WO2016042672A1 - ハイブリッド電源装置及びハイブリッド電源利用システム - Google Patents

ハイブリッド電源装置及びハイブリッド電源利用システム Download PDF

Info

Publication number
WO2016042672A1
WO2016042672A1 PCT/JP2014/074918 JP2014074918W WO2016042672A1 WO 2016042672 A1 WO2016042672 A1 WO 2016042672A1 JP 2014074918 W JP2014074918 W JP 2014074918W WO 2016042672 A1 WO2016042672 A1 WO 2016042672A1
Authority
WO
WIPO (PCT)
Prior art keywords
power
storage device
power storage
generation unit
power supply
Prior art date
Application number
PCT/JP2014/074918
Other languages
English (en)
French (fr)
Inventor
俊一 柳川
裕 杉江
浜田 修
謙一 太田
秀仁 青木
恭三 渡部
岡田 博志
文憲 木村
Original Assignee
株式会社昭電
ビフレステック株式会社
大阪府
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社昭電, ビフレステック株式会社, 大阪府 filed Critical 株式会社昭電
Priority to PCT/JP2014/074918 priority Critical patent/WO2016042672A1/ja
Publication of WO2016042672A1 publication Critical patent/WO2016042672A1/ja

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J7/00Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
    • H02J7/34Parallel operation in networks using both storage and other dc sources, e.g. providing buffering
    • H02J7/35Parallel operation in networks using both storage and other dc sources, e.g. providing buffering with light sensitive cells

