置器具110は、図4Eに示されるように、ウィンチ150によって海面20付近まで引き揚げられ、クレーン11によって作業船10に回収される。
 防護用砕石袋120の設置は、上記した方法により繰り返し行われ、海底ケーブル40の上には複数の防護用砕石袋120が設置される。海底ケーブル40は、複数の防護用砕石袋120が上に設置されることで、例えば漁船の漁具や錨等との接触による損傷から防護される。また、防護用砕石袋120により海底30に固定されることで、例えば潮流等により流されることがなく、岩石等との接触による損傷から防護される。
 なお、防護材としては、上記した防護用砕石袋120に限定されるものではなく、図5に示されるように、例えばコンクリートで形成された複数のブロック材161がワイヤ162によりマット状に連結された防護マット160であってもよい。
 防護マット160は、例えば2箇所にチェーン130が連結部材131を介して取り付けられ、防護材設置器具110に吊り下げられる。防護材として防護マット160を用いる場合であっても、上記した図3に示される防護材設置方法により、防護用砕石袋120と同様に海底ケーブル40の上に設置される。
 以上で説明したように、本実施形態に係る防護材設置方法及び防護材設置装置100によれば、探査機140の水中カメラ141を用いて海中を監視できる。また、水中カメラ141で防護用砕石袋120の底部に設けられているチェーン130を確認することで、防護用砕石袋120と海底30との距離や、防護用砕石袋120と海底ケーブル40との位置関係を容易に把握できる。したがって、本実施形態に係る防護材設置方法及び防護材設置装置100では、防護用砕石袋120等の防護材を、海底30に設けられている海底ケーブル40等の設置物の上に正確に設置することができる。
 以上、実施形態に係る防護材設置方法及び防護材設置装置について説明したが、本発明は上記実施形態に限定されるものではなく、本発明の範囲内で種々の変形及び改良が可能である。
10 作業船(移動手段)
11 クレーン
20 海面
30 海底
40 海底ケーブル(設置物)
100 防護材設置装置
110 防護材設置器具
120 防護用砕石袋(防護材)
121 網袋体
122 中詰材
130 チェーン(線状部材)
131 連結部材
140 探査機
141 水中カメラ(撮像装置)
150 ウィンチ(昇降手段)
160 防護マット(防護材)
161 ブロック体

Claims (7)

  1.  海底に設けられている設置物の上に防護材を設置する防護材設置方法であって、
     前記防護材に線状部材を取り付ける線状部材取付工程と、
     前記線状部材が前記防護材から吊り下げられるように、前記防護材を防護材設置器具に取り付ける防護材取付工程と、
     前記防護材設置器具を海中に吊り降ろす吊り降ろし工程と、
     前記防護材設置器具に設けられている撮像装置で前記線状部材を含む画像を撮像して海中を監視する監視工程と、
     前記線状部材が海底に到達するまで前記防護材設置器具を下降させる下降工程と、
     前記設置物の上に前記防護材が位置するように、前記防護材設置器具を移動させる移動工程と、
     前記防護材設置器具を下降させて前記防護材を前記設置物の上に設置し、前記防護材を前記防護材設置器具から取り外す設置工程と、
    を有することを特徴とする防護材設置方法。
  2.  前記線状部材取付工程は、前記防護材から前記線状部材を着脱可能に連結する連結部材を介して、前記線状部材を前記防護材に取り付ける
    ことを特徴とする請求項1に記載の防護材設置方法。
  3.  前記線状部材は、所定の長さごとに異なる色に着色されており、
     前記撮像工程は、前記線状部材の海底との接触部分の色に基づいて、前記防護材と海底との距離を確認する
    ことを特徴とする請求項1又は2に記載の防護材設置方法。
  4.  前記撮像装置は、前記防護材設置器具に連結されて海中を移動可能な探査機に搭載されており、
     前記撮像工程は、前記撮像装置が前記防護材を含む画像を撮像できるように前記探査機を移動させる探査機移動工程を有する
    ことを特徴とする請求項1から3の何れか一項に記載の防護材設置方法。
  5.  前記防護材は、砕石が網袋体に包まれた防護用砕石袋である
    ことを特徴とする請求項1から4の何れか一項に記載の防護材設置方法。
  6.  前記防護材は、複数のブロック材がマット状に連結された防護マットである
    ことを特徴とする請求項1から4の何れか一項に記載の防護材設置方法。
  7.  海底に設けられている設置物の上に防護材を設置する防護材設置装置であって、
     昇降可能に設けられ、前記防護材が着脱可能に取り付けられる防護材設置器具と、
     前記防護材設置器具に取り付けられた前記防護材から吊り下げられるように、前記防護材に取り付けられる線状部材と、
     前記防護材設置器具に設けられ、前記線状部材を含む画像を撮像する撮像装置と、
     前記防護材設置器具を昇降させる昇降手段と、
     前記防護材設置器具を海中で移動させる移動手段と、
    を有することを特徴とする防護材設置装置。
PCT/JP2014/078930 2014-10-30 2014-10-30 防護材設置方法及び防護材設置装置 WO2016067416A1 (ja)

Priority Applications (5)

Application Number Priority Date Filing Date Title
PCT/JP2014/078930 WO2016067416A1 (ja) 2014-10-30 2014-10-30 防護材設置方法及び防護材設置装置
JP2016556125A JP6354852B2 (ja) 2014-10-30 2014-10-30 防護材設置方法及び防護材設置装置
KR1020177011409A KR102301261B1 (ko) 2014-10-30 2014-10-30 방호재 설치 방법 및 방호재 설치 장치
TW104116166A TW201616752A (zh) 2014-10-30 2015-05-21 防護材設置方法及防護材設置裝置
PH12017500779A PH12017500779A1 (en) 2014-10-30 2017-04-26 Method of installing protective member and protective member installing apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2014/078930 WO2016067416A1 (ja) 2014-10-30 2014-10-30 防護材設置方法及び防護材設置装置

