- CN103939137A CN103939137A CN201410191662.1A CN201410191662A CN103939137A CN 103939137 A CN103939137 A CN 103939137A CN 201410191662 A CN201410191662 A CN 201410191662A CN 103939137 A CN103939137 A CN 103939137A
- Authority
- CN
- China
- Prior art keywords
- sand
- drift
- coal
- barnyard
- winch
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 239000004576 sand Substances 0.000 title claims abstract description 95
- 239000003245 coal Substances 0.000 title claims abstract description 35
- 238000005065 mining Methods 0.000 title claims abstract description 31
- 238000000034 method Methods 0.000 title claims abstract description 28
- 238000005553 drilling Methods 0.000 claims abstract description 16
- 238000004519 manufacturing process Methods 0.000 claims abstract description 7
- 238000010276 construction Methods 0.000 claims abstract description 4
- 230000000737 periodic effect Effects 0.000 claims abstract description 4
- 239000010410 layer Substances 0.000 claims description 6
- 230000000694 effects Effects 0.000 claims description 5
- 238000012856 packing Methods 0.000 claims description 5
- 238000007790 scraping Methods 0.000 claims description 3
- 239000002356 single layer Substances 0.000 claims description 3
- 239000011435 rock Substances 0.000 abstract description 7
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 abstract description 7
- 238000013459 approach Methods 0.000 abstract description 2
- 230000015572 biosynthetic process Effects 0.000 abstract description 2
- 238000011105 stabilization Methods 0.000 abstract 1
- 238000005516 engineering process Methods 0.000 description 5
- 230000009172 bursting Effects 0.000 description 3
- 239000007787 solid Substances 0.000 description 3
- 238000006467 substitution reaction Methods 0.000 description 3
- 241000196324 Embryophyta Species 0.000 description 2
- 238000004364 calculation method Methods 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000003203 everyday effect Effects 0.000 description 1
- 238000000605 extraction Methods 0.000 description 1
- 239000000945 filler Substances 0.000 description 1
- 239000010881 fly ash Substances 0.000 description 1
