WO2015011932A1 PCT/JP2014/003936 JP2014003936W WO2015011932A1 WO 2015011932 A1 WO2015011932 A1 WO 2015011932A1 JP 2014003936 W JP2014003936 W JP 2014003936W WO 2015011932 A1 WO2015011932 A1 WO 2015011932A1
Authority
WO
WIPO (PCT)
Prior art keywords
power
power generation
surplus
conversion device
information
Prior art date
Application number
PCT/JP2014/003936
Other languages
English (en)
French (fr)
Inventor
雅博 馬場
Original Assignee
京セラ株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 京セラ株式会社 filed Critical 京セラ株式会社
Priority to EP14829018.2A priority Critical patent/EP3026776B1/en
Priority to JP2015528157A priority patent/JP6223449B2/ja
Priority to US14/907,532 priority patent/US10074990B2/en
Publication of WO2015011932A1 publication Critical patent/WO2015011932A1/ja

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • H02J13/00004Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by the power network being locally controlled
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05FSYSTEMS FOR REGULATING ELECTRIC OR MAGNETIC VARIABLES
    • G05F1/00Automatic systems in which deviations of an electric quantity from one or more predetermined values are detected at the output of the system and fed back to a device within the system to restore the detected quantity to its predetermined value or values, i.e. retroactive systems
    • G05F1/66Regulating electric power
    • G05F1/67Regulating electric power to the maximum power available from a generator, e.g. from solar cell
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • H02J13/00002Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by monitoring
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • H02J3/381Dispersed generators
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J7/00Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
    • H02J7/34Parallel operation in networks using both storage and other dc sources, e.g. providing buffering
    • H02J7/345Parallel operation in networks using both storage and other dc sources, e.g. providing buffering using capacitors as storage or buffering devices
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J7/00Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
    • H02J7/34Parallel operation in networks using both storage and other dc sources, e.g. providing buffering
    • H02J7/35Parallel operation in networks using both storage and other dc sources, e.g. providing buffering with light sensitive cells
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02MAPPARATUS FOR CONVERSION BETWEEN AC AND AC, BETWEEN AC AND DC, OR BETWEEN DC AND DC, AND FOR USE WITH MAINS OR SIMILAR POWER SUPPLY SYSTEMS; CONVERSION OF DC OR AC INPUT POWER INTO SURGE OUTPUT POWER; CONTROL OR REGULATION THEREOF
    • H02M3/00Conversion of dc power input into dc power output
    • H02M3/02Conversion of dc power input into dc power output without intermediate conversion into ac
    • H02M3/04Conversion of dc power input into dc power output without intermediate conversion into ac by static converters
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02MAPPARATUS FOR CONVERSION BETWEEN AC AND AC, BETWEEN AC AND DC, OR BETWEEN DC AND DC, AND FOR USE WITH MAINS OR SIMILAR POWER SUPPLY SYSTEMS; CONVERSION OF DC OR AC INPUT POWER INTO SURGE OUTPUT POWER; CONTROL OR REGULATION THEREOF
    • H02M7/00Conversion of ac power input into dc power output; Conversion of dc power input into ac power output
    • H02M7/42Conversion of dc power input into ac power output without possibility of reversal
    • H02M7/44Conversion of dc power input into ac power output without possibility of reversal by static converters
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2203/00Indexing scheme relating to details of circuit arrangements for AC mains or AC distribution networks
    • H02J2203/20Simulating, e g planning, reliability check, modelling or computer assisted design [CAD]
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2300/00Systems for supplying or distributing electric power characterised by decentralized, dispersed, or local generation
    • H02J2300/20The dispersed energy generation being of renewable origin
    • H02J2300/22The renewable source being solar energy
    • H02J2300/24The renewable source being solar energy of photovoltaic origin
    • H02J2300/26The renewable source being solar energy of photovoltaic origin involving maximum power point tracking control for photovoltaic sources
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2310/00The network for supplying or distributing electric power characterised by its spatial reach or by the load
    • H02J2310/10The network having a local or delimited stationary reach
    • H02J2310/12The local stationary network supplying a household or a building
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02MAPPARATUS FOR CONVERSION BETWEEN AC AND AC, BETWEEN AC AND DC, OR BETWEEN DC AND DC, AND FOR USE WITH MAINS OR SIMILAR POWER SUPPLY SYSTEMS; CONVERSION OF DC OR AC INPUT POWER INTO SURGE OUTPUT POWER; CONTROL OR REGULATION THEREOF
    • H02M3/00Conversion of dc power input into dc power output
    • H02M3/02Conversion of dc power input into dc power output without intermediate conversion into ac
    • H02M3/04Conversion of dc power input into dc power output without intermediate conversion into ac by static converters
    • H02M3/10Conversion of dc power input into dc power output without intermediate conversion into ac by static converters using discharge tubes with control electrode or semiconductor devices with control electrode
    • H02M3/145Conversion of dc power input into dc power output without intermediate conversion into ac by static converters using discharge tubes with control electrode or semiconductor devices with control electrode using devices of a triode or transistor type requiring continuous application of a control signal
    • H02M3/155Conversion of dc power input into dc power output without intermediate conversion into ac by static converters using discharge tubes with control electrode or semiconductor devices with control electrode using devices of a triode or transistor type requiring continuous application of a control signal using semiconductor devices only
    • H02M3/156Conversion of dc power input into dc power output without intermediate conversion into ac by static converters using discharge tubes with control electrode or semiconductor devices with control electrode using devices of a triode or transistor type requiring continuous application of a control signal using semiconductor devices only with automatic control of output voltage or current, e.g. switching regulators
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B70/00Technologies for an efficient end-user side electric power management and consumption
    • Y02B70/30Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
    • Y02B70/3225Demand response systems, e.g. load shedding, peak shaving
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy
    • Y02E10/56Power conversion systems, e.g. maximum power point trackers
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E40/00Technologies for an efficient electrical power generation, transmission or distribution
    • Y02E40/70Smart grids as climate change mitigation technology in the energy generation sector
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/50Energy storage in industry with an added climate change mitigation effect
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/12Monitoring or controlling equipment for energy generation units, e.g. distributed energy generation [DER] or load-side generation
    • Y04S10/123Monitoring or controlling equipment for energy generation units, e.g. distributed energy generation [DER] or load-side generation the energy generation units being or involving renewable energy sources
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems
    • Y04S20/222Demand response systems, e.g. load shedding, peak shaving