Definitions

  • the present invention provides, for example, a hybrid power supply apparatus that can effectively use a small amount of power generation, such as a power generation amount of a solar power generation unit in a time zone with a small amount of solar radiation, and a hybrid power supply utilization system including the hybrid power supply apparatus About.
  • Patent Document 1 Japanese Patent Laid-Open No. 2011-34939 discloses a conventional technology of such a photovoltaic power generation facility.
  • Patent Document 1 discloses an illumination device that stores electricity by both an electric double layer capacitor and a storage battery, and switches between these to supply power.
  • Patent Document 2 Japanese Patent Laid-Open No. 2000-102190.
  • This Patent Document 2 also discloses a solar battery lighting device that stores electricity by both an electric double layer capacitor and a storage battery, and switches between these to supply power.
  • JP 2011-34939 A (FIGS. 1 and 2) JP 2000-102190 A (FIG. 1)
  • the solar power generation equipment has a small power generation amount when the amount of solar radiation is small, such as in the morning, evening or overcast, and it is difficult to charge the power storage device. In addition, when the amount of power generation is small, the power conditioner cannot be operated to sell power.
  • Patent Document 1 The prior art described in Patent Document 1 is charged by both an electric double layer capacitor and a storage battery during the daytime and discharged by the storage battery following the electric double layer capacitor at nighttime. However, no consideration is given to charging when the amount of solar radiation is low, such as in the morning or evening.
  • Patent Document 2 uses an electric double layer capacitor as a main battery and a storage battery as an auxiliary battery.
  • the storage battery is charged.
  • the electric double layer capacitor is charged from the storage battery, and power is always supplied from the electric double layer capacitor to the load.
  • the point of charging when the amount of solar radiation is small has not been considered.
  • the present invention has been made in view of the above problems, and an object of the present invention is to increase the amount of charge by effectively using the generated power that is not suitable for charging and discarded, and can be used for a longer time.
  • An apparatus and a hybrid power source utilization system including the hybrid power source apparatus are provided.
  • a hybrid power supply device is a hybrid power supply device that charges a plurality of power storage devices with electric power generated using natural energy, and discharges and uses the power storage devices.
  • a power generation unit that generates power using natural energy;
  • a short-time charge / discharge type first power storage device that is charged by the generated power of the power generation unit when the generated power of the power generation unit is a predetermined value or less;
  • the first power storage device is preferentially charged over the second power storage device, and
  • a control device that performs charge / discharge control to discharge the second power storage device after discharging the first power storage device preferentially over the second power storage device.
  • a hybrid power supply device is the hybrid power supply device according to the first aspect, wherein the control device charges the first power storage device when detecting that the first power storage device is fully charged. And the second power storage device is controlled to be charged by the generated power of the power generation unit.
  • a hybrid power supply device is the hybrid power supply device according to the first aspect, wherein the control device charges the first power storage device when detecting that the first power storage device is fully charged. And charging the second power storage device with the stored power of the first power storage device, and stopping the charging of the second power storage device when detecting that the second power storage device is fully charged, Further, the first power storage device is controlled to be fully charged and then the charging of the first power storage device is stopped.
  • the hybrid power supply device is the hybrid power supply device according to any one of claims 1 to 3, wherein the first power storage device is a lithium ion capacitor, and the second power storage device is a lithium ion battery. It is characterized by being.
  • the hybrid power supply device is the hybrid power supply device according to any one of claims 1 to 3, wherein the power generation unit is a solar power generation unit that generates power by sunlight, and a wind power generation unit that generates power by wind power. And a hydroelectric power generation unit that generates power by hydropower.
  • the power generation unit is a solar power generation unit that generates power by sunlight, and a wind power generation unit that generates power by wind power.
  • a hydroelectric power generation unit that generates power by hydropower.
  • the hybrid power supply device is the hybrid power supply device according to any one of claims 1 to 3, wherein when the disaster information is input from the outside to the control device, the control device Control is performed to reduce the amount of discharge from the power storage device or the second power storage device to the load.
  • a hybrid power source utilization system is the hybrid power source device according to the fifth aspect, comprising a solar power generation unit as the power generation unit and a lighting device as a load, and the control device is configured to provide a solar radiation amount.
  • the first power storage device is controlled to be preferentially charged during a time period when the amount of power generated by the solar power generation unit is small and the amount of power generated by the solar power generation unit is small.
  • a hybrid power supply utilization system includes the hybrid power supply device according to the third aspect, a power conditioner system that generates electric power for sale by using the generated electric power of the power generation unit as an input, and a load. , When the first power storage device and the second power storage device are fully charged and the generated power of the power generation unit is large enough to operate the power conditioner system, the control device causes the power conditioner system to operate. And the power output from the power conditioner system is sold.
  • the hybrid power source utilization system is the hybrid power source utilization system according to claim 8, wherein the first power storage device and the second power storage device are fully charged, and the generated power of the power generation unit is the power.
  • the control device causes the first power storage device to be discharged preferentially over the second power storage device and supplies the discharged power to the load, or Discharging power is sold.
  • a hybrid power supply apparatus and a hybrid power supply utilization system that can be used for power supply and power sale for a longer period of time by effectively using generated power that has been discarded without being suitable for charging in the past. Can be realized.
  • the 1st form for implementing this invention is demonstrated, referring FIG.
  • this invention is, for example in a wind power generation equipment or a hydroelectric power generation equipment
  • the present invention is also applicable to a system that uses power generated by a wind power generation unit or a hydropower generation unit. That is, even when the amount of power generation is small due to weak wind power or hydraulic power, it is possible to effectively utilize the generated power that has been discarded in the past by charging and discharging the first power storage device 205 described later.
  • the hybrid power supply utilization system 1 in FIG. 1 includes a solar power generation unit 100, a charge / discharge unit 200, a control device 300, and a load 400.
  • the photovoltaic power generation unit 100, the charge / discharge unit 200, and the control device 300 constitute the hybrid power supply device of the present invention.
  • the hybrid power supply utilization system 1 of the present invention has a configuration in which a load 400 is connected to the hybrid power supply apparatus.
  • the solar power generation unit 100 is a solar cell panel (including various forms such as a cell, a module, and an array) in which solar cells are laid flat.
  • the photovoltaic power generation unit 100 is formed to protect the inside from wind and rain, external force, and the like.
  • the number and arrangement of the solar cell panels can be selected as appropriate, and the solar cell panels may be configured to change the direction according to the position of the sun.
  • the types of solar cells used in the photovoltaic power generation unit 100 are single crystal silicon type, polycrystalline silicon type, thin film silicon type, microcrystalline silicon, amorphous silicon, or a silicon-based solar cell made of these layers, or InGaAs.
  • a quantum dot solar cell in which a quantum dot structure made of silicon or the like is formed in a layer (intrinsic semiconductor layer) can be appropriately selected.
  • the charge / discharge unit 200 further includes an input-side diode 201, an input-side detection unit 202, a first input-side switch 203, a first input-side DC / DC converter 204, a first power storage device 205, and a first output-side DC / DC converter.
  • 206, first output side switch 207, first output side diode 208, second input side switch 209, second input side DC / DC converter 210, second power storage device 211, second output side DC / DC converter 212, second A two output side switch 213 and a second output side diode 214 are provided.
  • Each component of the charge / discharge unit 200 is housed in a housing box (not shown).
  • the storage box is formed of a member (for example, reinforced plastic) that protects the inside from wind and rain, external force, and the like, is lightweight, and has durability, airtightness, robustness, rustproofness, and waterproofness.
  • the control apparatus 300 mentioned later may be accommodated in the same accommodation box as the charging / discharging unit 200, and the control apparatus 300 may be installed separately.
  • the input side diode 201 has an anode connected to the photovoltaic power generation unit 100 side. Thereby, the backflow of the electric current from the 1st electrical storage apparatus 205 or the 2nd electrical storage apparatus 211 to the photovoltaic power generation part 100 is prevented.
  • the input side detection unit 202 detects the current value I 0 and the voltage value V 0 output from the photovoltaic power generation unit 100, and uses the signal line to control the current value I 0 and the voltage value V 0 to the control device 300. Send to.
  • the control device 300 Based on the current value I 0 and the voltage value V 0 , the control device 300 generates, for example, a state where the power generation amount is 0 at night, a state where the power generation amount is small such as morning and evening, or power generation during the day. Detect whether the amount is large.
  • the power line is branched into a first system and a second system.
  • the first system is a system that charges and discharges the first power storage device 205, and includes a first input switch 203, a first input DC / DC converter 204 as a charging device, a first power storage device 205, and a first output DC / DC.
  • a DC converter 206, a first output side switch 207, and a first output side diode 208 are provided.
  • the second system is a system that charges and discharges the second power storage device 211, and includes a second input side switch 209, a second input side DC / DC converter 210 as a charging device, a second power storage device 211, and a second output side.
  • a DC / DC converter 212, a second output side switch 213, and a second output side diode 214 are provided.
  • the first input side switch 203 is, for example, a relay or a semiconductor switch, and the first input side switch 207, the second input side switch 209, and the second output side switch 213, which will be described later, are similarly configured by a relay or a semiconductor switch.
  • the first input side switch 203 is connected to the control device 300 and is turned on / off by a control signal from the control device 300.
  • the first input side DC / DC converter 204 boosts or steps down the output voltage of the photovoltaic power generation unit 100 to a voltage having a magnitude necessary for charging with the first power storage device 205.
  • the first input side DC / DC converter 204 is connected to the control device 300 and performs a step-up or step-down operation by turning on and off the semiconductor switching element by a control signal from the control device 300.
  • the output voltage and output current of the solar power generation unit 100 change according to the weather, but the first input side DC / DC converter 204 adjusts the magnitude of the voltage and current. Charging can be performed after leveling the output of the power generation unit 100.
  • the first power storage device 205 is a short-time charge / discharge type (rapid charge / discharge type) power storage device, for example, a lithium-ion capacitor (LIC: Lithium-Ion Capacitor).
  • a lithium ion capacitor is a hybrid capacitor that combines a positive electrode of an electric double layer capacitor (EDLC) with a negative electrode of a lithium ion secondary battery using a carbon material. It is an asymmetric capacitor with a different storage principle.
  • the positive electrode forms an electric double layer and is charged and discharged by a physical action, while the negative electrode is charged and discharged by a chemical action of lithium.