- 230000005484 gravity Effects 0.000 description 1
- -1 loess Substances 0.000 description 1
- 239000006210 lotion Substances 0.000 description 1
- 239000011800 void material Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21F—SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
- E21F15/00—Methods or devices for placing filling-up materials in underground workings
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21F—SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
- E21F15/00—Methods or devices for placing filling-up materials in underground workings
- E21F15/06—Filling-up mechanically
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Excavating Of Shafts Or Tunnels (AREA)
- Underground Or Underwater Handling Of Building Materials (AREA)
- Earth Drilling (AREA)
- Drilling And Exploitation, And Mining Machines And Methods (AREA)
Abstract
本发明公开的一种西部沙漠化矿区浅埋煤层的风积沙空场充填方法,适用于顶板自稳性能较好、后方能形成一定尺度空场的采煤工作面。利用地表钻井到浅埋煤层工程量小和风积沙自流性能好的特征,在采煤工作面开采后形成的空场上方布置钻井,直接将风积沙灌入空场,在井下周期来压之前,分段充填空场,实现风积沙对空场的充填。由于西部煤层埋藏浅,上覆松散层厚,基岩薄,钻井工程量小,成本低,施工周期短。同时能够有效地解决覆岩破坏、地表沉陷问题,缓解突水溃沙,改善西部矿区环境。为我国西部沙漠化矿区绿色开采开辟了一条新的技术途径,其生产效率高,投入设备少,充填成本低。
Description
技术领域
本发明涉及煤矿一种西部沙漠化矿区浅埋煤层的风积沙空场充填方法,尤其适用于顶板自稳性能较好、后方能形成一定尺度空场的采煤工作面。
背景技术
西部沙漠化矿区以煤层埋藏浅、开采厚度大、基岩厚度薄、风积沙松散层厚为地质构造特征,并有风积沙松散层内含水层局部较厚的水文地质特征,在这种条件下开采不仅容易引起覆岩破坏和地表沉陷,而且易导致重大突水或溃沙等灾害事故。工程实践表明,突水或溃沙掩埋工作面或巷道,已是威胁矿井安全的主要隐患之一。而充填开采是解决覆岩破坏、地表沉陷、突水和溃沙等问题的最直观和有效的方法。
目前国内外煤矿充填开采按充填材料不同主要分为3类:矸石、粉煤灰、黄土等固体充填技术,膏体、似膏体充填技术,高水、超高水材料充填技术。这3类方法在不同程度地解决了上述问题。其中固体充填技术由于其机械化程度相对高、回采率高等优点而得到广泛地推广。但是目前固体充填在工业广场设流沙井,而部分采区离工业广场远,造成井下运料路线长,运料能力不足,运料系统可靠性大大受限,且占用井下原本有限的空间和运料能力,因此生产效率不高。同时投入的设备较多,成本较高。研究一种风积沙充填法,在西部沙漠化矿区具有重要的现实意义和广阔的应用前景。
发明内容
技术问题:本发明的目的是要解决现有充填技术中存在的问题,提供一种西部沙漠化矿区浅埋煤层的风积沙空场充填方法,利用风积沙充填来解决覆岩破坏、地表沉陷、突水和溃沙等问题,从而提高生产效率,减少投入设备,降低充填成本。
技术方案:本发明的西部沙漠化矿区浅埋煤层的风积沙空场充填法,包括如下步骤:
a、根据煤层赋存特征和开采技术条件,确定采煤工作面和流沙井的技术参数;
b、分布式定点钻井:在采煤工作面和开采后形成的空场上方间隔排列施工多个通向地表的流沙井;
c、地表定量运料:在地表围绕流沙井布置耙沙绞车,将周围风积沙耙运到流沙井中,控制风积沙流量,并保证流沙井及其周围的稳定、安全;
d、工作面循环作业:随着采煤作业的推进,在井下周期来压之前,分段充填空场,实现风积沙对空场的充填;
若风积沙自流性较差时,布置可移动梭式摊平系统,辅助完成充填作业;所述可移动梭式摊平系统包括耙沙绞车、耙斗、滑轮、滑轮轨道,耙斗经钢丝绳分别与耙沙绞车和滑轮相连,在采煤工作面两侧的沿空巷道顶板架设滑轮轨道,在底板布设绞车轨道,将耙沙绞车骑于绞车轨道上,随着采煤工作面推进,控制耙斗在空场内往复梭式运动,从而将流沙井下方投料形成的沙堆均匀地摊平,并及时充填空场,充填空场后,耙沙绞车沿绞车轨道向采煤工作面移近,同时滑轮沿滑轮轨道向采煤工作面移近。
