WO2013129499A1 - 制御装置、制御システム及び蓄電池制御方法 - Google Patents

制御装置、制御システム及び蓄電池制御方法 Download PDF

Info

Publication number
WO2013129499A1
WO2013129499A1 PCT/JP2013/055195 JP2013055195W WO2013129499A1 WO 2013129499 A1 WO2013129499 A1 WO 2013129499A1 JP 2013055195 W JP2013055195 W JP 2013055195W WO 2013129499 A1 WO2013129499 A1 WO 2013129499A1
Authority
WO
WIPO (PCT)
Prior art keywords
storage battery
type
storage batteries
information
charge
Prior art date
Application number
PCT/JP2013/055195
Other languages
English (en)
French (fr)
Inventor
裕高 佐藤
Original Assignee
京セラ株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 京セラ株式会社 filed Critical 京セラ株式会社
Priority to US14/380,963 priority Critical patent/US9735591B2/en
Priority to JP2014502321A priority patent/JP5890513B2/ja
Priority to EP13754672.7A priority patent/EP2822138B1/en
Publication of WO2013129499A1 publication Critical patent/WO2013129499A1/ja

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J7/00Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
    • H02J7/00047Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries with provisions for charging different types of batteries
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J7/00Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
    • H02J7/00032Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries characterised by data exchange
    • H02J7/00036Charger exchanging data with battery
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J7/00Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
    • H02J7/00032Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries characterised by data exchange
    • H02J7/00038Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries characterised by data exchange using passive battery identification means, e.g. resistors or capacitors
    • H02J7/00041Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries characterised by data exchange using passive battery identification means, e.g. resistors or capacitors in response to measured battery parameters, e.g. voltage, current or temperature profile
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J7/00Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
    • H02J7/0013Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries acting upon several batteries simultaneously or sequentially
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J7/00Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
    • H02J7/0013Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries acting upon several batteries simultaneously or sequentially
    • H02J7/0025Sequential battery discharge in systems with a plurality of batteries
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01MPROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY
    • H01M10/00Secondary cells; Manufacture thereof
    • H01M10/42Methods or arrangements for servicing or maintenance of secondary cells or secondary half-cells
    • H01M10/4207Methods or arrangements for servicing or maintenance of secondary cells or secondary half-cells for several batteries or cells simultaneously or sequentially
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01MPROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY
    • H01M10/00Secondary cells; Manufacture thereof
    • H01M10/42Methods or arrangements for servicing or maintenance of secondary cells or secondary half-cells
    • H01M10/425Structural combination with electronic components, e.g. electronic circuits integrated to the outside of the casing
    • H01M10/4257Smart batteries, e.g. electronic circuits inside the housing of the cells or batteries
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01MPROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY
    • H01M10/00Secondary cells; Manufacture thereof
    • H01M10/42Methods or arrangements for servicing or maintenance of secondary cells or secondary half-cells
    • H01M10/425Structural combination with electronic components, e.g. electronic circuits integrated to the outside of the casing
    • H01M2010/4271Battery management systems including electronic circuits, e.g. control of current or voltage to keep battery in healthy state, cell balancing
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01MPROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY
    • H01M10/00Secondary cells; Manufacture thereof
    • H01M10/42Methods or arrangements for servicing or maintenance of secondary cells or secondary half-cells
    • H01M10/425Structural combination with electronic components, e.g. electronic circuits integrated to the outside of the casing
    • H01M2010/4278Systems for data transfer from batteries, e.g. transfer of battery parameters to a controller, data transferred between battery controller and main controller
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2310/00The network for supplying or distributing electric power characterised by its spatial reach or by the load
    • H02J2310/50The network for supplying or distributing electric power characterised by its spatial reach or by the load for selectively controlling the operation of the loads
    • H02J2310/56The network for supplying or distributing electric power characterised by its spatial reach or by the load for selectively controlling the operation of the loads characterised by the condition upon which the selective controlling is based
    • H02J2310/62The condition being non-electrical, e.g. temperature
    • H02J2310/64The condition being economic, e.g. tariff based load management
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/12Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load
    • H02J3/14Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load by switching loads on to, or off from, network, e.g. progressively balanced loading
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/28Arrangements for balancing of the load in a network by storage of energy
    • H02J3/32Arrangements for balancing of the load in a network by storage of energy using batteries with converting means
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J7/00Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
    • H02J7/0063Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries with circuits adapted for supplying loads from the battery
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02E60/10Energy storage using batteries
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems
    • Y04S20/222Demand response systems, e.g. load shedding, peak shaving
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S50/00Market activities related to the operation of systems integrating technologies related to power network operation or related to communication or information technologies
    • Y04S50/10Energy trading, including energy flowing from end-user application to grid