  • a negative electrode in which lithium is occluded in advance in a carbon material or the like as the negative electrode active material is used, and the energy density is dramatically improved.
  • the lithium ion capacitor uses a material that reversibly carries at least one of lithium ions and anions instead of the positive electrode active material layer of the lithium ion secondary battery.
  • a material that reversibly carries at least one of lithium ions and anions instead of the positive electrode active material layer of the lithium ion secondary battery.
  • Examples of such a material include activated carbon, a conductive polymer, and a polyacene organic semiconductor (PAS: Abbreviation of PolyAmeric Semiconductor).
  • PES Polyacene organic semiconductor
  • the first power storage device 205 may have a plurality of lithium ion capacitors connected in series or in parallel in order to obtain a predetermined voltage and capacity. As the first power storage device 205, a large-capacity electric double layer capacitor may be employed.
  • the first power storage device 205 is connected to the control unit 300 detects a current value I 1 and the voltage value V 1 of the charge and discharge of the first power storage device 205, and transmits to the controller 300 via the signal line. These current value I 1 and voltage value V 1 are used during charge / discharge control of first power storage device 205.
  • the first output side DC / DC converter 206 boosts or steps down the output voltage of the first power storage device 205 to a magnitude required by the load 400.
  • the first output side DC / DC converter 206 is connected to the control device 300 and performs a step-up or step-down operation by turning on and off the semiconductor switching element by a control signal from the control device 300.
  • the first output side switch 207 is connected to the output side of the first system.
  • the first output side switch 207 is connected to the control device 300 and is turned on / off by a control signal from the control device 300.
  • the first output side diode 208 has an anode connected to the first power storage device 205 side. Thereby, the backflow of the current from the second system or the load 400 to the first system is prevented.
  • the second input side switch 209 of the second system is connected to the output side of the input side detection unit 202.
  • the second input side switch 209 is connected to the control device 300 and is turned on / off by a control signal from the control device 300.
  • the second input side DC / DC converter 210 boosts or steps down the output voltage of the photovoltaic power generation unit 100 to a voltage having a magnitude necessary for charging the second power storage device 211.
  • the second input side DC / DC converter 210 is connected to the control device 300, and performs a step-up or step-down operation by turning on and off the semiconductor switching element by a control signal from the control device 300.
  • the second input side DC / DC converter 210 adjusts the voltage, the output of the photovoltaic power generation unit 100 can be leveled and used.
  • the second power storage device 211 is a large-capacity charge / discharge power storage device, and it is particularly preferable to employ a lithium ion battery (LIB) having high output and high energy density. Lithium ion batteries can be charged and discharged for a long time with a large capacity.
  • LIB lithium ion battery
  • the second power storage device 211 includes, for example, a lead storage battery, a lithium ion polymer secondary battery, a nickel hydride storage battery, a nickel cadmium storage battery, a nickel iron storage battery, a nickel / zinc storage battery, and silver oxide.
  • Secondary batteries such as zinc storage batteries, redox flow batteries, liquid circulation type secondary batteries such as zinc / chlorine batteries, zinc bromine batteries, etc., mechanical charge types such as aluminum / air batteries, air zinc batteries, air / iron batteries, etc.
  • Secondary batteries of high temperature operation type such as secondary batteries, sodium / sulfur batteries, lithium / iron sulfide batteries can be used.
  • Second power storage device 211 is connected to the control device 300, a current value I 2 and the voltage value V 2 at the time of charge and discharge of the second power storage device 211 is detected, it transmits to the control unit 300 via the signal line .
  • Second output side DC / DC converter 212 boosts or steps down the output voltage of second power storage device 211 to a magnitude required by load 400.
  • the second output side DC / DC converter 212 is connected to the control device 300, and performs a step-up or step-down operation by turning on and off the semiconductor switching element by a control signal from the control device 300.
  • the second output side switch 213 is connected to the output side of the second system.
  • the second output side switch 213 is connected to the control device 300 and is turned on / off by a control signal from the control device 300.
  • the second output side diode 214 has an anode connected to the second power storage device 211 side. Thereby, the backflow of the electric current from the 1st system or load 400 to the 2nd system is prevented.
  • control device 300 exchanges voltage, current, and control signals between the input side detection unit 202 and each part of the first system and the second system, and performs charge / discharge control as described later. Do.
  • Various information and control commands are input to the control device 300 by communication from the outside.
  • various information includes disaster information such as heavy rain information and earthquake information.
  • the control device 300 is configured by, for example, a microcomputer system.
  • the power supply of the control device 300 is preferably supplied from the second power storage device 211, but a dedicated power supply may be provided separately.
  • the load 400 various loads such as a lighting device, a communication device, and an air conditioner can be considered.
  • DC power is input to the load 400, but as the load 400, an AC load that converts the input DC power into AC power by an inverter, and an input Including both direct-current loads that use the direct-current power directly.
  • the use of the load 400 may be any home use or industrial use.
  • the load 400 will be described as an LED (Light Emitting Diode) illumination device fed from the charge / discharge unit 200.
  • the LED lighting device includes an LED and an LED lighting circuit, and can be used as, for example, an outdoor street lamp or an indoor lighting fixture.
  • the LED for example, a point light-emitting LED or a surface light-emitting LED can be used. If these LEDs are used, a large illuminance can be obtained with a small amount of power.
  • the LED lighting circuit can suppress the power consumption of the LED by, for example, PWM microcomputer control, and can be driven with excellent energy saving.
  • the LED lighting circuit has a dimming function, and can perform illumination with an optimum illuminance according to the brightness of the installation location.
  • the hybrid power source utilization system 1 of the present invention is integrally provided with, for example, the photovoltaic power generation unit 100, the charge / discharge unit 200, the control device 300, and the LED lighting device as the load 400, and is charged from morning to evening and at night. It can be provided as a system for lighting buildings and roads. In addition to LED lighting devices, various lighting devices including light-emitting units such as incandescent bulbs and fluorescent lamps, organic EL elements, and their lighting circuits can be used.
  • the present invention is characterized in that it uses generated power that has been discarded in the past. That is, the hybrid power supply device performs charging by switching between the first power storage device 205 that is charged in a time zone with a small amount of solar radiation and the second power storage device 211 that is charged in a time zone with a large amount of solar radiation.
  • the first power storage device 205 has a relatively small capacity like a lithium ion capacitor, but since the amount of solar radiation is small such as in the morning or evening, the first power storage device 205 can be charged in a short time even when the power generation amount of the solar power generation unit 100 is small. It is possible and is a charging destination for generated power that has not been used in the conventional solar power generation facility.
  • the second power storage device 211 is a power storage device that requires a long time for charging, such as a lithium ion battery, but is capable of charging and discharging a large capacity for a long time, and the amount of solar radiation is as in the daytime in fine weather. It is used as a charging destination when the power generation amount of the solar power generation unit 100 increases and increases. As described above, in the present invention, the charge amount can be increased by using the first power storage device 205 and the second power storage device 211 in combination.
  • charge / discharge control in this embodiment will be described.
  • charging is performed from morning to evening when the sun is out, the lighting device is automatically turned on in the evening, and automatically turned off in the morning of the next day.
  • This charge / discharge control will be described along with the passage of time.
  • the current time is night, power is supplied from the second power storage device 211 to the load 400, and the lighting device is turned on.
  • the second input side switch 209 is in an off state and the second output side switch 213 is in an on state.
  • the first power storage device 205 is not charged / discharged, and both the first input side switch 203 and the first output side switch 207 are off.
  • the photovoltaic power generation unit 100 When dawn comes into the morning, the photovoltaic power generation unit 100 starts generating power.
  • the input side detection unit 202 detects the current / voltage, and transmits the current value I 0 and the voltage value V 0 to the control device 300.
  • the control device 300 monitors the current value I 0 and the voltage value V 0 and detects that power generation is started in the photovoltaic power generation unit 100 after dawn. Thereafter, charging by the first power storage device 205 is started.
  • the control device 300 transmits a control signal to turn on the first input side switch 203, but keeps the second input side switch 209 in the off state. Then, charging to the power storage unit (referred to as the morning power storage unit) provided in the first power storage device 205 is started via the first input side DC / DC converter 204.
  • the morning power storage unit is an area formed by dividing the capacity of the first power storage device 205, for example, into two, and the current value I 0 and the voltage value V 0 detected by the input side detection unit 202 are 0 (in the nighttime). This is an area selected by the control device 300 when shifting from a power generation enabled state (indicating that it has become morning) to a power generation possible state.
  • the control device 300 uses the first input side DC / DC converter 204 so as to obtain the voltage and current necessary for charging the first power storage device 205 based on the current values I 0 and I 1 and the voltage values V 0 and V 1. To control.
  • a morning power storage unit having a capacity of about 10 [W] can be charged in a short time of about 30 minutes. In this case, other DC / DC converters are stopped to suppress unnecessary power consumption.
  • the lighting device as the load 400 is turned off because it is morning, and the control device 300 controls the first output side switch 207 and the second output side switch 213 to be turned off.
  • the control device 300 monitors the state of the first power storage device 205.
  • the control device 300 detects that the morning power storage unit is fully charged based on the current value I 1 and the voltage value V 1 detected by the first power storage device 205, the control device 300 determines the charging destination of the solar power generation unit 100. 2 Switch to power storage device 211.
  • the control device 300 transmits a control signal, and controls the first input side switch 203 to the off state and the second input side switch 209 to the on state.
  • the second power storage device 211 is charged via the second input side DC / DC converter 210 with the power generated by the photovoltaic power generation unit 100.
  • the control device 300 controls the second input side DC / DC converter 210 based on the current values I 0 , I 2 and the voltage values V 0 , V 2 , thereby determining a predetermined value suitable for charging the second power storage device 211. Outputs voltage and current. In this case, the other DC / DC converters are stopped.
  • the lighting device is kept off because it is bright during the day.
  • the control device 300 maintains both the first output side switch 207 and the second output side switch 213 in the off state.
  • the input side detection unit 202 transmits the detected current value I 0 and voltage value V 0 to the control device 300. Based on these current value I 0 and voltage value V 0 , control device 300 detects that the amount of power generation has decreased and charging of second power storage device 211 is no longer possible, and goes to first power storage device 205. Control to switch to charging.
  • the control device 300 transmits a control signal, and controls the first input side switch 203 to an on state and the second input side switch 209 to an off state.
