WO2013124938A1 - 生産管理システムおよび生産管理方法、制御プログラム、可読記憶媒体 - Google Patents
生産管理システムおよび生産管理方法、制御プログラム、可読記憶媒体 Download PDFInfo
- Publication number
- WO2013124938A1 WO2013124938A1 PCT/JP2012/007961 JP2012007961W WO2013124938A1 WO 2013124938 A1 WO2013124938 A1 WO 2013124938A1 JP 2012007961 W JP2012007961 W JP 2012007961W WO 2013124938 A1 WO2013124938 A1 WO 2013124938A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- information
- worker
- sample
- personal computer
- processing
- Prior art date
Links
- 238000004519 manufacturing process Methods 0.000 title claims abstract description 184
- 238000003860 storage Methods 0.000 title claims abstract description 63
- 238000007726 management method Methods 0.000 title claims description 315
- 238000000034 method Methods 0.000 claims abstract description 158
- 230000008569 process Effects 0.000 claims abstract description 144
- 238000012545 processing Methods 0.000 claims description 227
- 238000012795 verification Methods 0.000 claims description 90
- 238000012546 transfer Methods 0.000 claims description 47
- 238000007781 pre-processing Methods 0.000 claims description 35
- 230000032258 transport Effects 0.000 claims description 31
- 238000011156 evaluation Methods 0.000 claims description 24
- 238000012805 post-processing Methods 0.000 claims description 24
- 230000008859 change Effects 0.000 claims description 20
- 239000004065 semiconductor Substances 0.000 claims description 20
- 230000006870 function Effects 0.000 claims description 19
- 230000009471 action Effects 0.000 claims description 16
- 238000001514 detection method Methods 0.000 claims description 9
- 230000006872 improvement Effects 0.000 claims description 8
- 238000010586 diagram Methods 0.000 description 15
- 230000002265 prevention Effects 0.000 description 8
- 230000006399 behavior Effects 0.000 description 7
- 230000003111 delayed effect Effects 0.000 description 7
- 238000004364 calculation method Methods 0.000 description 6
- 238000007689 inspection Methods 0.000 description 6
- 238000004891 communication Methods 0.000 description 5
- 230000005856 abnormality Effects 0.000 description 4
- 150000001875 compounds Chemical class 0.000 description 4
- 238000005516 engineering process Methods 0.000 description 4
- 238000004140 cleaning Methods 0.000 description 3
- PWPJGUXAGUPAHP-UHFFFAOYSA-N lufenuron Chemical compound C1=C(Cl)C(OC(F)(F)C(C(F)(F)F)F)=CC(Cl)=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F PWPJGUXAGUPAHP-UHFFFAOYSA-N 0.000 description 3
- 238000013459 approach Methods 0.000 description 2
- 238000005530 etching Methods 0.000 description 2
- 239000012535 impurity Substances 0.000 description 2
- 238000005468 ion implantation Methods 0.000 description 2
- 238000012423 maintenance Methods 0.000 description 2
- 230000001960 triggered effect Effects 0.000 description 2
- 238000004458 analytical method Methods 0.000 description 1
- 230000005540 biological transmission Effects 0.000 description 1
- 230000000052 comparative effect Effects 0.000 description 1
- 238000012790 confirmation Methods 0.000 description 1
- 238000007796 conventional method Methods 0.000 description 1
- 238000002513 implantation Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000002488 metal-organic chemical vapour deposition Methods 0.000 description 1
- 230000008450 motivation Effects 0.000 description 1
- 230000003287 optical effect Effects 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
- 238000001039 wet etching Methods 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B19/00—Programme-control systems
- G05B19/02—Programme-control systems electric
- G05B19/04—Programme control other than numerical control, i.e. in sequence controllers or logic controllers
- G05B19/12—Programme control other than numerical control, i.e. in sequence controllers or logic controllers using record carriers
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/04—Manufacturing
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B2219/00—Program-control systems
- G05B2219/30—Nc systems
- G05B2219/31—From computer integrated manufacturing till monitoring
- G05B2219/31302—Verify id data and reread, rewrite or alarm on fault
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/30—Computing systems specially adapted for manufacturing
Definitions
- the present invention relates to a semiconductor such as a light emitting diode (LED) or a semiconductor laser element using one or a plurality of processing apparatuses including at least an off-line apparatus in a redevelopment to a compound semiconductor factory of an LSI manufacturing factory or a manual factory.
- a semiconductor such as a light emitting diode (LED) or a semiconductor laser element using one or a plurality of processing apparatuses including at least an off-line apparatus in a redevelopment to a compound semiconductor factory of an LSI manufacturing factory or a manual factory.
- PRODUCTION MANAGEMENT SYSTEM MANUFACTURING PRODUCTION MANUFACTURING WHICH MANUFACTURING SEMICONDUCTOR ELEMENTS, LIGHT EMITTING ELEMENTS, PRODUCTION MANAGEMENT METHOD USING THE SAME, CONTROL PROGRAM DESCRIBING PROCEDURES FOR RUNNING THE COMPUTER MANAGEMENT METHOD, AND CONTROL PROGRAM
- the present invention relates to a computer-readable readable storage medium in which is stored.
- Patent Document 1 In a conventional LSI manufacturing factory, for example, in Patent Document 1, in the lot transfer of a semiconductor manufacturing process, a system for automatically controlling / managing automatic transfer / equipment and transfer equipment is used as a front-end to collect facility operation status and facility processing plan. Based on the calculation result of the above and the required number of transporting carts, a control system for instructing transporting so as to minimize the waiting time has been proposed.
- this control system detailed instructions for production products are provided by performing automatic acquisition of information and time prediction calculation, etc., in a semiconductor manufacturing line that is highly automated and online with regard to production automation control and lot transportation. This makes it possible to optimize the conveyance control, that is, to minimize the conveyance waiting time. This is a technology that focuses on how to eliminate losses.
- Patent Document 2 in a lot transfer of a semiconductor manufacturing process, a system for automatically controlling / managing automatic transfer / equipment and transfer equipment is used as a front-end, collection of equipment operation status, calculation of an equipment processing plan, and the required number of transfer carts. Based on the calculation result, there has been proposed a control system for instructing conveyance so as to minimize the waiting time.
- This control system is a system programming technology for semiconductor manufacturing factories that enables the realization of human and time losses in the semiconductor manufacturing process.
- a method has been reported in which event information (not SECS) is received, the lot information of the event is processed by which device / port, and the information is stored in a database.
- Patent Document 3 in the lot transfer in the semiconductor manufacturing process, the system for automatically controlling and managing the automatic transfer / equipment and transfer device is used as a front, collecting the operation status of the equipment, calculating the facility processing plan, and the required number of transfer carts. Based on the calculation result, there has been proposed a control system for instructing conveyance so as to minimize the waiting time.
- Patent Document 1 the above-described conventional technique disclosed in Patent Document 1 is a system on the premise that the equipment and the transport system are on-line / CIM, and of course, the initial capital investment is enormous. Also, in the above prior arts disclosed in Patent Documents 2 and 3, as in the case of Patent Document 1, it is a system premised on the on-line / CIM installation of equipment and a transport system. Is also enormous.
- the present invention solves the above-described conventional problems, and realizes work efficiency and work error prevention by performing navigation for work management and labor saving in a production line having a manual transfer / offline device.
- the production management system includes a plurality of sample shelves that detect presence / absence of a unique ID of a placed sample box, and a unique ID of the sample box for each of the plurality of sample shelves.
- Each of the shelf management personal computers for managing the presence or absence of the sample box, and a host device for managing the location information of the sample box via each of the shelf management personal computers. .
- the sample shelf in the production management system of the present invention comprises sample box ID reader means for reading the unique ID of the sample box, and the unique ID of the sample box read by the sample box ID reader means is Information is provided to the host device via a shelf management personal computer, and the location information of the sample box is updated.
- the sample read by the sample box ID reader means when the operator places the sample box on the sample shelf in the production management system of the present invention and when the operator removes the sample box from the sample shelf. Based on the box ID information, the location information of the sample box is uploaded from the shelf management personal computer to the host device in real time.
- the plurality of sample shelves in the production management system of the present invention are arranged in sections divided for each process, and each section has one or a plurality of pre-processing sample shelves and one or a plurality of post-processing sample shelves. Is arranged.
- the shelf management personal computer in the production management system of the present invention has the manufacturing flow and processing device information, and the progress information of the flowing production sample. From the detected unique ID of the sample box, The processing apparatus in which the sample in the sample box is to be processed is determined, and the transport destination of the sample box is displayed on the display screen to instruct the operator.
- the shelf management personal computer in the production management system of the present invention counts up and displays on the display screen an elapsed time from when the transport destination is displayed on the display screen until the work is performed. Then, control is performed so that an alarm is displayed when the elapsed time is exceeded.
- each of the one or a plurality of processing devices arranged in each section further includes a respective device management personal computer, and each of the device management personal computers Counts up the elapsed time from when the processing start time is displayed on the display screen until the work is completed, and displays an alarm when the elapsed time is exceeded.
- the host device manages processes by exchanging information with each device management personal computer.
- the host device in the production management system of the present invention is provided with information on the presence or absence of the unique ID of the sample box read by the sample box ID reader means from the shelf management personal computer, and the unique ID of the sample box.
- the current location information of the sample box is A sample location determination unit to determine, and a location history storage unit that updates and stores the current location information of the sample box determined by the location determination unit as location location history information.
- each device management personal computer in which a unique ID is assigned to each of one or a plurality of processing devices arranged in each section, and each device management personal computer is connected
- the process is managed by exchanging information with a card reader capable of reading the contents of a worker card provided with worker information including a unique worker ID for each of the plurality of workers, and each device management personal computer.
- Each of the device management personal computers includes a flow verification means for verifying a worker / time based on worker information including the worker ID from the card reader, and each of the management personal computers Worker information including the worker ID and verification information including the worker ID are uploaded to the host device. Worker information / verification information transfer means for loading, and the host device includes worker information / verification information registration means for registering the uploaded worker information including the worker ID and verification information including the verification result.
- Worker information / verification information transfer means for loading
- the host device includes worker information / verification information registration means for registering the uploaded worker information including the worker ID and verification information including the verification result.
- the host device in the production management system of the present invention collects work history information from the sample shelf management personal computer and the device management personal computer installed at a predetermined location in the process to obtain the worker action history information and the sample location information.
- Work history information acquisition means for acquiring history information is provided.
- the navigation display has a work instruction means for displaying a destination for each worker.
- the host device in the production management system of the present invention is configured to evaluate work based on increase / decrease of work section, change of work type, improvement of work skill, increase / decrease of work amount, pass / fail of verification result, and magnitude of delay time.
- Work evaluation value update means for collecting and sequentially updating the values is provided.
- lot processing is performed on the one or a plurality of processing devices.
- the host personal computer based on the device status information of one or more processing devices including at least the offline device, via the management personal computer of the corresponding processing device.
- the production management method of the present invention is a production management method using the above-described production management system of the present invention, wherein in the host device, the identification information change detection unit is a sample box read by the sample box ID reader means.
- An identification information change detection step for detecting a change in the unique ID information of the sample box provided by the shelf management personal computer with presence / absence information of the unique ID, and the sample location determining unit determines whether or not the unique ID of the sample box is present
- a sample location determination step for determining the current location information of the sample box based on the previous location information of the sample box, and a location location history storage unit at the location determination unit
- the production management method is a production management method using the production management system according to the present invention, wherein in each of the management personal computers, the flow verification means includes the worker ID from the card reader.
- the control program of the present invention describes a processing procedure for causing a computer to execute the production management method of the present invention, thereby achieving the above object.
- the readable storage medium of the present invention is a computer-readable storage medium in which the control program of the present invention is stored, whereby the above object is achieved.
- a plurality of sample shelves for detecting the presence or absence of a unique ID of a placed sample box and a plurality of sample shelves are assigned a unique ID, respectively, and the presence or absence of a unique ID of the sample box is managed for each sample shelf.
- Each shelf management personal computer has a host device that manages the location information of the sample box via each shelf management personal computer.
- the operator places the sample box on the shelf or removes it from the shelf, and detects whether the sample box containing the sample to be produced (lot) is on the shelf using the wireless communication function.
- the location information of the production sample (lot) can be collected from all the shelves by the host device, and the production sample (lot) in the entire process can be obtained on a small line or locally distributed line with low investment. Can be managed online in a pseudo manner. As a result, it is possible to achieve work efficiency and prevent work errors by performing navigation for work management and labor saving in a production line with a manual transport / offline device.
- the presence or absence of the unique ID of the placed sample box is detected, and the collected unique ID information of the sample box is collected in the host device via each shelf management personal computer, and the sample is collected.
- the location information of the box it is possible to achieve work efficiency and prevent work errors by performing navigation for work management and labor saving in a production line with a manual transport / offline device.
- FIG. 1 It is a schematic diagram which shows the operation
- A) is a diagram in which the navigation screen of FIG. 1 is used as a work error prevention screen in addition to a work instruction screen and a delay screen
- (b) and (c) are diagrams showing an average work time comparison
- (d) is a group-specific view. It is a figure which shows a process performance ranking.
- FIG. 6 is a block diagram illustrating a software configuration example of a management personal computer and a host device in the production management system of FIG. 5. It is an image figure where an operator and each lot flow through each processing process. It is a flowchart which shows the operation example of the production management system containing the operator's work process in the case of performing a production process using the production management system of FIG.
- FIG. 6 is a layout diagram of a plurality of processing devices, management personal computers, and host devices that are offline devices in the production management system of FIG. 5.
- Embodiments 1 and 2 of the production management system and the production management method using the same according to the present invention will be described in detail below with reference to the drawings. Note that the size of each configuration in each figure is not limited to the illustrated configuration from the viewpoint of drawing creation.
- FIG. 1 is a schematic diagram showing an outline of work in a manual conveyance process in Embodiment 1 of the sample management shelf system in the production management system of the present invention.
- a sample management shelf system 11 in the production management system includes a pre-processing sample shelf 12 that detects and stores the presence or absence of a sample (lot) to be processed by each processing apparatus, and a pre-processing sample shelf 12.
- the sample shelf management personal computer 13 that performs the next processing instruction on the navigation screen 13a with respect to the sample (lot) detected in step 1, and the sample (lot) is taken out from the sample shelf 12 before processing and transported to the processing apparatus.
- the processing device for instructing the operator on the navigation screen 14a, various information such as the set contents when the sample is set and the conveyance time when the sample (lot) is taken out after the processing is completed, and the processing device A processed sample shelf that transports the processed sample (lot) from the processing device, detects the stored sample (lot), and stores it. 5, a post-processing sample shelf management personal computer 16 that issues a transport instruction to the next process on the navigation screen 16 a for the sample (lot) detected on the post-processing sample shelf 15, and these pre-processing sample shelf management personal computers 13.
- the host computer as a host device that performs the management of the entire location of the sample (lot) and the processing progress status of each sample (lot) by communicating the device management personal computer 14 and the processed sample shelf management personal computer 16 wirelessly or by wire. 17.
- the sample management shelf system 11 includes a pre-processing sample shelf 12 and a post-processing sample shelf 15 as a plurality of sample shelves for detecting a unique ID of a placed sample box (a lot storage box 19 containing a production sample).
- Each of the sample shelves is given a unique ID
- each pre-processing sample shelf management personal computer 13 and post-processing sample shelf management personal computer 16 as each shelf management personal computer provided for each sample shelf, and each shelf management personal
- a host computer 17 as a host device for managing the location information of the sample box via each computer.
- This sample management shelf system 11 is used in a manual conveyance process without an automated conveyance system, and an RF-ID tag 18 is added to a lot storage box 19, and a unique ID is assigned to each lot storage box 19.
- An RF-ID reader (not shown) as a sample box ID reader means is mounted on each shelf in the standby sample shelf (pseudo stocker), which is the shelf 12 and the processed sample shelf 15, so that an operator can perform a sample in the process. By simply performing a simple operation of placing a sample on the shelf or taking a sample from the shelf, the inventory position status (real-time location management) of all lots in the process is detected and grasped.
- the RF-ID reader of the shelf detects the RF-ID tag 18 of the lot storage box 19 regardless of where the lot storage box 19 containing the production sample (lot) is placed
- the pre-processing sample shelf management personal computer 13 and the post-processing sample shelf management personal computer 16 recognize whether the sample (lot) has been placed on this standby sample shelf and transmit it to the host computer 17, and the sample of the host computer 17. Management information is updated.
- the sample management shelf system 11 In this way, all the production samples (lots) are managed in real time by the sample management shelf system 11.
- the produced sample (lot) is put in the lot storage box 19 to be transported and stored, and the inventory other than the lot storage box 19 which is a storage box is out of management.
- the host computer 17 updates the location of all samples in the process. In this case, the host computer 17 is not a large-scale CIM system, and is triggered by the time when the lot storage box 19 containing the produced sample (lot) is placed on the pre-processing sample shelf 2 and the post-processing sample shelf 15. Work begins.
- the pre-processing sample shelf 12 and the post-processing sample shelf 15 as sample shelves are sample box IDs for reading the unique ID (RF-ID tag 18 of the lot storage box 19) of the sample box containing the production sample (lot).
- An RF-ID reader as a reader means is provided, and the unique ID of the sample box read by the RF-ID reader is the pre-processing sample shelf management personal computer 13 and the post-processing sample shelf management personal computer 16 as the shelf management personal computer.
- information is provided to the host computer 17 as the host device, and the location information of the sample box is updated.
- the location information of the sample box is real-time based on the sample box ID information read by the RF-ID reader when the operator places the sample box on the sample shelf and when the operator removes the sample box from the sample shelf.
- the shelf management personal computer uploads to the host device.
- the CPU (control unit) of the host computer 17 as the host device manages the presence / absence information of the unique ID of the sample box read by the RF-ID reader as the sample box ID reader means.
- An identification information change detection unit for detecting a change in the unique ID information of the sample box provided from the pre-process sample shelf management personal computer 13 and the post-process sample shelf management personal computer 16 as a personal computer, and the presence or absence of the unique ID of the sample box
- a sample location determination unit that determines the current location information of the sample box based on the previous location information of the sample box, and the current location of the sample box determined by the location determination unit
- the identification information change detection unit obtains the presence / absence information of the unique ID of the sample box read by the RF-ID reader as the sample box ID reader means.
