WO2015024464A1 - Ferme à montage rapide pour suspendre des nacelles - Google Patents

Ferme à montage rapide pour suspendre des nacelles Download PDF

Info

Publication number
WO2015024464A1
WO2015024464A1 PCT/CN2014/084048 CN2014084048W WO2015024464A1 WO 2015024464 A1 WO2015024464 A1 WO 2015024464A1 CN 2014084048 W CN2014084048 W CN 2014084048W WO 2015024464 A1 WO2015024464 A1 WO 2015024464A1
Authority
WO
WIPO (PCT)
Prior art keywords
chord
connecting rod
plane connecting
quick
node shaft
Prior art date
Application number
PCT/CN2014/084048
Other languages
English (en)
Chinese (zh)
Inventor
高作平
周剑波
陈明祥
张畅
Original Assignee
武汉武大巨成结构股份有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 武汉武大巨成结构股份有限公司 filed Critical 武汉武大巨成结构股份有限公司
Publication of WO2015024464A1 publication Critical patent/WO2015024464A1/fr

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/10Railings; Protectors against smoke or gases, e.g. of locomotives; Maintenance travellers; Fastening of pipes or cables to bridges
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/005Girders or columns that are rollable, collapsible or otherwise adjustable in length or height
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • E04G3/30Mobile scaffolds; Scaffolds with mobile platforms suspended by flexible supporting elements, e.g. cables
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D22/00Methods or apparatus for repairing or strengthening existing bridges ; Methods or apparatus for dismantling bridges
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/02Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces
    • E04C3/04Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of metal
    • E04C2003/0486Truss like structures composed of separate truss elements
    • E04C2003/0491Truss like structures composed of separate truss elements the truss elements being located in one single surface or in several parallel surfaces

