WO2015046897A1 - 수요 우선순위 결정 장치 및 방법과 그 프로그램을 기록한 기록 매체, 수요 통제 장치 및 방법 - Google Patents
수요 우선순위 결정 장치 및 방법과 그 프로그램을 기록한 기록 매체, 수요 통제 장치 및 방법 Download PDFInfo
- Publication number
- WO2015046897A1 WO2015046897A1 PCT/KR2014/008925 KR2014008925W WO2015046897A1 WO 2015046897 A1 WO2015046897 A1 WO 2015046897A1 KR 2014008925 W KR2014008925 W KR 2014008925W WO 2015046897 A1 WO2015046897 A1 WO 2015046897A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- lower level
- determined
- priority
- demand
- organization
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06315—Needs-based resource requirements planning or analysis
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/04—Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q30/00—Commerce
- G06Q30/02—Marketing; Price estimation or determination; Fundraising
- G06Q30/0201—Market modelling; Market analysis; Collecting market data
- G06Q30/0204—Market segmentation
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q99/00—Subject matter not provided for in other groups of this subclass
-
- G—PHYSICS
- G16—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR SPECIFIC APPLICATION FIELDS
- G16Z—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR SPECIFIC APPLICATION FIELDS, NOT OTHERWISE PROVIDED FOR
- G16Z99/00—Subject matter not provided for in other main groups of this subclass
Definitions
- the present invention relates to an apparatus and method for determining demand priorities, a recording medium recording the program, and an apparatus and method for controlling demand. More specifically, the present invention relates to an apparatus and method for determining demand priorities that can minimize the influence of demand fluctuations of a specific organization on a quantity planned for supply to another organization, and a recording medium, a demand control apparatus, and a method for recording the program. will be.
- Each sales level of the hierarchical structure may have a corresponding sales area.
- the person in charge of each sales level can calculate the demand for the level in charge of their own can be entered into the in-house computer system.
- High-level organizations such as headquarters, determine priorities for each demand based on the entered demand and establish a supply plan.
- the technical problem to be solved by the present invention is to provide a device and method for prioritizing demand for the prioritization of fixed demand, which is the basis of supply planning, which can simultaneously support the urgency of regional sales while maintaining supply equity. .
- the technical problem to be solved by the present invention is a demand priority that can simultaneously support the urgency of regional sales while maintaining supply equity by minimizing the influence of demand fluctuations of a specific organization on the quantities planned to be supplied to other organizations. It is to provide a determination apparatus and method.
- the priorities of the determined needs of each of the lower-level organizations to determine the priority according to the criteria of the upper-level organization the demand priority determination device for rearranging the priority determined according to the criteria for each lower-level organization and To provide a way.
- a demand priority determining apparatus wherein a higher level organization set by the higher level organization among hierarchical relationships between a higher level organization and a lower level organization exists.
- An upper level ranking unit configured to determine a comprehensive priority regarding firm demands of the lower level organizations according to a level rule; Priority regarding predetermined demands of some lower-level organizations of the lower-level organizations or lower-level organizations that set the lower-level rules is determined by lower-level rules set by any one of the lower-level organizations. It may include a low-level ranking unit for determining.
- a change unit may be configured to change the comprehensive priority information determined by the higher level ranking unit by using the priority information determined by the lower level ranking unit.
- the firm demands of the first and second low level organizations are aggregated, and the first and second low level organizations are combined.
- a high level ranking unit configured to determine a comprehensive priority of the aggregated determined demands according to a high level rule set by a high level organization of a level organization;
- a first lower-level ranking that determines, using the first lower-level rule, a priority regarding predetermined demands of the first lower-level organization when the first lower-level rule set by the first lower-level organization exists.
- Decision unit And each priority of the comprehensive priority by reflecting a priority regarding the determined demands of the first lower level organization determined by the first lower level ranking unit on the comprehensive priority determined by the upper level ranking unit. It may include a change unit for changing the information of the determined demand corresponding to the ranking.
- the changing unit, priorities of the determined needs of the first lower-level organization determined by the first lower-level ranking unit, out of the comprehensive priority determined by the higher-level ranking unit Can only be reflected between priorities relating to the firm demand of the first lower level organization.
- the changing unit changes the determined demand information corresponding to the respective comprehensive priorities according to the priority determined by the first lower level ranking unit, but is related to the determined demand of the second lower level organization at the comprehensive priority.
- the priority may not be changed according to the priority determined by the first lower level ranking unit.
- the upper level organization further includes a third lower level organization as the lower level organization
- the first ranking unit may include the first lower level organization, the second lower level organization, and the third lower level organization.
- the firm demand of the organization may be aggregated, and a general priority regarding the aggregated firm demand may be determined by a higher level rule set by the higher level organization.
- the demand priority determining apparatus is further configured to determine a demand for the second lower level organization when there is a second lower level rule set in the second lower level organization that is different from the higher level rule.
- a second lower level ranking unit configured to determine priority by using the second lower level rule, wherein the change unit is further configured to determine the determined demand of the second lower level organization determined by the second lower level ranking unit.
- the determined demand information corresponding to each of the priorities of the comprehensive priorities may be changed by reflecting the priorities on the overall priorities determined by the higher level ranking unit.
- the changing unit may be configured to determine the priority of the determined demand of the first lower-level organization determined by the second lower-level ranking unit, and determine the priority of the second lower-level organization from the comprehensive priority determined by the higher-level ranking unit.
- the fixed demand information is changed by reflecting only the priorities related to the firm demand, and the firm demand information corresponding to the respective general priorities is changed by the priority determined by the second lower level ranking unit, In the priority, the priority regarding the firm demand of the firm demand of the first lower level organization may not be changed according to the priority determined by the second lower level ranking unit.
- the specific demands of each organization may be subdivided into items relating to two or more demand types.
- the upper level of the first lower level organization and the second lower level organization The level organization combines the firm demands of the first lower level organization and the second lower level organization, and determines the overall priority of the aggregated firm demand according to a higher level rule set by the higher level organization.
- Decision unit When there is a first lower level rule that is different from the higher level rule set by the first lower level organization, the priority regarding the determined demand of the first lower level organization is determined using the first lower level rule.
- a first lower level ranking unit The priority level of the first lower level organization determined by the first lower level ranking unit is reflected on the priority level determined by the upper level ranking unit to reflect the priority of each of the priorities.
- Change unit for changing the corresponding content And a demand control unit that distributes a predetermined supply plan amount based on the comprehensive priority whose contents are changed by the change unit.
- the demand control control unit if the predetermined supply plan amount is less than the total amount of the firm demand input by each of the organizations, the predetermined supply plan amount is sequentially distributed from the highest priority order can do.
- the predetermined supply plan quantity is sequentially distributed from the highest priority order so that a predetermined demand corresponding to some priority among the priority items for which the supply plan quantity has not been distributed is shortened so that the supply plan is not established. Can be.
- the method of determining the priority of each organization, the first priority level and the second lower level A higher level ranking that aggregates the firm demands of the organization and determines the overall priority for the aggregated firm demands by a higher level rule set by the higher level organizations of the first lower level organization and the second lower level organization.
- Determination step; A first lower-level ranking that determines, using the first lower-level rule, a priority regarding predetermined demands of the first lower-level organization when the first lower-level rule set by the first lower-level organization exists.
- Determination step; And each priority of the comprehensive priority by reflecting a priority regarding the determined demands of the first lower level organization determined by the first lower level ranking step on the comprehensive priority determined by the higher level ranking step. It may include a change step of changing the information of the firm demand corresponding to the ranking.
- the changing step includes the priorities of the determined demands of the first lower level organization determined by the first lower level ranking step, the first lower level among the comprehensive priorities determined by the higher level ranking step. It can only be reflected between priorities regarding the firm's defined demand.
- the changing step changes the determined demand information corresponding to the respective comprehensive priorities according to the priority determined by the first lower level ranking step, but the second lower priority in the comprehensive priority.
- the priority regarding the firm demand of the level organization may not be changed according to the priority determined by the first lower level ranking step.
- the higher level organization further includes a third lower level organization as the lower level organization
- the first ranking step includes determining demands of the first lower level organization, the second lower level organization, and the third lower level organization.
- the overall priority of the aggregated determined demand may be determined based on a higher level rule set by the higher level organization.
- the method of determining the priority of the request may include setting the priority of the predetermined demand of the second lower-level organization when the second lower-level rule exists in the second lower-level organization.
- a second lower level ranking step of determining by using a lower level rule wherein the changing step comprises: prioritizing the determined demand of the second lower level organization determined by the second lower level ranking step;
- the determined demand information corresponding to each priority of the comprehensive priority may be changed by reflecting on the overall priority determined by the higher level ranking step.
- the changing may include: prioritizing the determined demand of the first lower level organization determined by the second lower level ranking step, and selecting the second lower level organization from the comprehensive priority determined by the higher level ranking step.
- the fixed demand information is changed by reflecting only between the fixed demands of and the fixed demand information corresponding to the respective comprehensive priorities is changed according to the priority determined by the second lower level ranking step, but the comprehensive priority is changed. In this case, the priority regarding the firm demand of the firm demand of the first lower level organization may not be changed according to the priority determined by the second low level ranking step.
- the specific demands of each organization may be subdivided into items relating to two or more demand types.
- the first lower-level organization and the second lower-level organization aggregates the firm demands of the first lower level organization and the second lower level organization and determines the overall priority of the aggregated firm demand according to the higher level rule set by the higher level organization.
- Ranking step When there is a first lower level rule that is different from the higher level rule set by the first lower level organization, the priority regarding the determined demand of the first lower level organization is determined using the first lower level rule.
- a first lower level ranking step Priority regarding the firm demand of the first lower level organization determined by the first lower level ranking step is reflected on the overall priority determined by the upper level ranking step to apply to each priority of the comprehensive priority.
- the predetermined supply plan amount is less than the total amount of the determined demand input by the organizations, the predetermined supply plan amount is sequentially distributed from the highest priority order, and the supply plan amount Definite demand corresponding to some of the above priorities, which are not distributed, can be shortened to prevent the supply plan.
- the method for determining priorities comprises: combining the determined demands of the first lower level organization and the second lower level organization; A high level ranking process of determining a comprehensive priority regarding the aggregated determined demands by a high level rule set by a higher level organization of the second lower level organization, a first lower level set by the first lower level organization A first lower level ranking process of determining, using the first lower level rule, a priority regarding firm demands of the first lower level organization when a level rule exists; And each priority of the comprehensive priority by reflecting a priority regarding the determined demands of the first lower level organization determined by the first lower level ranking step on the comprehensive priority determined by the higher level ranking step.
- It can be a computer-readable recording medium that records a program for performing a change process for changing the information of the firm demand corresponding to the ranking.
- the present invention may determine the priority of the firm demand so as to support the urgency of regional sales while maintaining supply equity.
- the present invention can support the urgency of regional sales at the same time, while maintaining the supply equity by minimizing the influence on the quantity of demand of a particular organization to supply to other organizations.
- the present invention can control the demand in accordance with the demand situation, supply situation, market situation and the like.
- FIG. 1 is a diagram illustrating a demand forecasting and supply planning process.
- FIG. 2 shows an example of an organizational hierarchy that prioritizes firm demands of a company with a global sales network.
- 3 is a diagram illustrating an example of preset items.
- FIG. 4 is a flowchart illustrating a priority determination method and a demand control method based on priorities according to the present invention.
- FIG. 5 is a block diagram of an apparatus for determining priority of demand according to an embodiment of the present invention.
- FIG. 6 is a diagram for explaining an example in which a predetermined upper level rule is applied differently according to a condition.
- FIG. 7 is a block diagram illustrating an embodiment of a higher level ranking unit.
- FIG. 8 is a diagram illustrating an example in which a ranking value is determined for each item by an item ranking determiner.
- 9 is a view for explaining an example in which the rank value of the Week Time item is corrected by the read time corrector 130.
- FIG. 10 is a diagram illustrating an example of a preset upper level rule.
- FIG. 11 is a diagram illustrating an example of a comprehensive priority value determined by a comprehensive priority value determiner.
- FIG. 12 is a diagram illustrating an example of a preset lower level rule.
- FIG. 13 is a diagram illustrating an example of a priority value determined by a lower level ranking unit.
- FIG. 15 is a diagram illustrating an example in which priorities of the determined needs of the first lower level organization are determined by the first lower level ranking unit among the lower level ranking units.
- FIG. 16 is a diagram illustrating an example in which a priority regarding determined demands of a second lower level organization is determined by a first lower level ranking unit of the lower level ranking unit.
- FIG. 17 shows the result of the change unit reflecting the priority of the determined needs of each lower level organization determined by the first lower level ranking unit and the second lower level ranking unit as shown in FIGS. It is a figure which shows an example.
- 18 is a diagram illustrating an example in which the higher level ranking unit determines the priority according to a predetermined higher level rule.
- 19 is a diagram illustrating a priority value and priority example of firm demands of the French corporation determined by the lower-level ranking unit.
- FIG. 20 is a diagram illustrating an example of a result of the change unit reflecting the contents of FIG. 19 in FIG. 18.
- 21 is a block diagram of a demand control apparatus according to an embodiment of the present invention.
- FIG. 22 is a diagram illustrating an example of a result of describing a determined demand request amount (Req. Qty) in the order of priority determined by the demand priority determining apparatus according to an embodiment of the present invention.
- FIG. 23 is a view showing an example in which a shortage process (Shrt. Qty) is insufficient by the demand control unit in the situation of FIG.
- 24 is a block diagram of a demand priority determining apparatus according to an embodiment of the present invention.
- 25 is a flowchart illustrating a demand priority determining method according to a preferred embodiment of the present invention.
- 26 is a flowchart illustrating a demand control method according to an embodiment of the present invention.
- the sales organization predicts sales for a certain period of time (planned interval) in the future after the present time agreed in advance with the production organization, and inputs the value into the relevant system by day, week, or month (S1).
- the value entered in this way confirms the agreed demand through consultation of the demand forecasting participants (S2).
- the firm demand is decomposed and classified according to the components of the firm demand using the order information requested for delivery in the planned section and the existing firm supply plan information (S3).
- the categorized firm demand is prioritized according to the pre-calculated profitability of the product and the importance of the customer (S4).
- the priority determination process of determining priority for each classification item using determined demand information decomposed and classified according to demand components is provided. It can be used in (S4).
- the present invention may be used not only in the process of determining the priorities of the determined demands (S3) but also in other fields for applying the effects of the present invention.
- FIG. 2 shows an example of an organizational hierarchy that prioritizes firm demands of a company with a global sales network.
- the organization and level of organization that determines priorities can vary from company to company.
- 2 illustrates an example of a prioritization organization composed of a head office, a district, a local corporation, a sales organization, and a customer hierarchy.
- Priority determination is based on input of confirmed demand information from one or more lower-level organizations, and the determined demands are prioritized using the received demand information. It can be an organization that has an organization.
- the organization that determines the priority in FIG. 2 may be the head office, the head office at level 1, each region at level 2, and each regional corporation at level 3.
- Organizations used to illustrate the invention may be corporations, organizations, corporations, etc. at each level. That is, in FIG. 2, the organization may be the head office, the Americas general manager, the European general manager, the very general manager, the US corporation, the Canadian corporation, the UK corporation, the French corporation, the Australian corporation, the Chinese corporation, and the sales1 to sales7. have.
- Each such organization can prioritize defined demands using the apparatus and method for prioritizing demand according to the present invention.
- priority information of firm demands determined by a specific organization may be input to a higher level organization.
- the higher level organization may determine the priorities of the determined demands by reflecting the priorities of the respective organizations input by the lower level organizations using the demand prioritization apparatus and method according to the present invention.
- firm demand information may be input from lower level organizations to determine priorities of firm demands of lower level organizations.
- the determined demand information is information about demand received from subordinate organizations of each level, and may include information about preset items.
- the preset items may be set to items that can be used to determine the priority, for example, as shown in FIG. 3.
- 3 is a diagram illustrating an example of preset items.
- the preset items include items related to importance of a customer (Preference Rank), items related to demand type (Demand Type Rank), items related to information input subject (Measure Rank), items related to order attributes (Order).
- Type Rank item on demand demand time (Week Rank), item on customer base based on profit and loss (Customer Rank), and / or item on item based on profit and loss (Product Rank).
- the preset items are not set to the items described as examples in FIG. 3, and may be changed according to various reasons such as a company's situation, a kind of goods, a company's organization, and a market situation.
- the item relating to the demand demand time is named as a Week Rank for ease of division and ease of understanding, but this naming does not mean that the demand demand time is set in weeks. That is, the demand demand time may be determined in various time units such as days, months, hours, and the like.
- To prioritize firm demands is to prioritize firm demands of each of the various subordinate organizations, starting with firm demands that must be prioritized using the alerts contained in each firm demand. Determining the priorities of defined demands means that there is no supply that meets all the defined demands of the subordinate organizations, to establish criteria for controlling supply or demand at a strategic level, or to consider profitability. It is necessary for the profit and future of the company.
- FIG. 4 is a flowchart illustrating a method of determining the priority of the determined demand and controlling the demand by using the demand priority determining method according to the present invention.
- the category rank step S11 may determine a rank value for each item using predetermined item-specific information included in the firm demand information received from organizations of each lower level.
- Bill of Distribution Lead Time (BOD L / T) correction step (S12) takes into account the lead time of the Bill of Distribution (BOD), and rank value of the item (Week Rank) related to demand demand time among the category ranks. Can be corrected.
- the high level / low level priority step S13 may determine the unified comprehensive priority value by arranging values of each category rank based on a high level rule which is a priority policy set at the enterprise level. On the other hand, if a priority policy for each region is specified, a comprehensive priority value of other values may be determined by rearranging Category Ranks based on a low level rule set for each organization or sales region.
- the comprehensive priority value may be determined using the ranking value for each item reflecting the ranking value information corrected by the BOD L / T correction step S12.
- Priority Swapping step S14 sorts the demands in order of priority based on the overall priority value determined by the lower level rule, and reflects the sorted order on the priority determined based on the comprehensive priority value determined by the higher level rule. can do.
- the priorities of the determined demands may be determined using the steps S11 to S14 of FIG. 4, and the steps S11 to S14 may change the order of steps or omit a specific step as necessary.
- the demand control method according to the present invention, the preallocation step (S15) is based on the priority of the determined demands determined by the demand prioritization method according to the present invention, limiting the amount of demand or For example, a firm's demand exceeding the limited demand can be treated as a shortage.
- the demand priority determination method described with reference to FIG. 4 is merely described with reference to an example of determining the priority of the determined demands.
- the apparatus and method for determining priority of demand requires a criterion for determining the priority of two or more determined demands when there are two or more criteria for determining the priority of the determined demands, such as a higher level rule and a lower level rule. Considering the point of view or importance, it is possible to prioritize the firm demand to meet the urgency of regional sales while maintaining the equilibrium of supply.