- An identification information change detection step for detecting a change in the unique ID information of the sample box provided from the pre-processing sample shelf management personal computer 13 and the post-processing sample shelf management personal computer 16 as a shelf management personal computer, and a sample location determination unit ,
- a sample location determination step for determining the current location information of the sample box based on the previous location information of the sample box when the presence / absence of the unique ID of the sample box is detected, and a location location history storage unit (Work history information acquisition means) determines the current location information of the sample box determined by the location determination unit as location location history information.
- a location history storage step (operation history information acquisition step) that to updates and stores.
- the standby sample shelf is where the lot storage box 19 containing the produced sample (lot) is located.
- the host computer 17 recognizes whether it has been placed on the standby sample shelf via the pre-processing sample shelf management personal computer 13, the apparatus management personal computer 14, and the post-processing sample shelf management personal computer 16.
- the lot storage box 19 containing the production sample (lot) processed by a predetermined processing apparatus is taken from the standby sample shelf and transported to the standby sample shelf where the next processing is performed.
- the standby sample shelf detects that the lot storage box 19 containing the processed sample (lot) that has been processed is no longer in the standby sample shelf, and informs the host computer 17 via the processed sample shelf management personal computer 16. introduce.
- the standby sample shelf contains the manufactured sample (lot) for the next processing.
- the lot storage box 19 is detected on the standby sample shelf, and information is transmitted to the host computer 17 via the pre-processing sample shelf management personal computer 13.
- the lamp at the standby sample shelf position where the lot storage box 19 is placed is lit. The operator may take in the lot storage box 19 at the position where the lamp is lit.
- the event is triggered by placing the lot storage box 19 containing the production sample (lot) on the standby sample shelf and taking the lot storage box 19 containing the production sample (lot) from the standby sample shelf.
- the lot location information of the produced sample (lot) is updated by communication.
- FIG. 2 is a layout diagram in which workers and lots flow through each processing step.
- each processing process includes a photolithographic process, a wet etching process, an inspection process, and an MOCVD process.
- a standby sample shelf indicated by “IN” and “OUT” is provided for each processing process. ing.
- the standby sample shelf indicated by “IN” is the pre-processing sample shelf 12, and the standby sample shelf indicated by “OUT” is the post-processing sample shelf 15.
- a lot storage box 19 containing a production sample (lot) is placed on the pre-processing sample shelf 12 of “IN”. Further, in order to perform the next processing, the lot storage box 19 containing the produced sample (lot) is taken from the “OUT” processed sample shelf 15 and transported to the “IN” unprocessed sample shelf 12 in the next process. .
- a production sample (lot) is set and predetermined processing is performed.
- the lot storage box 19 containing the processed sample (lot) after processing is placed in the processed sample shelf 15 of “OUT”.
- the transporting operator next places the lot storage box 19 in which the processed production sample (lot), which is placed on the sample shelf 15 after the processing of “OUT” and the lamp is lit, in order to perform the next processing.
- the lot storage box 19 containing the produced sample (lot) is transported to the pre-processing sample shelf 12 of the process “IN”.
- the process in this case is divided into a plurality of sections for each process, and an “IN” pre-processing sample shelf 12 and an “OUT” post-processing sample shelf 15 are arranged in each of the sections.
- the plurality of standby sample shelves are arranged in sections divided for each process, and one or a plurality of pre-processing sample shelves 12 and one or a plurality of post-processing sample shelves 15 are arranged in each section.
- Employees are assigned full-time workers (for example, photo staff, inspection staff, CVD staff, etc.) distinguished for each section.
- a dedicated worker for transporting the production sample (lot) between the sections is also arranged.
- Each worker has a unique skill for each section, and has a skill rank according to their experience.
- These workers perform in-process work and transfer work according to the instruction content displayed on the display screen of the shelf management computer arranged for each section.
- the worker has an ID that can identify an individual.
- the instructed work is performed reliably, and a new worker is utilized by utilizing the navigation screens 13a, 14a and 16a for performing without error, without delay and without error. (Workers in overseas factories) can work.
- each shelf management computer has a function of counting up the time from instruction to execution in order to monitor the work delay of each worker. The purpose of this is to improve the work efficiency of the worker by counting up the passage of time and to collect information on skill determination and lead to stable production.
- the calculation of the elapsed time is counted up from the time when the work instruction is performed (the time when the screen is displayed). During this time, the time setting is level 3 for up to 3 minutes, level 2 for up to 5 minutes, and level 3 for up to 10 minutes.
- the difference from the past average elapsed time is taken as one of the evaluation methods.
- the number of level 3 is used as one of the evaluation deduction items of the worker. The worker only performs the instructed work without any work mistakes and without delay, and does not require the skill level of the worker.
- the pre-processing sample shelf management personal computer 13 and the post-processing sample shelf management personal computer 16 as the shelf management personal computer have the manufacturing flow and processing device information, and the progress information of the flowing production sample, and the detected standby From the unique ID (RF-ID tag 18) of the sample box (lot storage box 19), the processing apparatus in which the sample in the standby sample box is to be processed next is judged, and the transport destination of the sample box is displayed on the display screen (navigation). Display on screens 13a, 14a and 16a) to instruct the operator.
- the pre-processing sample shelf management personal computer 13 and the post-processing sample shelf management personal computer 16 have elapsed time from when the transfer destination is displayed on the display screen (navigation screens 13a, 14a and 16a) until the work is performed. Is displayed on the display screen (navigation screens 13a, 14a and 16a), and an alarm is displayed as the elapsed time is exceeded.
- FIG. 3 is a diagram for explaining a count-up function as a means for avoiding in-process work loss.
- the apparatus management personal computer 14 displays the unloading time on the navigation screen 14 a to display the worker. Countdown display.
- the worker puts a sample (lot) processed by the processing device into the lot storage box 19 and transports it from the processing device to the post-processing sample shelf 15. In this manner, the time is managed by the timer so that there is no delay in the work of carrying out the sample (lot) from the processing apparatus to the sample shelf 15 after the transfer processing of “OUT”.
- the processed sample shelf management personal computer 16 navigates the transfer time. Displayed on the screen 16a to instruct the operator to count down.
- the operator transports the lot storage box 19 placed on the sample shelf 15 after the “OUT” transport process to the sample shelf 12 before the “IN” process in the next step.
- the timer manages the time so that there is no delay in the work of transporting the sample (lot) from the sample shelf 15 after the “OUT” transport processing to the sample shelf 12 before the “IN” processing.
- the pre-processing sample shelf management personal computer 13 displays the processing start time on the navigation screen 13a and works. Countdown display.
- the operator takes out the production sample (lot) from the lot storage box 19 placed on the sample shelf 12 before the transfer process of “IN” and sets the production sample (lot) in a predetermined processing apparatus. To do.
- time management is performed by the timer so that there is no delay in the work of carrying out the sample (lot) from the processing apparatus.
- the time is managed by the timer so that there is no delay in the processing start work of the sample (lot) from the sample shelf 12 before the conveyance process of “IN” to the set of processing apparatuses.
- the device management personal computer 14 displays the processing start time on the navigation screen 14a and counts down the worker from a predetermined time.
- the device management personal computer 14 displays the carrying-out time on the navigation screen 14a. And display the countdown to the worker.
- the worker puts a sample (lot) processed by the processing device into the lot storage box 19 and transports it from the processing device to the sample shelf 15 after the transport processing of “OUT”. In this manner, the time is managed by the timer so that there is no delay in the work of carrying out the sample (lot) from the processing apparatus to the sample shelf 15 after the transfer processing of “OUT”.
- the operator works by viewing the navigation screen 14a for the unloading time of the produced sample (lot).
- Each device management personal computer 14 counts up and displays on the display screen the elapsed time from when the processing start time is displayed on the display screen until the work is completed. Control may be performed so as to display an alarm.
- FIG. 4A is a diagram in which the navigation screens 13a, 14a, and 16a of FIG. 1 are used as work error prevention screens in addition to the work instruction screen and the delay screen, and FIGS. 4B and 4C are average work times.
- FIG. 4D is a comparative chart, and FIG.
- the navigation screens 13a, 14a and 16a in FIG. 1 are used as the next work instruction screen and the delay prevention screen has been described.
- the navigation screens 13a, 14a and 16a in FIG. It can also be used for an error prevention screen.
- the shelf RF-ID reader detects the RF-ID tag 18 of the lot storage box 19 to determine what The pre-processing sample shelf management personal computer 13 or the post-processing sample shelf management personal computer 16 recognizes whether the produced sample (lot) has been placed on this standby sample shelf.
- the screens 13a, 14a and 16a are displayed such as “Lot A; Work mistake”.
- the transport delay time for each apparatus and the daily average work time for each device as shown in FIG. 4C are tabulated by the host computer 17, and as shown in FIG. The separate processing result ranking is totaled by the host computer 17.
- the host computer 17 aggregates events for each worker, and displays and outputs navigation information for improving work awareness via the navigation screens 13a, 14a and 16a of the shelf management personal computer. For example, it is possible to give each worker a sense of competition with the best 10 display that can evaluate the processing performance of each section and each worker. Production managers (team leaders and line heads) make the results of processing for each work section visible so that they can be used as samples for decision-making such as increase / decrease and placement of personnel. Furthermore, when there is a difference event input with respect to the warehousing instruction and the warehousing instruction, it has a function of checking and a function of displaying this on the display screen.
- the pre-processing sample shelves 12 and the post-processing sample shelves 15 as the plurality of sample shelves for detecting the presence or absence of the unique ID of the placed lot storage box 19, and the plurality of sample shelves
- the pre-processing sample shelf 12 and the post-processing sample shelf 15 are assigned unique IDs, and the pre-processing sample shelf management personal computer as each shelf management personal computer that manages the presence or absence of the unique ID of the lot storage box 19 for each sample shelf. 13 and a processed sample shelf management personal computer 16 and a host computer 17 as a host device for managing the location information of the sample box through each shelf management personal computer.
- the operator places the lot storage box 19 on the shelf and only takes out the shelf from the shelf, and the wireless communication function detects whether the lot storage box 19 containing the produced sample (lot) is on the shelf.
- the location information of the production sample (lot) in the lot storage box 19 can be collected from all the shelves by the host device.
- Production samples (lots) can be managed on-line in a pseudo manner. As a result, it is possible to achieve work efficiency and prevent work errors by performing navigation for work management and labor saving in a production line with a manual transport / offline device.
- production lines that are premised on offline processing in an inexpensive labor environment, production lines that minimize the amount of investment without automating small-scale production, and transport automation systems (In a production line or the like that does not include a transfer robot and a lot stocker, navigation for work management and labor saving can be performed to improve work efficiency and prevent work mistakes.
- the sample management shelf system 1 of the first embodiment is managed on-line for worker information and sample location information on a production line with a manual transport / offline device.
- a production management system that can efficiently realize pseudo-online management even in a production line with offline equipment by performing low-investment navigation functions to prevent work loss and work mistakes and save labor. Can be applied to. Such a production management system will be described in detail in the second embodiment.
- the host computer 17 as the host device of the first embodiment and the host device 3 of the second embodiment are the same host device and have different functions. The functions of the first embodiment and the second embodiment will be described.
- the host device is a pre-processing sample shelf management personal computer 13 and a post-processing sample shelf management personal computer 16 as sample shelf management personal computers installed at predetermined locations in the process, as device management personal computers described later in the second embodiment.
- Work history information acquisition means for collecting work history information from the management personal computer 2 and acquiring worker action history information and sample location history information.
- the host device has sample location history information acquisition means (Embodiment 1) and worker action history information acquisition means (Embodiment 2). The worker action history information acquisition means will be described in the second embodiment. Details will be described later.
- the device management personal computer 14 of the first embodiment and the management personal computer 2 of the second embodiment are the same personal computer and have different functions. The functions of the first embodiment and the second embodiment will be described.
- FIG. 5 is a block diagram showing an example of the configuration of the main part of a production management system and its operation in Embodiment 2 of the present invention.
- the production management system 1 includes a plurality of processing devices including offline devices, and each management personal computer 2 in which a unique ID is assigned to each of a plurality of gates where an operator enters and leaves the room.
- a host device 3 capable of exchanging information with each management personal computer 2 and a worker connected to each management personal computer 2 and having worker information such as a unique worker ID attached to a plurality of workers
- the card (RF-ID) can be read and a data card (RF-ID) with a unique ID and processing information (flow) attached to each of multiple production works (multiple production lots) Can be given to workers from a device (not shown), and production information for each production work (each worker) can be read from the data card And a card reader 4.
- the management personal computer 2 to which the worker card is read and processed by making the worker card approach or contact the card reader 4 of the gate or the card reader 4 of the processing device and the card reader 4 is connected is a worker such as a worker ID.
- the management personal computer 2 Based on the information, the worker / time verification, that is, whether the worker is correct and whether the expected time is met or how late, the management personal computer 2 causes the host device 3 to perform work such as worker ID.
- the verification information including the worker information and the verification result is uploaded, and the host device 3 registers the uploaded verification information including the worker information and the verification result in the database 32 described later with reference to FIG.
- the verification information includes not only the verification result but also data such as which gate or which processing apparatus is the correct worker, whether the expected time is reached, or how much is delayed.
- the worker card has an IC chip mounted with a memory called a tag chip and an antenna embedded therein, a worker ID (name, affiliation group, work band), work area (cleaning, exposure, etching, inspection, transport, CVD and Impurity ion implantation, etc.), work type (management, processing, inspection, transfer and maintenance), work rank (1-5; work skill and work history information) and work point are recorded as worker information.
- the work point in the worker information in the worker card is the amount of work that can be performed by the worker, and is a numerical value indicating which work (how many work) has been performed per day.
- the work rank is work skill, and from the worker who performs only the transport, the worker who can perform the transport, perform the predetermined processing work, and perform the inspection work has a high rank. The higher the work point, the higher the work rank.
- the host device 3 aggregates and updates the work evaluation values by integrating the negative evaluation of how late the work must be finished within the specified time and the positive evaluation such as the work point being increased.
- a work evaluation value update unit 314 described later is included.
- the host device 3 controls the display of a work evaluation value for each worker including these work ranks and work points on a navigation display described later.
- This work evaluation value can be an index of each worker for improving work efficiency.
- the data card has an IC chip mounted with a memory called a tag chip and an antenna embedded therein, and "whether the production work of which stocker, which cassette (lot), is manually transported to which processing equipment for work" It is written on the card surface so that the operator can see it visually.
- the data card is registered in the IC chip so that input errors in the processing device can be avoided and can be easily and reliably read by the card reader 4, or the production conditions are indicated by a barcode.
- the data can be easily and reliably read by the data.
- the registration data in the IC chip is data that indicates what kind of lot needs processing and what kind of processing is necessary.
- the work instruction information of the cassette (lot) as the production work is displayed on the display screen of the management personal computer 2 or the contents of the data card are rewritten by the data card attaching device connected to the management personal computer 2. Is displayed.
- a management personal computer 2 provided in the vicinity of a processing device such as an offline device is connected to a host device 3 and a card reader 4.
- the management personal computer 2 uploads production information for each worker to the host device 3, and based on the uploaded production information, the host device 3 downloads work instruction information to the corresponding management personal computer 2.
- the management personal computer 2 touches (contacts) the card reader 4 with or closes the data card of the worker in which the production lot information (lot ID / flow information) is written at the start / end of the process.
- the contents of the card are read and transmitted to the host device 3 via the management personal computer 2.
- the host device 3 grasps the processing status (progress management, check of normal processing) of each lot, and the work instruction according to the lot progress status, An instruction for taking out a cassette (lot), selection of a processing apparatus for the next process, and an instruction for conveying the same are displayed on the display screen of the management personal computer 3, and work history is automatically collected in the database 32 described later with reference to FIG. .
- FIG. 6 is a block diagram showing a software configuration example of the management personal computer 2 and the host device 3 in the production management system 1 of FIG.
- the management personal computer 2 in the production management system 1 of the present embodiment includes a CPU (Central Processing Unit) 21 as a control unit that performs overall control, and a keyboard for performing input commands to the CPU 21.
- a CPU Central Processing Unit
- a mouse a touch panel, a pen input device, an input device 22 that receives and inputs via a communication network (for example, the Internet or an intranet), an initial screen, a selection scene, a control result screen by the CPU 21 and an operation input screen on the display screen.
- a communication network for example, the Internet or an intranet
- a ROM 24 as a computer-readable readable recording medium storing a control program and its data, and the control program and its data are read out at start-up, and the data for each control by the CPU 21 To read and store And a RAM25 as a storage unit which acts as a memory.
- the host device 3 in the production management system 1 includes a CPU (Central Processing Unit) 31 as a control unit that performs overall control, and a computer-readable readable recording medium in which a control program and data thereof are stored.
- ROM Central Processing Unit
- a control program and its data at the time of start-up and a RAM as a storage unit that functions as a work memory for reading and storing data for each control by the CPU 31, as well as a large amount of worker information and verification information , Worker behavior history information, work evaluation value update information, and a database 32 for storing a large amount of production information.
- the ROM as a readable recording medium may be composed of a portable optical disk, a magneto-optical disk, a magnetic disk, an IC memory, etc. in addition to a hard disk.
- This control program and its data are stored in the ROM, but this control program and its data may be downloaded to the ROM from another readable recording medium or via wireless, wired or the Internet.
- the CPU 21 in the management personal computer 2 has data input means 211 for inputting the worker information and lot ID read by the card reader 4 and the process contents, and the data input means 211 inputs data.
- the worker information such as the worker ID, the worker / time verification, i.e., verification (verification) whether the worker is correct and whether it is the expected time or how late, and the card reader
- the flow collation unit 212 for collating whether the lot ID read in step 4 and the process content are correct as production information, the collation result (or verification result) performed by the flow collation unit 212, and the next processing content (processing recipe) Is displayed on the display screen, and the host device 3
- Worker information / verification information transfer means 214 for uploading worker information such as supplier ID and verification information including a verification result, and a recipe number issuance for issuing a recipe number corresponding to the lot ID if the verification result is correct as a work instruction Means 215, processing end notifying means 216 for notifying the host device 3
- the verification result display control means 213 displays “warning” and emits a buzzer for a predetermined time. Display control of at least one of the delayed times on the display screen, and if the collation result is not correct as a work instruction, display a “warning” buzzer sound and display the “transport destination” The display is controlled above.
- the CPU 31 in the host device 3 receives the worker information such as the worker ID from the management personal computer 2 and the verification information including the verification result, records these in the database 32 and works.
- the destination for each worker is displayed on a navigation display installed at a predetermined location on the flow line of the worker in the process using the worker action history information obtained from the gate passing information for each worker collected in 3.
- the work evaluation value update means 314 for collecting and updating the work evaluation values based on the quality of the result and the delay time, and the recipe number corresponding to the lot ID of the management personal computer 2 are issued, and the recipe number is supported.
