CN107939401A - 一种特厚煤层分层间隔充填采煤方法 - Google Patents
一种特厚煤层分层间隔充填采煤方法 Download PDFInfo
- Publication number
- CN107939401A CN107939401A CN201711216568.7A CN201711216568A CN107939401A CN 107939401 A CN107939401 A CN 107939401A CN 201711216568 A CN201711216568 A CN 201711216568A CN 107939401 A CN107939401 A CN 107939401A
- Authority
- CN
- China
- Prior art keywords
- caving
- layering
- stratifying
- charge stratifying
- charge
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21C—MINING OR QUARRYING
- E21C41/00—Methods of underground or surface mining; Layouts therefor
- E21C41/16—Methods of underground mining; Layouts therefor
- E21C41/18—Methods of underground mining; Layouts therefor for brown or hard coal
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21F—SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
- E21F15/00—Methods or devices for placing filling-up materials in underground workings
Abstract
一种特厚煤层分层间隔充填采煤方法,开采步骤包括确定巨厚煤层分层层数,间隔布置充填分层和垮落分层;采用下行开采顺序,先从上至下逐一开采充填分层:在每个充填分层布置固体充填采煤工作面,铺设金属网和竹笆制造人工假顶、假底,对采空区输送物料进行夯实充填;再从上至下逐一开采垮落分层:对每个充填分层充填体的内应力及充填体变形进行监测,在确定充填体变形稳定后,在垮落层布置综采工作面,进行垮落法开采。本发明提高了资源回采效率,提高了人工假顶、假顶的稳定性,实现了矿井绿色、高效、安全开采。
Description
技术领域
本发明涉及“三下”巨厚压煤的固体充填采煤方法,尤其是一种特厚煤层分层间隔充填采煤方法。
背景技术
目前,国内针对“三下”巨厚煤层开采,主要有三类开采方式,第一类有分层开采、放顶煤开采方法,开采效率高,但采用垮落法管理顶板,对地表环境造成了严重的影响;第二类有限厚开采、条带开采、注浆减沉开采等方法,在一定程度上保护了地表环境,但其回采率低、生产成本高,造成了大量资源的浪费;第三类主要为充填开采等方法,抑制了岩层运动,有效地保护了地表生态环境,提高了资源回收率,但其工艺均较复杂,生产效率低。因此,研究一种既能控制岩层移动保护地表环境的同时,又能提高“三下”巨厚煤层回采效率的采煤方法迫在眉睫。
发明内容
为了克服现有技术的上述不足,本发明提供一种特厚煤层分层间隔充填采煤方法,既能提高资源的回采效率,又能实现矿井绿色、高效、安全开采。
本发明解决其技术问题采用的技术方案是:开采步骤包括确定巨厚煤层分层层数,间隔布置充填分层和垮落分层;采用下行开采顺序,先从上至下逐一开采充填分层:在每个充填分层布置固体充填采煤工作面,铺设金属网和竹笆制造人工假顶、假底,对采空区输送物料进行夯实充填;再从上至下逐一开采垮落分层:对每个充填分层充填体的内应力及充填体变形进行监测,在确定充填体变形稳定后,在垮落层布置综采工作面,进行垮落法开采。
相比现有技术,本发明的一种特厚煤层分层间隔充填采煤方法,通过确定巨厚煤层分层层数后间隔布置充填分层和垮落分层,进行分层间隔布置固体充填采煤工作面与综采工作面,采用下行开采顺序,先从上至下逐一所有的开采充填分层再逐一开采所有的开采垮落分层,并且固体充填采煤工作面铺设了金属网和竹笆,金属网和竹笆作为该固体充填采煤工作面的人工假顶、假底,上下相邻的充填分层为综采工作面制造了人工假顶、假底,同时监测采空区充填体变形稳定性,有效加强了回采安全性。可见,本发明提高资源的回采效率,提高了人工假顶、假底的稳定性,实现矿井绿色、高效、安全开采。
附图说明
下面结合附图和实施例对本发明进一步说明。
图1是本发明一个实施例中第一充填分层固体充填采煤工作面的侧视图。
图2是本发明一个实施例中充填分层开采完毕工作面的侧视图。
图3是本发明一个实施例中第一垮落分层综采工作面的侧视图。
图4是本发明一个实施例中第二垮落分层综采工作面的侧视图。
图中:1、顶板;2、底板;3、第一充填分层;4、第一垮落分层;5、第二充填分层;6、第二垮落分层;7、第三充填分层;8、第三垮落分层;9、金属网;10、竹笆;11、充填体;12、固体充填采煤工作面;13、综采工作面。
