Prior art keywords
communication
smart meter
command
received
power
Prior art date
Application number
PCT/JP2012/000547
Other languages
English (en)
French (fr)
Inventor
松島 秀樹
松崎 なつめ
芳賀 智之
Original Assignee
パナソニック株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by パナソニック株式会社 filed Critical パナソニック株式会社
Priority to JP2012529039A priority Critical patent/JP6145813B2/ja
Priority to US13/637,258 priority patent/US9130411B2/en
Priority to CN201280001040.7A priority patent/CN102823108B/zh
Publication of WO2012105210A1 publication Critical patent/WO2012105210A1/ja
Priority to US14/813,196 priority patent/US9583978B2/en
Priority to US15/403,377 priority patent/US10305324B2/en

Links

Images

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01DMEASURING NOT SPECIALLY ADAPTED FOR A SPECIFIC VARIABLE; ARRANGEMENTS FOR MEASURING TWO OR MORE VARIABLES NOT COVERED IN A SINGLE OTHER SUBCLASS; TARIFF METERING APPARATUS; MEASURING OR TESTING NOT OTHERWISE PROVIDED FOR
    • G01D4/00Tariff metering apparatus
    • G01D4/002Remote reading of utility meters
    • G01D4/004Remote reading of utility meters to a fixed location
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • H02J13/00006Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment
    • H02J13/00028Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment involving the use of Internet protocols
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • H02J13/00032Systems characterised by the controlled or operated power network elements or equipment, the power network elements or equipment not otherwise provided for
    • H02J13/00034Systems characterised by the controlled or operated power network elements or equipment, the power network elements or equipment not otherwise provided for the elements or equipment being or involving an electric power substation
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01DMEASURING NOT SPECIALLY ADAPTED FOR A SPECIFIC VARIABLE; ARRANGEMENTS FOR MEASURING TWO OR MORE VARIABLES NOT COVERED IN A SINGLE OTHER SUBCLASS; TARIFF METERING APPARATUS; MEASURING OR TESTING NOT OTHERWISE PROVIDED FOR
    • G01D2204/00Indexing scheme relating to details of tariff-metering apparatus
    • G01D2204/10Analysing; Displaying
    • G01D2204/12Determination or prediction of behaviour, e.g. likely power consumption or unusual usage patterns
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B90/00Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02B90/20Smart grids as enabling technology in buildings sector
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/30Smart metering, e.g. specially adapted for remote reading