Definitions

  • the present invention relates to a power conversion device, a power management device, and a power management method.
  • Patent Literature a technology for controlling a load provided to a consumer, a distributed power source provided to a consumer, and the like by a power management device (for example, HEMS; Home Energy Management System) provided for each consumer is known (Patent Literature). 1).
  • HEMS Home Energy Management System
  • a power generation device that generates power using natural energy, such as a solar power generation device, as a distributed power source.
  • natural energy such as a solar power generation device
  • the amount of power generated by the generation of natural energy can vary depending on various factors, but it is sometimes necessary to predict the amount of power generated in order to control each device by the power management apparatus. Therefore, it has been proposed to predict solar radiation intensity based on past solar radiation intensity and weather information, etc., convert the predicted solar radiation intensity into the amount of photovoltaic power generation, and calculate it as a predicted value (see Patent Document 2). ).
  • JP 2003-309928 A Japanese Patent Laying-Open No. 2005-086953
  • a conventional power conversion device such as a power conditioner does not notify the power management device of surplus information regarding the power generation capacity of the power generation device, and the power management device controls the operation of the load device based on the surplus power information. I could't.
  • An object of the present invention made in view of such circumstances is to provide a power conversion device, a power management device, and a power management method capable of communicating surplus information relating to the power generation capacity of the power generation device.
  • a power conversion device is a power conversion device that converts power of a power generation device and supplies the power to a load in a consumer, and acquires a power generation surplus of the power generation device. And a communication unit that transmits surplus information relating to the surplus power generation capacity to an external power management apparatus.
  • the communication unit periodically transmits the remaining power information.
  • the communication unit transmits the surplus information when the control unit newly acquires the surplus information.
  • the communication unit transmits the surplus information using an INFO command in the ECHONET Lite (registered trademark) standard.
  • the communication unit when the communication unit receives a request for the surplus information from the power management device, the communication unit transmits the surplus information as a response.
  • the communication unit receives the request by a GET command in the ECHONET Lite standard.
  • the power conversion device includes a plurality of input units for inputting generated power from a plurality of power generation devices of the same type, and the control unit includes at least one input unit among the plurality of input units.
  • MPPT control is performed preferentially, and a power generation surplus of a power generator connected to another input unit is calculated and acquired using a power generation current of the power generator connected to the input unit.
  • control unit acquires the power generation surplus during the independent operation disconnected from the power system.
  • each of the plurality of power generation devices is a solar cell string in which a plurality of solar cell modules are connected in series.
  • the plurality of solar cell modules all have the same characteristics.
  • a power management device is a power management device capable of communicating with a power conversion device that converts power of a power generation device, and the power generation surplus of the power generation device from the power conversion device.
  • the communication part which receives the surplus information regarding is provided.
  • the communication unit when the communication unit controls the operation of a load device connected to the power conversion apparatus, the communication unit requests the remaining power information from the power conversion apparatus, It is characterized by receiving surplus information.
  • the communication unit requests the surplus information using a GET command of ECHONET Lite.
  • a power management method includes a power conversion device that converts power of a power generation device, and a power management device that controls the operation of a load device connected to the power conversion device.
  • the power conversion device can communicate the surplus information regarding the remaining power generation capacity of the power generation device, and the power management device can control the operation of the load device based on the surplus power information.
  • FIG. 1 is a block diagram illustrating a configuration example of a system including a power conversion device according to an embodiment of the present invention.
  • a power conversion device (power conditioner) 1 includes a plurality of DC / DC converters (input units) 11, an intermediate link capacitor 12, an inverter 13, a control unit 14, a communication unit 15, and the like. Is provided.
  • the power conversion system includes a power conversion device 1 and a plurality of power generation devices (DC input power supplies) 10.
  • the output of the power converter device 1 in FIG. 1 is a single phase 2 wire system, the format of an output is not restricted to this, For example, a 3 phase system may be sufficient.
  • the power conversion device 1 converts the DC power input from the plurality of connected power generation devices 10 into power.
  • the power conversion apparatus 1 is normally connected to the power system and performs a connected operation. When a power failure occurs in the power system, the power conversion apparatus 1 performs the independent operation by releasing the connection and supplies the load in the consumer. .
  • the power generator 10 outputs DC power.
  • Each of the plurality of power generation devices 10 is a distributed power source such as a solar cell string, a wind power generator, or a fuel cell in which a plurality of solar cell modules that convert sunlight into DC power are connected in series. It is preferable that the plurality of solar cell modules have the same characteristics such as output characteristics by using exactly the same modules.
  • the DC / DC converter (input unit) 11 boosts the voltage input from a plurality of power generators 10 of the same type and aligns them to a constant voltage.
  • the number of the power generation devices 10 and the DC / DC converters 11 is three will be described.
  • the number of the power generation devices 10 and the DC / DC converters 11 may be two or more.
  • the intermediate link capacitor 12 smoothes the DC voltage boosted by the DC / DC converter 11 and stabilizes the input voltage to the inverter 13.
  • a smoothing capacitor may be further provided in each DC / DC converter 11 in order to stabilize the output voltage.
  • the inverter 13 inputs the output voltage of the DC / DC converter 11 at once and converts the DC voltage smoothed by the intermediate link capacitor 12 into an AC voltage.
  • the inverter 13 is normally connected to the power system, but performs an independent operation during a power failure or the like, and disconnects from the power system and supplies AC power to the AC input device (load device) 3.
  • FIG. 1 the connection of the power converter device 1 and the alternating current input device 3 at the time of independent operation is shown.
  • the control unit 14 controls the output of the DC / DC converter 11 and the inverter 13 by controlling the duty ratio of the switching elements of the DC / DC converter 11 and the inverter 13. Moreover, the control part 14 calculates and acquires the power generation surplus of the electric power generating apparatus 10 at the time of the independent operation disconnected from the electric power grid
  • the communication unit 15 acquires the surplus information indicating the power generation capacity of the power generation apparatus 10 from the control unit 14 and transmits a communication message including the surplus information to the power management apparatus 2.
  • the communication unit 15 may transmit the surplus information when the surplus information is newly obtained from the control unit 14, or may transmit the surplus information periodically at predetermined time intervals. In addition, when the power management device 2 requests surplus information, the communication unit 15 may transmit the surplus information as a response.
  • the power management apparatus 2 is an apparatus that controls the operation of a load device connected to the power conversion apparatus 1. Depending on the management target, the power management apparatus 2 includes HEMS (Home Energy Management System), BEMS (Building Energy Management System), and FEMS (Factory Energy Management System). ), CEMS (Community Energy Management System).
  • the power management apparatus 2 includes a communication unit 22 for communicating with the outside.
  • the communication unit 22 receives power generation surplus information from the communication unit 15, acquires information on power consumption such as ratings from the AC input device 3, and controls the AC input device 3 based on these information.
  • the communication unit 22 may request the power conversion device 1 for the remaining power information and receive the remaining power information as a response.
  • FIG. 2 is a block diagram illustrating another configuration example of the power conversion apparatus 1.
  • the power conversion device 1 illustrated in FIG. 2 further includes a DC / DC converter 16 on the output side as compared with the power conversion device 1 illustrated in FIG.
  • the DC / DC converter 16 converts the direct-current voltage smoothed by the intermediate link capacitor 12 into a predetermined direct-current voltage, and supplies direct-current power to the direct-current input device 4 during independent operation. By providing the DC / DC converter 16, power can be directly supplied to the DC input device 4.
  • the power conversion device 1 includes a power converter on the output side.
  • the power converter may be only the inverter 13 as shown in FIG. 1, or may be the inverter 13 and the DC / DC converter 16 connected in parallel as shown in FIG.
  • the power converter may be only the DC / DC converter 16 or may be an inverter 13 and a DC / DC converter 16 connected in parallel in any number.
  • FIG. 3 is a diagram illustrating an example of a circuit diagram of the DC / DC converter 11 in the power conversion device 1.
  • a control unit 14 that controls the DC / DC converter 11 is also shown.
  • FIG. 3 shows a general non-isolated boost converter, the specific circuit configuration is not limited to this, and the impedance viewed from the input power source can be changed, and each input power can be set as desired. Any function that can be controlled independently of the value may be used.
  • the control unit 14 includes the input voltage of each DC / DC converter 11 detected by the input voltage sensor 19 (19-1, 19-2, 19-3) and the input current sensor 20 (20-1, 20-2, 20-3) monitoring the input current of each DC / DC converter 11 detected by 20-3) and the intermediate link voltage of the inverter 13 detected by the intermediate link voltage sensor 21, and based on these, the DC / DC converter 11 A PWM signal for the switching element 18 (18-1, 18-2, 18-3) is generated. Details of the control for the DC / DC converter 11 will be described later.
  • FIG. 4 is a block diagram illustrating functions of the control unit 14 in the power conversion apparatus 1. The operation of the control unit 14 will be described with reference to FIG.
  • the duty ratio control unit 141-1 controls the duty ratio used to generate a PWM signal for the DC / DC converter 11-1.
  • the duty ratio control unit 141-2 controls the duty ratio used for generating the PWM signal for the DC / DC converter 11-2
  • the duty ratio control unit 141-3 is the DC / DC converter 11-. 3 to control the duty ratio used to generate the PWM signal.
  • the duty ratio control units 141-2 and 141-3 perform the same control as the duty ratio control unit 141-1, and the internal block diagram is the same as that of the duty ratio control unit 141-1. Yes.
  • the control mode determination unit 142 determines the control mode to be MPPT control during the interconnected operation. In the MPPT control, control is performed so that the generated power obtained from the power generation device 10 is maximized.
  • the control mode determination unit 142 determines the control mode to be either MPPT control or load following control according to the intermediate link voltage detected by the intermediate link voltage sensor 21 during the self-sustaining operation. For example, when the maximum generated power of each power generator 10 is 200 W and the power consumption of the AC input device 3 is 500 W, the DC / DC converters 11-1 and 11-2 are MPPT controlled to obtain 400 W of power, and the DC / The DC converter 11-3 is subjected to load following control to obtain the remaining 100W of power. In this way, the generated power of the entire power generation apparatus 10 is made to follow the power consumption of the load.
  • the MPPT control unit 143 monitors the input voltage detected by the input voltage sensor 19 and the input current detected by the input current sensor 20. Then, the MPPT control unit 143 determines an operating voltage for maximizing the input power to the power conversion device 1 when the MPPT control is determined by the control mode determination unit 142. In the example shown in FIG. 4, tracking is performed by the input voltage, but the specific method of MPPT control is not limited to this.
