WO2014102401A1 - Método predictivo de análisis de un equipo de bateado y equipo de bateado. - Google Patents
Método predictivo de análisis de un equipo de bateado y equipo de bateado. Download PDFInfo
- Publication number
- WO2014102401A1 WO2014102401A1 PCT/ES2012/070917 ES2012070917W WO2014102401A1 WO 2014102401 A1 WO2014102401 A1 WO 2014102401A1 ES 2012070917 W ES2012070917 W ES 2012070917W WO 2014102401 A1 WO2014102401 A1 WO 2014102401A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- batting
- equipment
- measuring equipment
- measuring
- peaks
- Prior art date
Links
Classifications
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B23/00—Testing or monitoring of control systems or parts thereof
- G05B23/02—Electric testing or monitoring
- G05B23/0205—Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults
- G05B23/0218—Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults characterised by the fault detection method dealing with either existing or incipient faults
- G05B23/0224—Process history based detection method, e.g. whereby history implies the availability of large amounts of data
- G05B23/0227—Qualitative history assessment, whereby the type of data acted upon, e.g. waveforms, images or patterns, is not relevant, e.g. rule based assessment; if-then decisions
- G05B23/0235—Qualitative history assessment, whereby the type of data acted upon, e.g. waveforms, images or patterns, is not relevant, e.g. rule based assessment; if-then decisions based on a comparison with predetermined threshold or range, e.g. "classical methods", carried out during normal operation; threshold adaptation or choice; when or how to compare with the threshold
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B27/00—Placing, renewing, working, cleaning, or taking-up the ballast, with or without concurrent work on the track; Devices therefor; Packing sleepers
- E01B27/12—Packing sleepers, with or without concurrent work on the track; Compacting track-carrying ballast
- E01B27/13—Packing sleepers, with or without concurrent work on the track
- E01B27/16—Sleeper-tamping machines
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01H—MEASUREMENT OF MECHANICAL VIBRATIONS OR ULTRASONIC, SONIC OR INFRASONIC WAVES
- G01H1/00—Measuring characteristics of vibrations in solids by using direct conduction to the detector
Definitions
- the present invention relates to a system and predictive method of failure analysis for mechanical elements included in a batter with a movable frame on rail tracks.
- the batting machine comprises a batting equipment movable in height and transversely by hydraulic drives.
- the batting equipment includes a set of batting peaks or adjustable bats by means of drives in the longitudinal direction of the machine.
- the batting peaks are synchronized and are housed in a height-adjustable support, being submersible in the ballast bed and movable relative to each other, with an active force, for example, up to 320 kN.
- ballast bats are submerged in the ballast to distribute the spilled ballast evenly over the entire track width.
- a renewed track segment is brought to the desired state of the track using the batting equipment, the equipment for lifting and leveling tracks as well as the control system of the road condition.
- an analysis system of the different mechanical elements included in the batting machine that allows to perform a Precise control of their status through a predictive fault analysis system.
- the present invention seeks to solve one or more of the problems set forth above by means of a predictive method of analyzing failures of mechanical elements included in a batting machine as claimed in the claims.
- An object thereof is to supply assemblable measuring equipment to a batting equipment to measure vibrations derived from gaps between mechanical elements of the batting equipment.
- the degree of clearance between mechanical elements influences the magnitude of the vibration, the amplitude of the vibration and the pressure of the mechanical drives, being able to deduce a state of maintenance of the batting equipment.
- Another object of the measuring equipment is to execute predictive analysis rules for fault analysis based on the setpoint threshold values stored on the same equipment.
- Yet another aspect of the measuring equipment is to measure vibrations in a range and frequency different from those caused by the batting equipment that performs the batting procedure of the ballast bed of a railway track. [0012] Consequently, the measurement results supplied to the predictive analysis method enable a reliable and documentable data on the operating status of the batting equipment, that is, the useful life of the batting equipment. [0013] This objective is attainable by the predictive analysis method that deduces differences between a set of measured values during the performance of the batting process and setpoints of operating parameters of the batting equipment before performing any batting process.
- Yet another aspect of the embodiment is to provide warning messages in case the parameterized values are out of a normal or standard operation, being able to predict the change of mechanical elements of the batting equipment when the useful life thereof is deducted from Parameterized and controlled values are different from normal operation.
