WO2014050200A1 - 熱源システム制御装置 - Google Patents
熱源システム制御装置 Download PDFInfo
- Publication number
- WO2014050200A1 WO2014050200A1 PCT/JP2013/063544 JP2013063544W WO2014050200A1 WO 2014050200 A1 WO2014050200 A1 WO 2014050200A1 JP 2013063544 W JP2013063544 W JP 2013063544W WO 2014050200 A1 WO2014050200 A1 WO 2014050200A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- heat source
- load
- temperature
- header
- source system
- Prior art date
Links
Images
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F11/00—Control or safety arrangements
- F24F11/89—Arrangement or mounting of control or safety devices
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F11/00—Control or safety arrangements
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F3/00—Air-conditioning systems in which conditioned primary air is supplied from one or more central stations to distributing units in the rooms or spaces where it may receive secondary treatment; Apparatus specially designed for such systems
- F24F3/06—Air-conditioning systems in which conditioned primary air is supplied from one or more central stations to distributing units in the rooms or spaces where it may receive secondary treatment; Apparatus specially designed for such systems characterised by the arrangements for the supply of heat-exchange fluid for the subsequent treatment of primary air in the room units
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F2140/00—Control inputs relating to system states
- F24F2140/50—Load
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F25—REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
- F25B—REFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
- F25B2313/00—Compression machines, plants or systems with reversible cycle not otherwise provided for
- F25B2313/003—Indoor unit with water as a heat sink or heat source
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F25—REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
- F25B—REFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
- F25B2600/00—Control issues
- F25B2600/13—Pump speed control
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F25—REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
- F25B—REFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
- F25B49/00—Arrangement or mounting of control or safety devices
- F25B49/02—Arrangement or mounting of control or safety devices for compression type machines, plants or systems
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B30/00—Energy efficient heating, ventilation or air conditioning [HVAC]
- Y02B30/70—Efficient control or regulation technologies, e.g. for control of refrigerant flow, motor or heating
Definitions
- the present invention relates to a heat source system control device.
- Patent Document 1 Japanese Patent Laid-Open No. 2005-114295
- the temperature of the cold / hot water supplied to the heat source device is measured, and the start and stop of the operation of each heat source device so that the coefficient of performance (COP) of the entire heat source system is maximized from that temperature.
- the control of the load of the compressor of each heat source machine, and the flow control of the cold / hot water in each heat source machine are implemented.
- a plurality of heat source devices that are controlled by the heat source system control device include a heat source device that can control the load of the compressor and a heat source device that cannot control the load of the compressor. Further, each of the heat source devices that can control the load of the compressor has the same capacity and load characteristics.
- the heat source system control device according to Patent Document 1 controls the compressor of each heat source unit so that the coefficient of performance of the entire heat source system is maximized for a plurality of heat source units having the same capacity and load characteristics. .
- some heat source systems have a plurality of heat source units having different capacities and / or load characteristics.
- the heat source system control device preferentially operates an efficient heat source unit according to the load of the entire system, resulting in poor efficiency.
- the setting of the load of the heat source machine that is operated preferentially does not always have an optimum coefficient of performance for the entire heat source machine. Therefore, there is a possibility that optimization is not performed so that the coefficient of performance of the entire heat source system is maximized.
- the present invention has been made in view of the above points, and the object of the present invention is that the coefficient of performance of the entire heat source system is optimal in controlling a heat source system having a plurality of heat source units having different capacities and / or load characteristics.
- An object of the present invention is to provide a heat source system control apparatus that performs efficiency improvement control.
- a heat source system control device that controls a heat source system, and includes a set temperature storage unit, a header temperature detection unit, and a control unit.
- the heat source system includes a heat source machine, a header, and a header temperature sensor.
- the heat source unit has a plurality of heat source units having different capacities and / or load characteristics.
- the header collects cold / hot water supplied from a plurality of heat source machines.
- the header temperature sensor measures the temperature of cold / hot water collected in the header.
- the set temperature storage unit stores the set temperature of the cold / hot water in the header.
- the header temperature detection unit detects an output value of the header temperature sensor.
- the control unit applies efficiency improvement control to the plurality of heat source units based on the respective capacities and / or load characteristics to bring the temperature of the cold / hot water closer to the set temperature.
- the control unit controls the heat source device so that the temperature of the cold / hot water gathered in the header becomes the set temperature of the cold / hot water stored in the set temperature storage unit.
- the heat source system control device performs efficiency improvement control that maximizes the operating efficiency of the heat source unit as a whole heat source system.
- the coefficient of performance of the entire heat source system can be maximized.
- “Coefficient of performance” refers to Coefficient of Performance (COP) and represents the cooling capacity (kW) per 1 kW of power consumption.
- the “load” is energy actually consumed by the heat source device.
- the load of the heat source machine is a number corresponding to the compressor step (number corresponding to the step).
- the heat source system control device is the heat source system control device according to the first aspect, wherein the control unit is configured to individually operate and stop each of the plurality of heat source units and to individually load each of the plurality of heat source units. And at least one of them is controlled.
- the load for each heat source unit is controlled. Control of the load for each heat source unit includes operation and stoppage for each heat source unit. Therefore, efficiency improvement control can be flexibly performed in the entire heat source system having a plurality of heat source units having different capacities and / or load characteristics.
- the heat source system control device is the heat source system control device according to the first aspect or the second aspect, and further includes a coefficient of performance storage unit.
- the coefficient of performance storage unit stores information about the coefficient of performance according to the load of each of the plurality of heat source machines as the coefficient of performance information.
- the control unit refers to the coefficient of performance information stored in the coefficient of performance storage, and operates each of the plurality of heat source units with a load having a high coefficient of performance.
- the control unit assigns each heat source unit a coefficient of performance based on information on the coefficient of performance of each heat source unit for a heat source system having a plurality of heat source units having different capacities and / or load characteristics. Drive with good load. Therefore, it is possible to easily and reliably perform the efficiency improvement control so that the coefficient of performance of the entire heat source system is maximized.
- a heat source system control device is the heat source system control device according to any one of the first to third aspects, and further includes a rated capacity storage unit.
- the rated capacity storage unit stores information on the rated capacity of each of the plurality of heat source machines as rated capacity information.
- the control unit determines a heat source device to be operated or stopped based on the rated capacity information stored in the rated capacity storage unit.
- a heat source unit to be operated or stopped is selected based on the rated capacity information of each heat source unit. Thereby, the efficiency improvement control can be performed so that the efficiency with respect to the total energy consumption of the entire heat source system is maximized.
- the heat source system control device is the heat source system control device according to any of the first to fourth aspects, and the heat source system further includes a plurality of pumps.
- the plurality of pumps supply cold / hot water to each of the plurality of heat source units.
- the control unit adjusts the temperature of the cold / hot water collected in the header by controlling the flow rate of the cold / hot water supplied from the plurality of pumps.
- the efficiency of the load of each heat source device and the flow rate of the cold / hot water supplied to each heat source device are controlled based on the temperature of the cold / hot water collected in the header.
- the heat source system control device is the heat source system control device according to the fifth aspect, and the heat source system further includes a plurality of outlet temperature sensors.
- the plurality of outlet temperature sensors are arranged near the outlets of the plurality of heat source units.
- the plurality of outlet temperature sensors measure the outlet temperature, which is the temperature of the cold / hot water supplied to the header.
- the heat source system control device further includes an outlet temperature detection unit.
- the outlet temperature detection unit detects output values of a plurality of outlet temperature sensors. Based on the outlet temperature of each of the plurality of heat source units and the flow rate of the cold / hot water supplied from each of the plurality of heat source units, the control unit The temperature of the cold / hot water in the header is adjusted by controlling the flow rate.
- the control unit detects the outlet temperature of the cold / hot water of each heat source unit by the outlet temperature detection unit. Moreover, a control part controls the flow volume of the cold / hot water of each heat source machine. A control part controls the load of each heat source machine, and the flow volume of cold / hot water with the exit temperature and flow volume of cold / hot water of each heat source machine. Thereby, the temperature and flow volume of the cold / hot water in a header can be controlled more easily and reliably.
- the heat source system control apparatus it is possible to maximize the coefficient of performance of the entire heat source system having a plurality of heat source units having different capacities and / or load characteristics.
- the efficiency improvement control can be flexibly performed in the entire heat source system having a plurality of heat source units having different capacities and / or load characteristics.
- the heat source can be more easily and reliably based on information on the coefficient of performance of each heat source unit.
- the efficiency improvement control can be performed so that the coefficient of performance of the entire heat source system with respect to the total energy consumption of the entire system and the efficiency with respect to the total energy consumption are maximized.
- the heat source unit to be operated or stopped is selected based on the rated capacity information of each heat source unit . Thereby, the efficiency improvement control can be performed so that the efficiency with respect to the total energy consumption of the entire heat source system is maximized.
- the efficiency is improved so that the efficiency of the total energy consumption of the entire heat source system can be made closer to the maximum. You can control.
- the temperature and flow rate of the cold / hot water in the header can be controlled more easily and reliably.
- A It is a graph showing the relationship between the load of one heat source machine, and a coefficient of performance.
- B It is a graph showing the relationship between the load of a heat source machine different from the heat source machine of (a), and a coefficient of performance. It is a table
- the energy management system 200 is shown in FIG.
- the energy management system 200 is a system that manages energy consumed in a building.
- the energy management system 200 includes a heat source system 100 and a heat source system control device 10.
- the energy management system 200 manages the energy consumed in the building by controlling the heat source units 50a, 50b, and 50c included in the heat source system 100 by the heat source system control device 10.
- the configuration of the heat source system 100 and the heat source system control apparatus 10 will be described.
- the heat source system 100 includes a plurality of heat source units 50a, 50b, 50c, air conditioners 32a, 32b, 32c, primary pumps 41a, 41b, 41c, a first header (header) 20, The second header 21 and the header temperature sensor 60 are included.
- Each of the plurality of heat source units 50a, 50b, 50c has different capacity and / or load characteristics.
- the heat source units 50a, 50b, and 50c are inverter type heat source units, for example, an air-cooled inverter chiller and an air-cooled screw chiller.
- the primary pumps 41a, 41b, 41c send cold / hot water to the heat source units 50a, 50b, 50c at a constant flow rate.
- the first header 20 collects cold / hot water sent from the heat source devices 50a, 50b, 50c.
- the water returned from the air conditioners 32a, 32b, and 32c gathers in the second header 21.
- cold / hot water is sent to the heat source units 50a, 50b, 50c by the primary pumps 41a, 41b, 41c.
- the cold / hot water sent out from the heat source devices 50 a, 50 b, 50 c gathers in the first header 20.
- the water gathered in the first header 20 passes through the upstream pipe 70 and is sent to the air conditioners 32a, 32b, and 32c.
- the header temperature sensor 60 is provided in a portion of the first header 20 where cold / hot water gathers.
- the header temperature sensor 60 measures the temperature of cold / hot water.
- the cold / hot water gathered in the first header 20 is heat-exchanged with room air by the air conditioners 32a, 32b, 32c.
- the cold / hot water sent from the air conditioners 32 a, 32 b, 32 c passes through the downstream pipe 71 and gathers in the second header 21.
- the cold / hot water gathered in the second header 21 is sent to the primary pumps 41a, 41b, 41c.
- FIG. 1 three heat source units and air conditioners included in the heat source system 100 are illustrated, but the number of heat source units and air conditioners is not limited to three.
- the heat source system controller 10 controls the heat source devices 50a, 50b, and 50c included in the heat source system 100 as described above.
- the heat source system control device 10 is connected to the header temperature sensor 60 via a communication line.
- the heat source system control device 10 detects the output value of the header temperature sensor 60 via the communication line.
- the heat source system control apparatus 10 controls the load of each heat source machine 50a, 50b, 50c via communication networks, such as LAN, for example.
- FIG. 2 is a schematic configuration diagram of the heat source system control apparatus 10.
- the heat source system control apparatus 10 will be described with reference to FIG.
- the heat source system control device 10 mainly includes an input unit 11, an output unit 12, a time management unit 13, a header temperature detection unit 14, a storage unit 15, and a control unit 16. Have.
- the input unit 11 mainly includes operation buttons, a keyboard, a mouse, and the like.
- the input unit 11 receives a set temperature of cold / hot water collected in the first header 20 from a user.
- the set temperature received by the input unit 11 is stored in a set temperature storage unit 15a described later.
- the output unit 12 mainly includes a display. On the output unit 12, a management screen showing various information stored in the storage unit 15 to be described later is displayed. Further, the output unit 12 sends a control command for an initial load described later or an adjustment load described later generated by a load command generation unit 16f described later to each of the heat source units 50a, 50b, 50c.
- (1-2-3) Time Management Unit The time management unit 13 performs time management of various controls executed by the heat source system control device 10.
- the header temperature detection unit 14 detects the output value of the header temperature sensor 60.
- the storage unit 15 includes a hard disk or the like, and includes a set temperature storage unit 15a, a coefficient of performance storage unit 15b, and a rated capacity storage unit 15c. “Coefficient of performance” refers to Coefficient of Performance (COP) and represents the cooling capacity (kW) per 1 kW of power consumption.
- the “load” is energy actually consumed by the heat source device.
- the load of the heat source machine is a number corresponding to the compressor step (number corresponding to the step).
- the set temperature storage unit 15a stores the set temperature of the cold / hot water of the first header 20 received by the input unit 11 from the user.
- the performance coefficient storage unit 15b stores information regarding the performance coefficient corresponding to the load for each of the heat source devices 50a, 50b, and 50c. Specifically, the performance coefficient storage unit 15b stores a load performance coefficient table (see FIG. 4).
- the load performance coefficient table is a table showing the coefficient of performance corresponding to the load of each heat source machine 50a, 50b, 50c. Specifically, in the load performance coefficient table, as shown in FIG.
- the load coefficient of performance table defines the coefficient of performance when the heat source units 50a, 50b, and 50c are operated at a predetermined load (10 to 100).
- the rated capacity storage unit 15c stores the rated capacity information regarding the heat source devices 50a, 50b, and 50c (see FIG. 5). Specifically, a rated capacity table as shown in FIG. 5 is stored in the rated capacity storage unit 15c. In the rated capacity table, the heat source unit number corresponding to each heat source unit 50a, 50b, 50c and the rated capability of each heat source unit 50a, 50b, 50c are associated. (1-2-6) Control Unit The control unit 16 includes a CPU, a ROM, a RAM, and the like. The control unit 16 reads and executes the program stored in the storage unit 15 described above.
- the control part 16 performs efficiency improvement control based on the capacity
- efficiency improvement control is control for keeping the coefficient of performance of the entire heat source system 100 high. Specifically, in the efficiency improvement control, the coefficient of performance of the entire heat source system 100 is increased by executing the operation number adjustment process and the adjustment load setting process described later.
- the control unit 16 mainly includes an initial load setting unit 16a, a temperature difference calculation unit 16b, a change necessity determination unit 16c, a load change unit 16d, an operating number adjustment unit 16e, and a load command generation. It functions as the part 16f. (1-2-6-1)
- the initial load setting unit 16a sets an initial load for each of the heat source devices 50a, 50b, and 50c (initial load setting process).
- the initial load is a load that is initially set for each of the heat source devices 50a, 50b, and 50c, and is the load having the best coefficient of performance.
- the initial load setting unit 16a sets a load indicating the best coefficient of performance for each of the heat source units 50a, 50b, and 50c based on the load coefficient coefficient table stored in the coefficient of performance storage unit 15b.