  • charging to another power storage unit (referred to as an evening power storage unit) provided in first power storage device 205 is started via first input side DC / DC converter 204.
  • This evening power storage unit has the same capacity as the morning power storage unit described above, and the current value I 0 and the voltage value V 0 detected by the input side detection unit 202 are somewhat large values (indicating that it is during the day). This is a region selected by the control device 300 when shifting to a value at which charging to the second power storage device 211 becomes impossible (indicating that it has become evening).
  • an evening power storage unit having a capacity of about 10 [W] can be charged in a short time of about 30 minutes.
  • the other DC / DC converters are stopped. In this way, the evening power storage unit of the first power storage device 205 is fully charged.
  • the lighting device as the load 400 is turned on.
  • power is first supplied to the load 400 from the morning charging unit or the evening charging unit of the first power storage device 205.
  • the control device 300 controls the first output side switch 207 to the on state and the second output side switch 213 to the off state.
  • the control device 300 controls the first output side DC / DC converter 206 based on the current value I 1 and the voltage value V 1 detected by the first power storage device 205, and the DC output power is determined according to the load 400. Control to value. In this way, by using the power of the first power storage device 205 preferentially, the generated power that has been discarded in the past can be used effectively.
  • control device 300 causes discharge of first power storage device 205 to fail based on current value I 1 and voltage value V 1 transmitted from first power storage device 205. Detect what is possible. Therefore, the control device 300 starts discharging by the large-capacity charge / discharge type second power storage device 211.
  • the control device 300 controls the first output side switch 207 to be turned off and the second output side switch 213 to be turned on to start discharging from the second power storage device 211.
  • the control device 300 controls the second output side DC / DC converter 212 based on the current value I 2 and the voltage value V 2 detected by the second power storage device 211, and the direct-current output power according to the load 400. Control to value.
  • the control device 300 controls the first output side switch 207 to be turned off and the second output side switch 213 to be turned on to start discharging from the second power storage device 211.
  • the control device 300 controls the second output side DC / DC converter 212 based on the current value I 2 and the voltage value V 2 detected by the second power storage device 211, and the direct-current output power according to the load 400. Control to value.
  • the first power storage device 205 is charged by the morning control described above, and the above-described operation is repeated thereafter.
  • the control device 300 sets a predetermined output side DC / DC converter 206 or 212 or the like. It is desirable to perform control to reduce the current supplied to the load 400 by controlling it and extend the power supply time to the load 400. As a result, power can be supplied for a long time in the event of a disaster or emergency.
  • the first embodiment not only the stored power by the second charging device 211 but also the stored power of the first power storage device 205 charged by the amount of power generated in the time zone with a small amount of solar radiation is effectively used. be able to. Therefore, it is possible to increase the amount of charge of the entire system by effectively utilizing natural energy.
  • unutilized power is utilized as in the first mode, and in particular, the sale of photovoltaic power and the power supply to the load 400 when a disaster occurs are considered.
  • the hybrid power source utilization system 2 of FIG. 2 includes a photovoltaic power generation unit 100, a charge / discharge unit 200 ′ having substantially the same configuration as that of the first embodiment, a control device 300, a load 400, a switch for a power conditioner system (hereinafter referred to as a power conditioner). 501, a power conditioner system input side diode (hereinafter referred to as a power conditioner input side diode) 502, a power conditioner system (hereinafter referred to as PCS) 503, and an inverter (INV) 504.
  • a power conditioner system input side diode hereinafter referred to as a power conditioner input side diode
  • PCS power conditioner system
  • ISV inverter
  • the photovoltaic power generation unit 100, the charge / discharge unit 200 ', and the control device 300 constitute the hybrid power supply device of the present invention.
  • the hybrid power supply utilization system 2 of the present invention has a configuration in which the hybrid power supply apparatus further includes a load 400, a power conditioner switch 501, a power conditioner input side diode 502, a PCS 503, and an inverter 504.
  • connection configuration and function in the charging / discharging unit 200 ′ are partly different from those of the charging / discharging unit 200.
  • PCS 503 and inverter 504 are different.
  • the charge / discharge control operation by the control device 300 is also partially different.
  • the PCS 503 and the inverter 504 can be controlled by the control device 300.
  • the output side of the first power storage device 205 in the first system branches and is connected to the second input side switch 209 ′ of the second system. Yes.
  • the second input side switch 209 ′ is also configured by a relay or a semiconductor switch.
  • the second system has the same configuration as that in FIG. 1 except that the second power storage device 211 is charged using the stored power of the first power storage device 205, and the first power storage device 205 has a short configuration.
  • a lithium ion capacitor that can be charged and discharged over time is used, and a lithium ion battery that is relatively large-capacity and suitable for long-time charging and discharging is used as the second power storage device 211.
  • the power control switch 501 connected to the output side of the photovoltaic power generation unit 100 is turned on by a control signal from the control device 300 and supplies the generated power of the photovoltaic power generation unit 100 to the PCS 503. Further, the power control input side diode 502 connected between the power control switch 501 and the PCS 503 is for preventing a backflow of current from the PCS 503 to the photovoltaic power generation unit 100 side.
  • the PCS 503 includes an inverter or the like inside, converts the input DC power into AC power having a predetermined magnitude and frequency, and outputs the AC power.
  • the AC power output from the PCS 503 is linked to the power system and can be sold to a power company or the like. Of course, power may be directly supplied from the PCS 503 to the various loads 400.
  • the inverter 504 is connected between the charge / discharge unit 200 ′ and the load 400, converts the DC power discharged from the charge / discharge unit 200 ′ into AC power having a predetermined magnitude and frequency, and supplies the AC power to the load 400.
  • the power supply system to the load 400 by the charge / discharge unit 200 ′ and the inverter 504 is provided assuming that the commercial power supply is interrupted mainly due to the occurrence of a disaster such as an earthquake. It goes without saying that the load 400 may sometimes be supplied with power. In addition, you may sell the alternating current power output from the inverter 504 as needed.
  • the switch 203 is turned on (the other switches 207, 209, 213, and 501) in the morning and evening when the amount of solar radiation is small regardless of whether it is normal or when a disaster occurs.
  • the first input side DC / DC converter 204 is controlled to charge the morning power storage unit or the evening power storage unit of the first power storage device 205.
  • the control device 300 detects on the basis of the current value I 1 and the voltage value V 1, to turn on the switch 209 'turns off the switch 203.
  • the second input side DC / DC converter 210 By controlling the second input side DC / DC converter 210 in this state, the first power storage device 205 is discharged, converted into a voltage / current of a predetermined magnitude, and the second power storage device 211 is charged.
  • the second power storage device 211 is fully charged, and when the first power storage device 205 is also fully charged, the switches 203 and 209 ′ are turned off, and the DC / DC converter 204 is turned on. , 210 is stopped. It can be detected from the current value I 2 and the voltage value V 2 that the second power storage device 211 is fully charged.
  • load 400 When load 400 is a lighting device, power is supplied to load 400 at night using the power of first power storage device 205 and second power storage device 211 in a fully charged state. In this case, the power supply to the load 400 is given priority to the first power storage device 205, and when the first power storage device 205 is completely discharged, the power supply is transferred to the second power storage device 211. In this case, the control operations of the DC / DC converters 206 and 212 and the switches 207 and 213 are the same as those in the first embodiment.
  • the control device 300 constantly monitors the current value I 0 and the voltage value V 0 output from the input side detection unit 202. Under normal conditions, when the amount of solar radiation, that is, the amount of power generated by the photovoltaic power generation unit 100 increases during the day, and a voltage / current capable of operating the PCS 503 is obtained, the power control switch 501 is turned on by the control signal, The power generated by the photovoltaic power generation unit 100 is input to the PCS 503.
  • the PCS 503 performs power sale by converting the power generated by the solar power generation unit 100 into predetermined AC power based on a command from the control device 300. Moreover, you may supply electric power to the load 400 from PCS503 as needed. Note that the control device 300 controls the operation of the PCS 503 based on the current value I 3 and the voltage value V 3 detected from the PCS 503. In the evening, when there is sunshine but the power generated by the photovoltaic power generation unit 100 cannot operate the PCS 503, the control device 300 turns off the power switch 501 and stops the operation of the PCS 503.
  • control device 300 when the control device 300 detects the occurrence of a disaster by an external input, control is performed according to the type of the disaster. For example, when earthquake early warning is input, the control device 300 turns off the power control switch 501 to stop the operation of the PCS 503, and the charge / discharge operation by the first power storage device 205 and the second power storage device 211 is performed. Switch. Further, when an external input such as a disaster occurs, the control circuit 300 performs control to extend the power supply time to the load 400 side by decreasing the output of the DC / DC converter 206 or 212. Is also possible.
  • the present invention is a wind power generation equipment using natural energy other than sunlight, rivers, etc. It can also be applied to hydropower facilities installed in For example, an AC generator installed in these power generation facilities and a wind power generation unit or a hydropower generation unit configured by an inverter or the like that converts the output into DC power are used as the solar power generation unit 100 in FIGS. By replacing, it is possible to configure a hybrid power supply device and a hybrid power supply utilization system based on the same principle as each embodiment.
  • the first power storage device 205 is preferentially charged using a small amount of generated power and the second power storage device 211 is used in combination, thereby increasing the overall charge amount and reducing the load 400 to the load 400. It can be used for power supply or for sale.
  • the present invention can supply various loads other than the above-described lighting device.
  • it can be used as a power supply device for various electric devices as a load assuming a disaster, and can be applied to a charger for a mobile phone, a smartphone, or a tablet for securing communication infrastructure.
  • it is used not only at the time of a disaster, but also as a power supply device for electric appliances used for household appliances such as home appliances, commercial appliances, industrial appliances, for example, school events such as leisure, sports festivals and cultural festivals, and construction work can do.
  • the hybrid power supply device and the hybrid power supply utilization system of the present invention have the following advantages. (1) It is possible to supply or sell power to a load by effectively using the generated power even in a time zone or weather where the generated power by natural energy is low. Moreover, it can be used as an emergency power supply device in a shelter at the time of a power failure of a commercial power supply, particularly when a disaster occurs, and is excellent in energy saving and environmental protection. (2) By using a power storage device that can be charged and discharged in a short time, such as a lithium ion capacitor, as the first power storage device, highly efficient charge and discharge using a small amount of power is possible.
  • the hybrid power supply device of the present invention and the hybrid power supply system including this hybrid power supply device are expected to have various uses other than the emergency power supply device at the time of disaster, and are highly versatile.

