WO2013111397A1 - プラント又は設備の異常診断方法及びヘルスマネージメント方法 - Google Patents

プラント又は設備の異常診断方法及びヘルスマネージメント方法 Download PDF

Info

Publication number
WO2013111397A1
WO2013111397A1 PCT/JP2012/076630 JP2012076630W WO2013111397A1 WO 2013111397 A1 WO2013111397 A1 WO 2013111397A1 JP 2012076630 W JP2012076630 W JP 2012076630W WO 2013111397 A1 WO2013111397 A1 WO 2013111397A1
Authority
WO
WIPO (PCT)
Prior art keywords
plant
equipment
time
data
facility
Prior art date
Application number
PCT/JP2012/076630
Other languages
English (en)
French (fr)
Inventor
前田 俊二
渋谷 久恵
Original Assignee
株式会社 日立製作所
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社 日立製作所 filed Critical 株式会社 日立製作所
Publication of WO2013111397A1 publication Critical patent/WO2013111397A1/ja

Links

Images

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B23/00Testing or monitoring of control systems or parts thereof
    • G05B23/02Electric testing or monitoring
    • G05B23/0205Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults
    • G05B23/0259Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults characterized by the response to fault detection
    • G05B23/0283Predictive maintenance, e.g. involving the monitoring of a system and, based on the monitoring results, taking decisions on the maintenance schedule of the monitored system; Estimating remaining useful life [RUL]