Definitions

  • the present invention relates to a control device, a control system, and a storage battery control method for controlling a plurality of storage batteries provided in a power consumer.
  • HEMS residential energy management system
  • Patent Document 1 a technique for distributing a plurality of storage batteries in a house has been proposed (for example, see Patent Document 1).
  • an object of the present invention is to provide a control device, a control system, and a storage battery control method that can efficiently control a plurality of storage batteries provided in a consumer.
  • the present invention has the following features.
  • the control device of the present invention is a control device that controls a plurality of storage batteries provided in a power consumer, the acquisition unit acquiring information on the type and / or deterioration degree of each of the plurality of storage batteries, and the plurality And a charge / discharge control unit that controls charge / discharge of each of the plurality of storage batteries based on the information on the type and / or the degree of deterioration of each of the storage batteries.
  • the acquisition unit may acquire information on the type and / or the degree of deterioration of the predetermined storage battery by communicating with a predetermined storage battery included in the plurality of storage batteries.
  • the acquisition unit may acquire information on the type and / or deterioration level of the predetermined storage battery by measuring charge / discharge characteristics of the predetermined storage battery included in the plurality of storage batteries.
  • the acquisition unit acquires information on the type and / or deterioration level of the predetermined storage battery by comparing charge / discharge characteristics of the predetermined storage battery with a charge / discharge pattern for each type and / or deterioration level. May be.
  • the charge / discharge control unit may change each of the plurality of storage batteries to each of the plurality of power supplies based on the type and / or deterioration degree information of each of the plurality of storage batteries. And may be controlled in association with each other.
  • the charge / discharge control unit distributes the storage battery of a type suitable for auxiliary charging to the distributed Control may be performed in association with the mold power source.
  • the charge / discharge control unit converts the storage battery of a type not suitable for supplementary charging to the system power supply. And may be controlled in association with each other.
  • the charge / discharge control unit may determine the association between each of the plurality of storage batteries and each of the plurality of power supplies for each time period.
  • the charge / discharge control unit may set the priority of charge / discharge of each of the plurality of storage batteries based on the information on the degree of deterioration of each of the plurality of storage batteries.
  • the charge / discharge control unit performs discharge of the storage battery of a type not suitable for auxiliary charging.
  • the discharge of the storage battery of the type not suitable for the auxiliary charge may be preferentially performed over the discharge of the storage battery of the type suitable for the auxiliary charge.
  • the control system of the present invention is a control system that controls a plurality of storage batteries provided in a power consumer, an acquisition unit that acquires information on the type and / or degree of deterioration of each of the plurality of storage batteries, and the plurality And a charge / discharge control unit that controls charge / discharge of each of the plurality of storage batteries based on the information on the type and / or the degree of deterioration of each of the storage batteries.
  • the power control method of the present invention is a storage battery control method applied to a control system for controlling a plurality of storage batteries provided in a power consumer, and information on the type and / or deterioration level of each of the plurality of storage batteries. Step A to be acquired and Step B for controlling charging / discharging of each of the plurality of storage batteries based on information on the type and / or degree of deterioration of each of the plurality of storage batteries.
  • control device it is possible to provide a control device, a control system, and a storage battery control method that can efficiently control a plurality of storage batteries provided in a consumer.
  • FIG. 1 is a block diagram of a control system according to the embodiment.
  • FIG. 2 is a block diagram of the HEMS according to the embodiment.
  • FIG. 3 shows an example of storage battery information according to the embodiment.
  • FIG. 4 is an operation flowchart of the storage battery information acquisition operation in the HEMS according to the embodiment.
  • FIG. 5 is an operation flowchart of charge / discharge control operation in the HEMS according to the embodiment.
  • FIG. 6 is a diagram for explaining a specific example of the charge / discharge schedule according to the embodiment.
  • FIG. 1 is a block diagram of a control system according to this embodiment.
  • the solid line between blocks shows a power line
  • the broken line between blocks shows a control line.
  • the control line may be wireless.
  • the control system includes a system power supply 1, a plurality of storage batteries 10, a distributed power supply 20, one or a plurality of load devices 30, a distribution board 40, and a HEMS 100.
  • the some storage battery 10 comprises a storage battery group.
  • the storage battery 10, the distributed power supply 20, the load device 30, the distribution board 40, and the HEMS 100 are provided in a house H as a consumer who receives power supply from the system power supply 1.
  • the system power supply 1 is an example of a power supply.
  • the system power supply 1 is managed by an electric power company and supplies electric power to the house H.
  • the system power supply 1 can always supply stable power to the house H unless a power failure occurs.
  • the charge of power supplied from the system power supply 1 to the house H is set at a lower price than in other time zones at midnight when the power demand is low.
  • the storage battery 10 is charged by electric power input via the distribution board 40.
  • the storage battery 10 supplies power to the load device 30 via the distribution board 40 by discharging.
  • Each charging / discharging of the storage battery 10 is controlled by the HEMS 100.
  • the storage batteries 10 are not unified with the same type of storage battery, and different types of storage batteries are mixed.
  • the storage battery 10-1 is a type of storage battery suitable for auxiliary charging
  • the storage battery 10-2 is a type of storage battery not suitable for auxiliary charging.
  • a storage battery of a type suitable for supplementary charging is a storage battery in which even if charging (so-called “additional charging”) is performed before the stored power is completely discharged, performance degradation due to the memory effect or the like hardly occurs.
  • Examples of such a storage battery include a lithium ion battery.
  • a storage battery of a type that is not suitable for supplementary charging is a storage battery that is liable to deteriorate in performance due to the memory effect or the like when additional charging is performed.
  • Examples of such a storage battery include a nickel cadmium battery, a nickel hydrogen battery, and a lead storage battery.
  • the storage battery 10 may have a function of managing information about itself (for example, type, number of days used, capacity, number of times of charging, and number of times of discharging).
  • the distributed power source 20 is an example of a power source.
  • the distributed power source 20 refers to a power generator that supplies power to the load device 30 and / or the storage battery 10 via the distribution board 40 by generating power.
  • the distributed power source 20 may be a type of distributed power source that can control the amount of power generation, or may be a type of distributed power source that cannot control the amount of power generation.
  • a “distributed power source of a type that can control the amount of power generation” is a distributed power source that generates power using gas or the like, for example, a fuel such as SOFC (Solid Oxide Fuel Cell) or PEFC (Polymer Electrolyte Fuel Cell). Includes batteries and gas turbine generators.
  • SOFC Solid Oxide Fuel Cell
  • PEFC Polymer Electrolyte Fuel Cell
  • a distributed power source of a type whose power generation amount cannot be controlled is a distributed power source that generates power using natural energy (renewable energy), and includes, for example, a solar cell and a wind power generator. .
  • a distributed power source can cause the generated power to flow backward (so-called power sale) to the system power source 1.
  • load following control cannot be applied to such a distributed power source.
  • the load device 30 operates by consuming electric power input via the distribution board 40.
  • the load device 30 is, for example, a home appliance (such as a refrigerator, an air conditioner, and a lighting device) provided in the house H.
  • Distribution board 40 supplies power from system power supply 1 to load device 30 and storage battery 10.
  • the distribution board 40 supplies power from the storage battery 10 to the load device 30 or supplies power from the distributed power source 20 to the load device 30 and the storage battery 10. Further, when the distributed power source 20 is a distributed power source that generates power using natural energy (renewable energy), the distribution board 40 reverses the power generated by the distributed power source 20 to the system power source 1. You may let them.
  • the distribution board 40 changes the internal connection state according to the control of the HEMS 100.
  • the distribution board 40 can electrically connect / disconnect any storage battery 10 to / from the distributed power source 20, or electrically connect / disconnect any storage battery 10 to / from the system power supply 1. .
  • the distribution board 40 includes a sensor 41 for measuring various kinds of electric power.
  • the distribution board 40 notifies the HEMS 100 of power information detected by the sensor 41.
  • the sensor 41 detects, for example, the amount of power purchased from the system power source 1, the amount of power sold to the system power source 1, the amount of power generated by the distributed power source 20, and the amount of charge / discharge power of the storage battery 10.
  • the HEMS 100 communicates with each of the storage battery 10, the distributed power source 20, the load device 30, and the distribution board 40 to control each of the storage battery 10, the distributed power source 20, the load device 30, and the distribution board 40.
  • the HEMS 100 will be described.
  • FIG. 2 is a block diagram of the HEMS 100.
  • the HEMS 100 includes a display unit 110, an input unit 120, a communication unit 130, a storage unit 140, and a control unit 150.
  • the display unit 110 performs various displays under the control of the control unit 150.
  • the input unit 120 receives input from the user and outputs the input content to the control unit 150.
  • the display unit 110 and the input unit 120 may be integrated as a touch panel.
  • the communication unit 130 communicates with each device (the storage battery 10, the distributed power source 20, the load device 30, and the distribution board 40) provided in the house H under the control of the control unit 150.
  • the communication unit 130 may be a Zigbee (registered trademark) module for performing wireless communication with each device provided in the house H.
  • the storage unit 140 stores various information used for control by the control unit 150.
  • the storage unit 140 stores information related to the storage battery 10 (hereinafter referred to as “storage battery information”).
  • the storage battery information includes information on the type (for example, lithium ion or lead) of the storage battery 10. Further, the storage battery information may include information on the degree of deterioration of the storage battery 10 (for example, the number of days used, the number of times of charging, and the number of times of discharging). Furthermore, the storage battery information may include information on the capacity of the storage battery 10.
  • FIG. 3 shows an example of storage battery information stored in the storage unit 140.
  • the type “lithium ion”, the number of use days “150 days”, the capacity “2 kWh”, the charge count “100 times”, and the discharge count “120 times” are stored. ing. These pieces of information are similarly stored for other storage batteries.
  • the control unit 150 includes an information acquisition unit 151, an information management unit 152, a schedule determination unit 153, and a storage battery control unit 154.
  • the information acquisition unit 151 acquires storage battery information of the storage battery 10 using the communication unit 130.
  • the information acquisition unit 151 acquires storage battery information of the newly installed storage battery 10 and stores the acquired storage battery information in the storage unit 140.
  • the information acquisition unit 151 acquires the storage battery information of the newly installed storage battery 10 by communicating with the newly installed storage battery 10 using the communication unit 130.
  • the storage battery 10 may transmit its storage battery information to the information acquisition unit 151 in a format compliant with a communication protocol such as Echonet Lite.
  • the information acquisition unit 151 may further request the storage battery 10 to transmit necessary storage battery information after receiving the storage battery information from the storage battery 10. In this case, it is assumed that the newly installed storage battery 10 manages its own storage battery information.
  • the information acquisition unit 151 uses the communication unit 130 to measure the charge / discharge characteristics of the newly installed storage battery 10, thereby The storage battery information of the newly installed storage battery 10 is acquired. For example, the information acquisition unit 151 periodically acquires charge / discharge power detected by the sensor 41 while instructing charge / discharge to the newly installed storage battery 10 using the communication unit 130. The charge / discharge characteristics of the newly installed storage battery 10 are measured. The storage unit 140 stores in advance a charge / discharge characteristic pattern for each type of storage battery, and the information acquisition unit 151 compares the charge / discharge characteristic measured for the storage battery 10 with each charge / discharge characteristic pattern. The type of the storage battery 10 is estimated. Furthermore, if each charge / discharge characteristic pattern is classified according to the degree of deterioration, the degree of deterioration of the storage battery 10 can also be estimated.