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Secondary Cells (AREA)
  • Supply And Distribution Of Alternating Current (AREA)
  • Charge And Discharge Circuits For Batteries Or The Like (AREA)

Abstract

 従来、未利用の電力を有効に利用して充電量を増大させ、より長時間の給電や売電を可能とするハイブリッド電源装置及びハイブリッド電源利用システムを提供する。 自然エネルギーを利用して発電した電力により複数の蓄電装置を充放電させて使用するハイブリッド電源装置であって、例えば太陽光発電部100と、その発電電力が所定値以下である時に充電される短時間充放電型の第1蓄電装置205と、第1蓄電装置205が満充電になってから充電を開始し、かつ第1蓄電装置205よりも大容量で長時間充放電型の第2蓄電装置211と、第1蓄電装置205を第2蓄電装置211よりも優先的に充電し、かつ、第1蓄電装置205を第2蓄電装置211よりも優先的に放電させてから第2蓄電装置211を放電させるように充放電制御を行う制御装置300と、を備える。

Description

ハイブリッド電源装置及びハイブリッド電源利用システム
 本発明は、例えば、日射量が少ない時間帯における太陽光発電部の発電量のように、少ない発電量を有効に利用可能としたハイブリッド電源装置、及び、このハイブリッド電源装置を含むハイブリッド電源利用システムに関する。
 我が国において、地震、台風、または、豪雨による土砂崩れや洪水などの災害が近年頻発している。これらの災害が発生すると道路や電気などのインフラが寸断されて地域が孤立し、復旧するまで地域住民は避難生活を強いられる。
 災害発生時、避難場所での連絡用の携帯電話の充電や、安心の為の夜間照明の点灯などには電気が必要になるが、避難場所で停電が発生することも多い。そこで、災害時の非常用電源として、太陽光発電設備の活用が考えられている。
 このような太陽光発電設備の従来技術が、例えば特許文献1(特開2011-34939号公報)に開示されている。この特許文献1には、電気二層層キャパシタと蓄電池との両者により蓄電させ、これらを切り換えて電力供給を行う照明装置が開示されている。
 また、太陽光発電設備の他の従来技術が、例えば特許文献2(特開2000-102190号公報)にも開示されている。この特許文献2においても、電気二重層コンデンサと蓄電池との両者により蓄電させ、これらを切り換えて電力供給を行う太陽電池照明装置が開示されている。
特開2011-34939号公報(図1,図2) 特開2000-102190号公報(図1)
 太陽光発電設備は、朝方や夕方または曇天時など、日射量が少ない場合には発電量が小さく、蓄電装置への充電が困難である。また、発電量が少ない場合にはパワーコンディショナを稼働させて売電することもできない。
 特許文献1に記載の従来技術は、昼間は電気二重層キャパシタと蓄電池との両者により充電させ、夜間は電気二重層キャパシタに続いて蓄電池により放電するものである。しかし、朝方や夕方のように日射量の少ない時に充電する点については考慮されていない。
 また、特許文献2に記載の従来技術は、電気二重層コンデンサを主の電池、蓄電池を補助の電池とし、電気二重層コンデンサの電圧が規格値以上のときは蓄電池に充電し、また、電気二重層コンデンサの電圧が規格値以下のときは蓄電池から電気二重層コンデンサを充電するものであり、常に電気二重層コンデンサから負荷に給電している。しかしながら、この従来技術においても、日射量の少ない時に充電する点については考慮されていなかった。
 このため、日射量が少なく、発電量が少ない場合でも蓄電装置への充電を可能として充電量を増大させ、電源装置としての用途を拡大したいという要請があった。
 言い換えれば、従来では利用していなかった太陽光などの自然エネルギーを有効に活用するハイブリッド電源装置の提供が望まれていた。
 本発明は上記の問題に鑑みてなされたものであり、その目的は、充電に適さず捨てられていた発電電力を有効に活用して充電量を増大させ、より長時間、使用可能なハイブリッド電源装置、及び、このハイブリッド電源装置を含むハイブリッド電源利用システムを提供することにある。
 上記課題を解決するために、請求項1に係るハイブリッド電源装置は、自然エネルギーを利用して発電した電力により複数の蓄電装置を充電し、前記蓄電装置を放電させて使用するハイブリッド電源装置であって、
 自然エネルギーにより発電する発電部と、
 前記発電部の発電電力が所定値以下である時に前記発電部の発電電力により充電される短時間充放電型の第1蓄電装置と、
 前記第1蓄電装置が満充電になってから充電を開始し、かつ、前記第1蓄電装置よりも大容量で長時間充放電型の第2蓄電装置と、
 前記発電部の発電電力、及び、前記第1蓄電装置並びに前記第2蓄電装置の充放電状態に基づいて、前記第1蓄電装置を前記第2蓄電装置よりも優先的に充電し、かつ、前記第1蓄電装置を前記第2蓄電装置よりも優先的に放電させてから前記第2蓄電装置を放電させるように充放電制御を行う制御装置と、を備えたことを特徴とする。
 請求項2に係るハイブリッド電源装置は、請求項1に記載したハイブリッド電源装置において、前記制御装置は、前記第1蓄電装置が満充電になったことを検出した時に、前記第1蓄電装置の充電を停止すると共に、前記発電部の発電電力により前記第2蓄電装置を充電するように制御することを特徴とする。
 請求項3に係るハイブリッド電源装置は、請求項1に記載したハイブリッド電源装置において、前記制御装置は、前記第1蓄電装置が満充電になったことを検出した時に、前記第1蓄電装置の充電を停止すると共に、前記第1蓄電装置の蓄電電力により前記第2蓄電装置を充電し、前記第2蓄電装置が満充電になったことを検出した時に前記第2蓄電装置の充電を停止し、更に前記第1蓄電装置を満充電にしてから前記第1蓄電装置の充電を停止するように制御することを特徴とする。
 請求項4に係るハイブリッド電源装置は、請求項1~3の何れか1項に記載したハイブリッド電源装置において、前記第1蓄電装置がリチウムイオンキャパシタであり、前記第2蓄電装置がリチウムイオン電池であることを特徴とする。
 請求項5に係るハイブリッド電源装置は、請求項1~3の何れか1項に記載したハイブリッド電源装置において、前記発電部が、太陽光により発電する太陽光発電部、風力により発電する風力発電部、水力により発電する水力発電部、のうちの何れかであることを特徴とする。
 請求項6に係るハイブリッド電源装置は、請求項1~3の何れか1項に記載したハイブリッド電源装置において、前記制御装置に外部から災害情報が入力された時に、前記制御装置は、前記第1蓄電装置または前記第2蓄電装置からの負荷への放電量を低減させるように制御することを特徴とする。
 請求項7に係るハイブリッド電源利用システムは、請求項5に記載したハイブリッド電源装置において、前記発電部としての太陽光発電部と、負荷としての照明装置と、を備え、前記制御装置は、日射量が少なく前記太陽光発電部による発電電力が少ない時間帯に前記第1蓄電装置を優先的に充電するように制御することを特徴とする。
 請求項8に係るハイブリッド電源利用システムは、請求項3に記載したハイブリッド電源装置と、前記発電部の発電電力を入力として売電用の電力を生成するパワーコンディショナシステムと、負荷と、を備え、
 前記第1蓄電装置及び前記第2蓄電装置が満充電の状態で、前記発電部の発電電力が前記パワーコンディショナシステムを運転可能な大きさである時は、前記制御装置により前記パワーコンディショナシステムを稼働させ、前記パワーコンディショナシステムから出力される電力を売電することを特徴とする。
 請求項9に係るハイブリッド電源利用システムは、請求項8に記載したハイブリッド電源利用システムにおいて、前記第1蓄電装置及び前記第2蓄電装置が満充電の状態で、前記発電部の発電電力が前記パワーコンディショナシステムを運転可能な大きさに満たない時は、前記制御装置により、前記第1蓄電装置を前記第2蓄電装置よりも優先的に放電させてその放電電力を負荷に供給し、または前記放電電力を売電することを特徴とする。
 本発明によれば、従来では充電に適さず捨てられていた発電電力を有効に活用して充電量を増大させ、より長時間、給電や売電に使用可能なハイブリッド電源装置及びハイブリッド電源利用システムを実現することができる。
本発明を実施するための第1の形態のハイブリッド電源利用システムのブロック構成図である。 本発明を実施するための第2の形態のハイブリッド電源利用システムのブロック構成図である。
 まず、本発明を実施するための第1の形態について、図1を参照しつつ説明する。
 なお、以下に説明する第1の形態及び第2の形態は、何れも太陽光発電部を備えた太陽光発電設備に関するものであるが、本発明は、例えば風力発電設備や水力発電設備において、風力発電部や水力発電部による発電電力を利用するシステムにも適用可能である。
 すなわち、風力や水力が弱いため発電量が少ない場合にも、後述の第1蓄電装置205を充放電させることで、従来では捨てられていた発電電力を有効に活用することができる。
 まず、図1のハイブリッド電源利用システム1は、太陽光発電部100、充放電ユニット200、制御装置300、負荷400を備える。このうち、太陽光発電部100、充放電ユニット200、制御装置300により本発明のハイブリッド電源装置を構成する。また、本発明のハイブリッド電源利用システム1は、上記ハイブリッド電源装置に負荷400を接続した構成である。
 太陽光発電部100は、詳しくは太陽電池を平面状に敷き詰めた太陽電池パネル(セル、モジュール、アレイ等の各種形態を含むものとする)である。太陽光発電部100は風雨や外力などから内部を保護するように形成されている。太陽電池パネルの数や配置は適宜選択することができ、太陽の位置に合わせて向きを変えるように構成してもよい。
 太陽光発電部100に使用する太陽電池の種類は、単結晶シリコン型、多結晶シリコン型、薄膜シリコン型、微結晶シリコン、非晶質シリコンまたはこれらの積層からなるシリコン系の太陽電池や、InGaAs系、GaAs系、CIS系、CuZnSnS、CdTe-CdS系の太陽電池、有機色素を用いた色素増感太陽電池、導電性ポリマーやフラーレン等を用いた有機薄膜太陽電池、pin構造におけるi層(真性半導体層)中にシリコン等による量子ドット構造を形成した量子ドット型太陽電池などの中から、適宜選択することができる。
 充放電ユニット200は、更に、入力側ダイオード201、入力側検出部202、第1入力側スイッチ203、第1入力側DC/DCコンバータ204、第1蓄電装置205、第1出力側DC/DCコンバータ206、第1出力側スイッチ207、第1出力側ダイオード208、第2入力側スイッチ209、第2入力側DC/DCコンバータ210、第2蓄電装置211、第2出力側DC/DCコンバータ212、第2出力側スイッチ213、第2出力側ダイオード214を備える。
 充放電ユニット200の各構成は、図示しない収容ボックスに収容されている。収容ボックスは、その内部を風雨や外力などから保護し、軽量で、耐久性、密閉性、堅牢性、防錆性、防水性を有する部材(例えば強化プラスチック)で形成されている。
 なお、後述する制御装置300を充放電ユニット200と同一の収容ボックスに収容しても良いし、制御装置300を別個に設置しても良い。
 入力側ダイオード201は、アノードが太陽光発電部100側に接続されている。これにより第1蓄電装置205や第2蓄電装置211から太陽光発電部100への電流の逆流を防止する。
 入力側検出部202は、太陽光発電部100から出力される電流値I及び電圧値Vを検出し、信号線を介して、これらの電流値I及び電圧値Vを制御装置300へ送信する。後述するが、制御装置300は、電流値I及び電圧値Vに基づいて、例えば夜間に発電量が0の状態か、朝夕のように発電量が少ない状態か、または、日中で発電量が多い状態かなどを検出する。
 電力線は、第1系統と第2系統とに分岐している。第1系統は第1蓄電装置205を充放電する系統であり、第1入力側スイッチ203、充電装置としての第1入力側DC/DCコンバータ204、第1蓄電装置205、第1出力側DC/DCコンバータ206、第1出力側スイッチ207、第1出力側ダイオード208を備えている。
 また、第2系統は第2蓄電装置211を充放電する系統であり、第2入力側スイッチ209、充電装置としての第2入力側DC/DCコンバータ210、第2蓄電装置211、第2出力側DC/DCコンバータ212、第2出力側スイッチ213、第2出力側ダイオード214を備えている。
 まず、第1系統について説明する。
 第1入力側スイッチ203は、例えばリレーや半導体スイッチであり、後述の第1入力側スイッチ207,第2入力側スイッチ209,第2出力側スイッチ213についても、同様にリレーや半導体スイッチによって構成される。