Definitions

  • This invention relates to the smart meter which stops the said supply, when the command which stops the supply of electric power to the electric equipment through the said smart meter is received.
  • an electric device such as a television used at home has been operated by electric power supplied from a distribution board, and the electric power used therein is measured by a meter.
  • smart meters capable of remote meter reading have been used.
  • the power from the grid (commercial power) is supplied to the distribution board through the smart meter and supplied to the electrical equipment (a power equipment group including one or more electrical equipments). .
  • the RD command is a command that causes the smart meter to stop supplying power to the power device when the command is received by the smart meter.
  • the RD command is transmitted to a smart meter via a network such as the Internet, for example, by a server of an electric power company that supplies power via a system.
  • Non-Patent Document 1 In recent years, it has been pointed out in Non-Patent Document 1 and the like that this RD command may be transmitted illegally by a hacker or the like.
  • JP 2003-143758 A Japanese Patent Laid-Open No. 2004-08919 Japanese Patent Laid-Open No. 2004-254459
  • a survey on the RD command is conducted, so that communication with a power company server or the like is performed by a smart meter (FIG. 8). (See Sa4 etc.).
  • the second communication communication via a predetermined device (see the registered device 1r in FIG. 11, the television 31 in FIG. 1 and the like) and communication that is relatively difficult to perform illegal communication is considered. Get it.
  • the first communication that is likely to be illegal communication is performed until after the illegal RD command is received in the first communication, and illegal communication is performed by a hacker or the like, and the secondary attack is performed.
  • a Dos (Denialosof Service attack) attack may be performed as a secondary attack.
  • an object of the present invention is to provide a smart meter that can avoid a secondary attack after an illegal RD command is received.
  • the smart meter of the present invention includes a power supply control unit that stops the supply when a command for stopping the supply of power to the electrical device is received through the smart meter.
  • a first communication unit that performs a first communication for receiving the command
  • a second communication unit that performs a second communication
  • performs the first communication before the command is received.
  • the smart meter includes a communication control unit that does not perform the first communication but performs only the second communication.
  • the first communication is communication in which the above command is received by the communication.
  • the first communication unit performs communication in a first communication network
  • the second communication unit performs communication in a second communication network different from the first communication network. May be.
  • the second communication network may be a mobile phone network.
  • the first communication unit may perform communication that does not pass through a predetermined device
  • the second communication unit may perform communication that passes through the predetermined device
  • the first communication may be interrupted after the above command is received.
  • the first communication may be stopped after the reception.
  • the first communication is a communication that is relatively easy to receive a secondary attack such as a Dos attack by a hacker or the like that illegally received a command.
  • the second communication is a communication that is relatively difficult to receive a secondary attack such as a Dos attack.
  • the first communication is communication on the first communication path that is not (sufficiently) safe.
  • the second communication is communication on the second communication path that is (sufficiently) safe.
  • the first communication is not performed, the second communication is performed, and the secondary attack can be avoided.
  • the second communication may be, for example, communication with an electrical device specified by data such as an ID registered in the smart meter, or communication via the electrical device.
  • FIG. 1 is a diagram showing a smart meter and the like.
  • FIG. 2 is a diagram illustrating a smart meter and the like.
  • FIG. 3 is a diagram showing a list of commands.
  • FIG. 4 is a diagram showing a smart meter and the like.
  • FIG. 5 is a flowchart of the operation of the smart meter.
  • FIG. 6 is a diagram showing a table of modes.
  • FIG. 7 is a diagram showing a table of modes.
  • FIG. 8 is a diagram showing the first half of the flow of operation.
  • FIG. 9 is a diagram showing the latter half of the operation flow.
  • FIG. 10 is a flowchart showing the operation in the system.
  • FIG. 11 is a diagram illustrating a smart meter, a registered device, a server, and the like.
  • FIG. 11 is a diagram illustrating a smart meter, a registered device, a server, and the like.
  • FIG. 12A is a diagram illustrating a CPU and the like in mode 1.
  • FIG. 12B is a diagram illustrating a CPU and the like in mode 2.
  • FIG. 12C is a diagram illustrating the CPU and the like in mode 3.
  • FIG. 12D is a diagram illustrating the CPU and the like in mode 4.
  • FIG. 13A is a diagram showing the first and second CPUs in mode 1.
  • FIG. 13B is a diagram illustrating the first and second CPUs in mode 2 and the like.
  • FIG. 13C is a diagram illustrating the first and second CPUs in mode 3 and the like.
  • FIG. 13D is a diagram illustrating the first and second CPUs in mode 4.
  • FIG. 14 is a diagram showing a list of commands.
  • FIG. 15 is a diagram illustrating each function.
  • FIG. 16 is a diagram illustrating a configuration of a smart meter.
  • FIG. 1 is a diagram showing a smart meter 1 and the like.
  • the system 1 s includes a smart meter 1, a television 31, a first server 41, and a second server 42.
  • the system 1s may further include a storage battery 1a, a router 1t, and the like.
  • the first server 41 and the second server 42 constitute a server system (server) 4 including the first and second servers 41 and 42.
  • the first server 41 is a server of an electric power company that supplies electric power from the system 9 a through the smart meter 1.
  • the second server 42 is a server of the manufacturer of the television 31.
  • Smart meter 1 is installed in a house (house) 1h.
  • the smart meter 1 is a device that supplies electric power (commercial power) from the system 9a to the electrical equipment group 3m through the smart meter 1.
  • the electrical equipment group 3m includes one or more electrical equipment (such as a television 31, a refrigerator 32, and an air conditioner 33) provided in the house 1h.
  • electrical equipment such as a television 31, a refrigerator 32, and an air conditioner 33
  • supply of electric power to the electric equipment group 3m is performed via the switchboard 1b between the electric equipment group 3m and the smart meter 1, for example.
  • the smart meter 1 detects the electric energy of the electric power supplied to the electric equipment group 3m.
  • the smart meter 1 transmits the detected electric energy through the Internet (first network 51).
  • the amount of power to be transmitted is a resident of about 1h of a house whose fee is charged by the power company of the grid 9a (refer to the first server 41 of the power company) and whose power company has contracted. Is the amount of power charged.
  • this makes it possible for a person such as a service person of an electric power company to easily and appropriately charge without having to go to the house 1h.
  • the smart meter 1 receives a command (such as the RD command 1c) (see Sa1, etc. in FIG. 8 described later).
  • the received command is, for example, a command for stopping the supply of power, such as an RD (Remote Disconnect) command 1c.
  • RD Remote Disconnect
  • the smart meter 1 stops the supply of power through the smart meter 1 described above.
  • the RD command 1c is transmitted to the smart meter 1 by the first server 41 of the electric power company, for example, when the electricity fee is not paid in the house 1h.
  • FIG. 2 is a diagram showing the configuration of the smart meter 1.
  • the smart meter 1 includes a command receiving unit 61 via a LAN (Local Area Network), a command execution unit 62 via a LAN, an NW (Network) / power source switching control unit 65, an NW switching unit 66, a power source switching unit 67,
  • the local command receiving unit 68 is provided.
  • the command reception unit 61 via LAN performs first communication (communication by the first communication unit 121 in FIG. 4 described later).
  • the first communication is communication through the first network 51 (FIG. 1).
  • the first network 51 is, for example, an IP network (IP network) based on IP (Internet Protocol).
  • IP network IP network
  • Internet Protocol Internet Protocol
  • the first communication between the smart meter 1 and the outside of the house 1h may be performed via the router 1t (FIG. 1).
  • the first network 51 is, for example, an IP network. That is, for example, a part of the first network 51 outside the house 1h, that is, a part outside the router 1t may be the Internet.
  • the command reception unit 61 via LAN receives a command through this first communication.
  • FIG. 3 is a diagram showing a list 62t of commands received by the command receiving unit 61 via the LAN.
  • the RD command 1c (FIG. 1) described above is received by the command receiving unit 61 via LAN, for example.
  • the LAN-routed command execution unit 62 executes a command (such as the RD command 1c) received by the LAN-routed command reception unit 61.
  • the power supply switching unit 67 stops the power supply (see Sa2 in FIG. 8 and Sm11 in FIG. 10 described later).
  • the power supply switching unit 67 may be, for example, a switch whose state is switched from the first state to the second state.
  • the first state is a state in which the system 9a and the switchboard 1b are connected and power is supplied to the electrical equipment group 3m.
  • the power supply switching unit 67 may switch the state from the first state to the second state and stop the power supply.
  • the power switching unit 67 may be controlled to perform this operation.
  • this control may be performed by the NW / power supply switching control unit 65.
  • control may be performed by, for example, a control unit provided in the power supply switching unit 67 or the like.
  • this makes it possible to simply stop the supply of power without having to go to the house 1h for a service person or the like when the fee is not paid.
  • the received RD command 1c is not only a illegitimate RD command 1c but also an unauthorized RD command 1c (see the above-mentioned Non-Patent Document 1 etc.).
  • the non-invalid RD command 1c is, for example, the RD command 1c transmitted by the first server 41 of the power company described above.
  • the unauthorized RD command 1c is the RD command 1c transmitted by the third person's computer 1Q (FIG. 1) such as a hacker.
  • step Sa5 it is assumed that it is necessary to communicate with the smart meter 1 even after such an illegal RD command 1c is received (steps Sa4 and FIG. 9 in FIG. 8, which will be described later). For example, Sa5).
  • the communication is performed, for example, in order to avoid an adverse effect (a large adverse effect) caused by receiving an illegal RD command 1c (for example, an investigation / recovery process, an illegal For example, processing for avoiding being stopped).
  • an adverse effect a large adverse effect
  • an illegal RD command 1c for example, an investigation / recovery process, an illegal For example, processing for avoiding being stopped.
  • the local command receiving unit 68 performs the second communication (communication at the second communication unit 122 of FIG. 4 described later) through the second network 52 (FIG. 1).
  • a third party computer 1Q such as a hacker is connected, and unauthorized communication is relatively difficult to perform.
  • the second communication (communication of the second communication unit 122) is communication that is less likely to be performed illegally than the first communication (communication of the first communication unit 121) described above.
  • the unauthorized communication is, for example, communication in which an unauthorized packet is sent from a third-party computer 1Q, communication of Dos attack, or the like.
  • the first communication is communication that is not communication with a predetermined device (for example, the television 31, see the registered device 1r in FIG. 11), and the second communication is with a predetermined device. Communication may be used.
  • the first communication when the first communication is performed, it is not necessary to be authenticated by a predetermined device (the television 31).
  • the second communication the authentication by the device is not performed. It may be necessary.
  • the attack in the first communication is performed even when the third party's computer 1Q is not authenticated illegally from a predetermined device, while the attack in the second communication is This may be performed when the device is illegally authenticated.
  • the second communication is performed only when an attack in the communication is illegally authenticated from the device (TV 31), and the attack may be relatively difficult.
  • the second communication may be communication via a device mediated by a predetermined device (such as the television 31).
  • the predetermined device described above is, for example, a device (registered device 1r in FIG. 11) specified by predetermined data (for example, “ID001” which is the ID of the television 31 in FIG. 1).
  • Such data is, for example, a registered device list 8d1 in FIG. 11 described later (see “001” in the registered device list 8d1 in FIG. 11).
  • a plurality of predetermined devices (“001” device, “005” device in the registered device list 8d1 in FIG. ) Are specified, and the communication with each predetermined device may be the second communication.
  • the registered device list 8d1 may be stored in a predetermined registration unit (for example, the local command receiving unit 68), and the device may be registered in the registration unit (FIG. 11). (See registered device 1r).
  • a personal computer does not operate when its power is turned off.
  • the predetermined device may be such a television 31 or the like.
  • the operation when the power is turned off by the television 31 or the like may include the above-described operation of the second communication with the smart meter 1 by the television 31 or the like.
  • the second communication may be realized by a public telephone network or the like.
  • the smart meter 1 may be provided with a SIM (Subscriber Identity Module Card) card provided in a mobile phone or the like, or the second communication function may be realized by a SIM implemented by software. Good.
  • SIM Subscriber Identity Module Card
  • And 2nd communication may be performed with the provided SIM card and soft SIM.
  • the NW switching unit 66 makes the first communication (Sx2) described above before the RD command 1c is received (see Sx3 No in FIG. 5 described later).
  • the NW switching unit 66 causes the second communication (Sx5) described above.
  • NW switching unit 66 may be controlled to perform such an operation.
  • this control may be performed by the NW / power supply switching control unit 65, for example.
  • control may be performed by a control unit provided inside the NW switching unit 66, for example.
  • not performing the first communication may be, for example, stopping the first communication.
  • FIG. 4 is a diagram showing the smart meter 1 and the like.
  • each functional block such as the first communication unit 121 in FIG. 4, refers to the description in other figures (FIG. 2 and the like) other than FIG. 4 as appropriate.
  • FIG. 5 is a diagram showing a flowchart of the smart meter 1.
  • step Sx1 the power of the grid 9a is supplied.
  • step Sx2 first communication (first communication unit 121, command reception unit 61 via LAN) is performed.
  • step Sx3 it is determined whether or not the RD command 1c is received.
  • control for continuing the supply of power (Sx1, Sx2) may be performed.
  • step Sx4 when it is determined that the RD command 1c has been received (Yes in Sx3), the supply of power from the system 9a is stopped (power supply control unit 11, power supply switching unit 67).
  • step Sx5 the second communication (second communication unit 122, local command receiving unit 68) is performed.
  • the RD command 1c may be received in Sx2 described above.
  • the first communication unit 121 and the like in FIG. 4 are as follows.
  • the power supply control unit 11 (such as the power supply switching unit 67 and the NW / power supply control unit 65 or only the power supply switching unit 67 in FIG. ) Is stopped (Yes in Sx3, Sa1 in FIG. 8 to be described later, Sm11 in FIG. 10 to be described later), and the supply is stopped (Sx4, in FIG. 8). Sa2, Sm12 in FIG. 10).
  • first and second communication units (communication interfaces) 121 and 122 for performing communication are provided (command reception unit 61 via LAN and command reception unit 68 via Local).
  • NW / power supply switching control unit 65 and NW switching unit 66 or only the NW switching unit 66 There is also a communication control unit 13 (NW / power supply switching control unit 65 and NW switching unit 66 or only the NW switching unit 66).
  • the communication control unit 13 performs the first communication in the first communication unit 121 (Sx2), and after the RD command 1c is received. (Sx3 Yes, Sa1), does not perform the first communication (Sx2) performed before the reception, only the second communication (Sx5, Sa4, Sa5, Sm12, Sm62) by the second communication unit 122 May be performed.
  • the Lan-routed command receiving unit 61 in FIG. 2 is a part of the first communication unit 121 in FIG. 2 may be a part of the functional block of FIG. 4 corresponding to the functional block, for example, as in this example.
  • the processing of Sx4 may be performed after the processing of Sx5.
  • the smart meter 1 does not immediately stop supplying power from the system 9a (Sx4) but stops (Sx4).
  • information may be acquired from the electric power company (first server 41) or the like in the second communication (Sx5) via the home appliance (registered device 1r) compatible with SG (Smart Grid) ( (See Sa5 in FIG. 9).
  • the acquired information is, for example, information indicating whether or not the received RD command 1c is a command (correct RD comment 1c) transmitted by the first server 41 of the electric power company.
  • the supply may not be stopped.
  • the supply stop (Sx4) is performed after the second communication (Sx5) described above. May be.
  • an unauthorized stop of power supply due to an unauthorized RD command 1c may be prevented in this way.
  • the smart meter provided in each of the plurality of houses may have the same configuration as that of the smart meter 1 of the house 1h described above.
  • the above-described registered device 1r is an electric device such as the television 31 to which power of the system 9a is supplied.
  • the registered device 1r When the RD command 1c is not received (No in Sx3), the registered device 1r operates with the power (Sx1) supplied from the system 9a supplied through the smart meter 1 (the first in the mode 1 in FIG. 6 described later). (Refer to the text “transmission network” in row 2, column 5).
  • the registered device 1r may operate with other power (for example, power of the storage battery 1a) other than the power from the grid 9a (mode). 2 (see “Storage Battery” in column 5).
  • the registered device 1r may perform the above-described processing in the second communication by the operation with the other power (power of the storage battery 1a).
  • Other power is, for example, power from the storage battery 1a (FIG. 1) as described above.
  • the storage battery 1a is, for example, a storage battery provided in a house 1h as shown in FIG.
  • the power supply switching unit 67 may not supply power from the system 9a to the registered device 1r (Sx4).
  • the power supply switching part 67 (FIG. 2) is not the electric power from the system
  • control for causing such an operation may be performed by the NW / power supply switching control unit 65 or the like.
  • the operation of the smart meter 1 may be performed with the power from the grid 9a, not with the power of the storage battery 1a. (Refer to the characters “transmission network” in the third row and the fourth column in mode 2 of FIG. 6).
  • FIG. 6 is a diagram showing a table of four modes.
  • the smart meter 1 may operate in a mode selected from a plurality of modes (modes 1 to 4). For example, the above selection may be performed by the power supply control unit 11 (FIG. 4).
  • the operation in mode 1 (second line in FIG. 6) may be performed.
  • the operation may be performed in the modes included in the modes 2 to 4 (the third to fifth lines in FIG. 6).
  • mode 2 third line
  • the communication may be blocked (see “impossible” in the third row and third column) as described above.
  • each electric device may be performed by the power of the storage battery 1a.
  • the electric power of the grid 9a may be supplied to the electric device.
  • condition may be, for example, a condition that the electrical device is the refrigerator 32.
  • the operation in mode 4 may be performed.
  • the operation of the registered device 1r is performed by the storage battery as shown in the fifth column “power transmission network” (fifth row, fifth column) with the characters “power transmission to the device”.
  • the power from the grid 9a may be used instead of the power of 1a (see the above description).
  • each electric device may be performed by the power of the grid 9a.
  • the operation in mode 1 may be performed again.
  • the mode 3 operation may be performed during a period other than the period in which the mode 4 operation is performed.