- the apparatus and method for determining priority of demand according to the present invention is not limited to the example of determining the priority of the firm demands described with reference to FIG. 4, but when there are two or more criteria for determining the priority of the firm demands. All may apply.
- FIG. 5 is a block diagram of an apparatus for determining priority of demand according to an embodiment of the present invention.
- the demand priority determining apparatus 1000 includes a high level ranking unit 100, a low level ranking unit 200, and a change unit 300.
- the high level ranking unit 100 will be described in detail.
- the higher level ranking unit 100 may synthesize the firm demand of the lower level organization and determine the overall priority of the aggregated firm demand based on the higher level rule set by the higher level organization.
- the higher level rule means a method set by the higher level organization with respect to a method of determining the priority of the determined demand based on the demand information input from the lower level organizations.
- the upper level organization is an organization corresponding to the upper level of the lower level organization.
- the upper level organization may be a direct upper level organization of a specific lower level organization or may be a higher level organization of several levels.
- the upper level organization when the lower level organization is a US regional corporation or a Canadian regional corporation, the upper level organization may be a US general corporation or a head office.
- the higher level rule may be set to be applied differently according to a condition.
- the upper level rule is set so that the overall priority is determined by prioritizing the demand type, and when the value of the Week Rank item is 05 to 12, Week Time A higher level rule may be set so that a comprehensive priority is determined by giving priority to an item.
- a lower level rule it may be set to be applied differently according to a condition.
- a method of determining the overall priority of the aggregated determined demand by the higher level ranking unit 100 synthesizes the determined demand of the lower level organization and the higher level rule set by the higher level organization. It will be described in detail with reference to.
- the high level ranking unit 100 will be described with reference to FIGS. 7 through 9 only as an example of a method in which the high level ranking unit 100 determines a comprehensive priority based on a high level rule. It is not limited to this.
- FIG. 7 is a block diagram illustrating an embodiment of a higher level ranking unit.
- the high level ranking unit 100 includes a demand information input unit 110, an item ranking unit 120, a lead time correction unit 130, a comprehensive ranking value determiner 140, and a comprehensive priority.
- the determination unit 150 may include.
- the demand information input unit 110 may receive and combine the determined demand information of each lower level organization including information on preset items. Compiling the defined demand information of each lower level organization includes the meaning of collecting and integrating the information. In other words, the higher-level ranking unit does not prioritize the fixed needs of each lower-level organization separately, but rather determines the priority by combining the defined demands of each lower-level organization.
- the demand information input unit 110 performs a Of the predetermined demands a, b, c, d, and e, and finally determine the priorities a, b, c, d, and e from the first to fifth ranks by the comprehensive priority determining unit.
- the comprehensive priority determining unit determines the priorities a, b, c, d, and e from the first to fifth ranks by the comprehensive priority determining unit.
- inputting and combining the determined demand information of each lower level organization determines the 1st and 2nd ranks of a, b, and does not determine the 1st, 2nd and 3rd ranks of c, d, and e, It combines b, c, d, and e from the 1st to 5th order.
- the preset items included in the finalized demand information may be the same as described above with reference to FIG. 3, and may be changed according to various reasons, such as a company's situation, a kind of goods, a company's organization, and a market situation.
- the information on the preset items received by the demand information input unit 110 may include detailed item information set at the enterprise level of each item.
- the item related to the demand type among the preset items is a quantity (COM_ORD) previously planned to be supplied for the sales order quantity, and a quantity (COM_FCST which is promised to be supplied in advance for the pure demand forecast amount which is subtracted from the sales order quantity).
- Selection information may be set.
- items related to the order attribute may include detailed selection information such as shipment (GI), delivery instruction (DO), delivery date (CO), and only order acceptance (NO). .
- the information received by the demand information input unit 110 may include detailed information selected for each preset item. If there is no detailed information selected in the information received by the demand information input unit 110, it may be processed as a default.
- the item ranking determiner 120 may determine a rank value for each preset item using the determined demand information received by the demand information input unit 110.
- the ranking value indicated by the detailed selection information existing for each preset item may be set in advance, and the item ranking determiner 120 may determine the ranking value corresponding to the selected detailed information according to the preset. .
- the item ranking determiner 120 determines a rank value with two digits with respect to an item (Week Rank) relating to demand demand time, and an item regarding demand demand time among preset items (Week Rank). For other items, the ranking value can be determined by a single digit.
- the item ranking determiner 120 may determine a number between 1 and 9 as a ranking value based on the detailed selection information regarding an item (Preference Rank) related to the importance of the customer.
- the item ranking unit 120 may determine an item related to a demand type (Demand Type Rank), an item related to an information input entity (Measure Rank), an order attribute related item (Order Type Rank), and a trading partner based on profit and loss criteria.
- a number between 1 and 9 may be determined as a ranking value based on each detailed selection information.
- the item ranking determiner 120 may determine a number between 01 and 99 as a ranking value with respect to the item (Week Rank) related to the demand request time based on the detailed selection information. Since the demand demand time may be 10 weeks or more, the item ranking unit 120 may determine the ranking value by two digits, and the numbers 1 through 9 may be 01 to 09 two digits for the consistency of the two digits. The rank value can be determined by expressing An example of the item ranking determiner 120 will be described with reference to FIG. 8.
- FIG. 8 is a diagram illustrating an example in which a ranking value is determined for each item by an item ranking determiner.
- ID is an identifier for identifying the firm demand.
- the different demand ID may mean that the organizations inputting the firm demand information are different, and even if the organizations that input the firm demand information are the same, it may be information about the firm demand separately classified due to different demand time. .
- Rule Seq may indicate information about the number of rules to follow when a predetermined upper level rule uses different rules based on a value of a specific item. That is, the Rule Rank item includes information about a rule to be used when a different priority rule is determined for each condition or section as described with reference to FIG. 6 when the comprehensive priority value determination unit 140 will be described in detail later. Contains items. If a different rule is not used for each section in determining the comprehensive priority value, the corresponding item may not exist.
- the table located at the top of FIG. 8 shows the detailed information for each item input by the demand information input unit 110, and the table located at the bottom shows the rank value corresponding to the detailed information for each item by the item ranking determiner 120.
- the item ranking determiner 120 may determine the rank value 2 corresponding to the COM_ORD in the demand type item as the rank value of the demand type item of Dmd 1 based on a preset bar. In addition, the item ranking determiner 120 may determine a rank value 5 corresponding to NEW_FCST in the demand type item as a rank value of the demand type item of Dmd 1 based on a preset bar.
- the item ranking determiner 120 determines the rank value of the Week Rank item for each determined demand by using information W5 and W2 of the Week Rank items of Dmd 1 and Dmd 2. Can be. Referring to the table located at the bottom of FIG. 8, it can be seen that the ranking value of the Week Rank item of Dmd 1 determined by the item ranking determiner 120 is 05 and the ranking value of the Week Rank item of Dmd 2 is 02.
- Other items may be determined by the item ranking unit 120 based on a preset value for each item of each determined demand. What is the rank value indicated by the subselection information may be set in advance as described above. However, such a setting may be changed by various conditions such as a company's situation, a market situation, and a kind of goods. For example, in FIG. 8, the detailed information COM_ORD selected in the Demand Type item is preset to indicate a rank value of 2, but is set to indicate another rank value such as 3 in other companies or other situations of the same company. May be
- the item ranking determiner 120 may process the default value and determine the rank value indicated by the default as the rank value of the corresponding item.
- the rank value indicated by the default may be preset for each item. Referring to FIG. 8, since there is no Preference Value information, which is information corresponding to the Preference Rank item of the firm demand Dmd 1, the item is treated as Default, and the rank value 9 indicated by Default of the Preference Rank item is set to the Preference Rank item of the Dmd 1. Can be determined by the rank value.
- rank value indicated by the default for each item may be as described in FIG. 3, and may be changed due to various reasons such as a market situation and a business environment.
- the lead time corrector 130 may determine a demand request time related to lead time from among item-level ranking values determined by the item rank determiner 120 using the BOD lead time information. You can correct the item (Week Rank).
- BOD is a table that sets up the product's transportation route, transportation method, and travel time when planning the product's inter-regional movement, that is, product transportation. That is, the lead time corrector 130 corrects the Week Rank by reflecting the BOD lead time from the production place to the corporation DC (distribution center) or the destination.
- 9 is a view for explaining an example in which the rank value of the Week Time item is corrected by the read time corrector 130.
- the table located at the upper end of FIG. 9 is a table representing ranking values for each item of different determined demands determined by the item ranking determiner 120. Looking at the ranking value of the Week Rank item in the table located in the upper portion of FIG. 9, the corresponding item ranking value of the firm demand Dmd 1 is 05 and the corresponding item ranking value of the firm demand Dmd 2 is 02.
- the lead time correction unit 130 adjusts the rank value of the Week Rank item of Dmd 1 from 05 to 2 weeks by reflecting the lead time of each firm demand. As a subtraction of 03, it can be seen that the rank value of the Week Rank item of Dmd 2 is corrected from 02 to 01 minus one week of lead time.
- the lead time corrector 130 does not correct the rank value in consideration of the lead time, the specific tissue having a relatively long BOD lead time may be disadvantageous compared to other tissues having a relatively short BOD lead time. Disruptions can also occur in planning and supply planning.
- the comprehensive priority value determiner 140 may determine the aggregate priority value by arranging the rank values for each item determined by the item rank determiner 120 according to a preset upper level rule.
- the comprehensive priority value determination unit 140 may determine the overall priority value by arranging the priority values determined for each of the preset items corrected by the lead time corrector 130 according to a preset upper level rule. .
- FIG. 10 is a diagram illustrating an example of a preset upper level rule.
- the RULE Type represents information about a type of rule to be applied.
- this is a high level rule.
- SEQ indicates an identification number of rules classified according to a condition when a predetermined upper level rule is set differently according to a condition.
- the Time item represents a condition for determining a predetermined upper level rule to be finally applied. That is, the SEQ may be determined by the condition. These conditions may change.
- the general priority value is determined by applying one of the upper level rules. Can mean.
- the number of each item from Preference Rank to Product Rank is a rank value determined by the item rank determiner 120 of each item (or a rank value to which the rank value corrected by the lead time corrector 130 is applied. ) Can mean the order in which they are arranged.
- FIG. 11 is a diagram illustrating an example of a comprehensive priority value determined by a comprehensive priority value determiner.
- Rank values 03 and 01 of the Week Rank item among the determined rank values may be rank values corrected by the read correction unit, respectively.
- the value of the Week item is information for determining a condition of a preset rule applied differently for each section.
- W5 and W2 respectively correspond to detailed information indicated by the rank value of the Week Rank item before correction by the read correction unit. This can be more clearly seen with reference to FIGS. 8 and 9.
- the overall priority value of Dmd 1 in the defined demand is explained first.
- Week information of Dmd 1 is W5, and when the overall priority value is determined by applying a higher level rule, the overall priority value determining unit 140 according to the rule having SEQ of 2 in the High Level Rule of FIG.
- the total priority value of Dmd 1 may be determined by arranging star rank values.
- Preference Rank is 1 rank
- Rule Rank is 2 rank
- demand Type Rank is 3 rank
- Product Rank is 4 rank
- Measure Rank is 5 rank
- Order Type Rank is 6 rank
- Week Rank is 7 rank. You can see that the rank and customer rank are eighth. According to the ranking, if the ranking value for each item of Dmd 1 of FIG. 11 is arranged, it becomes 9 1 2 3 1 3 03 1.
- the comprehensive priority value determination unit 140 may determine the overall priority value as 912313031 by arranging the rank value for each item of the firm demand Dmd 1 according to the second rule of the upper level rule.
- the comprehensive priority value determination unit 140 may determine 241501325 by applying the first (SEQ 1) of the higher level rule because it is a condition of W2. .
- the comprehensive priority value determined by the comprehensive priority value determiner 140 may vary according to a preset item, setting of a priority value indicated by Default, and setting of a priority value indicated by detailed information of each item.
- the comprehensive priority value does not necessarily have to be in the form of numbers, but may be represented by various alphabets.
- the comprehensive priority determiner 150 of the higher level ranking unit 100 may determine the comprehensive priority of each determined demand by using the comprehensive priority value of each determined demand determined using a predetermined upper level rule. For example, the comprehensive priority determination unit 150 may determine the comprehensive priority value such that the lower the size of the comprehensive priority value, the higher the priority.
- the comprehensive priority determination unit 150 may determine the priority of each determined demand by applying the comprehensive priority value of each determined demand to a predetermined function expression.
- the lower level ranking unit 200 determines the priority regarding the determined demands using the lower level rule.
- Lower-level rules refer to methods established by lower-level organizations regarding how to prioritize firm demand in a different way than higher-level rules.
- there are lower-level rules set by the lower-level organizations because of the characteristics of sales regions, market conditions, short-term demand changes, and the urgency of regional sales. This is to consider various situations.
- Each lower level organization does not have a lower level rule that matches the characteristics of each organization, and only some of the lower level organizations may set lower level rules different from the upper level rules.
- a lower level rule set by a specific lower level organization may be used in another lower level organization.
- the lower level organization may also be a higher level organization of lower level organizations.
- the lower level ranking unit 200 may also determine the priority among the determined demands of the lower level organization in a manner similar to the priority determining unit of the upper level ranking unit 100.
- the lower level ranking unit 200 uses priorities among predetermined demands of lower level organizations to which the predetermined lower level rule is applied using a predetermined lower level rule. Only you can decide.
- FIG. 12 is a diagram illustrating an example of a preset lower level rule.
- FIG. 13 is a diagram illustrating an example of a priority value determined by a lower level ranking unit.
- FIG. 12 is an example similar to FIG. 10 but shows an example in which a lower level rule is set instead of an upper level rule.
- the priority value is determined and the determined priority value is used. It is possible to determine the priority among the defined needs of the lower level organization to which the lower level rule is applied.
- the first lower-level ranking unit may determine the priority value of Dmd 1 based on the lower-level rule of the fly.
- the lower level rules set by the Paris corporation do not exist and may be set to follow the lower level rules set by the French corporation which is a higher level organization than the Paris corporation and a lower level organization than the head office.
- the set rule may be followed, and in this case, the overall priority value may vary.
- FIG. 12 it is assumed that the Paris corporation is set to determine the priority among the determined demands of the Paris corporation using a lower level rule set by the French corporation.
- the second of the lower-level rules of France is applicable. That is, when the ranking value for each item of FIG. 15 is arranged according to the arrangement order for each item displayed in the last row of FIG. 15, the first lower level ranking unit of the lower level ranking unit 200 may have a priority value of Dmd 1. It may be determined as 912310331.
- the second lower level ranking unit of the lower level ranking unit 200 may be determined to be 145013252 by applying the first (SEQ 1) of the lower level rules of France. have.
- the changer 300 reflects the priority of the determined needs of the first lower-level organization determined by the first lower-level ranking unit on the comprehensive priority determined by the upper-level ranking unit 100 so as to obtain a comprehensive priority.
- the information of the firm demand corresponding to each priority of the rank can be changed.
- a first lower level organization and a second lower level organization exist as lower organizations of the upper level organization that set the upper level rule, and in the case of the first lower level organization, the first lower level rule is set, and the second Assuming that the lower level organization is setting the second lower level rule, the process of finally determining the priority of the determined demand by the change unit 300 will be described.
- determining the priority of the predetermined demand of the first lower level organization using the preset first lower level rule may be the first lower level ranking unit of the lower level ranking unit 200.
- determining the priority regarding the determined demand of the second lower level organization using the preset second lower level rule may be the second lower level ranking unit of the lower level ranking unit 200.
- the lower level organization may be a plurality of organizations, such as a third lower level organization and a fourth lower level organization, and all or some of the plurality of lower organizations may set respective lower level rules.
- the lower level rules set by the lower organizations may be different from each other or may be the same.
- FIG. 14 illustrates an example of determining the overall priority by combining the determined demands of the German corporation SEG and the French corporation SEP by the upper level ranking unit 100.
- FIG. 14A relates to the firm demand information of the German firm SEG and the French firm SEF.
- the upper level ranking unit 100 determines the priority of the predetermined demand information based on the predetermined demands based on the predetermined upper level rule.
- FIG. 14B illustrates a result of the upper level ranking unit 100 determining the overall priority from the first priority to the seventh order according to a predetermined upper level rule.
- the preset higher level rule used to determine the priority in FIG. 14B may be in the order of item type DmdType, and as described with reference to FIG. The ranking may be determined.
- FIG. 15 is a diagram illustrating an example in which the priority regarding the determined needs of the first lower level organization is determined by the first lower level ranking unit among the lower level ranking unit 200.
- the first lower-level ranking unit of the lower-level ranking unit 200 sets the priority of the predetermined demands of the German corporation SEG, which is the first lower-level organization, by the German corporation SEG. 1 Can be determined based on lower level rules.
- the first lower level rule may be set to determine the priority of the firm demands by putting the Week item first among the items included in the firm demand.
- the Week item may be an item relating to time, and may be an item relating to demand demand time in FIG. 3.
- Week can be an item on the urgency of regional sales, and the priority of the Week item can be seen to reflect the urgency of regional sales.
- the first lower level rule is applied only between the firm demands of the first lower level organization. More specifically, the first lower level rule may be applied only between the firm demands of the lower level organization in which the first lower level rule is applied.
- the priorities of the determined demands of the German subsidiary (SEG), which is the first lower level organization are changed. That is, the first lower level ranking unit 200 may determine the priority on the determined demands of the German corporation (SEG) so that the smaller the value of the Week item is, the first lower level ranking unit 200 has a higher priority. .
- the second sub-level organization the French corporation (SEF) may determine the priority of the determined demands of the French corporation (SEF) based on the second lower level rule set by the French corporation (SEF).
- the second lower level rule may be set to prioritize the determined demands by giving the Week item the highest priority.
- the second lower level rule is applied only between defined demands of the second lower level organization.
- the priority of the determined demands of the French corporation (SEF), the second lower level organization is changed. That is, the second lower level ranking unit may determine the priority on the determined demands of the French corporation (SEF) such that the smaller the value of the Week item is, the higher priority is obtained using the second lower level rule.
- the changer 300 sets priorities regarding the determined needs of each lower-level organization determined by the first lower-level ranking unit and the second lower-level ranking unit as shown in FIGS. 15 and 16. Reflect on overall priority.
- the change unit 300 corresponds to each priority of the comprehensive priority by reflecting the priority regarding the determined demands of each lower-level organization determined by each lower-level ranking unit 200 in the comprehensive priority. You can change the information for firm demand.
- the changer 300 may determine that the overall priority of the predetermined needs of each lower-level organization is minimized in order to minimize the influence on the priority of other lower-level organizations by the priority determined based on the lower-level rules of the specific lower-level organization. Do not change. However, the change unit 300 determines the priority corresponding to each priority of the comprehensive priority by reflecting the priority of the determined needs of each lower-level organization determined by each lower-level ranking unit 200 in the comprehensive priority. By changing the information of demand, in practice, the effect of rearranging the aggregate priorities can occur.
