WO2016027378A1 - 需給制御装置、需給制御方法 - Google Patents

需給制御装置、需給制御方法 Download PDF

Info

Publication number
WO2016027378A1
WO2016027378A1 PCT/JP2014/072040 JP2014072040W WO2016027378A1 WO 2016027378 A1 WO2016027378 A1 WO 2016027378A1 JP 2014072040 W JP2014072040 W JP 2014072040W WO 2016027378 A1 WO2016027378 A1 WO 2016027378A1
Authority
WO
WIPO (PCT)
Prior art keywords
power
power generation
value
load
output
Prior art date
Application number
PCT/JP2014/072040
Other languages
English (en)
French (fr)
Inventor
充浩 竹下
高橋 知宏
大介 山下
弘章 杉原
田中 宏明
Original Assignee
中国電力株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 中国電力株式会社 filed Critical 中国電力株式会社
Priority to PCT/JP2014/072040 priority Critical patent/WO2016027378A1/ja
Priority to JP2016511455A priority patent/JP5946983B1/ja
Publication of WO2016027378A1 publication Critical patent/WO2016027378A1/ja

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/28Arrangements for balancing of the load in a network by storage of energy
    • H02J3/32Arrangements for balancing of the load in a network by storage of energy using batteries with converting means
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • H02J3/46Controlling of the sharing of output between the generators, converters, or transformers
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E70/00Other energy conversion or management systems reducing GHG emissions
    • Y02E70/30Systems combining energy storage with energy generation of non-fossil origin

