WO2012160904A1 - 充電器 - Google Patents

充電器 Download PDF

Info

Publication number
WO2012160904A1
WO2012160904A1 PCT/JP2012/060323 JP2012060323W WO2012160904A1 WO 2012160904 A1 WO2012160904 A1 WO 2012160904A1 JP 2012060323 W JP2012060323 W JP 2012060323W WO 2012160904 A1 WO2012160904 A1 WO 2012160904A1
Authority
WO
WIPO (PCT)
Prior art keywords
power
charging
regenerative
charger
transistors
Prior art date
Application number
PCT/JP2012/060323
Other languages
English (en)
French (fr)
Inventor
森 正樹
藤田 敏之
全良 尾崎
Original Assignee
シャープ株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by シャープ株式会社 filed Critical シャープ株式会社
Publication of WO2012160904A1 publication Critical patent/WO2012160904A1/ja

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J7/00Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
    • H02J7/34Parallel operation in networks using both storage and other dc sources, e.g. providing buffering
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L53/00Methods of charging batteries, specially adapted for electric vehicles; Charging stations or on-board charging equipment therefor; Exchange of energy storage elements in electric vehicles
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L53/00Methods of charging batteries, specially adapted for electric vehicles; Charging stations or on-board charging equipment therefor; Exchange of energy storage elements in electric vehicles
    • B60L53/50Charging stations characterised by energy-storage or power-generation means
    • B60L53/51Photovoltaic means
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L53/00Methods of charging batteries, specially adapted for electric vehicles; Charging stations or on-board charging equipment therefor; Exchange of energy storage elements in electric vehicles
    • B60L53/50Charging stations characterised by energy-storage or power-generation means
    • B60L53/55Capacitors
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J1/00Circuit arrangements for dc mains or dc distribution networks
    • H02J1/10Parallel operation of dc sources
    • H02J1/102Parallel operation of dc sources being switching converters
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J4/00Circuit arrangements for mains or distribution networks not specified as ac or dc
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J7/00Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
    • H02J7/34Parallel operation in networks using both storage and other dc sources, e.g. providing buffering
    • H02J7/345Parallel operation in networks using both storage and other dc sources, e.g. providing buffering using capacitors as storage or buffering devices
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2310/00The network for supplying or distributing electric power characterised by its spatial reach or by the load
    • H02J2310/40The network being an on-board power network, i.e. within a vehicle
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T10/00Road transport of goods or passengers
    • Y02T10/60Other road transportation technologies with climate change mitigation effect
    • Y02T10/70Energy storage systems for electromobility, e.g. batteries
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T10/00Road transport of goods or passengers
    • Y02T10/60Other road transportation technologies with climate change mitigation effect
    • Y02T10/7072Electromobility specific charging systems or methods for batteries, ultracapacitors, supercapacitors or double-layer capacitors
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T90/00Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02T90/10Technologies relating to charging of electric vehicles
    • Y02T90/12Electric charging stations
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T90/00Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02T90/10Technologies relating to charging of electric vehicles
    • Y02T90/14Plug-in electric vehicles