具体实施方式
为使本发明实施例的目的、技术方案和优点更加清楚,下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例是本发明的一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明的保护范围。
本发明的一种特厚煤层分层间隔充填采煤方法,开采步骤包括确定巨厚煤层分层层数,间隔布置充填分层和垮落分层;采用下行开采顺序,先从上至下逐一开采充填分层:在每个充填分层布置固体充填采煤工作面,铺设金属网和竹笆制造人工假顶、假底,对采空区输送物料进行夯实充填;再从上至下逐一开采垮落分层:对每个充填分层充填体的内应力及充填体变形进行监测,在确定充填体变形稳定后,在垮落层布置综采工作面,进行垮落法开采。
在图1所示的一种特厚煤层分层间隔充填采煤方法实施例中,具体步骤如下:
a.确定巨厚煤层的分层层数,间隔布置充填分层和垮落分层,即自上至下依次布置第一充填分层3、第一垮落分层4、第二充填分层5、第二垮落分层6、第三充填分层7和第三垮落分层8,充填分层和垮落分层的具体层数不限于各为三层,要根据实际煤层厚度来决定两种分层的层数;
b.采用下行开采顺序,先开采充填分层(第一充填分层3、第二充填分层5和第三充填分层7),后开采垮落分层(第一垮落分层4、第二垮落分层6和第三垮落分层8);
c.在第一充填分层3布置固体充填采煤工作面12,通过铺设金属网9和竹笆10制造人工假顶、假底,并对采空区输送矸石、黄土、粉煤灰、建筑垃圾等固体物料进行夯实充填,形成充填体11;(步骤a、b、c参见图1)。
d.重复步骤c,先完成第一充填分层3的开采,然后逐步开采下一充填分层,直至所有充填分层开采完毕;(步骤d参见图2)。
e.当所有充填分层回采完毕后,参见图3,对采空区充填体11内应力及充填体11变形进行监测,确定充填体11稳定时间;当第一充填分层3、第二充填分层5的采空区充填体11都变形稳定后,进行第一垮落分层4的回采;
f.在第一垮落分层4布置综采工作面13,在稳定的第一充填分层3、第二充填分层5作为的人工假顶、假底的条件下,完成工作面开采,重复作业,直至第一垮落分层4的开采完毕;(步骤e和f参见图3)。
g.在第一垮落分层4回采完毕后,参见图4,监测第二充填分层5、第三充填分层7的采空区充填体11变形稳定后,开采下一垮落分层即第二垮落分层6,重复作业,直至所有垮落分层开采完毕。
以上所述,仅是本发明的较佳实施例,并非对本发明做任何形式上的限制,凡是依据本发明的技术实质,对以上实施例所做出任何简单修改和同等变化,均落入本发明的保护范围之内。
Claims (3)
1.一种特厚煤层分层间隔充填采煤方法,其特征是:开采步骤包括确定巨厚煤层分层层数,间隔布置充填分层和垮落分层;采用下行开采顺序,先从上至下逐一开采充填分层:在每个充填分层布置固体充填采煤工作面,铺设金属网和竹笆制造人工假顶、假底,对采空区输送物料进行夯实充填;再从上至下逐一开采垮落分层:对每个充填分层充填体的内应力及充填体变形进行监测,在确定充填体变形稳定后,在垮落层布置综采工作面,进行垮落法开采。
2.根据权利要求1所述的一种特厚煤层分层间隔充填采煤方法,其特征是:具体步骤如下:
a.确定巨厚煤层的分层层数,间隔布置充填分层和垮落分层;
b.采用下行开采顺序,先开采充填分层,后开采垮落分层;
c.在第一充填分层(3)布置固体充填采煤工作面(12),通过铺设金属网(9)和竹笆(10)制造人工假顶、假底,并对采空区输送固体物料进行夯实充填,形成充填体(11);
d.重复步骤c,先完成第一充填分层(3)的开采,然后逐步开采下一充填分层,直至所有充填分层开采完毕;
e.当所有充填分层回采完毕后,对采空区充填体(11)内应力及充填体(11)变形进行监测,确定充填体(11)稳定时间;当第一充填分层(3)、第二充填分层(5)的采空区充填体(11)都变形稳定后,进行第一垮落分层(4)的回采;
f.在第一垮落分层(4)布置综采工作面(13),在稳定的第一充填分层(3)、第二充填分层(5)作为的人工假顶、假底的条件下,完成工作面开采,重复作业,直至第一垮落分层(4)的开采完毕;
g.在第一垮落分层(4)回采完毕后,监测第二充填分层(5)、第三充填分层(7)的采空区充填体(11)变形稳定后,开采下一垮落分层,重复作业,直至所有垮落分层开采完毕。
3.根据权利要求2所述的一种特厚煤层分层间隔充填采煤方法,其特征是:所述步骤c中的固体物料主要由矸石、黄土、粉煤灰和建筑垃圾组成。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711216568.7A CN107939401B (zh) | 2017-11-28 | 2017-11-28 | 一种特厚煤层分层间隔充填采煤方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711216568.7A CN107939401B (zh) | 2017-11-28 | 2017-11-28 | 一种特厚煤层分层间隔充填采煤方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107939401A true CN107939401A (zh) | 2018-04-20 |