- the temperature difference calculation unit 16b calculates the temperature difference between the temperature of the cold / hot water in the first header 20 and the set temperature (temperature difference calculation process).
- the temperature difference calculation unit 16b calculates the temperature difference by comparing the output value detected by the header temperature detection unit 14 with the set temperature stored in the set temperature storage unit 15a.
- the temperature difference calculation unit 16b calculates the temperature difference by subtracting the set temperature stored in the set temperature storage unit 15a from the temperature (measured temperature) of the cold / hot water in the first header 20.
- the temperature difference calculated by the temperature difference calculation unit 16b is stored in the storage unit 15 described above.
- the change necessity determination unit 16c determines whether or not to change the load at a predetermined timing (adjustment necessity determination process).
- the predetermined timing is after the temperature difference calculation process is performed.
- the change necessity determination unit 16c determines whether the load needs to be changed based on the temperature difference calculated by the temperature difference calculation unit 16b.
- the change necessity determination unit 16c determines whether or not the initial load needs to be changed when the initial load is set for each of the heat source units 50a, 50b, and 50c.
- the change necessity determination unit 16c determines whether the adjustment load needs to be changed.
- the initial load is the load with the best coefficient of performance initially set for each of the heat source units 50a, 50b, and 50c.
- the adjusted load is a load set by a load changing unit 16d described later, and is a load set by adjusting the initial setting.
- the change necessity determination unit 16c determines that there is no need to change the initial load when the temperature difference between the actually measured temperature and the set temperature is included in the predetermined range. On the other hand, the change necessity determination unit 16c determines that the initial load and the adjustment load need to be changed when the temperature difference between the actually measured temperature and the set temperature is out of a predetermined range. When it is determined that the load needs to be changed, the change necessity determination unit 16c determines whether the temperature difference is a positive value or a negative value. Here, when the temperature difference is a positive value, the actually measured temperature is higher than the set temperature. On the other hand, when the temperature difference is a negative value, the actually measured temperature is lower than the set temperature.
- the change necessity determination unit 16c determines that a change in the load in the plus direction is necessary (load increase is necessary). In addition, when the temperature difference is a negative value, the change necessity determination unit 16c determines that it is necessary to change the load in the minus direction (necessary to reduce the load).
- the load changing unit 16d changes the load set for each of the heat source units 50a, 50b, and 50c.
- the load changing unit 16d sets an adjustment load (adjustment load setting process).
- the load changing unit 16d sets the adjustment load for each of the heat source devices 50a, 50b, and 50c when the above-described change necessity determining unit 16c determines that the initial load needs to be changed.
- the load change part 16d sets a new adjustment load to each heat-source equipment 50a, 50b, 50c, when it determines with the change of adjustment load being required.
- the adjustment load is a load of each heat source device 50a, 50b, 50c adjusted based on the temperature difference calculated by the temperature difference calculation unit 16b.
- the adjustment load is a load adjusted to bring the temperature of the cold / hot water of the first header 20 close to the set temperature.
- the new adjustment load is an adjustment load that is newly set based on the temperature difference after setting the adjustment load.
- the load changing unit 16d selects a load for controlling the heat source devices 50a, 50b, and 50c from a range of loads having a high coefficient of performance. Specifically, the load changing unit 16d determines a load having a high coefficient of performance for each of the heat source devices 50a, 50b, and 50c, based on the load performance coefficient table stored in the coefficient of performance storage unit 15b.
- the adjustment load determination process by the load changing unit 16d will be described in detail with reference to FIGS.
- FIGS. 3A and 3B show the relationship between the load of the first heat source unit 50a and the coefficient of performance, and the relationship between the load of the second heat source unit 50b and the coefficient of performance, respectively. Specifically, in FIGS.
- the horizontal axis indicates the load of the heat source devices 50a and 50b
- the vertical axis indicates the coefficient of performance of the heat source devices 50a and 50b. That is, the curves shown in FIGS. 3A and 3B show the coefficient of performance that changes according to the load of the heat source devices 50a and 50b.
- the load of the 1st heat source machine 50a and the 2nd heat source machine 50b shows the step equivalent value of a compressor. That is, in order to increase or decrease the load, the step equivalent value is increased or decreased.
- the first heat source unit 50a has a capacity and load characteristics different from those of the second heat source unit 50b.
- a load will be a value close
- the control unit 16 sets the lower limit value (35%) as the lower limit target value in the load range indicating the coefficient of performance close to the maximum.
- the upper limit value (50%) is set as the upper limit target value in the load range indicating the coefficient of performance close to the maximum.
- the control unit 16 controls the first heat source device 50a at any one of three stages of loads, ie, a lower limit target value, a central target value, and an upper limit target value.
- the initial load of the first heat source device 50a is 50%, and when the energy consumption of the first heat source device 50a is reduced, the load is set to 42.5%. Furthermore, when reducing the energy consumption of the 1st heat-source equipment 50a, the control part 16 reduces the target value of load 1 step
- a load coefficient is a value close
- the control unit 16 sets the lower limit value (50%) as the lower limit target value in the load range indicating the coefficient of performance close to the maximum.
- the upper limit value (100%) is set as the upper limit target value in the load range indicating the coefficient of performance close to the maximum.
- the median value (75%) is set as the median target value in the load range indicating the coefficient of performance close to the maximum.
- the control unit 16 controls the second heat source device 50b at any one of the three stages of loads of the lower limit target value, the central target value, and the upper limit target value.
- the initial load of the second heat source device 50b is 100%, and when the energy consumption of the second heat source device 50b is reduced, the load is set to 75%. Furthermore, when reducing the energy consumption of the 2nd heat-source equipment 50b, the control part 16 reduces the target value of load 1 step
- the operating number adjustment unit 16e is operated when the change necessity determination unit 16c determines that the initial load or the adjustment load needs to be changed and the adjustment load cannot be changed.
- the number of heat source units 50a, 50b, 50c is adjusted.
- the number of steps corresponding to the compressors of all the operating heat source devices 50a, 50b, and 50c is the upper limit target value, and the change necessity determining unit 16c increases the load. If it is determined that it is necessary, increase the number of heat source units to be operated.
- the operating number adjusting unit 16e is a heat source to be operated when the number of steps corresponding to all of the operating compressors is the lower limit target value and the change necessity determining unit 16c determines that the load needs to be reduced.
- the number of machines 50a, 50b, 50c is reduced.
- the operating number adjusting unit 16e compares the rated capacities of the heat source units 50a, 50b, and 50c (rated capacity comparison process), and operates the heat source units 50a, 50b, and 50c or stops the heat source units 50a, 50b, and 50c. To decide. For example, the first heat source machine 50a with a rated capacity of 30 horsepower and the second heat source machine 50b with a rated capacity of 50 horsepower shown in the table of FIG. 5 are not in operation and are operated as a result of the operation number adjustment process. Is increased, the first heat source machine 50a having a small rated capacity is operated. This is to avoid sudden changes in the outputs of the heat source devices 50a, 50b, and 50c with respect to the heat source system 100.
- the load command generation unit 16f generates a control command based on the adjustment load for each of the heat source units 50a, 50b, and 50c. Specifically, when the adjustment load is set by the load changing unit 16d, the load command generating unit 16f sends the control command to each of the heat source devices 50a, 50b, and 50c via the output unit 12.
- step S101 the initial load setting unit 16a performs an initial load setting process.
- the header temperature detection unit 14 measures the actually measured temperature.
- the header temperature detection unit 14 detects the output value of the header temperature sensor 60 and stores it in the storage unit 15.
- step S103 the temperature difference calculation unit 16b performs a temperature difference calculation process.
- the control unit 16 stores the calculated temperature difference in the storage unit 15.
- step S104 the change necessity determination unit 16c performs an adjustment necessity determination process. If the result of the temperature difference calculation process indicates that there is a temperature difference, the change necessity determination unit 16c determines whether the load needs to be increased or decreased. If it is determined in step S105 that the load increase is necessary, the process proceeds to step S106. In other cases, the process proceeds to step S116.
- step S106 based on the temperature difference information stored in the storage unit 15 and the load performance coefficient table stored in the performance coefficient storage unit 15b, the load changing unit 16d determines the heat source units 50a and 50b currently in operation.
- the adjustment load setting process is performed so as to increase the load. Specifically, the load of the heat source units 50a and 50b is increased by increasing the number of steps of the compressor.
- the efficiency improvement control for keeping the coefficient of performance of the entire heat source system 100 high can be realized by controlling the heat source units 50a and 50b within the range where the coefficient of performance of each of the heat source units 50a and 50b is high as shown in FIG. It is.
- the control unit 16 controls the loads of the heat source devices 50a and 50b in three stages of a lower limit target value, a central target value, and an upper limit target value. Based on the temperature difference stored in the storage unit 15 and the load coefficient coefficient table stored in the coefficient of performance storage unit 15b, the control unit 16 increases the load to the heat source units 50a and 50b and the heat source units 50a and 50b. Determine the target value of the stage load.
- the load command generation unit 16f generates a control command based on the adjustment load for the heat source devices 50a and 50b.
- the output unit 12 sends the control command generated by the load command generation unit 16f to the heat source units 50a and 50b.
- step S107 it is determined whether the loads of all the heat source devices 50a and 50b operated by the control unit 16 are the upper limit target values. When the loads of all the heat source devices 50a, 50b are not the upper limit target value, the upper limit flag is stored in the storage unit 15 as OFF, and the process returns to step S102. When the loads of all the heat source devices 50a, 50b are the upper limit target value, the upper limit flag is stored in the storage unit 15 as ON, and the process proceeds to step S108.
- step S108 the time management unit 13 starts measurement of a predetermined waiting time, for example, 5 minutes. After a predetermined waiting time elapses, the temperature difference calculation unit 16b performs a temperature difference calculation process. Thereafter, the change necessity determination unit 16c performs adjustment necessity determination processing. If the upper limit flag in the storage unit 15 is ON and the adjustment necessity determination process determines that the load needs to be increased, the process proceeds to step S109. In other cases, the process returns to step S102.
- a predetermined waiting time for example, 5 minutes.
- the temperature difference calculation unit 16b After a predetermined waiting time elapses, the temperature difference calculation unit 16b performs a temperature difference calculation process. Thereafter, the change necessity determination unit 16c performs adjustment necessity determination processing. If the upper limit flag in the storage unit 15 is ON and the adjustment necessity determination process determines that the load needs to be increased, the process proceeds to step S109. In other cases, the process returns to step S102.
- step S109 the operating number adjustment unit 16e performs an operating number adjustment process to determine the number of heat source units to be operated. Thereafter, the operating number adjusting unit 16e performs a rated capacity comparison process to determine a heat source machine to be newly operated.
- the operation of the third heat source machine 50c is started.
- the load of the third heat source device 50c that starts operation is set to the lower limit target value.
- the lower limit target value is set so that the outputs of the heat source units 50a, 50b, and 50c are not suddenly changed with respect to the heat source system 100.
- a control command is generated by the load command generation unit 16 f and is sent to the third heat source device 50 c via the output unit 12.
- step S116 if it is determined in step S104 that the load needs to be reduced, the process proceeds to step S117. If it is not determined that the load needs to be increased or decreased, the process proceeds to step S102.
- step S117 based on the temperature difference information stored in the storage unit 15 and the load performance coefficient table stored in the performance coefficient storage unit 15b, the load changing unit 16d determines the heat source units 50a and 50b that are currently in operation.
- the adjustment load setting process is performed so as to reduce the load. Specifically, the load on the heat source units 50a and 50b is reduced by reducing the number of steps of the compressor. Further, the efficiency improvement control for keeping the coefficient of performance of the entire heat source system 100 high can be realized by controlling the heat source units 50a and 50b within the range where the coefficient of performance of each of the heat source units 50a and 50b is high as shown in FIG. It is.
- control unit 16 controls the loads of the heat source devices 50a and 50b in three stages of a lower limit target value, a central target value, and an upper limit target value. Based on the temperature difference stored in the storage unit 15 and the load coefficient coefficient table stored in the coefficient of performance storage unit 15b, the control unit 16 reduces the load to the heat source units 50a and 50b and the heat source units 50a and 50b. Determine the target value of the stage load.
- the load command generation unit 16f generates a control command based on the adjustment load for the heat source devices 50a and 50b.
- the output unit 12 sends the control command generated by the load command generation unit 16f to the heat source units 50a and 50b.
- the control part 16 determines whether the load of all the heat-source equipment 50a and 50b which is drive
- step S119 the time management unit 13 starts measurement of a predetermined waiting time, for example, 5 minutes. After a predetermined waiting time elapses, the temperature difference calculation unit 16b performs a temperature difference calculation process. Thereafter, the change necessity determination unit 16c performs adjustment necessity determination processing. If the lower limit flag in the storage unit 15 is ON and the adjustment necessity determination process determines that the load needs to be reduced, the process proceeds to step S120. In other cases, the process returns to step S102.
- a predetermined waiting time for example, 5 minutes.
- the temperature difference calculation unit 16b After a predetermined waiting time elapses, the temperature difference calculation unit 16b performs a temperature difference calculation process. Thereafter, the change necessity determination unit 16c performs adjustment necessity determination processing. If the lower limit flag in the storage unit 15 is ON and the adjustment necessity determination process determines that the load needs to be reduced, the process proceeds to step S120. In other cases, the process returns to step S102.
- step S120 the operating number adjusting unit 16e performs an operating number adjusting process to determine the number of heat source devices to be operated. Thereafter, the operating number adjusting unit 16e performs a rated capacity comparison process to determine a heat source machine to be stopped.
- the heat source machines in operation are the first heat source machine 50a and the second heat source machine 50b.
- the rating of the first heat source machine 50a is compared. Since the capacity is small, the operation of the first heat source machine 50a is stopped.
- a control command is generated by the load command generation unit 16f and sent to the first heat source device 50a via the output unit 12.
- the 1st heat source machine 50a stops and returns to Step S102.
- the control unit 16 sets the cold / hot water in which the temperature of the cold / hot water in the first header 20 detected by the header temperature detection unit 14 is stored in the set temperature storage unit 15a.
- the heat source devices 50a, 50b, and 50c are controlled so that the temperature is reached.
- efficiency improvement control is performed based on the capacity and load characteristics of each heat source unit 50a, 50b, 50c so that the coefficient of performance of each heat source unit 50a, 50b, 50c is maximized.
- the coefficient of performance of the entire heat source system 100 having the plurality of heat source units 50a, 50b, 50c having different capacities and / or load characteristics can be maximized.
- the control unit 16 has loads corresponding to the lower limit target value, the central target value, and the upper limit target value in three stages with high coefficient of performance for each of the heat source units 50a, 50b, 50c of the heat source system 100. To control the heat source devices 50a, 50b, and 50c. Therefore, the efficiency improvement control can be performed so that the coefficient of performance of the entire heat source system 100 approaches the maximum.
- control part 16 controls the load for every heat source machine 50a, 50b, 50c including the driving
- the heat source system control device 10 relates to the coefficient of performance of each of the heat source units 50a, 50b, 50c. Based on the information, the efficiency improvement control can be performed more easily and reliably so that the coefficient of performance of the entire heat source system with respect to the total energy consumption of the entire heat source system is maximized.
- control part 16 is controlling the load of each heat source machine 50a, 50b, 50c. Therefore, the amount of heat output from each of the heat source devices 50a, 50b, and 50c is grasped. In this modification, the amount of heat output from the heat source devices 50a, 50b, and 50c is made constant by making the loads of the respective heat source devices 50a, 50b, and 50c constant.