Publications (1)

Publication Number Publication Date
WO2016067416A1 true WO2016067416A1 (ja) 2016-05-06

Family

ID=55856800

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2014/078930 WO2016067416A1 (ja) 2014-10-30 2014-10-30 防護材設置方法及び防護材設置装置

Country Status (5)

Country Link
JP (1) JP6354852B2 (ja)
KR (1) KR102301261B1 (ja)
PH (1) PH12017500779A1 (ja)
TW (1) TW201616752A (ja)
WO (1) WO2016067416A1 (ja)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2018138511A1 (en) * 2017-01-26 2018-08-02 Ecosse Subsea Systems Ltd Method and apparatus for laying subsea cable from on-board a vessel
JP7475243B2 (ja) 2020-08-31 2024-04-26 前田工繊株式会社 海底長尺物の保護構造体およびこれを用いた海底長尺物の保護方法

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102570054B1 (ko) * 2021-07-06 2023-08-22 한국해양과학기술원 해저케이블 보호공 시공장치를 이용한 해저케이블 보호공 시공방법

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS62204085A (ja) * 1986-03-03 1987-09-08 鹿島建設株式会社 水底取水管の敷設工法
JPH04321887A (ja) * 1991-04-22 1992-11-11 Furukawa Electric Co Ltd:The 海底布設長尺体の着底状態監視方法
JPH06159553A (ja) * 1992-11-27 1994-06-07 Penta Ocean Constr Co Ltd 水底沈設管布設方法
JP2001132012A (ja) * 1999-11-08 2001-05-15 Fujikura Ltd トレミー管の位置誘導装置
JP2011139629A (ja) * 2009-12-29 2011-07-14 Kyowa Co Ltd 海底におけるケーブルおよび管の長尺物の保護方法

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3696389B2 (ja) * 1997-10-31 2005-09-14 キョーワ株式会社 水中構造物の洗掘防止材と洗掘防止工法
KR101244829B1 (ko) * 2011-04-05 2013-03-18 모터웰 주식회사 자중 회전 낙하형 수중영상취득장치

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS62204085A (ja) * 1986-03-03 1987-09-08 鹿島建設株式会社 水底取水管の敷設工法
JPH04321887A (ja) * 1991-04-22 1992-11-11 Furukawa Electric Co Ltd:The 海底布設長尺体の着底状態監視方法
JPH06159553A (ja) * 1992-11-27 1994-06-07 Penta Ocean Constr Co Ltd 水底沈設管布設方法
JP2001132012A (ja) * 1999-11-08 2001-05-15 Fujikura Ltd トレミー管の位置誘導装置
JP2011139629A (ja) * 2009-12-29 2011-07-14 Kyowa Co Ltd 海底におけるケーブルおよび管の長尺物の保護方法

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2018138511A1 (en) * 2017-01-26 2018-08-02 Ecosse Subsea Systems Ltd Method and apparatus for laying subsea cable from on-board a vessel
JP7475243B2 (ja) 2020-08-31 2024-04-26 前田工繊株式会社 海底長尺物の保護構造体およびこれを用いた海底長尺物の保護方法

Also Published As

Publication number Publication date
PH12017500779B1 (en) 2017-10-09
KR102301261B1 (ko) 2021-09-10
TW201616752A (zh) 2016-05-01
JPWO2016067416A1 (ja) 2017-08-31
KR20170073610A (ko) 2017-06-28
PH12017500779A1 (en) 2017-10-09
JP6354852B2 (ja) 2018-07-11

Similar Documents

Publication Publication Date Title
KR101750614B1 (ko) 수중 구조물 검사장치
EP3257738B1 (en) Method for installing a subsea cable
EP2655869B1 (en) Power generating equipment
JP5884978B2 (ja) 水中航走体の揚収装置及び揚収方法
JP6354852B2 (ja) 防護材設置方法及び防護材設置装置
US11162855B2 (en) Intelligent fiber rope termination, module, and networking technologies
US10040515B2 (en) Support buoy
JP6406665B2 (ja) 浮魚礁の回収装置及び回収方法
JP6316354B2 (ja) 係留チェーンの敷設方法
US10330072B2 (en) Power generating systems
JP5813025B2 (ja) 水中観測機器の回収設備および水中観測機器の回収方法
EP3264143A1 (en) Towed remote controlled vehicle for seismic spread intervention and method
US20220380009A1 (en) Splash zone inspection robot
KR20170084726A (ko) 무인잠수정 인양 고리 근처의 엄빌리컬 케이블 상태 실시간 모니터링 장치
JP6200150B2 (ja) 遠隔玉外し装置
JP2018131199A (ja) 繋留補助部材
KR101368592B1 (ko) 해빈류 관측용 무인 조사선
JP2016068759A (ja) 水中機器の揚収用装置、水中機器の母船、及び水中機器の揚収方法
CA3127876A1 (en) Intelligent fiber rope termination, module, and networking technologies
KR101630245B1 (ko) 복수 케이블 로봇을 이용한 수중에서의 중량물 이동 시스템
JPH11299035A (ja) 海底ケーブル防護工法
GB2516375A (en) System, device and method for deploying and monitoring subsea cables

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 14904883

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2016556125

Country of ref document: JP

Kind code of ref document: A

ENP Entry into the national phase

Ref document number: 20177011409

Country of ref document: KR

Kind code of ref document: A

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 14904883

Country of ref document: EP

Kind code of ref document: A1