西部沙漠化矿区浅埋煤层的风积沙空场充填方法 Download PDFInfo
- Publication number
- WO2015168972A1 WO2015168972A1 PCT/CN2014/079202 CN2014079202W WO2015168972A1 WO 2015168972 A1 WO2015168972 A1 WO 2015168972A1 CN 2014079202 W CN2014079202 W CN 2014079202W WO 2015168972 A1 WO2015168972 A1 WO 2015168972A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- sand
- coal
- mining
- winch
- filling
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21F—SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
- E21F15/00—Methods or devices for placing filling-up materials in underground workings
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21F—SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
- E21F15/00—Methods or devices for placing filling-up materials in underground workings
- E21F15/06—Filling-up mechanically
Definitions
- the invention relates to an aeolian sand empty field filling method for a shallow coal seam in a western desertification mining area, and is particularly suitable for a coal mining face with good self-stabilizing performance of the roof and a certain scale empty field.
- the western desertification mining area has shallow coal seam burial, large mining thickness, thin bedrock thickness, and aeolian sand loose layer thickness as geological structural features, and there are localized thick hydrogeological features of the aquifer in the aeolian sand loose layer.
- Mining under conditions is not only easy to cause overburden damage and surface subsidence, but also easily lead to major water inrush or sand collapse.
- Engineering practice shows that burying water or sand to bury the working face or roadway is one of the main hidden dangers that threaten mine safety.
- Filling mining is the most intuitive and effective method to solve the problems of overburden damage, surface subsidence, water inrush and sand collapse.
- coal-filling mining at home and abroad is mainly divided into three categories according to different filling materials: solid filling technology such as vermiculite, fly ash and loess, paste, paste-like filling technology, high water and super high water material filling technology.
- solid filling technology such as vermiculite, fly ash and loess, paste, paste-like filling technology, high water and super high water material filling technology.
- the object of the present invention is to solve the problems existing in the existing filling technology, and to provide an aeolian sand empty field filling method for a shallow buried coal seam in a western desertification mining area, which utilizes aeolian sand filling to solve overburden damage and surface subsidence. Problems such as water inrush and sand collapse, thereby increasing production efficiency, reducing input equipment, and reducing filling costs.
- the aeolian sand empty field filling method of the shallow buried coal seam in the western desertification mining area of the present invention comprises the following steps: a. determining the technical parameters of the coal mining face and the quicksand well according to the occurrence characteristics of the coal seam and the mining technical conditions; b Distributed fixed-point drilling: Arranging a plurality of quicksand wells leading to the surface at intervals above the coal mining face and the open space formed after mining;
- Quantitative transportation of surface surface Arrange the sand-sand winch around the surface of the sand-sand well, transport the surrounding aeolian sand to the quicksand well, control the flow of the aeolian sand, and ensure the stability and safety of the quick-sand well and its surroundings;
- a movable shuttle leveling system is arranged to assist the filling operation; the movable shuttle
- the flattening system includes a winch winch, a bucket, a pulley and a pulley track.
- the bucket is connected to the sand winch and the pulley respectively through the wire rope.
- the pulley track is placed on the roof of the roadway on both sides of the coal mining face, and the winch is arranged on the floor.
- Orbital riding the winch winch on the winch track, with the coal mining face advancing, controlling the shuttle to reciprocate shuttle movement in the empty field, so that the sand pile formed by the bottom of the flow sand well is evenly leveled, and filled in time After filling the empty field, the winch winch moves closer to the coal mining face along the winch track, and the pulley moves closer to the coal mining face along the pulley track.
- the drilling diameter of the quicksand well is not lower than the equivalent diameter when the aeolian sand falls, the equivalent diameter is 3 ⁇ 4, where 4 is the coal production capacity, the drilling diameter is generally 200 ⁇ 400mm, and the aeolian sand flow is generally 0.04 ⁇ 0.20m 3 /s
- the length of the coal mining face is limited by the amount of the downhole winch winch, not exceeding 100m
- the distance between the empty field and the strike is wider.
- the temporary support is used to increase the strength of the top plate to prolong the self-stabilization time.