- the number of heat source devices 50a, 50b, 50c to be operated controls all the heat source devices 50a, 50b, 50c in order to bring the temperature of the cold / hot water gathered in the first header 20 close to the set temperature by controlling the flow rate of the cold / hot water. To drive.
- step S202 the header temperature detection unit 14 measures the actually measured temperature.
- the header temperature detection unit 14 detects the output value of the header temperature sensor 60 and stores it in the storage unit 15.
- step S203 the temperature difference calculation unit 16b performs a temperature difference calculation process.
- the control unit 16 stores the calculated temperature difference in the storage unit 15.
- step S204 when the above-mentioned temperature difference is a positive value, the control part 16 judges that it is necessary to reduce the flow volume of the cold / hot water sent to the heat-source equipment 50a, 50b, 50c (flow volume reduction required).
- control part 16 determines with it being necessary to increase the flow volume of the cold / warm water sent to the heat source machine 50a, 50b, 50c (flow volume increase required). If it is determined in step S205 that the flow rate needs to be reduced, the process proceeds to step S206. In other cases, the process proceeds to step S216.
- step S206 the control part 16 makes the flow volume of the cold / hot water sent out to each heat source machine 50a, 50b, 50c a smaller flow volume.
- the controller 16 can control the primary pumps 41a, 41b, and 41c to reduce the flow rate. If it does so, the temperature of the cold / hot water discharged from each heat source machine 50a, 50b, 50c will fall.
- the load of the heat source devices 50a, 50b, and 50c is constant, but the load of the heat source devices 50a, 50b, and 50c can be further increased to lower the temperature of the cold / hot water.
- step S216 if it is determined in step S204 that the flow rate needs to be increased, the process proceeds to step S217. In other cases, the process proceeds to step S202.
- step S217 the control part 16 makes the flow volume of the cold / warm water sent out to each heat source machine 50a, 50b, 50c a larger flow volume.
- the control part 16 can be made more flow volume by controlling the primary pumps 41a, 41b, and 41c. If it does so, the temperature of the cold / hot water discharged from each heat source machine 50a, 50b, 50c will rise.
- step S217 the load of the heat source devices 50a, 50b, and 50c is constant, but the temperature of the cold / hot water can be increased by further reducing the load of the heat source devices 50a, 50b, and 50c.
- the flow rates of cold / hot water supplied to the heat source units 50a, 50b, 50c are set so that the temperature of the cold / hot water gathered in the first header 20 approaches the set temperature. And the load of each heat source machine 50a, 50b, 50c is controlled. Therefore, in a heat source system having a plurality of heat source units 50a, 50b, and 50c having different capacities and / or load characteristics, the efficiency improvement control is more easily performed so as to bring the total energy consumption efficiency of the entire heat source system closer to the maximum. Can do.
- control unit 16 gathers in the first header 20 by controlling the flow rate of the cold / hot water sent to the respective heat source units 50a, 50b, 50c by the primary pumps 41a, 41b, 41c.
- the temperature of cold / hot water was brought close to the set temperature, it is not limited to this.
- outlet temperature sensors 61a, 61b, 61c that detect the temperature of the cold / hot water discharged from each of the heat source units 50a, 50b, 50c may be further provided.
- the heat source system control apparatus 10 may further include an outlet temperature detection unit 17 as shown in FIG.
- the outlet temperature detector 17 detects the output values of the outlet temperature sensors 61a, 61b, 61c via a communication network such as a signal line.
- the heat source system control apparatus 10 controls the load of each heat source machine 50a, 50b, 50c and the flow rate of cold / hot water.
- the control part 16 can grasp
- control unit 16 controls the primary pumps 41a, 41b, and 41c and the loads of the heat source devices 50a, 50b, and 50c to thereby bring the coefficient of performance of the heat source system 100 close to the maximum so that the heat source devices 50a, 50b and 50c are controlled. Then, the temperature of the cold / hot water gathered in the first header 20 may be brought close to the set temperature.
- step S301 the initial load setting unit 16a performs an initial load setting process.
- the number of the heat source devices 50a, 50b, 50c to be operated brings the temperature of the cold / hot water gathered in the first header 20 close to the set temperature by controlling the flow rate of the cold / hot water and the load of the heat source devices 50a, 50b, 50c. Therefore, all the heat source machines 50a, 50b, and 50c are operated.
- step S302 the header temperature detection unit 14 measures the actually measured temperature.
- the header temperature detection unit 14 detects the output value of the header temperature sensor 60 and stores it in the storage unit 15.
- step S303 the temperature difference calculation unit 16b performs a temperature difference calculation process.
- the control unit 16 calculates and stores the temperature difference in the storage unit 15.
- step S304 the change necessity determination unit 16c performs an adjustment necessity determination process. If the result of the temperature difference calculation process indicates that there is a temperature difference, the change necessity determination unit 16c determines whether the load needs to be increased or decreased. If it is determined in step S305 that the load increase is necessary, the process proceeds to step S306. In other cases, the process proceeds to step S316.
- step S306 the outlet temperature detection part 17 detects the outlet temperature which is an output value of each outlet temperature sensor 61a, 61b, 61c. The outlet temperature detection unit 17 stores the detected outlet temperature in the storage unit 15.
- step S307 the control part 16 determines the exit temperature of each heat source machine 50a, 50b, 50c and the flow volume which each heat source machine 50a, 50b, 50c discharges.
- the above-described determination of the outlet temperature and the flow rate is performed so that the actually measured temperature approaches the set temperature, and the flow rate of the cold / hot water becomes the flow rate of the cold / hot water required by the heat source system 100.
- step S304 Since the control unit 16 determines that the load needs to be increased in step S304, the outlet temperature of each of the heat source devices 50a, 50b, and 50c and the outlet of each of the heat source devices 50a, 50b, and 50c determined by the control unit 16 Based on the temperature difference with temperature, the load of each heat source machine 50a, 50b, 50c is increased. Furthermore, the flow control of the cold / hot water to discharge is performed. And the control part 16 is made into the exit temperature of each heat source machine 50a, 50b, 50c which the control part 16 determined. Furthermore, the control part 16 makes it the flow volume which each above-mentioned heat-source equipment 50a, 50b, 50c determined by the control part 16 discharges. When the process of step S307 ends, the process returns to step S302.
- step S316 If it is determined in step S316 that the load reduction is necessary, the process proceeds to step S317. In other cases, the process proceeds to step S302.
- step S317 the outlet temperature detection part 17 detects the outlet temperature which is an output value of each outlet temperature sensor 61a, 61b, 61c.
- the outlet temperature detection unit 17 stores the detected outlet temperature in the storage unit 15.
- step S3108 the control part 16 determines the exit temperature of each heat source machine 50a, 50b, 50c, and the flow volume which each heat source machine 50a, 50b, 50c discharges.
- step S304 the controller 16 determines the outlet temperatures of the respective heat source devices 50a, 50b, and 50c, and the determined heat source devices 50a, 50b, and 50c determined by the control unit 16.