  • the first communication may be performed even after the reception of the RD command 1c.
  • the smart meter 1 in mode 3, as indicated by the characters “storage battery” in the fourth row and fourth column, the smart meter 1 also operates with the power of the storage battery 1a without operating with the power from the system 9a. Also good.
  • FIG. 7 is a diagram showing a table 65t.
  • the smart meter 1 is included in the system 1s (FIG. 1).
  • the first server 41 of the power company in the server system 4 may transmit the RD command 1c.
  • the manufacturer's second server 42 receives the transmitted RD command 1c, and transmits the received RD command 1c to the smart meter via the Internet (first network 51) through the first communication. 1 may be transmitted.
  • FIG. 8 is a diagram showing the first half of the operation flow in the system 1s. Note that FIG. 9 for the latter half will be described in detail later.
  • FIG. 10 is a flowchart of the operation in the system 1s.
  • the RD command 1c transmitted by the second server 42 is received by the smart meter 1 (Sa1, Sm11, Sx2, Sx3 in FIG. 5 Yes).
  • the power supply is stopped and the first communication may be interrupted (Sa2, Sm12, Sx4, Sx5).
  • FIG. 11 is a diagram showing the smart meter 1, the registered device 1r, the server system 4, and the like.
  • the second communication is performed between the smart meter 1 and the registered device 1r (such as the television 31) (Sx5).
  • the operation history 8d2 (FIG. 11) of the smart meter 1 may be transmitted through the second communication (command execution history transmission unit 64a, Sa4, Sm12 in FIG. 2).
  • the history 8d2 to be transmitted may be information (command history) for identifying each command executed by the smart meter 1 before the RD command 1c is received.
  • the history 8d2 may be stored by the smart meter 1 (the history storage unit 64 in FIG. 2), and the stored history 8d2 may be transmitted to the registered device 1r.
  • the history storage unit 64 may be, for example, a storage device that has so-called tamper resistance, and the stored history 8d2 is relatively difficult to read illegally.
  • the signature 8d3 (FIG. 11) of the history 8d2 may be generated by the smart meter 1 or the like (Sa3, Sm12).
  • the smart meter 1 may transmit the signature 8d3 of the history 8d2 together with the history 8d2 to the registered device 1r.
  • signatures are generated for data other than the history 8d2 (device information 8d5, data 8d7, 8d9, etc.) (Sb3, Sd3, etc.). Sc6), transmission, reception, verification (Sd2, Sc4, Sb6, Sa6) of the generated signature may be performed.
  • the transmitted history 8d2 is received by the registered device 1r (Sb1, Sm21).
  • the received history 8d2 is transmitted from the registered device 1r to the manufacturer's second server 42 (Sb4, Sm22).
  • the history 8d2 but also device information 8d5 (FIG. 11) indicating the power consumption of the electrical device (registered device 1r, etc.) may be transmitted (Sb4, Sm22).
  • the device information 8d5 of the power consumption of the registered device 1r may be transmitted, the device information 8d5 of other electrical devices (such as the refrigerator 32 in FIG. 1) may be transmitted, or any of them may be transmitted. Good.
  • the server system 4 may acquire device group information 8d4 (FIG. 11) including the device information 8d5 of each electrical device.
  • the electric device When the history 8d2 is received (Sb1, Sm21), the electric device (for example, the registered device 1r) may operate in the emergency operation mode (Sm22 in FIG. 10) (Sb2).
  • the emergency operation mode described above is a mode that consumes relatively little power.
  • the history 8d2 may be received as a notification indicating that the RD command 1c is received, and the RD command 1c may be received.
  • the recovery guideline data 8d7 and the operation guideline data 8d9 may be generated.
  • the generated recovery guideline data 8d7 may be control data for specifying the operation of the smart meter 1 and controlling the smart meter 1 to perform the operation.
  • the operation may be instructed by the data 8d7.
  • the data 8d7 may be data that specifies the mode (see FIG. 6) and causes the specified mode to operate.
  • the generated operation guideline data 8d9 may be, for example, data specifying the operation of the registered device 1r and instructing the registered device 1r to perform the operation.
  • an operation instruction of a device other than the registered device 1r may be instructed by the operation guideline data 8d9.
  • data 8d9 may also be data that specifies a mode and operates in that mode.
  • the recovery guide data 8d7 of the operation of the smart meter 1 may be generated by the first server 41 of the electric power company (Sd3, Sm42).
  • the operation guideline data 8d9 of the operation of the registered device 1r may be generated by the manufacturer's second server 42 (Sc5, Sm51).
  • the history 8d2 of the operation of the smart meter 1 transmitted by the registered device 1r is received by the manufacturer's second server 42 in the server system 4 (Sc1, Sm31).
  • the received history 8d2 or the like is transmitted to the first server 41 of the power company (Sc2, Sm31).
  • the recovery guide data 8d7 (FIG. 11) described above is generated by the first server 41 from a part or all of the received history 8d2 or the like (Sd1, Sm41) (Sd3, Sm42). .
  • FIG. 9 is a diagram showing the latter half of the operation in the system 1s.
  • the generated data 8d7 is transmitted to the second server 42 of the manufacturer (Sd4, Sm42).
  • the transmitted data 8d7 is received by the second server 42 of the manufacturer (Sc3, Sm51).
  • the manufacturer's second server 42 generates operation guideline data 8d9 (Sc5, Sm51).
  • this generation is performed from the received history 8d2 and the like (Sc1) and one or both of the received recovery guideline data 8d7 and (Sc3).
  • the recovery guideline data 8d7 (Sc3) and the generated operation guideline data 8d9 (Sc5) received from the first server 41 of the power company are respectively transmitted to the registered device 1r ( Sc7, Sm51).
  • the registered device 1r receives the transmitted data 8d7 and 8d9 (Sb5, Sm61).
  • the received recovery guide data 8d7 is transmitted to the smart meter 1 (Sb8, Sm62).
  • the transmitted recovery guide data 8d9 is received (Sa5, Sm71, Sx5), and the operation specified by the received data 8d9 is performed by the smart meter 1 (Sa7, Sm71).
  • the following operation may be performed.
  • the system 1 s may include the smart meter 1, a registered device 1 r (for example, the television 31) that is supplied with power from the system 9 a through the smart meter 1, and the server system 4.
  • the smart meter 1 performs the second communication by the second communication unit 122 in the history 8d2 of the operation of the smart meter 1. May be transmitted to a predetermined electrical device (registered device 1r, television 31) (command execution history transmitters 64a, Sa4, Sx5).
  • the registered device 1r may transmit the transmitted history 8d2 to the server system 4 (first server 41 of the manufacturer) (Sb4).
  • the server system 4 (first server 41) generates the recovery guide data 8d7, which is the first data for specifying the operation of the smart meter 1 generated from the transmitted history 8d2, and the registered device.
  • Operation guide data 8d9 which is second data for specifying the operation of 1r (electric device), may be transmitted to each registered device 1r (Sc7).
  • the registered device 1r may perform the operation of the transmitted second data (data 8d9) and may transmit the transmitted first data (data 8d7) to the smart meter 1.
  • the smart meter 1 may perform the operation of the transmitted first data (data 8d7).
  • FIG. 12A is a diagram showing a RAM and the like in the operation of mode 1 (FIG. 6).
  • FIG. 12B is a diagram illustrating the RAM and the like in the operation of mode 2.
  • FIG. 12C is a diagram showing a RAM and the like in the operation of mode 3.
  • FIG. 12D is a diagram showing a RAM and the like in the operation of mode 4.
  • the first firmware 71 (see FIG. 12A and the like) may be executed, and the second firmware 73 may also be executed by the CPU 70 (Central Processing Unit).
  • the CPU 70 will be described in detail later.
  • the first firmware 71 may be executed in the case of FIG. 12A (operation 1) and FIG. 12D (operation 4).
  • the second firmware 73 may be executed in the case of FIG. 12B (operation 2) and FIG. 12C (operation 4).
  • the size of the second firmware 73 is smaller than the size of the first firmware 71 as shown by the horizontal width of each firmware program shown in the figure.
  • the second firmware 73 does not include the first communication processing part, and its size is relatively small.
  • the second firmware 73 has a relatively low vulnerability (risk) due to its small size as described above (there are few problems that may cause a risk). Thereby, when the second firmware 73 is executed, a safer operation is performed.
  • the second firmware 73 may be low in vulnerability because it is small in size, has few functions to be realized, and does not easily include a security hole in the realized functions.
  • the power supplied is the power of the storage battery 1a in each of the operations 2 and 3, as indicated by the locations of the “storage battery” and “system” (mode 2, 3).
  • the first communication is performed in each of the operations 1 and 3, as indicated by the descriptions of “local” and “LAN” at the lower left end of FIG. 12A (mode 1 in FIG. 6). 3).
  • the CPU 70 is, for example, a CPU provided in the smart meter 1.
  • the CPU 70 may be a CPU provided in the registration device 1r described above.
  • the smart meter 1 when the smart meter 1 is operated in the mode 3 (see FIG. 12C and the like) and is operated with the power of the storage battery 1a, the power consumption is relatively small. An action may be taken.
  • the RD command 1c for stopping Before the RD command 1c for stopping is received (FIG. 12A), it operates with the first firmware 71, and after it is received (FIG. 12B, FIG. 12C), it operates with the second firmware 73.
  • Devices (smart meter 1, television 31, etc.) may be used.
  • the smart meter 1 or the like operates with the first firmware 71 as an exception when the device operates in the system 9a even after being received (FIG. 12D). Also good.
  • an operation at a relatively high frequency (normal operation 70H in FIG. 12A) is performed, while in the cases of FIGS. 12B and 12C, an operation at a relatively low frequency is performed. (Power saving operation 70L) may be performed.
  • a device that operates at a relatively high frequency before receiving the RD command 1c for stopping (FIG. 12A) and that operates at a relatively low frequency after being received (FIGS. 12B and 12C) ( A smart meter 1, a television 31 or the like may be used.
  • the mode in which the smart meter 1 operates may be detected from the modes 1 to 4 in FIG. 6 by the registered device 1r by the second communication or the like.
  • the operation 1 in the case of FIG. 12A may be performed.
  • FIG. 13A is a diagram showing a RAM or the like in the operation of mode 1.
  • FIG. 13B is a diagram illustrating the RAM and the like in the operation of mode 2.
  • FIG. 13C is a diagram showing a RAM and the like in the operation of mode 3.
  • FIG. 13D is a diagram illustrating a RAM or the like in the operation of mode 4.
  • the process is executed by the first CPU 74, and when the second firmware 78 is executed, the process is executed by the second CPU 76. Also good.
  • the first and second CPUs 74 and 76 are provided in the smart meter 1.
  • the power consumption in the second CPU 75 is the same program as that program.
  • the power consumption of the first CPU 74 may be smaller.
  • the processing is executed by the first CPU 74, and after being received (FIG. 13B, FIG. 13C), the second CPU 75
  • An apparatus (smart meter 1, television 31 or the like) that performs processing is configured.
  • the second firmware 78 may be firmware having a lower vulnerability than the first firmware 76 (fewer problems that may cause a risk).
  • FIG. 14 is a diagram showing a list 69t of commands received in the second communication.
  • each command in the list 69t may be received by the second communication.
  • the received command may be executed by the local command execution unit 69 (FIG. 2).
  • reception of the command in the second communication as described above may be performed before, for example, the RD command 1c is received, or may be performed only after the reception. .
  • the types of commands in the list 69t are less than the types of commands in the list 62t in FIG. 3, and may be limited.
  • a remote meter reading command may not be accepted.
  • a command to shut off the network may not be accepted.
  • the following operation may be performed in the smart meter.
  • the operation mode changes from standard (remote command acceptance) mode (mode 1) to emergency (interacts only with internally registered devices, where power devices are driven by storage batteries) (such as mode 2). Is done.
  • the command execution history (history 8d2) is safely held (history storage unit 64). Then, the held command execution history is safely sent to the first server 41 of the power company via the home appliance (TV 31) when a failure occurs.
  • the sent command execution history is used as a clue to determine whether an attack is made by a hacker or an actual disaster.
  • the standard operation mode may be changed to a power failure countermeasure mode (such as a mode in which data that may be lost is quickly shut down).
  • the registered device 1r may be notified that the RD command 1c has been received by transmitting the history 8d2.
  • the first server 41 of the electric power company formulates a recovery guideline (data 8d7) based on the command execution history (history 8d2) and sends it to the smart meter 1 via the television 31.
  • the transmission of the unauthorized RD command 1c described above may be a so-called cyber attack, for example.
  • the server system 4 (for example, the first server 41 of the electric power company), the following operation may be performed.
  • the smart meter 1 may be determined whether the RD command 1c received by the smart meter 1 is a non-invalid RD command 1c.
  • this determination it is determined whether or not the identification number or the like of the RD command 1c received by the smart meter 1 is the same as the identification number or the like of the RD command 1c transmitted by the first server 41. And so on.
  • the following determination may be performed by the first server 41 of the electric power company or the like.
  • the same phenomenon the number of cases larger than the threshold value
  • the system 9a (the power transmission network, etc.) is not abnormal, or has occurred and is abnormal.
  • the following operation may be performed.
  • recovery guide data 8d7 for instructing the smart meter 1 to operate in the recovery mode (mode 4) may be generated and transmitted.
  • the above-described generation and transmission may be performed only when a predetermined process for confirming that there is no abnormality in the power transmission network is performed and it is confirmed that there is no abnormality in the process.
  • this may be notified from the first server 41 of the power company to the second server 42 of the manufacturer.
  • the manufacturer's second server 42 may instruct the television 31 or the like to operate in a predetermined recovery mode (see operation guideline data 8d8 or the like). ).
  • the first server 41 of the electric power company or the like may transmit the scheduled recovery date (to the smart meter 1 or the like) (refer to the recovery guideline data 8d7).
  • scheduled recovery date to be transmitted may specify the specified planned recovery date.
  • the refrigerator 32 or the like may perform control for reducing the consumed power as the recovery scheduled date is farther.
  • Whether or not to transmit such an instruction for power saving control is determined by the manufacturer's second server 42 or the like by the scheduled recovery date, the storage capacity of the storage battery 1a, the device usage status (device group information 8d4 in FIG. 11). Etc.) may be taken into consideration.
  • FIG. 15 is a diagram showing a plurality of functions (function 81 to function 89).
  • the smart meter 1 may include, for example, function blocks of functions 81 to 89 in FIG.
  • the smart meter 1 is further superior to the assumed smart meter.
  • the address of the smart meter 1 in the first communication by the first communication unit 121 is the first address, and the address of the smart meter 1 in the second communication by the second communication unit 122 May be a second address.
  • the address of the smart meter 1 at the time of communication may be switched by the smart meter 1 between the first address and the second address.
  • MAC address Media Access Control Address
  • communication with the first MAC address may be performed, and in the second communication, communication with the second MAC address may be performed.
  • the first communication unit 121 is a first communication device that performs communication using a first MAC address
  • the second communication unit 122 uses a second communication that performs communication using a second MAC address. It may be a communication device.
  • Each communication device may be a so-called communication card, for example.
  • the first communication may be communication on the first communication path
  • the second communication may be communication on a second communication path different from the first communication path.
  • FIG. 16 is a diagram showing the configuration of the smart meter 1 and the like.
  • the first communication is communication in the first communication network (first network) 51n (FIG. 16), and the second communication is a second communication different from the first communication network 51n. Communication via the network (second network) 52n may be used.
  • the first communication network 51n may be the IP network shown in FIG. 16, while the second communication network 52n may be a mobile phone network.
  • the second communication network 52n is a mobile phone network, and it is relatively difficult for an attack by a hacker or the like to communicate with the second communication network 52n.
  • the first communication network 51n may be the Internet.
  • the second communication network 52n may be a WiMAX (Widemax, Interoperability for Microwave Access) communication network or the like instead of the mobile phone network.
  • WiMAX Widemax, Interoperability for Microwave Access
  • the first address (previously described) in the first communication is an address in the first communication network 51n
  • the second address (previously described) in the second communication is an address in the second communication network 52n. But you can.
  • the first communication path (previously described) may be a communication path passing through the first communication network 51n
  • the second communication path (previously described) may be a communication path passing through the second communication network 52n.
  • the first communication device is a communication device that performs communication in the first communication network 51n
  • the second communication device is a communication device that performs communication in the second communication network 52n. But you can.
  • the first communication device is a so-called NIC (Network Interface Card) or WNIC (Wireless Network Interface Card), while the second communication device is a communication device that performs wireless communication with a mobile phone. But you can.
  • NIC Network Interface Card
  • WNIC Wireless Network Interface Card
  • the smart meter 1 may be provided with a SIM card (Subscriber Identity Module Card).
  • SIM card Subscriber Identity Module Card
  • the operation may be performed by the smart meter 1 in this way.
  • This operation is, for example, an operation executed by a CPU provided in the smart meter 1.
  • This operation includes, for example, an operation performed by the power supply control unit 11 and an operation performed by the communication control unit 13, while an operation performed by the first communication unit 121 and an operation performed by the second communication unit 122. Not included.
  • the clock frequency of the CPU that executes this operation may be a first frequency (see FIG. 12A or the like) and a second frequency lower than the first frequency (see FIG. 12B or the like).
  • the first firmware 71 and the second firmware 73 may be included as firmware executed by the CPU.
  • the first meter 74 and the second CPU 75 may be provided in the smart meter 1 as CPUs that execute this operation.
  • the first operation may be performed at the first frequency and the second operation may be performed at the second frequency.
  • the first operation may be performed by the first firmware 71 and the second operation may be performed by the second firmware 73.
  • the first CPU 74 may perform the first operation
  • the second CPU 75 may perform the second operation.
  • the present technology a plurality of configurations (for example, see the power supply control unit 11 and the communication control unit 13 in FIG. 4) are combined to produce a synergistic effect from the combination.
  • the known prior art lacks some or all of these multiple configurations and does not produce a synergistic effect.
  • the present technology is different from the preceding example and is superior to the preceding example.
  • the present invention can be realized not only as a device, a system, etc., but also as a method having steps as processing means constituting the device, etc., or as a program for causing a computer to execute these steps. It can also be realized as a recorded computer-readable recording medium such as a CD-ROM or as information, data or a signal indicating the program. These programs, information, data, and signals may be distributed via a communication network such as the Internet.