  • the information management unit 152 manages storage battery information (see FIG. 3) for each storage battery 10 stored in the storage unit 140. For example, for each storage battery 10, the information management unit 152 updates the number of days of use according to the passage of days, updates the number of times of charging according to the execution of charging, and updates the number of times of discharging according to the execution of discharging.
  • the schedule determination unit 153 is based on the storage battery information managed by the information management unit 152, and the charge / discharge schedule of each storage battery 10 (hereinafter simply referred to as “schedule” as appropriate) every predetermined period (for example, one day). To decide.
  • the charge / discharge schedule means a schedule of which storage battery 10 performs charge / discharge in which time zone and in which mode. The charging / discharging mode of the storage battery 10 will be described later.
  • the schedule determination unit 153 associates each of the plurality of storage batteries 10 with each of a plurality of power sources (the system power source 1 and the distributed power source 20) based on the storage battery information of each storage battery 10, and schedules them. To decide.
  • the schedule determination unit 153 determines the schedule by associating the storage battery 10 of a type suitable for supplementary charging with the distributed power source 20. As described above, the distributed power source 20 can frequently generate excess or deficiency of generated power. Therefore, the schedule determination unit 153 determines the schedule so that the storage battery 10 of a type suitable for auxiliary charging is associated with the distributed power source 20 and the excess or deficiency is offset. As a result, the amount of power purchased from the system power source 1 can be reduced, or the amount of power sold to the system power source 1 can be increased.
  • the schedule determination unit 153 determines the schedule by associating the storage battery 10 of a type not suitable for auxiliary charging with the system power supply 1.
  • the system power supply 1 can basically always supply stable power. Therefore, the schedule determination unit 153 associates the storage battery 10 of a type that is not suitable for auxiliary charging with the system power supply 1, and discharges all power from the storage battery 10 after the storage battery 10 is fully charged. Determine the schedule.
  • the storage battery 10 can be fully charged with inexpensive system power at midnight, and all the power can be discharged from the storage battery 10 in other time zones.
  • the schedule determination unit 153 sets the priority of charge / discharge for each storage battery 10 according to the degree of deterioration of each storage battery 10 (for example, the number of days used, the number of times of charging, and the number of times of discharging). For example, when there are a plurality of storage batteries 10 of the same type, the priority for the storage battery 10 with a low degree of deterioration is “high” (main), and the priority for the storage battery 10 with a high degree of deterioration is “low” (backup). To do. As a result, the degree of deterioration of these storage batteries 10 can be leveled, and the life of the storage battery group can be extended.
  • the degree of deterioration of each storage battery 10 for example, the number of days used, the number of times of charging, and the number of times of discharging.
  • the priority for the storage battery 10 with a low degree of deterioration is “low” (backup), and the priority for the storage battery 10 with a high degree of deterioration is “high” (main).
  • the deteriorated storage battery 10 can be used up and replaced at an early stage, and the performance of the storage battery group can be improved.
  • the storage battery control unit 154 controls each storage battery 10 according to the schedule determined by the schedule determination unit 153. Specifically, the storage battery control unit 154 transmits a charge / discharge instruction to each storage battery 10 or transmits a connection state change instruction to the distribution board 40 using the communication unit 130. Various instructions are transmitted using a signal conforming to a communication protocol such as Lite or ZigBee.
  • the storage battery control unit 154 may appropriately change the schedule when the schedule needs to be changed according to the amount of power stored in the storage battery 10 and the power consumption of the load device 30.
  • the storage battery control unit 154 may control the display unit 110 to display charge / discharge schedule information (see FIG. 4). Further, the schedule may be changed according to user input to the input unit 120.
  • FIG. 4 is an operation flowchart of the storage battery information acquisition operation in the HEMS 100.
  • step S11 the information acquisition unit 151 confirms whether or not the storage battery 10 newly installed in the house H has been detected.
  • the process proceeds to step S12.
  • step S12 the information acquisition unit 151 checks whether or not the storage battery information can be acquired from the newly installed storage battery 10, that is, whether or not the storage battery 10 manages its own storage battery information.
  • step S12; YES the process proceeds to step S13.
  • step S12; NO the process proceeds to step S14.
  • step S13 the information acquisition unit 151 acquires storage battery information from the newly installed storage battery 10, and stores the acquired storage battery information in the storage unit 140.
  • step S14 the information acquisition unit 151 measures the charge / discharge characteristics of the newly installed storage battery 10.
  • step S15 the information acquisition unit 151 acquires the storage battery information of the newly installed storage battery 10 based on the charge / discharge characteristics measured in step S14, and stores the acquired storage battery information in the storage unit 140.
  • FIG. 5 is an operation flowchart of the charge / discharge control operation in the HEMS 100. This operation flow assumes a case where a schedule is determined on a daily basis, for example.
  • step S21 the schedule determination unit 153 confirms whether or not the current time is a time at which the schedule should be determined. If the current time is the time at which the schedule should be determined (step S21; YES), the process proceeds to step S22.
  • step S ⁇ b> 22 the schedule determination unit 153 determines a schedule for each storage battery 10 based on storage battery information for each storage battery 10 stored in the storage unit 140 for each time zone in a day. A specific example of the schedule will be described later.
  • step S23 the storage battery control unit 154 controls each storage battery 10 according to the schedule of the day.
  • step S24 the storage battery control unit 154 confirms whether or not the schedule for the day has been completed. If the schedule for that day has not been completed (step S24; NO), the process proceeds to step S25.
  • step S25 the storage battery control unit 154 confirms whether or not the schedule of the day needs to be changed. If it is not necessary to change the schedule for that day (step S25; NO), the process returns to step S23. On the other hand, when the schedule of the day needs to be changed (step S25; YES), the process proceeds to step S26.
  • step S26 the storage battery control unit 154 changes the schedule of the day. Thereafter, the process returns to step S23.
  • FIG. 6 is a diagram for explaining a specific example of a schedule.
  • a lithium ion battery is illustrated as a type of storage battery 10 suitable for auxiliary charging
  • a lead storage battery is illustrated as a type of storage battery 10 not suitable for auxiliary charging.
  • the case where the lithium ion battery A with a low deterioration degree and the lithium ion battery B with a high deterioration degree coexist is assumed.
  • the schedule determination unit 153 determines the schedule by associating the lithium ion battery A with the distributed power source 20.
  • the schedule determination unit 153 cancels the excess or deficiency of the power generation amount of the distributed power source 20 in the lithium-ion battery A except during a time period (midnight time period) when the power consumption of the load device 30 is small. (Offset mode).
  • the storage battery control unit 154 controls the discharge of the power corresponding to the shortage from the lithium ion battery A when the power generation amount of the distributed power source 20 is insufficient with respect to the power consumption of the load device 30. To do. Further, in the cancellation mode, when the power generation amount of the distributed power source 20 exceeds the power consumption of the load device 30, the storage battery control unit 154 charges the lithium ion battery A with power corresponding to the excess amount. Control as follows. Here, the storage battery control unit 154 grasps the difference between the power generation amount of the distributed power source 20 and the power consumption amount of the load device 30 from the measurement value of the sensor 41, for example, and controls charging / discharging of the lithium ion battery A.
  • the schedule determination unit 153 determines that the lithium ion battery A is operated in a mode (charging mode) in which the lithium ion battery A is charged with system power during a time period (midnight time period) in which the power consumption of the load device 30 is small. .
  • the storage battery control unit 154 controls the lithium-ion battery A to be charged with inexpensive system power at midnight. However, if the lithium ion battery A is fully charged at the end of the canceling mode, the charging mode may be stopped.
  • the schedule determination unit 153 determines the schedule by associating the lead storage battery with the system power supply 1.
  • the schedule determination unit 153 is determined to operate in a mode (charging mode) in which the lead storage battery is charged to a fully charged state by system power in a time period (midnight time period) in which the power consumption of the load device 30 is small. However, it is determined to operate in a mode (discharge mode) in which all electric power is discharged from the lead storage battery in other time zones.
  • the storage battery control unit 154 controls to charge the lead storage battery with inexpensive system power at midnight.
  • the storage battery control unit 154 discharges the power corresponding to the shortage from the lead storage battery. Control as follows. In the case where both the lithium ion battery A and the lead storage battery can be discharged, it is preferable that the lead storage battery is discharged preferentially in order to reduce the storage amount of the lead storage battery to zero.
  • the schedule determination unit 153 determines the schedule by associating the lithium ion battery B with the distributed power source 20.
  • the schedule determination unit 153 is in a mode (backup mode) in which the priority for the lithium ion battery B is “low” (backup) because the deterioration degree of the lithium ion battery B is high.
  • the storage battery control unit 154 controls to use the lithium ion battery B as a backup for the lithium ion battery A. For example, the storage battery control unit 154 controls the lithium ion battery B to be charged instead of the lithium ion battery A after the lithium ion battery A is fully charged. In addition, when the storage amount of the lithium ion battery A falls below a predetermined lower limit value, or when an abnormality occurs in the lithium ion battery A, the storage battery control unit 154 does not use the lithium ion battery A but the lithium ion battery A. B may be changed to operate in the cancellation mode.
  • the HEMS 100 that controls the plurality of storage batteries 10 provided in the house controls charging / discharging for each of the plurality of storage batteries 10 based on the storage battery information of each of the plurality of storage batteries 10. Thereby, the some storage battery 10 can be controlled efficiently.
  • the HEMS 100 acquires the storage battery information of the newly installed storage battery 10 by communicating with the newly installed storage battery 10.
  • the HEMS 100 acquires the storage battery information of the newly installed storage battery 10 by measuring the charge / discharge characteristics of the newly installed storage battery 10. Thereby, HEMS100 can acquire storage battery information automatically.
  • the HEMS 100 controls the storage battery 10 of a type suitable for auxiliary charging in association with the distributed power source 20.
  • excess and deficiency of the generated power of the distributed power source 20 can be offset.
  • the amount of power purchased from the system power source 1 can be reduced, or the amount of power sold to the system power source 1 can be increased.
  • the HEMS 100 controls the storage battery 10 of a type that is not suitable for auxiliary charging in association with the system power supply 1.
  • the said storage battery 10 can be made into a full charge state with the cheap system electric power of midnight, and all the electric power can be discharged from the said storage battery 10 in the time zone other than that.
  • the electricity bill in the house H can be reduced.
  • the HEMS 100 determines the correspondence between each of the plurality of storage batteries 10 and each of the plurality of power supplies for each time period. Thereby, the some storage battery 10 can be efficiently controlled in consideration of an electricity bill and power consumption.
  • HEMS100 sets the priority of charging / discharging for every some storage battery 10 based on the information of the deterioration degree of each of the some storage battery 10.
  • FIG. Thereby, the deterioration degree of a storage battery group can be leveled, or the performance improvement of a storage battery group can be aimed at.
  • a storage battery mounted on an electric vehicle can be regarded as one storage battery constituting a storage battery group when the electric vehicle is not used.
  • the storage battery control unit 154 controls the storage battery 10 to be charged with inexpensive system power at midnight.
  • the storage battery control unit 154 may control the storage battery 10 to charge the generated power of the distributed power source 20.
  • the HEMS 100 which is a control device for performing power management in units of houses, has been described.
  • BEMS Building Energy Management System
  • FEMS Fractory Energy Management
  • CEMS Common Energy Management System
  • control device it is possible to provide a control device, a control system, and a storage battery control method that can efficiently control a plurality of storage batteries provided in a consumer.