Definitions

  • the present invention relates to a supply and demand control device and a supply and demand control method.
  • an electric power system provided on a remote island an electric power system to which an internal combustion power generation device (first power generation device), a renewable energy power generation device (second power generation device), a storage battery, and a load are connected is known (for example, Patent Documents). 1).
  • Renewable energy power generators have a structure that generates power using natural energy such as wind power and solar power, so the power generation output of renewable energy power generators is difficult to predict and depends on the weather conditions. It is unstable. Therefore, when introducing a renewable energy power generation device, (A) even if the power generation output of the renewable energy power generation device becomes zero, it is possible to supplement the supply of power to the load with the generated power of the internal combustion power generation device. B) The introduction amount of the renewable energy power generation apparatus is determined so as to satisfy the two conditions that the generated power of the renewable energy power generation apparatus does not become excessive.
  • condition (A) is “maximum output of internal combustion power generation device ⁇ number of internal combustion power generation devices> load
  • the condition (B) is expressed as “the minimum output of the internal combustion power generation apparatus ⁇ the number of internal combustion power generation apparatuses + the power generation output of the renewable energy power generation apparatus ⁇ the total load demand”.
  • the power generation output of the renewable energy power generation device in the corresponding area on the corresponding day is predicted to be low based on weather-related data transmitted from the Japan Meteorological Agency, and the storage battery charging capacity is set to be small.
  • the storage battery cannot charge all the surplus power, and the power generation is excessive due to a shortage of reduction. There is a risk of becoming.
  • the present invention provides a supply and demand control device that controls parallel and disconnection of the first power generator with respect to the power system so that the amount of power supplied to the load can be secured even when the power generation output of the second power generator fluctuates.
  • An object is to provide a supply and demand control method.
  • the main present invention for solving the above-mentioned problems is that a load frequency control is performed so that the demand and supply of power between the load and the load are balanced, and a plurality of first power generators that supply power to the load can be regenerated.
  • a load frequency control is performed so that the demand and supply of power between the load and the load are balanced, and a plurality of first power generators that supply power to the load can be regenerated.
  • the plurality of first power generation devices are connected in parallel and A supply and demand control device for controlling a row, wherein each rated output value of a first power generation device that is parallel to the power system among the plurality of first power generation devices and the first power supply that is parallel to the power system.
  • a first determination is made as to whether or not the first added value of the output value of the storage battery that continuously supplies power to the load until the power generation device is activated is insufficient with respect to the total demand of the load.
  • a determination unit and the first When the calculated value is insufficient with respect to the total demand of the load, a first control unit that parallels a predetermined first power generation device disconnected from the power system among the plurality of first power generation devices; It has.
  • the power system 1 includes a plurality of internal combustion power generation devices 2 (2-1 to 2-n), a plurality of renewable energy power generation devices 3 (3-1 to 3-n), a storage battery 4, and a plurality of loads 5 (5- 1 to 5-n) are connected to the power line 6.
  • the internal combustion power generation device 2 is a device that performs thermal power generation by turning the internal combustion engine with chemical energy released by the combustion of fuel, and is configured using, for example, a compression ignition engine using a diesel engine. Since the internal combustion power generator 2 has a feature that it can be started in a relatively short time, it is installed in a small-scale thermal power plant on a remote island and is operated efficiently.
  • the internal combustion power generator 2 is composed of n devices having the same rated output, and is selectively paralleled or disconnected from the power line 6 in accordance with a control command from a supply and demand controller 7 described later. .
  • the parallel internal combustion power generators 2 are started or stopped in accordance with a control command from the supply and demand controller 7, and load frequency control (LFC: LFC) is performed so that the power demand and supply with the load 5 are balanced. Perform Load (Frequency Control).
  • LFC load frequency control
  • the internal combustion power generator 2 may be referred to as DG.
  • the renewable energy power generation device 3 is a device that generates power using natural energy such as sunlight, wind power, wave power, tidal power, geothermal heat, and biomass.
  • the plurality of renewable energy power generation devices 3 may be power generation devices that use the same natural energy, or may be power generation devices that use different natural energy.
  • the storage battery 4 is composed of, for example, a sodium / sulfur battery (NAS battery: registered trademark), and has a capacity capable of charging surplus power of the renewable energy power generation device 3.
  • NAS battery registered trademark
  • Sodium-sulfur batteries are rechargeable batteries that use sodium (Na) as the negative electrode, sulfur (S) as the positive electrode, and ⁇ -alumina solid electrolyte as the electrolyte that separates both electrodes, and are repeatedly charged and discharged by a chemical reaction of sulfur and sodium ions. is there.
  • the storage battery 4 charges the surplus power of the renewable energy power generation device 3 according to a control command from the supply / demand control device 7 or discharges the charged power to the load 5 in accordance with the supply / demand plan of the power system 1.
  • the load 5 is a power device that consumes power in a consumer such as a private house, a public facility, or a factory. Power is supplied to the load 5 from any one of the internal combustion power generation device 2, the renewable energy power generation device 3, and the storage battery 4 depending on the situation.
  • the supply and demand control device 7 controls parallel and disconnection of the internal combustion power generation device 2 with respect to the power line 6, start and stop of the internal combustion power generation device 2, charge / discharge of the storage battery 4, and power flow of the power system 1.
  • the supply and demand control device 7 is provided together with the internal combustion power generation device 2 in, for example, a small-scale thermal power plant.
  • the supply and demand control device 7 includes the number N of internal combustion power generation devices 2 in parallel, the power generation output DG of the internal combustion power generation device 2, the power generation output RE of the renewable energy power generation device 3, and the output S of the storage battery 4.
  • Information indicating the charge level SOC of the storage battery 4, the total demand L of the load 5, and the frequency F of the power system 1 is input (positive during charging and negative during discharging).
  • the supply and demand control device 7 receives parallel and disconnection commands C for the internal combustion power generation device 2, start and stop commands D for the internal combustion power generation device 2, and charge / discharge commands E for the storage battery 4. Is output.
  • the supply and demand control device 7 includes an input unit 7A, a storage unit 7B, a control unit 7C, and an output unit 7D.
  • the input unit 7A includes the parallel number N of the internal combustion power generation devices 2 and the power generation output DG, the power generation output RE of the renewable energy power generation device 3, the output S and the charge level SOC of the storage battery 4, the total demand L of the load 5, the power system Information indicating the frequency F of 1 is input.
  • the storage unit 7B stores program data for generating the commands C to E from the above information, table data necessary for generating the commands C to E, and the like.
  • the control unit 7C Based on the program data and table data read from the storage unit 7B, the control unit 7C calculates the above information obtained from the input unit 7A to generate commands C to E.
  • the output unit 7D outputs commands C to E obtained from the control unit 7C.
  • the commands C to E are transmitted from, for example, a small-scale thermal power plant via a communication line when controlling the internal combustion power generation device
  • the total demand L of the load 5 at time t is expressed by the equation (1).
  • the receiving balance is satisfied by setting the output S of the storage battery 4 at time t + 1 to a value represented by the expression (3).
  • the output St + 1 of the storage battery 4 can be said to be a value at a time t + 1 after the so-called time t, which is determined from the result of the value on the right side at the time t.
  • the main body that controls the operation of FIG. 4 is the control unit 7C.
  • the power generation output of the internal combustion power generation device 2 performing the load frequency control has the minimum target value. It is desirable that the storage battery 4 be in a discharged state as much as possible so that control is performed so as not to fall below. Therefore, the supply and demand control device 7 determines that the internal combustion power generation device has a state where the charge level SOC of the storage battery 4 is equal to or higher than the first charge level T 1 in a state where the power generation output of the internal combustion power generation device 2 has not decreased to the minimum target value. Control is performed to discharge the storage battery 4 while performing load frequency control using at least one of the storage battery 2 and the storage battery 4.
  • the supply and demand control device 7 sets the charge level SOC of the storage battery 4 to the second charge level T 1 + ⁇ (> first charge level T 1) in a state where the power generation output of the internal combustion power generation device 2 has not decreased to the minimum target value.
  • control is performed to discharge the storage battery 4 while performing load frequency control using at least one of the internal combustion power generation device 2 and the storage battery 4 (S101). Details of step S101 will be described later.
  • the supply and demand control device 7 controls parallel and disconnection of the internal combustion power generation device 2 in accordance with fluctuations in the power generation output of the renewable energy power generation device 3, and the internal combustion power generation devices 2 that are already in parallel. Is also controlled (S102).
  • the supply and demand control device 7 for example, as a result of a decrease in the power generation output of the renewable energy power generation device 3, the power generation output (rated output) of the internal combustion power generation device 2 that is currently operating and the power generation output of the renewable energy power generation device 3.
  • the power generator 2 is started in parallel with the power system 1.
  • the supply and demand control device 7 for example, as a result of an increase in the power generation output of the renewable energy power generation device 3, the power generation output (minimum output) of the internal combustion power generation device 2 that is currently operating and the power generation output of the renewable energy power generation device 3.
  • the power generation output minimum output
  • the internal combustion power generation device 2 is a thermal power generation device that burns fuel. Therefore, if the internal combustion power generation device 2 is frequently started and stopped, the fuel consumption is deteriorated.
  • the supply and demand control device 7 controls the number of parallel internal combustion power generation devices 2 with respect to the power system 1 in accordance with fluctuations in the power generation output of the renewable energy power generation device 3. Therefore, since the internal combustion power generation device 2 is not always in parallel with the power system 1, even if the power generation output of the renewable energy power generation device 3 fluctuates, the internal combustion power generation device 2 stops immediately after starting or immediately after stopping. The start-up is not performed frequently, and an economic merit can be obtained. Details of step S102 will be described later.
  • the supply and demand control device 7 determines whether or not the number of the internal combustion power generation devices 2 arranged in parallel with the power system 1 is either a predetermined minimum number or a number that cannot be disconnected (S103). ).
  • the number of internal combustion power generation devices 2 that cannot be disconnected means the number of internal combustion power generation devices 2 that are parallel to the power system 1 when the supply and demand control device 7 determines in step S102 that it cannot be disconnected. That is.
  • the number of internal combustion power generators 2 that cannot be disconnected means the minimum number that can supply power to the load 5 without a shortage when the power generation output of the renewable energy power generator 3 becomes zero. is there.
  • the supply and demand controller 7 repeats the operation from step S101. .
  • the supply and demand control device 7 It is determined whether or not the output value of the generated power of the internal combustion power generator 2 parallel to the system 1 has reached the minimum target value (S104).
  • the minimum target value of the internal combustion power generator 2 is the minimum output value at which the internal combustion power generator 2 can supply power to the load 5.
  • the supply and demand controller 7 repeats the operation from step S101.
  • the number of internal combustion power generation devices 2 that are parallel to the power system 1 is either a predetermined minimum number or the number that cannot be disconnected, and the internal combustion power generation that is parallel to the power system 1.
  • the supply and demand control device 7 stores the storage battery so that the output value of the generated power of the internal combustion power generation device 2 does not fall below the minimum target value. 4 is controlled to charge the power generation output of the renewable energy power generation device 3 (S105). Details of step S105 will be described later.
  • the overall control operation of the supply and demand control device 7 is an operation of repeating the above steps S101 to S105.
  • step S ⁇ b> 101 in FIG. 4 at the time when the output value of the generated power of the internal combustion power generator 2 arranged in parallel with the power system 1 is larger than the minimum target value will be described.
  • the main body that controls the operation of FIG. 5 is the control unit 7C.
  • the supply and demand control device 7 determines whether or not it is necessary to set the second charge level T 1 + ⁇ as a reference level to be compared with the charge level SOC of the storage battery 4 according to the calculation result of the control unit 7C (S201). ).
  • the supply and demand control device 7 When it is necessary to set the second charge level T 1 + ⁇ (S201: YES), the supply and demand control device 7 generates a predetermined charge level ⁇ (> 0) and sets the second charge level T 1 + ⁇ ( S202).
  • the case where the setting of the second charge level T 1 + ⁇ is necessary is, for example, a case where it is expected that any of the internal combustion power generation devices 2 needs to be started in a short time in parallel with the power system 1. is there.
  • the supply and demand control device 7 determines whether or not the charge level SOC of the storage battery 4 is equal to or higher than the second charge level T 1 + ⁇ (S203).
  • the charge level SOC of the storage battery 4 is less than the second charge level T 1 + ⁇ (S203: NO)
  • the discharge of the storage battery 4 stops at the second charge level T 1 + ⁇ higher than the first charge level T 1
  • the internal combustion power generator 2 that is expected to be parallel to the power system 1 is disconnected. As it is, power can be supplied from the storage battery 4 to the load 5.
  • the supply and demand control device 7, and outputs a command at step S205 the flow returns to the determination of the necessity of first charge level T 1 or second charge level T 1 + alpha settings in step S201.
  • ⁇ DG ctl represents the total adjustment output when the N internal combustion power generation devices 2 parallel to the power system 1 perform load frequency control. That is, as conditions for stopping the discharge of the storage battery 4, the adjustment output ⁇ DG ctl of the internal combustion power generation device 2 on the power supply side, the power generation output RE of the renewable energy power generation device 3, and the load 5 on the power demand side
  • the internal combustion power generation device 2 outputs the adjustment output ⁇ DG ctl with the load frequency controlled so that the difference from the total demand L becomes zero.
  • the supply and demand control device 7 sets the predetermined charge level ⁇ to zero and sets the first charge level T 1 (S206).
  • the case where the setting of the second charge level T 1 + ⁇ is unnecessary is a case where, for example, any of the internal combustion power generation devices 2 is expected not to be started in a short time in parallel with the power system 1. is there. In this case, even if the total generated power of the internal combustion power generation device 2 and the renewable energy power generation device 3 exceeds the total demand of the load 5, the power generation output of the internal combustion power generation device 2 performing the load frequency control is the minimum target value.
  • the control (modes A to C) for discharging the storage battery 4 as much as possible is performed so that the control is performed so as not to fall below.
  • the supply and demand control device 7 determines whether or not the charge level SOC of the storage battery 4 is equal to or higher than the first charge level T 1 (S207).
  • the supply and demand control device 7 executes the above steps S204 and S205, stops the discharge of the storage battery 4, and A command is output so that the load frequency control is performed only by the internal combustion power generator 2 that is already in parallel with the power generator 1.
  • the supply and demand controller 7 discharges the storage battery 4
  • One of the three modes A to C is selected (S208).
  • a selection method of the three types of modes A to C for example, a method in which an operator manually selects any one of the three types of modes A to C, or the supply / demand control device 7 selects the three types of modes A to C. A method of selecting either one according to the condition including the total demand L of the load 5 is conceivable.
  • the supply and demand control device 7 determines that the charge level of the storage battery 4 is equal to or higher than the first charge level T 1 or the second charge level T 1 + ⁇ , for example, three types of modes A to C for the worker. Output an alarm to prompt selection.
  • the supply / demand control device 7 receives a signal notifying that the worker has selected one of the three modes A to C, the supply / demand control device 7 can execute the mode selected by the worker.
  • the three types of modes A to C are respectively associated with the three types of sizes of the total demand L of the load 5.
  • the supply and demand control device 7 determines the total demand L of the load 5 from among the three modes A to C. The mode corresponding to can be selected and executed.
  • the supply and demand control device 7 controls the storage battery 4 to discharge at a constant output (S209) and is parallel to the power system 1.
  • a command is output so that the load frequency control is performed only by the internal combustion power generation device 2 that is in operation (S210).
  • the supply and demand control device 7 stops the load frequency control of the internal combustion power generation device 2 parallel to the power system 1, and this internal combustion
  • the power generation output of the power generation device 2 is fixed to the minimum output that is the minimum target value (S211), and a command is output so that the storage battery 4 performs load frequency control (S212).
  • the supply and demand control device 7 When the mode C for discharging the storage battery 4 is selected (S208: C), the supply and demand control device 7 performs the load frequency control of the storage battery 4 (S213), and the internal combustion power generation parallel to the power system 1 The apparatus 2 also outputs a command to perform load frequency control (S214). The supply and demand control device 7, and outputs a command at step S214, the flow returns to the determination of the necessity of first charge level T 1 or second charge level T 1 + alpha settings in step S201.
  • the internal combustion power generator 2 outputs the adjusted output ⁇ DG ctl while controlling the load frequency while considering the power generation output RE of the renewable energy power generator 3 and the total demand L of the load 5, and the storage battery 4 controls the load frequency. Then, control is performed so as to output the adjustment output Sctl .
  • the storage battery 4 can be discharged.
  • step S102 of FIG. 4 for controlling the parallel and disconnection of the internal combustion power generation device 2 with respect to the power system 1 according to the fluctuation of the power generation output of the renewable energy power generation device 3 will be described.
  • the supply and demand control device 7 applies to the power system 1 according to equations (8) and (9). It is determined whether or not the internal combustion power generator 2 should be paralleled or disconnected.
  • ⁇ DG max is the total of the rated outputs (maximum outputs) of the N internal combustion power generators 2 in parallel with the power system 1
  • S Ts is the load 5 until the internal combustion power generator 2 is activated.
  • ⁇ 1 is a margin for fluctuations in demand of the load 5
  • ⁇ RE is a rapid decrease in the power generation output of the renewable energy generator 3 Even if it does, it represents the minimum expected output.
  • ⁇ DG max is the total of the rated outputs of the N ⁇ 1 internal combustion power generators 2 assumed to be parallel to the power system 1, and ⁇ 2 represents a margin for fluctuations in the demand of the load 5.
  • ⁇ RE is 20% of this It represents the power generation output. Note that ⁇ RE is an expected value and may be omitted from the equations (8) and (9).
  • Equation (8) is obtained by calculating the load 5 including the margin ⁇ 1 when the sum of the rated output ⁇ DG max of the N internal combustion power generation devices 2, the expected output ⁇ RE of the renewable energy power generation device 3, and the output S Ts of the storage battery 4. It represents that it is less than the total demand L. That is, Expression (8) represents that the amount of power supplied to the load 5 is insufficient. Therefore, when the condition of Expression (8) is satisfied, the supply and demand control device 7 parallels one internal combustion power generation device 2 among the already disconnected internal combustion power generation devices 2 with respect to the power system 1. Command is output. One internal combustion power generator 2 is started in parallel with the power system 1 in response to this command. In this way, the number of internal combustion power generators 2 arranged in parallel with the power system 1 is changed from N to N + 1.
  • Equation (9) assumes that the number of internal combustion power generators 2 in parallel with the power system 1 has decreased from N to N ⁇ 1, and the rating of N ⁇ 1 internal combustion power generators 2
  • the sum of the output ⁇ DG max , the expected output ⁇ RE of the renewable energy power generation device 3 and the (discharge) output ⁇ S Ts of the storage battery 4 is equal to or greater than the total demand L of the load 5 including the margin ⁇ 2 . That is, equation (9) represents that the amount of power supplied to the load 5 remains even if the number of internal combustion power generation devices 2 decreases from the current N to N ⁇ 1.