CN107939401B CN107939401B (zh) | 2019-05-14 |
Family
ID=61949397
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711216568.7A Active CN107939401B (zh) | 2017-11-28 | 2017-11-28 | 一种特厚煤层分层间隔充填采煤方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107939401B (zh) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108716401A (zh) * | 2018-06-28 | 2018-10-30 | 中国矿业大学 | 一种巨厚煤层分层开采方法 |
CN109025998A (zh) * | 2018-08-02 | 2018-12-18 | 缪协兴 | 一种利用采空区固体充填技术的巨厚煤层开采方法 |
CN109356582A (zh) * | 2018-11-15 | 2019-02-19 | 山东科技大学 | 一种用于综采放顶煤工作面的充填开采方法 |
CN111691885A (zh) * | 2020-05-26 | 2020-09-22 | 太原理工大学 | 一种特厚煤层高效充填开采方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102678121A (zh) * | 2012-05-21 | 2012-09-19 | 山东黄金矿业(莱州)有限公司三山岛金矿 | 无盘区中深孔留矿分层控顶嗣后充填采矿法 |
CN103306720A (zh) * | 2013-05-20 | 2013-09-18 | 中国矿业大学 | 一种特厚煤层倾斜分层固体充填采煤方法 |
CN103527197A (zh) * | 2013-10-28 | 2014-01-22 | 中国矿业大学 | 一种特厚煤层固体胶结充填巷式开采方法 |
CN104832178A (zh) * | 2015-03-23 | 2015-08-12 | 中国矿业大学 | 一种厚煤层分层部分充填采煤方法 |
CN106014410A (zh) * | 2016-06-21 | 2016-10-12 | 中南大学 | 一种下向进路部分充填采矿方法 |
-
2017
- 2017-11-28 CN CN201711216568.7A patent/CN107939401B/zh active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102678121A (zh) * | 2012-05-21 | 2012-09-19 | 山东黄金矿业(莱州)有限公司三山岛金矿 | 无盘区中深孔留矿分层控顶嗣后充填采矿法 |
CN103306720A (zh) * | 2013-05-20 | 2013-09-18 | 中国矿业大学 | 一种特厚煤层倾斜分层固体充填采煤方法 |
CN103527197A (zh) * | 2013-10-28 | 2014-01-22 | 中国矿业大学 | 一种特厚煤层固体胶结充填巷式开采方法 |
CN104832178A (zh) * | 2015-03-23 | 2015-08-12 | 中国矿业大学 | 一种厚煤层分层部分充填采煤方法 |
CN106014410A (zh) * | 2016-06-21 | 2016-10-12 | 中南大学 | 一种下向进路部分充填采矿方法 |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108716401A (zh) * | 2018-06-28 | 2018-10-30 | 中国矿业大学 | 一种巨厚煤层分层开采方法 |
CN109025998A (zh) * | 2018-08-02 | 2018-12-18 | 缪协兴 | 一种利用采空区固体充填技术的巨厚煤层开采方法 |
US20200040727A1 (en) * | 2018-08-02 | 2020-02-06 | Xiexing Miao | Method for mining ultra-thick coal seam by utilizing goaf solid backfilling technique |
US10876403B2 (en) * | 2018-08-02 | 2020-12-29 | Xiexing Miao | Method for mining ultra-thick coal seam by utilizing goaf solid backfilling technique |
CN109356582A (zh) * | 2018-11-15 | 2019-02-19 | 山东科技大学 | 一种用于综采放顶煤工作面的充填开采方法 |
CN109356582B (zh) * | 2018-11-15 | 2019-09-03 | 山东科技大学 | 一种用于综采放顶煤工作面的充填开采方法 |