Definitions

  • the present invention relates to a charger for charging a storage battery provided in a vehicle (hereinafter referred to as an electric vehicle) driven using electric power obtained by discharging the storage battery.
  • Patent Document 1 after charging of the high-voltage battery is stopped, the power charged in the capacitor in the circuit is charged into the low-voltage battery, and the power that could not be charged into the low-voltage battery is used using an element such as a resistor.
  • Consuming chargers have been proposed. According to this charger, since the electric power charged in the circuit can be recovered after charging the storage battery, the electric power can be used efficiently. In addition, by consuming electric power charged in the circuit, an electric shock or the like can be prevented, so that safety is high.
  • an object of the present invention is to provide a battery charger that can efficiently use power, has high safety, and has a simple configuration.
  • the present invention is a charger for performing a charging operation for generating charging power for charging a storage battery using supply power supplied via a power supply line, A capacitor element connected in parallel with the storage battery during the charging operation, A regenerative operation for generating regenerative power to be supplied to the power supply line is performed using capacitive power obtained by discharging the capacitive element in a state where the storage battery is not electrically connected to the charger.
  • the charger having the above characteristics generates a primary charge power using the supplied power during the charging operation, and generates the regenerative power using a regenerative secondary power during the regenerative operation.
  • a second power generation unit that includes the capacitive element, generates the charging power using charging secondary power during the charging operation, and generates regenerative primary power using the capacitive power during the regenerating operation;
  • a power converter that generates the charging secondary power using the charging primary power during the charging operation, and generates the regenerative secondary power using the regenerative primary power during the regenerating operation; Is preferable.
  • each of the supplied power, the charging power, the capacity power, and the regenerative power is DC power
  • Each of the charging primary power, the charging secondary power, the regenerative primary power and the regenerative secondary power is AC power
  • the first power generation unit switches the supplied power to generate the charging primary power, and rectifies the regenerative secondary power to generate the regenerative power.
  • the second power generation unit generates the charging power by smoothing the charging secondary power after rectification by the capacitive element, and generates the regenerative primary power by switching the capacitive power.
  • the power conversion unit transforms the charging primary power to generate the charging secondary power and transforms the regenerative primary power to generate the regenerative secondary power.
  • each of the charging power and the capacity power is DC power
  • Each of the supply power, the charging primary power, the charging secondary power, the regenerative primary power, the regenerative secondary power, and the regenerative power is AC power
  • the first power generation unit switches the supplied power after rectification to generate the charging primary power, and switches the regenerative secondary power after rectification to generate the regenerative power.
  • the second power generation unit generates the charging power by smoothing the charging secondary power after rectification by the capacitive element, and generates the regenerative primary power by switching the capacitive power.
  • the power conversion unit transforms the charging primary power to generate the charging secondary power and transforms the regenerative primary power to generate the regenerative secondary power.
  • the charger having the above characteristics further includes a detection unit that detects the magnitude of the voltage of the power supply line, It is preferable to perform the regenerative operation so that the voltage detected by the detection unit is equal to or less than a predetermined magnitude.
  • the charging power is generated using the supply power supplied from the power supply line, and the capacity power charged in the capacitor element when the charging power is generated is used for the power supply line. Generate regenerative power to be supplied. For this reason, it is possible to suppress the unnecessary use of the capacitive power charged in the capacitive element, prevent the heat generated inside the charger due to the consumption of the capacitive power, the risk of electric shock, etc. and consume the capacitive power. Therefore, it is possible to eliminate the need to provide a separate element. Therefore, it is possible to realize a battery charger that can efficiently use electric power and has a high safety and a simple configuration.
  • the block diagram which shows an example of the utilization aspect of the charger which concerns on 1st Embodiment of this invention.
  • the block diagram which shows an example of a structure of the charger which concerns on 1st Embodiment of this invention.
  • the circuit diagram which shows an example of a structure of the electric power generation part with which the charger shown in FIG. 2 is provided.
  • the flowchart which shows an example of operation
  • 2 is a timing chart illustrating an example of the operation of the power generation unit illustrated in FIG. 3 when the charger illustrated in FIG. 2 performs a regenerative operation.
  • FIG. 9 is a timing chart illustrating an example of the operation of the power generation unit illustrated in FIG. 9 when the charger illustrated in FIG. 8 performs the charging operation.
  • FIG. 9 is a timing chart illustrating an example of the operation of the power generation unit illustrated in FIG. 9 when the charger illustrated in FIG. 8 performs a regenerative operation.
  • the charger according to the first embodiment and the second embodiment of the present invention will be described with reference to the drawings.
  • the chargers according to the first embodiment and the second embodiment of the present invention will be exemplified for the case of charging a storage battery provided in an electric vehicle.
  • the invention can also be applied to other chargers.
  • FIG. 1 is a block diagram illustrating an example of a usage mode of the charger according to the first embodiment of the present invention.
  • DC power obtained by converting AC power (system power) supplied from a power system 30 by an AC / DC converter 31 or DC power obtained by discharging a stationary storage battery 40 is DC / DC.
  • the line D is connected to the charger 1 according to the present embodiment.
  • the charger 1 uses the direct current power supplied from the direct current power supply line D to generate charging power for charging a storage battery (not shown in FIG. 1) provided in the electric vehicle.
  • the charger 1 has a capacitive element (not shown in FIG. 1) connected in parallel with the storage battery when generating charging power. Therefore, when the charger 1 generates charging power, the capacitive element is charged.
  • the charger 1 According to the present embodiment generates DC regenerative power to be supplied to the DC power supply line D using the capacitive power obtained by discharging the capacitive element. Details of a specific operation for generating charging power (hereinafter referred to as a charging operation) and a specific operation for generating regenerative power (hereinafter referred to as a regenerating operation) by the charger 1 will be described later.
  • the load 60 which is a home electric device or the like, consumes DC power supplied via the DC power supply line D.
  • the DC power consumed by the load 60 may include regenerative power supplied by the charger 1.
  • some devices constituting the charger 1 for example, a device that performs control such as a power generation operation control unit and a general operation control unit described later, a device that performs temperature adjustment such as a fan, and the like)
  • a device connected directly to the charger 1 without using the DC power supply line D may consume the regenerative power generated by the charger 1.
  • the charger 1 suppresses unnecessary consumption of the capacitive power charged in the capacitive element by the charging operation, and the charger 1 inside the charger 1 due to the consumption of the capacitive power. It is possible to prevent dangers such as heat generation and electric shock and to eliminate the need to separately provide an element for consuming the capacity power. Therefore, it is possible to realize the charger 1 that can efficiently use electric power and has a high safety and a simple configuration.
  • the DC / DC converters 41 and 51 may not be provided, and direct-current power obtained by power generation or discharge may be directly supplied to the direct-current power supply line D. Further, the DC / DC converters 41 and 51 may be shared. Further, the power system 30 and the AC / DC converter 31, the stationary storage battery 40 and the DC / DC converter 41, the photovoltaic power generation unit 50, and the DC / DC converter 51 may be configured not to include at least one set. However, it is assumed that there is at least one device (one set) for supplying DC power to the DC power supply line D.
  • FIG. 2 is a block diagram showing an example of the configuration of the charger according to the first embodiment of the present invention.
  • FIG. 3 is a circuit diagram illustrating an example of a configuration of a power generation unit included in the charger illustrated in FIG. 2.
  • the DC power supply line D which is simply indicated by one line in FIG. 1, is indicated by two lines (Da is a high voltage side and Db is a low voltage side).
  • the charger 1 includes a power generation unit 10 that generates charging power and regenerative power, a power generation operation control unit 11 that controls the operation of the power generation unit 10, and a power generation unit 10 that is charged with power.
  • Side detection unit 13 charging connector 14 that can be electrically connected to storage battery EVB provided in electric vehicle EV and physically connected to electric vehicle EV, and supply power supplied from DC power supply lines Da and Db Power supply lines 15a and 15b (15a is on the high voltage side and 15b is on the low voltage side), and power supply lines 15a and 15
  • the regeneration side detection unit 16 that detects the magnitude of the voltage applied to the power supply and notifies the power generation operation control unit 11 and whether to electrically connect the charging wires 12a and 12b and the charging connector 14 are switched.
  • Conductor unit 17 a user (specifically, for example, a user of the electric vehicle EV, the same applies hereinafter), an operation unit 18 that receives an instruction from the user, and a user that is input to the operation unit 18 And a general operation control unit 19 that controls the operation of the charging connector 14 and the conductor unit 17 according to the instruction.
  • the power supply lines 15a and 15b in the charger 1 according to the present embodiment can be interpreted as part of the DC power supply lines Da and Db.
  • the power generation unit 10 includes a first power generation unit 10A including one capacitor C1 and four transistors T1 to T4 that form a bridge circuit, and one capacitor C2 (the above-described capacitance). Corresponding to the element) and four transistors T5 to T8 constituting a bridge circuit, and two coils L1 and L2 constituting a transformer, and the electric power generated by the first power generator 10A.
  • a power conversion unit 10C that converts and supplies power to the second power generation unit 10B and converts power generated by the second power generation unit 10B to supply to the first power generation unit 10A.
  • the transistors T1 to T8 are N-channel MOSFETs (Metal Oxide Semiconductor Field Effect Transistor) is illustrated.
  • the capacitor C1 has one end connected to the power supply line 15a and the other end connected to the power supply line 15b.
  • the drain of the transistor T1 is connected to the power supply line 15a.
  • the transistor T2 has a drain connected to the drain of the transistor T1 and a connection node of the power supply line 15a.
  • the transistor T3 has a drain connected to the source of the transistor T2 and a source connected to the power supply line 15b.
  • the transistor T4 has a drain connected to the source of the transistor T1, and a source connected to the source of the transistor T3 and a connection node of the power supply line 15b. Further, the gate voltage applied to the gates of the transistors T1 to T4 is controlled by the power generation operation control unit 11.
  • the capacitor C2 has one end connected to the charging line 12a and the other end connected to the charging line 12b.
  • the drain of the transistor T5 is connected to the charging line 12a.
  • the drain of the transistor T6 is connected to the connection node of the drain of the transistor T5 and the charging line 12a.
  • the transistor T7 has a drain connected to the source of the transistor T6 and a source connected to the charging line 12b.
  • the transistor T8 has a drain connected to the source of the transistor T5, and a source connected to the source of the transistor T7 and a connection node of the charging line 12b. Further, the gate voltage applied to the gates of the transistors T5 to T8 is controlled by the power generation operation control unit 11.
  • the coil L1 has one end L1a connected to the connection node between the source of the transistor T2 and the drain of the transistor T3, and the other end L1b connected to the connection node between the source of the transistor T1 and the drain of the transistor T4.
  • the coil L2 has one end L2a connected to the connection node between the source of the transistor T6 and the drain of the transistor T7, and the other end L2b connected to the connection node between the source of the transistor T5 and the drain of the transistor T8.
  • the coils L1 and L2 are arranged to face each other so that one end L1a and L2a and the other end L1b and L2b are on the same side.
  • FIG. 4 is a flowchart showing an example of the operation of the charger according to the first embodiment of the present invention.
  • FIG. 5 is a timing chart showing an example of the operation of the power generation unit shown in FIG. 3 when the charger shown in FIG. 2 performs a charging operation.
  • 6 is a timing chart illustrating an example of the operation of the power generation unit illustrated in FIG. 3 when the charger illustrated in FIG. 2 performs a regenerative operation. Note that the gate voltage H shown in FIGS.
  • 5 and 6 indicates a voltage for turning on the transistors T1 to T8 (the drain and the source are in a conductive state, the same applies hereinafter), and the gate voltage L indicates the transistors T1 to T8.
  • a voltage for turning OFF (the drain and the source are non-conductive state, the same applies hereinafter) is shown.
  • the user physically connects the charging connector 14 to the electric vehicle EV.
  • the charging connector 14 and the storage battery EVB are electrically connected, and the charger 1 is in a state in which the storage battery EVB can be charged.
  • it waits until a user operates the operation part 18 and inputs the instruction
  • the general operation control unit 19 controls the conductor part 17 to electrically connect the charging wires 12a and 12b and the charging connector 14 (step # 2).
  • the general operation control unit 19 controls the charging connector 14 so that the physical connection state between the charging connector 14 and the electric vehicle EV is not released (specifically, for example, charging inserted in the electric vehicle EV).