- a predictive method of analyzing a batting equipment that can be installed in a movable batting machine on a path applicable to the batting equipment comprising a set of batting peaks that can be displaced in height and transversely by means of actuators; where the method comprises a stage of installation of a measuring equipment on the batting equipment, which is adapted to measure vibrations of the batting equipment derived from gaps between the drive elements of the batting peaks while developing the batting process of the bed of road ballast.
- the method also comprises a step of capturing a set of objective parameters of operation of the batting equipment being said objective parameters controlled by the measuring equipment before performing a first batting process of the road ballast bed; storage of the target parameters acquired by the measuring equipment as setpoint threshold values; comparison of the set of objective parameters of operation of the batting equipment controlled by the measuring equipment with the setpoint threshold values stored during the performance of a batting process of the track ballast bed; and provision by an interface included in the measuring equipment of a warning signal in the event that the difference in the comparison stage is different from a certain increase in a setpoint threshold value.
- the batting equipment comprises a set of batting peaks movable in height and transversely by means of actuators; where a measuring equipment is installable on the batting equipment to measure vibrations of the batting equipment derived from gaps between the actuating elements of the batting peaks while developing a batting process of the track ballast bed.
- the measuring equipment is adapted to store the acquired target parameters as setpoint threshold values before performing a first batting process of the one-way ballast bed.
- the measuring equipment is adapted to provide a warning signal through an interface if the difference between an acquired value and a setpoint threshold value is different from a certain increase for the given setpoint threshold value.
- Figure 1 shows in an elevation view of the batting equipment a measuring equipment assembled in the same batting equipment
- Figure 2 shows in a profile view of the batting equipment the measuring equipment assembled in the same batting equipment
- Figure 3 shows in a plan view a cross-sectional section of the batting equipment a measuring equipment assembled in the same batting equipment.
- a batting machine has a machine frame movable on a track, formed by sleepers and rails, supported by a bed of ballast that must be maintained periodically by a batting process.
- the batting machine comprises a batting equipment 11 that can be displaced in height and transversely by means of actuators, as well as an equipment for lifting and leveling tracks.
- the batting equipment 11 is equipped with batting peaks 12 adjustable in height and transversely by mechanical and hydraulic drives in the longitudinal direction of the machine.
- a measuring device is assembled externally to batting equipment 11.
- the measuring equipment is adapted to accurately capture parameters of operation of batting equipment 11 while the batting process is taking place.
- the batting equipment 11 Before the batting machine performs the first batting work of the ballast bed of a railroad track; the batting equipment 11 must be put into operation in order for the measuring equipment to capture data relating to the objective set of operating parameters of the batting equipment 11 prior to the completion of the first batting process.
- the setpoint threshold values acquired by the measuring equipment are entered into a predictive fault analysis system in order to perform maintenance tasks of the batting equipment 11 from the acquisition or capture of values related to parameters of the monitored batting equipment or controlled by the measuring equipment in subsequent batting processes to keep said equipment 11 in an optimal state of operation.
- the predictive fault analysis system allows to reduce the number of faults that affect batting equipment 11 during its useful life.
- the objective set of operating parameters of batting equipment 11 monitored or controlled by The measuring equipment before starting to work said batting equipment 11, are stored by the measuring equipment as setpoint threshold values for any parameter value captured in a batting process of the ballast bed after the first capture of threshold values.
- the measuring equipment automatically analyzes, as the batting process is carried out, the objective set of operating parameters of the batting equipment 11 to determine the existence of deviations from the values captured with respect to the setpoint threshold values of the batting equipment operating parameter set 11.
- the measuring equipment is connectable by cable or a wireless interface to a central control system to which the results of the analysis performed by the measuring equipment are transmitted in real time or deferred.
- the measuring equipment comprises a set of angular displacement meters adapted to measure vibrations in the batting equipment 11, installable one per axis in each drive of the batting equipment.
- the displacement meter is of the acceleration sensor type that records the amplitudes and frequency of the vibration derived from the clearance between mechanical elements of the batting equipment.
- the acceleration measurement range is equal to or greater than 5mm / s.
- the measuring equipment also includes temperature sensors that can be installed in each motor of the batting equipment 11 for the control and monitoring of the temperature during the operation of the motors.