Definitions

  • the present invention relates to a plant or facility abnormality diagnosis method and a health management method for grasping the health state of a plant or facility and diagnosing the operation continuation time, and relates to data from a sensor added to the plant or facility, the plant or facility Estimate the progress of abnormalities of the plant or equipment from the operation information, event information indicating operation of the plant or equipment, equipment load such as engine load, work reports on past failures, etc., and evaluate the operation continuation time Is.
  • Periodic maintenance is important for construction machinery, medical equipment, power generation facilities such as wind power, solar power, and thermal power generation, water treatment, and plant facilities to prevent a reduction in operating rate due to equipment abnormalities. Even if implemented, it is inevitable that the equipment will go down due to a failure, and early detection (predictive detection) of abnormalities based on sensor data added to the equipment and early identification (diagnosis) of abnormal parts are becoming important. .
  • Patent Document 1 discloses an abnormality detection method for detecting an abnormality of a plant or equipment at an early stage, in which data is acquired from a plurality of sensors, and data having low similarity between data based on the similarity between data.
  • learning data is generated / updated by adding / deleting data to / from learning data using the presence / absence of abnormality of the data, and newly acquired observation data and individual data included in learning data
  • An anomaly detection method for detecting anomalies in observation data based on the degree of data divergence is described.
  • Patent Document 2 discloses an abnormality detection method for detecting an abnormality of a plant or equipment at an early stage, acquiring data from a plurality of sensors, modeling learning data composed of almost normal data, and using the modeled learning data Calculating the abnormal measure of the acquired data and modeling the time-series behavior of the acquired data by linear prediction, calculating the prediction error from the model, and using both the abnormal measure and the prediction error, whether there is an abnormality An anomaly detection method for detecting the error is described.
  • Non-Patent Document 1 proposes a method for evaluating a remaining useful life (RUL) for a lithium ion battery.
  • the Gaussian process which is a non-linear regression method, and the particle method are applied.
  • the degradation mechanism can be expressed by a relatively simple physical model, and its parameters are derived from sensor data. Since it is determined, there is no major obstacle to obtaining the RUL.
  • Non Patent Literature 2 proposes a diagnostic method for a hard disk drive.
  • hard disk drives have various degradation mechanisms compared to lithium ion batteries, classical methods such as the Mahalanobis distance are applied instead of the above Gaussian process.
  • Non-Patent Document 3 provides agent software in the form of linking various information related to RUL for aircraft and the like is doing.
  • the RUL defined in Non-Patent Documents 1, 2, and 3 described above represents the time until the equipment breaks down.
  • the health condition is a model that gradually and monotonously decreases.
  • the health condition is a model in which the health condition is increased or decreased by maintenance work.
  • the RUL described in the present application is the operation continuation time of the plant or equipment with respect to the plant or equipment of increasing or decreasing health level, and means that the plant or equipment can be operated until the next diagnosis time. It should also be called short cycle RUL.
  • the operation continuation time is an index for determining the next diagnosis date and time, and is not defined throughout the life cycle of the plant or equipment, but for each plant or equipment, for each time, for each history, Have different values.
  • hard disk drives Compared to lithium-ion batteries that can express the degradation mechanism with a relatively simple physical model, hard disk drives have a variety of degradation mechanisms, making it difficult to apply advanced Gaussian processes and particle methods. .
  • an object of the present invention is to construct a statistical model of current symptoms in consideration of the past history (medical history) of the plant or equipment, the current operating state, and the load state, and grasp the health state of the equipment. . That is, the degree of abnormality and progress are estimated from the sensor data, and information such as operation information, event information, equipment load, work report, etc. is added to this to grasp the health status of the plant or equipment. Is to estimate the operation continuation possible time (RUL).
  • the present invention provides a method for grasping the health condition of a plant or equipment and diagnosing the operation continuation possible time of the plant or equipment. Sensor data, operation information, event information, Estimate the progress of abnormality from the equipment load, work report, etc., and evaluate the operation continuation time of the plant or equipment.
  • Prediction of anomaly measure using Gaussian process which is a nonlinear regression method
  • Anomaly applying recognition method such as k-NN (k-Nearest Neibor) method to time series data
  • Modeling dynamics for time series data and obtaining a state space model Prediction of abnormal measure by particle filter
  • Prediction of RUL from abnormal measure (5) Targeting abnormal measure
  • operation information, event information, and equipment load are also targeted, modeling dynamics to obtain a state space model, predicting RUL with a particle filter, etc., and predicting the continuation time of a plant or equipment.
  • the next diagnosis time can be determined according to the operation continuation time of the plant or equipment.
  • the health state of a plant or equipment can be accurately grasped, and the plant or equipment operation continuation time (RUL) can be determined from the abnormality level and operation information, event information, equipment load, work report, etc. of the plant or equipment. ) Can be estimated, and appropriate maintenance scheduling such as determination of the next diagnosis time can be planned and executed. As a result, a maintenance plan based on the state monitoring can be drafted, corrected, and executed, and it is possible to escape from time-planned maintenance.
  • RUL plant or equipment operation continuation time
  • FIG. 1 is a diagram for explaining the change in abnormal measure and RUL (Remaining Useful Life) of the present invention.
  • FIG. 2 is a diagram for explaining remote monitoring of the facility of the present invention.
  • FIG. 3 illustrates an abnormality prediction that calculates an abnormality measure using sensor data obtained from the sensor added to the facility according to the first embodiment of the present invention and event data that represents the operation of the facility, and a method of predicting the RUL.
  • FIG. FIG. 4 is a diagram illustrating an example of multidimensional time-series sensor data and event data according to the first embodiment of the present invention.
  • FIG. 5 is a diagram illustrating an example of time-series sensor data according to the first embodiment of the present invention.
  • FIG. 6 is a diagram illustrating an example of the daily operation time of the facility according to the first embodiment of the present invention and the accumulated operation time obtained by accumulating the operation time.
  • FIG. 7 is a diagram illustrating an example of the load factor of the engine mounted on the facility according to the first embodiment of the present invention.
  • FIG. 8 is a diagram for explaining the regression operation of data according to the first embodiment of the present invention.
  • FIG. 9 is a diagram for explaining the operation of the Gaussian process according to the first embodiment of the present invention.
  • FIG. 10 is a diagram for explaining a situation in which future sensor data (or abnormal measure data) is predicted from past time-series sensor data (or abnormal measure data) according to the first embodiment of the present invention.
  • FIG. 10 is a diagram for explaining a situation in which future sensor data (or abnormal measure data) is predicted from past time-series sensor data (or abnormal measure data) according to the first embodiment of the present invention.
  • FIG. 11 is a diagram for explaining a situation in which future sensor data (or abnormal measure data) is predicted from past time-series sensor data (or abnormal measure data) according to the first embodiment of the present invention.
  • FIG. 12 illustrates an abnormality prediction for calculating an abnormality measure using sensor data obtained from a sensor added to the facility according to the second embodiment of the present invention and event data representing operation of the facility, and a method of predicting the RUL.
  • FIG. 13 is a block diagram illustrating a prediction operation by the classifier according to the second embodiment of the present invention.
  • FIG. 14 is a diagram illustrating a prediction operation by the classifier according to the second embodiment of the present invention.
  • FIG. 15 illustrates an abnormality prediction for calculating an abnormality measure using sensor data obtained from a sensor added to the facility according to the third embodiment of the present invention and event data representing operation of the facility, and a method of predicting the RUL.
  • FIG. FIG. 16 is a diagram illustrating a state model according to the third embodiment of the present invention.
  • FIG. 17 is a diagram for explaining the concept of the particle (particle) filter according to the third embodiment of the present invention.
  • FIG. 18 illustrates an abnormality prediction for calculating an abnormality measure using sensor data obtained from a sensor added to the facility according to the fourth embodiment of the present invention and event data representing operation of the facility, and a method of predicting the RUL.
  • FIG. 19 is a diagram for explaining a function of lethality conversion in the state model according to the fourth embodiment of the present invention.
  • FIG. 20 is a diagram illustrating a component model representing the influence of operation data in the state model according to the fourth embodiment of the present invention.
  • FIG. 21 is a diagram illustrating a component model showing the influence of accumulated load data in the state model according to the fourth embodiment of the present invention.
  • FIG. 22 is a diagram illustrating the concept of the local subspace method according to the fourth embodiment of the present invention.
  • FIG. 23 is a diagram illustrating the concept of the operation continuation possible time of the facility proposed in Example 4 of the present invention.
  • FIG. 20 is a diagram illustrating a component model representing the influence of operation data in the state model according to the fourth embodiment of the present invention.
  • FIG. 21 is a diagram illustrating a component model showing the influence of accumulated load data in the state model according to the fourth embodiment of the present invention.
  • FIG. 22 is a diagram illustrating the concept of the local subspace method
  • FIG. 24 shows an abnormality prediction for calculating an abnormality measure almost in synchronization with the maintenance work using sensor data obtained from the sensor added to the facility according to the fifth embodiment of the present invention and event data representing the operation of the facility.
  • FIG. 5 is a block diagram for explaining a method of predicting a RUL almost in synchronization with maintenance work.
  • FIG. 25 is a diagram for explaining the state change accompanying the maintenance work of the fifth embodiment of the present invention and the accompanying change in the abnormality measure.
  • FIG. 26 is a diagram for explaining the effect of the difference in the interval between periodic inspections according to the fifth embodiment of the present invention.
  • FIG. 27 is a diagram illustrating the update status of the estimated value of the facility continuation possible time according to the fifth embodiment of the present invention.
  • the present invention provides a method for grasping the health state of a plant or equipment and diagnosing the equipment operation continuation time in order to maintain and improve the operation rate of the plant or equipment, and includes sensor data, operation information, Estimate the progress of the degree of abnormality from event information, equipment load, work report, etc., and evaluate the operation continuation time of the plant or equipment.
  • a recognition method such as k-NN
  • FIG. 1 shows time series data of anomaly measure 1 obtained from sensor data in a plant or facility targeted by the present invention.
  • the anomaly measure 1 is obtained by the method described later.
  • the anomaly measure 1 gradually increases with time.
  • the threshold value 2 in the figure is set for the anomaly measure 1 and indicates the limit of failure of the plant or equipment. If the abnormal measure 1 exceeds the threshold value 2, the state of the plant or equipment is not normal.
  • RUL4 is an acronym for Remaining Useful Life.
  • a method for predicting the abnormality measure 1 and RUL4 will be described.
  • FIG. 2 shows an example of the target equipment 5 that is a target of remote monitoring.
  • Medical diagnostic equipment 5a such as MRI (nuclear magnetic resonance imaging) and X-ray CT (computer tomography)
  • power generation equipment 5b such as gas engine and gas turbine
  • construction machine 5c such as excavator and dump truck
  • Many plants or facilities such as the power generation facility 5d are subject to remote monitoring. Although not shown, railways, airplanes, ships, etc. are also subject to remote monitoring. These plants, facilities, and machines are equipped with a plurality of sensors, and by analyzing sensor data, it is monitored for abnormal signs in the plant or facilities on a 24-hour basis.
  • FIG. 3 is a block diagram for explaining a method for predicting a future abnormality sign from time-series data related to past sensor data according to the present invention.
  • Current time-series sensor data 10 is obtained from the target facility 5. This is stored in the time series database 11 every time it is acquired, and can be used as past information.
  • the time series database 11 includes sensor data 12, event data 13, operation data 14, load data 15, and the like. These strongly represent the environment in which the target facility 5 is placed, and are named environmental data.
  • Event data 13 represents equipment status such as equipment operation pattern such as start and stop.
  • the operation data 14 represents the operation time of the facility and its accumulation. For example, in the case of an excavator or the like, detailed operation time such as travel time and turn operation time is applicable.
  • the load data 15 represents, for example, the state of the load applied to the engine.