- the spacing of the flow sand wells is limited by the capacity of the downhole winch winch, generally not exceeding 100m, not less than 5 ⁇ 15m.
- the invention utilizes the characteristics of small amount of surface drilling to shallow buried coal seam engineering and good self-flow performance of surface aeolian sand, and arranges drilling above the empty field formed after mining coal mining face, directly pouring the aeolian sand into the empty field , to achieve filling.
- the method opens up a new technical approach for green mining in the desertification mining area in western China, which has high production efficiency, low input equipment and low filling cost.
- the movable shuttle leveling system is simple and easy to operate. After the flat sand is accumulated, the high-efficiency filling or partially filling the empty field, the void ratio is low, the compactness is large, and the filling effect is good;
- FIG. 1 is a top plan view showing an aeolian sand empty field filling method for a shallow buried coal seam in a western desertification mining area according to the present invention.
- 2 is a schematic cross-sectional view showing an aeolian sand empty field filling method for a shallow coal seam in a western desertification mining area according to the present invention.
- 3 is a schematic perspective view of an aeolian sand empty field filling method for a shallow buried coal seam in a western desertification mining area according to the present invention.
- a. Determine the technical parameters of the coal mining face 8 and the quicksand well 1 according to the characteristics of the coal seam and the technical conditions of the mining; b. Distributed fixed-point drilling: arranged at intervals above the coal mining face 8 and the empty field 9 formed after mining Construction of multiple quicksand wells to the surface;
- Quantitative transportation of surface surface Arrange the shoal winch around the surface of the quicksand well 1 and transport the surrounding aeolian sand to the quicksand well 1 to control the flow of the aeolian sand and ensure the stability and safety of the quicksand well 1 and its surroundings;
- a movable shuttle leveling system is arranged to assist the filling operation;
- the movable shuttle leveling system comprises a sand winch 2, a bucket 3, a pulley 4, and a pulley track 5,
- the bucket 3 is connected to the sand winch 2 and the pulley 4 via the wire rope respectively, and the pulley track 5 is set on the top plate of the roadway 7 on both sides of the coal mining face 8, the winch track 6 is arranged on the floor, and the winch winch 2 is rided on the winch
- the control bucket 3 reciprocates in the empty field 9, so that the sand pile formed under the streamhole well 1 is evenly leveled, and the empty field 9 is filled in time, filling After the empty field 9, the raking winch 2 moves closer to the coal mining face 8 along the winch track 6, while the pulley 4 moves closer to the coal mining face 8 along the pulley track 5.
- the drilling diameter of the quicksand well 1 is not lower than the equivalent diameter when the aeolian sand falls, and the equivalent diameter is 3 ⁇ 4 ⁇ 3 ⁇ 4 , where the coal production capacity is, the diameter of the drilling is generally 200 ⁇ 400mm, and the flow of the aeolian sand is generally 0.04 ⁇ 0.20. m 3 /s.
- the length of the coal mining face 8 is limited by the amount of the rope capacity of the downhole winch, and generally does not exceed 100 m.
- the temporary support is used to increase the strength of the top plate to prolong the self-stabilization time.
- the spacing of the quicksand wells 1 is limited by the amount of the ropes of the downhole winch, generally not exceeding 100 m and not less than 5 to 15 m.
- the row spacing of the quicksand well 1 is consistent with the self-stabilizing span of the coal mining face 8 in the propulsion direction and the working surface period, generally not exceeding 10 ⁇ 40m, in order to minimize the accumulation of sand in the coal mining
- the carrying distance in the direction of advancement of the working face; wherein: the working face period is determined by the formula L K / ⁇ /( 3 , where: ⁇ is the old top cycle to press the lay length; R T is the old The tensile strength of the top rock layer; the load of the old top rock beam; A is the single layer thickness of the old top rock layer.
- a mine in the west is buried about 65m deep, the aeolian sand loose layer is about 45m thick, the bedrock is about 20m thick, and the coal bulk density y is 1.3t/m 3 .
- the designed mining face 8 has a length L of 90 m and a mining height H of 5.2 m.
- the empty field roof has better self-stability performance.
