CN103306720B - 一种特厚煤层倾斜分层固体充填采煤方法 - Google Patents

一种特厚煤层倾斜分层固体充填采煤方法 Download PDF

Info

Publication number
CN103306720B
CN103306720B CN201310187986.3A CN201310187986A CN103306720B CN 103306720 B CN103306720 B CN 103306720B CN 201310187986 A CN201310187986 A CN 201310187986A CN 103306720 B CN103306720 B CN 103306720B
Authority
CN
China
Prior art keywords
filling
mining
coal
layer
wire lath
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310187986.3A
Other languages
English (en)
Other versions
CN103306720A (zh
Inventor
张吉雄
周楠
张强
郭继伟
沈晓明
巨峰
姜海强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Mining and Technology CUMT
Original Assignee
China University of Mining and Technology CUMT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Mining and Technology CUMT filed Critical China University of Mining and Technology CUMT
Priority to CN201310187986.3A priority Critical patent/CN103306720B/zh
Publication of CN103306720A publication Critical patent/CN103306720A/zh
Priority to AU2014271115A priority patent/AU2014271115B2/en
Priority to PCT/CN2014/071088 priority patent/WO2014187163A1/zh
Priority to US14/891,288 priority patent/US9494037B2/en
Application granted granted Critical
Publication of CN103306720B publication Critical patent/CN103306720B/zh
Priority to ZA2015/07615A priority patent/ZA201507615B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F15/00Methods or devices for placing filling-up materials in underground workings
    • E21F15/02Supporting means, e.g. shuttering, for filling-up materials
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Layouts therefor
    • E21C41/16Methods of underground mining; Layouts therefor
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Layouts therefor
    • E21C41/16Methods of underground mining; Layouts therefor
    • E21C41/18Methods of underground mining; Layouts therefor for brown or hard coal
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D23/00Mine roof supports for step- by- step movement, e.g. in combination with provisions for shifting of conveyors, mining machines, or guides therefor
    • E21D23/04Structural features of the supporting construction, e.g. linking members between adjacent frames or sets of props; Means for counteracting lateral sliding on inclined floor
    • E21D23/0481Supports specially adapted for use in combination with the placing of filling-up materials

Abstract

本发明公开的一种特厚煤层倾斜分层固体充填采煤方法,适用于“三下”特厚煤层的开采。本方法按照分层厚度2.5~4.5m的原则确定倾斜分层层数,采用分层分采下行充填开采顺序;按常规固体充填采煤方法布置巷道及设备;实行采煤、铺设金属网和竹笆、充填的循环顺序,完成首采面及第一分层的充填开采;同时,在本分层工作面采完4个月后,在第二分层对应位置,在第一分层形成的人工假顶掩护下,按相同充填采煤方法开采,如此循环,不断在上一分层制造的人工假顶掩护下进行本分层开采,直至采完整个特厚煤层。采用此方法解放“三下”特厚煤层资源,有效控制岩层移动及地表沉陷,该方法回采率高,生产效率高,成本低,在厚煤层充填开采领域,具有广泛的实用性。