- the measuring equipment includes a pressure sensor for recording the operating pressure of a hydraulic drive, being installable, for example, at the inlet and outlet of the hydraulic drive for pressure control and monitoring. of work of the ones of batted peaks, with the purpose of detecting variations of pressure during the operation of the drives.
- the different sensors and meters of the measuring equipment are connected to the control unit that stores the data collected by the different sensors and meters to execute predictive analysis rules for fault analysis based on the stored threshold values as well.
- the different sensors and meters continuously capture values during the batting process, which are transmitted to the controller unit that compares the received data with the setpoint threshold values. In the event that the result of the comparison of the measured value with the setpoint threshold value is different from a predetermined difference value, the controller unit supplies a warning signal.
Abstract
Description
Claims
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
AU2012398058A AU2012398058A1 (en) | 2012-12-27 | 2012-12-27 | Predictive method for analysing tampering equipment, and tampering equipment |
PCT/ES2012/070917 WO2014102401A1 (es) | 2012-12-27 | 2012-12-27 | Método predictivo de análisis de un equipo de bateado y equipo de bateado. |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
PCT/ES2012/070917 WO2014102401A1 (es) | 2012-12-27 | 2012-12-27 | Método predictivo de análisis de un equipo de bateado y equipo de bateado. |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2014102401A1 true WO2014102401A1 (es) | 2014-07-03 |
Family
ID=51019915
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/ES2012/070917 WO2014102401A1 (es) | 2012-12-27 | 2012-12-27 | Método predictivo de análisis de un equipo de bateado y equipo de bateado. |
Country Status (2)
Country | Link |
---|---|
AU (1) | AU2012398058A1 (es) |
WO (1) | WO2014102401A1 (es) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2019110239A1 (de) * | 2017-12-07 | 2019-06-13 | Plasser & Theurer Export Von Bahnbaumaschinen Gmbh | Verfahren und system zur belastungsüberwachung eines stopfaggregates |
WO2019120829A1 (de) * | 2017-12-21 | 2019-06-27 | Plasser & Theurer Export Von Bahnbaumaschinen Gmbh | Verfahren zum betreiben eines stopfaggregats einer gleisbaumaschine sowie stopfvorrichtung zur gleisbettverdichtung und gleisbaumaschine |
WO2019129448A1 (de) * | 2017-12-28 | 2019-07-04 | Plasser & Theurer Export Von Bahnbaumaschinen Gmbh | Verfahren zum betreiben eines stopfaggregats einer gleisbaumaschine sowie stopfvorrichtung zur gleisbettverdichtung und gleisbaumaschine |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
AT518195B1 (de) * | 2016-01-26 | 2017-11-15 | Plasser & Theurer Export Von Bahnbaumaschinen Gmbh | Verfahren zur Verdichtung der Schotterbettung eines Gleises sowie Stopfaggregat |
Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0386398A1 (de) * | 1989-03-10 | 1990-09-12 | Franz Plasser Bahnbaumaschinen-Industriegesellschaft m.b.H. | Fahrbare Gleisstopf-, Nivellier- und Richtmaschine mit verschwenkbaren Stopfaggregaten |
ES2049060T3 (es) * | 1990-05-02 | 1994-04-01 | Plasser Bahnbaumasch Franz | Bateadora de balastro con unidades de bateo ajustables en la direccion transversal de la via ferrea. |
ES2068700T3 (es) * | 1991-10-24 | 1995-04-16 | Plasser Bahnbaumasch Franz | Grupo de bateado. |