- the recipe registration means 315 for registering the recipe (process content) in the database 32, and after the recipe content (process content) corresponding to the recipe number is registered by the recipe registration means 315, "processing start" is managed for the processing device.
- Processing start instruction means 316 for instructing via the personal computer 2 and processing history writing for instructing the management personal computer 2 of the processing apparatus to write the processing history data of the processing apparatus upon receiving the processing end notification
- the database To scan 32 and process history registration unit 318 for registering a process history data of the processing unit, and a next step the content display instruction unit 319 in the management personal computer 2 performs a display instruction of the next process contents.
- the work instruction means 313 uses a worker action history information obtained from the gate passing information for each worker collected in the host device 3 and displays it on a navigation display installed at a predetermined location on the flow line of the worker in the process. In addition to displaying the destination for each worker, a unique terminal device that can identify an individual worker in the process may be carried by each worker, and the host device 3 may instruct work to each individual terminal device. .
- the work evaluation value update unit 314 aggregates and updates the work evaluation values based on increase / decrease of work area, change of work type, improvement of work skill, increase / decrease of work amount, pass / fail of verification result, and magnitude of delay time.
- the data is transferred so that the work evaluation value for each worker is displayed on a navigation display installed at a predetermined location on the flow line of the worker in the process.
- FIG. 7 is an image diagram in which workers and lots flow through each processing step.
- each processing process includes a cleaning process, an exposure process, an etching process, an inspection process, a CVD process, an impurity ion implantation process, and the like.
- Each entry / exit gate in the entry / exit gate, cleaning process, exposure process, CVD process, and implantation process is checked by an operator card.
- the worker card is touched or brought close to the card reader 4 for entering or leaving, so that the worker is correct and the time is correct.
- Work analysis information can be obtained regarding the verification time, such as whether or not it is delayed and how much it is delayed.
- the worker is the person himself / herself at each point moved. For example, the worker's whereabouts information about where the worker is now can be obtained, and it becomes clear whether the worker who is working is the right person to work.
- the lot is delivered within a specified time or if it is delayed with respect to the specified time information on where and when the lot is to be delivered, information on how late the lot is is obtained. This is an operator tag for a lot tag.
- the host device 3 receives the gate passage information set at a predetermined place in the process from each management personal computer 2. Collected to obtain worker action history information.
- Navigation installed at a predetermined location on the flow line of the worker in the process using the worker action history information obtained from the location and time information of the worker information and verification information for each worker collected in the host device 3
- the destination for each worker is displayed on the display.
- a unique terminal device that can identify an individual worker in the process is carried by each worker, and work information is instructed from the host device 3 to each unique terminal device.
- FIG. 8 is a flowchart showing an operation example of the production management system 1 including the worker's work process when the production process is performed using the production management system 1 of FIG.
- step S ⁇ b> 1 the operator operates the stocker management personal computer 51 constituting the data card giving apparatus 5 to select “card output information”. As the “card output information”, an operator is instructed which cassette (lot) is taken out from which stocker and to which processing apparatus is manually conveyed.
- step S2 the operator operates the stocker management personal computer 51 to print out the data card 53 from the data card printer 52.
- step S3 the worker issues the instructed cassette (lot) from the source stocker 54 in accordance with the contents of the data card 53 printed out.
- step S4 the operator manually transports the delivered cassette (lot) to a predetermined processing apparatus.
- step S5 the worker reads the contents of the worker card (worker ID, assigned area, work rank (work skill and work history information)) with the card reader 4. Also, the worker manually conveys the work card.
- the cassette (lot) is set in the apparatus loader and the contents of the data card 53 are read by the card reader 4. That is, the operator sets the cassette (lot) in the processing apparatus as “set cassette”.
- the operator executes an event instructed by the stocker management personal computer 51 and the data card 53, and at the same time, the operator's work is to cause the card reader 4 to read the contents of the worker card and the data card 53. It is.
- step S 6 the management personal computer 2 performs the work in which the data input means 211 inputs the worker information such as the worker ID read by the card reader 4 and the time information at the time of reading by the card reader 4. Based on the worker information and the time information, the flow matching unit 212 verifies the worker / time flow matching, that is, whether the worker is a correct worker and whether it is the expected time or how late. The management personal computer 2 verifies whether the worker is a correct worker from the production flow of the production work and the information of the processing device and the worker information in order to determine whether the worker is correct and whether the time is correct.
- the collation result (verification result) performed by the flow collation unit 212 is good by the collation result display control unit 213, the content is displayed on the display screen of the management personal computer 2, and the collation result (verification result) is not possible. If there is, a “warning” is displayed on the display screen of the management personal computer 2 and a buzzer sound is emitted for a predetermined time.
- step S7 the worker information / verification information transfer unit 214 of the management personal computer 2 uploads the worker information such as the worker ID and the verification information including the verification result to the host device 3, and the host device 3
- the uploaded verification information including the worker information and the verification result is registered in the database 32.
- step S8 in the management personal computer 2, the data input means 211 inputs data on the lot ID and process contents read by the card reader 4 and processed by the processing apparatus, and the flow matching means 212 performs the processing.
- the flow collation for each apparatus is performed, “cassette verification, recipe check” is performed, and the collation result display control unit 213 displays the collation result and the next work content on the display unit 23. That is, the management personal computer 2 provided in the processing apparatus confirms whether the lot ID read by the card reader 4 and the process contents are correct as a work instruction. If the lot ID read by the card reader 4 and the process content (flow) are correct, the management personal computer 2 confirms the reception on the display screen with respect to the worker.
- step S9 the host device 3 accepts the recipe number corresponding to the lot ID, and the recipe registration means 315 of the host device 3 registers the cassette (lot) and recipe (process contents) in the database 32. To do.
- step S10 after the recipe number corresponding to the lot ID is registered by the recipe registration unit 315 of the host apparatus 3, the process start instruction unit 316 automatically instructs “processing start” to the processing apparatus.
- step S11 if the lot ID and the process content are not correct as a result of the collation by the flow collating unit 212 (no), the collation result display control unit 213 displays “warning” and “conveyance destination” as its management personal computer. The display is controlled on the display screen 2 and a buzzer sound is generated.
- steps S8 to S10 are operations performed by the management personal computer 2 and the host device 3.
- step S11 when a “warning” is issued on the display screen in step S11, the worker removes the cassette (lot) from the processing apparatus, and processes the cassette (lot) as a regular transport destination. Manually transport to the equipment.
- step S10 the processing device starts processing according to the “processing start instruction” from the processing start instruction means 316, and the processing device ends the processing after a predetermined time.
- step S12 the processing device notifies the host device 3 that the processing for the cassette (lot) has been completed, and the processing history writing instruction unit 317 of the host device 3 causes the processing device to notify the host device 3 that the processing has been completed.
- step S13 the management personal computer 2 of the processing device is instructed to write processing history data, and the processing history transfer means 217 of the management personal computer 2 sends the host device 3 to the processing history data.
- the processing history data of the processing device is transferred to.
- the processing history registration means 318 of the host device 3 registers the processing history data of the processing device in the database 32.
- step S14 the host device 3 determines whether or not the processing has been completed for the cassette (lot). If the processing has been completed for the cassette (lot) (YES), the host device 3 In step S15, the next process content display instruction means 319 instructs the management personal computer 2 to display the next process content, and the next process content display control means 218 of the management personal computer 2 displays “ The display of the message “Remove cassette” is controlled, and “Receiving stocker” is displayed on the display screen of the management personal computer 2. In accordance with this instruction, the operator removes the cassette (lot) from the apparatus loader and transports it to a predetermined instruction stocker, and enters the cassette (lot) into the predetermined instruction stocker.
- next process content display instruction means 319 of the host device 3 sends the next process content to the management personal computer 2 in step S16.
- the next process content display control means 218 of the management personal computer 2 displays a message “Remove cassette” on the display screen and also displays “Next process” on the display screen of the management personal computer 2. Is displayed.
- the worker causes the card reader 4 to read the contents of the worker card (worker ID, area in charge, work rank (work skill and work history information).
- the worker uses the cassette (lot ) Is removed from the apparatus loader and conveyed to the processing apparatus of the next process, and the worker sets the cassette (lot) in the apparatus loader and brings the data card and the worker card closer to the card reader 4 in step S5.
- the card information is read by the card reader 4.
- the management personal computer 2 uses the production work flow, the processing device information, and the worker information to determine whether the worker is correct and whether the time is correct. Whether it is a correct worker or downloaded from the host device 3 Progress information of the work, for example, in order to arrive from the transport instruction is issued time within a predetermined time, or delayed much or what if time as the expected are verified.
- the management personal computer 2 uses the data input means 211 to input the worker information such as the worker ID read by the card reader 4 and the time information at the time of reading by the card reader 4. Based on the information and the time information, the flow matching means 212 verifies the worker / time flow matching, that is, whether the worker is a correct worker and whether it is the expected time or how late. Furthermore, if the collation result (verification result) performed by the flow collation unit 212 is good by the collation result display control unit 213, the content is displayed on the display screen of the management personal computer 2, and the process proceeds to the next step S18. . If the collation result (verification result) is not possible, “Warning” is displayed on the display screen of the management personal computer 2 and a buzzer sound is generated for a predetermined time in the next step S11.
- step S18 the worker information / verification information transfer means 214 of the management personal computer 2 uploads the worker information such as the worker ID and the verification information including the verification result to the host device 3, and the host device 3
- the uploaded worker information and verification information including the verification result are registered in the database 32, and the process returns to the next step S4.
- the above steps S12 to S18 are operations performed by the management personal computer 2 and the host device 3.
- the worker performs other work during the processing of the processing apparatus, and if instructions of “take out cassette” and “convey to next process” are displayed on the display screen of the management personal computer 2, The cassette is taken out from the processing apparatus, and the cassette (lot) is manually conveyed to the next process.
- the data input means 211 causes the data input means 211 to input the lot ID read by the card reader 4 and the process contents thereof, and the flow collating means 212 inputs the lot ID and the process contents thereof.
- the flow verification process for verifying whether the production information is correct, and the verification result display control unit 213 controls the display of the verification result and the next work content performed by the flow verification unit 212 on the display screen.
- worker information / verification information transfer means 214 uploads worker information such as worker ID and verification information including verification results to the host device 3, and the collation result is the work If it is correct as an instruction, the recipe number issuing means 215 receives the recipe number corresponding to the lot ID.
- the processing history transfer means 217 transfers the processing history data of the processing apparatus to the host device 3, and the next process content display control means 218 controls the display of a “cassette removal” message on the display screen.
- it has a next process content display control process for controlling display of the “warehousing stocker” or the “processing apparatus for the next process”.
- worker information / verification information registration means 311 receives worker information such as a worker ID from the management personal computer 2 and verification information including a verification result, records them in the database 32 and works.
- Worker information / verification information registration step for updating points and worker behavior history information acquisition means 312 collects gate passage information installed at a predetermined place in the step and acquires worker behavior history information.
- the history information acquisition step and the work instruction means 313 use the worker action history information obtained from the gate passage information for each worker collected in the host device 3 to obtain a predetermined place on the flow line of the worker in the process.
- the work instruction process for displaying the destination for each worker on the installed navigation display and the work evaluation value update means 314 are provided to increase / decrease the work area.
- Work evaluation value update process for collecting and updating work evaluation values based on change of work type, improvement of work skills, increase / decrease of work amount, quality of verification result and delay time, and recipe from management personal computer 2
- the recipe registration means 315 registers the recipe contents corresponding to the recipe number in the database
- the processing start instruction means 316 gives the processing device a “processing”
- a process start instructing step for instructing “start” a process history write instructing step for instructing the management personal computer 2 to write process history data by the process history write instructing means 317 upon receiving a process end notification
- the processing history registration means 318 receives the transfer processing history data from the management personal computer 2 and stores it in the database 32.
- the operator who is an operator, circulates a predetermined route by manual conveyance at a predetermined cycle, thereby verifying the identity of the operator card and time.
- it is a processing device that cannot automatically receive a lot with an offline device according to the production information displayed on the display screen of the management personal computer 2 or the work instruction screen of the data card (RF-ID tag).
- accurate work processing and lot transportation / next process processing can be performed reliably.
- FIG. 9 is a layout diagram of a plurality of processing devices, a management personal computer 2 and a host device 3 which are offline devices in the production management system 1 of FIG.
- the offline device 6 is lit up so that the processing device can be checked for abnormality (alarm), operation / non-operation (maintenance (forced stop), processing possible, processing, processing end, processing waiting), etc.
- a signal tower 61 is provided.
- the signal tower 61 of the offline device 6 is widely used for detecting the device state such as operation / non-operation, which is the original purpose.
- a signal tower signal / warning signal hereinafter, simply referred to as a signal tower signal
- the offline device 6 can be pseudo-online and the device status of the offline device 6 can be obtained in real time. .
- a decoder device 63 that reads various signals is provided on the signal line 62 connected to the signal tower 61 and is read by an electronic device capable of online communication of the management personal computer 2, so that the device body of the offline device 6 is not modified.
- the device status information of the offline device 6 is transmitted from the management personal computer 2 to the host device 3 that performs process management.
- This production management system 1 includes a host device 3 having a lot process flow progress management function and one or more processing devices including at least one offline device 6 and devices added to the offline device 6.
- the host device 3 includes at least device status information (abnormality (alarm) and operation / operation) of one or a plurality of processing devices including the offline device 6.
- Non-operating state information (information on whether or not the device is available) via each management personal computer 2 And outputs the work instruction information of the door.
- the processing priority of lots, the worker's current location, etc. are comprehensively determined and managed for each offline device 6.
- the work instruction information is output to the personal computer 2. That is, when a signal requiring work is detected simultaneously from one or a plurality of processing devices including at least the off-line device 6, the host device 3 comprehensively determines the production conditions such as the processing priority of lots and the worker's current location.
- the work instruction information is output via each management personal computer 2 of at least one processing apparatus including the off-line apparatus 6.
- the processing end time is predicted from the processing start signal included in the signal tower signal read from the offline device 6 and the process time of the offline device 6 registered in advance, and the work is reserved in the management personal computer 2 for each offline device 6.
- the host device 3 predicts the processing end time from the processing start signal read from one or a plurality of processing devices including at least the offline device 6 and the process time registered in advance, and includes at least one or more of the offline devices 6 Work reservation instruction information is output via each management personal computer 2 of each of the plurality of processing devices.
- the lot work instruction information via each management personal computer 2 is displayed and output on the display screen of the display unit 23 of each management personal computer 2 as text or a pattern, or by a buzzer or the like at the time of abnormality (alarm). It is possible to output a voice or output various instructions to the worker.
- a signal tower signal (including an alarm signal) that informs the operation status of the device attached to the offline device 6 by lighting / non-lighting is read, and the device of the offline device 6 is read.
- the management personal computer 2 transfers the status information to the host device 3, and the host device 3 outputs work instruction information on the lot of the offline device via the management personal computer 2 based on the device status information of the offline device 6.
- the production management method according to the second embodiment reads at least one offline device 6 by reading a signal tower signal (including an alarm signal) that informs the operation status of the device added to the offline device 6 by lighting / non-lighting.
- each management personal computer 2 transfers the device status information of a plurality of processing devices to the host device 3, and the host device 3 responds based on the device status information of one or more processing devices including at least the offline device 6.
- the lot work instruction information of at least one processing apparatus including at least the off-line apparatus 6 is output.
- the management personal computer 2 uploads the device status information to the host device 3, and based on the uploaded device status information, the host device 3 downloads the lot work instruction information to each management personal computer 2 corresponding thereto. .
- a management personal computer 2 capable of communicating with the host device 3 and a card reader 4 (RF-ID reader) connected thereto are installed in the vicinity of the offline device, and worker information is written at the start / end of processing.
- a card reader 4 RFID reader
- the worker information and time of the worker card are input from the card reader 4 to the management personal computer 2, and the management personal computer 2 operates from the card reader 4.
- the worker / time is verified based on the worker information including the worker ID, and the management personal computer 2 uploads the worker information and the verification information including the worker ID to the host device 3.
- the host device 3 grasps the processing status (progress management, normal processing check) of each lot, and at the same time calculates whether there is a work delay or a pick-up delay in the lot progress for each worker. Is displayed on the corresponding management personal computer 2 and other work instruction screens.
- the worker's assigned area, work skill, and work ability can be managed as system information by the production management system.
- the operator circulates a predetermined route at a predetermined cycle, and according to the information displayed on the screen of the management personal computer 2, the offline device can perform accurate processing and lot transportation / next process processing. it can.
- the work results of each “worker” to the worker it is possible to improve the worker's work skill, work consciousness, and process efficiency.
- the worker behavior history information acquisition unit 312 of the host device 3 collects gate passage information installed at a predetermined place in the process and acquires the worker behavior history information. By analyzing this worker behavior history information, it can be reflected in further efficiency improvement of the worker in the process.
- the work instruction means 313 in the host device 3 uses the worker action history information obtained from the gate passage information for each worker collected in the host device 3, the work instruction means 313 in the host device 3 causes the predetermined location on the flow line of the worker in the process.
- the destination for each worker is displayed on the navigation display 7 installed in the.
- the large screen of the navigation display 7 allows the worker to constantly check the latest information for each worker, thereby efficiently flowing without waste and always checking the priority of the next work.
- the work evaluation value update means 314 of the host device 3 is based on increase / decrease of work area for each worker, change of work type, improvement of work skill, increase / decrease of work amount, pass / fail of verification result, and magnitude of delay time. Aggregate and update work evaluation values.
- the update of the work evaluation value can be displayed on the large screen of the navigation display 7 and can be used as an index for increasing the motivation of a plurality of workers.
- each management personal computer 2 to which a unique ID is assigned to each of a plurality of processing devices including an offline device and an entrance / exit gate is connected to each management personal computer 2.
- a card reader 4 capable of reading the contents of a worker card with worker information including a worker ID unique to each worker, and a host for managing processes by exchanging information with each management personal computer 2
- Each management personal computer 2 includes a flow verification unit 212 for verifying the worker / time based on worker information including the worker ID from the card reader 4, and each management personal computer 2 is a host device.
- the host device 3 includes worker information / verification information registration unit 311 for registering worker information including the uploaded worker ID and verification information including the verification result. .
- the worker information is managed online on the production line with the manual transfer / offline device, and the work due to different workers.
- pseudo on-line management is possible even for production lines with offline equipment. It can be realized efficiently.