  • the abnormality prediction unit 16 refers to the data stored in the time series database 11 and predicts the abnormality measure 1 by the similar time series data selection unit 17 and the identification 18 by the regression engine. Made.
  • the similar time series data selection unit 17 selects past time series sensor data similar to the current time series sensor data 10. Prediction of the abnormality measure 1 is performed on the selected past time series sensor data by a regression equation.
  • the RUL 4 is predicted by the RUL prediction 20 from the obtained abnormal measure data 19.
  • the display unit 21 displays and outputs the sensor data 12 and the waveform of the abnormality measure 1.
  • the display data is transmitted to AHM (asset health management) and AEM (enterprise asset management) which are higher systems.
  • FIG. 4 shows an example of sensor data 12 and event data 13.
  • the time series data acquisition unit 6 acquires the sensor data 12 and the event data 13 for the power generation equipment 5b and the construction machine 5c that are the target equipment 5.
  • the operation data 14 and the load data 15 are also acquisition targets.
  • the sensor data 12 includes cooling water and oil temperature, oil pressure, voltage, and the like. These data are acquired at regular sampling intervals.
  • the event data 13 is data representing the start, stop, and other operations of the equipment. In some cases, an alarm is included.
  • FIG. 5 shows an example of sensor data 12 of the gas engine. In this example, the operation is repeatedly turned on and off.
  • FIG. 6 shows an example of the operation data 14.
  • the upper part of FIG. 6 shows the daily operation time in seconds.
  • the lower part of FIG. 6 shows the operation data 14-1 of the facility (1) and the operation data 14-2 of the facility (2), which are the cumulative operation time of two devices, within a certain period. .
  • the time series data 7 corresponds to the age of the equipment.
  • FIG. 7 shows an example of the load data 15.
  • the engine load factor is represented.
  • the time series data 7 indicates the environment in which the equipment is used.
  • FIG. 8 is a diagram for explaining estimation by a nonlinear regression method such as a Gaussian process or a prediction method.
  • FIG. 8 shows the learning data 23 and the regression function 22.
  • the learning data 23 is past time series sensor data that is similar to the current time series sensor data 10.
  • FIG. 9 shows an example of a Gaussian process as regression.
  • the characteristic of the Gaussian process is that data similar to learning data can be selected and output, and its reliability can be output as variance.
  • the output t est is obtained as a predicted value by the method shown in FIG.
  • Non-Patent Document 5 introduces a technique for estimating Remaining-useful-life (RUL) of a storage battery using a Gaussian process or a particle filter described later, for a Li-ion storage battery.
  • RUL Remaining-useful-life
  • One of the technical differences between this embodiment and the above document is that the above document defines the time until failure as RUL, and a further difference is that in the Li-ion battery, resistance and capacitance are different.
  • the circuit physical model can be assumed, and the RUL is obtained based on the model.
  • RUL4 is defined as the operation continuation time of the plant or equipment until the next diagnosis. That is, a short-cycle RUL4 is defined and updated every time or every diagnosis.
  • Fig. 10 shows an example of prediction of anomaly measure 1 by the Gaussian process.
  • the anomaly measure 1 up to the present time is displayed. Up to this point, it is assumed that the condition of the equipment is already known.
  • the portion surrounded by a square is the data of the time series abnormality measure 1 up to the present time. Data for this period is used for prediction. The period is set as one month. Of course, the longer one can cover various phenomena and expect high accuracy. Waveforms of anomaly measure 1 in time series are collected as vectors and expressed as X.
  • Fig. 11 shows the prediction stage. From the waveform surrounded by the square, the prediction result of the anomaly measure 1 by the Gaussian process is indicated by a circle. Data to the right of the waveform enclosed by the square will be actually obtained later. Here, the time increment is t.
  • FIG. 12 shows an example of identification 24 by the recognition engine.
  • the operation block is shown in FIG.
  • Sensor data 12, event data 13, operation data 14, and load data 15 are input by the recognition engine, and past time series data is read from the database 11 and recognized. Past data is used as learning data.
  • FIG. 14 shows an example of identification 24 by the recognition engine.
  • the k-NN method is mentioned, but the time trajectory is targeted in the sense that it is applied to the time-series data 7.
  • the past time series data 7 is vectorized for a predetermined period.
  • the time series data 7 is vectorized for the period determined up to the present time, and the distance from the vector of the past time series data 7 is obtained. Based on the magnitude of this distance, the past time series data close to the unknown pattern A plurality of 7 vectors are selected.
  • class A corresponds to past normal data.
  • Class B may not exist.
  • five pieces of data corresponding to an unknown pattern
  • five past time series data 7 (belonging to class A), and between these centroids.
  • the numerical value of 5 is merely an example.
  • FIG. 15 shows an example of identification 22 using a particle filter.
  • Formula 1 shows a model for prediction of time series abnormality measure 1 data.
  • Equations 2 and 3 are component models.
  • Formula 2 is a trend model and is expressed by a second-order difference.
  • Equation 3 is a noise term.
  • FIG. 16 shows the concept of the state model of the particle filter
  • FIG. 17 shows the operation of the particle filter. Details of the particle filter itself are detailed in Non-Patent Document 5. Although it is important to study a model that reflects the dynamics corresponding to the anomaly measure 1, here it has been simplified as shown in Equations 2 and 3.
  • FIG. 18 shows a block configuration diagram using the RUL prediction 20 by the particle (particle) filter.
  • Equation 1 shows a model for predicting time-series data of equipment continuation time.
  • Equations 5 to 8 show component models, and in Equation 4, the criticality for each part is added.
  • FIG. 19 shows a function for converting and obtaining the fatality degree based on the predicted value of the abnormality measure 1 of the part j. This corresponds to Equation 5.
  • the predicted value of the abnormality measure 1 uses the information because a certain part can be specified when the abnormality measure 1 is calculated. Moreover, lethality was made into the reciprocal number of operation continuation time of a plant or an installation here. Of course, a non-linear function may be assumed. In Formula 4, the above fatalities for each part are added.
  • FIG. 20 shows a component model representing the influence of operating data. This corresponds to Equation 6. This means that the criticality increases as the operating time of the plant or equipment increases. Here, considering the replacement of parts, the operation time for each part is used.
  • FIG. 21 shows a component model representing the influence of accumulated load data. This means that the criticality increases as the cumulative load of the plant or equipment is accumulated.
  • Equations 7 and 8 are models showing fluctuations different from the trend component. Although the difference is expressed as the second floor difference, any number of floor differences may be used. ⁇ is a noise term. As a result of these modeling, a prediction result as shown in FIG. 11 is obtained.
  • the output can be processed from various viewpoints such as instantaneousness, reliability, and the like, such as the earliest predicted time, the latest time, and the average time.
  • FIG. 14 shows an example of identification 24 by the recognition engine.
  • the subspace method described in Patent Document 1 Japanese Patent Laid-Open No. 2010-191556 can be used.
  • Fig. 22 shows the method. Paying attention to the similarity between sensor data, generate compact learning data consisting of normal cases, model the generated learning data by subspace method (LSC: Local Subspace Classifier), and observe the observed sensor data 12 and subspace Based on the distance relationship, the degree of deviation of the observed sensor data, that is, the abnormality measure 1 is obtained, and the health status of the equipment is determined from the observed sensor data 12. The handling of the maintenance work data 46 will be described later.
  • LSC Local Subspace Classifier
  • FIG. 23 illustrates the operation continuation time and RUL of the plant or equipment until the next diagnosis.
  • the health status of the facility is plotted on the vertical axis and time is plotted on the horizontal axis.
  • the health state is given, for example, in the form of a function having the reciprocal of the abnormal measure 1 described above or the abnormal measure 1.
  • the health condition of the equipment is decreasing with the passage of time.
  • Reference numeral 58 denotes an alarm that occurs midway.
  • 59 is a load factor or an operating rate (in this case, the vertical axis is not in a healthy state).
  • Reference numeral 56 denotes the effect of maintenance work.
  • 57a is an inclination indicating the degree of attenuation of the health condition before maintenance
  • 57b is an inclination indicating the degree of attenuation of the health condition after maintenance.
  • Li-ion batteries and hard disk drives do not require maintenance work in many cases, so the health condition does not increase or decrease in this way, but it is basically reduced. Therefore, the present embodiment is particularly effective in equipment that involves an increase or decrease in the health status of equipment due to maintenance work.
  • the slope 57b indicating the degree of attenuation of the health condition after maintenance can be grasped by comparing the pre-maintenance RUL 54 this time with that before maintenance.
  • the effect 56 of the maintenance work cannot be completely restored every time maintenance is performed, and it is expected that the recovery of the health condition gradually becomes difficult. Therefore, the health condition before and after each maintenance is measured. If you evaluate the degree of inability to recover, health deterioration is easy to understand.
  • FIG. 24 is obtained by adding the information of the maintenance work 51 to FIG. 18 in order to realize the above.
  • the abnormality measure 1 and the health condition are calculated, and the abnormality measure 1 and the health condition are displayed almost in synchronization with the timing of the maintenance work 51.
  • the display unit 21 displays time series data 7 of the abnormality measure 1, the health state, the operation continuation possible time 54 of the plant or equipment.
  • time series data 7 indicating an inclination indicating the degree of attenuation of the health condition before and after maintenance, and time series data 7 of the center of gravity of the partial space described later are also displayed.
  • FIG. 25 shows an example of a change in state that occurs with deterioration of a plant or equipment or maintenance work, and an abnormality measure 1 that fluctuates accordingly.
  • the learning data before and after the state change due to maintenance, its subspace (represented by a line segment here), and the anomaly measure 1 when observation data is input are shown.
  • the observation data is time-series data 7 such as sensor data, and is a snapshot at a certain time.
  • the learning data itself has changed because the state has changed due to deterioration of the plant or equipment and maintenance work.
  • an anomaly measure 1 there is a problem of how to consider whether an anomaly measure A or an anomaly measure B is adopted.
  • the alarm 58 of FIG. 23 is generated because the abnormality measure 1 exceeds the threshold value 2, but is in a relatively healthy facility state. Therefore, it is desirable to perform maintenance work after grasping the essential health condition of the plant or equipment.
  • the abnormal measure 1 exceeds the threshold value 2 in a state of poor health, it can be said that maintenance work requires sufficient diagnosis and countermeasures. In this way, it can be seen that it is important to evaluate the health condition of the learning data itself. Here, it is important to quantify where the partial space is located in the feature space and how it is displaced by adjustment or replacement of parts.
  • the maintenance work data 46 is input, and the learning data accumulation / displacement evaluation 42 evaluates how the subspace of the learning data is displaced.
  • the subspace method 45 every time maintenance work is performed, the subspace moves in the feature space. For example, if the subspace is represented by a representative cluster such as the center of gravity, the point sequence is obtained. This point sequence repeats a cycle in which it deteriorates from the normal state, rejuvenates slightly due to maintenance, and further deteriorates.
  • the subspace is expressed by a representative cluster such as the center of gravity.
  • the inventors' patent document 2 Japanese Patent Laid-Open No. 2011-145846 shows the utilization of the starting point of the residual vector to the local subspace. Yes.
  • the locus of this starting point becomes time series data 7 representing the state of the equipment.
  • the start point b corresponds to this.
  • the k vicinity of the local subspace (the number k of learning data to be selected from the one close to the observation data) is expanded and the part is obtained by increasing k.
  • a space may be formed, and the starting point may be used as a representative point.
  • the method of selecting representative points shall be selected according to the prior art depending on how representativeness is taken.
  • the time determined by the time plan maintenance can be changed by the operation continuation possible time 54. This is shown in FIG.
  • periodic inspections referred to as inspections that are stopped because the inspections are performed while the equipment is stopped.
  • the equipment is inspected by state monitoring maintenance during times other than the periodic inspections, and the inspections are in operation.
  • You can shift the time behind.
  • the health condition can be grasped by the inspection during operation, the inspection items can be reduced, the working time determined by the time plan maintenance can be shortened, and the equipment downtime can be reduced.
  • condition monitoring maintenance and time-planned maintenance are combined.
  • FIG. 27 shows how the estimated value of the operation continuation time of the plant or equipment gradually increases.
  • 60 is the probability of equipment failure (probability density function: PDF). This probability is calculated in the RUL prediction 20 by the particle filter of FIG. The periodic inspection period is determined from the calculated probability of equipment failure.
  • PDF probability density function
  • the effect of the maintenance work 51 itself can be estimated in advance.
  • the present invention can be used for plant or facility diagnosis and maintenance scheduling based on short cycle RUL.