- the overall priority H-Rank determined by the predetermined higher level rule is not fixedly changed and is determined by the first lower level rule and the second lower level rule. It can be seen that only the information pointed to by each H-Rank has changed. That is, the priority change according to the priority determined by the first low level rule is only the demands of the first low level organization, and the change according to the priority determined by the second low level rule is the confirmation of the second low level organization. Only demands.
- the changer 300 prevents the priority determined by the first lower level rule from changing the priority of the determined demands of the second lower level organization determined by the preset higher level rule.
- the result of changing the content (order of contents) indicated by the comprehensive priority of the determined demands determined by the higher level ranking unit 100 may be used for the supply plan, the demand control plan, and the like.
- the changer 300 may perform priority swapping.
- Priority Swapping means a priority corresponding to each of the overall rankings by reflecting the priorities of the predetermined demands of the respective lower level organizations determined by the predetermined lower level rule in the overall ranking determined by the upper level rule set by the changer 300. It means to change the content.
- 18 is a diagram illustrating an example in which the upper level ranking unit 100 determines the priority level according to a predetermined higher level rule.
- the High Level Priority is a value in which priority values are arranged according to a predetermined high level rule. The lower the High Level Priority, the higher priority is shown in the confirmed Wednesday located above in the table of FIG. 18.
- the comprehensive priority value determined by the comprehensive priority value determiner 140 of the higher level ranking unit 100 is described in the High Level Priority item for each specific demand.
- 203 is a value obtained by arranging 2, which is a rank value indicated by COM_ORD, and 03, which is a rank value indicated by W3, in accordance with an arrangement according to a higher level rule.
- 304 is a value obtained by arranging 3, which is a rank value indicated by COM_FCST, and 04, which is a rank value indicated by W4, according to an arrangement according to a higher level rule.
- the predetermined upper level rule shown in FIG. 18 is a rule that prioritizes a Demand Type Rank item, which is an item of Demand Type information, over a Week Rank item, which is an item of Week information.
- the setting of this higher level rule can be changed.
- 19 is a diagram illustrating a priority value and priority examples of firm demands of the French corporation determined by the lower-level ranking unit 200.
- a lower level rule of a French organization which is a lower level organization, is a rule that prioritizes a Week Rank item that is an item of Week information over a Demand Type Rank item that is an item of Demand Type information. Therefore, when the lower level ranking unit 200 determines priority values of Demand IDs 2, 4, and 6 corresponding to the French organization by the lower level rules, 208 becomes 082, 304 is 043, and 505 is 055. It can be seen that.
- the changer 300 may perform priority swapping. That is, the changer 300 maintains the priority determined by the higher level ranking unit 100 according to a preset higher level rule. In addition, when there is a change in the priority value according to the lower level rule, the change unit 300 applies the changed rank only between the determined demands to which the corresponding lower level rule is applied among the general priorities determined by the higher level rule. Can be changed.
- FIG. 20 is a diagram illustrating an example of a result of the change unit reflecting the contents of FIG. 19 in FIG. 18.
- the changer 300 does not reflect the priority value shown in FIG. 19 as it is in FIG. 18, but maintains the comprehensive priority value and priority according to the higher level rule in FIG. 18, but the French organization to which the lower level rule is applied.
- the order IDs 2, 4, and 6 may be changed in order by applying the priority value generated by the lower level rule shown in FIG.
- the information is changed to reflect that Demand ID 4 is the highest priority, Demand ID 6 is the next priority, and Demand ID 2 is the last priority within the French organization that applies the lower level rule.
- the final rank is changed in order of Demand ID 1, 4, 3, 6, 5, 2, and 7.
- the changer 300 may perform priority swapping to reflect the priority of the predetermined lower level rule reflecting the urgency of the characteristic sales of the organization and to minimize the disadvantages to other organizations.
- 21 is a block diagram of a demand control apparatus 2000 according to an embodiment of the present invention.
- the demand control apparatus 2000 includes a high level ranking unit 100, a low level ranking unit 200, a change unit 300, and a demand control unit 400. ).
- the demand control device 2000 may establish a supply plan and control the demand based on the priorities of the determined demands determined by the demand priority determining device 1000.
- the upper level ranking unit 100, the lower level ranking unit 200, and the changing unit 300 are described above, and thus detailed description thereof will be omitted.
- the demand control unit 400 may sequentially distribute a predetermined supply plan amount from the order of priority of the determined demand (highest).
- the demand control unit 400 if the amount of the predetermined goods is less than the total amount of the firm demand input by each sales organization, and distributes the predetermined supply plan in order from the highest priority of the determined firm demand For example, the firms in the lower-priority order of the determined firms that have not been allocated their supply plans may be dealt with in the absence of a supply plan.
- the determined demand request amount (Req. Qty) is described in order of priority determined by the demand priority determining apparatus 1000 according to an embodiment of the present invention.
- the demand control unit 400 may distribute 500 items sequentially from the highest priority.
- the demand control unit 400 distributes the quantity 100 required by the firm demand of demand Demand 3, which is the highest priority, from 500, and then distributes the quantity 200 required by the firm demand of demand Demand ID 6, which is the priority of the remaining 400.
- the demand control unit 400 distributes the quantity 150 required by the firm demand of Demand ID 1, which is the third order, from the remaining 200.
- the demand control unit 400 distributes the remaining 50 to supplement the quantity 120 required by the firm demand of Demand ID 2 which is the fourth order.
- the demand control unit 400 distributes the supply plan quantity according to the priority, finally, in FIG. 22, 70 out of the quantity 120 required by the demand for confirmation of Demand ID 2, the quantity 80 required by the demand for confirmation of Demand ID 5, Demand The supply for quantity 90 required by the firm demand of ID 4 will be insufficient.
- the demand control unit 400 may process all the insufficient quantities to prevent the supply plan from being established.
- shortage processing Shrt. Qty
- FIG. 23 an example in which shortage processing (Shrt. Qty) is insufficient for the demand control unit 400 may be displayed as shown in FIG. 23.
- 24 is a block diagram of the demand priority determining apparatus 1000 according to an embodiment of the present invention.
- the demand priority determining apparatus 1000 may have a configuration shown in FIG. 24.
- the demand priority determining apparatus 1000 stores a processor 10 that executes an instruction, priority determining program data, data regarding inputted determined demand information, rank value information data corresponding to preset item information, and detailed information, and the like.
- the storage device 30, a memory 40, and a network interface 50 for transmitting and receiving data with an external device may be included.
- the storage device 30 aggregates the determined demands of the first lower level organization and the second lower level organization, and sets the upper level organization of the first lower level organization and the second lower level organization according to the higher level rules.
- the priority of each of the comprehensive priorities is reflected by reflecting the priority of the determined needs of the first lower level organization determined by the first lower level ranking step on the comprehensive priority determined by the higher level ranking step.
- a program that performs a change process for changing information of a firm demand corresponding to the program may be stored, and the program may be loaded through a memory and then executed by the processor 10.
- the program stored in the storage device 30 may perform at least one of the processes described with reference to FIGS. 1 to 19.
- 25 is a flowchart illustrating a demand priority determining method according to a preferred embodiment of the present invention.
- the upper level ranking unit 100 sets a predetermined upper level rule on a comprehensive priority regarding determined needs of lower level organizations. It can be determined using (step S2410).
- the lower level ranking unit 200 may determine the priority regarding the determined demand of the lower level organization to which each predetermined lower level rule is applied using one or more predetermined lower level rules (step S2420).
- the changer 300 uses the priority information regarding the determined demand of each lower-level organization determined by the lower-level ranking unit 200, to change the priority of the determined demands determined by the higher-level ranking unit 100.
- the corresponding information may be changed (step S2430).
- 26 is a flowchart illustrating a demand control method according to an embodiment of the present invention.
- the demand control unit 400 may distribute a supply plan amount based on a comprehensive priority determined and determined by steps S2410 to S2430. (Step S2510).
- the demand control unit 400 may prevent the supply plan is not established by processing the shortage of the demand that is not distributed in the supply plan of the determined demand (step S2520).
- both the contents of the demand priority determining apparatus 1000 and the demand controlling apparatus 2000 according to an embodiment of the present invention described with reference to FIGS. 1 to 24 may be applied.
- 5, 10, and 20 may refer to software or hardware such as a field-programmable gate array (FPGA) or an application-specific integrated circuit (ASIC).
- FPGA field-programmable gate array
- ASIC application-specific integrated circuit
- the components are not limited to software or hardware, and may be configured to be in an addressable storage medium and may be configured to execute one or more processors.
- the functions provided in the above components may be implemented by more detailed components, or may be implemented as one component that performs a specific function by combining a plurality of components.
Landscapes
- Business, Economics & Management (AREA)
- Engineering & Computer Science (AREA)
- Human Resources & Organizations (AREA)
- Strategic Management (AREA)
- Entrepreneurship & Innovation (AREA)
- Economics (AREA)
- Development Economics (AREA)
- Theoretical Computer Science (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- Marketing (AREA)
- Game Theory and Decision Science (AREA)
- Operations Research (AREA)
- Tourism & Hospitality (AREA)
- Quality & Reliability (AREA)
- Accounting & Taxation (AREA)
- Finance (AREA)
- Educational Administration (AREA)
- Data Mining & Analysis (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
본 발명은 특정 조직의 수요 변동이 다른 조직에 공급 계획된 물량에 대한 영향을 최소화할 수 있는 수요 우선순위 결정 장치 및 방법과 그 프로그램을 기록한 기록 매체, 수요 통제 장치 및 방법에 관한 것이다. 본 발명의 일 실시예에 따른 수요 우선순위 결정 장치는, 상위 레벨 조직과 하위 레벨 조직의 계층적 관계가 존재하는 조직들 중 상기 상위 레벨 조직이 설정한 상위레벨 룰에 의하여 상기 하위 레벨 조직들의 확정 수요들에 관한 종합 우선순위를 결정하는 상위레벨 순위결정부; 및 상기 하위 레벨 조직들 중 어느 하나의 하위레벨 조직이 설정한 하위레벨 룰에 의하여 상기 하위 레벨 조직들 중 일부 하위 레벨 조직이나 상기 하위레벨 룰을 설정한 하위레벨 조직의 확정 수요들에 관한 우선순위를 결정하는 하위레벨 순위결정부를 포함할 수 있다.
Description
본 발명은 수요 우선순위 결정 장치 및 방법과 그 프로그램을 기록한 기록 매체, 수요 통제 장치 및 방법에 관한 것이다. 보다 상세하게는, 본 발명은 특정 조직의 수요 변동이 다른 조직에 공급 계획된 물량에 대한 영향을 최소화할 수 있는 수요 우선순위 결정 장치 및 방법과 그 프로그램을 기록한 기록 매체, 수요 통제 장치 및 방법에 관한 것이다.
기업의 영업 조직은 계층적 구조를 가지는 경우가 많다. 상기 계층적 구조의 각각의 세일즈 레벨(Sales Level)은 그에 대응하는 영업 영역을 가질 수 있다.
한편, 상기 기업의 수요 예측 및 생산 관리를 위하여, 각각의 세일즈 레벨을 담당하는 담당자들은 자신이 담당하는 레벨에 대하여 확정 수요를 산출하여 사내 전산 시스템에 입력할 수 있다.
본사 등의 상위 레벨 조직은 입력된 확정 수요를 기준으로 각 수요 별 우선순위를 결정하고, 공급 계획을 수립한다.
그러나, 본사 등 상위 레벨 조직은 판매 법인들간 공정성과 신뢰성 있는 공급 계획이 수립되도록 우선순위를 결정하고, 지역 조직들은 수요들 간 공정성 보다는 단기의 수요 변화에 빠르게 대응하는 것이 더욱 중요할 수 있다.
즉, 글로벌 공급 형평성을 유지하면서 지역적 판매의 시급성을 동시에 지원할 수 있는 확정 수요의 우선순위를 결정하는 기술이 필요하다.
본 발명이 해결하고자 하는 기술적 과제는, 공급 형평성을 유지하면서 지역적 판매의 시급성을 동시에 지원할 수 있는 공급 계획 수립의 기반이 되는 확정 수요의 우선순위 결정에 관한 수요 우선순위 결정 장치 및 방법을 제공하는 것이다.
구체적으로, 본 발명이 해결하고자 하는 기술적 과제는, 특정 조직의 수요 변동이 다른 조직에 공급 계획되어 있는 물량에 대한 영향을 최소화하여 공급 형평성을 유지하면서 지역적 판매의 시급성을 동시에 지원할 수 있는 수요 우선순위 결정 장치 및 방법을 제공하는 것이다.
본 발명이 해결하고자 하는 기술적 과제는, 각 하위 레벨 조직들의 확정 수요들을 상위 레벨 조직의 기준에 따라서 우선순위를 결정하고, 하위 레벨 조직 별 기준에 따라서 결정된 우선순위를 재배치 하는 수요 우선순위 결정 장치 및 방법을 제공하는 것이다.
본 발명의 기술적 과제들은 이상에서 언급한 기술적 과제들로 제한되지 않으며, 언급되지 않은 또 다른 기술적 과제들은 아래의 기재로부터 당업자에게 명확하게 이해 될 수 있을 것이다.
상기 기술적 과제를 달성하기 위한 본 발명의 제1 태양(ASPECT)에 따른 수요 우선순위 결정 장치는, 상위 레벨 조직과 하위 레벨 조직의 계층적 관계가 존재하는 조직들 중 상기 상위 레벨 조직이 설정한 상위레벨 룰에 의하여 상기 하위 레벨 조직들의 확정 수요들에 관한 종합 우선순위를 결정하는 상위레벨 순위결정부; 상기 하위 레벨 조직들 중 어느 하나의 하위레벨 조직이 설정한 하위레벨 룰에 의하여 상기 하위 레벨 조직들 중 일부 하위 레벨 조직이나 상기 하위레벨 룰을 설정한 하위레벨 조직의 확정 수요들에 관한 우선순위를 결정하는 하위레벨 순위결정부를 포함할 수 있다.
일 실시예에 따르면, 상기 하위레벨 순위결정부에 의하여 결정된 우선순위 정보를 이용하여, 상기 상위레벨 순위결정부에 의하여 결정된 종합 우선순위 정보를 변경하는 변경부를 포함할 수 있다.
일 실시예에 따르면, 각 조직 별 확정 수요들의 우선순위를 결정하는 장치에 있어서, 제1 하위 레벨 조직과 제2 하위 레벨 조직의 확정 수요들을 종합하고, 상기 제1 하위 레벨 조직과 상기 제2 하위 레벨 조직의 상위 레벨 조직에서 설정한 상위레벨 룰에 의하여 상기 종합된 확정 수요들에 관한 종합 우선순위를 결정하는 상위레벨 순위결정부; 상기 제1 하위 레벨 조직에서 설정한 제1 하위레벨 룰이 존재하는 경우, 상기 제1 하위 레벨 조직의 확정 수요들에 관한 우선순위를 상기 제1 하위레벨 룰을 이용하여 결정하는 제1 하위레벨 순위결정부; 및 상기 제1 하위레벨 순위결정부에 의하여 결정된 상기 제1 하위 레벨 조직의 확정 수요들에 관한 우선순위를 상기 상위레벨 순위결정부에 의하여 결정된 종합 우선순위 상에 반영하여 상기 종합 우선순위의 각 우선순위에 해당하는 확정 수요의 정보를 변경하는 변경부를 포함할 수 있다.
일 실시예에 따르면, 상기 변경부는, 상기 제1 하위레벨 순위결정부에 의하여 결정된 상기 제1 하위 레벨 조직의 확정 수요들에 관한 우선순위를, 상기 상위레벨 순위결정부에 의하여 결정된 종합 우선순위 중에서 상기 제1 하위 레벨 조직의 확정 수요에 관한 우선순위 사이에서만 반영할 수 있다.
상기 변경부는, 상기 각 종합 우선순위에 해당하는 확정 수요 정보를 상기 제1 하위레벨 순위결정부에 의하여 결정된 우선순위에 의하여 변경하나, 상기 종합 우선순위에서 상기 제2 하위 레벨 조직의 확정 수요에 관한 우선순위는 상기 제1 하위레벨 순위결정부에 의하여 결정된 우선순위에 의하여 변경하지 않는 것을 특징으로 할 수 있다.
일 실시예에 따르면, 상기 상위 레벨 조직은, 상기 하위 레벨 조직으로 제3 하위 레벨 조직을 더 포함하며, 제1 순위 결정부는, 상기 제1 하위 레벨 조직, 제2 하위 레벨 조직 및 제3 하위 레벨 조직의 확정 수요를 종합하고, 상기 상위 레벨 조직에서 설정한 상위레벨 룰에 의하여 상기 종합된 확정 수요에 관한 종합 우선순위를 결정할 수 있다.
일 실시예에 따르면, 상기 수요 우선순위 결정 장치는, 상기 상위레벨 룰과 상이한 상기 제2 하위 레벨 조직에서 설정한 제2 하위레벨 룰이 존재하는 경우, 상기 제2 하위 레벨 조직의 확정 수요에 관한 우선순위를 상기 제2 하위레벨 룰을 이용하여 결정하는 제2 하위레벨 순위결정부를 더 포함하며, 상기 변경부는, 상기 제2 하위레벨 순위결정부에 의하여 결정된 상기 제2 하위 레벨 조직의 확정 수요에 관한 우선순위를 상기 상위레벨 순위결정부에 의하여 결정된 종합 우선순위 상에 반영하여 상기 종합 우선순위의 각 우선순위에 해당하는 상기 확정 수요 정보를 변경할 수 있다.
상기 변경부는, 상기 제2 하위레벨 순위결정부에 의하여 결정된 상기 제1 하위 레벨 조직의 확정 수요에 관한 우선순위를, 상기 상위레벨 순위결정부에 의하여 결정된 종합 우선순위 중에서 상기 제2 하위 레벨 조직의 확정 수요에 관한 우선순위 사이에서만 반영하여 상기 확정 수요 정보를 변경하며, 상기 각 종합 우선순위에 해당하는 확정 수요 정보를 상기 제2 하위레벨 순위결정부에 의하여 결정된 우선순위에 의하여 변경하나, 상기 종합 우선순위에서 상기 제1 하위 레벨 조직의 확정 수요의 확정 수요에 관한 우선순위는 상기 제2 하위레벨 순위결정부에 의하여 결정된 우선순위에 의하여 변경하지 않는 것을 특징으로 할 수 있다.
상기 각 조직 별 확정 수요들은 둘 이상의 수요 타입에 관한 항목으로 세분화될 수 있다.