- the load on each of the heat source units 50a, 50b, and 50c is reduced based on the temperature difference between the outlet temperature and the outlet temperature. Furthermore, the flow control of the cold / hot water to discharge is performed.
- control part 16 is made into the exit temperature of each heat source machine 50a, 50b, 50c which the control part 16 determined. Furthermore, the control part 16 makes it the flow volume which each above-mentioned heat-source equipment 50a, 50b, 50c determined by the control part 16 discharges.
- the outlet temperature detection unit 17 detects the outlet temperature of the cold / hot water of each of the heat source devices 50a, 50b, 50c, and the cold / hot water of each of the heat source devices 50a, 50b, 50c. Is controlled by the control unit 16. Therefore, the control part 16 controls the load of each heat source machine 50a, 50b, 50c, and the flow volume of cold / hot water based on the exit temperature and flow volume of cold / hot water of each heat source machine 50a, 50b, 50c. Therefore, the temperature and flow rate of the cold / hot water in the first header 20 can be controlled more easily and reliably. Further, the efficiency improvement control can be applied to the heat source system so that the coefficient of performance of the entire heat source system 100 is maximized.
- the present invention is applicable to a heat source system having a plurality of heat source units and a header in which cold / hot water supplied from the heat source unit is gathered.
- Heat Source System Controller 20 First Header (Header) 21 2nd header 32a 1st air conditioner 32b 2nd air conditioner 32c 3rd air conditioner 41a 1st primary pump 41b 2nd primary pump 41c 3rd primary pump 50a 1st heat source machine 50b 2nd heat source machine 50c 3rd heat source machine 60 Header temperature sensor 70 Upstream piping 71 Downstream piping 100 Heat source system 200 Energy management system
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Air Conditioning Control Device (AREA)
- Physics & Mathematics (AREA)
- Thermal Sciences (AREA)
Abstract
容量および/または負荷特性が異なる複数の熱源機を有する熱源システムの制御において、熱源システム全体の成績係数が最適となるように効率向上制御を行う熱源システム制御装置を提供する。容量および/または負荷特性が異なる複数の熱源機(50a,50b,50c)と、前記複数の熱源機から供給される冷温水を集合させる第1ヘッダ(20)と、前記第1ヘッダ(20)に集合させた冷温水の温度を測定するヘッダ温度センサ(60)と、を有する熱源システム(100)、を制御する熱源システム制御装置であって、前記ヘッダの前記冷温水の設定温度を記憶する設定温度記憶部(15a)と、前記ヘッダ温度センサの出力値を検出するヘッダ温度検出部(14)と、前記複数の熱源機に、それぞれの容量および/または負荷特性に基づいて効率向上制御をかけ、前記冷温水の温度を前記設定温度に近づける、制御部(16)と、を備える。
Description
本発明は、熱源システム制御装置に関する。
従来より、熱源システムに含まれる複数の熱源機を台数制御する熱源システム制御装置として、例えば、特許文献1(特開2005-114295)に示される装置が知られている。特許文献1に係るシステムでは、熱源機に供給される冷温水の温度を測定し、その温度から熱源システム全体の成績係数(COP)が最大となるように、各熱源機の運転の開始と停止、各熱源機の圧縮機の負荷の制御、および各熱源機における冷温水の流量制御を実施している。特許文献1に係る熱源システムにおいて、熱源システム制御装置が台数制御する複数の熱源機には、圧縮機の負荷を制御できる熱源機と、圧縮機の負荷を制御できない熱源機とが混在する。また、圧縮機の負荷を制御できる熱源機のそれぞれは容量および負荷特性が同じである。特許文献1に係る熱源システム制御装置は、容量および負荷特性が同じ複数の熱源機に対して、熱源システム全体の成績係数が最大となるように、各熱源機の圧縮機の制御を行っている。
ここで、熱源システムには、容量および/または負荷特性が異なる複数の熱源機を有するものも存在する。容量および/または負荷特性が異なる複数の熱源機を有する熱源システムを制御する方法として、熱源システム制御装置がシステム全体の負荷に応じて、効率の良い熱源機を優先的に運転し、効率の悪い熱源機の運転を停止させる方法がある。この制御方法では、優先的に運転させた熱源機の負荷の設定が、その熱源機全体において、最適な成績係数となるとは限らない。よって、熱源システム全体の成績係数が最大となるように最適化されない可能性がある。
本発明は上述した点に鑑みてなされたものであり、本発明の課題は、容量および/または負荷特性が異なる複数の熱源機を有する熱源システムの制御において、熱源システム全体の成績係数が最適となるように効率向上制御を行う熱源システム制御装置を提供することにある。
本発明は上述した点に鑑みてなされたものであり、本発明の課題は、容量および/または負荷特性が異なる複数の熱源機を有する熱源システムの制御において、熱源システム全体の成績係数が最適となるように効率向上制御を行う熱源システム制御装置を提供することにある。
第1観点に係る熱源システム制御装置は、熱源システムを制御する熱源システム制御装置であって、設定温度記憶部と、ヘッダ温度検出部と、制御部と、を備える。熱源システムは、熱源機と、ヘッダと、ヘッダ温度センサとを有する。熱源機は、容量および/または負荷特性が異なる複数の熱源機を有する。ヘッダは複数の熱源機から供給される冷温水を集合させる。ヘッダ温度センサは、ヘッダに集合させた冷温水の温度を測定する。設定温度記憶部は、ヘッダの冷温水の設定温度を記憶する。ヘッダ温度検出部は、ヘッダ温度センサの出力値を検出する。制御部は、複数の熱源機に、それぞれの容量および/または負荷特性に基づいて効率向上制御をかけ、冷温水の温度を設定温度に近づける。
この熱源システム制御装置では、制御部は、ヘッダに集合させた冷温水の温度が、設定温度記憶部に記憶された冷温水の設定温度となるように熱源機を制御する。この時、それぞれの熱源機の容量および負荷特性に基づいて、熱源システム制御装置は、熱源システム全体として熱源機の運転効率が最大となるような効率向上制御を行う。
この熱源システム制御装置では、制御部は、ヘッダに集合させた冷温水の温度が、設定温度記憶部に記憶された冷温水の設定温度となるように熱源機を制御する。この時、それぞれの熱源機の容量および負荷特性に基づいて、熱源システム制御装置は、熱源システム全体として熱源機の運転効率が最大となるような効率向上制御を行う。
この結果、容量および/または負荷特性が異なる複数の熱源機を有する熱源システムにおいて、熱源システム全体の成績係数を最大にすることが可能となる。
なお、「成績係数」とは、Coefficient of Performance(COP)のことであり、消費電力1kW当たりの冷房能力(kW)を表したものである。また、「負荷」とは、熱源機が実際に消費するエネルギーである。なお、熱源機の負荷は、熱源機がインバーター方式の圧縮機を有する場合は、圧縮機のステップに相当する数(ステップ相当数)である。
なお、「成績係数」とは、Coefficient of Performance(COP)のことであり、消費電力1kW当たりの冷房能力(kW)を表したものである。また、「負荷」とは、熱源機が実際に消費するエネルギーである。なお、熱源機の負荷は、熱源機がインバーター方式の圧縮機を有する場合は、圧縮機のステップに相当する数(ステップ相当数)である。
第2観点に係る熱源システム制御装置は、第1観点に係る熱源システム制御装置であって、制御部は、複数の熱源機それぞれの個別の運転および停止と、複数の熱源機それぞれの個別の負荷との少なくともいずれか一つを制御する。
この熱源システム制御装置では、熱源機ごとの負荷を制御する。熱源機ごとの負荷の制御には熱源機ごとの運転および停止も含まれる。そのため、容量および/または負荷特性が異なる複数の熱源機を有する熱源システム全体において、効率向上制御を柔軟に行うことができる。
この熱源システム制御装置では、熱源機ごとの負荷を制御する。熱源機ごとの負荷の制御には熱源機ごとの運転および停止も含まれる。そのため、容量および/または負荷特性が異なる複数の熱源機を有する熱源システム全体において、効率向上制御を柔軟に行うことができる。
第3観点に係る熱源システム制御装置は、第1観点または第2観点に係る熱源システム制御装置であって、成績係数記憶部をさらに備える。成績係数記憶部は、複数の熱源機それぞれの負荷に応じた成績係数に関する情報を、成績係数情報として記憶する。制御部は、成績係数記憶部に記憶した成績係数情報を参照し、成績係数が高い負荷で複数の熱源機それぞれを運転させる。
この熱源システム制御装置では、制御部が、容量および/または負荷特性が異なる複数の熱源機を有する熱源システムに対して、熱源機それぞれの成績係数に関する情報に基づいて、それぞれの熱源機を成績係数のよい負荷で運転させる。よって、容易かつ確実に、熱源システム全体の成績係数が、最大となるような効率向上制御を行うことができる。
この熱源システム制御装置では、制御部が、容量および/または負荷特性が異なる複数の熱源機を有する熱源システムに対して、熱源機それぞれの成績係数に関する情報に基づいて、それぞれの熱源機を成績係数のよい負荷で運転させる。よって、容易かつ確実に、熱源システム全体の成績係数が、最大となるような効率向上制御を行うことができる。
第4観点に係る熱源システム制御装置は、第1観点から第3観点のいずれかに係る熱源システム制御装置であって、定格能力記憶部をさらに備える。定格能力記憶部は、複数の熱源機それぞれの定格能力に関する情報を、定格能力情報として記憶する。制御部は、定格能力記憶部に記憶した定格能力情報に基づき運転または停止する熱源機を決める。
この熱源システム制御装置では、容量および/または負荷特性が異なる複数の熱源機を有する熱源システムにおいて、それぞれの熱源機の定格能力情報に基づいて、運転または停止させる熱源機を選択する。これにより、熱源システム全体の総消費エネルギーに対する効率が最大となるような効率向上制御を行うことができる。
この熱源システム制御装置では、容量および/または負荷特性が異なる複数の熱源機を有する熱源システムにおいて、それぞれの熱源機の定格能力情報に基づいて、運転または停止させる熱源機を選択する。これにより、熱源システム全体の総消費エネルギーに対する効率が最大となるような効率向上制御を行うことができる。
第5観点に係る熱源システム制御装置は、第1観点から第4観点のいずれかに係る熱源システム制御装置であって、熱源システムは、複数のポンプをさらに有する。複数のポンプは、複数の熱源機それぞれに冷温水を供給する。制御部は、複数のポンプから供給される冷温水の流量を制御することによりヘッダに集合させた冷温水の温度を調整する。
この熱源システム制御装置では、ヘッダに集合させた冷温水の温度に基づき、それぞれの熱源機の負荷と、それぞれの熱源機に供給される冷温水の流量とを効率向上制御する。これにより、容量および/または負荷特性が異なる複数の熱源機を有する熱源システムにおいて、熱源システム全体の総消費エネルギーの効率を、より容易に最大に近づけることができる。
第6観点に係る熱源システム制御装置は、第5観点に係る熱源システム制御装置であって、熱源システムは、複数の出口温度センサをさらに有する。複数の出口温度センサは、複数の熱源機それぞれの出口近傍に配置される。また、複数の出口温度センサは、ヘッダに供給される冷温水の温度である出口温度を測定する。熱源システム制御装置は、出口温度検出部をさらに備える。出口温度検出部は、複数の出口温度センサの出力値を検出する。制御部は、複数の熱源機それぞれの出口温度と、複数の熱源機それぞれから供給される冷温水の流量とに基づいて、複数の熱源機それぞれの負荷と複数のポンプから供給される冷温水の流量とを制御することにより、ヘッダ内の冷温水の温度を調整する。
この熱源システム制御装置では、制御部が、それぞれの熱源機の冷温水の出口温度を出口温度検出部が検出する。また、制御部は、それぞれの熱源機の冷温水の流量を制御する。制御部は、それぞれの熱源機の冷温水の出口温度および流量により、それぞれの熱源機の負荷と冷温水の流量とを制御する。これにより、ヘッダにおける冷温水の温度と流量をより容易かつ確実に制御することができる。
第1観点に係る熱源システム制御装置では、容量および/または負荷特性が異なる複数の熱源機を有する熱源システム全体の成績係数を最大にすることが可能となる。
第2観点に係る熱源システム制御装置では、容量および/または負荷特性が異なる複数の熱源機を有する熱源システム全体において、効率向上制御を柔軟に行うことができる。
第3観点に係る熱源システム制御装置では、容量および/または負荷特性が異なる複数の熱源機を有する熱源システムに対して、熱源機それぞれの成績係数に関する情報に基づいて、より容易かつ確実に、熱源システム全体の総消費エネルギーに対する熱源システム全体の成績係数と総消費エネルギーに対する効率とが最大となるように効率向上制御を行うことができる。
第4観点に係る熱源システム制御装置では、容量および/または負荷特性が異なる複数の熱源機を有する熱源システムにおいて、それぞれの熱源機の定格能力情報に基づいて、運転または停止させる熱源機を選択する。これにより、熱源システム全体の総消費エネルギーに対する効率が最大となるような効率向上制御を行うことができる。
第2観点に係る熱源システム制御装置では、容量および/または負荷特性が異なる複数の熱源機を有する熱源システム全体において、効率向上制御を柔軟に行うことができる。
第3観点に係る熱源システム制御装置では、容量および/または負荷特性が異なる複数の熱源機を有する熱源システムに対して、熱源機それぞれの成績係数に関する情報に基づいて、より容易かつ確実に、熱源システム全体の総消費エネルギーに対する熱源システム全体の成績係数と総消費エネルギーに対する効率とが最大となるように効率向上制御を行うことができる。
第4観点に係る熱源システム制御装置では、容量および/または負荷特性が異なる複数の熱源機を有する熱源システムにおいて、それぞれの熱源機の定格能力情報に基づいて、運転または停止させる熱源機を選択する。これにより、熱源システム全体の総消費エネルギーに対する効率が最大となるような効率向上制御を行うことができる。
第5観点に係る熱源システム制御装置では、容量および/または負荷特性が異なる複数の熱源機を有する熱源システムにおいて、より容易に、熱源システム全体の総消費エネルギーの効率を最大に近づけるように効率向上制御をすることができる。
第6観点に係る熱源システム制御装置では、より容易かつ確実にヘッダにおける冷温水の温度と流量を制御することができる。
第6観点に係る熱源システム制御装置では、より容易かつ確実にヘッダにおける冷温水の温度と流量を制御することができる。
以下、図面を参照しながら、本発明にかかる熱源システム制御装置10を含むエネルギー管理システム200について説明する。
(1)エネルギー管理システム
図1にエネルギー管理システム200を示す。エネルギー管理システム200は、建物内で消費されるエネルギーを管理するシステムである。
エネルギー管理システム200は、熱源システム100と熱源システム制御装置10とを含む。エネルギー管理システム200は、熱源システム100に含まれる熱源機50a,50b,50cを熱源システム制御装置10によって制御することにより、建物内で消費されるエネルギーを管理する。以下、熱源システム100および熱源システム制御装置10の構成について説明する。
(1)エネルギー管理システム
図1にエネルギー管理システム200を示す。エネルギー管理システム200は、建物内で消費されるエネルギーを管理するシステムである。
エネルギー管理システム200は、熱源システム100と熱源システム制御装置10とを含む。エネルギー管理システム200は、熱源システム100に含まれる熱源機50a,50b,50cを熱源システム制御装置10によって制御することにより、建物内で消費されるエネルギーを管理する。以下、熱源システム100および熱源システム制御装置10の構成について説明する。
(1-1)熱源システム
熱源システム100は、複数の熱源機50a,50b,50cと、空調機32a,32b,32cと、1次ポンプ41a,41b,41cと、第1ヘッダ(ヘッダ)20と、第2ヘッダ21と、ヘッダ温度センサ60とを有する。複数の熱源機50a,50b,50cのそれぞれは、異なる容量および/または負荷特性を有する。熱源機50a,50b,50cは、インバーター方式の熱源機であり、例えば、空冷インバータチラー、空冷スクリューチラーである。1次ポンプ41a,41b,41cは、熱源機50a,50b,50cに一定の流量で冷温水を送る。第1ヘッダ20には、熱源機50a,50b,50cから送られる冷温水が集合する。また、第2ヘッダ21には、空調機32a,32b,32cから戻ってきた水が集合する。