- the host device 3 that performs process management by grasping the operating / non-operating state of the apparatus in real time from the signal tower signal including the apparatus state information (operating / non-operating state information) of the off-line apparatus 6 allows the off-line apparatus 6 to manage the process.
- An in-process production work (lot) conveyance / processing instruction can be accurately displayed on the display screen of each management personal computer 2. Further, it is possible to reliably notify the operator who is in a position where the signal tower 61 is not visible, by displaying on the display screen of the management personal computer 2 for each offline device 6.
- the host device 3 that performs the process management determines the priority, and the work priority is determined by a display instruction on the display screen of the management personal computer 2 for each offline device 6. Can be managed. Furthermore, since the process end time can be predicted from the process start time, it is possible to improve the work efficiency of the worker (labor saving) by incorporating a function such as giving a prior (planned) work instruction to the worker. . Further, the host device 3 can automatically collect the device operation status data of the offline device 6, and the operation rate management which has been manually accumulated can be performed in real time and accurately, so that the process such as line balance can be performed. Improvement is possible.
- the present invention relates to a semiconductor such as a light emitting diode (LED) or a semiconductor laser element using one or a plurality of processing apparatuses including at least an off-line apparatus in a redevelopment to a compound semiconductor factory of an LSI manufacturing factory or a manual factory.
- a semiconductor such as a light emitting diode (LED) or a semiconductor laser element using one or a plurality of processing apparatuses including at least an off-line apparatus in a redevelopment to a compound semiconductor factory of an LSI manufacturing factory or a manual factory.
- the presence or absence of a unique ID of a placed sample box is detected, and the detected unique ID information of the sample box is hosted via each shelf management personal computer.
- Manual to collect information and manage the location information of the sample box Transmission / is in a certain production line off-line device, it is possible to realize the prevention of efficiency and operational mistakes of the work carried out navigation for the work management and labor saving.
Landscapes
- Engineering & Computer Science (AREA)
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- General Physics & Mathematics (AREA)
- Economics (AREA)
- Physics & Mathematics (AREA)
- Strategic Management (AREA)
- Entrepreneurship & Innovation (AREA)
- Tourism & Hospitality (AREA)
- Marketing (AREA)
- Theoretical Computer Science (AREA)
- General Business, Economics & Management (AREA)
- Quality & Reliability (AREA)
- Educational Administration (AREA)
- Game Theory and Decision Science (AREA)
- Development Economics (AREA)
- Operations Research (AREA)
- Automation & Control Theory (AREA)
- Manufacturing & Machinery (AREA)
- Health & Medical Sciences (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- General Factory Administration (AREA)
Abstract
置かれたロット保管ボックス(19)の固有IDの有無を検知する複数の試料棚としての処理前試料棚(12)および処理後試料棚(15)と、複数の試料棚としての処理前試料棚(12)および処理後試料棚(15)にそれぞれ固有IDが付与されて試料棚毎にロット保管ボックス(19)の固有IDの有無を管理する各棚管理パーソナルコンピュータとしての処理前試料棚管理パーソナルコンピュータ(13)および処理後試料棚管理パーソナルコンピュータ(16)と、該各棚管理パーソナルコンピュータをそれぞれ介して該試料箱の所在位置情報を管理するホスト装置としてのホストコンピュータ(17)とを有している。
Description
本発明は、例えばLSI製造工場の化合物半導体工場などへの再開発やマニュアル工場などにおいて、少なくともオフライン装置を含む一または複数の処理装置を用いて、発光ダイオード(LED)や半導体レーザ素子などの半導体発光素子などの半導体素子を製造する際の生産を管理する生産管理システムおよびこれを用いた生産管理方法、この生産管理方法をコンピュータに実行させるための処理手順が記述された制御プログラム、この制御プログラムが格納されたコンピュータ読み取り可能な可読記憶媒体に関する。
従来の例えばLSI製造工場などにおいて、特許文献1では、半導体製造工程のロット搬送において、自動搬送・設備と搬送機器を自動制御・管理するシステムを前置として、設備稼動状況の収集と設備処理計画の算出、必要となる搬送台車数の算出結果を元に、待ち時間が最短となるように搬送指示を行う制御システムが提案されている。この制御システムでは、生産自動化制御技術に関して、生産装置とロット搬送を高度に自動化・オンライン化した半導体製造ラインにおいて、情報の自動取得と時間予測計算等を行うことにより、生産品へのきめ細かな指示を可能にし、搬送制御の最適化、即ち、搬送待ち時間の極小化を可能にしている。これは如何にロスを無くすかに着目した技術である。
特許文献2では、半導体製造工程のロット搬送において、自動搬送・設備と搬送機器を自動制御・管理するシステムを前置として、設備稼動状況の収集と設備処理計画の算出、必要となる搬送台車数の算出結果を元に、待ち時間が最短となるように搬送指示を行う制御システムが提案されている。この制御システムでは、半導体製造工程の人的・時間的ロスの顕在化を可能にする半導体製造工場のシステム・プログラム技術として、ロット進捗状況の詳細分析と装置稼働状態の分析を行うために、装置からのイベント情報(SECSではない)を受け取り、そのイベントがどのロットの情報で、どの装置・ポートで処理されたものかを判定し、データベースに情報を蓄積する手法が報告されている。
特許文献3では、半導体製造工程のロット搬送において、自動搬送・設備と搬送機器を自動制御・管理するシステムを前置として、設備稼動状況の収集と設備処理計画の算出、必要となる搬送台車数の算出結果を元に、待ち時間が最短となるように搬送指示を行う制御システムが提案されている。
LSI工場の化合物半導体工場への再開発やマニュアル工場の活用に際し、オフラインのマニュアル処理を低投資でオンラインに準じた管理を行い、省人化や作業ミス防止を実現する技術が求められている。
これに対して、特許文献1に開示されている上記従来技術では、設備と搬送システムのオンライン化・CIM化が前提のシステムであり、当然、初期設備投資額も莫大である。また、特許文献2,3に開示されている上記従来技術においても、特許文献1の場合と同様に、設備と搬送システムのオンライン化・CIM化が前提のシステムであり、当然、初期設備投資額も莫大である。
要するに、上記特許文献1~3の従来技術は、全てオンライン自動化制御を前提とした大規模投資についての技術であって、特に、マニュアル搬送/オフライン装置に展開する場合には、自動搬送とオンライン管理に向けた装置改造に膨大な工数、膨大な試行錯誤および膨大な調整が必要であって、多額の投資が必要であり、オンライン装置やオフライン装置が混在する生産ラインの他、安価な労働力環境下でオフライン処理が前提の生産ラインや、ライン再開発で制御方法が大幅に変わった生産ラインおよび小規模生産で自動化せず、投資額を極力抑えた生産ラインなどではその実現が困難であった。
LSI製造工場の化合物半導体工場などへの再開発やマニュアル工場の活用に際し、オフラインのマニュアル処理を低投資でかつオンラインに準じて管理を行い、省人化や作業ミス防止を実現する技術が求められている。
本発明は、上記従来の問題を解決するもので、マニュアル搬送/オフライン装置がある生産ラインで、作業管理および省人化に向けたナビゲーションを行って作業の効率化および作業ミスの防止を実現することができる生産管理システムおよびこれを用いた生産管理方法、この生産管理方法をコンピュータに実行させるための処理手順が記述された制御プログラム、この制御プログラムが格納されたコンピュータ読み取り可能な可読記憶媒体を提供することを目的とする。
本発明の生産管理システムは、置かれた試料箱の固有IDの有無を検知する複数の試料棚と、該複数の試料棚にそれぞれ固有IDが付与されて試料棚毎に該試料箱の固有IDの有無を管理する各棚管理パーソナルコンピュータと、該各棚管理パーソナルコンピュータをそれぞれ介して該試料箱の所在位置情報を管理するホスト装置とを有するものであり、そのことにより上記目的が達成される。
また、好ましくは、本発明の生産管理システムにおける試料棚は、前記試料箱の固有IDを読み取る試料箱IDリーダ手段を具備し、該試料箱IDリーダ手段で読み取った試料箱の固有IDが、前記棚管理パーソナルコンピュータを介して前記ホスト装置に情報提供されて前記試料箱の所在位置情報が更新される。
さらに、好ましくは、本発明の生産管理システムにおける試料棚に作業者が試料箱を置く作業と該試料棚から作業者が該試料箱を取出す作業の際に前記試料箱IDリーダ手段が読み取った試料箱ID情報により、該試料箱の所在位置情報をリアルタイムに前記棚管理パーソナルコンピュータから前記ホスト装置にアップロードする。
さらに、好ましくは、本発明の生産管理システムにおける複数の試料棚はそれぞれ工程毎に区分された区画に配置され、各区画には一または複数の処理前試料棚と一または複数の処理後試料棚が配置されている。
さらに、好ましくは、本発明の生産管理システムにおける棚管理パーソナルコンピュータは、製造フローと処理装置情報、流動する生産試料の進度情報を保有しており、検出した前記試料箱の固有IDから、次に当該試料箱内の試料が処理されるべき処理装置を判断し、該試料箱の搬送先を表示画面上に表示して作業者に指示する。
さらに、好ましくは、本発明の生産管理システムにおける棚管理パーソナルコンピュータは、前記搬送先を表示画面上に表示した時点から作業が実施されるまでの経過時間を前記表示画面上にカウントアップ表示すると共に、該経過時間の超過度合に伴ってアラーム表示を行うように制御する。
さらに、好ましくは、本発明の生産管理システムにおいて、各区画に配置された一または複数の処理装置のそれぞれに固有IDが付与された各装置管理パーソナルコンピュータを更に有し、該各装置管理パーソナルコンピュータは、処理開始時間を表示画面上に表示した時点から作業が実施され終わるまでの経過時間を前記表示画面上にカウントアップ表示すると共に、該経過時間の超過度合に伴ってアラーム表示を行うように制御するものであり、前記ホスト装置は該各装置管理パーソナルコンピュータと情報交換して工程を管理する。
さらに、好ましくは、本発明の生産管理システムにおけるホスト装置は、前記試料箱IDリーダ手段で読み取られた試料箱の固有IDの有無情報を前記棚管理パーソナルコンピュータから提供されて該試料箱の固有ID情報の変化を検知する識別情報変化検知部と、該試料箱の固有IDの有無を検知したときに、該試料箱の前回の所在位置情報に基づいて、該試料箱の現在の所在位置情報を決定する試料所在位置決定部と、該所在位置決定部で決定した該試料箱の現在の所在位置情報を所在位置履歴情報として更新して記憶する所在位置履歴記憶部とを有する。
さらに、好ましくは、本発明の生産管理システムにおいて、各区画に配置された一または複数の処理装置のそれぞれに固有IDが付与された各装置管理パーソナルコンピュータと、該各装置管理パーソナルコンピュータにそれぞれ接続され、複数の作業者に各々固有の作業者IDを含む作業者情報を付与した作業者カードの内容を読み取り可能とするカードリーダと、該各装置管理パーソナルコンピュータと情報交換して工程を管理する前記ホスト装置とを備え、該各装置管理パーソナルコンピュータは、該カードリーダからの該作業者IDを含む作業者情報に基づいて作業者/時間を検証するフロー照合手段と、該各管理パーソナルコンピュータは該ホスト装置に該作業者IDを含む作業者情報および該作業者IDを含む検証情報をアップロードする作業者情報/検証情報転送手段とを有し、該ホスト装置は、アップロードした該作業者IDを含む作業者情報および検証結果を含む検証情報を登録する作業者情報/検証情報登録手段を有する。
さらに、好ましくは、本発明の生産管理システムにおけるホスト装置は、工程内の所定場所に設置した試料棚管理パーソナルコンピュータ及び装置管理パーソナルコンピュータから作業履歴情報を収集して作業者行動履歴情報および試料所在履歴情報を取得する作業履歴情報取得手段を有する。
さらに、好ましくは、本発明の生産管理システムにおけるホスト装置に収集された作業者別の前記情報から得られる前記作業者行動履歴情報を用いて、工程内の作業者の動線上の所定場所に設置されたナビゲーションディスプレイに該作業者毎の行き先を表示する作業指示手段を有する。
さらに、好ましくは、本発明の生産管理システムにおけるホスト装置は、作業区画の増減、作業種別の変更、作業スキルの向上、作業量の増減、検証結果の良否および遅れ時間の大小に基づいて作業評価値を集計して順次更新する作業評価値更新手段を有する。
さらに、好ましくは、本発明の生産管理システムにおいて、少なくともオフライン装置を含む一または複数の処理装置を用いて半導体素子を製造する半導体製造工程において、該一または複数の処理装置に対してロットの処理フロー進捗管理機能を有した前記ホスト装置と、該オフライン装置に付加されている装置稼働状況を点灯・非点灯で知らせるシグナルタワー信号を読み取って、該オフライン装置の装置状態情報を該ホスト装置に送信する管理パーソナルコンピュータとを有し、該ホスト装置は、該少なくともオフライン装置を含む一または複数の処理装置の装置状態情報に基づいて、対応する該処理装置の該管理パーソナルコンピュータを介して、該オフライン装置を含む一または複数の処理装置の各ロットの作業指示情報を出力させる。
本発明の生産管理方法は、本発明の上記生産管理システムを用いた生産管理方法であって、前記ホスト装置において、識別情報変化検知部が、前記試料箱IDリーダ手段で読み取られた試料箱の固有IDの有無情報を前記棚管理パーソナルコンピュータから提供されて該試料箱の固有ID情報の変化を検知する識別情報変化検知工程と、試料所在位置決定部が、該試料箱の固有IDの有無を検知したときに、該試料箱の前回の所在位置情報に基づいて、該試料箱の現在の所在位置情報を決定する試料所在位置決定工程と、所在位置履歴記憶部が、該所在位置決定部で決定した該試料箱の現在の所在位置情報を所在位置履歴情報として更新して記憶する所在位置履歴記憶工程とを有するものであり、そのことにより上記目的が達成される。
本発明の生産管理方法は、本発明の上記生産管理システムを用いた生産管理方法であって、前記各管理パーソナルコンピュータにおいて、フロー照合手段が、前記カードリーダからの前記作業者IDを含む作業者情報に基づいて作業者/時間を検証するフロー照合工程と、作業者情報/検証情報転送手段が、該各管理パーソナルコンピュータは前記ホスト装置に該作業者IDを含む作業者情報および該作業者IDを含む検証情報をアップロードする作業者情報/検証情報転送工程とを有し、該ホスト装置において、作業者情報/検証情報登録手段が、アップロードした該作業者IDを含む作業者情報および検証結果を含む検証情報を登録する作業者情報/検証情報登録工程を有するものであり、そのことにより上記目的が達成される。
本発明の制御プログラムは、本発明の上記生産管理方法をコンピュータに実行させるための処理手順が記述されたものであり、そのことにより上記目的が達成される。
本発明の可読記憶媒体は、本発明の上記制御プログラムが格納されたコンピュータ読み取り可能なものであり、そのことにより上記目的が達成される。
上記構成により、以下、本発明の作用を説明する。
本発明においては、置かれた試料箱の固有IDの有無を検知する複数の試料棚と、複数の試料棚にそれぞれ固有IDが付与されて試料棚毎に試料箱の固有IDの有無を管理する各棚管理パーソナルコンピュータと、各棚管理パーソナルコンピュータをそれぞれ介して試料箱の所在位置情報を管理するホスト装置とを有している。