  • the supply and demand control device 7 disconnects one internal combustion power generation device 2 from the internal combustion power generation devices 2 already in parallel with the power system 1.
  • Command is output.
  • One internal combustion power generator 2 is disconnected from the power system 1 in response to this command. In this way, the number of internal combustion power generators 2 in parallel with the power system 1 is reduced from N to N-1.
  • the supply and demand control device 7 has an internal combustion system for the power system 1 according to the equation (10) for the purpose of securing a “lowering allowance (reduction margin)” that is an adjustment force that systematically lowers the output of the internal combustion power generation device 2. It is determined whether or not the power generator 2 should be paralleled or disconnected.
  • ⁇ DG min is the sum of the minimum outputs (minimum target values) of the N internal combustion power generators 2 in parallel with the power system 1 and ⁇ RE i is the current output subtracted from the rated output of the renewable energy generator 3.
  • S max represents the rated output (charge) of the storage battery 4)
  • ⁇ RE i included in Expression (10) is expressed by Expression (11).
  • + ⁇ RE i indicates that the power generation output of the renewable energy power generation device 3 increases from the current output to the rated output. That is, + ⁇ RE i represents a margin for reducing the power generation output of the internal combustion power generation device 2. Therefore, Expression (10) indicates that the power generation output of the renewable energy power generation device 3 increases to the rated output when the power generation output of the internal combustion power generation device 2 is at the minimum target value, and there is no allowance for lowering the internal combustion power generation device 2. Although the storage battery 4 has been charged to the rated output, the power supplied from the internal combustion power generation device 2 and the renewable energy power generation device 3 to the load 5 is surplus.
  • the supply and demand control device 7 disconnects one internal combustion power generation device 2 from the internal combustion power generation devices 2 already in parallel with the power system 1.
  • Command is output.
  • One internal combustion power generator 2 is disconnected from the power system 1 in response to this command.
  • the number of internal combustion power generators 2 in parallel with the power system 1 is reduced from N to N-1.
  • the “raising allowance” should not be such that the amount of power supplied to the load 5 is insufficient.
  • the supply and demand control device 7 follows the formula (12) in addition to the formula (10) for the purpose of securing “a raise margin (a surplus surplus power)” that is an adjustment force that systematically increases the output of the internal combustion power generation device 2. It is determined whether or not the internal combustion power generation apparatus 2 should be paralleled or disconnected from the power system 1.
  • ⁇ DG max is the total of the rated outputs of the N ⁇ 1 internal combustion power generators 2 assumed to be in parallel with the power grid 1
  • ⁇ RE d is the current output of the renewable energy power generator 3
  • S max is (Represents the rated output (discharge: negative value) of the storage battery 4)
  • ⁇ RE d included in Expression (12) is expressed by Expression (13).
  • Equation (12) assumes that the number of internal combustion power generators 2 in parallel with the power system 1 has decreased from N to N ⁇ 1, and the power output of the internal combustion power generator 2 is the rated output. In this state, the power generation output of the renewable energy power generation device 3 becomes zero, and there is no need to raise the internal combustion power generation device 2, and the rated output of the storage battery 4 is supplied to the load 5.
  • the supply / demand control apparatus 7 selects one internal combustion power generator 2 from the internal combustion power generation apparatus 2 already in parallel with the power system 1. It is better to output a command for disconnecting the power generation device 2. One internal combustion power generator 2 is disconnected from the power system 1 in response to this command. In this way, the number of internal combustion power generators 2 in parallel with the power system 1 decreases from N to N ⁇ 1, but the lowering and raising allowances for the N ⁇ 1 internal combustion power generators 2 are secured.
  • equations (10) and (12) indicate that when the power generation output of the renewable energy power generation device 3 fluctuates and reaches a minimum output or a rated output, the internal combustion power generation device 2 is newly connected to the power system 1 in parallel. It can be said that it is an equation for determining whether or not the supply amount of power to the load 5 becomes excessive or insufficient without disconnecting.
  • step S102 of FIG. 4 the parallelism and disconnection of the internal combustion power generator 2 with respect to the power system 1 are controlled in consideration of all the conditions of the equations (8), (9), (10), and (12), and the load 5 controls the number of internal combustion power generation devices 2 that supply power to the power.
  • the future generation power RE ′ is predicted from the output fluctuation distribution in the future (for example, after several minutes) in consideration of the power generation output RE of the renewable energy power generation device 3, and the amount of power supplied to the load 5 is secured by the generation power RE ′.
  • the supply and demand control device 7 outputs a command for disconnecting one internal combustion power generation device 2 from the power system 1.
  • the raising allowance ⁇ P i of the internal combustion power generation device 2 is expressed by Expression (15) based on Expression (12).
  • ⁇ P d and ⁇ P i the one with the smaller expected frequency fluctuation in terms of the amount of damage.
  • the supply and demand control device 7 disconnects one internal combustion power generation device 2 from the power system 1. That is, ⁇ P d is a shortage of the lowering allowance, and if the value of ⁇ P d is a positive value, it represents a shortage of the lowering allowance.
  • [Delta] P i is a raised margin when the internal combustion power generation apparatus 2 and one disconnection from the power system 1 in order to solve the shortage of lower cost, the lack of increased cost if it is negative value is the value of [Delta] P i To express. Then, when one internal combustion power generation device 2 is disconnected and the raising allowance is insufficient, the shortage amount is reduced compared with the lowering allowance insufficient when the internal combustion power generation device 2 is not disconnected. Determine whether to line up.
  • securing the lowering allowance is given priority over securing the raising allowance. That is, regardless of whether the condition of Expression (12) is satisfied, when the condition of Expression (10) is satisfied, the supply and demand control device 7 outputs a command for disconnecting one internal combustion power generation device 2 from the power system 1. To do.
  • step S105 in FIG. 4 Details of step S105 in FIG. 4 will be described using one control method with reference to FIGS.
  • the main body that controls the operation of FIG. 6 is the control unit 7C.
  • the supply and demand control device 7 determines whether or not the output value of each generated power of the internal combustion power generation device 2 parallel to the power system 1 has reached a predetermined minimum target value while decreasing (S301). ).
  • the supply and demand control device 7 exceeds the minimum target value of the output value of each generated power of the internal combustion power generation device 2.
  • a command for changing the output S of the storage battery 4 to the output S + ⁇ S is output so that the output S of the storage battery 4 increases step by step with ⁇ S as a unit (S302).
  • ⁇ S is an amount set in advance.
  • step S302 When the command in step S302 is output, the storage battery 4 charges the power generation output of the renewable energy power generation device 3 so that the output S of the storage battery 4 increases by ⁇ S. At this time, since the internal combustion power generation device 2 performs load frequency control over the entire power system 1, if the power generation output of the renewable energy power generation device 3 decreases as the storage battery 4 is charged, the internal combustion power generation The power generation output of the device 2 will increase. Then, step S301 is executed again. When the output value of each generated power of the internal combustion power generation device 2 does not exceed the minimum target value (S301: YES), the supply and demand control device 7 outputs a command for changing the output S + ⁇ S of the storage battery 4 to the output S + 2 ⁇ S ( S302).
  • Step S302 When the command in step S302 is output, the storage battery 4 charges the power generation output of the renewable energy power generation device 3 so that the output S + ⁇ S of the storage battery 4 increases by ⁇ S. Steps S301 and S302 are repeatedly executed until the output value of each generated power of the internal combustion power generation device 2 exceeds the minimum target value.
  • the supply and demand controller 7 determines that the output value of each generated power of the internal combustion power generator 2 is the minimum target value + ⁇ S + ⁇ ( It is determined whether or not ⁇ ⁇ S) is exceeded (S303). For convenience of explanation, it is assumed that the output of the storage battery 4 when executing step S303 for the first time is S.
  • the supply and demand control device 7 sets the output value of each generated power of the internal combustion power generation device 2 as the minimum target value.
  • a command for changing the output S of the storage battery 4 to the output S ⁇ S is output so that the output S of the storage battery 4 decreases step by step with ⁇ S as a unit in order to make the value between the minimum target value + ⁇ S. (S304).
  • the command in step S304 is output, the storage battery 4 is discharged to the load 5 so that the output S of the storage battery 4 is decreased by ⁇ S.
  • the internal combustion power generation apparatus 2 performs load frequency control over the entire power system 1, the power generation output of the internal combustion power generation apparatus 2 decreases as the storage battery 4 is discharged. Then, step S301 is executed again.
  • Step S304 When the output value of each generated power of the internal combustion power generation device 2 continues to exceed the minimum target value + ⁇ S + ⁇ (S303: YES), the supply and demand control device 7 changes the output S ⁇ S of the storage battery 4 to the output S ⁇ 2 ⁇ S. Command is output (S304). When the command in step S304 is output, the storage battery 4 is discharged to the load 5 so that the output S- ⁇ S of the storage battery 4 is decreased by ⁇ S. Steps S301, S303, and S304 are repeatedly executed until the output value of each generated power of the internal combustion power generation device 2 falls below the minimum target value + ⁇ S + ⁇ .
  • step S301 When the output value of each generated electric power of the internal combustion power generator 2 is below the minimum target value + ⁇ S + ⁇ (S303: NO), it is determined whether or not the output S of the storage battery 4 is a negative value (S305). When the output S of the storage battery 4 is a positive value (S305: NO), the storage battery 4 is being charged, so step S301 is executed again.
  • the supply and demand control device 7 outputs a command for stopping charging / discharging of the storage battery 4 (S306).
  • the storage battery 4 stops charging and discharging, and the output S of the storage battery 4 becomes zero.
  • the horizontal axis represents time, and the vertical axis represents the power generation output level of the internal combustion power generation device 2.
  • the solid line indicates the power generation output of the internal combustion power generation device 2 when the storage battery 4 is not charged / discharged, which is a value obtained by subtracting the power generation output of the renewable energy power generation device 3 from the total demand of the load 5.
  • the alternate long and short dash line indicates how the output S of the storage battery 4 increases or decreases with ⁇ S as a unit.
  • a downward change in the output S of the storage battery 4 indicates ⁇ S charging, and an upward change in the output S of the storage battery 4 indicates ⁇ S discharge.
  • the thick broken line indicates the power generation output of the internal combustion power generation apparatus 2 when the storage battery 4 is charged and discharged.
  • the thin broken line indicates the minimum target value of the internal combustion power generation device 2.
  • the storage battery 4 When the power generation output of the internal combustion power generation device 2 decreases and reaches the minimum target value, the storage battery 4 generates power from the renewable energy power generation device 3 so that the output S of the storage battery 4 at this time increases by one step with ⁇ S as a unit. The output is charged, and accordingly, the power generation output of the internal combustion power generation device 2 increases (time t1, t2, t3). When the power generation output of the internal combustion power generator 2 exceeds the minimum target value + ⁇ S + ⁇ , the storage battery 4 is discharged to the load 5 so that the output S of the storage battery 4 at this time decreases by one step with ⁇ S as a unit. Accordingly, the power generation output of the internal combustion power generation device 2 decreases (time t4, t5, t6). After time t6, the power generation output of the internal combustion power generation device 2 exceeds the minimum target value, and charging / discharging of the storage battery 4 stops.
  • FIG. 6 The operation of FIG. 6 will be described with reference to FIG.
  • the output S of the storage battery 4 at this time increases by ⁇ S, and thus the power generation output of the internal combustion power generation device 2 increases.
  • the power generation output of the internal combustion power generation apparatus 2 exceeds the minimum target value + ⁇ S + ⁇
  • the output S of the storage battery 4 at this time decreases by ⁇ S, and thus the power generation output of the internal combustion power generation apparatus 2 decreases.
  • the power generation output of the internal combustion power generator 2 changes between the minimum target value and the minimum target value + ⁇ S according to the charge / discharge of the storage battery 4.
  • the storage battery 4 charges the power generation output of the renewable energy power generation device 3, so that the power generation output of the internal combustion power generation device 2 is the minimum target value. It is maintained above, and it becomes possible to secure the allowance for lowering the internal combustion power generation device 2. Moreover, since the internal combustion power generation device 2 continues the load frequency control while the storage battery 4 is charging / discharging, it is possible to perform the load frequency control with good continuity in the power system 1.
  • step S303 the power generation output of the internal combustion power generation device 2 is compared, and since ⁇ smaller than ⁇ S, which is a change unit when increasing or decreasing the output S of the storage battery 4, is included, the internal combustion power generation device The power generation output of 2 can be converged within the range of one step between the lowest target value and the lowest target value + ⁇ S (minimum target value + ⁇ ).
  • step S105 in FIG. 4 Details of step S105 in FIG. 4 will be described using another control method with reference to FIGS.
  • the main body that controls the operation of FIG. 9 is the control unit 7C.
  • the supply and demand control device 7 determines that the internal combustion power generation device 2 The load frequency control is stopped, and a command for fixing the power generation output of the internal combustion power generation device 2 to the minimum target value is output (S401).
  • the command in step S401 is output, the load frequency control by the internal combustion power generation device 2 is stopped, and the power generation output of the internal combustion power generation device 2 is fixed to the minimum target value.
  • the renewable energy power generation device When the total power output of the internal combustion power generation device 2 and the renewable energy power generation device 3 exceeds the total demand of the load 5 in a state where the power generation output of the internal combustion power generation device 2 is fixed to the minimum target value, the renewable energy power generation device Therefore, it is necessary to charge only the surplus power of the renewable energy power generation device 3 using the storage battery 4. Therefore, during the period in which the power generation output of the internal combustion power generation device 2 is fixed to the minimum target value, the supply / demand control device 7 charges the storage battery 4 so that the demand and supply of power with the load 5 are balanced.
  • the command for performing the load frequency control is output (S402). When the command in step S402 is output, the adjustment output S ctl of the storage battery 4 is controlled so that the condition shown in the following equation (16) is satisfied.
  • the supply and demand control device 7 determines whether or not the output S of the storage battery 4 is less than a predetermined negative value ⁇ as a result of the load frequency control performed by the storage battery 4 (S403). When the output S of the storage battery 4 is greater than or equal to ⁇ (S403: NO), since the discharge amount of the storage battery 4 has not reached the amount corresponding to ⁇ , the supply and demand control device 7 loads the load while the storage battery 4 is charging. A command for performing frequency control is continuously output (S402).
  • the supply / demand control device 7 charges / discharges the storage battery 4 because the discharge amount of the storage battery 4 has reached an amount corresponding to ⁇ .
  • a command for stopping is output (S404).
  • the storage battery 4 stops charging / discharging, and the output S of the storage battery 4 becomes zero. Therefore, the load frequency control by the storage battery 4 is stopped.
  • the supply and demand control device 7 releases the state where the power generation output of the internal combustion power generation device 2 is fixed to the minimum target value, and outputs a command for restarting the load frequency control by the internal combustion power generation device 2 (S405).
  • the command in step S405 is output, the load frequency control by the internal combustion power generation device 2 is resumed, and the power generation output of the internal combustion power generation device 2 changes according to the load frequency control.
  • FIG. 9 The operation of FIG. 9 will be described with reference to FIG.
  • the horizontal axis represents time, and the vertical axis represents the power generation output level of the internal combustion power generation device 2.
  • a thick solid line indicates a power generation output of the internal combustion power generation apparatus 2 when the load frequency control by the storage battery 4 is not performed, and a value obtained by subtracting the power generation output of the renewable energy power generation apparatus 3 from the total demand of the load 5. Yes.
  • the thin solid line indicates the power generation output of the internal combustion power generation apparatus 2 when the load frequency control by the storage battery 4 is performed.
  • the thin broken line indicates the minimum target value of the internal combustion power generation device 2.
  • the load frequency control by the internal combustion power generation apparatus 2 stops and the power generation output of the internal combustion power generation apparatus 2 is fixed to the minimum target value (thin solid line). Is done.
  • the storage battery 4 performs load frequency control while charging so that the demand and supply of power among the internal combustion power generation device 2 and the renewable energy power generation device 3 and the load 5 are balanced (time t1).
  • the discharge amount of the storage battery 4 reaches an amount corresponding to ⁇
  • the load frequency control by the storage battery 4 is stopped, the state where the power generation output of the internal combustion power generation device 2 is fixed to the minimum target value is released, and the internal combustion engine The power generator 2 resumes the load frequency control (time t2).
  • load frequency control is performed so that the demand and supply of power to and from the load 5 are balanced, and the plurality of internal combustion power generation devices 2 that supply power to the load 5 and the power to the load 5 are supplied.
  • the supply and demand control device 7 which is a rated output value of the internal combustion power generation device 2 that is parallel to the power system 1 among the plurality of internal combustion power generation devices 2, and the internal combustion power generation device 2 that is parallel to the power system 1.
  • a function for determining whether or not the first added value of the output value of the storage battery 4 that continuously supplies power to the load 5 until it is activated is insufficient with respect to the total demand of the load 5; 1 added value is the total demand of load 5
  • a control unit 7C to perform a function for parallel a predetermined internal combustion power generation device 2 which is Kairetsu from the power system 1 of the plurality of internal combustion power generation device 2.
  • the total demand of the load 5 may be a value obtained by subtracting the power generation output that can be expected at the minimum even if the power generation output of the renewable energy power generation device 3 decreases. Thereby, it becomes possible to control parallelism of the internal combustion power generation device 2 with respect to the power system 1 in consideration of the generated power of the renewable energy power generation device 3.
  • control unit 7C has each rated output value when it is assumed that the predetermined internal combustion power generation device 2 is disconnected from the internal combustion power generation device 2 that is parallel to the power system 1 among the plurality of internal combustion power generation devices 2. And the output value of the storage battery 4 that continuously supplies power to the load 5 until the internal combustion power generator 2 in parallel with the power system 1 is started up, If the second added value is not insufficient with respect to the total demand of the load 5, the predetermined internal combustion power generator 2 that is parallel to the power system 1 is solved. And the function to queue.
  • the total demand of the load 5 may be a value obtained by subtracting the power generation output that can be expected at the minimum even if the power generation output of the renewable energy power generation device 3 decreases. Thereby, it is possible to control the disconnection of the internal combustion power generation device 2 with respect to the power system 1 in consideration of the generated power of the renewable energy power generation device 3.
  • the control unit 7C also sets the minimum target value of the internal combustion power generation device 2 that is parallel to the power system 1 among the plurality of internal combustion power generation devices 2, the output value of the renewable energy power generation device 3, and the renewable energy.
  • the third added value of the fluctuation value when the output value of the power generation device 3 increases to the rated output value is insufficient with respect to the fourth added value of the total demand of the load 5 and the rated output value of the storage battery 4.
  • control unit 7C has each rated output value when it is assumed that the predetermined internal combustion power generation device 2 is disconnected from the internal combustion power generation device 2 that is parallel to the power system 1 among the plurality of internal combustion power generation devices 2.
  • the first subtracted value of the sum of the output value of the renewable energy power generator 3 and the fluctuation value when the output value of the renewable energy power generator 3 becomes zero is the total demand of the load 5 and the storage battery.
  • the predetermined internal combustion power generation device 2 is disconnected. As a result, it is possible to secure a margin for raising the internal combustion power generation device 2.
  • this embodiment is for making an understanding of this invention easy, and is not for limiting and interpreting this invention.
  • the present invention can be changed and improved without departing from the gist thereof, and the present invention includes equivalents thereof.