Definitions

  • the present invention relates to a basket truss, and more particularly to a basket truss that can be assembled quickly, and belongs to the technical field of bridge maintenance equipment.
  • the Chinese patent authorization publication number is: CN102635069A
  • the announcement date is: August 15, 2012
  • invention patent discloses a composite bridge truss structure assembly rotating frame, including a bracket, and the bracket is formed into a narrow and wide trapezoidal stable structure.
  • Two bearing seats are fixedly mounted on both ends of the bracket, a frame type platform is arranged in the middle of the bracket, two shafts are fixedly connected on both sides of the frame type platform, and the two bearing housings are connected with the bracket, in the frame
  • the inside of the platform is provided with eight workpieces, and the workpiece is fixed on the frame platform by a pressure plate, and the frame platform can be rotated around the axis by a certain angle on the bracket.
  • the structure of the device is complicated, cannot be assembled and disassembled quickly, and cannot be integrally stretched and unfolded. It is difficult, time-consuming and labor-intensive to assemble and disassemble, occupying a large space, and being inconvenient to transport, which is not conducive to improving the construction efficiency of bridge maintenance.
  • the object of the present invention is to solve the single structure of the hanging basket truss used in the existing bridge maintenance, which cannot be assembled and disassembled quickly, and is difficult and time-consuming to assemble and disassemble, and the space occupied is large, and the defects of transportation are not easy. Insufficient, it is now available as a fast-assembling basket truss that is compact, quick to assemble and disassemble, small in space, easy to transport, easy to use, and reusable.
  • a basket truss that can be quickly assembled, including an upper chord plane connecting rod and a lower chord plane connecting rod, and an end portion of the upper chord plane connecting rod and the lower chord plane connecting rod
  • An abdominal rod is respectively connected, and an upper node shaft bolt is arranged on an outer side of the upper end of the upper chord plane connecting rod and the lower chord plane connecting rod, and a lower node shaft bolt is arranged on the outer side of the upper end of the upper chord plane connecting rod and the lower chord plane connecting rod , the adjacent two upper node shaft bolts and the lower node shaft bolt are hinged by a diagonal web, and the upper joint shaft bolts on the same side are mounted with an upper chord.
  • a lower chord is mounted on the lower node shaft bolt, and an aluminum spring plate is mounted on the upper plane of the upper chord by bolts.
  • the upper chord is equidistantly disposed with a guardrail support, and the guardrail support is vertically installed on the guardrail support, and the guardrail is connected by a plurality of guardrails, and the guardrail is a steel cable or a soft rope, steel Both ends of the cable or the cord are respectively fixed on the upper chord.
  • the end portions of the upper chord and the lower chord are respectively provided with end plates, and the end plates are provided with bolt holes, and the upper chord and the lower chord respectively pass the bolt holes on the end plate and the upper node shaft bolt and the lower node shaft bolt Connected.
  • the inner diameter of the guardrail support is larger than the outer diameter of the guardrail, the bottom end of the guardrail is sleeved into the inner hole of the guardrail support, and the guardrail support and the guardrail are fixed by the screw.
  • the intersecting bars are respectively fixed on the diagonal lines of the rectangular frames formed by the upper chord plane connecting rod, the lower chord plane connecting rod and the webs, and the intersecting rods are made of angle steel.
  • the aluminum springboard is formed by longitudinally and cross-welding of the slotted aluminum material, and a patterned aluminum plate is also laid on the board surface and the bottom of the aluminum springboard.
  • the upper chord and the lower chord are both made of steel pipe, and the guardrail is made of steel pipe or aluminum alloy.
  • the upper node shaft bolt and the lower node shaft bolt are respectively provided with a limit position circlip.
  • the inclined web group of the present invention can be rotated or folded around a node axis by a certain angle, and the upper node shaft bolt is mounted with an upper chord, and the lower node shaft bolt is correspondingly equipped with a lower chord, and the upper chord and the lower string are mounted.
  • a rectangular frame formed by the upper chord connecting rod, the lower chord connecting rod and the web is installed between the rods, forming a space truss structure with quick installation and reasonable force.
  • the invention is provided with an aluminum springboard on the upper plane of the upper chord.
  • the aluminum springboard can not only bear the vertical load, but also has a certain in-plane stiffness, and can play a certain horizontal supporting role on the upper chord.
  • a guardrail is installed through the guardrail support, and the guardrails are connected by a plurality of guardrails to improve the safety protection performance during construction.
  • the invention has compact structure, adopts integral stretching and partial assembling structure, and the inclined web can realize stretching or gathering, which is convenient for quick assembly and disassembly, and has small space occupation, is convenient for transportation and repeated use, and can be widely used. Used for bridge overhaul.
  • FIG. 1 is a schematic view showing the structure of a diagonal web of the present invention when unstretched.
  • FIG. 2 is a schematic structural view of the oblique web of the present invention after stretching and stretching.
  • FIG 3 is a schematic structural view of the oblique web of the present invention after stretching and deploying the upper chord and the lower chord.
  • FIG. 4 is a schematic structural view of the utility model after installing the guard rail and the guard rail.
  • FIG. 5 is a schematic view showing the connection of the upper chord and the upper chord plane connecting rod of the present invention.
  • FIG. 6 is a schematic view showing the connection of the lower chord and the lower chord plane connecting rod of the present invention.
  • FIG. 7 is a schematic structural view of a rectangular frame of the present invention.
  • FIG. 8 is a schematic structural view of a joint shaft bolt connection portion of the present invention.
  • FIG. 9 is a side view of the joint shaft bolt connection portion of the present invention.
  • FIG. 10 is a schematic structural view of the present invention after laying an aluminum springboard.
  • FIG. 11 is a schematic view showing the structure of an end portion of an upper chord and a lower chord according to the present invention.
  • FIG. 12 is a side view of FIG. 11.
  • FIG. 13 is a schematic view showing the end structure of the web of the present invention.
  • FIG. 14 is a side view of FIG. 13.
  • a quick-assembling basket truss of the present invention includes an upper chord plane connecting rod 9 and a lower chord plane connecting rod 10, an end of the upper chord plane connecting rod 9 and the lower chord plane connecting rod 10.
  • An abdominal rod 11 is respectively connected between the upper shaft connecting rod 9 and the lower end of the lower chord connecting rod 10, and the upper node shaft bolt 2 is disposed at the lower end of the upper chord plane connecting rod 9 and the lower chord plane connecting rod 10
  • the lower node shaft bolt 3 is disposed on the outer side, and the adjacent two upper node shaft bolts 2 and the lower node shaft bolt 3 are hinged by the inclined web 1 , and the upper node shaft bolt 2 on the same side is mounted with the upper chord 4
  • a lower chord 5 is mounted on the lower node shaft bolt 3, and an aluminum springboard 15 is attached to the upper plane of the upper chord 4 by bolts.
  • the upper chord 4 is equidistantly disposed with a guardrail support 6, and the guardrail support 6 is vertically mounted with a guardrail 7, a guardrail
  • guard rails 8 are steel cables or cords, and the ends of the ropes or cords are respectively fixed on the upper chord 4.
  • the inner diameter of the guard rail support 6 is larger than the outer diameter of the guard rail 7, and the bottom end of the guard rail 7 is fitted into the inner hole of the guard rail support 6, and the guard rail support 6 and the guard rail 7 are fixed by the screw.
  • the aluminum springboard 15 is formed by cross-welding of the slot-shaped aluminum material, and a pattern aluminum plate is further laid on the board surface and the bottom of the aluminum springboard 15.
  • the upper chord 4 and the lower chord 5 are both made of steel pipe, and the guardrail 7 is made of steel pipe or aluminum alloy.
  • the upper node shaft bolt 2 and the lower node shaft bolt 3 are respectively provided with a limit position circlip 14 .
  • a rectangular frame formed by a web 11, an upper chord plane connecting rod 9, a lower chord plane connecting rod 10, and a web 11 is respectively connected between the end portions of the upper chord plane connecting rod 9 and the lower chord plane connecting rod 10.
  • the cross bars 12 are respectively fixed on the diagonal lines of the rectangular frame.
  • the cross bar 12 is made of angle steel, and the cross bar 12 serves as a support for improving the stability of the rectangular frame.
  • the upper node shaft bolt 2 is disposed on the outer side of the upper end of the upper chord plane connecting rod 9 and the lower chord plane connecting rod 10, and the lower node shaft bolt 3 is provided on the outer side of the lower end of the upper chord plane connecting rod 9 and the lower chord plane connecting rod 10, the upper chord plane
  • the connecting rod 9 and the lower chord plane connecting rod 10 mainly serve to connect.
  • the two adjacent upper node shaft bolts 2 and the lower node shaft bolts 3 are hinged by the inclined web 1 and the formed diagonal web system can be stretched or folded, which is quick and easy to deploy.
  • the upper node shaft bolt 2 on the same side is mounted with the upper chord 4, and the lower node shaft bolt 3 is correspondingly mounted with the lower chord 5.
  • the end portions of the upper chord 4 and the lower chord 5 are respectively provided with end plates, and the end plates are provided with bolt holes, and the upper chord 4 and the lower chord 5 respectively pass the bolt holes on the end plates and the upper node shaft bolts 2 and the lower node shaft bolts 3 phase connection.
  • Both the upper chord 4 and the lower chord 5 are made of steel pipe and have good strength.
  • the upper chord 4 is equidistantly disposed with a guard rail support 6, the inner diameter of the guard rail support 6 is larger than the outer diameter of the guard rail 7, and the bottom end of the guard rail 7 is fitted into the inner hole of the guard rail support 6, and is passed through a screw or The rivet secures the guard rail support 6 and the guard rail 7, and the guard rail 7 is perpendicular to the upper chord 4.
  • the guard rails 7 are connected by a plurality of guard rails 8 and the guard rails 8 are steel cables or cords, and the two ends of the ropes or cords are respectively fixed on the upper chord 4.
  • An aluminum springboard is mounted on the upper plane of the upper chord 4 by bolts, and the aluminum springboard is formed by cross-section welding of the slotted aluminum material, and a pattern aluminum plate is also laid on the surface and the bottom of the aluminum springboard.
  • the aluminum springboard should have a certain in-plane stiffness and horizontal support, which increases the space stiffness of the truss.
  • the basic parameters of the basket platform are finally determined.
  • the calculation of the space truss structure includes material strength check, member yield stress check, node bearing capacity check and overall structural stability check. Due to the uncertainty of the joint characteristics of the nodes and the spatial torsional effect, the finite element simulation of stability is difficult, so the stability of the overall structure is determined by the load test.
  • the invention adopts an overall stretching and partial assembling structure, and the inclined web can realize stretching or gathering, which is convenient for quick assembly and disassembly, and greatly facilitates transportation. It eliminates the need for a traditional hanging basket to be assembled with a large number of bolts. The trivial process saves manpower and is conducive to improving the construction efficiency of bridge overhaul.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