상기 기술적 과제를 달성하기 위한 본 발명의 제2 태양(ASPECT)에 따른 수요 통제 장치는 각 조직 별 확정 수요의 우선순위를 결정하는 장치에 있어서, 제1 하위 레벨 조직과 제2 하위 레벨 조직의 상위 레벨 조직은 상기 제1 하위 레벨 조직과 제2 하위 레벨 조직의 확정 수요를 종합하고, 상기 상위 레벨 조직에서 설정한 상위레벨 룰에 의하여 상기 종합된 확정 수요에 관한 종합 우선순위를 결정하는 상위레벨 순위결정부; 상기 제1 하위 레벨 조직에서 설정한 상기 상위레벨 룰과 상이한 제1 하위레벨 룰이 존재하는 경우, 상기 제1 하위 레벨 조직의 확정 수요에 관한 우선순위를 상기 제1 하위레벨 룰을 이용하여 결정하는 제1 하위레벨 순위결정부; 상기 제1 하위레벨 순위결정부에 의하여 결정된 상기 제1 하위 레벨 조직의 확정 수요에 관한 우선순위를 상기 상위레벨 순위결정부에 의하여 결정된 종합 우선순위 상에 반영하여 상기 종합 우선순위의 각 우선순위에 해당하는 내용을 변경하는 변경부; 및 상기 변경부에 의하여 내용이 변경된 상기 종합 우선순위를 기반으로 하여, 기 설정된 공급 계획량을 분배하는 수요통제부를 포함할 수 있다.
일 실시예에 따르면, 상기 수요 통제제부는, 상기 기 설정된 공급 계획량이 상기 각 조직들이 입력한 확정 수요의 총 량보다 적은 경우, 상기 종합 우선순위가 높은 순서부터 순차적으로 상기 기 설정된 공급 계획량을 분배할 수 있다.
상기 종합 우선순위가 높은 순서부터 순차적으로 상기 기 설정된 공급 계획량을 분배하여, 상기 공급 계획량을 분배 받지 못한 상기 종합 우선순위 중 일부 우선순위에 해당하는 확정 수요는 결품 처리하여 공급계획이 수립되지 않도록 할 수 있다.
상기 기술적 과제를 달성하기 위한 본 발명의 제3 태양(ASPECT)에 따른 수요 우선순위 결정 방법은, 각 조직 별 확정 수요들의 우선순위를 결정하는 방법에 있어서, 제1 하위 레벨 조직과 제2 하위 레벨 조직의 확정 수요들을 종합하고, 상기 제1 하위 레벨 조직과 상기 제2 하위 레벨 조직의 상위 레벨 조직에서 설정한 상위레벨 룰에 의하여 상기 종합된 확정 수요들에 관한 종합 우선순위를 결정하는 상위레벨 순위결정단계; 상기 제1 하위 레벨 조직에서 설정한 제1 하위레벨 룰이 존재하는 경우, 상기 제1 하위 레벨 조직의 확정 수요들에 관한 우선순위를 상기 제1 하위레벨 룰을 이용하여 결정하는 제1 하위레벨 순위결정단계; 및 상기 제1 하위레벨 순위결정단계에 의하여 결정된 상기 제1 하위 레벨 조직의 확정 수요들에 관한 우선순위를 상기 상위레벨 순위결정단계에 의하여 결정된 종합 우선순위 상에 반영하여 상기 종합 우선순위의 각 우선순위에 해당하는 확정 수요의 정보를 변경하는 변경단계를 포함할 수 있다.
상기 변경단계는, 상기 제1 하위레벨 순위결정단계에 의하여 결정된 상기 제1 하위 레벨 조직의 확정 수요들에 관한 우선순위를, 상기 상위레벨 순위결정단계에 의하여 결정된 종합 우선순위 중에서 상기 제1 하위 레벨 조직의 확정 수요에 관한 우선순위 사이에서만 반영할 수 있다.
일 실시예에 따르면, 상기 변경단계는, 상기 각 종합 우선순위에 해당하는 확정 수요 정보를 상기 제1 하위레벨 순위결정단계에 의하여 결정된 우선순위에 의하여 변경하나, 상기 종합 우선순위에서 상기 제2 하위 레벨 조직의 확정 수요에 관한 우선순위는 상기 제1 하위레벨 순위결정단계에 의하여 결정된 우선순위에 의하여 변경하지 않는 것을 특징으로 할 수 있다.
상기 상위 레벨 조직은, 상기 하위 레벨 조직으로 제3 하위 레벨 조직을 더 포함하며, 제1 순위 결정단계는, 상기 제1 하위 레벨 조직, 제2 하위 레벨 조직 및 제3 하위 레벨 조직의 확정 수요를 종합하고, 상기 상위 레벨 조직에서 설정한 상위레벨 룰에 의하여 상기 종합된 확정 수요에 관한 종합 우선순위를 결정할 수 있다.
일 실시예에 따르면, 상기 수요 우선순위 결정 방법은, 상기 제2 하위 레벨 조직에서 설정한 제2 하위레벨 룰이 존재하는 경우, 상기 제2 하위 레벨 조직의 확정 수요에 관한 우선순위를 상기 제2 하위레벨 룰을 이용하여 결정하는 제2 하위레벨 순위결정단계를 더 포함하며, 상기 변경단계는, 상기 제2 하위레벨 순위결정단계에 의하여 결정된 상기 제2 하위 레벨 조직의 확정 수요에 관한 우선순위를 상기 상위레벨 순위결정단계에 의하여 결정된 종합 우선순위 상에 반영하여 상기 종합 우선순위의 각 우선순위에 해당하는 상기 확정 수요 정보를 변경할 수 있다.
상기 변경단계는, 상기 제2 하위레벨 순위결정단계에 의하여 결정된 상기 제1 하위 레벨 조직의 확정 수요에 관한 우선순위를, 상기 상위레벨 순위결정단계에 의하여 결정된 종합 우선순위 중에서 상기 제2 하위 레벨 조직의 확정 수요들 사이에서만 반영하여 상기 확정 수요 정보를 변경하며, 상기 각 종합 우선순위에 해당하는 확정 수요 정보를 상기 제2 하위레벨 순위결정단계에 의하여 결정된 우선순위에 의하여 변경하나, 상기 종합 우선순위에서 상기 제1 하위 레벨 조직의 확정 수요의 확정 수요에 관한 우선순위는 상기 제2 하위레벨 순위결정단계에 의하여 결정된 우선순위에 의하여 변경하지 않는 것을 특징으로 할 수 있다.
상기 각 조직 별 확정 수요들은 둘 이상의 수요 타입에 관한 항목으로 세분화될 수 있다.
상기 기술적 과제를 달성하기 위한 본 발명의 제4 태양(ASPECT)에 따른 수요 통제 방법은, 각 조직 별 확정 수요의 우선순위를 결정하는 방법에 있어서, 제1 하위 레벨 조직과 제2 하위 레벨 조직의 상위 레벨 조직은 상기 제1 하위 레벨 조직과 제2 하위 레벨 조직의 확정 수요를 종합하고, 상기 상위 레벨 조직에서 설정한 상위레벨 룰에 의하여 상기 종합된 확정 수요에 관한 종합 우선순위를 결정하는 상위레벨 순위결정단계; 상기 제1 하위 레벨 조직에서 설정한 상기 상위레벨 룰과 상이한 제1 하위레벨 룰이 존재하는 경우, 상기 제1 하위 레벨 조직의 확정 수요에 관한 우선순위를 상기 제1 하위레벨 룰을 이용하여 결정하는 제1 하위레벨 순위결정단계; 상기 제1 하위레벨 순위결정단계에 의하여 결정된 상기 제1 하위 레벨 조직의 확정 수요에 관한 우선순위를 상기 상위레벨 순위결정단계에 의하여 결정된 종합 우선순위 상에 반영하여 상기 종합 우선순위의 각 우선순위에 해당하는 내용을 변경하는 변경단계; 및 상기 변경단계에 의하여 내용이 변경된 상기 종합 우선순위를 기반으로 하여, 기 설정된 공급 계획량을 분배하는 수요 통제단계를 포함할 수 있다.
상기 수요 통제제단계는, 상기 기 설정된 공급 계획량이 상기 각 조직들이 입력한 확정 수요의 총 량보다 적은 경우, 상기 종합 우선순위가 높은 순서부터 순차적으로 상기 기 설정된 공급 계획량을 분배하고, 상기 공급 계획량을 분배 받지 못한 상기 종합 우선순위 중 일부 우선순위에 해당하는 확정 수요는 결품 처리하여 공급계획이 수립되지 않도록 할 수 있다.
상기 기술적 과제를 달성하기 위한 본 발명의 제5 태양(ASPECT)에 따른 수요 우선순위 결정 방법은, 제1 하위 레벨 조직과 제2 하위 레벨 조직의 확정 수요들을 종합하고, 상기 제1 하위 레벨 조직과 상기 제2 하위 레벨 조직의 상위 레벨 조직에서 설정한 상위레벨 룰에 의하여 상기 종합된 확정 수요들에 관한 종합 우선순위를 결정하는 상위레벨 순위결정 과정, 상기 제1 하위 레벨 조직에서 설정한 제1 하위레벨 룰이 존재하는 경우, 상기 제1 하위 레벨 조직의 확정 수요들에 관한 우선순위를 상기 제1 하위레벨 룰을 이용하여 결정하는 제1 하위레벨 순위결정 과정; 및 상기 제1 하위레벨 순위결정단계에 의하여 결정된 상기 제1 하위 레벨 조직의 확정 수요들에 관한 우선순위를 상기 상위레벨 순위결정단계에 의하여 결정된 종합 우선순위 상에 반영하여 상기 종합 우선순위의 각 우선순위에 해당하는 확정 수요의 정보를 변경하는 변경 과정을 수행하는 프로그램을 기록한, 컴퓨터로 읽을 수 있는 기록 매체가 될 수 있다.
상기와 같은 본 발명은 공급 형평성을 유지하면서 지역적 판매의 시급성을 동시에 지원할 수 있도록 확정 수요의 우선순위를 결정할 수 있다.
또한, 본 발명은, 특정 조직의 수요 변동이 다른 조직에 공급 계획되어 있는 물량에 대한 영향을 최소화하여 공급 형평성을 유지하면서 지역적 판매의 시급성을 동시에 지원할 수 있다.
또한, 본 발명은 수요 상황, 공급 상황, 시장 상황 등에 따라서 수요를 통제할 수 있다.
본 발명의 효과는 상기 언급된 것으로 한정되지 아니하며, 본 명세서의 기재 사항을 통하여 자명하게 유추될 수 있는 효과가 존재할 수 있다.
도 1은 수요 예측 및 공급 계획 수립 프로세스를 나타낸 도면이다.
도 2는 글로벌 판매 망을 갖춘 기업의 확정 수요들의 우선순위를 결정하는 조직 계층의 예를 표시하는 도면이다.
도 3은 기 설정된 항목들의 일 예를 나타내는 도면이다.
도 4는 본 발명에 따른 우선순위 결정 방법 및 우선순위에 기반한 수요 통제 방법을 설명하기 위한 흐름도이다.
도 5는 본 발명의 일 실시예에 따른 수요 우선순위 결정 장치에 관한 블록도이다.
도 6은 기 설정된 상위레벨 룰이 조건에 따라서 상이하게 적용되도록 설정된 일 예를 설명하기 위한 도면이다.
도 7은 상위레벨 순위결정부의 일 실시예를 나타내는 블록도이다.
도 8은 항목순위 결정부에 의하여 각 항목별로 순위값이 결정된 일 예를 나타내는 도면이다.
도 9는 리드타임 보정부(130)에 의하여 Week Time 항목의 순위값이 보정되는 일 예를 설명하기 위한 도면이다.
도 10은 기 설정된 상위레벨 룰의 일 예를 나타내는 도면이다.
도 11은 종합순위값 결정부에 의하여 결정된 종합 우선순위값의 일 예를 나타내는 도면이다.
도 12는 기 설정된 하위레벨 룰의 일 예를 나타내는 도면이다.
도 13은 하위레벨 순위결정부에 의하여 결정된 우선순위값의 일 예를 나타내는 도면이다.
도 14는 상위레벨 순위결정부에 의하여 독일 법인(SEG)과 프랑스 법인(SEF)의 각각의 확정 수요들을 종합하여 종합 우선순위를 결정한 일 예이다.
도 15는 하위레벨 순위결정부 중 제1 하위레벨 순위결정부에 의하여 제1 하위레벨 조직의 확정수요들에 관한 우선순위가 결정되는 예를 나타내는 도면이다.
도 16은 하위레벨 순위결정부 중 제1 하위레벨 순위결정부에 의하여 제2 하위레벨 조직의 확정 수요들에 관한 우선순위가 결정되는 예를 나타내는 도면이다.
도 17은 도 15와 도 16과 같이 제1 하위레벨 순위결정부 및 제2 하위레벨 순위결정부에 의하여 결정된 각 하위레벨 조직의 확정수요들에 관한 우선순위를 변경부가 종합 우선순위에 반영한 결과의 일 예를 나타내는 도면이다.
도 18은 상위레벨 순위결정부가 기 설정된 상위레벨 룰 의하여 우선순위를 결정한 예를 나타내는 도면이다.
도 19는 하위레벨 순위결정부에 의하여 결정되는 프랑스 법인의 확정 수요들의 우선순위값 및 우선순위 예를 나타내는 도면이다.
도 20은 변경부가 도 18에 도 19의 내용을 반영한 결과의 일 예를 나타내는 도면이다.
도 21은 본 발명의 일 실시예에 따른 수요 통제 장치에 관한 블록도이다.
도 22는 본 발명의 일 실시예에 따른 수요 우선순위 결정 장치에 의하여 결정된 우선순위 순서대로, 확정 수요 요청량(Req. Qty)을 기재한 결과의 일 예를 나타낸 도면이다.
도 23은 도 22의 상황에서 수요통제부에 의하여 부족한 수량을 결품처리 (Shrt. Qty)한 예를 나타낸 도면이다.
도 24는 본 발명의 일 실시예에 따른 수요 우선순위 결정 장치의 구성도이다.
도 25는 본 발명의 바람직한 실시예에 따른 수요 우선순위 결정 방법에 관한 흐름도이다.
도 26은 본 발명의 일 실시예에 따른 수요 통제 방법에 관한 흐름도이다.
이하, 첨부된 도면을 참조하여 본 발명의 바람직한 실시예를 상세히 설명한다. 본 발명의 이점 및 특징, 그리고 그것들을 달성하는 방법은 첨부되는 도면과 함께 상세하게 후술되어 있는 실시 예들을 참조하면 명확해질 것이다. 그러나 본 발명은 이하에서 게시되는 실시 예들에 한정되는 것이 아니라 서로 다른 다양한 형태로 구현될 수 있으며, 단지 본 실시 예들은 본 발명의 게시가 완전하도록 하고, 본 발명이 속하는 기술분야에서 통상의 지식을 가진 자에게 발명의 범주를 완전하게 알려주기 위해 제공되는 것이며, 본 발명은 청구항의 범주에 의해 정의될 뿐이다. 명세서 전체에 걸쳐 동일 참조 부호는 동일 구성 요소를 지칭한다.
어떤 구성요소가 다른 구성요소에 “연결되어”있다거나 “접속되어”있다고 언급된 때에는, 그 다른 구성요소에 직접적으로 연결되어 있거나 또는 접속되어 있을 수도 있지만, 중간에 다른 구성요소가 존재할 수도 있다고 이해되어야 할 것이다. 반면에, 어떤 구성요소가 다른 구성요소에 “직접 연결되어”있다거나 “직접 접속되어”있다고 언급된 때에는, 중간에 다른 구성요소가 존재하지 않는 것으로 이해되어야 할 것이다.
다른 정의가 없다면, 본 명세서에서 사용되는 모든 용어(기술 및 과학적 용어를 포함)는 본 발명이 속하는 기술분야에서 통상의 지식을 가진 자에게 공통적으로 이해될 수 있는 의미로 사용될 수 있을 것이다. 또 일반적으로 사용되는 사전에 정의되어 있는 용어들은 명백하게 특별히 정의되어 있지 않는 한 이상적으로 또는 과도하게 해석되지 않는다.
본 명세서에서, 단수형은 문구에서 특별히 언급하지 않는 한 복수형도 포함될 수 있다. 명세서에서 사용되는 "포함한다(comprises)" 및/또는 "포함하는(comprising)"은 언급된 구성요소, 단계, 동작 및/또는 소자는 하나 이상의 다른 구성요소, 단계, 동작 및/또는 소자의 존재 또는 추가를 배제하지 않는다.
먼저, 도 1를 참조하여 기업의 수요 예측 및 공급 계획 수립 프로세스를 설명한다. 먼저 영업조직에서 생산조직과 미리 합의된 현재 이후 미래의 일정 기간(계획구간) 동안의 판매를 예측하고 그 값을 일자 별 혹은 주 별, 혹은 월 별로 관련 시스템에 입력한다(S1). 이렇게 입력된 값은 수요예측 참여자들의 협의를 거쳐서 합의된 수요를 확정한다(S2). 확정 수요는 계획구간에 배송이 요청된 주문정보와 기존의 확정 공급계획정보를 이용하여 확정 수요의 성분에 따라 분해되고 분류된다(S3). 분류된 확정 수요는 사전에 계산된 제품의 수익성 및 거래선의 중요도에 따라 각각 우선순위를 결정한다(S4), 우선순위가 결정된 각각의 확정 수요에 대해서 제품 생산에 필요한 자재, 조립 혹은 가공에 필요한 설비의 가용성을 점검하여 계획구간 동안에 생산 가능한 공급계획을 수립한다(S5). 수립된 공급계획을 생산부서에서 최종적으로 실행 가능한지 검토, 조절 후 영업 부서에 통보한다(S6).
일 실시예에 따르면, 본 발명은 도 1에 도시된 수요 예측 및 공급 계획 수립 프로세스에서 수요 성분에 따라 분해되고 분류된 확정 수요 정보를 이용하여 각각의 분류 항목 별로 우선순위를 결정하는 우선순위 결정 과정(S4)에서 이용될 수 있다. 다만, 본 발명은 확정 수요들의 우선순위를 결정하는 과정(S3)뿐만 아니라, 본 발명의 효과를 적용하기 위한 다른 분야에도 사용될 수 있다.
도 2는 글로벌 판매 망을 갖춘 기업의 확정 수요들의 우선순위를 결정하는 조직 계층의 예를 표시하는 도면이다.
우선순위를 결정하는 조직의 구성 및 레벨은 기업마다 다를 수 있다. 도 2에는 본사, 권역, 지역법인, 영업조직, 고객 계층으로 구성된 우선순위 결정 조직이 사례로 설명되어 있다.
우선순위의 결정은 하나 이상의 하위 레벨의 조직으로부터 확정된 수요 정보를 입력 받고, 입력 받은 확정된 수요 정보를 이용하여 확정수요들의 우선순위가 결정되는 바, 우선순위를 결정하는 조직은 하나 이상의 하위 레벨의 조직을 가지고 있는 조직이 될 수 있다. 예를 들면, 도 2에서 우선순위를 결정하는 조직은 본사, 레벨1의 본사, 레벨2의 각 권역, 레벨3의 각 지역법인이 될 수 있다.