  • a state in which the user cannot pull out the connector 14 (hereinafter referred to as a locked state) is realized. Thereby, it is possible to prevent an electric shock through the charging connector 14 during the charging operation.
  • the configuration for realizing the locked state of the charging connector 14 may be any configuration.
  • the general operation control unit 19 inputs an instruction to start the charging operation to the power generation operation control unit 11. Thereby, the power generation operation control unit 11 starts controlling the charging operation of the power generation unit 10 (step # 3).
  • the charging operation of the power generation unit 11 will be described with reference to FIGS. 3 and 5.
  • the gate voltage of H or L is applied to the gates of the transistors T1 and T3 at the same timing.
  • an H or L gate voltage is applied to the gates of the transistors T2 and T4 at the same timing.
  • a gate voltage of H is applied to the gates of the transistors T1 and T3
  • a gate voltage of L is applied to the gates of the transistors T2 and T4 (hereinafter referred to as a first charging state).
  • a gate voltage of L is applied to the gates of the transistors T1 and T3
  • a gate voltage of H is applied to the gates of the transistors T2 and T4 (hereinafter referred to as a charging second state).
  • a gate voltage of L is applied to the gates of the transistors T5 to T8.
  • the power generation operation control unit 11 controls the gate voltage applied to the gates of the transistors T1 to T8 so that the first charging state and the second charging state are alternately repeated. Thereby, the electric power generation part 10 produces
  • each of the transistors T1 and T3 is turned on.
  • the body diodes (parasitic diodes) of the transistors T2 and T4 are reverse-biased and thus are substantially OFF.
  • a current flows from the other end L1b of the coil L1 toward the one end L1a.
  • a current flows from one end L2a of the opposing coil L2 toward the other end L2b.
  • the body diodes of the transistors T5 and T7 are forward-biased, current flows from each source toward the drain.
  • the body diodes of the transistors T6 and T8 are reverse-biased, they are substantially OFF.
  • the capacitor C2 smoothes the power supplied to the charging lines 12a and 12b.
  • each of the transistors T2 and T4 is turned on.
  • the body diodes of the transistors T1 and T3 are reverse-biased, they are substantially OFF.
  • a current flows from one end L1a to the other end L1b of the coil L1.
  • a current flows from the other end L2b of the opposing coil L2 toward the one end L2a.
  • the body diodes of the transistors T6 and T8 are forward biased, current flows from the source to the drain.
  • the body diodes of the transistors T5 and T7 are reverse-biased, they are substantially OFF.
  • the capacitor C2 smoothes the power supplied to the charging lines 12a and 12b.
  • the first power generation unit 10A switches the DC supply power, and the coil L1 has AC power (hereinafter referred to as charging primary power). Will occur.
  • the power conversion unit 10C causes the coil L2 to generate AC power obtained by transforming the charging primary power (hereinafter referred to as charging secondary power).
  • the second power generation unit 10B generates DC charging power by rectifying and smoothing the charging secondary power (full wave). However, the capacitor C2 is charged by this smoothing.
  • the timing chart shown in FIG. 5 shows that the respective times of the charging first state and the charging second state do not fluctuate, but these may fluctuate during the charging operation.
  • the power generation operation control unit 11 confirms the magnitude of the voltage of the charging power detected by the charging side detection unit 13 so that the voltage of the charging power generated by the power generation unit 10 approaches the target voltage. The time of the charge first state and the charge second state is controlled.
  • the power generation operation control unit 11 continues the above-described charging operation until the charging operation end condition is achieved (step # 4, NO).
  • the charging operation end condition is achieved when, for example, the storage battery EVB provided in the electric vehicle EV is sufficiently close to full charge (for example, the voltage of the storage battery EVB becomes larger than a predetermined level, or the storage battery
  • the general operation control unit 19 confirms that the current charged to the EVB becomes smaller than a predetermined magnitude) or that the user inputs an instruction to end the charging operation by operating the operation unit 18. It is to be.
  • step # 4 When the charging operation end condition is achieved (step # 4, YES), the general operation control unit 19 inputs an instruction to end the charging operation to the power generation operation control unit 11. Thereby, the power generation operation control unit 11 ends the control of the charging operation of the power generation unit 10 (step # 5). Further, the general operation control unit 19 controls the conductor unit 17 to release the electrical connection between the charging wires 12a and 12b and the charging connector 14 (step # 6).
  • the general operation control unit 19 inputs an instruction to start the regenerative operation to the power generation operation control unit 11. Thereby, the power generation operation control unit 11 starts control of the regenerative operation of the power generation unit 10 (step # 7).
  • the gate voltage of H or L is applied to the gates of the transistors T5 and T7 at the same timing. Further, an H or L gate voltage is applied to the gates of the transistors T6 and T8 at the same timing. In particular, when a gate voltage of H is applied to the gates of the transistors T5 and T7, a gate voltage of L is applied to the gates of the transistors T6 and T8 (hereinafter referred to as a regenerative first state).
  • a gate voltage of L is applied to the gates of the transistors T5 and T7
  • a gate voltage of H is applied to the gates of the transistors T6 and T8 (hereinafter referred to as a regenerative second state).
  • an L gate voltage is applied to the gates of the transistors T1 to T4.
  • the power generation operation control unit 11 controls the gate voltage applied to the gates of the transistors T1 to T8 so that the regeneration first state and the regeneration second state are alternately repeated. Thereby, as will be described below, the power generation unit 10 generates regenerative power using the capacitive power obtained by discharging the capacitor C2.
  • each of the transistors T5 and T7 is turned on.
  • the body diodes of the transistors T6 and T8 are reverse-biased, they are substantially OFF.
  • a current flows from the other end L2b of the coil L2 toward the one end L2a.
  • a current flows from one end L1a of the opposing coil L1 toward the other end L1b.
  • the body diodes of the transistors T1 and T3 are forward-biased, current flows from each source toward the drain.
  • the body diodes of the transistors T6 and T8 are reverse-biased, they are substantially OFF.
  • the capacitor C1 smoothes the power supplied to the power supply lines 15a and 15b.
  • each of the transistors T6 and T8 is turned on.
  • the body diodes of the transistors T5 and T7 are reverse-biased, they are substantially OFF.
  • a current flows from one end L2a of the coil L2 toward the other end L2b.
  • a current flows from the other end L1b of the opposing coil L1 toward the one end L1a.
  • the body diodes of the transistors T2 and T4 are forward-biased, current flows from the source to the drain.
  • the body diodes of the transistors T1 and T3 are reverse-biased, they are substantially OFF.
  • the capacitor C1 smoothes the power supplied to the power supply lines 15a and 15b.
  • the second power generation unit 10B switches the DC capacitive power, and the coil L2 has an AC power (hereinafter referred to as a regenerative primary power). Will occur.
  • the power conversion unit 10C causes the coil L1 to generate AC power (hereinafter, referred to as regenerative secondary power) obtained by transforming the regenerated primary power.
  • the respective times of the regeneration first state and the regeneration second state are illustrated so as not to vary, but these may vary during the regeneration operation.
  • the power generation operation control unit 11 confirms the magnitude of the voltage of the regenerative power detected by the regeneration side detection unit 16, and the voltage applied to the power supply lines 15a and 15b has a predetermined magnitude (for example, power
  • the times of the first regeneration state and the second regeneration state are controlled so as to be equal to or lower than the rated voltages of the supply lines 15a and 15b.
  • the power generation operation control unit 11 continues the above-described regenerative operation until the regenerative operation end condition is achieved (step # 8, NO).
  • the condition that the regenerative operation end condition is achieved specifically means that, for example, the capacitor C2 is sufficiently discharged (for example, the voltage discharged by the capacitor C2 is smaller than a predetermined magnitude), etc.
  • the part 19 is to confirm.
  • step # 8 When the regenerative operation end condition is achieved (step # 8, YES), the general operation control unit 19 inputs an instruction to end the regenerative operation to the power generation operation control unit 11. Thereby, the power generation operation control unit 11 ends the control of the regenerative operation of the power generation unit 10 (step # 9).
  • the general operation control unit 19 controls the charging connector 14 to release the locked state of the charging connector 14 and the electric vehicle EV, so that the battery 1 provided with the charger 1 according to this embodiment is provided in the electric vehicle EV.
  • a series of operations for charging EVB is completed.
  • the lock state of the charging connector 14 and the electric vehicle EV may be released after step # 6, but by performing after step # 9, the electric shock through the charging connector 14 during the regenerative operation can be further improved. It becomes possible to prevent reliably.
  • FIG. 7 is a block diagram illustrating an example of a usage mode of the charger according to the second embodiment of the present invention.
  • AC power (system power) supplied from the power system 130 AC power obtained by converting DC power obtained by discharging the stationary storage battery 140 by the DC / AC converter 141, solar power
  • Charger 101 generates charging power for charging a storage battery (not shown in FIG. 1) provided in the electric vehicle using AC power supplied from AC power supply line A.
  • the charger 101 has a capacitive element (not shown in FIG. 7) connected in parallel with the storage battery when generating charging power. Therefore, when the charger 101 generates charging power, the capacitive element is charged.
  • the charger 101 generates AC regenerative power to be supplied to the AC power supply line A using the capacitive power obtained by discharging the capacitive element.
  • the details of the specific generation operation (charging operation) and the specific generation operation (regeneration operation) of regenerative power by the charger 101 will be described later.
  • the load 160 which is a home electric device or the like, consumes AC power supplied via the AC power supply line A.
  • the AC power consumed by the load 160 may include regenerative power supplied by the charger 101.
  • some devices constituting the charger 101 for example, a device that performs control such as a power generation operation control unit and a general operation control unit described later, and a device that performs temperature adjustment such as a fan) ) Or a device or the like directly connected to the charger 101 without using the AC power supply line A may consume the regenerative power generated by the charger 101.
  • the charger 101 suppresses unnecessary consumption of the capacitive power charged in the capacitive element by the charging operation, and the charger 101 inside the charger 101 accompanying the consumption of the capacitive power. It is possible to prevent dangers such as heat generation and electric shock and to eliminate the need to separately provide an element for consuming the capacity power. Therefore, it is possible to realize the charger 101 that can efficiently use electric power and has a high safety and a simple configuration.
  • An AC / AC converter that converts AC power obtained from the power system 130 may be further provided, and AC power obtained from the AC / AC converter may be supplied to the AC power supply line A.
  • the DC / AC converters 141 and 151 may be shared.
  • the power system 130, the stationary storage battery 140, the DC / AC converter 141, the solar power generation unit 150, and the DC / AC converter 151 may be configured not to include at least one set. However, it is assumed that there is at least one device (one set) for supplying AC power to the AC power supply line A.
  • FIG. 8 is a block diagram showing an example of the configuration of the charger according to the second embodiment of the present invention.
  • FIG. 9 is a circuit diagram illustrating an example of a configuration of a power generation unit included in the charger illustrated in FIG. 8.
  • the AC power supply line A which is simply shown by one line in FIG. 7, is shown by two lines (Aa, Ab).
  • the charger 101 includes a power generation unit 110 that generates charging power and regenerative power, a power generation operation control unit 111 that controls the operation of the power generation unit 110, and the power generation unit 110 that is charged power.
  • a general operation control unit 119 that controls the operation of the conductor unit 117.
  • the 1st electric power supply line 115a, 115b in the charger 101 which concerns on this embodiment can be interpreted also as a part of alternating current electric power supply line Aa, Ab.
  • the power generation unit 110 includes two capacitors C11 and C21, four transistors T11 to T14 that form a bridge circuit, four transistors T21 to T24 that form a bridge circuit, and two coils L21. , L22, a first power generation unit 110B including one capacitor C12 (corresponding to the above-described capacitance element) and four transistors T15 to T18 constituting a bridge circuit, and a transformer.
  • Two coils L11 and L12 that constitute the first power generation unit 110A are converted and supplied to the second power generation unit 110B.
  • the first power generation unit 110B converts the power generated by the first power generation unit 110B.
  • a power converter 110C that supplies power to the power generator 110A.
  • the capacitor C11 has one end connected to the second power supply line 115c and the other end connected to the second power supply line 115d (115c is on the high voltage side and 112d is on the low voltage side).
  • the drain of the transistor T11 is connected to the second power supply line 115c.
  • the drain of the transistor T12 is connected to the connection node of the drain of the transistor T11 and the second power supply line 115c.
  • the transistor T13 has a drain connected to the source of the transistor T12 and a source connected to the second power supply line 115d.
  • the transistor T14 has a drain connected to the source of the transistor T11, and a source connected to the source of the transistor T13 and a connection node of the second power supply line 115d.
  • the gate voltage applied to the gates of the transistors T11 to T14 is controlled by the power generation operation control unit 111.
  • the drain of the transistor T21 is connected to the second power supply line 115c.
  • the drain of the transistor T22 is connected to the connection node of the drain of the transistor T21 and the second power supply line 115c.