 第1入力側スイッチ203は、制御装置300と接続されており、制御装置300からの制御信号によりオンオフする。
 第1入力側DC/DCコンバータ204は、太陽光発電部100の出力電圧を、第1蓄電装置205で充電するために必要な大きさの電圧に昇圧または降圧する。第1入力側DC/DCコンバータ204は、制御装置300と接続されており、制御装置300からの制御信号により半導体スイッチング素子をオンオフさせて昇圧または降圧動作を行う。
 例えば、太陽光発電では、天候に応じて太陽光発電部100の出力電圧や出力電流が変化するが、第1入力側DC/DCコンバータ204が電圧及び電流の大きさを調整するため、太陽光発電部100の出力を平準化した上で充電することができる。
 第1蓄電装置205は、短時間充放電型(急速充放電型)の蓄電装置であり、例えば、リチウムイオンキャパシタ(LIC:Lithium-Ion Capacitor)である。
 周知のように、リチウムイオンキャパシタは、電気二重層キャパシタ(EDLC:Electric Double Layer Capacitor)の正極に、炭素材料を用いたリチウムイオン二次電池の負極を組み合わせたハイブリッドキャパシタであり、正極及び負極の蓄電原理が異なる非対称キャパシタである。リチウムイオンキャパシタでは、正極が電気二重層を形成して物理的作用により充放電を行うが、負極はリチウムの化学的作用により充放電を行う。この負極活物質である炭素材料等に予めリチウムを吸蔵させた負極を用いており、エネルギー密度を飛躍的に向上させている。
 リチウムイオンキャパシタは、リチウムイオン二次電池の正極活物質層に代えて、リチウムイオンやアニオンの少なくとも一つを可逆的に担持する材料を用いる。このような材料としては、活性炭、導電性高分子、ポリアセン系有機半導体(PAS:PolyAcenic Semiconductorの略)などが挙げられる。リチウムイオンキャパシタは、充放電の効率が高く、短時間での充放電が可能であり、繰り返し使用しても寿命が長い。
 また、第1蓄電装置205は、所定の電圧及び容量を得るため、複数のリチウムイオンキャパシタを直列や並列接続したものとしても良い。第1蓄電装置205としては、大容量の電気二重層キャパシタを採用しても良い。
 第1蓄電装置205は制御装置300と接続されており、第1蓄電装置205の充放電時の電流値I及び電圧値Vを検出し、信号線を介して制御装置300へ送信する。これらの電流値I及び電圧値Vは第1蓄電装置205の充放電制御時に利用される。
 第1出力側DC/DCコンバータ206は、第1蓄電装置205の出力電圧を、負荷400が必要とする大きさに昇圧または降圧する。第1出力側DC/DCコンバータ206は、制御装置300と接続されており、制御装置300からの制御信号により半導体スイッチング素子をオンオフさせて昇圧または降圧動作を行う。
 第1出力側スイッチ207は、第1系統の出力側に接続される。第1出力側スイッチ207は、制御装置300と接続されており、制御装置300からの制御信号によりオンオフする。
 第1出力側ダイオード208は、アノードが第1蓄電装置205側に接続されている。これにより、第2系統や負荷400から第1系統への電流の逆流を防止する。
 続いて、第2系統について説明する。
 第2系統の第2入力側スイッチ209は、入力側検出部202の出力側に接続される。この第2入力側スイッチ209は制御装置300と接続されており、制御装置300からの制御信号によりオンオフする。
 第2入力側DC/DCコンバータ210は、太陽光発電部100の出力電圧を、第2蓄電装置211に充電するために必要な大きさの電圧に昇圧または降圧する。第2入力側DC/DCコンバータ210は、制御装置300と接続されており、制御装置300からの制御信号により半導体スイッチング素子をオンオフさせて昇圧または降圧動作を行う。第1系統と同様に、第2入力側DC/DCコンバータ210が電圧を調整するため、太陽光発電部100の出力を平準化して利用することができる。
 第2蓄電装置211は、大容量充放電型の蓄電装置であり、特に高出力、高エネルギー密度であるリチウムイオン電池(LIB)の採用が好ましい。リチウムイオン電池は、大容量で長時間の充放電が可能である。
 なお、上記のリチウムイオン電池以外にも、第2蓄電装置211には、例えば、鉛蓄電池、リチウムイオンポリマー二次電池、ニッケル水素蓄電池、ニッケルカドミウム蓄電池、ニッケル鉄蓄電池、ニッケル・亜鉛蓄電池、酸化銀・亜鉛蓄電池等の二次電池、レドックス・フロー電池、亜鉛・塩素電池、亜鉛臭素電池等の液循環型の二次電池、アルミニウム・空気電池、空気亜鉛電池、空気・鉄電池等のメカニカルチャージ型の二次電池、ナトリウム・硫黄電池、リチウム・硫化鉄電池などの高温動作型の二次電池を用いることができる。
 第2蓄電装置211は、制御装置300と接続されており、第2蓄電装置211の充放電時の電流値I及び電圧値Vを検出し、信号線を介して制御装置300へ送信する。
 第2出力側DC/DCコンバータ212は、第2蓄電装置211の出力電圧を、負荷400が必要とする大きさに昇圧または降圧する。第2出力側DC/DCコンバータ212は制御装置300と接続されており、制御装置300からの制御信号により半導体スイッチング素子をオンオフさせて昇圧または降圧動作を行う。
 第2出力側スイッチ213は、第2系統の出力側に接続される。第2出力側スイッチ213は制御装置300と接続されており、制御装置300からの制御信号によりオンオフする。
 第2出力側ダイオード214は、アノードが第2蓄電装置211側に接続されている。これにより、第1系統や負荷400から第2系統への電流の逆流を防止する。
 制御装置300は、前述したように、入力側検出部202と、第1系統,第2系統の各部との間で、電圧、電流、及び制御信号を授受し、後述するような充放電制御を行う。
 また、制御装置300には、外部からの通信により各種情報や制御指令が入力される。ここで、各種情報としては、例えば豪雨情報や地震情報などの災害情報がある。
 制御装置300は、例えばマイクロコンピュータシステムによって構成されている。制御装置300の電源は、第2蓄電装置211から供給することが望ましいが、別個に専用の電源を備えていても良い。
 負荷400としては、照明装置、通信装置、空調装置などの各種の負荷が考えられる。ここで、図1では、負荷400に直流電力が入力される形になっているが、負荷400としては、入力される直流電力をインバータにより交流電力に変換して利用する交流負荷、及び、入力される直流電力をそのまま用いる直流負荷の双方を含む。また、負荷400の用途は、家庭用途、産業用途を問わない。
 本形態では、負荷400が、充放電ユニット200から給電されるLED(Light Emitting Diode)照明装置であるものとして説明する。LED照明装置は、LED及びLED点灯回路を備えており、例えば、屋外の街路灯や室内の照明器具として使用することができる。
 LEDとしては、例えば点発光LEDや面発光LEDを採用可能であり、これらのLEDを採用すれば、少ない電力で大きな照度を得ることができる。また、LED点灯回路は、例えばPWMマイコン制御によりLEDの消費電力を抑え、省エネルギー性に優れた駆動が可能である。LED点灯回路は調光機能を有し、設置場所の明るさに応じて最適な照度で照明を行うことができる。
 従って、本発明のハイブリッド電源利用システム1は、例えば、太陽光発電部100、充放電ユニット200、制御装置300及び負荷400であるLED照明装置を一体に備え、朝方から夕方まで充電し、夜間に建物や道路を照明するシステムとして提供することができる。
 なお、LED照明装置以外でも、白熱電球、蛍光灯などの放電ランプ、有機EL素子などの発光部やその点灯回路を備えた各種の照明装置を使用することができる。
 続いて、本発明のハイブリッド電源装置及びハイブリッド電源利用システム1の特徴について説明する。本発明は、従来では捨てられていた発電電力を活用する点に特徴がある。
 すなわち、ハイブリッド電源装置は、日射量が少ない時間帯に充電される第1蓄電装置205と、日射量が多い時間帯に充電される第2蓄電装置211とを切り換えて充電を行う。
 第1蓄電装置205は、リチウムイオンキャパシタのように、容量は比較的少ないが、朝方や夕方のように日射量が少ないため太陽光発電部100の発電量が小さい場合でも短時間での充電が可能であり、従来、太陽光発電設備において未利用であった発電電力の充電先である。
 また、第2蓄電装置211は、リチウムイオン電池のように、充電に時間を要するが、長時間で大容量の充放電が可能な蓄電装置であり、晴天時の日中のように日射量が増えて太陽光発電部100の発電量が増加した場合の充電先として使用される。
 このように、本発明では、第1蓄電装置205及び第2蓄電装置211を併用することにより、充電量を増加させることができる。
 次に、本形態における充放電制御について説明する。本形態のハイブリッド電源利用システム1においては、太陽が出ている朝方から夕方までの間に充電し、夕方に照明装置を自動点灯し、翌日の朝方に自動消灯する。
 この充放電制御について、時間の経過に沿って説明を進める。
 まず、現時点は夜間であって第2蓄電装置211から負荷400へ電力が供給され、照明装置が点灯しているものとする。この時、太陽光発電部100は発電していないため、第2入力側スイッチ209はオフ状態、第2出力側スイッチ213はオン状態である。また、第1蓄電装置205は充放電されておらず、第1入力側スイッチ203及び第1出力側スイッチ207はともにオフ状態である。
 夜が明けて朝方になると、太陽光発電部100が発電を開始する。入力側検出部202が電流・電圧を検出し、電流値I及び電圧値Vを制御装置300へ送信する。制御装置300は、これらの電流値I及び電圧値Vを監視し、夜が明けて太陽光発電部100で発電が開始されたことを検知する。その後、第1蓄電装置205による充電を開始する。
 制御装置300は、制御信号を送信して第1入力側スイッチ203をオン状態にするが、第2入力側スイッチ209はオフ状態のままとする。すると、第1入力側DC/DCコンバータ204を介して、第1蓄電装置205内に設けられた蓄電部(朝方蓄電部という)への充電が開始される。この朝方蓄電部は、第1蓄電装置205の容量を例えば二分割して形成された領域であり、入力側検出部202により検出した電流値I及び電圧値Vが、0(夜中であることを示す)から発電可能状態(朝方になったことを示す)へ移行したときに、制御装置300によって選択される領域である。
 制御装置300は、電流値I,I及び電圧値V,Vに基づいて、第1蓄電装置205の充電に必要な電圧・電流を得るように第1入力側DC/DCコンバータ204を制御する。朝方に太陽光発電部100の発電量が少ない場合、例えば、10[W]程度の容量を持つ朝方蓄電部を30分間程度の短時間で充電することができる。この場合、他のDC/DCコンバータは停止させて不要な電力消費を抑える。
 なお、負荷400である照明装置は、朝になったため消灯するものとし、制御装置300は、第1出力側スイッチ207及び第2出力側スイッチ213を共にオフさせるように制御する。
 さて、第1蓄電装置205への充電が続き、制御装置300は、第1蓄電装置205の状態を監視している。制御装置300は、第1蓄電装置205が検出した電流値I及び電圧値Vに基づいて、朝方蓄電部が満充電になったことを検出すると、太陽光発電部100の充電先を第2蓄電装置211に切り替える。
 制御装置300は、制御信号を送信し、第1入力側スイッチ203をオフ状態に、また、第2入力側スイッチ209をオン状態に制御する。これにより、第2蓄電装置211は、太陽光発電部100の発電電力により第2入力側DC/DCコンバータ210を介して充電される。
 制御装置300は、電流値I,I及び電圧値V,Vに基づいて第2入力側DC/DCコンバータ210を制御することにより、第2蓄電装置211の充電に適した所定の電圧・電流を出力する。この場合、他のDC/DCコンバータは停止させておく。
 第2蓄電装置211への充電中は、日中で明るいため、照明装置は消灯状態が維持される。この場合、制御装置300は、第1出力側スイッチ207及び第2出力側スイッチ213を共にオフ状態に維持している。
 その後、夕方になって日射量が減少すると、太陽光発電部100の発電量も減少する。
入力側検出部202は、検出した電流値I及び電圧値Vを制御装置300へ送信する。制御装置300は、これらの電流値I及び電圧値Vに基づき、発電量が減少して第2蓄電装置211への充電が不可能になったことを検知し、第1蓄電装置205への充電に切り換えるように制御を行う。