熱源システム100は、複数の熱源機50a,50b,50cと、空調機32a,32b,32cと、1次ポンプ41a,41b,41cと、第1ヘッダ(ヘッダ)20と、第2ヘッダ21と、ヘッダ温度センサ60とを有する。複数の熱源機50a,50b,50cのそれぞれは、異なる容量および/または負荷特性を有する。熱源機50a,50b,50cは、インバーター方式の熱源機であり、例えば、空冷インバータチラー、空冷スクリューチラーである。1次ポンプ41a,41b,41cは、熱源機50a,50b,50cに一定の流量で冷温水を送る。第1ヘッダ20には、熱源機50a,50b,50cから送られる冷温水が集合する。また、第2ヘッダ21には、空調機32a,32b,32cから戻ってきた水が集合する。
具体的に、熱源システム100では、1次ポンプ41a,41b,41cにより、冷温水が、熱源機50a,50b,50cに冷温水が送られる。熱源機50a,50b,50cから送り出される冷温水は、第1ヘッダ20に集合する。第1ヘッダ20に集合した水は、上流側配管70を通って、空調機32a,32b,32cに送られる。ヘッダ温度センサ60は、冷温水が集合する第1ヘッダ20の部分に設けられる。ヘッダ温度センサ60は、冷温水の温度を測定する。第1ヘッダ20に集合した冷温水は、空調機32a,32b,32cにより、室内空気と熱交換される。空調機32a,32b,32cから送られた冷温水は、下流側配管71を通って、第2ヘッダ21に集合する。第2ヘッダ21に集合した冷温水は、1次ポンプ41a,41b,41cに送られる。なお、図1では、熱源システム100が有する熱源機および空調機を3つ記載しているが、熱源機および空調機の数は、3つに限定されるものではない。
(1-2)熱源システム制御装置
熱源システム制御装置10は、上述したように熱源システム100に含まれる熱源機50a,50b,50cを制御する。熱源システム制御装置10は、ヘッダ温度センサ60と通信線で接続されている。熱源システム制御装置10は、通信線を介して、ヘッダ温度センサ60の出力値を検出する。また、熱源システム制御装置10は、例えば、LAN等の通信ネットワークを介して、それぞれの熱源機50a,50b,50cの負荷を制御する。
図2は、熱源システム制御装置10の概略構成図である。以下、図2を用いて、熱源システム制御装置10について説明する。熱源システム制御装置10は、図2に示すように、主として、入力部11と、出力部12と、時間管理部13と、ヘッダ温度検出部14と、記憶部15と、制御部16と、を有する。
熱源システム制御装置10は、上述したように熱源システム100に含まれる熱源機50a,50b,50cを制御する。熱源システム制御装置10は、ヘッダ温度センサ60と通信線で接続されている。熱源システム制御装置10は、通信線を介して、ヘッダ温度センサ60の出力値を検出する。また、熱源システム制御装置10は、例えば、LAN等の通信ネットワークを介して、それぞれの熱源機50a,50b,50cの負荷を制御する。
図2は、熱源システム制御装置10の概略構成図である。以下、図2を用いて、熱源システム制御装置10について説明する。熱源システム制御装置10は、図2に示すように、主として、入力部11と、出力部12と、時間管理部13と、ヘッダ温度検出部14と、記憶部15と、制御部16と、を有する。
(1-2-1)入力部
入力部11は、主として操作ボタン、キーボード、およびマウス等から構成される。入力部11は、第1ヘッダ20に集合された冷温水の設定温度をユーザーから受け付ける。入力部11が受け付けた設定温度は、後述の設定温度記憶部15aに記憶される。
(1-2-2)出力部
出力部12は、主としてディスプレイから構成される。出力部12には、後述する記憶部15に記憶される各種情報を示す管理画面が表示される。また、出力部12は、後述の負荷指令生成部16fが生成した、後述の初期負荷または後述の調整負荷の制御指令を、それぞれの熱源機50a,50b,50cに送る。
(1-2-3)時間管理部
時間管理部13は、熱源システム制御装置10が実行する各種制御の時間管理を行う。
入力部11は、主として操作ボタン、キーボード、およびマウス等から構成される。入力部11は、第1ヘッダ20に集合された冷温水の設定温度をユーザーから受け付ける。入力部11が受け付けた設定温度は、後述の設定温度記憶部15aに記憶される。
(1-2-2)出力部
出力部12は、主としてディスプレイから構成される。出力部12には、後述する記憶部15に記憶される各種情報を示す管理画面が表示される。また、出力部12は、後述の負荷指令生成部16fが生成した、後述の初期負荷または後述の調整負荷の制御指令を、それぞれの熱源機50a,50b,50cに送る。
(1-2-3)時間管理部
時間管理部13は、熱源システム制御装置10が実行する各種制御の時間管理を行う。
(1-2-4)ヘッダ温度検出部
ヘッダ温度検出部14は、ヘッダ温度センサ60の出力値を検出する。
(1-2-5)記憶部
記憶部15は、ハードディスク等から構成され、設定温度記憶部15aと、成績係数記憶部15bと、定格能力記憶部15cと、を有する。
なお、「成績係数」とは、Coefficient of Performance(COP)のことであり、消費電力1kW当たりの冷房能力(kW)を表したものである。また、「負荷」とは、熱源機が実際に消費するエネルギーである。なお、熱源機の負荷は、熱源機がインバーター方式の圧縮機を有する場合は、圧縮機のステップに相当する数(ステップ相当数)である。
ヘッダ温度検出部14は、ヘッダ温度センサ60の出力値を検出する。
(1-2-5)記憶部
記憶部15は、ハードディスク等から構成され、設定温度記憶部15aと、成績係数記憶部15bと、定格能力記憶部15cと、を有する。
なお、「成績係数」とは、Coefficient of Performance(COP)のことであり、消費電力1kW当たりの冷房能力(kW)を表したものである。また、「負荷」とは、熱源機が実際に消費するエネルギーである。なお、熱源機の負荷は、熱源機がインバーター方式の圧縮機を有する場合は、圧縮機のステップに相当する数(ステップ相当数)である。
(1-2-5-1)設定温度記憶部
設定温度記憶部15aは、入力部11がユーザーより受け付けた第1ヘッダ20の冷温水の設定温度を記憶する。
(1-2-5-2)成績係数記憶部
成績係数記憶部15bは、各熱源機50a,50b,50cについて、負荷に応じた成績係数に関する情報が記憶されている。具体的に、成績係数記憶部15bは、負荷成績係数表を記憶する(図4参照)。負荷成績係数表は、各熱源機50a,50b,50cの負荷に応じた成績係数を示す表である。具体的に、負荷成績係数表では、図4に示すように、各熱源機50a,50b,50cに対応する熱源機番号と、各熱源機50a,50b,50cの負荷に対応する成績係数とが関連付けられている。言い換えると、負荷成績係数表は、各熱源機50a,50b,50cを所定の負荷(10~100)で動作させた場合の成績係数を定義する。
設定温度記憶部15aは、入力部11がユーザーより受け付けた第1ヘッダ20の冷温水の設定温度を記憶する。
(1-2-5-2)成績係数記憶部
成績係数記憶部15bは、各熱源機50a,50b,50cについて、負荷に応じた成績係数に関する情報が記憶されている。具体的に、成績係数記憶部15bは、負荷成績係数表を記憶する(図4参照)。負荷成績係数表は、各熱源機50a,50b,50cの負荷に応じた成績係数を示す表である。具体的に、負荷成績係数表では、図4に示すように、各熱源機50a,50b,50cに対応する熱源機番号と、各熱源機50a,50b,50cの負荷に対応する成績係数とが関連付けられている。言い換えると、負荷成績係数表は、各熱源機50a,50b,50cを所定の負荷(10~100)で動作させた場合の成績係数を定義する。
(1-2-5-3)定格能力記憶部
定格能力記憶部15cは、熱源機50a,50b,50cに関する定格能力情報を記憶する(図5参照)。具体的に、定格能力記憶部15cには、図5に示されるような定格能力表が記憶されている。定格能力表は、各熱源機50a,50b,50cに対応する熱源機番号と、各熱源機50a,50b,50cの定格能力とが関連付けられている。
(1-2-6)制御部
制御部16は、CPU,ROM,RAM等から構成される。制御部16は、上述の記憶部15に記憶されているプログラムを読み出して実行する。制御部16は、プログラムを実行することにより、各熱源機50a,50b,50cの容量および/または負荷特性に基づいて、効率向上制御をかける。ここで、効率向上制御とは、熱源システム100全体の成績係数を高く保つための制御である。具体的に、効率向上制御では、後述する運転台数調整処理および調整負荷設定処理を実行することにより、熱源システム100全体の成績係数を高くする。
定格能力記憶部15cは、熱源機50a,50b,50cに関する定格能力情報を記憶する(図5参照)。具体的に、定格能力記憶部15cには、図5に示されるような定格能力表が記憶されている。定格能力表は、各熱源機50a,50b,50cに対応する熱源機番号と、各熱源機50a,50b,50cの定格能力とが関連付けられている。
(1-2-6)制御部
制御部16は、CPU,ROM,RAM等から構成される。制御部16は、上述の記憶部15に記憶されているプログラムを読み出して実行する。制御部16は、プログラムを実行することにより、各熱源機50a,50b,50cの容量および/または負荷特性に基づいて、効率向上制御をかける。ここで、効率向上制御とは、熱源システム100全体の成績係数を高く保つための制御である。具体的に、効率向上制御では、後述する運転台数調整処理および調整負荷設定処理を実行することにより、熱源システム100全体の成績係数を高くする。
制御部16は、効率向上制御を実行するために、主として、初期負荷設定部16a、温度差算出部16b、変更要否判定部16c、負荷変更部16d、運転台数調整部16e、および負荷指令生成部16fとして機能する。
(1-2-6-1)
初期負荷設定部16aは、各熱源機50a,50b,50cに対して初期負荷を設定する(初期負荷設定処理)。初期負荷とは、各熱源機50a,50b,50cに対して最初に設定される負荷であって、成績係数の最も良い負荷である。具体的に、初期負荷設定部16aは、成績係数記憶部15bに記憶された負荷成績係数表に基づいて、各熱源機50a,50b,50cに対して最も良い成績係数を示す負荷を設定する。
(1-2-6-2)
温度差算出部16bは、第1ヘッダ20内の冷温水の温度と設定温度との温度差を算出する(温度差算出処理)。温度差算出部16bは、ヘッダ温度検出部14によって検出された出力値と、設定温度記憶部15aに記憶された設定温度とを比較して、温度差を算出する。具体的に、温度差算出部16bは、第1ヘッダ20内の冷温水の温度(実測温度)から、設定温度記憶部15aに記憶された設定温度を減算して、温度差を算出する。温度差算出部16bによって算出された温度差は、上述の記憶部15に記憶される。
(1-2-6-1)
初期負荷設定部16aは、各熱源機50a,50b,50cに対して初期負荷を設定する(初期負荷設定処理)。初期負荷とは、各熱源機50a,50b,50cに対して最初に設定される負荷であって、成績係数の最も良い負荷である。具体的に、初期負荷設定部16aは、成績係数記憶部15bに記憶された負荷成績係数表に基づいて、各熱源機50a,50b,50cに対して最も良い成績係数を示す負荷を設定する。
(1-2-6-2)
温度差算出部16bは、第1ヘッダ20内の冷温水の温度と設定温度との温度差を算出する(温度差算出処理)。温度差算出部16bは、ヘッダ温度検出部14によって検出された出力値と、設定温度記憶部15aに記憶された設定温度とを比較して、温度差を算出する。具体的に、温度差算出部16bは、第1ヘッダ20内の冷温水の温度(実測温度)から、設定温度記憶部15aに記憶された設定温度を減算して、温度差を算出する。温度差算出部16bによって算出された温度差は、上述の記憶部15に記憶される。
変更要否判定部16cは、所定のタイミングで、負荷の変更要否を判定する(調整要否判定処理)。ここで、所定のタイミングとは、温度差算出処理を行った後などである。具体的に、変更要否判定部16cは、温度差算出部16bによって算出された温度差に基づき、負荷の変更要否を判定する。ここで、変更要否判定部16cは、各熱源機50a,50b,50cに対して初期負荷が設定されている場合には、初期負荷の変更要否を判定する。一方、変更要否判定部16cは、各熱源機50a,50b,50cに対して調整負荷が設定されている場合には、調整負荷の変更要否を判定する。初期負荷とは、上述したように、各熱源機50a,50b,50cに対して最初に設定された成績係数の最も良い負荷である。また、調整負荷とは、後述する負荷変更部16dによって設定される負荷であって、初期設定を調整して設定された負荷である。
(1-2-6-3)
変更要否判定部16cは、実測温度と設定温度との温度差が所定の範囲に含まれる場合には、初期負荷を変更する必要がないと判定する。一方、変更要否判定部16cは、実測温度と設定温度との温度差が所定の範囲を外れる場合には、初期負荷および調整負荷を変更する必要があると判定する。
負荷の変更が必要であると判定した場合、変更要否判定部16cは、温度差が正の値であるか負の値であるかを判定する。ここで、温度差が正の値の場合、実測温度が設定温度より高い。一方、温度差が負の値の場合、実測温度が設定温度より低い。変更要否判定部16cは、温度差が正の値である場合、プラス方向への負荷の変更が必要(負荷増必要)であると判定する。また、変更要否判定部16cは、温度差が負の値である場合、マイナス方向への負荷の変更(負荷減必要)が必要であると判定する。
変更要否判定部16cは、実測温度と設定温度との温度差が所定の範囲に含まれる場合には、初期負荷を変更する必要がないと判定する。一方、変更要否判定部16cは、実測温度と設定温度との温度差が所定の範囲を外れる場合には、初期負荷および調整負荷を変更する必要があると判定する。
負荷の変更が必要であると判定した場合、変更要否判定部16cは、温度差が正の値であるか負の値であるかを判定する。ここで、温度差が正の値の場合、実測温度が設定温度より高い。一方、温度差が負の値の場合、実測温度が設定温度より低い。変更要否判定部16cは、温度差が正の値である場合、プラス方向への負荷の変更が必要(負荷増必要)であると判定する。また、変更要否判定部16cは、温度差が負の値である場合、マイナス方向への負荷の変更(負荷減必要)が必要であると判定する。
(1-2-6-4)
負荷変更部16dは、各熱源機50a,50b,50cに対して設定されていた負荷を変更する。言い換えると、負荷変更部16dは、調整負荷を設定する(調整負荷設定処理)。負荷変更部16dは、上述の変更要否判定部16cによって、初期負荷の変更が必要であると判定された場合に、各熱源機50a,50b,50cに対する調整負荷を設定する。また、負荷変更部16dは、調整負荷の変更が必要であると判定された場合に、各熱源機50a,50b,50cに新たな調整負荷を設定する。ここで、調整負荷とは、温度差算出部16bによって算出された温度差に基づいて調整された各熱源機50a,50b,50cの負荷である。言い換えると、調整負荷とは、第1ヘッダ20の冷温水の温度を設定温度に近づけるために調整された負荷である。また、新たな調整負荷とは、調整負荷設定後の温度差に基づいて、新たに設定される調整負荷である。
負荷変更部16dは、各熱源機50a,50b,50cに対して設定されていた負荷を変更する。言い換えると、負荷変更部16dは、調整負荷を設定する(調整負荷設定処理)。負荷変更部16dは、上述の変更要否判定部16cによって、初期負荷の変更が必要であると判定された場合に、各熱源機50a,50b,50cに対する調整負荷を設定する。また、負荷変更部16dは、調整負荷の変更が必要であると判定された場合に、各熱源機50a,50b,50cに新たな調整負荷を設定する。ここで、調整負荷とは、温度差算出部16bによって算出された温度差に基づいて調整された各熱源機50a,50b,50cの負荷である。言い換えると、調整負荷とは、第1ヘッダ20の冷温水の温度を設定温度に近づけるために調整された負荷である。また、新たな調整負荷とは、調整負荷設定後の温度差に基づいて、新たに設定される調整負荷である。
負荷変更部16dは、各熱源機50a,50b,50cを制御する負荷を、高い成績係数を有する負荷の範囲から選択する。具体的に、負荷変更部16dは、成績係数記憶部15bに記憶された負荷成績係数表に基づいて、各熱源機50a,50b,50cに対して高い成績係数を有する負荷を決定する。
負荷変更部16dによる調整負荷決定処理について、図3(a),(b)を用いて詳細に説明する。
図3(a),(b)は、第1熱源機50aの負荷および成績係数の関係と、第2熱源機50bの負荷および成績係数の関係とをそれぞれ示す。具体的に、図3(a),(b)中、横軸は、熱源機50a,50bの負荷を示し、縦軸は、熱源機50a,50bの成績係数を示す。すなわち、図3(a),(b)に示す曲線は、熱源機50a,50bの負荷に応じて変化する成績係数を示す。
負荷変更部16dによる調整負荷決定処理について、図3(a),(b)を用いて詳細に説明する。
図3(a),(b)は、第1熱源機50aの負荷および成績係数の関係と、第2熱源機50bの負荷および成績係数の関係とをそれぞれ示す。具体的に、図3(a),(b)中、横軸は、熱源機50a,50bの負荷を示し、縦軸は、熱源機50a,50bの成績係数を示す。すなわち、図3(a),(b)に示す曲線は、熱源機50a,50bの負荷に応じて変化する成績係数を示す。
第1熱源機50aおよび第2熱源機50bの負荷は、圧縮機のステップ相当値を示す。すなわち、負荷を増減させるためには、ステップ相当値が増減される。第1熱源機50aは、第2熱源機50bとは、異なる容量および負荷特性を有する。
第1熱源機50aについては、図3(a)に示すように、負荷が35%から50%の範囲で、成績係数が最大に近い値となる。制御部16は、最大に近い成績係数を示す負荷の範囲のうち、下限値(35%)を下限目標値とする。同様に、最大に近い成績係数を示す負荷の範囲のうち、上限値(50%)を上限目標値とする。さらに、最大に近い成績係数を示す負荷の範囲のうち、中央値(42.5%)を中央目標値とする。制御部16は、下限目標値、中央目標値、および上限目標値の3段階の負荷のいずれかの段階で第1熱源機50aを制御する。
第1熱源機50aについては、図3(a)に示すように、負荷が35%から50%の範囲で、成績係数が最大に近い値となる。制御部16は、最大に近い成績係数を示す負荷の範囲のうち、下限値(35%)を下限目標値とする。同様に、最大に近い成績係数を示す負荷の範囲のうち、上限値(50%)を上限目標値とする。さらに、最大に近い成績係数を示す負荷の範囲のうち、中央値(42.5%)を中央目標値とする。制御部16は、下限目標値、中央目標値、および上限目標値の3段階の負荷のいずれかの段階で第1熱源機50aを制御する。