  • the transistor T23 has a drain connected to the source of the transistor T22 and a source connected to the second power supply line 115d.
  • the transistor T24 has a drain connected to the source of the transistor T21, and a source connected to the source of the transistor T23 and a connection node of the second power supply line 115d.
  • the gate voltage applied to the gates of the transistors T21 to T24 is controlled by the power generation operation control unit 111.
  • the capacitor C21 has one end connected to the first power supply line 115a and the other end connected to the first power supply line 115b.
  • the coil L21 has one end connected to the first power supply line 115a and the other end connected to a connection node between the source of the transistor T22 and the drain of the transistor T23.
  • the coil L22 has one end connected to the first power supply line 115b and the other end connected to a connection node between the source of the transistor T21 and the drain of the transistor T24.
  • the capacitor C12 has one end connected to the charging line 112a and the other end connected to the charging line 112b.
  • the drain of the transistor T15 is connected to the charging line 112a.
  • the drain of the transistor T16 is connected to the connection node of the drain of the transistor T15 and the charging line 112a.
  • the transistor T17 has a drain connected to the source of the transistor T16 and a source connected to the charging line 112b.
  • the transistor T18 has a drain connected to the source of the transistor T15, and a source connected to the source of the transistor T17 and a connection node of the charging line 112b. Further, the gate voltage applied to the gates of the transistors T15 to T18 is controlled by the power generation operation control unit 111.
  • the coil L11 has one end L11a connected to the connection node between the source of the transistor T12 and the drain of the transistor T13, and the other end L11b connected to the connection node between the source of the transistor T11 and the drain of the transistor T14.
  • the coil L12 has one end L12a connected to the connection node between the source of the transistor T16 and the drain of the transistor T17, and the other end L12b connected to the connection node between the source of the transistor T15 and the drain of the transistor T18.
  • the coils L11 and L12 are arranged to face each other so that one end L11a and L12a and the other end L11b and L12b are on the same side.
  • FIG. 10 is a timing chart showing an example of the operation of the power generation unit shown in FIG. 9 when the charger shown in FIG. 8 performs the charging operation.
  • FIG. 11 is a timing chart illustrating an example of the operation of the power generation unit illustrated in FIG. 9 when the charger illustrated in FIG. 8 performs a regenerative operation.
  • the gate voltage H shown in FIG. 10 is a voltage for turning on the transistors T11 to T18 and T21 to T24
  • the gate voltage L is a voltage for turning off the transistors T11 to T18 and T21 to T24. Indicates.
  • the gate voltage of H or L is applied to the gates of the transistors T11 and T13 at the same timing. Further, an H or L gate voltage is applied to the gates of the transistors T12 and T14 at the same timing. In particular, when an H gate voltage is applied to the gates of the transistors T11 and T13, an L gate voltage is applied to the gates of the transistors T12 and T14 (charging first state). On the other hand, when an L gate voltage is applied to the gates of the transistors T11 and T13, an H gate voltage is applied to the gates of the transistors T12 and T14 (charging second state). In both the first charging state and the second charging state, a gate voltage of L is applied to each gate of the transistors T15 to T18.
  • an L gate voltage is applied to the gates of the transistors T21 to T24.
  • the power generation operation control unit 111 controls the gate voltage applied to the gates of the transistors T11 to T18 so that the first charging state and the second charging state are alternately repeated. Furthermore, the power generation operation control unit 111 controls the gate voltage applied to the gates of the transistors T21 to T24 regardless of the first charging state and the second charging state. Thereby, as will be described below, the power generation unit 110 generates charging power using the supply power supplied via the first power supply lines 115a and 115b.
  • AC supply power is supplied to the first power supply lines 115a and 115b.
  • the body diodes of the transistors T22 and T24 are forward biased, so that current flows from the source to the drain. Further, since the body diodes of the transistors T6 and T8 are reverse-biased, they are substantially OFF.
  • the voltage of the first power supply line 115b is higher than the voltage of the first power supply line 115a, the body diodes of the transistors T21 and T23 are forward-biased, so that current flows from each source toward the drain.
  • the capacitor C11 smoothes the power supplied to the second power supply lines 115c and 115d. Therefore, DC power obtained by rectifying and smoothing the supplied power (full wave) is supplied to the second power supply lines 115c and 115d. As described above, the second power supply line 115c is on the high voltage side, and the second power supply line 115d is on the low voltage side.
  • each of the transistors T11 and T13 is turned on.
  • the body diodes of the transistors T12 and T14 are reverse-biased, they are substantially OFF.
  • a current flows from the other end L11b of the coil L11 toward the one end L11a.
  • a current flows from one end L12a of the opposing coil L12 toward the other end L12b.
  • the body diodes of the transistors T15 and T17 are forward-biased, current flows from the source to the drain.
  • the body diodes of the transistors T16 and T18 are reverse-biased, they are substantially OFF.
  • the capacitor C12 smoothes the power supplied to the charging lines 112a and 112b.
  • each of the transistors T12 and T14 is turned on.
  • the body diodes of the transistors T11 and T13 are reverse-biased and thus are substantially OFF.
  • a current flows from one end L11a to the other end L11b of the coil L11.
  • a current flows from the other end L12b of the opposing coil L12 toward the one end L12a.
  • the body diodes of the transistors T16 and T18 are forward-biased, current flows from the source to the drain.
  • the body diodes of the transistors T15 and T17 are reverse-biased, they are substantially OFF.
  • the capacitor C12 smoothes the power supplied to the charging lines 112a and 112b.
  • the first power generation unit 110A switches the DC power obtained by rectifying and smoothing the AC supply power (full wave).
  • AC power (charging primary power) is generated in the coil L11.
  • the power converter 110C causes the coil L12 to generate AC power (charging secondary power) obtained by transforming the charging primary power.
  • the second power generation unit 110B generates DC charging power by rectifying and smoothing the charging secondary power (full wave).
  • the capacitor C12 is charged by this smoothing.
  • the timing chart shown in FIG. 10 shows that the respective times of the charging first state and the charging second state do not fluctuate, but these may fluctuate during the charging operation.
  • the power generation operation control unit 111 confirms the magnitude of the charging power voltage detected by the charging-side detection unit 113 so that the charging power voltage generated by the power generation unit 110 approaches the target voltage. The time of the charge first state and the charge second state is controlled.
  • an H or L gate voltage is applied to the gates of the transistors T15 and T17 at the same timing. Further, an H or L gate voltage is applied to the gates of the transistors T16 and T18 at the same timing. In particular, when an H gate voltage is applied to the gates of the transistors T15 and T17, an L gate voltage is applied to the gates of the transistors T16 and T18 (regeneration first state). On the other hand, when an L gate voltage is applied to the gates of the transistors T15 and T17, an H gate voltage is applied to the gates of the transistors T16 and T18 (regeneration second state). In both the regeneration first state and the regeneration second state, an L gate voltage is applied to the gates of the transistors T11 to T14.
  • the gate voltage of H or L is applied to the gates of the transistors T21 and T23 at the same timing. Further, an H or L gate voltage is applied to the gates of the transistors T22 and T24 at the same timing. In particular, when an H gate voltage is applied to the gates of the transistors T21 and T23, an L gate voltage is applied to the gates of the transistors T22 and T24. On the other hand, when an L gate voltage is applied to the gates of the transistors T21 and T23, an H gate voltage is applied to the gates of the transistors T22 and T24. Note that the timing chart shown in FIG.
  • the cycle in which the gate voltages of the transistors T21 to T24 fluctuate is longer than the cycle in which the gate voltages of the transistors T11 to T18 fluctuate. Absent. That is, the cycle in which the gate voltages of the transistors T21 to T24 vary may be equal to or less than the cycle in which the gate voltages of the transistors T11 to T18 vary.
  • the power generation operation control unit 111 controls the gate voltage applied to the gates of the transistors T11 to T18 so that the first regeneration state and the second regeneration state are alternately repeated. Furthermore, the power generation operation control unit 111 controls the gate voltage applied to the gates of the transistors T21 to T24 regardless of the first charging state and the second charging state. Thereby, as will be described below, the power generation unit 110 generates regenerative power using the capacitive power obtained by discharging the capacitor C2.
  • each of the transistors T15 and T17 is turned on.
  • the body diodes of the transistors T16 and T18 are reverse-biased, they are substantially OFF.
  • a current flows from the other end L12b of the coil L12 toward the one end L12a.
  • a current flows from one end L11a of the opposing coil L11 toward the other end L11b.
  • the body diodes of the transistors T11 and T13 are forward biased, current flows from the source to the drain.
  • the body diodes of the transistors T16 and T18 are reverse-biased, they are substantially OFF.
  • the capacitor C11 smoothes the power supplied to the second power supply lines 115c and 115d.
  • each of the transistors T16 and T18 is turned on.
  • the body diodes of the transistors T15 and T17 are reverse-biased, they are substantially OFF.
  • a current flows from one end L12a of the coil L12 toward the other end L12b.
  • a current flows from the other end L11b of the opposing coil L11 toward the one end L11a.
  • the body diodes of the transistors T12 and T14 are forward-biased, current flows from the source to the drain.
  • the body diodes of the transistors T11 and T13 are reverse-biased and thus are substantially OFF.
  • the capacitor C11 smoothes the power supplied to the second power supply lines 115c and 115d.
  • the second power generation unit 110B switches the DC capacitive power, and AC power (regenerative primary power) is generated in the coil L12.
  • the power converter 110C causes the coil L11 to generate AC power (regenerated secondary power) obtained by transforming the regenerated primary power.
  • the transistors T11 to T14 and the capacitor C11 of the first power generation unit 110A supply DC power to the second power supply lines 115c and 115d by rectifying and smoothing the regenerated secondary power (full wave). .
  • the second power supply line 115c is on the high voltage side and the second power supply line 115d is on the low voltage side during the regenerative operation as in the charging operation.
  • the transistors T21 and T23 and the transistors T22 and T24 are alternately turned on.
  • the body diodes of the transistors T22 and T24 are reverse-biased, and thus are substantially turned off.
  • the transistors T22 and T24 are turned on, the body diodes of the transistors T21 and T23 are reverse-biased, and thus are substantially turned off. That is, the transistors T21 to T24 of the first power generation unit 110A generate AC power by switching the second power supply lines 115c and 115d.
  • the AC power generated by the transistors T21 to T24 of the first power generation unit 110A is a square wave. Therefore, the waveform is shaped using the coils L21 and L22 and the capacitor C21. As a result, regenerative power that is sinusoidal AC power is generated and supplied to the first power supply lines 115a and 115b.
  • the power generation operation control unit 111 confirms the magnitude of the voltage of the regenerative power detected by the regeneration side detection unit 116, and the voltage applied to the first power supply lines 115a and 115b has a predetermined magnitude (for example, The rated time of the first power supply lines 115a and 115b) is controlled to be equal to or lower than the time of the first regeneration state and the second regeneration state.
  • the timing at which the gate voltage applied to the gates of the transistors T21 to T24 varies is the timing at which the first regeneration state and the second regeneration state vary (that is, the gate voltage applied to the gates of the transistors T11 to T18 varies).
  • the timing may be (synchronized) according to the timing at which the first regeneration state and the second regeneration state fluctuate.
  • FIGS. 3 and 9 are merely examples, and various modifications may be made as long as the same operations as the above-described charging operation and regenerative operation are performed.
  • at least one of the above-described transistors T1 to T8, T11 to T18, and T21 to T24 is a P-channel MOSFET (a transistor in which the gate voltage is turned off at the above-mentioned H and the gate voltage is turned on at the above-mentioned L). It is also good.
  • P-channel MOSFET a transistor in which the gate voltage is turned off at the above-mentioned H and the gate voltage is turned on at the above-mentioned L.
  • the power generation operation control units 11 and 111 and the general operation control units 19 and 119 are illustrated as separate bodies, but they may be integrated. Similarly, the conductor portion 14 and the charging connector 17 may be integrated.
  • the charger 101 according to the second embodiment may be configured to consume DC regenerative power instead of (or in addition to) AC regenerative power.
  • the DC power applied to the second power supply lines 115c and 115d may be consumed as DC regenerative power.
  • some devices of the load 160 and the charger 101 may consume DC regenerative power instead of (or in addition to) AC regenerative power.
  • the regeneration side detection unit 116 instead of (or in addition to) the regeneration side detection unit 116, the regeneration side detection that detects the magnitude of the voltage applied to the second power supply lines 115c and 115d and notifies the power generation operation control unit 111 of the magnitude. A part may be provided.
  • the power generation operation control unit 111 performs the power generation operation of the charger 1 according to the first embodiment in accordance with the voltage level of the second power supply lines 115c and 115d detected by the regeneration side detection unit. Similarly to the control unit 11 (see FIG. 2), the operation of the power generation unit 110 may be controlled.
  • the charger (the charger 1 according to the first embodiment and the charger 101 according to the second embodiment) that is a separate body from the electric vehicle EV has been described.
  • the charger of the invention can also be applied to a built-in charger provided in the electric vehicle EV. In this case, the charging connectors 14 and 114 may be unnecessary.
  • the present invention can be used for a charger for charging a storage battery provided in an electric vehicle or the like.