所述流沙井的钻井直径不低于风积沙下落时的当量直径d0,当量直径式中A为产煤能力,钻井直径一般取200~400mm,风积沙流量一般取0.04~0.20m3/s。
所述采煤工作面的长度受井下耙沙绞车容绳量限制,不超过100m。
所述空场沿走向的距离较宽,顶板自稳性能较差时,采用临时支护手段提高顶板强度,以延长自稳时间。
所述流沙井的间距受井下耙沙绞车容绳量限制,一般不超过100m、不低于5~15m。
所述流沙井的排距与空场在采煤工作面推进方向自稳跨距、工作面周期来压歩距一致,一般不超过10~40m,以尽量减少风积沙在采煤工作面推进方向上的搬运距离;其中:工作面周期来压歩距由式确定,式中:LlS为老顶周期来压歩距;RT为老顶岩层抗拉强度;q为老顶岩梁所受载荷;h为老顶岩层的单层厚度。
有益效果:本发明利用地表钻井到浅埋煤层工程量小和地表风积沙自流性能好的特征,在采煤工作面开采后形成的空场上方布置钻井,直接将风积沙灌入空场,实现充填。本方法为我国西部沙漠化矿区绿色开采开辟了一条新的技术途径,其生产效率高,投入设备少,充填成本低。具体优点如下:
1、采用风积沙充填法,能够有效地解决覆岩破坏、地表沉陷问题,缓解突水溃沙,改善西部矿区环境;
2、由于西部埋藏浅,上覆松散层厚,基岩薄,钻井工程量小,成本低,周期短,且极大缩短了运料路线,基本不占用井下空间,大大提高了生产效率;
3、西部沙漠化矿区风积沙广布,便于就地取材,降低了充填成本;
4、可移动梭式摊平系统简单易操作,摊平风积沙后,高效充填或部分充填空场,空隙率低,密实度大,充填效果好;
5、尤其适用于顶板自稳性能较好、后方能形成一定尺度空场的采煤工作面;顶板自稳性能较差时,采用临时支护手段后也可适用。
附图说明
图1是本发明的西部沙漠化矿区浅埋煤层的风积沙空场充填法俯视示意图。
图2是本发明的西部沙漠化矿区浅埋煤层的风积沙空场充填法剖面示意图。
图3是本发明的西部沙漠化矿区浅埋煤层的风积沙空场充填法立体示意图。
图中:1-流沙井,2-耙沙绞车,3-耙斗,4-滑轮,5-滑轮轨道,6-绞车轨道,7-沿空巷道,8-采煤工作面,9-空场。
具体实施方式
下面结合附图对本发明的实施例作进一步的描述:
本发明的西部沙漠化矿区浅埋煤层的风积沙空场充填方法,具体步骤如下:
a、根据煤层赋存特征和开采技术条件,确定采煤工作面8和流沙井1的技术参数;
b、分布式定点钻井:在采煤工作面8和开采后形成的空场9上方间隔排列施工多个通向地表的流沙井1;
c、地表定量运料:在地表围绕流沙井1布置耙沙绞车,将周围风积沙耙运到流沙井1中,控制风积沙流量,并保证流沙井1及其周围的稳定、安全;
d、工作面循环作业:随着采煤作业的推进,在井下周期来压之前,分段充填空场(9),实现风积沙对空场的充填;
若风积沙自流性较差时,布置可移动梭式摊平系统,辅助完成充填作业;所述可移动梭式摊平系统包括耙沙绞车2、耙斗3、滑轮4、滑轮轨道5,耙斗3经钢丝绳分别与耙沙绞车2和滑轮4相连,在采煤工作面8两侧的沿空巷道7顶板架设滑轮轨道5,在底板布设绞车轨道6,将耙沙绞车2骑于绞车轨道6上,随着采煤工作面8推进,控制耙斗3在空场9内往复梭式运动,从而将流沙井1下方投料形成的沙堆均匀地摊平,并及时充填空场9,充填空场9后,耙沙绞车2沿绞车轨道6向采煤工作面8移近,同时滑轮4沿滑轮轨道5向采煤工作面8移近。
所述流沙井1的钻井直径不低于风积沙下落时的当量直径d0,当量直径式中A为产煤能力,钻井直径一般取200~400mm,风积沙流量一般取0.04~0.20m3/s。
所述采煤工作面8的长度受井下耙沙绞车容绳量限制,一般不超过100m。
所述空场9沿走向的距离较宽,顶板自稳性能较差时,采用临时支护手段提高顶板强度,以延长自稳时间。
所述流沙井1的间距受井下耙沙绞车容绳量限制,一般不超过100m、不低于5~15m。
所述流沙井1的排距与空场9在采煤工作面8推进方向自稳跨距、工作面周期来压歩距一致,一般不超过10~40m,以尽量减少风积沙在采煤工作面推进方向上的搬运距离;其中:工作面周期来压歩距由式确定,式中:LlS为老顶周期来压歩距;RT为老顶岩层抗拉强度;q为老顶岩梁所受载荷;h为老顶岩层的单层厚度。
实例1、
(1)西部某矿埋深约65m,风积沙松散层厚约45m,基岩厚约20m,煤容重γ为1.3t/m3。设计采煤工作面8长度L为90m,采高H为5.2m。空场顶板自稳性能较好。平均周期来压步距15m,取流沙井排距15m,按1-1布置,并布置以耙沙绞车为主的可移动梭式摊平系统。
(2)在采煤工作面8两侧的沿空巷道7各布置1台耙沙绞车2,耙斗3容积V0=1.2m3,耙斗3总数n为2个,绞车容绳量100m,耙斗3平均工作速度vt为1.2m/s,每日摊平充填作业时间0.5d,采煤作业时间0.5d,年工作日330d,可推导出日摊平体积计算公式为vdt=n×V0/(L/vt)。易知投料形成的沙堆体积V=π×H×r2/3,其中r=H×cot α,α为风积沙的自然堆积角,取α=32°。所以根据等体积部分充填原理,令充填率β=0.8,可以推导出工作面理论产煤能力计算公式为A=330×(vdt+V)×γ×0.5/β,最大推进度v0=A/[330×H×L×γ]。代入数据计算得到工作面理论产煤能力A=83.2万t/a,最大推进度v0=4m/d。代入风积沙下落时的当量直径计算公式得出其当量直径d0=180mm。代入风积沙下落流量计算公式Q=v0×L×H/43200,得出其流量Q=0.045m3/s。故流沙井钻井直径可取250m,流量控制在0.04~0.05m3/s。