  • the load follow-up control unit 144 determines the operation voltage so that the intermediate link voltage detected by the intermediate link voltage sensor 21 becomes the target voltage when the control mode determination unit 142 determines the load follow-up control.
  • the input voltage control unit 145 compares the input voltage detected by the input voltage sensor 19 with the operation voltage command value determined by the MPPT control unit 143 or the load follow-up control unit 144, so that the difference is equal to zero. Perform feedback control to change the ratio. In the example shown in FIG. 4, control is performed using the operating voltage of the input power supply as a command value, but any control unit 14 may be used so long as it switches between MPPT control and load following control by the intermediate link voltage. Therefore, control (feedback control with input current) may be performed with the operating current of the input power supply.
  • the PWM unit 147 generates a PWM signal by comparing the reference waveform synchronized with the clock generated by the clock generation unit 146 and the duty ratio generated by the input voltage control unit 145. Then, a PWM signal is output to each DC / DC converter 11.
  • the power generation surplus calculation unit 148 is connected to another DC / DC converter 11 using the power generation current of the power generation apparatus 10 connected to the DC / DC converter 11 that is MPPT-controlled during the independent operation disconnected from the power system.
  • the power generation capacity of the power generation device 10 is calculated, and surplus information indicating the power generation capacity is output to the communication unit 15. A specific calculation method will be described later.
  • FIG. 5 is a flowchart showing the operation of the control unit 14.
  • the control unit 14 performs a grid operation and performs MPPT control on all the DC / DC converters 11 (step S102).
  • step S101 When a power failure occurs (step S101—Yes), the control unit 14 cancels the interconnection and performs a self-sustained operation to preferentially perform MPPT control on at least one DC / DC converter 11 (step S103). The reason for this will be described with reference to FIGS.
  • FIG. 6 is a diagram showing current-voltage characteristics when the power generation device 10 is a solar cell string, where the horizontal axis represents the output voltage and the vertical axis represents the output current.
  • the output voltage of the solar cell string is determined by the number of solar cell modules and the temperature, and changes little.
  • the output current of the solar cell string varies greatly depending on the amount of solar radiation, and the output current decreases as the amount of solar radiation decreases. That is, when the amount of solar radiation changes, the maximum generated power depends on the generated current.
  • FIG. 7 is a diagram schematically showing voltages and currents generated by the three power generation devices 10-1, 10-2, and 10-3.
  • the maximum generated power increases in the order of the power generation device 10-1, the power generation device 10-2, and the power generation device 10-3.
  • the area of the portion surrounded by the broken line indicates the maximum generated power during the interconnection operation (that is, during MPPT control), and the area of the hatched portion indicates the generated power during the independent operation.
  • the power generation voltages V1 M , V2 M , and V3 M of each power generation device 10 during MPPT control have different values depending on the number of solar cell modules of the power generation device 10.
  • the control unit 14 preferentially performs MPPT control on the DC / DC converter 11-1 to which the power generator 10-1 having the smallest maximum generated power is connected during the self-sustaining operation. Thereby, the value of the maximum generated current can be acquired at an early stage.
  • the MPPT control is performed on the DC / DC converter 11-1 preferentially.
  • the control unit 14 performs MPPT control on the DC / DC converter 11-1 to obtain 100 W from the power generation apparatus 10-1. For the remaining 100 W, the control unit 14 performs load following control on the DC / DC converters 11-2 and 11-3 so that the total power obtained from the power generation apparatus 10-2 and the power generation apparatus 10-3 is 100 W. Alternatively, only one of the DC / DC converters 11-2 and 11-3 may be subjected to load following control, and control may be performed so as to obtain 100 W from only one of the power generation devices 10-2 and 10-3. .
  • the power generation surplus calculation unit 148 acquires the value of the power generation current I1 M of the power generation apparatus 10-1 from the input current sensor 20-1 (step S104). Then, the power generation surplus calculation unit 148 uses the power generation current I1 M of the power generation device 10-1 to calculate the power generation surplus of the remaining power generation devices 10-1 and 10-2 as the difference between the maximum power generation power and the current power generation power. (Step S105).
  • the power generation surplus calculation unit 148 stores the values of the power generation voltages V2 M and V3 M of the power generation apparatuses 10-2 and 10-3 during the interconnection operation (that is, during MPPT control), and stores the values of the power generation apparatus 10-2.
  • the maximum generated power P2 M is calculated from I1 M ⁇ V2 M
  • the maximum generated power P3 M of the power generation apparatus 10-3 is calculated from I1 M ⁇ V3 M.
  • the power generation surplus calculation unit 148 calculates the power generation surplus of the power generation apparatus 10-2 by P2 M ⁇ (I2 L ⁇ V2 L ). To do.
  • Power margin calculating unit 148 obtains a current value I2 L from the input current sensor 20-2, to obtain the voltage value V2 L from the input voltage sensor 19-2. As described above, the power generation surplus calculation unit 148 calculates the power generation surplus of the other power generation devices 10-1 and 10-2 using the power generation current I1 M of the power generation device 10-1.
  • the solar radiation amount for each power generation device 10 can be regarded as the same has been described, but the solar radiation amount for each power generation device 10 may be different, for example, when each power generation device 10 is installed in each direction of a dormitory roof. is there.
  • FIG. 8 is a diagram illustrating the power generation amount when the solar radiation amount between the power generation apparatuses 10 is different.
  • the power generation device 10-1 is installed on the west roof
  • the power generation device 10-2 is installed on the east roof
  • the power generation device 10-3 is installed on the south roof
  • each of the generated currents during the interconnection operation The values of I1 M , I2 M and I3 M are different. Further, the values of the generated currents I1 M , I2 M , and I3 M also fluctuate depending on the amount of solar radiation.
  • FIG. 8A shows a case where the amount of solar radiation at 10 am is large, and FIG. The maximum generated power when the amount of solar radiation is small is shown.
  • the power generation surplus calculation unit 148 calculates the ratio of the maximum power generation or power generation current of each power generation device 10 during the interconnection operation. Is stored together with the time information.
  • the power generation surplus calculation unit 148 performs the ratio of the maximum power generation P1 M , P2 M , P3 M of each power generation device 10 or the maximum power generation current I1 M of the power generation device 10 during the interconnected operation (MPPT control). , I2 M , I3 M ratios are stored. Then, during the self-sustaining operation, the power generation surplus is calculated based on the stored maximum generated power ratio or maximum generated current ratio.
  • the power generation surplus calculation unit 148 calculates the value of the power generation current I1 M of the power generation apparatus 10-1 acquired from the input current sensor 20-1 and the input voltage sensor 19-1. From the value of the generated voltage V1 M acquired from the above, the maximum generated power P1 M is calculated from I1 M ⁇ V1 M , and the maximum generated power P2 M and P3 M are calculated from the maximum generated power ratio.
  • the power generation surplus power calculation unit 148 acquires the value of the power generation current I1 M of the power generation device 10-1 from the input current sensor 20-1, and the maximum power generation current I2 M and I3 M are calculated from the maximum generated current ratio, the maximum generated power P2 M is calculated from I1 M ⁇ V2 M , and the maximum generated power P3 M is calculated from I1 M ⁇ V3 M.
  • the maximum generated power is obtained, the difference from the actual generated power is calculated as the power generation surplus.
  • FIG. 9 is a sequence diagram showing the operation of the power conversion device 1, the power management device 2, and the AC input device 3 during the self-sustaining operation, and shows the sequence after the power generation surplus calculation of the power conversion device 1.
  • the control unit 14 of the power conversion apparatus 1 calculates the power generation surplus as needed during the self-sustaining operation period by the above-described method (step S201).
  • the communication unit 22 of the power management apparatus 2 transmits a message for inquiring about ratings such as a use current and a use voltage to the AC input device 3 which is a load device to be activated (step S202).
  • the AC input device 3 responds to the rating inquiry and notifies the power management device 2 of the rating (step S203).
  • the power management device 2 calculates the power necessary for the execution of the AC input device 3 (step S204).
  • the communication unit 22 of the power management apparatus 2 transmits a message for inquiring the surplus information to the power conversion apparatus 1 (step S205).
  • the communication unit 15 of the power conversion device 1 responds to the inquiry about the surplus power information, and transmits the surplus information on the surplus power calculated in step S201 to the power management device 2 (step S206).
  • the power management which communicates the information regarding electric power between the power converter 1 which converts the electric power of the electric power generating apparatus 10, and the power management apparatus 2 which controls operation
  • the method includes the steps of the power conversion device 1 acquiring the power generation surplus of the power generation device 10 and the power conversion device 1 transmitting surplus information regarding the power generation surplus to the power management device 2.
  • the communication between the power conversion device 1 and the power management device 2 uses communication protocols of various standards such as ECHONET Lite (registered trademark), ZigBee (registered trademark) smart energy profile, and KNX (registered trademark). Can be done.
  • ECHONET Lite registered trademark
  • ZigBee registered trademark
  • KNX registered trademark
  • the communication unit 22 of the power management apparatus 2 requests the surplus information using a GET command defined in the ECHONET Lite standard, so that it can be used between devices that comply with the standard. It becomes easy to ensure versatility (step S205).
  • the power management apparatus 2 determines whether or not the AC input device 3 can be operated based on the power necessary for the execution of the AC input device 3 calculated in step S204 and the remaining power information acquired in step S206. (Step S207).
  • FIG. 9 shows a case where the power management apparatus 2 determines that the AC input device 3 can be operated, and requests the AC input device 3 to start (step S208). Then, the AC input device 3 returns a confirmation response to the power management apparatus 2 (step S209), and activates the AC input device 3 (step S210).
  • the power management apparatus 2 determines that the AC input device 3 cannot be operated, for example, the user is notified that the AC input device 3 cannot be started due to insufficient power generation capacity.
  • the communication unit 15 may transmit the surplus information regarding the surplus power calculated in step S201 to the power management apparatus 2 periodically or whenever new surplus information is acquired from the control unit 14. In this case, there is no need to make an inquiry about the remaining power information of the power management apparatus 2 (step S205).
  • ECHONET Lite is used as a communication protocol, the communication unit 15 can easily ensure versatility between devices compliant with the standard by transmitting surplus information using an INFO command defined in ECHONET Lite.
  • the control unit 14 acquires the power generation surplus of the power generation device 10, and the communication unit 15 transmits the surplus information regarding the power generation surplus to the external power management device 2. Therefore, the power management apparatus 2 can control the operation of the load device based on the surplus information.
  • the power conversion device acquires and notifies the power generation surplus of another wind power generator by operating at least one wind power generator by MPPT control. Can do.