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Transportation (AREA)
  • Mechanical Engineering (AREA)
  • Charge And Discharge Circuits For Batteries Or The Like (AREA)
  • Secondary Cells (AREA)

Abstract

 電力供給線を介して供給される供給電力を用いて、蓄電池に充電する充電電力を生成する充電動作を行う充電器であって、充電動作時に蓄電池と並列に接続される容量素子を備え、蓄電池が充電器と電気的に接続されない状態で、容量素子を放電して得られる容量電力を用いて、電力供給線に供給する回生電力を生成する回生動作を行うことを特徴とする充電器。

Description

充電器
 本発明は、蓄電池の放電により得られる電力を用いて駆動する車両(以下、電動車両とする)等に備えられる蓄電池を充電する充電器に関する。
 近年、二酸化炭素の削減や省エネルギー化を図るべく、電動車両が普及してきている。そのような中で、効率良く電力を利用するとともに安全性が高い充電器が、求められている。
 例えば、特許文献1では、高電圧バッテリの充電停止後に、回路内のコンデンサに充電されている電力を低電圧バッテリに充電し、低電圧バッテリに充電できなかった電力を抵抗等の素子を用いて消費する充電器が、提案されている。この充電器によれば、蓄電池を充電した後、回路に充電されている電力を回収することができるため、効率良く電力を利用することができる。また、当該回路に充電されている電力を消費することで、感電などを防止することができるため、安全性が高い。
特開2010-213500号公報
 しかしながら、上記の充電器では、低電圧バッテリに充電できなかった電力が、抵抗等の素子を用いて大量に消費される場合がある。このような場合、電力の利用効率が悪くなるともに、充電器内部の発熱など感電以外の危険も生じるため、問題となる。また、電力を消費するための素子を回路内に別途設ける必要があることから、回路構成が複雑化するため、問題となる。
 本発明は、上記の問題点に鑑み、電力を効率良く利用可能であり、安全性が高く簡素な構成の充電器を提供することを目的とする。
 上記目的を達成するため、本発明は、電力供給線を介して供給される供給電力を用いて、蓄電池に充電する充電電力を生成する充電動作を行う充電器であって、
 前記充電動作時に前記蓄電池と並列に接続される容量素子を備え、
 前記蓄電池が前記充電器と電気的に接続されない状態で、前記容量素子を放電して得られる容量電力を用いて、前記電力供給線に供給する回生電力を生成する回生動作を行うことを特徴とする充電器を提供する。
 さらに、上記特徴の充電器は、前記充電動作時に、前記供給電力を用いて充電一次電力を生成し、前記回生動作時に、回生二次電力を用いて前記回生電力を生成する第1電力生成部と、
 前記容量素子を備え、前記充電動作時に、充電二次電力を用いて前記充電電力を生成し、前記回生動作時に、前記容量電力を用いて回生一次電力を生成する第2電力生成部と、
 前記充電動作時に、前記充電一次電力を用いて前記充電二次電力を生成し、前記回生動作時に、前記回生一次電力を用いて前記回生二次電力を生成する電力変換部と、
 を備えると、好ましい。
 さらに、上記特徴の充電器は、前記供給電力、前記充電電力、前記容量電力及び前記回生電力のそれぞれが直流電力であり、
 前記充電一次電力、前記充電二次電力、前記回生一次電力及び前記回生二次電力のそれぞれが交流電力であり、
 前記第1電力生成部が、前記供給電力をスイッチングして前記充電一次電力を生成するとともに、前記回生二次電力を整流して前記回生電力を生成するものであり、
 前記第2電力生成部が、前記充電二次電力を整流後に前記容量素子で平滑化することにより前記充電電力を生成するとともに、前記容量電力をスイッチングして前記回生一次電力を生成するものであり、
 前記電力変換部が、前記充電一次電力を変圧して前記充電二次電力を生成するとともに、前記回生一次電力を変圧して前記回生二次電力を生成するものであると、好ましい。
 さらに、上記特徴の充電器は、前記充電電力及び前記容量電力のそれぞれが直流電力であり、
 前記供給電力、前記充電一次電力、前記充電二次電力、前記回生一次電力、前記回生二次電力及び前記回生電力のそれぞれが交流電力であり、
 前記第1電力生成部が、前記供給電力を整流後にスイッチングして前記充電一次電力を生成するとともに、前記回生二次電力を整流後にスイッチングして前記回生電力を生成するものであり、
 前記第2電力生成部が、前記充電二次電力を整流後に前記容量素子で平滑化することにより前記充電電力を生成するとともに、前記容量電力をスイッチングして前記回生一次電力を生成するものであり、
 前記電力変換部が、前記充電一次電力を変圧して前記充電二次電力を生成するとともに、前記回生一次電力を変圧して前記回生二次電力を生成するものであると、好ましい。
 さらに、上記特徴の充電器は、前記電力供給線の電圧の大きさを検出する検出部をさらに備え、
 前記検出部で検出される電圧が所定の大きさ以下になるように、前記回生動作を行うと、好ましい。
 上記特徴の充電器では、電力供給線から供給される供給電力を用いて充電電力を生成するとともに、当該充電電力を生成する際に容量素子に充電された容量電力を用いて、電力供給線に供給する回生電力を生成する。そのため、容量素子に充電された容量電力が無用に消費されることを抑制するとともに、当該容量電力の消費に伴う充電器内部の発熱や、感電等の危険を防止し、かつ当該容量電力を消費するための素子を別途設ける必要を無くすことができる。したがって、電力を効率良く利用可能であり、安全性が高く簡素な構成の充電器を、実現することができる。
本発明の第1実施形態に係る充電器の利用態様の一例を示すブロック図 本発明の第1実施形態に係る充電器の構成の一例を示すブロック図 図2に示す充電器が備える電力生成部の構成の一例を示す回路図 本発明の第1実施形態に係る充電器の動作の一例を示すフローチャート 図2に示す充電器が充電動作を行う場合における図3に示す電力生成部の動作の一例を示すタイミングチャート 図2に示す充電器が回生動作を行う場合における図3に示す電力生成部の動作の一例を示すタイミングチャート 本発明の第2実施形態に係る充電器の利用態様の一例を示すブロック図 本発明の第2実施形態に係る充電器の構成の一例を示すブロック図 図8に示す充電器が備える電力生成部の構成の一例を示す回路図 図8に示す充電器が充電動作を行う場合における図9に示す電力生成部の動作の一例を示すタイミングチャート 図8に示す充電器が回生動作を行う場合における図9に示す電力生成部の動作の一例を示すタイミングチャート
 以下、本発明の第1実施形態及び第2実施形態に係る充電器について、図面を参照して説明する。なお、以下では説明の具体化のため、本発明の第1実施形態及び第2実施形態に係る充電器のそれぞれが、電動車両に備えられる蓄電池を充電するものである場合について例示するが、本発明はこれ以外の充電器にも適用可能である。
<第1実施形態>
 最初に、本発明の第1実施形態に係る充電器の利用態様の一例について、図面を参照して説明する。図1は、本発明の第1実施形態に係る充電器の利用態様の一例を示すブロック図である。
 図1に示すように、例えば電力系統30から供給される交流電力(系統電力)をAC/DCコンバータ31により変換して得られる直流電力や、定置蓄電池40の放電により得られる直流電力をDC/DCコンバータ41により変換して得られる直流電力や、太陽光発電部(ソーラーパネル)50の発電により得られる直流電力をDC/DCコンバータ51により変換して得られる直流電力が供給される直流電力供給線Dが、本実施形態に係る充電器1に接続されている。
 充電器1は、直流電力供給線Dから供給される直流電力を用いて、電動車両に備えられる蓄電池(図1では不図示)を充電する充電電力を生成する。充電器1は、充電電力を生成する際に蓄電池と並列に接続される容量素子(図1では不図示)を有する。そのため、充電器1が充電電力を生成すると、この容量素子が充電される。
 そこで、本実施形態に係る充電器1は、この容量素子を放電して得られる容量電力を用いて、直流電力供給線Dに供給する直流の回生電力を生成する。なお、充電器1による、充電電力の具体的な生成動作(以下、充電動作とする)及び回生電力の具体的な生成動作(以下、回生動作とする)の詳細については、後述する。
 そして、例えば家庭の電気機器等である負荷60は、直流電力供給線Dを介して供給される直流電力を消費する。負荷60が消費する直流電力の中には、充電器1が供給する回生電力が含まれ得る。なお、負荷60の他に、充電器1を構成する一部の機器(例えば、後述する電力生成動作制御部や一般動作制御部などの制御を行う機器や、ファンなどの温度調整を行う機器等)や、直流電力供給線Dを介さずに充電器1に直接的に接続する機器等が、充電器1が生成する回生電力を消費しても良い。
 以上のように、本実施形態に係る充電器1は、充電動作によって容量素子に充電された容量電力が無用に消費されることを抑制するとともに、当該容量電力の消費に伴う充電器1内部の発熱や、感電等の危険を防止し、かつ当該容量電力の消費を行うための素子を別途設ける必要を無くすことができる。したがって、電力を効率良く利用可能であり、安全性が高く簡素な構成の充電器1を、実現することができる。
 なお、DC/DCコンバータ41,51の少なくとも一方を設けず、発電や放電により得られた直流電力が、直流電力供給線Dに対して直接的に供給される構成としても良い。また、DC/DCコンバータ41,51を、共通化しても良い。また、電力系統30及びAC/DCコンバータ31、定置蓄電池40及びDC/DCコンバータ41、太陽光発電部50及びDC/DCコンバータ51の、少なくとも1組を備えない構成としても良い。ただし、直流電力供給線Dに直流電力を供給する装置が、少なくとも1つ(1組)存在するものとする。
 次に、本発明の第1実施形態に係る充電器の構成の一例について、図面を参照して説明する。図2は、本発明の第1実施形態に係る充電器の構成の一例を示すブロック図である。図3は、図2に示す充電器が備える電力生成部の構成の一例を示す回路図である。なお、図2では、図1において1本の線で簡略的に示していた直流電力供給線Dを、2本の線(Daが高電圧側、Dbが低電圧側)で示している。
 図2に示すように、充電器1は、充電電力及び回生電力を生成する電力生成部10と、電力生成部10の動作を制御する電力生成動作制御部11と、電力生成部10が充電電力を供給する充電線12a,12b(12aが高電圧側、12bが低電圧側)と、充電線12a,12bに印加される電圧の大きさを検出して電力生成動作制御部11に通知する充電側検出部13と、電動車両EVに備えられる蓄電池EVBと電気的に接続し得るとともに電動車両EVと物理的に接続し得る充電コネクタ14と、直流電力供給線Da,Dbから供給される供給電力を電力生成部10に供給するとともに電力生成部10が生成する回生電力が供給される電力供給線15a,15b(15aが高電圧側、15bが低電圧側)と、電力供給線15a,15bに印加される電圧の大きさを検出して電力生成動作制御部11に通知する回生側検出部16と、充電線12a,12bと充電コネクタ14とを電気的に接続するか否かを切替制御するコンダクタ部17と、ユーザ(具体的に例えば、電動車両EVの使用者、以下同じ)に操作されることで当該ユーザの指示が入力される操作部18と、操作部18に入力されるユーザの指示に応じて電力生成動作制御部11と充電コネクタ14とコンダクタ部17との動作を制御する一般動作制御部19と、を備える。なお、本実施形態に係る充電器1における電力供給線15a,15bは、直流電力供給線Da,Dbの一部としても解釈され得る。
 また、図3に示すように、電力生成部10は、1つのコンデンサC1とブリッジ回路を構成する4つのトランジスタT1~T4とを備える第1電力生成部10Aと、1つのコンデンサC2(上述の容量素子に相当)とブリッジ回路を構成する4つのトランジスタT5~T8とを備える第2電力生成部10Bと、トランスを構成する2つのコイルL1,L2を備え第1電力生成部10Aが生成する電力を変換して第2電力生成部10Bに供給するとともに第2電力生成部10Bが生成する電力を変換して第1電力生成部10Aに供給する電力変換部10Cと、を備える。なお、以下では説明の具体化のため、トランジスタT1~T8が、NチャネルのMOSFET(Metal Oxide Semiconductor Field Effect Transistor)である場合について例示する。
 コンデンサC1は、一端が電力供給線15aに接続され、他端が電力供給線15bに接続される。トランジスタT1は、ドレインが電力供給線15aに接続される。トランジスタT2は、ドレインがトランジスタT1のドレイン及び電力供給線15aの接続ノードに接続される。トランジスタT3は、ドレインがトランジスタT2のソースに接続され、ソースが電力供給線15bに接続される。トランジスタT4は、ドレインがトランジスタT1のソースに接続され、ソースがトランジスタT3のソース及び電力供給線15bの接続ノードに接続される。また、トランジスタT1~T4のゲートに印加されるゲート電圧は、電力生成動作制御部11によって制御される。
 コンデンサC2は、一端が充電線12aに接続され、他端が充電線12bに接続される。トランジスタT5は、ドレインが充電線12aに接続される。トランジスタT6は、ドレインがトランジスタT5のドレイン及び充電線12aの接続ノードに接続される。トランジスタT7は、ドレインがトランジスタT6のソースに接続され、ソースが充電線12bに接続される。トランジスタT8は、ドレインがトランジスタT5のソースに接続され、ソースがトランジスタT7のソース及び充電線12bの接続ノードに接続される。また、トランジスタT5~T8のゲートに印加されるゲート電圧は、電力生成動作制御部11によって制御される。
 コイルL1は、一端L1aがトランジスタT2のソース及びトランジスタT3のドレインの接続ノードに接続され、他端L1bがトランジスタT1のソース及びトランジスタT4のドレインの接続ノードに接続される。コイルL2は、一端L2aがトランジスタT6のソース及びトランジスタT7のドレインの接続ノードに接続され、他端L2bがトランジスタT5のソース及びトランジスタT8のドレインの接続ノードに接続される。また、コイルL1,L2は、一端L1a,L2a及び他端L1b,L2bのそれぞれが同じ側になるように、対向して配置される。
 次に、本実施形態に係る充電器1が電動車両EVに備えられる蓄電池EVBを充電する一連の動作の一例について、図面を参照して説明する。図4は、本発明の第1実施形態に係る充電器の動作の一例を示すフローチャートである。図5は、図2に示す充電器が充電動作を行う場合における図3に示す電力生成部の動作の一例を示すタイミングチャートである。図6は、図2に示す充電器が回生動作を行う場合における図3に示す電力生成部の動作の一例を示すタイミングチャートである。なお、図5及び図6に示すゲート電圧のHは、トランジスタT1~T8をON(ドレイン及びソース間が導通状態、以下同じ)にする電圧を示し、ゲート電圧のLは、トランジスタT1~T8をOFF(ドレイン及びソース間が非導通状態、以下同じ)にする電圧を示す。
 図4に示す一連の動作が行われる前に、ユーザは、電動車両EVに充電コネクタ14を物理的に接続する。これにより、充電コネクタ14と蓄電池EVBとが電気的に接続され、充電器1が蓄電池EVBを充電可能な状態になる。そして、図4に示すように、ユーザが、操作部18を操作して、充電器1に対して充電を行う旨の指示を入力するまで、待機する(ステップ#1、NO)。
 ユーザが、操作部18を操作して、充電器1に対して充電を行う旨の指示を入力し(ステップ#1、YES)、当該指示を一般動作制御部19が確認すると、一般動作制御部19は、コンダクタ部17を制御して充電線12a,12b及び充電コネクタ14を電気的に接続する(ステップ#2)。
 このとき、一般動作制御部19は、充電コネクタ14を制御して、充電コネクタ14及び電動車両EVの物理的な接続状態が解除されない状態(具体的に例えば、電動車両EVに挿入されている充電コネクタ14を、ユーザが引き抜くことができない状態。以下、ロック状態とする。)を実現する。これにより、充電動作中における充電コネクタ14を介した感電を、防止することが可能になる。なお、充電コネクタ14がロック状態を実現するための構成は、どのようなものであっても良い。
 次に、一般動作制御部19は、充電動作を開始する旨の指示を電力生成動作制御部11に入力する。これにより、電力生成動作制御部11が、電力生成部10の充電動作の制御を開始する(ステップ#3)。