具体的に、第1熱源機50aの初期負荷が50%となっており、さらに、第1熱源機50aの消費エネルギーを減らす場合には、負荷を42.5%と設定する。さらに、第1熱源機50aの消費エネルギーを減らす場合には、制御部16は、負荷の目標値を1段ずつ減らす。一方、第1熱源機50aの初期設定が35%であり、第1熱源機50aの消費エネルギーを増やす場合には、負荷を42.5%に変化させる。すなわち、制御部16は、1段階ずつ負荷の目標値を上げて消費エネルギーを増やす。
一方、第2熱源機50bについては、図3(b)に示すように、負荷が50%から100%の範囲で、成績係数が最大に近い値となる。制御部16は、最大に近い成績係数を示す負荷の範囲のうち、下限値(50%)を下限目標値とする。同様に、最大に近い成績係数を示す負荷の範囲のうち、上限値(100%)を上限目標値とする。さらに、最大に近い成績係数を示す負荷の範囲のうち、中央値(75%)を中央目標値とする。制御部16は、下限目標値、中央目標値、および上限目標値の3段階の負荷のいずれかの段階で第2熱源機50bを制御する。
一方、第2熱源機50bについては、図3(b)に示すように、負荷が50%から100%の範囲で、成績係数が最大に近い値となる。制御部16は、最大に近い成績係数を示す負荷の範囲のうち、下限値(50%)を下限目標値とする。同様に、最大に近い成績係数を示す負荷の範囲のうち、上限値(100%)を上限目標値とする。さらに、最大に近い成績係数を示す負荷の範囲のうち、中央値(75%)を中央目標値とする。制御部16は、下限目標値、中央目標値、および上限目標値の3段階の負荷のいずれかの段階で第2熱源機50bを制御する。
具体的に、第2熱源機50bの初期負荷が100%となっており、さらに、第2熱源機50bの消費エネルギーを減らす場合には、負荷を75%と設定する。さらに、第2熱源機50bの消費エネルギーを減らす場合には、制御部16は、負荷の目標値を1段ずつ減らす。一方、第2熱源機50bの初期設定が50%であり、第2熱源機50bの消費エネルギーを増やす場合には、負荷を75%に変化させる。すなわち、制御部16は、1段階ずつ負荷の目標値を上げて消費エネルギーを増やす。
(1-2-6-5)
運転台数調整部16eは、運転させる熱源機の台数を調整する(運転台数調整処理)。具体的に、運転台数調整部16eは、変更要否判定部16cよって、初期負荷または調整負荷の変更が必要であると判定された場合であって、調整負荷の変更ができない場合に、運転させる熱源機50a,50b,50cの台数を調整する。具体的に、運転台数調整部16eは、運転している全ての熱源機50a,50b,50cの圧縮機のステップ相当数が上限目標値となっており、且つ変更要否判定部16cが負荷増必要と判定した場合に、運転させる熱源機の台数を増加させる。また、運転台数調整部16eは、運転している全ての圧縮機のステップ相当数が下限目標値となっており、且つ変更要否判定部16cが負荷減必要と判定した場合に、運転させる熱源機50a,50b,50cの台数を減少させる。
(1-2-6-5)
運転台数調整部16eは、運転させる熱源機の台数を調整する(運転台数調整処理)。具体的に、運転台数調整部16eは、変更要否判定部16cよって、初期負荷または調整負荷の変更が必要であると判定された場合であって、調整負荷の変更ができない場合に、運転させる熱源機50a,50b,50cの台数を調整する。具体的に、運転台数調整部16eは、運転している全ての熱源機50a,50b,50cの圧縮機のステップ相当数が上限目標値となっており、且つ変更要否判定部16cが負荷増必要と判定した場合に、運転させる熱源機の台数を増加させる。また、運転台数調整部16eは、運転している全ての圧縮機のステップ相当数が下限目標値となっており、且つ変更要否判定部16cが負荷減必要と判定した場合に、運転させる熱源機50a,50b,50cの台数を減少させる。
なお、運転台数調整部16eは、各熱源機50a,50b,50cの定格能力を比較して(定格能力比較処理)、運転させる熱源機50a,50b,50cまたは停止させる熱源機50a,50b,50cを決定する。例えば、図5の表に示す、定格能力が30馬力の第1熱源機50aと定格能力が50馬力の第2熱源機50bが運転しておらず、運転台数調整処理の結果、運転させる熱源機を増やす場合には、定格能力の小さい第1熱源機50aを運転させる。熱源システム100に対する熱源機50a,50b,50cの出力の急な変化を避けるためである。
(1-2-6-6)
負荷指令生成部16fは、各熱源機50a,50b,50cに対する調整負荷に基づく制御指令を生成する。具体的に、負荷指令生成部16fは、負荷変更部16dによって調整負荷が設定されると、出力部12を介して当該制御指令を各熱源機50a,50b,50cに送る。
(1-2-6-6)
負荷指令生成部16fは、各熱源機50a,50b,50cに対する調整負荷に基づく制御指令を生成する。具体的に、負荷指令生成部16fは、負荷変更部16dによって調整負荷が設定されると、出力部12を介して当該制御指令を各熱源機50a,50b,50cに送る。
(2)熱源システム制御装置で行われる制御処理について
以下、熱源システム制御装置10における、熱源システム制御の処理の流れを、図6を用いて説明する。
まず、ステップS101では、初期負荷設定部16aが初期負荷設定処理を行う。運転する熱源機50a,50b,50cの台数は、熱源システム100が3台の熱源機50a,50b,50cを有するので、その半数近くの2台を運転させる。
ステップS102では、ヘッダ温度検出部14が、実測温度を測定する。ヘッダ温度検出部14は、ヘッダ温度センサ60の出力値を検出し、記憶部15に記憶させる。
ステップS103では、温度差算出部16bが、温度差算出処理を行う。制御部16は、算出した温度差を記憶部15に記憶させる。
以下、熱源システム制御装置10における、熱源システム制御の処理の流れを、図6を用いて説明する。
まず、ステップS101では、初期負荷設定部16aが初期負荷設定処理を行う。運転する熱源機50a,50b,50cの台数は、熱源システム100が3台の熱源機50a,50b,50cを有するので、その半数近くの2台を運転させる。
ステップS102では、ヘッダ温度検出部14が、実測温度を測定する。ヘッダ温度検出部14は、ヘッダ温度センサ60の出力値を検出し、記憶部15に記憶させる。
ステップS103では、温度差算出部16bが、温度差算出処理を行う。制御部16は、算出した温度差を記憶部15に記憶させる。
ステップS104では、変更要否判定部16cが調整要否判定処理を行う。変更要否判定部16cは、温度差算出処理の結果、温度差がある場合は、負荷増必要または負荷減必要の判定を行う。
ステップS105では、上述の負荷増必要と判定された場合は、ステップS106へ移行する。その他の場合は、ステップS116へ移行する。
ステップS106では、記憶部15に記憶された温度差の情報と成績係数記憶部15bに記憶されている負荷成績係数表に基づいて、負荷変更部16dが、現在運転中の熱源機50a,50bの負荷を増すように調整負荷設定処理を行う。具体的には、圧縮機のステップ数を上げることで、熱源機50a,50bの負荷を増加させる。また、熱源システム100全体の成績係数を高く保つ効率向上制御は、図3に示した、それぞれの熱源機50a,50bの成績係数が高い範囲で、熱源機50a,50bを制御することで実現可能である。具体的には、制御部16は、各熱源機50a,50bの負荷を下限目標値と、中央目標値と、上限目標値との3段階で制御する。制御部16は、記憶部15に記憶された温度差と成績係数記憶部15bに記憶された負荷成績係数表とに基づいて、負荷を増す熱源機50a,50bと、熱源機50a,50bに対する3段階の負荷の目標値とを定める。
ステップS105では、上述の負荷増必要と判定された場合は、ステップS106へ移行する。その他の場合は、ステップS116へ移行する。
ステップS106では、記憶部15に記憶された温度差の情報と成績係数記憶部15bに記憶されている負荷成績係数表に基づいて、負荷変更部16dが、現在運転中の熱源機50a,50bの負荷を増すように調整負荷設定処理を行う。具体的には、圧縮機のステップ数を上げることで、熱源機50a,50bの負荷を増加させる。また、熱源システム100全体の成績係数を高く保つ効率向上制御は、図3に示した、それぞれの熱源機50a,50bの成績係数が高い範囲で、熱源機50a,50bを制御することで実現可能である。具体的には、制御部16は、各熱源機50a,50bの負荷を下限目標値と、中央目標値と、上限目標値との3段階で制御する。制御部16は、記憶部15に記憶された温度差と成績係数記憶部15bに記憶された負荷成績係数表とに基づいて、負荷を増す熱源機50a,50bと、熱源機50a,50bに対する3段階の負荷の目標値とを定める。
負荷指令生成部16fは、熱源機50a,50bに対する調整負荷に基づく制御指令を生成する。
出力部12は、負荷指令生成部16fが生成した制御指令を熱源機50a,50bに送る。
ステップS107では、制御部16が運転させている全ての熱源機50a,50bの負荷が上限目標値であるかを判定する。全ての熱源機50a,50bの負荷が上限目標値となっていない場合には、記憶部15に上限フラグをOFFとして記憶させ、ステップS102に戻る。全ての熱源機50a,50bの負荷が上限目標値となっている場合は、記憶部15に上限フラグをONとして記憶させ、ステップS108に移行する。
ステップS108では、時間管理部13が所定の待ち時間、例えば5分間などの計測を開始させる。所定の待ち時間が経過後、温度差算出部16bが温度差算出処理を行う。その後、変更要否判定部16cが調整要否判定処理を行う。ここで、記憶部15にある上限フラグがONであり、且つ調整要否判定処理が負荷増必要と判定した場合は、ステップS109に移行する。その他の場合は、ステップS102に戻る。
出力部12は、負荷指令生成部16fが生成した制御指令を熱源機50a,50bに送る。
ステップS107では、制御部16が運転させている全ての熱源機50a,50bの負荷が上限目標値であるかを判定する。全ての熱源機50a,50bの負荷が上限目標値となっていない場合には、記憶部15に上限フラグをOFFとして記憶させ、ステップS102に戻る。全ての熱源機50a,50bの負荷が上限目標値となっている場合は、記憶部15に上限フラグをONとして記憶させ、ステップS108に移行する。
ステップS108では、時間管理部13が所定の待ち時間、例えば5分間などの計測を開始させる。所定の待ち時間が経過後、温度差算出部16bが温度差算出処理を行う。その後、変更要否判定部16cが調整要否判定処理を行う。ここで、記憶部15にある上限フラグがONであり、且つ調整要否判定処理が負荷増必要と判定した場合は、ステップS109に移行する。その他の場合は、ステップS102に戻る。
ステップS109では、運転台数調整部16eが運転台数調整処理を行い、運転する熱源機の台数を決定する。その後、運転台数調整部16eが定格能力比較処理を行い、新たに運転する熱源機を決定する。ここでは、運転停止中の熱源機は、第3熱源機50cのみであるので、第3熱源機50cの運転を開始する。運転を開始する第3熱源機50cの負荷は、下限目標値とする。下限目標値とするのは、熱源システム100に対して熱源機50a,50b,50cの出力を急に変えないためである。負荷指令生成部16fにより制御指令が生成され、出力部12を介して第3熱源機50cに送られる。第3熱源機50cが運転を開始し、ステップS102に戻る。
ステップS116では、ステップS104において負荷減必要と判定された場合には、ステップS117へ移行する。負荷増必要および負荷減必要とも判定されなかった場合には、ステップS102へ移行する。
ステップS116では、ステップS104において負荷減必要と判定された場合には、ステップS117へ移行する。負荷増必要および負荷減必要とも判定されなかった場合には、ステップS102へ移行する。
ステップS117では、記憶部15に記憶された温度差の情報と成績係数記憶部15bに記憶されている負荷成績係数表に基づいて、負荷変更部16dが、現在運転中の熱源機50a,50bの負荷を減らすように調整負荷設定処理を行う。具体的には、圧縮機のステップ数を下げることで、熱源機50a,50bの負荷を減らす。また、熱源システム100全体の成績係数を高く保つ効率向上制御は、図3に示した、それぞれの熱源機50a,50bの成績係数が高い範囲で、熱源機50a,50bを制御することで実現可能である。具体的には、制御部16は、各熱源機50a,50bの負荷を下限目標値と、中央目標値と、上限目標値との3段階で制御する。制御部16は、記憶部15に記憶された温度差と成績係数記憶部15bに記憶された負荷成績係数表とに基づいて、負荷を減らす熱源機50a,50bと、熱源機50a,50bに対する3段階の負荷の目標値とを定める。
負荷指令生成部16fは、熱源機50a,50bに対する調整負荷に基づく制御指令を生成する。
出力部12は、負荷指令生成部16fが生成した制御指令を熱源機50a,50bに送る。
ステップS118では、制御部16が、運転している全ての熱源機50a,50bの負荷が下限目標値であるかを判定する。運転中の全ての熱源機50a,50bの負荷が下限目標値となっていない場合には、記憶部15に下限フラグをOFFとして記憶させ、ステップS102に戻る。全ての熱源機50a,50bの負荷が下限目標値となっている場合は、記憶部15に下限フラグをONとして記憶させ、ステップS119に移行する。
ステップS119では、時間管理部13が所定の待ち時間、例えば5分間などの計測を開始させる。所定の待ち時間が経過後、温度差算出部16bが温度差算出処理を行う。その後、変更要否判定部16cが調整要否判定処理を行う。ここで、記憶部15にある下限フラグがONであり、且つ調整要否判定処理が負荷減必要と判定した場合は、ステップS120に移行する。その他の場合は、ステップS102に戻る。
出力部12は、負荷指令生成部16fが生成した制御指令を熱源機50a,50bに送る。
ステップS118では、制御部16が、運転している全ての熱源機50a,50bの負荷が下限目標値であるかを判定する。運転中の全ての熱源機50a,50bの負荷が下限目標値となっていない場合には、記憶部15に下限フラグをOFFとして記憶させ、ステップS102に戻る。全ての熱源機50a,50bの負荷が下限目標値となっている場合は、記憶部15に下限フラグをONとして記憶させ、ステップS119に移行する。
ステップS119では、時間管理部13が所定の待ち時間、例えば5分間などの計測を開始させる。所定の待ち時間が経過後、温度差算出部16bが温度差算出処理を行う。その後、変更要否判定部16cが調整要否判定処理を行う。ここで、記憶部15にある下限フラグがONであり、且つ調整要否判定処理が負荷減必要と判定した場合は、ステップS120に移行する。その他の場合は、ステップS102に戻る。
ステップS120では、運転台数調整部16eが運転台数調整処理を行い、運転する熱源機の台数を決定する。その後、運転台数調整部16eが定格能力比較処理を行い、停止する熱源機を決定する。ここでは、運転中の熱源機は、第1熱源機50aと第2熱源機50bであり、図5に示されるそれぞれの熱源機50a,50bの定格能力を比較すると、第1熱源機50aの定格能力が小さいため、第1熱源機50aの運転を停止する。負荷指令生成部16fにより制御指令が生成され、出力部12を介して第1熱源機50aに送られる。第1熱源機50aが停止し、ステップS102に戻る。
(3)特徴
(3-1)
本実施形態に係る熱源システム制御装置では、制御部16が、ヘッダ温度検出部14によって検出された第1ヘッダ20内の冷温水の温度が、設定温度記憶部15aに記憶された冷温水の設定温度となるように、熱源機50a,50b,50cを制御する。この時、それぞれの熱源機50a,50b,50cの容量および負荷特性に基づいて、それぞれの熱源機50a,50b,50cの成績係数が最大となるように効率向上制御を行う。
(3)特徴
(3-1)
本実施形態に係る熱源システム制御装置では、制御部16が、ヘッダ温度検出部14によって検出された第1ヘッダ20内の冷温水の温度が、設定温度記憶部15aに記憶された冷温水の設定温度となるように、熱源機50a,50b,50cを制御する。この時、それぞれの熱源機50a,50b,50cの容量および負荷特性に基づいて、それぞれの熱源機50a,50b,50cの成績係数が最大となるように効率向上制御を行う。
この結果、容量および/または負荷特性が異なる複数の熱源機50a,50b,50cを有する熱源システム100全体の成績係数を最大にすることができる。
(3-2)
本実施形態では、制御部16は、熱源システム100が有する、それぞれの熱源機50a,50b,50cに対して、成績係数が高い3段階の下限目標値、中央目標値、上限目標値となる負荷で熱源機50a,50b,50cを制御する。よって、熱源システム100全体の成績係数が最大に近づくように効率向上制御をすることができる。
(3-3)
本実施形態では、制御部16が、熱源機50a,50b,50cごとの運転および停止も含め、熱源機50a,50b,50cごとの負荷を制御する。よって、容量および/または負荷特性が異なる複数の熱源機50a,50b,50cを有する熱源システム全体において、効率向上制御を柔軟に行うことができる。
(3-2)
本実施形態では、制御部16は、熱源システム100が有する、それぞれの熱源機50a,50b,50cに対して、成績係数が高い3段階の下限目標値、中央目標値、上限目標値となる負荷で熱源機50a,50b,50cを制御する。よって、熱源システム100全体の成績係数が最大に近づくように効率向上制御をすることができる。
(3-3)
本実施形態では、制御部16が、熱源機50a,50b,50cごとの運転および停止も含め、熱源機50a,50b,50cごとの負荷を制御する。よって、容量および/または負荷特性が異なる複数の熱源機50a,50b,50cを有する熱源システム全体において、効率向上制御を柔軟に行うことができる。
(3-4)
本実施形態では、容量および/または負荷特性が異なる複数の熱源機50a,50b,50cを有する熱源システム100に対して、熱源システム制御装置10が、熱源機50a,50b,50cそれぞれの成績係数に関する情報に基づいて、より容易かつ確実に、熱源システム全体の総消費エネルギーに対する熱源システム全体の成績係数が最大となるように効率向上制御を行うことができる。
(3-5)
本実施形態では、熱源システム制御装置10が、容量および/または負荷特性が異なる複数の熱源機50a,50b,50cを有する熱源システム100において、熱源機の運転または停止による制御が必要な場合に、それぞれの熱源機50a,50b,50cの定格能力情報に基づいて、最適な熱源機50a,50b,50cを選択し、その運転または停止を行い、熱源システム100全体の成績係数が最大となるように効率向上制御を行うことができる。
本実施形態では、容量および/または負荷特性が異なる複数の熱源機50a,50b,50cを有する熱源システム100に対して、熱源システム制御装置10が、熱源機50a,50b,50cそれぞれの成績係数に関する情報に基づいて、より容易かつ確実に、熱源システム全体の総消費エネルギーに対する熱源システム全体の成績係数が最大となるように効率向上制御を行うことができる。
(3-5)