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

 負荷との間における電力の需要及び供給がバランスするように負荷周波数制御が行われ、前記負荷に電力を供給する複数の第1発電装置と、再生可能エネルギーを用いて前記負荷に電力を供給する第2発電装置と、前記第2発電装置の発電電力を充電する蓄電池と、が接続される電力系統において、前記複数の第1発電装置の並列及び解列を制御する需給制御装置であって、前記複数の第1発電装置のうち前記電力系統に並列されている第1発電装置の各定格出力値と、前記電力系統に並列されている前記第1発電装置が起動されるまで前記負荷に電力を連続して供給する前記蓄電池の出力値と、の第1加算値が、前記負荷の総需要に対して不足しているか否かを判定する第1判定部と、前記第1加算値が前記負荷の総需要に対して不足している場合、前記複数の第1発電装置のうち前記電力系統から解列されている所定の第1発電装置を並列させる第1制御部と、を備える。

Description

需給制御装置、需給制御方法
 本発明は、需給制御装置、需給制御方法に関する。
 例えば離島に設けられる電力系統として、内燃力発電装置(第1発電装置)、再生可能エネルギー発電装置(第2発電装置)、蓄電池、負荷が接続される電力系統が知られている(例えば特許文献1)。
 再生可能エネルギー発電装置は風力や太陽光等の自然エネルギーを用いて発電を行う構造であるため、再生可能エネルギー発電装置の発電出力は予測が困難であることに加え天候の状態に左右されてしまい不安定である。そこで、再生可能エネルギー発電装置を導入する場合、(A)再生可能エネルギー発電装置の発電出力が零になったとしても、内燃力発電装置の発電電力で負荷への電力の供給を補えること、(B)再生可能エネルギー発電装置の発電電力が余剰にならないこと、の2条件を満足するように、再生可能エネルギー発電装置の導入量は定められている。ここで、内燃力発電装置を複数設置する場合、仮に同一の内燃力発電装置を設置することとすると、条件(A)は「内燃力発電装置の最大出力×内燃力発電装置の台数>負荷の総需要」と表され、条件(B)は「内燃力発電装置の最低出力×内燃力発電装置の台数+再生可能エネルギー発電装置の発電出力<負荷の総需要」と表される。
 しかし、地球環境を保護する観点から、再生可能エネルギー発電装置の導入は拡大する方が望ましい。そこで、再生可能エネルギー発電装置を導入した結果、条件(A)(B)を満足せず、再生可能エネルギー発電装置の発電電力が余剰になるような場合、蓄電池を用いて余剰電力を充電し、電力系統の需給計画に従って蓄電池の充電電力を負荷に放電することが行われている。このようにして、上記の電力系統において再生可能エネルギー発電装置の導入を拡大させている。
特開2011-114945号公報
 しかし、再生可能エネルギー発電装置の発電出力を正確に予測することは困難であるため、以下のような問題を生じる。例えば、気象庁から発信される天候に関するデータに基づいて、該当日の該当地域における再生可能エネルギー発電装置の発電出力が低くなると予測され、蓄電池の充電余力が少なく設定されている場合を想定する。この場合、上記の予測が外れて再生可能エネルギー発電装置の発電出力が高くなって余剰電力が生じたとしても、蓄電池は余剰電力を全て充電することができなくなり、下げ代が不足して発電過剰になる虞がある。
 そこで、本発明は、第2発電装置の発電出力が変動した場合でも、負荷に対する電力の供給量を確保できるように、電力系統に対する第1発電装置の並列及び解列を制御する需給制御装置、需給制御方法を提供することを目的とする。
 前述した課題を解決する主たる本発明は、負荷との間における電力の需要及び供給がバランスするように負荷周波数制御が行われ、前記負荷に電力を供給する複数の第1発電装置と、再生可能エネルギーを用いて前記負荷に電力を供給する第2発電装置と、前記第2発電装置の発電電力を充電する蓄電池と、が接続される電力系統において、前記複数の第1発電装置の並列及び解列を制御する需給制御装置であって、前記複数の第1発電装置のうち前記電力系統に並列されている第1発電装置の各定格出力値と、前記電力系統に並列されている前記第1発電装置が起動されるまで前記負荷に電力を連続して供給する前記蓄電池の出力値と、の第1加算値が、前記負荷の総需要に対して不足しているか否かを判定する第1判定部と、前記第1加算値が前記負荷の総需要に対して不足している場合、前記複数の第1発電装置のうち前記電力系統から解列されている所定の第1発電装置を並列させる第1制御部と、を備えている。
 本発明の他の特徴については、添付図面及び本明細書の記載により明らかとなる。
 本発明によれば、第2発電装置の発電出力が変動した場合でも、負荷に対する電力の供給量を確保できるように、電力系統に対する第1発電装置の並列及び解列を制御することが可能になる。
本実施形態に係る需給制御装置によって制御される電力系統の一例を示す図である。 本実施形態に係る需給制御装置に対する入出力を示す図である。 本実施形態に係る需給制御装置の構成を示す図である。 本実施形態に係る需給制御装置の全体制御動作を示すフローチャートである。 本実施形態に係る需給制御装置の常時の需給制御動作を示すフローチャートである。 内燃力発電装置が最低台数又は解列不可台数で内燃力発電装置の発電出力が最低出力を下回ったときの、本実施形態に係る需給制御装置の需給制御動作を示すフローチャートである。 内燃力発電装置が最低台数又は解列不可台数で内燃力発電装置の発電出力が最低出力の下回ったときの、本実施形態に係る需給制御装置の特性を示す図である。 内燃力発電装置が最低台数又は解列不可台数で内燃力発電装置の発電出力が最低出力を下回ったときの、本実施形態に係る需給制御装置の特性を示す図である。 内燃力発電装置が最低台数又は解列不可台数で内燃力発電装置の発電出力が最低出力を下回ったときの、本実施形態に係る需給制御装置の他の需給制御動作を示すフローチャートである。 内燃力発電装置が最低台数又は解列不可台数で内燃力発電装置の発電出力が最低出力を下回ったときの、本実施形態に係る需給制御装置の他の特性を示す図である。
 本明細書および添付図面の記載により、少なくとも以下の事項が明らかとなる。
===電力系統===
 以下、図1乃至図3を参照して、本実施形態に係る需給制御装置によって制御される電力系統について説明する。尚、図1の電力系統は例えば離島等の僻地に設けられることとする。
 電力系統1は、複数の内燃力発電装置2(2-1~2-n)、複数の再生可能エネルギー発電装置3(3-1~3-n)、蓄電池4、複数の負荷5(5-1~5-n)が電力線6に接続されて構成されている。
 内燃力発電装置2は、燃料の燃焼で放出される化学エネルギーで内燃機関を回して火力発電を行う装置であり、例えばディーゼルエンジンを用いる圧縮着火機関を用いて構成されている。内燃力発電装置2は、比較的短時間で起動可能な特長を有しているため、離島における小規模火力発電所に設置されて効率的に稼働される。内燃力発電装置2は、同一の定格出力を有するn個の装置から構成されることとし、後述する需給制御装置7からの制御指令に従って、電力線6に対して選択的に並列又は解列される。そして、並列された内燃力発電装置2は、需給制御装置7からの制御指令に従って、起動又は停止するとともに、負荷5との間における電力の需要及び供給がバランスするように負荷周波数制御(LFC:Load Frequency Control)を行う。尚、以下の説明において、内燃力発電装置2のことをDGと称することもある。
 再生可能エネルギー発電装置3は、太陽光、風力、波力、潮力、地熱、バイオマス等の自然エネルギーを用いて発電を行う装置である。ここで、複数の再生可能エネルギー発電装置3は、夫々、同一の自然エネルギーを用いる発電装置であってもよいし、異なる自然エネルギーを用いる発電装置であってもよいこととする。
 蓄電池4は、例えばナトリウム・硫黄電池(NAS電池:登録商標)で構成され、再生可能エネルギー発電装置3の余剰電力を充電可能な容量を有している。尚、ナトリウム・硫黄電池は、負極にナトリウム(Na)、正極に硫黄(S)、両電極を隔てる電解質にβアルミナ個体電解質を用いて、硫黄及びナトリウムイオンの化学反応で充放電を繰り返す蓄電池である。蓄電池4は、需給制御装置7からの制御指令に従って、再生可能エネルギー発電装置3の余剰電力を充電したり、電力系統1の需給計画に沿って充電電力を負荷5に放電したりする。
 負荷5は、個人宅、公共施設、工場等の需要家において電力を消費する電力機器である。負荷5には、状況に応じて、内燃力発電装置2、再生可能エネルギー発電装置3、蓄電池4の何れかから電力が供給される。
 需給制御装置7は、電力線6に対する内燃力発電装置2の並列及び解列と、内燃力発電装置2の起動及び停止と、蓄電池4の充放電と、電力系統1の潮流と、を制御する。需給制御装置7は、例えば、小規模火力発電所内に内燃力発電装置2とともに設けられている。
 需給制御装置7は、上記の制御を行うために、内燃力発電装置2の並列台数N、内燃力発電装置2の発電出力DG、再生可能エネルギー発電装置3の発電出力RE、蓄電池4の出力S(充電時を正、放電時を負とする)、蓄電池4の充電レベルSOC、負荷5の総需要L、電力系統1の周波数Fを示す情報が入力される。需給制御装置7は、上記の情報が入力されると、内燃力発電装置2に対する並列及び解列の指令C、内燃力発電装置2に対する起動及び停止の指令D、蓄電池4に対する充放電の指令Eを出力する。
 需給制御装置7は、入力部7A、記憶部7B、制御部7C、出力部7Dを含んで構成される。入力部7Aには、内燃力発電装置2の並列台数N及び発電出力DG、再生可能エネルギー発電装置3の発電出力RE、蓄電池4の出力S及び充電レベルSOC、負荷5の総需要L、電力系統1の周波数Fを示す情報が入力される。記憶部7Bには、上記の情報から指令C乃至Eを生成するためのプログラムデータ、指令C乃至Eを生成する際に必要になるテーブルデータ等が記憶されている。制御部7Cは、記憶部7Bから読み出されるプログラムデータ及びテーブルデータに基づいて、入力部7Aから得られる上記の情報に演算を施して指令C乃至Eを生成する。出力部7Dは、制御部7Cから得られる指令C乃至Eを出力する。指令C乃至Eは、内燃力発電装置2及び蓄電池4の制御に際して例えば小規模火力発電所から通信線を介して送信される。
 ここで、蓄電池4を含む電力系統1の需給バランスについて説明する。
 時刻tにおける負荷5の総需要Lは、式(1)で表わされる。
Figure JPOXMLDOC01-appb-M000001
 また、電力系統1の需給アンバランス量ARは、式(2)で表わされる。
Figure JPOXMLDOC01-appb-M000002
 (但し、-Kは定数,ΔFは時刻tにおける電力系統1の周波数偏差を表す。)
 また、時刻t+1における蓄電池4の出力Sを、式(3)で表わされる値とすることで受給バランスが満足される。
Figure JPOXMLDOC01-appb-M000003
 そして、式(2)を式(1)に代入することにより、内燃力発電装置2の総発電出力、再生可能エネルギー発電装置3の総発電出力、負荷5の総需要、需給アンバランス量、蓄電池4の出力Sから負荷Lが求められる。つまり、式(3)において、蓄電池4の出力St+1は、時刻tにおける右辺の値の結果から定まる、所謂時刻tの後の時刻t+1における値と言うことができる。
===需給制御装置の動作===
 <<全体制御動作>>
 図4を参照して、需給制御装置7の全体制御動作について説明する。尚、図4の動作の制御を行う主体は制御部7Cである。
 先ず、内燃力発電装置2及び再生可能エネルギー発電装置3の総発電電力が負荷5の総需要を上回ったとしても、負荷周波数制御を行っている内燃力発電装置2の発電出力が最低目標値を下回らないような制御が行われるように、蓄電池4は可能な限り放電された状態であることが望ましい。そこで、需給制御装置7は、内燃力発電装置2の発電出力が最低目標値まで下降していない状態において、蓄電池4の充電レベルSOCが第1充電レベルT1以上である場合、内燃力発電装置2及び蓄電池4の少なくとも一方を用いて負荷周波数制御を行いながら、蓄電池4を放電させる制御を行う。一方、複数の内燃力発電装置2のうち何れの内燃力発電装置2が何れのタイミングで電力系統1に対して並列又は解列されるかは、該当日における再生可能エネルギー発電装置3の発電出力の予測値及び負荷5の需要の予測値に基づいて所定の計算式から求められる。例えば、計算結果に従って、何れかの内燃力発電装置2が何れかの時刻に電力系統1に並列されて短時間起動される必要があると見込まれる場合、燃費等の経済性の観点から、この内燃力発電装置2を電力系統1に並列しないで蓄電池4から負荷5に電力を供給することが望ましい。そこで、需給制御装置7は、内燃力発電装置2の発電出力が最低目標値まで下降していない状態において、蓄電池4の充電レベルSOCが第2充電レベルT1+α(>第1充電レベルT1)以上である場合、内燃力発電装置2及び蓄電池4の少なくとも一方を用いて負荷周波数制御を行いながら、蓄電池4を放電させる制御を行う(S101)。ステップS101の詳細に関しては後述する。