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Automation & Control Theory (AREA)
  • Testing And Monitoring For Control Systems (AREA)

Abstract

 プラント又は設備に装着した複数のセンサから取得したセンサデータ、および/あるいは設備の置かれた状態を表す環境データを対象に、前記プラント又は設備の稼動継続可能時間を推定する。

Description

プラント又は設備の異常診断方法及びヘルスマネージメント方法
 本発明は、プラント又は設備の健康状態を把握し、稼働継続可能時間を診断する、プラント又は設備の異常診断方法及びヘルスマネージメント方法に関し、プラント又は設備に付加したセンサからのデータ、プラント又は設備の稼働情報、プラント又は設備の操作などを表すイベント情報、エンジン負荷などの設備負荷、過去の故障に関する作業報告書などから、プラント又は設備の異常度の進展を推測し、稼働継続可能時間を評価するものである。
 建設機械、医療機器、風力・太陽光や火力などの発電設備、水処理、プラント等の設備において、設備異常による稼働率低下を未然に防止するため、定期保守が重要であるが、定期保守を実施していても、故障により設備ダウンすることは避けられず、設備に付加したセンサのデータに基づく異常の早期発見(予兆検知)、異常個所の早期特定(診断)が重要になってきている。
 しかし、多くのセンサデータ、膨大な設備情報や保守履歴情報があるなかで、設備の健康状態を把握し、さらに、あとどれくらい故障しないで稼動可能なのか(設備の稼働継続可能時間)を予測することは、設計・現場の両知識と、多くのデータ解析を必要とし、難易度が高く困難を伴うものであった。
 例えば、特許文献1には、プラントまたは設備の異常を早期に検知する異常検知方法であって、複数のセンサからデータを取得し、データ間の類似度に基づき、データ間で類似度が低いデータの場合は、そのデータの異常の有無を用いて、学習データへのデータの追加や削除を行うことにより、学習データを生成・更新し、あらたに取得した観測データと、学習データに含まれる個々のデータの乖離度に基づいて、観測データの異常を検知する異常検知方法が記載されている。
 特許文献2には、プラントまたは設備の異常を早期に検知する異常検知方法であって、複数のセンサからデータを取得し、ほぼ正常データからなる学習データをモデル化し、モデル化した学習データを用いて取得データの異常測度を算出し、かつ、線形予測により上記取得データの時系列的振舞いをモデル化し、モデルからの予測誤差を算出し、異常測度と予測誤差の双方を用いて、異常の有無を検知する異常検知方法が記載されている。
 また、非特許文献1には、リチウムイオンバッテリを対象に、残存耐用年数(Remaining Useful Life: RUL) を評価する手法が提案されている。ここでは、非線形回帰手法であるガウシアンプロセスや、粒子(パーティクル)法が適用されているが、リチウムイオンバッテリでは、その劣化のメカニズムを比較的簡単な物理モデルで表現でき、そのパラメータはセンサデータから決められることから、そのRULを得ることに、大きな障害はない。
 非特許文献2には、ハードディスクドライブの診断手法が提案されている。しかし、ハードディスクドライブは、リチウムイオンバッテリに比べ、多様な劣化のメカニズムが存在するため、上記のガウシアンプロセスの適用でなく、マハラノビス距離のような古典的な手法が適用されている。
 PHM(Prognostics and Health Management) では、RULの算出が重要と言われており、非特許文献3には、航空機などを対象に、RULと関連がある各種情報をリンクする形で、エージェントソフトを提供している。
 上述した非特許文献1,2,3で定義されたRULは、設備が故障するまでの時間を表している。健康状態は、徐々に、単調に減少していくモデルである。本明細書では、健康状態は、保守作業により増減するというモデルである。
 本出願で述べるRULは、増減する健康度のプラント又は設備に対する、プラント又は設備の稼働継続可能時間であり、次の診断時期まで運転可能であるということを意味するものである。短周期RULとも言うべきものである。換言すれば、稼働継続可能時間は、次回の診断日時を決めるための指標であり、プラント又は設備のライフサイクル全般にわたって定義するものでなく、プラント又は設備ごとに、時刻ごとに、来歴ごとに、異なる値をもつものである。
特開2010-191556号公報 特開2011-145846号公報
K. Goebel: Prognostics in Battery Health Management, IEEE Instrumentation AndMeasurement Magazine, Vol. 11, 4, pp 33-40(2008) Yu Wang, Qiang Miao, Pecht,M. ;   Health monitoring of hard diskdrive based on Mahalanobis distance, Prognostics and System Health ManagementConference (PHM-Shenzhen), 2011 Camci, F., Valentine, G.S.,Navarra, K. : Methodologies for Integration of PHM Systems with MaintenanceData, Aerospace Conference, 2007IEEE 学会報告「尾崎 晋作, 和田 俊和, 前田 俊二, 渋谷 久恵,『異常検出におけるSimilarity Based ModelingとGaussian Processesの関連に関して」,パターン認識・メディア理解研究会(PRMU),画像工学(IE),133-138(2011.5)』 樋口知之:粒子フィルタ、電子情報通信学会誌 Vol.88, No.12,2005
 劣化のメカニズムを比較的簡単な物理モデルで表現できるリチウムイオンバッテリに対し、ハードディスクドライブでは、劣化のメカニズムが多様であるため、高度なガウシアンプロセスや粒子(パーティクル)法を適用することは困難である。
 一般に、建設機械、医療機器、風力・太陽光や火力などの発電設備、プラント等の設備では、大規模システムであること、購入部品の素性まで含めて計算機モデルを構築するには、膨大な費用・長い時間も必要とすることから、劣化のメカニズムを高精度に表現可能なものの方が稀であり、そのため、異常検知自体が簡単な統計的モデリングに頼るケースが多く、このような事例では、プラント又は設備の稼働継続可能時間(RUL)の算出は極めて困難な課題と言える。このため、次期診断時期も的確には指定できない。結局のところ、保守は、時間計画保全になっているのが実情である。
 そこで、本発明の目的は、プラント又は設備の過去の履歴(病歴)、今までの稼動状態、負荷の状態も考慮した、現在の症状の統計的モデルを構築し、設備の健康状態を把握する。すなわち、センサデータから異常の度合い、進展を推定し、これに、稼働情報、イベント情報、設備負荷、作業報告書などの情報を加味して、プラント又は設備の健康状態を把握し、プラント又は設備の稼働継続可能時間(RUL)を推定することである。
 上記目的を達成するために、本発明は、プラント又は設備の健康状態を把握し、プラント又は設備の稼働継続可能時間を診断する方法を提供するものであり、センサデータ、稼働情報、イベント情報、設備負荷、作業報告書などから、異常度の進展を推測し、プラント又は設備の稼働継続可能時間を評価する。
 具体的には、(1)非線形回帰手法であるガウシアンプロセスを用いた異常測度の予測、(2)k-NN(k個-Nearest Neibor)法と言った認識手法を時系列データに適用した異常測度の予測、(3)時系列データを対象にダイナミクスをモデリングし状態空間モデルを得、粒子フィルタによる異常測度の予測、(4)異常測度からRULの予測、(5)異常測度を対象に、これに稼働情報、イベント情報、設備負荷も併せて対象とし、ダイナミクスをモデリングし状態空間モデルを得、粒子フィルタによるRULの予測などからなる高精度異常度予測及びプラント又は設備の稼働継続可能時間予測方法を提供する。
 プラント又は設備の稼働継続可能時間により、次期診断時期の決定などが可能となる。これらにより、プラント又は設備の安定稼動を実現することを可能とする。
 本発明によれば、プラント又は設備の健康状態を的確に把握でき、プラント又は設備の異常度と稼働情報、イベント情報、設備負荷、作業報告書などから、プラント又は設備の稼働継続可能時間(RUL)を推定でき、次期診断時期の決定など、的確な保守スケジューリングを立案、実行できる。これにより、状態監視に基づく保守計画を立案、修正、実行でき、時間計画保全から脱却できる。
図1は、本発明の異常測度の変化とRUL(Remaining UsefulLife)を説明する図である。 図2は、本発明の設備の遠隔監視を説明する図である。 図3は、本発明の実施例1にかかる設備に付加したセンサから得られるセンサデータや設備の操作などを表すイベントデータを用いて異常測度を算出する異常予測と、RULの予測の方法を説明するブロック図である。 図4は、本発明の実施例1の多次元時系列センサデータ、イベントデータの一例を示す図である。 図5は、本発明の実施例1の時系列センサデータの一例を表す図である。 図6は、本発明の実施例1の設備の日々の稼働時間とそれを累積した累積稼働時間の一例を示す図である。 図7は、本発明の実施例1の設備に搭載されたエンジンの負荷率の一例を説明する図である。 図8は、本発明の実施例1のデータの回帰動作を説明する図である。 図9は、本発明の実施例1のガウシアンプロセスの動作を説明する図である。 図10は、本発明の実施例1にかかる過去の時系列センサデータ(あるいは異常測度データ)から、未来のセンサデータ(あるいは異常測度データ)を予測する状況を説明する図である。 図11は、本発明の実施例1にかかる過去の時系列センサデータ(あるいは異常測度データ)から、未来のセンサデータ(あるいは異常測度データ)を予測する状況を説明する図である。 図12は、本発明の実施例2にかかる設備に付加したセンサから得られるセンサデータや設備の操作などを表すイベントデータを用いて異常測度を算出する異常予測と、RULの予測の方法を説明するブロック図である。 図13は、本発明の実施例2の識別器による予測動作を説明するブロック図である。 図14は、本発明の実施例2の識別器による予測動作を説明する図である。 図15は、本発明の実施例3にかかる設備に付加したセンサから得られるセンサデータや設備の操作などを表すイベントデータを用いて異常測度を算出する異常予測と、RULの予測の方法を説明するブロック図である。 図16は、本発明の実施例3の状態モデルを説明する図である。 図17は本発明の実施例3の粒子(パーティクル)フィルタの概念を説明する図である。 図18は、本発明の実施例4にかかる設備に付加したセンサから得られるセンサデータや設備の操作などを表すイベントデータを用いて異常測度を算出する異常予測と、RULの予測の方法を説明するブロック図である。 図19は、本発明の実施例4の状態モデルにおける致命度変換の関数を説明する図である。 図20は、本発明の実施例4の状態モデルにおける稼働データの影響を表す成分モデルを示す図である。 図21は、本発明の実施例4の状態モデルにおける累積負荷データの影響を示す成分モデルを示す図である。 図22は、本発明の実施例4の局所部分空間法の概念を説明する図である。 図23は、本発明の実施例4で提唱する設備の稼働継続可能時間の概念を説明する図である。 図24は、本発明の実施例5にかかる設備に付加したセンサから得られるセンサデータや設備の操作などを表すイベントデータを用いて、保守作業にほぼ同期して異常測度を算出する異常予測と、保守作業にほぼ同期してRULを予測する方法を説明するブロック図である。 図25は、本発明の実施例5の保守作業に伴う状態変化、およびそれに伴う異常測度の変動を説明する図である。 図26は、本発明の実施例5による定期検査の間隔の違いの効果を説明する図である。 図27は、本発明の実施例5による設備の稼働継続可能時間の推定値の更新状況を説明する図である。