- the average cycle is 15m, the row spacing is 15m, and the 1-1 is arranged, and a movable shuttle leveling system based on the shoal winch is arranged.
- One shoal winch 2 is arranged on the roadway 7 on both sides of the coal mining face 8, the volume of the bucket 3 is 1.2m 3 , the total number of hoppers 3 is 2, and the capacity of the winch is 100m.
- the average working speed of bucket 3 is 1.2m/s, the daily filling and filling operation time is 0.5d, the coal mining operation time is 0.5d, and the annual working day is 330d.
- a pulley track 5 is erected on the top plate of the roadway 7 on both sides of the coal mining face 8, a winch track 6 is arranged on the floor, and the winch winch 2 is mounted on the winch track 6, with the coal mining face 8 advancing, Control the bucket 3 to reciprocate shuttle movement in the empty field 9, thereby evenly leveling the sand pile formed by the flow of the sand well 1 and filling the empty field 9 in time, after filling the empty field 9, the winch winch 2 along the winch track 6
- the coal working face 8 is moved closer, and the pulley 4 is moved closer to the coal mining face 8 along the pulley track 5.
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Excavating Of Shafts Or Tunnels (AREA)
- Earth Drilling (AREA)
- Drilling And Exploitation, And Mining Machines And Methods (AREA)
- Underground Or Underwater Handling Of Building Materials (AREA)
Abstract
Description
Claims
Priority Applications (3)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| RU2016120684A RU2635927C1 (ru) | 2014-05-07 | 2014-06-05 | Способ закладки открытого забоя эоловым песком в угольном пласте неглубокого залегания в западных опустыненных районах горных работ |
| AU2014393189A AU2014393189B2 (en) | 2014-05-07 | 2014-06-05 | Method for filling open stope with aeolian sand in shallow coal seam in western desertified mining areas |
| ZA2016/03501A ZA201603501B (en) | 2014-05-07 | 2016-05-23 | Method for filling open stope with aeolian sand in shallow coal seam in western desertified mining areas |
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201410191662.1A CN103939137B (zh) | 2014-05-07 | 2014-05-07 | 西部沙漠化矿区浅埋煤层的风积沙空场充填方法 |
| CN201410191662.1 | 2014-05-07 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| WO2015168972A1 true WO2015168972A1 (zh) | 2015-11-12 |
Family
ID=51186983
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| PCT/CN2014/079202 Ceased WO2015168972A1 (zh) | 2014-05-07 | 2014-06-05 | 西部沙漠化矿区浅埋煤层的风积沙空场充填方法 |
Country Status (5)
| Country | Link |
|---|---|
| CN (1) | CN103939137B (zh) |
| AU (1) | AU2014393189B2 (zh) |
| RU (1) | RU2635927C1 (zh) |
| WO (1) | WO2015168972A1 (zh) |
| ZA (1) | ZA201603501B (zh) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN113187544A (zh) * | 2021-05-28 | 2021-07-30 | 辽宁科技大学 | 一种梁式顶板结构的大型地下空区处理方法 |
| CN115163072A (zh) * | 2022-07-14 | 2022-10-11 | 中冶长天国际工程有限责任公司 | 一种“三下”矿体开采的关键层构造方法及其应用 |