Ferme à montage rapide pour suspendre des nacelles, comprenant des tiges de liaison planes câblées supérieures (9) et des tiges de liaison planes câblées inférieures (10) ; les points de liaison supérieurs des tiges de liaison planes câblées supérieures (9) et des tiges de liaison planes câblées inférieures (10) comprennent, sur l'extérieur, des boulons d'arbre de nœud supérieurs (2), et les points de liaison inférieurs des tiges de liaison planes câblées supérieures (9) et des tiges de liaison planes câblées inférieures (10) comprennent, sur l'extérieur, des boulons d'arbre de nœud inférieurs (3) ; deux boulons d'arbre de nœud supérieurs (2) et boulons d'arbre de nœud inférieurs (3) voisins sont reliés par articulation par le biais d'une tige à âme diagonale (1) ; les boulons d'arbre de nœud supérieurs (2) du même côté sont dotés de tiges câblées supérieures (4), et des tiges câblées inférieures (5) sont disposées en correspondance au niveau des boulons d'arbre de nœud inférieurs (3). La présente invention présente une structure compacte et utilise une structure d'extension globale et d'assemblage partiel. Des tiges à âme diagonales peuvent être étendues ou repliées pour un montage et un démontage rapides. L'invention occupe un petit espace, elle facilite le transport et des usages répétés, et peut être largement appliquée pour l'inspection et l'entretien de ponts.
PCT/CN2014/084048 2013-08-21 2014-08-10 Ferme à montage rapide pour suspendre des nacelles WO2015024464A1 (fr)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201310366347.3A CN103437283B (zh) 2013-08-21 2013-08-21 一种能快速组装的吊篮桁架
CN201310366347.3 2013-08-21