Description

一种特厚煤层倾斜分层固体充填采煤方法
技术领域
本发明涉及一种特厚煤层倾斜分层固体充填采煤方法,尤其适用于“三下”特厚煤层的开采。
背景技术
“三下”特厚煤层(8~20m)资源在我国分布广泛,而且是我国煤矿实现高产高效开采的重要煤层。目前国内关于“三下”特厚煤层(8~20m)的开采方式主要有两大类,第一类有:分层开采、放顶煤开采、限厚开采,这类方法采用自然垮落法管理顶板,存在以下问题:顶板自然垮落造成地表塌陷,破坏了地表建筑物、铁路等,同时还引起地下水位沉降破坏生态环境;第二类有:条带开采、大面积协调开采、注浆减沉开采等,这类开采方法虽然对地表下沉起到一定的控制作用,能保证地面建筑物、铁路的安全使用,但其机械化程度相对较低、回采率底、生产成本高、生产效率差、规模小或部分处于研究阶段。因此,研究一种既能有效控制岩层移动保证地面建筑物、铁路等安全使用,又能高效地回收“三下”特厚煤层(8~20m)资源的采煤方法迫在眉睫。
发明内容
技术问题:本发明的目的是提供一种“三下”特厚煤层倾斜分层固体充填的采煤方法。
技术方案:本发明的特厚煤层倾斜分层固体充填采煤方法,包括如下步骤:
a.根据“三下”特厚煤层厚度,覆岩结构及地表建筑物保护等级要求,按照2.5~4.5m厚度进行分层,确定特厚煤层倾斜分层的层数,采用分层分采下行充填开采顺序;
b.按照已有固体充填采煤方法布置巷道及安装设备,开采第一分层的首采工作面;
c.按常规进行第一个充填采煤循环,依次进行割煤、推移刮板输送机、推移充填采煤液压支架,在采空区的底部处施工人工假顶,首先沿采空区的底部铺设金属网,金属网边缘距充填采煤液压支架的底座为5cm,然后在金属网上面铺设竹笆,竹笆的边缘滞后金属网的边缘为5cm,金属网、竹笆沿平行于采煤工作面的方向进行铺设,直至铺满整个采空区底部,金属网、竹笆铺设完毕后,再对采空区进行固体物料充填,并用夯实机进行夯实,完成第一个步距内的循环;继续第二个充填采煤循环,在充填采煤液压支架的掩护下,在采空区的底部处铺设金属网、竹笆,并分别用铁丝与第一个充填采煤循环铺设的金属网、竹笆连成一体,随后进行采空区的充填作业,完成第二个步距的循环;如此重复循环作业,直至开采至保护煤柱处,完成首采工作面的充填开采;
d.工作面搬家至第一分层的下一个工作面,重复步骤c,依次进行第一分层所有工作面的充填开采,同时,在第一分层首采工作面充填完成间隔4个月后,在其相对应的第二分层位置,在金属网、竹笆和人工假顶的掩护下,按第一分层同样的充填开采方法,进行第二分层的充填开采,直至完成本分层所有工作面的充填开采;
e.重复步骤c、d,依次在上一分层制造的人工假顶掩护下进行本分层充填开采,直至完成整个特厚煤层所有分层的充填开采。
有益效果:本发明的“三下”特厚煤层倾斜分层固体充填的采煤方法,具有以下优势:采用矸石等固体物料充填采空区,并在固体物料下面铺设金属网、竹笆,制造人工假顶,为下分层的充填开采提供掩护,一方面,解决了地表下沉问题,保证了地面建筑物的安全使用,另一方面提高了煤炭的回采率,延长了矿井服务年限,解放了“三下”特厚煤层资源,提高矿井资源采出率。本发明克服了现有技术中存在的两大问题,一是顶板自然垮落造成地表塌陷,破坏了地表建筑物、铁路等;二是机械化程度相对较低、回采率底、生产成本高、生产效率差等。本发明采用地面矸石等固体物料作为充填物料用于充填,减少了对地表环境的污染及土地的侵占,能有效控制岩层移动及地表沉陷,其方法简单,生产效率高,成本低,在本技术领域内具有广泛的实用性。
附图说明
图1本发明第一分层首采工作面布置俯视图;
图2本发明第一分层第一个循环时采空区铺设金属网状态侧视图;
图3本发明第一分层第一个循环时采空区充填固体物料状态侧视图;
图4本发明第一分层第二个循环时采煤状态侧视图;
图5本发明第一分层第二个循环时采空区铺设金属网状态侧视图;
图6本发明第一分层第二个循环时采空区充填固体物料状态侧视图;
图7本发明第一分层开采至保护煤柱状态侧视图;
图8本发明第二分层开采状态侧视图。
图中:1-采煤机,2-运料平巷,3-自移式转载输送机,4-运料带式输送机,5-运煤平巷,6-运煤转载输送机,7-运煤带式输送机,8-破碎机,9-采煤工作面,10-刮板输送机,11-充填采煤液压支架,12-底卸式输送机,13-固体物料,14-金属网,15-底座,16-夯实机,17-保护煤柱,18-采空区,19-充填工作面,20-上覆岩层,21-第一分层,22-第二分层,23-人工假顶,24-竹笆,25-底板。
具体实施方式
下面结合附图对本发明的一个实施例作进一步的描述:
本发明的特厚煤层倾斜分层固体充填采煤方法,具体步骤如下:
a.根据“三下”特厚煤层厚度,覆岩结构及地表建筑物保护等级要求,按照2.5~4.5m厚度进行分层,确定特厚煤层倾斜分层层数,采用分层分采下行充填开采顺序;
b.按照已有固体固体充填采煤方法布置巷道及设备,形成充填采煤系统,即在地面适宜位置打一个垂直投料井,在垂直投料井底部开掘与主要运输巷道相贯通的固体充填物料运送巷道;在运料平巷2内布置运料带式输送机4;在运煤平巷5内布置运煤带式输送机7;在采煤工作面9的端头布置自移式转载输送机3,破碎机8,运煤转载输送机6;在采煤工作面9布置充填采煤液压支架11,刮板输送机10,采煤机1;在充填工作面19布置底卸式输送机12,夯实机16;
c.首先开采第一分层21的首采工作面,在第一个循环内,按正常采煤依次进行割煤、推移刮板输送机10、推移充填采煤液压支架11的流程,随后在采空区18的底部处施工人工假顶23,即首先沿采空区18的底部铺设金属网14,金属网14的边缘距底座15为5cm,以免充填固体物料13全部覆盖金属网14,其次,在金属网14上面铺设竹笆24,竹笆24的边缘滞后金属网14的边缘为5cm,便于金属网14的连接,金属网14、竹笆24沿平行于采煤工作面9的方向进行铺设,直至铺满整个采空区18底部,金属网14,竹笆24铺设完毕后,再对采空区18进行固体物料13充填,并用夯实机16进行夯实,以形成致密充填体,完成第一个步距内的循环;在第二个循环内,采煤同第一个循环,紧接着在充填采煤液压支架11的掩护下,在采空区18的底部处铺设金属网14,竹笆24,并分别用铁丝与第一个循环铺设的金属网14,竹笆24连成一体,随后进行同样的充填作业程序,完成第二个步距内的循环;如此重复循环作业,直至开采至保护煤柱17处,完成首采工作面的充填开采。
d.工作面搬家至本分层下一个工作面,按照首采工作面的充填开采方法,不断充填开采其它工作面,直至完成第一分层21的所有充填开采;同时,在第一分层21首采工作面充填采完之后,间隔4个月时间,在其相对应的第二分层22位置,在金属网14、竹笆24的人工假顶23掩护下,按同样的充填采煤方法,充填开采第二分层22,如此循环,不断的在上一分层制造的人工假顶掩护下进行本分层充填开采,直至开采完上覆岩层20与底板25之间的整个特厚煤层。