Families Citing this family (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN108104816B (zh) * | 2017-11-27 | 2019-07-05 | 西北矿冶研究院 | 一种急倾斜薄矿体的上向开采方法 |
| CN109268063B (zh) * | 2018-10-24 | 2020-10-16 | 新疆大学 | 利用风积沙充填网箱构筑沿空留巷护巷墙体的方法 |
| CN109519218B (zh) * | 2018-10-24 | 2020-10-16 | 新疆大学 | 利用风积沙干式填充网箱承载体充填采空区的方法 |
| CN109322669B (zh) * | 2018-12-04 | 2021-02-02 | 新疆大学 | 倾斜煤层采空区刚柔条带相间充填无煤柱连续开采法 |
| CN110145360B (zh) * | 2019-06-21 | 2024-09-27 | 山东威斯特矿山工程科技股份有限公司 | 一种巷道智能矸石充填机及充填方法 |
| CN110145308B (zh) * | 2019-06-21 | 2021-03-30 | 山东威斯特矿山工程科技股份有限公司 | 近水平特厚煤层集中充填巷分层迈步采充的三下采煤法 |
| CN119900556B (zh) * | 2025-01-06 | 2025-11-04 | 中煤科工西安研究院(集团)有限公司 | 高地温工作面的坚硬顶板弱化协同煤自燃防治方法 |
Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US4340254A (en) * | 1979-02-14 | 1982-07-20 | Tatabanyai Szenbanyak | Method of mining heavy coal seams in two or more benches |
| CN101806059A (zh) * | 2010-04-02 | 2010-08-18 | 中铁二局股份有限公司 | 高速公路下伏采空区地表钻孔注浆投沙工艺 |
| CN201635765U (zh) * | 2010-04-02 | 2010-11-17 | 中铁二局股份有限公司 | 用于高速公路下伏采空区的投沙器 |
| CN202500606U (zh) * | 2012-01-20 | 2012-10-24 | 山东大学 | 通过地面钻孔向地层空洞内填充骨料的装置 |
Family Cites Families (10)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| SU960454A1 (ru) * | 1981-02-16 | 1982-09-23 | Предприятие П/Я А-3226 | Способ заполнени подземных пустот сыпучим материалом |
| SU1244354A1 (ru) * | 1985-01-17 | 1986-07-15 | Уральский филиал Всесоюзного научно-исследовательского и проектного института галургии | Способ закладки выработанного пространства при камерной системе разработки пологих калийных пластов |
| CN1162690A (zh) * | 1996-04-12 | 1997-10-22 | 崔正洙 | 地下矿山采矿新工艺 |
| RU2136886C1 (ru) * | 1997-12-29 | 1999-09-10 | Российский Университет Дружбы Народов | Способ управления неустойчивой кровлей в длинных очистных забоях |
| RU2178084C1 (ru) * | 2000-07-11 | 2002-01-10 | Открытое акционерное общество "Сильвинит" | Способ возведения гидрозакладочного массива в выработанном пространстве при камерной системе разработки |
| RU2278273C1 (ru) * | 2004-11-05 | 2006-06-20 | Акционерная компания "АЛРОСА" (Закрытое акционерное общество) | Способ возведения закладочного массива из твердеющих бесклинкерных смесей |
| CN101008316B (zh) * | 2007-01-31 | 2011-04-20 | 贵州开磷(集团)有限责任公司 | 磷石膏胶结嗣后充填采矿法及其制浆工艺 |
| CN102392641B (zh) * | 2011-08-02 | 2013-09-11 | 中钢矿业开发有限公司 | 一种点柱式全矿床不分中段上向高分层连续推进充填采矿方法 |
| CN103046955A (zh) * | 2012-12-24 | 2013-04-17 | 河北钢铁集团矿业有限公司 | 一种大范围采空区群充填处理方法 |
| CN103233771B (zh) * | 2013-05-13 | 2014-12-31 | 河北钢铁集团矿业有限公司 | 一种采空区充填处理过程中的接顶工艺 |
-
2014
- 2014-05-07 CN CN201410191662.1A patent/CN103939137B/zh not_active Expired - Fee Related
- 2014-06-05 WO PCT/CN2014/079202 patent/WO2015168972A1/zh not_active Ceased
- 2014-06-05 AU AU2014393189A patent/AU2014393189B2/en not_active Ceased
- 2014-06-05 RU RU2016120684A patent/RU2635927C1/ru not_active IP Right Cessation
-
2016
- 2016-05-23 ZA ZA2016/03501A patent/ZA201603501B/en unknown