Publications (1)

Publication Number Publication Date
WO2015024464A1 true WO2015024464A1 (fr) 2015-02-26

Family

ID=49690992

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2014/084048 WO2015024464A1 (fr) 2013-08-21 2014-08-10 Ferme à montage rapide pour suspendre des nacelles

Country Status (2)

Country Link
CN (1) CN103437283B (fr)
WO (1) WO2015024464A1 (fr)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113309006A (zh) * 2021-07-01 2021-08-27 中交二航局第四工程有限公司 五排相邻并行悬浇连续梁错位同步设备及其施工方法

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103437283B (zh) * 2013-08-21 2015-08-26 武汉武大巨成结构股份有限公司 一种能快速组装的吊篮桁架
KR101567741B1 (ko) * 2015-02-16 2015-11-09 권용근 조립트러스 매립형 합성보
CN110879177B (zh) * 2018-09-06 2022-03-04 水利部交通运输部国家能源局南京水利科学研究院 一种混凝土水力劈裂测试中试件密封加固装置
CN109469205B (zh) * 2018-11-30 2024-01-30 中国电建集团成都勘测设计研究院有限公司 可展开单元式双层网壳结构
CN110552459B (zh) * 2019-09-26 2022-01-07 武汉卡特激光工程有限责任公司 一种高强度横梁结构

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3994036A (en) * 1972-09-18 1976-11-30 Fisher Sidney L Flexible staging platform and the like
US4089148A (en) * 1975-10-06 1978-05-16 Oehmsen Plastic Greenhouse Mfg. Inc. Structural truss assembly
CN2176379Y (zh) * 1993-10-09 1994-09-07 张建锡 桁架机构伸缩式晾衣架
CN101215821A (zh) * 2007-12-29 2008-07-09 武汉武大巨成加固实业有限公司 移动式桥梁结构检测与维护装置
CN201747060U (zh) * 2010-05-19 2011-02-16 山东德建集团有限公司 组装式模板桁架支撑
CN202090283U (zh) * 2011-05-12 2011-12-28 广州市承信公路工程检验有限公司 一种可拼装、拆解的桥梁检测工作平台
CN102808373A (zh) * 2012-08-10 2012-12-05 南京工业大学 快速装配式张弦桁架人行钢桥
CN103437283A (zh) * 2013-08-21 2013-12-11 武汉武大巨成加固实业有限公司 一种能快速组装的吊篮桁架
CN203451999U (zh) * 2013-08-21 2014-02-26 武汉武大巨成加固实业有限公司 一种能快速组装的吊篮桁架