Claims (1)

1.一种特厚煤层倾斜分层固体充填采煤方法,其特征在于,包括如下步骤:
a. 根据“三下”特厚煤层厚度,覆岩结构及地表建筑物保护等级要求,按照2.5~4.5m厚度进行分层,确定特厚煤层倾斜分层的层数,采用分层分采下行充填开采顺序;
b. 按照已有固体充填采煤方法布置巷道及安装设备,开采第一分层(21)的首采工作面;
c. 按常规进行第一个充填采煤循环,依次进行割煤、推移刮板输送机(10)、推移充填采煤液压支架(11),在采空区(18)的底板处施工人工假顶(23),施工人工假顶(23)首先沿采空区(18)的底部铺设金属网(14),金属网(14)边缘距充填采煤液压支架(11)的底座(15)为5cm,然后在金属网(14)上面铺设竹笆(24),竹笆(24)的边缘滞后金属网(14)的边缘为5cm,金属网(14)、竹笆(24)沿平行于采煤工作面(9)的方向进行铺设,直至铺满整个采空区(18)底部,金属网(14)、竹笆(24)铺设完毕后,再对采空区(18)进行固体物料(13)充填,并用夯实机(16)进行夯实,完成第一个步距内的循环;继续第二个充填采煤循环,在充填采煤液压支架(11)的掩护下,在采空区(18)的底部处铺设金属网(14)、竹笆(24),并分别用铁丝与第一个充填采煤循环铺设的金属网(14)、竹笆(24)连成一体,随后进行采空区(18)的充填作业,完成第二个步距的循环;如此重复循环作业,直至开采至保护煤柱处,完成首采工作面的充填开采;
d.工作面搬家至第一分层(21)的下一个工作面,重复步骤c,依次进行第一分层(21)所有工作面的充填开采,同时,在第一分层(21)首采工作面充填完成间隔4个月后,在其相对应的第二分层(22)位置,在人工假顶(23)掩护下,按第一分层(21)同样的充填开采方法,进行第二分层(22)的充填开采,直至完成本分层所有工作面的充填开采;
e.重复步骤c、d,依次在上一分层制造的人工假顶掩护下进行本分层充填开采,直至完成整个特厚煤层所有分层的充填开采。
CN201310187986.3A 2013-05-20 2013-05-20 一种特厚煤层倾斜分层固体充填采煤方法 Active CN103306720B (zh)