 本発明は、プラント又は設備の稼働率を維持・向上するため、プラント又は設備の健康状態を把握し、設備の稼働継続可能時間を診断する方法を提供するものであり、センサデータ、稼働情報、イベント情報、設備負荷、作業報告書などから、異常度の進展を推測し、プラント又は設備の稼働継続可能時間を評価する。
 このため、センサデータ、イベント情報はもちろんのこと、稼働情報、設備負荷といった時系列データも用いる。また、過去の故障事例からなる作業報告書も扱う。
 そして、具体的には、(1)非線形回帰手法であるガウシアンプロセスを用いた異常測度の予測、(2)k-NNと言った認識手法を時系列データに適用した異常測度の予測、(3)時系列データを対象にダイナミクスをモデリングし状態空間モデルを得、粒子フィルタによる異常測度の予測、(4)異常測度からRULの予測、(5)異常測度を対象に、これに稼働情報、イベント情報、設備負荷も併せて対象とし、ダイナミクスをモデリングし状態空間モデルを得、粒子フィルタによるRULの予測などからなる高精度異常度予測及びプラント又は設備の稼働継続可能時間の予測方法を提供する。
 以下に、本発明の実施の形態について、図面を参照して説明する。図1は本発明が対象とするプラント又は設備におけるセンサデータから求めた異常測度1の時系列データを示す。異常測度1は後述する方法で求める。異常測度1は、時間の経過とともに徐々に増加している。同図のしきい値2は、異常測度1に対して設定したもので、プラント又は設備が故障する限界を示す。このしきい値2を異常測度1が超えると、プラント又は設備の状態は正常でない。
 このしきい値2を超える故障発生時期3までの残された時間が、RUL4と一般に呼ばれている値である。ここでは、RUL4はRemaining Useful Lifeの頭文字である。本実施例では、異常測度1およびRUL4を予測する方法について説明する。
 図2は、遠隔監視の対象となる対象設備5の一例を示すものである。MRI(核磁気共鳴イメージング)やX線CT(コンピュータ断層装置)などの医療診断装置5a、ガスエンジン・ガスタービンなどの発電設備5b、ショベルやダンプトラックなどの建設機械5c、風力発電や太陽光発電などの発電設備5dなど、多くのプラント又は設備が遠隔監視の対象になる。図示していないが、鉄道、飛行機、艦船なども遠隔監視の対象になる。これらのプラントや設備・機械は、複数のセンサを装備しており、センサデータを分析することにより、24時間体制で、プラント又は設備に異常予兆が発生していないか監視されている。
 図3に、本発明にかかる過去のセンサデータに関わる時系列データから、未来の異常予兆を予測する方法を説明するブロック図を示す。現在の時系列センサデータ10が、上記対象設備5から得られる。これは、時系列データベース11に取得のたびに毎回蓄積され、過去の情報として活用できる形態になっている。この時系列データベース11には、センサデータ12、イベントデータ13、稼動データ14、負荷データ15などがある。これらは、対象設備5の置かれた環境を強く表すもので、環境データと名づける。
 イベントデータ13は、起動や停止など設備の運転パターンなどの設備状態を表す。稼動データ14は、設備の運転時間やその累積を表す。たとえば、ショベルなどでは、走行時間や旋回動作の時間など、動作の詳細時間が該当する。負荷データ15は、たとえばエンジンにかかる負荷の状況を表す。異常の状態の予測時には、異常予測部16にて、時系列データベース11に格納されているデータを参照して、類似時系列データ選択部17と回帰エンジンによる識別18により、異常測度1の予測がなされる。類似時系列データ選択部17は、現在の時系列センサデータ10と類似する過去の時系列センサデータを選択する。選択された過去の時系列センサデータに対し、回帰式により異常測度1の予測を行う。
 回帰の方法は、あとで図8~図11を用いて説明する。そして、得られた異常測度データ19からRUL予測20にてRUL4の予測を行う。表示部21は、センサデータ12の表示や異常測度1の波形を表示し、出力するものである。また、上位システムであるAHM(asset health management)やAEM(enterprise asset management)に表示データを送信する。
 以下、図4から図7を用いて、データの一例を説明する。図4に、センサデータ12とイベントデータ13の例を示す。対象設備5である発電設備5b、建設機械5cを対象に、時系列データ取得部6にて、センサデータ12、イベントデータ13を取得する。稼動データ14、負荷データ15も取得対象である。センサデータ12は、冷却水やオイルの温度、オイルの圧力、電圧などである。一定のサンプリング間隔で、これらのデータが取得される。イベントデータ13は、設備の起動、停止、そのほかの操作を表すデータである。警報などが含まれる場合もある。
 図5に、ガスエンジンのセンサデータ12の例を示す。運転ON,OFFの繰り返しをしている例である。
 図6に、稼動データ14の例を示す。図6の上段が、日々の稼動時間を秒単位で表示したものである。図6の下段が、ある期間内を対象に、2台の装置の累積稼動時間である設備(1)の稼働データ14-1,設備(2)の稼働データ14-2を示したものである。この場合、時系列データ7は、設備の年齢に相当する。
 図7に、負荷データ15の例を示す。ここでは、エンジン負荷率を表している。この場合、時系列データ7は、設備が使われている環境を示している。
 次に、異常測度1の予測の方法を図8~図11を用いて説明する。図8は、ガウシアンプロセス等の非線形回帰手法や予測手法による推定を説明する図である。図8には、学習データ23と回帰関数22が描かれている。ここで、学習データ23が、現在の時系列センサデータ10と類似したとされる過去の時系列センサデータである。
 図9に、回帰としてガウシアンプロセスの例を示す。ガウシアンプロセスの解説記事は多いが、ここでは、非特許文献4を参照している。ガウシアンプロセスの特徴は、学習データと類似したデータを選択出力し、かつその信頼性も分散として出力可能なことである。図9に示した方法で、出力testが予測値として得られる。
 なお、非特許文献5には、Li-ion蓄電池を対象に、ガウシアンプロセスや後述の粒子(パーティクル)フィルタを用いた蓄電池のRemaining-useful-life(RUL)を推定する技術が紹介されている。本実施例と上記文献の技術的な相違点のひとつは、上記文献では、故障までの期間をRULと定義している点にあり、さらなる相違点は、Li-ion蓄電池では、抵抗やキャパシタンスからなる回路物理モデルを仮定でき、それに基づきRULを求めている点である。
 本実施例では、RUL4を次の診断までのプラント又は設備の稼働継続可能時間と定義している。すなわち短周期のRUL4を定義し、これを時刻ごとに、あるいは診断毎に更新するようにした。
 また、多くの対象設備では、物理モデルを仮定することはコストがかかり、また精度を確保しようとすると、ますます膨大なコストがかかるというデメリットがある。これを考慮して、本実施例では、精度の高い物理モデルを必ずしも準備できなくても、対応可能とした。
 ここでは、さらに、精度を確保すべく、過去にできるだけ遡ることや、データの時間刻み(サンプリング)を細かくすると、いずれも容量の増大を招く。このような膨大な類似時系列データ7を、事前に、逐一選択する点であり、これにより、図9に示した計算、特に逆行列計算の負荷が減り、短期(短時間での)予測を可能にしている。
 図10に、ガウシアンプロセスによる異常測度1の予測の例を示す。同図において、現時点までの異常測度1が表示されている。ここまでは、設備の状態も含めて、既知と仮定している。同図において、四角で囲んだ部分が、現時点までの時系列異常測度1のデータである。この期間のデータを予測に利用する。期間は、一ヶ月などと定める。もちろん、長い方がいろいろな現象を網羅でき、高い精度を期待できる。時系列での異常測度1の波形を、ベクトルとしてまとめ、Xと表記している。
 図11に、予測の段階を示す。四角で囲んだ波形から、ガウシアンプロセスによる異常測度1の予測結果を○印で示す。四角で囲んだ波形より右のデータが、のちに、実際に得られることになる。ここで、時刻の刻みをtとしている。
 次に、異常測度1の予測の別の方法を図12~図14を用いて説明する。図12に、認識エンジンによる識別24の例を示す。動作ブロックを図13に示す。認識エンジンによるセンサデータ12、イベントデータ13、稼動データ14、負荷データ15を入力し、過去の時系列データをデータベース11から読み出し、認識する。過去のデータは、学習データとして使用する。
 図14に認識エンジンによる識別24の例を示す。ここでは、k-NN法を挙げているが、時系列データ7に適用する意味で、時間軌跡を対象にする。過去の時系列データ7に対し、定めた期間についてこれをベクトル化する。未知パターンとして、現時点までの定めた期間について時系列データ7をベクトル化し、これと、過去の時系列データ7のベクトルからの距離を求め、この距離の大小により、未知パターンに近い過去時系列データ7のベクトルを複数選ぶものである。
 図14では、クラスA、Bがあるが、クラスAが過去の正常データに対応する。クラスBは存在しなくてもよい。たとえば、選んだ複数の5個の過去時系列データ7のベクトル(クラスAに属している)から、時間的に数ステップ先のデータ(未知パターンに対応する)を5個読み出し、これらの重心間の距離などを、異常測度1の予測値とする。なお、5個という数値は一例に過ぎない。
 次に、異常測度1の予測の別の方法を図15~図17を用いて説明する。図15に、粒子フィルタによる識別22の例を示す。数式1に、時系列異常測度1データの予測のためのモデルを示す。数式2、3は、成分モデルである。数式2はトレンドモデルであり、2階差分で表している。数式3は、ノイズ項である。
Figure JPOXMLDOC01-appb-M000001
Figure JPOXMLDOC01-appb-M000003
 図16は、粒子フィルタの状態モデルの概念、図17には粒子フィルタの動作を示す。粒子(パーティクル)フィルタ自体の詳細は、非特許文献5に詳しい。異常測度1に即したダイナミクスを反映したモデルを検討することが重要であるが、ここでは数式2,3のように簡単化して説明した。