 電力生成部11の充電動作について、図3及び図5を参照して説明する。図5に示すように、電力生成部11の充電動作では、トランジスタT1,T3のゲートに、同じタイミングでHまたはLのゲート電圧が印加される。また、トランジスタT2,T4のゲートに、同じタイミングでHまたはLのゲート電圧が印加される。特に、トランジスタT1,T3のゲートにHのゲート電圧が印加されるとき、トランジスタT2,T4のゲートにはLのゲート電圧が印加される(以下、充電第1状態とする)。一方、トランジスタT1,T3のゲートにLのゲート電圧が印加されるとき、トランジスタT2,T4のゲートにはHのゲート電圧が印加される(以下、充電第2状態とする)。また、充電第1状態及び充電第2状態の双方において、トランジスタT5~T8のそれぞれのゲートには、Lのゲート電圧が印加される。
 電力生成動作制御部11は、充電第1状態及び充電第2状態が交互に繰り返されるように、トランジスタT1~T8のゲートに印加されるゲート電圧を制御する。これにより、以下説明するように、電力生成部10が、電力供給線15a,15bを介して供給される供給電力を用いて、充電電力を生成する。
 充電第1状態では、トランジスタT1,T3のそれぞれがONになる。一方、トランジスタT2,T4のボディダイオード(寄生ダイオード)は逆バイアスになるため、略OFFとなる。その結果、コイルL1の他端L1bから一端L1aに向かって、電流が流れる。すると、対向するコイルL2の一端L2aから他端L2bに向かって、電流が流れる。このとき、トランジスタT5,T7のボディダイオードは順バイアスになるため、それぞれのソースからドレインに向かって電流が流れる。一方、トランジスタT6,T8のボディダイオードは逆バイアスになるため、略OFFとなる。さらにこのとき、コンデンサC2は、充電線12a,12bに供給する電力を平滑化する。
 充電第2状態では、トランジスタT2,T4のそれぞれがONになる。一方、トランジスタT1,T3のボディダイオードは逆バイアスになるため、略OFFとなる。その結果、コイルL1の一端L1aから他端L1bに向かって、電流が流れる。すると、対向するコイルL2の他端L2bから一端L2aに向かって、電流が流れる。このとき、トランジスタT6,T8のボディダイオードは順バイアスになるため、それぞれのソースからドレインに向かって電流が流れる。一方、トランジスタT5,T7のボディダイオードは逆バイアスになるため、略OFFとなる。さらにこのとき、コンデンサC2は、充電線12a,12bに供給する電力を平滑化する。
 上記の充電第1状態及び充電第2状態を交互に繰り返すと、第1電力生成部10Aが直流の供給電力をスイッチングすることになり、コイルL1に交流の電力(以下、充電一次電力とする)が発生する。また、電力変換部10Cは、コイルL2に、充電一次電力を変圧して得られる交流の電力(以下、充電二次電力とする)を発生させる。さらに、第2電力生成部10Bは、充電二次電力を(全波)整流及び平滑化することで、直流の充電電力を生成する。ただし、この平滑化により、コンデンサC2が充電される。
 なお、説明の簡略化のため、図5に示すタイミングチャートでは、充電第1状態及び充電第2状態のそれぞれの時間が変動しないように図示しているが、これらは充電動作中に変動し得る。例えば、電力生成動作制御部11は、充電側検出部13が検出する充電電力の電圧の大きさを確認して、電力生成部10が生成する充電電力の電圧が目標とする電圧に近づくように、充電第1状態及び充電第2状態の時間を制御する。
 電力生成動作制御部11は、充電動作終了条件が達成されるまで、上述の充電動作を継続する(ステップ#4、NO)。充電動作終了条件が達成されるとは、具体的に例えば、電動車両EVに備えられる蓄電池EVBが満充電に十分近づいたこと(例えば、蓄電池EVBの電圧が所定の大きさよりも大きくなったり、蓄電池EVBに充電する電流が所定の大きさよりも小さくなったりすること)や、ユーザが操作部18を操作して充電動作を終了する旨の指示を入力したことなどを、一般動作制御部19が確認することである。
 充電動作終了条件が達成されると(ステップ#4、YES)、一般動作制御部19は、充電動作を終了する旨の指示を電力生成動作制御部11に入力する。これにより、電力生成動作制御部11が、電力生成部10の充電動作の制御を終了する(ステップ#5)。また、一般動作制御部19は、コンダクタ部17を制御して、充電線12a,12b及び充電コネクタ14の電気的な接続を解除する(ステップ#6)。
 次に、一般動作制御部19は、回生動作を開始する旨の指示を電力生成動作制御部11に入力する。これにより、電力生成動作制御部11が、電力生成部10の回生動作の制御を開始する(ステップ#7)。
 電力生成部11の回生動作について、図3及び図6を参照して説明する。図6に示すように、電力生成部11の回生動作では、トランジスタT5,T7のゲートに、同じタイミングでHまたはLのゲート電圧が印加される。また、トランジスタT6,T8のゲートに、同じタイミングでHまたはLのゲート電圧が印加される。特に、トランジスタT5,T7のゲートにHのゲート電圧が印加されるとき、トランジスタT6,T8のゲートにはLのゲート電圧が印加される(以下、回生第1状態とする)。一方、トランジスタT5,T7のゲートにLのゲート電圧が印加されるとき、トランジスタT6,T8のゲートにはHのゲート電圧が印加される(以下、回生第2状態とする)。また、回生第1状態及び回生第2状態の双方において、トランジスタT1~T4のそれぞれのゲートには、Lのゲート電圧が印加される。
 電力生成動作制御部11は、回生第1状態及び回生第2状態が交互に繰り返されるように、トランジスタT1~T8のゲートに印加されるゲート電圧を制御する。これにより、以下説明するように、電力生成部10が、コンデンサC2を放電して得られる容量電力を用いて、回生電力を生成する。
 回生第1状態では、トランジスタT5,T7のそれぞれがONになる。一方、トランジスタT6,T8のボディダイオードは逆バイアスになるため、略OFFとなる。その結果、コイルL2の他端L2bから一端L2aに向かって、電流が流れる。すると、対向するコイルL1の一端L1aから他端L1bに向かって、電流が流れる。このとき、トランジスタT1,T3のボディダイオードは順バイアスになるため、それぞれのソースからドレインに向かって電流が流れる。一方、トランジスタT6,T8のボディダイオードは逆バイアスになるため、略OFFとなる。さらにこのとき、コンデンサC1は、電力供給線15a,15bに供給する電力を平滑化する。
 回生第2状態では、トランジスタT6,T8のそれぞれがONになる。一方、トランジスタT5,T7のボディダイオードは逆バイアスになるため、略OFFとなる。その結果、コイルL2の一端L2aから他端L2bに向かって、電流が流れる。すると、対向するコイルL1の他端L1bから一端L1aに向かって、電流が流れる。このとき、トランジスタT2,T4のボディダイオードは順バイアスになるため、それぞれのソースからドレインに向かって電流が流れる。一方、トランジスタT1,T3のボディダイオードは逆バイアスになるため、略OFFとなる。さらにこのとき、コンデンサC1は、電力供給線15a,15bに供給する電力を平滑化する。
 上記の回生第1状態及び回生第2状態を交互に繰り返すと、第2電力生成部10Bが直流の容量電力をスイッチングすることになり、コイルL2に交流の電力(以下、回生一次電力とする)が発生する。また、電力変換部10Cは、コイルL1に、回生一次電力を変圧して得られる交流の電力(以下、回生二次電力とする)を発生させる。さらに、第1電力生成部10Aは、回生二次電力を(全波)整流及び平滑化することで、直流の充電電力を生成する。
 なお、説明の簡略化のため、図6に示すタイミングチャートでは、回生第1状態及び回生第2状態のそれぞれの時間が変動しないように図示しているが、これらは回生動作中に変動し得る。例えば、電力生成動作制御部11は、回生側検出部16が検出する回生電力の電圧の大きさを確認して、電力供給線15a,15bに印加される電圧が所定の大きさ(例えば、電力供給線15a,15bの定格電圧)以下になるように、回生第1状態及び回生第2状態の時間を制御する。これにより、電力供給線15a,15bに印加される電圧が過度に大きくなることが抑制されるため、充電器1の安全性を高くすることができる。
 電力生成動作制御部11は、回生動作終了条件が達成されるまで、上述の回生動作を継続する(ステップ#8、NO)。回生動作終了条件が達成されるとは、具体的に例えば、コンデンサC2が十分に放電したこと(例えば、コンデンサC2が放電する電圧が所定の大きさよりも小さくなったこと)などを、一般動作制御部19が確認することである。
 回生動作終了条件が達成されると(ステップ#8、YES)、一般動作制御部19は、回生動作を終了する旨の指示を電力生成動作制御部11に入力する。これにより、電力生成動作制御部11が、電力生成部10の回生動作の制御を終了する(ステップ#9)。
 さらにこの後、一般動作制御部19が、充電コネクタ14を制御して充電コネクタ14及び電動車両EVのロック状態を解除することで、本実施形態に係る充電器1が電動車両EVに備えられる蓄電池EVBを充電する一連の動作が終了する。なお、充電コネクタ14及び電動車両EVのロック状態の解除は、ステップ#6の後に行っても良いが、ステップ#9の後に行うことで、回生動作中における充電コネクタ14を介した感電を、より確実に防止することが可能になる。
<第2実施形態>
 次に、本発明の第2実施形態に係る充電器の利用態様の一例について、図面を参照して説明する。図7は、本発明の第2実施形態に係る充電器の利用態様の一例を示すブロック図である。
 図7に示すように、例えば電力系統130から供給される交流電力(系統電力)や、定置蓄電池140の放電により得られる直流電力をDC/ACコンバータ141により変換して得られる交流電力や、太陽光発電部(ソーラーパネル)150の発電により得られる直流電力をDC/ACコンバータ151により変換して得られる交流電力が供給される交流電力供給線Aが、本実施形態に係る充電器101に接続されている。
 充電器101は、交流電力供給線Aから供給される交流電力を用いて、電動車両に備えられる蓄電池(図1では不図示)を充電する充電電力を生成する。充電器101は、充電電力を生成する際に蓄電池と並列に接続される容量素子(図7では不図示)を有する。そのため、充電器101が充電電力を生成すると、この容量素子が充電される。
 そこで、本実施形態に係る充電器101は、この容量素子を放電して得られる容量電力を用いて、交流電力供給線Aに供給する交流の回生電力を生成する。なお、充電器101による、充電電力の具体的な生成動作(充電動作)及び回生電力の具体的な生成動作(回生動作)の詳細については、後述する。
 そして、例えば家庭の電気機器等である負荷160は、交流電力供給線Aを介して供給される交流電力を消費する。負荷160が消費する交流電力の中には、充電器101が供給する回生電力が含まれ得る。なお、負荷160の他に、充電器101を構成する一部の機器(例えば、後述する電力生成動作制御部や一般動作制御部などの制御を行う機器や、ファンなどの温度調整を行う機器など)や、交流電力供給線Aを介さずに充電器101に直接的に接続する機器等が、充電器101が生成する回生電力を消費しても良い。
 以上のように、本実施形態に係る充電器101は、充電動作によって容量素子に充電された容量電力が無用に消費されることを抑制するとともに、当該容量電力の消費に伴う充電器101内部の発熱や、感電等の危険を防止し、かつ当該容量電力の消費を行うための素子を別途設ける必要を無くすことができる。したがって、電力を効率良く利用可能であり、安全性が高く簡素な構成の充電器101を、実現することができる。
 なお、電力系統130から得られる交流電力を変換するAC/ACコンバータをさらに設け、当該AC/ACコンバータから得られる交流電力が、交流電力供給線Aに対して供給される構成としても良い。また、DC/ACコンバータ141,151を、共通化しても良い。また、電力系統130、定置蓄電池140及びDC/ACコンバータ141、太陽光発電部150及びDC/ACコンバータ151の、少なくとも1組を備えない構成としても良い。ただし、交流電力供給線Aに交流電力を供給する装置が、少なくとも1つ(1組)存在するものとする。
 次に、本発明の第2実施形態に係る充電器の構成の一例について、図面を参照して説明する。図8は、本発明の第2実施形態に係る充電器の構成の一例を示すブロック図である。図9は、図8に示す充電器が備える電力生成部の構成の一例を示す回路図である。なお、図8では、図7において1本の線で簡略的に示していた交流電力供給線Aを、2本の線(Aa,Ab)で示している。
 図8に示すように、充電器101は、充電電力及び回生電力を生成する電力生成部110と、電力生成部110の動作を制御する電力生成動作制御部111と、電力生成部110が充電電力を供給する充電線112a,112b(112aが高電圧側、112bが低電圧側)と、充電線112a,112bに印加される電圧の大きさを検出して電力生成動作制御部111に通知する充電側検出部113と、電動車両EVに備えられる蓄電池EVBと電気的に接続し得るとともに電動車両EVと物理的に接続し得る充電コネクタ114と、交流電力供給線Aa,Abから供給される供給電力を電力生成部10に供給するとともに電力生成部10が生成する回生電力が供給される第1電力供給線115a,115bと、第1電力供給線115a,115bに印加される電圧の大きさを検出して電力生成動作制御部111に通知する回生側検出部116と、充電線112a,112bと充電コネクタ114とを電気的に接続するか否かを切替制御するコンダクタ部117と、ユーザに操作されることで当該ユーザの指示が入力される操作部118と、操作部118に入力されるユーザの指示に応じて電力生成動作制御部111と充電コネクタ114とコンダクタ部117との動作を制御する一般動作制御部119と、を備える。なお、本実施形態に係る充電器101における第1電力供給線115a,115bは、交流電力供給線Aa,Abの一部としても解釈され得る。
 また、図9に示すように、電力生成部110は、2つのコンデンサC11,C21とブリッジ回路を構成する4つのトランジスタT11~T14とブリッジ回路を構成する4つのトランジスタT21~T24と2つのコイルL21,L22とを備える第1電力生成部110Aと、1つのコンデンサC12(上述の容量素子に相当)とブリッジ回路を構成する4つのトランジスタT15~T18とを備える第2電力生成部110Bと、トランスを構成する2つのコイルL11,L12を備え第1電力生成部110Aが生成する電力を変換して第2電力生成部110Bに供給するとともに第2電力生成部110Bが生成する電力を変換して第1電力生成部110Aに供給する電力変換部110Cと、を備える。なお、以下では説明の具体化のため、トランジスタT11~T18,T21~T24が、NチャネルのMOSFETである場合について例示する。
 コンデンサC11は、一端が第2電力供給線115cに接続され、他端が第2電力供給線115dに接続される(115cが高電圧側、112dが低電圧側)。トランジスタT11は、ドレインが第2電力供給線115cに接続される。トランジスタT12は、ドレインがトランジスタT11のドレイン及び第2電力供給線115cの接続ノードに接続される。トランジスタT13は、ドレインがトランジスタT12のソースに接続され、ソースが第2電力供給線115dに接続される。トランジスタT14は、ドレインがトランジスタT11のソースに接続され、ソースがトランジスタT13のソース及び第2電力供給線115dの接続ノードに接続される。また、トランジスタT11~T14のゲートに印加されるゲート電圧は、電力生成動作制御部111によって制御される。
 トランジスタT21は、ドレインが第2電力供給線115cに接続される。トランジスタT22は、ドレインがトランジスタT21のドレイン及び第2電力供給線115cの接続ノードに接続される。トランジスタT23は、ドレインがトランジスタT22のソースに接続され、ソースが第2電力供給線115dに接続される。トランジスタT24は、ドレインがトランジスタT21のソースに接続され、ソースがトランジスタT23のソース及び第2電力供給線115dの接続ノードに接続される。また、トランジスタT21~T24のゲートに印加されるゲート電圧は、電力生成動作制御部111によって制御される。
 コンデンサC21は、一端が第1電力供給線115aに接続され、他端が第1電力供給線115bに接続される。コイルL21は、一端が第1電力供給線115aに接続され、他端がトランジスタT22のソース及びトランジスタT23のドレインの接続ノードに接続される。コイルL22は、一端が第1電力供給線115bに接続され、他端がトランジスタT21のソース及びトランジスタT24のドレインの接続ノードに接続される。
 コンデンサC12は、一端が充電線112aに接続され、他端が充電線112bに接続される。トランジスタT15は、ドレインが充電線112aに接続される。トランジスタT16は、ドレインがトランジスタT15のドレイン及び充電線112aの接続ノードに接続される。トランジスタT17は、ドレインがトランジスタT16のソースに接続され、ソースが充電線112bに接続される。トランジスタT18は、ドレインがトランジスタT15のソースに接続され、ソースがトランジスタT17のソース及び充電線112bの接続ノードに接続される。また、トランジスタT15~T18のゲートに印加されるゲート電圧は、電力生成動作制御部111によって制御される。
 コイルL11は、一端L11aがトランジスタT12のソース及びトランジスタT13のドレインの接続ノードに接続され、他端L11bがトランジスタT11のソース及びトランジスタT14のドレインの接続ノードに接続される。コイルL12は、一端L12aがトランジスタT16のソース及びトランジスタT17のドレインの接続ノードに接続され、他端L12bがトランジスタT15のソース及びトランジスタT18のドレインの接続ノードに接続される。また、コイルL11,L12は、一端L11a,L12a及び他端L11b,L12bのそれぞれが同じ側になるように、対向して配置される。
 次に、本実施形態に係る充電器101が電動車両EVに備えられる蓄電池EVBを充電する一連の動作の一例について、説明する。ただし、充電動作及び回生動作を除く全体的な動作については、第1実施形態に係る充電器1の動作例(図4参照)と同様であっても良いため、第1実施形態に係る充電器1の動作例の説明を適宜参酌するものとして、説明を省略する。したがって、以下では、本実施形態に係る充電器101(特に、電力生成部110)の充電動作及び回生動作について、それぞれ図面を参照して説明する。
 図10は、図8に示す充電器が充電動作を行う場合における図9に示す電力生成部の動作の一例を示すタイミングチャートである。図11は、図8に示す充電器が回生動作を行う場合における図9に示す電力生成部の動作の一例を示すタイミングチャートである。なお、図10及び図11に示すゲート電圧のHは、トランジスタT11~T18,T21~T24をONにする電圧を示し、ゲート電圧のLは、トランジスタT11~T18,T21~T24をOFFにする電圧を示す。
 電力生成部110の充電動作について、図9及び図10を参照して説明する。図10に示すように、電力生成部110の充電動作では、トランジスタT11,T13のゲートに、同じタイミングでHまたはLのゲート電圧が印加される。また、トランジスタT12,T14のゲートに、同じタイミングでHまたはLのゲート電圧が印加される。特に、トランジスタT11,T13のゲートにHのゲート電圧が印加されるとき、トランジスタT12,T14のゲートにはLのゲート電圧が印加される(充電第1状態)。一方、トランジスタT11,T13のゲートにLのゲート電圧が印加されるとき、トランジスタT12,T14のゲートにはHのゲート電圧が印加される(充電第2状態)。また、充電第1状態及び充電第2状態の双方において、トランジスタT15~T18のそれぞれのゲートには、Lのゲート電圧が印加される。
 また、充電第1状態及び充電第2状態に関係なく、トランジスタT21~T24のそれぞれのゲートには、Lのゲート電圧が印加される。
 電力生成動作制御部111は、充電第1状態及び充電第2状態が交互に繰り返されるように、トランジスタT11~T18のゲートに印加されるゲート電圧を制御する。さらに、電力生成動作制御部111は、充電第1状態及び充電第2状態に関係なく、トランジスタT21~T24のゲートに印加されるゲート電圧を制御する。これにより、以下説明するように、電力生成部110が、第1電力供給線115a,115bを介して供給される供給電力を用いて、充電電力を生成する。
 充電第1状態及び充電第2状態に関係なく、第1電力供給線115a,115bには、交流の供給電力が供給される。第1電力供給線115aの電圧が第1電力供給線115bの電圧よりも大きいとき、トランジスタT22,T24のボディダイオードは順バイアスになるため、それぞれのソースからドレインに向かって電流が流れる。さらに、トランジスタT6,T8のボディダイオードは逆バイアスになるため、略OFFとなる。一方、第1電力供給線115bの電圧が第1電力供給線115aの電圧よりも大きいとき、トランジスタT21,T23のボディダイオードは順バイアスになるため、それぞれのソースからドレインに向かって電流が流れる。さらに、トランジスタT22,T24のボディダイオードは逆バイアスになるため、略OFFとなる。さらにこのとき、コンデンサC11は、第2電力供給線115c,115dに供給する電力を平滑化する。したがって、第2電力供給線115c,115dには、供給電力を(全波)整流及び平滑化して得られる直流電力が、供給される。なお、上述のように、第2電力供給線115cが高電圧側であり、第2電力供給線115dが低電圧側である。
 充電第1状態では、トランジスタT11,T13のそれぞれがONになる。一方、トランジスタT12,T14のボディダイオードは逆バイアスになるため、略OFFとなる。その結果、コイルL11の他端L11bから一端L11aに向かって、電流が流れる。すると、対向するコイルL12の一端L12aから他端L12bに向かって、電流が流れる。このとき、トランジスタT15,T17のボディダイオードは順バイアスになるため、それぞれのソースからドレインに向かって電流が流れる。一方、トランジスタT16,T18のボディダイオードは逆バイアスになるため、略OFFとなる。さらにこのとき、コンデンサC12は、充電線112a,112bに供給する電力を平滑化する。
 充電第2状態では、トランジスタT12,T14のそれぞれがONになる。一方、トランジスタT11,T13のボディダイオードは逆バイアスになるため、略OFFとなる。その結果、コイルL11の一端L11aから他端L11bに向かって、電流が流れる。すると、対向するコイルL12の他端L12bから一端L12aに向かって、電流が流れる。このとき、トランジスタT16,T18のボディダイオードは順バイアスになるため、それぞれのソースからドレインに向かって電流が流れる。一方、トランジスタT15,T17のボディダイオードは逆バイアスになるため、略OFFとなる。さらにこのとき、コンデンサC12は、充電線112a,112bに供給する電力を平滑化する。
 上記の充電第1状態及び充電第2状態を交互に繰り返すと、第1電力生成部110Aが、交流の供給電力を(全波)整流及び平滑化して得られる直流の電力をスイッチングすることになり、コイルL11に交流の電力(充電一次電力)が発生する。また、電力変換部110Cは、コイルL12に、充電一次電力を変圧して得られる交流の電力(充電二次電力)を発生させる。さらに、第2電力生成部110Bは、充電二次電力を(全波)整流及び平滑化することで、直流の充電電力を生成する。ただし、この平滑化により、コンデンサC12が充電される。
 なお、説明の簡略化のため、図10に示すタイミングチャートでは、充電第1状態及び充電第2状態のそれぞれの時間が変動しないように図示しているが、これらは充電動作中に変動し得る。例えば、電力生成動作制御部111は、充電側検出部113が検出する充電電力の電圧の大きさを確認して、電力生成部110が生成する充電電力の電圧が目標とする電圧に近づくように、充電第1状態及び充電第2状態の時間を制御する。
 電力生成部111の回生動作について、図9及び図11を参照して説明する。図11に示すように、電力生成部11の回生動作では、トランジスタT15,T17のゲートに、同じタイミングでHまたはLのゲート電圧が印加される。また、トランジスタT16,T18のゲートに、同じタイミングでHまたはLのゲート電圧が印加される。特に、トランジスタT15,T17のゲートにHのゲート電圧が印加されるとき、トランジスタT16,T18のゲートにはLのゲート電圧が印加される(回生第1状態)。一方、トランジスタT15,T17のゲートにLのゲート電圧が印加されるとき、トランジスタT16,T18のゲートにはHのゲート電圧が印加される(回生第2状態)。また、回生第1状態及び回生第2状態の双方において、トランジスタT11~T14のそれぞれのゲートには、Lのゲート電圧が印加される。
 また、回生第1状態及び回生第2状態に関係なく、トランジスタT21,T23のゲートに、同じタイミングでHまたはLのゲート電圧が印加される。また、トランジスタT22,T24のゲートに、同じタイミングでHまたはLのゲート電圧が印加される。特に、トランジスタT21,T23のゲートにHのゲート電圧が印加されるとき、トランジスタT22,T24のゲートにはLのゲート電圧が印加される。一方、トランジスタT21,T23のゲートにLのゲート電圧が印加されるとき、トランジスタT22,T24のゲートにはHのゲート電圧が印加される。なお、図11に示すタイミングチャートでは、トランジスタT21~T24のゲート電圧が変動する周期が、トランジスタT11~T18のゲート電圧が変動する周期より長くなる場合を図示しているが、これは例示に過ぎない。即ち、トランジスタT21~T24のゲート電圧が変動する周期が、トランジスタT11~T18のゲート電圧が変動する周期以下となっても良い。
 電力生成動作制御部111は、回生第1状態及び回生第2状態が交互に繰り返されるように、トランジスタT11~T18のゲートに印加されるゲート電圧を制御する。さらに、電力生成動作制御部111は、充電第1状態及び充電第2状態に関係なく、トランジスタT21~T24のゲートに印加されるゲート電圧を制御する。これにより、以下説明するように、電力生成部110が、コンデンサC2を放電して得られる容量電力を用いて、回生電力を生成する。
 回生第1状態では、トランジスタT15,T17のそれぞれがONになる。一方、トランジスタT16,T18のボディダイオードは逆バイアスになるため、略OFFとなる。その結果、コイルL12の他端L12bから一端L12aに向かって、電流が流れる。すると、対向するコイルL11の一端L11aから他端L11bに向かって、電流が流れる。このとき、トランジスタT11,T13のボディダイオードは順バイアスになるため、それぞれのソースからドレインに向かって電流が流れる。一方、トランジスタT16,T18のボディダイオードは逆バイアスになるため、略OFFとなる。さらにこのとき、コンデンサC11は、第2電力供給線115c,115dに供給する電力を平滑化する。
 回生第2状態では、トランジスタT16,T18のそれぞれがONになる。一方、トランジスタT15,T17のボディダイオードは逆バイアスになるため、略OFFとなる。その結果、コイルL12の一端L12aから他端L12bに向かって、電流が流れる。すると、対向するコイルL11の他端L11bから一端L11aに向かって、電流が流れる。このとき、トランジスタT12,T14のボディダイオードは順バイアスになるため、それぞれのソースからドレインに向かって電流が流れる。一方、トランジスタT11,T13のボディダイオードは逆バイアスになるため、略OFFとなる。さらにこのとき、コンデンサC11は、第2電力供給線115c,115dに供給する電力を平滑化する。
 上記の回生第1状態及び回生第2状態を交互に繰り返すと、第2電力生成部110Bが直流の容量電力をスイッチングすることになり、コイルL12に交流の電力(回生一次電力)が発生する。また、電力変換部110Cは、コイルL11に、回生一次電力を変圧して得られる交流の電力(回生二次電力)を発生させる。さらに、第1電力生成部110AのトランジスタT11~T14及びコンデンサC11は、回生二次電力を(全波)整流及び平滑化することで、第2電力供給線115c,115dに直流の電力を供給する。なお、充電動作時と同様に回生動作時も、第2電力供給線115cが高電圧側であり、第2電力供給線115dが低電圧側である。
 また、回生第1状態及び回生第2状態に関係なく、トランジスタT21,T23のそれぞれと、トランジスタT22,T24のそれぞれと、が交互にONになる。トランジスタT21,T23がONになる場合、トランジスタT22,T24のボディダイオードは逆バイアスになるため、略OFFとなる。また、トランジスタT22,T24がONになる場合、トランジスタT21,T23のボディダイオードは逆バイアスになるため、略OFFとなる。即ち、第1電力生成部110AのトランジスタT21~T24は、第2電力供給線115c,115dをスイッチングすることで、交流の電力を生成する。
 第1電力生成部110AのトランジスタT21~T24が生成する上記の交流の電力は、方形波である。そこで、コイルL21,L22及びコンデンサC21を用いて波形を整形する。これにより、正弦波の交流電力である回生電力が生成され、第1電力供給線115a,115bに供給される。
 なお、説明の簡略化のため、図11に示すタイミングチャートでは、回生第1状態及び回生第2状態のそれぞれの時間が変動しないように図示しているが、これらは回生動作中に変動し得る。例えば、電力生成動作制御部111は、回生側検出部116が検出する回生電力の電圧の大きさを確認して、第1電力供給線115a,115bに印加される電圧が所定の大きさ(例えば、第1電力供給線115a,115bの定格電圧)以下になるように、回生第1状態及び回生第2状態の時間を制御する。これにより、第1電力供給線115a,115bに印加される電圧が過度に大きくなることが抑制されるため、充電器101の安全性を高くすることができる。
 また、トランジスタT21~T24のゲートに印加されるゲート電圧が変動するタイミングが、回生第1状態及び回生第2状態が変動するタイミング(即ち、トランジスタT11~T18のゲートに印加されるゲート電圧が変動するタイミング)に関係ないと説明したが、回生第1状態及び回生第2状態が変動するタイミングに応じた(同期した)タイミングとしても良い。
<<変形例>>
 [1] 図3及び図9に示す回路図は一例に過ぎず、上述した充電動作及び回生動作と同様の動作が行われる限り、種々の変更を加えても良い。例えば、上述のトランジスタT1~T8,T11~T18,T21~T24の少なくとも一つを、PチャネルのMOSFET(ゲート電圧が上述のHでOFFになり、ゲート電圧が上述のLでONになるトランジスタ)としても良い。この場合、図5、図6、図10及び図11に示すゲート電圧のH及びLを逆にすることで、上述した充電動作及び回生動作と同様の動作が行われ得る。
 [2] 図2及び図8において、電力生成動作制御部11,111及び一般動作制御部19,119を別体のように図示したが、これらは一体であっても良い。また同様に、コンダクタ部14及び充電コネクタ17が、一体であっても良い。
 [3] 第2実施形態に係る充電器101において、交流の回生電力に代えて(または加えて)、直流の回生電力が消費される構成にしても良い。具体的に例えば、第2電力供給線115c,115dに印加される直流電力が、直流の回生電力として消費される構成にしても良い。この場合、負荷160や充電器101の一部の機器が、交流の回生電力に代えて(または加えて)、直流の回生電力を消費しても良い。またこの場合、回生側検出部116に代えて(または加えて)、第2電力供給線115c,115dに印加される電圧の大きさを検出して電力生成動作制御部111に通知する回生側検出部を設けても良い。さらにこの場合、電力生成動作制御部111が、この回生側検出部が検出する第2電力供給線115c,115dの電圧の大きさに応じて、第1実施形態に係る充電器1の電力生成動作制御部11(図2参照)と同様に、電力生成部110の動作を制御しても良い。
 [4] 本発明に係る充電器の一例として、電動車両EVと別体である充電器(第1実施形態に係る充電器1及び第2実施形態に係る充電器101)について説明したが、本発明の充電器は、電量車両EVに備えられる内蔵の充電器にも適用可能である。この場合、充電コネクタ14,114を不要としても良い。
 本発明は、電動車両等に備えられる蓄電池を充電する充電器に利用可能である。
 1,101 : 充電器
 10,110 : 電力生成部
 10A,110A : 第1電力生成部
 10B,110B : 第2電力生成部
 10C,110C : 電力変換部
 11,111 : 電力生成動作制御部
 12a,12b,112a,112b : 充電線
 13,113 : 充電側検出部
 14,114 : 充電コネクタ
 15a,15b : 電力供給線
 115a,115b : 第1電力供給線
 115c,115d : 第2電力供給線
 16,116 : 回生側検出部
 17,117 : コンダクタ部
 18,118 : 操作部
 19,119 : 一般動作制御部