Abstract

 発電装置の発電余力に関する余力情報を通信可能とする。 電力変換装置1は、発電装置10の発電余力を取得する制御部14と、発電余力に関する余力情報を外部の電力管理装置2に送信する通信部15と、を備える。

Description

電力変換装置、電力管理装置、および電力管理方法 関連出願の相互参照
 本出願は、2013年7月26日に出願された日本国特許出願2013-155935号の優先権を主張するものであり、この先の出願の開示全体をここに参照のために取り込む。
 本発明は、電力変換装置、電力管理装置、および電力管理方法に関する。
 近年、需要家毎に設けられる電力管理装置(例えば、HEMS;Home Energy Management System)によって、需要家に設けられる負荷や需要家に設けられる分散電源などを制御する技術が知られている(特許文献1参照)。
 また、分散電源として、例えば太陽光発電装置などの自然エネルギーにより発電を行う発電装置を用いることが考えられている。自然エネルギーによる発電における発電量は様々な要因により変動し得るが、電力管理装置による各機器の制御のためには、発電量の予測が必要となることがある。そこで、過去の日射強度および気象情報などに基づいて日射強度を予測し、予測した日射強度を太陽光発電の発電量に換算し、予測値として算出することが提案されている(特許文献2参照)。
特開2003-309928号公報 特開2005-086953号公報
 しかしながら、従来のパワーコンディショナーなどの電力変換装置は、発電装置の発電余力に関する余力情報を電力管理装置に対して通知するものではなく、電力管理装置は余力情報に基づいて負荷機器の動作を制御することができなかった。
 かかる事情に鑑みてなされた本発明の目的は、発電装置の発電余力に関する余力情報を通信可能な電力変換装置、電力管理装置、および電力管理方法を提供することにある。
 上記課題を解決するため、本発明に係る電力変換装置は、発電装置の電力を変換し、需要家内の負荷に供給を行う電力変換装置であって、前記発電装置の発電余力を取得する制御部と、前記発電余力に関する余力情報を外部の電力管理装置に送信する通信部と、を備えることを特徴とする。
 さらに、本発明に係る電力変換装置において、前記通信部は、定期的に前記余力情報を送信することを特徴とする。
 さらに、本発明に係る電力変換装置において、前記通信部は、前記制御部が余力情報を新たに取得すると、前記余力情報を送信することを特徴とする。
 さらに、本発明に係る電力変換装置において、前記通信部は、前記余力情報をECHONET Lite(登録商標)規格におけるINFOコマンドを用いて送信することを特徴とする。
 さらに、本発明に係る電力変換装置において、前記通信部は、前記電力管理装置から前記余力情報の要求を受信すると、その応答として前記余力情報を送信することを特徴とする。
 さらに、本発明に係る電力変換装置において、前記通信部は、前記要求をECHONET Lite規格におけるGETコマンドにより受信することを特徴とする。
 さらに、本発明に係る電力変換装置において、同種の複数の発電装置からそれぞれの発電電力を入力する複数の入力部を備え、前記制御部は、前記複数の入力部のうち少なくとも1つの入力部を優先的にMPPT制御し、該入力部に接続される発電装置の発電電流を用いて、他の入力部に接続される発電装置の発電余力を算出して取得することを特徴とする。
 さらに、本発明に係る電力変換装置において、前記制御部は、電力系統から解列した自立運転時に、前記発電余力を取得することを特徴とする。
さらに、本発明に係る電力変換装置において、前記複数の発電装置のそれぞれは、複数の太陽電池モジュールを直列接続した太陽電池ストリングであることを特徴とする。
 さらに、本発明に係る電力変換装置において、前記複数の太陽電池モジュールは全て同じ特性を有することを特徴とする。
 また、上記課題を解決するため、本発明に係る電力管理装置は、発電装置の電力を変換する電力変換装置と通信可能な電力管理装置であって、前記電力変換装置から前記発電装置の発電余力に関する余力情報を受信する通信部を備えることを特徴とする。
 さらに、本発明に係る電力管理装置において、前記通信部は、前記電力変換装置に接続される負荷機器の動作を制御する際に、前記電力変換装置に前記余力情報を要求し、その応答として前記余力情報を受信することを特徴とする。
 さらに、本発明に係る電力管理装置において、前記通信部は、前記余力情報をECHONET LiteのGETコマンドを用いて要求することを特徴とする。
 また、上記課題を解決するため、本発明に係る電力管理方法は、発電装置の電力を変換する電力変換装置と、該電力変換装置に接続される負荷機器の動作を制御する電力管理装置との間で電力に関する情報を通信する電力管理方法であって、前記電力変換装置が、前記発電装置の発電余力を取得するステップと、前記電力変換装置が前記電力管理装置に対し、前記発電余力に関する余力情報を送信するステップと、を含むことを特徴とする。
 本発明によれば、電力変換装置は発電装置の発電余力に関する余力情報を通信でき、電力管理装置は余力情報に基づいて負荷機器の動作を制御することができるようになる。
本発明の一実施形態に係る電力変換装置を備えるシステムの構成例を示すブロック図である。 本発明の一実施形態に係る電力変換装置の他の構成例を示すブロック図である。 本発明の一実施形態に係る電力変換装置におけるDC/DCコンバータの回路図を示す図である。 本発明の一実施形態に係る電力変換装置における制御部の機能を示すブロック図である。 本発明の一実施形態に係る電力変換装置における制御部の動作を示すフローチャートである。 本発明の一実施形態に係る電力変換装置における発電装置の電流-電圧特性を示す図である。 本発明の一実施形態に係る電力変換装置における発電装置の発電電力を示す図である。 本発明の一実施形態に係る電力変換装置における発電装置の、日射量が異なる場合の発電電力を示す図である。 本発明の一実施形態に係る電力変換装置を備えるシステムの動作を示すシーケンス図である。
 以下、本発明による一実施形態について、図面を参照して詳細に説明する。
 図1は、本発明の一実施形態に係る電力変換装置を備えるシステムの構成例を示すブロック図である。図1に示すように、電力変換装置(パワーコンディショナ)1は、複数のDC/DCコンバータ(入力部)11と、中間リンクコンデンサ12と、インバータ13と、制御部14と、通信部15とを備える。電力変換システムは、電力変換装置1と、複数の発電装置(直流入力電源)10とからなる。なお、図1における電力変換装置1の出力は単相2線式であるが、出力の形式はこれに限らず例えば3相式であってもよい。
 電力変換装置1は、接続される複数の発電装置10から入力される直流電力を電力変換する。電力変換装置1は、通常は電力系統に連系して連系運転を行い、電力系統に停電が発生した際には連系を解除して自立運転を行い、需要家内の負荷に供給を行う。
 発電装置10は、直流電力を出力する。複数の発電装置10のそれぞれは、例えば太陽光を直流電力に変換する複数の太陽電池モジュールを直列接続した太陽電池ストリング、風力発電機、または燃料電池などの分散型電源である。複数の太陽電池モジュールは、それぞれ全く同一のモジュールを用いるなどして、出力特性などの特性を全て同一とするのが好適である。
 DC/DCコンバータ(入力部)11は、同種の複数の発電装置10から入力される電圧を昇圧して一定の電圧に揃える。なお、本実施形態では発電装置10及びDC/DCコンバータ11の数が3つの場合について説明するが、発電装置10及びDC/DCコンバータ11の数は2つ以上であればよい。
 中間リンクコンデンサ12は、DC/DCコンバータ11により昇圧された直流電圧を平滑化し、インバータ13への入力電圧を安定させる。なお、各DC/DCコンバータ11内に、出力電圧を安定させるために、更に平滑化用のコンデンサを設けてもよい。
 インバータ13は、DC/DCコンバータ11の出力電圧を一括して入力し、中間リンクコンデンサ12により平滑化された直流電圧を交流電圧に変換する。インバータ13は、通常時には電力系統に連系するが、停電時等には自立運転を行い、電力系統から解列して交流入力機器(負荷機器)3に交流電力を供給する。図1では、自立運転時における電力変換装置1と交流入力機器3との接続を示している。
 制御部14は、DC/DCコンバータ11及びインバータ13のスイッチング素子のデューティ比を制御することにより、DC/DCコンバータ11及びインバータ13の出力を制御する。また、制御部14は、電力系統から解列した自立運転時に、発電装置10の発電余力を算出して取得する。その際、制御部14は少なくとも1つのDC/DCコンバータ11を優先的にMPPT制御し、該DC/DCコンバータ11に接続される発電装置10の発電電流を用いて、他のDC/DCコンバータ11に接続される発電装置10の発電余力を算出する。
 通信部15は、制御部14から発電装置10の発電余力を示す余力情報を取得し、余力情報を含む通信メッセージを電力管理装置2に送信する。通信部15は、制御部14から新規に余力情報を得たときに余力情報を送信するようにしてもよいし、所定の時間ごとに定期的に前記余力情報を送信するようにしてもよい。また、通信部15は、電力管理装置2から余力情報を要求されると、その応答として余力情報を送信するようにしてもよい。
 電力管理装置2は、電力変換装置1に接続される負荷機器の動作を制御する装置であり、管理対象によりHEMS(Home Energy Management System)、BEMS(Building Energy Management System)、FEMS(Factory Energy Management System)、CEMS(Community Energy Management System)と称される。電力管理装置2は、外部と通信を行うための通信部22を備える。
 通信部22は、通信部15から発電余力情報を受信するとともに交流入力機器3から定格などの消費電力に関する情報を取得し、これらの情報に基づいて交流入力機器3を制御する。通信部22は、負荷機器の動作を制御する際に、電力変換装置1に余力情報を要求し、その応答として余力情報を受信するようにしてもよい。
 図2は、電力変換装置1の他の構成例を示すブロック図である。図2に示す電力変換装置1は、図1に示した電力変換装置1と比較して、出力側に更にDC/DCコンバータ16を備える。DC/DCコンバータ16は、中間リンクコンデンサ12により平滑化された直流電圧を所定の直流電圧に変換し、自立運転時に直流入力機器4に直流電力を供給する。DC/DCコンバータ16を備えることで、直流入力機器4に対して直接電力を供給することができる。
 このように、電力変換装置1は、出力側に電力変換器を備える。電力変換器は、図1に示すようにインバータ13のみであってもよいし、図2に示すように並列接続されたインバータ13及びDC/DCコンバータ16であってもよい。また、図示していないが、電力変換器はDC/DCコンバータ16のみであってもよいし、インバータ13及びDC/DCコンバータ16をそれぞれ任意の個数並列接続したものであってもよい。
 図3は、電力変換装置1におけるDC/DCコンバータ11の回路図の一例を示す図である。あわせて、DC/DCコンバータ11に対する制御を行う制御部14も示している。図3には一般的な非絶縁型ブーストコンバータを示しているが、具体的な回路構成はこれに限定されるものではなく、入力電源から見たインピーダンスを変更可能で、各入力電力を所望の値に独立して制御できる機能を有するものであればよい。
 制御部14は、入力電圧センサ19(19-1,19-2,19-3)により検出される各DC/DCコンバータ11の入力電圧と、入力電流センサ20(20-1,20-2,20-3)により検出される各DC/DCコンバータ11の入力電流と、中間リンク電圧センサ21により検出されるインバータ13の中間リンク電圧とを監視し、これらに基づいて各DC/DCコンバータ11のスイッチング素子18(18-1,18-2,18-3)に対するPWM信号を生成する。DC/DCコンバータ11に対する制御の詳細については後述する。
 図4は、電力変換装置1における制御部14の機能を示すブロック図である。図4を参照して制御部14の動作を説明する。
 デューティ比制御部141-1は、DC/DCコンバータ11-1に対するPWM信号を生成するために用いられるデューティ比を制御する。同様に、デューティ比制御部141-2は、DC/DCコンバータ11-2に対するPWM信号を生成するために用いられるデューティ比を制御し、デューティ比制御部141-3は、DC/DCコンバータ11-3に対するPWM信号を生成するために用いられるデューティ比を制御する。なお、デューティ比制御部141-2,141-3はデューティ比制御部141-1と同じ制御を行い、内部のブロック図はデューティ比制御部141-1と同じであるため、図示を省略している。
 制御モード判定部142は、連系運転時には制御モードをMPPT制御に決定する。MPPT制御では、発電装置10から得られる発電電力が最大になるように制御する。
 一方、自立運転時に全てのDC/DCコンバータ11をMPPT制御すると、交流入力機器3の消費電力と発電装置10の発電電力とのバランスが崩れてしまう。また、自立運転時に全てのDC/DCコンバータ11を負荷追従制御すると、発電装置10は最大電力で発電することが困難となる。負荷追従制御では、負荷の消費電力と入力電源の発電電力とが同じになるようにDC/DCコンバータ11の出力電圧を制御する。負荷の消費電力に追従しようとしてある発電装置10が最大電力点を乗り越えると、その発電装置10の発電電力が減少し、他の発電装置10が連鎖的に最大電力点を乗り越えるため、最終的に発電電力不足で停止するおそれがある。
 そのため、制御モード判定部142は、自立運転時には中間リンク電圧センサ21により検出した中間リンク電圧に応じて、制御モードをMPPT制御又は負荷追従制御のいずれかに決定する。例えば、各発電装置10の最大発電電力が200Wで、交流入力機器3の消費電力が500Wの場合、DC/DCコンバータ11-1および11-2をMPPT制御して400Wの電力を得て、DC/DCコンバータ11-3を負荷追従制御して残りの100Wの電力を得る。このようにして、発電装置10全体の発電電力を負荷の消費電力に追従させる。
 MPPT制御部143は、入力電圧センサ19により検出した入力電圧、及び入力電流センサ20により検出した入力電流を監視している。そして、MPPT制御部143は、制御モード判定部142によりMPPT制御と決定された場合に、電力変換装置1への入力電力を最大限とするための動作電圧を決定する。なお、図4に示す例では入力電圧による追従を行っているが、MPPT制御の具体的な方式はこれに限られるものではない。
 負荷追従制御部144は、制御モード判定部142により負荷追従制御と決定された場合に、中間リンク電圧センサ21により検出した中間リンク電圧が目標電圧となるように、動作電圧を決定する。
 入力電圧制御部145は、入力電圧センサ19により検出した入力電圧と、MPPT制御部143又は負荷追従制御部144により決定された動作電圧指令値とを比較し、その差が0に等しくなるようデューティ比を変化させるフィードバック制御を行う。図4に示す例では入力電源の動作電圧を指令値とする制御を行っているが、制御部14が中間リンク電圧によりMPPT制御と負荷追従制御とを切り替えるように制御するものであればよい。よって、入力電源の動作電流で制御(入力電流でフィードバック制御)を行ってもよい。
 PWMユニット147は、クロック生成部146により生成されたクロックに同期した基準波形と、入力電圧制御部145によって生成されたデューティ比とを比較することで、PWM信号を生成する。そして、各DC/DCコンバータ11に対してPWM信号を出力する。
 発電余力算出部148は、電力系統から解列した自立運転時に、MPPT制御されるDC/DCコンバータ11に接続される発電装置10の発電電流を用いて、他のDC/DCコンバータ11に接続される発電装置10の発電余力を算出し、発電余力を示す余力情報を通信部15に出力する。具体的な算出方法については後述する。
 図5は、制御部14の動作を示すフローチャートである。停電が発生していない場合には(ステップS101-No)、制御部14は、連系運転を行い、全てのDC/DCコンバータ11をMPPT制御する(ステップS102)。
 停電が発生した場合には(ステップS101-Yes)、制御部14は、連系を解除して自立運転を行い、少なくとも1つのDC/DCコンバータ11を優先的にMPPT制御する(ステップS103)。この理由を、図6,7を参照して説明する。
 図6は、発電装置10が太陽電池ストリングである場合の電流-電圧特性を示す図であり、横軸に出力電圧、縦軸に出力電流を示している。太陽電池ストリングの出力電圧は、太陽電池モジュール数および温度によって決定され、変化は少ない。一方、太陽電池ストリングの出力電流は、日射量によって大きく変化し、日射量が少なくなると出力電流は低下する。つまり、日射量が変化する場合、最大発電電力は発電電流に依存する。
 図7は、3つの発電装置10-1,10-2,10-3が発電する電圧および電流を模式的に示す図である。以下、本実施形態では、発電装置10-1、発電装置10-2、発電装置10-3の順に最大発電電力が大きくなるものとする。破線で囲われた部分の面積は連系運転時(つまり、MPPT制御時)の最大発電電力を示しており、斜線が施された部分の面積は自立運転時の発電電力を示している。
 MPPT制御時における各発電装置10の発電電圧V1M,V2M,V3Mは、発電装置10の太陽電池モジュール数に応じて異なる値となる。一方、MPPT制御時における各発電装置10の発電電流I1M,I2M,I3Mは、日射量に応じて変化するが、発電装置10間で日射量が同じであると仮定すると、I1M=I2M=I3Mとみなせる。よって、制御部14は自立運転時には、少なくとも1つのDC/DCコンバータ11を優先的にMPPT制御することにより(ステップS103)、他のDC/DCコンバータ11をMPPT制御した場合の発電電流を知ることができる。
 自立運転時において、交流入力機器3の消費電力が少ない場合でも、発電装置10-1の最大発電電力を上回るものと考えられる。よって、制御部14は自立運転時に、最大発電電力の最も小さい発電装置10-1が接続されるDC/DCコンバータ11-1を優先的にMPPT制御するのが好適である。これにより、早い段階で最大発電電流の値を取得することができる。以下、DC/DCコンバータ11-1を優先的にMPPT制御するものとして説明を続ける。
 例えば、発電装置10-1の最大発電電力が100W、発電装置10-2の最大発電電力が200W、発電装置10-3の最大発電電力が300Wで、交流入力機器3の消費電力が200Wの場合、制御部14はDC/DCコンバータ11-1をMPPT制御し、発電装置10-1から100Wを得る。残りの100Wについては、制御部14はDC/DCコンバータ11-2および11-3を負荷追従制御し、発電装置10-2および発電装置10-3から得られる電力の合計が100Wになるように制御してもよいし、DC/DCコンバータ11-2,11-3の一方のみを負荷追従制御し、発電装置10-2,10-3の一方のみから100Wを得るように制御してもよい。
 次に、発電余力算出部148は、発電装置10-1の発電電流I1Mの値を入力電流センサ20-1から取得する(ステップS104)。そして、発電余力算出部148は、発電装置10-1の発電電流I1Mを用いて、残りの発電装置10-1,10-2の発電余力を、最大発電電力と現在の発電電力との差分により算出する(ステップS105)。
 発電余力算出部148は、連系運転時(つまり、MPPT制御時)における発電装置10-2,10-3の発電電圧V2M,V3Mの値を記憶しておき、発電装置10-2の最大発電電力P2MをI1M×V2Mにより算出し、発電装置10-3の最大発電電力P3MをI1M×V3Mにより算出する。例えば、図6に示すようにDC/DCコンバータ11-2を負荷追従制御するとき、発電余力算出部148は、発電装置10-2の発電余力をP2M-(I2L×V2L)により算出する。発電余力算出部148は、電流値I2Lを入力電流センサ20-2から取得し、電圧値V2Lを入力電圧センサ19-2から取得する。このように、発電余力算出部148は、発電装置10-1の発電電流I1Mを用いて、他の発電装置10-1,10-2の発電余力を算出する。
 これまで、各発電装置10に対する日射量が同一とみなせる場合について説明したが、寄棟型の屋根の各方位に各発電装置10を設置する場合など、各発電装置10に対する日射量が異なる場合がある。
 図8は、発電装置10間の日射量が異なる場合の発電量を示す図である。西側の屋根に発電装置10-1が設置され、東側の屋根に発電装置10-2が設置され、南側の屋根に発電装置10-3が設置されている場合、それぞれ連系運転時の発電電流I1M,I2M,I3Mの値は異なる。また、日射量に応じても発電電流I1M,I2M,I3Mの値は変動し、図8(a)は午前10時の日射量が多い場合、図8(b)は午前10時の日射量が少ない場合の最大発電電力を示している。
 日射量の違いは太陽の方位により決まるため、各発電装置10に対する日射量が異なる場合には、発電余力算出部148は、連系運転時の各発電装置10の最大発電電力または発電電流の比を時刻情報とともに記憶する。
 そして、発電余力算出部148は、連系運転時(MPPT制御時)において、各発電装置10の最大発電電力P1M,P2M,P3Mの比、あるいは、発電装置10の最大発電電流I1M,I2M,I3Mの比を記憶しておく。そして、自立運転時には、記憶した最大発電電力比または最大発電電流比に基づいて発電余力を算出する。
 発電余力算出部148は、最大発電電力比に基づいて発電余力を算出する場合、入力電流センサ20-1から取得した発電装置10-1の発電電流I1Mの値と、入力電圧センサ19-1から取得した発電電圧V1Mの値から、最大発電電力P1MをI1M×V1Mにより算出し、最大発電電力P2M,P3Mを、最大発電電力比により算出する。
 また、発電余力算出部148は、最大発電電流比に基づいて発電余力を算出する場合、入力電流センサ20-1から発電装置10-1の発電電流I1Mの値を取得し、最大発電電流I2M,I3Mを最大発電電流比により算出し、最大発電電力P2MをI1M×V2Mにより算出し、最大発電電力P3MをI1M×V3Mにより算出する。最大発電電力が求まれば、実際の発電電力との差分を発電余力として算出する。
 図9は、電力変換装置1、電力管理装置2、および交流入力機器3の自立運転時の動作を示すシーケンス図であり、電力変換装置1の発電余力算出以降のシーケンスを示している。電力変換装置1の制御部14は、上述の方法により、自立運転期間中に発電余力を随時算出する(ステップS201)。
 また、電力管理装置2の通信部22は、起動させようとする負荷機器である交流入力機器3に対して、使用電流、使用電圧などの定格を問い合わせるメッセージを送信する(ステップS202)。交流入力機器3は、定格の問い合わせに対して応答し、電力管理装置2に定格を通知する(ステップS203)。
 電力管理装置2は、交流入力機器3の定格を取得すると、この交流入力機器3の実行に必要となる電力を算出する(ステップS204)。
 続いて、電力管理装置2の通信部22は、電力変換装置1に対して余力情報を問い合わせるメッセージを送信する(ステップS205)。電力変換装置1の通信部15は、余力情報の問い合わせに対して応答し、ステップS201で算出した発電余力に関する余力情報を電力管理装置2に送信する(ステップS206)。
 このように、発電装置10の電力を変換する電力変換装置1と、電力変換装置1に接続される負荷機器3の動作を制御する電力管理装置2との間で電力に関する情報を通信する電力管理方法は、電力変換装置1が発電装置10の発電余力を取得するステップと、電力変換装置1が電力管理装置2に対し発電余力に関する余力情報を送信するステップと、を含む。
 ここで、電力変換装置1と電力管理装置2との間の通信は、ECHONET Lite(登録商標)、ZigBee(登録商標)のスマートエナジープロファイル、KNX(登録商標)などの各種規格の通信プロトコルを用いて行うことができる。例えば、通信プロトコルとしてECHONET Liteを用いる場合、電力管理装置2の通信部22は、ECHONET Lite規格において規定されているGETコマンドを用いて余力情報を要求することにより、規格に準拠した機器間での汎用性を担保しやすくなる(ステップS205)。
 電力管理装置2は、ステップS204で算出した交流入力機器3の実行に必要となる電力と、ステップS206で取得した余力情報とに基づき、交流入力機器3を動作させることが可能か否かを判断する(ステップS207)。図9では電力管理装置2が交流入力機器3を動作させることが可能と判断した場合を示しており、交流入力機器3に起動要求する(ステップS208)。すると、交流入力機器3は電力管理装置2に確認応答を返信し(ステップS209)、交流入力機器3を起動する(ステップS210)。電力管理装置2が交流入力機器3を動作させることが不可能と判断した場合には、例えば、発電余力が不足していて交流入力機器3を起動できない旨をユーザに通知する。
 また、通信部15は、定期的に、あるいは制御部14から余力情報を新たに取得するたびに、ステップS201で算出した発電余力に関する余力情報を電力管理装置2に送信するようにしてもよい。この場合、電力管理装置2の余力情報の問い合わせ(ステップS205)は無くとも良い。通信プロトコルとしてECHONET Liteを用いる場合、通信部15は、余力情報をECHONET Liteにおいて規定されているINFOコマンドを用いて送信することにより、規格に準拠した機器間での汎用性を担保しやすくなる。
 このように、本発明に係る電力変換装置1は、制御部14により発電装置10の発電余力を取得し、通信部15により発電余力に関する余力情報を外部の電力管理装置2に送信する。そのため、電力管理装置2は、余力情報に基づいて負荷機器の動作を制御することができる。
 上述の実施形態は、代表的な例として説明したが、本発明の趣旨および範囲内で、多くの変更及び置換ができることは当業者に明らかである。したがって、本発明は、上述の実施形態によって制限するものと解するべきではなく、特許請求の範囲から逸脱することなく、種々の変形や変更が可能である。例えば、発電装置として複数の風力発電機を用いる場合にも、電力変換装置は少なくとも1つの風力発電機をMPPT制御により動作させることにより、他の風力発電機の発電余力を取得し、通知することができる。
 1   電力変換装置
 2   電力管理装置
 3   交流入力機器
 10  発電装置
 11  DC/DCコンバータ
 12  中間リンクコンデンサ
 13  インバータ
 14  制御部
 15  通信部
 16  DC/DCコンバータ
 17  直流入力機器
 18  スイッチング素子
 19  入力電圧センサ
 20  入力電流センサ
 21  中間リンク電圧センサ
 22  通信部
 141 デューティ比制御部
 142 制御モード判定部
 143 MPPT制御部
 144 負荷追従制御部
 145 入力電圧制御部
 146 クロック生成部
 147 PWMユニット
 148 発電余力算出部

Claims (14)

  1.  発電装置の電力を変換し、需要家内の負荷に供給を行う電力変換装置であって、
     前記発電装置の発電余力を取得する制御部と、
     前記発電余力に関する余力情報を外部の電力管理装置に送信する通信部と、
    を備えることを特徴とする電力変換装置。
  2.  前記通信部は、定期的に前記余力情報を送信することを特徴とする、請求項1に記載の電力変換装置。
  3.  前記通信部は、前記制御部が余力情報を新たに取得すると、前記余力情報を送信することを特徴とする、請求項1に記載の電力変換装置。
  4.  前記通信部は、前記余力情報をECHONET Lite規格におけるINFOコマンドを用いて送信することを特徴とする、請求項2に記載の電力変換装置。
  5.  前記通信部は、前記電力管理装置から前記余力情報の要求を受信すると、その応答として前記余力情報を送信することを特徴とする、請求項1に記載の電力変換装置。
  6.  前記通信部は、前記要求をECHONET Lite規格におけるGETコマンドにより受信することを特徴とする、請求項5に記載の電力変換装置。
  7.  同種の複数の発電装置からそれぞれの発電電力を入力する複数の入力部を備え、
     前記制御部は、前記複数の入力部のうち少なくとも1つの入力部を優先的にMPPT制御し、該入力部に接続される発電装置の発電電流を用いて、他の入力部に接続される発電装置の発電余力を算出して取得することを特徴とする、請求項1に記載の電力変換装置。
  8.  前記制御部は、電力系統から解列した自立運転時に、前記発電余力を取得することを特徴とする、請求項1に記載の電力変換装置。
  9.  前記複数の発電装置のそれぞれは、複数の太陽電池モジュールを直列接続した太陽電池ストリングであることを特徴とする、請求項7に記載の電力変換装置。
  10.  前記複数の太陽電池モジュールは全て同じ特性を有することを特徴とする、請求項9に記載の電力変換装置。
  11.  発電装置の電力を変換する電力変換装置と通信可能な電力管理装置であって、
     前記電力変換装置から前記発電装置の発電余力に関する余力情報を受信する通信部
    を備えることを特徴とする電力管理装置。
  12.  前記通信部は、前記電力変換装置に接続される負荷機器の動作を制御する際に、前記電力変換装置に前記余力情報を要求し、その応答として前記余力情報を受信することを特徴とする、請求項11に記載の電力管理装置。
  13.  前記通信部は、前記余力情報をECHONET LiteのGETコマンドを用いて要求することを特徴とする、請求項11に記載の電力管理装置。
  14.  発電装置の電力を変換する電力変換装置と、該電力変換装置に接続される負荷機器の動作を制御する電力管理装置との間で電力に関する情報を通信する電力管理方法であって、
     前記電力変換装置が、前記発電装置の発電余力を取得するステップと、
     前記電力変換装置が前記電力管理装置に対し、前記発電余力に関する余力情報を送信するステップと、
    を含むことを特徴とする電力管理方法。
PCT/JP2014/003936 2013-07-26 2014-07-25 電力変換装置、電力管理装置、および電力管理方法 WO2015011932A1 (ja)

Priority Applications (3)

Application Number Priority Date Filing Date Title
EP14829018.2A EP3026776B1 (en) 2013-07-26 2014-07-25 Power conversion device, power management device, and power management method
JP2015528157A JP6223449B2 (ja) 2013-07-26 2014-07-25 電力変換装置、電力管理装置、および電力管理方法
US14/907,532 US10074990B2 (en) 2013-07-26 2014-07-25 Power conversion apparatus, power management apparatus, and method for power management

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2013-155935 2013-07-26
JP2013155935 2013-07-26

Publications (1)

Publication Number Publication Date
WO2015011932A1 true WO2015011932A1 (ja) 2015-01-29

Family

ID=52392996

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2014/003936 WO2015011932A1 (ja) 2013-07-26 2014-07-25 電力変換装置、電力管理装置、および電力管理方法

Country Status (4)

Country Link
US (1) US10074990B2 (ja)
EP (1) EP3026776B1 (ja)
JP (1) JP6223449B2 (ja)
WO (1) WO2015011932A1 (ja)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2017184402A (ja) * 2016-03-29 2017-10-05 東京電力ホールディングス株式会社 電源装置

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP3086431B1 (en) * 2013-12-16 2019-07-24 Kyocera Corporation Power control device, equipment control device, and method
US10651735B2 (en) * 2017-02-06 2020-05-12 Futurewei Technologies, Inc. Series stacked DC-DC converter with serially connected DC power sources and capacitors
US10665743B2 (en) 2017-02-16 2020-05-26 Futurewei Technologies, Inc. Distributed/central optimizer architecture
US10333314B2 (en) * 2017-04-17 2019-06-25 Futurewei Technologies, Inc. Multiple buck stage single boost stage optimizer
US10673246B2 (en) * 2017-11-13 2020-06-02 Futurewei Technologies, Inc. System and device for exporting power, and method of configuring thereof
US10886749B2 (en) * 2018-10-23 2021-01-05 Hewlett Packard Enterprise Development Lp Synchronized startup of power supplies in electrical systems
US11205896B2 (en) 2018-11-21 2021-12-21 Black & Decker Inc. Solar power system
WO2020121362A1 (ja) * 2018-12-10 2020-06-18 三菱電機株式会社 電力変換システム及びその管理装置、並びに、分散電源装置

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003309928A (ja) 2002-04-16 2003-10-31 Nippon Futo Soko Kk 電力管理システム
JP2005086953A (ja) 2003-09-10 2005-03-31 Nippon Telegr & Teleph Corp <Ntt> エネルギー需給制御方法及び装置
JP2012016156A (ja) * 2010-06-30 2012-01-19 Tempearl Ind Co Ltd 電源供給システム及び住宅用分電盤
JP2012100504A (ja) * 2010-11-05 2012-05-24 Creative Techno Solution Co Ltd 電力供給システム
JP2012182906A (ja) * 2011-03-01 2012-09-20 Nippon Telegr & Teleph Corp <Ntt> 電力管理システムおよび電力管理方法

Family Cites Families (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002056225A (ja) 2000-08-14 2002-02-20 Toshiba Corp 電力取引仲介方法及び電力取引仲介システム並びに電力取引仲介用ソフトウェアを記録した記録媒体
JP4736317B2 (ja) * 2003-11-14 2011-07-27 ソニー株式会社 バッテリーパック及びバッテリー残量算出方法
JP4330542B2 (ja) 2005-02-01 2009-09-16 大阪瓦斯株式会社 コージェネレーションシステム
JP2008042999A (ja) 2006-08-02 2008-02-21 Matsushita Electric Works Ltd 電源供給装置
CN101848294A (zh) * 2009-03-24 2010-09-29 鸿富锦精密工业(深圳)有限公司 通信方法及移动通信装置
JP5226586B2 (ja) * 2009-03-31 2013-07-03 Kddi株式会社 無線通信端末および通信方式選択方法
KR101146670B1 (ko) * 2009-12-16 2012-05-23 삼성에스디아이 주식회사 에너지 관리 시스템 및 이의 제어 방법
JP5377668B2 (ja) * 2010-01-26 2013-12-25 三菱電機株式会社 ナビゲーション装置、車両情報表示装置、車両情報表示システム、車両情報表示制御プログラムおよび車両情報表示制御方法
JP5651424B2 (ja) 2010-10-14 2015-01-14 株式会社東芝 電力安定化システムおよび電力安定化方法
US8831788B2 (en) * 2011-04-20 2014-09-09 General Electric Company Systems, methods, and apparatus for maintaining stable conditions within a power grid
CN102904272B (zh) * 2011-07-29 2015-07-29 通用电气公司 具有改善的瞬态事件穿越能力的能量转换系统和方法
JP5709001B2 (ja) * 2011-09-05 2015-04-30 株式会社日立製作所 計算機システム及び計算機
US9846418B2 (en) * 2011-09-28 2017-12-19 Kyocera Corporation Energy control system, energy control device, and energy control method for prioritizing a power generation source based on the possibility of selling generated power
KR101343191B1 (ko) 2011-11-29 2013-12-19 엘에스산전 주식회사 태양광 시스템
US10698433B2 (en) * 2013-07-26 2020-06-30 Kyocera Corporation Power management apparatus, power management system, and method for power management

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003309928A (ja) 2002-04-16 2003-10-31 Nippon Futo Soko Kk 電力管理システム
JP2005086953A (ja) 2003-09-10 2005-03-31 Nippon Telegr & Teleph Corp <Ntt> エネルギー需給制御方法及び装置
JP2012016156A (ja) * 2010-06-30 2012-01-19 Tempearl Ind Co Ltd 電源供給システム及び住宅用分電盤
JP2012100504A (ja) * 2010-11-05 2012-05-24 Creative Techno Solution Co Ltd 電力供給システム
JP2012182906A (ja) * 2011-03-01 2012-09-20 Nippon Telegr & Teleph Corp <Ntt> 電力管理システムおよび電力管理方法

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See also references of EP3026776A4

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2017184402A (ja) * 2016-03-29 2017-10-05 東京電力ホールディングス株式会社 電源装置

Also Published As

Publication number Publication date
EP3026776B1 (en) 2024-04-10
US20160164298A1 (en) 2016-06-09
JPWO2015011932A1 (ja) 2017-03-02
EP3026776A1 (en) 2016-06-01
JP6223449B2 (ja) 2017-11-01
EP3026776A4 (en) 2017-04-05
US10074990B2 (en) 2018-09-11

Similar Documents

Publication Publication Date Title
JP6223449B2 (ja) 電力変換装置、電力管理装置、および電力管理方法
JP6167252B2 (ja) 電力変換装置、電力管理方法、および電力変換システム
US11476666B1 (en) Grid-tied electric meter adapter and systems for automated power resilience and on-demand grid balancing
JP5940946B2 (ja) パワーコンディショナ及びその制御方法
JP2020078242A (ja) 電力管理装置、および電力管理方法
JP2009207234A (ja) ハイブリッド系統連系システム
Riccobono et al. Next generation automation architecture for DC smart homes
JP6271638B2 (ja) パワーコンディショナ及びその制御方法
JP6617283B2 (ja) 電力変換システム
JP5258324B2 (ja) ハイブリッド系統連系システム
JP2017515454A (ja) 設定可能なインバータ装置、該インバータ装置を備える太陽光発電システム
JP6343434B2 (ja) 電力変換装置及び電力変換方法
JP2019017192A (ja) 制御装置、電力変換システム、及び発電システム
JP2015111962A (ja) 並列運転電源システム
JP6208617B2 (ja) 電力制御システム、電力制御装置、および電力制御システムの制御方法

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 14829018

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2015528157

Country of ref document: JP

Kind code of ref document: A

WWE Wipo information: entry into national phase

Ref document number: 14907532

Country of ref document: US

NENP Non-entry into the national phase

Ref country code: DE

WWE Wipo information: entry into national phase

Ref document number: 2014829018

Country of ref document: EP