WO2020098089A1 (zh) * | 2018-11-15 | 2020-05-22 | 山东科技大学 | 一种用于综采放顶煤工作面的充填开采方法 |
US11047236B2 (en) | 2018-11-15 | 2021-06-29 | Shandong University Of Science And Technology | Filling mining method for fully-mechanized top coal caving working face |
CN111691885A (zh) * | 2020-05-26 | 2020-09-22 | 太原理工大学 | 一种特厚煤层高效充填开采方法 |
CN111691885B (zh) * | 2020-05-26 | 2021-11-09 | 太原理工大学 | 一种特厚煤层高效充填开采方法 |
Also Published As
Publication number | Publication date |
---|---|
CN107939401B (zh) | 2019-05-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103306720B (zh) | 一种特厚煤层倾斜分层固体充填采煤方法 | |
CN107939401B (zh) | 一种特厚煤层分层间隔充填采煤方法 | |
AU2013252230B2 (en) | Method for distributed storage and use of underground water in mine | |
CN105971606B (zh) | 一种巨厚煤层长壁工作面开采方法 | |
CN102536239B (zh) | 一种长壁工作面无煤柱开采方法 | |
CN107975372A (zh) | 一种特厚煤层下行分层充填采矿方法 | |
AU2019435042A1 (en) | Two-step grouting modified coal mining method under water-preservation for roof aquifer | |
CN104863592B (zh) | 一种大结构分段凿岩阶段出矿嗣后充填采矿法 | |
CN103821515B (zh) | 一种对拉工作面充填采煤工艺 | |
CN103790588B (zh) | 一种缓倾斜矿体自溜采矿方法 | |
CN104453904B (zh) | 免拉槽分段充填采矿法 | |
CN105041314A (zh) | 一种深部嗣后回采矿房—分层回采矿柱的联合采矿法 | |
CN106014410A (zh) | 一种下向进路部分充填采矿方法 | |
CN104712358A (zh) | 基于首采全岩卸压工作面沿空留巷的高瓦斯煤层群卸压共采方法 | |
CN103967495A (zh) | 一种尾矿坝坝坡尾矿回采技术 | |
CN106150545B (zh) | 一种根据顶板垮落特征进行采空区部分充填的方法 | |
CN107939399A (zh) | 一种多中段同时开采模式下水平矿柱回收方法及进路结构 | |
CN106499396B (zh) | 一种中厚缓倾斜含废石夹层矿体房柱采矿法 | |
CN104330107A (zh) | 一种固体充填采煤工作面充填质量评价方法 | |
CN109209379A (zh) | 一种矿山采选充+x开采模式 | |
CN103993882A (zh) | 一种冒落区注浆充填置换条带煤柱的方法 | |
AU2018431390A1 (en) | Method for recovering room-type coal pillars by cemented filling of reserved roadways | |
CN102102518B (zh) | 一种水库坝体下厚煤层放顶煤协调开采方法 | |
CN105003269A (zh) | 一种巨厚煤层长壁工作面的开采方法 | |
CN103726846B (zh) | 一种上行分层开采特厚、巨厚煤层的采煤方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information |
Inventor after: Li Meng Inventor after: Zhang Jixiong Inventor after: Qi Wenyue Inventor after: Zhang Qiang Inventor after: Liu Yang Inventor before: Zhang Jixiong Inventor before: Qi Wenyue Inventor before: Zhang Qiang Inventor before: Li Meng Inventor before: Liu Yang |
|
CB03 | Change of inventor or designer information | ||
GR01 | Patent grant | ||
GR01 | Patent grant |