Abstract

 電力の需要家に設けられる複数の蓄電池10を制御するHEMS100は、複数の蓄電池10のそれぞれの種別及び/又は劣化度の情報を取得する。HEMS100は、複数の蓄電池10のそれぞれの種別及び/又は劣化度の情報に基づいて、複数の蓄電池10のそれぞれの充放電を制御する。

Description

制御装置、制御システム及び蓄電池制御方法
 本発明は、電力の需要家に設けられる複数の蓄電池を制御する制御装置、制御システム及び蓄電池制御方法に関する。
 近年、省エネルギー化に対する関心が高まっており、電力の需要家単位で電力管理を行うためのエネルギー管理システム(EMS)が注目されている。住宅単位で電力管理を行うための制御装置は、宅内エネルギー管理システム(HEMS)と称されている。
 また、需要家において、分散型電源又は系統電源からの電力によって充電され、放電した電力を負荷機器に供給するための蓄電池の導入が進められている。
 さらに、複数の蓄電池を住宅に分散して設置する技術が提案されている(例えば、特許文献1参照)。
特開2011-17203号公報
 ところで、高性能かつ大容量の蓄電池は高価であることから、そのような蓄電池を住宅に複数個導入することは必ずしも容易ではない。
 よって、中古の車載用蓄電池を住宅用に再利用したり、低性能又は小容量の蓄電池を多数組み合わせて住宅用に利用したりすることが想定される。
 しかしながら、従来提案されている技術には、そのような事情が考慮されていないため、複数の蓄電池を効率的に制御することが困難である。
 そこで、本発明は、需要家に設けられる複数の蓄電池を効率的に制御できる制御装置、制御システム及び蓄電池制御方法を提供することを目的とする。
 上述した課題を解決するために、本発明は以下のような特徴を有している。
 本発明の制御装置は、電力の需要家に設けられる複数の蓄電池を制御する制御装置であって、前記複数の蓄電池のそれぞれの種別及び/又は劣化度の情報を取得する取得部と、前記複数の蓄電池のそれぞれの前記種別及び/又は劣化度の情報に基づいて、前記複数の蓄電池のそれぞれの充放電を制御する充放電制御部と、を有することを特徴とする。
 前記取得部は、前記複数の蓄電池に含まれる所定の蓄電池との通信を行うことによって、前記所定の蓄電池の前記種別及び/又は劣化度の情報を取得してもよい。
 前記取得部は、前記複数の蓄電池に含まれる所定の蓄電池の充放電特性を計測することによって、前記所定の蓄電池の種別及び/又は劣化度の情報を取得してもよい。
 前記取得部は、前記所定の蓄電池の充放電特性を、前記種別及び/又は劣化度毎の充放電パターンと比較することによって、前記所定の蓄電池の前記種別及び/又は劣化度の情報を取得してもよい。
 複数の電源が利用可能である場合において、前記充放電制御部は、前記複数の蓄電池それぞれの前記種別及び/又は劣化度の情報に基づいて、前記複数の蓄電池のそれぞれを前記複数の電源のそれぞれと対応付けて制御してもよい。
 前記複数の電源が分散型電源を含み、かつ、前記複数の蓄電池が補充電に適した種別の蓄電池を含む場合において、前記充放電制御部は、前記補充電に適した種別の蓄電池を前記分散型電源と対応付けて制御してもよい。
 前記複数の電源が系統電源を含み、かつ、前記複数の蓄電池が補充電に適さない種別の蓄電池を含む場合において、前記充放電制御部は、前記補充電に適さない種別の蓄電池を前記系統電源と対応付けて制御してもよい。
 前記充放電制御部は、前記複数の蓄電池のそれぞれと前記複数の電源のそれぞれとの対応付けを、時間帯別に決定してもよい。
 前記充放電制御部は、前記複数の蓄電池それぞれの前記劣化度の情報に基づいて、前記複数の蓄電池のそれぞれの充放電の優先度を設定してもよい。
 前記複数の蓄電池が補充電に適した種別の蓄電池及び補充電に適さない種別の蓄電池を含む場合において、前記充放電制御部は、前記補充電に適さない種別の蓄電池の放電を行う場合に、前記補充電に適さない種別の蓄電池の放電を前記補充電に適した種別の蓄電池の放電よりも優先的に行ってもよい。
 本発明の制御システムは、電力の需要家に設けられる複数の蓄電池を制御する制御システムであって、前記複数の蓄電池のそれぞれの種別及び/又は劣化度の情報を取得する取得部と、前記複数の蓄電池のそれぞれの前記種別及び/又は劣化度の情報に基づいて、前記複数の蓄電池のそれぞれの充放電を制御する充放電制御部と、を有することを特徴とする。
 本発明の電力制御方法は、電力の需要家に設けられる複数の蓄電池を制御する制御システムに適用される蓄電池制御方法であって、前記複数の蓄電池のそれぞれの種別及び/又は劣化度の情報を取得するステップAと、前記複数の蓄電池のそれぞれの前記種別及び/又は劣化度の情報に基づいて、前記複数の蓄電池のそれぞれの充放電を制御するステップBと、を有することを特徴とする。
 本発明によれば、需要家に設けられる複数の蓄電池を効率的に制御できる制御装置、制御システム及び蓄電池制御方法を提供できる。
図1は、実施形態に係る制御システムのブロック図である。 図2は、実施形態に係るHEMSのブロック図である。 図3は、実施形態に係る蓄電池情報の一例を示す。 図4は、実施形態に係るHEMSにおける蓄電池情報取得動作の動作フロー図である。 図5は、実施形態に係るHEMSにおける充放電制御動作の動作フロー図である。 図6は、実施形態に係る充放電スケジュールの具体例を説明するための図である。
 図面を参照して、本発明の実施形態について、(1)全体構成、(2)HEMSの構成、(3)HEMSの動作、(4)まとめ、(5)その他の実施形態の順に説明する。以下の実施形態に係る図面において、同一又は類似の部分には同一又は類似の符号を付す。
 (1)全体構成
 図1は、本実施形態に係る制御システムのブロック図である。図1において、ブロック間の実線は電力ラインを示し、ブロック間の破線は制御ラインを示す。なお、制御ラインは無線としてもよい。
 図1に示すように、本実施形態に係る制御システムは、系統電源1と、複数の蓄電池10と、分散型電源20と、1又は複数の負荷機器30と、分電盤40と、HEMS100と、を有する。複数の蓄電池10は、蓄電池群を構成する。
 蓄電池10、分散型電源20、負荷機器30、分電盤40、及びHEMS100は、系統電源1から電力の供給を受ける需要家としての住宅Hに設けられる。
 系統電源1は、電源の一例である。系統電源1は、電力会社によって管理されており、電力を住宅Hに供給する。系統電源1は、停電が生じない限り、安定した電力を常に住宅Hに供給できる。
 一般的に、系統電源1から住宅Hに供給される電力の料金は、電力需要の少ない深夜においては、それ以外の時間帯に比べて安価に設定されている。
 蓄電池10は、分電盤40を介して入力される電力によって充電される。蓄電池10は、放電を行うことによって、分電盤40を介して電力を負荷機器30に供給する。蓄電池10のそれぞれの充放電は、HEMS100によって制御される。
 本実施形態では、蓄電池10は、同じ種別の蓄電池で統一されておらず、異なる種別の蓄電池が混在している。例えば、蓄電池10-1は補充電に適した種別の蓄電池であり、蓄電池10-2は補充電に適さない種別の蓄電池である。
 「補充電に適した種別の蓄電池」とは、蓄えた電力を完全に放電する前に充電(いわゆる、継ぎ足し充電)を行っても、メモリー効果などに起因する性能低下が生じ難い蓄電池である。このような蓄電池としては、例えばリチウムイオン電池などが挙げられる。
 これに対し、「補充電に適さない種別の蓄電池」とは、継ぎ足し充電を行うと、メモリー効果などに起因する性能低下が生じ易い蓄電池である。このような蓄電池としては、例えば、ニッケルカドニウム電池、ニッケル水素電池、及び鉛蓄電池などが挙げられる。
 蓄電池10は、自身に関する情報(例えば、種別、使用日数、容量、充電回数、及び放電回数)を管理する機能を有していてもよい。
 分散型電源20は、電源の一例である。ここで、分散型電源20は、発電を行うことによって、分電盤40を介して電力を負荷機器30及び/又は蓄電池10に供給する発電装置を意味する。分散型電源20は、発電量を制御可能な種別の分散型電源であってもよく、発電量を制御不能な種別の分散型電源であってもよい。
 「発電量を制御可能な種別の分散型電源」とは、ガスなどを用いて発電を行う分散型電源であり、例えば、SOFC(Solid Oxide Fuel Cell)又はPEFC(Polymer Electrolyte Fuel Cell)等の燃料電池、及びガスタービン発電機などを含む。このような分散型電源には、通常、負荷機器30の消費電力の増減に応じて発電量を増減する負荷追従制御が適用される。ただし、このような分散型電源は、発電量を急速に変化させることはできず、負荷機器30の消費電力に対する過不足が生じ得る。
 これに対し、「発電量を制御不能な種別の分散型電源」とは、自然エネルギー(再生可能エネルギー)を用いて発電を行う分散型電源であり、例えば、太陽電池及び風力発電機などを含む。このような分散型電源は、発電した電力を系統電源1に逆潮流(いわゆる、売電)させることができる。ただし、このような分散型電源には負荷追従制御を適用できない。
 負荷機器30は、分電盤40を介して入力される電力を消費して動作する。負荷機器30は、例えば住宅Hに設けられる家電機器(冷蔵庫、エアコン、及び照明など)である。