Patent Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US4340254A (en) * | 1979-02-14 | 1982-07-20 | Tatabanyai Szenbanyak | Method of mining heavy coal seams in two or more benches |
| CN101806059A (zh) * | 2010-04-02 | 2010-08-18 | 中铁二局股份有限公司 | 高速公路下伏采空区地表钻孔注浆投沙工艺 |
| CN201635765U (zh) * | 2010-04-02 | 2010-11-17 | 中铁二局股份有限公司 | 用于高速公路下伏采空区的投沙器 |
| CN202500606U (zh) * | 2012-01-20 | 2012-10-24 | 山东大学 | 通过地面钻孔向地层空洞内填充骨料的装置 |
Non-Patent Citations (1)
| Title |
|---|
| "Mining Handbook", vol. 2, article MINING HANDBOOK EDITORIAL COMMITTEE, pages: 418 - 419 * |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN113187544A (zh) * | 2021-05-28 | 2021-07-30 | 辽宁科技大学 | 一种梁式顶板结构的大型地下空区处理方法 |
| CN115163072A (zh) * | 2022-07-14 | 2022-10-11 | 中冶长天国际工程有限责任公司 | 一种“三下”矿体开采的关键层构造方法及其应用 |
Also Published As
| Publication number | Publication date |
|---|---|
| AU2014393189A1 (en) | 2016-07-14 |
| CN103939137A (zh) | 2014-07-23 |
| RU2635927C1 (ru) | 2017-11-17 |
| AU2014393189B2 (en) | 2016-12-01 |
| ZA201603501B (en) | 2017-07-26 |
| CN103939137B (zh) | 2015-12-02 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN103939137B (zh) | 西部沙漠化矿区浅埋煤层的风积沙空场充填方法 | |
| CN105971606B (zh) | 一种巨厚煤层长壁工作面开采方法 | |
| CN103306720B (zh) | 一种特厚煤层倾斜分层固体充填采煤方法 | |
| CN104775816B (zh) | 切眼侧局部压煤覆岩隔离注浆充填不迁村开采方法 | |
| CN106894817B (zh) | 一种机械化上向分层楔合混合充填采矿法 | |
| CN106869931B (zh) | 一种废石与胶结分层楔合充填采矿工艺及其结构 | |
| CN101864957B (zh) | 大量放矿同步充填无顶柱留矿采矿方法 | |
| CN103498696B (zh) | 一种从顶板巷道注浆充填压实采空区充填体的方法 | |
| CN109209380A (zh) | 一种矿山采选充控开采方法 | |
| CN103206215B (zh) | 一种预控顶上向进路充填采矿法 | |
| WO2020062432A1 (zh) | 近距离煤层群井下采选充协同开采方法 | |
| CN103628878B (zh) | 破碎围岩矿体下向进路分层无分段巷道充填采矿方法 | |
| CN102865103A (zh) | 一种矿井地下水的分布式利用方法 | |
| CN103628914B (zh) | 一种缓倾角煤层分层开采探放低渗厚层基岩含水层的方法 | |
| CN104088662B (zh) | 一种固体充填采煤沿空留巷支护墙体的施工方法 | |
| CN105332733A (zh) | 普采工作面采空区泵送胶结材料的条带充填方法 | |
| CN113482711B (zh) | 一种减小末采煤柱的预充填方法 | |
| CN107939401A (zh) | 一种特厚煤层分层间隔充填采煤方法 | |
| CN109973095A (zh) | 一种煤矿固体充填开采再造地下储水空间的方法 | |
| CN103726846B (zh) | 一种上行分层开采特厚、巨厚煤层的采煤方法 | |
| CN102102518A (zh) | 一种水库坝体下厚煤层放顶煤协调开采方法 | |
| CN104481538A (zh) | 一种非煤矿山急倾斜多层矿体中夹层的处理方法 | |
| CN115263415A (zh) | 一种嗣后充填采矿法全尾砂多点充填法 | |
| CN102418528B (zh) | 使用钢混结构人工假顶的端部放矿崩落法开采工艺 | |
| CN108104816A (zh) | 一种急倾斜薄矿体的上向开采方法 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| 121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 14891349 Country of ref document: EP Kind code of ref document: A1 |
|
| ENP | Entry into the national phase |
Ref document number: 2016120684 Country of ref document: RU Kind code of ref document: A |
|
| ENP | Entry into the national phase |
Ref document number: 2014393189 Country of ref document: AU Date of ref document: 20140605 Kind code of ref document: A |
|
| NENP | Non-entry into the national phase |
Ref country code: DE |
|
| 122 | Ep: pct application non-entry in european phase |
Ref document number: 14891349 Country of ref document: EP Kind code of ref document: A1 |