본 발명을 설명하기 위하여 사용되는 조직은 각 레벨에서 기업, 조직, 법인 등이 될 수 있다. 즉, 도 2에서, 조직은 본사, 미주 총괄, 구주 총괄, 아주 총괄, 미국 법인, 캐나다 법인, 영국 법인, 프랑스 법인, 호주 법인, 중국 법인, 영업1 내지 영업7들 각각이 모두 조직이 될 수 있다.
이러한 각각의 조직은 본 발명에 따른 수요 우선순위 결정 장치 및 방법을 이용하여 확정 수요들의 우선순위를 결정할 수 있다.
또한, 특정 조직이 결정한 확정 수요들의 우선순위 정보는 상위 레벨의 조직에 입력 될 수 있다. 상위 레벨의 조직은 본 발명에 따른 수요 우선순위 결정 장치 및 방법을 이용하여 하위 레벨의 조직들에 의하여 입력된 각 조직들의 우선순위를 반영하여 확정 수요들의 우선순위를 결정할 수도 있다.
또는, 본사 레벨, 권역 레벨 또는 지역법인 레벨에서는 하위 레벨의 조직들로부터 확정 수요 정보를 입력 받아, 하위 레벨의 조직들의 확정 수요들의 우선순위를 결정할 수 있다.
확정 수요 정보는 각 레벨의 하위 조직들로부터 입력 받는 수요에 관한 정보로, 기 설정된 항목들에 관한 정보가 포함될 수 있다.
기 설정된 항목들은 우선순위를 결정하는데 이용될 수 있는 항목들로 설정될 수 있는데, 예를 들면 도 3과 같이 설정될 수 있다.
도 3은 기 설정된 항목들의 일 예를 나타내는 도면이다.
도 3을 참조하면, 기 설정된 항목들은 거래선의 중요성에 관한 항목(Preference Rank), 수요 타입에 관한 항목(Demand Type Rank), 정보 입력 주체에 관한 항목(Measure Rank), 주문 속성에 관한 항목(Order Type Rank), 수요 요구 시간에 관한 항목(Week Rank), 손익실적 기준에 따른 거래선에 관한 항목(Customer Rank) 및/또는 손익실적 기준에 따른 제품에 관한 항목(Product Rank)으로 설정될 수 있다.
다만, 기 설정된 항목들이 도 3에서 예로 설명한 항목들로 설정되는 것은 아니며, 기업의 상황, 물품의 종류, 기업 조직의 형태, 시장 상황 등 다양한 이유에 따라서 변경 될 수 있다.
또한, 수요 요구 시간에 관한 항목은 구분의 용이함 및 이해의 용이함을 위하여 Week Rank로 명명하고 있으나, 이러한 명명이 수요 요구 시간이 주 단위로 정해지는 것을 의미하지는 않는다. 즉, 수요 요구 시간은 일, 달, 시간 등의 다양한 시간 단위로 정해질 수 있다.
확정 수요들의 우선순위를 결정한다는 것은, 여러 하위 조직들 각각의 확정 수요들을, 각각의 확정 수요에 포함된 경보를 이용하여 최우선시 해야 될 확정 수요부터 순차적으로 우선순위를 결정한다는 것이다. 확정 수요들의 우선순위를 결정하는 것은, 하위 조직들이 요구하는 확정 수요를 모두 만족시키는 공급이 존재하지 않거나, 기업의 전략적 차원에서 수요나 공급을 통제하기 위한 기준을 마련하거나, 수익성을 고려하기 위함 등 기업의 수익과 미래를 위하여 필요하다.
도 4는 본 발명에 따른 수요 우선순위 결정 방법을 이용하여 확정 수요의 우선순위를 결정하고 수요를 통제하는 방법을 설명하기 위한 흐름도이다.
도 4를 참조하여, 본 발명에 따른 우선순위 결정 방법을 이용하여 확정 수요의 우선순위를 결정하는 방법에 관하여 간략하게 설명한다.
도 4에서 Category Rank 단계(S11)는 각 하위 레벨의 조직들로부터 입력 받은 확정 수요 정보에 포함된 기 설정된 항목별 정보를 이용하여 각 항목에 대한 순위값을 결정할 수 있다.
BOD L/T(Bill of Distribution Lead Time) 보정 단계(S12)는 BOD(Bill of Distribution)의 리드 타임(Lead Time)을 고려하여, Category Rank 중 수요 요구 시간에 관한 항목(Week Rank)의 순위값을 보정할 수 있다.
High Level/Low Level Priority 단계(S13)는 전사 차원에서 설정된 우선순위 정책인 상위레벨 룰(High Level Rule)을 바탕으로 각 Category Rank의 값들을 배열하여 단일화된 종합 우선순위값을 결정할 수 있다. 한편, 지역별 우선순위 정책이 지정되어 있는 경우, 각 조직 별 또는 판매 지역별로 설정된 하위레벨 룰(Low Level Rule)을 바탕으로 Category Rank를 재배열하여 다른 값의 종합 우선순위값을 결정할 수 있다.
High Level/Low Level Priority 단계(S13)는 BOD L/T 보정 단계(S12)에 의하여 보정된 순위값 정보를 반영한 각 항목별 순위값을 이용하여 종합 우선순위값을 결정할 수도 있다.
Priority Swapping 단계(S14)는 수요들을 하위레벨 룰에 의하여 결정된 종합 우선순위값에 기반하여 우선순위대로 정렬하고, 정렬된 순서를 상위레벨 룰에 의하여 결정된 종합 우선순위값에 기반하여 결정된 우선순위에 반영할 수 있다.
도 4의 S11 단계 내지 S14 단계를 이용하여 확정 수요들의 우선순위를 결정할 수 있으며, S11 단계 내지 S14 단계는 필요에 의하여 단계의 순서를 변경하거나 특정 단계를 생략할 수도 있다.
계속하여 도 4를 참조하여, 본 발명에 따른 수요 통제 방법을 설명하면, Preallocation 단계(S15)는 본 발명에 따른 수요 우선순위 결정 방법에 의하여 결정된 확정 수요들의 우선순위에 기반하여, 수요량을 제한하거나, 제한된 수요량을 초과한 확정 수요량은 결품 처리할 수 있다.
도 4를 참조하여 설명한 수요 우선순위 결정 방법은 확정 수요들의 우선 순위를 결정하는 일 예에 관하여 설명한 것에 불과하다.
본 발명에 따른 수요 우선순위 결정 장치 및 방법은 상위레벨 룰 및 하위레벨 룰과 같이 확정 수요들의 우선순위를 결정하는 기준이 두 가지 이상인 경우, 두 가지 이상의 확정 수요들의 우선순위를 결정하는 기준이 요구하는 점이나 중요시하는 점을 고려하여 물량의 공급 형평성을 유지하면서 지역적 판매의 시급성을 동시에 충족하도록 확정 수요의 우선순위를 결정할 수 있는 점이 특징이다.
즉, 본 발명에 따른 수요 우선순위 결정 장치 및 방법은 도 4를 참조하여 설명한 확정 수요들의 우선순위를 결정하는 예에 한해서 적용되는 것이 아니라, 확정 수요들의 우선순위를 결정하는 기준이 두 가지 이상인 경우에는 모두 적용될 수 있다.
도 5는 본 발명의 일 실시예에 따른 수요 우선순위 결정 장치에 관한 블록도이다.
도 5를 참조하면, 본 발명의 일 실시예에 따른 수요 우선순위 결정 장치(1000)는 상위레벨 순위결정부(100), 하위레벨 순위결정부(200) 및 변경부(300)를 포함한다.
먼저 상위레벨 순위결정부(100)에 관하여 구체적으로 설명한다.
상위레벨 순위결정부(100)는 하위 레벨 조직의 확정 수요를 종합하고, 상위 레벨 조직에서 설정한 상위레벨 룰에 의하여 상기 종합된 확정 수요의 종합 우선순위를 결정할 수 있다.
상위레벨 룰은 하위 레벨 조직들로부터 입력된 수요 정보를 기반으로 하여 확정 수요의 우선순위를 결정하는 방법에 관하여 상위 레벨 조직에서 설정한 방법을 의미한다. 여기서 상위 레벨 조직이란, 하위 레벨의 조직의 상위 레벨에 해당하는 조직으로, 특정 하위 레벨 조직의 직속 상위 레벨 조직일 수도 있고, 몇 단계 위의 상위 레벨 조직일 수도 있다.
도 2를 참조하여 예를 들면, 하위 레벨 조직이 미국 지역 법인, 캐나다 지역 법인인 경우, 상위 레벨 조직은 미국 총괄 법인일수도 있고 본사 일 수도 있다.
또한, 상위레벨 룰은 조건에 따라서 상이하게 적용되도록 설정될 수 있다.
구체적으로 도 6을 참조하여 상위레벨 룰이 조건에 따라서 상이하게 적용되도록 설정된 일 예를 설명한다.
도 6를 참조하면, Week Rank 항목의 값이 01 내지 04인 경우에는 Demand Type을 우선시하여 종합 우선순위가 결정되도록 상위레벨 룰이 설정하고, Week Rank 항목의 값이 05 내지 12인 경우에는 Week Time 항목을 우선시하여 종합 우선순위가 결정되도록 상위레벨 룰이 설정될 수 있다.
하위레벨 룰의 경우에도 조건에 따라서 상이하게 적용되도록 설정될 수 있다.
상위레벨 순위결정부(100)가 하위 레벨 조직의 확정 수요를 종합하고, 상위 레벨 조직에서 설정한 상위레벨 룰에 의하여 상기 종합된 확정 수요의 종합 우선순위를 결정하는 방법에 관하여 도 7 내지 도 9를 참조하여 구체적으로 설명한다.
다만, 도 7 내지 도 9를 참조하여 상위레벨 순위결정부(100)에 관하여 설명하는 것은 상위레벨 순위결정부(100)가 상위레벨 룰에 의하여 종합 우선순위를 결정하는 방법의 일 예에 불과하며 이에 한정되는 것은 아니다.
도 7은 상위레벨 순위결정부의 일 실시예를 나타내는 블록도이다.
도 7을 참조하면, 상위레벨 순위결정부(100)는 수요정보 입력부(110), 항목순위 결정부(120), 리드타임 보정부(130), 종합순위값 결정부(140) 및 종합 우선순위 결정부(150)를 포함할 수 있다.
수요정보 입력부(110)는 기 설정된 항목들에 관한 정보가 포함된 각 하위 레벨 조직들의 확정수요 정보들을 입력 받아 종합할 수 있다. 각 하위 레벨 조직들의 확정수요 정보들을 종합한다는 것은, 정보의 취합, 통합의 의미가 포함된다. 즉, 상위레벨 순위결정부는 각 하위 레벨 조직마다의 확정수요들를 별도로 우선순위를 결정하는 것이 아니라, 각 하위 레벨 조직의 확정 수요들을 종합하여 우선순위를 결정한다는 뜻이다.
예를 들면, 제1 하위레벨 조직의 확정수요가 a, b가 존재하고, 제2 하위레벨 조직의 확정수요가 c, d, e가 존재하는 경우, 수요정보 입력부(110)부는 각 하위레벨 조직들의 확정수요들 a, b, c, d, e를 종합하고, 최종적으로 종합 우선순위 결정부에 의하여 a, b, c, d, e를 1순위부터 5순위까지 우선순위를 결정할 수 있다. 즉, 각 하위 레벨 조직들의 확정수요 정보들을 입력 받아 종합한다는 것은 a, b중 1순위, 2순위를 결정하고, c, d, e 중 1순위, 2순위, 3순위를 결정하지 않고, a, b, c, d, e를 종합하여 1순위부터 5순위까지 결정한다는 것에서 종합한다는 것이다.
확정수요 정보에 포함된 기 설정된 항목들은 앞서 도 3을 참조하여 설명한 바와 같을 수 있으며, 기업의 상황, 물품의 종류, 기업 조직의 형태, 시장 상황 등 다양한 이유에 따라서 변경 될 수 있다.
수요정보 입력부(110)에 의하여 입력 받은 기 설정된 항목들에 관한 정보는 각 항목별로 기업의 전사적 차원에서 설정한 세부 항목 정보를 포함할 수 있다. 예를 들어, 기 설정된 항목 중 수요 타입에 관한 항목은, 판매 주문량에 대하여 공급하기로 사전에 계획된 수량(COM_ORD), 판매 주문량을 차감한 순수요 예측량에 대하여 사전에 공급하기로 약속한 수량(COM_FCST), 사전에 공급하기로 약속한 수량을 초과한 판매 주문량(NEW_ORD), 사전에 공급하기로 약속한 수량을 초과한 순수요 예측량(NEW_FCST) 및 수요 예측량을 초과한 판매 주문량(UNF_ORD) 등의 세부 선택 정보가 설정되어 있을 수 있다. 다른 예를 들면, 기 설정된 항목 중 주문 속성에 관한 항목은, 출하(GI), 배송지시(DO), 납기약속(CO), 주문만 접수(NO) 등의 세부 선택 정보가 설정되어 있을 수 있다.
즉, 수요정보 입력부(110)에 의하여 입력 받은 정보는, 기 설정된 항목별로, 선택된 세부 정보가 포함되어 있을 수 있다. 만약, 수요정보 입력부(110)에 의하여 입력 받은 정보에 선택된 세부 정보가 없다면 Default로 처리할 수 있다.
항목순위 결정부(120)는 수요정보 입력부(110)에 의하여 입력 받은 확정수요 정보를 이용하여 기 설정된 항목들 별로 순위(Rank)값을 결정할 수 있다.
기 설정된 항목들 별로 존재하는 각각의 세부 선택 정보가 가리키는 순위값은 미리 설정되어 있을 수 있으며, 항목순위 결정부(120)는 상기 미리 설정된 바에 따라서, 선택된 세부 정보에 해당하는 순위값을 결정할 수 있다.
예를 들면, 항목순위 결정부(120)는, 수요 요구 시간에 관한 항목(Week Rank)에 관하여는 두 자리 숫자로 순위값을 결정하며, 기 설정된 항목 중 수요 요구 시간에 관한 항목(Week Rank) 외의 항목에 관하여 한자리 숫자로 순위값을 결정할 수 있다.
구체적으로 도 3을 참조하면, 항목순위 결정부(120)는 거래선의 중요성에 관한 항목(Preference Rank)에 관해서 세부 선택 정보를 기반으로 1 내지 9 사이의 숫자를 순위값으로 결정할 수 있다. 마찬가지로 항목순위 결정부(120)는 수요 타입에 관한 항목(Demand Type Rank), 정보 입력 주체에 관한 항목(Measure Rank), 주문 속성에 관한 항목(Order Type Rank), 손익실적 기준에 따른 거래선에 관한 항목(Customer Rank) 및 손익실적 기준에 따른 제품에 관한 항목(Product Rank)에 관해서도 각각의 세부 선택 정보를 기반으로 1 내지 9 사이의 숫자를 순위값으로 결정할 수 있다.
항목순위 결정부(120)는 수요 요구 시간에 관한 항목(Week Rank)에 관해서는 세부 선택 정보를 기반으로 01 내지 99 사이의 숫자를 순위값으로 결정할 수 있다. 수요 요구 시간은 10주 이상이 될 수 있으므로 항목순위 결정부(120)는 두 자리 숫자로 순위값을 결정할 수 있으며, 두 자리 숫자의 일관성을 위하여 1 내지 9의 숫자를 01 내지 09로 두 자리 숫자로 표현하여 순위값을 결정할 수 있다. 도 8을 참조하여 항목순위 결정부(120)에 관하여 예를 들어 설명한다.
도 8은 항목순위 결정부에 의하여 각 항목별로 순위값이 결정된 일 예를 나타내는 도면이다.
도 8을 참조하여 항목순위 결정부(120)가 수요정보 입력부(110)에 의하여 입력 받은 정보를 이용하여 각 항목별로 순위값을 결정하는 일 예를 설명하면, 도 8의 상단에 위치한 표에서 Demand ID는 확정 수요를 구분하기 위한 식별자이다. Demand ID가 다르다는 것은 확정 수요 정보를 입력한 조직이 상이하다는 의미일 수 있으며, 확정 수요 정보를 입력한 조직이 동일하더라도 수요 요구 시간 등의 상이함으로 인하여 구분하여 입력한 확정 수요에 관한 정보일 수 있다.
Rule Seq는 기 설정된 상위레벨 룰이 특정 항목의 값을 조건으로 서로 다른 룰을 이용하는 경우, 몇 번째의 룰을 따를 것인지에 관한 정보를 나타내는 것일 수 있다. 즉, Rule Rank 항목은 차후 자세하게 설명할 종합순위값 결정부(140)에 의하여 종합 우선순위값 결정시 도 6을 참조하여 설명한 바와 같이 조건이나 구간별로 다른 룰을 이용하는 경우, 이용하는 룰에 관한 정보를 담고 있는 항목이다. 종합 우선순위값 결정시 구간별로 다른 룰을 이용하지 않는 경우, 해당 항목은 존재하지 않을 수 있다.
도 8의 상단에 위치한 표는 수요정보 입력부(110)에 의하여 입력된 항목별 세부 정보를 나타내는 것이고, 하단에 위치한 표는 항목순위 결정부(120)에 의하여 각 항목별 세부 정보에 해당하는 순위값을 결정한 예를 나타내는 표이다.
계속하여 도 8를 참조하면, 각각의 항목 별로, 세부 정보가 포함되어 있는 것을 알 수 있다. 즉, Dmd 1 확정 수요의 Demand Type 항목에 관한 정보는 COM_ORD이고, Dmd 2 확정 수요의 Demand Type 항목에 관한 정보는 NEW_FCST인 것을 알 수 있다. 항목순위 결정부(120)는 미리 설정된 바에 기반하여 Demand Type 항목에서 COM_ORD에 해당하는 순위값 2를 Dmd 1의 Demand Type 항목의 순위값으로 결정할 수 있다. 또한, 항목순위 결정부(120)는 미리 설정된 바에 기반하여 Demand Type 항목에서 NEW_FCST에 해당하는 순위값 5를 Dmd 1의 Demand Type 항목의 순위값으로 결정할 수 있다.
도 8을 참조하여, 다른 예를 더 설명하면, 항목순위 결정부(120)는 Dmd 1과 Dmd 2의 Week Rank 항목에 관한 정보 W5와 W2를 이용하여 Week Rank 항목의 순위값을 확정 수요마다 결정할 수 있다. 도 8의 하단에 위치한 표를 보면, 항목순위 결정부(120)에 의하여 결정된 Dmd 1의 Week Rank 항목의 순위값은 05, Dmd 2의 Week Rank 항목의 순위값은 02로 결정된 것을 볼 수 있다.
다른 항목들도 미리 설정된 바에 기반하여 항목순위 결정부(120)가 각 확정수요의 각 항목 별로 순위값을 결정할 수 있다. 세부 선택 정보가 가리키는 순위값이 무엇인지에 관한 것은 앞서 기재한 바와 같이 미리 설정될 수 있다. 다만, 이러한 설정은 기업의 상황, 시장 상황, 물품의 종류 등 다양한 조건에 의하여 변경될 수 있다. 예를 들어, 도 8에서는, Demand Type 항목에서 선택된 세부 정보 COM_ORD가 2의 순위값을 가리키는 것으로 미리 설정되어 있지만, 다른 기업이나, 같은 기업의 다른 상황 등에서는 3 등의 다른 순위값을 가리키는 것으로 설정될 수도 있다.