Claims (5)

  1.  電力供給線を介して供給される供給電力を用いて、蓄電池に充電する充電電力を生成する充電動作を行う充電器であって、
     前記充電動作時に前記蓄電池と並列に接続される容量素子を備え、
     前記蓄電池が前記充電器と電気的に接続されない状態で、前記容量素子を放電して得られる容量電力を用いて、前記電力供給線に供給する回生電力を生成する回生動作を行うことを特徴とする充電器。
  2.  前記充電動作時に、前記供給電力を用いて充電一次電力を生成し、前記回生動作時に、回生二次電力を用いて前記回生電力を生成する第1電力生成部と、
     前記容量素子を備え、前記充電動作時に、充電二次電力を用いて前記充電電力を生成し、前記回生動作時に、前記容量電力を用いて回生一次電力を生成する第2電力生成部と、
     前記充電動作時に、前記充電一次電力を用いて前記充電二次電力を生成し、前記回生動作時に、前記回生一次電力を用いて前記回生二次電力を生成する電力変換部と、
     を備えることを特徴とする請求項1に記載の充電器。
  3.  前記供給電力、前記充電電力、前記容量電力及び前記回生電力のそれぞれが直流電力であり、
     前記充電一次電力、前記充電二次電力、前記回生一次電力及び前記回生二次電力のそれぞれが交流電力であり、
     前記第1電力生成部が、前記供給電力をスイッチングして前記充電一次電力を生成するとともに、前記回生二次電力を整流して前記回生電力を生成するものであり、
     前記第2電力生成部が、前記充電二次電力を整流後に前記容量素子で平滑化することにより前記充電電力を生成するとともに、前記容量電力をスイッチングして前記回生一次電力を生成するものであり、
     前記電力変換部が、前記充電一次電力を変圧して前記充電二次電力を生成するとともに、前記回生一次電力を変圧して前記回生二次電力を生成するものである
     ことを特徴とする請求項2に記載の充電器。
  4.  前記充電電力及び前記容量電力のそれぞれが直流電力であり、
     前記供給電力、前記充電一次電力、前記充電二次電力、前記回生一次電力、前記回生二次電力及び前記回生電力のそれぞれが交流電力であり、
     前記第1電力生成部が、前記供給電力を整流後にスイッチングして前記充電一次電力を生成するとともに、前記回生二次電力を整流後にスイッチングして前記回生電力を生成するものであり、
     前記第2電力生成部が、前記充電二次電力を整流後に前記容量素子で平滑化することにより前記充電電力を生成するとともに、前記容量電力をスイッチングして前記回生一次電力を生成するものであり、
     前記電力変換部が、前記充電一次電力を変圧して前記充電二次電力を生成するとともに、前記回生一次電力を変圧して前記回生二次電力を生成するものである
     ことを特徴とする請求項2に記載の充電器。
  5.  前記電力供給線の電圧の大きさを検出する検出部をさらに備え、
     前記検出部で検出される電圧が所定の大きさ以下になるように、前記回生動作を行うことを特徴とする請求項1~4のいずれか一項に記載の充電器。
PCT/JP2012/060323 2011-05-24 2012-04-17 充電器 WO2012160904A1 (ja)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2011115562A JP5069363B1 (ja) 2011-05-24 2011-05-24 充電器
JP2011-115562 2011-05-24

Publications (1)

Publication Number Publication Date
WO2012160904A1 true WO2012160904A1 (ja) 2012-11-29

Family

ID=47216989

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2012/060323 WO2012160904A1 (ja) 2011-05-24 2012-04-17 充電器

Country Status (2)

Country Link
JP (1) JP5069363B1 (ja)
WO (1) WO2012160904A1 (ja)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2015154526A (ja) * 2014-02-12 2015-08-24 株式会社デンソー 電力システム

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004032942A (ja) * 2002-06-27 2004-01-29 Fuji Electric Holdings Co Ltd 常時商用給電方式無停電電源装置の未充電二次電池の充電方法
JP2010213500A (ja) * 2009-03-11 2010-09-24 Omron Corp 電力制御装置および方法、並びにプログラム

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004032942A (ja) * 2002-06-27 2004-01-29 Fuji Electric Holdings Co Ltd 常時商用給電方式無停電電源装置の未充電二次電池の充電方法
JP2010213500A (ja) * 2009-03-11 2010-09-24 Omron Corp 電力制御装置および方法、並びにプログラム

Also Published As

Publication number Publication date
JP5069363B1 (ja) 2012-11-07
JP2012244868A (ja) 2012-12-10

Similar Documents

Publication Publication Date Title
US9315112B2 (en) Power source apparatus for electrically powered vehicle and control method therefor
US9575502B2 (en) Bi-directional DC-DC converter with current reference by comparing the voltage errors of the low and high voltage sides
JP5759060B2 (ja) 電源装置及びその制御方法
WO2013129231A1 (ja) 電源装置
US9954454B2 (en) DC/DC converter and electrical storage system
JP5903628B2 (ja) 電力変換装置
KR20160038348A (ko) 저전압 dc-dc 컨버터 일체형 충전 장치
JP2014023231A (ja) 車載充電制御装置
JP2012100443A (ja) 急速充電方法及び装置
JP5936359B2 (ja) 電気自動車用充電設備
JP2009207328A (ja) 電源装置
JP2014171313A (ja) Dc/dcコンバータ
JP5804231B1 (ja) 電気鉄道用回生インバータ装置
WO2013031934A1 (ja) 電力連系システム
JP5069363B1 (ja) 充電器
CN112217244A (zh) 控制车辆电池的充电的系统和方法
JP5828774B2 (ja) 2次電池の充放電装置およびそれを用いた充放電検査装置
CN210350838U (zh) 车载充放电系统
US9917473B2 (en) Power system, power management method, and program
US10919407B2 (en) Vehicle power system with configurable output converter
Choi et al. A high efficiency LLC resonant converter-based Li-ion battery charger with adaptive turn ratio variable scheme
US20230318429A1 (en) Power conversion apparatus
JP2014003828A (ja) 充放電システム
JP2019149866A (ja) 電力変換装置及び電力変換システム
JP7205451B2 (ja) 車両および車両の制御方法

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 12789722

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 12789722

Country of ref document: EP

Kind code of ref document: A1