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Selective Calling Equipment (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Telephonic Communication Services (AREA)

Abstract

 スマートメータ(1)が、当該スマートメータ(1)を通じた、テレビ(31)等への、電力の供給を停止させるRDコマンド(1c)が受信された場合に、前記供給を停止させる電力供給制御部(11)と、前記RDコマンド(1c)が受信される第1の通信を行う第1の通信部(121)と、第2の通信を行う第2の通信部(122)と、前記RDコマンド(1c)が受信される以前に、前記第1の通信を行わせ、前記RDコマンド(1c)が受信された後には、前記第1の通信を行わせず、前記第2の通信のみを行わせる通信制御部(13)とを備える。

Description

スマートメータ、供給制御方法、動作方法、集積回路、システム、およびプログラム
 本発明は、当該スマートメータを通じた、電気機器への、電力の供給を停止させるコマンドが受信された場合に、当該供給を停止させるスマートメータに関する。
 従来より、家庭で用いられるテレビなどの電気機器は、分電盤より供給される電力により動作しており、そこで使用される電力は、メータで計測されている。また、近年は、リモートでの検針が可能なスマートメータも用いられてきている。
 スマートメータを用いた場合、系統(商用電力)からの電力がスマートメータを通じて分電盤に供給され、電気機器(1以上の電気機器が含まれてなる電力機器群)まで供給されることになる。
 スマートメータでは、RDコマンド(Remote Disconnect:リモートディスコネクト)に対応しているものも多い。RDコマンドは、そのコマンドが、スマートメータにより受信された場合に、スマートメータが、電力機器への、電力の供給を停止させるコマンドである。
 RDコマンドは、例えば、系統を介して、電力を供給する電力会社のサーバにより、インターネットなどのネットワークを介してスマートメータに送信される。
 そして、近年においては、非特許文献1などにおいて、このRDコマンドが、ハッカーなどにより、不正に送信される可能性があることが指摘されている。
特開2003-143758号公報 特開2004-08919号公報 特開2004-254459号公報
SCAN DISPATCH :補助金目当、脆弱性続出のスマートメータ(https://www.netsecurity.ne.jp/2_13857.html)
 しかしながら、不正なRDコマンドがスマートメータによって受信されるのを完全に防ぐことは難しい。
 また、不正なRDコマンドが受信された後に、スマートメータにより通信が行われることが考えられる。
 例えば、不正なRDコマンドが受信された後に、そのRDコマンドに関する調査がされるために、電力会社のサーバなどとの間での通信が、スマートメータによりされることなどが考えられる(図8のSa4などを参照)。
 しかも、通常は、RDコマンドが受信される以前に行われる第1の通信よりも、不正な通信がされ難い第2の通信がある。
 つまり、第2の通信としては、予め定められた機器(図11の登録機器1r、図1のテレビ31などを参照)を介した通信で、比較的、不正な通信がされ難い通信などが考えらえる。
 また、第2の通信としては、公衆電話網での通信などの様々な通信が想定される。
 このため、不正なRDコマンドが、第1の通信で受信された後にまで、不正な通信がされ易い第1の通信が行われて、ハッカーなどにより、不正な通信がされ、二次攻撃が行われる可能性があると考えられる。
 例えば、二次攻撃として、Dos(Denial of Service attack)攻撃などが行われることが考えられる。
 そこで、本発明は、不正なRDコマンドが受信された後における二次攻撃が回避できるスマートメータを提供することを目的とする。
 上記の課題を解決するために、本発明のスマートメータは、当該スマートメータを通じた、電気機器への、電力の供給を停止させるコマンドが受信された場合に、前記供給を停止させる電力供給制御部と、前記コマンドが受信される第1の通信を行う第1の通信部と、第2の通信を行う第2の通信部と、前記コマンドが受信される以前に、前記第1の通信を行わせ、前記コマンドが受信された後には、前記第1の通信を行わせず、前記第2の通信のみを行わせる通信制御部とを備えるスマートメータである。
 なお、このように、第1の通信は、その通信によって、上記のコマンドが受信される通信である。
 なお、例えば、前記第1の通信部は、第1の通信網での通信を行い、前記第2の通信部は、前記第1の通信網とは異なる第2の通信網での通信を行ってもよい。
 なお、前記第2の通信網は、携帯電話網でもよい。
 他方、例えば、前記第1の通信部は、予め定められた機器を経由しない通信を行い、前記第2の通信部は、前記予め定められた機器を経由した通信を行ってもよい。
 なお、例えば、上記のコマンドが受信された後には、第1の通信が遮断されてもよい。
 また、例えば、その受信の後に、第1の通信が停止されてもよい。
 つまり、第1の通信は、例えば、不正にコマンドを受信させたハッカー等による、Dos攻撃などでの二次攻撃を、比較的受け易い通信である。そして、第2の通信は、Dos攻撃などでの二次攻撃を、比較的受け難い通信等である。
 つまり、例えば、第1の通信は、(十分に)安全ではない第1の通信路での通信である。そして、例えば、第2の通信は、(十分に)安全である第2の通信路での通信である。
 これにより、コマンドが受信された後には、第1の通信がされず、第2の通信がされて、二次攻撃が回避できる。
 なお、第2の通信は、例えば、スマートメータに登録されたID等のデータにより特定される電気機器との通信でもよいし、その電気機器を経由する通信などでもよい。
 電力の供給を停止させるコマンド(RDコマンドなど)の受信の後における二次攻撃が回避できる。
 ひいては、二次攻撃がなく、停止のコマンドの受信の後に、確実に、適切な動作(図9のSa7などを参照)ができる。
 つまり、例えば、受信の後に、受信がされたコマンドが不正でないか否が判定されて、不正と判定される場合には、停止をさせない制御が行われてもよい。つまり、例えば、この動作が確実に適切に行われて、確実に、不正なコマンドでの不適切な停止が回避され。確実に、不適な停止が回避できる。
図1は、スマートメータなどを示す図である。 図2は、スマートメータなどを示す図である。 図3は、コマンドのリストを示す図である。 図4は、スマートメータなどを示す図である。 図5は、スマートメータの動作のフローチャートである。 図6は、モードの表を示す図である。 図7は、モードの表を示す図である。 図8は、動作の流れの前半部分を示す図である。 図9は、動作の流れの後半部分を示す図である。 図10は、システムにおける動作を示すフローチャートである。 図11は、スマートメータ、登録機器およびサーバなどを示す図である。 図12Aは、モード1でのCPUなどを示す図である。 図12Bは、モード2でのCPUなどを示す図である。 図12Cは、モード3でのCPUなどを示す図である。 図12Dは、モード4でのCPUなどを示す図である。 図13Aは、モード1での第1、第2のCPUなどを示す図である。 図13Bは、モード2での第1、第2のCPUなどを示す図である。 図13Cは、モード3での第1、第2のCPUなどを示す図である。 図13Dは、モード4での第1、第2のCPUなどを示す図である。 図14は、コマンドのリストを示す図である。 図15は、各機能を示す図である。 図16は、スマートメータの構成などを示す図である。
 以下、図面を参照して、本発明を実施する形態について説明する。なお、以下で説明する実施の形態は、何れも本発明の好ましい一具体例を示すものである。以下の実施の形態で示される数値、形状、材料、構成要素、構成要素の配置位置及び接続形態、ステップ、ステップの順序等は、一例である。よって、以下の実施の形態における構成要素のうち、本発明の最上位概念を示す独立請求項に記載されていない構成要素については、本発明の課題を達成するのに必ずしも必要ではないが、より好ましい形態を構成するものとして説明される。
 図1は、スマートメータ1などを示す図である。
 システム1sは、スマートメータ1と、テレビ31と、第1のサーバ41と、第2のサーバ42とを含む。
 なお、システム1sは、蓄電池1a、ルータ1tなどを更に含んでもよい。
 第1のサーバ41および第2のサーバ42は、それら第1、第2のサーバ41、42を含んでなるサーバシステム(サーバ)4を構成する。
 例えば、第1のサーバ41は、スマートメータ1を通じて、系統9aから、電力を供給する電力会社のサーバである。
 そして、例えば、第2のサーバ42は、テレビ31のメーカーのサーバである。
 スマートメータ1は、住宅(家)1hに設けられる。
 そして、スマートメータ1は、当該スマートメータ1を通して、系統9aからの電力(商用電力)が電気機器群3mに供給される装置である。
 電気機器群3mは、住宅1hに設けられた1以上の電気機器(テレビ31、冷蔵庫32、エアコン33など)を含んでなる。
 なお、電気機器群3mへの、電力の供給は、例えば、電気機器群3mと、スマートメータ1との間にある配電盤1bを介して行われる。
 そして、スマートメータ1は、電気機器群3mに供給される電力の電力量を検出する。
 そして、スマートメータ1は、検出された電力量を、インターネット(第1のネットワーク51)を通じて送信する。
 送信される電力量は、その電力量の料金が、系統9aの電力会社(電力会社の第1のサーバ41を参照)により、その電力会社が契約をした相手である、約住宅1hの住人などに対して課金される電力量である。
 例えば、これにより、電力会社のサービスマンなどの人間が、住宅1hまで行く必要なく、簡単に、適切な課金がされてもよい。
 そして、スマートメータ1は、コマンド(RDコマンド1cなど)を受信する(後述される、図8のSa1などを参照)。
 受信されるコマンドは、例えば、例えば、RD(Remote Disconnect:リモートディスコネクト)コマンド1cなどの、電力の供給を停止させるコマンドである。
 RDコマンド1c等が受信された場合には、スマートメータ1が、上述された、当該スマートメータ1を通じた電力の供給を停止させる。
 RDコマンド1cは、例えば、住宅1hにおいて、電力料金が未払いの場合などに、電力会社の第1のサーバ41により、スマートメータ1に送信される。
 図2は、スマートメータ1の構成を示す図である。
 スマートメータ1は、LAN(Local Area Network)経由コマンド受信部61と、LAN経由コマンド実行部62と、NW(Network)・電源切替制御部65と、NW切替部66と、電源切替部67と、Local経由コマンド受信部68などを備える。
 LAN経由コマンド受信部61は、第1の通信(後述される、図4の第1の通信部121での通信)を行う。
 第1の通信は、第1のネットワーク51(図1)を通じた通信である。
 なお、第1のネットワーク51は、例えば、IP(Internet Protocol)によるIPネットワーク(IP網)などである。
 なお、例えば、スマートメータ1と、住宅1hの外部(サーバシステム4など)との間での第1の通信は、ルータ1t(図1)を介して行われてもよい。
 そして、先述のように、第1のネットワーク51は、例えばIP網である。つまり、例えば、第1のネットワーク51のうちの、住宅1hの外部の部分、つまり、ルータ1tよりも外側の部分が、インターネットでもよい。
 そして、LAN経由コマンド受信部61は、この第1の通信により、コマンドを受信する。
 図3は、LAN経由コマンド受信部61により受信されるコマンドのリスト62tを示す図である。
 なお、図3の「003」の欄で示されるように、先述されたRDコマンド1c(図1)は、例えば、LAN経由コマンド受信部61により受信される。
 LAN経由コマンド実行部62は、LAN経由コマンド受信部61により受信されたコマンド(RDコマンド1cなど)を実行する。
 電源切替部67は、RDコマンド1cが受信された場合に、電力の供給を停止させる(後述される図8のSa2、図10のSm11などを参照)。
 なお、電源切替部67は、例えば、その状態が、第1の状態から第2の状態へと切り替わるスイッチなどでもよい。
 つまり、例えば、第1の状態は、その状態においては、系統9aと配電盤1bとが接続され、電気機器群3mへの、電力の供給が行われる状態である。
 そして、第2の状態は、この接続がされず、供給がされない状態である。
 つまり、電源切替部67は、RDコマンド1cが受信された場合に、その状態を、第1の状態から第2の状態へと切り替えて、電力の供給を停止させてもよい。
 なお、電源切替部67に対して、この動作をさせる制御が行われてもよい。
 つまり、例えば、この制御は、NW・電源切替制御部65により行われてもよい。
 なお、この制御は、例えば、電源切替部67の内部などに設けられた制御部などにより行われてもよい。
 例えば、これにより、料金の未払いなどに際して、サービスマン等が、住宅1hに行く必要なく、簡単に、電力の供給が停止されてもよい。
 そして、受信されるRDコマンド1cが、不正でないRDコマンド1cである場合だけでなく、不正なRDコマンド1cである場合もあるのが考えられる(先述の非特許文献1などを参照)。
 つまり、不正でないRDコマンド1cは、例えば、先述された、電力会社の第1のサーバ41により送信されたRDコマンド1cである。
 他方、不正なRDコマンド1cは、ハッカーなどの第3の者のコンピュータ1Q(図1)により送信されたRDコマンド1cなどである。
 つまり、電力の供給の停止としては、不正でないRDコマンド1cによる、不正でない停止だけがではなく、不正なRDコマンド1cによる、不正な停止も考えられる。
 そして、このような、不正なRDコマンド1cの受信がされた後にも、スマートメータ1により通信がされることが必要であることが想定される(後述される、図8のステップSa4、図9のSa5などを参照)。
 つまり、その通信は、後で詳しく説明されるように、例えば、不正なRDコマンド1cが受信されたことによる弊害(大きな弊害)を回避するための処理(例えば、調査・復旧の処理、不正な停止がされるのを回避させる処理など)での通信等である。
 Local経由コマンド受信部68は、第2のネットワーク52(図1)を通じた第2の通信(後述の図4の第2の通信部122での通信)を行う。
 第2の通信は、その通信では、ハッカーなどの第3者のコンピュータ1Q(図1)が接続され、不正な通信が行われることが、比較的され難い通信である。
 つまり、第2の通信(第2の通信部122の通信)は、上述された第1の通信(第1の通信部121の通信)よりも、不正な通信がされ難い通信である。
 ここで、不正な通信とは、例えば、第3者のコンピュータ1Qなどからの、不正なパケットを送り込まれる通信や、Dos攻撃の通信などである。
 つまり、例えば、第1の通信は、予め定められた機器(例えばテレビ31、図11の登録機器1rを参照)との通信ではない通信で、第2の通信は、予め定められた機器との通信でもよい。
 なお、例えば、第1の通信がされる際には、予め定められた機器(テレビ31)により認証される必要がない一方で、第2の通信がされる際には、その機器による認証が必要でもよい。
 つまり、第1の通信での攻撃は、第3者のコンピュータ1Qが、予め定められた機器から、不正に認証を受けた場合でない場合でも行われる一方で、第2の通信での攻撃は、その機器から、不正に認証を受けた場合に行われてもよい。
 つまり、第2の通信は、その通信での攻撃が、その機器(テレビ31)から不正に認証を受けた場合にのみ行われ、攻撃が比較的され難くてもよい。
 なお、第2の通信は、予め定められた機器(テレビ31など)により仲介される、その機器を経由する通信などでもよい。
 なお、上述された予め定められた機器は、例えば、所定のデータ(例えば、図1における、テレビ31のIDである「ID001」)により特定される機器(図11の登録機器1r)である。
 なお、このようなデータは、例えば、後述される図11の登録機器リスト8d1などである(図11の登録機器リスト8d1の「001」などを参照)。
 なお、例えば、図11の登録機器リスト8d1に示されるように、所定のデータにより、予め定められた機器の複数個(図11の登録機器リスト8d1の「001」の機器、「005」の機器)がそれぞれ特定され、それぞれの予め定められた機器との通信が、第2の通信でもよい。
 そして、登録機器リスト8d1が、予め定められた登録部(例えば、Local経由コマンド受信部68などでもよい)に記憶されて、登録部への、機器の登録が行われてもよい(図11の登録機器1rを参照)。
 なお、例えば、パーソナルコンピュータなどは、その電源が切られた際には、動作を行わない。
 これに対して、テレビ31などの家電機器では、電源が切られても、リモコンによる指示があるか否かの検出などの、いわゆる待機電力での動作などの動作が行われる。
 つまり、予め定められた機器は、このような、テレビ31などでもよい。
 そして、テレビ31などによる、電源が切られた際の動作が、そのテレビ31等による、スマートメータ1との間での、上述された第2の通信の処理の動作などを含んでもよい。
 これにより、予め定められた機器(テレビ31)の電源が切られた場合でも、第2の通信が可能で、確実に、第2の通信が可能にできる。
 なお、第2の通信は、公衆電話網などによって実現されてもよい。
 つまり、例えば、スマートメータ1には、携帯電話などに設けられるSIM(Subscriber Identity Module Card)カードが設けられてもよいし、第2の通信の機能が、ソフト実装によるSIMなどで実現されてもよい。
 そして、第2の通信は、設けられたSIMカードやソフトSIMで行われてもよい。
 NW切替部66は、RDコマンド1cが受信される以前に(後述の図5のSx3のNoを参照)、上述された第1の通信(Sx2)をさせる。
 そして、NW切替部66は、RDコマンド1cが受信された後に(Sx3のYesを参照)、上述された第2の通信(Sx5)をさせる。
 なお、NW切替部66に対して、このような動作をさせる制御が行われてもよい。
 つまり、この制御は、例えば、NW・電源切替制御部65により行われてもよい。
 なお、この制御は、例えば、NW切替部66の内部に設けられた制御部などにより行われてもよい。
 なお、第1の通信をさせないとは、例えば、第1の通信(の通信路)を遮断することである。
 また、第1の通信をさせないとは、例えば、第1の通信を停止させることなどでもよい。
 なお、RDコマンド1cが受信される以前に、第1の通信だけでなく、第2の通信も行われてもよい。
 これにより、(不正な)RDコマンド1cが受信された後に(図5のSx3のYes)、不正な通信がされ易い第1の通信がされて、二次攻撃がされてしまうことが回避される。
 つまり、RDコマンド1cが受信された後には(Sx3のYes)、不正な通信がされ難い第2の通信(Sx5)がされて、二次攻撃が防止できる。
 これにより、ひいては、二次攻撃がされて、適切な動作(後述される図8のSa2~Sa4、図9のSa5~Sa7など)が不能になるのが回避され、RDコマンド1cが受信された後に、確実に、適切な動作ができる。
 図4は、スマートメータ1などを示す図である。
 なお、図4における、第1の通信部121などのそれぞれの機能ブロックの詳細については、適宜、図4以外の他の図(図2など)における説明も、参照されたい。
 図5は、スマートメータ1のフローチャートを示す図である。
 なお、例えば、こうして、次の動作が行われてもよい。
 ステップSx1では、系統9aの電力の供給が行われる。
 ステップSx2では、第1の通信(第1の通信部121、LAN経由コマンド受信部61)がされる。
 ステップSx3では、RDコマンド1cが受信されたか否かが判定される。
 受信されたと判定されない場合には(Sx3のNo)、このSx3が行われる時刻よりも後の後続の時刻でも、電力の供給(Sx1)がされ、第1の通信(Sx2)もされる。
 つまり、例えば、この場合には(Sx3のNo)、これら電力の供給等(Sx1、Sx2)を続けさせる制御がされてもよい。
 ステップSx4では、RDコマンド1cが受信されたと判定された場合に(Sx3のYes)、系統9aからの電力の供給が停止される(電力供給制御部11、電源切替部67)。
 ステップSx5では、第2の通信(第2の通信部122、Local経由コマンド受信部68)が行われる。
 なお、例えば、上述のSx2で、RDコマンド1cが受信されてもよい。
 このように、図4の第1の通信部121等について、次の通りである。
 つまり、例えば、電力供給制御部11(図2における、電源切替部67及びNW・電源制御部65、または、電源切替部67のみなど)が、当該スマートメータ1を通じた、電気機器(テレビ31など)への、電力の供給を停止させるRDコマンド1cが受信された場合に(Sx3のYes、後述の図8のSa1、後述の図10のSm11)、当該供給を停止させる(Sx4、図8のSa2、図10のSm12)。
 そして、それぞれ通信を行う第1、第2の通信部(通信インタフェース)121、122が設けられる(LAN経由コマンド受信部61およびLocal経由コマンド受信部68)。
 そして、通信制御部13(NW・電源切替制御部65およびNW切替部66、または、NW切替部66のみなど)もある。
 そして、通信制御部13が、RDコマンド1cが受信される以前に(Sx3のNo)、第1の通信部121での第1の通信を行わせ(Sx2)、RDコマンド1cが受信された後には(Sx3のYes、Sa1)、受信の以前に行われる第1の通信(Sx2)を行わせず、第2の通信部122による第2の通信(Sx5、Sa4、Sa5、Sm12、Sm62)のみが行わせてもよい。
 これにより、二次攻撃が回避され、確実に、停止のコマンドの受信の後に、適切な動作ができる。
 なお、例えば、図2のLan経由コマンド受信部61は、図4の第1の通信部121の一部である。なお、図2のLocal経由コマンド受信部68などの機能ブロックについても、この例と同様に、例えば、その機能ブロックに対応する、図4の機能ブロックの一部などでもよい。
 なお、サブアイディアとしては、次の技術なども考えられる。
 つまり、例えば、Sx4の処理は、Sx5の処理よりも後にされてもよい。
 つまり、例えば、スマートメータ1は、RDコマンド1cが受信された場合に(Sx3のYes)、すぐには、系統9aからの電力の供給の停止(Sx4)をさせず、停止(Sx4)をさせるよりも先に、SG(Smart Grid)対応家電機器(登録機器1r)を経由した第2の通信(Sx5)で、電力会社(の第1のサーバ41)などから情報を取得してもよい(図9のSa5などを参照)。
 つまり、取得される情報は、例えば、受信されたRDコマンド1cが、電力会社の第1のサーバ41により送信されたコマンド(正しいRDコメント1c)であるか否かを示す情報などである。
 そして、取得(Sx5)された情報により、第1のサーバ41からのコマンドであると示されない場合には、供給の停止がされなくてもよい。
 そして、取得(Sx5)された情報により、第1のサーバ41からのコマンドであると示される場合にのみ、供給の停止(Sx4)が、上述された第2の通信(Sx5)の後に行われてもよい。
 なお、こうして、情報が取得されることにより、状況が確認されてもよい。
 そして、この確認(Sx5)の後に、系統9aからの供給が停止(Sx4)されてもよい。
 例えば、こうして、不正なRDコマンド1cによる、不正な、電力の供給停止が防がれてもよい。
 これにより、料金の未払いのない住宅で、不正なRDコマンド1cにより、不正な停止がされるのが回避できる。
 これにより、ひいては、住宅1hのある地域の複数の住宅において、不正な停止が回避されて、それら複数の住宅に、一斉に、不正なRDコマンド1cが送信されて、それら複数の住宅で、一斉に、不正な停止がされて、系統9aがダウンしてしまうことが回避できる。つまり、それらの複数の住宅のうちのそれぞれの住宅に設けられたスマートメータが、上述された、住宅1hのスマートメータ1の構成と同様の構成を備えてもよい。
 これにより、系統9aの状態が、ダウンした状態になるのが回避され、確実に、適切な状態にできる。
 ≪蓄電池1a≫
 なお、例えば、先述された登録機器1r(図11)は、テレビ31などの、系統9aの電力が供給される電気機器である。
 登録機器1rは、RDコマンド1cが受信されない場合には(Sx3のNo)、スマートメータ1を通じて供給される、系統9aからの電力(Sx1)で動作する(後述の図6のモード1における、第2行第5列の「送電網」の文字を参照)。
 そして、RDコマンド1cが受信された場合には(Sx3のNo)、系統9aからの電力の供給が停止される。
 そこで、登録機器1rは、例えば、RDコマンド1cが受信された場合に(Sx3のYes)、系統9aからの電力以外のその他の電力(例えば、蓄電池1aの電力)で動作してもよい(モード2の第5列の「蓄電池」を参照)。
 つまり、登録機器1rは、このような、他の電力(蓄電池1aの電力)での動作により、上述された、第2の通信での処理などをしてもよい。
 その他の電力は、例えば、上述のように、蓄電池1a(図1)からの電力などである。
 なお、蓄電池1aは、図1に示されるように、例えば、住宅1hに設けられた蓄電池である。
 つまり、例えば、電源切替部67は、RDコマンド1cが受信された場合には(Sx3のYes)、登録機器1rに対して、系統9aからの電力を供給させなくてもよい(Sx4)。
 そして、電源切替部67(図2)は、RDコマンド1cが受信された場合には(Sx3のYes)、系統9aからの電力ではなく、上述されたされたその他の電力(蓄電池1aの電力)を、登録機器1rに供給させてもよい。
 なお、このような動作をさせる制御が、NW・電源切替制御部65などにより行われてもよい。
 なお、後述のように、例えば、RDコマンド1cが受信された場合でも(Sx3のYes)、スマートメータ1の動作は、蓄電池1aの電力でされず、系統9aからの電力で行われてもよい(図6のモード2における、第3行第4列の「送電網」の文字などを参照)。
 ≪複数のモード≫
 図6は、4つのモードの表を示す図である。
 なお、例えば、スマートメータ1が、複数のモード(モード1~4)から選択されたモードで動作してもよい。なお、例えば、上記の選択は、電力供給制御部11(図4)により行われてもよい。
 つまり、例えば、RDコマンド1cが受信される以前に(Sx3のNo)、モード1(図6の第2行)での動作がされてもよい。
 そして、例えば、RDコマンド1cが受信された後に(Sx3のYes)、モード2~4(図6の第3行~第5行)に含まれるモードでの動作がされてもよい。
 つまり、例えば、モード1が終了する直後に、モード2(第3行)での動作がされてもよい。
 つまり、モード2では、先述された、通信の遮断(第3行第3列の「不可能」を参照)などがされてもよい。
 そして、モード2では、「機器への送電」の文字が付された第5列の「蓄電池」の文字(第3行第5列)により示されるように、登録機器1rの動作が、蓄電池1aの電力でされてもよい(先述の説明を参照)。
 つまり、例えば、モード2では、それぞれの電気機器の動作が、蓄電池1aの電力でされてもよい。
 なお、モード2では、予め定められた条件が満たされる場合などには、電気機器に、系統9aの電力が供給されてもよい。
 つまり、その条件とは、例えば、その電気機器が、冷蔵庫32であるとの条件などでもよい。
 これにより、比較的多くの消費電力での冷却がされて、冷蔵される食物等が傷むのが回避されてもよい。
 そして、このような、モード2での動作がされた後に、モード4での動作がされてもよい。
 つまり、モード4では、「機器への送電」の文字が付された第5列の「送電網」の文字(第5行第5列)に示されるように、登録機器1rの動作が、蓄電池1aの電力でなく、系統9aからの電力でされてもよい(先述の説明を参照)。
 つまり、例えば、モード4では、それぞれの電気機器の動作が、系統9aの電力でされてもよい。
 これにより、蓄電池1aでの供給がされるだけに止まる不便な時間が短い時間にできる。
 そして、モード4での動作がされた後に、再び、モード1での動作がされてもよい。
 なお、RDコマンド1cが受信された後において、モード4での動作がされる期間でない期間に、モード3の動作がされてもよい。
 つまり、例えば、モード3では、第4行第3列の「可能」の文字に示されるように、RDコマンド1cの受信の後であるにも関わらず、第1の通信がされてもよい。
 そして、例えば、モード3では、第4行第4列の「蓄電池」の文字により示されるように、スマートメータ1も、系統9aからの電力で動作せずに、蓄電池1aの電力で動作してもよい。
 なお、例えば、このようなモード3での動作はされず、モード1、2、4での動作のみがされてもよい。
 図7は、表65tを示す図である。
 表65tでは、第2行で、系統9aの電力が供給されるか否かが示され、第3行で、第1の通信がされるか否かが示される。
 適宜、この表65tも参照されたい。
 ≪履歴8d2の通信など≫
 上述のように、RDコマンド1cが受信された場合に(Sx3のYes)、第2の通信(第2の通信部122での通信)が行われる。
 そこで、次の処理が行われてもよい。
 つまり、先述の通り、スマートメータ1は、システム1s(図1)に含まれる。
 そして、例えば、サーバシステム4(図1)における、電力会社の第1のサーバ41が、RDコマンド1cを送信してもよい。
 そして、メーカーの第2のサーバ42が、送信されたRDコマンド1cを受信して、受信されたRDコマンド1cを、インターネット(第1のネットワーク51)を介して、第1の通信で、スマートメータ1へと送信してもよい。
 図8は、システム1sにおける動作の流れの前半部分を示す図である。なお、後半部分についての図9は、後で詳しく説明される。
 図10は、システム1sにおける動作のフローチャートである。
 そして、スマートメータ1により、第2のサーバ42により送信されたRDコマンド1cが受信される(Sa1、Sm11、図5のSx2、Sx3のYes)。
 そして、RDコマンド1cが受信された場合に(Sa1、Sx3のYes)、電力の供給が停止されると共に、第1の通信の遮断がされてもよい(Sa2、Sm12、Sx4、Sx5)。
 図11は、スマートメータ1、登録機器1r、サーバシステム4などを示す図である。
 そして、RDコマンド1cが受信がされた場合に(Sa1、Sx3のYes)、スマートメータ1と、登録機器1r(テレビ31など)との間で、第2の通信がされる(Sx5)。
 つまり、この第2の通信で、スマートメータ1の動作の履歴8d2(図11)が送信されてもよい(図2のコマンド実行履歴送信部64a、Sa4、Sm12)。
 なお、送信される履歴8d2は、スマートメータ1が、RDコマンド1cが受信される以前に実行したそれぞれのコマンドを特定する情報(コマンドの履歴)などでもよい。
 つまり、履歴8d2が、スマートメータ1(図2の履歴記憶部64)により記憶されて、記憶された履歴8d2が、登録機器1rへと送信されてもよい。
 なお、履歴記憶部64は、例えば、いわゆる耐タンパ性を有するなどで、記憶された履歴8d2が比較的、不正に読み出され難い記憶装置などでもよい。
 なお、スマートメータ1などにより、履歴8d2の署名8d3(図11)が生成されてもよい(Sa3、Sm12)。
 そして、スマートメータ1により、履歴8d2と共に、履歴8d2の署名8d3が、登録機器1rへと送信されてもよい。
 そして、サーバシステム4などにおいて、送信された署名8d3の検証が行われて(図8のSd2)、その検証に成功した場合に、履歴8d2に基づいた動作がされてもよい。
 なお、同様に、図11に示されるように、履歴8d2以外のデータ(機器情報8d5、データ8d7、8d9など)についても、署名(署名8d6、8d8、8d10など)が生成され(Sb3、Sd3、Sc6)、生成された署名の送信、受信、検証(Sd2、Sc4、Sb6、Sa6)などが行われてもよい。
 そして、送信された履歴8d2が登録機器1rにより受信される(Sb1、Sm21)。
 そして、受信された履歴8d2が、登録機器1rから、メーカーの第2のサーバ42へと送信される(Sb4、Sm22)。
 なお、例えば、履歴8d2だけでなく、電気機器(登録機器1rなど)の消費電力を示す機器情報8d5(図11)も送信されてもよい(Sb4、Sm22)。
 なお、登録機器1rの消費電力の機器情報8d5が送信されてもよいし、他の電気機器(図1の冷蔵庫32など)の機器情報8d5が送信されてもよいし、何れも送信されてもよい。
 こうして、例えば、1以上の機器情報8d5が送信されることにより、サーバシステム4において、それぞれの電気機器の機器情報8d5が含まれてなる機器群情報8d4(図11)が取得されてもよい。
 なお、履歴8d2の受信がされた場合に(Sb1、Sm21)、電気機器(例えば、登録機器1rなど)が、緊急動作モード(図10のSm22)で動作してもよい(Sb2)。
 なお、例えば、上述された緊急動作モードは、そのモードでは、消費される消費電力が比較的少ないモードなどである。
 これにより、蓄電池1aの電力が減り難くできる。
 なお、履歴8d2が、RDコマンド1cの受信がされたことを示す通知として受信されて、RDコマンド1cが受信されたことが通知されてもよい。
 そして、サーバシステム4において、送信された、スマートメータ1の動作の履歴8d2等が受信された場合に(Sc1)、データ(データ8d7、8d9(図11))が生成されてもよい。
 つまり、サーバシステム4において、復旧指針のデータ8d7と、運用指針のデータ8d9とがそれぞれ生成されてもよい。
 そして、例えば、生成される、復旧指針のデータ8d7は、例えば、スマートメータ1の動作を特定して、その動作をさせる制御をスマートメータ1に行う制御データ等でもよい。
 つまり、このデータ8d7により、その動作が指示されてもよい。
 なお、データ8d7は、モード(図6を参照)を特定して、特定されるモードの動作をさせるデータなどでもよい。
 そして、生成される、運用指針のデータ8d9は、例えば、登録機器1rの動作を特定して、登録機器1rに、その動作をすることを指示するデータでもよい。
 なお、運用指針のデータ8d9により、登録機器1r以外の他の機器の動作の指示がされてもよい。
 なお、データ8d9も、モードを特定して、そのモードの動作をさせるデータなどでもよい。
 なお、後で詳しく説明されるように、スマートメータ1の動作の、復旧指針のデータ8d7は、電力会社の第1のサーバ41により生成されてもよい(Sd3、Sm42)。
 そして、登録機器1rの動作の、運用指針のデータ8d9は、メーカーの第2のサーバ42により生成されてもよい(Sc5、Sm51)。
 つまり、登録機器1rにより送信された、スマートメータ1の動作の履歴8d2等が、サーバシステム4における、メーカーの第2のサーバ42により受信される(Sc1、Sm31)。
 そして、受信された履歴8d2等が、電力会社の第1のサーバ41へと送信される(Sc2、Sm31)。
 そして、第1のサーバ41により、受信された履歴8d2等の一部または全部(Sd1、Sm41)などから、上述された、復旧指針のデータ8d7(図11)が生成される(Sd3、Sm42)。
 図9は、システム1sでの動作の後半部分を示す図である。
 そして、例えば、生成されたデータ8d7が、メーカーの第2のサーバ42へと送信される(Sd4、Sm42)。
 そして、メーカーの第2のサーバ42により、送信されたデータ8d7が受信される(Sc3、Sm51)。
 そして、メーカーの第2のサーバ42により、運用指針のデータ8d9が生成される(Sc5、Sm51)。
 つまり、受信された履歴8d2等と(Sc1)、受信された、復旧指針のデータ8d7と(Sc3)のうちの一方または両方などから、この生成がされる。
 そして、電力会社の第1のサーバ41から受信された、復旧指針のデータ8d7(Sc3)と、生成された、運用指針のデータ8d9(Sc5)とがそれぞれ、登録機器1rへと送信される(Sc7、Sm51)。
 そして、登録機器1rが、送信された、データ8d7、8d9を受信する(Sb5、Sm61)。
 そして、受信された、運用指針のデータ8d9により特定される動作が登録機器1rにより行われる(Sb7、Sm61)。
 そして、受信された、復旧指針のデータ8d7が、スマートメータ1へと送信される(Sb8、Sm62)。
 そして、送信された、復旧指針のデータ8d9が受信され(Sa5、Sm71、Sx5)、受信されたデータ8d9により特定される動作がスマートメータ1により行われる(Sa7、Sm71)。
 このように、例えば、次の動作が行われてもよい。
 つまり、システム1sは、スマートメータ1と、当該スマートメータ1を通じて、系統9aから電力が供給される登録機器1r(例えばテレビ31)と、サーバシステム4とを含んでもよい。
 そして、電力供給制御部11(図4)が、第1の通信部121により、サーバシステム4により送信された、停止をさせるRDコマンド1cが受信された場合に(Sa1、Sx3のYes)、電力の供給を停止させてもよい(Sa2、Sx4)。
 そして、当該スマートメータ1は、停止をさせるRDコマンド1cが受信された場合に(Sa1、Sx3のYes)、第2の通信部122による第2の通信で、当該スマートメータ1の動作の履歴8d2を、予め定められた電気機器(登録機器1r、テレビ31)に送信してもよい(コマンド実行履歴送信部64a、Sa4、Sx5)。
 そして、登録機器1r(テレビ31)が、送信された当該履歴8d2をサーバシステム4(メーカーの第1のサーバ41)に送信してもよい(Sb4)。
 そして、サーバシステム4(第1のサーバ41)が、送信された当該履歴8d2から生成された、スマートメータ1の動作を特定する第1のデータである、復旧指針のデータ8d7、および、登録機器1r(電気機器)の動作を特定する第2のデータである、運用指針のデータ8d9を、それぞれ登録機器1rに送信してもよい(Sc7)。
 そして、登録機器1rは、送信された第2のデータ(データ8d9)の動作を行うと共に、送信された第1のデータ(データ8d7)を、スマートメータ1へと送信してもよい。
 そして、スマートメータ1は、送信された第1のデータ(データ8d7)の動作を行ってもよい。
 ≪ファームウェアなど≫
 より具体的には、例えば、次の動作がされてもよい。
 図12Aは、モード1(図6)の動作でのRAMなどを示す図である。
 図12Bは、モード2の動作でのRAMなどを示す図である。
 図12Cは、モード3の動作でのRAMなどを示す図である。
 図12Dは、モード4の動作でのRAMなどを示す図である。
 つまり、例えば、第1のファームウェア71(図12Aなどを参照)が実行されると共に、第2のファームウェア73も、CPU70(Central Processing Unit)により実行されてもよい。なお、CPU70については、後で詳述される。
 そして、例えば、第1のファームウェア71は、図12A(動作1)、図12D(動作4)の場合にそれぞれ実行されてもよい。
 一方で、第2のファームウェア73は、図12B(動作2)、図12C(動作4)の場合に、それぞれ実行されてもよい。
 そして、例えば、図示された、それぞれのファームウェアのプログラムの横幅により示されるように、第2のファームウェア73のサイズは、第1のファームウェア71のサイズよりも小さい。
 つまり、例えば、第2のファームウェア73は、第1の通信の処理の部分が含まれず、そのサイズが比較的小さい。
 これにより、第2のファームウェア73が実行される際には、消費電力が小さくされ、また、用いられる資源(リソース)が少なくされる。
 また、第2のファームウェア73では、上述のようにサイズが小さいことにより、脆弱性(リスク)が比較的低(リスクを生じる恐れがある問題点が少なく)い。これにより、第2のファームウェア73が実行されるときには、より安全な動作がされる。
 なお、例えば、第2のファームウェア73では、サイズが小さく、実現される機能が少なくて、実現される機能に、セキュリティホールが含まれ難いなどで、脆弱性が低くてもよい。
 このため、第2のファームウェア73が実行されるときには、省メモリ(図12B、図12CのRAM(Random Access memory)等を参照)、低リソース、低リスクが実現される。
 なお、図12A、図12Dの左端上部の、「蓄電池」および「系統」の記載の箇所で示されるように、例えば、動作1および4のそれぞれでは、供給される電力が、系統9aの電力である(図6のモード1、4を参照)。
 そして、図12B、図12Dでの、それら「蓄電池」および「系統」の箇所で示されるように、動作2および3のそれぞれでは、供給される電力が、蓄電池1aの電力である(モード2、3を参照)。
 そして、図12A、図12Cの左端下部の、「ローカル」および「LAN」の記載の箇所で示されるように、動作1および3のそれぞれでは、第1の通信がされる(図6のモード1、3を参照)。
 そして、動作2および4のそれぞれでは、第1の通信がされない(モード2、4を参照)。
 つまり、例えば、CPU70は、例えば、スマートメータ1に設けられたCPUである。なお、CPU70は、上述された登録機器1rに設けられたCPUでもよい。
 つまり、スマートメータ1などの装置において、RDコマンド1cが受信されて、その装置に、蓄電池1aの電力が供給される際には、比較的少ない消費電力での動作が行われてもよい(図12B、図12C)。
 なお、例えば、上述のように、スマートメータ1において、モード3での動作(図12Cなどを参照)がされて、蓄電池1aの電力での動作がされる際に、比較的少ない消費電力での動作がされてもよい。
 こうして、例えば、停止をさせるRDコマンド1cが受信される前に(図12A)、第1のファームウェア71で動作し、受信された後に(図12B、図12C)、第2のファームウェア73で動作する装置(スマートメータ1、テレビ31など)が用いられてもよい。
 なお、スマートメータ1等は、例えば、受信がされた後でも、その装置において、系統9aでの動作がされる場合には(図12D)、例外的に、第1のファームウェア71で動作してもよい。
 なお、図12A、図12Dの場合には、比較的高い周波数での動作(図12Aの通常動作70H)がされる一方で、図12B、図12Cの場合には、比較的低い周波数での動作(省電力動作70L)がされてもよい。
 これにより、図12B、図12Cの場合には、より十分に、消費電力が小さくできる。
 つまり、例えば、停止をさせるRDコマンド1cが受信される前に(図12A)、比較的高い周波数で動作し、受信された後に(図12B、図12C)、比較的低い周波数で動作する装置(スマートメータ1、テレビ31など)が用いられてもよい。
 なお、例えば、登録機器1rにより、図6のモード1~4のうちから、スマートメータ1が動作するモードが、第2の通信などで、検知されてもよい。
 そして、例えば、第1のモードと検知された場合に、図12Aの場合の動作1が行われるなどしてもよい。
 図13Aは、モード1の動作でのRAMなどを示す図である。
 図13Bは、モード2の動作でのRAMなどを示す図である。
 図13Cは、モード3の動作でのRAMなどを示す図である。
 図13Dは、モード4の動作でのRAMなどを示す図である。
 また、具体的には、例えば、1つのCPU70(図12Aなど)のみが設けられるのでなく、第1のCPU74と、第2のCPU75(図13Aなど)との2つのCPUが設けられてもよい。
 つまり、第1のファームウェア76が実行される際には、第1のCPU74により、処理が実行され、第2のファームウェア78が実行される際には、第2のCPU76により、処理が実行されてもよい。なお、例えば、第1、第2のCPU74、76は、スマートメータ1に設けられる。
 そして、第1、第2のCPU74、75の、図示されるサイズにより模式的に示されるように、例えば、プログラム実行される際における、第2のCPU75での消費電力は、そのプログラムと同じプログラム実行される際における、第1のCPU74での消費電力はよりも小さくてもよい。
 これにより、第2のファームウェア78が実行されるときの消費電力が、更に小さくできる。
 こうして、例えば、停止をさせるRDコマンド1cが受信されるよりも前に(図13A)、第1のCPU74で処理が実行され、受信された後に(図13B、図13C)、第2のCPU75で処理が実行される装置(スマートメータ1、テレビ31など)が構成される。
 なお、第2のファームウェア78は、第1のファームウェア76よりも、脆弱性が低い(リスクを生じる可能性がある問題点が少ない)ファームウェアなどでもよい。
 ≪その他≫
 図14は、第2の通信で受信されるコマンドのリスト69tを示す図である。
 例えば、このリスト69tにおけるそれぞれのコマンドが、第2の通信で受信されてもよい。
 そして、受信されたコマンドが、Local経由コマンド実行部69(図2)により実行されてもよい。
 なお、このような、第2の通信での、コマンドの受信は、例えば、RDコマンド1cが受信されるよりも前にも行われてもよいし、受信がされた後にのみ行われてもよい。
 そして、例えば、リスト69tのコマンドの種類は、図3のリスト62tでのコマンドの種類よりも少なく、限定的でもよい。
 つまり、第2の通信では、例えば、遠隔検針のコマンドが受け付けられなくてもよい。
 また、第2の通信では、例えば、ネットワークの遮断のコマンド(例えばRDコマンド1c)が受け付けられなくてもよい。
 なお、こうして、スマートメータ1と、宅内家電機器(テレビ31など)との連係プレーにより、障害(例えば、不正なRDコマンド1cによる、不正な、電力の供給停止など)の発生事由の、調査と復旧などができる(図8、図9などを参照)。
 すなわち、スマートメータにおいて、次の動作がされてもよい。
 障害発生時に、標準(リモートコマンド受付可)モード(モード1)から、緊急(内部登録機器のみと対話をする。電力機器が蓄電池駆動される)モード(モード2など)に、動作のモードが遷移される。
 そして、コマンド実行履歴(履歴8d2)が安全に保持される(履歴記憶部64)。そして、保持されたコマンド実行履歴が、障害発生時に、家電(テレビ31)経由で、電力会社の第1のサーバ41へ安全に送付される。そして、送付されたコマンド実行履歴が、ハッカー等による攻撃か、実際の災害かの切り分けの糸口とされる。
 また、SG(Smart Grid)対応家電(テレビ31など)により、次の動作がされる。
 つまり、スマートメータ1のコマンド実行履歴を、電力会社の第1のサーバ41に送り届ける仲介役の動作が行われる(図8のSb1、Sb4などを参照)。
 また、スマートメータ1への復旧指針および運用指針(データ8d7、8d9)を、電力会社の第1のサーバ41からスマートメータ1へと送り届ける仲介役の動作が行われる(図9のSb5、Sb8などを参照)。
 なお、テレビ31などの電気機器においては、障害発生が通知されると、標準動作モードから、停電対策モード(失う危険性のあるデータが、速やかにShutdownされるモードなど)に遷移してもよい。
 なお、先述のように、履歴8d2が送信されることにより、RDコマンド1cが受信されたことが、登録機器1rに通知されてもよい。
 また、電力会社の第1のサーバ41では、コマンド実行履歴(履歴8d2)に基づいて、復旧指針(データ8d7)を策定し、テレビ31経由で、スマートメータ1へ送り届ける。
 なお、上述された、不正なRDコマンド1cの送信などは、例えば、いわゆるサイバーアタックなどでもよい。
 なお、サーバシステム4(例えば、電力会社の第1のサーバ41)において、次の動作がされてもよい。
 つまり、スマートメータ1により受信されたRDコマンド1cが、不正でないRDコマンド1cか否かが判定されてもよい。
 なお、例えば、この判定は、スマートメータ1に受信されたRDコマンド1cの識別番号等が、第1のサーバ41により送信されたRDコマンド1cの識別番号等と同じか否かが判定されることなどで、行われてもよい。
 そして、不正なコマンドであるとの判定がされた場合に、電力会社の第1のサーバ41などにより、次の判定がされてもよい。
 つまり、スマートメータ1が設けられた住宅1hがある地域(同地域)にある他の住宅で、同様の現象が(閾値よりも多くの件数)発生しているか否かが判定されてもよい。
 つまり、発生していず、系統9a(の送電網など)が異常なしであるか、発生しており、異常ありであるかが判定されてもよい。
 そして、異常なしと判定され、問題の根が比較的浅いと判断される場合に、次の動作がされてもよい。
 つまり、この場合に、スマートメータ1に、回復モード(モード4)で動作をさせる指示をする、復旧指針のデータ8d7が生成され、送信されてもよい。
 なお、送電網に異常がないことを確認する予め定められた処理がされて、その処理で、異常がないことが確認された場合にのみ、上記された生成、送信などがされてもよい。
 なお、同地域で異常なしと判断された場合には、そのことが、電力会社の第1のサーバ41から、メーカーの第2のサーバ42へと通知されてもよい。
 そして、この通知がされた場合に、メーカーの第2のサーバ42が、テレビ31などに、予め定められた回復モードでの動作をさせる指示をしてもよい(運用指針のデータ8d8などを参照)。
 一方で、同地域で同様の現象が発生しており、系統9aで異常ありと判断され、問題の根が深いと判断される場合に、次の動作がされてもよい。
 すなわち、この場合においては、送電網(系統9a)の調査・復旧と、RDコマンド1c実行の原因究明となどに、比較的長い時間がかかるのが想定される。
 そこで、この場合には、電力会社の第1のサーバ41などが、復旧予定日程を(スマートメータ1などに)送信してもよい(復旧指針のデータ8d7を参照)。
 なお、送信される復旧予定日程は、特定された復旧予定日などを特定してもよい。
 なお、こうして、復旧予定日程が送付されることにより、緊急モード(図6のモード2などを参照)を、送付された復旧予定日程における復旧予定日まで維持することが指示されてもよい(復旧指針のデータ8d7を参照)。
 なお、このような、原因究明などに比較的長い時間がかかる場合には、メーカーの第2のサーバ42などにより、冷蔵庫のみ稼働させる制御などの、省電力制御をするようにさせる指示がされてもよい(運用指針のデータ8d9などを参照)。
 なお、例えば、復旧予定日が遠いほど、消費される消費電力を少なくさせる制御などが、冷蔵庫32等により行われてもよい。
 なお、このような、省電力制御の指示を送信するか否かが、メーカーの第2のサーバ42などにより、復旧予定日程、蓄電池1aの蓄電容量、機器利用状況(図11の機器群情報8d4など)などを勘案して、判断されてもよい。
 なお、こうして、複数の動作モード(図6)での動作がされる。これにより、従来からある未払い対策を実現しながらも、ネットワーク経由の攻撃が、いたずらであるのか、テロであるのかなどの状況に応じて、柔軟な運用ができる(例えば、図6のモード2~4などを参照)。
 図15は、複数の機能(機能81~機能89)を示す図である。
 上述された、スマートメータ1の機能が理解される際には、適宜、図15も参照されたい。スマートメータ1は、例えば、図15の機能81~機能89のそれぞれの機能の機能ブロックを備えてもよい。
 なお、例えば、本技術を用いないスマートメータとしては、図2の範囲1jの機能ブロックのみを備えるスマートメータが想定される。
 上述の説明のように、本スマートメータ1は、このような、想定されるスマートメータよりも、更に優れる。
 なお、例えば、以下の通りでもよい。
 第1の通信部121(図4)による第1の通信における、スマートメータ1のアドレスは、第1のアドレスであると共に、第2の通信部122による第2の通信における、スマートメータ1のアドレスは、第2のアドレスでもよい。
 例えば、これにより、通信がされる際における、スマートメータ1のアドレスが、第1のアドレスと、第2のアドレスとの間で、スマートメータ1により、切り替られてもよい。
 なお、アドレスとしては、MACアドレス(Media Access Control address)がある。
 例えば、第1の通信では、第1のMACアドレスでの通信がされると共に、第2の通信では、第2のMACアドレスでの通信がされてもよい。
 例えば、第1の通信部121は、第1のMACアドレスでの通信をする第1の通信デバイスであると共に、第2の通信部122は、第2のMACアドレスでの通信をする第2の通信デバイスでもよい。
 なお、それぞれの通信デバイスは、例えば、いわゆる通信カードでもよい。
 なお、第1の通信は、第1の通信経路での通信であると共に、第2の通信は、第1の通信経路とは異なる第2の通信経路での通信でもよい。
 図16は、スマートメータ1の構成などを示す図である。
 なお、第1の通信は、第1の通信網(第1のネットワーク)51n(図16)での通信であると共に、第2の通信は、第1の通信網51nとは異なる第2の通信網(第2のネットワーク)52nでの通信でもよい。
 例えば、第1の通信網51nは、図16で示されるIP網である一方で、第2の通信網52nは、携帯電話網でもよい。
 このように、例えば、第2の通信網52nは、携帯電話網で、この第2の通信網52nでの通信では、比較的、ハッカーなどによる攻撃がされ難くてもよい。
 なお、第1の通信網51nの少なくとも一部は、インターネットでもよい。
 なお、第2の通信網52nは、携帯電話網ではなくて、WiMAX(ワイマックス、Worldwide Interoperability for Microwave Access)の通信網などでもよい。
 なお、第1の通信における第1のアドレス(先述)は、第1の通信網51nにおけるアドレスであると共に、第2の通信における第2のアドレス(先述)は、第2の通信網52nにおけるアドレスでもよい。
 同様に、第1の通信経路(先述)は、第1の通信網51nを通る通信経路であると共に、第2の通信経路(先述)は、第2の通信網52nを通る通信経路でもよい。
 また、第1の通信デバイス(先述)は、第1の通信網51nにおける通信をする通信デバイスであると共に、第2の通信デバイス(先述)は、第2の通信網52nにおける通信をする通信デバイスでもよい。
 例えば、第1の通信デバイスは、いわゆるNIC(Network Interface Card)、または、WNIC(Wireless Network Interface Card)などである一方で、第2の通信デバイスは、携帯電話での無線通信をする通信デバイスなどでもよい。
 なお、先述のように、スマートメータ1には、SIMカード(Subscriber Identity Module Card)が設けられてもよい。
 なお、こうして、スマートメータ1により、動作が行われてもよい。
 この動作は、例えば、スマートメータ1に設けられたCPUにより実行される動作である。
 この動作は、例えば、電力供給制御部11により行われる動作と、通信制御部13により行われる動作とを含む一方で、第1の通信部121による動作と、第2の通信部122による動作とを含まない。
 この動作を実行するCPUのクロックの周波数として、第1の周波数(図12Aなどを参照)と、第1の周波数よりも低い第2の周波数(図12Bなどを参照)とがあってもよい。
 この動作がされる際に、CPUにより実行されるファームウェアとして、第1のファームウェア71と、第2のファームウェア73とがあってもよい。
 この動作を実行するCPUとして、第1のCPU74と、第2のCPU75とが、スマートメータ1に設けられてもよい。
 そして、この動作として、RDコマンド1cが受信される以前における第1の動作と、受信された後における第2の動作とがあってもよい。
 第1の周波数で第1の動作がされ、第2の周波数で第2の動作がされてもよい。また、第1のファームウェア71で第1の動作がされ、第2のファームウェア73で第2の動作がされてもよい。また、第1のCPU74で第1の動作がされ、第2のCPU75で第2の動作がされてもよい。
 このように、本技術では、複数の構成(例えば、図4の電力供給制御部11、通信制御部13などを参照)が組合わせられることにより、組合わせからの相乗効果が生じる。これに対して、知られた先行例では、これら複数の構成の一部または全部を欠き、相乗効果が生じない。この点で、本技術は、先行例とは相違し、先行例よりも優れる。
 なお、本発明は、装置、システムなどとして実現できるだけでなく、その装置等を構成する処理手段をステップとする方法として実現したり、それらステップをコンピュータに実行させるプログラムとして実現したり、そのプログラムを記録したコンピュータ読み取り可能なCD-ROMなどの記録媒体として実現したり、そのプログラムを示す情報、データ又は信号として実現したりすることもできる。そして、それらプログラム、情報、データ及び信号は、インターネット等の通信ネットワークを介して配信してもよい。
 なお、本発明について、実施の形態に基づいて説明したが、本発明は、上記の実施の形態に限定されるものではない。本発明の主旨を逸脱しない限り、当業者が思いつく各種変形を本実施の形態に施したものや、異なる実施の形態における構成要素を組み合わせて構築される形態も、本発明の範囲内に含まれる。
 不正なRDコマンドが受信された後において、二次攻撃がされてしまうことが防がれる。これにより、不正なRDコマンドの受信の後に、二次攻撃がなく、適切な動作ができるスマートメータを提供できる。
  1 スマートメータ
  1c RDコマンド
  1r 登録機器
  1s システム
  1Q 第3者のコンピュータ
  4  サーバシステム
  9a 系統
  11 電力供給制御部
  11s 供給停止制御信号
  13 通信制御部
  31 テレビ
  41 第1のサーバ
  42 第2のサーバ
  51n 第1の通信網
  52n 第2の通信網
  67 電源切替部
  121 第1の通信部
  121n、51 第1のネットワーク
  122 第2の通信部
  122n、52 第2のネットワーク

Claims (19)

  1.  スマートメータであって、
     当該スマートメータを通じた、電気機器への、電力の供給を停止させるコマンドが受信された場合に、前記供給を停止させる電力供給制御部と、
     前記コマンドが受信される第1の通信を行う第1の通信部と、
     第2の通信を行う第2の通信部と、
     前記コマンドが受信される以前に、前記第1の通信を行わせ、
     前記コマンドが受信された後には、前記第1の通信を行わせず、前記第2の通信のみを行わせる通信制御部とを備えるスマートメータ。
  2.  前記第1の通信部は、第1の通信網での通信を行い、
     前記第2の通信部は、前記第1の通信網とは異なる第2の通信網での通信を行う請求項1記載のスマートメータ。
  3.  前記第2の通信網は、携帯電話網である請求項2記載のスマートメータ。
  4.  前記第1の通信部は、予め定められた機器を経由しない通信を行い、
     前記第2の通信部は、前記予め定められた機器を経由した通信を行う請求項1記載のスマートメータ。
  5.  前記予め定められた機器は、系統からの前記電力が供給される前記電気機器であり、
     前記電力供給制御部は、前記コマンドが受信された後に、前記予め定められた機器に、前記系統からの前記電力を供給させず、予め定められた蓄電池からの電力を供給させる請求項4記載のスマートメータ。
  6.  当該スマートメータは、
     第1のモードと、第2のモードとを含む複数のモードのうちの1つのモードで動作し、
     前記コマンドが受信されない場合に、前記第1のモードで動作し、受信された場合に、前記第2のモードで動作し、
     前記通信制御部は、前記第1のモードで動作する際に、前記第1の通信を行わせ、前記第2のモードで動作する際には、前記第1の通信を行わせず、前記第2の通信のみを行わせる請求項1記載のスマートメータ。
  7.  前記電力供給制御部は、前記第2のモードで動作する際に、当該スマートメータと、前記電気機器とのうちで、前記電気機器への、系統からの前記電力の供給のみを停止させ、
     当該スマートメータは、前記第2のモードで動作する際にも、前記系統からの前記電力で動作する請求項6記載のスマートメータ。
  8.  当該スマートメータは、
     前記コマンドが受信された場合において、前記第2のモードで動作しないときに、第3のモードで動作し、
     前記第3のモードで動作する際には、系統からの前記電力で動作せず、予め定められた蓄電池からの電力で動作し、
     前記通信制御部は、前記第3のモードで動作する際には、前記第1の通信を行わせる請求項6記載のスマートメータ。
  9.  当該スマートメータは、前記コマンドが受信された場合に、前記第2のモードで動作した後に、第4のモードで動作し、
     前記第2の通信は、前記電気機器を経由した通信であり、
     前記電力供給制御部は、
     前記第2のモードで動作する際には、前記電気機器に、予め定められた蓄電池からの電力を供給させ、
     前記第4のモードで動作する際には、前記電気機器に、系統からの前記電力を供給させる請求項6記載のスマートメータ。
  10.  前記コマンドが受信された後に、受信がされる以前における、当該スマートメータの動作の履歴を、前記予め定められた機器に、前記第2の通信で送信する履歴送信部を備える請求項4記載のスマートメータ。
  11.  前記第2の通信部は、
     前記履歴が送信された前記予め定められた機器から、当該スマートメータの動作を特定するデータを受信し、
     当該スマートメータは、前記データが受信された場合に、前記データにより特定される前記動作を行う請求項10記載のスマートメータ。
  12.  前記コマンドが受信される前に、第1の周波数で動作し、受信された後に、前記第1の周波数よりも低い第2の周波数で動作する請求項1記載のスマートメータ。
  13.  前記コマンドが受信される前に、第1のファームウェアで動作し、受信された後に、第2のファームウェアで動作する請求項1記載のスマートメータ。
  14.  前記コマンドが受信される前に、第1のCPUで動作し、受信された後に、第2のCPUで動作する請求項1記載のスマートメータ。
  15.  請求項1記載のスマートメータと、
     前記電気機器と、
     サーバとを含むシステムであって、
     前記スマートメータは、
     前記コマンドを、前記サーバから、前記第1の通信で受信し、
     受信がされた場合に、当該スマートメータの動作の履歴を、前記第2の通信で、前記電気機器に送信する履歴送信部を備え、
     前記電気機器は、送信された前記履歴を前記サーバに送信し、
     前記サーバは、送信された前記履歴から生成された、前記スマートメータの動作を特定する第1のデータ、および、前記電気機器の動作を特定する第2のデータを、それぞれ前記電気機器に送信し、
     前記電気機器は、送信された前記第2のデータの前記動作を行うと共に、送信された前記第1のデータを、前記電気機器から前記スマートメータへと送信し、
     前記スマートメータは、送信された前記第1のデータの前記動作を行うシステム。
  16.  スマートメータが備える第1の通信部と第2の通信部とのうちの前記第1の通信部により行われる第1の通信で、前記スマートメータを通じた、電気機器への、電力の供給を停止させるコマンドが受信された場合に、前記供給を停止させる電力供給制御ステップと、
     前記コマンドが受信される以前に、前記第1の通信を行わせ、
     前記コマンドが受信された後には、前記第1の通信を行わせず、前記第2の通信部により行われる第2の通信のみを行わせる通信制御ステップとを含む供給制御方法。
  17.  請求項1記載のスマートメータと、
     前記電気機器と、
     サーバとを含むシステムで実行される動作方法であって、
     前記スマートメータが、前記コマンドが、前記サーバから、前記第1の通信で受信された場合に、当該スマートメータの動作の履歴を、前記第2の通信で、前記電気機器に送信するステップと、
     前記電気機器が、送信された前記履歴を前記サーバに送信するステップと、
     前記サーバが、送信された前記履歴から生成された、前記スマートメータの動作を特定する第1のデータ、および、前記電気機器の動作を特定する第2のデータを、それぞれ前記電気機器に送信するステップと、
     前記電気機器が、送信された前記第2のデータの前記動作を行うと共に、送信された前記第1のデータを、前記電気機器から前記スマートメータへと送信するステップと、
     前記スマートメータが、送信された前記第1のデータの前記動作を行うステップとを含む動作方法。
  18.  スマートメータが備える第1の通信部と第2の通信部とのうちの前記第1の通信部により行われる第1の通信で、前記スマートメータを通じた、電気機器への、電力の供給を停止させるコマンドが受信された場合に、前記供給を停止させる電力供給制御部と、
     前記コマンドが受信される以前に、前記第1の通信を行わせ、
     前記コマンドが受信された後には、前記第1の通信を行わせず、前記第2の通信部により行われる第2の通信のみを行わせる通信制御部とを備える集積回路。
  19.  スマートメータが備える第1の通信部と第2の通信部とのうちの前記第1の通信部により行われる第1の通信で、前記スマートメータを通じた、電気機器への、電力の供給を停止させるコマンドが受信された場合に、前記供給を停止させる電力供給制御ステップと、
     前記コマンドが受信される以前に、前記第1の通信を行わせ、
     前記コマンドが受信された後には、前記第1の通信を行わせず、前記第2の通信部により行われる第2の通信のみを行わせる通信制御ステップとをコンピュータに実行させるためのプログラム。
PCT/JP2012/000547 2011-02-04 2012-01-27 スマートメータ、供給制御方法、動作方法、集積回路、システム、およびプログラム WO2012105210A1 (ja)

Priority Applications (5)

Application Number Priority Date Filing Date Title
JP2012529039A JP6145813B2 (ja) 2011-02-04 2012-01-27 スマートメータ、供給制御方法、動作方法、集積回路、システム、およびプログラム
US13/637,258 US9130411B2 (en) 2011-02-04 2012-01-27 Smart meter, supply control method, operating method, integrated circuit, system, and program
CN201280001040.7A CN102823108B (zh) 2011-02-04 2012-01-27 智能仪表、供给控制方法、动作方法、集成电路、系统及程序
US14/813,196 US9583978B2 (en) 2011-02-04 2015-07-30 Smart meter, supply control method, operating method, integrated circuit, system, and program
US15/403,377 US10305324B2 (en) 2011-02-04 2017-01-11 Smart meter, supply control method, operating method, integrated circuit, system, and program

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2011022297 2011-02-04
JP2011-022297 2011-02-04

Related Child Applications (3)

Application Number Title Priority Date Filing Date
US13/637,258 A-371-Of-International US9130411B2 (en) 2011-02-04 2012-01-27 Smart meter, supply control method, operating method, integrated circuit, system, and program
US14/813,196 Continuation US9583978B2 (en) 2011-02-04 2015-07-30 Smart meter, supply control method, operating method, integrated circuit, system, and program
US14/813,196 Division US9583978B2 (en) 2011-02-04 2015-07-30 Smart meter, supply control method, operating method, integrated circuit, system, and program

Publications (1)

Publication Number Publication Date
WO2012105210A1 true WO2012105210A1 (ja) 2012-08-09

Family

ID=46602436

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2012/000547 WO2012105210A1 (ja) 2011-02-04 2012-01-27 スマートメータ、供給制御方法、動作方法、集積回路、システム、およびプログラム

Country Status (4)

Country Link
US (3) US9130411B2 (ja)
JP (1) JP6145813B2 (ja)
CN (1) CN102823108B (ja)
WO (1) WO2012105210A1 (ja)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2016075849A1 (ja) * 2014-11-13 2016-05-19 パナソニックIpマネジメント株式会社 機器制御装置及びデマンドレスポンス方法
CN110347232A (zh) * 2012-12-31 2019-10-18 施耐德电气It公司 不间断电源通信
CN113821099A (zh) * 2017-06-14 2021-12-21 施耐德电气It公司 不间断电源通信

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9612133B2 (en) 2014-07-14 2017-04-04 International Technological University Smart meter system communication methods
US9383223B2 (en) 2014-07-14 2016-07-05 International Technological University Smart meter system architecture
US9000753B1 (en) 2014-07-14 2015-04-07 International Technological University Smart meter voltage and current sensing using optically coupled isolators
US20170373536A1 (en) * 2016-06-23 2017-12-28 Powermatic Technologies Bvba Smart Remote Power Management Method and Apparatus
AU2016429466B2 (en) * 2016-11-11 2020-04-02 Mitsubishi Electric Corporation Communication device, communication system, communication method, and program

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001283364A (ja) * 2000-03-28 2001-10-12 Tokyo Gas Co Ltd 計測装置およびガスメータならびに計測システム
JP2006010095A (ja) * 2004-06-22 2006-01-12 Matsushita Electric Ind Co Ltd 遠隔制御装置
JP2009033880A (ja) * 2007-07-27 2009-02-12 Kyushu Electric Power Co Inc 電力線通信信号遮断機能を有する電力量計
JP2010250508A (ja) * 2009-04-14 2010-11-04 Chugoku Electric Power Co Inc:The 電力情報管理方法

Family Cites Families (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5461558A (en) * 1994-04-18 1995-10-24 Motorola, Inc. Method and apparatus having time dependent sleep modes
CN1251158C (zh) 2001-07-02 2006-04-12 松下电器产业株式会社 电力管理装置
JP2003143758A (ja) 2001-11-01 2003-05-16 Hitachi Ltd 電力供給サービスおよび電力供給システム
JP2004080919A (ja) 2002-08-19 2004-03-11 Tamura Electric Works Ltd 電気機器の電源制御システム及び電源制御方法
JP3890592B2 (ja) 2003-02-21 2007-03-07 デンセイ・ラムダ株式会社 電源ネットワークシステム
JP2006100952A (ja) * 2004-09-28 2006-04-13 Matsushita Electric Ind Co Ltd 通信装置
US20100010683A1 (en) * 2008-07-14 2010-01-14 Lawrence Kates Method and apparatus for power-limiting electrical access
TWI364518B (en) * 2008-07-29 2012-05-21 Ind Tech Res Inst Power saving managing method and system using the same
US20110309689A1 (en) * 2010-06-17 2011-12-22 Semiconductor Energy Laboratory Co., Ltd. Electric power transmitting device, electric power receiving device, and power supply method using electric power transmitting and receiving devices

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001283364A (ja) * 2000-03-28 2001-10-12 Tokyo Gas Co Ltd 計測装置およびガスメータならびに計測システム
JP2006010095A (ja) * 2004-06-22 2006-01-12 Matsushita Electric Ind Co Ltd 遠隔制御装置
JP2009033880A (ja) * 2007-07-27 2009-02-12 Kyushu Electric Power Co Inc 電力線通信信号遮断機能を有する電力量計
JP2010250508A (ja) * 2009-04-14 2010-11-04 Chugoku Electric Power Co Inc:The 電力情報管理方法

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110347232A (zh) * 2012-12-31 2019-10-18 施耐德电气It公司 不间断电源通信
WO2016075849A1 (ja) * 2014-11-13 2016-05-19 パナソニックIpマネジメント株式会社 機器制御装置及びデマンドレスポンス方法
JP2016096643A (ja) * 2014-11-13 2016-05-26 パナソニックIpマネジメント株式会社 機器制御装置及びデマンドレスポンス方法
CN106063068A (zh) * 2014-11-13 2016-10-26 松下知识产权经营株式会社 设备控制装置以及需求响应方法
AU2015346946B2 (en) * 2014-11-13 2017-06-29 Panasonic Intellectual Property Management Co., Ltd. Apparatus control device and demand response method
US10135246B2 (en) 2014-11-13 2018-11-20 Panasonic Intellectual Property Management Co., Ltd. Device control apparatus and demand response method
CN106063068B (zh) * 2014-11-13 2019-04-09 松下知识产权经营株式会社 设备控制装置以及需求响应方法
CN113821099A (zh) * 2017-06-14 2021-12-21 施耐德电气It公司 不间断电源通信

Also Published As

Publication number Publication date
US20130015716A1 (en) 2013-01-17
JPWO2012105210A1 (ja) 2014-07-03
CN102823108B (zh) 2016-03-16
US20150333571A1 (en) 2015-11-19
US9583978B2 (en) 2017-02-28
US10305324B2 (en) 2019-05-28
US20170126058A1 (en) 2017-05-04
CN102823108A (zh) 2012-12-12
JP6145813B2 (ja) 2017-06-14
US9130411B2 (en) 2015-09-08

Similar Documents

Publication Publication Date Title
JP6145813B2 (ja) スマートメータ、供給制御方法、動作方法、集積回路、システム、およびプログラム
CN104601799A (zh) 一种数据传输的方法及移动终端
EP2744220A1 (en) Set top box authentication method and device
JP2007201851A (ja) 無線通信装置
KR101722696B1 (ko) 홈에너지 관리 시스템에서 비콘을 이용한 홈에너지 관리 장치 및 방법
CN105553924A (zh) 一种应用于智能家居的安全防护方法、智能家居及系统
CN101616017A (zh) 对网络应用设备进行配置的方法、设备及系统
CN109103986A (zh) 变电站远方操作安全防护方法及系统
US20200145824A1 (en) Localized Multi-Factor Network Authentication
JP2016039562A (ja) 通信システム及び機器
JP6270542B2 (ja) 認証システム
CN103516532A (zh) 实时告警系统及方法
JP6281749B2 (ja) 通信システム及び機器
EP2645314A1 (en) Method, device and system for managing a provision of energy
TWM468111U (zh) 具多重驗證機制及無線介面之電腦切換器及外接模組
CN103929674A (zh) 一种机顶盒授权方法及机顶盒
CN103200157A (zh) 一种基于rf4ce设备之间配对连接的鉴权方法
EP3331212A1 (en) Method, first device and system for authenticating to a second device
KR102057637B1 (ko) 네트워크를 통한 분전반 장비의 관리 방법 및 이에 사용되는 관리 서버
WO2016046861A1 (ja) 制御装置、サーバ装置、制御システム、制御方法および制御プログラム
JP7067032B2 (ja) 温水利用システム及びそれに用いられる中継装置
JP2015173397A (ja) 通信装置および無線通信確立方法
CN105553860B (zh) 一种具有WIFIKey的路由器
KR101401464B1 (ko) 모바일을 이용한 원격 보안 제어 장치
WO2016080398A1 (ja) 接続管理制御装置、無線接続システム、ネットワークへの無線接続管理方法、及びネットワークへの無線接続の管理プログラム

Legal Events

Date Code Title Description
WWE Wipo information: entry into national phase

Ref document number: 201280001040.7

Country of ref document: CN

WWE Wipo information: entry into national phase

Ref document number: 2012529039

Country of ref document: JP

WWE Wipo information: entry into national phase

Ref document number: 13637258

Country of ref document: US

121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 12742280

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 12742280

Country of ref document: EP

Kind code of ref document: A1