 分電盤40は、系統電源1からの電力を負荷機器30及び蓄電池10に供給する。また、分電盤40は、蓄電池10からの電力を負荷機器30に供給したり、分散型電源20からの電力を負荷機器30及び蓄電池10に供給したりする。また、分散型電源20が、自然エネルギー(再生可能エネルギー)を用いて発電を行う分散型電源である場合は、分電盤40は、分散型電源20が発電した電力を系統電源1に逆潮流させてもよい。
 分電盤40は、HEMS100の制御に応じて、内部の結線状態を変更する。例えば、分電盤40は、何れかの蓄電池10を分散型電源20と電気的に接続/切断したり、何れかの蓄電池10を系統電源1と電気的に接続/切断したりすることができる。
 本実施形態では、分電盤40は、各種の電力を計測するためのセンサ41を含む。分電盤40は、センサ41が検知する電力の情報をHEMS100に通知する。センサ41は、例えば、系統電源1からの買電量、系統電源1に対する売電量、分散型電源20の発電量、及び蓄電池10の充放電電力量を検知する。
 HEMS100は、蓄電池10、分散型電源20、負荷機器30、及び分電盤40のそれぞれと通信を行い、蓄電池10、分散型電源20、負荷機器30、及び分電盤40のそれぞれを制御する。以下において、HEMS100について説明する。
 (2)HEMSの構成
 図2は、HEMS100のブロック図である。
 図2に示すように、HEMS100は、表示部110と、入力部120と、通信部130と、記憶部140と、制御部150と、を有する。
 表示部110は、制御部150の制御下で、各種の表示を行う。入力部120は、ユーザからの入力を受け付けて、入力された内容を制御部150に出力する。表示部110及び入力部120は、タッチパネルとして一体化されていてもよい。
 通信部130は、制御部150の制御下で、住宅Hに設けられた各機器(蓄電池10、分散型電源20、負荷機器30、及び分電盤40)との通信を行う。通信部130は、住宅Hに設けられた各機器との無線通信を行うためのZigbee(登録商標)モジュールであってもよい。
 記憶部140は、制御部150による制御に使用される各種の情報を記憶する。また、記憶部140は、蓄電池10に関する情報(以下、「蓄電池情報」と称する)を記憶する。蓄電池情報は、蓄電池10の種別(例えば、リチウムイオン又は鉛)の情報を含む。また、蓄電池情報は、蓄電池10の劣化度(例えば、使用日数、充電回数、及び放電回数)の情報を含んでもよい。さらに、蓄電池情報は、蓄電池10の容量の情報を含んでもよい。
 図3は、記憶部140が記憶する蓄電池情報の一例を示す。図3に示すように、蓄電池Aについての蓄電池情報として、種別“リチウムイオン”、使用日数“150日”、容量“2kWh”、充電回数“100回”、及び放電回数“120回”が記憶されている。他の蓄電池についても同様にこれらの情報が記憶されている。
 制御部150は、情報取得部151と、情報管理部152と、スケジュール決定部153と、蓄電池制御部154と、を含む。
 情報取得部151は、通信部130を用いて、蓄電池10の蓄電池情報を取得する。本実施形態では、情報取得部151は、蓄電池10が住宅Hに新たに設置された際に、当該新たに設置された蓄電池10の蓄電池情報を取得して、取得した蓄電池情報を記憶部140に記憶させる。
 情報取得部151は、通信部130を用いて、新たに設置された蓄電池10との通信を行うことによって、当該新たに設置された蓄電池10の蓄電池情報を取得する。ここで、蓄電池10は、住宅Hに新たに設置され、HEMS100と接続された際に、Echonet Lite等の通信プロトコルに準拠したフォーマットで、自身の蓄電池情報を情報取得部151に送信してもよい。情報取得部151は、蓄電池10から蓄電池情報を受信した後、さらに必要な蓄電池情報の送信を、蓄電池10に要求してもよい。この場合、当該新たに設置された蓄電池10が自身の蓄電池情報を管理していることが前提となる。
 新たに設置された蓄電池10が自身の蓄電池情報を管理していない場合、情報取得部151は、通信部130を用いて、新たに設置された蓄電池10の充放電特性を計測することによって、当該新たに設置された蓄電池10の蓄電池情報を取得する。例えば、情報取得部151は、通信部130を用いて新たに設置された蓄電池10に対して充放電を指示しつつ、センサ41により検知される充放電電力を周期的に取得することによって、当該新たに設置された蓄電池10の充放電特性を計測する。また、記憶部140には、蓄電池の種別毎の充放電特性パターンが予め記憶されており、情報取得部151は、蓄電池10について計測された充放電特性を各充放電特性パターンと比較することによって、当該蓄電池10の種別を推定する。さらに、各充放電特性パターンが劣化度別に分類されていれば、当該蓄電池10の劣化度も推定できる。
 情報管理部152は、記憶部140に記憶されている蓄電池10毎の蓄電池情報(図3参照)を管理する。例えば、情報管理部152は、蓄電池10毎に、日数の経過に応じて使用日数を更新し、充電の実施に応じて充電回数を更新し、放電の実施に応じて放電回数を更新する。
 スケジュール決定部153は、情報管理部152が管理している蓄電池情報に基づいて、所定期間(例えば1日)毎に、各蓄電池10の充放電スケジュール(以下、適宜、単に「スケジュール」と称する)を決定する。充放電スケジュールとは、どの蓄電池10が、どの時間帯で、どのモードで充放電を行うかのスケジュールを意味する。蓄電池10の充放電のモードについては、後述する。
 本実施形態では、スケジュール決定部153は、各蓄電池10の蓄電池情報に基づいて、複数の蓄電池10のそれぞれを、複数の電源(系統電源1及び分散型電源20)のそれぞれと対応付けて、スケジュールを決定する。
 第1に、スケジュール決定部153は、補充電に適した種別の蓄電池10を分散型電源20と対応付けてスケジュールを決定する。上述したように、分散型電源20は、発電電力の過不足が頻繁に生じ得る。そこで、スケジュール決定部153は、補充電に適した種別の蓄電池10を分散型電源20と対応付け、当該過不足を相殺するように、スケジュールを決定する。その結果、系統電源1からの買電量を減らしたり、系統電源1への売電量を増やしたりすることができる。
 第2に、スケジュール決定部153は、補充電に適さない種別の蓄電池10を系統電源1と対応付けてスケジュールを決定する。上述したように、系統電源1は、基本的には安定した電力を常に供給可能である。そこで、スケジュール決定部153は、補充電に適さない種別の蓄電池10を系統電源1と対応付け、当蓄電池10を満充電状態にした上で、当該蓄電池10から全ての電力を放電するように、スケジュールを決定する。その結果、例えば、深夜の安価な系統電力により当該蓄電池10を満充電状態とし、それ以外の時間帯で当該蓄電池10から全ての電力を放電できる。
 第3に、スケジュール決定部153は、蓄電池10それぞれの劣化度(例えば、使用日数、充電回数、及び放電回数)に応じて、蓄電池10毎に充放電の優先度を設定する。例えば、同じ種別の蓄電池10が複数個存在する場合において、劣化度の低い蓄電池10に対する優先度を“高”(メイン)とし、劣化度の高い蓄電池10に対する優先度を“低”(バックアップ)とする。その結果、これらの蓄電池10の劣化度を平準化することができ、蓄電池群の長寿命化を図ることができる。或いは、劣化度の低い蓄電池10に対する優先度を“低”(バックアップ)とし、劣化度の高い蓄電池10に対する優先度を“高”(メイン)とする。その結果、劣化の進行した蓄電池10を早期に使い切って交換することができ、蓄電池群の性能向上を図ることができる。
 蓄電池制御部154は、スケジュール決定部153により決定されたスケジュールに従って、各蓄電池10を制御する。詳細には、蓄電池制御部154は、通信部130を用いて、各蓄電池10に対して充放電の指示を送信したり、分電盤40に対して結線状態の変更指示を送信したりする。Lite又はZigBee等の通信プロトコルに準拠した信号を用いて、各種指示の送信を行う。
 蓄電池制御部154は、蓄電池10の蓄電量及び負荷機器30の電力消費量に応じて、スケジュールの変更が必要になった場合には、スケジュールを適宜変更してもよい。
 蓄電池制御部154は、充放電スケジュールの情報(図4参照)を表示するよう表示部110を制御してもよい。また、入力部120に対するユーザ入力に応じて、スケジュールを変更してもよい。
 (3)HEMSの動作
 以下において、HEMS100の動作を説明する。
 (3.1)蓄電池情報取得動作
 図4は、HEMS100における蓄電池情報取得動作の動作フロー図である。
 図4に示すように、ステップS11において、情報取得部151は、住宅Hに新たに設置された蓄電池10が検出されたか否かを確認する。新たに設置された蓄電池10が検出された場合(ステップS11;YES)、処理がステップS12に進む。
 ステップS12において、情報取得部151は、新たに設置された蓄電池10から蓄電池情報を取得可能であるか否か、すなわち、当該蓄電池10が自身の蓄電池情報を管理しているか否かを確認する。新たに設置された蓄電池10から蓄電池情報を取得可能である場合(ステップS12;YES)、処理がステップS13に進む。これに対し、新たに設置された蓄電池10から蓄電池情報を取得不能である場合(ステップS12;NO)、処理がステップS14に進む。