(3)在采煤工作面8两侧的沿空巷道7顶板架设滑轮轨道5,在底板布设绞车轨道6,将耙沙绞车2骑于绞车轨道6上,随着采煤工作面8推进,控制耙斗3在空场9内往复梭式运动,从而将流沙井1下方投料形成的沙堆均匀地摊平,并及时充填空场9,充填空场9后,耙沙绞车2沿绞车轨道6向采煤工作面8移近,同时滑轮4沿滑轮轨道5向采煤工作面8移近。
Claims (6)
1.一种西部沙漠化矿区浅埋煤层的风积沙空场充填方法,其特征在于:包括如下步骤:
a、根据煤层赋存特征和开采技术条件,确定采煤工作面(8)和流沙井(1)的技术参数;
b、分布式定点钻井:在采煤工作面(8)和开采后形成的空场(9)上方间隔排列施工多个通向地表的流沙井(1);
c、地表定量运料:在地表围绕流沙井(1)布置耙沙绞车,将周围风积沙耙运到流沙井(1)中,控制风积沙流量,并保证流沙井(1)及其周围的稳定、安全;
d、工作面循环作业:随着采煤作业的推进,在井下周期来压之前,分段充填空场(9),实现风积沙对空场的充填;
若风积沙自流性较差时,布置可移动梭式摊平系统,辅助完成充填作业;所述可移动梭式摊平系统包括耙沙绞车(2)、耙斗(3)、滑轮(4)、滑轮轨道(5),耙斗(3)经钢丝绳分别与耙沙绞车(2)和滑轮(4)相连,在采煤工作面(8)两侧的沿空巷道(7)顶板架设滑轮轨道(5),在底板布设绞车轨道(6),将耙沙绞车(2)骑于绞车轨道(6)上,随着采煤工作面(8)推进,控制耙斗(3)在空场(9)内往复梭式运动,从而将流沙井(1)下方投料形成的沙堆均匀地摊平,并及时充填空场(9),充填空场(9)后,耙沙绞车(2)沿绞车轨道(6)向采煤工作面(8)移近,同时滑轮(4)沿滑轮轨道(5)向采煤工作面(8)移近。
2.根据权利要求1所述的西部沙漠化矿区浅埋煤层的风积沙空场充填法,其特征在于:所述流沙井(1)的钻井直径不低于风积沙下落时的当量直径d0,当量直径式中A为产煤能力,钻井直径取200~400mm,风积沙流量一般取0.04~0.20m3/s。
3.根据权利要求1所述的西部沙漠化矿区浅埋煤层的风积沙空场充填方法,其特征在于:所述采煤工作面(8)的长度受井下耙沙绞车容绳量限制,一般不超过100m。
4.根据权利要求1所述的西部沙漠化矿区的浅埋煤层风积沙空场充填方法,其特征在于:所述空场(9)沿走向的距离较宽,顶板自稳性能较差时,采用临时支护手段提高顶板强度,以延长自稳时间。
5.根据权利要求1所述的西部沙漠化矿区浅埋煤层的风积沙空场充填方法,其特征在于:所述流沙井(1)的间距受井下耙沙绞车容绳量限制,一般不超过100m、不低于5~15m。
6.根据权利要求1所述的西部沙漠化矿区浅埋煤层的风积沙空场充填方法,其特征在于:所述流沙井(1)的排距与空场(9)在采煤工作面(8)推进方向自稳跨距、工作面周期来压歩距一致,不超过10~40m,以尽量减少风积沙在采煤工作面推进方向上的搬运距离;其中:工作面周期来压歩距由式确定,式中:LlS为老顶周期来压歩距;RT为老顶岩层抗拉强度;q为老顶岩梁所受载荷;h为老顶岩层的单层厚度。
Priority Applications (5)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410191662.1A CN103939137B (zh) | 2014-05-07 | 2014-05-07 | 西部沙漠化矿区浅埋煤层的风积沙空场充填方法 |
AU2014393189A AU2014393189B2 (en) | 2014-05-07 | 2014-06-05 | Method for filling open stope with aeolian sand in shallow coal seam in western desertified mining areas |
RU2016120684A RU2635927C1 (ru) | 2014-05-07 | 2014-06-05 | Способ закладки открытого забоя эоловым песком в угольном пласте неглубокого залегания в западных опустыненных районах горных работ |
PCT/CN2014/079202 WO2015168972A1 (zh) | 2014-05-07 | 2014-06-05 | 西部沙漠化矿区浅埋煤层的风积沙空场充填方法 |