 次に、需給制御装置7は、再生可能エネルギー発電装置3の発電出力の変動に応じて、内燃力発電装置2の並列及び解列を制御し、また、既に並列されている内燃力発電装置2の起動及び停止も制御する(S102)。
 需給制御装置7は、例えば、再生可能エネルギー発電装置3の発電出力が低下した結果、その時点において運転中の内燃力発電装置2の発電出力(定格出力)と再生可能エネルギー発電装置3の発電出力とを合わせても、負荷5に対する電力の供給量が不足する場合、負荷5に対する電力の供給量不足が解消されるように、解列されている内燃力発電装置2のうち何れかの内燃力発電装置2を電力系統1に並列して起動する。一方、需給制御装置7は、例えば、再生可能エネルギー発電装置3の発電出力が上昇した結果、その時点において運転中の内燃力発電装置2の発電出力(最低出力)と再生可能エネルギー発電装置3の発電出力とを合わせると、負荷5に対する電力の供給量が余剰になる場合、再生可能エネルギー発電装置3の発電出力が余剰でなくなるように、並列されている内燃力発電装置2のうち何れかの内燃力発電装置2を電力系統1から解列する。一般に、内燃力発電装置2は燃料を燃焼させる火力発電装置であることから、内燃力発電装置2の起動及び停止が頻繁に行われると、燃費が悪くなって好ましくない。そこで、需給制御装置7は、再生可能エネルギー発電装置3の発電出力の変動に応じて、電力系統1に対する内燃力発電装置2の並列台数を制御している。従って、内燃力発電装置2が電力系統1に常時並列された状態ではなくなるため、再生可能エネルギー発電装置3の発電出力が変動したとしても、内燃力発電装置2における起動直後の停止や停止直後の起動が頻繁に行われなくなり、経済的メリットを得ることができる。ステップS102の詳細に関しては後述する。
 次に、需給制御装置7は、電力系統1に並列されている内燃力発電装置2の台数が予め定められた最低台数又は解列不可台数の何れか一方であるか否かを判定する(S103)。尚、内燃力発電装置2の解列不可台数とは、ステップS102において需給制御装置7が解列不可能であると判定したときの電力系統1に並列されている内燃力発電装置2の台数のことである。具体的には、内燃力発電装置2の解列不可台数とは、再生可能エネルギー発電装置3の発電出力が零になったとき、負荷5に対して電力を不足なく供給できる最低台数のことである。電力系統1に並列されている内燃力発電装置2の台数が予め定められた最低台数又は解列不可台数の何れでもない場合(S103:NO)、需給制御装置7はステップS101からの動作を繰り返す。
 次に、電力系統1に並列されている内燃力発電装置2の台数が予め定められた最低台数又は解列不可台数の何れか一方である場合(S103:YES)、需給制御装置7は、電力系統1に並列されている内燃力発電装置2の発電電力の出力値が最低目標値に達したか否かを判定する(S104)。尚、内燃力発電装置2の最低目標値とは、内燃力発電装置2が負荷5に対して電力を供給し得る最低出力値のことである。電力系統1に並列されている内燃力発電装置2の発電電力の出力値が最低目標値に達していない場合(S104:NO)、需給制御装置7はステップS101からの動作を繰り返す。
 一方、電力系統1に並列されている内燃力発電装置2の台数が予め定められた最低台数又は解列不可台数の何れか一方であって、且つ、電力系統1に並列されている内燃力発電装置2の発電電力の出力値が最低目標値に達した場合(S104:YES)、需給制御装置7は、内燃力発電装置2の発電電力の出力値が最低目標値を下回らないように、蓄電池4に対して再生可能エネルギー発電装置3の発電出力を充電させる制御を行う(S105)。ステップS105の詳細に関しては後述する。
 需給制御装置7の全体制御動作は、上記のステップS101乃至S105を繰り返す動作である。
 <<需給制御動作>>
 図5を参照して、電力系統1に並列されている内燃力発電装置2の発電電力の出力値が最低目標値より大きい常時における、図4のステップS101の詳細について説明する。尚、図5の動作の制御を行う主体は制御部7Cである。
 先に説明したように、複数の内燃力発電装置2のうち何れの内燃力発電装置2が何れのタイミングで電力系統1に対して並列又は解列されるかは、該当日における再生可能エネルギー発電装置3の発電出力の予測値及び負荷5の需要の予測値に基づいて所定の計算式から求められる。上記の計算は、需給制御装置7において制御部7Cが記憶部7Bに記憶されているプログラムデータを実行することにより実現される。例えば、制御部7Cの計算結果に従って、何れかの内燃力発電装置2が電力系統1に並列されて短時間起動される必要があると見込まれる場合、燃費等の経済性の観点から、この内燃力発電装置2を電力系統1に並列しないで蓄電池4から負荷5に電力を供給することが望ましい。
 先ず、需給制御装置7は、制御部7Cの計算結果に従って、蓄電池4の充電レベルSOCと比較される基準レベルとして第2充電レベルT1+αの設定が必要であるか否かを判定する(S201)。第2充電レベルT1+αの設定が必要である場合(S201:YES)、需給制御装置7は、所定の充電レベルα(>0)を生成し、第2充電レベルT1+αを設定する(S202)。尚、第2充電レベルT1+αの設定が必要である場合とは、例えば、何れかの内燃力発電装置2が電力系統1に並列されて短時間起動される必要があると見込まれる場合である。
 次に、需給制御装置7は、蓄電池4の充電レベルSOCが第2充電レベルT1+α以上であるか否かを判定する(S203)。蓄電池4の充電レベルSOCが第2充電レベルT1+α未満である場合(S203:NO)、蓄電池4の放電を停止し(S=0)(S204)、電力系統1に既に並列されている内燃力発電装置2のみで負荷周波数制御を行うように指令を出力する(S205)。このように、蓄電池4の放電が第1充電レベルT1より高い第2充電レベルT1+αを境として停止することから、電力系統1に対する並列を見込まれている内燃力発電装置2を解列したまま、蓄電池4から負荷5に電力を供給することができる。そして、需給制御装置7は、ステップS205における指令を出力すると、ステップS201における第1充電レベルT1又は第2充電レベルT1+αの設定の要否の判定に戻る。
 ここで、需給制御装置7がステップS204を実行する際の内燃力発電装置2の発電出力及び蓄電池4の出力の関係は、式(4)で表される。
Figure JPOXMLDOC01-appb-M000004
 (但し、ΣDGctlは電力系統1に並列されているN台の内燃力発電装置2が負荷周波数制御を行っているときの調整出力の合計を表す。)
 つまり、蓄電池4が放電を停止する条件として、電力の供給側である内燃力発電装置2の調整出力ΣDGctl及び再生可能エネルギー発電装置3の発電出力REと、電力の需要側である負荷5の総需要Lと、の差が零になるように、内燃力発電装置2は負荷周波数制御されて調整出力ΣDGctlを出力する。
 第2充電レベルT1+αの設定が不要である場合(S201:NO)、需給制御装置7は、所定の充電レベルαを零とし、第1充電レベルT1を設定する(S206)。尚、第2充電レベルT1+αの設定が不要である場合とは、例えば、何れかの内燃力発電装置2が電力系統1に並列されて短時間起動される必要はないと見込まれる場合である。この場合、内燃力発電装置2及び再生可能エネルギー発電装置3の総発電電力が負荷5の総需要を上回ったとしても、負荷周波数制御を行っている内燃力発電装置2の発電出力が最低目標値を下回らないような制御が行われるように、蓄電池4を可能な限り放電するための制御(モードA~C)を行う。
 次に、需給制御装置7は、蓄電池4の充電レベルSOCが第1充電レベルT1以上であるか否かを判定する(S207)。蓄電池4の充電レベルSOCが第1充電レベルT1未満である場合(S207:NO)、需給制御装置7は、上記のステップS204及びS205を実行し、蓄電池4の放電を停止して、電力系統1に既に並列されている内燃力発電装置2のみで負荷周波数制御を行うように指令を出力する。そして、需給制御装置7は、ステップS205における指令を出力すると、ステップS201における第1充電レベルT1又は第2充電レベルT1+αの設定の要否の判定に戻る。
 蓄電池4の充電レベルSOCが第2充電レベルT1+α以上(S203:YES)又は第1充電レベルT1以上(S207:YES)である場合、需給制御装置7は、蓄電池4を放電するための3種類のモードA~Cの何れかを選択する(S208)。尚、3種類のモードA~Cの選択方法として、例えば、作業員が3種類のモードA~Cの何れかをマニュアルで選択する方法や、需給制御装置7が3種類のモードA~Cの何れかを負荷5の総需要Lを含む条件に応じて選択する方法が考えられる。前者の場合、需給制御装置7は、蓄電池4の充電レベルが第1充電レベルT1以上又は第2充電レベルT1+α以上であると、例えば作業員に対して3種類のモードA~Cの選択を促すための警報を出力する。そして、需給制御装置7は、作業員が3種類のモードA~Cの何れかを選択したことを知らせる信号を受信すると、作業員が選択したモードを実行することができる。また、後者の場合、例えば3種類のモードA~Cは負荷5の総需要Lの3種類の大きさに夫々対応付けられている。そして、需給制御装置7は、蓄電池4の充電レベルが第1充電レベルT1以上又は第2充電レベルT1+α以上であると、3種類のモードA~Cの中から負荷5の総需要Lに対応するモードを選択して実行することができる。
 蓄電池4を放電するためのモードAが選択された場合(S208:A)、需給制御装置7は、蓄電池4が一定の出力で放電するように制御するとともに(S209)、電力系統1に並列されている内燃力発電装置2のみで負荷周波数制御を行うように指令を出力する(S210)。そして、需給制御装置7は、ステップS210における指令を出力すると、ステップS201における第1充電レベルT1又は第2充電レベルT1+αの設定の要否の判定に戻る。
 ここで、需給制御装置7がモードAであるステップS209及びS210を実行する際の内燃力発電装置2の発電出力及び蓄電池4の出力の関係は、式(5)で表される。
Figure JPOXMLDOC01-appb-M000005
 (但し、Sfixは蓄電池4の固定出力を表す。)
 つまり、再生可能エネルギー発電装置3の発電出力RE及び負荷5の総需要Lを考慮しつつ、蓄電池4が一定の出力Sfixで放電するように、内燃力発電装置2は負荷周波数制御されて調整出力ΣDGctlを出力する。
 蓄電池4を放電するためのモードBが選択された場合(S208:B)、需給制御装置7は、電力系統1に並列されている内燃力発電装置2の負荷周波数制御を停止して、この内燃力発電装置2の発電出力を最低目標値である最低出力に固定するとともに(S211)、蓄電池4が負荷周波数制御を行うように指令を出力する(S212)。そして、需給制御装置7は、ステップS212における指令を出力すると、ステップS201における第1充電レベルT1又は第2充電レベルT1+αの設定の要否の判定に戻る。
 ここで、需給制御装置7がステップS211及びS212を実行する際の内燃力発電装置2の発電出力及び蓄電池4の出力の関係は、式(6)で表される。
Figure JPOXMLDOC01-appb-M000006
 (但し、Sctlは蓄電池4が負荷周波数制御を行っているときの調整出力、ΣDGminは電力系統1に並列されているN台の内燃力発電装置2の最低出力の合計を表す。)
 つまり、再生可能エネルギー発電装置3の発電出力RE及び負荷5の総需要Lを考慮しつつ、内燃力発電装置2が最低出力ΣDGminを出力するように、蓄電池4は負荷周波数制御されて調整出力Sctlを出力する。
 蓄電池4を放電するためのモードCが選択された場合(S208:C)、需給制御装置7は、蓄電池4が負荷周波数制御を行うとともに(S213)、電力系統1に並列されている内燃力発電装置2も負荷周波数制御を行うように指令を出力する(S214)。そして、需給制御装置7は、ステップS214における指令を出力すると、ステップS201における第1充電レベルT1又は第2充電レベルT1+αの設定の要否の判定に戻る。
 ここで、需給制御装置7がステップS213及びS214を実行する際の内燃力発電装置2の発電出力及び蓄電池4の出力の関係は、式(7)で表される。
Figure JPOXMLDOC01-appb-M000007
 つまり、再生可能エネルギー発電装置3の発電出力RE及び負荷5の総需要Lを考慮しつつ、内燃力発電装置2が負荷周波数制御されて調整出力ΣDGctlを出力するとともに、蓄電池4が負荷周波数制御されて調整出力Sctlを出力するように制御される。尚、負荷5に対する調整出力ΣDGctl、Sctlの配分としては、例えば比例配分や周波数配分が考えられる
 このように、内燃力発電装置2及び蓄電池4が負荷5に対する電力の供給を分担しながら、蓄電池4を放電することができる。
 <<台数制御動作>>
 再生可能エネルギー発電装置3の発電出力の変動に応じて、電力系統1に対する内燃力発電装置2の並列及び解列を制御する図4のステップS102の詳細について説明する。
 先ず、需給制御装置7は、負荷5に対する電力の供給量を確保することを目的として、上記のモードA~Cの何れかが実行されると、式(8)(9)に従って電力系統1に対する内燃力発電装置2の並列又は解列を行うべきか否かを判定する。
Figure JPOXMLDOC01-appb-M000008