 ステップS13において、情報取得部151は、新たに設置された蓄電池10から蓄電池情報を取得して、取得した蓄電池情報を記憶部140に記憶させる。
 一方、ステップS14において、情報取得部151は、新たに設置された蓄電池10の充放電特性を計測する。
 ステップS15において、情報取得部151は、ステップS14で計測された充放電特性に基づいて、新たに設置された蓄電池10の蓄電池情報を取得して、取得した蓄電池情報を記憶部140に記憶させる。
 (3.2)充放電制御動作
 図5は、HEMS100における充放電制御動作の動作フロー図である。本動作フローは、例えば1日単位でスケジュールを決定するようなケースを想定している。
 図5に示すように、ステップS21において、スケジュール決定部153は、現在の時刻がスケジュールを決定すべき時刻であるか否かを確認する。現在の時刻がスケジュールを決定すべき時刻である場合(ステップS21;YES)、処理がステップS22に進む。
 ステップS22において、スケジュール決定部153は、記憶部140に記憶されている蓄電池10毎の蓄電池情報に基づいて、1日における時間帯別に、蓄電池10毎のスケジュールを決定する。スケジュールの具体例については後述する。
 ステップS23において、蓄電池制御部154は、その日のスケジュールに従って、各蓄電池10を制御する。
 ステップS24において、蓄電池制御部154は、その日のスケジュールが完了したか否かを確認する。その日のスケジュールが完了していない場合(ステップS24;NO)、処理がステップS25に進む。
 ステップS25において、蓄電池制御部154は、その日のスケジュールの変更が必要であるか否かを確認する。その日のスケジュールの変更が不要である場合(ステップS25;NO)、処理がステップS23に戻る。これに対し、その日のスケジュールの変更が必要である場合(ステップS25;YES)、処理がステップS26に進む。
 ステップS26において、蓄電池制御部154は、その日のスケジュールを変更する。その後、処理がステップS23に戻る。
 図6は、スケジュールの具体例を説明するための図である。ここでは、補充電に適した種別の蓄電池10としてリチウムイオン電池を例示し、補充電に適さない種別の蓄電池10として鉛蓄電池を例示している。また、劣化度の低いリチウムイオン電池Aと劣化度の高いリチウムイオン電池Bとが併存するケースを想定している。
 図6に示すように、スケジュール決定部153は、リチウムイオン電池Aを分散型電源20と対応付けてスケジュールを決定する。
 詳細には、スケジュール決定部153は、負荷機器30の電力消費量が少ない時間帯(深夜の時間帯)以外は、リチウムイオン電池Aを、分散型電源20の発電量の過不足を相殺するモード(相殺モード)で運用すると決定している。
 相殺モードにおいて、蓄電池制御部154は、分散型電源20の発電量が負荷機器30の電力消費量に対して不足するときは、当該不足分に相当する電力をリチウムイオン電池Aから放電するよう制御する。また、相殺モードにおいて、蓄電池制御部154は、分散型電源20の発電量が負荷機器30の電力消費量に対して超過するときは、当該超過分に相当する電力をリチウムイオン電池Aに充電するよう制御する。ここで、蓄電池制御部154は、例えばセンサ41の計測値から、分散型電源20の発電量と負荷機器30の電力消費量との差を把握し、リチウムイオン電池Aの充放電を制御する。
 一方、スケジュール決定部153は、負荷機器30の電力消費量が少ない時間帯(深夜の時間帯)は、リチウムイオン電池Aを、系統電力で充電するモード(充電モード)で運用すると決定している。
 充電モードにおいて、蓄電池制御部154は、深夜の安価な系統電力をリチウムイオン電池Aに充電するよう制御する。ただし、相殺モードの終了時点で、リチウムイオン電池Aが満充電状態であれば、充電モードを中止してもよい。
 また、スケジュール決定部153は、鉛蓄電池を系統電源1と対応付けてスケジュールを決定する。
 詳細には、スケジュール決定部153は、負荷機器30の電力消費量が少ない時間帯(深夜の時間帯)において、系統電力により鉛蓄電池を満充電状態まで充電するモード(充電モード)で運用すると決定し、それ以外の時間帯において、鉛蓄電池から全ての電力を放電するモード(放電モード)で運用すると決定している。
 充電モードにおいて、蓄電池制御部154は、深夜の安価な系統電力を鉛蓄電池に充電するよう制御する。これに対し、放電モードにおいて、蓄電池制御部154は、分散型電源20の発電量が負荷機器30の電力消費量に対して不足するときに、当該不足分に相当する電力を鉛蓄電池から放電するよう制御する。リチウムイオン電池A及び鉛蓄電池の何れも放電可能なケースでは、鉛蓄電池の蓄電量をゼロにするために、鉛蓄電池から優先的に放電することが好ましい。
 さらに、スケジュール決定部153は、リチウムイオン電池Bを分散型電源20と対応付けてスケジュールを決定する。ここでは、スケジュール決定部153は、リチウムイオン電池Bの劣化度が高いことから、リチウムイオン電池Bに対する優先度を“低”(バックアップ)とするモード(バックアップモード)としている。
 バックアップモードにおいて、蓄電池制御部154は、リチウムイオン電池Aのバックアップとしてリチウムイオン電池Bを使用するよう制御する。例えば、蓄電池制御部154は、リチウムイオン電池Aが満充電状態になった後は、リチウムイオン電池Aの代わりにリチウムイオン電池Bが充電を行うよう制御する。また、リチウムイオン電池Aの蓄電量が所定の下限値を下回った場合、又は、リチウムイオン電池Aに異常が生じた場合には、蓄電池制御部154は、リチウムイオン電池Aの代わりにリチウムイオン電池Bを相殺モードで運用するよう変更してもよい。
 (4)まとめ
 以上説明したように、住宅に設けられる複数の蓄電池10を制御するHEMS100は、複数の蓄電池10それぞれの蓄電池情報に基づいて、複数の蓄電池10毎に充放電を制御する。これにより、複数の蓄電池10を効率的に制御できる。
 本実施形態では、HEMS100は、新たに設置された蓄電池10との通信を行うことによって、当該新たに設置された蓄電池10の蓄電池情報を取得する。或いは、HEMS100は、新たに設置された蓄電池10の充放電特性を計測することによって、当該新たに設置された蓄電池10の蓄電池情報を取得する。これにより、HEMS100が蓄電池情報を自動で取得できる。
 本実施形態では、HEMS100は、補充電に適した種別の蓄電池10を分散型電源20と対応付けて制御する。これにより、分散型電源20の発電電力の過不足を相殺できる。その結果、系統電源1からの買電量を減らしたり、系統電源1への売電量を増やしたりすることができる。
 本実施形態では、HEMS100は、補充電に適さない種別の蓄電池10を系統電源1と対応付けて制御する。これにより、深夜の安価な系統電力により当該蓄電池10を満充電状態とし、それ以外の時間帯で当該蓄電池10から全ての電力を放電できる。その結果、住宅Hにおける電気料金を低減できる。
 本実施形態では、HEMS100は、複数の蓄電池10のそれぞれと複数の電源のそれぞれとの対応付けを、時間帯別に決定する。これにより、電気料金及び電力消費量を考慮して複数の蓄電池10を効率的に制御できる。
 本実施形態では、HEMS100は、複数の蓄電池10それぞれの劣化度の情報に基づいて、複数の蓄電池10毎に充放電の優先度を設定する。これにより、蓄電池群の劣化度を平準化したり、蓄電池群の性能向上を図ったりすることができる。
 (5)その他の実施形態
 上記のように、本発明は実施形態によって記載したが、この開示の一部をなす論述及び図面はこの発明を限定するものであると理解すべきではない。この開示から当業者には様々な代替実施形態、実施例及び運用技術が明らかとなる。
 例えば、電気自動車に搭載されている蓄電池は、当該電気自動車が使用されていない状態においては、蓄電池群を構成する一つの蓄電池とみなすことができる。
 また、上述した実施形態では、充電モードにおいて、蓄電池制御部154は、深夜の安価な系統電力を蓄電池10に充電するよう制御する。しかしながら、充電モードにおいて、蓄電池制御部154は、分散型電源20の発電電力を蓄電池10に充電するよう制御してもよい。
 また、上述した実施形態では、住宅単位で電力管理を行うための制御装置であるHEMS100を説明したが、ビルを対象としたBEMS(Building Energy Manegement System)、工場を対象としたFEMS(Factory Energy Manegement System)、又は地域を対象としたCEMS(Community Energy Management System)などであってもよい。
 このように、本発明は、ここでは記載していない様々な実施の形態などを含むことは勿論である。また、上述した実施形態及び変更例は、組み合わせることが可能である。したがって、本発明の技術的範囲は、上述の説明から妥当な請求の範囲に係る発明特定事項によってのみ定められる。
 なお、日本国特許出願第2012-040684号(2012年2月27日出願)の全内容が、参照により、本願に組み込まれている。
 本発明によれば、需要家に設けられる複数の蓄電池を効率的に制御できる制御装置、制御システム及び蓄電池制御方法を提供できる。