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2532286B2 (ja) * 1989-12-08 1996-09-11 川崎重工業株式会社 展開式構造物
JP4387600B2 (ja) * 2001-01-22 2009-12-16 光洋機械産業株式会社 支保工
CN201133114Y (zh) * 2007-10-17 2008-10-15 张松根 一种折叠式衍架
CN102635069A (zh) * 2012-03-20 2012-08-15 常州金马交通工程设备有限公司 一种组合桥梁桁架结构组装旋转架
CN102912718B (zh) * 2012-09-24 2014-09-17 同济大学 一种上拱幅度可自动调节的跨越结构
CN202881858U (zh) * 2012-11-07 2013-04-17 中铁六局集团有限公司 用于桁架拱桥立拼装施工的胎架

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3994036A (en) * 1972-09-18 1976-11-30 Fisher Sidney L Flexible staging platform and the like
US4089148A (en) * 1975-10-06 1978-05-16 Oehmsen Plastic Greenhouse Mfg. Inc. Structural truss assembly
CN2176379Y (zh) * 1993-10-09 1994-09-07 张建锡 桁架机构伸缩式晾衣架
CN101215821A (zh) * 2007-12-29 2008-07-09 武汉武大巨成加固实业有限公司 移动式桥梁结构检测与维护装置
CN201747060U (zh) * 2010-05-19 2011-02-16 山东德建集团有限公司 组装式模板桁架支撑
CN202090283U (zh) * 2011-05-12 2011-12-28 广州市承信公路工程检验有限公司 一种可拼装、拆解的桥梁检测工作平台
CN102808373A (zh) * 2012-08-10 2012-12-05 南京工业大学 快速装配式张弦桁架人行钢桥
CN103437283A (zh) * 2013-08-21 2013-12-11 武汉武大巨成加固实业有限公司 一种能快速组装的吊篮桁架
CN203451999U (zh) * 2013-08-21 2014-02-26 武汉武大巨成加固实业有限公司 一种能快速组装的吊篮桁架

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113309006A (zh) * 2021-07-01 2021-08-27 中交二航局第四工程有限公司 五排相邻并行悬浇连续梁错位同步设备及其施工方法
CN113309006B (zh) * 2021-07-01 2023-04-07 中交二航局第四工程有限公司 五排相邻并行悬浇连续梁错位同步设备及其施工方法

Also Published As

Publication number Publication date
CN103437283A (zh) 2013-12-11
CN103437283B (zh) 2015-08-26

Similar Documents

Publication Publication Date Title
WO2015024464A1 (fr) Ferme à montage rapide pour suspendre des nacelles
CN204662661U (zh) 大跨度双箱梁双索张弦桁架体系
TWI506190B (zh) 一種高層施工安全防護升降平臺
CN204571259U (zh) 一种适用于风机塔筒维修的环形检修平台
CN107902545B (zh) 一种马道风管吊装施工装置及施工工法
CN110468724B (zh) 一种空间缆索悬索桥主缆施工辅助装置及主缆施工方法
CN203531493U (zh) 火电厂框架式非金属组合烟囱
CN105350759A (zh) 一种悬挂式脚手架
CN205295918U (zh) 一种多用途制式拼装桁片
CN106522364B (zh) 一种用于体育场周边的“拉花”钢结构体系及其安装工艺
CN201665992U (zh) 大型钢网架整体提升平台
CN202530730U (zh) 炉内铝合金检修平台
CN203451999U (zh) 一种能快速组装的吊篮桁架
CN203361654U (zh) 预制钢架构件
CN212317426U (zh) 一种建筑施工用快速拆装折叠式脚手架
CN113006530B (zh) 一种预应力叠合板支撑装置及施工方法
CN113550550A (zh) 一种便于组合拆装的悬挑单元式脚手架
CN111188524B (zh) 全系列多功能收放式雷达塔及其施工方法
CN204038917U (zh) 可拆卸外挂式操作平台
CN203225074U (zh) 网架结构广告牌
CN203626212U (zh) 一种快速拆装式墩柱施工操作平台
CN202265776U (zh) 三角形桁架组合式桥用超长吊篮
CN205476662U (zh) 一种双曲线四管格构斜交网格钢结构冷却塔
CN214302782U (zh) 一种便携式脚手架
CN219365503U (zh) 一种高层建筑施工用安全防护装置

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 14837867

Country of ref document: EP

Kind code of ref document: A1

DPE1 Request for preliminary examination filed after expiration of 19th month from priority date (pct application filed from 20040101)
NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 14837867

Country of ref document: EP

Kind code of ref document: A1