US5515788A (en) * | 1993-01-27 | 1996-05-14 | Franz Plasser Bahnbaumaschinen-Industriegesellschaft M.B.H. | Tamping machine |
US5752447A (en) * | 1996-01-12 | 1998-05-19 | Franz Plasser Bahnbaumaschinen-Industriegesellscaft M.B.H. | Tamping machine |
WO1998036251A1 (en) * | 1997-02-18 | 1998-08-20 | Dme Corporation | Method and apparatus for predictive diagnosis of moving machine parts |
WO1999060351A1 (en) * | 1998-05-20 | 1999-11-25 | Reid Asset Management Company | Diagnostic vibration data collector and analyzer |
EP1227382A2 (en) * | 2001-01-24 | 2002-07-31 | Bombardier Transportation GmbH | Rolling stock diagnostic condition monitoring and on-line predictive maintenance |
WO2006081870A1 (de) * | 2005-01-31 | 2006-08-10 | Franz Plasser Bahnbaumaschinen-Industriegesellschaft Mbh | Gleisstopfmaschine |
ES2272334T3 (es) * | 1999-11-05 | 2007-05-01 | Bombardier Transportation Gmbh | Vehiculo sobre railes ligero con un sistema de diagnostico predictivo para puertas automatizadas motorizadas. |
ES2335377A1 (es) * | 2008-07-04 | 2010-03-25 | Metro De Madrid, S.A | Metodo de mantenimiento de un material rodante. |
-
2012
- 2012-12-27 AU AU2012398058A patent/AU2012398058A1/en not_active Abandoned
- 2012-12-27 WO PCT/ES2012/070917 patent/WO2014102401A1/es active Application Filing
Patent Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0386398A1 (de) * | 1989-03-10 | 1990-09-12 | Franz Plasser Bahnbaumaschinen-Industriegesellschaft m.b.H. | Fahrbare Gleisstopf-, Nivellier- und Richtmaschine mit verschwenkbaren Stopfaggregaten |
ES2049060T3 (es) * | 1990-05-02 | 1994-04-01 | Plasser Bahnbaumasch Franz | Bateadora de balastro con unidades de bateo ajustables en la direccion transversal de la via ferrea. |
ES2068700T3 (es) * | 1991-10-24 | 1995-04-16 | Plasser Bahnbaumasch Franz | Grupo de bateado. |
US5515788A (en) * | 1993-01-27 | 1996-05-14 | Franz Plasser Bahnbaumaschinen-Industriegesellschaft M.B.H. | Tamping machine |
US5752447A (en) * | 1996-01-12 | 1998-05-19 | Franz Plasser Bahnbaumaschinen-Industriegesellscaft M.B.H. | Tamping machine |
WO1998036251A1 (en) * | 1997-02-18 | 1998-08-20 | Dme Corporation | Method and apparatus for predictive diagnosis of moving machine parts |
WO1999060351A1 (en) * | 1998-05-20 | 1999-11-25 | Reid Asset Management Company | Diagnostic vibration data collector and analyzer |
ES2272334T3 (es) * | 1999-11-05 | 2007-05-01 | Bombardier Transportation Gmbh | Vehiculo sobre railes ligero con un sistema de diagnostico predictivo para puertas automatizadas motorizadas. |
EP1227382A2 (en) * | 2001-01-24 | 2002-07-31 | Bombardier Transportation GmbH | Rolling stock diagnostic condition monitoring and on-line predictive maintenance |
WO2006081870A1 (de) * | 2005-01-31 | 2006-08-10 | Franz Plasser Bahnbaumaschinen-Industriegesellschaft Mbh | Gleisstopfmaschine |
ES2335377A1 (es) * | 2008-07-04 | 2010-03-25 | Metro De Madrid, S.A | Metodo de mantenimiento de un material rodante. |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2019110239A1 (de) * | 2017-12-07 | 2019-06-13 | Plasser & Theurer Export Von Bahnbaumaschinen Gmbh | Verfahren und system zur belastungsüberwachung eines stopfaggregates |
CN111417756A (zh) * | 2017-12-07 | 2020-07-14 | 普拉塞-陶伊尔铁路机械出口股份有限公司 | 用于监测捣固单元的载荷的方法和系统 |
US20200370248A1 (en) * | 2017-12-07 | 2020-11-26 | Plasser & Theurer Export Von Bahnbaumaschinen Gmbh | Method and system for monitoring the loading of a tamping unit |
JP2021505795A (ja) * | 2017-12-07 | 2021-02-18 | プラッサー ウント トイラー エクスポート フォン バーンバウマシーネン ゲゼルシャフト ミット ベシュレンクテル ハフツングPlasser & Theurer, Export von Bahnbaumaschinen, Gesellschaft m.b.H. | タンピングユニットの負荷を監視する方法およびシステム |
JP7179851B2 (ja) | 2017-12-07 | 2022-11-29 | プラッサー ウント トイラー エクスポート フォン バーンバウマシーネン ゲゼルシャフト ミット ベシュレンクテル ハフツング | タンピングユニットの負荷を監視する方法およびシステム |
WO2019120829A1 (de) * | 2017-12-21 | 2019-06-27 | Plasser & Theurer Export Von Bahnbaumaschinen Gmbh | Verfahren zum betreiben eines stopfaggregats einer gleisbaumaschine sowie stopfvorrichtung zur gleisbettverdichtung und gleisbaumaschine |
CN111479965A (zh) * | 2017-12-21 | 2020-07-31 | 普拉塞-陶伊尔铁路机械出口股份有限公司 | 操作轨道维护机的捣固单元的方法、固结道床的捣固装置及轨道维护机 |
US11834794B2 (en) | 2017-12-21 | 2023-12-05 | Plasser & Theurer Export Von Bahnbaumaschinen Gmbh | Method of operating a tamping unit of a track maintenance machine, and a tamping device for ballast bed consolidation, and a track maintenance machine |
WO2019129448A1 (de) * | 2017-12-28 | 2019-07-04 | Plasser & Theurer Export Von Bahnbaumaschinen Gmbh | Verfahren zum betreiben eines stopfaggregats einer gleisbaumaschine sowie stopfvorrichtung zur gleisbettverdichtung und gleisbaumaschine |
Also Published As
Publication number | Publication date |
---|---|
AU2012398058A1 (en) | 2015-08-13 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2014102401A1 (es) | Método predictivo de análisis de un equipo de bateado y equipo de bateado. | |
ES2782084T3 (es) | Sistema de medición de desplazamiento de vía férrea y procedimiento para mantenimiento proactivo | |
CN105313908B (zh) | 一种铁路轨旁设施扫描装置 | |
ES2828323T3 (es) | Dispositivo de diagnóstico de fallos y método de diagnóstico de fallos | |
US20140110537A1 (en) | Multi-function dragger | |
CN107476151A (zh) | 基于图像识别的道岔尖轨爬行量监测方法、装置及其系统 | |
CN205997898U (zh) | 一种铁路道岔检测小车 | |
BR102015030366A2 (pt) | sistema para monitorar as condições de operação de um trem | |
CN204902885U (zh) | 受电弓综合检测试验台 | |
ES2576981B1 (es) | Método predictivo de análisis de un equipo de bateado y equipo de bateado | |
CN205320146U (zh) | 铁路轨旁设施的3d扫描仪 | |
CN109838210A (zh) | 一种刚性接触网悬挂全自动智能定位钻孔设备的使用方法 | |
CN110823606A (zh) | 一种动车组闸片智能诊断系统及方法 | |
ES2823163T3 (es) | Procedimiento y dispositivo para la monitorización de al menos un componente de vía montado en la construcción de ferrocarril | |
JP2007275244A (ja) | 挙動異常検出装置および検出方法 | |
CN103508303B (zh) | 异常诊断方法、异常诊断装置以及具有异常诊断装置的乘客传送设备 | |
CN211342762U (zh) | 一种双钻头隧道自动钻孔机 | |
CN206034214U (zh) | 控制系统及铁路道岔检测装置 | |
JP2006502328A (ja) | 固定軌道の下部構造状態を監視するための装置とその方法 | |
CN204759185U (zh) | 消除车轮打滑干扰的轨道车辆精密定位装置 | |
ES2333286B1 (es) | Dispositivo y procedimiento para la inspeccion y/o supervision de unainstalacion de cambio de agujas que presenta uno o varios cambios de agujas. | |
CA2929920C (en) | Vibration monitoring system and method | |
KR100544405B1 (ko) | 이동식 교량세굴 조사장치 | |
KR101815891B1 (ko) | 실시간 궤도거동 모니터링이 가능한 멤스 일체형 프리캐스트 콘크리트 슬래브 패널 및 그 제조방법 | |
BR112013019312B1 (pt) | Sistema e método de monitoramento |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 12890986 Country of ref document: EP Kind code of ref document: A1 |
|
WWE | Wipo information: entry into national phase |
Ref document number: P201590071 Country of ref document: ES |
|
NENP | Non-entry into the national phase |
Ref country code: DE |
|
ENP | Entry into the national phase |
Ref document number: 2012398058 Country of ref document: AU Date of ref document: 20121227 Kind code of ref document: A |
|
122 | Ep: pct application non-entry in european phase |
Ref document number: 12890986 Country of ref document: EP Kind code of ref document: A1 |