 (但し、ΣDGmaxは電力系統1に並列されているN台の内燃力発電装置2の定格出力(最大出力)の合計、STsは内燃力発電装置2が起動されるまでの間、負荷5に対して電力を連続して供給可能な蓄電池4の出力(放電:負値)、ε1は負荷5の需要の変動に対するマージン、εREは再生可能エネルギー発電装置3の発電出力が急速に低下したとしても、最低限期待できる出力を表す。)
Figure JPOXMLDOC01-appb-M000009
 (但し、ΣDGmaxは電力系統1に並列されていると仮定されるN-1台の内燃力発電装置2の定格出力の合計、ε2は負荷5の需要の変動に対するマージンを表す。)
 ここで、再生可能エネルギー発電装置3の発電出力が急速に低下したとしても、再生可能エネルギー発電装置3に対して例えば20%の発電出力が最低限期待される場合、εREはこの20%の発電出力を表すことになる。尚、εREは見込みの値であるため、式(8)(9)から省略してもよい。
 式(8)は、N台の内燃力発電装置2の定格出力ΣDGmax、再生可能エネルギー発電装置3の期待出力εRE、蓄電池4の出力STsの合計が、マージンε1を含む負荷5の総需要L未満であることを表している。つまり、式(8)は、負荷5に対する電力の供給量が不足していることを表している。そこで、式(8)の条件が成立すると、需給制御装置7は、電力系統1に対して、既に解列されている内燃力発電装置2の中から一の内燃力発電装置2を並列するための指令を出力する。一の内燃力発電装置2は、この指令に応じて電力系統1に並列されて起動される。こうして、電力系統1に並列される内燃力発電装置2の台数はN台からN+1台になる。
 一方、式(9)は、電力系統1に並列されている内燃力発電装置2の台数がN台からN-1台に減少したと仮定し、N-1台の内燃力発電装置2の定格出力ΣDGmax、再生可能エネルギー発電装置3の期待出力εRE、蓄電池4の(放電)出力-STsの合計が、マージンε2を含む負荷5の総需要L以上であることを表している。つまり、式(9)は、内燃力発電装置2の台数が現在のN台からN-1台に減少してもなお、負荷5に対する電力の供給量が余ることを表している。そこで、式(9)の条件が成立すると、需給制御装置7は、電力系統1に対して、既に並列されている内燃力発電装置2の中から一の内燃力発電装置2を解列するための指令を出力する。一の内燃力発電装置2は、この指令に応じて電力系統1から解列される。こうして、電力系統1に並列される内燃力発電装置2の台数はN台からN-1台に減少する。
 尚、蓄電池4の出力STsが大きくなると、式(8)の条件が成立する機会が減少し、内燃力発電装置2の並列が抑制されることが分かる。このことからも、常時の需給制御動作において、蓄電池4が充電レベルSOCを第1充電レベルT1より大きい第2充電レベルT1+αと比較するステップ(図5のステップS201~S203)を設けているため、何れかの内燃力発電装置2が電力系統1に並列されて短時間起動される必要があると見込まれる場合でも、内燃力発電装置2の並列の抑制が可能になることが理解できる。
 また、需給制御装置7は、内燃力発電装置2の出力を計画的に下げる調整力である「下げ代(下げ余力)」を確保することを目的として、式(10)に従って電力系統1に対する内燃力発電装置2の並列又は解列を行うべきか否かを判定する。
Figure JPOXMLDOC01-appb-M000010
 (但し、ΣDGminは電力系統1に並列されているN台の内燃力発電装置2の最低出力(最低目標値)の合計、ΔREiは再生可能エネルギー発電装置3の定格出力から現在出力を減算した値、Smaxは蓄電池4の定格出力(充電)を表す。)
 式(10)に含まれるΔREiは、式(11)で表される。
Figure JPOXMLDOC01-appb-M000011
 (但し、ΣREmaxは電力系統に接続されているM台の再生可能エネルギー発電装置3の定格出力の合計を表す。)
 +ΔREiは、再生可能エネルギー発電装置3の発電出力が現在出力から定格出力まで増加することを表している。つまり、+ΔREiは、内燃力発電装置2の発電出力の下げ代を表している。よって、式(10)は、内燃力発電装置2の発電出力が最低目標値の状態で、再生可能エネルギー発電装置3の発電出力が定格出力まで増加して内燃力発電装置2の下げ代がなくなり、蓄電池4が定格出力まで充電したにも関わらず、内燃力発電装置2及び再生可能エネルギー発電装置3から負荷5へ供給される電力が余剰であることを表している。そこで、式(10)の条件が成立すると、需給制御装置7は、電力系統1に対して、既に並列されている内燃力発電装置2の中から一の内燃力発電装置2を解列するための指令を出力する。一の内燃力発電装置2は、この指令に応じて電力系統1から解列される。こうして、電力系統1に並列される内燃力発電装置2の台数はN台からN-1台に減少する。しかし、N-1台の内燃力発電装置2の発電出力を定格出力まで増加させても、負荷5に対する電力の供給量が不足するような「上げ代不足」になってはならない。
 需給制御装置7は、内燃力発電装置2の出力を計画的に上げる調整力である「上げ代(上げ余力)」を確保することを目的として、式(10)の他に式(12)に従って電力系統1に対する内燃力発電装置2の並列又は解列を行うべきか否かを判定する。
Figure JPOXMLDOC01-appb-M000012
 (但し、ΣDGmaxは電力系統1に並列されていると仮定されるN-1台の内燃力発電装置2の定格出力の合計、ΔREdは再生可能エネルギー発電装置3の現在出力、Smaxは蓄電池4の定格出力(放電:負値)を表す。)
 式(12)に含まれるΔREdは、式(13)で表される。
Figure JPOXMLDOC01-appb-M000013
 (但し、ΣREは電力系統に接続されているM台の再生可能エネルギー発電装置3の現在出力の合計を表す。)
 -ΔREdは、再生可能エネルギー発電装置3の発電出力が現在出力から零になることを表している。つまり、-ΔREdは、内燃力発電装置2の発電出力の上げ代を表している。よって、式(12)は、電力系統1に並列されている内燃力発電装置2の台数がN台からN-1台に減少したと仮定し、内燃力発電装置2の発電出力が定格出力の状態で、再生可能エネルギー発電装置3の発電出力が零になって内燃力発電装置2の上げ代がなくなり、蓄電池4の定格出力を負荷5に供給することで、内燃力発電装置2及び再生可能エネルギー発電装置3から負荷5へ供給される電力が余剰であることを表している。そこで、式(10)の他に式(12)の条件も成立したときに、需給制御装置7は、電力系統1に対して、既に並列されている内燃力発電装置2の中から一の内燃力発電装置2を解列するための指令を出力するようにした方がよい。一の内燃力発電装置2は、この指令に応じて電力系統1から解列される。こうして、電力系統1に並列される内燃力発電装置2の台数はN台からN-1台に減少するが、N-1台の内燃力発電装置2の下げ代及び上げ代は確保される。尚、式(10)(12)は、再生可能エネルギー発電装置3の発電出力が変動して最低出力や定格出力になったとき、電力系統1に対して内燃力発電装置2を新たに並列や解列せずに、負荷5に対する電力の供給量が余剰又は不足になることがないかを判定するための式と言える。
 図4のステップS102を実行する場合、式(8)(9)(10)(12)の全ての条件を考慮し、電力系統1に対する内燃力発電装置2の並列及び解列を制御し、負荷5に対して電力を供給する内燃力発電装置2の台数を制御する。
 しかし、再生可能エネルギー発電装置3の台数が増加すると、電力系統1に対する内燃力発電装置2の並列及び解列の制御に際して、式(8)(9)(10)(12)の全ての条件を満足する解が得られなくなる可能性が高くなる。具体的には、内燃力発電装置2の下げ代不足が予想されているにも関わらず、負荷5に対する電力の供給量を確保するために内燃力発電装置2を1台解列することができない場合、即ち、式(10)の条件が成立するときに式(12)の条件が成立しない場合である。この場合、需給制御装置7は、電力系統1に対する内燃力発電装置2の並列及び解列の制御方法を以下の方法A~Fの何れかに切り替える。
 <方法A>
 再生可能エネルギー発電装置3の発電出力RE(現在出力)によって負荷5に対する電力の供給量が確保され、発電出力REを考慮すると式(12)の条件が成立する場合、需給制御装置7は、電力系統1から内燃力発電装置2を1台解列するための指令を出力する。
 <方法B>
 再生可能エネルギー発電装置3の発電出力REを考慮した未来(例えば数分後)の出力変動分布から未来の発電電力RE’を予想し、発電電力RE’によって負荷5に対する電力の供給量が確保され、発電出力RE’を考慮すると式(12)の条件が成立する場合、需給制御装置7は、電力系統1から内燃力発電装置2を1台解列するための指令を出力する。
 <方法C>
 内燃力発電装置2の下げ代の不足分ΔPdは、式(10)を基にして式(14)で表される。
Figure JPOXMLDOC01-appb-M000014
 内燃力発電装置2の上げ代ΔPiは、式(12)を基にして式(15)で表される。
Figure JPOXMLDOC01-appb-M000015
 内燃力発電装置2の下げ代及び上げ代に不足が生じた場合、被害の大きさの観点において、ΔPd及びΔPiのうち絶対値が小さい方(想定される周波数変動が小さい方)を選択する。例えば、ΔPd及びΔPiのうちΔPdの絶対値の方が大きい場合、需給制御装置7は、電力系統1から内燃力発電装置2を1台解列する。つまり、ΔPdは下げ代の不足分であって、ΔPdの値が正値であれば下げ代不足を表す。また、ΔPiは下げ代不足を解消するために電力系統1から内燃力発電装置2を1台解列したときの上げ代であって,ΔPiの値が負値であれば上げ代不足を表す。そして、内燃力発電装置2を1台解列して上げ代不足になる場合、内燃力発電装置2を解列しなかったときの下げ代不足と比較して,不足量を小さくするよう,解列すべきかどうかを判断する。
 <方法D>
 内燃力発電装置2において上げ代の確保よりも下げ代の確保を優先する。つまり、式(12)の条件の成立に関わらず、式(10)の条件が成立すると、需給制御装置7は、電力系統1から内燃力発電装置2を1台解列するための指令を出力する。
 <方法E>
 再生可能エネルギー発電装置3の発電出力REが急速に低下した場合に最低限期待される出力εREを見込んだ上で、発電出力RE(現在出力)によって負荷5に対する電力の供給量が確保され、発電出力REを考慮すると式(12)の条件が成立する場合、需給制御装置7は、電力系統1から内燃力発電装置2を1台解列するための指令を出力する。
 <方法F>
 再生可能エネルギー発電装置3の台数が減少すると式(10)(12)の条件がともに成立する可能性が高まることから、需給制御装置7は、式(10)(12)の条件がともに成立するまで、電力系統1から再生可能エネルギー発電装置3を1台ずつ解列するための指令を出力する。尚、再生可能エネルギー発電装置3の解列順は、例えば定格出力の小さい順であるものとする。
 <<内燃力発電装置の発電出力が最低出力時の制御動作>>
 需給制御装置7は、電力系統1に対して並列又は解列される内燃力発電装置2の台数を制御した結果、電力系統1に並列されている内燃力発電装置2の台数が予め定められた最低台数又は解列不可台数の何れか一方であって、且つ、電力系統1に並列されている内燃力発電装置2の各発電電力の出力値が予め定められた最低目標値を下回るような場合、内燃力発電装置2の各発電電力の出力値が最低目標値を下回らないように、蓄電池4に対して再生可能エネルギー発電装置3の発電出力を充電させる制御を行う必要がある。
 <内燃力発電装置による負荷周波数制御>
 図6乃至図8を参照して、図4のステップS105の詳細について一の制御方法を用いて説明する。尚、図6の動作の制御を行う主体は制御部7Cである。
 先ず、需給制御装置7は、電力系統1に並列されている内燃力発電装置2の各発電電力の出力値が下降しつつ予め定められた最低目標値に達したか否かを判定する(S301)。内燃力発電装置2の各発電電力の出力値が最低目標値に達した場合(S301:YES)、需給制御装置7は、内燃力発電装置2の各発電電力の出力値を最低目標値を上回る値にするために、蓄電池4の出力SがΔSを単位として1ステップずつ増加するように、蓄電池4の出力Sを出力S+ΔSに変更するための指令を出力する(S302)。尚、ΔSは予め整定された量である。ステップS302の指令が出力されると、蓄電池4は、蓄電池4の出力SがΔSだけ増加するように、再生可能エネルギー発電装置3の発電出力を充電する。このとき、内燃力発電装置2は電力系統1の全体に亘って負荷周波数制御を行っていることから、蓄電池4の充電に伴って再生可能エネルギー発電装置3の発電出力が減少すると、内燃力発電装置2の発電出力は増加することになる。そして、ステップS301を再度実行する。内燃力発電装置2の各発電電力の出力値が最低目標値を上回らない場合(S301:YES)、需給制御装置7は、蓄電池4の出力S+ΔSを出力S+2ΔSに変更するための指令を出力する(S302)。ステップS302の指令が出力されると、蓄電池4は、蓄電池4の出力S+ΔSがΔSだけ増加するように、再生可能エネルギー発電装置3の発電出力を充電する。内燃力発電装置2の各発電電力の出力値が最低目標値を上回るまで、ステップS301,S302を繰り返し実行する。