本実施形態では、熱源システム制御装置10が、容量および/または負荷特性が異なる複数の熱源機50a,50b,50cを有する熱源システム100において、熱源機の運転または停止による制御が必要な場合に、それぞれの熱源機50a,50b,50cの定格能力情報に基づいて、最適な熱源機50a,50b,50cを選択し、その運転または停止を行い、熱源システム100全体の成績係数が最大となるように効率向上制御を行うことができる。
(4)変形例
以上、本発明の実施形態について図面に基づいて説明したが、具体的な構成は、上記の実施形態に限られるものではなく、発明の要旨を逸脱しない範囲で変更可能である。以下に本実施形態の変形例を示す。なお、複数の変形例は適宜組み合わされてもよい。
(4-1)変形例A
上記実施形態に係る熱源システム100では、1次ポンプ41a,41b,41cから一定量の冷温水が送られている。ここで、熱源システム制御装置10は、1次ポンプ41a,41b,41cから熱源機50a,50b,50cに送る冷温水の流量を制御することにより、第1ヘッダ20に集合した冷温水の温度を設定温度に近づけてもよい。熱源システム制御装置10の制御部16は、信号線等の通信ネットワークを介して1次ポンプ41a,41b,41cの流量を制御する。
以上、本発明の実施形態について図面に基づいて説明したが、具体的な構成は、上記の実施形態に限られるものではなく、発明の要旨を逸脱しない範囲で変更可能である。以下に本実施形態の変形例を示す。なお、複数の変形例は適宜組み合わされてもよい。
(4-1)変形例A
上記実施形態に係る熱源システム100では、1次ポンプ41a,41b,41cから一定量の冷温水が送られている。ここで、熱源システム制御装置10は、1次ポンプ41a,41b,41cから熱源機50a,50b,50cに送る冷温水の流量を制御することにより、第1ヘッダ20に集合した冷温水の温度を設定温度に近づけてもよい。熱源システム制御装置10の制御部16は、信号線等の通信ネットワークを介して1次ポンプ41a,41b,41cの流量を制御する。
なお、制御部16は、それぞれの熱源機50a,50b,50cの負荷を制御している。よって、それぞれの熱源機50a,50b,50cが出力する熱量を把握している。本変形例では、それぞれの熱源機50a,50b,50cの負荷を一定とすることにより熱源機50a,50b,50cが出力する熱量を一定とする。
(4-1-1)変形例Aの熱源システム制御装置で行われる制御処理について
以下、変形例Aの熱源システム制御装置10における、熱源システム制御の処理の流れを、図7を用いて説明する。
まず、ステップS201では、初期負荷設定部16aが、初期負荷設定処理を行う。運転する熱源機50a,50b,50cの台数は、冷温水の流量を制御することで、第1ヘッダ20に集合した冷温水の温度を設定温度に近づけるため、全ての熱源機50a,50b,50cを運転する。
(4-1-1)変形例Aの熱源システム制御装置で行われる制御処理について
以下、変形例Aの熱源システム制御装置10における、熱源システム制御の処理の流れを、図7を用いて説明する。
まず、ステップS201では、初期負荷設定部16aが、初期負荷設定処理を行う。運転する熱源機50a,50b,50cの台数は、冷温水の流量を制御することで、第1ヘッダ20に集合した冷温水の温度を設定温度に近づけるため、全ての熱源機50a,50b,50cを運転する。
ステップS202では、ヘッダ温度検出部14が、実測温度を測定する。ヘッダ温度検出部14は、ヘッダ温度センサ60の出力値を検出し、記憶部15に記憶させる。
ステップS203では、温度差算出部16bが温度差算出処理を行う。制御部16は、算出した温度差を記憶部15に記憶させる。
ステップS204では、制御部16が、上述の温度差が正の値である場合は、熱源機50a,50b,50cへ送る冷温水の流量を減らすことが必要(流量減必要)と判断する。また、制御部16が、上述の温度差が負の値である場合は、熱源機50a,50b,50cへ送る冷温水の流量を増やすことが必要(流量増必要)と判定する。
ステップS205では、上述の流量減必要と判定された場合は、ステップS206へ移行する。その他の場合は、ステップS216へ移行する。
ステップS203では、温度差算出部16bが温度差算出処理を行う。制御部16は、算出した温度差を記憶部15に記憶させる。
ステップS204では、制御部16が、上述の温度差が正の値である場合は、熱源機50a,50b,50cへ送る冷温水の流量を減らすことが必要(流量減必要)と判断する。また、制御部16が、上述の温度差が負の値である場合は、熱源機50a,50b,50cへ送る冷温水の流量を増やすことが必要(流量増必要)と判定する。
ステップS205では、上述の流量減必要と判定された場合は、ステップS206へ移行する。その他の場合は、ステップS216へ移行する。
ステップS206では、制御部16が、それぞれの熱源機50a,50b,50cに送り出す冷温水の流量を、より少ない流量とする。制御部16は、1次ポンプ41a,41b,41cを制御することにより、より少ない流量とすることができる。そうすると、それぞれの熱源機50a,50b,50cから吐出される冷温水の温度は下がることとなる。本変形例では、熱源機50a,50b,50cの負荷を一定としたが、さらに熱源機50a,50b,50cの負荷を増して冷温水の温度を下げることも可能である。ステップS206の処理が終了すると、処理はステップS202に戻る。
ステップS216では、ステップS204において流量増必要と判定された場合には、ステップS217へ移行する。その他の場合は、ステップS202へ移行する。
ステップS217では、制御部16が、それぞれの熱源機50a,50b,50cに送り出す冷温水の流量を、より多い流量とする。制御部16は、1次ポンプ41a,41b,41cを制御することにより、より多い流量とすることができる。そうすると、それぞれの熱源機50a,50b,50cから吐出される冷温水の温度は上がることとなる。本変形例では、熱源機50a,50b,50cの負荷を一定としたが、さらに熱源機50a,50b,50cの負荷を減らして冷温水の温度を上げることも可能である。ステップS217の処理が終了すると、処理はステップS202に戻る。
ステップS216では、ステップS204において流量増必要と判定された場合には、ステップS217へ移行する。その他の場合は、ステップS202へ移行する。
ステップS217では、制御部16が、それぞれの熱源機50a,50b,50cに送り出す冷温水の流量を、より多い流量とする。制御部16は、1次ポンプ41a,41b,41cを制御することにより、より多い流量とすることができる。そうすると、それぞれの熱源機50a,50b,50cから吐出される冷温水の温度は上がることとなる。本変形例では、熱源機50a,50b,50cの負荷を一定としたが、さらに熱源機50a,50b,50cの負荷を減らして冷温水の温度を上げることも可能である。ステップS217の処理が終了すると、処理はステップS202に戻る。
(4-1-2)特徴
本変形例では、第1ヘッダ20に集合させた冷温水の温度を設定温度に近づけるように、それぞれに熱源機50a,50b,50cに供給される冷温水の流量と、それぞれの熱源機50a,50b,50cの負荷とを制御する。よって、容量および/または負荷特性が異なる複数の熱源機50a,50b,50cを有する熱源システムにおいて、より容易に、熱源システム全体の総消費エネルギーの効率を最大に近づけるように効率向上制御をすることができる。
(4-2)変形例B
上記変形例Aでは、制御部16が、1次ポンプ41a,41b,41cによって、それぞれの熱源機50a,50b,50cに送られる冷温水の流量を制御することにより、第1ヘッダ20に集合した冷温水の温度を設定温度に近づけていたが、これに限られるものではない。
本変形例では、第1ヘッダ20に集合させた冷温水の温度を設定温度に近づけるように、それぞれに熱源機50a,50b,50cに供給される冷温水の流量と、それぞれの熱源機50a,50b,50cの負荷とを制御する。よって、容量および/または負荷特性が異なる複数の熱源機50a,50b,50cを有する熱源システムにおいて、より容易に、熱源システム全体の総消費エネルギーの効率を最大に近づけるように効率向上制御をすることができる。
(4-2)変形例B
上記変形例Aでは、制御部16が、1次ポンプ41a,41b,41cによって、それぞれの熱源機50a,50b,50cに送られる冷温水の流量を制御することにより、第1ヘッダ20に集合した冷温水の温度を設定温度に近づけていたが、これに限られるものではない。
本変形例Bでは、図8に示すように、それぞれの熱源機50a,50b,50cが吐出する冷温水の温度を検知する出口温度センサ61a,61b,61cを、さらに備えてもよい。熱源システム制御装置10は、図9に示すように出口温度検出部17を、さらに備えてもよい。出口温度検出部17は、信号線などの通信ネットワークを介して、出口温度センサ61a,61b,61cの出力値を検知する。
熱源システム制御装置10は、それぞれの熱源機50a,50b,50cの負荷と、冷温水の流量を制御する。制御部16は、1次ポンプ41a,41b,41cを制御することにより、それぞれの熱源機50a,50b,50cが吐出する冷温水の流量を把握することができる。また、制御部16は、出口温度センサ61a,61b,61cにより、それぞれの熱源機50a,50b,50cが吐出する冷温水の温度を把握することができる。よって、第1ヘッダ20に集合される冷温水の流量と、冷温水の温度とをヘッダ温度センサ60の出力値を使用せずに把握することができる。これにより、制御部16は、1次ポンプ41a,41b,41cと熱源機50a,50b,50cの負荷とを制御することにより熱源システム100の成績係数を最大に近づけるようにそれぞれの熱源機50a,50b,50cを制御する。そして、第1ヘッダ20に集合した冷温水の温度を設定温度に近づけてもよい。
熱源システム制御装置10は、それぞれの熱源機50a,50b,50cの負荷と、冷温水の流量を制御する。制御部16は、1次ポンプ41a,41b,41cを制御することにより、それぞれの熱源機50a,50b,50cが吐出する冷温水の流量を把握することができる。また、制御部16は、出口温度センサ61a,61b,61cにより、それぞれの熱源機50a,50b,50cが吐出する冷温水の温度を把握することができる。よって、第1ヘッダ20に集合される冷温水の流量と、冷温水の温度とをヘッダ温度センサ60の出力値を使用せずに把握することができる。これにより、制御部16は、1次ポンプ41a,41b,41cと熱源機50a,50b,50cの負荷とを制御することにより熱源システム100の成績係数を最大に近づけるようにそれぞれの熱源機50a,50b,50cを制御する。そして、第1ヘッダ20に集合した冷温水の温度を設定温度に近づけてもよい。
(4-2-1)変形例Bの熱源システム制御装置で行われる制御処理について
以下、変形例Bの熱源システム制御装置10における、熱源システム制御の処理の流れを、図10を用いて説明する。
まず、ステップS301では、初期負荷設定部16aが、初期負荷設定処理を行う。運転する熱源機50a,50b,50cの台数は、冷温水の流量と熱源機50a,50b,50cの負荷とを制御することで、第1ヘッダ20に集合した冷温水の温度を設定温度に近づけるため、全ての熱源機50a,50b,50cを運転する。
ステップS302では、ヘッダ温度検出部14が実測温度を測定する。ヘッダ温度検出部14は、ヘッダ温度センサ60の出力値を検出し、記憶部15に記憶させる。
ステップS303では、温度差算出部16bが、温度差算出処理を行う。制御部16は、算出して温度差を記憶部15に記憶させる。
以下、変形例Bの熱源システム制御装置10における、熱源システム制御の処理の流れを、図10を用いて説明する。
まず、ステップS301では、初期負荷設定部16aが、初期負荷設定処理を行う。運転する熱源機50a,50b,50cの台数は、冷温水の流量と熱源機50a,50b,50cの負荷とを制御することで、第1ヘッダ20に集合した冷温水の温度を設定温度に近づけるため、全ての熱源機50a,50b,50cを運転する。
ステップS302では、ヘッダ温度検出部14が実測温度を測定する。ヘッダ温度検出部14は、ヘッダ温度センサ60の出力値を検出し、記憶部15に記憶させる。
ステップS303では、温度差算出部16bが、温度差算出処理を行う。制御部16は、算出して温度差を記憶部15に記憶させる。
ステップS304では、変更要否判定部16cが調整要否判定処理を行う。変更要否判定部16cは、温度差算出処理の結果、温度差がある場合は、負荷増必要または負荷減必要の判定を行う。
ステップS305では、上述の負荷増必要と判定された場合は、ステップS306へ移行する。その他の場合は、ステップS316へ移行する。
ステップS306では、出口温度検出部17が、それぞれの出口温度センサ61a,61b,61cの出力値である出口温度を検出する。出口温度検出部17は、検出した出口温度を記憶部15に記憶する。
ステップS307では、制御部16が、それぞれの熱源機50a,50b,50cの出口温度と、それぞれの熱源機50a,50b,50cが吐出する流量とを決定する。上述の出口温度と流量の決定は、実測温度が設定温度に近づき、冷温水の流量が熱源システム100が必要とする冷温水の流量となるようになされる。制御部16は、ステップS304で負荷増必要の判断がされているので、それぞれの熱源機50a,50b,50cの出口温度と、制御部16が決定したそれぞれの熱源機50a,50b,50cの出口温度と、の温度差に基づき、それぞれの熱源機50a,50b,50cの負荷を増やす。さらに、吐出する冷温水の流量制御を行う。そして、制御部16は、制御部16が決定したそれぞれの熱源機50a,50b,50cの出口温度にする。さらに、制御部16は、制御部16が決定した上述のそれぞれの熱源機50a,50b,50cが吐出する流量にする。ステップS307の処理が終了すると、処理はステップS302に戻る。
ステップS305では、上述の負荷増必要と判定された場合は、ステップS306へ移行する。その他の場合は、ステップS316へ移行する。
ステップS306では、出口温度検出部17が、それぞれの出口温度センサ61a,61b,61cの出力値である出口温度を検出する。出口温度検出部17は、検出した出口温度を記憶部15に記憶する。
ステップS307では、制御部16が、それぞれの熱源機50a,50b,50cの出口温度と、それぞれの熱源機50a,50b,50cが吐出する流量とを決定する。上述の出口温度と流量の決定は、実測温度が設定温度に近づき、冷温水の流量が熱源システム100が必要とする冷温水の流量となるようになされる。制御部16は、ステップS304で負荷増必要の判断がされているので、それぞれの熱源機50a,50b,50cの出口温度と、制御部16が決定したそれぞれの熱源機50a,50b,50cの出口温度と、の温度差に基づき、それぞれの熱源機50a,50b,50cの負荷を増やす。さらに、吐出する冷温水の流量制御を行う。そして、制御部16は、制御部16が決定したそれぞれの熱源機50a,50b,50cの出口温度にする。さらに、制御部16は、制御部16が決定した上述のそれぞれの熱源機50a,50b,50cが吐出する流量にする。ステップS307の処理が終了すると、処理はステップS302に戻る。
ステップS316では、上述の負荷減必要と判定された場合は、ステップS317へ移行する。その他の場合は、ステップS302へ移行する。
ステップS317では、出口温度検出部17が、それぞれの出口温度センサ61a,61b,61cの出力値である出口温度を検出する。出口温度検出部17は、検出した出口温度を記憶部15に記憶する。
ステップS318では、制御部16が、それぞれの熱源機50a,50b,50cの出口温度と、それぞれの熱源機50a,50b,50cが吐出する流量とを決定する。上述の出口温度と流量の決定は、実測温度が設定温度に近づき、冷温水の流量が熱源システム100が必要とする冷温水の流量となるようになされる。制御部16は、ステップS304で負荷減必要の判断がされているので、それぞれの熱源機50a,50b,50cの出口温度と、制御部16が決定した決定したそれぞれの熱源機50a,50b,50cの出口温度と、の温度差に基づき、それぞれの熱源機50a,50b,50cの負荷を減らす。さらに、吐出する冷温水の流量制御を行う。そして、制御部16は、制御部16が決定したそれぞれの熱源機50a,50b,50cの出口温度にする。さらに、制御部16は、制御部16が決定した上述のそれぞれの熱源機50a,50b,50cが吐出する流量にする。ステップS318の処理が終了すると、処理はステップS302に戻る。
ステップS317では、出口温度検出部17が、それぞれの出口温度センサ61a,61b,61cの出力値である出口温度を検出する。出口温度検出部17は、検出した出口温度を記憶部15に記憶する。
ステップS318では、制御部16が、それぞれの熱源機50a,50b,50cの出口温度と、それぞれの熱源機50a,50b,50cが吐出する流量とを決定する。上述の出口温度と流量の決定は、実測温度が設定温度に近づき、冷温水の流量が熱源システム100が必要とする冷温水の流量となるようになされる。制御部16は、ステップS304で負荷減必要の判断がされているので、それぞれの熱源機50a,50b,50cの出口温度と、制御部16が決定した決定したそれぞれの熱源機50a,50b,50cの出口温度と、の温度差に基づき、それぞれの熱源機50a,50b,50cの負荷を減らす。さらに、吐出する冷温水の流量制御を行う。そして、制御部16は、制御部16が決定したそれぞれの熱源機50a,50b,50cの出口温度にする。さらに、制御部16は、制御部16が決定した上述のそれぞれの熱源機50a,50b,50cが吐出する流量にする。ステップS318の処理が終了すると、処理はステップS302に戻る。
(4-2-2)特徴
本変形例では、それぞれの熱源機50a,50b,50cの冷温水の出口温度を出口温度検出部17が検出し、それぞれの熱源機50a,50b,50cの冷温水の流量を制御部16が制御する。よって、制御部16は、それぞれの熱源機50a,50b,50cの冷温水の出口温度と流量に基づき、それぞれの熱源機50a,50b,50cの負荷と冷温水の流量を制御する。よって、より容易かつ確実に第1ヘッダ20における冷温水の温度と流量を制御することができる。また、熱源システム100全体の成績係数が最大となるように熱源システムに対して効率向上制御をかけることができる。
本変形例では、それぞれの熱源機50a,50b,50cの冷温水の出口温度を出口温度検出部17が検出し、それぞれの熱源機50a,50b,50cの冷温水の流量を制御部16が制御する。よって、制御部16は、それぞれの熱源機50a,50b,50cの冷温水の出口温度と流量に基づき、それぞれの熱源機50a,50b,50cの負荷と冷温水の流量を制御する。よって、より容易かつ確実に第1ヘッダ20における冷温水の温度と流量を制御することができる。また、熱源システム100全体の成績係数が最大となるように熱源システムに対して効率向上制御をかけることができる。
本発明は、複数の熱源機と、熱源機から供給される冷温水が集合するヘッダとを有する熱源システムに適用可能である。
10 熱源システム制御装置
20 第1ヘッダ(ヘッダ)