항목순위 결정부(120)는 각 확정 수요의 정보에 특정 항목의 선택된 세부 정보가 존재하지 않는 경우, Default로 처리하여, Default가 가리키는 순위값을 해당 항목의 순위값으로 결정할 수 있다. Default가 가리키는 순위값은 각 항목별로 미리 설정될 수 있다. 도 8을 참조하면, 확정 수요 Dmd 1의 Preference Rank 항목에 해당하는 정보인 Preference Value 정보가 없으므로, 해당 항목을 Default로 처리하고 Preference Rank 항목의 Default가 가리키는 순위값 9를 Dmd 1의 Preference Rank 항목의 순위값으로 결정할 수 있다.
각 항목별로 Default가 가리키는 순위값의 일 예는 도 3에 기재된 바와 같을 수 있으며, 시장 상황, 기업 환경 등 다양한 이유로 인하여 변경될 수 있다.
리드타임 보정부(130)는 BOD(Bill of Distribution) 리드 타임(Lead Time) 정보를 이용하여 항목순위 결정부(120)에 의하여 결정된 각 항목별 순위값 중에서 리드 타임과 관련 있는 수요 요구 시간에 관한 항목(Week Rank)을 보정할 수 있다.
BOD는 제품의 지역간 이동, 즉 제품 운송에 대한 계획을 할 때, 제품의 운송 경로, 운송 수단, 이동 시간 등을 설정해 둔 테이블(Table)을 의미한다. 즉, 리드타임 보정부(130)는 생산지에서 법인 DC(Distribution Center) 또는 목적지까지의 BOD 리드 타임을 반영하여, Week Rank를 보정한다.
도 9를 참조하여 리드타임 보정부(130)에 의하여 Week Time 항목의 순위값이 보정되는 일 예를 설명한다.
도 9는 리드타임 보정부(130)에 의하여 Week Time 항목의 순위값이 보정되는 일 예를 설명하기 위한 도면이다.
도 9를 참조하면, 도 9의 상단부에 위치한 표는 항목순위 결정부(120)에 의하여 결정된 서로 다른 확정 수요의 각 항목별 순위값을 나타내는 표이다. 도 9의 상단부에 위치한 표에서 Week Rank 항목의 순위값을 보면, 확정 수요 Dmd 1의 해당 항목 순위값은 05이고, 확정 수요 Dmd 2의 해당 항목 순위값은 02이다.
확정 수요 중 Dmd 1의 수요 요청 제품 IXT04F(Product Rank 3에 해당하는 제품, 도 8 참조)이 생산지에서 목적지 Paris 조직(Customer Rank 1에 해당하는 목적지, 도 8 참조)으로 이동하는 리드 타임이 2주이고, 확정 수요 중 Dmd 2의 수요 요청 제품 EB12KD(Product Rank 2에 해당하는 제품, 도 8 참조)이 생산지에서 목적지 France 조직(Customer Rank 1에 해당하는 목적지, 도 8 참조)으로 이동하는 리드 타임이 1주라고 가정한다.
이러한 가정의 경우, 도 9의 하단부에 위치한 표를 참조하면, 리드타임 보정부(130)가 각 확정 수요의 리드 타임을 반영하여 Dmd 1의 Week Rank 항목의 순위값을 05에서 리드 타임 2주를 차감한 03으로, Dmd 2의 Week Rank 항목의 순위값을 02에서 리드 타임 1주를 차감한 01로 보정한 것을 볼 수 있다.
만약, 리드타임 보정부(130)가 리드타임을 반영하여 순위값을 보정하지 않으면, BOD 리드 타임이 상대적으로 긴 특정 조직의 경우, BOD 리드 타임이 상대적으로 짧은 다른 조직에 비하여 불리하게 되고, 생산계획 및 공급계획에도 차질이 발생할 수 있다.
종합순위값 결정부(140)는 항목순위 결정부(120)에 의하여 결정된 각 항목들 별 순위값을 기 설정된 상위레벨 룰에 따라서 배열하여 종합 우선순위값을 결정할 수 있다. 바람직하게는, 종합순위값 결정부(140)는 리드타임 보정부(130)에 의하여 보정된 기 설정된 항목들 별로 결정된 순위값을 기 설정된 상위레벨 룰에 따라서 배열하여 종합 우선순위값을 결정할 수 있다.
구체적으로 도 10과 도 11를 참조하여 종합순위값 결정부(140)의 일 실시예에 관하여 설명한다.
도 10은 기 설정된 상위레벨 룰의 일 예를 나타내는 도면이다.
도 10을 참조하면, RULE Type은 적용되는 룰의 타입에 관한 정보를 나타내는 것이다. 도 10에서는 상위레벨 룰(High Level Rule)이다. SEQ는 기 설정된 상위레벨 룰이 조건에 따라서 상이하게 설정되는 경우, 조건에 따라서 구분되는 룰의 식별 번호를 나타내는 것이다. Time 항목은 최종적으로 적용될 기 설정된 상위레벨 룰을 결정하기 위한 조건을 나타내는 것이다. 즉, 조건에 의하여 SEQ가 결정될 수 있다. 이러한 조건은 변경될 수 있다.
따라서, 도 10에서 RULE Type이 High Level이고 SEQ가 1이고 TIME이 W1~W3는 Week Rank 항목의 선택된 세부 정보가 01 내지 03 인 경우이면 상위레벨 룰 중 1번을 적용하여 종합 우선순위값을 결정한다는 것을 의미할 수 있다.
도 10에서 Preference Rank 부터 Product Rank까지의 각 항목들의 숫자는, 각 항목들의 항목순위 결정부(120)에 의하여 결정된 순위값(또는 리드타임 보정부(130)에 의하여 보정된 순위값을 적용한 순위값)을 배열하는 순서를 의미할 수 있다.
도 11은 종합순위값 결정부에 의하여 결정된 종합 우선순위값의 일 예를 나타내는 도면이다.
도 10과 도 11를 참고하여, 종합순위값 결정부(140)에 의하여 결정된 종합 우선순위값의 일 예를 설명한다.
도 11의 상단부에 위치한 표를 참조하면, 서로 다른 확정 수요 Dmd 1과 Dmd 2의 각 항목별로 결정된 순위값을 나타내고 있다. 결정된 순위값 중 Week Rank 항목의 순위값 03과 01은 각각 리드 보정부에 의하여 보정된 순위값일 수 있다.
도 11의 하단부에 위치한 표에서 Week 항목의 값은 구간 별로 서로 상이하게 적용되는 기 설정된 룰의 조건을 결정하는 정보이다.
W5와 W2는 각각 리드 보정부에 의하여 보정되기 이전의 Week Rank 항목의 순위값이 가리키는 세부 정보에 해당하는 것이다. 이는, 도 8과 도 9를 참조하면 보다 명확하게 알 수 있다.
확정 수요 중 Dmd 1의 종합 우선순위값을 먼저 설명한다. Dmd 1의 Week 정보는 W5이고, 상위레벨 룰을 적용하여 종합 우선순위값을 결정하는 경우, 종합순위값 결정부(140)는 도 10의 High Level Rule 중 SEQ가 2인 룰에 따라서, 각 항목별 순위값을 배열하여 Dmd 1의 종합 우선순위값을 결정할 수 있다.
구체적으로 도 11를 참조하면, Preference Rank가 1순위, Rule Rank가 2순위, demand Type Rank가 3 순위, Product Rank가 4 순위, Measure Rank가 5순위, Order Type Rank가 6순위, Week Rank가 7순위, Customer Rank가 8순위인 것을 알 수 있다. 이러한 순위에 따라서, 도 11의 Dmd 1의 각 항목별 순위값을 배열하면, 9 1 2 3 1 3 03 1이 된다.
즉, 종합순위값 결정부(140)는 확정 수요 Dmd 1의 각 항목별 순위값을 상위레벨 룰 중 2번째 룰에 따라서 배열하여 912313031으로 종합 우선순위값을 결정할 수 있다.
마찬가지로, 종합순위값 결정부(140)는 Dmd 2의 종합 우선순위값을 상위레벨 룰에 의하여 결정하는 경우, W2의 조건이므로 상위레벨 룰의 1번째(SEQ 1)를 적용하여 241501325로 결정할 수 있다.
기 설정된 항목, Default가 가리키는 순위값의 설정, 각 항목의 세부 정보가 가리키는 순위값의 설정 등의 변경에 따라서 종합순위값 결정부(140)에 의하여 결정되는 종합 우선순위값은 다르게 나타날 수 있다. 또한, 반드시 종합 우선순위값이 숫자 형태일 필요는 없으며, 다양한 알파벳으로 나타낼 수도 있다.
상위레벨 순위결정부(100)의 종합 우선순위 결정부(150)는 기 설정된 상위레벨 룰을 이용하여 결정된 각 확정수요들의 종합 우선순위값을 이용하여 각 확정수요들의 종합 우선순위를 결정할 수 있다. 예를 들면, 종합 우선순위 결정부(150)는 종합 우선순위값의 크기가 낮을수록 우선순위가 높도록 종합 우선순위값을 결정할 수 있다.
또는, 종합 우선순위 결정부(150)는 기 설정된 함수 식에 각 확정수요들의 종합 우선순위값을 적용하여 각 확정 수요의 우선순위를 결정할 수 있다.
하위레벨 순위결정부(200)는, 각 하위 레벨 조직마다 설정된 하위레벨 룰이 존재하는 경우, 하위레벨 룰을 이용하여 확정 수요들에 관한 우선순위를 결정한다.
하위레벨 룰은 상위레벨 룰과 다른 방식으로 확정 수요의 우선순위를 결정하는 방법에 관하여 하위 레벨 조직에서 설정한 방법을 의미한다. 상위 레벨 조직에서 설정한 상위레벨 룰 외에 하위 레벨 조직에서 설정한 하위레벨 룰이 존재하는 이유는, 하위 레벨 조직의 판매 지역의 특성, 시장 상황, 단기의 수요 변화, 지역적 판매의 시급성 등, 각 지역의 다양한 상황을 고려하기 위함이다.
각 하위 레벨 조직은 각 조직의 특성에 맞는 하위레벨 룰이 존재하는 것은 아니며, 상위레벨 룰과 상이한 하위레벨 룰을 하위 레벨 조직 중 일부만이 설정하고 있을 수 있다. 또한, 특정 하위레벨 조직에 의하여 설정된 하위레벨 룰이 다른 하위레벨 조직에서 이용될 수도 있다. 또한, 상기 하위레벨 조직은 보다 하위레벨의 조직들의 상위레벨 조직이 될 수도 있다.
하위레벨 순위결정부(200)도 상위레벨 순위결정부(100)의 우선순위 결정부와 유사한 방법으로 하위레벨 조직의 확정 수요들간 우선순위를 정할 수 있다.
다만, 상위레벨 순위결정부(100)와는 상이하게, 하위레벨 순위결정부(200)는 기 설정된 하위레벨 룰을 이용하여 상기 기 설정된 하위레벨 룰이 적용되는 하위레벨 조직들의 확정 수요들 간의 우선순위만을 결정할 수 있다.
하위레벨 순위결정부(200)가 상위레벨 순위결정부(100)와 유사한 방식이나 기 설정된 하위레벨 룰을 이용하여 순위를 결정하는 방법의 일 예를 도 12와 도 13을 참조하여 설명한다.
도 12는 기 설정된 하위레벨 룰의 일 예를 나타내는 도면이다.
도 13은 하위레벨 순위결정부에 의하여 결정된 우선순위값의 일 예를 나타내는 도면이다.
도 12는 도 10과 유사하나 상위레벨 룰이 아닌 하위레벨 룰이 설정된 일 예를 나타내고 있으며, 이를 도 12에서 설명한 바와 같이 도 13에 적용하면 우선순위값이 결정되고, 결정된 우선순위값을 이용하여 하위레벨 룰이 적용되는 하위레벨 조직의 확정수요들간 우선순위를 결정할 수 있다.
구체적으로, 제1 하위레벨 조직을 파리라고 할 경우, 제1 하위레벨 순위결정부는 Dmd 1의 우선순위값을 파리의 하위레벨 룰에 의하여 결정할 수 있다. 다만 파리 법인에서 설정한 하위레벨 룰이 존재하지 않고, 파리 법인 보다 상위 레벨 조직이며 본사보다 하위레벨 조직인 프랑스 법인에서 설정한 하위레벨 룰을 따르도록 설정될 수도 있다.
다만, 파리 법인에서 설정한 하위레벨 룰이 별로도 존재하는 경우, 해당 설정된 룰을 따를 수 있으며, 이러한 경우 종합 우선순위값은 달라질 수 있다. 도 12에서는 파리 법인은 프랑스 법인에서 설정한 하위레벨 룰을 이용하여 파리 법인의 확정수요들간의 우선순위를 결정하도록 설정된 것으로 가정한다.
W5의 조건이므로 프랑스의 하위레벨 룰 중 2번째를 적용할 수 있다. 즉, 도 15의 마지막 줄에 표시된 각 항목 별 배열 순서에 따라서 도 15의 각 항목별 순위값을 배열하면, 하위레벨 순위결정부(200) 중 제1 하위레벨 순위결정부는 Dmd 1의 우선순위값을 912310331로 결정할 수도 있다.
제2 하위레벨 조직을 프랑스라고 할 경우, 하위레벨 순위결정부(200) 중 제2 하위레벨 순위결정부는 W2의 조건이므로 프랑스의 하위레벨 룰 중 1번째(SEQ 1)를 적용하여 145013252로 결정할 수도 있다.
다시 도 5로 되돌아가, 변경부에 관하여 설명한다.
변경부(300)는 제1 하위레벨 순위결정부에 의하여 결정된 제1 하위 레벨 조직의 확정 수요들에 관한 우선순위를 상위레벨 순위결정부(100)에 의하여 결정된 종합 우선순위 상에 반영하여 종합 우선순위의 각 우선순위에 해당하는 확정 수요의 정보를 변경할 수 있다.
구체적으로, 상위레벨 룰을 설정한 상위 레벨 조직의 하위 조직으로 제1 하위레벨 조직, 제2 하위레벨 조직이 존재하고, 제1 하위레벨 조직의 경우 제1 하위레벨 룰을 설정하고 있으며, 제2 하위레벨 조직은 제2 하위레벨 룰을 설정하고 있다고 가정하여 변경부(300)에 의하여 확정 수요의 우선순위가 최종적으로 확정되는 과정을 설명한다.
이러한 경우, 기 설정된 제1 하위레벨 룰을 이용하여 제1 하위레벨 조직의 확정 수요에 관한 우선순위를 결정하는 것은 하위레벨 순위결정부(200) 중 제1 하위레벨 순위결정부가 될 수 있다. 마찬가지로, 기 설정된 제2 하위레벨 룰을 이용하여 제2 하위레벨 조직의 확정 수요에 관한 우선순위를 결정하는 것은 하위레벨 순위결정부(200) 중 제2 하위레벨 순위결정부가 될 수 있다.
이러한 가정은, 발명의 이해를 돕기 위한 가정이며, 이에 한정되는 것이 아니다. 즉, 하위레벨 조직은 제3 하위레벨 조직, 제4 하위레벨 조직 등 복수 개의 조직들이 될 수 있고, 복수 개의 하위 조직들 중 전부 또는 일부가 서로 각각의 하위레벨 룰을 설정할 수도 있다. 하위 조직들이 각각 설정한 하위레벨 룰은 서로 상이할 수 있으며, 동일할 수도 있다.
구체적으로 도 14 내지 도 17를 참조하여 변경부(300)에 의하여 종합 우선순위의 각 우선순위에 해당하는 확정 수요의 정보가 변경되는 예를 설명한다.
도 14는 상위레벨 순위결정부(100)에 의하여 독일 법인(SEG)과 프랑스 법인(SEF)의 각각의 확정 수요들을 종합하여 종합 우선순위를 결정한 일 예이다.
도 14의 (a)가 독일 법인(SEG)의 확정 수요들과, 프랑스 법인(SEF)의 확정 수요들을 종합한 확정 수요 정보에 관한 것이다. 상위레벨 순위결정부(100)가 확정 수요들을 종합한 확정 수요 정보를 기 설정된 상위레벨 룰에 의하여 우선순위를 결정한다.
도 14의 (b)는 상위레벨 순위결정부(100)가 기 설정된 상위레벨 룰에 의하여 종합 우선순위 1순위부터 7순위까지 결정한 결과이다.
도 14의 (b)에서 우선순위를 결정하는데 이용되는 기 설정된 상위레벨 룰은 수요 타입에 관한 항목(DmdType) 순일 수 있으며, 도 3에서 설명한 바와 같이 수요 타입에 관한 항목의 세부 내용들은 미리 중요도에 따른 순위가 결정되어 있을 수 있다.
도 15는 하위레벨 순위결정부(200) 중 제1 하위레벨 순위결정부에 의하여 제1 하위레벨 조직의 확정수요들에 관한 우선순위가 결정되는 예를 나타내는 도면이다.
도 15를 참조하면, 하위레벨 순위결정부(200) 중 제1 하위레벨 순위결정부가 제1 하위레벨 조직인 독일 법인(SEG)의 확정 수요들에 관한 우선순위를 독일 법인(SEG)이 설정한 제1 하위레벨 룰에 기반하여 결정할 수 있다. 도 15에서, 제1 하위레벨 룰은 확정 수요에 포함된 항목 중 Week 항목을 최우선시하여 확정 수요들의 우선순위를 결정하는 것으로 설정될 수 있다. Week 항목은 시간에 관한 항목으로 도 3에서 수요 요구 시간에 관한 항목(Week Rank)가 될 수도 있다. 즉, Week는 지역적 판매의 시급성에 관한 항목이 될 수 있고, Week 항목을 우선시하는 것은 지역적 판매의 시급성을 반영하는 것으로 볼 수 있다.
구체적으로, 도 15의 (a)을 참조하면, 제1 하위레벨 룰은 제1 하위레벨 조직의 확정 수요들 사이에서만 적용된다. 보다 구체적으로는 제1 하위레벨 룰은 제1 하위레벨 룰이 적용되도록 설정된 하위레벨 조직의 확정 수요들 사이에서만 적용될 수 있다. 도 15의 (b)와 (c)를 참조하면, Week 항목에 기반한 제1 하위레벨 룰에 따라서, 제1 하위레벨 조직인 독일 법인(SEG)의 확정 수요들의 우선순위가 변경된 것을 볼 수 있다. 즉, 제1하위레벨 순위결정부(200)는 제1 하위레벨 룰을 이용하여 Week 항목의 수치가 작을수록 우선순위를 가지도록 독일 법인(SEG)의 확정 수요들에 관한 우선순위를 결정할 수 있다.