 次に、上記を拡張し、プラント又は設備の稼働継続可能時間を予測する方法を説明する。図18に、粒子(パーティクル)フィルタによるRUL予測20を用いたブロック構成図を示す。数式1に、時系列での設備の稼働継続可能時間データの予測のためのモデルを示す。数式5から8に、成分モデルを示し、数式4では、部位ごとの致命度を加算している。
 図19に、部位jの異常測度1の予測値に基づき、致命度を換算して求めるための関数を示す。数式5に対応している。異常測度1の予測値は、異常測度1の算出時にある程度の部位を特定できるため、その情報を用いる。また、致命度は、ここではプラント又は設備の稼働継続可能時間の逆数とした。もちろん、非線形の関数を仮定してもよい。数式4では、部位ごとの上記致命度を加算している。
Figure JPOXMLDOC01-appb-M000004
Figure JPOXMLDOC01-appb-M000005
 図20に、稼動データの影響を表す成分モデルを示す。数式6に対応している。プラント又は設備の稼動時間が長くなるにつれ、致命度が増すことを意味している。
Figure JPOXMLDOC01-appb-M000006
 ここでは、部品交換を考慮し、部位ごとの稼動時間とした。図21には累積負荷データの影響を表す成分モデルを示す。プラント又は設備の累積負荷が蓄積されるにつれ、致命度が増すことを意味している。
 なお、数式7と数式8は、トレンド成分と別な揺らぎを示すモデルである。2階差分で表したが、何階 差分でもよい。ξはノイズ項である。これらのモデル化により、結果的には、図11に示すような予測結果が得られる。
Figure JPOXMLDOC01-appb-M000007
Figure JPOXMLDOC01-appb-M000008
 上述した実施例において、ガウシアンプロセス、認識エンジン、粒子(パーティクル)フィルタなどを用いて説明したが、これらは組合せて使用してもよい。たとえば、予測時刻の最も早い時刻、遅い時刻、平均時刻など、瞬発性、信頼性、いろいろな視点で出力を加工できる。
 さらには、図14に、認識エンジンによる識別24の例を示したが、たとえば、特許文献1(特開2010-191556号公報)に記載の部分空間法などが使える。
 図22にその方法を示す。センサデータ間の類似度に着目し、正常事例からなるコンパクトな学習データを生成し、生成した学習データを部分空間法(LSC:Local Subspace Classifier)でモデル化し、観測したセンサデータ12と部分空間の距離関係に基づき、観測したセンサデータの乖離度、すなわち異常測度1を求め、観測したセンサデータ12から、設備の健康状態を判断する。保守作業データ46の扱いは、後で説明する。
 次に、図23に、次の診断までのプラント又は設備の稼働継続可能時間、RULを説明する。図23では、設備の健康状態を縦軸に、横軸に時間をとっている。健康状態は、たとえば、今までに説明した異常測度1の逆数や、異常測度1のある関数形式で与えられる。同図では、時間の経過とともに、設備の健康状態は低下している。途中で、保守作業51が入り、健康状態はやや回復し、現在に至る。58は途中で発生したアラームである。59は負荷率や稼働率である(この場合は、縦軸は健康状態ではない)。56は保守作業の効果を示している。
 図23において、57aは、保守前の健康状態の減衰度合いを示す傾きであり、57bは、保守後の健康状態の減衰度合いを示す傾きである。このように、表示すると(図18の表示部21にて表示する。)、プラント又は設備の健康状態や、保守作業との関係、稼動時間や設備に加わる負荷の状況などが、分かり易くなる。プラント又は設備の稼働継続可能時間54は、健康状態がしきい値2を下回るまでの、残された時間を表す。この時期までは、稼動継続性が確保されているという意味である。従って、保守スケジューリングは、このプラント又は設備の稼働継続可能時間54に基づいて行うことができる。
 ちなみに、Liイオン電池やハードディスクドライブなどでは、多くの場合、保守作業が入らないため、このように健康状態が増減することはなく、単調に減少することを基本とする。したがって、保守作業により、設備の健康状態に増減を伴う設備において、本実施例は特に効果を発揮することになる。
 なお、保守後の健康状態の減衰度合いを示す傾き57bは、保守前と比べることにより、前回算出したRUL54が今度はどうなるか把握することもできる。保守作業の効果56は、保守のたびに完全には元に復元できず、徐々に健康状態の回復が困難になることが予想されるため、保守のたびに、その前後の健康状態を計測し、回復できない度合いを評価していけば、健康劣化が分かり易い。
 注意すべきは、保守作業51の後を始点として、稼働継続可能時間54を計測している点である。保守すべき、次の時期が、この図から判断できる。
 図24は、上記を実現するため、図18に保守作業51の情報を加えたものである。異常測度1や健康状態を算出し、この保守作業51のタイミングとほぼ同期して、異常測度1や健康状態を表示する。表示部21では、異常測度1、健康状態、プラント又は設備の稼働継続可能時間54の時系列データ7を表示する。また、保守前後の健康状態の減衰度合いを示す傾きを表す時系列データ7や、後述する部分空間の重心の時系列データ7も表示する。
 図25に、プラント又は設備の劣化や保守作業に伴って発生する状態の変化、それに伴って変動する異常測度1の例を示す。保守による状態変化前後の学習データ、その部分空間(ここでは、線分で表現)、観測データが入力されたときの異常測度1をそれぞれ表している。
 観測データは、センサデータなどの時系列データ7であり、ある時刻のスナップショットである。プラント又は設備の劣化および保守作業に伴って、状態が変化したため、学習データ自体が変化している。異常測度1として、異常測度Aを採用するのか、異常測度Bを採用するのか、どのように考えるかが問題となる。たとえば、図23のアラーム58は、異常測度1がしきい値2を超えたため発生したのであるが、比較的健康な設備状態にある。したがって、プラント又は設備の本質的な健康状態を把握した上で、保守作業を実施することが望ましい。
 すなわち、健康状態が悪い状態で、異常測度1がしきい値2を超えた場合は、保守作業も十分な診断と対処が必要と言える。このように考えると、学習データ自体の健康状態を評価することが重要であることが分かる。ここでは、部分空間が特徴空間のどこに位置しているか、調整や部品交換によって、どのように変位するのかを定量化しておくことが重要となる。
 そこで、図22に示すように、保守作業データ46を入力し、学習データの部分空間がどのように変位するかを、学習データ蓄積・変位評価42にて評価する。保守作業のたびに、部分空間法45では、特徴空間内で部分空間が動き、たとえば、部分空間を重心などの代表クラスタで表現すれば、その点列が得られることになる。そして、この点列は、正常状態から劣化し、保守によって若干若返り、また劣化が進むというサイクルを繰り返す。
 単位時間あたりの移動量も考慮すれば、健康状態の変化の速度、すなわち図23に示した、保守後の健康状態の減衰度合いを示す傾き57bを知ることもできる。この軌跡も、時系列データ7であることから、これを成分モデルとして数式化し(たとえば数式7のように表現。2階差分とは限らない)、図24の粒子フィルタによるRUL予測20にて使用する。稼働継続可能時間54の観点で、保守作業51の効果を精度良く捉えることは、従来実現できていなかったと考えられ、その意味で大きな成果になる。
 ここで、部分空間を重心などの代表クラスタで表現するとしたが、発明者らの特許文献2(特開2011-145846号公報)では、局所部分空間への残差ベクトルの始点の活用を示している。この始点の軌跡が、設備の状態を表す時系列データ7になる。図22では、始点bがそれに該当する。あるいは、観測データから遠いものも含めて、安定性を増すため、局所部分空間のk近傍(観測データに近いものから、選択する学習データの個数k)を拡大解釈し、kを大きくとって部分空間を形成し、その始点を代表点としてもよい。
 いずれにせよ、代表点の選び方は、代表性をどのようにとるかによって、従来技術により選ぶものとする。
 本実施例により、時間計画保全で決まっている時期を、稼働継続可能時間54で前後することができるようになる。この様子を図26に示す。同図下段では、この場合、定期検査(設備を停止して実施する検査のため、停止中検査と呼ぶ。定期検査以外の時間は状態監視保全で設備を検査しており、運転中検査となる)時期をうしろにずらすことができている。さらに、運転中検査にて健康状態を把握できているため、検査項目を削減でき、時間計画保全で決まっている作業時間を短縮することができ、設備ダウンタイムを削減できる。図26の下段では、結果的に、状態監視保全と時間計画保全が組み合わされている。
 図27に、プラント又は設備の稼働継続可能時間の推定値が徐々に確からしさが増す様子を示す。60は設備故障の確率(確率密度関数:Probability Density Function:PDF)である。図24の粒子フィルタによるRUL予測20にて、この確率を算出する。算出した、この設備故障の確率から、定期検査時期を決定する。
 副次的効果として、これらにより、保守作業51自体の効果を、事前に見積もることも可能となる。
 上記具体例において、効果が見られるものとしては、たとえば、港湾を出ると保守が困難な艦船が当てはまる。艦船の航海計画において、その稼働継続可能時間の把握は最も重要である。従って、本実施例で求められた稼働継続可能時間をよりどころに寄港までのスケジュールや、準備すべき保守部品などを決めることができる。このような例は、艦船のみならず、飛行機、鉄道などにも当てはまる。
 本発明は、プラント又は設備の診断、短周期RULに基づく保守スケジューリングに利用することが出来る。
 1 異常測度
 2 しきい値
 3 故障発生時期
 4 RUL
 5 対象設備
 5a 医療診断装置
 5b 発電設備
 5c 建設機械
 5d 発電設備
 6 時系列データ取得部
 7 時系列データ
 10 現在の時系列センサデータ
 11 時系列データベース
 12 センサデータ
 12-1 信号1のセンサデータ
 12-2 信号2のセンサデータ 
 12-3 信号3のセンサデータ
 12-4 信号4のセンサデータ
 13 イベントデータ
 14 稼動データ
 14-1 設備(1)の稼動データ
 14-1 設備(2)の稼動データ
 15 負荷データ
 16 異常予測部
 17 類似時系列データ選択部
 18 回帰エンジンによる識別
 19 異常測度データ
 20 粒子フィルタによるRUL予測
 21 表示部
 22 回帰関数
 23 学習データ
 24 認識エンジンによる識別
 25 粒子フィルタによる識別
 41 特徴抽出・選択・変換
 42 学習データ蓄積・変位評価部
 43 識別器
 45 部分空間法
 46 保守作業データ
 50 健康状態
 51 保守作業
 52 診断推奨時期
 54 稼働継続可能時間
 55 しきい値
 56 保守作業の効果
 58 アラーム
 59 負荷率や稼動率
 60 設備故障の確率

