WO2014171330A1 - 配管継手 - Google Patents

配管継手 Download PDF

Info

Publication number
WO2014171330A1
WO2014171330A1 PCT/JP2014/059674 JP2014059674W WO2014171330A1 WO 2014171330 A1 WO2014171330 A1 WO 2014171330A1 JP 2014059674 W JP2014059674 W JP 2014059674W WO 2014171330 A1 WO2014171330 A1 WO 2014171330A1
Authority
WO
WIPO (PCT)
Prior art keywords
pipe
confirmation
engagement
spool
insertion hole
Prior art date
Application number
PCT/JP2014/059674
Other languages
English (en)
French (fr)
Inventor
貢司 田山
賢史 松原
Original Assignee
三桜工業株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 三桜工業株式会社 filed Critical 三桜工業株式会社
Publication of WO2014171330A1 publication Critical patent/WO2014171330A1/ja

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L37/00Couplings of the quick-acting type
    • F16L37/08Couplings of the quick-acting type in which the connection between abutting or axially overlapping ends is maintained by locking members
    • F16L37/084Couplings of the quick-acting type in which the connection between abutting or axially overlapping ends is maintained by locking members combined with automatic locking
    • F16L37/088Couplings of the quick-acting type in which the connection between abutting or axially overlapping ends is maintained by locking members combined with automatic locking by means of a split elastic ring
    • F16L37/0885Couplings of the quick-acting type in which the connection between abutting or axially overlapping ends is maintained by locking members combined with automatic locking by means of a split elastic ring with access to the split elastic ring from a radial or tangential opening in the coupling
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L2201/00Special arrangements for pipe couplings
    • F16L2201/10Indicators for correct coupling

Definitions

  • the present invention relates to a pipe joint.
  • Patent Document 1 Japanese Patent Laid-Open No. 2013-32801
  • the spool and the restraining member of the pipe joint are engaged.
  • the removal of the pipe from the pipe joint is suppressed.
  • the confirmation member (pull tab) can be pulled out from the main body. That is, by pulling out the confirmation member from the main body, the engagement between the spool and the suppression member is confirmed.
  • An object of the present invention is to release the engagement between the piping spool and the suppression member using a confirmation member that confirms the engagement between the piping spool and the suppression member.
  • the pipe joint according to the first aspect of the present invention includes a housing in which an insertion hole into which an end of a pipe having an annular spool is inserted is formed, and the spool of the pipe in which an end is inserted into the insertion hole.
  • a restraining member that engages and suppresses the pipe from being removed from the insertion hole, and an end of the pipe is inserted into the insertion hole in a state of being disposed at the temporary fixing position, and the restraining member is moved to the spool. Is engaged, it is possible to move to one side of the intersecting direction intersecting the insertion direction of the pipe, and the engagement state between the restraining member and the spool is confirmed, and the other side of the intersecting direction is moved. And a confirmation release member for deforming the restraining member so as to release the engagement between the restraining member and the spool.
  • the engagement between the piping spool and the restraining member can be released using the confirmation releasing member for confirming the engagement between the piping spool and the restraining member.
  • the restraining member has an annular shape in which a part thereof is spaced apart and an opening is formed.
  • the engaging portion engages with the spool from the outside in the radial direction of the pipe; A projecting portion projecting outward in the radial direction is formed, and when the confirmation canceling member is moved to the other side in the intersecting direction, the projecting portion is pulled up to widen the opening of the engaging portion.
  • a pulling-up portion for deforming the engaging portion to release the engagement between the spool and the engaging portion is formed.
  • the pulling portion formed on the confirmation release member pulls up the protruding portion of the suppression member so that the opening of the engagement portion is widened. Deform. Thereby, the engagement between the suppression member and the spool is released.
  • the engagement portion has a curved shape.
  • a guide part for guiding the pulling part so that the opening of the engaging part is widened when the confirmation releasing member is moved to the other side in the crossing direction.
  • the guide part guides the pulling part so that the opening of the engaging part spreads. For this reason, compared with the case where the guide part is not provided, the engagement part can be easily deformed so that the opening of the engagement part is widened, and the engagement between the spool and the engagement part can be released.
  • the confirmation release member may be attached to the housing in a state where the engagement release portion is deformed so that the confirmation release member is moved to the other side in the intersecting direction so that the opening of the engagement portion is widened.
  • a restriction portion that is locked and restricts movement of the confirmation release member to one side in the intersecting direction is formed.
  • the engagement between the piping spool and the suppression member can be released using the confirmation member that confirms the engagement between the piping spool and the suppression member.
  • piping joint concerning a 1st embodiment of the present invention it is a sectional view showing the state where piping was inserted in the insertion hole.
  • it is a sectional view showing the attachment state of a housing and a retainer.
  • it is a sectional view showing the attachment state of a housing and a retainer.
  • it is sectional drawing which showed the state at the time of piping being inserted in an insertion hole.
  • the piping joint concerning a 1st embodiment of the present invention is a sectional view showing the state at the time of raising a check member from a temporary stop position. It is the perspective view which showed the confirmation member used for the piping joint which concerns on 2nd Embodiment of this invention.
  • it is a sectional view showing the state at the time of raising a check member from a temporary stop position.
  • the pipe joint 10 has a tube (not shown) fixed on one side, and the other end of the pipe 200 having an annular spool 200A on the outer peripheral surface is inserted into an insertion hole 20 described later, whereby the flow of the pipe 200 is increased.
  • the path and the flow path of the tube are communicated with each other.
  • the pipe joint 10 includes a housing 12 that extends in the insertion direction of the pipe 200 inserted into the insertion hole 20 (hereinafter referred to as “X direction”). Furthermore, the pipe joint 10 is attached to the housing 12 and has a retainer 14 as an example of a restraining member that is engaged with the spool 200A of the pipe 200 and prevents the pipe 200 inserted into the insertion hole 20 from being removed. I have.
  • the pipe joint 10 includes a confirmation member 16 as an example of a confirmation release member disposed at a temporary fixing position temporarily fixed to the housing 12 and the retainer 14 (see FIG. 3).
  • the confirmation member 16 disposed at the temporary fixing position is in the negative direction of the crossing direction (hereinafter referred to as “Y direction”) that crosses (is orthogonal to the present embodiment) the X direction. (One side: the lower side in the figure) can be moved.
  • the housing 12 is integrally formed of a resin material. Further, the housing 12 includes a cylindrical portion 22 that extends in the X direction and has an insertion hole 20 into which an end of the pipe 200 is inserted, and an attachment portion 24 to which the retainer 14 is attached.
  • the housing 12 is formed symmetrically with respect to a center line (line C shown in each figure) extending in the Y direction of the insertion hole 20 when viewed from the X direction (see FIGS. 12A and 12B).
  • the insertion hole 20 formed in the cylindrical portion 22 is reduced in diameter in a step shape toward the plus side in the X direction. Further, in the insertion hole 20, the end on the negative side in the X direction (the insertion side where the pipe 200 is inserted) is in contact with the outer peripheral surface of the pipe 200 inserted into the insertion hole 20, and the inner circumference of the insertion hole 20 An O-ring 28 that seals the surface and the outer peripheral surface of the pipe 200 is disposed.
  • the attachment part 24 is formed on the negative side of the cylindrical part 22 in the X direction.
  • the interior of the attachment portion 24 is such that the retainer 14 is attached to the attachment portion 24 by moving the retainer 14 from the outside of the housing 12 to the negative side in the Y direction (lower side in FIG. 1). Furthermore, it is open to the plus side (upper side in FIG. 1) in the Y direction.
  • the attachment portion 24 includes a pair of side wall portions 30 that are separated in a width direction (hereinafter referred to as “Z direction” direction) orthogonal to the X direction and the Y direction. Further, the attachment portion 24 is connected to the negative side in the X direction of the pair of side wall portions 30 and is opposed to the opposing wall portion 32 facing the end portion of the insertion hole 20 and the negative side in the Y direction of the pair of side wall portions 30. And a cross-linked portion 34 (see FIG. 10).
  • each side wall portion 30 is arranged on the plus side in the X direction and has a plate-like side plate 38 in which the plus side end portion in the X direction is fixed to the cylindrical portion 22. And a rail portion 40 disposed on the negative side in the X direction.
  • the rail portion 40 includes a concave rail 40A extending in the Y direction and a rail 40B disposed on the plus side in the X direction with respect to the rail 40A.
  • the opposite wall portion 32 has both ends in the Z direction fixed to the rail portion 40, and has a substantially rectangular shape when viewed from the X direction, as shown in FIGS. 12A and 12B. Further, the opposing wall portion 32 includes a through hole 42 that is concentric with the insertion hole 20.
  • a pair of guide grooves 44 that are separated in the Z direction are formed on the positive side in the Y direction with respect to the through hole 42 in the opposing wall portion 32.
  • the outer side of the pair of guide grooves 44 in the Z direction (the side away from the insertion hole 20 when viewed from the X direction) is opened, and the pair of guide grooves 44 approaches each other toward the plus side in the Y direction. It is inclined with respect to.
  • the bridging portion 34 is bridged on the negative side of the pair of rail portions 40 in the Y direction. As shown in FIG. 10, the bridging portion 34 has a circular arc surface 48A concentric with the insertion hole 20 as viewed from the X direction, and extends from both ends of the circular arc surface 48A in the Z direction to the negative side in the Y direction. A block 48 surrounded by the portion 40 and a pair of side surfaces 48B spaced apart in the Z direction is provided.
  • top part 48C constituted by the arc surface 48A and the side surface 48B meshes with a concave groove 84A described later, and the confirmation member 16 is arranged at the temporary fixing position (details will be described later).
  • the retainer 14 is integrally formed of a resin material, and as described above, the retainer 14 is moved to the negative side in the Y direction so as to be attached to the mounting portion 24 of the housing 12 from the outside of the housing 12. Can be attached to. Moreover, the retainer 14 is formed symmetrically with respect to a center line (line C shown in each drawing) extending in the Y direction of the insertion hole 20 when viewed from the X direction.
  • the retainer 14 has a restriction portion 50 that is formed on the plus side in the X direction and restricts the position in the X direction of the O-ring 28 (see FIG. 5) disposed in the insertion hole 20. Further, the retainer 14 has a suppression portion 52 that engages with the spool 200 ⁇ / b> A of the pipe 200 whose end is inserted into the insertion hole 20 and prevents the pipe 200 from being removed from the insertion hole 20.
  • the restriction part 50 faces the positive side in the X direction, contacts the O-ring 28 disposed in the insertion hole 20 in the X direction, and moves the O-ring 28 on the negative side in the X direction.
  • the restriction part 50 includes an insertion hole 54 through which the pipe 200 inserted into the insertion hole 20 is inserted.
  • the restriction part 50 is sandwiched between the pair of side plates 38 of the attachment part 24 in a state where the retainer 14 is attached to the attachment part 24 of the housing 12.
  • a pair of side surfaces 56 facing the outside in the Z direction in the restricting portion 50 are respectively formed with concave concave portions 56A.
  • the concave portions 56A are formed on the side plate 38. It is configured to mesh with the formed protrusion 38A.
  • the concave portion 56A and the projection 38A mesh with each other, so that the movement of the retainer 14 attached to the attachment portion 24 to the plus side in the Y direction is regulated (the attachment state of the retainer 14 is Retained).
  • protrusions 50A that protrude outward in the Z direction are formed, and in the state where the retainer 14 is attached to the attachment portion 24, the protrusion 50A is connected to the Y of the side plate 38. It comes in contact with the positive end surface of the direction from the positive side in the Y direction. As described above, the protrusion 50A hits the side plate 38 from the positive side in the Y direction, so that the movement of the retainer 14 attached to the attachment portion 24 to the negative side in the Y direction is restricted (the retainer 14). The mounting state is maintained).
  • the restriction portion 50 includes a hooking portion 58 disposed on the minus side in the X direction with respect to the concave portion 56A.
  • the hook 58 extends in the Y direction and is formed on the negative side of the support bar 58A in the Y direction, and is formed on the negative side of the support bar 58A in the Y direction.
  • a protrusion 58B protruding outward.
  • the protrusion 58 ⁇ / b> B is hooked on the edge of the side plate 38. This further restricts the movement of the retainer 14 attached to the attachment site 24 to the plus side in the Y direction (the attachment state of the retainer 14 is maintained).
  • the suppression part 52 is arranged on the negative side in the X direction with respect to the restriction part 50, and the positive side in the Y direction of the restriction part 52 and the positive side in the Y direction of the restriction part 50 are connected. Has been.
  • the suppression portion 52 includes an engagement portion 62 as an example of an engagement portion that engages with the spool 200A from the outside in the radial direction of the pipe 200 inserted into the insertion hole 20, and the diameter of the pipe 200 from the engagement portion 62. And a protruding portion 64 as an example of a protruding portion protruding outward in the direction.
  • the engaging portion 62 has an annular shape with an opening 62 ⁇ / b> A in which a part on the minus side in the Y direction is spaced, and has a curved shape (curved shape). Furthermore, as shown in FIGS. 9A and 9B, the engaging portion 62 is formed with a pair of tapered surfaces 62B pressed against the spool 200A of the pipe 200 when the pipe 200 is inserted into the insertion hole 20. Has been.
  • the taper surface 62B is inclined so as to be inclined inward in the Z direction (side approaching the insertion hole 20 when viewed from the X direction) toward the plus side in the X direction.
  • two protrusions 64 are formed so as to protrude outward in the radial direction of the pipe 200 inserted into the insertion hole 20 from the outer peripheral surface of the engaging part 62. .
  • the pair of protrusions 64 are formed symmetrically with respect to the line C as viewed from the X direction.
  • Each protrusion 64 has an inclined member 64A that is inclined so that the tip is disposed on the plus side in the Y direction with respect to the Z direction, and an intermediate member 64B that extends from the tip of the inclined member 64A to the plus side in the Y direction, And a protrusion 64C extending outward in the Z direction from the tip of the intermediate member 64B.
  • the confirmation member 16 is integrally formed of a resin material, and is formed symmetrically with respect to the line C when viewed from the X direction. Further, the pipe joint 10 is shipped in a state where the confirmation member 16 is disposed at a temporary fixing position where the confirmation member 16 is temporarily fixed to the housing 12 and the retainer 14 (see FIG. 3). The details of the temporary fixing position will be described later.
  • the confirmation member 16 contacts the spool 200 ⁇ / b> A in an engaged state and moves the confirmation member 16 to the negative side in the Y direction with the confirmation member 16 disposed at the temporary fixing position. Is provided (see FIG. 9B). Further, when the confirmation member 16 is moved from the temporary fixing position to the plus side in the Y direction, the confirmation member 16 is deformed to deform the engagement portion 62 of the retainer 14 and release the engagement between the engagement portion 62 and the spool 200A.
  • the region 72 is provided (see FIG. 15B).
  • the release site 72 is arranged on the minus side in the X direction with respect to the confirmation site 70, and the release site 72 and the check site 70 are connected on the plus side in the Y direction.
  • the confirmation site 70 includes a pair of guide portions 76 that extend in the Y direction, are fitted in the rail 40 ⁇ / b> B, are guided in the Y direction, and have a negative end in the Y direction as a free end.
  • the confirmation site 70 includes a bridging portion 78 that spans the plus side of the pair of guide portions 76 in the Y direction.
  • the confirmation member 16 includes a pair of confirmation portions 80 arranged on the inner side in the Z direction with respect to the guide portion 76.
  • the confirmation portion 80 has a base end portion fixed to the bridging portion 78, an extension member 82 extending on the negative side in the Y direction, and formed at the distal end of the extension member 82 and in the Z direction with respect to the extension member 82.
  • a tip member 84 that is widened inward is provided.
  • a concave groove 84A is formed at the negative end of the tip member 84 in the Y direction, and the top portion 48C of the bridge portion 34 described above is a concave groove in the Y direction in a state where the confirmation member 16 is disposed at the temporary fixing position. It is designed to fit with 84A. Thereby, the movement to the negative
  • an inclined surface 84B that is inclined toward the plus side in the Y direction is formed on the inner side in the Z direction with respect to the concave groove 84A in the tip member 84.
  • the tip member 84 is formed with a tapered surface 84C that is pressed against the engaging portion 62 and the spool 200A in the engaged state.
  • the tapered surface 84C is inclined so as to be inclined inward in the Z direction as it goes toward the plus side in the X direction.
  • the state in which the confirmation member 16 is disposed at the temporary fixing position is a state in which the pipe 200 can be inserted into the insertion hole 20 and the engaging portion 62 can be engaged with the spool 200A. In this state, movement to the minus side in the Y direction is restricted. This is a delivery state (initial state) of the so-called piping joint 10.
  • the release portion 72 extends in the Y direction and is fitted in the rail 40 ⁇ / b> A and guided in the Y direction, and a pair of guide portions 88 having a negative end in the Y direction as a free end, and a pair of guide portions. And a bridging portion 90 that spans the positive side of 88 in the Y direction.
  • the bridging portion 90 is coupled to the bridging portion 78 (see FIG. 10) of the confirmation site 70 in the X direction.
  • a distal end portion 96 is formed as an example of a pulling portion that protrudes inward in the Z direction and outward in the Z direction with respect to the guide portion 88.
  • a portion of the distal end portion 96 that protrudes inward in the Z direction comes into contact with the protrusion 64C of the suppression portion 52 from the negative side in the Y direction.
  • positioned at the temporary fix position is controlled.
  • the portion of the tip 96 that protrudes outward in the Z direction protrudes outward in the Z direction from the attachment site 24 when viewed from the X direction (see FIG. 12A).
  • the spool 200A and the engaging portion 62 are engaged, and the confirmation member 16 in which the fitting between the concave groove 84A and the top portion 48C is released can be moved to the minus side in the Y direction. (See FIG. 11A). Therefore, when the confirmation member 16 is moved to the negative side in the Y direction, as shown in FIG. 14A, an inner peripheral surface 90A (an example of a restraining curved surface) of the bridging portion 90 and an outer peripheral surface 62C of the engaging portion 62 are obtained. Surface contact in the Y direction. And the confirmation member 16 is arrange
  • the release portion 72 includes two concave portions 92 as an example of concave portions that respectively hold the intermediate member 64B and the protrusion 64C of the protruding portion 64 in a state where the confirmation member 16 is disposed at the engagement confirmation position.
  • the confirmation member 16 arranged at the engagement confirmation position is moved to the plus side in the Y direction and arranged at the temporary fixing position (see FIG. 15A). Further, when the confirmation member 16 arranged at the temporary fixing position is moved to the plus side in the Y direction, the tip 96 pulls the protruding portion 64 to the plus side in the Y direction as shown in FIG. 15B. Yes.
  • a cylindrical projection 94 used for restricting the movement of the distal end portion 96 is formed on the opposing wall portion 32 so as to protrude from the distal end portion 96 to the minus side in the X direction, as shown in FIG.
  • the guide groove 44 is disposed (see FIG. 12A).
  • the guide portion 46 that guides the protruding portion 64 so that the opening 62A of the engaging portion 62 is widened includes the guide groove 44 and the protrusion 94. (See FIGS. 12A and 12B).
  • the pipe insertion operation is an operation for attaching the pipe 200 to the pipe joint 10
  • the confirmation operation is an operation for confirming that the pipe 200 is attached to the pipe joint 10. This is an operation of removing 200 from the pipe joint 10.
  • the confirmation member 16 of the pipe joint 10 is disposed at a temporary fixing position where it is temporarily fixed to the housing 12 and the retainer 14 as shown in FIG. Then, a tube (not shown) is attached to the outer peripheral surface of the tubular portion 22 of the pipe joint 10.
  • the recessed groove 84 ⁇ / b> A of the confirmation portion 80 and the top portion 48 ⁇ / b> C of the bridging portion 34 are fitted. Thereby, the movement of the confirmation member 16 to the minus side in the Y direction is restricted. Further, as shown in FIG. 13, the inner portion in the Z direction of the distal end portion 96 of the release portion 72 contacts the protrusion 64C from the minus side in the Y direction, and the movement of the confirmation member 16 to the plus side in the Y direction is performed. It is regulated.
  • the end portion of the pipe 200 is inserted into the insertion hole 20 through the through hole 42 of the opposing wall portion 32 and the insertion hole 54 of the restriction portion 50.
  • the spool 200A of the pipe 200 comes into contact with the tapered surface 62B of the engaging portion 62 from the negative side in the X direction, as shown in FIG. 9A. Furthermore, when the pipe 200 is moved to the plus side in the X direction, the spool 200A presses the taper surface 62B to the plus side in the X direction, so that the opening 62A (see FIG. 13) of the engaging portion 62 is expanded. It is elastically deformed.
  • the spool 200A that has moved to the plus side in the X direction comes into contact with the end surface of the restriction portion 50 and stops (see FIG. 9B).
  • the engaging portion 62 is elastically restored to engage with the spool 200A (engaged state), and the removal of the pipe 200 from the insertion hole 20 is suppressed.
  • the O-ring 28 disposed in the insertion hole 20 comes into contact with the outer peripheral surface of the pipe 200 inserted into the insertion hole 20, and the inner peripheral surface of the insertion hole 20 and the outer peripheral surface of the pipe 200 Is sealed.
  • the pipe 200 is inserted into the insertion hole 20 and attached to the pipe joint 10, and the flow path of the pipe 200 and the flow path of the tube communicate with each other.
  • the confirmation work is a work for confirming that the pipe 200 is attached to the pipe joint 10, in other words, confirms that the spool 200 ⁇ / b> A and the engaging portion 62 are in an engaged state. Work.
  • the fitting between the concave groove 84A of the confirmation portion 80 and the top portion 48C of the bridging portion 34 is released,
  • the confirmation member 16 arranged at the stop position can be moved to the minus side in the Y direction.
  • the confirmation member 16 When the confirmation member 16 is moved to the minus side in the Y direction, as shown in FIGS. 11B and 14A, the inner peripheral surface 90A of the bridging portion 90 and the outer peripheral surface 62C of the engaging portion 62 are in the Y direction. The surface contact is made and the movement of the confirmation member 16 to the minus side in the Y direction is restricted. Thereby, the confirmation member 16 is arrange
  • the respective recesses 92 formed in the release portion 72 respectively hold the intermediate member 64B and the protrusion 64C of the protrusion 64. . Furthermore, the portion of the tip 96 that protrudes inward in the Z direction is locked to the lower end of the rail 40A. Thereby, the movement to the plus side of the Y direction of the confirmation member 16 is controlled.
  • the pipe removing operation is an operation for removing the pipe 200 from the pipe joint 10 as described above.
  • the confirmation member 16 is moved to the plus side in the Y direction, and as shown in FIG. 15A, the confirmation member 16 is moved to the temporary fixing position. .
  • the pressing force an example of the holding force
  • the portion that protrudes outward in the Z direction of the distal end portion 96 or the lifting force to the positive side of the confirmation member 16 in the Y direction Release an example of holding force.
  • the engaging portion 62 is elastically restored, and the confirmation member 16 is moved (arranged) to the temporary fixing position.
  • the retainer 14 includes a restriction portion 50 that restricts the position of the O-ring 28 (see FIG. 5) disposed in the insertion hole 20 as shown in FIG. 1. Yes. Further, the retainer 14 includes a suppression portion 52 that engages with the spool 200 ⁇ / b> A of the pipe 200 and suppresses the pipe 200 from being removed from the insertion hole 20. Further, by moving the retainer 14 to the negative side in the Y direction and attaching the retainer 14 to the attachment portion 24, the retainer 14 is moved to the opposing wall portion 32 and the cylindrical portion 22 in the X direction as shown in FIG. Sandwiched. That is, the movement of the retainer 14 in the X direction is restricted by the facing wall portion 32 and the cylindrical portion 22.
  • the retainer 14 is integrally formed of a resin material. For this reason, it can be set as a cheap structure compared with the case where a retainer is comprised combining a some member. Further, by devising the shape, the undercut can be eliminated and a simple mold structure can be obtained.
  • the portion protruding outward in the Z direction of the tip 96 of the confirmation member 16 is pressed inward in the Z direction, or the confirmation member 16 is lifted to the positive side in the Y direction. Then, as shown in FIGS. 12A and 12B, the protrusion 94 moves from one end of the guide groove 44 to the other end. As a result, as shown in FIG. 15B, the distal end portion 96 pulls up the protruding portion 64 to the plus side in the Y direction, the opening 62A of the engaging portion 62 is expanded, and the engagement between the spool 200A and the engaging portion 62 is released. Is done.
  • the engagement between the spool 200A of the pipe 200 and the engaging portion 62 can be released using the confirmation member 16 that confirms the engagement between the spool 200A of the pipe 200 and the engaging portion 62.
  • the engagement between the spool 200A and the engaging portion 62 can be released with a simple configuration without using a dedicated tool.
  • the portion protruding outward in the Z direction of the tip 96 of the confirmation member 16 is pressed inward in the Z direction, or the confirmation member 16 is lifted to the positive side in the Y direction. Then, as shown in FIGS. 12A and 12B, the protrusion 94 moves from one end of the guide groove 44 to the other end. That is, when the guide part 46 presses a portion of the distal end portion 96 of the confirmation member 16 that protrudes outward in the Z direction toward the inside in the Z direction, or lifts the confirmation member 16 toward the positive side in the Y direction, The distal end portion 96 is guided so that the opening 62A of 62 expands.
  • the engagement portion 62 is easily deformed so that the opening 62A of the engagement portion 62 is widened, and the spool 200A and the engagement portion 62 are engaged. It can be canceled.
  • the confirmation part 108 of the confirmation member 106 in the pipe joint 100 according to the second embodiment includes an extending member 110 that is wider in the X direction than the tip member 84, as shown in FIG.
  • Each extending member 110 is integrally formed with a restricting claw 112 as an example of a restricting portion that extends to the plus side in the Y direction and whose tip protrudes outward in the Z direction.
  • the regulation claw 112 includes a bar 112A whose base end is fixed to the extending member 110 and a positive tip in the Y direction is a free end, and an outer side in the Z direction from the tip of the bar 112A.
  • a protrusion 112 ⁇ / b> B that protrudes from the surface.
  • the portion of the front end portion 96 of the confirmation member 106 that protrudes outward in the Z direction is pressed inward in the Z direction, or the confirmation member 106 is moved in the Y direction. Lift to the plus side.
  • the protrusion 112B of the restricting claw 112 also moves to the plus side in the Y direction.
  • the restricting claw 112 is elastically restored, and the projection 112B is locked to the end of the rail 40B.
  • the tip 96 lifts the protrusion 64 to the plus side in the Y direction, The opening 62A of 62 expands, and the engagement between the spool 200A and the engaging portion 62 is released. Then, the confirmation member 106 tries to move to the minus side in the Y direction as the engaging portion 62 whose opening 62A has been widened returns elastically.
  • a pressing force (an example of a holding force) that presses a portion of the distal end portion 96 of the guide portion 88 that protrudes outward in the Z direction (an example of a holding force) or a lifting force that raises the confirmation member 106 to the plus side in the Y direction (holding force). Even if the example) is released, the pipe 200 can be removed from the insertion hole 20.
  • the present invention has been described in detail with respect to specific embodiments, the present invention is not limited to such embodiments, and various other embodiments are possible within the scope of the present invention. It is clear to the contractor.
  • the retainer 14 is moved to the negative side in the Y direction and attached to the attachment portion 24 so that the retainer 14 is sandwiched between the opposing wall portion 32 and the cylindrical portion 22 in the X direction. The movement of the retainer 14 in the X direction is suppressed.
  • the present invention is not particularly limited to this, and the retainer 14 is moved to the negative side in the Y direction and attached to the attachment portion 24 to suppress the movement of the retainer 14 in the X direction.
  • Other configurations may be used as long as they are configured.
  • the pair of recesses 56A (see FIG. 7) and the pair of hooking portions 58 (see FIG. 8) are used to fix the retainer 14 to the housing 12. Good.
  • the confirmation is performed after the confirmation member 106 is moved to the engagement confirmation position after the spool 200A of the pipe 200 and the engagement portion 62 are engaged.
  • the member 106 may be moved to the plus side in the Y direction.

Abstract

 配管のスプールと抑制部材との係合を確認する確認部材を用いて、配管のスプールと抑制部材との係合を解除することができる配管継手を得る。 確認部材(16)の先端部(96)のZ方向の外側に突出した部分をZ方向の内側へ押圧すると、先端部(96)が突出部(64)をY方向のプラス側に引き上げて係合部(62)の開口(62A)が広がり、スプール(200A)と係合部(62)との係合が解除される。このように、配管(200)のスプール(200A)と係合部(62)との係合を確認する確認部材(16)を用いて、配管(200)のスプール(200A)と係合部(62)との係合を解除することができる。

Description

配管継手
 本発明は、配管継手に関する。
 特許文献1(特開2013-32801号公報)に記載の配管継手では、円環状のスプールを有する配管を配管継手に取り付けると、スプールと配管継手の抑制部材(リテーナの脚部)とが係合して配管継手からの配管の抜去が抑制されるようになっている。
 さらに、スプールと抑制部材とが係合状態となると、確認部材(プルタブ)が本体から引き抜き可能となる。つまり、確認部材を本体から引き抜くことで、スプールと抑制部材との係合が確認される。
 このように、従来の確認部材では、配管のスプールと抑制部材との係合を確認することしかできなかった。
 本発明の課題は、配管のスプールと抑制部材との係合を確認する確認部材を用いて、配管のスプールと抑制部材との係合を解除することである。
 本発明の第一態様の配管継手は、円環状のスプールを有する配管の端部が挿入される挿入孔が形成されるハウジングと、端部が前記挿入孔に挿入された前記配管の前記スプールと係合し、前記配管が前記挿入孔から抜去されるのを抑制する抑制部材と、仮止め位置に配置された状態で前記配管の端部が前記挿入孔へ挿入されて前記抑制部材が前記スプールと係合すると、前記配管の挿入方向に対して交差する交差方向の一側へ移動可能となり前記抑制部材と前記スプールとの係合状態が確認されると共に、前記交差方向の他側へ移動させると前記抑制部材と前記スプールとの係合を解除させるように前記抑制部材を変形させる確認解除部材と、を備えることを特徴とする。
 上記構成によると、確認解除部材が仮止め位置に配置された状態で、配管の端部がハウジングの挿入孔へ挿入されて抑制部材がスプールと係合すると、確認解除部材の交差方向の一側へ移動が可能となり抑制部材とスプールとの係合状態が確認される。
 一方、配管の端部がハウジングの挿入孔へ挿入されて抑制部材がスプールと係合した状態で、確認解除部材を交差方向の他側へ移動させると(持ち上げると)、抑制部材とスプールとの係合を解除するように抑制部材が変形する。
 このように、配管のスプールと抑制部材との係合を確認する確認解除部材を用いて、配管のスプールと抑制部材との係合を解除することができる。
 上記態様において、前記抑制部材には、一部が離間して開口が形成された環状とされ、前記配管の径方向の外側から前記スプールに係合する係合部位と、前記係合部位から前記径方向の外側に突出する突出部位とが形成され、前記確認解除部材には、前記確認解除部材を前記交差方向の他側へ移動させると前記突出部位を引き上げて前記係合部位の開口が広がるように前記係合部位を変形させて前記スプールと前記係合部位との係合を解除する引上げ部位が形成されることを特徴とする。
 上記構成によると、確認解除部材を交差方向の他側へ移動させると、確認解除部材に形成される引上げ部位が、抑制部材の突起部位を引き上げて係合部位の開口が広がるように抑制部材を変形させる。これにより、抑制部材とスプールとの係合が解除される。
 このように、簡易な構成で、スプールと抑制部材との係合を解除することができる。
 上記態様において、前記係合部位が湾曲形状とされている。
 上記態様において、前記確認解除部材を前記交差方向の他側へ移動させると、前記係合部位の開口が広がるように前記引上げ部位を案内する案内部位が備えられることを特徴とする。
 上記構成によると、確認解除部材を交差方向の他側へ移動させると、案内部位が、係合部位の開口が広がるように引上げ部位を案内する。このため、案内部位が備えられていない場合と比して、容易に係合部位の開口が広がるように係合部位を変形させてスプールと係合部位との係合を解除することができる。
 上記態様において、前記確認解除部材には、前記確認解除部材を前記交差方向の他側へ移動させて前記係合部位の開口が広がるように前記係合部位を変形させた状態で、前記ハウジングに係止されて前記確認解除部材の前記交差方向の一側への移動を規制する規制部位が形成されることを特徴とする。
 上記構成によると、確認解除部材を交差方向の他側へ移動させて係合部位の開口が広がるように係合部位を変形させた状態で、規制部位がハウジングに係止されて確認解除部材の交差方向の一側への移動が規制される。
 これにより、係合部位が変形した状態を維持するために確認解除部材に負荷される保持力を解除しても、配管を配管継手から取り外すことができる。
 本発明によれば、配管のスプールと抑制部材との係合を確認する確認部材を用いて、配管のスプールと抑制部材との係合を解除することができる。
本発明の第1実施形態に係る配管継手を示した分解斜視図である。 本発明の第1実施形態に係る配管継手において、確認部材を取り外した状態を示した分解斜視図である。 本発明の第1実施形態に係る配管継手において、確認部材が仮止め位置に配置された状態を示した斜視図である。 本発明の第1実施形態に係る配管継手において、確認部材が係合確認位置に配置された状態を示した斜視図である。 本発明の第1実施形態に係る配管継手において、配管が挿入孔に挿入された状態を示した断面図である。 本発明の第1実施形態に係る配管継手において、配管が挿入孔に挿入された状態を示した断面図である。 本発明の第1実施形態に係る配管継手において、ハウジングとリテーナとの取付状態を示した断面図である。 本発明の第1実施形態に係る配管継手において、ハウジングとリテーナとの取付状態を示した断面図である。 本発明の第1実施形態に係る配管継手において、配管が挿入孔に挿入される際の状態を示した断面図である。 本発明の第1実施形態に係る配管継手において、配管が挿入孔に挿入される際の状態を示した断面図である。 本発明の第1実施形態に係る配管継手において、確認部材が仮止め位置に配置された状態を示した断面図である。 本発明の第1実施形態に係る配管継手において、確認部材が仮止め位置から係合確認位置へ移動する際の状態を示した断面図である。 本発明の第1実施形態に係る配管継手において、確認部材が仮止め位置から係合確認位置へ移動する際の状態を示した断面図である。 本発明の第1実施形態に係る配管継手において、確認部材を仮止め位置から持ち上げる際の状態を示した背面図である。 本発明の第1実施形態に係る配管継手において、確認部材を仮止め位置から持ち上げる際の状態を示した背面図である。 本発明の第1実施形態に係る配管継手において、確認部材が仮止め位置に配置された状態を示した断面図である。 本発明の第1実施形態に係る配管継手において、係合確認位置に配置された確認部材の先端部とレールの下端との係止を解除する際の状態を示した断面図である。 本発明の第1実施形態に係る配管継手において、係合確認位置に配置された確認部材の先端部とレールの下端との係止を解除する際の状態を示した断面図である。 本発明の第1実施形態に係る配管継手において、確認部材を仮止め位置から持ち上げる際の状態を示した断面図である。 本発明の第1実施形態に係る配管継手において、確認部材を仮止め位置から持ち上げる際の状態を示した断面図である。 本発明の第2実施形態に係る配管継手に用いられる確認部材を示した斜視図である。 本発明の第2実施形態に係る配管継手において、確認部材を仮止め位置から持ち上げる際の状態を示した断面図である。 本発明の第2実施形態に係る配管継手において、確認部材を仮止め位置から持ち上げる際の状態を示した断面図である。 本発明の第2実施形態に係る配管継手において、確認部材を仮止め位置から持ち上げた状態が維持されているのを示した断面図である。
 <第1実施形態>
 本発明の第1実施形態に係る配管継手の一例について図1~図15に従って説明する。
 (全体構成)
 配管継手10は、一方にチューブ(図示省略)が固定され、他方に円環状のスプール200Aを外周面に有する配管200の端部が後述する挿入孔20に挿入されることで、配管200の流路とチューブの流路とを連通させるようになっている。
 配管継手10は、図1に示されるように、挿入孔20に挿入される配管200の挿入方向(以下「X方向」と記載する)に延びるハウジング12を備えている。さらに、配管継手10は、ハウジング12に取り付けられると共に、配管200のスプール200Aと係合して挿入孔20に挿入された配管200が抜去されるのを抑制する抑制部材の一例としてのリテーナ14を備えている。
 また、配管継手10は、ハウジング12及びリテーナ14に仮止めされる仮止め位置に配置される確認解除部材の一例としての確認部材16を備えている(図3参照)。仮止め位置に配置された確認部材16は、配管200が挿入孔20に挿入されると、X方向に対して交差(本実施形態では直交)する交差方向(以下「Y方向」)のマイナス側(一側:図中下側)へ移動できるようになっている。
 (ハウジング)
 ハウジング12は、樹脂材料で一体的に成形されている。さらに、ハウジング12は、X方向に延びると共に配管200の端部が挿入される挿入孔20が形成される筒部位22と、リテーナ14が取り付けられる取付部位24とを備えている。
 また、ハウジング12は、X方向から見て、挿入孔20のY方向に延びる中心線(各図に示す線C)に対して対称に形成されている(図12A、図12B参照)。
 〔筒部位〕
 筒部位22の外周面においてX方向のプラス側(図中右側)には、図5、図6に示されるように、X方向のプラス側が先細りとなるテーパ部26が複数(本実施形態では3個)形成されている。これにより、筒部位22のX方向のプラス側が、図示せぬチューブに挿入され、筒部位22にチューブが固定されるようになっている。また、筒部位22の外周面には、チューブが筒部位22に固定された状態で、筒部位22の外周面とチューブの内周面とをシールするOリング(図示省略)が配置されている。
 一方、筒部位22に形成された挿入孔20は、X方向のプラス側に向かうに従って段状に小径化されている。また、挿入孔20において、X方向のマイナス側(配管200が挿入される挿入側)の端部には、挿入孔20に挿入された配管200の外周面と接触して挿入孔20の内周面と配管200の外周面とをシールするOリング28が配置されている。
 〔取付部位〕
 取付部位24は、筒部位22のX方向のマイナス側に形成されている。
 ハウジング12の外部からリテーナ14をY方向のマイナス側(図1の下側)に移動させることでリテーナ14が取付部位24に取り付けられるように、取付部位24の内部は、図1に示されるように、Y方向のプラス側(図1の上側)に開放されている。
 具体的には、取付部位24は、X方向及びY方向に対して直交する幅方向(以下「Z方向」方向と記載する)に離間する一対の側壁部30を備えている。さらに、取付部位24は、一対の側壁部30のX方向のマイナス側を連結させると共に挿入孔20の端部と対向する対向壁部32と、一対の側壁部30のY方向のマイナス側に架け渡された架橋部34(図10参照)と、を備えている。
 [側壁部]
 夫々の側壁部30は、図5に示されるように、X方向のプラス側に配置されてX方向のプラス側の端部が筒部位22に固定された板状の側板38と、側板に対してX方向のマイナス側に配置されたレール部40とを備えている。このレール部40は、Y方向に延びる凹状のレール40Aと、レール40Aに対してX方向のプラス側に配置されるレール40Bとを備えている。
 [対向壁部]
 対向壁部32は、そのZ方向の両端部がレール部40に固定され、図12A、図12Bに示されるように、X方向からみて、略矩形状とされている。さらに、対向壁部32は、挿入孔20と同心円となる貫通孔42を備えている。
 また、対向壁部32において貫通孔42に対してY方向のプラス側には、Z方向に離間する一対の案内溝44が形成されている。
 一対の案内溝44のZ方向の外側(X方向から見て挿入孔20から離間する側)は開放され、一対の案内溝44は、Y方向のプラス側に向かうに従って互いに接近するようにY方向に対して傾斜している。
 [架橋部]
 架橋部34は、一対のレール部40のY方向のマイナス側を架け渡されている。この架橋部34は、図10に示されるように、X方向から見て、挿入孔20と同心の円弧面48Aと、円弧面48AのZ方向の両端部からY方向のマイナス側に延びると共にレール部40とZ方向で離間する一対の側面48Bとから囲まれるブロック48を備えている。
 そして、円弧面48Aと側面48Bとで構成される頂部48Cが、後述する凹溝84Aと噛合って、確認部材16が仮止め位置に配置されるようになっている(詳細は後述する)。
 (リテーナ)
 リテーナ14は、図1、図2に示されるように、樹脂材料で一体的に成形され、前述したように、Y方向のマイナス側に移動させることでハウジング12の外側からハウジング12の取付部位24に取り付けられるようになっている。また、リテーナ14は、X方向から見て、挿入孔20のY方向に延びる中心線(各図に示す線C)に対して対称に形成されている。
 さらに、リテーナ14は、X方向のプラス側に形成され、挿入孔20に配置されたOリング28(図5参照)のX方向の位置を規制する規制部位50を有している。また、リテーナ14は、挿入孔20に端部が挿入された配管200のスプール200Aと係合して配管200が挿入孔20から抜去されるのを抑制する抑制部位52を有している。
 そして、リテーナ14が取付部位24に取り付けられた状態で、リテーナ14は、図6に示されるように、X方向において対向壁部32と筒部位22とに挟まれるようになっている。
 〔規制部位〕
 規制部位50は、図5に示されるように、X方向のプラス側を向いて、X方向において挿入孔20に配置されたOリング28と接触してOリング28のX方向のマイナス側の移動を規制する規制面60を備えている。さらに、規制部位50は、挿入孔20に挿入される配管200が挿通する挿通孔54を備えている。
 また、規制部位50は、図7に示されるように、リテーナ14がハウジング12の取付部位24に取り付けられた状態で、取付部位24の一対の側板38に挟み込まれるようになっている。
 さらに、規制部位50においてZ方向の外側を向いた一対の側面56には、凹状の凹部56Aが夫々形成され、リテーナ14が取付部位24に取り付けられた状態で、この凹部56Aが、側板38に形成された突起38Aと噛合うようになっている。このように、凹部56Aと突起38Aとが噛合うことで、取付部位24に取り付けられたリテーナ14のY方向のプラス側への移動が規制されるようになっている(リテーナ14の取付状態が保持される)。
 また、規制部位50のY方向のプラス側には、Z方向の外側に突出する突起50Aが夫々形成され、リテーナ14が取付部位24に取り付けられた状態で、この突起50Aが、側板38のY方向のプラス側の端面にY方向のプラス側から当たるようになっている。このように、突起50Aが側板38にY方向のプラス側から当たることで、取付部位24に取り付けられたリテーナ14のY方向のマイナス側への移動が規制されるようになっている(リテーナ14の取付状態が保持される)。
 また、規制部位50は、図1に示されるように、凹部56Aに対してX方向のマイナス側に配置される引掛け部58を備えている。この引掛け部58は、図8に示されるように、Y方向に延びると共にY方向のマイナス側が自由端とされる支持棒58Aと、支持棒58AのY方向のマイナス側に形成されてZ方向の外側に突出する突起58Bとを備えている。
 そして、リテーナ14がハウジング12に取り付けられた状態で、この突起58Bが、側板38の端縁に引っ掛けられるようになっている。これにより、取付部位24に取り付けられたリテーナ14のY方向のプラス側への移動が一層規制されるようになっている(リテーナ14の取付状態が保持される)。
 〔抑制部位〕
 抑制部位52は、図1に示されるように、規制部位50に対してX方向のマイナス側に配置され、抑制部位52のY方向のプラス側と規制部位50のY方向のプラス側とが連結されている。
 そして、抑制部位52は、挿入孔20に挿入される配管200の径方向の外側からスプール200Aに係合する係合部位の一例としての係合部62と、係合部62から配管200の径方向の外側に突出する突出部位の一例としての突出部64とを備えている。
 [係合部]
 係合部62は、図13に示されるように、Y方向のマイナス側の一部が離間した開口62Aが形成された環状で、湾曲した形状(湾曲形状)とされている。さらに、係合部62には、配管200が挿入孔20に挿入される際に、配管200のスプール200Aに押圧される一対のテーパ面62Bが、図9A、図9Bに示されるように、形成されている。
 テーパ面62Bは、X方向のプラス側に向かうに従って、Z方向の内側(X方向から見て挿入孔20に接近する側)に傾くように傾斜している。これにより、配管200が挿入孔20に挿入される際に、配管200のスプール200Aがテーパ面62BをX方向のプラス側に押圧すると、係合部62は開口62A(図13参照)が広がるように弾性変形するようになっている。
 そして、スプール200AのX方向のプラス側への移動が許容され、図9Bに示されるように、X方向のプラス側へ移動したスプール200Aは、規制部位50の端面と当たって停止するようになっている。この状態で、係合部62が弾性復帰してスプール200Aと係合し(係合状態)、挿入孔20からの配管200の抜去が抑制されるようになっている。
 [突出部]
 突出部64は、図13に示されるように、係合部62の外周面から、挿入孔20に挿入される配管200の径方向の外側に突出するように2個(一対)形成されている。
 一対の突出部64は、X方向から見て、線Cに対して対称に形成されている。夫々の突出部64は、Z方向に対して先端がY方向のプラス側に配置されるように傾斜する傾斜材64Aと、傾斜材64Aの先端からY方向のプラス側に延びる中間材64Bと、中間材64Bの先端からZ方向の外側に延びる突起64Cとを備えている。
 (確認部材)
 確認部材16は、樹脂材料で一体的に成形され、X方向から見て、線Cに対して対称に形成されている。また、確認部材16は、ハウジング12及びリテーナ14に仮止めされる仮止め位置に配置された状態で、配管継手10が出荷されるようになっている(図3参照)。なお、仮止め位置については、詳細を後述する。
 さらに、確認部材16は、確認部材16が仮止め位置に配置された状態で、図3に示されるように、係合状態のスプール200Aと当たって確認部材16のY方向のマイナス側への移動を許容する確認部位70を備えている(図9B参照)。また、確認部材16は、確認部材16を仮止め位置からY方向のプラス側へ移動させるとリテーナ14の係合部62を変形させて係合部62とスプール200Aとの係合を解除させる解除部位72を備えている(図15B参照)。解除部位72は、確認部位70に対してX方向のマイナス側に配置され、解除部位72と確認部位70とはY方向のプラス側で連結されている。
 〔確認部位〕
 確認部位70は、図10に示されるように、Y方向に延びると共にレール40Bに嵌ってY方向に案内され、Y方向のマイナス側が自由端とされる一対のガイド部76を備えている。また、確認部位70は、一対のガイド部76のY方向のプラス側に架け渡される架橋部78を備えている。
 さらに、確認部材16は、ガイド部76に対してZ方向の内側に配置される一対の確認部80を備えている。確認部80は、基端部が架橋部78に固定され、Y方向のマイナス側に延びる延設材82と、延設材82の先端に形成されると共に延設材82に対してZ方向の内側へ広くされた先端材84とを夫々備えている。
 先端材84のY方向のマイナス側の端部には、凹溝84Aが形成され、確認部材16が仮止め位置に配置された状態で、前述した架橋部34の頂部48CがY方向で凹溝84Aと嵌るようになっている。これにより、仮止め位置に配置された確認部材16のY方向のマイナス側への移動が規制されるようになっている。
 また、X方向から見て、先端材84における凹溝84Aに対してZ方向の内側には、Y方向のプラス側に向けて傾斜する傾斜面84Bが形成されている。
 さらに、先端材84には、図9Bに示されるように、係合部62と係合状態のスプール200Aに押圧されるテーパ面84Cが形成されている。テーパ面84Cは、X方向のプラス側に向かうに従って、Z方向の内側に傾くように傾斜している。
 これにより、配管200が挿入孔20に挿入されてスプール200Aと係合部62とが係合状態となると、スプール200Aがテーパ面84Cを押圧して、図11Aに示されるように、延設材82の自由端部がZ方向の外側に弾性変形する。そして、凹溝84Aと頂部48Cとの嵌合が解除され、仮止め位置に配置された確認部材16のY方向のマイナス側へ移動が可能となるようになっている。
 つまり、確認部材16が仮止め位置に配置された状態とは、配管200を挿入孔20に挿入してスプール200Aに係合部62を係合させることができる状態であると共に、確認部材16のY方向のマイナス側への移動が規制されている状態である。所謂配管継手10の納入状態(初期状態)である。
 〔解除部位〕
 解除部位72は、図13に示されるように、Y方向に延びると共にレール40Aに嵌ってY方向に案内され、Y方向のマイナス側が自由端とされる一対のガイド部88と、一対のガイド部88のY方向のプラス側に架け渡される架橋部90とを備えている。この架橋部90が、確認部位70の架橋部78(図10参照)とX方向で連結されている。
 このガイド部88の先端には、ガイド部88に対してZ方向の内側及びZ方向の外側に突出した引上げ部位の一例としての先端部96が形成されている。確認部材16が仮止め位置に配置された状態で、先端部96においてZ方向の内側に突出した部分は、抑制部位52の突起64CにY方向のマイナス側から接触するようになっている。これにより、仮止め位置に配置された確認部材16のY方向のプラス側への移動が規制されるようになっている。また、先端部96においてZ方向の外側に突出した部分は、X方向から見て取付部位24からZ方向の外側へ突出している(図12A参照)。
 一方、前述したように、スプール200Aと係合部62とが係合状態となり、凹溝84Aと頂部48Cとの嵌合が解除された確認部材16のY方向のマイナス側へ移動が可能となる(図11A参照)。そこで、確認部材16をY方向のマイナス側へ移動させると、図14Aに示されるように、架橋部90の内周面90A(抑止曲面の一例)と、係合部62の外周面62CとがY方向で面接触する。そして、確認部材16が係合確認位置へ配置されるようになっている(図4参照)。
 また、解除部位72は、確認部材16が係合確認位置に配置された状態で、突出部64の中間材64B及び突起64Cを夫々抱え込む凹部位の一例としての凹部92を2個備えている。
 さらに、この係合確認位置に確認部材16が配置された状態で、先端部96においてZ方向の内側に突出した部分が、レール40Aの下端に係止されるようになっている。
 これに対して、係合確認位置に配置された確認部材16をY方向のプラス側に移動させて仮止め位置に配置する(図15A参照)。さらに、仮止め位置に配置された確認部材16をY方向のプラス側に移動させると、図15Bに示されるように、先端部96が突出部64をY方向のプラス側に引き上げるようになっている。
 この際に、先端部96の移動を規制するために用いられる円筒状の突起94が、図3に示されるように、先端部96からX方向のマイナス側に突出して対向壁部32に形成された案内溝44内に配置されている(図12A参照)。
 この構成により、確認部材16が仮止め位置に配置された状態で、先端部96のZ方向の外側に突出した部分を、Z方向の内側へ押圧する、又は、確認部材16をY方向のプラス側へ持ち上げる。そうすると、図12A、図12Bに示されるように、突起94が、案内溝44の一端から他端へ移動する。これにより、先端部96の移動が規制されるようになっている。そして、先端部96が突出部64をY方向のプラス側に引き上げ、図15Bに示されるように、係合部62の開口62Aが広がり、スプール200Aと係合部62との係合が解除されるようになっている。
 以上より、確認部材16をY方向のプラス側へ移動させると、係合部62の開口62Aが広がるように突出部64を案内する案内部位46は、案内溝44と突起94とから構成されている(図12A、図12B参照)。
 (作用)
 次に、本第1実施形態に係る配管継手10の作用を、配管挿入作業、確認作業、及び配管抜去作業に分けて説明する。なお、配管挿入作業は、配管200を配管継手10に取り付ける作業であって、確認作業は、配管200が配管継手10に取り付けられているのを確認する作業であって、配管抜去作業は、配管200を配管継手10から取り外す作業である。
 〔配管挿入作業〕
 配管挿入作業では、配管継手10の確認部材16は、図3に示されるように、ハウジング12及びリテーナ14に仮止めされる仮止め位置に配置されている。そして、配管継手10の筒部位22の外周面に、チューブ(図示省略)を取り付ける。
 確認部材16が仮止め位置に配置された状態では、図10に示されるように、確認部80の凹溝84Aと架橋部34の頂部48Cとが嵌合している。これにより、確認部材16のY方向のマイナス側への移動が規制されている。さらに、図13に示されるように、解除部位72の先端部96のZ方向の内側の部分が突起64CにY方向のマイナス側から接触し、確認部材16のY方向のプラス側への移動が規制されている。
 この状態で先ず、配管200の端部を、対向壁部32の貫通孔42、及び規制部位50の挿通孔54を通過させ、挿入孔20に挿入する。
 配管200の端部を挿入孔20に挿入すると、図9Aに示されるように、配管200のスプール200Aが係合部62のテーパ面62BへX方向のマイナス側から接触する。さらに、配管200をX方向のプラス側へ移動させると、スプール200Aがテーパ面62BをX方向のプラス側に押圧し、これにより、係合部62は、開口62A(図13参照)が広がるように弾性変形する。
 そして、スプール200AのX方向のプラス側への移動が許容され、配管200を、さらに、X方向のプラス側へ移動させると、図9Bに示されるように、スプール200Aが確認部80のテーパ面84CをX方向のプラス側に押圧する。これにより、図11Aに示されるように、延設材82の自由端がZ方向の外側に弾性変形する。そして、凹溝84Aと頂部48Cとの嵌合が解除され、仮止め位置に配置された確認部材16のY方向のマイナス側へ移動が可能となる。X方向のプラス側へ移動したスプール200Aは規制部位50の端面と当たって停止する(図9B参照)。この状態で、図9Bに示されるように、係合部62が弾性復帰して、スプール200Aと係合し(係合状態)、挿入孔20からの配管200の抜去が抑制される。
 また、この係合状態で、挿入孔20に配置されたOリング28が、挿入孔20に挿入された配管200の外周面と接触して挿入孔20の内周面と配管200の外周面とがシールされる。
 このようにして、配管200が挿入孔20に挿入されて配管継手10に取り付けられ、配管200の流路とチューブの流路とが連通される。
 〔確認作業〕
 確認作業は、前述したように、配管200が配管継手10に取り付けられているのを確認する作業であり、換言すれば、スプール200Aと係合部62とが係合状態にあることを確認する作業である。
 前述したように、スプール200Aと係合部62との係合状態では、図11Aに示されるように、確認部80の凹溝84Aと架橋部34の頂部48Cとの嵌合が解除され、仮止め位置に配置されていた確認部材16のY方向のマイナス側への移動が可能となる。
 そして、確認部材16をY方向のマイナス側へ移動させると、図11B、図14Aに示されるように、架橋部90の内周面90Aと、係合部62の外周面62CとがY方向で面接触し、確認部材16のY方向のマイナス側への移動が規制される。これにより、確認部材16が係合確認位置へ配置される。
 また、確認部材16が係合確認位置へ配置されると、図14Aに示されるように、解除部位72に形成された夫々の凹部92が、突出部64の中間材64B及び突起64Cを夫々抱え込む。さらに、先端部96においてZ方向の内側に突出した部分が、レール40Aの下端に係止される。これにより、確認部材16のY方向のプラス側への移動が規制される。
 このように、確認部材16を係合確認位置へ移動させることで、スプール200Aと係合部62との係合状態が確認される。
 〔配管抜去作業〕
 配管抜去作業は、前述したように、配管200を配管継手10から取り外す作業である。
 確認部材16が係合確認位置へ配置された状態から、配管200を配管継手10から取り外す場合には、先ず、図14Bに示されるように、先端部96においてZ方向の外側に突出した部分を用いて、先端部96をZ方向の外側へ広げる。これにより、先端部96においてZ方向の内側に突出した部分とレール40Aの下端との係止が解除される。
 先端部96とレール40Aの下端との係止が解除された状態で、確認部材16をY方向のプラス側へ移動させ、図15Aに示されるように、確認部材16を仮止め位置へ移動させる。
 そして、確認部材16が仮止め位置に配置された状態で、先端部96のZ方向の外側に突出した部分を、Z方向の内側へ押圧する、又は、確認部材16をY方向のプラス側へ持ち上げる。そうすると、図12A、図12Bに示されるように、突起94が、案内溝44の一端から他端へ移動する。これにより、図15Bに示されるように、先端部96が突出部64をY方向のプラス側に引き上げることで、係合部62の開口62Aが広がり(図中矢印参照)、スプール200Aと係合部62との係合が解除される。
 さらに、スプール200Aと係合部62との係合が解除された状態で、配管200をX方向のマイナス側へ移動させると、配管200の端部が挿入孔20から抜去され、配管200が配管継手10から取り外される。
 配管が20を配管継手10から取り外した後、先端部96のZ方向の外側に突出した部分の押圧力(保持力の一例)、又は、確認部材16のY方向のプラス側へ持ち上力(保持力の一例)を解除する。そうすると、図10、図13に示されるように、係合部62が弾性復帰して、確認部材16が仮止め位置に移動する(配置される)。
 (効果)
 次に、本第1実施形態に係る配管継手10の効果について説明する。
 本第1実施形態に係る配管継手10では、リテーナ14は、図1に示されるように、挿入孔20に配置されたOリング28(図5参照)の位置を規制する規制部位50を備えている。また、リテーナ14は、配管200のスプール200Aと係合して配管200が挿入孔20から抜去されるのを抑制する抑制部位52とを備えている。さらに、リテーナ14をY方向のマイナス側に移動させてリテーナ14を取付部位24に取り付けることで、リテーナ14は、図6に示されるように、X方向において対向壁部32と筒部位22とに挟まれる。つまり、リテーナ14のX方向の移動が、対向壁部32と筒部位22によって規制されている。
 これにより、部品点数を削減した上で、配管継手10内をX方向に流れる流体の圧力により、Oリング28の位置を規制するリテーナ14がX方向に移動してしまうのを抑制することができる。
 また、リテーナ14は、樹脂材料で一体的に成形されている。このため、複数の部材を組み合わせてリテーナを構成する場合と比して、安価な構成とすることができる。また、形状を工夫することで、アンダーカットを無くし、簡易な金型構造とすることができる。
 また、前述した確認作業において、確認部材16が係合確認位置へ配置されると、架橋部90の内周面90Aと、係合部62の外周面62Cとが面接触する。これにより、係合部62の開口62Aが広がるような係合部62の変形が抑止されてスプール200Aと係合部62との係合が解除されるのを抑制する。換言すれば、配管200のスプール200Aと係合部62との係合を確認する確認部材16を用いて、配管継手10が配管200を保持する際の保持力を向上させることができる。
 また、前述した確認作業において、確認部材16が係合確認位置へ配置されると、解除部位72に形成された夫々凹部92が、突出部64の中間材64B及び突起64Cを夫々抱え込む。これにより、係合部62の開口62Aが広がるような係合部62の変形が抑止されてスプール200Aと係合部62との係合が解除されるのを抑制する。このように、スプール200Aと係合部62との係合が解除されるのを効果的に抑制することができる。
 また、前述した確認作業において、確認部材16が係合確認位置へ配置されると、先端部96においてZ方向の内側に突出した部分が、レール40Aの下端に係止される。そして、確認部材16のY方向のプラス側への移動が規制される。これにより、係合確認位置に配置された確認部材16が意図せずY方向のプラス側に移動して、配管継手10が配管200を保持する際の保持力が低下するのを抑制することができる。
 また、前述した配管抜去作業において、確認部材16の先端部96のZ方向の外側に突出した部分をZ方向の内側へ押圧する、又は、確認部材16をY方向のプラス側へ持ち上げる。そうすると、図12A、図12Bに示されるように、突起94が、案内溝44の一端から他端へ移動する。これにより、図15Bに示されるように、先端部96が突出部64をY方向のプラス側に引き上げて係合部62の開口62Aが広がり、スプール200Aと係合部62との係合が解除される。このように、配管200のスプール200Aと係合部62との係合を確認する確認部材16を用いて、配管200のスプール200Aと係合部62との係合を解除することができる。換言すれれば、専用の工具を用いることなく、簡易な構成で、スプール200Aと係合部62との係合を解除することができる。
 また、前述した配管抜去作業において、確認部材16の先端部96のZ方向の外側に突出した部分をZ方向の内側へ押圧する、又は、確認部材16をY方向のプラス側へ持ち上げる。そうすると、図12A、図12Bに示されるように、突起94が、案内溝44の一端から他端へ移動する。つまり、案内部位46は、確認部材16の先端部96のZ方向の外側に突出した部分をZ方向の内側へ押圧する、又は、確認部材16をY方向のプラス側へ持ち上げると、係合部62の開口62Aが広がるように先端部96を案内する。このため、案内部位46が備えられていない場合と比して、容易に係合部62の開口62Aが広がるように係合部62を変形させてスプール200Aと係合部62との係合を解除することができる。
 <第2実施形態>
 次に、本発明の第2実施形態に係る配管継手の一例について図16~図18に従って説明する。なお、第1実施形態と同一部材については、同一符号を付してその説明を省略し、第1実施形態と異なる部分を主に説明する。
 第2実施形態に係る配管継手100における確認部材106の確認部108は、図16に示されるように、先端材84よりもX方向に幅広の延設材110を備えている。
 夫々の延設材110には、Y方向のプラス側に延びると共に先端部がZ方向の外側に突出する規制部位の一例としての規制爪112が一体的に形成されている。具体的には、規制爪112は、基端が延設材110に固定されてY方向のプラス側の先端が自由端とされる棒材112Aと、棒材112Aの先端部からZ方向の外側に突出する突起112Bとを備えている。
 以上の構成により、確認部材106が仮止め位置に配置された状態で、配管継手100に配管200を挿入すると、図17A、図17Bに示されるように、延設材110の自由端部がZ方向の外側に弾性変形する。そして、凹溝84Aと頂部48Cとの嵌合が解除され、仮止め位置に配置された確認部材106のY方向のマイナス側へ移動が可能となる。この状態では、規制爪112の突起112Bがレール40Bの内壁と接触し、棒材112Aの先端がZ方向の内側に弾性変形して撓む。また、配管200のスプール200Aと係合部62とが係合状態となっている。
 スプール200Aと係合部62との係合を解除しようとして、確認部材106の先端部96のZ方向の外側に突出した部分をZ方向の内側へ押圧する、又は、確認部材106をY方向のプラス側へ持ち上げる。そうすると、図18に示されるように、規制爪112の突起112BもY方向のプラス側へ移動する。そして、突起112Bがレール40BよりもY方向のプラス側へ到達すると、規制爪112が弾性復帰して、突起112Bがレール40Bの端部に係止される。
 突起112Bがレール40Bの端部に係止された状態では、第1実施形態で図15Bを用いて説明したように、先端部96が突出部64をY方向のプラス側に引き上げ、係合部62の開口62Aが広がり、スプール200Aと係合部62との係合が解除されている。そして、開口62Aを広げられた係合部62が弾性復帰しよとして、確認部材106は、Y方向のマイナス側へ移動しようとする。
 しかし、図18で示されるように、突起112Bがレール40Bの端部に係止されているため、確認部材106のY方向のマイナス側への移動は規制され、スプール200Aと係合部62との係合が解除されている状態が維持される。
 これにより、ガイド部88の先端部96のZ方向の外側に突出した部分を押圧する押圧力(保持力の一例)、又は、確認部材106をY方向のプラス側へ持ち上げる持ち上力(保持力の一例)を解除しても、配管200を挿入孔20から抜去することができる。
 なお、本発明を特定の実施形態について詳細に説明したが、本発明は係る実施形態に限定されるものではなく、本発明の範囲内にて他の種々の実施形態が可能であることは当業者にとって明らかである。例えば、上記実施形態では、リテーナ14をY方向のマイナス側に移動させて取付部位24に取り付けることで、X方向においてリテーナ14が対向壁部32と筒部位22とに挟まれるようにし、これにより、リテーナ14のX方向の移動を抑制したが、特にこれに限定されず、リテーナ14をY方向のマイナス側に移動させて取付部位24に取り付けることで、リテーナ14のX方向の移動を抑制する構成であれば他の構成であってもよい。
 また、上記実施形態では、リテーナ14をハウジング12に固定するために、一対の凹部56A(図7参照)と、一対の引掛け部58(図8参照)とを用いたが、どちらか一方でもよい。
 また、上記第2実施形態では、特に説明しなかったが、配管200のスプール200Aと係合部62とが係合状態となった後、確認部材106を係合確認位置に移動させてから確認部材106をY方向のプラス側に移動させてもよい。
 (符号の説明)
10    配管継手
12    ハウジング
14    リテーナ(抑制部材の一例)
16    確認部材(確認解除部材の一例)
20    挿入孔
46    案内部位
62    係合部(係合部位の一例)
62A    開口
64    突出部(突出部位の一例)
96    先端部(引上げ部位の一例)
112    規制爪(規制部位の一例)
200  配管
200A  スプール

Claims (5)

  1.  円環状のスプールを有する配管の端部が挿入される挿入孔が形成されるハウジングと、
     端部が前記挿入孔に挿入された前記配管の前記スプールと係合し、前記配管が前記挿入孔から抜去されるのを抑制する抑制部材と、
     仮止め位置に配置された状態で前記配管の端部が前記挿入孔へ挿入されて前記抑制部材が前記スプールと係合すると、前記配管の挿入方向に対して交差する交差方向の一側へ移動可能となり前記抑制部材と前記スプールとの係合状態が確認されると共に、前記交差方向の他側へ移動させると前記抑制部材と前記スプールとの係合を解除させるように前記抑制部材を変形させる確認解除部材と、
     を備える配管継手。
  2.  前記抑制部材には、一部が離間して開口が形成された環状とされ、前記配管の径方向の外側から前記スプールに係合する係合部位と、前記係合部位から前記径方向の外側に突出する突出部位とが形成され、
     前記確認解除部材には、前記確認解除部材を前記交差方向の他側へ移動させると前記突出部位を引き上げて前記係合部位の開口が広がるように前記係合部位を変形させて前記スプールと前記係合部位との係合を解除する引上げ部位が形成される請求項1に記載の配管継手。
  3.  前記係合部位が湾曲形状とされた請求項2に記載の配管継手。
  4.  前記確認解除部材を前記交差方向の他側へ移動させると、前記係合部位の開口が広がるように前記引上げ部位を案内する案内部位が備えられる請求項2又は請求項3に記載の配管継手。
  5.  前記確認解除部材には、前記確認解除部材を前記交差方向の他側へ移動させて前記係合部位の開口が広がるように前記係合部位を変形させた状態で、前記ハウジングに係止されて前記確認解除部材の前記交差方向の一側への移動を規制する規制部位が形成される請求項2~4のいずれか1項に記載の配管継手。
PCT/JP2014/059674 2013-04-16 2014-04-01 配管継手 WO2014171330A1 (ja)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2013-085860 2013-04-16
JP2013085860A JP5497224B1 (ja) 2013-04-16 2013-04-16 配管継手

Publications (1)

Publication Number Publication Date
WO2014171330A1 true WO2014171330A1 (ja) 2014-10-23

Family

ID=50941662

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2014/059674 WO2014171330A1 (ja) 2013-04-16 2014-04-01 配管継手

Country Status (2)

Country Link
JP (1) JP5497224B1 (ja)
WO (1) WO2014171330A1 (ja)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2018159201A1 (ja) * 2017-02-28 2018-09-07 三桜工業株式会社 配管継手
JP7150209B1 (ja) 2022-07-08 2022-10-07 三桜工業株式会社 配管継手
JP7150210B1 (ja) 2022-07-08 2022-10-07 三桜工業株式会社 配管継手

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004060884A (ja) * 2002-06-04 2004-02-26 Piolax Inc チェック機能内蔵コネクタ
JP4041457B2 (ja) * 2003-12-12 2008-01-30 三桜工業株式会社 クイックコネクタ
JP2009236206A (ja) * 2008-03-27 2009-10-15 Toyoda Gosei Co Ltd コネクタ
JP2013032801A (ja) * 2011-08-01 2013-02-14 Sanoh Industrial Co Ltd 配管継手

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004060884A (ja) * 2002-06-04 2004-02-26 Piolax Inc チェック機能内蔵コネクタ
JP4041457B2 (ja) * 2003-12-12 2008-01-30 三桜工業株式会社 クイックコネクタ
JP2009236206A (ja) * 2008-03-27 2009-10-15 Toyoda Gosei Co Ltd コネクタ
JP2013032801A (ja) * 2011-08-01 2013-02-14 Sanoh Industrial Co Ltd 配管継手

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2018159201A1 (ja) * 2017-02-28 2018-09-07 三桜工業株式会社 配管継手
JP2018141543A (ja) * 2017-02-28 2018-09-13 三桜工業株式会社 配管継手
US11035507B2 (en) 2017-02-28 2021-06-15 Sanoh Industrial Co., Ltd. Pipe connector
JP7150209B1 (ja) 2022-07-08 2022-10-07 三桜工業株式会社 配管継手
JP7150210B1 (ja) 2022-07-08 2022-10-07 三桜工業株式会社 配管継手
CN117366364A (zh) * 2022-07-08 2024-01-09 三樱工业株式会社 配管接头
CN117366368A (zh) * 2022-07-08 2024-01-09 三樱工业株式会社 配管接头
WO2024010098A1 (ja) * 2022-07-08 2024-01-11 三桜工業株式会社 配管継手
WO2024010097A1 (ja) * 2022-07-08 2024-01-11 三桜工業株式会社 配管継手
JP2024008549A (ja) * 2022-07-08 2024-01-19 三桜工業株式会社 配管継手
JP2024008548A (ja) * 2022-07-08 2024-01-19 三桜工業株式会社 配管継手
CN117366364B (zh) * 2022-07-08 2024-05-03 三樱工业株式会社 配管接头

Also Published As

Publication number Publication date
JP5497224B1 (ja) 2014-05-21
JP2014209008A (ja) 2014-11-06

Similar Documents

Publication Publication Date Title
WO2014171329A1 (ja) 配管継手
WO2014171331A1 (ja) 配管継手
JP5242421B2 (ja) 管継手
US8794887B2 (en) Clip and support member
US9113680B2 (en) Buckle
JP5687152B2 (ja) 配管継手
WO2014050119A1 (ja) コネクタ
EP2871398B1 (en) Connector
WO2014171330A1 (ja) 配管継手
WO2017051684A1 (ja) クイックコネクタ
JP6894815B2 (ja) パイプ用コネクタ
BR112012006043B1 (pt) Prendedor de mangueira
JP4330415B2 (ja) 管継手
WO2014010234A1 (ja) コネクタ
JP5911729B2 (ja) コネクタ
JP2006038092A (ja) ホースクランプ
JP4458983B2 (ja) 管継手
JP5890166B2 (ja) 管継手及び係止部材
JP2005337322A (ja) 管継手

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 14785607

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 14785607

Country of ref document: EP

Kind code of ref document: A1