これによって、試料箱を作業者が棚に置く、または棚から取出す作業のみで、被生産試料(ロット)が入った試料箱が棚にあるかどうかを無線通信機能で検知し、試料箱内の被生産試料(ロット)の所在情報をホスト装置が全棚から収集することが可能となって、低投資で、小規模ライン・局所的な分散ラインにおいて、工程内全体の被生産試料(ロット)を擬似的にオンライン管理することができる。これによって、マニュアル搬送/オフライン装置がある生産ラインで、作業管理および省人化に向けたナビゲーションを行って作業の効率化および作業ミスの防止を実現することができる。
以上により、本発明によれば、置かれた試料箱の固有IDの有無を検知し、検知された試料箱の固有ID情報を各棚管理パーソナルコンピュータをそれぞれ介してホスト装置に情報収集して試料箱の所在位置情報を管理するため、マニュアル搬送/オフライン装置がある生産ラインで、作業管理および省人化に向けたナビゲーションを行って作業の効率化および作業ミスの防止を実現することができる。
11 試料管理棚システム
12 処理前試料棚
13 処理前試料棚管理パーソナルコンピュータ
13a、14a、16a ナビゲーション画面
14 装置管理パーソナルコンピュータ
15 処理後試料棚
16 処理後試料棚管理パーソナルコンピュータ
17 ホストコンピュータ
18 RF-IDタグ
19 ロット保管ボックス
1 生産管理システム
2 管理パーソナルコンピュータ
21,31 CPU(中央演算処理装置)
22 入力装置
23 表示部
24 ROM
25 RAM
32 データベース
211 データ入力手段
212 フロー照合手段
213 照合結果表示制御手段
214 作業者情報/検証情報転送手段
215 レシピ番号発行手段
216 処理終了通知手段
217 処理履歴転送手段
218 次工程内容表示制御手段
3 ホスト装置
311 作業者情報/検証情報登録手段
312 作業者行動履歴情報取得手段
313 作業指示手段
314 作業評価値更新手段
315 レシピ登録手段
316 処理開始指示手段
317 処理履歴書込指示手段
318 処理履歴登録手段
319 次工程内容表示指示手段
4 カードリーダ
5 データカード付与装置
51 ストッカ管理パーソナルコンピュータ
52 データカードプリンタ
53 データカード
54 ソースストッカ
6 オフライン装置
61 シグナルタワー
62 信号線
63 デコーダ装置
7 ナビゲーションディスプレイ
12 処理前試料棚
13 処理前試料棚管理パーソナルコンピュータ
13a、14a、16a ナビゲーション画面
14 装置管理パーソナルコンピュータ
15 処理後試料棚
16 処理後試料棚管理パーソナルコンピュータ
17 ホストコンピュータ
18 RF-IDタグ
19 ロット保管ボックス
1 生産管理システム
2 管理パーソナルコンピュータ
21,31 CPU(中央演算処理装置)
22 入力装置
23 表示部
24 ROM
25 RAM
32 データベース
211 データ入力手段
212 フロー照合手段
213 照合結果表示制御手段
214 作業者情報/検証情報転送手段
215 レシピ番号発行手段
216 処理終了通知手段
217 処理履歴転送手段
218 次工程内容表示制御手段
3 ホスト装置
311 作業者情報/検証情報登録手段
312 作業者行動履歴情報取得手段
313 作業指示手段
314 作業評価値更新手段
315 レシピ登録手段
316 処理開始指示手段
317 処理履歴書込指示手段
318 処理履歴登録手段
319 次工程内容表示指示手段
4 カードリーダ
5 データカード付与装置
51 ストッカ管理パーソナルコンピュータ
52 データカードプリンタ
53 データカード
54 ソースストッカ
6 オフライン装置
61 シグナルタワー
62 信号線
63 デコーダ装置
7 ナビゲーションディスプレイ
以下に、本発明の生産管理システムおよびこれを用いた生産管理方法の実施形態1、2について図面を参照しながら詳細に説明する。なお、各図における構成のそれぞれのサイズなどは図面作成上の観点から、図示する構成に限定されるものではない。
(実施形態1)
図1は、本発明の生産管理システムにおける試料管理棚システムの実施形態1において手動搬送工程での作業概要を示す模式図である。
図1は、本発明の生産管理システムにおける試料管理棚システムの実施形態1において手動搬送工程での作業概要を示す模式図である。
図1において、本実施形態1の生産管理システムにおける試料管理棚システム11は、各処理装置で処理する試料(ロット)の有無を検出して保管する処理前試料棚12と、処理前試料棚12で検出した試料(ロット)に対してナビゲーション画面13aで次の処理指示を行う処理前試料棚管理パーソナルコンピュータ13と、処理前試料棚12から試料(ロット)を取り出して処理装置まで搬送し処理装置にセットする場合のセット内容や、処理が完了して試料(ロット)を取り出す場合の搬送時間などの各種情報をナビゲーション画面14aで作業者に指示を行う装置管理パーソナルコンピュータ14と、その処理装置で処理が完了した試料(ロット)を処理装置から搬送し、置かれた試料(ロット)を検出して保管する処理後試料棚15と、処理後試料棚15で検出した試料(ロット)に対してナビゲーション画面16aで次工程への搬送指示を行う処理後試料棚管理パーソナルコンピュータ16と、これらの処理前試料棚管理パーソナルコンピュータ13、装置管理パーソナルコンピュータ14および処理後試料棚管理パーソナルコンピュータ16が無線または有線で通信されて試料(ロット)の全所在管理および試料(ロット)毎の処理進捗状況管理を行うホスト装置としてのホストコンピュータ17とを有している。
要するに、試料管理棚システム11は、置かれた試料箱(被生産試料が入ったロット保管ボックス19)の固有IDを検知する複数の試料棚としての処理前試料棚12および処理後試料棚15と、複数の試料棚にそれぞれ固有IDが付与されて試料棚毎に設けられた各棚管理パーソナルコンピュータとしての処理前試料棚管理パーソナルコンピュータ13および処理後試料棚管理パーソナルコンピュータ16と、各棚管理パーソナルコンピュータをそれぞれ介して試料箱の所在位置情報を管理するホスト装置としてのホストコンピュータ17とを有している。
この試料管理棚システム11は、自動化搬送システムがない手動搬送工程に用いられ、RF-IDタグ18をロット保管ボックス19に付加し、それぞれのロット保管ボックス19毎に固有IDを割り付け、処理前試料棚12および処理後試料棚15である待機試料棚(擬似ストッカ)には棚毎に試料箱IDリーダ手段としてのRF-IDリーダ(図示せず)を搭載して、工程内で作業者が試料を棚に置くかまたは棚から試料を取るかの簡単な操作を行うだけで、工程内の全ロット在庫位置状況(リアルタイム所在位置管理)を検出して把握するようになっている。被生産試料(ロット)が入ったロット保管ボックス19が待機試料棚の何処に置かれても棚のRF-IDリーダがロット保管ボックス19のRF-IDタグ18を検出してどのような被生産試料(ロット)がこの待機試料棚に置かれたのかを処理前試料棚管理パーソナルコンピュータ13および処理後試料棚管理パーソナルコンピュータ16が認識してこれをホストコンピュータ17に送信し、ホストコンピュータ17の試料管理情報がデータ更新される。
このように、被生産試料(ロット)は全て試料管理棚システム11でリアルタイムに所在管理が行われる。被生産試料(ロット)はロット保管ボックス19内に入れられて、搬送、保管されるものであり、保管箱であるロット保管ボックス19以外の在庫は管理外となる。各管理コンピュータからのイベント収集により、ホストコンピュータ17により工程内の全試料の所在を更新して行く。この場合のホストコンピュータ17は大規模CIMシステムではなく、被生産試料(ロット)が入ったロット保管ボックス19を処理前試料棚2と処理後試料棚15に置かれた時点をトリガとして作業者の作業が開始される。要するに、被生産試料(ロット)が入ったロット保管ボックス19が処理前試料棚12に置かれたことにより処理装置による処理が可能となり、FIFO(先入先出)で順次処理が開始される。また、被生産試料(ロット)が入ったロット保管ボックス19が処理後試料棚15に置かれたことにより次の区画への搬送指示が出される。トリガは棚に置かれたイベントによる。
要するに、試料棚としての処理前試料棚12および処理後試料棚15は、被生産試料(ロット)が入った試料箱の固有ID(ロット保管ボックス19のRF-IDタグ18)を読み取る試料箱IDリーダ手段としてのRF-IDリーダを具備し、RF-IDリーダで読み取った試料箱の固有IDが、棚管理パーソナルコンピュータとしての処理前試料棚管理パーソナルコンピュータ13および処理後試料棚管理パーソナルコンピュータ16を介してホスト装置としてのホストコンピュータ17に情報提供されて試料箱の所在位置情報が更新されるようになっている。即ち、試料棚に作業者が試料箱を置く作業と該試料棚から作業者が試料箱を取出す作業の際にRF-IDリーダが読み取った試料箱ID情報により、試料箱の所在位置情報をリアルタイムに棚管理パーソナルコンピュータからホスト装置にアップロードするようになっている。
ホスト装置としてのホストコンピュータ17のCPU(制御部)は、制御プログラムおよびそのデータに基づいて、試料箱IDリーダ手段としてのRF-IDリーダで読み取られた試料箱の固有IDの有無情報を棚管理パーソナルコンピュータとしての処理前試料棚管理パーソナルコンピュータ13および処理後試料棚管理パーソナルコンピュータ16から提供されて試料箱の固有ID情報の変化を検知する識別情報変化検知部と、試料箱の固有IDの有無を検知したときに、試料箱の前回の所在位置情報に基づいて、試料箱の現在の所在位置情報を決定する試料所在位置決定部と、所在位置決定部で決定した該試料箱の現在の所在位置情報を所在位置履歴情報として更新して記憶する所在位置履歴記憶部(作業履歴情報取得手段)とを有している。
本実施形態1の生産管理方法は、ホスト装置としてのホストコンピュータ17において、識別情報変化検知部が、試料箱IDリーダ手段としてのRF-IDリーダで読み取られた試料箱の固有IDの有無情報を棚管理パーソナルコンピュータとしての処理前試料棚管理パーソナルコンピュータ13および処理後試料棚管理パーソナルコンピュータ16から提供されて試料箱の固有ID情報の変化を検知する識別情報変化検知工程と、試料所在位置決定部が、試料箱の固有IDの有無を検知したときに、試料箱の前回の所在位置情報に基づいて、試料箱の現在の所在位置情報を決定する試料所在位置決定工程と、所在位置履歴記憶部(作業履歴情報取得手段)が、所在位置決定部で決定した該試料箱の現在の所在位置情報を所在位置履歴情報として更新して記憶する所在位置履歴記憶工程(作業履歴情報取得工程)とを有している。
上記構成により、作業者が、被生産試料(ロット)が入ったロット保管ボックス19を待機試料棚に置くと、待機試料棚はその被生産試料(ロット)が入ったロット保管ボックス19が何処の待機試料棚に置かれたかを、処理前試料棚管理パーソナルコンピュータ13、装置管理パーソナルコンピュータ14および処理後試料棚管理パーソナルコンピュータ16を介してホストコンピュータ17が認識するようになっている。所定の処理装置で処理が済んだ被生産試料(ロット)が入ったロット保管ボックス19を待機試料棚から取って次の処理を行う待機試料棚まで搬送する。処理が済んだ被生産試料(ロット)が入ったロット保管ボックス19がその待機試料棚からなくなったことを待機試料棚は検出して処理後試料棚管理パーソナルコンピュータ16を介してホストコンピュータ17に情報伝達する。その処理が済んだ被生産試料(ロット)が入ったロット保管ボックス19を次の処理を行う待機試料棚に置くとその待機試料棚は、次の処理が行われる被生産試料(ロット)が入ったロット保管ボックス19が待機試料棚の何処に置かれたかを検出して処理前試料棚管理パーソナルコンピュータ13を介してホストコンピュータ17に情報伝達する。このとき、ロット保管ボックス19が置かれた待機試料棚位置のランプが点灯するようになっている。作業者はランプが点灯した位置のロット保管ボックス19を取り込めばよい。このように、被生産試料(ロット)が入ったロット保管ボックス19を待機試料棚に置く、被生産試料(ロット)が入ったロット保管ボックス19を待機試料棚から取るということをイベントのトリガにして被生産試料(ロット)のロット所在情報の更新を通信により行う。
図2は、各処理工程を作業者および各ロットが流動するレイアウト図である。
図2に示すように、各処理工程としては、フォトリソ工程、ウェットエッチング工程、検査工程およびMOCVD工程などがあるが、各処理工程毎に「IN」および「OUT」で示す待機試料棚が設けられている。「IN」で示す待機試料棚は処理前試料棚12であり、「OUT」で示す待機試料棚は処理後試料棚15である。
所定の処理を行うために「IN」の処理前試料棚12に被生産試料(ロット)が入ったロット保管ボックス19を置く。また、次の処理をするために「OUT」の処理後試料棚15から被生産試料(ロット)が入ったロット保管ボックス19を取って次工程の「IN」の処理前試料棚12まで搬送する。各工程内に処理装置があり、各工程内にいる作業者は「IN」の処理前試料棚12に置かれた被生産試料(ロット)が入ったロット保管ボックス19を取って処理装置に被生産試料(ロット)をセットして所定の処理を行う。その処理装置による処理が済めば、「OUT」の処理後試料棚15に処理後の被生産試料(ロット)が入ったロット保管ボックス19を置く。搬送する作業者は、「OUT」の処理後試料棚15に置かれてランプが点灯している処理後の被生産試料(ロット)が入ったロット保管ボックス19を次の処理を行うために次工程の「IN」の処理前試料棚12までその被生産試料(ロット)が入ったロット保管ボックス19を搬送する。
この場合の工程は、プロセス毎に複数の区画に区切られており、そのぞれの区画に「IN」の処理前試料棚12と「OUT」の処理後試料棚15とが配置されている。これらの工程内および工程間には自動搬送システム(搬送ロボットや保管ストッカ)は存在せず、手動生産工程である。
複数の待機試料棚はそれぞれ工程毎に区分された区画に配置され、各区画には一または複数の処理前試料棚12と一または複数の処理後試料棚15が配置されている。
作業者は区画毎に区別された専任作業者(例えばフォト担当者、検査担当者およびCVD担当者など)が配置されている。区画間に対して被生産試料(ロット)を搬送する搬送専任の作業者も配置されている。それぞれの作業者は、区画毎に特有のスキルを保有しており、それぞれの経験によりスキルランクを持っている。これらの作業者は区画毎に配置された棚管理コンピュータの表示画面上に表示される指示内容に従って工程内作業および搬送作業を行う。作業者は個人を識別できるIDを持っている。
特に、本実施形態1の試料管理棚システム11では、指示された作業を確実に行い、ミス無く、遅れ無く、間違い無く実施するためのナビゲーション画面13a,14aおよび16aを活用することにより新人作業者(海外工場のワーカ)の作業を可能とする。
また、各作業者の作業遅延を監視するために各棚管理コンピュータには指示から実施までの時間をカウントアップする機能を有している。この時間経過をカウントアップすることにより作業者の作業効率の向上を図ると共にスキル判定の情報をも収集し、安定生産に繋げることを目的としている。この経過時間の算出開始は、作業指示を実施した時点(画面表示した時点)からカウントアップする。この時間経過には時間設定を3分までがレベル3とし、5分までがレベル2とし、10分までがレベル3とする。過去の平均経過時刻との差を評価手法の一つとする。レベル3の回数を作業者の評価減点項目の対象の一つとして用いる。作業者には、指示された作業を作業ミスなく、遅れなく実施するのみであり、作業者に熟練度を要求するものではない。
要するに、棚管理パーソナルコンピュータとしての処理前試料棚管理パーソナルコンピュータ13および処理後試料棚管理パーソナルコンピュータ16は、製造フローと処理装置情報、流動する生産試料の進度情報を保有しており、検出した待機試料箱(ロット保管ボックス19)の固有ID(RF-IDタグ18)から、次にこの待機試料箱内の試料が処理されるべき処理装置を判断し、試料箱の搬送先を表示画面(ナビゲーション画面13a,14aおよび16a)上に表示して作業者に指示する。さらに、処理前試料棚管理パーソナルコンピュータ13および処理後試料棚管理パーソナルコンピュータ16は、搬送先を表示画面(ナビゲーション画面13a,14aおよび16a)上に表示した時点から作業が実施されるまでの経過時間を表示画面(ナビゲーション画面13a,14aおよび16a)上にカウントアップ表示すると共に、経過時間の超過度合に伴ってアラーム表示を行うように制御される。
図3は、工程内作業ロスを回避する手段としてのカウントアップ機能について説明する図である。
図3に示すように、所定の処理装置によって処理が完了した被生産試料(ロット)が棚で搬出待ちのときに、装置管理パーソナルコンピュータ14は、搬出時間をナビゲーション画面14aで表示して作業者にカウントダウン表示する。これに対して、作業者は、処理装置で処理が完了した試料(ロット)をロット保管ボックス19に入れて処理装置から搬送処理後試料棚15に搬送する。このように、処理装置から「OUT」の搬送処理後試料棚15に試料(ロット)の搬出作業に遅れがないようにタイマにより時間管理されている。
「OUT」の搬送処理後試料棚15に置かれた被生産試料(ロット)が入ったロット保管ボックス19の次工程搬送待ちのときに、処理後試料棚管理パーソナルコンピュータ16は、搬送時間をナビゲーション画面16aで表示して作業者にカウントダウン指示する。これに対して、作業者は、「OUT」の搬送処理後試料棚15に置かれたロット保管ボックス19を次工程の「IN」の処理前試料棚12に搬送する。このように、「OUT」の搬送処理後試料棚15から「IN」の処理前試料棚12に試料(ロット)を搬送する作業に遅れがないようにタイマにより時間管理している。
この工程の「IN」の処理前試料棚12に置かれたロット保管ボックス19の処理着工待ちのときに、処理前試料棚管理パーソナルコンピュータ13は、処理着工時間をナビゲーション画面13aで表示して作業者にカウントダウン表示する。これに対して、作業者は、「IN」の搬送処理前試料棚12に置かれたロット保管ボックス19から被生産試料(ロット)を取り出して被生産試料(ロット)を所定の処理装置にセットする。このように、処理装置からの試料(ロット)の搬出作業に遅れがないようにタイマにより時間管理されている。このように、「IN」の搬送処理前試料棚12から処理装置のセットに試料(ロット)の処理着工作業に遅れがないようにタイマにより時間管理されている。
次に、装置管理パーソナルコンピュータ14は、処理開始時間をナビゲーション画面14aで表示して所定の持ち時間から作業者にカウントダウン表示する。これに対して、作業者は処理を開始し、所定の処理装置によって処理が完了した被生産試料(ロット)が搬出待ちのときに、装置管理パーソナルコンピュータ14は、搬出時間をナビゲーション画面14aで表示して作業者にカウントダウン表示する。これに対して、作業者は、処理装置で処理が完了した試料(ロット)をロット保管ボックス19に入れて処理装置から「OUT」の搬送処理後試料棚15に搬送する。このように、処理装置から「OUT」の搬送処理後試料棚15に試料(ロット)の搬出作業に遅れがないようにタイマにより時間管理されている。作業者は被生産試料(ロット)の搬出時間をナビゲーション画面14aを見てせかされて作業をすることになる。
また、各装置管理パーソナルコンピュータ14は、処理開始時間を表示画面上に表示した時点から作業が実施され終わるまでの経過時間を表示画面上にカウントアップ表示すると共に、この経過時間の超過度合に伴ってアラーム表示を行うように制御するようにしてもよい。
図4(a)は、図1のナビゲーション画面13a,14aおよび16aを作業指示画面および遅延画面の他に作業ミス防止画面とする図、図4(b)および図4(c)は平均作業時間比較図、図4(d)は班別処理実績ランキング図である。