마찬가지로 도 16을 참조하면, 제2 하위레벨 조직인 프랑스 법인(SEF)은 프랑스 법인(SEF)의 확정 수요들의 우선순위를 프랑스 법인(SEF)이 설정한 제2 하위레벨 룰에 기반하여 결정할 수 있다. 제2 하위레벨 룰도, 제1 하위레벨 룰과 마찬가지로 Week 항목을 최우선신하여 확정 수요들의 우선순위를 결정하는 것으로 설정될 수 있다.
구체적으로, 구체적으로, 도 16의 (a)을 참조하면, 제2 하위레벨 룰은 제2 하위레벨 조직의 확정 수요들 사이에서만 적용된다. 도 16의 (b)와 (c)를 참조하면, Week 항목에 기반한 제2 하위레벨 룰에 따라서, 제2 하위레벨 조직인 프랑스 법인(SEF)의 확정 수요들의 우선순위가 변경된 것을 볼 수 있다. 즉, 제2 하위레벨 순위결정부는 제2 하위레벨 룰을 이용하여 Week 항목의 수치가 작을수록 우선순위를 가지도록 프랑스 법인(SEF)의 확정 수요들에 관한 우선순위를 결정할 수 있다.
도 17을 참조하면, 변경부(300)는 도 15와 도16과 같이 제1 하위레벨 순위결정부 및 제2 하위레벨 순위결정부에 의하여 결정된 각 하위레벨 조직의 확정수요들에 관한 우선순위를 종합 우선순위에 반영한다.
구체적으로, 변경부(300)는 종합 우선순위에 각 하위레벨 순위결정부(200)에 의하여 결정된 각 하위레벨 조직의 확정수요들에 관한 우선순위를 반영하여 종합 우선순위의 각 우선순위에 해당하는 확정 수요의 정보를 변경할 수 있다.
변경부(300)는 특정 하위레벨 조직의 하위레벨 룰에 기반하여 결정된 우선순위에 의하여 다른 하위레벨 조직의 우선순위에 미치는 영향을 최소화하기 위하여 각 하위레벨 조직의 확정 수요들에 관한 종합 우선순위는 변경하지 않는다. 다만, 변경부(300)가 종합 우선순위에 각 하위레벨 순위결정부(200)에 의하여 결정된 각 하위레벨 조직의 확정수요들에 관한 우선순위를 반영하여 종합 우선순위의 각 우선순위에 해당하는 확정 수요의 정보를 변경함으로 인하여 실질적으로, 종합 우선순위가 재배치 되는 효과가 발생할 수 있다.
구체적으로 도 15와 도 16을 참조하면, 기 설정된 상위레벨 룰에 의하여 결정된 종합 우선순위(H-Rank)는 고정되어 변경되지 않고, 제1 하위레벨 룰과 제2 하위레벨 룰에 의하여 결정된 우선순위에 따라서 각 H-Rank가 가리키는 정보만 변경된 것을 알 수 있다. 즉, 제1 하위레벨 룰에 의하여 결정된 우선순위에 따른 순위 변경은 제1 하위레벨 조직의 확정수요들뿐이며, 제2 하위레벨 룰에 의하여 결정된 우선순위에 따른 순위 변경은 제2 하위레벨 조직의 확정수요들뿐인 것이다. 변경부(300)는 제1 하위레벨 룰에 의하여 결정된 우선순위는 기 설정된 상위레벨 룰에 의하여 결정된 제2 하위레벨 조직의 확정 수요들의 우선순위를 변경하지 않도록 한다.
변경부(300)가 상위레벨 순위결정부(100)에 의하여 결정된 확정수요들의 종합 우선순위가 가리키는 내용(내용의 순서)를 변경한 결과는 공급 계획, 수요 통제 계획 등에 이용될 수 있다.
종합 우선순위 결정부(150)더불어 도 18 내지 도 20을 참조하여, 변경부(300)에 관하여 종합 우선순위에 해당하는 내용이 변경되는 다른 예를 추가적으로 설명한다.
변경부(300)는 Priority Swapping을 수행할 수 있다. Priority Swapping이란, 변경부(300)에 의하여 기 설정된 상위레벨 룰에 의하여 결정된 종합 순위에 기 설정된 하위레벨 룰에 의하여 결정된 각 하위레벨 조직의 확정 수요들의 우선순위를 반영하여 각각의 종합순위에 해당하는 내용을 변경하는 것을 의미한다.
도 18은 상위레벨 순위결정부(100)가 기 설정된 상위레벨 룰 의하여 우선순위를 결정한 예를 나타내는 도면이다.
High Level Priority는 기 설정된 상위레벨 룰에 따라서 우선순위값을 배열한 값이며, High Level Priority가 낮을 수록, 도 18의 표에서 상측에 위치한 확정 수요일 수록 높은 우선순위를 나타낸다.
구체적으로, 도 18에서, 상위레벨 순위결정부(100)의 종합순위값 결정부(140)에 의하여 결정된 종합 우선순위값을 High Level Priority 항목에 확정수요 별로 각각 기재하고 있다. 203은 COM_ORD가 나타내는 순위값인 2와 W3이 나타내는 순위값인 03을 상위레벨 룰에 의한 배열에 따라서 배열한 값이다. 304는 COM_FCST가 나타내는 순위값인 3과 W4가 나타내는 순위값인 04을 상위레벨 룰에 의한 배열에 따라서 배열한 값이다.
즉, 도 18에서 알 수 있는 기 설정된 상위레벨 룰은 Week 정보의 항목인 Week Rank 항목보다 Demand Type 정보의 항목인 Demand Type Rank 항목을 우선시하는 룰이다. 이러한 상위레벨 룰의 설정은 변경될 수 있다.
도 19는 하위레벨 순위결정부(200)에 의하여 결정되는 프랑스 법인의 확정 수요들의 우선순위값 및 우선순위 예를 나타내는 도면이다.
도 19를 참조하면, 하위레벨 조직인 프랑스 조직의 하위레벨 룰은 Week 정보의 항목인 Week Rank 항목을 Demand Type 정보의 항목인 Demand Type Rank 항목 보다 우선시하는 룰인 것을 알 수 있다. 따라서, 하위레벨 순위결정부(200)가 프랑스 조직에 해당하는 Demand ID 2, 4, 6 각각의 우선순위값을 하위레벨 룰에 의하여 결정하면, 208은 082가 되고, 304는 043, 505는 055가 되는 것을 알 수 있다.
종래 기술의 경우, 이러한 하위레벨 룰이 적용되는 조직과, 상위레벨 룰이 적용되는 조직의 종합 우선순위값이 혼재되는 경우, 하위레벨 룰이 적용되는 조직에 의하여 상위레벨 룰이 적용되는 조직이 불이익을 받는 경우가 발생하는 문제점이 존재한다. 즉, 도 19에서 결정된 Demand ID 2, 4, 6 각각의 결정된 종합 우선순위값을 상위레벨 룰에 의하여 결정된 종합 우선순위값이 기재된 도 18에 적용하면, Demand ID 2, 4, 6이 모두 독일 판매 지역의 확정수요들인 Demand ID 1, 3, 5, 7, 보다 높은 우선순위를 차지하게 되는 것을 알 수 있다.
이러한 문제를 해결하기 위하여 변경부(300)는 Priority Swapping을 수행할 수 있다. 즉, 변경부(300)는 상위레벨 순위결정부(100)가 기 설정된 상위레벨 룰에 의하여 결정한 우선순위는 유지한다. 그러면서, 변경부(300)는 하위레벨 룰에 의하여 우선순위값의 변경이 있는 경우, 해당 변경된 순위를 상위레벨 룰에 의하여 결정된 종합 우선순위 중 해당 하위레벨 룰을 적용한 확정수요들 사이에서만 적용하여 정보를 변경할 수 있다.
종합 우선순위 결정부(150)가 Priority Swapping을 수행한 결과에 관한 일 예를 도20을 참조하여 설명한다.
도 20은 변경부가 도 18에 도 19의 내용을 반영한 결과의 일 예를 나타내는 도면이다.
변경부(300)는 도 19에서 나타나는 우선순위값을 도 18에 그대로 반영하는 것이 아니라, 도 18에서 상위레벨 룰에 의한 종합 우선순위값 및 우선순위는 유지하되, 하위레벨 룰이 적용된 프랑스 조직의 Demand ID 2, 4, 6 들 사이에서는 도 19에서 나타나는 하위레벨 룰에 의하여 생성된 우선순위값을 적용하여 순서를 변경할 수 있다.
즉, 도 20을 계속하여 참조하면, 하위레벨 룰을 적용하는 프랑스 조직 내에서는 Demand ID 4가 최우선순위고, Demand ID 6이 그 다음 순위이고, Demand ID 2이 최후순위인 것을 반영하여 정보가 변경되어 최종 순위가 Demand ID 1, 4, 3, 6, 5, 2, 7 순으로 변경된 것을 알 수 있다.
변경부(300)는 Priority Swapping을 수행하여 해당 조직의 특성 판매의 시급성 등을 반영하는 기 설정된 하위레벨 룰에 의한 우선순위를 반영함과 동시에 다른 조직에 불이익이 최소화 되도록 할 수 있다.
도 21은 본 발명의 일 실시예에 따른 수요 통제 장치(2000)에 관한 블록도이다.
도 21을 참조하면, 본 발명의 일 실시예에 따른 수요 통제 장치(2000)는 상위레벨 순위결정부(100), 하위레벨 순위결정부(200), 변경부(300) 및 수요통제부(400)를 포함한다.
즉, 본 발명의 일 실시예에 따른 수요 통제 장치(2000)는, 수요 우선순위 결정 장치(1000)에 의하여 결정된 확정 수요들의 우선순위를 기반으로 공급 계획을 수립하고, 수요를 통제할 수 있다. 상위레벨 순위결정부(100), 하위레벨 순위결정부(200), 변경부(300)는 앞서 설명한바 상세한 설명은 생략한다.
수요통제부(400)는 확정수요의 우선순위가 높은(중요한) 순서부터 순차적으로 기 설정된 공급 계획량을 분배할 수 있다.
또한, 수요통제부(400)는, 기 설정된 물품의 양이 각 판매 조직들이 입력한 확정 수요의 총 량보다 적은 경우, 결정된 확정 수요의 우선순위가 높은 순서부터 순차적으로 기 설정된 공급 계획량을 분배하고, 공급 계획량을 분배 받지 못한 결정된 확정 수요의 우선순위가 낮은 순서의 확정 수요는 결품 처리하여 공급계획이 수립되지 않도록 할 수 있다.
구체적으로 도 22을 참조하면, 본 발명의 일 실시예에 따른 수요 우선순위 결정 장치(1000)에 의하여 결정된 우선순위 순서대로, 확정 수요 요청량(Req. Qty)이 기재되어 있다. 만약, 기업의 전사적 차원에서의 수요 통제, 또는 공급 계획량 등을 고려하여 500의 물품 공급계획이 수립된 경우, 수요통제부(400)는 최우선순위부터 순차적으로 500의 물품을 분배할 수 있다. 도 22에서는, 수요통제부(400)는 최우선순위인 Demand ID 3의 확정수요가 요구하는 수량 100을 500에서 분배하고, 그 다음 우선순위인 Demand ID 6의 확정수요가 요구하는 수량 200을 나머지 400에서 분배한다. 계속하여 수요통제부(400)는 3순위인 Demand ID 1의 확정수요가 요구하는 수량 150을 나머지 200에서 분배한다. 3순위까지 분배하고 남은 공급계획량은 50이 된다. 수요통제부(400)는 나머지 50을 4순위인 Demand ID 2의 확정수요가 요구하는 수량 120을 보충하기 위하여 분배한다. 수요통제부(400)가 공급계획량을 우선순위에 따라서 분배하면, 최종적으로 도 22에서는, Demand ID 2의 확정수요가 요구하는 수량 120 중 70, Demand ID 5의 확정수요가 요구하는 수량 80, Demand ID 4의 확정수요가 요구하는 수량 90을 위한 공급은 부족하게 된다.
수요통제부(400)는 부족한 수량을 모두 결품 처리하여 공급계획이 수립되지 않도록 할 수 있다. 도 22의 상황에서 수요통제부(400)가 부족한 수량을 결품처리(Shrt. Qty)한 예를 도 23과 같이 표시할 수 있다.
도 24는 본 발명의 일 실시예에 따른 수요 우선순위 결정 장치(1000)의 구성도이다.
본 발명의 일 실시예에 따른 수요 우선순위 결정 장치(1000)는 도 24에 도시된 구성을 가질 수도 있다. 수요 우선순위 결정 장치(1000)는 명령어를 수행하는 프로세서(10), 우선순위 결정 프로그램 데이터, 입력된 확정수요 정보에 관한 데이터, 기 설정된 항목 정보 및 세부 정보에 해당하는 순위값 정보 데이터 등이 저장되는 저장 장치(30), 메모리(40), 외부 장치와의 데이터 송수신을 위한 네트워크 인터페이스(50)를 포함할 수 있다.
저장 장치(30)에는 제1 하위 레벨 조직과 제2 하위 레벨 조직의 확정 수요들을 종합하고, 상기 제1 하위 레벨 조직과 상기 제2 하위 레벨 조직의 상위 레벨 조직에서 설정한 상위레벨 룰에 의하여 상기 종합된 확정 수요들에 관한 종합 우선순위를 결정하는 상위레벨 순위결정 과정, 상기 제1 하위 레벨 조직에서 설정한 제1 하위레벨 룰이 존재하는 경우, 상기 제1 하위 레벨 조직의 확정 수요들에 관한 우선순위를 상기 제1 하위레벨 룰을 이용하여 결정하는 제1 하위레벨 순위결정 과정; 상기 제1 하위레벨 순위결정단계에 의하여 결정된 상기 제1 하위 레벨 조직의 확정 수요들에 관한 우선순위를 상기 상위레벨 순위결정단계에 의하여 결정된 종합 우선순위 상에 반영하여 상기 종합 우선순위의 각 우선순위에 해당하는 확정 수요의 정보를 변경하는 변경 과정을 수행하는 프로그램이 저장될 수 있으며, 상기 프로그램은 메모리에 로드된 후, 프로세서(10)를 통하여 수행될 수 있다. 저장 장치(30)에 저장된 상기 프로그램은, 도 1 내지 19를 참조하여 설명된 프로세스 중 적어도 하나를 수행할 수 있다.
도 25는 본 발명의 바람직한 실시예에 따른 수요 우선순위 결정 방법에 관한 흐름도이다.
도 25를 참조하여 본 발명의 일 실시예에 따른 수요 우선순위 결정 방법에 관하여 설명하면, 상위레벨 순위결정부(100)는 하위레벨 조직들의 확정수요들에 관한 종합 우선순위를 기 설정된 상위 레벨 룰을 이용하여 결정할 수 있다(S2410 단계).
하위레벨 순위결정부(200)는 하나 이상의 기 설정된 하위레벨 룰을 이용하여 각각의 기 설정된 하위레벨 룰이 적용되는 하위레벨 조직의 확정수요에 관한 우선순위를 결정할 수 있다(S2420 단계).
변경부(300)는 하위레벨 순위결정부(200)에 의하여 결정된 각 하위레벨 조직의 확정수요에 관한 우선순위 정보를 이용하여, 상위레벨 순위결정부(100)에 의하여 결정된 확정 수요들의 우선순위에 해당하는 정보를 변경할 수 있다(S2430 단계).
도 26은 본 발명의 일 실시예에 따른 수요 통제 방법에 관한 흐름도이다.
도 26을 참조하여 본 발명의 일 실시예에 따른 수요 통제 방법을 설명하면, 수요통제부(400)가 S2410 단계 내지 S2430 단계에 의하여 변경 및 결정된 종합 우선순위에 기반하여 공급 계획량을 분배할 수 있다(S2510 단계).
또한 수요통제부(400)는 확정수요 중 공급 계획량을 분배 받지 못한 수요는 결품 처리하여 공급계획이 수립되지 않도록 할 수 있다(S2520 단계).
도 26에서 설명하는 수요 통제 방법은 도 1내지 도 24를 참고하여 설명한 본 발명의 일 실시예에 따른 수요 우선순위 결정 장치(1000) 및 수요 통제 장치(2000)의 내용이 모두 적용될 수 있다.
도 5, 10, 20의 각 구성요소는 소프트웨어(software) 또는, FPGA(field-programmable gate array)나 ASIC(application-specific integrated circuit)과 같은 하드웨어(hardware)를 의미할 수 있다. 그렇지만 상기 구성요소들은 소프트웨어 또는 하드웨어에 한정되는 의미는 아니며, 어드레싱(addressing)할 수 있는 저장 매체에 있도록 구성될 수도 있고 하나 또는 그 이상의 프로세서들을 실행시키도록 구성될 수도 있다. 상기 구성요소들 안에서 제공되는 기능은 더 세분화된 구성요소에 의하여 구현될 수 있으며, 복수의 구성요소들을 합하여 특정한 기능을 수행하는 하나의 구성요소로 구현할 수도 있다.
이상 첨부된 도면을 참조하여 본 발명의 실시예들을 설명하였지만, 본 발명이 속하는 기술분야에서 통상의 지식을 가진 자는 본 발명이 그 기술적 사상이나 필수적인 특징을 변경하지 않고서 다른 구체적인 형태로 실시될 수 있다는 것을 이해할 수 있을 것이다. 그러므로 이상에서 기술한 실시예들은 모든 면에서 예시적인 것이며 한정적이 아닌 것으로 이해해야만 한다.
Claims (22)
- 계층적 관계가 존재하는 조직들 중 상위 레벨 조직이 설정한 상위레벨 룰에 의하여 하위 레벨 조직들의 확정 수요들에 관한 종합 우선순위를 결정하는 상위레벨 순위결정부; 및상기 하위 레벨 조직들 중 적어도 어느 하나의 하위레벨 조직이 설정한 하위레벨 룰에 의하여, 상기 하위 레벨 조직들 중 일부 하위 레벨 조직의 확정 수요들에 관한 우선순위 또는 상기 하위레벨 룰을 설정한 하위레벨 조직의 확정 수요들에 관한 우선순위를 결정하는 하위레벨 순위결정부를 포함하는, 수요 우선순위 결정 장치.
- 제 1 항에 있어서,상기 상위레벨 조직의 하위 레벨 조직으로 제1 하위 레벨 조직과 제2 하위 레벨 조직을 포함하며, 상기 제1 하위 레벨 조직에서 설정한 제1 하위레벨 룰이 존재하는 경우,상기 하위레벨 순위결정부는, 상기 제1 하위 레벨 조직의 확정 수요들에 관한 우선순위를 상기 제1 하위레벨 룰을 이용하여 결정하고,상기 수요 우선순위 결정 장치는,상기 하위레벨 순위결정부에 의하여 결정된 상기 제1 하위 레벨 조직의 확정 수요들에 관한 우선순위를 이용하여, 상기 종합 우선순위 정보를 변경하는 변경부를 더 포함하는, 수요 우선순위 결정 장치.