ZA2016/03501A ZA201603501B (en) | 2014-05-07 | 2016-05-23 | Method for filling open stope with aeolian sand in shallow coal seam in western desertified mining areas |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410191662.1A CN103939137B (zh) | 2014-05-07 | 2014-05-07 | 西部沙漠化矿区浅埋煤层的风积沙空场充填方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103939137A true CN103939137A (zh) | 2014-07-23 |
CN103939137B CN103939137B (zh) | 2015-12-02 |
Family
ID=51186983
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410191662.1A Active CN103939137B (zh) | 2014-05-07 | 2014-05-07 | 西部沙漠化矿区浅埋煤层的风积沙空场充填方法 |
Country Status (5)
Country | Link |
---|---|
CN (1) | CN103939137B (zh) |
AU (1) | AU2014393189B2 (zh) |
RU (1) | RU2635927C1 (zh) |
WO (1) | WO2015168972A1 (zh) |
ZA (1) | ZA201603501B (zh) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108104816A (zh) * | 2017-11-27 | 2018-06-01 | 西北矿冶研究院 | 一种急倾斜薄矿体的上向开采方法 |
CN109268063A (zh) * | 2018-10-24 | 2019-01-25 | 新疆大学 | 利用风积沙充填网箱构筑沿空留巷护巷墙体的方法 |
CN109322669A (zh) * | 2018-12-04 | 2019-02-12 | 新疆大学 | 倾斜煤层采空区刚柔条带相间充填无煤柱连续开采法 |
CN109519218A (zh) * | 2018-10-24 | 2019-03-26 | 新疆大学 | 利用风积沙干式填充网箱承载体充填采空区的方法 |
CN110145308A (zh) * | 2019-06-21 | 2019-08-20 | 山东威斯特矿山工程科技股份有限公司 | 近水平特厚煤层集中充填巷分层迈步采充的三下采煤法 |
CN110145360A (zh) * | 2019-06-21 | 2019-08-20 | 山东威斯特矿山工程科技股份有限公司 | 一种巷道智能矸石充填机及充填方法 |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113187544B (zh) * | 2021-05-28 | 2023-05-26 | 辽宁科技大学 | 一种梁式顶板结构的大型地下空区处理方法 |
CN115163072B (zh) * | 2022-07-14 | 2024-07-02 | 中冶长天国际工程有限责任公司 | 一种“三下”矿体开采的关键层构造方法及其应用 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1162690A (zh) * | 1996-04-12 | 1997-10-22 | 崔正洙 | 地下矿山采矿新工艺 |
CN101008316A (zh) * | 2007-01-31 | 2007-08-01 | 贵州开磷(集团)有限责任公司 | 磷石膏胶结嗣后充填采矿法及其制浆工艺 |
CN102392641A (zh) * | 2011-08-02 | 2012-03-28 | 中钢矿业开发有限公司 | 一种点柱式全矿床不分中段上向高分层连续推进充填采矿方法 |
CN103046955A (zh) * | 2012-12-24 | 2013-04-17 | 河北钢铁集团矿业有限公司 | 一种大范围采空区群充填处理方法 |
CN103233771A (zh) * | 2013-05-13 | 2013-08-07 | 河北钢铁集团矿业有限公司 | 一种采空区充填处理过程中的接顶工艺 |
Family Cites Families (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
HU177046B (hu) * | 1979-02-14 | 1981-06-28 | Tatabanyai Szenbanyak | Sposob poslojnoj obvalnoj vyrabotki tol'stogo ugol'nogo plasta |