Claims (12)

  1.  電力の需要家に設けられる複数の蓄電池を制御する制御装置であって、
     前記複数の蓄電池のそれぞれの種別及び/又は劣化度の情報を取得する取得部と、
     前記複数の蓄電池のそれぞれの前記種別及び/又は劣化度の情報に基づいて、前記複数の蓄電池のそれぞれの充放電を制御する充放電制御部と、
    を有することを特徴とする制御装置。
  2.  前記取得部は、前記複数の蓄電池に含まれる所定の蓄電池との通信を行うことによって、前記所定の蓄電池の前記種別及び/又は劣化度の情報を取得することを特徴とする請求項1に記載の制御装置。
  3.  前記取得部は、前記複数の蓄電池に含まれる所定の蓄電池の充放電特性を計測することによって、前記所定の蓄電池の前記種別及び/又は劣化度の情報を取得することを特徴とする請求項1に記載の制御装置。
  4.  前記取得部は、前記所定の蓄電池の充放電特性を、前記種別及び/又は劣化度毎の充放電パターンと比較することによって、前記所定の蓄電池の前記種別及び/又は劣化度の情報を取得することを特徴とする請求項3に記載の制御装置。
  5.  複数の電源が利用可能である場合において、前記充放電制御部は、前記複数の蓄電池のそれぞれの前記種別及び/又は劣化度の情報に基づいて、前記複数の蓄電池のそれぞれを前記複数の電源のそれぞれと対応付けて制御することを特徴とする請求項1に記載の制御装置。
  6.  前記複数の電源が分散型電源を含み、かつ、前記複数の蓄電池が補充電に適した種別の蓄電池を含む場合において、前記充放電制御部は、前記補充電に適した種別の蓄電池を前記分散型電源と対応付けて制御することを特徴とする請求項4に記載の制御装置。
  7.  前記複数の電源が系統電源を含み、かつ、前記複数の蓄電池が補充電に適さない種別の蓄電池を含む場合において、前記充放電制御部は、前記補充電に適さない種別の蓄電池を前記系統電源と対応付けて制御することを特徴とする請求項4に記載の制御装置。
  8.  前記充放電制御部は、前記複数の蓄電池のそれぞれと前記複数の電源のそれぞれとの対応付けを、時間帯別に決定することを特徴とする請求項4に記載の制御装置。
  9.  前記充放電制御部は、前記複数の蓄電池それぞれの前記劣化度の情報に基づいて、前記複数の蓄電池毎に充放電の優先度を設定することを特徴とする請求項1に記載の制御装置。
  10.  前記複数の蓄電池が補充電に適した種別の蓄電池及び補充電に適さない種別の蓄電池を含む場合において、前記充放電制御部は、前記補充電に適さない種別の蓄電池の放電を行う場合に、前記補充電に適さない種別の蓄電池の放電を前記補充電に適した種別の蓄電池の放電よりも優先的に行うことを特徴とする請求項1に記載の制御装置。
  11.  電力の需要家に設けられる複数の蓄電池を制御する制御システムであって、
     前記複数の蓄電池のそれぞれの種別及び/又は劣化度の情報を取得する取得部と、
     前記複数の蓄電池のそれぞれの前記種別及び/又は劣化度の情報に基づいて、前記複数の蓄電池のそれぞれの充放電を制御する充放電制御部と、
    を有することを特徴とする制御システム。
  12.  電力の需要家に設けられる複数の蓄電池を制御する制御システムに適用される蓄電池制御方法であって、
     前記複数の蓄電池のそれぞれの種別及び/又は劣化度の情報を取得するステップAと、
     前記複数の蓄電池のそれぞれの前記種別及び/又は劣化度の情報に基づいて、前記複数の蓄電池のそれぞれの充放電を制御するステップBと、
    を有することを特徴とする蓄電池制御方法。
PCT/JP2013/055195 2012-02-27 2013-02-27 制御装置、制御システム及び蓄電池制御方法 WO2013129499A1 (ja)

Priority Applications (3)

Application Number Priority Date Filing Date Title
US14/380,963 US9735591B2 (en) 2012-02-27 2013-02-27 Control apparatus, control system, and storage battery control method
JP2014502321A JP5890513B2 (ja) 2012-02-27 2013-02-27 制御装置、制御システム及び蓄電池制御方法
EP13754672.7A EP2822138B1 (en) 2012-02-27 2013-02-27 Control device, control system, and storage cell control method

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2012-040684 2012-02-27
JP2012040684 2012-02-27

Publications (1)

Publication Number Publication Date
WO2013129499A1 true WO2013129499A1 (ja) 2013-09-06

Family

ID=49082693

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2013/055195 WO2013129499A1 (ja) 2012-02-27 2013-02-27 制御装置、制御システム及び蓄電池制御方法

Country Status (4)

Country Link
US (1) US9735591B2 (ja)
EP (1) EP2822138B1 (ja)
JP (2) JP5890513B2 (ja)
WO (1) WO2013129499A1 (ja)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2015164378A (ja) * 2014-02-28 2015-09-10 株式会社Nttファシリティーズ 蓄電池制御装置、給電システム、蓄電池制御方法、及びプログラム
JP2015165732A (ja) * 2014-02-28 2015-09-17 株式会社Nttファシリティーズ 蓄電池制御装置、給電システム、蓄電池制御方法、及びプログラム
JP2016077139A (ja) * 2014-10-08 2016-05-12 パナソニックIpマネジメント株式会社 蓄電システムの制御方法及び蓄電システム制御装置
CN105874733B (zh) * 2013-12-26 2019-04-16 冷王公司 用于构造用在运输制冷系统中的运输制冷单元的电池充电器的方法和系统
JP2020188559A (ja) * 2019-05-13 2020-11-19 株式会社デンソー 地域コントローラ、建物コントローラおよびエネルギー管理システム
WO2021192847A1 (ja) * 2020-03-27 2021-09-30 本田技研工業株式会社 バッテリシステム
JP7456408B2 (ja) 2021-03-23 2024-03-27 トヨタ自動車株式会社 電池管理システムおよび電池管理方法

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2013125909A1 (ko) * 2012-02-23 2013-08-29 한국전력공사 전력저장장치 스케줄링 장치 및 방법
CN104133540A (zh) * 2013-05-02 2014-11-05 鸿富锦精密工业(深圳)有限公司 电源管理系统和方法
WO2015100397A1 (en) 2013-12-26 2015-07-02 Thermo King Corporation Method and system for configuring a transport refrigeration unit battery charger for use in a transport refrigeration system
KR102400501B1 (ko) * 2015-09-24 2022-05-20 삼성에스디아이 주식회사 무정전 전원 공급장치
JP6765995B2 (ja) * 2017-03-09 2020-10-07 株式会社ダイヘン ワイヤレス給電管理装置、ワイヤレス給電管理方法、及びプログラム
FR3068837B1 (fr) * 2017-07-07 2021-07-02 Creatifs Unite pour la fourniture d'energie electrique, rechargeable et connectee, procede por sa realisation, et son utilisation
WO2020259860A1 (en) * 2019-06-27 2020-12-30 Smart Power Gmbh Hybrid battery energy storage system
DE102020100008A1 (de) * 2020-01-02 2021-07-08 Innogy Se Elektrisches Versorgungssystem für ein Gebäude

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10201120A (ja) * 1996-12-27 1998-07-31 Canon Inc バッテリ制御方法及び装置並びに記憶媒体
JP2007259612A (ja) * 2006-03-24 2007-10-04 Hitachi Ltd 電源制御装置
JP2008067418A (ja) * 2006-09-04 2008-03-21 Nippon Telegr & Teleph Corp <Ntt> 充電制御方法、蓄電装置および充電制御システム
JP2010028876A (ja) * 2008-07-15 2010-02-04 Lenovo Singapore Pte Ltd 充放電システムおよび携帯式コンピュータ
JP2011017203A (ja) 2009-07-09 2011-01-27 Toyota Motor Corp 建物