図4(a)に示すように、図1のナビゲーション画面13a,14aおよび16aを次の作業指示画面および遅延防止画面として用いる場合について説明したが、図1のナビゲーション画面13a,14aおよび16aを作業ミス防止画面に用いることもできる。例えば、「IN」の処理前試料棚12にシステムが期待しない試料(ロット)が置かれた場合、棚のRF-IDリーダがロット保管ボックス19のRF-IDタグ18を検出してどのような被生産試料(ロット)がこの待機試料棚に置かれたのかを処理前試料棚管理パーソナルコンピュータ13または処理後試料棚管理パーソナルコンピュータ16が認識するが、それが間違っている旨、図1のナビゲーション画面13a,14aおよび16aに「ロットA;作業ミス」などの表示が為される。本来、何処の棚または処理装置に運ばれるべきかをも併せて画面表示させるようになっている。通常、「IN」の処理前試料棚2に被生産試料(ロット)が置かれると、処理前試料棚12は被生産試料(ロット)を検出して、作業指示画面が表示されてこの処理装置でどのような処理を行うかが表示されるが、間違えた場合には「作業ミス」が警告表示される。これによって、作業者がシステムが期待しない動作に対して警告表示を行って「作業ミス」を早期に防止することができる正しい作業に修正するように指示することができる。要するに、被生産試料(ロット)を処理装置Aで処理しようとした場合に、それが間違いで処理装置Bですることを作業者に正しく作業指示することができる。どのような作業者であっても作業が遅れずかつミスがないように正しく導くシステムである。
図4(b)に示すように装置別の搬送遅延時間や、図4(c)に示すように日別の平均作業時間がホストコンピュータ17で集計され、図4(d)に示すように班別処理実績ランキングがホストコンピュータ17で集計される。
各作業者毎にイベントをホストコンピュータ17が集計することにより棚管理パーソナルコンピュータのナビゲーション画面13a,14aおよび16aを介して作業意識向上のナビゲーション情報を表示出力する。例えば、各区画、各作業者の処理実績の評価を行うことができるベスト10表示により各作業者に競争意識を持たせることができる。生産ラインの管理者(班長やライン長)には各作業区画毎の処理実績を見える化することにより、人員の増減および配置などの意思決定の試料とする。さらに、出庫指示および入庫指示に対する相違のイベント入力があった場合は、チェックする機能を有し、これを表示画面に表示する機能を有している。
以上により、本実施形態1によれば、置かれたロット保管ボックス19の固有IDの有無を検知する複数の試料棚としての処理前試料棚12および処理後試料棚15と、複数の試料棚としての処理前試料棚12および処理後試料棚15にそれぞれ固有IDが付与されて試料棚毎にロット保管ボックス19の固有IDの有無を管理する各棚管理パーソナルコンピュータとしての処理前試料棚管理パーソナルコンピュータ13および処理後試料棚管理パーソナルコンピュータ16と、該各棚管理パーソナルコンピュータをそれぞれ介して該試料箱の所在位置情報を管理するホスト装置としてのホストコンピュータ17とを有している。
このように、ロット保管ボックス19を作業者が棚に置く、また棚から取出す作業のみで、被生産試料(ロット)が入ったロット保管ボックス19が棚にあるかどうかを無線通信機能で検知し、ロット保管ボックス19内の被生産試料(ロット)の所在情報をホスト装置が全棚から収集することができて、低投資で、小規模ライン・局所的な分散ラインにおいて、工程内全体の被生産試料(ロット)を擬似的にオンライン管理することができる。これによって、マニュアル搬送/オフライン装置がある生産ラインで、作業管理および省人化に向けたナビゲーションを行って作業の効率化および作業ミスの防止を実現することができる。
マニュアル搬送/オフライン装置が混在する生産ラインの他に、安価な労働力環境下でオフライン処理が前提の生産ライン、小規模生産で自動化せず、投資額を極力抑えた生産ライン、搬送自動化システム(搬送ロボット及びロットストッカ)が存在しない生産ラインなどにおいて、作業管理および省人化に向けたナビゲーションを行って作業の効率化および作業ミスの防止を実現することができる。
なお、本実施形態1では特に説明しなかったが、本実施形態1の試料管理棚システム1を、マニュアル搬送/オフライン装置がある生産ラインで、作業者情報や試料所在情報をオンライン管理して、作業ロスおよび作業ミスの防止や省人化に向けたナビゲーション機能を低投資で行うことにより、オフライン装置がある生産ラインであっても疑似的なオンライン管理を効率よく実現することができる生産管理システムに適用することができる。このような生産管理システムについて次の実施形態2で詳細に説明する。
本実施形態1のホスト装置としてのホストコンピュータ17と、次の実施形態2のホスト装置3とは同じホスト装置であってそれぞれ異なる機能を共に有している。本実施形態1と次の実施形態2でそれぞれの機能について説明する。ホスト装置は、工程内の所定場所に設置した試料棚管理パーソナルコンピュータとしての処理前試料棚管理パーソナルコンピュータ13および処理後試料棚管理パーソナルコンピュータ16、次の実施形態2で後述する装置管理パーソナルコンピュータとしての管理パーソナルコンピュータ2から作業履歴情報を収集して作業者行動履歴情報および試料所在履歴情報を取得する作業履歴情報取得手段を有している。ホスト装置は、試料所在履歴情報取得手段(実施形態1)と作業者行動履歴情報取得手段(実施形態2)とを有しており、作業者行動履歴情報取得手段については次の実施形態2で詳細に後述する。
本実施形態1の装置管理パーソナルコンピュータ14と次の実施形態2の管理パーソナルコンピュータ2とも同じパーソナルコンピュータであってそれぞれ異なる機能を併せ持っている。本実施形態1と次の実施形態2でそれぞれの機能について説明する。
(実施形態2)
図5は、本発明の実施形態2における生産管理システムの要部構成例およびその動作を示すブロック図である。
図5は、本発明の実施形態2における生産管理システムの要部構成例およびその動作を示すブロック図である。
図5において、本実施形態2の生産管理システム1は、オフライン装置を含む複数の処理装置および、作業者が入退室する複数のゲートのそれぞれに固有のIDが付された各管理パーソナルコンピュータ2と、各管理パーソナルコンピュータ2とそれぞれ情報交換を可能とするホスト装置3と、各管理パーソナルコンピュータ2にそれぞれ接続され、複数の作業者に各々固有の作業者IDなどの作業者情報を付した作業者カード(RF-ID)の内容を読み取り可能とすると共に、複数の生産ワーク(複数の生産ロット)に各々固有のIDおよび処理情報(フロー)を付したデータカード(RF-ID)をデータカード付与装置(図示せず)から作業者に付与し、そのデータカードから生産ワーク毎(作業者毎)の生産情報を読み取り可能とするカードリーダ4とを有している。
作業者カードをゲートのカードリーダ4または処理装置のカードリーダ4に接近または接触させて作業者情報を読み取り処理し、カードリーダ4が接続された管理パーソナルコンピュータ2は、作業者IDなどの作業者情報に基づいて、作業者/時間検証、即ち、正しい作業者かどうかおよび、期待した時刻通りかどうかまたはどの程度遅れたかを検証し、管理パーソナルコンピュータ2はホスト装置3に作業者IDなどの作業者情報および検証結果を含む検証情報をアップロードし、ホスト装置3は、アップロードしたその作業者情報および検証結果を含む検証情報を図6で後述するデータベース32に登録する。検証情報は、検証結果だけではなく、どのゲートまたはどの処理装置において、正しい作業者かどうかおよび、期待した時刻通りかどうかまたはどの程度遅れたかなどのデータを有している。
作業者カードは、タグチップと呼ばれるメモリを搭載したICチップおよびアンテナが埋め込まれており、作業者ID(名前、所属班、勤務帯)、作業エリア(洗浄、露光、エッチング、検査、搬送、CVDおよび不純物イオン注入など)、作業種別(管理、処理、検査、搬送およびメンテ)、作業ランク(1~5;作業スキルおよび作業履歴情報)および作業ポイントが作業者情報として記録されている。作業者カード内の作業者情報のうちの作業ポイントは、その作業者がこなせる作業量のことであり、日にどの作業をどれだけ(作業数)こなしたかを数値化したものである。作業ランクは、作業スキルのことであって、搬送だけを行う作業者から、搬送はもちろんできるし所定の処理作業もできるし検査作業もできる作業者はランクが高い。作業ポイントが高くなれば作業ランクも高くなる。
ホスト装置3は、規定時間内に作業が終わらないといけないのにどの程度遅れたかのマイナス評価や、作業ポイントが高くなるなどのプラス評価を総合して作業評価値を集計して更新する図6で後述する作業評価値更新手段314を有する。これらの作業ランクおよび作業ポイントを含む作業者毎の作業評価値は、ホスト装置3が、後述するナビゲーションディスプレイに表示制御する。この作業評価値は、作業効率を上げるための各作業者の指標になり得る。各ゲートでの作業者カードによる入退室チェックにより、その作業者と無関係のエリアに入ることはできないし、作業内容にしても作業ランクに基づいてその作業者にはできないことが警告としてブザー音や画面表示により確認されて作業者が所定の作業者と異なることによる作業ロスおよび作業ミスを未然に防ぐことができるようになっている。
データカードには、タグチップと呼ばれるメモリを搭載したICチップおよびアンテナが埋め込まれており、「どのストッカのどの生産ワークであるカセット(ロット)をどの処理装置にマニュアル搬送して作業を行うか」を作業者が目で見て分かるようにカード表面に記載されている。データカードは、処理装置での入力ミスを回避するようにデータがICチップ内に登録されてカードリーダ4により容易かつ確実に読み取りが可能であったり、バーコードで生産条件が表記されてバーコードデーダにより容易かつ確実に読み取りが可能であったりする。ICチップ内の登録データは、例えば処理が必要なロットがどういうものでどのような処理が必要であるのかが分かるデータである。
生産ワークとしてのカセット(ロット)の作業指示情報は、管理パーソナルコンピュータ2の表示画面上に表示されるかまたは、管理パーソナルコンピュータ2に接続されたデータカード付与装置によりデータカードの内容が書き換えられて表示される。
例えばオフライン装置などの処理装置の近傍に設けられた管理パーソナルコンピュータ2はホスト装置3とカードリーダ4にそれぞれ接続されている。管理パーソナルコンピュータ2はホスト装置3に作業者毎の生産情報をアップロードし、アップロードした生産情報に基づいて、ホスト装置3は作業指示情報をそれに対応する管理パーソナルコンピュータ2にダウンロードする。要するに、管理パーソナルコンピュータ2は、処理開始/終了時に生産ロット情報(ロットID/フロー情報)が書き込まれた作業者のデータカードをカードリーダ4にタッチ(接触)するかまたは近づけることにより、そのデータカードの内容を読み取って管理パーソナルコンピュータ2を介してホスト装置3に送信する。ホスト装置3は、その送信されたデータカードの内容(生産ロット情報)に基づいて、各ロットの処理状況(進捗管理、正常処理のチェック)を把握し、そのロット進捗状況に合わせた作業指示、カセット(ロット)の取り出し指示、次工程の処理装置選定とその搬送指示を管理パーソナルコンピュータ3の表示画面に表示させると共に、ホスト装置3の図6で後述するデータベース32に作業履歴を自動で収集する。
図6は、図5の生産管理システム1における管理パーソナルコンピュータ2とホスト装置3のソフト構成例を示すブロック図である。
図6において、本実施形態の生産管理システム1における管理パーソナルコンピュータ2は、全体の制御を行う制御部としてのCPU(中央演算処理装置)21と、CPU21に対して入力指令を行うためのキーボード、マウス、タッチパネルおよびペン入力装置、さらには通信ネットワーク(例えばインターネットやイントラネット)を介して受信入力する入力装置22と、表示画面上に、初期画面、選択場面、CPU21による制御結果画面および操作入力画面などを表示する表示部23と、制御プログラムおよびそのデータなどが記憶されたコンピュータ読み出し可能な可読記録媒体としてのROM24と、起動時に制御プログラムおよびそのデータなどが読み出されて、CPU21による制御毎にデータを読み出し・記憶するワークメモリとして働く記憶部としてのRAM25とを有している。
本実施形態の生産管理システム1におけるホスト装置3は、全体の制御を行う制御部としてのCPU(中央演算処理装置)31と、制御プログラムおよびそのデータなどが記憶されたコンピュータ読み出し可能な可読記録媒体としてのROMおよび、起動時に制御プログラムおよびそのデータなどが読み出されて、CPU31による制御毎にデータを読み出し・記憶するワークメモリとして働く記憶部としてのRAMの他、膨大な作業者情報および検証情報、作業者行動履歴情報、作業評価値更新情報、さらに膨大な生産情報を記憶するデータベース32とを有している。
可読記録媒体としてのROMは、ハードディスクの他、携帯自在な光ディスク、光磁気ディスク、磁気ディスクおよびICメモリなどで構成されていてもよい。この制御プログラムおよびそのデータなどがROMに記憶されるが、この制御プログラムおよびそのデータは、他の可読記録媒体から、または、無線、有線またはインターネットなどを介してROMにダウンロードされてもよい。
管理パーソナルコンピュータ2におけるCPU21は、制御プログラムおよびそのデータに基づいて、カードリーダ4で読み取った作業者情報やロットIDとその工程内容をデータ入力させるデータ入力手段211と、データ入力手段211がデータ入力した作業者IDなどの作業者情報に基づいて、作業者/時間検証、即ち、正しい作業者かどうかおよび、期待した時刻通りかどうかまたはどの程度遅れたかを検証(照合)し、また、カードリーダ4で読み取ったロットIDとその工程内容を生産情報として正しいかどうかをフロー照合するフロー照合手段212と、フロー照合手段212が行った照合結果(または検証結果)および次の処理内容(処理レシピ)を表示画面上に表示する照合結果表示制御手段213と、ホスト装置3に作業者IDなどの作業者情報および検証結果を含む検証情報をアップロードする作業者情報/検証情報転送手段214と、照合結果が作業指示として正しければ、ロットIDに対応したレシピ番号を発行するレシピ番号発行手段215と、そのロットIDに対する処理が終了したことをホスト装置3に通知する処理終了通知手段216と、処理履歴書込後、ホスト装置3にその処理装置の処理履歴データを転送する処理履歴転送手段217と、表示画面上に「カセットの取出」のメッセージを表示制御すると共に「入庫ストッカ」または「次工程の処理装置」を表示させる次工程内容表示制御手段218とを有している。
照合結果表示制御手段213は、照合結果(検証結果)が作業者および規定時刻のうちの少なくともいずれかが正しくなければ、「警告」を表示すると共にブザー音を所定時間発し、その正しい作業者および遅れた時間のうちの少なくともいずれかを表示画面上に表示制御し、また、照合結果が作業指示として正しくなければ、「警告」のブザー音と表示を行って、その「搬送先」を表示画面上に表示制御するものである。
ホスト装置3におけるCPU31は、制御プログラムおよびそのデータに基づいて、管理パーソナルコンピュータ2からの作業者IDなどの作業者情報および検証結果を含む検証情報を受けて、これらをデータベース32に記録すると共に作業ポイントを更新する作業者情報/検証情報登録手段311と、工程内の所定場所に設置したゲート通過情報を収集して作業者行動履歴情報を取得する作業者行動履歴情報取得手段312と、ホスト装置3に収集された作業者別のゲート通過情報から得られる作業者行動履歴情報を用いて、工程内の作業者の動線上の所定場所に設置されたナビゲーションディスプレイに作業者毎の行き先を表示する作業指示手段313と、作業エリアの増減、作業種別の変更、作業スキルの向上、作業量の増減、検証結果の良否および遅れ時間の大小に基づいて作業評価値を集計して更新する作業評価値更新手段314と、管理パーソナルコンピュータ2のロットIDに対応したレシピ番号の発行を受けて、レシピ番号に対応したレシピ(工程内容)をデータベース32に登録するレシピ登録手段315と、レシピ登録手段315によるレシピ番号に対応したレシピ内容(工程内容)の登録後、処理装置に対して「処理開始」を、管理パーソナルコンピュータ2を介して指示する処理開始指示手段316と、処理終了通知を受けて、その処理装置の管理パーソナルコンピュータ2に対してその処理装置の処理履歴データを書き込むように指示する処理履歴書込指示手段317と、管理パーソナルコンピュータ2からの転送処理履歴データを受けてデータベース32にその処理装置の処理履歴データを登録する処理履歴登録手段318と、管理パーソナルコンピュータ2に次工程内容の表示指示を行う次工程内容表示指示手段319とを有している。
作業指示手段313は、ホスト装置3に収集された作業者別のゲート通過情報から得られる作業者行動履歴情報を用いて、工程内の作業者の動線上の所定場所に設置されたナビゲーションディスプレイに作業者毎の行き先を表示する以外に、工程内の作業者個人を特定できる固有端末装置を作業者毎に携帯させ、ホスト装置3から個々の固有端末装置に作業指示を行うようにしてもよい。
作業評価値更新手段314は、作業エリアの増減、作業種別の変更、作業スキルの向上、作業量の増減、検証結果の良否および遅れ時間の大小に基づいて作業評価値を集計して更新すると共に、工程内の作業者の動線上の所定場所に設置されたナビゲーションディスプレイに作業者毎の作業評価値を表示するようにデータ転送する。
図7は、各処理工程を作業者および各ロットが流動するイメージ図である。
図7に示すように、各処理工程としては、洗浄工程、露光工程、エッチング工程、検査工程、CVD工程および不純物イオン注入工程などがあるが、処理工程スタート時点の入退出ゲートおよび処理工程終了時点の入退出ゲート、洗浄工程、露光工程、CVD工程および注入工程の各入退出ゲートにおいてそれぞれ作業者の入退出を作業者カードによりチェックして行う。
各入退出ゲートにおいて、入室または退室を目的として、作業者カードを入室用または退室用のカードリーダ4に作業者カードをタッチするかまたは接近させることにより、作業者が正しいかどうか、時間が正しいかどうか、遅れた場合にどの程度遅れたのかなどの検証時間に関して作業分析情報が得られる。作業処理の始めと終わり、移動した各地点での作業者本人であるかどうかやその時間情報が取得される。例えば作業者が今何処にいるかの作業者の居場所情報も取れるし、作業をしようとしている作業者が、作業をすべき正しい人かどうかも明確になる。また、このロットを何処に何時までに届けるのかという規定時間情報に対して規定時間内にそのロットが届けられたのかまたは遅れたのであればどの程度遅れたのかの情報が得られる。これは、ロットタグに対して作業者タグである。
作業者カードとして、作業者ID、担当エリア、作業スキルおよび作業履歴情報を付したカードが付与されており、工程内の所定場所に設置したゲート通過情報をホスト装置3が各管理パーソナルコンピュータ2から収集して作業者行動履歴情報が得られる。
ホスト装置3に収集された作業者別の作業者情報および検証情報の場所および時間情報から得られる作業者行動履歴情報を用いて、工程内の作業者の動線上の所定場所に設置されたナビゲーションディスプレイに作業者毎の行き先を表示する。また、工程内の作業者個人を特定できる固有端末装置を作業者毎に携帯させ、ホスト装置3から個々の固有端末装置に作業情報指示が行われる。
上記構成により、本実施形態の生産管理システム1を用いて作業者が生産処理をする場合の一例について説明する。
図8は、図5の生産管理システム1を用いて生産処理を行う場合の作業者の作業処理を含む生産管理システム1の動作例を示すフローチャートである。
まず、図8に示すように、ステップS1で、作業者により、データカード付与装置5を構成するストッカ管理パーソナルコンピュータ51が操作されて「カード出力情報」が選択される。作業者に対して、「カード出力情報」として、どのカセット(ロット)をどのストッカから取り出してどの処理装置にマニュアル搬送するかが指示される。
次に、ステップS2で、作業者は、ストッカ管理パーソナルコンピュータ51を操作してデータカードプリンタ52からデータカード53をプリント出力する。
続いて、ステップS3で、作業者は、プリント出力されたデータカード53の内容に応じてソースストッカ54からその指示されたカセット(ロット)を出庫する。
その後、ステップS4で、作業者は、出庫したカセット(ロット)を所定の処理装置にマニュアル搬送する。