Priority Applications (5)

Application Number Priority Date Filing Date Title
CN201310187986.3A CN103306720B (zh) 2013-05-20 2013-05-20 一种特厚煤层倾斜分层固体充填采煤方法
AU2014271115A AU2014271115B2 (en) 2013-05-20 2014-01-22 Inclined layered solid-filling mining method in ultrathick coal layer
PCT/CN2014/071088 WO2014187163A1 (zh) 2013-05-20 2014-01-22 一种特厚煤层倾斜分层固体充填采煤方法
US14/891,288 US9494037B2 (en) 2013-05-20 2014-01-22 Inclined layered solid-filling mining method in ultrathick coal layer
ZA2015/07615A ZA201507615B (en) 2013-05-20 2015-10-13 Inclined layered solid-filling mining method in ultra-thick coal layer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310187986.3A CN103306720B (zh) 2013-05-20 2013-05-20 一种特厚煤层倾斜分层固体充填采煤方法

Publications (2)

Publication Number Publication Date
CN103306720A CN103306720A (zh) 2013-09-18
CN103306720B true CN103306720B (zh) 2015-05-20

Family

ID=49132395

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310187986.3A Active CN103306720B (zh) 2013-05-20 2013-05-20 一种特厚煤层倾斜分层固体充填采煤方法

Country Status (5)

Country Link
US (1) US9494037B2 (zh)
CN (1) CN103306720B (zh)
AU (1) AU2014271115B2 (zh)
WO (1) WO2014187163A1 (zh)
ZA (1) ZA201507615B (zh)