 内燃力発電装置2の各発電電力の出力値が最低目標値を上回った場合(S302:NO)、需給制御装置7は、内燃力発電装置2の各発電電力の出力値が最低目標値+ΔS+ε(ε<ΔS)を上回ったか否かを判定する(S303)。尚、説明の便宜上、ステップS303を最初に実行する際の蓄電池4の出力はSであることとする。内燃力発電装置2の各発電電力の出力値が最低目標値+ΔS+εを上回った場合(S303:YES)、需給制御装置7は、内燃力発電装置2の各発電電力の出力値を最低目標値と最低目標値+ΔSとの間の値にするために、蓄電池4の出力SがΔSを単位として1ステップずつ減少するように、蓄電池4の出力Sを出力S-ΔSに変更するための指令を出力する(S304)。ステップS304の指令が出力されると、蓄電池4は、蓄電池4の出力SがΔSだけ減少するように、負荷5に対して放電する。このとき、内燃力発電装置2は電力系統1の全体に亘って負荷周波数制御を行っていることから、蓄電池4の放電に伴って内燃力発電装置2の発電出力は減少することになる。そして、ステップS301を再度実行する。内燃力発電装置2の各発電電力の出力値が最低目標値+ΔS+εを上回り続けている場合(S303:YES)、需給制御装置7は、蓄電池4の出力S-ΔSを出力S-2ΔSに変更するための指令を出力する(S304)。ステップS304の指令が出力されると、蓄電池4は、蓄電池4の出力S-ΔSがΔSだけ減少するように、負荷5に対して放電する。内燃力発電装置2の各発電電力の出力値が最低目標値+ΔS+εを下回るまで、ステップS301,S303,S304を繰り返し実行する。
 内燃力発電装置2の各発電電力の出力値が最低目標値+ΔS+εを下回った場合(S303:NO)、蓄電池4の出力Sが負の値であるか否かを判定する(S305)。蓄電池4の出力Sが正の値である場合(S305:NO)、蓄電池4の充電が行われていることから、ステップS301を再度実行する。
 蓄電池4の出力Sが負の値である場合(S305:YES)、蓄電池4の放電が行われていることから、即ち、内燃力発電装置2は発電電力を蓄電池4に依存せずに減少可能な余裕を有していることから、需給制御装置7は、蓄電池4の充放電を停止させるための指令を出力する(S306)。ステップS306の指令が出力されると、蓄電池4は充放電を停止し、蓄電池4の出力Sは零になる。
 図7を参照して図6の動作を説明する。横軸は時間を示し、縦軸は内燃力発電装置2の発電出力レベルを示している。実線は、蓄電池4の充放電が行われない場合の、内燃力発電装置2の発電出力であって負荷5の総需要から再生可能エネルギー発電装置3の発電出力を減じた値を示している。一点鎖線は、蓄電池4の出力SがΔSを単位として増加又は減少する様子を示している。尚、蓄電池4の出力Sの下方向の変化はΔSの充電を示し、蓄電池4の出力Sの上方向の変化はΔSの放電を示している。太破線は、蓄電池4の充放電が行われた場合の、内燃力発電装置2の発電出力を示している。細破線は、内燃力発電装置2の最低目標値を示している。
 内燃力発電装置2の発電出力が下降しつつ最低目標値に達すると、このときの蓄電池4の出力SがΔSを単位として1ステップ増加するように、蓄電池4は再生可能エネルギー発電装置3の発電出力を充電し、これに伴い、内燃力発電装置2の発電出力は増加する(時刻t1,t2,t3)。内燃力発電装置2の発電出力が最低目標値+ΔS+εを上回ると、このときの蓄電池4の出力SがΔSを単位として1ステップ減少するように、蓄電池4は負荷5に対して放電し、これに伴い、内燃力発電装置2の発電出力は減少する(時刻t4,t5,t6)。時刻t6を過ぎると、内燃力発電装置2の発電出力は最低目標値を上回り、蓄電池4の充放電は停止する。
 図8を参照して図6の動作を説明する。
 内燃力発電装置2の発電出力が最低目標値を下回ると、このときの蓄電池4の出力SがΔS増加するため、内燃力発電装置2の発電出力は増加する。一方、内燃力発電装置2の発電出力が最低目標値+ΔS+εを上回ると、このときの蓄電池4の出力SがΔS減少するため、内燃力発電装置2の発電出力は減少する。内燃力発電装置2の発電出力は、蓄電池4の充放電に従って、最低目標値と最低目標値+ΔSとの間で変化することになる。
 このように、内燃力発電装置2の発電出力が最低目標値を下回った場合、蓄電池4が再生可能エネルギー発電装置3の発電出力を充電するため、内燃力発電装置2の発電出力が最低目標値以上に維持され、内燃力発電装置2の下げ代を確保することが可能になる。また、蓄電池4が充放電を行っている期間、内燃力発電装置2は負荷周波数制御を継続するため、電力系統1において連続性のよい負荷周波数制御を行うことが可能になる。また、ステップS303において、内燃力発電装置2の発電出力が比較される対象として、蓄電池4の出力Sを増減させる際の変化単位であるΔSより小さいεが含まれているため、内燃力発電装置2の発電出力を最低目標値と最低目標値+ΔSとの間の1ステップ分の範囲内(最低目標値+ε)に収束させることが可能になる。
 <蓄電池による負荷周波数制御>
 図9及び図10を参照して、図4のステップS105の詳細について他の制御方法を用いて説明する。尚、図9の動作の制御を行う主体は制御部7Cである。
 先ず、電力系統1に並列されている内燃力発電装置2の各発電電力の出力値が下降しつつ予め定められた最低目標値に達した場合、需給制御装置7は、内燃力発電装置2が負荷周波数制御を停止し、内燃力発電装置2の発電出力を最低目標値に固定するための指令を出力する(S401)。ステップS401の指令が出力されると、内燃力発電装置2による負荷周波数制御が停止し、内燃力発電装置2の発電出力は最低目標値に固定される。
 内燃力発電装置2の発電出力が最低目標値に固定された状態で、内燃力発電装置2及び再生可能エネルギー発電装置3の総発電出力が負荷5の総需要を上回ると、再生可能エネルギー発電装置3の発電出力が余剰になってしまうため、蓄電池4を用いて再生可能エネルギー発電装置3の余剰電力のみを充電する必要がある。そこで、内燃力発電装置2の発電出力が最低目標値に固定されている期間、需給制御装置7は、負荷5との間における電力の需要及び供給がバランスするように、蓄電池4が充電を行いながら負荷周波数制御を行うための指令を出力する(S402)。ステップS402の指令が出力されると、以下の式(16)に示す条件が成立するように、蓄電池4の調整出力Sctlは制御される。
Figure JPOXMLDOC01-appb-M000016
 (但し、Sctl=-ARである。)
 需給制御装置7は、蓄電池4が負荷周波数制御を行った結果、蓄電池4の出力Sが予め定められた負の値-ε未満であるか否かを判定する(S403)。蓄電池4の出力Sが-ε以上である場合(S403:NO)、蓄電池4の放電量が-εに相当する量に達していないため、需給制御装置7は、蓄電池4が充電を行いながら負荷周波数制御を行うための指令を継続して出力する(S402)。一方、蓄電池4の出力Sが-ε未満である場合(S403:YES)、蓄電池4の放電量が-εに相当する量に達しているため、需給制御装置7は、蓄電池4の充放電を停止するための指令を出力する(S404)。ステップS404の指令が出力されると、蓄電池4が充放電を停止し、蓄電池4の出力Sは零になる。従って、蓄電池4による負荷周波数制御は停止する。そして、需給制御装置7は、内燃力発電装置2の発電出力が最低目標値に固定された状態を解除し、内燃力発電装置2による負荷周波数制御を再開するための指令を出力する(S405)。ステップS405の指令が出力されると、内燃力発電装置2による負荷周波数制御が再開され、内燃力発電装置2の発電出力は負荷周波数制御に応じて変化することになる。
 図10を参照して図9の動作を説明する。横軸は時間を示し、縦軸は内燃力発電装置2の発電出力レベルを示している。太実線は、蓄電池4による負荷周波数制御が行われない場合の、内燃力発電装置2の発電出力であって負荷5の総需要から再生可能エネルギー発電装置3の発電出力を減じた値を示している。細実線は、蓄電池4による負荷周波数制御が行われた場合の、内燃力発電装置2の発電出力を示している。細破線は、内燃力発電装置2の最低目標値を示している。
 内燃力発電装置2の発電出力が下降しつつ最低目標値に達すると、内燃力発電装置2による負荷周波数制御が停止し、内燃力発電装置2の発電出力は最低目標値(細実線)に固定される。一方、蓄電池4は、内燃力発電装置2及び再生可能エネルギー発電装置3と負荷5との間における電力の需要及び供給がバランスするように、充電を行いながら負荷周波数制御を行う(時刻t1)。そして、蓄電池4の放電量が-εに相当する量に達すると、蓄電池4による負荷周波数制御が停止し、内燃力発電装置2の発電出力が最低目標値に固定された状態が解除され、内燃力発電装置2は負荷周波数制御を再開する(時刻t2)。蓄電池4から内燃力発電装置2へ負荷周波数制御を切り替える際にεを考慮しているため、蓄電池4は最低目標値を上回ってから充電を停止する。従って、内燃力発電装置2及び蓄電池4の間で負荷周波数制御が頻繁に切り替わるチャタリングを防止することが可能になる。
 以上説明したように、負荷5との間における電力の需要及び供給がバランスするように負荷周波数制御が行われ、負荷5に電力を供給する複数の内燃力発電装置2と、負荷5に電力を供給する再生可能エネルギー発電装置3と、再生可能エネルギー発電装置3の発電電力を充電する蓄電池4と、が接続される電力系統1において、複数の内燃力発電装置2の並列及び解列を制御する需給制御装置7であって、複数の内燃力発電装置2のうち電力系統1に並列されている内燃力発電装置2の各定格出力値と、電力系統1に並列されている内燃力発電装置2が起動されるまで負荷5に電力を連続して供給する蓄電池4の出力値と、の第1加算値が、負荷5の総需要に対して不足しているか否かを判定する機能と、第1加算値が負荷5の総需要に対して不足している場合、複数の内燃力発電装置2のうち電力系統1から解列されている所定の内燃力発電装置2を並列させる機能と、を実行する制御部7Cを備える。これにより、再生可能エネルギー発電装置3の発電出力が変動した場合でも、負荷5に対する電力の供給量を最適に確保できるように、電力系統に対する内燃力発電装置2の並列を制御することが可能になる。ここで、負荷5の総需要は、再生可能エネルギー発電装置3の発電出力が低下したとしても最低限期待できる発電出力が減算された値としてもよい。これにより、再生可能エネルギー発電装置3の発電電力を考慮して、電力系統1に対する内燃力発電装置2の並列を制御することが可能になる。
 また、制御部7Cは、複数の内燃力発電装置2のうち電力系統1に並列されている内燃力発電装置2から所定の内燃力発電装置2を解列したと仮定したときの各定格出力値と、電力系統1に並列されている内燃力発電装置2が起動されるまで負荷5に電力を連続して供給する蓄電池4の出力値と、の第2加算値が、負荷5の総需要に対して不足しているか否かを判定する機能と、第2加算値が負荷5の総需要に対して不足していない場合、電力系統1に並列されている所定の内燃力発電装置2を解列させる機能と、を実行する。これにより、再生可能エネルギー発電装置3の発電出力が変動した場合でも、負荷5に対する電力の供給量を最適に確保できるように、電力系統に対する内燃力発電装置2の解列を制御することが可能になる。ここで、負荷5の総需要は、再生可能エネルギー発電装置3の発電出力が低下したとしても最低限期待できる発電出力が減算された値としてもよい。これにより、再生可能エネルギー発電装置3の発電電力を考慮して、電力系統1に対する内燃力発電装置2の解列を制御することが可能になる。
 また、制御部7Cは、複数の内燃力発電装置2のうち電力系統1に並列されている内燃力発電装置2の各最低目標値と、再生可能エネルギー発電装置3の出力値と、再生可能エネルギー発電装置3の出力値が定格出力値まで増加した場合の変動値と、の第3加算値が、負荷5の総需要と蓄電池4の定格出力値との第4加算値に対して不足しているか否かを判定する機能と、第3加算値が第4加算値に対して不足していない場合、電力系統1に並列されている所定の内燃力発電装置2を解列させる機能と、を実行する。これにより、内燃力発電装置2の下げ代を確保することが可能になる。
 また、制御部7Cは、複数の内燃力発電装置2のうち電力系統1に並列されている内燃力発電装置2から所定の内燃力発電装置2を解列したと仮定したときの各定格出力値と再生可能エネルギー発電装置3の出力値との加算値と、再生可能エネルギー発電装置3の出力値が零になった場合の変動値と、の第1減算値が、負荷5の総需要と蓄電池4の定格出力値との第2減算値に対して不足しているか否かを判定する機能と、第1減算値が第2減算値に対して不足していない場合、電力系統1に並列されている所定の内燃力発電装置2を解列させる機能と、を実行する。これにより、内燃力発電装置2の上げ代を確保することが可能になる。
 尚、本実施形態は、本発明の理解を容易にするためのものであり、本発明を限定して解釈するためのものではない。本発明は、その趣旨を逸脱することなく、変更、改良され得るとともに、本発明にはその等価物も含まれる。
1 電力系統
2 内燃力発電装置
3 再生エネルギー発電装置
4 蓄電池
5 負荷
7 需給制御装置
7C 制御部