さらに、ステップS5で、作業者は、カードリーダ4にて作業者カードの内容(作業者ID、担当エリア、作業ランク(作業スキルおよび作業履歴情報)を読み取る。また、作業者は、マニュアル搬送したカセット(ロット)を装置ローダにセットすると共に、カードリーダ4にてデータカード53の内容を読み取る。即ち、作業者が「カセットのセット」として、その処理装置にカセット(ロット)をセットする。その処理装置に設けられたカードリーダ4にデータカードを接近させることにより、「ロットID/工程読取」を行って、その処理装置で処理を行うロットIDとその工程内容を読み取りミスなく正確にカードリーダ4が読み取ることができる。
以上のステップS1~S5は、ストッカ管理パーソナルコンピュータ51およびデータカード53により指示されたイベントを作業者が実行すると共に、カードリーダ4に作業者カードおよびデータカード53の内容を読み取らせる作業者の作業である。
次に、ステップS6で、管理パーソナルコンピュータ2は、カードリーダ4で読み取った作業者IDなどの作業者情報および、カードリーダ4で読み取った時点の時刻情報を、データ入力手段211がデータ入力した作業者情報および時刻情報に基づいて、フロー照合手段212が、作業者/時間のフロー照合、即ち、正しい作業者かどうかおよび、期待した時刻通りかどうかまたはどの程度遅れたかを検証する。管理パーソナルコンピュータ2は、作業者が合っているかどうかおよび時間が合っているかどうかを判断するために、生産ワークの製造フローおよび処理装置の情報と作業者情報から、正しい作業者かどうかが検証され、また、ホスト装置3からダウンロードされた、流動する生産ワークの進度情報、例えば搬送指示が出された時刻から所定時間以内に到着するために、期待した時刻通りかどうかまたはどの程度遅れたかが検証される。さらに、照合結果表示制御手段213により、フロー照合手段212が行った照合結果(検証結果)が良ければその内容が管理パーソナルコンピュータ2の表示画面上に表示され、照合結果(検証結果)が不可であれば、「警告」を管理パーソナルコンピュータ2の表示画面上に表示すると共にブザー音を所定時間だけ発する。
さらに、ステップS7で、管理パーソナルコンピュータ2の作業者情報/検証情報転送手段214が、ホスト装置3に作業者IDなどの作業者情報および検証結果を含む検証情報をアップロードし、ホスト装置3は、アップロードしたその作業者情報および検証結果を含む検証情報をデータベース32に登録する。
続いて、ステップS8で、管理パーソナルコンピュータ2では、カードリーダ4で読み取ったその処理装置で処理を行うロットIDとその工程内容をデータ入力手段211がデータ入力し、フロー照合手段212が、その処理装置毎のフロー照合を行って、「カセット検証、レシピチェック」を行い、照合結果表示制御手段213がその照合結果および次の作業内容を表示部23に表示する。即ち、その処理装置に設けられた管理パーソナルコンピュータ2は、カードリーダ4が読み取ったロットIDおよびその工程内容が作業指示として正しいかどうかを確認する。カードリーダ4が読み込んだロットIDおよびその工程内容(フロー)が正しければ、管理パーソナルコンピュータ2は、その表示画面上で作業者に対して受付確認を行う。即ち、そのロットIDおよびその工程内容が正しければ、受付確認として作業者が処理開始を処理装置に対して指示しても良いし、管理パーソナルコンピュータ2のレシピ番号発行手段215が、ロットIDに対応したレシピ番号を発行し、ステップS9で、ホスト装置3がそのロットIDに対応したレシピ番号を受け付けてカセット(ロット)およびレシピ(工程内容)をホスト装置3のレシピ登録手段315がデータベース32に登録する。
ステップS10で、ホスト装置3のレシピ登録手段315によるロットIDに対応したレシピ番号の登録後、処理開始指示手段316が処理装置に対して「処理開始」を自動で指示する。
ステップS11で、フロー照合手段212が照合した結果として、そのロットIDおよびその工程内容が正しくなければ(否)、照合結果表示制御手段213が「警告」およびその「搬送先」をその管理パーソナルコンピュータ2の表示画面上に表示制御すると共にブザー音を発生させる。
以上のステップS8~S10は、管理パーソナルコンピュータ2およびホスト装置3が行う動作である。
次に、ステップS11で、表示画面上に「警告」が発せられた場合には、作業者は、その処理装置からカセット(ロット)を取り外して、そのカセット(ロット)を正規の搬送先の処理装置にマニュアル搬送する。
さらに、ステップS10で、処理開始指示手段316の「処理開始指示」によって処理装置が処理を開始し、一定時間後に処理装置はその処理を終了する。処理装置は、ステップS12で、管理パーソナルコンピュータ2の処理終了通知手段216は、そのカセット(ロット)に対する処理が終了したことをホスト装置3に通知し、ホスト装置3の処理履歴書込指示手段317は、この処理終了通知を受けて、ステップS13で、その処理装置の管理パーソナルコンピュータ2に対して処理履歴のデータを書き込むように指示し、管理パーソナルコンピュータ2の処理履歴転送手段217がホスト装置3にその処理装置の処理履歴データを転送する。ホスト装置3では、管理パーソナルコンピュータ2からの処理履歴データを受けて、ホスト装置3の処理履歴登録手段318がデータベース32にその処理装置の処理履歴データを登録する。
さらに、ステップS14で、ホスト装置3は、そのカセット(ロット)に対して処理が終了したかどうかを判断して、そのカセット(ロット)に対して処理が終了したならば(YES)、ホスト装置3の次工程内容表示指示手段319は、ステップS15で、管理パーソナルコンピュータ2に次工程内容の表示指示を行って、管理パーソナルコンピュータ2の次工程内容表示制御手段218は、その表示画面上に「カセットの取出」のメッセージを表示制御すると共に、管理パーソナルコンピュータ2の表示画面上に「入庫ストッカ」を表示させる。この指示に従って、作業者は、そのカセット(ロット)を装置ローダから取り外して所定指示ストッカまで搬送し、そのカセット(ロット)を所定指示ストッカに入庫する。
また、ステップS14で、そのカセット(ロット)に対して処理が終了していなければ(NO)、ホスト装置3の次工程内容表示指示手段319は、ステップS16で、管理パーソナルコンピュータ2に次工程内容の表示指示を行って、管理パーソナルコンピュータ2の次工程内容表示制御手段218は、その表示画面上に「カセットの取出」のメッセージを表示すると共に、管理パーソナルコンピュータ2の表示画面上に「次工程の処理装置」を表示させる。作業者は、カードリーダ4にて作業者カードの内容(作業者ID、担当エリア、作業ランク(作業スキルおよび作業履歴情報)を読み取らせる。その後、この指示に従って、作業者は、そのカセット(ロット)を装置ローダから取り外して次工程の処理装置まで搬送して、作業者はステップS5で、そのカセット(ロット)を装置ローダにセットすると共に、データカードおよび作業者カードをカードリーダ4に近づけてカードリーダ4がカード情報を読み取る。管理パーソナルコンピュータ2は、作業者が合っているかどうかおよび時間が合っているかどうかを判断するために、生産ワークの製造フローおよび処理装置の情報と作業者情報から、正しい作業者かどうかが検証され、また、ホスト装置3からダウンロードされた、流動する生産ワークの進度情報、例えば搬送指示が出された時刻から所定時間以内に到着するために、期待した時刻通りかどうかまたはどの程度遅れたかが検証される。
次のステップS17で、管理パーソナルコンピュータ2は、カードリーダ4で読み取った作業者IDなどの作業者情報および、カードリーダ4で読み取った時点の時刻情報を、データ入力手段211がデータ入力した作業者情報および時刻情報に基づいて、フロー照合手段212が、作業者/時間のフロー照合、即ち、正しい作業者かどうかおよび、期待した時刻通りかどうかまたはどの程度遅れたかを検証する。さらに、照合結果表示制御手段213により、フロー照合手段212が行った照合結果(検証結果)が良ければその内容が管理パーソナルコンピュータ2の表示画面上に表示され、次のステップS18の処理に移行する。また、照合結果(検証結果)が不可であれば、次のステップS11で、「警告」を管理パーソナルコンピュータ2の表示画面上に表示すると共にブザー音を所定時間だけ発音させる。
さらに、ステップS18で、管理パーソナルコンピュータ2の作業者情報/検証情報転送手段214が、ホスト装置3に作業者IDなどの作業者情報および検証結果を含む検証情報をアップロードし、ホスト装置3は、アップロードしたその作業者情報および検証結果を含む検証情報をデータベース32に登録して、次のステップS4の処理に戻る。
以上のステップS12~S18は、管理パーソナルコンピュータ2およびホスト装置3が行う動作である。
なお、作業者は、その処理装置の処理の間は他の仕事を行い、管理パーソナルコンピュータ2の表示画面上に「カセットの取出」および「次工程への搬送」の指示が表示されれば、その処理装置から「カセットの取出」を行って、次工程にそのカセット(ロット)をマニュアル搬送をする。
要するに、管理パーソナルコンピュータ2において、データ入力手段211が、カードリーダ4で読み取ったロットIDとその工程内容をデータ入力させるデータ入力工程と、フロー照合手段212が、入力されたロットIDとその工程内容を生産情報として正しいかどうかをフロー照合するフロー照合工程と、照合結果表示制御手段213が、フロー照合手段212が行った照合結果および次の作業内容を表示画面上に表示制御する照合結果表示制御工程と、作業者情報/検証情報転送手段214が、ホスト装置3に作業者IDなどの作業者情報および検証結果を含む検証情報をアップロードする作業者情報/検証情報転送工程と、照合結果が作業指示として正しければ、レシピ番号発行手段215が、ロットIDに対応したレシピ番号を発行するレシピ番号発行工程と、処理終了通知手段216が、ロットIDに対して処理装置の処理が終了したことをホスト装置3に通知する処理終了通知工程と、処理装置の処理履歴書込後、処理履歴転送手段217が、ホスト装置3に当該処理装置の処理履歴データを転送する処理履歴転送工程と、次工程内容表示制御手段218が、表示画面上に「カセットの取出」のメッセージを表示制御すると共に「入庫ストッカ」または「次工程の処理装置」を表示制御する次工程内容表示制御工程とを有している。
ホスト装置3において、作業者情報/検証情報登録手段311が、管理パーソナルコンピュータ2からの作業者IDなどの作業者情報および検証結果を含む検証情報を受けて、これらをデータベース32に記録すると共に作業ポイントを更新する作業者情報/検証情報登録工程と、作業者行動履歴情報取得手段312が、工程内の所定場所に設置したゲート通過情報を収集して作業者行動履歴情報を取得する作業者行動履歴情報取得工程と、作業指示手段313が、ホスト装置3に収集された作業者別のゲート通過情報から得られる作業者行動履歴情報を用いて、工程内の作業者の動線上の所定場所に設置されたナビゲーションディスプレイに作業者毎の行き先を表示する作業指示工程と、作業評価値更新手段314が、作業エリアの増減、作業種別の変更、作業スキルの向上、作業量の増減、検証結果の良否および遅れ時間の大小に基づいて作業評価値を集計して更新する作業評価値更新工程と、管理パーソナルコンピュータ2からのレシピ番号の発行を受けて、レシピ登録手段315が、レシピ番号に対応したレシピ内容をデータベースに登録するレシピ登録工程と、レシピ内容の登録後、処理開始指示手段316が、処理装置に対して「処理開始」を指示する処理開始指示工程と、処理終了通知を受けて、処理履歴書込指示手段317が、管理パーソナルコンピュータ2に対して処理履歴データを書き込むように指示する処理履歴書込指示工程と、処理履歴登録手段318が、管理パーソナルコンピュータ2からの転送処理履歴データを受けてデータベース32に処理装置の処理履歴データを登録する処理履歴登録工程と、次工程内容表示指示手段319が、管理パーソナルコンピュータ2に次工程内容の表示指示する次工程内容表示指示工程とを有している。
以上は、ホスト装置3と作業者との作業インターフェースとしての管理パーソナルコンピュータ2およびカードリーダ4について説明してきたが、次は、処理装置としてオフライン装置がある生産ラインであっても、生産管理システム1による疑似的なオンライン管理を実現する管理パーソナルコンピュータ2の別の機能について図9を用いて詳細に説明する。
以上の本実施形態2の生産管理システム1により、オペレータである作業者は予め決められたルートを決められた周期でマニュアル搬送で巡回することにより、作業者カードによる本人検証の他、時間的な作業遅れについて検証した後に、管理パーソナルコンピュータ2の表示画面またはデータカード(RF-IDタグ)の作業指示用画面に表示される生産情報に従って、オフライン装置で自動的にロットを受け取れない処理装置であっても正確な作業処理とロット運搬・次工程処理を確実に行うことができる。これによって、マニュアル搬送/オフライン装置がある生産ラインにおいて、作業管理および省人化に向けたナビゲーションによる作業指示を行って作業の効率化および作業ミスの防止を確実に実現することができる。
図9は、図5の生産管理システム1におけるオフライン装置である複数の処理装置、管理パーソナルコンピュータ2およびホスト装置3の配置図である。
図9において、オフライン装置6には、処理装置が異常(アラーム)や稼働・非稼働(メンテナンス(強制停止)、処理可能、処理中、処理終了、処理待ち)などを確認可能なように点灯表示するシグナルタワー61が設けられている。このオフライン装置6のシグナルタワー61は、本来の目的である稼働・非稼働などの装置状態の検知に広く用いられている。この装置ステータス情報を含むシグナルタワー信号/警告信号(以下、単にシグナルタワー信号という)を読み取って、オフライン装置6を疑似的にオンライン化してオフライン装置6の装置状態をリアルタイムに情報入手することができる。このシグナルタワー61と接続された信号線62に、各種信号を読み取るデコーダ装置63を設け、管理パーソナルコンピュータ2のオンライン通信可能な電子機器で読み取ることにより、オフライン装置6の装置本体を改造せずに、オフライン装置6の装置状態を、工程管理を行うホスト装置3に管理パーソナルコンピュータ2から装置状態情報を送信する。
この生産管理システム1は、少なくともオフライン装置6を一または複数含む一または複数の処理装置に対して、ロットの処理フロー進捗管理機能を有したホスト装置3と、オフライン装置6に付加されている装置稼働状況を点灯・非点灯で知らせるシグナルタワー信号(アラーム信号を含む)を読み取って、オフライン装置6の装置状態情報(異常(アラーム)や稼働・非稼働状態情報;装置が空いているかどうかの情報)をホスト装置3に送信する各管理パーソナルコンピュータ2とを有しており、ホスト装置3は、少なくともオフライン装置6を含む一または複数の処理装置の各装置状態情報(異常(アラーム)や稼働・非稼働状態情報;装置が空いているかどうかの情報)に基づいて、各管理パーソナルコンピュータ2を介してロットの作業指示情報を出力する。
この場合、ホスト装置3において、複数のオフライン装置6から同時に作業が必要な信号が検出されたとき、ロットの処理優先順位、作業者現在地点などを総合的に判断してオフライン装置6毎の管理パーソナルコンピュータ2に作業指示情報を出力する。即ち、少なくともオフライン装置6を含む一または複数の処理装置から同時に作業が必要な信号が検出されたときに、ホスト装置3は、ロットの処理優先順位、作業者現在地点などの生産条件を総合的に判断して、少なくともオフライン装置6を含む一または複数の処理装置のそれぞれの各管理パーソナルコンピュータ2を介して作業指示情報を出力させる。また、オフライン装置6から読み取ったシグナルタワー信号に含まれる処理開始信号と、予め登録されたオフライン装置6のプロセス時間から処理終了時刻を予測して、オフライン装置6毎の管理パーソナルコンピュータ2に作業予約指示を出力する。ホスト装置3は、少なくともオフライン装置6を含む一または複数の処理装置からそれぞれ読み取った処理開始信号と、予め登録されたプロセス時間とから処理終了時刻を予測して、少なくともオフライン装置6を含む一または複数の処理装置のそれぞれの各管理パーソナルコンピュータ2を介して作業予約指示情報を出力させる。
この各管理パーソナルコンピュータ2を介したロットの作業指示情報は、各管理パーソナルコンピュータ2の表示部23の表示画面上に、文章や絵柄などで表示出力したり、異常(アラーム)時などブザーなどによって音声出力したり、作業者に対して各種の指示出力が考えられる。
この生産管理システム1を用いた生産管理方法としては、オフライン装置6に付加されている装置稼働状況を点灯・非点灯で知らせるシグナルタワー信号(アラーム信号を含む)を読み取って、オフライン装置6の装置状態情報を管理パーソナルコンピュータ2がホスト装置3に転送し、ホスト装置3は、オフライン装置6の装置状態情報に基づいて、管理パーソナルコンピュータ2を介してオフライン装置のロットの作業指示情報を出力させる。即ち、本実施形態2の生産管理方法は、オフライン装置6に付加されている装置稼働状況を点灯・非点灯で知らせるシグナルタワー信号(アラーム信号を含む)を読み取って、少なくともオフライン装置6を含む一または複数の処理装置の装置状態情報を各管理パーソナルコンピュータ2がそれぞれホスト装置3に転送し、ホスト装置3は、少なくともオフライン装置6を含む一または複数の処理装置の装置状態情報に基づいて、対応した各管理パーソナルコンピュータ2を介して、少なくともオフライン装置6を含む一または複数の処理装置のロットの作業指示情報を出力させる。この場合、管理パーソナルコンピュータ2はホスト装置3に装置状態情報をアップロードし、アップロードした装置状態情報に基づいて、ホスト装置3はロットの作業指示情報をそれに対応する各管理パーソナルコンピュータ2にそれぞれダウンロードする。
オフライン装置の近傍に、ホスト装置3と通信ができる管理パーソナルコンピュータ2とこれに接続されるカードリーダ4(RF-IDリーダ)とが設置され、処理開始/終了時に、作業者情報が書き込まれた作業者カードをカードリーダ4にタッチするかまたは近づけることにより、カードリーダ4から作業者カードの作業者情報および時間を管理パーソナルコンピュータ2に入力し、管理パーソナルコンピュータ2は、カードリーダ4からの作業者IDを含む作業者情報に基づいて作業者/時間を検証し、管理パーソナルコンピュータ2はホスト装置3に作業者IDを含む作業者情報および検証情報をアップロードする。これによって、ホスト装置3が各ロットの処理状況(進捗管理、正常処理のチェック)を把握すると同時に、作業者毎にロット進捗に、作業遅延や取り出し遅延がないかを算出し、次の処理装置への搬送指示を、対応する管理パーソナルコンピュータ2やその他の作業指示用画面に表示する。
これによって、作業者IDをICタグに書き込むことにより、作業者の担当エリア、作業スキル、作業能力をシステム情報として生産管理システムで管理することができる。作業者は予め決められたルートを決められた周期で巡回することになり、管理パーソナルコンピュータ2の画面に表示される情報に従って、オフライン装置でも正確な処理とロット運搬・次工程処理を行うことができる。また、「作業者」毎の作業成果を作業者に見せることにより、作業者の作業スキル向上、作業意識向上、工程効率化を図ることができる。
また、ホスト装置3の作業者行動履歴情報取得手段312が、工程内の所定場所に設置したゲート通過情報を収集して作業者行動履歴情報を取得する。この作業者行動履歴情報を分析することにより工程内の作業者の更なる効率化に反映させることができる。また、ホスト装置3に収集された作業者別のゲート通過情報から得られる作業者行動履歴情報を用いて、ホスト装置3内の作業指示手段313が、工程内の作業者の動線上の所定場所に設置されたナビゲーションディスプレイ7に作業者毎の行き先を表示する。ナビゲーションディスプレイ7の大画面によって、作業者が常時作業者毎の最新情報を確認することにより、無駄なく効率よく流動し、次の作業の優先順位を常に確認することを可能となる。さらに、ホスト装置3の作業評価値更新手段314が、作業者毎の作業エリアの増減、作業種別の変更、作業スキルの向上、作業量の増減、検証結果の良否および遅れ時間の大小に基づいて作業評価値を集計して更新する。この作業評価値の更新をナビゲーションディスプレイ7の大画面に表示させて、複数の作業者の意欲を高めるための指標とすることができる。