Claims (11)

  1.  プラント又は設備の健康状態に基づき、保守スケジューリングを決定するプラント又は設備のヘルスマネージメント方法であって、
     前記プラント又は設備に装着した複数のセンサから取得したセンサデータ、および/あるいは設備の置かれた状態を表す環境データを対象に、前記プラント又は設備の健康状態を把握し、前記プラント又は設備の稼働継続可能時間を推定することにより、保守のスケジューリングを実施するために必要な情報を出力することを特徴とするプラント又は設備のヘルスマネージメント方法。
  2.  前記環境データは、前記プラント又は設備の運転状態を表すイベントデータ、および/あるいは運転時間や操作時間などの稼動データ、および/あるいは前記プラント又は設備の負荷状態を表すデータ、および/あるいは過去の故障内容、部品交換などの作業履歴を表す保守履歴データであることを特徴とする請求項1に記載のプラント又は設備のヘルスマネージメント方法。
  3.  前記稼働継続可能時間は、次に前記プラント又は設備の診断を実施するまで、前記プラント又は設備が稼動可能な時間を表すものであり、前記プラント又は設備の健康状態からこの前記プラント又は設備の稼働継続可能時間を推定することを特徴とする請求項1に記載のプラント又は設備のヘルスマネージメント方法。
  4.  前記プラント又は設備に装着した複数のセンサから取得したセンサデータから、前記プラント又は設備の異常測度を算出し、この異常測度を、前記プラント又は設備の健康状態を決定することに用いることを特徴とする請求項1に記載の前記プラント又は設備のヘルスマネージメント方法。
  5.  前記プラント又は設備に装着した複数のセンサから取得したセンサデータから、前記プラント又は設備の異常測度を算出する際、ガウシアンプロセスなどの回帰手法、および/あるいはk-NNと言った認識手法、および/あるいは状態空間モデルを適用し、粒子フィルタを用いることを特徴とする請求項4に記載のプラント又は設備のヘルスマネージメント方法。
  6.  保守作業のスケジューリングにほぼ同期して前記プラント又は設備の稼働継続可能時間を推定することを特徴とする請求項1に記載のプラント又は設備のヘルスマネージメント方法。
  7.  前記稼働継続可能時間を用いて、次期診断時期を決定することを特徴とする請求項1に記載のプラント又は設備のヘルスマネージメント方法。
  8.  実施した保守作業の効果、あるいは/および着手予定の保守作業の効果を見積もることを特徴とする請求項1に記載のプラント又は設備のヘルスマネージメント方法。
  9.  保守作業の前後で、健康状況の劣化度合いをモニタすることにより、前記プラント又は設備の稼働継続可能時間を更新することを特徴とする請求項1に記載のプラント又は設備のヘルスマネージメント方法。
  10.  プラント又は設備の異常診断方法であって、
     前記プラント又は設備に装着した複数のセンサから取得したセンサデータ、および/あるいは前記プラント又は設備の運転状態を表すイベントデータ、および/あるいは運転時間や操作時間などの稼動データ、および/あるいは前記プラント又は設備の負荷状態を表すデータ、および/あるいは過去の故障内容、部品交換などの作業履歴を表す保守履歴データを対象に、前記プラント又は設備の異常測度を評価し、これから、前記プラント又は設備の稼働継続可能時間を推定することを特徴とするプラント又は設備の異常診断方法。
  11.  プラント又は設備の異常診断方法であって、
     前記プラント又は設備に装着した複数のセンサから取得したセンサデータ、および/あるいは前記プラント又は設備の運転状態を表すイベントデータ、および/あるいは運転時間や操作時間などの稼動データ、および/あるいは前記プラント又は設備の負荷状態を表すデータ、および/あるいは過去の故障内容、部品交換などの作業履歴を表す保守履歴データを対象に、運転中に前記プラント又は設備の上記データ群を取得し、点検時や設備休止時にデータを取得することを極力廃し、これにより点検のための前記プラント又は設備の停止期間を短くすることを特徴とするプラント又は設備の異常診断方法。
PCT/JP2012/076630 2012-01-26 2012-10-15 プラント又は設備の異常診断方法及びヘルスマネージメント方法 WO2013111397A1 (ja)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2012-013689 2012-01-26
JP2012013689A JP2013152655A (ja) 2012-01-26 2012-01-26 プラント又は設備の異常診断方法及びヘルスマネージメント方法

Publications (1)

Publication Number Publication Date
WO2013111397A1 true WO2013111397A1 (ja) 2013-08-01

Family

ID=48873143

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2012/076630 WO2013111397A1 (ja) 2012-01-26 2012-10-15 プラント又は設備の異常診断方法及びヘルスマネージメント方法

Country Status (2)

Country Link
JP (1) JP2013152655A (ja)
WO (1) WO2013111397A1 (ja)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5530020B1 (ja) * 2013-11-01 2014-06-25 株式会社日立パワーソリューションズ 異常診断システム及び異常診断方法
JP5530019B1 (ja) * 2013-11-01 2014-06-25 株式会社日立パワーソリューションズ 異常予兆検知システム及び異常予兆検知方法
JP5530045B1 (ja) * 2014-02-10 2014-06-25 株式会社日立パワーソリューションズ ヘルスマネージメントシステム及びヘルスマネージメント方法
EP2930579A2 (en) 2014-03-28 2015-10-14 Hitachi High-Technologies Corporation State monitoring system, state monitoring method and state monitoring program
JP2016120767A (ja) * 2014-12-24 2016-07-07 三菱重工業株式会社 船舶機器メンテナンス判定装置
US9465387B2 (en) 2015-01-09 2016-10-11 Hitachi Power Solutions Co., Ltd. Anomaly diagnosis system and anomaly diagnosis method
US9740545B2 (en) 2015-03-20 2017-08-22 Kabushiki Kaisha Toshiba Equipment evaluation device, equipment evaluation method and non-transitory computer readable medium
CN109670243A (zh) * 2018-12-20 2019-04-23 华中科技大学 一种基于勒贝格空间模型的寿命预测方法
CN110431502A (zh) * 2017-03-29 2019-11-08 三菱重工业株式会社 预兆检测系统以及预兆检测方法
US20200210144A1 (en) * 2018-12-27 2020-07-02 Mitsubishi Hitachi Power Systems, Ltd. Data sorting device and method, and monitoring and diagnosis device
EP3995080A1 (en) * 2020-11-09 2022-05-11 Koninklijke Philips N.V. Maintenance prediction for a medical imaging apparatus
EP3995919A1 (en) * 2020-11-05 2022-05-11 Hitachi, Ltd. Method and system for diagnosing a machine

Families Citing this family (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2013030984A1 (ja) 2011-08-31 2013-03-07 株式会社日立エンジニアリング・アンド・サービス 設備状態監視方法およびその装置
JP2015138395A (ja) * 2014-01-22 2015-07-30 三菱重工業株式会社 メンテナンス管理装置、メンテナンス管理方法及びプログラム
CN103823452B (zh) * 2014-03-11 2016-08-17 李卓东 砂石船监测记录仪及其工作方法
JP6326321B2 (ja) * 2014-08-07 2018-05-16 株式会社日立製作所 データ表示システム
CN104615123B (zh) * 2014-12-23 2017-02-22 浙江大学 基于k近邻的传感器故障隔离方法
JP5827426B1 (ja) * 2015-01-09 2015-12-02 株式会社日立パワーソリューションズ 予兆診断システム及び予兆診断方法
JP5827425B1 (ja) * 2015-01-09 2015-12-02 株式会社日立パワーソリューションズ 予兆診断システム及び予兆診断方法
JP6276732B2 (ja) * 2015-07-03 2018-02-07 横河電機株式会社 設備保全管理システムおよび設備保全管理方法
JP6812660B2 (ja) * 2016-04-22 2021-01-13 オムロン株式会社 生産ラインの管理装置
JP6869011B2 (ja) * 2016-11-16 2021-05-12 三菱電機株式会社 監視装置、発電装置、監視方法、及び監視プログラム
US10729382B2 (en) * 2016-12-19 2020-08-04 Mitsubishi Electric Research Laboratories, Inc. Methods and systems to predict a state of the machine using time series data of the machine
JP7045030B2 (ja) * 2017-09-15 2022-03-31 エナジー・ソリューションズ株式会社 検査システム、検査方法、サーバ装置、及びプログラム
CN109358587B (zh) * 2018-11-05 2021-02-05 国电南京自动化股份有限公司 一种水电机组状态检修决策方法及系统
JP7062577B2 (ja) * 2018-11-21 2022-05-06 株式会社日立製作所 製造条件特定システムおよび方法
US20200380388A1 (en) * 2019-05-31 2020-12-03 Hitachi, Ltd. Predictive maintenance system for equipment with sparse sensor measurements
WO2021001991A1 (ja) * 2019-07-04 2021-01-07 日本電気株式会社 予測方法、予測装置、記録媒体
JP7249902B2 (ja) * 2019-07-17 2023-03-31 東京エレクトロン株式会社 状態管理システム及び状態管理方法
EP3923213A1 (en) 2020-06-08 2021-12-15 ABB Power Grids Switzerland AG Method and computing system for performing a prognostic health analysis for an asset
JP7506960B2 (ja) 2021-06-02 2024-06-27 株式会社Tmeic データ管理装置
CN116561528B (zh) * 2023-05-08 2024-03-01 重庆市荣冠科技有限公司 一种旋转机械的rul预测方法

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08261886A (ja) * 1995-03-22 1996-10-11 Yokogawa Electric Corp 設備管理システム
JP2003005822A (ja) * 2001-06-25 2003-01-08 Mitsubishi Chemicals Corp 設備管理システム
JP2009251822A (ja) * 2008-04-03 2009-10-29 Toshiba Corp 複合診断・保守計画支援システム及びその支援方法

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08261886A (ja) * 1995-03-22 1996-10-11 Yokogawa Electric Corp 設備管理システム
JP2003005822A (ja) * 2001-06-25 2003-01-08 Mitsubishi Chemicals Corp 設備管理システム
JP2009251822A (ja) * 2008-04-03 2009-10-29 Toshiba Corp 複合診断・保守計画支援システム及びその支援方法

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9933338B2 (en) 2013-11-01 2018-04-03 Hitachi Power Solutions Co., Ltd. Health management system, fault diagnosis system, health management method, and fault diagnosis method
JP5530019B1 (ja) * 2013-11-01 2014-06-25 株式会社日立パワーソリューションズ 異常予兆検知システム及び異常予兆検知方法
EP2869153A1 (en) * 2013-11-01 2015-05-06 Hitachi Power Solutions Co., Ltd. Health management system, fault diagnosis system, health management method, and fault diagnosis method
JP5530020B1 (ja) * 2013-11-01 2014-06-25 株式会社日立パワーソリューションズ 異常診断システム及び異常診断方法
JP5530045B1 (ja) * 2014-02-10 2014-06-25 株式会社日立パワーソリューションズ ヘルスマネージメントシステム及びヘルスマネージメント方法
EP2930579A2 (en) 2014-03-28 2015-10-14 Hitachi High-Technologies Corporation State monitoring system, state monitoring method and state monitoring program
JP2016120767A (ja) * 2014-12-24 2016-07-07 三菱重工業株式会社 船舶機器メンテナンス判定装置
US9465387B2 (en) 2015-01-09 2016-10-11 Hitachi Power Solutions Co., Ltd. Anomaly diagnosis system and anomaly diagnosis method
US9740545B2 (en) 2015-03-20 2017-08-22 Kabushiki Kaisha Toshiba Equipment evaluation device, equipment evaluation method and non-transitory computer readable medium
CN110431502A (zh) * 2017-03-29 2019-11-08 三菱重工业株式会社 预兆检测系统以及预兆检测方法
CN110431502B (zh) * 2017-03-29 2023-06-27 三菱重工业株式会社 预兆检测系统以及预兆检测方法
CN109670243A (zh) * 2018-12-20 2019-04-23 华中科技大学 一种基于勒贝格空间模型的寿命预测方法
US20200210144A1 (en) * 2018-12-27 2020-07-02 Mitsubishi Hitachi Power Systems, Ltd. Data sorting device and method, and monitoring and diagnosis device
US11886831B2 (en) * 2018-12-27 2024-01-30 Mitsubishi Heavy Industries, Ltd. Data sorting device and method, and monitoring and diagnosis device
EP3995919A1 (en) * 2020-11-05 2022-05-11 Hitachi, Ltd. Method and system for diagnosing a machine
EP3995080A1 (en) * 2020-11-09 2022-05-11 Koninklijke Philips N.V. Maintenance prediction for a medical imaging apparatus
WO2022096386A1 (en) * 2020-11-09 2022-05-12 Koninklijke Philips N.V. Maintenance prediction for a medical imaging apparatus

Also Published As

Publication number Publication date
JP2013152655A (ja) 2013-08-08

Similar Documents

Publication Publication Date Title
WO2013111397A1 (ja) プラント又は設備の異常診断方法及びヘルスマネージメント方法
JP5530020B1 (ja) 異常診断システム及び異常診断方法
JP5530045B1 (ja) ヘルスマネージメントシステム及びヘルスマネージメント方法
Kordestani et al. Failure prognosis and applications—A survey of recent literature
JP5530019B1 (ja) 異常予兆検知システム及び異常予兆検知方法
Ahmadzadeh et al. Remaining useful life estimation
CN108604360B (zh) 设施异常监测方法及其系统
Uckun et al. Standardizing research methods for prognostics
Di Maio et al. Combining relevance vector machines and exponential regression for bearing residual life estimation
US9465387B2 (en) Anomaly diagnosis system and anomaly diagnosis method
Jouin et al. Prognostics of PEM fuel cell in a particle filtering framework
Medjaher et al. Remaining useful life estimation of critical components with application to bearings
KR101713985B1 (ko) 예지 정비 방법 및 장치
JP6216242B2 (ja) 異常検知方法およびその装置
US8478479B2 (en) Predicting time to maintenance by fusion between modeling and simulation for electronic equipment on board an aircraft
Fan et al. A sequential Bayesian approach for remaining useful life prediction of dependent competing failure processes
US20130197854A1 (en) System and method for diagnosing machine tool component faults
CN113614359A (zh) 用于预测风力涡轮机齿轮箱组件中的可观察损坏的风险的方法和系统
Mosallam et al. Component based data-driven prognostics for complex systems: Methodology and applications
Baptista et al. Comparative case study of life usage and data-driven prognostics techniques using aircraft fault messages
Wang et al. Lévy process-based stochastic modeling for machine performance degradation prognosis
CN113962253B (zh) 基于深度小波极限学习机的轴承剩余寿命预测方法及系统
Bartram et al. Probabilistic prognosis with dynamic bayesian networks
Al Rashdan et al. Development of a Technology Roadmap for Online Monitoring of Nuclear Power Plants
Laayouj et al. Prognosis of degradation based on a new dynamic method for remaining useful life prediction

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 12866673

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 12866673

Country of ref document: EP

Kind code of ref document: A1