SU960454A1 (ru) * | 1981-02-16 | 1982-09-23 | Предприятие П/Я А-3226 | Способ заполнени подземных пустот сыпучим материалом |
SU1244354A1 (ru) * | 1985-01-17 | 1986-07-15 | Уральский филиал Всесоюзного научно-исследовательского и проектного института галургии | Способ закладки выработанного пространства при камерной системе разработки пологих калийных пластов |
RU2136886C1 (ru) * | 1997-12-29 | 1999-09-10 | Российский Университет Дружбы Народов | Способ управления неустойчивой кровлей в длинных очистных забоях |
RU2178084C1 (ru) * | 2000-07-11 | 2002-01-10 | Открытое акционерное общество "Сильвинит" | Способ возведения гидрозакладочного массива в выработанном пространстве при камерной системе разработки |
RU2278273C1 (ru) * | 2004-11-05 | 2006-06-20 | Акционерная компания "АЛРОСА" (Закрытое акционерное общество) | Способ возведения закладочного массива из твердеющих бесклинкерных смесей |
CN101806059B (zh) * | 2010-04-02 | 2011-04-13 | 中铁二局股份有限公司 | 高速公路下伏采空区地表钻孔注浆投沙工艺 |
CN201635765U (zh) * | 2010-04-02 | 2010-11-17 | 中铁二局股份有限公司 | 用于高速公路下伏采空区的投沙器 |
CN202500606U (zh) * | 2012-01-20 | 2012-10-24 | 山东大学 | 通过地面钻孔向地层空洞内填充骨料的装置 |
-
2014
- 2014-05-07 CN CN201410191662.1A patent/CN103939137B/zh active Active
- 2014-06-05 RU RU2016120684A patent/RU2635927C1/ru not_active IP Right Cessation
- 2014-06-05 AU AU2014393189A patent/AU2014393189B2/en not_active Ceased
- 2014-06-05 WO PCT/CN2014/079202 patent/WO2015168972A1/zh active Application Filing
-
2016
- 2016-05-23 ZA ZA2016/03501A patent/ZA201603501B/en unknown
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1162690A (zh) * | 1996-04-12 | 1997-10-22 | 崔正洙 | 地下矿山采矿新工艺 |
CN101008316A (zh) * | 2007-01-31 | 2007-08-01 | 贵州开磷(集团)有限责任公司 | 磷石膏胶结嗣后充填采矿法及其制浆工艺 |
CN102392641A (zh) * | 2011-08-02 | 2012-03-28 | 中钢矿业开发有限公司 | 一种点柱式全矿床不分中段上向高分层连续推进充填采矿方法 |
CN103046955A (zh) * | 2012-12-24 | 2013-04-17 | 河北钢铁集团矿业有限公司 | 一种大范围采空区群充填处理方法 |
CN103233771A (zh) * | 2013-05-13 | 2013-08-07 | 河北钢铁集团矿业有限公司 | 一种采空区充填处理过程中的接顶工艺 |
Non-Patent Citations (1)
Title |
---|
崔锋等: "沙漠边缘煤矿风积砂膏体充填保水开采研究", 《煤炭科学技术》, vol. 39, no. 2, 28 February 2011 (2011-02-28), pages 1 - 4 * |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108104816A (zh) * | 2017-11-27 | 2018-06-01 | 西北矿冶研究院 | 一种急倾斜薄矿体的上向开采方法 |