Families Citing this family (33)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103306720B (zh) 2013-05-20 2015-05-20 中国矿业大学 一种特厚煤层倾斜分层固体充填采煤方法
CN103485819B (zh) * 2013-09-23 2015-11-04 中国矿业大学 一种大倾角煤层采空区倒台阶袋式充填方法
CN103527197B (zh) * 2013-10-28 2016-01-06 中国矿业大学 一种特厚煤层固体胶结充填巷式开采方法
CN103628914B (zh) * 2013-11-13 2016-04-13 陕西煤业化工技术研究院有限责任公司 一种缓倾角煤层分层开采探放低渗厚层基岩含水层的方法
CN103758567B (zh) * 2014-01-26 2016-02-03 山东科技大学 一种破碎顶板冒落区注浆充填方法
CN104088662B (zh) * 2014-06-25 2016-08-31 中国矿业大学 一种固体充填采煤沿空留巷支护墙体的施工方法
CN104131829B (zh) * 2014-06-25 2016-05-04 中国矿业大学 一种固体充填采煤液压支架撤架方法
CN104265292B (zh) * 2014-09-19 2016-04-13 中国矿业大学 一种固体充填采煤工作面分层保留伪顶方法
CN104727847B (zh) * 2015-01-14 2016-11-02 中国矿业大学 充填墙体自消除的无煤柱沿空留巷方法
CN104832178A (zh) * 2015-03-23 2015-08-12 中国矿业大学 一种厚煤层分层部分充填采煤方法
CN105065047B (zh) * 2015-07-27 2017-11-14 安徽理工大学 一种高水复合矸石充填液压支架
CN106194187A (zh) * 2016-08-04 2016-12-07 安徽理工大学 一种特厚松软煤层分层开采的采煤工艺
CN106884676B (zh) * 2017-04-19 2018-08-17 中国矿业大学 一种邻近露天矿的井工塌陷区治理方法
CN107975372A (zh) * 2017-11-22 2018-05-01 中国矿业大学 一种特厚煤层下行分层充填采矿方法
CN107939401B (zh) * 2017-11-28 2019-05-14 中国矿业大学 一种特厚煤层分层间隔充填采煤方法
CN108226447B (zh) * 2018-01-31 2023-09-12 山东科技大学 煤炭地下开采地表移动三维模拟试验装置及试验方法
CN108708726B (zh) * 2018-05-18 2019-07-19 中南大学 一种双层双向水平分条空场嗣后充填采矿方法
CN108825237B (zh) * 2018-06-01 2019-10-11 中国煤炭科工集团太原研究院有限公司 一种特厚煤连采机与充填相结合的分层分采工艺
CN108716401B (zh) * 2018-06-28 2019-09-27 中国矿业大学 一种巨厚煤层分层开采方法
CN110630263B (zh) * 2018-08-29 2021-04-27 中国矿业大学 一种中部含夹矸层巨厚煤层分层开采方法
CN109356582B (zh) * 2018-11-15 2019-09-03 山东科技大学 一种用于综采放顶煤工作面的充填开采方法
CN110630265B (zh) * 2018-12-26 2021-07-09 中国矿业大学 一种控制地表台阶下沉的巨厚煤层分层开采方法
CN109538204A (zh) * 2019-01-04 2019-03-29 天地科技股份有限公司上海分公司 矿料机械化连续生产方法
CN109882174B (zh) * 2019-04-04 2022-04-01 中国矿业大学(北京) 工作面旋转开采上山煤柱与贯通上山交替协同开采方法
CN110145363B (zh) * 2019-04-30 2024-03-29 中国矿业大学(北京) 一种实现综采面垮落到充填开采过渡的顶板控制方法
CN110043260B (zh) * 2019-05-17 2020-10-13 中国矿业大学(北京) 一种利用常规液压支架进行充填采煤的方法
CN111691885B (zh) * 2020-05-26 2021-11-09 太原理工大学 一种特厚煤层高效充填开采方法
CN112983420A (zh) * 2021-03-31 2021-06-18 神华神东煤炭集团有限责任公司 一种采煤方法
CN113187545A (zh) * 2021-05-28 2021-07-30 金川镍钴研究设计院有限责任公司 一种下向分层上下交错进路充填采矿法
CN113187481B (zh) * 2021-05-28 2023-05-26 辽宁科技大学 一种覆盖岩集中注浆崩落回采的充填采矿法
CN113374478B (zh) * 2021-07-02 2023-12-01 中国煤炭科工集团太原研究院有限公司 边帮特厚煤层分层开采及填充方法
CN116517543A (zh) * 2023-05-10 2023-08-01 中国矿业大学 一种含有软夹矸的急倾斜煤层群的综采放顶煤开采方法
CN117266855B (zh) * 2023-11-23 2024-01-19 太原理工大学 一种本煤层极薄分层开采的卸压增透方法及系统