- 제 2 항에 있어서,상기 변경부는,상기 하위레벨 순위결정부에 의하여 결정된 상기 제1 하위 레벨 조직의 확정 수요들에 관한 우선순위를, 상기 상위레벨 순위결정부에 의하여 결정된 종합 우선순위 중에서 상기 제1 하위 레벨 조직의 확정 수요에 관한 우선순위 사이에서만 반영하는, 수요 우선순위 결정 장치.
- 제 2 항에 있어서,상기 변경부는,상기 각 종합 우선순위에 해당하는 확정 수요 정보를 상기 하위레벨 순위결정부에 의하여 결정된 우선순위에 의하여 변경하되, 상기 종합 우선순위에서 상기 제2 하위 레벨 조직의 확정 수요에 관한 우선순위는 상기 하위레벨 순위결정부에 의하여 결정된 제1 하위레벨 조직의 확정수요에 관한 우선순위에 의하여 변경하지 않는 것을 특징으로 하는, 수요 우선순위 결정 장치.
- 제 1 항에 있어서,상기 상위 레벨 조직은,상기 하위 레벨 조직으로 제3 하위 레벨 조직을 더 포함하며,제1 순위 결정부는, 상기 제1 하위 레벨 조직, 제2 하위 레벨 조직 및 제3 하위 레벨 조직의 확정 수요를 종합하고, 상기 상위 레벨 조직에서 설정한 상위레벨 룰에 의하여 상기 종합된 확정 수요에 관한 종합 우선순위를 결정하는, 수요 우선순위 결정 장치.
- 제 2 항에 있어서,상기 제2 하위 레벨 조직에서 설정한 제2 하위레벨 룰이 존재하는 경우, 상기 하위레벨 순위결정부는 상기 제2 하위 레벨 조직의 확정 수요에 관한 우선순위를 상기 제2 하위레벨 룰을 이용하여 결정하며,상기 변경부는, 상기 하위레벨 순위결정부에 의하여 결정된 상기 제2 하위 레벨 조직의 확정 수요에 관한 우선순위를 상기 상위레벨 순위결정부에 의하여 결정된 종합 우선순위 상에 반영하여 상기 종합 우선순위의 각 우선순위에 해당하는 상기 확정 수요 정보를 변경하는, 수요 우선순위 결정 장치.
- 제 6 항에 있어서,상기 변경부는,상기 각 종합 우선순위에 해당하는 확정 수요 정보를 상기 하위레벨 순위결정부에 의하여 결정된 우선순위에 의하여 변경하되, 상기 종합 우선순위에서 상기 제1 하위 레벨 조직의 확정 수요의 확정 수요에 관한 우선순위는 상기 하위레벨 순위결정부에 의하여 결정된 상기 제2 하위레벨 조직의 확정 수요에 관한 우선순위에 의하여 변경하지 않는 것을 특징으로 하는, 수요 우선순위 결정 장치.
- 제 1 항에 있어서,상기 각 조직 별 확정 수요들은 둘 이상의 수요 타입에 관한 항목으로 세분화되는, 수요 우선순위 결정 장치.
- 제1 하위 레벨 조직과 제2 하위 레벨 조직의 상위 레벨 조직은 상기 제1 하위 레벨 조직과 제2 하위 레벨 조직의 확정 수요를 종합하고, 상기 상위 레벨 조직에서 설정한 상위레벨 룰에 의하여 상기 종합된 확정 수요에 관한 종합 우선순위를 결정하는 상위레벨 순위결정부;상기 제1 하위 레벨 조직에서 설정한 상기 상위레벨 룰과 상이한 제1 하위레벨 룰이 존재하는 경우, 상기 제1 하위 레벨 조직의 확정 수요에 관한 우선순위를 상기 제1 하위레벨 룰을 이용하여 결정하는 제1 하위레벨 순위결정부;상기 제1 하위레벨 순위결정부에 의하여 결정된 상기 제1 하위 레벨 조직의 확정 수요에 관한 우선순위를 상기 상위레벨 순위결정부에 의하여 결정된 종합 우선순위 상에 반영하여 상기 종합 우선순위의 각 우선순위에 해당하는 내용을 변경하는 변경부; 및상기 변경부에 의하여 내용이 변경된 상기 종합 우선순위를 기반으로 하여, 기 설정된 공급 계획량을 분배하는 수요통제부를 포함하는, 수요 통제 장치.
- 제 9 항에 있어서,상기 수요 통제제부는, 상기 기 설정된 공급 계획량이 상기 각 조직들이 입력한 확정 수요의 총 량보다 적은 경우, 상기 종합 우선순위가 높은 순서부터 순차적으로 상기 기 설정된 공급 계획량을 분배하는, 수요 통제 장치.
- 제 9 항에 있어서,상기 종합 우선순위가 높은 순서부터 순차적으로 상기 기 설정된 공급 계획량을 분배하여, 상기 공급 계획량을 분배 받지 못한 확정 수요를 결품 처리 하는, 수요 통제 장치.
- 계층적 관계가 존재하는 조직들 중 상위 레벨 조직이 설정한 상위레벨 룰에 의하여 하위 레벨 조직들의 확정 수요들에 관한 종합 우선순위를 결정하는 상위레벨 순위결정단계; 및상기 하위 레벨 조직들 중 적어도 어느 하나의 하위레벨 조직이 설정한 하위레벨 룰에 의하여, 상기 하위 레벨 조직들 중 일부 하위 레벨 조직의 확정 수요들에 관한 우선순위 또는 상기 하위레벨 룰을 설정한 하위레벨 조직의 확정 수요들에 관한 우선순위를 결정하는 하위레벨 순위결정단계를 포함하는, 수요 우선순위 결정 방법.
- 제 12 항에 있어서,상기 상위레벨 조직의 하위 레벨 조직으로 제1 하위 레벨 조직과 제2 하위 레벨 조직을 포함하며, 상기 제1 하위 레벨 조직에서 설정한 제1 하위레벨 룰이 존재하는 경우,상기 하위레벨 순위결정단계는 상기 제1 하위 레벨 조직의 확정 수요들에 관한 우선순위를 상기 제1 하위레벨 룰을 이용하여 결정하고,상기 수요 우선순위 결정 방법은,상기 하위레벨 순위결정단계에서 결정된 상기 제1 하위 레벨 조직의 확정 수요들에 관한 우선순위를 이용하여 상기 종합 우선순위 정보를 변경하는, 수요 우선순위 결정 방법.
- 제 13 항에 있어서,상기 변경단계는,상기 하위레벨 순위결정단계에서 결정된 상기 제1 하위 레벨 조직의 확정 수요들에 관한 우선순위를, 상기 상위레벨 순위결정단계에 의하여 결정된 종합 우선순위 중에서 상기 제1 하위 레벨 조직의 확정 수요에 관한 우선순위 사이에서만 반영하는, 수요 우선순위 결정 방법.
- 제 13 항에 있어서,상기 변경단계는,상기 각 종합 우선순위에 해당하는 확정 수요 정보를 상기 하위레벨 순위결정단계에서 결정된 우선순위에 의하여 변경하되, 상기 종합 우선순위에서 상기 제2 하위 레벨 조직의 확정 수요에 관한 우선순위는 상기 하위레벨 순위결정단계에서 결정된 제1 하위 레벨 조직의 확정 수요들에 관한 우선순위에 의하여 변경하지 않는 것을 특징으로 하는, 수요 우선순위 결정 방법.
- 제 13 항에 있어서,상기 상위 레벨 조직은,상기 하위 레벨 조직으로 제3 하위 레벨 조직을 더 포함하며,제1 순위 결정단계는, 상기 제1 하위 레벨 조직, 제2 하위 레벨 조직 및 제3 하위 레벨 조직의 확정 수요를 종합하고, 상기 상위 레벨 조직에서 설정한 상위레벨 룰에 의하여 상기 종합된 확정 수요에 관한 종합 우선순위를 결정하는, 수요 우선순위 결정 방법.
- 제 13 항에 있어서,상기 제2 하위 레벨 조직에서 설정한 제2 하위레벨 룰이 존재하는 경우,상기 하위레벨 순위결정단계는, 상기 제2 하위 레벨 조직의 확정 수요에 관한 우선순위를 상기 제2 하위레벨 룰을 이용하여 결정하고,상기 변경단계는, 상기 하위레벨 순위결정단계에서 결정된 상기 제2 하위 레벨 조직의 확정 수요에 관한 우선순위를 상기 상위레벨 순위결정단계에서 결정된 종합 우선순위 상에 반영하여 상기 종합 우선순위의 각 우선순위에 해당하는 상기 확정 수요 정보를 변경하는, 수요 우선순위 결정 방법.
- 제 17 항에 있어서,상기 변경단계는,상기 하위레벨 순위결정단계에서 결정된 상기 제2 하위 레벨 조직의 확정 수요에 관한 우선순위를, 상기 상위레벨 순위결정단계에서 결정된 종합 우선순위 중에서 상기 제2 하위 레벨 조직의 확정 수요들 사이에서만 반영하여 상기 확정 수요 정보를 변경하는, 수요 우선순위 결정 방법.
- 제 12 항에 있어서,상기 각 조직 별 확정 수요들은 둘 이상의 수요 타입에 관한 항목으로 세분화되는, 수요 우선순위 결정 방법.
- 제1 하위 레벨 조직과 제2 하위 레벨 조직의 상위 레벨 조직은 상기 제1 하위 레벨 조직과 제2 하위 레벨 조직의 확정 수요를 종합하고, 상기 상위 레벨 조직에서 설정한 상위레벨 룰에 의하여 상기 종합된 확정 수요에 관한 종합 우선순위를 결정하는 상위레벨 순위결정단계;상기 제1 하위 레벨 조직에서 설정한 상기 상위레벨 룰과 상이한 제1 하위레벨 룰이 존재하는 경우, 상기 제1 하위 레벨 조직의 확정 수요에 관한 우선순위를 상기 제1 하위레벨 룰을 이용하여 결정하는 제1 하위레벨 순위결정단계;상기 제1 하위레벨 순위결정단계에 의하여 결정된 상기 제1 하위 레벨 조직의 확정 수요에 관한 우선순위를 상기 상위레벨 순위결정단계에 의하여 결정된 종합 우선순위 상에 반영하여 상기 종합 우선순위의 각 우선순위에 해당하는 내용을 변경하는 변경단계; 및상기 변경단계에 의하여 내용이 변경된 상기 종합 우선순위를 기반으로 하여, 기 설정된 공급 계획량을 분배하는 수요 통제단계를 포함하는, 수요 통제 방법.
- 제 20 항에 있어서,상기 수요 통제제단계는, 상기 기 설정된 공급 계획량이 상기 각 조직들이 입력한 확정 수요의 총 량보다 적은 경우, 상기 종합 우선순위가 높은 순서부터 순차적으로 상기 기 설정된 공급 계획량을 분배하고,상기 공급 계획량을 분배 받지 못한 확정 수요를 결품 처리 하는, 수요 통제 방법.
- 상위 레벨 조직과 하위 레벨 조직의 계층적 관계가 존재하는 조직들 중 상기 상위 레벨 조직이 설정한 상위레벨 룰에 의하여 상기 하위 레벨 조직들의 확정 수요들에 관한 종합 우선순위를 결정하는 과정; 및상기 하위 레벨 조직들 중 적어도 어느 하나의 하위레벨 조직이 설정한 하위레벨 룰에 의하여, 상기 하위 레벨 조직들 중 일부 하위 레벨 조직의 확정 수요들에 관한 우선순위 또는 상기 하위레벨 룰을 설정한 하위레벨 조직의 확정 수요들에 관한 우선순위를 결정하는 과정을 수행하는 프로그램을 기록한, 컴퓨터로 읽을 수 있는 기록 매체.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US15/023,464 US20160232469A1 (en) | 2013-09-25 | 2014-09-25 | Demand priority determination device and method, recording medium having program therefor recorded thereon, and demand control device and method |
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| KR10-2013-0113899 | 2013-09-25 | ||
| KR1020130113899A KR101836129B1 (ko) | 2013-09-25 | 2013-09-25 | 수요 우선순위 결정 장치 및 방법과 그 프로그램을 기록한 기록 매체, 수요 통제 장치 및 방법 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| WO2015046897A1 true WO2015046897A1 (ko) | 2015-04-02 |
Family
ID=52743931
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| PCT/KR2014/008925 Ceased WO2015046897A1 (ko) | 2013-09-25 | 2014-09-25 | 수요 우선순위 결정 장치 및 방법과 그 프로그램을 기록한 기록 매체, 수요 통제 장치 및 방법 |
Country Status (3)
| Country | Link |
|---|---|
| US (1) | US20160232469A1 (ko) |
| KR (1) | KR101836129B1 (ko) |
| WO (1) | WO2015046897A1 (ko) |
Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2004295226A (ja) * | 2003-03-25 | 2004-10-21 | Matsushita Electric Works Ltd | 需要量予測支援システム及びそのプログラム並びにそのプログラムを記録したコンピュータで読み取り可能な記録媒体 |
| JP2007219965A (ja) * | 2006-02-20 | 2007-08-30 | Hitachi Ltd | 出荷計画算出方法 |
| JP2008021020A (ja) * | 2006-07-11 | 2008-01-31 | Hitachi Information & Control Solutions Ltd | 販売計画作成支援システム |
| US20080065407A1 (en) * | 2002-05-17 | 2008-03-13 | Klett Robert D | System and method for determining a promise date for a demand in a business environment |
| JP2013161452A (ja) * | 2012-02-08 | 2013-08-19 | Mitsubishi Heavy Ind Ltd | 需要予測装置、需要予測方法および需要予測プログラム |
Family Cites Families (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US7966214B2 (en) * | 2004-01-29 | 2011-06-21 | International Business Machines Corporation | Method for considering hierarchical preemptive demand priorities in a supply chain optimization model |
| US7333870B2 (en) * | 2006-06-13 | 2008-02-19 | International Business Machines Corporation | Self-adjusting inventory management process for personalizing and re-personalizing parts |
| US20140114727A1 (en) * | 2011-04-26 | 2014-04-24 | Hewlett-Packard Development Company, L.P. | Method and system for hierarchical forecasting |
-
2013
- 2013-09-25 KR KR1020130113899A patent/KR101836129B1/ko active Active
-
2014
- 2014-09-25 WO PCT/KR2014/008925 patent/WO2015046897A1/ko not_active Ceased
- 2014-09-25 US US15/023,464 patent/US20160232469A1/en not_active Abandoned
Patent Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20080065407A1 (en) * | 2002-05-17 | 2008-03-13 | Klett Robert D | System and method for determining a promise date for a demand in a business environment |
| JP2004295226A (ja) * | 2003-03-25 | 2004-10-21 | Matsushita Electric Works Ltd | 需要量予測支援システム及びそのプログラム並びにそのプログラムを記録したコンピュータで読み取り可能な記録媒体 |
| JP2007219965A (ja) * | 2006-02-20 | 2007-08-30 | Hitachi Ltd | 出荷計画算出方法 |
| JP2008021020A (ja) * | 2006-07-11 | 2008-01-31 | Hitachi Information & Control Solutions Ltd | 販売計画作成支援システム |
| JP2013161452A (ja) * | 2012-02-08 | 2013-08-19 | Mitsubishi Heavy Ind Ltd | 需要予測装置、需要予測方法および需要予測プログラム |
Also Published As
| Publication number | Publication date |
|---|---|
| KR101836129B1 (ko) | 2018-04-19 |
| KR20150033955A (ko) | 2015-04-02 |
| US20160232469A1 (en) | 2016-08-11 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| WO2022225088A1 (ko) | 아이템 폐기와 관련된 정보 제공 방법 및 그 장치 | |
| WO2015137641A2 (ko) | 계층적인 룰 구조를 가지고 있는 비즈니스 룰 관리 시스템 및 그 표현 방법 | |
| WO2023101042A1 (ko) | 아이템 판매 관리를 위한 전자 장치 및 정보 제공 방법 | |
| WO2014142539A1 (en) | Computing system with resource management mechanism and method of operation thereof | |
| WO2024010137A1 (en) | Method and system for automatic establishment of optimal schedule for construction project | |
| WO2022211154A1 (ko) | 아이템 정보의 제공을 위한 전자 장치의 동작 방법 및 이를 지원하는 전자 장치 | |
| WO2015099445A1 (ko) | 일정 관리 디바이스 및 그 방법 | |
| WO2018062974A1 (en) | Electronic device and method thereof for managing notifications | |
| WO2018166098A1 (zh) | 数据稽核方法、装置、移动终端及计算机可读存储介质 | |
| WO2018135834A1 (ko) | 수정 항공권을 이용한 항공권 검색 시스템 및 방법 | |
| WO2022181917A1 (ko) | 교차 순환 방식의 네트워크 마케팅 보상 시스템 및 보상 방법 | |
| WO2023096012A1 (ko) | 비상장 주식의 거래를 지원하기 위한 방법 및 이를 이용한 비상장 주식거래 서버 | |
| WO2015046896A1 (ko) | 우선순위에 기반한 수요 통제 장치 및 방법, 우선순위 결정 장치 및 방법과 그 프로그램을 기록한 기록 매체 | |
| WO2023167534A1 (ko) | 콘텐츠 제공 방법 및 시스템 | |
| WO2023243897A1 (ko) | 다수 주문에 따른 상품의 집품, 포장 및 배송 관리 방법 및 장치 | |
| WO2021145722A1 (ko) | 보조지표를 활용한 주식 및 상품 투자 가격 예측시스템 및 방법 | |
| EP2638517A2 (en) | Method and apparatus for generating community | |
| WO2020222558A2 (ko) | 정산 서버 및 그 방법 | |
| WO2023038324A1 (ko) | 대체 불가능한 토큰 분산 소유 방법 | |
| WO2020222347A1 (ko) | 가상 머신 배치 방법 및 이를 구현하는 가상 머신 배치 장치 | |
| WO2022231023A1 (ko) | 아이템 결품과 관련된 정보 제공 방법 및 그 장치 | |
| WO2024029972A1 (ko) | 캘린더 애플리케이션을 이용한 카테고리화된 일정의 입력 방법 | |
| WO2010002174A2 (ko) | 입찰 속성 정보를 이용한 입찰 관리 방법 및 시스템 | |
| WO2023106496A1 (ko) | 비상장 주식의 거래를 지원하기 위한 ui 제공 방법 및 이를 이용한 비상장 주식거래 서버 | |
| WO2023191138A1 (ko) | 일자 정보를 제공하는 전자 장치 및 그 방법 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| 121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 14847875 Country of ref document: EP Kind code of ref document: A1 |
|
| WWE | Wipo information: entry into national phase |
Ref document number: 15023464 Country of ref document: US |
|
| NENP | Non-entry into the national phase |
Ref country code: DE |
|
| 122 | Ep: pct application non-entry in european phase |
Ref document number: 14847875 Country of ref document: EP Kind code of ref document: A1 |