CN109268063A (zh) * | 2018-10-24 | 2019-01-25 | 新疆大学 | 利用风积沙充填网箱构筑沿空留巷护巷墙体的方法 |
CN109519218A (zh) * | 2018-10-24 | 2019-03-26 | 新疆大学 | 利用风积沙干式填充网箱承载体充填采空区的方法 |
CN109519218B (zh) * | 2018-10-24 | 2020-10-16 | 新疆大学 | 利用风积沙干式填充网箱承载体充填采空区的方法 |
CN109268063B (zh) * | 2018-10-24 | 2020-10-16 | 新疆大学 | 利用风积沙充填网箱构筑沿空留巷护巷墙体的方法 |
CN109322669A (zh) * | 2018-12-04 | 2019-02-12 | 新疆大学 | 倾斜煤层采空区刚柔条带相间充填无煤柱连续开采法 |
CN109322669B (zh) * | 2018-12-04 | 2021-02-02 | 新疆大学 | 倾斜煤层采空区刚柔条带相间充填无煤柱连续开采法 |
CN110145308A (zh) * | 2019-06-21 | 2019-08-20 | 山东威斯特矿山工程科技股份有限公司 | 近水平特厚煤层集中充填巷分层迈步采充的三下采煤法 |
CN110145360A (zh) * | 2019-06-21 | 2019-08-20 | 山东威斯特矿山工程科技股份有限公司 | 一种巷道智能矸石充填机及充填方法 |
Also Published As
Publication number | Publication date |
---|---|
AU2014393189A1 (en) | 2016-07-14 |
CN103939137B (zh) | 2015-12-02 |
RU2635927C1 (ru) | 2017-11-17 |
WO2015168972A1 (zh) | 2015-11-12 |
ZA201603501B (en) | 2017-07-26 |
AU2014393189B2 (en) | 2016-12-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103939137B (zh) | 西部沙漠化矿区浅埋煤层的风积沙空场充填方法 | |
CN105971606B (zh) | 一种巨厚煤层长壁工作面开采方法 | |
CN103016053B (zh) | 一种采空区局部充填控制地表沉陷的方法 | |
CN103306720B (zh) | 一种特厚煤层倾斜分层固体充填采煤方法 | |
CN103615285B (zh) | 一种利于充填接顶的采场进路布置方式及方法 | |
CN104763434B (zh) | 一种无煤柱双巷掘进方法 | |
CN108222938A (zh) | 一种大倾角煤层采空区组合注浆充填开采方法 | |
CN106958446B (zh) | 一种急倾斜煤层开采的岩层移动及地表沉陷的控制方法 | |
CN108194088A (zh) | 一种软顶煤层无爆破切顶卸压沿空留巷方法 | |
CN105464700B (zh) | 综采‑充填混合开采工作面充填段长度确定方法 | |
CN101555107B (zh) | 煤矿胶结充填工艺技术 | |
CN103527197A (zh) | 一种特厚煤层固体胶结充填巷式开采方法 | |
CN104712358A (zh) | 基于首采全岩卸压工作面沿空留巷的高瓦斯煤层群卸压共采方法 | |
CN104632220B (zh) | 缓倾斜中厚矿体条柱再造采场结构尺寸可调可控采矿方法 | |
CN103498696A (zh) | 一种从顶板巷道注浆充填压实采空区充填体的方法 | |
CN104675399B (zh) | 煤矿采掘充填一体化采煤方法 | |
CN109339785B (zh) | 一种缓倾斜中厚矿体多单元组合集约化采矿方法 | |
CN107939403A (zh) | 一种垂直交叉矩形进路式盘区下向胶结充填采矿工艺 | |
CN105003269A (zh) | 一种巨厚煤层长壁工作面的开采方法 | |
CN104500070A (zh) | 一种连续采煤机膏体充填开采方法 | |
CN102102518B (zh) | 一种水库坝体下厚煤层放顶煤协调开采方法 | |
CN109322669A (zh) | 倾斜煤层采空区刚柔条带相间充填无煤柱连续开采法 | |
CN105822305A (zh) | 一种用于煤矿开采的覆岩隔离柱将充填减沉方法 | |
CN103061767B (zh) | 下向水平分层干式充填采矿法 | |
CN106150502A (zh) | 一种多级梯式构造充填复采残采区遗留煤柱群的方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |