WO2012060112A1 - 洋上風車設置用船舶およびこれを用いた洋上風車設置方法 - Google Patents

洋上風車設置用船舶およびこれを用いた洋上風車設置方法 Download PDF

Info

Publication number
WO2012060112A1
WO2012060112A1 PCT/JP2011/050481 JP2011050481W WO2012060112A1 WO 2012060112 A1 WO2012060112 A1 WO 2012060112A1 JP 2011050481 W JP2011050481 W JP 2011050481W WO 2012060112 A1 WO2012060112 A1 WO 2012060112A1
Authority
WO
WIPO (PCT)
Prior art keywords
windmill
wind turbine
installation
ship
offshore
Prior art date
Application number
PCT/JP2011/050481
Other languages
English (en)
French (fr)
Inventor
貴之 澤井
均 熊本
友則 渡部
重友 藤田
Original Assignee
三菱重工業株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 三菱重工業株式会社 filed Critical 三菱重工業株式会社
Publication of WO2012060112A1 publication Critical patent/WO2012060112A1/ja

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B1/00Hydrodynamic or hydrostatic features of hulls or of hydrofoils
    • B63B1/02Hydrodynamic or hydrostatic features of hulls or of hydrofoils deriving lift mainly from water displacement
    • B63B1/10Hydrodynamic or hydrostatic features of hulls or of hydrofoils deriving lift mainly from water displacement with multiple hulls
    • B63B1/107Semi-submersibles; Small waterline area multiple hull vessels and the like, e.g. SWATH
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B1/00Hydrodynamic or hydrostatic features of hulls or of hydrofoils
    • B63B1/02Hydrodynamic or hydrostatic features of hulls or of hydrofoils deriving lift mainly from water displacement
    • B63B1/04Hydrodynamic or hydrostatic features of hulls or of hydrofoils deriving lift mainly from water displacement with single hull
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B35/00Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for
    • B63B35/003Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for for transporting very large loads, e.g. offshore structure modules
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B35/00Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for
    • B63B35/44Floating buildings, stores, drilling platforms, or workshops, e.g. carrying water-oil separating devices
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B43/00Improving safety of vessels, e.g. damage control, not otherwise provided for
    • B63B43/02Improving safety of vessels, e.g. damage control, not otherwise provided for reducing risk of capsizing or sinking
    • B63B43/04Improving safety of vessels, e.g. damage control, not otherwise provided for reducing risk of capsizing or sinking by improving stability
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/18Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes
    • B66C23/185Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes for use erecting wind turbines
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/18Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes
    • B66C23/36Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes mounted on road or rail vehicles; Manually-movable jib-cranes for use in workshops; Floating cranes
    • B66C23/52Floating cranes
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • E02B17/02Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor placed by lowering the supporting construction to the bottom, e.g. with subsequent fixing thereto
    • E02B17/021Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor placed by lowering the supporting construction to the bottom, e.g. with subsequent fixing thereto with relative movement between supporting construction and platform
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • E02B17/02Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor placed by lowering the supporting construction to the bottom, e.g. with subsequent fixing thereto
    • E02B17/027Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor placed by lowering the supporting construction to the bottom, e.g. with subsequent fixing thereto steel structures
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F03MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
    • F03DWIND MOTORS
    • F03D13/00Assembly, mounting or commissioning of wind motors; Arrangements specially adapted for transporting wind motor components
    • F03D13/10Assembly of wind motors; Arrangements for erecting wind motors
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F03MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
    • F03DWIND MOTORS
    • F03D13/00Assembly, mounting or commissioning of wind motors; Arrangements specially adapted for transporting wind motor components
    • F03D13/40Arrangements or methods specially adapted for transporting wind motor components
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B1/00Hydrodynamic or hydrostatic features of hulls or of hydrofoils
    • B63B1/02Hydrodynamic or hydrostatic features of hulls or of hydrofoils deriving lift mainly from water displacement
    • B63B1/10Hydrodynamic or hydrostatic features of hulls or of hydrofoils deriving lift mainly from water displacement with multiple hulls
    • B63B1/12Hydrodynamic or hydrostatic features of hulls or of hydrofoils deriving lift mainly from water displacement with multiple hulls the hulls being interconnected rigidly
    • B63B2001/128Hydrodynamic or hydrostatic features of hulls or of hydrofoils deriving lift mainly from water displacement with multiple hulls the hulls being interconnected rigidly comprising underwater connectors between the hulls
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B21/00Tying-up; Shifting, towing, or pushing equipment; Anchoring
    • B63B21/50Anchoring arrangements or methods for special vessels, e.g. for floating drilling platforms or dredgers
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B2221/00Methods and means for joining members or elements
    • B63B2221/20Joining substantially rigid elements together by means that allow one or more degrees of freedom, e.g. hinges, articulations, pivots, universal joints, telescoping joints, elastic expansion joints, not otherwise provided for in this class
    • B63B2221/24Joining substantially rigid elements together by means that allow one or more degrees of freedom, e.g. hinges, articulations, pivots, universal joints, telescoping joints, elastic expansion joints, not otherwise provided for in this class by means that allow one or more degrees of translational freedom, e.g. telescopic joints, not otherwise provided for in this class
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B2241/00Design characteristics
    • B63B2241/02Design characterised by particular shapes
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • E02B2017/0091Offshore structures for wind turbines
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F05INDEXING SCHEMES RELATING TO ENGINES OR PUMPS IN VARIOUS SUBCLASSES OF CLASSES F01-F04
    • F05BINDEXING SCHEME RELATING TO WIND, SPRING, WEIGHT, INERTIA OR LIKE MOTORS, TO MACHINES OR ENGINES FOR LIQUIDS COVERED BY SUBCLASSES F03B, F03D AND F03G
    • F05B2230/00Manufacture
    • F05B2230/60Assembly methods
    • F05B2230/61Assembly methods using auxiliary equipment for lifting or holding
    • F05B2230/6102Assembly methods using auxiliary equipment for lifting or holding carried on a floating platform
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F05INDEXING SCHEMES RELATING TO ENGINES OR PUMPS IN VARIOUS SUBCLASSES OF CLASSES F01-F04
    • F05BINDEXING SCHEME RELATING TO WIND, SPRING, WEIGHT, INERTIA OR LIKE MOTORS, TO MACHINES OR ENGINES FOR LIQUIDS COVERED BY SUBCLASSES F03B, F03D AND F03G
    • F05B2240/00Components
    • F05B2240/90Mounting on supporting structures or systems
    • F05B2240/95Mounting on supporting structures or systems offshore
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/72Wind turbines with rotation axis in wind direction
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/727Offshore wind turbines
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P70/00Climate change mitigation technologies in the production process for final industrial or consumer products
    • Y02P70/50Manufacturing or production processes characterised by the final manufactured product

Definitions

  • the present invention relates to an offshore windmill installation ship and an offshore windmill installation method using the same.
  • an automatic elevator platform equipped with a jack-up device and a deck crane is used.
  • Wind turbine parts such as split or partially joined wind turbine blades, a nacelle containing a generator and gearbox, and a tower, and a basic structure built from the bottom of the ocean to install a wind turbine on the ocean are loaded on this automatic elevator platform ship. Is included.
  • the jack crane on the carriage was used with the jack-up legs of the jack-up device lowered to the seabed and the hull completely lifted to the sea surface. The windmill is assembled.
  • Most existing windmill installation boats can load two or three windmill parts and foundation structures at a time. After loading the windmill parts and the foundation structure at the accumulation port, they moved to the installation sea area, installed the number of windmills and the foundation structure loaded, and then returned to the accumulation port to repeat transportation and installation of the windmill.
  • an automatic elevator carrier is resident exclusively for windmill installation work in the sea area where the windmill is installed, while another automatic elevator carrier is used for parts transportation.
  • a plurality of windmill parts and foundation structures are loaded from the accumulation port onto the parts transport trolley, stopped next to the resident windmill dedicated trolley, jacked up, and then the deck for the dedicated trolley installation Lift the wind turbine parts and the foundation structure loaded on the parts transport trolley with a crane, and perform the installation work as it is.
  • the current construction methods as described above are expected to require enormous costs for offshore installation work from the viewpoint of installation work time and cost of trolley vessels, and their reduction and improvement are major issues.
  • the problem of the installation work time is that the windmill installation area is further away from the shore than the current situation, so the round trip time from the accumulation port to the installation sea area will increase, and the water depth of the installation sea area will deepen more than before.
  • the time required to move up and down by the jack-up device is increased, and the time work efficiency is lowered by reducing the number of wind turbines that can be transported at once by the equipment currently used due to the increase in the size of the wind turbine to be used.
  • the problem of trolley ship costs is that the demand for work trolleys increases due to an increase in construction volume, and the size of trolleys and the capacity of jack-up devices and deck cranes increase with the increase in the size of wind turbines used. The ship price will increase.
  • Patent Document 1 discloses a system in which an offshore wind turbine is installed by using the foundation of the wind turbine as a floating body, towing to the installation sea area, and sinking the floating body into the sea and sitting down. In this way, since the wind turbine is assembled and transported to the installation sea area, there is an advantage that assembly work at the installation site does not occur.
  • Patent Document 1 when installing a windmill, it is necessary to submerge the floating body in the sea while supporting the windmill with a crane ship and maintaining the posture, which is difficult. Moreover, since it is necessary to arrange a crane ship in addition to the towing ship, it is difficult to reduce the cost.
  • This invention is made
  • An object of the present invention is to provide an installation ship and an offshore wind turbine installation method using the same.
  • the offshore wind turbine installation ship of the present invention and the offshore wind turbine installation method using the same employ the following means. That is, the offshore wind turbine installation ship according to the first aspect of the present invention includes a wind turbine in which a tower, a nacelle, and a wind turbine blade are assembled, and / or a foundation in which a lower end is fixed to the sea floor and a wind turbine is fixed to the upper end. Is mounted on the deck, self-towed or towed to the wind turbine installation sea area, and the wind turbine or the foundation is lifted by a crane provided on the deck and installed at a target installation position on the ocean.
  • the ship body has a plurality of projecting portions projecting outward, and the crane installs the windmill or the foundation with the recessed side formed between the projecting portions adjacent to each other as the target installation position. To do.
  • the offshore wind turbine installation ship performs so-called wind turbine integrated installation in which a tower, a nacelle, and wind turbine blades are assembled and / or a foundation is transported and installed as it is to a wind turbine installation sea area. Therefore, the assembly work in the sea area where the windmill is installed can be omitted. And it was set as the ship type main body which has two or more overhang
  • the target installation position is provided in the recess that is within the reach range of the crane.
  • the target installation position is set in a recess that is within the reach range of the crane, the outreach of the crane can be further shortened and workability is improved.
  • the mounting positions of the plurality of wind turbines and / or the plurality of foundations on the deck are provided so as to surround the crane. It is preferable that
  • the mounting position of the wind turbine and / or the foundation on the deck is provided between the crane and the recess. preferable.
  • the windmill or foundation By setting the mounting position on the deck of the windmill or foundation between the crane and the recess, the windmill or foundation can be mounted at a position close to the target installation position. Thereby, since the moving distance of the windmill or foundation by a crane can be shortened, the shortening of the installation work by a crane can further be aimed at.
  • each overhang is provided with a jack-up device that lifts and supports the hull body from the seabed.
  • a jack-up device will be installed at each overhang. Therefore, since a ship can be positioned stably at the time of installation work of a windmill or a foundation, work efficiency improves.
  • a lower hull is provided below the hull main body through a plurality of columns.
  • a lower hull is provided below the hull form body via a plurality of columns.
  • the lower hull is located in the water at a size that gives a predetermined buoyancy, lowers the center of gravity by putting in and out the ballast, and gives a predetermined restoring force. In other words, it is a semi-sub (semi-submersible) type ship.
  • the lower hull is provided below the hull main body while being separated from the hull main body by the column. Therefore, the center of gravity is lowered by ballast water, etc., and the column is expanded to a predetermined restoring force and the diameter is reduced. By doing so, it is possible to suppress the fluctuation of the hull caused by waves and to obtain a predetermined stability.
  • DPS Dynamic It is preferable to fix the position and attitude of the hull by the Positioning System. In this way, the jack-up and jack-down steps for fixing the ship are not necessary, and the working time can be further shortened.
  • the hull main body has a shape in which the projecting portions project outward from the four corners of a substantially square when viewed in plan,
  • the shape is preferably symmetrical in the left-right direction.
  • the hull-shaped body has a symmetrical shape based on a square, and the projecting parts project from the four corners.
  • the mounting position of a windmill or a foundation can be set to four places which face four side surfaces between adjacent overhang
  • the wall portion for reducing fluid resistance is located between the projecting portions adjacent to each other at a position different from the position where the recess is formed. It is preferable that it is provided over.
  • the wall portion for reducing the fluid resistance is provided between the adjacent overhang portions, the fluid resistance during self-navigation or towing can be reduced.
  • a wall part it is good also as a wall part which connected between the overhang
  • the offshore wind turbine installation method includes a wind turbine in which a tower, a nacelle, and a wind turbine blade are assembled, and / or a foundation in which a lower end is fixed to the seabed and a wind turbine is fixed to the upper end.
  • a vessel for offshore windmill installation that is mounted on the deck, self-towed or towed to the windmill installation sea area, and the crane installed on the deck lifts the windmill or the foundation and installs it at the target installation position on the ocean
  • the offshore installation ship is a ship body having a plurality of overhanging portions projecting outward, and the crane is formed in a recess formed between adjacent overhanging portions.
  • the wind turbine or the foundation is installed with the target installation position as.
  • the offshore wind turbine installation method performs wind turbine integrated installation in which a tower, a nacelle, and wind turbine blades are assembled and / or a foundation is transported and installed as it is to a wind turbine installation sea area. Therefore, the assembly work in the sea area where the windmill is installed can be omitted. And it was set as the ship body which has two or more overhang
  • each wind turbine blade when the wind turbine is viewed from the front is different from the angular position of the wind turbine blade of the adjacent wind turbine. It is preferable that each wind turbine blade is fixed and a plurality of the wind turbines are mounted on the deck.
  • the angle (azimuth angle) position of the windmill blade when the windmill is viewed from the front is made different for each adjacent windmill. Thereby, a windmill blade can be prevented from contacting between adjacent windmills.
  • the angle position where each wind turbine blade is positioned in a Y shape when viewed from the front is used as the reference position, and the wind turbine blades of adjacent wind turbine blades are about 5 to 10 ° from the reference position.
  • the shifted angular position By shifting the angular position in this manner, for example, it is effective when three wind turbines are mounted so as to surround the crane.
  • the windmill or foundation is installed with a crane with the recess side formed between these projecting parts as the target installation position. Or the distance which moves a foundation can be shortened and shortening of the installation work by a crane can be aimed at. As a result, the construction period can be shortened and the construction cost can be reduced.
  • FIG. 1 is a perspective view showing a case where an offshore windmill installation ship according to a first embodiment of the present invention is mounted with a windmill. It is the top view which showed roughly the relationship between a windmill mounting position and a windmill installation position. It is the perspective view which showed the case where the ship for offshore windmill installation of FIG. 1 mounted a foundation structure. It is the ship for an offshore windmill installation concerning 2nd Embodiment of this invention, and is the perspective view which showed the case where a windmill is mounted. It is the perspective view which looked at the ship for offshore windmill installation of FIG. 4 from diagonally downward. It is the top view which showed the modification of the installation procedure of a windmill. It is the top view which showed the modification of the shape of a hull form main body.
  • FIG. 1 shows an offshore windmill installation ship 1 (hereinafter simply referred to as “ship 1”) equipped with four windmills.
  • the ship 1 includes a hull main body 3 having a deck 2 on the upper surface, a main tower 4 erected substantially at the center of the deck 2, and a crane 6 installed at the upper end of the main tower 4.
  • the ship body 3 of the ship 1 is provided with overhang portions 5 that project outward from four corners that are substantially square when viewed in plan as shown in FIG. That is, the hull main body 3 has an outer shape in which an X shape (a cross shape) extending on a diagonal line is superimposed on a square, and has a symmetrical shape in the front-rear and left-right directions. Between each overhang part 5, the side edge part 13 which forms the outer shape of the hull body 3 so that it may be dented in the center side (crane 6 side) of the hull body 3 is provided, and, thereby, adjacent tension
  • tensile_strength is provided.
  • a recess 11 is formed between the protruding portions 5. As shown in FIG.
  • each overhanging portion 5 is provided with a jackup device 7 so that a jackup leg 9 penetrating the overhanging portion 5 in the vertical direction can be moved up and down.
  • the lower end of the jack-up leg 9 is landed on the seabed, and the entire ship 1 is lifted to fix the scaffold.
  • a plurality of wind turbines 20 are mounted on the deck 2.
  • the windmill 20 includes a windmill tower 22, a nacelle 24 in which a speed increaser and a generator are accommodated, and a windmill blade 26 that rotates by receiving wind power.
  • the windmill tower 22, the nacelle 24, and the windmill blades 26 are mounted on the deck 2 after being assembled in advance on land before offshore transportation.
  • the wind turbine blades 26 are fixed at a predetermined azimuth angle so that the wind turbine blades 26 of the adjacent wind turbines 20 do not interfere with each other. Specifically, when four wind turbines 20 are mounted as shown in FIG.
  • the three wind turbine blades 26 are Y-shaped when viewed from the front, as in the wind turbine 20 located on the left side in FIG.
  • the wind turbine blades 26 are fixed by setting the azimuth angle so that the wind turbine blades 26 are positioned on the right side in the drawing adjacent to the wind turbine blades 26 so that the wind turbine blades 20 have inverted Y shapes that are vertically inverted from the Y shape. 26 is fixed. That is, the wind turbine blades 26 are fixed so that the pair of wind turbines 20 has a Y shape with the crane 6 interposed therebetween, and the wind turbine blades 26 are fixed so that the other pair of wind turbines 20 have an inverted Y shape.
  • the wind turbine blades 26 of other adjacent wind turbines 20 may be fixed at an angular position shifted from the Y shape by a predetermined angle (for example, 5 to 10 °).
  • FIG. 2 shows the mounting positions of the wind turbines 20 on the deck 2.
  • each wind turbine 20 is provided so as to surround the crane 6 as a center, and between the main tower 4 supporting the crane 6 and the recess 11, specifically, the side edge 13 is the main edge. It is provided in the vicinity of the position closest to the tower 4 side (substantially central position between the adjacent overhang portions 5).
  • the deck 2 since the deck 2 has a symmetrical shape in the front-rear direction and the left-right direction, wind turbine mounting positions are provided at four locations around the main tower 4.
  • the crane 6 can lift the windmill 20 mounted on the deck 2 and transport the windmill 20 onto the foundation 30 that is the target installation position of the windmill 20.
  • the crane 6 includes a boom 6a, a lifting tool 6b having a hook, and a hoisting wire 6c that passes from the hoisting tool 6b to the hoisting drum (not shown) through the tip of the boom 6a.
  • the crane 6 can lift and lower the boom 6a so that the lifting tool 6b can be moved away from the center of the crane 6 in the radial direction, and the hoisting wire 6c is wound or unwound by a hoisting drum.
  • the hanger 6b can be moved up and down, and the hanger 6b can be turned by rotating the crane 6 around the central axis.
  • the suspension wire 36 is hung on the hook of the suspension 6 b while being suspended from the lower end of the windmill 20 and the intermediate position.
  • the foundation 30 serving as the target installation position of the windmill 20 is provided on the recess 11 side when viewed from the crane 6. That is, the position of the ship 1 is fixed in a state in which the target installation position is sandwiched between the overhang portions 5, and the installation work of the windmill 20 is performed.
  • the foundation 30 is installed on the seabed and fixes the lower end of the wind turbine tower 22.
  • the foundation 30 has a framework structure made of a metal material.
  • a windmill guide 32 is erected on both sides of the windmill tower 22 to prevent the windmill 20 from falling.
  • a bridge 40 equipped with a steering device is provided at an intermediate position of the main tower 4.
  • a living area for sailors and the like is provided below the bridge 40.
  • the ship 1 can be used when the foundation 30 is transported, and the foundation 30 can be mounted in the same manner as the windmill 20 as shown in FIG.
  • an extension part 14 for installing the lower end of the foundation 30 is preferably provided between the overhanging parts 5.
  • the windmill 20 the windmill tower 20, the nacelle 24, and the windmill blades 26 are assembled in advance on land before offshore transportation. And it is mounted on the deck 2 of the ship 1 by the crane on the land side or the crane 6 of the ship 1. As shown in FIG. 2, the mounting position is in the vicinity of the position where the side edge 13 is closest to the main tower 4 side. In the present embodiment, four wind turbines 20 are mounted simultaneously. After the windmills 20 are mounted, the azimuth angle of the windmill blades 26 is fixed so that the windmill blades 26 of the windmills 20 do not interfere with each other.
  • the ship 1 is towed to a windmill-installed sea area by a towing ship (not shown).
  • a propulsion device may be provided in the ship 1 so as to be self-propelled.
  • the ship When it reaches the windmill installation sea area, it approaches the pre-installed foundation 30 and, more specifically, as shown in FIG.
  • the ship is stopped at a position where the foundation 30 is sandwiched between the adjacent overhang portions 5 so as to be located in the recess 11 within the reach range. In this state, the target installation position is positioned so as to face the windmill 20 to be installed.
  • the jack-up device 9 After stopping the boat, the jack-up device 9 lowers the jack-up leg 9 to the seabed, and lowers the lower end of the jack-up leg 9 on the seabed. Thereby, the scaffold for windmill installation work is fixed. Then, as shown by the arrow A in FIG. 2, the wind turbine 20 is moved from the mounting position onto the foundation 30 by the crane 6. Thus, since the foundation 30 which is the target installation position of the windmill 20 is located on the recess 11 side when viewed from the crane 6, the travel distance after the windmill 20 is lifted by the crane 6 can be shortened. Since the windmill 20 can be transported to the target installation position by swinging the boom 6a slightly outward after being suspended by the crane 6, the installation operation can be performed extremely simply and in a short time. After transporting the windmill 20 onto the foundation 30, a predetermined fixing operation or the like is performed, and the windmill 20 is securely fixed onto the foundation 30.
  • the jackup leg 9 is pulled up from the seabed (jackdown) by the jackup device 7, and the ship 1 is moved to the next target installation position. Then, in the same manner as described above, the ship is stopped facing the foundation 30 located at the next target installation position so as to face the windmill 20 to be installed, jack-up is performed, and installation work is performed. This work process is sequentially repeated, and the installation work of four wind turbines mounted on the ship 1 is performed.
  • the ship 1 performs so-called windmill integrated installation in which the windmill 20 in which the windmill tower 22, the nacelle 24, and the windmill blades 26 are assembled and / or the foundation 30 is directly transported to the windmill installation sea area and installed, the assembly work in the installation sea area is performed. Can be omitted. And it is set as the hull main body 3 which has the some overhang
  • the distance to which the windmill 20 or the foundation 30 is moved by the crane 6 can be shortened. Shortening can be achieved.
  • the ship body 3 is symmetrically shaped in the front-rear and left-right directions, and the mounting positions of the windmill 20 or the foundation 30 are set at four locations facing the four side surfaces, and the four units are transported and installed simultaneously. Thereby, since many windmills can be conveyed and installed at a time, the installation cost of a windmill can be reduced.
  • the ship 1 ⁇ / b> B includes a plurality of columns 52 extending downward from the lower surface of the hull main body 3, and a lower hull 54 is fixed to the lower end of each column 52.
  • the lower hull 54 has an X shape (cross character shape) formed by two substantially orthogonal cylinders following the X shape (cross character shape) extending in the diagonal direction of the hull main body 3.
  • the lower hull 54 is located in the water so as to give a predetermined buoyancy, and lowers the center of gravity by putting in and out ballast such as seawater into the lower hull 54 to give a predetermined restoring force. By adjusting this ballast, the draft is maintained at approximately the middle position of the column 52.
  • the lower hull 54 is provided below the hull main body 3 while being separated from the hull main body 3 by the column 52, the center of gravity is lowered by ballast water or the like, and the column 52 has a predetermined restoring force.
  • a plurality of propeller propulsion devices 58 are provided on the lower surface of the hull main body 3. During the installation work of the windmill 20 and the foundation 30, the position and attitude of the hull can be fixed by a DPS (Dynamic Positioning System) that controls the propeller propulsion device 58.
  • DPS Dynamic Positioning System
  • the ship 1B of this embodiment can fix the position and posture of the hull without jacking up and jacking down as in the first embodiment, the working time can be further shortened.
  • the process which transports and installs the windmill 20 and the foundation 30 to the installation sea area on the ocean is the same as that of 1st Embodiment mentioned above, the description is abbreviate
  • the target installation position (the position of the foundation 30) is positioned on the side of the recess 11 so as to face the windmill 20 to be installed.
  • the windmill 20 at another mounting position is moved to a position facing the target installation position (the position of the foundation 30) (see arrow B).
  • the windmill 20 may be moved to the target installation position (arrow A).
  • the operation of moving from another mounting position to the mounting position facing the target installation position does not increase the operation time so much because it is only necessary to turn the crane 6.
  • a wall portion may be provided between the adjacent overhang portions 5 so as to reduce the fluid resistance of the hull body 3.
  • a bow wall portion 61 having a bow shape having a projecting portion and a ship side wall portion 63 that forms a ship side shape by being connected linearly continuously between the overhanging portions are configured.
  • the windmill 20 and the foundation 30 cannot be installed at this position. In such a case, the windmill 20 is moved to the mounting position where the recess 11 is formed (see arrow B), and then the installation work is performed.
  • 1,1B Vessel (offshore wind turbine installation vessel) 2 deck 3 hull form body 5 overhang 6 crane 7 jack-up device 9 jack-up leg 11 recess 20 windmill 22 windmill tower 24 nacelle 26 windmill blade 30 foundation 52 column 54 lower hull

Abstract

 組み立てられた状態の風車を運搬して設置海域にて設置する場合に、簡便な作業で風車を設置することができる洋上風車設置用船舶およびこれを用いた洋上風車設置方法を提供する。 風車タワー(22)、ナセル(24)及び風車翼(26)が組み立てられた風車(20)をデッキ(2)上に搭載し、風車設置海域まで自航または曳航し、デッキ(2)上に設けられたクレーン(6)によって風車(20)を吊り上げて洋上の目標設置位置に設置する洋上風車設置用船舶(1)であって、外方へ張り出す張出部(5)を複数有した船型本体(3)とされ、クレーン(6)は、隣り合う張出部(5)の間に形成された凹所側を目標設置位置として風車(20)を設置する洋上風車設置用船舶(1)である。

Description

洋上風車設置用船舶およびこれを用いた洋上風車設置方法
 本発明は、洋上風車設置用船舶およびこれを用いた洋上風車設置方法に関するものである。
 現在、欧州では、洋上風車建設が盛んに行われており、今後益々その規模が拡大し、洋上における設置工事量が大幅に増大する傾向にある。さらに、風車の設置海域も岸からより遠く、大水深海域での風車設置が計画されており、使用される風車自体も大型化の傾向にある。
 洋上風車の設置作業は、ジャッキアップ装置及びデッキクレーンを備えた自動昇降台船が用いられる。この自動昇降台船上に、分割または一部接合された風車翼、発電機・増速機を内包したナセル、タワーといった風車パーツや、洋上に風車を設置するために海底から築かれる基礎構造が積込まれる。そして、自動昇降台船を自航または曳航により風車設置海域まで運搬した後、ジャッキアップ装置のジャッキアップ脚を海底へ降ろして船体を海面上へ完全に持ち上げた状態で台船上のデッキクレーンを用いて風車の組立作業が行われる。
 既存の大半の風車設置用台船では、風車2~3台分の風車パーツおよび基礎構造を一度に積載できるようになっている。風車パーツおよび基礎構造を集積港にて船積みした後、設置海域へ移動して積載した基数分の風車および基礎構造を設置した後、再び集積港へ戻り、風車の輸送・設置を繰り返している。
 また、風車の設置海域に自動昇降台船を風車設置作業専用として常駐させ、一方で別の自動昇降台船をパーツ輸送用として用いる場合もある。すなわち、集積港から複数の風車パーツ、基礎構造をパーツ輸送用台船に積載し、常駐している風車設置作業専用台船の隣へ停船し、ジャッキアップした後、設置作業専用台船のデッキクレーンでパーツ輸送用台船上に積載された風車パーツおよび基礎構造を吊り上げ、そのまま設置作業を行う。
 しかし、上記のような現状の工法では設置工事時間および台船用船コストの観点で洋上での設置工事に莫大なコストが必要となることが見込まれ、その削減、改善が大きな課題となっている。
 設置工事時間の問題は、風車の設置海域が岸から現状よりも更に遠くなることから集積港から設置海域までの回航時間が増大すること、設置海域の水深がこれまで以上に深まることで台船をジャッキアップ装置により昇降する時間が増大すること、また使用する風車の大型化により現状使用している機材で一度に輸送できる風車の台数が減ることにより時間的作業効率が下がることが挙げられる。
 台船用船コストの問題は、工事量の増大により作業台船需要が増大すること、使用する風車の大型化に伴い台船のサイズ、ジャッキアップ装置やデッキクレーンの容量が大きくなることで台船の船価が増大することが挙げられる。
 一方、下記特許文献1には、風車の基礎を浮体とし、設置海域まで曳航し、浮体を海中に沈めて着座させることによって洋上風車を設置する方式が開示されている。このように、風車を組み立てた状態で設置海域まで運搬して設置するので、設置現場での組み立て作業が発生しないという利点がある。
特開2005-69025号公報
 しかし、特許文献1では、風車を設置する際に、クレーン船によって風車を支持して姿勢を保ちながら浮体を海中に沈める必要があり、困難な作業が伴う。また、曳航船に加えてクレーン船をも手配する必要があるので、コストの低減を図ることが難しい。
 本発明は、このような事情に鑑みてなされたものであって、組み立てられた状態の風車を運搬して設置海域にて設置する場合に、簡便な作業で風車を設置することができる洋上風車設置用船舶およびこれを用いた洋上風車設置方法を提供することを目的とする。
 上記課題を解決するために、本発明の洋上風車設置用船舶およびこれを用いた洋上風車設置方法は以下の手段を採用する。
 すなわち、本発明の第1の態様にかかる洋上風車設置用船舶は、タワー、ナセル及び風車翼が組み立てられた風車、及び/又は、下端が海底に固定されるとともに上端に風車が固定される基礎をデッキ上に搭載し、風車設置海域まで自航または曳航し、前記デッキ上に設けられたクレーンによって前記風車または前記基礎を吊り上げて洋上の目標設置位置に設置する洋上風車設置用船舶であって、外方へ張り出す張出部を複数有した船型本体とされ、前記クレーンは、隣り合う前記張出部の間に形成された凹所側を前記目標設置位置として前記風車または前記基礎を設置するものである。
 本発明の第1の態様にかかる洋上風車設置用船舶は、タワー、ナセル及び風車翼が組み立てられた風車、及び/又は、基礎をそのまま風車設置海域まで運搬し設置するいわゆる風車一体設置を行う。したがって、風車の設置海域における組み立て作業を省略することができる。
 そして、外方へ張り出す張出部を複数有する船型本体とし、これら張出部の間に形成された凹所側を目標設置位置として、風車または基礎をクレーンによって設置することとした。このように、目標設置位置が凹所側に設けられているので、クレーンによって風車または基礎を移動させる距離を短くすることができ、クレーンによる設置作業の短縮化を図ることができる。
 さらに、本発明の第1の態様にかかる洋上風車設置用船舶においては、前記目標設置位置は、前記クレーンのリーチ範囲内となる前記凹所内に設けられていることが好ましい。
 目標設置位置をクレーンのリーチ範囲内となる凹所内に設けることとしたので、クレーンのアウトリーチをさらに短縮することができ、作業性が向上する。
 さらに、本発明の第1の態様にかかる洋上風車設置用船舶においては、複数台の前記風車及び/又は複数台の前記基礎の前記デッキ上における搭載位置は、前記クレーンを中心として取り囲むように設けられていることが好ましい。
 複数台の風車及び/又は複数台の基礎をデッキ上に搭載する際に、クレーンを中心として取り囲むように搭載することとしたので、クレーンリーチ内に複数台の風車及び/又は基礎が搭載されることとなり、作業性が向上する。
 さらに、本発明の第1の態様にかかる洋上風車設置用船舶においては、前記風車及び/又は前記基礎の前記デッキ上における搭載位置は、前記クレーンと前記凹所の間に設けられていることが好ましい。
 風車や基礎のデッキ上における搭載位置を、クレーンと凹所の間とすることにより、風車や基礎を目標設置位置に近い位置で搭載することができる。これにより、クレーンによる風車または基礎の移動距離を短くできるので、クレーンによる設置作業の短縮化を更に図ることができる。
 さらに、本発明の第1の態様にかかる洋上風車設置用船舶においては、各前記張出部には、前記船型本体を海底から持ち上げて支持するジャッキアップ装置が設けられていることが好ましい。
 各張出部にジャッキアップ装置を設けることとした。これにより、風車または基礎の設置作業時に、船舶を安定的に位置決めすることができるので、作業効率が向上する。
 さらに、本発明の第1の態様にかかる洋上風車設置用船舶においては、船型本体の下方には、複数のコラムを介してロワーハルが設けられていることが好ましい。
 船型本体の下方に複数のコラムを介してロワーハルを設けることとした。ロワーハルは所定の浮力を与えるだけの大きさで水中に位置し、バラストの出し入れによって重心を下げ所定の復原力を与える。すなわち、セミサブ(半没水)型の船舶とされている。また、ロワーハルはコラムによって船型本体から離間された状態で船型本体の下方に設けられているのでバラスト張水などにより重心を下げ、コラムは所定の復原力が得られる程度に展開されかつ直径を細くすることで、波浪による船体の動揺を小さく抑えかつ所定の復原性を得ることができる。
 なお、風車の設置時には、DPS(Dynamic
Positioning System)によって船体の位置および姿勢を固定することが好ましい。このようにすれば、船舶を固定するためのジャッキアップおよびジャッキダウンの工程が不要となるので、より作業時間を短縮することができる。
 さらに、本発明の第1の態様にかかる洋上風車設置用船舶においては、前記船型本体は、平面視した場合に、略正方形の四隅から外方に前記張出部が張り出した形状とされ、前後左右方向に対称とされた形状とされていることが好ましい。
 船型本体を、正方形を基本とした前後左右対称形状とし、その四隅から張出部が張り出す形状とした。これにより、隣り合う張出部の間の4つの側面に面する4カ所に風車または基礎の搭載位置を設定することができ、4台を同時に運搬して設置することができる。
 さらに、本発明の第1の態様にかかる洋上風車設置用船舶においては、前記凹所が形成された位置とは別の位置に、流体抵抗を低減する壁部が隣り合う前記張出部の間に亘って設けられていることが好ましい。
 流体抵抗を低減する壁部が隣り合う張出部の間に亘って設けられているので、自航または曳航するときの流体抵抗を低減することができる。このような壁部としては、張出部間を直線状に結んだ壁部としても良いし、あるいは、張出部間に突出部を有する船首形状とした壁部としても良い。
 また、本発明の第2の態様にかかる洋上風車設置方法は、タワー、ナセル及び風車翼が組み立てられた風車、及び/又は、下端が海底に固定されるとともに上端に風車が固定される基礎をデッキ上に搭載し、風車設置海域まで自航または曳航し、前記デッキ上に設けられたクレーンによって前記風車または前記基礎を吊り上げて洋上の目標設置位置に設置する洋上風車設置用船舶を用いた洋上風車設置方法であって、前記洋上設置用船舶は、外方へ張り出す張出部を複数有した船型本体とされ、前記クレーンは、隣り合う前記張出部の間に形成された凹所側を前記目標設置位置として前記風車または前記基礎を設置するものである。
 本発明の第2の態様にかかる洋上風車設置方法は、タワー、ナセル及び風車翼が組み立てられた風車、及び/又は、基礎をそのまま風車設置海域まで運搬し設置するいわゆる風車一体設置を行う。したがって、風車の設置海域における組み立て作業を省略することができる。
 そして、外方へ張り出す張出部を複数有する船型本体とし、これら張出部の間に形成された凹所を目標設置位置として、風車または基礎をクレーンによって設置することとした。このように、目標設置位置が凹所側に設けられているので、クレーンによって風車または基礎を移動させる距離を短くすることができ、クレーンによる設置作業の短縮化を図ることができる。
 さらに、本発明の第2の態様にかかる洋上風車設置方法においては、前記風車を正面視した場合の各前記風車翼の角度位置が、隣り合う前記風車の前記風車翼の角度位置と異なるように各前記風車翼を固定して複数台の前記風車を前記デッキ上に搭載することが好ましい。
 風車を正面視した場合の風車翼の角度(アジマス角)位置を、隣り合う風車ごとに異なるようにした。これにより、隣り合う風車間で風車翼が接触しないようにすることができる。
 例えば、3枚の風車翼を備えた風車の場合、正面視してY形状に各風車翼を位置させた角度位置を基準位置とし、隣り合う風車の風車翼は基準位置から5~10°程度ずらされた角度位置とされる。このように角度位置をずらすことで、例えばクレーンを取り囲むように3台の風車を搭載する場合に効果的である。
 外方へ張り出す張出部を複数有する船型本体とし、これら張出部の間に形成された凹所側を目標設置位置として、風車または基礎をクレーンによって設置することとしたので、クレーンによって風車または基礎を移動させる距離を短くすることができ、クレーンによる設置作業の短縮化を図ることができる。これにより、工事期間の短縮かおよび工事費用の低減が実現される。
本発明の第1実施形態にかかる洋上風車設置用船舶であり、風車を搭載した場合を示した斜視図である。 風車搭載位置と風車設置位置の関係を概略的に示した平面図である。 図1の洋上風車設置用船舶が基礎構造物を搭載した場合を示した斜視図である。 本発明の第2実施形態にかかる洋上風車設置用船舶であり、風車を搭載した場合を示した斜視図である。 図4の洋上風車設置用船舶を斜め下方から見た斜視図である。 風車の設置手順の変形例を示した平面図である。 船型本体の形状の変形例を示した平面図である。
 以下に、本発明にかかる実施形態について、図面を参照して説明する。
[第1実施形態]
 以下、本発明の第1実施形態について、図1~図3を用いて説明する。
 図1には、4台の風車を搭載した洋上風車設置用船舶1(以下、単に「船舶1」という。)が示されている。
 船舶1は、上面にデッキ2を有する船型本体3と、デッキ2の略中央に立設された主タワー4と、この主タワー4の上端に設置されたクレーン6とを備えている。
 船舶1の船型本体3は、図2のように平面視した場合に、略正方形とされた四隅から外方に張り出した張出部5が設けられている。すなわち、船型本体3は、正方形に対して、その対角線上に延在するX形状(十文字形状)が重ね合わされた外形状となっており、前後左右対称な形状とされている。各張出部5の間には、船型本体3の中央側(クレーン6側)に凹むように船型本体3の外形状を形成する側面縁部13が設けられており、これにより、隣り合う張出部5間には凹所11が形成されている。
 各張出部5には、図1に示すように、ジャッキアップ装置7が設けられており、張出部5を上下方向に貫通するジャッキアップ脚9が上下動させられるようになっている。風車を設置する作業時には、ジャッキアップ脚9の下端が海底に着床し、船舶1全体を持ち上げて足場を固定するようになっている。
 デッキ2上には、複数台(本実施形態では4台)の風車20が搭載されるようになっている。風車20は、風車タワー22と、増速機や発電機が収容されるナセル24と、風力を受けて回転する風車翼26とを備えている。これら風車タワー22、ナセル24及び風車翼26は、洋上輸送前の陸上にて予め組み立てられた上でデッキ2上に搭載されている。搭載時には、隣り合う風車20の風車翼26同士が干渉しないように、所定のアジマス角にて風車翼26が固定されている。具体的には、図1のように4台の風車20を搭載する場合には、同図において左側に位置した風車20のように、3枚とされた風車翼26が正面視してY形状となるようにアジマス角を設定して各風車翼26を固定し、これと隣り合う同図において右側に位置した風車20についてはY形状を上下反転させた逆Y形状となるように各風車翼26を固定する。すなわち、クレーン6を挟んで一対の風車20はY形状となるように各風車翼26が固定され、他対の風車20は逆Y形状となるように各風車翼26が固定される。
 なお、クレーン6を取り囲むように3台の風車20を設置する場合には、図1で示したようにY形状と逆Y形状の組合せとする必要は無く、一の風車翼26をY形状に設定した場合には、隣り合う他の風車20の風車翼26はY形状から所定角度(例えば5~10°)ずらした角度位置にて固定するようにすればよい。
 図2には、各風車20のデッキ2上における搭載位置が示されている。同図に示すように、各風車20は、クレーン6を中心として取り囲むように設けられ、クレーン6を支持する主タワー4と凹所11との間、具体的には、側面縁部13が主タワー4側に最も近づいた位置(隣り合う張出部5間の略中央位置)の近傍に設けられている。本実施形態では、デッキ2が前後左右対称形状となっているので、主タワー4の周囲の4カ所に風車の搭載位置が設けられている。
 図1に示すように、クレーン6は、デッキ2上に搭載された風車20を吊り上げて、風車20の目標設置位置となる基礎30上まで風車20を搬送できるようになっている。クレーン6は、ブーム6aと、フックを備えた吊り具6bと、吊り具6bからブーム6a先端を通過して巻上ドラム(図示せず)へと導かれる巻上ワイヤ6cとを備えている。クレーン6は、ブーム6aを起伏させることによって吊り具6bをクレーン6中心から半径方向に接近離間させることができるようになっており、また巻上ワイヤ6cを巻上ドラムで巻上げまたは繰り出すことによって、吊り具6bを上下させることができ、また、クレーン6を中心軸線回りに回転させることによって吊り具6bを旋回させることができる。
 クレーン6が風車20を吊り上げる際には、風車20下端および中間位置に掛け回された吊りワイヤ36を吊り具6bのフックに引っ掛けた状態で吊り上げるようになっている。
 風車20の目標設置位置となる基礎30は、図2に示すように、クレーン6から見て凹所11側に設けられている。すなわち、張出部5間に目標設置位置を挟み込むような状態で船舶1の位置が固定され、風車20の設置作業が行われる。
 基礎30は、海底に設置されて風車タワー22の下端を固定するものであり、例えば図1に示すように、金属材料で構成された骨組み構造とされている。
 風車タワー22の両側方には、風車ガイド32が立設され、風車20の転倒を防止している。
 主タワー4の中間位置には、操舵装置を備えた船橋40が設けられている。この船橋40の下方位置には、船員等の居住区域が設けられている。
 また、船舶1は、基礎30を輸送する際にも利用することができ、図3に示すように、基礎30を風車20と同様に搭載できる。なお、基礎30の大きさによっては、図3に示すように、基礎30の下端を設置するための延長部14を張出部5間に設けることが好ましい。
 次に、上記構成の船舶1を用いた風車20の洋上における設置方法について説明する。
 風車20は、洋上輸送前の陸上にて、風車タワー20、ナセル24及び風車翼26が予め組み立てられる。そして、陸側のクレーンまたは船舶1のクレーン6によって、船舶1のデッキ2上に搭載される。搭載される位置は、図2に示したように、側面縁部13が主タワー4側に最も近づいた位置の近傍である。本実施形態では、4台の風車20が同時に搭載される。
 風車20を搭載した後、各風車20の風車翼26が干渉しないように風車翼26のアジマス角を固定する。
 その後、図示しない曳航船によって船舶1は風車設置海域まで曳航される。なお、船舶1に推進装置を設け、自航するようにしてもよい。
 風車設置海域に到達すると、予め設置されている基礎30に接近し、図2に示すように、基礎30がクレーン6から見て凹所11側に位置するように、より具体的にはクレーン6のリーチ範囲内となる凹所11内に位置するように、隣り合う張出部5間に基礎30を挟み込む位置で停船する。この状態で、設置する予定の風車20に対向するように、目標設置位置が位置されることになる。
 停船後、ジャッキアップ装置7によってジャッキアップ脚9を海底に降ろし、ジャッキアップ脚9の下端を海底に着床させた後に、船舶1全体を持ち上げる。これにより、風車設置作業のための足場を固定する。
 そして、クレーン6によって、図2の矢印Aで示すように、風車20を、その搭載位置から基礎30上へと移動させる。このように、風車20の目標設置位置である基礎30がクレーン6から見て凹所11側に位置させているので、クレーン6によって風車20を吊り上げた後の移動距離を短くすることができ、クレーン6で吊った後に少し外側へブーム6aを振り出すだけで目標設置位置へと風車20を搬送することができるので、極めて簡便かつ短時間で設置作業を行うことができる。
 風車20を基礎30上へと搬送した後は、所定の固定作業等が行われ、風車20が基礎30上に確実に固定される。
 次の風車20を設置する際には、ジャッキアップ装置7によってジャッキアップ脚9を海底から引き上げ(ジャッキダウン)、次の目標設置位置まで船舶1を移動させる。そして、上述したのと同様に、設置する予定の風車20に対向するように、次の目標設置位置に位置する基礎30に対向させて停船させ、ジャッキアップを行い、設置作業を行う。
 この作業工程を順次繰り返して、船舶1に搭載された4台の風車の設置作業が行われる。
 なお、図3に示した基礎30を搭載した船舶1の設置作業についても、上述した風車の場合と同様に、目標位置まで移動し、ジャッキアップした後に、設置作業が行われる。
 以上の通り、本実施形態によれば、以下の作用効果を奏する。
 船舶1は、風車タワー22、ナセル24及び風車翼26が組み立てられた風車20、及び/又は、基礎30をそのまま風車設置海域まで運搬し設置するいわゆる風車一体設置を行うので、設置海域における組み立て作業を省略することができる。
 そして、外方へ張り出す張出部5を複数有する船型本体3とし、これら張出部5の間に形成された凹所11側(より具体的にはクレーン6のリーチ範囲内となる凹所11内)を目標設置位置として、風車20または基礎30をクレーン6によって設置することとしたので、クレーン6によって風車20または基礎30を移動させる距離を短くすることができ、クレーン6による設置作業の短縮化を図ることができる。
 また、船型本体3を前後左右対称形状として、4つの側面に面する4カ所に風車20または基礎30の搭載位置を設定して、4台を同時に運搬して設置することとした。これにより、多くの風車を一度に運搬して設置することができるので、風車の設置コストを下げることができる。
[第2実施形態]
 次に、本発明の第2実施形態について、図4及び図5を用いて説明する。
 第1実施形態に示した船舶1は、ジャッキアップ装置7を備えたいわゆるジャッキアップ船であるが、本実施形態の船舶1Bは、セミサブ(半没水)型とされている点が相違する。それ以外の構成は、第1実施形態と同様なので、共通する構成については同一符号を付しその説明を省略する。
 船舶1Bは、船型本体3の下面から下方に向かって伸びる複数のコラム52を備えており、各コラム52の下端にロワーハル54が固定されている。ロワーハル54は、船型本体3の対角線方向に延在するX形状(十文字形状)に倣って、略直交する2つの円筒体によって形成されたX形状(十文字形状)となっている。ロワーハル54は所定の浮力を与えるだけの大きさで水中に位置し、ロワーハル54内に海水等のバラストの出し入れによって重心を下げ所定の復原力を与える。このバラストの調整によって、喫水は、おおよそコラム52の中間位置に保たれる。
 本実施形態では、ロワーハル54がコラム52によって船型本体3から離間された状態で船型本体3の下方に設けられているので、バラスト張水などにより重心を下げ、しかもコラム52は所定の復原力が得られる程度に展開されかつ直径を細くすることで、波浪による船体の動揺を小さく抑えかつ所定の復原性を得ることができるようになっている。
 船型本体3の下面には、複数のプロペラ推進装置58が設けられている。風車20および基礎30の設置作業時には、これらプロペラ推進装置58を制御するDPS(Dynamic Positioning System)によって、船体の位置および姿勢を固定することができるようになっている。すなわち、本実施形態の船舶1Bは、第1実施形態のようにジャッキアップおよびジャッキダウンを行わずに船体の位置および姿勢を固定することができるので、作業時間を更に短縮することができる。
 なお、風車20及び基礎30を洋上の設置海域へと輸送し設置する工程は、上述した第1実施形態と同様なのでその説明を省略する。
 なお、上述した各実施形態では、設置する予定の風車20に対向するように、目標設置位置(基礎30の位置)を凹所11側に位置させて停船することとしたが、本発明はこれに限定されるものではなく、例えば、図6に示すように、目標設置位置(基礎30の位置)に対向する位置まで、他の搭載位置にある風車20を移動させ(矢印B参照)、その後、風車20を目標設置位置まで移動させる(矢印A)こととしても良い。他の搭載位置から目標設置位置に対向する搭載位置まで移動させる作業(矢印B参照)は、単にクレーン6を旋回させるだけで良いので、それほど作業時間の増大にはならない。
 また、図7に示すように、船型本体3の流体抵抗を低減するように、隣り合う張出部5の間に亘って壁部を設けても良い。具体的には、突出部を有する船首形状となるような船首壁部61や、張出部間に連続して直線状に連結して船側形状を成す船側壁部63を構成する。なお、これら船首壁部61や船側壁部63は、必要に応じて何れか一方を用いても良い。
 船首壁部61や船側壁部63が設けられた位置では、凹所11がなくなるので、この位置では風車20や基礎30の設置作業を行うことができない。このような場合には、凹所11が形成された搭載位置まで風車20を移動させ(矢印B参照)、その後、設置作業が行われる。
  1,1B 船舶(洋上風車設置用船舶)
  2 デッキ
  3 船型本体
  5 張出部
  6 クレーン
  7 ジャッキアップ装置
  9 ジャッキアップ脚
 11 凹所
 20 風車
 22 風車タワー
 24 ナセル
 26 風車翼
 30 基礎
 52 コラム
 54 ロワーハル

Claims (10)

  1.  タワー、ナセル及び風車翼が組み立てられた風車、及び/又は、下端が海底に固定されるとともに上端に風車が固定される基礎をデッキ上に搭載し、風車設置海域まで自航または曳航し、前記デッキ上に設けられたクレーンによって前記風車または前記基礎を吊り上げて洋上の目標設置位置に設置する洋上風車設置用船舶であって、
     外方へ張り出す張出部を複数有した船型本体とされ、
     前記クレーンは、隣り合う前記張出部の間に形成された凹所側を前記目標設置位置として前記風車または前記基礎を設置する洋上風車設置用船舶。
  2.  前記目標設置位置は、前記クレーンのリーチ範囲内となる前記凹所内に設けられている請求項1に記載の洋上風車設置用船舶。
  3.  複数台の前記風車及び/又は複数台の前記基礎の前記デッキ上における搭載位置は、前記クレーンを中心として取り囲むように設けられている請求項1又は2に記載の洋上風車設置用船舶。
  4.  前記搭載位置は、前記クレーンと前記凹所の間に設けられている請求項1から3のいずれかに記載の洋上風車設置用船舶。
  5.  各前記張出部には、前記船型本体を海底から持ち上げて支持するジャッキアップ装置が設けられている請求項1から4のいずれかに記載の洋上風車設置用船舶。
  6.  船型本体の下方には、複数のコラムを介してロワーハルが設けられている請求項1から4のいずれかに記載の洋上風車設置用船舶。
  7.  前記船型本体は、平面視した場合に、略正方形の四隅から外方に前記張出部が張り出した形状とされ、前後左右方向に対称とされた形状とされている請求項1から6のいずれかに記載の洋上風車設置用船舶。
  8.  前記凹所が形成された位置とは別の位置に、流体抵抗を低減する壁部が隣り合う前記張出部の間に亘って設けられている請求項1から6のいずれかに記載の洋上風車設置用船舶。
  9.  タワー、ナセル及び風車翼が組み立てられた風車、及び/又は、下端が海底に固定されるとともに上端に風車が固定される基礎をデッキ上に搭載し、風車設置海域まで自航または曳航し、前記デッキ上に設けられたクレーンによって前記風車または前記基礎を吊り上げて洋上の目標設置位置に設置する洋上風車設置用船舶を用いた洋上風車設置方法であって、
     前記洋上設置用船舶は、外方へ張り出す張出部を複数有した船型本体とされ、
     前記クレーンは、隣り合う前記張出部の間に形成された凹所側を前記目標設置位置として前記風車または前記基礎を設置する洋上風車設置用船舶を用いた洋上風車設置方法。
  10.  前記風車を正面視した場合の各前記風車翼の角度位置が、隣り合う前記風車の前記風車翼の角度位置と異なるように各前記風車翼を固定して複数台の前記風車を前記デッキ上に搭載する請求項9に記載の洋上風車設置用船舶を用いた洋上風車設置方法。
PCT/JP2011/050481 2010-11-05 2011-01-13 洋上風車設置用船舶およびこれを用いた洋上風車設置方法 WO2012060112A1 (ja)

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
JP2010248527 2010-11-05
JP2010-248527 2010-11-05
JP2010274503A JP2012112370A (ja) 2010-11-05 2010-12-09 洋上風車設置用船舶およびこれを用いた洋上風車設置方法
JP2010-274503 2010-12-09

Publications (1)

Publication Number Publication Date
WO2012060112A1 true WO2012060112A1 (ja) 2012-05-10

Family

ID=46024237

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2011/050481 WO2012060112A1 (ja) 2010-11-05 2011-01-13 洋上風車設置用船舶およびこれを用いた洋上風車設置方法

Country Status (2)

Country Link
JP (1) JP2012112370A (ja)
WO (1) WO2012060112A1 (ja)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102765466A (zh) * 2012-07-27 2012-11-07 北京金风科创风电设备有限公司 半潜式海上浮动风机基础
JP2020514181A (ja) * 2016-12-27 2020-05-21 ノーチラス フローティング ソリューションズ エスエル 浮体式海洋プラットフォーム

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102758447B (zh) * 2012-07-30 2014-09-17 北京金风科创风电设备有限公司 半潜式海上浮动风机基础
JP6329461B2 (ja) * 2014-08-11 2018-05-23 鹿島建設株式会社 洋上風車の設置方法、洋上風車設置用フローティングドック

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004001750A (ja) * 2003-06-25 2004-01-08 Penta Ocean Constr Co Ltd 特殊作業船及び洋上構造物の施工方法
JP2006037397A (ja) * 2004-07-23 2006-02-09 Kinsho Bussan Kk 洋上風力発電施設の施工方法
JP2008013101A (ja) * 2006-07-07 2008-01-24 Japan Drilling Co Ltd 浮体式構造物の補助浮力体及び浮体式構造物の改造方法
JP2010175262A (ja) * 2009-01-27 2010-08-12 Koichiro Mori 海上移動式原子力発電プラント

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102079476A (zh) * 2009-11-27 2011-06-01 三一电气有限责任公司 一种风机抱举装置及移动式水上作业平台
CN102079477A (zh) * 2009-11-27 2011-06-01 三一电气有限责任公司 一种风机抱举装置及移动式水上作业平台
DK2436593T3 (en) * 2010-10-01 2014-02-17 Nordic Yards Holding Gmbh Ship and method of transport and installation of offshore structures

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004001750A (ja) * 2003-06-25 2004-01-08 Penta Ocean Constr Co Ltd 特殊作業船及び洋上構造物の施工方法
JP2006037397A (ja) * 2004-07-23 2006-02-09 Kinsho Bussan Kk 洋上風力発電施設の施工方法
JP2008013101A (ja) * 2006-07-07 2008-01-24 Japan Drilling Co Ltd 浮体式構造物の補助浮力体及び浮体式構造物の改造方法
JP2010175262A (ja) * 2009-01-27 2010-08-12 Koichiro Mori 海上移動式原子力発電プラント

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102765466A (zh) * 2012-07-27 2012-11-07 北京金风科创风电设备有限公司 半潜式海上浮动风机基础
CN102765466B (zh) * 2012-07-27 2016-07-06 北京金风科创风电设备有限公司 半潜式海上浮动风机基础
JP2020514181A (ja) * 2016-12-27 2020-05-21 ノーチラス フローティング ソリューションズ エスエル 浮体式海洋プラットフォーム
JP7053663B2 (ja) 2016-12-27 2022-04-12 ノーチラス フローティング ソリューションズ エスエル 浮体式海洋プラットフォーム

Also Published As

Publication number Publication date
JP2012112370A (ja) 2012-06-14

Similar Documents

Publication Publication Date Title
JP5383631B2 (ja) 洋上風車設置用船舶およびこれを用いた洋上風車設置方法
CN111807239B (zh) 起重机、包括这种起重机的船舶以及用于竖立纵向结构的方法
JP6022170B2 (ja) 風力タービンを洋上サイトに輸送するための船舶およびそれを設置する方法
US20090217852A1 (en) Method and apparatus for transporting and mounting offshore wind generators
JP5189050B2 (ja) 連結型自己昇降式作業台船及び外洋における風力発電施設の設置方法
US10906785B2 (en) Crane for wind turbine blade assembly, a vessel, a hoisting method, and an assembly method
JP2004001750A (ja) 特殊作業船及び洋上構造物の施工方法
WO2012066790A1 (ja) 洋上風車設置用船舶およびこれを用いた洋上風車設置方法
US20220234697A1 (en) A floating structure and method of installation
JP2020172872A (ja) セミサブ浮体、及びセミサブ浮体を用いた風車の洋上設置方法
KR101401985B1 (ko) 수상구조물 설치용 잭업식 플로팅 크레인
WO2012060112A1 (ja) 洋上風車設置用船舶およびこれを用いた洋上風車設置方法
US20230399206A1 (en) Offshore wind turbine assembly vessel
WO2022229455A1 (en) Upend crane and installation vessel
JP5820953B1 (ja) 風力発電装置の組み付け方法、風力発電装置の分解方法、風力発電装置の設置方法、及び風力発電装置の作業用船舶
WO2017204656A1 (en) A vessel and method of employing a vessel, e.g. in a process of maintaining or assembling an offshore windmill, and a related assembly
JP2021024352A (ja) 浮体構造物設置システム、及び、浮体構造物設置方法
JP2014227765A (ja) 洋上風力発電施設の据付方法及び洋上風力発電施設用バージ
CN106089597B (zh) 海上风电机组用运输安装平台
JP2018203195A (ja) 洋上施工用浮体
JP7197118B2 (ja) クレーンを備えた作業台船及びそのクレーン運用方法
JP2014148261A (ja) 作業台船の固定方法、保守方法、設置方法、浮体及び浮体式風力設備
CN214729534U (zh) 一种自漂浮稳桩平台
TWI834746B (zh) 具備起重機之作業台船及其起重機運用方法
JP2012112239A (ja) 洋上風力発電施設の施工方法

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 11837766

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 11837766

Country of ref document: EP

Kind code of ref document: A1