以上によって、本実施形態2によれば、オフライン装置を含む複数の処理装置および入退室用ゲートのそれぞれに固有のIDが付された各管理パーソナルコンピュータ2と、各管理パーソナルコンピュータ2にそれぞれ接続され、複数の作業者に各々固有の作業者IDを含む作業者情報を付した作業者カードの内容を読み取り可能とするカードリーダ4と、各管理パーソナルコンピュータ2と情報交換して工程を管理するホスト装置3とを備え、各管理パーソナルコンピュータ2は、カードリーダ4からの作業者IDを含む作業者情報に基づいて作業者/時間を検証するフロー照合手段212と、各管理パーソナルコンピュータ2はホスト装置3に作業者IDを含む作業者情報および作業者IDを含む検証情報をアップロードする作業者情報/検証情報転送手段214とを有し、ホスト装置3は、アップロードした作業者IDを含む作業者情報および検証結果を含む検証情報を登録する作業者情報/検証情報登録手段311を有している。
これによって、作業者IDを含む作業者情報に基づいて作業者/時間を検証するため、マニュアル搬送/オフライン装置がある生産ラインで、作業者情報をオンライン管理して、作業者が異なることによる作業ロスおよび作業ミスの防止を低投資で行い、作業者情報を用いて省人化に向けたナビゲーション機能を低投資で行うことにより、オフライン装置がある生産ラインであっても疑似的なオンライン管理を効率よく実現することができる。
また、オフライン装置6の装置状態情報(稼働・非稼働状態情報)を含むシグナルタワー信号からリアルタイムに装置の稼働・非稼働状態を把握することにより、工程管理を行うホスト装置3は、オフライン装置6毎の管理パーソナルコンピュータ2の表示画面に仕掛りの生産ワーク(ロット)搬送/処理指示を的確に表示指示することができる。また、シグナルタワー61の見えない位置にいる作業者に対しても、オフライン装置6毎の管理パーソナルコンピュータ2の表示画面への表示によって処理終了を確実に知らせることができる。これと同時に、作業に必要な信号が発生した場合に、工程管理を行うホスト装置3が優先順位を判断し、オフライン装置6毎の管理パーソナルコンピュータ2の表示画面への表示指示によって作業の優先順位を管理することができる。さらに、処理開始時刻から処理終了時刻を予測できるため、作業者へ先行(予定)作業指示が出せるなどの機能を組み込むことにより、作業者の作業効率を高めること(省人化)が可能となる。さらに、ホスト装置3は、オフライン装置6の装置稼働状況データの自動集計が可能となって、従来手集計されていた稼働率管理がリアルタイムでかつ正確に行えるようになって、ラインバランスなどの工程改善が可能となる。
以上のように、本発明の好ましい実施形態1、2を用いて本発明を例示してきたが、本発明は、この実施形態1、2に限定して解釈されるべきものではない。本発明は、特許請求の範囲によってのみその範囲が解釈されるべきであることが理解される。当業者は、本発明の具体的な好ましい実施形態1、2の記載から、本発明の記載および技術常識に基づいて等価な範囲を実施することができることが理解される。本明細書において引用した特許、特許出願および文献は、その内容自体が具体的に本明細書に記載されているのと同様にその内容が本明細書に対する参考として援用されるべきであることが理解される。
本発明は、例えばLSI製造工場の化合物半導体工場などへの再開発やマニュアル工場などにおいて、少なくともオフライン装置を含む一または複数の処理装置を用いて、発光ダイオード(LED)や半導体レーザ素子などの半導体発光素子などの半導体素子を製造する際の生産を管理する生産管理システムおよびこれを用いた生産管理方法、この生産管理方法をコンピュータに実行させるための処理手順が記述された制御プログラム、この制御プログラムが格納されたコンピュータ読み取り可能な可読記憶媒体の分野において、置かれた試料箱の固有IDの有無を検知し、検知された試料箱の固有ID情報を各棚管理パーソナルコンピュータをそれぞれ介してホスト装置に情報収集して試料箱の所在位置情報を管理するため、マニュアル搬送/オフライン装置がある生産ラインで、作業管理および省人化に向けたナビゲーションを行って作業の効率化および作業ミスの防止を実現することができる。
Claims (17)
- 置かれた試料箱の固有IDの有無を検知する複数の試料棚と、該複数の試料棚にそれぞれ固有IDが付与されて試料棚毎に該試料箱の固有IDの有無を管理する各棚管理パーソナルコンピュータと、該各棚管理パーソナルコンピュータをそれぞれ介して該試料箱の所在位置情報を管理するホスト装置とを有する生産管理システム。
- 前記試料棚は、前記試料箱の固有IDを読み取る試料箱IDリーダ手段を具備し、該試料箱IDリーダ手段で読み取った試料箱の固有IDが、前記棚管理パーソナルコンピュータを介して前記ホスト装置に情報提供されて前記試料箱の所在位置情報が更新される請求項1に記載の生産管理システム。
- 前記試料棚に作業者が試料箱を置く作業と該試料棚から作業者が該試料箱を取出す作業の際に前記試料箱IDリーダ手段が読み取った試料箱ID情報により、該試料箱の所在位置情報をリアルタイムに前記棚管理パーソナルコンピュータから前記ホスト装置にアップロードする請求項2に記載の生産管理システム。
- 前記複数の試料棚はそれぞれ工程毎に区分された区画に配置され、各区画には一または複数の処理前試料棚と一または複数の処理後試料棚が配置されている請求項1に記載の生産管理システム。
- 前記棚管理パーソナルコンピュータは、製造フローと処理装置情報、流動する生産試料の進度情報を保有しており、検出した前記試料箱の固有IDから、次に当該試料箱内の試料が処理されるべき処理装置を判断し、該試料箱の搬送先を表示画面上に表示して作業者に指示する請求項1に記載の生産管理システム。
- 前記棚管理パーソナルコンピュータは、前記搬送先を表示画面上に表示した時点から作業が実施されるまでの経過時間を前記表示画面上にカウントアップ表示すると共に、該経過時間の超過度合に伴ってアラーム表示を行うように制御する請求項5に記載の生産管理システム。
- 各区画に配置された一または複数の処理装置のそれぞれに固有IDが付与された各装置管理パーソナルコンピュータを更に有し、
該各装置管理パーソナルコンピュータは、処理開始時間を表示画面上に表示した時点から作業が実施され終わるまでの経過時間を前記表示画面上にカウントアップ表示すると共に、該経過時間の超過度合に伴ってアラーム表示を行うように制御するものであり、
前記ホスト装置は該各装置管理パーソナルコンピュータと情報交換して工程を管理する請求項1に記載の生産管理システム。 - 前記ホスト装置は、
前記試料箱IDリーダ手段で読み取られた試料箱の固有IDの有無情報を前記棚管理パーソナルコンピュータから提供されて該試料箱の固有ID情報の変化を検知する識別情報変化検知部と、
該試料箱の固有IDの有無を検知したときに、該試料箱の前回の所在位置情報に基づいて、該試料箱の現在の所在位置情報を決定する試料所在位置決定部と、
該所在位置決定部で決定した該試料箱の現在の所在位置情報を所在位置履歴情報として更新して記憶する所在位置履歴記憶部とを有する請求項2に記載の生産管理システム。 - 各区画に配置された一または複数の処理装置のそれぞれに固有IDが付与された各装置管理パーソナルコンピュータと、該各装置管理パーソナルコンピュータにそれぞれ接続され、複数の作業者に各々固有の作業者IDを含む作業者情報を付与した作業者カードの内容を読み取り可能とするカードリーダと、該各装置管理パーソナルコンピュータと情報交換して工程を管理する前記ホスト装置とを備え、
該各装置管理パーソナルコンピュータは、該カードリーダからの該作業者IDを含む作業者情報に基づいて作業者/時間を検証するフロー照合手段と、該各管理パーソナルコンピュータは該ホスト装置に該作業者IDを含む作業者情報および該作業者IDを含む検証情報をアップロードする作業者情報/検証情報転送手段とを有し、
該ホスト装置は、アップロードした該作業者IDを含む作業者情報および検証結果を含む検証情報を登録する作業者情報/検証情報登録手段を有する請求項1に記載の生産管理システム。 - 前記ホスト装置は、工程内の所定場所に設置した試料棚管理パーソナルコンピュータ及び装置管理パーソナルコンピュータから作業履歴情報を収集して作業者行動履歴情報および試料所在履歴情報を取得する作業履歴情報取得手段を有する請求項9に記載の生産管理システム。
- 前記ホスト装置に収集された作業者別の前記情報から得られる前記作業者行動履歴情報を用いて、工程内の作業者の動線上の所定場所に設置されたナビゲーションディスプレイに該作業者毎の行き先を表示する作業指示手段を有する請求項9に記載の生産管理システム。
- 前記ホスト装置は、作業区画の増減、作業種別の変更、作業スキルの向上、作業量の増減、検証結果の良否および遅れ時間の大小に基づいて作業評価値を集計して順次更新する作業評価値更新手段を有する請求項1~11のいずれかに記載の生産管理システム。
- 少なくともオフライン装置を含む一または複数の処理装置を用いて半導体素子を製造する半導体製造工程において、
該一または複数の処理装置に対してロットの処理フロー進捗管理機能を有した前記ホスト装置と、該オフライン装置に付加されている装置稼働状況を点灯・非点灯で知らせるシグナルタワー信号を読み取って、該オフライン装置の装置状態情報を該ホスト装置に送信する装置管理パーソナルコンピュータとを有し、該ホスト装置は、該少なくともオフライン装置を含む一または複数の処理装置の装置状態情報に基づいて、対応する該処理装置の該装置管理パーソナルコンピュータを介して、該オフライン装置を含む一または複数の処理装置の各ロットの作業指示情報を出力させる請求項1に記載の生産管理システム。 - 請求項8に記載の生産管理システムを用いた生産管理方法であって、
前記ホスト装置において、
識別情報変化検知部が、前記試料箱IDリーダ手段で読み取られた試料箱の固有IDの有無情報を前記棚管理パーソナルコンピュータから提供されて該試料箱の固有ID情報の変化を検知する識別情報変化検知工程と、
試料所在位置決定部が、該試料箱の固有IDの有無を検知したときに、該試料箱の前回の所在位置情報に基づいて、該試料箱の現在の所在位置情報を決定する試料所在位置決定工程と、
所在位置履歴記憶部が、該所在位置決定部で決定した該試料箱の現在の所在位置情報を所在位置履歴情報として更新して記憶する所在位置履歴記憶工程とを有する生産管理方法。 - 請求項9に記載の生産管理システムを用いた生産管理方法であって、
前記各装置管理パーソナルコンピュータにおいて、フロー照合手段が、前記カードリーダからの前記作業者IDを含む作業者情報に基づいて作業者/時間を検証するフロー照合工程と、作業者情報/検証情報転送手段が、該各装置管理パーソナルコンピュータは前記ホスト装置に該作業者IDを含む作業者情報および該作業者IDを含む検証情報をアップロードする作業者情報/検証情報転送工程とを有し、
該ホスト装置において、作業者情報/検証情報登録手段が、アップロードした該作業者IDを含む作業者情報および検証結果を含む検証情報を登録する作業者情報/検証情報登録工程を有する生産管理方法。 - 請求項14または15に記載の生産管理方法をコンピュータに実行させるための処理手順が記述された制御プログラム。
- 請求項16に記載の制御プログラムが格納されたコンピュータ読み取り可能な可読記憶媒体。
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2012-038026 | 2012-02-23 | ||
JP2012038026 | 2012-02-23 |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2013124938A1 true WO2013124938A1 (ja) | 2013-08-29 |
Family
ID=49005162
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/JP2012/007961 WO2013124938A1 (ja) | 2012-02-23 | 2012-12-13 | 生産管理システムおよび生産管理方法、制御プログラム、可読記憶媒体 |
Country Status (1)
Country | Link |
---|---|
WO (1) | WO2013124938A1 (ja) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108205280A (zh) * | 2016-12-16 | 2018-06-26 | 横河电机株式会社 | 设定装置、设定方法、记录介质及终端装置 |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2001076269A (ja) * | 1999-09-06 | 2001-03-23 | Canon Inc | 稼働管理装置および稼働管理方法 |
JP2009043950A (ja) * | 2007-08-09 | 2009-02-26 | Panasonic Corp | 半導体製造装置 |
JP2010006594A (ja) * | 2008-06-30 | 2010-01-14 | Takenaka Komuten Co Ltd | ピッキング支援システム及びピッキング支援方法 |
JP2010128646A (ja) * | 2008-11-26 | 2010-06-10 | Mitsubishi Heavy Ind Ltd | 配膳支援システム |
JP2010170195A (ja) * | 2009-01-20 | 2010-08-05 | Hitachi Ltd | 部品配膳台車を用いた部品配膳システム及び部品配膳方法 |
JP2010205345A (ja) * | 2009-03-04 | 2010-09-16 | Bifristec Kk | ディスク管理システム |
JP2011215992A (ja) * | 2010-04-01 | 2011-10-27 | Panasonic Electric Works Co Ltd | 部品管理システムおよび部品管理方法 |
-
2012
- 2012-12-13 WO PCT/JP2012/007961 patent/WO2013124938A1/ja active Application Filing
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2001076269A (ja) * | 1999-09-06 | 2001-03-23 | Canon Inc | 稼働管理装置および稼働管理方法 |
JP2009043950A (ja) * | 2007-08-09 | 2009-02-26 | Panasonic Corp | 半導体製造装置 |
JP2010006594A (ja) * | 2008-06-30 | 2010-01-14 | Takenaka Komuten Co Ltd | ピッキング支援システム及びピッキング支援方法 |
JP2010128646A (ja) * | 2008-11-26 | 2010-06-10 | Mitsubishi Heavy Ind Ltd | 配膳支援システム |
JP2010170195A (ja) * | 2009-01-20 | 2010-08-05 | Hitachi Ltd | 部品配膳台車を用いた部品配膳システム及び部品配膳方法 |
JP2010205345A (ja) * | 2009-03-04 | 2010-09-16 | Bifristec Kk | ディスク管理システム |
JP2011215992A (ja) * | 2010-04-01 | 2011-10-27 | Panasonic Electric Works Co Ltd | 部品管理システムおよび部品管理方法 |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108205280A (zh) * | 2016-12-16 | 2018-06-26 | 横河电机株式会社 | 设定装置、设定方法、记录介质及终端装置 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2013150702A1 (ja) | 生産管理システム | |
JP2014151995A (ja) | 生産管理システムおよび生産管理方法、制御プログラム、可読記憶媒体 | |
JP2023526362A (ja) | 物品処理の方法、装置、システム、電子機器、記憶媒体およびコンピュータプログラム | |
CN105046468A (zh) | 基于物联网的智能仓储方法 | |
JP5453354B2 (ja) | 生産管理システムおよび生産管理方法、制御プログラム、可読記憶媒体 | |
CN113242971B (zh) | 包括至少部分联网的实验室设备的实验室系统以及用于控制包括至少部分联网的实验室设备的实验室系统的方法 | |
CN101644930A (zh) | 工序管理装置、工序管理方法及工序管理系统 | |
JP4655270B2 (ja) | 管理対象物の通過監視システム | |
JP5314000B2 (ja) | 生産管理システムおよび生産管理方法 | |
JP2012133599A (ja) | 生産管理システムおよび生産管理方法、制御プログラム、可読記憶媒体 | |
US6618639B2 (en) | System, process, apparatus and program for controlling special lot carrying in semiconductor carrying facility | |
JP6766269B2 (ja) | 情報処理装置、実装システム及び情報処理方法 | |
WO2013124938A1 (ja) | 生産管理システムおよび生産管理方法、制御プログラム、可読記憶媒体 | |
CN100507782C (zh) | 制程控制方法及制程控制系统 | |
US20220283578A1 (en) | Resource Allocation System for Maintaining a Production Facility | |
WO2008096016A1 (en) | Configurable system, method and associated software for managing the manufacturing and processing of high valued goods in high volume | |
CN113837560A (zh) | 物品拣选方法及装置 | |
JP2008077559A (ja) | トラッキングシステム及び方法 | |
JP5116145B2 (ja) | ユニット振り分け配送管理システム | |
JP2005208891A (ja) | 制御装置及び処理システム | |
JP2010277390A (ja) | 搬送制御装置及び方法 | |
JP2008117030A (ja) | 工程管理システム、工程管理方法、および工程管理プログラム | |
JP2020038411A (ja) | 設備保全装置、設備保全システムおよび設備保全方法 | |
CN118411114B (zh) | 一种无人化安全工器具库房管理系统及方法 | |
JP4482879B2 (ja) | 工程情報管理システム |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 12869406 Country of ref document: EP Kind code of ref document: A1 |
|
NENP | Non-entry into the national phase |
Ref country code: DE |
|
122 | Ep: pct application non-entry in european phase |
Ref document number: 12869406 Country of ref document: EP Kind code of ref document: A1 |
|
NENP | Non-entry into the national phase |
Ref country code: JP |