21 第2ヘッダ
32a 第1空調機
32b 第2空調機
32c 第3空調機
41a 第1の1次ポンプ
41b 第2の1次ポンプ
41c 第3の1次ポンプ
50a 第1熱源機
50b 第2熱源機
50c 第3熱源機
60 ヘッダ温度センサ
70 上流側配管
71 下流側配管
100 熱源システム
200 エネルギー管理システム
20 第1ヘッダ(ヘッダ)
21 第2ヘッダ
32a 第1空調機
32b 第2空調機
32c 第3空調機
41a 第1の1次ポンプ
41b 第2の1次ポンプ
41c 第3の1次ポンプ
50a 第1熱源機
50b 第2熱源機
50c 第3熱源機
60 ヘッダ温度センサ
70 上流側配管
71 下流側配管
100 熱源システム
200 エネルギー管理システム
Claims (6)
- 容量および/または負荷特性が異なる複数の熱源機(50a,50b,50c)と、前記複数の熱源機から供給される冷温水を集合させるヘッダ(20)と、前記ヘッダに集合させた冷温水の温度を測定するヘッダ温度センサ(60)と、を有する熱源システム(100)、を制御する熱源システム制御装置(10)であって、
前記ヘッダの前記冷温水の設定温度を記憶する設定温度記憶部(15a)と、
前記ヘッダ温度センサの出力値を検出するヘッダ温度検出部(14)と、
前記複数の熱源機に、それぞれの容量および/または負荷特性に基づいて効率向上制御をかけ、前記冷温水の温度を前記設定温度に近づける、制御部(16)と、
を備える熱源システム制御装置。 - 前記制御部は、前記複数の熱源機それぞれの個別の運転および停止と、前記複数の熱源機それぞれの個別の負荷との少なくともいずれか一つを制御する、
請求項1に記載の熱源システム制御装置。 - 前記複数の熱源機それぞれの負荷に応じた成績係数に関する情報を、成績係数情報として記憶する成績係数記憶部(15b)をさらに備え、
前記制御部は、前記成績係数記憶部に記憶した前記成績係数情報を参照し、前記成績係数が高い負荷で前記複数の熱源機それぞれを運転させる、
請求項1または請求項2に記載の熱源システム制御装置。 - 前記複数の熱源機それぞれの定格能力に関する情報を、定格能力情報として記憶する定格能力記憶部(15c)をさらに備え、
前記制御部は、前記定格能力記憶部に記憶した前記定格能力情報に基づき運転または停止する熱源機を決める、
請求項1から3のいずれか1項に記載の熱源システム制御装置。 - 前記熱源システムは、前記複数の熱源機それぞれに前記冷温水を供給する複数のポンプ(41a,41b,41c)をさらに有し、
前記制御部は、前記複数のポンプから供給される前記冷温水の流量を制御することにより前記ヘッダに集合させた前記冷温水の温度を調整する、
請求項1から4のいずれか1項に記載の熱源システム制御装置。 - 前記熱源システムは、前記複数の熱源機それぞれの出口近傍に配置され、前記ヘッダに供給される前記冷温水の温度である出口温度を測定する複数の出口温度センサ(61a,61b,61c)をさらに有し、
前記複数の出口温度センサの出力値を検出する出口温度検出部(17)をさらに備え、
前記制御部は、前記複数の熱源機それぞれの前記出口温度と、前記複数の熱源機それぞれから供給される冷温水の流量とに基づいて、前記複数の熱源機それぞれの負荷と前記複数のポンプから供給される前記冷温水の流量とを制御することにより、前記ヘッダ内の前記冷温水の温度を調整する、
請求項5に記載の熱源システム制御装置。
Priority Applications (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
EP13842395.9A EP2918933A4 (en) | 2012-09-26 | 2013-05-15 | HEAT SOURCE SYSTEM CONTROL DEVICE |
CN201380049988.4A CN104736939A (zh) | 2012-09-26 | 2013-05-15 | 热源系统控制装置 |
US14/430,521 US20150211762A1 (en) | 2012-09-26 | 2013-05-15 | Heat source system control device |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2012212567A JP5447627B1 (ja) | 2012-09-26 | 2012-09-26 | 熱源システム制御装置 |
JP2012-212567 | 2012-09-26 |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2014050200A1 true WO2014050200A1 (ja) | 2014-04-03 |
Family
ID=50387619
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/JP2013/063544 WO2014050200A1 (ja) | 2012-09-26 | 2013-05-15 | 熱源システム制御装置 |
Country Status (5)
Country | Link |
---|---|
US (1) | US20150211762A1 (ja) |
EP (1) | EP2918933A4 (ja) |
JP (1) | JP5447627B1 (ja) |
CN (1) | CN104736939A (ja) |
WO (1) | WO2014050200A1 (ja) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP6345088B2 (ja) * | 2014-04-07 | 2018-06-20 | 積水化学工業株式会社 | 空調システム及び建物 |
JP6676490B2 (ja) * | 2016-07-12 | 2020-04-08 | 東芝キヤリア株式会社 | 熱源装置およびその制御方法 |
CN108626923B (zh) * | 2017-03-15 | 2021-10-22 | 约克广州空调冷冻设备有限公司 | 一种空调系统的控制结构以及控制方法 |
JP2023137404A (ja) * | 2022-03-18 | 2023-09-29 | ダイキン工業株式会社 | 熱源システム |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH10311585A (ja) * | 1997-05-12 | 1998-11-24 | Chubu Electric Power Co Inc | 蓄熱式空気調和機のデマンド制御装置 |
JP2005114295A (ja) | 2003-10-09 | 2005-04-28 | Takasago Thermal Eng Co Ltd | 熱源システム及び制御装置 |
JP2011137611A (ja) * | 2009-12-28 | 2011-07-14 | Sanyo Electric Co Ltd | 熱源機、熱源システム、熱源機の運転制御方法 |
JP2012145263A (ja) * | 2011-01-11 | 2012-08-02 | Hitachi Plant Technologies Ltd | 熱源システム、その制御方法およびそのプログラム |
Family Cites Families (20)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4187543A (en) * | 1977-10-25 | 1980-02-05 | United Technologies Corporation | Temperature control of chill water and steam in heating, ventilation, air conditioning (HVAC) systems |
US4210957A (en) * | 1978-05-08 | 1980-07-01 | Honeywell Inc. | Operating optimization for plural parallel connected chillers |
US4463574A (en) * | 1982-03-15 | 1984-08-07 | Honeywell Inc. | Optimized selection of dissimilar chillers |
US5195329A (en) * | 1991-11-12 | 1993-03-23 | Carrier Corporation | Automatic chiller plant balancing |
US6453993B1 (en) * | 2000-05-17 | 2002-09-24 | Carrier Corporation | Advanced starting control for multiple zone system |
US7857233B2 (en) * | 2006-09-01 | 2010-12-28 | Flow Design, Inc. | Electronically based control valve with feedback to a building management system (BMS) |
JP4539777B2 (ja) * | 2008-02-01 | 2010-09-08 | ダイキン工業株式会社 | 貯湯式給湯機および貯湯式暖房給湯機 |
DE102008057730A1 (de) * | 2008-11-17 | 2010-05-20 | Brüning, Olaf | Verfahren zum Betreiben eines Systems zum Transport thermischer Energie über ein flüssiges Medium |
US8939196B2 (en) * | 2009-02-13 | 2015-01-27 | Toshiba Carrier Corporation | Secondary pump type heat source and secondary pump type heat source control method |
US9500376B2 (en) * | 2009-03-30 | 2016-11-22 | Mitsubishi Electric Corporation | Fluid heating system, fluid heating method, fluid heating control system, control apparatus, and control method |
JP5460701B2 (ja) * | 2009-05-08 | 2014-04-02 | 三菱電機株式会社 | 空気調和装置 |
IT1399586B1 (it) * | 2009-05-15 | 2013-04-26 | Rhoss S P A | Metodo e sistema per controllare una pluralita' di macchine frigorifere di un impianto di climatizzazione |
JP5404333B2 (ja) * | 2009-11-13 | 2014-01-29 | 三菱重工業株式会社 | 熱源システム |
JP5558400B2 (ja) * | 2011-03-30 | 2014-07-23 | 三菱重工業株式会社 | 熱源システム及び熱源システムの台数制御方法 |
ES2584409T3 (es) * | 2011-07-29 | 2016-09-27 | Carrier Corporation | Sistemas de HVAC |
JP5403076B2 (ja) * | 2012-01-13 | 2014-01-29 | ダイキン工業株式会社 | エネルギー制御装置 |
JP5836156B2 (ja) * | 2012-02-28 | 2015-12-24 | 三菱重工業株式会社 | 熱源システム及びその熱媒流量制御方法 |
JP5787792B2 (ja) * | 2012-02-29 | 2015-09-30 | 三菱重工業株式会社 | 熱源システムの台数制御装置及びその方法並びに熱源システム |
US20130240172A1 (en) * | 2012-03-13 | 2013-09-19 | Victaulic Company | Hydronic System and Control Method |
JP5984456B2 (ja) * | 2012-03-30 | 2016-09-06 | 三菱重工業株式会社 | 熱源システムの制御装置、熱源システムの制御方法、熱源システム、電力調整ネットワークシステム、及び熱源機の制御装置 |
-
2012
- 2012-09-26 JP JP2012212567A patent/JP5447627B1/ja not_active Expired - Fee Related
-
2013
- 2013-05-15 US US14/430,521 patent/US20150211762A1/en not_active Abandoned
- 2013-05-15 WO PCT/JP2013/063544 patent/WO2014050200A1/ja active Application Filing
- 2013-05-15 EP EP13842395.9A patent/EP2918933A4/en not_active Withdrawn
- 2013-05-15 CN CN201380049988.4A patent/CN104736939A/zh active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH10311585A (ja) * | 1997-05-12 | 1998-11-24 | Chubu Electric Power Co Inc | 蓄熱式空気調和機のデマンド制御装置 |
JP2005114295A (ja) | 2003-10-09 | 2005-04-28 | Takasago Thermal Eng Co Ltd | 熱源システム及び制御装置 |
JP2011137611A (ja) * | 2009-12-28 | 2011-07-14 | Sanyo Electric Co Ltd | 熱源機、熱源システム、熱源機の運転制御方法 |
JP2012145263A (ja) * | 2011-01-11 | 2012-08-02 | Hitachi Plant Technologies Ltd | 熱源システム、その制御方法およびそのプログラム |
Non-Patent Citations (1)
Title |
---|
See also references of EP2918933A4 |
Also Published As
Publication number | Publication date |
---|---|
EP2918933A4 (en) | 2016-07-13 |
CN104736939A (zh) | 2015-06-24 |
EP2918933A1 (en) | 2015-09-16 |
JP5447627B1 (ja) | 2014-03-19 |
JP2014066453A (ja) | 2014-04-17 |
US20150211762A1 (en) | 2015-07-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105318494B (zh) | 空气调节器及其控制方法 | |
US10422547B2 (en) | Air-conditioning apparatus | |
KR101508448B1 (ko) | 열원 시스템 및 열원 시스템의 대수 제어 방법 | |
CN104913445B (zh) | 风机档位的控制方法、风机档位的控制系统和空调器 | |
CN101650552B (zh) | 多联式变频空调能力预测控制系统和方法 | |
JP5447627B1 (ja) | 熱源システム制御装置 | |
CN105546745B (zh) | 一种中央空调主机机组群控方法和装置 | |
JP6327558B2 (ja) | 空気調和装置 | |
CN105299824B (zh) | 空气调节器及其控制方法 | |
CN107655180B (zh) | 运行控制方法、运行控制装置和多联机式空调器系统 | |
CN104566769B (zh) | 空调节能控制方法和系统 | |
JP6482826B2 (ja) | 熱源システム及びその制御装置並びに制御方法 | |
CN107314505B (zh) | 一种变频空调机组自适应控制方法 | |
CN113432354B (zh) | 空气源热泵控制方法、装置、空气源热泵和存储介质 | |
JPWO2021033231A1 (ja) | 情報処理装置 | |
WO2018214766A1 (zh) | 一种变频空调器控制方法、控制设备和变频空调器 | |
JP6345397B2 (ja) | 制御装置及び方法並びにプログラム、それを備えた空気調和装置 | |
CN112212471B (zh) | 空调系统及其压缩机控制方法 | |
JP5538191B2 (ja) | 冷温水システム及び冷温水システムのポンプ制御方法 | |
JPWO2015092845A1 (ja) | ヒートポンプ給湯装置 | |
CN105180342B (zh) | 空气调节器及其控制方法 | |
CN114517957B (zh) | 一种多联机控制方法及多联机 | |
CN113834180B (zh) | 一种多联机长连管输出自适应方法、装置及系统 | |
CN113883663A (zh) | 一种冷机出水温度的控制方法、装置及空调设备 | |
JP5963305B2 (ja) | 発電プラントの給水流量制御装置、および、通風流量制御装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 13842395 Country of ref document: EP Kind code of ref document: A1 |
|
WWE | Wipo information: entry into national phase |
Ref document number: 14430521 Country of ref document: US |
|
NENP | Non-entry into the national phase |
Ref country code: DE |
|
REEP | Request for entry into the european phase |
Ref document number: 2013842395 Country of ref document: EP |
|
WWE | Wipo information: entry into national phase |
Ref document number: 2013842395 Country of ref document: EP |