 すなわち、制御装置300は、制御信号を送信し、第1入力側スイッチ203をオン状態に、また、第2入力側スイッチ209をオフ状態に制御する。これにより、第1入力側DC/DCコンバータ204を介して、第1蓄電装置205内に設けられた別の蓄電部(夕方蓄電部という)への充電が開始される。この夕方蓄電部は、前述した朝方蓄電部と同容量の領域であり、入力側検出部202により検出した電流値I及び電圧値Vが、ある程度大きな値(日中であることを示す)から第2蓄電装置211への充電が不可能になった値(夕方になったことを示す)へ移行したときに、制御装置300によって選択される領域である。
 朝方と同様に、日射量が少なく太陽光発電部100の発電量が少ない夕方には、例えば、10[W]程度の容量を持つ夕方蓄電部を30分間程度の短時間で充電することができる。この場合、他のDC/DCコンバータは停止させておく。
 このようにして、第1蓄電装置205の夕方蓄電部を満充電にする。
 次に、夜間になったら、負荷400としての照明装置を点灯する。この場合、まず、第1蓄電装置205の朝方充電部や夕方充電部から負荷400に給電する。制御装置300は、第1出力側スイッチ207をオン状態に、また、第2出力側スイッチ213をオフ状態に制御する。この際、制御装置300は、第1蓄電装置205が検出した電流値I及び電圧値Vに基づいて第1出力側DC/DCコンバータ206を制御し、直流出力電力を負荷400に応じた値に制御する。このようにして、第1蓄電装置205の電力を優先的に利用することにより、従来では捨てられていた発電電力を有効に活用することができる。
 そして、第1蓄電装置205からの放電量が減少すると、制御装置300は、第1蓄電装置205から送信された電流値I及び電圧値Vに基づき、第1蓄電装置205の放電が不可能になったことを検出する。そこで、制御装置300は、大容量充放電型の第2蓄電装置211による放電を開始させる。
 この場合、制御装置300は、第1出力側スイッチ207をオフ状態に、また、第2出力側スイッチ213をオン状態に制御し、第2蓄電装置211からの放電を開始させる。この際、制御装置300は、第2蓄電装置211が検出した電流値I及び電圧値Vに基づいて第2出力側DC/DCコンバータ212を制御し、直流出力電力を負荷400に応じた値に制御する。以下、翌日の朝方まで、第2蓄電装置211から負荷400に継続して給電することにより、夜間における照明が可能になる。
 これ以降は、先に説明した朝方の制御により第1蓄電装置205を充電し、以下、上述した動作が繰り返されることになる。
 制御装置300は、災害情報などの外部入力があった場合や、一方の蓄電装置が故障などにより利用できなくなったことを検出した場合には、所定の出力側DC/DCコンバータ206または212などを制御して負荷400に供給する電流を減少させ、負荷400への給電時間を延長する制御を行うことが望ましい。これにより、災害発生時や非常時における長時間の給電が可能となる。
 以上のように、第1の形態によれば、第2充電装置211による蓄電電力だけでなく、日射量の少ない時間帯の発電量により充電した第1蓄電装置205の蓄電電力も有効に利用することができる。
 従って、自然エネルギーを有効に活用してシステム全体の充電量を増加させることが可能である。
 次に、本発明を実施するための第2の形態について、図2を参照しつつ説明する。
 この第2の形態は、第1の形態と同様に未利用電力を活用する一方で、特に、太陽光発電電力の売電や災害発生時における負荷400への給電を考慮したものである。
 すなわち、図2のハイブリッド電源利用システム2は、太陽光発電部100、第1の形態とほぼ同一構成の充放電ユニット200’、制御装置300、負荷400、パワーコンディショナシステム用スイッチ(以下、パワコン用スイッチという)501、パワーコンディショナシステム入力側ダイオード(以下、パワコン入力側ダイオードという)502、パワーコンディショナシステム(以下、PCSという)503、インバータ(INV)504を備える。
 このうち、太陽光発電部100、充放電ユニット200’、制御装置300により本発明のハイブリッド電源装置を構成する。また、本発明のハイブリッド電源利用システム2は、上記ハイブリッド電源装置に、負荷400、パワコン用スイッチ501、パワコン入力側ダイオード502、PCS503、インバータ504を更に備えた構成である。
 図2と図1とを比較すると、充放電ユニット200’内の接続構成及び機能が充放電ユニット200とは一部相違しており、また、図2ではパワコン用スイッチ501、パワコン入力側ダイオード502、PCS503、及びインバータ504を備えている点が相違する。更に、制御装置300による充放電制御動作も一部相違している。
 ここで、PCS503及びインバータ504は制御装置300により制御可能となっている。
 図2の充放電ユニット200’では、図1の充放電ユニット200と異なり、第1系統における第1蓄電装置205の出力側が分岐して第2系統の第2入力側スイッチ209’に接続されている。この第2入力側スイッチ209’も、リレーや半導体スイッチにより構成されている。
 また、第2系統については、第1蓄電装置205の蓄電電力を用いて第2蓄電装置211を充電する点を除けば、図1と同様の構成であり、第1蓄電装置205には、短時間での充放電が可能なリチウムイオンキャパシタなどが使用され、第2蓄電装置211には、比較的大容量で長時間の充放電に適したリチウムイオン電池などが使用されている。
 太陽光発電部100の出力側に接続されたパワコン用スイッチ501は、制御装置300からの制御信号によってオンし、太陽光発電部100の発電電力をPCS503に供給する。また、パワコン用スイッチ501とPCS503との間に接続されたパワコン入力側ダイオード502は、PCS503から太陽光発電部100側への電流の逆流を防止するためのものである。
 PCS503は、内部にインバータなどを備え、入力された直流電力を所定の大きさ及び周波数の交流電力に変換して出力する。PCS503から出力される交流電力は、電力系統に連系されて電力会社などに売電可能となっている。勿論、PCS503から各種の負荷400に直接給電しても良い。
 インバータ504は、充放電ユニット200’と負荷400との間に接続され、充放電ユニット200’から放電される直流電力を所定の大きさ及び周波数の交流電力に変換して負荷400に供給する。
 ここで、充放電ユニット200’及びインバータ504による負荷400への給電系統は、主として地震などの災害発生により商用電源が停電した場合を想定して設けられているが、災害が発生していない正常時に負荷400へ給電しても良いことは言うまでもない。なお、必要に応じて、インバータ504から出力される交流電力を売電しても良い。
 この第2の形態において、正常時、災害発生時を問わず、日射量の少ない朝方や夕方には、第1の形態と同様に、スイッチ203をオン(他のスイッチ207,209,213,501はオフ)し、第1入力側DC/DCコンバータ204を制御して第1蓄電装置205の朝方蓄電部または夕方蓄電部を充電する。
 そして、電流値I及び電圧値Vに基づいて第1蓄電装置205が満充電になったことを制御装置300が検出したら、スイッチ203をオフすると共にスイッチ209’をオンする。この状態で第2入力側DC/DCコンバータ210を制御することにより、第1蓄電装置205を放電させ、所定の大きさの電圧・電流に変換して第2蓄電装置211を充電する。
 上記の動作を繰り返すことにより、第2蓄電装置211を満充電状態とし、更に第1蓄電装置205も満充電状態になった時点でスイッチ203,209’をオフし、かつ、DC/DCコンバータ204,210の動作を停止する。なお、第2蓄電装置211が満充電になったことは、電流値I及び電圧値Vから検出することができる。
 また、負荷400が照明装置である場合には、満充電状態にある第1蓄電装置205及び第2蓄電装置211の電力を用いて、夜間に負荷400に給電する。この場合、負荷400への給電は第1蓄電装置205を優先させるものとし、第1蓄電装置205が完全に放電したら第2蓄電装置211による給電に移行する。
 この場合のDC/DCコンバータ206,212及びスイッチ207,213等の制御動作は第1の形態と同様である。
 一方、制御装置300は、入力側検出部202から出力される電流値I及び電圧値Vを常に監視している。
 正常時において、日中に日射量すなわち太陽光発電部100の発電量が増加し、PCS503を運転可能な電圧・電流が得られる状態になったら、制御信号によりパワコン用スイッチ501をオンさせ、太陽光発電部100の発電電力をPCS503に入力する。
 PCS503は、制御装置300からの指令に基づき、太陽光発電部100の発電電力を所定の交流電力に変換して売電を行う。また、必要に応じてPCS503から負荷400に給電しても良い。なお、制御装置300は、PCS503から検出した電流値I及び電圧値Vに基づいてPCS503の動作を制御している。
 夕方になり、日照はあるが太陽光発電部100の発電電力ではPCS503の稼働が不可能な場合には、制御装置300によりパワコン用スイッチ501をオフさせ、PCS503の運転を停止する。
 また、外部入力により、制御装置300が災害発生を検知した場合には、その災害の種類に応じて制御を行う。例えば、地震速報が入力された場合には、制御装置300によりパワコン用スイッチ501をオフしてPCS503の運転を停止すると共に、前述した第1蓄電装置205及び第2蓄電装置211による充放電動作に切り替えればよい。
 更に、災害発生などの外部入力が発生した場合には、制御回路300がDC/DCコンバータ206または212の出力を減少させることにより、負荷400側への給電時間を延長させるような制御を行うことも可能である。
 上述した各形態は、本発明を太陽光発電設備に適用した場合のものであるが、冒頭に説明したように、本発明は、太陽光以外の自然エネルギーを利用した風力発電設備や、河川などに設置された水力発電設備にも適用可能である。
 例えば、これらの発電設備に設置された交流発電機と、その出力を直流電力に変換するインバータ等により構成された風力発電部や水力発電部を、図1,図2の太陽光発電部100に置き換えることにより、各形態と同一の原理に基づくハイブリッド電源装置及びハイブリッド電源利用システムを構成することができる。
 つまり、風力発電設備や水力発電設備においても、天候などに起因して風力や水流が弱く、発電電力が少ない場合が想定される。よって、これらの場合にも、少ない発電電力を利用して第1蓄電装置205を優先的に充電すると共に第2蓄電装置211を併用することで、全体としての充電量を増加させ、負荷400への給電または売電に供することが可能である。
 以上、本発明のハイブリッド電源装置及びハイブリッド電源利用システムについて説明したが、本発明は、前述の照明装置以外にも各種の負荷に給電することが可能である。
 例えば、災害を想定した負荷として様々な電気機器に対する電源装置に利用可能であり、通信インフラを確保するための携帯電話やスマートフォン、タブレット用の充電器に適用することができる。また、災害時に限らず、家電等の民生用、業務用、産業用等電気機器、例えば、レジャーや体育祭・文化祭などの学校行事、工事などの作業に使用する電気機器の電源装置として利用することができる。
 総じて、本発明のハイブリッド電源装置及びハイブリッド電源利用システムによれば、以下のような利点を有する。
(1)自然エネルギーによる発電電力が少ない時間帯や天候でも、その発電電力を有効に活用して負荷に給電または売電することができる。また、商用電源の停電時、特に災害発生による停電時には、避難所等における非常用電源装置として利用可能であり、省エネルギー性、環境保護性にも優れている。
(2)第1蓄電装置として、リチウムイオンキャパシタのように短時間での充放電が可能な蓄電装置を用いることにより、少ない電力を用いた高効率の充放電が可能である。
 本発明のハイブリッド電源装置、及び、このハイブリッド電源装置を備えたハイブリッド電源利用システムは、災害時の非常用電源装置以外にも各種の用途が見込めるものであり、汎用性が高い。
1,2:ハイブリッド電源利用システム
100:太陽光発電部
200,200’:充放電ユニット
201:入力側ダイオード
202:入力側検出部
203:第1入力側スイッチ
204:第1入力側DC/DCコンバータ
205:第1蓄電装置(LIC)
206:第1出力側DC/DCコンバータ
207:第1出力側スイッチ
208:第1出力側ダイオード
209,209’:第2入力側スイッチ
210:第2入力側DC/DCコンバータ
211:第2蓄電装置(LIB)
212:第2出力側DC/DCコンバータ
213:第2出力側スイッチ
214:第2出力側ダイオード
300:制御装置
400:負荷
501:パワーコンディショナシステム用スイッチ(パワコン用スイッチ)
502:パワーコンディショナシステム入力側ダイオード(パワコン入力側ダイオード)
503:パワーコンディショナシステム(PCS)
504:インバータ(INV)
 

Claims (9)

  1.  自然エネルギーを利用して発電した電力により複数の蓄電装置を充電し、前記蓄電装置を放電させて使用するハイブリッド電源装置であって、
     自然エネルギーにより発電する発電部と、
     前記発電部の発電電力が所定値以下である時に前記発電部の発電電力により充電される短時間充放電型の第1蓄電装置と、
     前記第1蓄電装置が満充電になってから充電を開始し、かつ、前記第1蓄電装置よりも大容量で長時間充放電型の第2蓄電装置と、
     前記発電部の発電電力、及び、前記第1蓄電装置並びに前記第2蓄電装置の充放電状態に基づいて、前記第1蓄電装置を前記第2蓄電装置よりも優先的に充電し、かつ、前記第1蓄電装置を前記第2蓄電装置よりも優先的に放電させてから前記第2蓄電装置を放電させるように充放電制御を行う制御装置と、
     を備えたことを特徴とするハイブリッド電源装置。
  2.  請求項1に記載したハイブリッド電源装置において、
     前記制御装置は、前記第1蓄電装置が満充電になったことを検出した時に、前記第1蓄電装置の充電を停止すると共に、前記発電部の発電電力により前記第2蓄電装置を充電するように制御することを特徴とするハイブリッド電源装置。
  3.  請求項1に記載したハイブリッド電源装置において、
     前記制御装置は、前記第1蓄電装置が満充電になったことを検出した時に、前記第1蓄電装置の充電を停止すると共に、前記第1蓄電装置の蓄電電力により前記第2蓄電装置を充電し、前記第2蓄電装置が満充電になったことを検出した時に前記第2蓄電装置の充電を停止し、更に前記第1蓄電装置を満充電にしてから前記第1蓄電装置の充電を停止するように制御することを特徴とするハイブリッド電源装置。
  4.  請求項1~3の何れか1項に記載したハイブリッド電源装置において、
     前記第1蓄電装置がリチウムイオンキャパシタであり、前記第2蓄電装置がリチウムイオン電池であることを特徴とするハイブリッド電源装置。
  5.  請求項1~3の何れか1項に記載したハイブリッド電源装置において、
     前記発電部が、太陽光により発電する太陽光発電部、風力により発電する風力発電部、水力により発電する水力発電部、のうちの何れかであることを特徴とするハイブリッド電源装置。
  6.  請求項1~3の何れか1項に記載したハイブリッド電源装置において、
     前記制御装置に外部から災害情報が入力された時に、前記制御装置は、前記第1蓄電装置または前記第2蓄電装置からの負荷への放電量を低減させるように制御することを特徴とするハイブリッド電源装置。
  7.  請求項5に記載したハイブリッド電源装置において、
     前記発電部としての太陽光発電部と、負荷としての照明装置と、を備え、
     前記制御装置は、日射量が少なく前記太陽光発電部による発電電力が少ない時間帯に前記第1蓄電装置を優先的に充電するように制御することを特徴とするハイブリッド電源利用システム。
  8.  請求項3に記載したハイブリッド電源装置と、前記発電部の発電電力を入力として売電用の電力を生成するパワーコンディショナシステムと、負荷と、を備え、
     前記第1蓄電装置及び前記第2蓄電装置が満充電の状態で、前記発電部の発電電力が前記パワーコンディショナシステムを運転可能な大きさである時は、前記制御装置により前記パワーコンディショナシステムを稼働させ、前記パワーコンディショナシステムから出力される電力を売電することを特徴とするハイブリッド電源利用システム。
  9.  請求項8に記載したハイブリッド電源利用システムにおいて、
     前記第1蓄電装置及び前記第2蓄電装置が満充電の状態で、前記発電部の発電電力が前記パワーコンディショナシステムを運転可能な大きさに満たない時は、前記制御装置により、前記第1蓄電装置を前記第2蓄電装置よりも優先的に放電させてその放電電力を負荷に供給し、または前記放電電力を売電することを特徴とするハイブリッド電源利用システム。
     
PCT/JP2014/074918 2014-09-19 2014-09-19 ハイブリッド電源装置及びハイブリッド電源利用システム WO2016042672A1 (ja)

Priority Applications (1)

Application Number Priority Date Filing Date Title
PCT/JP2014/074918 WO2016042672A1 (ja) 2014-09-19 2014-09-19 ハイブリッド電源装置及びハイブリッド電源利用システム

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2014/074918 WO2016042672A1 (ja) 2014-09-19 2014-09-19 ハイブリッド電源装置及びハイブリッド電源利用システム

Publications (1)

Publication Number Publication Date
WO2016042672A1 true WO2016042672A1 (ja) 2016-03-24

Family

ID=55532735

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2014/074918 WO2016042672A1 (ja) 2014-09-19 2014-09-19 ハイブリッド電源装置及びハイブリッド電源利用システム

Country Status (1)

Country Link
WO (1) WO2016042672A1 (ja)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000102190A (ja) * 1998-09-24 2000-04-07 Matsushita Electric Works Ltd 太陽電池照明装置
JP2003158831A (ja) * 2001-09-10 2003-05-30 Sanburijji:Kk 充放電可能な電源装置
JP2008187800A (ja) * 2007-01-29 2008-08-14 Matsushita Electric Ind Co Ltd 電源システム、電源システムの電力供給制御方法及びその電力供給制御プログラム
JP2009089585A (ja) * 2007-09-13 2009-04-23 Ricoh Co Ltd 電源装置、スキャナ用電源装置及び画像形成装置
JP2012029513A (ja) * 2010-07-27 2012-02-09 Selco Corp 太陽光発電による充放電制御装置及び太陽光発電による充放電制御方法

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000102190A (ja) * 1998-09-24 2000-04-07 Matsushita Electric Works Ltd 太陽電池照明装置
JP2003158831A (ja) * 2001-09-10 2003-05-30 Sanburijji:Kk 充放電可能な電源装置
JP2008187800A (ja) * 2007-01-29 2008-08-14 Matsushita Electric Ind Co Ltd 電源システム、電源システムの電力供給制御方法及びその電力供給制御プログラム
JP2009089585A (ja) * 2007-09-13 2009-04-23 Ricoh Co Ltd 電源装置、スキャナ用電源装置及び画像形成装置
JP2012029513A (ja) * 2010-07-27 2012-02-09 Selco Corp 太陽光発電による充放電制御装置及び太陽光発電による充放電制御方法

Similar Documents

Publication Publication Date Title
JP4641507B2 (ja) 給電システム
US9608438B2 (en) Inverter system for photovoltaic power generation
CN202109382U (zh) 登船桥太阳能光伏交流照明系统
CN102548154A (zh) 一种太阳能led照明系统控制装置
CN101820708A (zh) 一种可自动调节能量输出的节能控制器
CN101277028B (zh) 采用双蓄电池蓄电的太阳能电池供电系统
CN201663461U (zh) 一种风光电互补电源装置
KR20120058794A (ko) 신재생 에너지를 이용한 최적 경관 조명 시스템 및 방법
TWI686564B (zh) 複合型綠能路燈裝置
CN103024993A (zh) 一种节能室外照明控制系统及控制方法
JP5953663B2 (ja) 交通信号制御機
JP2004064855A (ja) 光電池を使用した電源装置
JP2017127173A (ja) 蓄電装置
CN202218031U (zh) 离网型电力输入控制系统
WO2016042672A1 (ja) ハイブリッド電源装置及びハイブリッド電源利用システム
KR20120071147A (ko) 스마트 태양광 가로등의 그룹화를 통한 분산 전원 시스템 및 그의 제어 방법
CN202444667U (zh) 风光互补led灯控制系统
JP2011199963A (ja) 発光装置
JP2012227999A (ja) 太陽光蓄発電システム
KR102555198B1 (ko) 슈퍼커패시터를 이용한 전압제어식 태양광 및 풍력 가로등 장치
WO2020087020A1 (en) Supplemental renewable energy system
JP2016144301A (ja) 太陽光発電による電力備蓄システム
CN203870914U (zh) 太阳能el场致发光显示系统
CN204062816U (zh) 一种集中储能式太阳能led路灯系统
KR101303027B1 (ko) 재생에너지 계통연계 시스템, 가로등 및 그의 제어 방법

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 14902231

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 14902231

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: JP