Claims (11)

  1.  負荷との間における電力の需要及び供給がバランスするように負荷周波数制御が行われ、前記負荷に電力を供給する複数の第1発電装置と、再生可能エネルギーを用いて前記負荷に電力を供給する第2発電装置と、前記第2発電装置の発電電力を充電する蓄電池と、が接続される電力系統において、前記複数の第1発電装置の並列及び解列を制御する需給制御装置であって、
     前記複数の第1発電装置のうち前記電力系統に並列されている第1発電装置の各定格出力値と、前記電力系統に並列されている前記第1発電装置が起動されるまで前記負荷に電力を連続して供給する前記蓄電池の出力値と、の第1加算値が、前記負荷の総需要に対して不足しているか否かを判定する第1判定部と、
     前記第1加算値が前記負荷の総需要に対して不足している場合、前記複数の第1発電装置のうち前記電力系統から解列されている所定の第1発電装置を並列させる第1制御部と、
     を備えたことを特徴とする需給制御装置。
  2.  前記負荷の総需要は、前記第2発電装置の発電出力が低下したとしても最低限期待できる発電出力が減算された値である
     ことを特徴とする請求項1に記載の需給制御装置。
  3.  前記複数の第1発電装置のうち前記電力系統に並列されている第1発電装置から所定の第1発電装置を解列したと仮定したときの各定格出力値と、前記電力系統に並列されている前記第1発電装置が起動されるまで前記負荷に電力を連続して供給する前記蓄電池の放電出力値と、の第2加算値が、前記負荷の総需要に対して不足しているか否かを判定する第2判定部と、
     前記第2加算値が前記負荷の総需要に対して不足していない場合、前記電力系統に並列されている所定の第1発電装置を解列させる第2制御部と、
     を更に備えたことを特徴とする請求項1に記載の需給制御装置。
  4.  前記負荷の総需要は、前記第2発電装置の発電出力が低下したとしても最低限期待できる発電出力が減算された値である
     ことを特徴とする請求項3に記載の需給制御装置。
  5.  前記複数の第1発電装置のうち前記電力系統に並列されている第1発電装置の各最低目標値と、前記第2発電装置の出力値と、前記第2発電装置の出力値が定格出力値まで増加した場合の変動値と、の第3加算値が、前記負荷の総需要と前記蓄電池の定格出力値との第4加算値に対して過剰であるか否かを判定する第3判定部と、
     前記第3加算値が前記第4加算値に対して過剰である場合、前記電力系統に並列されている所定の第1発電装置を解列させる第3制御部と、
     を更に備えたことを特徴とする請求項3に記載の需給制御装置。
  6.  前記複数の第1発電装置のうち前記電力系統に並列されている第1発電装置から所定の第1発電装置を解列したと仮定したときの各定格出力値と前記第2発電装置の出力値との加算値と、前記第2発電装置の出力値が零になった場合の変動値と、の第1減算値が、前記負荷の総需要と前記蓄電池の定格放電出力値との第2減算値に対して不足しているか否かを判定する第4判定部と、
     前記第1減算値が前記第2減算値に対して不足していない場合、前記電力系統に並列されている所定の第1発電装置を解列させる第4制御部と、
     を更に備えたことを特徴とする請求項5に記載の需給制御装置。
  7.  前記第1発電装置は、内燃力発電装置である
     ことを特徴とする請求項1乃至6の何れか一項に記載の需給制御装置。
  8.  負荷との間における電力の需要及び供給がバランスするように負荷周波数制御が行われ、前記負荷に電力を供給する複数の第1発電装置と、再生可能エネルギーを用いて前記負荷に電力を供給する第2発電装置と、前記第2発電装置の発電電力を充電する蓄電池と、が接続される電力系統において、前記複数の第1発電装置の並列及び解列を制御する需給制御方法であって、
     前記複数の第1発電装置のうち前記電力系統に並列されている第1発電装置の各定格出力値と、前記電力系統に並列されている前記第1発電装置が起動されるまで前記負荷に電力を連続して供給する前記蓄電池の放電出力値と、の第1加算値が、前記負荷の総需要に対して不足しているか否かを判定し、
     前記第1加算値が前記負荷の総需要に対して不足している場合、前記複数の第1発電装置のうち前記電力系統から解列されている所定の第1発電装置を並列させる
     ことを特徴とする需給制御方法。
  9.  前記複数の第1発電装置のうち前記電力系統に並列されている第1発電装置から所定の第1発電装置を解列したと仮定したときの各定格出力値と、前記電力系統に並列されている前記第1発電装置が起動されるまで前記負荷に電力を連続して供給する前記蓄電池の放電出力値と、の第2加算値が、前記負荷の総需要に対して不足しているか否かを判定し、
     前記第2加算値が前記負荷の総需要に対して不足していない場合、前記電力系統に並列されている所定の第1発電装置を解列させる
     ことを特徴とする請求項8に記載の需給制御方法。
  10.  前記複数の第1発電装置のうち前記電力系統に並列されている第1発電装置の各最低目標値と、前記第2発電装置の出力値と、前記第2発電装置の出力値が定格出力値まで増加した場合の変動値と、の第3加算値が、前記負荷の総需要と前記蓄電池の定格出力値との第4加算値に対して過剰であるか否かを判定し、
     前記第3加算値が前記第4加算値に対して過剰である場合、前記電力系統に並列されている所定の第1発電装置を解列させる
     ことを特徴とする請求項9に記載の需給制御方法。
  11.  前記複数の第1発電装置のうち前記電力系統に並列されている第1発電装置から所定の第1発電装置を解列したと仮定したときの各定格出力値と前記第2発電装置の出力値との加算値と、前記第2発電装置の出力値が零になった場合の変動値と、の第1減算値が、前記負荷の総需要と前記蓄電池の定格放電出力値との第2減算値に対して不足しているか否かを判定し、
     前記第1減算値が前記第2減算値に対して不足していない場合、前記電力系統に並列されている所定の第1発電装置を解列させる
     ことを特徴とする請求項10に記載の需給制御方法。
PCT/JP2014/072040 2014-08-22 2014-08-22 需給制御装置、需給制御方法 WO2016027378A1 (ja)

Priority Applications (2)

Application Number Priority Date Filing Date Title
PCT/JP2014/072040 WO2016027378A1 (ja) 2014-08-22 2014-08-22 需給制御装置、需給制御方法
JP2016511455A JP5946983B1 (ja) 2014-08-22 2014-08-22 需給制御装置、需給制御方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2014/072040 WO2016027378A1 (ja) 2014-08-22 2014-08-22 需給制御装置、需給制御方法

Publications (1)

Publication Number Publication Date
WO2016027378A1 true WO2016027378A1 (ja) 2016-02-25

Family

ID=55350355

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2014/072040 WO2016027378A1 (ja) 2014-08-22 2014-08-22 需給制御装置、需給制御方法

Country Status (2)

Country Link
JP (1) JP5946983B1 (ja)
WO (1) WO2016027378A1 (ja)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2017079507A (ja) * 2015-10-19 2017-04-27 株式会社日立製作所 分散型電源の電力供給システム
WO2017158669A1 (ja) * 2016-03-14 2017-09-21 シャープ株式会社 電力制御装置、電源システム、出力制御方法、及び、記録媒体
CN109830994A (zh) * 2019-04-08 2019-05-31 北方工业大学 一种分布式微电网系统及控制方法

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001037085A (ja) * 1999-07-22 2001-02-09 Kansai Electric Power Co Inc:The 二次電池を含む電力系統の周波数制御方法及びその装置
JP2011114900A (ja) * 2009-11-25 2011-06-09 Fuji Electric Systems Co Ltd マイクログリッドの需給制御装置およびマイクログリッドの需給制御方法

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001037085A (ja) * 1999-07-22 2001-02-09 Kansai Electric Power Co Inc:The 二次電池を含む電力系統の周波数制御方法及びその装置
JP2011114900A (ja) * 2009-11-25 2011-06-09 Fuji Electric Systems Co Ltd マイクログリッドの需給制御装置およびマイクログリッドの需給制御方法

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2017079507A (ja) * 2015-10-19 2017-04-27 株式会社日立製作所 分散型電源の電力供給システム
WO2017158669A1 (ja) * 2016-03-14 2017-09-21 シャープ株式会社 電力制御装置、電源システム、出力制御方法、及び、記録媒体
CN109830994A (zh) * 2019-04-08 2019-05-31 北方工业大学 一种分布式微电网系统及控制方法

Also Published As

Publication number Publication date
JPWO2016027378A1 (ja) 2017-04-27
JP5946983B1 (ja) 2016-07-06

Similar Documents

Publication Publication Date Title
JP6304008B2 (ja) 電力供給システム
EP2587623A1 (en) Dc power distribution system
JP6430775B2 (ja) 蓄電池装置
JP6190185B2 (ja) マイクログリッドの制御装置及びその制御方法
JP6192531B2 (ja) 電力管理システム、電力管理装置、電力管理方法及びプログラム
JP2008154360A (ja) 電力貯蔵装置及びハイブリッド型分散電源システム
JP2016220396A (ja) 分散電源システム、および、分散電源システムの制御方法
JP2014131369A (ja) 電力制御システム
JP2013176282A (ja) 発電設備及び電力貯蔵装置を備えた発電システム及びその制御方法並びにプログラム
JP5946983B1 (ja) 需給制御装置、需給制御方法
JP6386536B2 (ja) 需給制御装置、需給制御方法
JP2016039685A (ja) 制御装置、それを備えた蓄電システム、及びその制御方法並びに制御プログラム
EP3261211B1 (en) Systems and methods for controlling performance parameters of an energy storage device
JP2016039728A (ja) 蓄電池システムの制御装置
JP5995804B2 (ja) 蓄電システムの管理装置及び制御目標値決定方法
JP2016116428A (ja) 分散型電源の自律運転システム
JP2021010204A (ja) 電力供給システム
JP6090532B2 (ja) 需給制御装置、需給制御方法
JP2018157647A (ja) 情報処理装置、蓄電装置の制御装置、電力システム、制御方法及びプログラム
KR102053812B1 (ko) 하이브리드 배터리에 연결된 전력 변환 시스템을 제어하기 위한 방법 및 시스템
US9768634B2 (en) Facility for controlling charge current for storage units in electrical energy supply grids connecting distributed generators and distributed storage units, among others
JP7226730B2 (ja) 電力地産地消システム
WO2019097582A1 (ja) 直流給電システム
JP2015226351A (ja) 充放電制御装置及び蓄電装置
JP2020150690A (ja) 電力システムおよび電力制御装置

Legal Events

Date Code Title Description
ENP Entry into the national phase

Ref document number: 2016511455

Country of ref document: JP

Kind code of ref document: A

121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 14899940

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 14899940

Country of ref document: EP

Kind code of ref document: A1