Family Cites Families (37)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08138749A (ja) 1994-11-16 1996-05-31 Pfu Ltd バッテリ制御方式
US5939861A (en) * 1996-05-24 1999-08-17 Hino Jidosha Kogyo Kabushiki Kaisha Control system for on-vehicle battery
JP3641885B2 (ja) * 1996-11-12 2005-04-27 日産自動車株式会社 電池の充電方法及び充電装置
JP3890168B2 (ja) * 1999-08-03 2007-03-07 株式会社東京アールアンドデー 電動装置及びその電池ユニットの充放電方法
TW510977B (en) * 2000-03-13 2002-11-21 Nippon Telegraph & Telephone Capacity estimation method, degradation estimation method and degradation estimation apparatus for lithium-ion cells, and lithium-ion batteries
JP2001309568A (ja) * 2000-04-26 2001-11-02 Internatl Business Mach Corp <Ibm> 充電システム、充電制御装置、充電制御方法及びコンピュータ
TW535308B (en) * 2000-05-23 2003-06-01 Canon Kk Detecting method for detecting internal state of a rechargeable battery, detecting device for practicing said detecting method, and instrument provided with said
JP3539412B2 (ja) * 2001-08-09 2004-07-07 日産自動車株式会社 組電池の異常検出装置
JP3807965B2 (ja) * 2001-09-19 2006-08-09 インターナショナル・ビジネス・マシーンズ・コーポレーション インテリジェント電池、電気機器、コンピュータ装置及び電池の劣化度を求める方法
US7385496B2 (en) * 2002-04-15 2008-06-10 Matsushita Electric Industrial Co., Ltd. Monitoring system
US6850038B2 (en) * 2002-05-14 2005-02-01 Yazaki Corporation Method of estimating state of charge and open circuit voltage of battery, and method and device for computing degradation degree of battery
EP2472277A3 (en) * 2003-06-27 2012-10-17 The Furukawa Electric Co., Ltd. Method and device for measuring secondary cell internal impedance and judging deterioration
US7227335B2 (en) * 2003-07-22 2007-06-05 Makita Corporation Method and apparatus for diagnosing the condition of a rechargeable battery
JP4445361B2 (ja) * 2004-09-24 2010-04-07 関西電力株式会社 二次電池を用いた電力系統制御方法及び電力系統制御装置
JP4265629B2 (ja) * 2006-08-01 2009-05-20 トヨタ自動車株式会社 二次電池の充放電制御装置およびそれを搭載したハイブリッド車両
JP2008151526A (ja) * 2006-12-14 2008-07-03 Matsushita Electric Ind Co Ltd 二次電池の劣化判定装置及びバックアップ電源
JP2008228492A (ja) * 2007-03-14 2008-09-25 Sanyo Electric Co Ltd リチウムイオン二次電池の充電方法
JP2008295172A (ja) * 2007-05-23 2008-12-04 Canon Inc バッテリーパック、充電装置、及び電子機器
US20100274508A1 (en) * 2007-12-27 2010-10-28 Kyocera Corporation Mobile Electronic Device and Method for Controlling the Same
JP5106272B2 (ja) * 2008-06-30 2012-12-26 パナソニック株式会社 劣化判定回路、電源装置、及び二次電池の劣化判定方法
KR100970841B1 (ko) * 2008-08-08 2010-07-16 주식회사 엘지화학 배터리 전압 거동을 이용한 배터리 용량 퇴화 추정 장치 및방법
JP4649682B2 (ja) * 2008-09-02 2011-03-16 株式会社豊田中央研究所 二次電池の状態推定装置
JP5310003B2 (ja) * 2009-01-07 2013-10-09 新神戸電機株式会社 風力発電用鉛蓄電池制御システム
US8798832B2 (en) * 2009-03-27 2014-08-05 Hitachi, Ltd. Electric storage device
JP4744622B2 (ja) * 2009-07-01 2011-08-10 トヨタ自動車株式会社 車両の制御装置
US8575886B2 (en) * 2009-09-10 2013-11-05 Hitachi Engineering & Services Co., Ltd. Power storage apparatus of power generation system and operating method of power storage apparatus
JP5586219B2 (ja) * 2009-12-25 2014-09-10 株式会社東芝 診断装置、電池パック及び電池価値指標の製造方法
US9048514B2 (en) * 2010-04-23 2015-06-02 Psion Inc. Replacement battery indicator on a battery powered device
JP5415359B2 (ja) * 2010-05-31 2014-02-12 日立コンシューマエレクトロニクス株式会社 電気機器制御システム及び電気機器コントローラ
JP5467010B2 (ja) * 2010-07-22 2014-04-09 ニチコン株式会社 学習型蓄電池マネジメントシステム
US20110125337A1 (en) * 2010-08-30 2011-05-26 Vyacheslav Zavadsky Household appliance adapted to work with time of use electricity rates
WO2012032776A1 (ja) * 2010-09-10 2012-03-15 パナソニック株式会社 電力制御装置、電力制御方法、及び電力供給システム
JPWO2012091077A1 (ja) * 2010-12-28 2014-06-05 三洋電機株式会社 電池の劣化度の検出方法
JP2012168728A (ja) * 2011-02-14 2012-09-06 Mitsumi Electric Co Ltd 保護モジュール及び該保護モジュールにおける状態情報管理方法
WO2013031394A1 (ja) 2011-09-02 2013-03-07 日本電気株式会社 電池制御システム、電池制御装置、電池制御方法、および記録媒体
JP5537521B2 (ja) * 2011-09-20 2014-07-02 株式会社日立製作所 リチウムイオン二次電池制御システムおよび組電池制御システム
JP5675727B2 (ja) * 2012-08-10 2015-02-25 株式会社東芝 充放電指示装置、プログラム

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10201120A (ja) * 1996-12-27 1998-07-31 Canon Inc バッテリ制御方法及び装置並びに記憶媒体
JP2007259612A (ja) * 2006-03-24 2007-10-04 Hitachi Ltd 電源制御装置
JP2008067418A (ja) * 2006-09-04 2008-03-21 Nippon Telegr & Teleph Corp <Ntt> 充電制御方法、蓄電装置および充電制御システム
JP2010028876A (ja) * 2008-07-15 2010-02-04 Lenovo Singapore Pte Ltd 充放電システムおよび携帯式コンピュータ
JP2011017203A (ja) 2009-07-09 2011-01-27 Toyota Motor Corp 建物

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105874733B (zh) * 2013-12-26 2019-04-16 冷王公司 用于构造用在运输制冷系统中的运输制冷单元的电池充电器的方法和系统
JP2015164378A (ja) * 2014-02-28 2015-09-10 株式会社Nttファシリティーズ 蓄電池制御装置、給電システム、蓄電池制御方法、及びプログラム
JP2015165732A (ja) * 2014-02-28 2015-09-17 株式会社Nttファシリティーズ 蓄電池制御装置、給電システム、蓄電池制御方法、及びプログラム
JP2016077139A (ja) * 2014-10-08 2016-05-12 パナソニックIpマネジメント株式会社 蓄電システムの制御方法及び蓄電システム制御装置
JP2020188559A (ja) * 2019-05-13 2020-11-19 株式会社デンソー 地域コントローラ、建物コントローラおよびエネルギー管理システム
WO2021192847A1 (ja) * 2020-03-27 2021-09-30 本田技研工業株式会社 バッテリシステム
JP7456408B2 (ja) 2021-03-23 2024-03-27 トヨタ自動車株式会社 電池管理システムおよび電池管理方法

Also Published As

Publication number Publication date
US20150171641A1 (en) 2015-06-18
US9735591B2 (en) 2017-08-15
EP2822138B1 (en) 2018-11-07
JPWO2013129499A1 (ja) 2015-07-30
EP2822138A1 (en) 2015-01-07
EP2822138A4 (en) 2015-12-02
JP5890513B2 (ja) 2016-03-22
JP2016123267A (ja) 2016-07-07

Similar Documents

Publication Publication Date Title
JP5890513B2 (ja) 制御装置、制御システム及び蓄電池制御方法
US10193343B2 (en) Method for managing power of energy storage system connected with renewable energy
US10243396B2 (en) Control device, power control system, and power control method
US9509149B2 (en) Power management system and management method
JP5529887B2 (ja) 制御システム、補正装置、及び電力制御方法
JP5729764B2 (ja) 集合住宅電力システム及び制御装置
JP2008182851A (ja) 電力貯蔵装置及びシステム
JP6129068B2 (ja) 電力制御装置、機器制御装置、及び方法
US20120249152A1 (en) Charging/discharging determination apparatus and computer-readable non-transitory medium storing charging/discharging determination program
JP5592772B2 (ja) 電力供給制御装置及びそれを用いた電力供給システム
JP6693545B2 (ja) 電力管理システム、蓄電池搭載機器、emsコントローラ及び電力管理サーバ
JP2013038838A (ja) 集合住宅電力システム
US9846418B2 (en) Energy control system, energy control device, and energy control method for prioritizing a power generation source based on the possibility of selling generated power
KR20140137545A (ko) 에너지 저장 모듈을 구비한 지능형 배전반 시스템
EP2882023B1 (en) Management system, management method, control device, and power generator
EP2882022B1 (en) Management system, management method, control device, and power generator
EP3718815A1 (en) Electric power management system
JP2013116033A (ja) 電力供給装置
JP6523120B2 (ja) 電力供給システム
JP4496112B2 (ja) 電力供給システム、電力供給方法、及び建造物
JP5456002B2 (ja) 電動車両の充放電システム
JP6476240B2 (ja) 電力制御装置、電力制御装置の制御方法および電力制御装置の制御プログラム
JP6174477B2 (ja) 電力制御装置、電力制御装置の制御方法および電力制御装置の制御プログラム
JP2016036213A (ja) 電力供給システム
JP2021065020A (ja) 電源制御装置及びシステム

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 13754672

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2014502321

Country of ref document: JP

Kind code of ref document: A

WWE Wipo information: entry into national phase

Ref document number: 14380963

Country of ref document: US

NENP Non-entry into the national phase

Ref country code: DE

WWE Wipo information: entry into national phase

Ref document number: 2013754672

Country of ref document: EP