Family Cites Families (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3564857A (en) * 1969-01-23 1971-02-23 Hans Joachim Von Hippel Apparatus for protecting underground excavations against collapse
US3937025A (en) * 1973-05-02 1976-02-10 Alvarez Calderon Alberto Inflatable envelope systems for use in excavations
CN85109137A (zh) * 1985-12-13 1988-02-17 昆明工学院 金属矿床下向分层开采法
CN1260460A (zh) 2000-02-16 2000-07-19 程宇鸣 一种扩胀成型的承插式柔性接口钢管及其制造方法
CN1354318A (zh) * 2000-11-17 2002-06-19 连云港市白集煤矿 急倾斜松软厚煤层走向长壁倾斜分层采煤技术
RU2229607C1 (ru) * 2002-12-06 2004-05-27 Санкт-Петербургский государственный горный институт им. Г.В. Плеханова (Технический университет) Способ закладки выработанного пространства
CN1260460C (zh) * 2003-06-06 2006-06-21 中南大学 顶底柱超前回采深孔落矿连续采矿法
CN100590295C (zh) * 2004-02-10 2010-02-17 中国矿业大学(北京校区) 厚煤层全高开采的三段式回采工艺
CN101586460B (zh) 2009-06-02 2011-03-30 中国矿业大学 一种采煤固体物充填方法
CN101666230B (zh) * 2009-10-09 2011-05-25 耿学文 三软煤层加长前梁综采、综采放顶煤采煤方法及设备
CN102003185B (zh) 2010-11-05 2012-12-19 中蓝连海设计研究院 分段条带回采尾盐干式充填采矿法
CN102606159B (zh) * 2012-03-26 2014-04-09 中南大学 中厚急倾斜破碎矿体框架式人工假顶下向分段胶结充填法
CN103306720B (zh) * 2013-05-20 2015-05-20 中国矿业大学 一种特厚煤层倾斜分层固体充填采煤方法

Also Published As

Publication number Publication date
US20160102553A1 (en) 2016-04-14
WO2014187163A1 (zh) 2014-11-27
ZA201507615B (en) 2018-11-28
AU2014271115A1 (en) 2015-11-26
CN103306720A (zh) 2013-09-18
US9494037B2 (en) 2016-11-15
AU2014271115B2 (en) 2016-07-21

Similar Documents

Publication Publication Date Title
CN103306720B (zh) 一种特厚煤层倾斜分层固体充填采煤方法
CN105587318B (zh) 一种缓倾斜平行中厚矿体群连续回采的充填采矿法
CN103557002B (zh) 一种盘区机械化集中溜井上向水平分层充填采矿法
CN103016053B (zh) 一种采空区局部充填控制地表沉陷的方法
US10876403B2 (en) Method for mining ultra-thick coal seam by utilizing goaf solid backfilling technique
CN102518438B (zh) 一种顶板再造中深孔落矿嗣后充填采矿法
CN105626071B (zh) 一种缓倾斜薄矿体采矿方法
CN105041314A (zh) 一种深部嗣后回采矿房—分层回采矿柱的联合采矿法
CN106223958A (zh) 倾斜中厚矿体分区凿岩阶段落矿嗣后充填协同采矿法
CN104775816B (zh) 切眼侧局部压煤覆岩隔离注浆充填不迁村开采方法
CN105464700B (zh) 综采‑充填混合开采工作面充填段长度确定方法
CN106930763A (zh) 一种充填复采特厚煤层残采区护巷煤柱的方法
CN104632220B (zh) 缓倾斜中厚矿体条柱再造采场结构尺寸可调可控采矿方法
CN106499396B (zh) 一种中厚缓倾斜含废石夹层矿体房柱采矿法
CN104847355A (zh) 中厚急倾斜矿体空场连续开采方法
CN104895566A (zh) 一种残矿回收采矿法
CN108843382A (zh) 一种适合缓倾斜围岩不稳定中厚矿体的下向嗣后充填法
CN107975372A (zh) 一种特厚煤层下行分层充填采矿方法
RU2635927C1 (ru) Способ закладки открытого забоя эоловым песком в угольном пласте неглубокого залегания в западных опустыненных районах горных работ
CN103527196A (zh) 一种黄土充填回收房式煤柱的方法
CN106640080B (zh) 一种深部高应力环境下自稳窿形采场布置采矿方法
CN104453996A (zh) 一种上向分层壁式袋装充填采矿法
CN105003269A (zh) 一种巨厚煤层长壁工作面的开采方法
CN103557001A (zh) 一种低段高无底柱留矿嗣后充填采矿法
CN102418528B (zh) 使用钢混结构人工假顶的端部放矿崩落法开采工艺

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant