WO2014115569A1 - 電力ルータとその運転制御方法、電力ネットワークシステム、プログラムが格納された非一時的なコンピュータ可読媒体 - Google Patents
電力ルータとその運転制御方法、電力ネットワークシステム、プログラムが格納された非一時的なコンピュータ可読媒体 Download PDFInfo
- Publication number
- WO2014115569A1 WO2014115569A1 PCT/JP2014/000419 JP2014000419W WO2014115569A1 WO 2014115569 A1 WO2014115569 A1 WO 2014115569A1 JP 2014000419 W JP2014000419 W JP 2014000419W WO 2014115569 A1 WO2014115569 A1 WO 2014115569A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- power
- leg
- operation mode
- activation target
- voltage
- Prior art date
Links
Images
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J1/00—Circuit arrangements for dc mains or dc distribution networks
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B15/00—Systems controlled by a computer
- G05B15/02—Systems controlled by a computer electric
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/12—Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/38—Arrangements for parallely feeding a single network by two or more generators, converters or transformers
- H02J3/40—Synchronising a generator for connection to a network or to another generator
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02M—APPARATUS FOR CONVERSION BETWEEN AC AND AC, BETWEEN AC AND DC, OR BETWEEN DC AND DC, AND FOR USE WITH MAINS OR SIMILAR POWER SUPPLY SYSTEMS; CONVERSION OF DC OR AC INPUT POWER INTO SURGE OUTPUT POWER; CONTROL OR REGULATION THEREOF
- H02M7/00—Conversion of ac power input into dc power output; Conversion of dc power input into ac power output
- H02M7/66—Conversion of ac power input into dc power output; Conversion of dc power input into ac power output with possibility of reversal
- H02M7/68—Conversion of ac power input into dc power output; Conversion of dc power input into ac power output with possibility of reversal by static converters
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02M—APPARATUS FOR CONVERSION BETWEEN AC AND AC, BETWEEN AC AND DC, OR BETWEEN DC AND DC, AND FOR USE WITH MAINS OR SIMILAR POWER SUPPLY SYSTEMS; CONVERSION OF DC OR AC INPUT POWER INTO SURGE OUTPUT POWER; CONTROL OR REGULATION THEREOF
- H02M7/00—Conversion of ac power input into dc power output; Conversion of dc power input into ac power output
- H02M7/66—Conversion of ac power input into dc power output; Conversion of dc power input into ac power output with possibility of reversal
- H02M7/68—Conversion of ac power input into dc power output; Conversion of dc power input into ac power output with possibility of reversal by static converters
- H02M7/72—Conversion of ac power input into dc power output; Conversion of dc power input into ac power output with possibility of reversal by static converters using discharge tubes with control electrode or semiconductor devices with control electrode
- H02M7/75—Conversion of ac power input into dc power output; Conversion of dc power input into ac power output with possibility of reversal by static converters using discharge tubes with control electrode or semiconductor devices with control electrode using devices of a thyratron or thyristor type requiring extinguishing means
- H02M7/757—Conversion of ac power input into dc power output; Conversion of dc power input into ac power output with possibility of reversal by static converters using discharge tubes with control electrode or semiconductor devices with control electrode using devices of a thyratron or thyristor type requiring extinguishing means using semiconductor devices only
- H02M7/758—Conversion of ac power input into dc power output; Conversion of dc power input into ac power output with possibility of reversal by static converters using discharge tubes with control electrode or semiconductor devices with control electrode using devices of a thyratron or thyristor type requiring extinguishing means using semiconductor devices only with automatic control of output waveform or frequency
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02M—APPARATUS FOR CONVERSION BETWEEN AC AND AC, BETWEEN AC AND DC, OR BETWEEN DC AND DC, AND FOR USE WITH MAINS OR SIMILAR POWER SUPPLY SYSTEMS; CONVERSION OF DC OR AC INPUT POWER INTO SURGE OUTPUT POWER; CONTROL OR REGULATION THEREOF
- H02M7/00—Conversion of ac power input into dc power output; Conversion of dc power input into ac power output
- H02M7/66—Conversion of ac power input into dc power output; Conversion of dc power input into ac power output with possibility of reversal
- H02M7/68—Conversion of ac power input into dc power output; Conversion of dc power input into ac power output with possibility of reversal by static converters
- H02M7/72—Conversion of ac power input into dc power output; Conversion of dc power input into ac power output with possibility of reversal by static converters using discharge tubes with control electrode or semiconductor devices with control electrode
- H02M7/75—Conversion of ac power input into dc power output; Conversion of dc power input into ac power output with possibility of reversal by static converters using discharge tubes with control electrode or semiconductor devices with control electrode using devices of a thyratron or thyristor type requiring extinguishing means
- H02M7/77—Conversion of ac power input into dc power output; Conversion of dc power input into ac power output with possibility of reversal by static converters using discharge tubes with control electrode or semiconductor devices with control electrode using devices of a thyratron or thyristor type requiring extinguishing means arranged for operation in parallel
Definitions
- the present invention relates to a power router, its operation control method, a power network system, and a non-transitory computer readable medium storing a program.
- Digital Grid registered trademark
- Digital Grid is a power network system in which a power network is subdivided into small cells and these are interconnected asynchronously.
- Each power cell is a small house, a building, or a commercial facility, and a large one is a prefecture or a municipality.
- Each power cell may have a load therein, as well as a power generation facility and a power storage facility. Examples of power generation facilities include power generation facilities that use natural energy such as solar power generation, wind power generation, and geothermal power generation.
- FIG. 16 is a diagram illustrating an example of the power network system 810.
- the backbone system 811 transmits the backbone power from the large-scale power plant 812.
- a plurality of power cells 821 to 824 are arranged.
- Each of the power cells 821 to 824 includes a load such as a house 831 and a building 832, a power generation facility (for example, a solar power generation panel 833, a wind power generator 834), and a power storage facility (for example, a storage battery 835).
- a power generation facility for example, a solar power generation panel 833, a wind power generator 834
- a power storage facility for example, a storage battery 835.
- the power generation facility and the power storage facility may be collectively referred to as a distributed power source.
- each of the power cells 821 to 824 includes power routers 841 to 844 serving as connection ports (connection ports) for connection to other power cells and the backbone system 811.
- the power routers 841 to 844 have a plurality of legs (LEGs).
- LAGs legs
- a leg has a connection terminal and a power converter, and an address is given to each leg.
- the power conversion by a leg means changing from alternating current to direct current or from direct current to alternating current, and changing the voltage, frequency, and phase of electric power.
- All the power routers 841 to 844 are connected to the management server 850 by the communication network 851, and all the power routers 841 to 844 are integrated and controlled by the management server 850.
- the management server 850 instructs the power routers 841 to 844 to transmit or receive power for each leg.
- power interchange between the power cells is performed via the power routers 841 to 844.
- one power generation facility for example, a solar power generation panel 833, a wind power generator 834
- one power storage facility for example, a storage battery 835
- surplus power can be interchanged between power cells, the power supply / demand balance can be stably maintained while greatly reducing the equipment cost.
- the present invention has been made in view of the above circumstances, and an object of the present invention is to more appropriately manage power routers in the construction of a power network system in which power cells are interconnected asynchronously. That is.
- the power router includes a DC bus that maintains a voltage at a predetermined rating, a first connection end connected to the DC bus, and a second connection end serving as an external connection terminal.
- a plurality of power conversion legs connected to the other party and having a function of bidirectionally converting power between the first connection end and the second connection end, and controlling operation of the plurality of power conversion legs Control means, and the control means receives a driving instruction including a designation of a leg to be activated among the plurality of power conversion legs and a designation of an operation mode of the activation target leg, It is determined whether the activation target leg can be activated in the specified operation mode, and the activation target leg is activated in the designated operation mode when the activation object leg can be activated in the designated operation mode. To do.
- a power network system includes one or more power routers and a power system to which the power routers are directly or indirectly connected, and each of the one or more power routers is A DC bus that maintains a voltage at a predetermined rating, a first connection end connected to the DC bus, a second connection end connected to an external connection partner as an external connection terminal, and the first connection A plurality of power conversion legs having a function of bidirectionally converting power between an end and the second connection end; and a control means for controlling operation of the plurality of power conversion legs, the control means Receives the operation instruction including the designation of the leg to be activated among the plurality of power conversion legs and the designation of the operation mode of the activation target leg, and the operation mode in which the activation target leg is designated. Can be started with Make decisions about whether, when said start target legs can be started by the operation mode to the specified, it is intended to start the start target leg in the operation mode to the specified.
- An operation control method for a power router includes a DC bus that maintains a voltage at a predetermined rating, a first connection end connected to the DC bus, and a second connection end connected to an external connection terminal.
- a plurality of power conversion legs connected to an external connection partner and having a function of bidirectionally converting power between the first connection end and the second connection end.
- an operation instruction including an activation target leg to be activated and an operation mode designation of the activation target leg is received, and the activation target leg is designated in the operation mode.
- a determination is made as to whether or not the activation target leg can be activated, and when the activation target leg can be activated in the designated operation mode, the activation target leg is activated in the designated operation mode.
- An operation control program for a power router includes a DC bus that maintains a voltage at a predetermined rating, a first connection end connected to the DC bus, and a second connection end connected to an external connection terminal.
- a plurality of power conversion legs connected to an external connection partner and having a function of bidirectionally converting power between the first connection end and the second connection end, and a plurality of power conversion legs
- the computer is configured to specify a start target leg to be started among the plurality of power conversion legs, and an operation mode of the start target leg.
- a control program for a management apparatus controls one or a plurality of power routers, a power system to which the power routers are directly or indirectly connected, and an operation of the one or more power routers.
- Each of the one or more power routers is connected to the DC bus, and a first connection terminal is connected to the DC bus.
- a plurality of power conversion legs connected to an external connection partner as external connection terminals and having a function of bidirectionally converting power between the first connection end and the second connection end;
- Control means for controlling the operation of the plurality of power conversion legs, and in the computer, designation of the activation target leg to be activated among the plurality of power conversion legs, and the operation mode of the activation target leg Finger
- a determination is made as to whether or not the activation target leg can be activated, and when the activation target leg can be activated in the designated operation mode, the activation target leg is activated in the designated operation mode.
- FIG. 1 is a block diagram showing a schematic configuration of a power router 100.
- FIG. It is the block diagram of the power router 100 which displayed the example of the internal structure of a leg.
- FIG. It is the block diagram of the power router 100 which displayed the internal structure of the leg in detail.
- 3 is a block diagram illustrating a configuration example of a power router 170 having an AC through leg 60.
- FIG. It is a block diagram which shows typically the structure of the control part 19, and the relationship with a starting object leg.
- 4 is a flowchart showing a start-up procedure of a start target leg in the power router 100. It is a flowchart which shows the process sequence of driving
- FIG. 5 is a flowchart showing a procedure of a power transmission start operation of the power router 200. It is a flowchart which shows the procedure of 1st power transmission adjustment process step S61 of the electric power router 200.
- FIG. It is a flowchart which shows the procedure of 2nd power transmission adjustment process step S71 of the electric power router 200.
- FIG. It is a flowchart which shows the procedure of 3rd power transmission adjustment process step S73 of the electric power router 200.
- FIG. It is a block diagram which shows typically the structure of the electric power network system 1001 which is an example of an electric power network system. It is a block diagram which shows typically the structure of the power network system 1002 which is an example of a power network system. It is a block diagram which shows typically the structure of the electric power network system 1003 which is an example of an electric power network system.
- 1 is a diagram illustrating an example of a power network system 810.
- Embodiment 1 In the present embodiment, the activation of the power router and the activation of the legs included in the power router will be specifically described.
- the power router 100 is a specific example of the above-described power routers 841 to 844 (FIG. 16).
- FIG. 1 is a block diagram illustrating a schematic configuration of the power router 100.
- the power router 100 generally includes a DC bus 101, a first leg 11, a second leg 12, a third leg 13, a fourth leg 14, and a control unit 19.
- the first leg to the fourth leg are indicated as leg 1 to leg 4, respectively, for the convenience of the paper width.
- a first leg 11 to a fourth leg 14 are connected to the DC bus 101 in parallel.
- the DC bus 101 is for flowing DC power.
- the control unit 19 controls the operation state of the first leg 11 to the fourth leg 14 via the communication bus 102 (external power transmission operation, external power reception operation, etc.), thereby generating the bus voltage V of the DC bus 101.
- 101 is maintained at a predetermined constant value.
- the power router 100 is connected to the outside via the first leg 11 to the fourth leg 14, but all the power exchanged with the outside is once converted to direct current and placed on the direct current bus 101. In this way, once through direct current, even when the frequency, voltage, and phase are different, the power cells can be connected asynchronously.
- the power router 100 has four legs, but this is only an example.
- the power router can be provided with any number of legs equal to or greater than two.
- the first leg 11 to the fourth leg 14 have the same configuration, but the two or more legs included in the power router may have the same configuration or different configurations.
- the leg is also referred to as a power conversion leg.
- FIG. 2 is a block diagram of the power router 100 displaying an example of the internal structure of the leg.
- the internal structure of the first leg 11 and the second leg 12 is displayed in FIG. 2, and the third leg 13 and the fourth leg 14 are displayed.
- the display of the internal structure of the leg 14 is omitted.
- FIG. 3 is a block diagram of the power router 100 showing in more detail the internal structure of the leg.
- the first leg 11 to the fourth leg 14 have the same configuration, in order to simplify the drawing, the internal structure of the first leg 11 is displayed in FIG. 3, the internal structure of the second leg 12, and the third leg 13.
- the display of the fourth leg 14 and the communication bus 102 is omitted.
- the first leg 11 to the fourth leg 14 are provided in parallel to the DC bus 101. As described above, the first leg 11 to the fourth leg 14 have the same configuration. Therefore, the configuration of the first leg 11 will be described as a representative. As shown in FIG. 2, the first leg 11 includes a power conversion unit 111, a current sensor 112, a switch 113, and a voltage sensor 114. The first leg 11 is connected to, for example, the backbone system 811 via the connection terminal 115.
- the power conversion unit 111 converts AC power into DC power, or converts DC power into AC power.
- the power conversion unit 111 converts the DC power of the DC bus 101 into AC power having a predetermined frequency and voltage, and flows it from the connection terminal 115 to the outside. Alternatively, the power conversion unit 111 converts AC power flowing from the connection terminal 115 into DC power and flows the DC power to the DC bus 101.
- the power conversion unit 111 has a configuration of an inverter circuit. Specifically, as shown in FIG. 3, the power conversion unit 111 has a configuration in which an antiparallel circuit 111P including a thyristor 111T and a feedback diode 111D is connected in a three-phase bridge. That is, one inverter circuit (power conversion unit 111) has six antiparallel circuits 111P. A wire drawn from a node between the two antiparallel circuits 111P and connecting the node and the connection terminal is referred to as a branch line BL. Since it is a three-phase alternating current, in this case, one leg has three branch lines BL. Here, since a three-phase alternating current is used, a three-phase inverter circuit is used. However, a single-phase inverter circuit may be used in some cases.
- the switch 113 is disposed between the power conversion unit 111 and the connection terminal 115.
- the branch line BL is opened and closed by opening and closing the switch 113. As a result, the outside and the DC bus 101 are disconnected or connected.
- the current sensor 112 and the voltage sensor 114 output detection values to the control unit 19 via the communication bus 102.
- the power conversion unit is an inverter circuit, and the connection partner of the leg uses alternating current.
- the connection partner of the leg may use a direct current such as a storage battery 835 (for example, in FIG. 1).
- the third leg 13 is connected to the storage battery 835).
- the power conversion in this case is DC-DC conversion. Therefore, an inverter circuit and a converter circuit may be provided in parallel in the power conversion unit, and the inverter circuit and the converter circuit may be selectively used depending on whether the connection partner is AC or DC.
- a leg dedicated to DC-DC conversion in which the power conversion unit is a DC-DC conversion unit may be provided.
- the second leg 12 includes a power converter 121, a current sensor 122, a switch 123, and a voltage sensor 124.
- the second leg 12 is connected to, for example, a load 830 through the connection terminal 125.
- the power converter 121, current sensor 122, switch 123, and voltage sensor 124 of the second leg 12 correspond to the power converter 111, current sensor 112, switch 113, and voltage sensor 114 of the first leg 11, respectively.
- the connection terminal 125 connected to the second leg 12 corresponds to the connection terminal 115 connected to the first leg 11.
- the power conversion unit 121 has a configuration in which an antiparallel circuit 121P including a thyristor 121T and a feedback diode 121D is connected in a three-phase bridge.
- the thyristor 121T, the feedback diode 121D, and the antiparallel circuit 121P correspond to the thyristor 111T, the feedback diode 111D, and the antiparallel circuit
- the third leg 13 includes a power converter 131, a current sensor 132, a switch 133, and a voltage sensor 134.
- the third leg 13 is connected to, for example, the storage battery 835 through the connection terminal 135.
- the power conversion unit 131, the current sensor 132, the switch 133, and the voltage sensor 134 of the third leg 13 correspond to the power conversion unit 111, the current sensor 112, the switch 113, and the voltage sensor 114 of the first leg 11, respectively.
- the connection terminal 135 connected to the third leg 13 corresponds to the connection terminal 115 connected to the first leg 11.
- the power conversion unit 131 has a configuration in which an antiparallel circuit 131P including a thyristor 131T and a feedback diode 131D is connected in a three-phase bridge.
- the thyristor 131T, the feedback diode 131D, and the antiparallel circuit 131P correspond to the thyristor 111T, the feedback diode 111D, and the antiparallel circuit 111P, respectively.
- the internal structure of the third leg 13 is not shown in FIGS.
- the fourth leg 14 includes a power converter 141, a current sensor 142, a switch 143, and a voltage sensor 144.
- the fourth leg 14 is connected to, for example, another power cell via the connection terminal 145.
- the power converter 141, current sensor 142, switch 143, and voltage sensor 144 of the fourth leg 14 correspond to the power converter 111, current sensor 112, switch 113, and voltage sensor 114 of the first leg 11, respectively.
- the connection terminal 145 connected to the fourth leg 14 corresponds to the connection terminal 115 connected to the first leg 11.
- the power conversion unit 141 has a configuration in which an antiparallel circuit 141P including a thyristor 141T and a feedback diode 141D is connected in a three-phase bridge.
- the thyristor 141T, the feedback diode 141D, and the antiparallel circuit 141P correspond to the thyristor 111T, the feedback diode 111D, and the antiparallel circuit 111P, respectively.
- the display of the internal structure of the fourth leg 14 is omitted in FIGS.
- the control unit 19 receives a control instruction 52 from the external management server 850 via the communication network 851.
- the control instruction 52 includes information for instructing the operation of each leg of the power router 100.
- the operation instruction to each leg includes, for example, designation of power transmission / reception, designation of operation mode, designation of power to be transmitted or received, and the like.
- the control unit 19 monitors the bus voltage V 101 of the DC bus 101 via the voltage sensor 103 and controls the direction of power, the frequency of AC power, and the like. That is, the control unit 19 controls switching of the thyristors 111T, 121T, 131T, and 141T and opening / closing of the switches 113, 123, 133, and 143 via the communication bus 102.
- FIG. 4 is a block diagram illustrating a configuration example of the power router 170 having the AC through leg 60.
- the power router 170 will be described as having a configuration in which the AC through leg 60 is added to the power router 100.
- the third leg 13 is omitted in FIG.
- the leg is configured using a thyristor that is a separately excited power conversion element, but this is merely an example.
- a leg may be configured using an IGBT (Insulated Gate Bipolar Transistor) or a MOSFET (Metal-Oxide-Semiconductor Field-Effect Transistor) which are self-excited power conversion elements.
- IGBT Insulated Gate Bipolar Transistor
- MOSFET Metal-Oxide-Semiconductor Field-Effect Transistor
- the AC through leg 60 includes a current sensor 162, a switch 163, and a voltage sensor 164.
- the AC through leg 60 is connected to, for example, another power cell via the connection terminal 165.
- a branch line BL of the AC through leg 60 is connected to a branch line BL of another leg having a power conversion unit via a switch 163. That is, the connection terminal 165 to which the AC through leg 60 is connected is connected to the connection terminal to which another leg having the power conversion unit is connected.
- the connection terminal 165 to which the AC through leg 60 is connected is shown as being connected to the connection terminal 145 to which the fourth leg 14 is connected.
- connection terminal 165 of the AC through leg 60 There is only a switch 163 between the connection terminal 165 of the AC through leg 60 and the connection terminal 145 to which the fourth leg 14 is connected, and the AC through leg 60 does not have a power converter. Therefore, power is conducted between the connection terminal 165 to which the AC through leg 60 is connected and the connection terminal 145 to which the fourth leg 14 is connected without undergoing any conversion. Therefore, a leg that does not have a power converter is called an AC through leg.
- FIG. 5 is a block diagram schematically showing the relationship between the configuration of the control unit 19 and the activation target leg.
- FIG. 5 shows a case where the first leg 11 is designated as the activation target leg.
- the control unit 19 includes a storage unit 191, an operation mode management unit 192, a power conversion command unit 193, a DA / AD conversion unit 194, and a sensor value reading unit 195.
- the storage unit 191 holds the control instruction 52 from the management server 850 as a control instruction database 196 (the first database, which is indicated as # 1DB in the drawing). In addition to the control instruction database 196, the storage unit 191 displays a leg identification information database 197 (second database, # 2DB in the figure) for identifying each of the first leg 11 to the fourth leg 14. ).
- the storage unit 191 can be realized by various storage units such as a flash memory.
- the leg identification information database 197 is information allocated to specify each of the first leg 11 to the fourth leg 14, such as an IP address, a URL, and a URI.
- the operation mode management unit 192 is configured by a CPU, for example.
- the operation mode management unit 192 reads the operation mode designation information MODE that designates the operation mode (operation mode will be described later) of the activation target leg (first leg 11) included in the control instruction database 196.
- the operation mode management unit 192 reads information (for example, IP address) corresponding to the activation target leg (first leg 11) with reference to the leg identification information database 197 in the storage unit 191. Thereby, the operation mode management part 192 can output the starting instruction
- the operation mode management unit 192 outputs a waveform instruction signal SD1 that is a digital signal. Further, the operation mode management unit outputs the opening / closing control signal SIG1 to the switch 113 of the activation target leg (first leg 11).
- the waveform instruction signal SD1 is digital-analog converted by the DA / AD conversion unit 194, and is output to the power conversion command unit 193 as a waveform instruction signal SA1 which is an analog signal.
- the power conversion command unit 193 outputs a control signal SCON to the power conversion unit 111 in response to the waveform instruction signal SA1.
- the sensor value reading unit 195 includes a value of the bus voltage V 101 detected by the voltage sensor 103, a detection value Ir of the current sensor 112 of the activation target leg (first leg 11), and a detection value Vr of the voltage sensor 114. Read.
- the sensor value reading unit 195 outputs the reading result as a reading signal SA2 that is an analog signal.
- the read signal SA2 is analog-to-digital converted by the DA / AD conversion unit 194, and is output to the operation mode management unit 192 as a read signal SD2 that is a digital signal.
- the operation mode management unit 192 reads the IP address corresponding to the first leg 11 from the leg identification information database 197. Then, the operation mode management unit 192 outputs an activation instruction to the first leg 11 using the read IP address. Thereby, the operation mode management part 192 can start the 1st leg 11 in the designated operation mode, for example.
- control instruction 52 includes the operation mode designation of each leg.
- the first leg 11 to the fourth leg 14 have power conversion units 111, 121, 131 and 141, and it has already been described that the switching operation of the thyristor in the power conversion unit is controlled by the control unit 19. It was.
- the power router 100 is in a node of the power network system 810, and has an important role of connecting the backbone system 811, the load 830, the distributed power source, the power cell, and the like.
- the connection terminals 115, 125, 135, and 145 of the first leg 11 to the fourth leg 14 are connected to the backbone system 811, the load 830, the distributed power source, and the power router of another power cell, respectively.
- the present inventors have different roles of the first leg 11 to the fourth leg 14 depending on the connection partner. If the first leg 11 to the fourth leg 14 do not perform an appropriate operation according to the role, the power router I realized that it didn't happen.
- the inventors of the present invention have the same leg structure, but change the operation of the leg depending on the connection partner.
- the manner of driving the leg is referred to as an operation mode.
- the present inventors prepared three types of leg operation modes, and switched the mode depending on the connection partner. Leg operating modes include Master mode, Independent mode, There are designated power transmission / reception modes. Hereinafter, it demonstrates in order.
- the master mode is an operation mode in the case of being connected to a stable power supply source such as a system, and is an operation mode for maintaining the bus voltage V 101 of the DC bus 101.
- FIG. 1 shows an example in which the connection terminal 115 of the first leg 11 is connected to the backbone system 811.
- the first leg 11 is controlled to operate as a master mode, and plays a role of maintaining the bus voltage V 101 of the DC bus 101.
- the other second leg 12 to the fourth leg 14 are connected to the DC bus 101, power may flow from the second leg 12 to the fourth leg 14 into the DC bus 101, or the second leg 12 Electric power may flow out from the fourth leg 14.
- the first leg 11 which becomes the master mode, when power flows out from the DC bus 101 and the bus voltage V 101 of the DC bus 101 falls from the rating, the power shortage due to outflow is connected to the other party (here, the main system 811). Make up from. Or, if the bus voltage V 101 of the DC bus 101 and flows the power to the DC bus 101 is raised from the rated, escape to (bulk power system 811 in this case) the power fraction becomes excessive at the inflow connection partner. In this way, the first leg 11 that is in the master mode maintains the bus voltage V 101 of the DC bus 101. Thus, in one power router, at least one leg must be operated in master mode. Otherwise, because the bus voltage V 101 of the DC bus 101 can not be maintained constant.
- two or more legs may be operated in the master mode in one power router, but it is better to have one master mode leg in one power router.
- you may connect the leg used as master mode to the distributed power supply (a storage battery is also included) which mounts a self-excited inverter other than a basic system, for example.
- a distributed power source equipped with a separately excited inverter cannot be connected to a leg that becomes a master mode.
- a leg operated in the master mode may be referred to as a master leg.
- the switch 113 When activating the master leg: First, the switch 113 is opened (cut off). In this state, the connection terminal 115 is connected to the connection partner. Here, the connection partner is the backbone system 811. The voltage of the connected system is measured by the voltage sensor 114, and the amplitude, frequency, and phase of the system voltage are determined using a PLL (Phase-Locked-Loop) or the like. Thereafter, the output of the power conversion unit 111 is adjusted so that the voltage of the obtained amplitude, frequency, and phase is output from the power conversion unit 111. That is, the on / off pattern of the thyristor 111T is determined. When this output becomes stable, the switch 113 is turned on to connect the power conversion unit 111 and the backbone system 811. At this time, since the output of the power converter 111 and the voltage of the backbone system 811 are synchronized, no current flows.
- PLL Phase-Locked-Loop
- Bus voltage V 101 of the DC bus 101 is measured by the voltage sensor 103.
- the bus voltage V 101 of the DC bus 101 is not greater than the predetermined rated bus voltage, as the power transmission is performed toward the line from the master leg (first leg 11), controls the power conversion unit 111.
- At least one of the amplitude and phase of the voltage output from the power converter 111 is adjusted so that power is transmitted from the DC bus 101 to the backbone system 811 via the master leg (first leg 11).
- the rated voltage of the DC bus 101 is determined in advance by setting.
- bus voltage V 101 of the DC bus 101 when I falls below the predetermined rated bus voltage the master leg (first leg 11) to allow receiving from the bulk power system 811, controls the power conversion unit 111. (At least one of the amplitude and phase of the voltage output from the power converter 111 is adjusted so that power is transmitted from the backbone system 811 to the DC bus 101 via the master leg (first leg 11).) It will be understood that such a master leg operation allows the bus voltage V 101 of the DC bus 101 to be maintained at a predetermined rating.
- the self-sustained mode is an operation mode in which a voltage having an amplitude and frequency designated by the management server 850 is generated by itself and power is transmitted to and received from a connection partner.
- the operation mode is for supplying power toward a power consuming device such as the load 830. Or it becomes an operation mode for receiving the electric power transmitted from the connection partner as it is.
- FIG. 1 shows an example in which the connection terminal 125 of the second leg 12 is connected to the load 830. The second leg 12 is controlled to operate in the self-supporting mode, and power is supplied to the load 830.
- the fourth leg 14 when connected to another power router like the fourth leg 14, the fourth leg 14 may be operated in a self-supporting mode as a mode for transmitting the power required by the other power router. .
- the fourth leg 14 when connected to another power router as in the fourth leg 14, the fourth leg 14 may be operated in a self-supporting mode as a mode for receiving power transmitted from the other power router.
- the second leg can be operated in the self-supporting mode even when the second leg is connected to the power generation facility instead of the load 830.
- a separately-excited inverter is mounted on the power generation facility. The operation mode when connecting power routers will be described later.
- the leg that is operated in the autonomous mode will be referred to as the autonomous leg.
- the switch 123 is opened (shut off).
- the connection terminal 125 is connected to the load 830.
- the management server 850 instructs the power router 100 about the amplitude and frequency of power (voltage) to be supplied to the load 830. Therefore, the control unit 19 causes the power (voltage) having the instructed amplitude and frequency to be output from the power conversion unit 121 toward the load 830. (That is, the on / off pattern of the thyristor 121T is determined.)
- the switch 123 is turned on, and the power converter 121 and the load 830 are connected. After that, if electric power is consumed by the load 830, the corresponding electric power flows out from the self-supporting leg (second leg 12) to the load 830.
- the designated power transmission / reception mode is an operation mode for exchanging the power determined by the designation. That is, there are a case where the designated power is transmitted to the connection partner and a case where the designated power is received from the connection partner.
- the fourth leg 14 is connected to another power router. In such a case, a predetermined amount of power is interchanged from one to the other.
- the third leg 13 is connected to the storage battery 835. In such a case, a predetermined amount of power is transmitted to the storage battery 835 and the storage battery 835 is charged.
- a distributed power source including a storage battery equipped with a self-excited inverter and a designated power transmission / reception leg may be connected. However, a distributed power source equipped with a separately-excited inverter cannot be connected to a designated power transmission / reception leg.
- a leg operated in the specified power transmission / reception mode is referred to as a specified power transmission / reception leg.
- a specified power transmission / reception leg In one power router, there may be a plurality of designated power transmission / reception legs.
- the operation control when operating the designated power transmission / reception leg will be described.
- the reference numerals attached to the third leg 13 are used.
- the voltage of the connection partner system is measured by the voltage sensor 134, and the frequency and phase of the connection partner voltage are determined using a PLL (Phase-Locked-Loop) or the like.
- PLL Phase-Locked-Loop
- the target value of the current input / output by the power conversion unit 131 is obtained.
- the current value of the current is measured by the current sensor 132.
- the power converter 131 is adjusted so that a current corresponding to the difference between the target value and the current value is additionally output. (At least one of the amplitude and phase of the voltage output from the power converter 131 is adjusted so that desired power flows between the designated power transmission / reception leg and the connection partner.)
- first leg 11 to the fourth leg 14 having the same configuration can play the role of three patterns depending on the manner of operation control.
- the power router 100 can operate each leg in the above-described three operation modes by referring to the operation mode designation information included in the control instruction 52. Thereby, the power router 100 can drive each leg appropriately according to a role.
- Power router receives an activation instruction of the management server 850 to operate the first master leg, after the bus voltage V 101 of the DC bus 101 is confirmed to be kept constant, to operate the other leg.
- the power router stops the start-up process.
- FIG. 6 is a flowchart showing the activation procedure of the activation target leg (first leg 11) in the power router 100.
- the leg starting procedure in the power router includes an operation mode instruction receiving step S1, an operation mode validity determination S2, and a leg starting step S3.
- Operation mode instruction receiving step S1 The control unit 19 receives the operation mode designation information MODE included in the control instruction 52 output from the management server 850. Specifically, the operation mode management unit 192 reads the operation mode designation information MODE included in the control instruction database 196 of the storage unit 191.
- Operation mode validity judgment S2 The control unit 19 determines whether the operation mode of the activation target leg (first leg 11) designated by the operation mode designation information MODE is any of the master mode, the independent mode, and the designated power transmission / reception mode. Then, it is determined whether the activation target leg (first leg 11) can be activated in the designated operation mode.
- the control unit 19 sets information necessary for outputting power from the activation target leg (first leg 11) in the designated operation mode in the activation target leg (first leg 11). Then, the management server 850 is notified of whether the activation has been completed.
- FIG. 7 is a flowchart showing a processing procedure of the operation mode validity determination S2.
- Operation mode validity determination S2 includes operation mode determination step S21, bus voltage acquisition step S22, bus voltage value determination step S23, bus voltage abnormality notification step S24, start-up process stop step S25, master mode leg confirmation step S26, master mode leg.
- the absence notification step S27 is configured.
- Operation mode determination step S21 The operation mode management unit 192 determines whether the operation mode of the activation target leg (first leg 11) designated by the operation mode designation information MODE is the master mode, the independent mode, or the designated power transmission / reception mode.
- Bus voltage acquisition step S22 When the operation mode of the activation target leg (first leg 11) designated by the operation mode designation information MODE is the master mode, the operation mode management unit 192 displays the DA / AD conversion unit 194 and the sensor value reading unit 195. Then, the bus voltage V 101 of the DC bus 101 is acquired from the voltage sensor 103.
- Bus voltage determination step S23 Operation mode management unit 192, bus voltage V 101 acquired in the bus voltage acquisition step S22, determines whether more than a predetermined value Vth. If the bus voltage V 101 is equal to or higher than the predetermined value Vth, the process proceeds to the leg starting step S3.
- Bus voltage abnormality notification step S24 If the bus voltage V 101 is less than the predetermined value Vth, the operation mode management unit 192 outputs a bus voltage abnormality alarm to the management server 850.
- the operation mode management unit 192 determines whether any leg other than the activation target leg (first leg 11) has been activated in the master mode. Specifically, the operation mode management unit 192 can refer to the control instruction database 196 in the storage unit 191 and determine whether there is a leg in the power router 100 in which the operation mode is designated as the master mode. If any leg other than the activation target leg (first leg 11) in the power router 100 has been activated in the master mode, the process proceeds to the leg activation step S3.
- the operation mode management unit 192 manages the absence of the master mode leg. Output to the server 850. That is, in the state where there is no leg in the master mode, it is possible to prevent other operation modes from being activated.
- FIG. 8 is a flowchart showing the processing procedure of the leg starting step S3.
- the leg activation step S3 includes a first operation mode determination step S31, a master mode waveform generation step S32, a non-master mode waveform generation step S33, a switch control step S34, and an activation completion notification step S35.
- First operation mode determination step S31 The operation mode management unit 192 determines whether the operation mode of the activation target leg (first leg 11) designated by the operation mode designation information MODE is the master mode.
- Master mode waveform generation step S32 is a step of generating a waveform when power transmission is performed in the master mode.
- the master mode waveform generation step S32 includes a master mode waveform information acquisition step S321, a waveform model generation step S322, a difference calculation step S323, an output voltage determination step S324, and an amplitude synchronization step S325.
- the operation mode management unit 192 acquires the voltage amplitude and the voltage waveform cycle of the connection partner (for example, the backbone system) of the activation target leg (first leg 11). Specifically, the operation mode management unit 192 acquires the voltage Vr of the branch line BL connected to the outside through the terminal 115 from the voltage sensor 113 via the DA / AD conversion unit 194 and the sensor value reading unit 195. The operation mode management unit 192 acquires the voltage amplitude and the voltage fluctuation period from the acquired voltage Vr. At this time, for example, it is possible to acquire the voltage amplitude and voltage waveform period of the connection partner (for example, the backbone system) by so-called zero point detection.
- the connection partner for example, the backbone system
- Waveform model generation step S322 The operation mode management unit 192 creates a waveform model that is temporally synchronized with the acquired cycle. At this time, the waveform model is generated as a sine wave, for example.
- Output voltage determination step S324 The operation mode management unit 192 determines the output voltage of the activation target leg (first leg 11) according to the value of the difference ⁇ V.
- the operation mode management unit 192 synchronizes the amplitude of the waveform model with the determined output voltage value.
- the operation mode management unit 192 outputs, as a waveform instruction signal SD1, information on the waveform model whose amplitude has been synchronized.
- the power conversion command unit 193 receives a waveform command signal SA1 which is a signal obtained by digital-analog conversion of the waveform command signal SD1 by the DA / AD converter 194. Thereby, the 1st leg 11 completes the preparation which transmits electric power synchronizing with an external backbone system as a master mode leg.
- Non-master mode waveform generation step S33 is a step of generating a waveform when power transmission is performed in an operation mode other than the master mode.
- the non-master mode waveform generation step S33 includes a waveform information acquisition step S331, a waveform generation step S332, a second operation mode determination step S333, an output power value acquisition step S334, and an amplitude synchronization step S335.
- Waveform information acquisition step S331 On the other hand, when the operation mode is the self-sustained mode or the specified power transmission / reception mode, the operation mode management unit 192 reads from the control instruction database 196 the connection destination partner (for example, other power) Read the voltage waveform period of the router leg).
- the connection destination partner for example, other power
- Waveform generation step S332 The operation mode management unit 192 creates a waveform model synchronized with the read voltage waveform cycle. At this time, the waveform model is generated as a sine wave, for example.
- the operation mode management unit 192 outputs information on the created waveform model as a waveform instruction signal SD1.
- the power conversion command unit 193 receives a waveform command signal SA1 which is a signal obtained by digital-analog conversion of the waveform command signal SD1 by the DA / AD converter 194. Thereby, the 1st leg 11 completes the preparation which transmits electric power with the designated period.
- Second operation mode determination step S333 The operation mode management unit 192 determines whether the operation mode of the activation target leg (first leg 11) designated by the operation mode designation information MODE is the independent mode. When the operation mode is the self-supporting mode, the process proceeds to the switch control step S34.
- Output power value acquisition step S334 When the operation mode is the designated power transmission / reception mode, the operation mode management unit 192 reads the output power value in the designated power transmission / reception mode from the control instruction database 196.
- the operation mode management unit 192 synchronizes the amplitude of the waveform model with a value that realizes the read output power value.
- the operation mode management unit 192 outputs, as a waveform instruction signal SD1, information on the waveform model whose amplitude has been synchronized.
- the power conversion command unit 193 receives a waveform command signal SA1 which is a signal obtained by digital-analog conversion of the waveform command signal SD1 by the DA / AD converter 194. Thereby, the 1st leg 11 completes the preparations which transmit electric power as a designated electric power transmission / reception mode leg.
- Switch control step S34 The operation mode management unit 192 sets the switch 113 in the “closed” state by the switching control signal SIG1. As a result, the activation target leg (first leg 11) can transmit and receive power.
- Startup completion notification step S35 The operation mode management unit 192 notifies the management server 850 that the activation of the activation target leg (first leg 11) has been completed after the master mode waveform generation step S32 or the non-master mode waveform generation step S33.
- the power router 100 can start the leg specified as the start target by the control instruction of the management server 850 among the plurality of legs in the specified operation mode.
- the power router 100 receives the control instruction 52 from the management server 850 by the control unit 19.
- the received control instruction 52 is stored in the storage unit 191 of the control unit 19 as the control instruction database 196 and is read by the operation mode management unit 192.
- the operation mode management unit 192 can specifically identify the activation target leg (first leg 11) by comparing the control instruction database 196 with the leg identification information database 197.
- the operation mode management part 192 can start a starting object leg (1st leg 11) in the designated operation mode.
- the power router 100 receives the control instruction 52 from the management server 850.
- the power router 100 can hold the control instruction 52 in advance without receiving the control instruction 52 from the management server 850.
- the storage unit 191 may hold a control instruction database 101 and a control instruction schedule indicating the control instruction 52 for each time period.
- the control unit 19 may generate the control instruction 52 and send the generated control instruction 52 to the operation mode management unit 192.
- a power router that can activate the activation target leg (first leg 11) provided therein in the designated operation mode is specifically realized. be able to.
- the power router 100 can notify the management server 850 whether or not the operation can be performed in the designated operation mode.
- the management server 850 can consider whether or not the activation target leg can be activated, and can specify the operation mode of another leg as necessary. For example, when a certain activation target leg cannot be activated in the master mode, it is possible to designate another activation target leg and issue a control instruction to activate the designated activation target leg in the master mode. Become.
- the power router 200 is a modification of the power router 100 according to the first embodiment.
- the power router 200 can further perform a power transmission start operation when starting power transmission after starting the activation target leg described in the first embodiment. Since the configuration of the power router 200 and the activation process of the activation target leg are the same as those of the power router 100, description thereof is omitted.
- FIG. 9 is a flowchart showing the procedure of the power transmission start operation of the power router 200.
- the operation mode management unit 192 outputs a waveform instruction signal SD1 that instructs the start of power transmission.
- the power conversion command unit 193 receives a waveform command signal SA1 which is a signal obtained by digital-analog conversion of the waveform command signal SD1 by the DA / AD converter 194. Thereby, the power converter 111 starts power transmission.
- Operation mode determination step S5 The operation mode management unit 192 determines whether or not the operation mode of the activation target leg designated by the operation mode designation information MODE is the master mode.
- FIG. 10 is a flowchart showing the procedure of the first power transmission adjustment processing step S61 of the power router 200.
- the first power transmission adjustment processing step S61 includes processing number initial setting step S611, bus voltage acquisition step S612, bus voltage determination step S613, power transmission success notification step S614, difference calculation step S615, voltage comparison step S616, amplitude synchronization step S617, voltage The comparison number adding step S618, the comparison number confirmation step S619, and the power transmission impossible notification step S620 are configured.
- Bus voltage acquisition step S612 The operation mode management unit 192 acquires the bus voltage V 101 of the DC bus 101 from the voltage sensor 103 via the DA / AD conversion unit 194 and the sensor value reading unit 195.
- Bus voltage determination step S613 The operation mode management unit 192 confirms whether the bus voltage V 101 is within a predetermined range (Vth1 to Vth2).
- Power transmission success notification step S614 If it is Vth1 ⁇ V 101 ⁇ Vth2, the operation mode management unit 192, the power transmission from the boot target leg is successful, notifies the management server 850, the process ends.
- the operation mode management unit 192 determines the output voltage Vr of the activation target leg according to the value of the difference ⁇ V.
- the operation mode management unit 192 synchronizes the amplitude of the waveform model with the determined output voltage value.
- the operation mode management unit 192 outputs, as a waveform instruction signal SD1, information on the waveform model whose amplitude has been synchronized.
- the power conversion command unit 193 receives a waveform command signal SA1 which is a signal obtained by digital-analog conversion of the waveform command signal SD1 by the DA / AD converter 194.
- the power conversion instruction unit 193 may be the bus voltage V 101 is closer to the rated value V0, to change the output voltage.
- Voltage comparison count addition step S618 The operation mode management unit 192 adds “1” to the voltage comparison count i.
- Comparison number confirmation step S619 The operation mode management unit 192 confirms whether the voltage comparison number i has reached the set number n (n is an integer of 2 or more). If i ⁇ n, the process returns to the bus voltage acquisition step S612.
- Operation mode determination step S63 On the other hand, in the operation mode determination step S5, when the operation mode is other than the master mode, the operation mode management unit 192 indicates that the operation mode of the activation target leg designated by the operation mode designation information MODE is the designated power transmission / reception mode. It is determined whether it is.
- FIG. 11 is a flowchart showing the procedure of the second power transmission adjustment processing step S71 of the power router 200.
- the second power transmission adjustment processing step S71 includes a processing number initial setting step S711, an output power value acquisition step S712, an output power value determination step S713, a power transmission success notification step S714, a difference calculation step S715, a voltage comparison step S716, and an amplitude synchronization step S717. , Voltage comparison number addition step S718, comparison number confirmation step S719, and power transmission failure notification step S720.
- Processing count initial setting step S711 The operation mode management unit 192 sets the voltage comparison count i to “0”.
- Output power value acquisition step S712 The operation mode management unit 192 acquires the current value Ir of the branch line BL from the current sensor 112 and acquires the voltage Vr of the branch line BL from the voltage sensor 114 via the DA / AD conversion unit 194 and the sensor value reading unit 195. Thereby, the operation mode management part 192 acquires the output electric power value Wr of a starting object leg (1st leg 11).
- Output power value determination step S713 The operation mode management unit 192 confirms whether the output power value Wr is within a predetermined range (Wr1 to Wr2).
- Power transmission success notification step S714 When Wr1 ⁇ Wr ⁇ Wr2, the operation mode management unit 192 notifies the management server 850 that power transmission from the activation target leg is successful, and the processing is completed.
- the operation mode management unit 192 determines the voltage amplitude of the waveform model of the activation target leg according to the value of the difference ⁇ W.
- the operation mode management unit 192 synchronizes the amplitude of the waveform model with the determined output voltage value.
- the operation mode management unit 192 outputs, as a waveform instruction signal SD1, information on the waveform model whose amplitude has been synchronized.
- the power conversion command unit 193 receives a waveform command signal SA1 which is a signal obtained by digital-analog conversion of the waveform command signal SD1 by the DA / AD converter 194. Thereby, the power conversion command unit 193 can change the output voltage so that the output power value Wr approaches the designated output power value W0.
- Voltage comparison count addition step S718 The operation mode management unit 192 adds “1” to the voltage comparison count i.
- Comparison number confirmation step S719 The operation mode management unit 192 confirms whether the voltage comparison number i has reached the set number n (n is an integer of 2 or more). If i ⁇ n, the process returns to the output power value acquisition step S712.
- the third power transmission adjustment processing step S73 When the operation mode is not the designated power transmission / reception mode (that is, when the operation mode is the self-sustaining mode), the third power transmission adjustment processing step S73 is executed.
- FIG. 12 is a flowchart showing the procedure of the third power transmission adjustment processing step S73 of the power router 200.
- the third power transmission adjustment processing step S73 includes a processing number initial setting step S731, an output voltage / frequency acquisition step S732, an output voltage determination step S733, a frequency determination step S734, a power transmission success notification step S735, a processing number addition step S736, and a processing number confirmation. It comprises step S737, waveform model regeneration step S738, and power transmission failure notification step S739.
- Processing count initial setting step S731 The operation mode management unit 192 sets the voltage comparison count i to “0”.
- Output voltage / frequency acquisition step S732 The operation mode management unit 192 acquires the voltage Vr of the branch line BL and the frequency of voltage fluctuation from the voltage sensor 114 via the DA / AD conversion unit 194 and the sensor value reading unit 195.
- Output voltage determination step S733 The operation mode management unit 192 determines whether the output voltage Vr is within a predetermined range (V1 to V2) and whether the frequency is constant with the set frequency.
- Frequency determination step S734 When V1 ⁇ Vr ⁇ V2, the operation mode management unit 192 determines whether the frequency f related to power transmission is constant with the set frequency f0.
- Processing count addition step S736 The operation mode management unit 192 adds “1” to the voltage comparison count i.
- Processing count confirmation step S737 The operation mode management unit 192 confirms whether the voltage comparison number i has reached the set number n (n is an integer of 2 or more).
- the operation mode management unit 192 outputs information on the created waveform model as a waveform instruction signal SD1.
- the power conversion command unit 193 receives a waveform command signal SA1 which is a signal obtained by digital-analog conversion of the waveform command signal SD1 by the DA / AD converter 194. Thereby, the waveform model set in the power conversion command unit 193 is updated. Thereafter, the process returns to the output voltage / frequency acquisition step S732.
- the power router 200 can not only start the activation target leg in the designated operation mode but also specifically realize the start of power transmission from the leg after activation in the designated operation mode.
- the power router 200 can notify whether or not the operation can be performed under the power transmission condition specified in the management server 850.
- the management server can designate the operation mode of another leg as needed, taking into consideration the power transmission of the activation target leg. For example, if a certain activation target leg cannot transmit power in the master mode, it is possible to specify another activation target leg and issue a control instruction to activate the specified activation target leg in the master mode. It becomes.
- Embodiment 3 Next, Embodiment 3 will be described.
- a power network system constructed using one or a plurality of power routers will be described.
- a power network system is constructed using power routers 1011 to 1014.
- Each of power routers 1011 to 1014 is one of the power routers according to the first and second embodiments described above. May be used.
- FIG. 13 is a block diagram schematically showing the configuration of a power network system 1001 that is an example of a power network system.
- the reference numerals of the legs are omitted for simplification of the drawing.
- White circles attached to the power routers 1011 to 1014 indicate connection terminals of the legs.
- connection line connecting the power routers is referred to as a power transmission line
- the power transmission line may be a part of the backbone system or may be disconnected from the backbone system.
- a transmission line 1021 is attached to a power transmission line that is a part of the backbone system
- a transmission line 1022 is attached to a transmission line that is disconnected from the backbone system. That is, a plurality of power routers may be connected to the backbone system.
- two or more power routers may be connected without going through the backbone system.
- a connection line connecting the power router and the load 830 (or distributed power source)
- the distribution line 1023 is disconnected from the main systems 811A to 811C. That is, the distribution line 1023 that connects the power router and the load 830 (or the distributed power source) is not connected to the backbone systems 811A to 811C.
- FIG. 14 is a block diagram schematically showing a configuration of a power network system 1002 that is an example of the power network system.
- the power routers 1011 to 1014 and the backbone system 811 are displayed for simplification of the drawing.
- the connection lines are indicated by thick lines and the distribution lines are indicated by thin lines.
- the power routers 1011 to 1014 may be connected in a bus connection.
- the description of the operation mode of each leg is omitted, but it is a matter of course that the operation mode of each leg must be appropriately selected in consideration of the direction of power interchange and the connection constraints described so far.
- the backbone system 811 may be replaced with a distributed power source such as a storage battery or power generation equipment. That is, a plurality of power routers may be bus-connected to the distributed power source.
- FIG. 15 is a block diagram schematically illustrating a configuration of a power network system 1003 that is an example of the power network system.
- the power routers 1011 and 1012 and the backbone system 811 are displayed for simplification of the drawing.
- the connection lines are indicated by thick lines and the distribution lines are indicated by thin lines.
- the power routers 1011 and 1012 may be connected to the backbone system 811.
- the backbone system 811 may be replaced with a distributed power source.
- the power router connection partner includes a main system, a distributed power source including a storage battery and a power generation facility, and other power routers. It is called a power system.
- the following effects can be obtained. That is, with the power router of this embodiment, a power network system in which power cells are asynchronously interconnected can be constructed. As described in the present embodiment, the leg in the power router is operated in accordance with the control instruction from the management server, and a specific operation such as power interchange in the power network system becomes possible.
- control unit 19 has been described as a hardware configuration, but the present invention is not limited to this.
- the control unit 19 can be configured by a computer, and arbitrary processing can be realized by causing a CPU (Central Processing Unit) to execute a computer program.
- a control device is incorporated in the power conversion unit of the leg, and the control device is, for example, a dynamic reconfigurable logic (FPGA: Field Programmable Gate Array). Then, the FPGA control program is changed to the contents adapted to the leg mode and operated.
- FPGA Field Programmable Gate Array
- Non-transitory computer readable media include various types of tangible storage media.
- non-transitory computer-readable media examples include magnetic recording media (for example, flexible disks, magnetic tapes, hard disk drives), magneto-optical recording media (for example, magneto-optical disks), CD-ROM (Read Only Memory) CD-R, CD -R / W, including semiconductor memory (for example, mask ROM, PROM (Programmable ROM), EPROM (Erasable PROM), flash ROM, RAM (Random Access Memory)).
- the program may also be supplied to the computer by various types of transitory computer readable media. Examples of transitory computer readable media include electrical signals, optical signals, and electromagnetic waves.
- the temporary computer-readable medium can supply the program to the computer via a wired communication path such as an electric wire and an optical fiber, or a wireless communication path.
- Control instruction 60 AC through leg 100 , 170, 200, 1011 to 1014 Power router 101 DC bus 102 Communication bus 103 Voltage sensor 111, 121, 131, 141, 151 Power converter 111D Feedback diode 111P Reverse parallel circuit 111T Thyristors 112, 122, 132, 142, 152, 162 Current sensor 113, 123, 133, 143, 153, 163 Switch 114, 124, 134, 144, 154, 164 Voltage sensor 115, 125, 135, 145, 155, 165 Connection terminal 121T Thyristor 191 Storage unit 192 Operation mode Manager 193 Power conversion finger Part 194 DA / AD conversion section 195 the sensor value reading unit 196 control instruction database (# 1DB) 197 Leg Identification Information Database (# 2DB) 810, 1001 to 1003 Power network system 811, 811A to 8
Landscapes
- Engineering & Computer Science (AREA)
- Power Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Automation & Control Theory (AREA)
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
- Direct Current Feeding And Distribution (AREA)
- Inverter Devices (AREA)
Abstract
Description
デジタルグリッド(登録商標)とは、電力網を小規模なセルに細分化し、それらを非同期に相互接続した電力ネットワークシステムである。各電力セルは、小さなものとしては一つの家やビル、商業施設であり、大きなものとしては県や市町村といった規模になる。各電力セルは、その中に負荷を有することはもちろん、発電設備や電力貯蔵設備を有する場合もある。発電設備としては、太陽光発電や風力発電、地熱発電などの自然エネルギーを利用する発電設備が例として挙げられる。
図16は、電力ネットワークシステム810の例を示す図である。図16において、基幹系統811は大規模発電所812からの基幹電力を送電する。そして、複数の電力セル821~824が配置されている。各電力セル821~824は、家831やビル832などの負荷や、発電設備(例えば太陽光発電パネル833、風力発電機834)や、電力貯蔵設備(例えば蓄電池835)、を有している。
なお、本明細書では、発電設備と電力貯蔵設備とを総称して、分散型電源ということがある。
ここで、レグとは、接続端子と電力変換部とを有しており、各レグにはアドレスが付されている。なお、レグによる電力変換とは、交流から直流へまたは直流から交流への変換や、電力の電圧、周波数、位相を変化させることをいう。
しかし、実際に電力ルータを実用化するとなると、これまでの送配電設備にはない特有の課題がある。現在主流の送配電設備は、電圧、位相および周波数が完全に同期している電力系統を前提としているから、電圧あるいは位相、周波数が異なる電力系統同士を接続する電力ルータには新たな課題に対する配慮が必要である。
前記起動対象レグを指定された前記運転モードで起動できるかについて判断を行い、前記起動対象レグを指定された前記運転モードで起動できる場合に、前記起動対象レグを指定された前記運転モードで起動するものである。
本実施の形態では、電力ルータの起動、及び電力ルータに含まれるレグの起動について具体的に説明する。ここでは、まず、実施の形態1にかかる電力ルータ100の構成について説明する。電力ルータ100は、上述の電力ルータ841~844(図16)の具体例である。図1は、電力ルータ100の概略構成を示すブロック図である。電力ルータ100は、概略、直流母線101、第1レグ11、第2レグ12、第3レグ13、第4レグ14及び制御部19を有する。なお、図中では、紙幅の都合上、第1レグ~第4レグを、それぞれレグ1~レグ4と表示している。
図2に示すように、第1レグ11は、電力変換部111、電流センサ112、開閉器113、電圧センサ114を有する。第1レグ11は、接続端子115を介して、例えば基幹系統811と接続される。電力変換部111は、交流電力を直流電力に、あるいは、直流電力を交流電力に変換する。直流母線101には直流電力が流れているので、つまり、電力変換部111は、直流母線101の直流電力を定められた周波数及び電圧の交流電力に変換して、接続端子115から外部に流す。あるいは、電力変換部111は、接続端子115から流入する交流電力を直流電力に変換して、直流母線101に流す。
ここでは、三相交流を使用しているので三相インバータ回路としたが、場合によっては単相インバータ回路としてもよい。
従って、電力変換部にインバータ回路とコンバータ回路とを並列に設け、接続相手が交流か直流かに応じてインバータ回路とコンバータ回路と使い分けるようにしてもよい。あるいは、電力変換部がDC-DC変換部であるDC-DC変換専用のレグを設けるようにしてもよい。
なお、すべてのレグのなかにインバータ回路とコンバータ回路とを並列に設けるよりは、AC-DC変換専用のレグとDC-DC変換専用のレグとを併せ持つ電力ルータとする方がサイズやコスト面で有利な点も多々ある。
具体的には、制御部19は、電圧センサ103を介して直流母線101の母線電圧V101を監視し、電力の向きや交流電力の周波数等を制御する。すなわち、制御部19は、通信バス102を介して、サイリスタ111T、121T、131T及び141Tのスイッチングと、開閉器113、123、133及び143の開閉とを制御する。
ここで、電力ルータ100は、電力ネットワークシステム810のノードにあって、基幹系統811、負荷830、分散型電源および電力セルなどを互いに結びつける重要な役割を持つ。このとき、第1レグ11~第4レグ14の接続端子115、125、135及び145がそれぞれ基幹系統811や負荷830、分散型電源、他の電力セルの電力ルータに接続されるわけである。本発明者らは、接続相手によって第1レグ11~第4レグ14の役割は異なるものであり、第1レグ11~第4レグ14が役割に応じた適切な運転を行わなければ電力ルータが成り立たないことに気付いた。本発明者らは、レグの構造自体は同じであるが、接続相手によってレグの運転の仕方を変えるようにした。
レグの運転の仕方を、運転モードと称する。
本発明者らは、レグの運転モードとして3種類を用意しておき、接続相手によってモードを切り換えるようにした。
レグの運転モードとしては、
マスターモードと、
自立モードと、
指定電力送受電モードと、がある。
以下、順番に説明する。
マスターモードとは、系統など安定した電力供給源に接続される場合の運転モードであり、直流母線101の母線電圧V101を維持するための運転モードである。図1では、第1レグ11の接続端子115が基幹系統811に接続されている例を示している。図1の場合、第1レグ11は、マスターモードとして運転制御され、直流母線101の母線電圧V101を維持する役目を担うことになる。直流母線101には他の第2レグ12~第4レグ14が接続されているところ、第2レグ12~第4レグ14から直流母線101に電力が流入することもあれば、第2レグ12~第4レグ14から電力が流出することもある。マスターモードとなる第1レグ11は、直流母線101から電力が流出して直流母線101の母線電圧V101が定格から下がった場合、流出で不足した電力分を接続相手(ここでは基幹系統811)から補てんする。または、直流母線101に電力が流入して直流母線101の母線電圧V101が定格から上がった場合、流入で過剰になった電力分を接続相手(ここでは基幹系統811)に逃がす。このようにして、マスターモードとなる第1レグ11は、直流母線101の母線電圧V101を維持するのである。
したがって、一の電力ルータにおいて、少なくとも一つのレグはマスターモードとして運転されなければならない。さもなくば、直流母線101の母線電圧V101が一定に維持されなくなるからである。逆に、一の電力ルータにおいて二つ以上のレグがマスターモードで運転されてもよいが、やはり、マスターモードのレグは一つの電力ルータには一つであった方がよい。
また、マスターモードとなるレグは、基幹系統の他、例えば、自励式インバータを搭載する分散型電源(蓄電池も含む)に接続してもよい。ただし、他励式インバータを搭載する分散型電源とマスターモードとなるレグとは接続できない。
マスターレグを起動させる際には次のようにする。
まず、開閉器113を開(遮断)状態にしておく。この状態で接続端子115を接続相手に繋ぐ。ここでは、接続相手は基幹系統811である。
電圧センサ114によって接続先の系統の電圧を測定し、PLL(Phase-Locked-Loop)などを用いて系統の電圧の振幅、周波数および位相を求める。その後、求めた振幅、周波数および位相の電圧が電力変換部111から出力されるように、電力変換部111の出力を調整する。すなわち、サイリスタ111Tのオン/オフパターンを決定する。この出力が安定するようになったら、開閉器113を投入し、電力変換部111と基幹系統811とを接続する。この時点では、電力変換部111の出力と基幹系統811の電圧とが同期しているため、電流は流れない。
直流母線101の母線電圧V101を電圧センサ103によって測定する。直流母線101の母線電圧V101が所定の定格母線電圧を上回っていたら、マスターレグ(第1レグ11)から系統に向けて送電が行われるように、電力変換部111を制御する。(電力変換部111から出る電圧の振幅および位相の少なくともいずれか一方を調整して、マスターレグ(第1レグ11)を介して直流母線101から基幹系統811に向けて送電が行われるようにする。)なお、直流母線101の定格電圧は、予め設定によって定められているものである。
自立モードとは、管理サーバ850から指定された振幅・周波数の電圧を自ら作り出し、接続相手との間で送受電する運転モードである。
例えば負荷830などの電力を消費するものに向けて電力を供給するための運転モードとなる。あるいは、接続相手から送電されてくる電力をそのまま受け取るための運転モードとなる。
図1では、第2レグ12の接続端子125が負荷830に接続されている例を示している。第2レグ12が自立モードとして運転制御され、負荷830に電力を供給することになる。
また、第4レグ14のように他の電力ルータと接続される場合に、他の電力ルータから要求される電力分を送電するためのモードとして第4レグ14を自立モードで運転する場合もある。
または、第4レグ14のように他の電力ルータと接続される場合に、他の電力ルータから送電されてくる電力を受電するためのモードとして第4レグ14を自立モードで運転する場合もある。
また、図に示していないが、負荷830に代えて、第2レグを発電設備に接続する場合も第2レグを自立モードで運転することもできる。ただし、この場合には発電設備に他励式インバータを搭載するようにする。
電力ルータ同士を接続する場合の運転モードについては後述する。
まず開閉器123を開(遮断)にしておく。接続端子125を負荷830に接続する。管理サーバ850から電力ルータ100に対し、負荷830に供給すべき電力(電圧)の振幅および周波数が指示される。そこで、制御部19は、指示された振幅および周波数の電力(電圧)が電力変換部121から負荷830に向けて出力されるようにする。(すなわち、サイリスタ121Tのオン/オフパターンを決定する。)この出力が安定するようになったら、開閉器123を投入し、電力変換部121と負荷830とを接続する。あとは、負荷830で電力が消費されれば、その分の電力が自立レグ(第2レグ12)から負荷830に流れ出すようになる。
指定電力送受電モードとは、指定によって定められた分の電力をやり取りするための運転モードである。すなわち、接続相手に指定電力を送電する場合と、接続相手から指定電力を受電する場合と、がある。
図1では、第4レグ14が他の電力ルータと接続されている。
このような場合に、決まった分の電力を一方から他方へ融通するようなことが行われる。
または、第3レグ13は蓄電池835に接続されている。
このような場合に、決まった分の電力を蓄電池835に向けて送電して、蓄電池835を充電するというようなことが行われる。
また、自励式インバータを搭載する分散型電源(蓄電池も含む)と指定電力送受電レグとを接続してもよい。ただし、他励式インバータを搭載する分散型電源と指定電力送受電レグとは接続できない。
電圧センサ134によって接続相手の系統の電圧を測定し、PLL(Phase-Locked-Loop)などを用いて接続相手の電圧の周波数・位相を求める。管理サーバ850から指定された有効電力値および無効電力値と、接続相手の電圧の周波数および位相と、に基づいて、電力変換部131が入出力する電流の目標値を求める。電流センサ132によって電流の現在値を測定する。目標値と現在値との差分に相当する電流が追加で出力されるように、電力変換部131を調整する。(電力変換部131から出る電圧の振幅および位相の少なくともいずれか一方を調整して、指定電力送受電レグと接続相手との間で所望の電力が流れるようにする。)
制御部19は、管理サーバ850から出力される制御指示52に含まれる運転モード指定情報MODEを受領する。具体的には、運転モード管理部192は、記憶部191の制御指示データベース196に含まれる運転モード指定情報MODEを読み出す。
制御部19は、運転モード指定情報MODEにより指定された起動対象レグ(第1レグ11)の運転モードが、マスターモード、自立モード及び指定電力送受電モードのいずれかであるかを判定する。そして、指定された運転モードで起動対象レグ(第1レグ11)を起動可能であるかを判定する。
制御部19は、指定され運転モードにて起動対象レグ(第1レグ11)から電力を出力するために必要な情報を、起動対象レグ(第1レグ11)に設定する。そして、起動完了の是非を管理サーバ850に通知する。
運転モード管理部192は、運転モード指定情報MODEにより指定された起動対象レグ(第1レグ11)の運転モードが、マスターモード、自立モード及び指定電力送受電モードのいずれであるかを判定する。
運転モード指定情報MODEにより指定された起動対象レグ(第1レグ11)の運転モードがマスターモードである場合には、運転モード管理部192は、DA/AD変換部194及びセンサ値読み取り部195を介して、電圧センサ103から直流母線101の母線電圧V101を取得する。
運転モード管理部192は、母線電圧取得ステップS22で取得した母線電圧V101が、所定値Vth以上であるかを判定する。母線電圧V101が所定値Vth以上であれば、レグ起動ステップS3へ進む。
母線電圧V101が所定値Vth未満であれば、運転モード管理部192は、母線電圧異常警報を管理サーバ850に出力する。
母線電圧異常警報の出力後、運転モード管理部192は、起動処理を中止する。
一方、運転モード指定情報MODEにより指定された起動対象レグ(第1レグ11)の運転モードが自立モード又は指定電力送受電モードである場合には、運転モード管理部192は、電力ルータ100内の起動対象レグ(第1レグ11)以外のレグの中で、マスターモードで起動完了しているものがあるかを判定する。具体的には、運転モード管理部192は、記憶部191の制御指示データベース196を照会し、電力ルータ100内に運転モードがマスターモードと指定されているレグが有るかを判定することができる。電力ルータ100内の起動対象レグ(第1レグ11)以外のレグの中で、マスターモードで起動完了しているものが有る場合には、レグ起動ステップS3へ進む。
電力ルータ100内の起動対象レグ(第1レグ11)以外のレグの中で、マスターモードで起動完了しているものが無い場合には、運転モード管理部192は、マスターモードレグ不存在を管理サーバ850に出力する。つまり、マスターモードのレグが存在しない状態では、他の運転モードが起動されることを防止できる。
運転モード管理部192は、運転モード指定情報MODEにより指定された起動対象レグ(第1レグ11)の運転モードが、マスターモードであるかを判定する。
マスターモード波形生成ステップS32は、マスターモードにて送電を行う際の波形を生成するステップである。マスターモード波形生成ステップS32は、マスターモード波形情報取得ステップS321、波形モデル生成ステップS322、差分計算ステップS323、出力電圧決定ステップS324、振幅同期ステップS325により構成される。
運転モードがマスターモードである場合には、運転モード管理部192は、起動対象レグ(第1レグ11)の接続先相手(例えば基幹系統)の電圧振幅及び電圧波形の周期を取得する。具体的には、運転モード管理部192は、DA/AD変換部194及びセンサ値読み取り部195を介して、電圧センサ113から、端子115を通じて外部と接続される支線BLの電圧Vrを取得する。運転モード管理部192は、取得した電圧Vrから、電圧振幅と電圧変動の周期を取得する。この際、例えば、いわゆるゼロポイント検出により接続先相手(例えば基幹系統)の電圧振幅及び電圧波形の周期を取得することが可能である。
運転モード管理部192は、取得した周期と時間的に同期した波形モデルを作成する。この際、波形モデルは、例えば正弦波として生成される。
運転モード管理部192は、母線電圧の定格値V0と、現状の母線電圧V101との差分ΔV(ΔV=V0-V101)を計算する。
運転モード管理部192は、差分ΔVの値に応じて、起動対象レグ(第1レグ11)の出力電圧を決定する。
運転モード管理部192は、波形モデルの振幅を、決定した出力電圧値に同期させる。運転モード管理部192は、振幅の同期が完了した波形モデルの情報を波形指示信号SD1として出力する。電力変換指令部193は、波形指示信号SD1をDA/AD変換部194でデジタル-アナログ変換した信号である波形指示信号SA1を受け取る。これにより、第1レグ11は、マスターモードレグとして、外部の基幹系統に同期して電力を送電する準備が完了する。
非マスターモード波形生成ステップS33は、マスターモード以外の運転モードにて送電を行う際の波形を生成するステップである。非マスターモード波形生成ステップS33は、波形情報取得ステップS331、波形生成ステップS332、第2運転モード判定ステップS333、出力電力値取得ステップS334及び振幅同期ステップS335により構成される。
一方、運転モードが自立モード又は指定電力送受電モードである場合には、運転モード管理部192は、制御指示データベース196から、起動対象レグ(第1レグ11)の接続先相手(例えば他の電力ルータのレグなど)の電圧波形周期を読み出す。
運転モード管理部192は、読み出した電圧波形周期と同期した波形モデルを作成する。この際、波形モデルは、例えば正弦波として生成される。運転モード管理部192は、作成した波形モデルの情報を波形指示信号SD1として出力する。電力変換指令部193は、波形指示信号SD1をDA/AD変換部194でデジタル-アナログ変換した信号である波形指示信号SA1を受け取る。これにより、第1レグ11は、指定された周期にて電力を送電する準備が完了する。
運転モード管理部192は、運転モード指定情報MODEにより指定された起動対象レグ(第1レグ11)の運転モードが、自立モードであるかを判定する。運転モードが自立モードである場合には、開閉器制御ステップS34へ進む。
運転モードが指定電力送受電モードである場合には、運転モード管理部192は、制御指示データベース196から、指定電力送受電モードでの出力電力値を読み出す。
運転モード管理部192は、波形モデルの振幅を、読み出した出力電力値を実現する値に同期させる。運転モード管理部192は、振幅の同期が完了した波形モデルの情報を波形指示信号SD1として出力する。電力変換指令部193は、波形指示信号SD1をDA/AD変換部194でデジタル-アナログ変換した信号である波形指示信号SA1を受け取る。これにより、第1レグ11は、指定電力送受電モードレグとして電力を送電する準備が完了する。
運転モード管理部192は、開閉制御信号SIG1により、開閉器113を「閉」状態とする。これにより、起動対象レグ(第1レグ11)は送受電が可能となる。
運転モード管理部192は、マスターモード波形生成ステップS32又は非マスターモード波形生成ステップS33の後、起動対象レグ(第1レグ11)の起動が完了したことを、管理サーバ850に通知する。
次に、実施の形態2にかかる電力ルータ200について説明する。電力ルータ200は、実施の形態1にかかる電力ルータ100の変形例である。電力ルータ200は、実施の形態1で説明した起動対象レグを起動後に、送電を開始する際の送電開始動作を更に行うことができる。電力ルータ200の構成及び起動対象レグの起動処理は電力ルータ100と同様であるので、説明を省略する。
運転モード管理部192は、送電開始を指令する波形指示信号SD1を出力する。電力変換指令部193は、波形指示信号SD1をDA/AD変換部194でデジタル-アナログ変換した信号である波形指示信号SA1を受け取る。これにより、電力変換部111は、送電を開始する。
運転モード管理部192は、運転モード指定情報MODEにより指定された起動対象レグの運転モードが、マスターモードであるかを判定する。
運転モードがマスターモードである場合には、第1送電調整処理ステップS61を実行する。図10は、電力ルータ200の第1送電調整処理ステップS61の手順を示すフローチャートである。第1送電調整処理ステップS61は、処理回数初期設定ステップS611、母線電圧取得ステップS612、母線電圧判定ステップS613、送電成功通知ステップS614、差分計算ステップS615、電圧比較ステップS616、振幅同期ステップS617、電圧比較回数加算ステップS618、比較回数確認ステップS619、送電不能通知ステップS620により構成される。
運転モードがマスターモードである場合には、運転モード管理部192は、電圧比較回数iを「0」に設定する。
運転モード管理部192は、DA/AD変換部194及びセンサ値読み取り部195を介して、電圧センサ103から直流母線101の母線電圧V101を取得する。
運転モード管理部192は、母線電圧V101が所定の範囲内(Vth1~Vth2)に収まっているかを確認する。
Vth1≦V101≦Vth2である場合には、運転モード管理部192は、起動対象レグからの送電が成功したことを、管理サーバ850に通知し、処理を完了する。
Vth1>V101又はV101>Vth2である場合には、運転モード管理部192は、母線電圧の定格値V0と、現状の母線電圧V101との差分ΔV(ΔV=V0-V101)を計算する。
運転モード管理部192は、差分ΔVの値に応じて、起動対象レグの出力電圧Vrを決定する。
運転モード管理部192は、波形モデルの振幅を、決定した出力電圧値に同期させる。運転モード管理部192は、振幅の同期が完了した波形モデルの情報を波形指示信号SD1として出力する。電力変換指令部193は、波形指示信号SD1をDA/AD変換部194でデジタル-アナログ変換した信号である波形指示信号SA1を受け取る。これにより、電力変換指令部193は、母線電圧V101が定格値V0に近づくように、出力電圧を変更することができる。
運転モード管理部192は、電圧比較回数iに「1」を加算する。
運転モード管理部192は、電圧比較回数iが設定回数n(nは、2以上の整数)に到達したかを確認する。i≠nである場合には、母線電圧取得ステップS612へ戻る。
i=nである場合には、運転モード管理部192は、送電を中止し、起動対象レグからの送電が不能であることを、管理サーバ850に通知する。
一方、運転モード判定ステップS5において、運転モードがマスターモード以外である場合には、運転モード管理部192は、運転モード指定情報MODEにより指定された起動対象レグの運転モードが、指定電力送受電モードであるかを判定する。
運転モードが指定電力送受電モードである場合には、第2送電調整処理ステップS71を実行する。図11は、電力ルータ200の第2送電調整処理ステップS71の手順を示すフローチャートである。第2送電調整処理ステップS71は、処理回数初期設定ステップS711、出力電力値取得ステップS712、出力電力値判定ステップS713、送電成功通知ステップS714、差分計算ステップS715、電圧比較ステップS716、振幅同期ステップS717、電圧比較回数加算ステップS718、比較回数確認ステップS719、送電不能通知ステップS720により構成される。
運転モード管理部192は、電圧比較回数iを「0」に設定する。
運転モード管理部192は、DA/AD変換部194及びセンサ値読み取り部195を介して、電流センサ112から支線BLの電流値Irを取得し、電圧センサ114から支線BLの電圧Vrを取得する。これにより、運転モード管理部192は、起動対象レグ(第1レグ11)の出力電力値Wrを取得する。
運転モード管理部192は、出力電力値Wrが所定の範囲内(Wr1~Wr2)に収まっているかを確認する。
Wr1≦Wr≦Wr2である場合には、運転モード管理部192は、起動対象レグからの送電が成功したことを、管理サーバ850に通知し、処理を完了する。
Wr1>Wr又はWr>Wr2である場合には、運転モード管理部192は、指定出力電力値W0と、現状の出力電力値Wrとの差分ΔW(ΔW=Wr-W0)を計算する。
運転モード管理部192は、差分ΔWの値に応じて、起動対象レグの波形モデルの電圧振幅を決定する。
運転モード管理部192は、波形モデルの振幅を、決定した出力電圧値に同期させる。運転モード管理部192は、振幅の同期が完了した波形モデルの情報を波形指示信号SD1として出力する。電力変換指令部193は、波形指示信号SD1をDA/AD変換部194でデジタル-アナログ変換した信号である波形指示信号SA1を受け取る。これにより、電力変換指令部193は、出力電力値Wrが指定出力電力値W0に近づくように、出力電圧を変更することができる。
運転モード管理部192は、電圧比較回数iに「1」を加算する。
運転モード管理部192は、電圧比較回数iが設定回数n(nは、2以上の整数)に到達したかを確認する。i<nである場合には、出力電力値取得ステップS712に戻る。
i=nである場合には、運転モード管理部192は、送電を中止し、起動対象レグからの送電が不能であることを、管理サーバ850に通知する。
運転モードが指定電力送受電モードではない場合(すなわち、運転モードが自立モードである場合)には、第3送電調整処理ステップS73を実行する。図12は、電力ルータ200の第3送電調整処理ステップS73の手順を示すフローチャートである。第3送電調整処理ステップS73は、処理回数初期設定ステップS731、出力電圧/周波数取得ステップS732、出力電圧判定ステップS733、周波数判定ステップS734、送電成功通知ステップS735、処理回数加算ステップS736、処理回数確認ステップS737、波形モデル再生成ステップS738、送電不能通知ステップS739により構成される。
運転モード管理部192は、電圧比較回数iを「0」に設定する。
運転モード管理部192は、DA/AD変換部194及びセンサ値読み取り部195を介して、電圧センサ114から支線BLの電圧Vr及び電圧変動の周波数を取得する。
運転モード管理部192は、出力電圧Vrが、所定の範囲(V1~V2)に収まっているか、かつ、周波数が設定周波数と一定しているかを判定する。
V1≦Vr≦V2である場合には、運転モード管理部192は、送電にかかる周波数fが設定周波数f0と一定しているかを判定する。
Wr1≦Wr≦Wr2、かつf=f0である場合には、運転モード管理部192は、起動対象レグからの送電が成功したことを、管理サーバ850に通知し、処理を完了する。
運転モード管理部192は、電圧比較回数iに「1」を加算する。
運転モード管理部192は、電圧比較回数iが設定回数n(nは、2以上の整数)に到達したかを確認する。
V1>Vr、Vr>V2又はf=f0である場合には、指定電圧Vs及び周期を基に、波形モデルを再生成する。運転モード管理部192は、作成した波形モデルの情報を波形指示信号SD1として出力する。電力変換指令部193は、波形指示信号SD1をDA/AD変換部194でデジタル-アナログ変換した信号である波形指示信号SA1を受け取る。これにより、電力変換指令部193に設定される波形モデルが更新される。その後、出力電圧/周波数取得ステップS732に戻る。
i=nである場合には、運転モード管理部192は、送電を中止し、起動対象レグからの送電が不能であることを、管理サーバ850に通知する。
次に、実施の形態3について説明する。本実施の形態の形態では、1又は複数の電力ルータを用いて構築された電力ネットワークシステムの例について説明する。なお、本実施の形態においては、電力ルータ1011~1014を用いて電力ネットワークシステムを構築しているが、電力ルータ1011~1014のそれぞれは、上述の実施の形態1及び2にかかる電力ルータのいずれを用いてもよい。
各レグの運転モードについては説明を省略するが、電力融通の方向とこれまでに説明した接続制約とを考慮して適切に各レグの運転モードを選択しなければならないことはもちろんである。
なお、図14において、基幹系統811を、蓄電池や発電設備などの分散型電源に代えてもよいことはもちろんである。すなわち、複数の電力ルータを分散型電源にバス接続してもよい。
すなわち、本実施形態の電力ルータにより、電力セル同士を非同期に相互接続した電力ネットワークシステムを構築することができる。そして、本実施形態に説明したように、電力ルータ内のレグを管理サーバからの制御指示の通りに運転し、電力ネットワークシステムにおける電力融通等の具体的な運用が可能となる。
なお、本発明は上記実施の形態に限られたものではなく、趣旨を逸脱しない範囲で適宜変更することが可能である。例えば、上述の実施の形態では、制御部19をハードウェアの構成として説明したが、本発明は、これに限定されるものではない。例えば、制御部19をコンピュータにより構成し、任意の処理を、CPU(Central Processing Unit)にコンピュータプログラムを実行させることにより実現することも可能である。また、レグの電力変換部に制御装置を組み込み、制御装置を例えば動的再構成ロジック(FPGA:Field Programmable Gate Array)とする。そしてFPGAの制御プログラムをレグのモードに適応した内容に変更して動作させる。これによりレグの種類、動作に応じてFPGAを書き換えることでその動作モードに応じた制御が可能となるためハードウェア容量やコストが削減できる。また、上述したプログラムは、様々なタイプの非一時的なコンピュータ可読媒体(non-transitory computer readable medium)を用いて格納され、コンピュータに供給することができる。非一時的なコンピュータ可読媒体は、様々なタイプの実体のある記録媒体(tangible storage medium)を含む。非一時的なコンピュータ可読媒体の例は、磁気記録媒体(例えばフレキシブルディスク、磁気テープ、ハードディスクドライブ)、光磁気記録媒体(例えば光磁気ディスク)、CD-ROM(Read Only Memory)CD-R、CD-R/W、半導体メモリ(例えば、マスクROM、PROM(Programmable ROM)、EPROM(Erasable PROM)、フラッシュROM、RAM(Random Access Memory))を含む。また、プログラムは、様々なタイプの一時的なコンピュータ可読媒体(transitory computer readable medium)によってコンピュータに供給されてもよい。一時的なコンピュータ可読媒体の例は、電気信号、光信号、及び電磁波を含む。一時的なコンピュータ可読媒体は、電線及び光ファイバ等の有線通信路、又は無線通信路を介して、プログラムをコンピュータに供給できる。
12、22、32、42 第2レグ
13、23、33、43 第3レグ
14、24、34、44 第4レグ
19 制御部
52 制御指示
60 ACスルーレグ
100、170、200、1011~1014 電力ルータ
101 直流母線
102 通信バス
103 電圧センサ
111、121、131、141、151 電力変換部
111D 帰還ダイオード
111P 逆並列回路
111T サイリスタ
112、122、132、142、152、162 電流センサ
113、123、133、143、153、163 開閉器
114、124、134、144、154、164 電圧センサ
115、125、135、145、155、165 接続端子
121T サイリスタ
191 記憶部
192 運転モード管理部
193 電力変換指令部
194 DA/AD変換部
195 センサ値読み取り部
196 制御指示データベース(#1DB)
197 レグ識別情報データベース(#2DB)
810、1001~1003 電力ネットワークシステム
811、811A~811C 基幹系統
812 大規模発電所
821~824 電力セル
831 家
832 ビル
833 太陽光発電パネル
834 風力発電機
835 蓄電池
841~844 電力ルータ
850 管理サーバ
851 通信網
1021、1022 接続線
1023 配電線
BL 支線
MODE 運転モード指定情報
SA1、SD1 波形指示信号
SA2、SD2 読み取り信号
SCON 制御信号
SIG1 開閉制御信号
Claims (25)
- 所定の定格に電圧が維持される直流母線と、
第1の接続端が前記直流母線に接続され、第2の接続端が外部接続端子として外部の接続相手に接続され、前記第1の接続端と前記第2の接続端との間で電力を双方向に変換する機能を有する複数の電力変換レグと、
前記複数の電力変換レグの運転を制御する制御手段と、を備え、
前記制御手段は、
前記複数の電力変換レグのうちで起動対象となる起動対象レグの指定と、前記起動対象レグの運転モードの指定と、が含まれる制御指示を受け取り、
前記起動対象レグを指定された前記運転モードで起動できるかについて判断を行い、
前記起動対象レグを指定された前記運転モードで起動できる場合に、前記起動対象レグを指定された前記運転モードで起動する、
電力ルータ。 - 前記制御手段は、
前記判断において、
前記制御指示で指定された運転モードが、マスターモード、指定電力送受電モード及び自立モードのいずれであるかを判定し、
運転モードごとに前記起動対象レグを起動できるかについて判断する、
請求項1に記載の電力ルータ。 - 前記制御手段は、
前記制御指示で指定された運転モードがマスターモードである場合には、
前記直流母線の電圧を取得し、
前記直流母線の電圧が所定値よりも大きい場合には、前記起動対象レグを起動可能と判断し、
前記直流母線の電圧が所定値よりも小さい場合には、外部へ母線電圧異常を通知し、前記起動対象レグの起動を中止する、
請求項2に記載の電力ルータ。 - 前記制御手段は、
前記制御指示で指定された運転モードがマスターモードではない場合には、
前記起動対象レグ以外に、前記複数の電力変換レグのうちでマスターモードにて運転しているレグが有るかを判定し、
マスターモードで運転しているレグが有る場合には、前記起動対象レグを起動可能と判断し、
マスターモードで運転しているレグが無い場合には、マスターモードのレグが無いことを外部へ通知し、前記起動対象レグの起動を中止する、
請求項2又は3に記載の電力ルータ。 - 前記電力変換レグは、
前記第1の接続端と前記第2の接続端との間に接続され、前記第1の接続端と前記第2の接続端との間で電力を双方向に変換する電力変換部と、
前記電力変換部と前記第2の接続端との間に流れる電流を検出する電流センサと、
前記電力変換部と前記第2の接続端との間に挿入され、前記電力変換部と前記第2の接続端との間の接続または開放する開閉器と、
前記開閉器と前記第2の接続端との間の電圧を検知する電圧センサと、を備える、
請求項1乃至4のいずれか一項に記載の電力ルータ。 - 前記制御手段は、
前記起動対象レグが起動可能である場合に、
前記制御指示で指定された運転モードが、マスターモード、指定電力送受電モード及び自立モードのいずれであるかを判定し、
運転モードごとに異なる条件で前記起動対象レグを起動する、
請求項5に記載の電力ルータ。 - 前記制御指示で指定された運転モードがマスターモードである場合には、
前記制御手段は、
前記起動対象レグの前記電圧センサから、接続相手の電圧振幅及び周波数を取得し、
前記周波数と時間的に同期した波形モデルを生成し、
前記直流母線の電圧と前記電圧振幅との差分を算出し、
前記差分に基づいて前記波形モデルの振幅を設定し、前記波形モデルを前記起動対象レグの前記電力変換部に設定する、
請求項6に記載の電力ルータ。 - 前記制御指示で指定された運転モードがマスターモードではない場合には、
前記制御手段は、
前記制御指示に含まれる波形モデルの周波数を取得し、
前記周波数と時間的に同期した波形モデルを生成する、
請求項7に記載の電力ルータ。 - 前記制御手段は、
前記制御指示で指定された運転モードが指定電力送受電モード及び自立モードのいずれであるかを判断し、
前記制御指示で指定された運転モードが指定電力送受電モードである場合には、
前記制御指示に含まれる波形モデルの振幅を取得し、
取得した前記振幅を前記波形モデルの振幅として設定し、前記波形モデルを前記起動対象レグの前記電力変換部に設定し、
前記制御指示で指定された運転モードが自立モードである場合には、
生成した前記波形モデルを前記起動対象レグの前記電力変換部に設定する、
請求項7に記載の電力ルータ。 - 前記制御手段は、
前記電力変換部の前記波形モデルを設定した後に、
前記開閉器を制御して、前記電力変換部と前記第2の接続端とを接続させ、
外部に起動完了を通知する、
請求項8又は9に記載の電力ルータ。 - 前記制御手段は、
前記起動対象レグの起動が完了した後に、前記起動対象レグから接続相手への送電を開始させる、
請求項7乃至10のいずれか一項に記載の電力ルータ。 - 前記制御手段は、
前記制御指示で指定された運転モードに応じて、送電状態を調整する、
請求項11に記載の電力ルータ。 - 前記制御手段は、
前記制御指示で指定された運転モードがマスターモードである場合には、
前記直流母線の電圧を取得し、
前記直流母線の電圧が所定範囲内であるかを判定し、
前記直流母線の電圧が所定範囲内である場合には、
外部に送電成功を通知する、
請求項12に記載の電力ルータ。 - 前記制御手段は、
前記直流母線の電圧が所定範囲外である場合には、
前記直流母線の電圧の定格値と前記直流母線の電圧との差分を算出し、
算出した前記差分に基づいて、前記起動対象レグの出力電圧を決定し、
決定した前記出力電圧を前記波形モデルの振幅として設定し、前記波形モデルを前記起動対象レグの前記電力変換部に設定し、
再度、前記直流母線の電圧を取得し、
前記直流母線の電圧が所定範囲内であるかを判定する、
請求項13に記載の電力ルータ。 - 前記制御手段は、
前記直流母線の電圧が所定範囲内であるかを判定した回数が所定回数となった場合、
前記起動対象レグからの送電を中止し、外部に送電不可を通知する、
請求項14に記載の電力ルータ。 - 前記制御手段は、
前記制御指示で指定された運転モードが指定電力送受電モードである場合には、
前記起動対象レグの出力電力を取得し、
前記出力電力が所定範囲内であるかを判定し、
前記出力電力が所定範囲内である場合には、
外部に送電成功を通知する、
請求項12に記載の電力ルータ。 - 前記制御手段は、
前記出力電力が所定範囲外である場合には、
前記出力電力の定格値と前記出力電力との差分を算出し、
算出した前記差分に基づいて、前記起動対象レグの出力電圧を決定し、
決定した前記出力電圧を前記波形モデルの振幅として設定し、前記波形モデルを前記起動対象レグの前記電力変換部に設定し、
再度、前記出力電力を取得し、
前記出力電力が所定範囲内であるかを判定する、
請求項16に記載の電力ルータ。 - 前記制御手段は、
前記出力電力が所定範囲内であるかを判定した回数が所定回数となった場合、
前記起動対象レグからの送電を中止し、外部に送電不可を通知する、
請求項17に記載の電力ルータ。 - 前記制御手段は、
前記制御指示で指定された運転モードが自立モードである場合には、
前記制御指示で指定された出力電圧及び周波数を取得し、
前記出力電圧が所定範囲内であるかを判定し、
前記周波数が所定値であるかを判定し、
前記出力電圧が前記所定範囲内かつ前記周波数が前記所定値である場合には、
外部に送電成功を通知する、
請求項12に記載の電力ルータ。 - 前記制御手段は、
前記出力電圧が前記所定範囲外、又は、前記周波数が前記所定値ではない場合には、
前記制御指示で指定される出力電圧及び周波数を取得し、
取得した前記出力電圧及び周波数に基づいた波形モデルを再生成し、再生成した前記波形モデルを前記起動対象レグの前記電力変換部に設定し、
再度、出力電圧及び周波数を取得し、
前記出力電圧が所定範囲内であるかを判定し、
前記周波数が所定値であるかを判定する、
請求項19に記載の電力ルータ。 - 前記制御手段は、
前記出力電圧が所定範囲内であるかを判定し、前記周波数が所定値であるかを判定した回数が所定回数となった場合、
前記起動対象レグからの送電を中止し、外部に送電不可を通知する、
請求項20に記載の電力ルータ。 - 一又は複数の電力ルータと、
前記電力ルータが直接的又は間接的に接続される電力系統と、を備え、
前記一又は複数の電力ルータのそれぞれは、
所定の定格に電圧が維持される直流母線と、
第1の接続端が前記直流母線に接続され、第2の接続端が外部接続端子として外部の接続相手に接続され、前記第1の接続端と前記第2の接続端との間で電力を双方向に変換する機能を有する複数の電力変換レグと、
前記複数の電力変換レグの運転を制御する制御手段と、を備え、
前記制御手段は、
前記複数の電力変換レグのうちで起動対象となる起動対象レグの指定と、前記起動対象レグの運転モードの指定と、が含まれる制御指示を受け取り、
前記起動対象レグを指定された前記運転モードで起動できるかについて判断を行い、
前記起動対象レグを指定された前記運転モードで起動できる場合に、前記起動対象レグを指定された前記運転モードで起動する、
電力ネットワークシステム。 - 所定の定格に電圧が維持される直流母線と、
第1の接続端が前記直流母線に接続され、第2の接続端が外部接続端子として外部の接続相手に接続され、前記第1の接続端と前記第2の接続端との間で電力を双方向に変換する機能を有する複数の電力変換レグと、を備える電力ルータにおいて、
前記複数の電力変換レグのうちで起動対象となる起動対象レグの指定と、前記起動対象レグの運転モードの指定と、が含まれる制御指示を受け取り、
前記起動対象レグを指定された前記運転モードで起動できるかについて判断を行い、
前記起動対象レグを指定された前記運転モードで起動できる場合に、前記起動対象レグを指定された前記運転モードで起動する、
電力ルータの運転制御方法。 - 所定の定格に電圧が維持される直流母線と、
第1の接続端が前記直流母線に接続され、第2の接続端が外部接続端子として外部の接続相手に接続され、前記第1の接続端と前記第2の接続端との間で電力を双方向に変換する機能を有する複数の電力変換レグと、
前記複数の電力変換レグの運転を制御する制御手段を構成するコンピュータと、を備える電力ルータにおいて、
前記コンピュータに、
前記複数の電力変換レグのうちで起動対象となる起動対象レグの指定と、前記起動対象レグの運転モードの指定と、が含まれる制御指示を受け取る処理と、
前記起動対象レグを指定された前記運転モードで起動できるかについて判断を行う処理と、
前記起動対象レグを指定された前記運転モードで起動できる場合に、前記起動対象レグを指定された前記運転モードで起動する処理と、を実行させる、
電力ルータの運転制御プログラムが格納された非一時的なコンピュータ可読媒体。 - 一又は複数の電力ルータと、
前記電力ルータが直接的又は間接的に接続される電力系統と、
前記一又は複数の電力ルータの運転を制御する管理装置を構成するコンピュータと、を備え、
前記一又は複数の電力ルータのそれぞれは、
所定の定格に電圧が維持される直流母線と、
第1の接続端が前記直流母線に接続され、第2の接続端が外部接続端子として外部の接続相手に接続され、前記第1の接続端と前記第2の接続端との間で電力を双方向に変換する機能を有する複数の電力変換レグと、
前記複数の電力変換レグの運転を制御する制御手段と、を備え、
前記コンピュータに、
前記複数の電力変換レグのうちで起動対象となる起動対象レグの指定と、前記起動対象レグの運転モードの指定と、が含まれる制御指示を、前記一又は複数の電力ルータのいずれかに含まれる起動対象レグに出力する処理を実行させ、
前記制御手段は、
前記起動対象レグを指定された前記運転モードで起動できるかについて判断を行い、
前記起動対象レグを指定された前記運転モードで起動できる場合に、前記起動対象レグを指定された前記運転モードで起動する、
管理装置の制御プログラムが格納された非一時的なコンピュータ可読媒体。
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2014558514A JPWO2014115569A1 (ja) | 2013-01-28 | 2014-01-28 | 電力ルータとその運転制御方法及びプログラム、電力ネットワークシステム、管理装置の制御プログラム |
US14/763,654 US20150372487A1 (en) | 2013-01-28 | 2014-01-28 | Power router and operation control method thereof, power network system, and non-transitory computer readable media storing program |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2013013633 | 2013-01-28 | ||
JP2013-013633 | 2013-01-28 |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2014115569A1 true WO2014115569A1 (ja) | 2014-07-31 |
Family
ID=51227361
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/JP2014/000419 WO2014115569A1 (ja) | 2013-01-28 | 2014-01-28 | 電力ルータとその運転制御方法、電力ネットワークシステム、プログラムが格納された非一時的なコンピュータ可読媒体 |
Country Status (3)
Country | Link |
---|---|
US (1) | US20150372487A1 (ja) |
JP (1) | JPWO2014115569A1 (ja) |
WO (1) | WO2014115569A1 (ja) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US9577428B2 (en) * | 2013-11-19 | 2017-02-21 | New Jersey Institute Of Technology | Packeted energy delivery system and methods |
KR102044513B1 (ko) * | 2018-02-07 | 2019-11-13 | 효성중공업 주식회사 | Dc배전에서 무순단 전력변환 시스템 |
US20240027533A1 (en) * | 2022-07-22 | 2024-01-25 | Analog Devices International Unlimited Company | Distributed battery monitoring system |
CN115842345B (zh) * | 2023-02-07 | 2023-06-02 | 长园飞轮物联网技术(杭州)有限公司 | 能源路由器控制方法和能源路由器 |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2006288162A (ja) * | 2005-04-05 | 2006-10-19 | Inst Of Research & Innovation | 電力システムの電力量融通制御方法 |
JP2012010530A (ja) * | 2010-06-27 | 2012-01-12 | Rikiya Abe | 多端子型電力変換装置と電力システムならびにその制御プログラム |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH07131936A (ja) * | 1993-11-01 | 1995-05-19 | Hitachi Ltd | 直流送電制御装置 |
-
2014
- 2014-01-28 WO PCT/JP2014/000419 patent/WO2014115569A1/ja active Application Filing
- 2014-01-28 US US14/763,654 patent/US20150372487A1/en not_active Abandoned
- 2014-01-28 JP JP2014558514A patent/JPWO2014115569A1/ja active Pending
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2006288162A (ja) * | 2005-04-05 | 2006-10-19 | Inst Of Research & Innovation | 電力システムの電力量融通制御方法 |
JP2012010530A (ja) * | 2010-06-27 | 2012-01-12 | Rikiya Abe | 多端子型電力変換装置と電力システムならびにその制御プログラム |
Also Published As
Publication number | Publication date |
---|---|
US20150372487A1 (en) | 2015-12-24 |
JPWO2014115569A1 (ja) | 2017-01-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US11050260B2 (en) | Smart main electrical panel for energy generation systems | |
JP6175443B2 (ja) | 電力ルータ、電力ネットワークシステム、電力融通方法、および電力ルータの運転制御プログラム | |
JPWO2014020644A1 (ja) | 電力供給システム、マスタ蓄電システム及びスレーブ蓄電システム | |
WO2014020645A1 (ja) | 電力供給システム及びスレーブ蓄電システム | |
US20160134109A1 (en) | Power network system, and power adjustment apparatus and method | |
WO2014115569A1 (ja) | 電力ルータとその運転制御方法、電力ネットワークシステム、プログラムが格納された非一時的なコンピュータ可読媒体 | |
US10168728B2 (en) | Power network system, power identification method, and power router | |
JP5475387B2 (ja) | 電力供給システムの電源最適化装置 | |
JP2015070746A (ja) | 制御装置および蓄電システム | |
JP6213478B2 (ja) | 電力ルータ、電力ネットワークシステム、電力ルータの運転制御方法、および電力ルータの運転制御プログラム | |
KR101196729B1 (ko) | 마이크로그리드의 동기 투입을 능동적으로 제어하기 위한 장치 및 그 방법 | |
WO2014115557A1 (ja) | 電力ルータとその運転制御方法、電力ネットワークシステム、プログラムが格納された非一時的なコンピュータ可読媒体 | |
WO2015107593A1 (ja) | 電力ルータとその制御方法、コンピュータ可読媒体、及び、電力ネットワークシステム | |
WO2016013191A1 (ja) | 電力ルータ、電力送受電システム、電力送受電方法、および電力送受電用プログラムが記憶された記憶媒体 | |
JP4101201B2 (ja) | 分散型電源の運転方法 | |
JP2015033286A (ja) | 電力ルータ及び電力ネットワークシステム、並びに、電力ルータの制御方法及び制御プログラム | |
JP2016127726A (ja) | 電力ルータ、電力ルータの制御方法及びプログラム | |
JP2013132156A (ja) | 蓄電システム、蓄電制御装置及び電力制御方法 | |
JP2005086984A (ja) | 電力供給システム及び電力供給設備 | |
EP4422015A1 (en) | Systems and methods for determining a site control architecture for controlling inverters in microgrid-based site | |
Kim et al. | Solid State Power Substation DC Node Optimization and Controller Hardware-In-The-Loop Demonstration | |
WO2014203520A1 (ja) | 電力ネットワークシステム、電力融通方法、電力ルータ及び制御装置 | |
JP2023098652A (ja) | 燃料電池システム | |
JP6199794B2 (ja) | 電力制御システム、電力制御システムの制御方法、及び電力制御装置 | |
JP2016165181A (ja) | 電力ルータとその制御方法及びその制御プログラム、電力ネットワークシステム |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 14743890 Country of ref document: EP Kind code of ref document: A1 |
|
ENP | Entry into the national phase |
Ref document number: 2014558514 Country of ref document: JP Kind code of ref document: A |
|
WWE | Wipo information: entry into national phase |
Ref document number: 14763654 Country of ref document: US |
|
NENP | Non-entry into the national phase |
Ref country code: DE |
|
122 | Ep: pct application non-entry in european phase |
Ref document number: 14743890 Country of ref document: EP Kind code of ref document: A1 |