WO2011132273A1 - 板厚制御装置、板厚制御方法、板厚制御プログラム - Google Patents

板厚制御装置、板厚制御方法、板厚制御プログラム Download PDF

Info

Publication number
WO2011132273A1
WO2011132273A1 PCT/JP2010/057051 JP2010057051W WO2011132273A1 WO 2011132273 A1 WO2011132273 A1 WO 2011132273A1 JP 2010057051 W JP2010057051 W JP 2010057051W WO 2011132273 A1 WO2011132273 A1 WO 2011132273A1
Authority
WO
WIPO (PCT)
Prior art keywords
rolling load
roll
rolling
backup
work roll
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
PCT/JP2010/057051
Other languages
English (en)
French (fr)
Inventor
宏幸 今成
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toshiba Mitsubishi Electric Industrial Systems Corp
Original Assignee
Toshiba Mitsubishi Electric Industrial Systems Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toshiba Mitsubishi Electric Industrial Systems Corp filed Critical Toshiba Mitsubishi Electric Industrial Systems Corp
Priority to JP2012511448A priority Critical patent/JP5637637B2/ja
Priority to CN201080066250.5A priority patent/CN102858475B/zh
Priority to AU2010351732A priority patent/AU2010351732B2/en
Priority to KR1020127027080A priority patent/KR101414871B1/ko
Priority to PCT/JP2010/057051 priority patent/WO2011132273A1/ja
Publication of WO2011132273A1 publication Critical patent/WO2011132273A1/ja
Anticipated expiration legal-status Critical
Ceased legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21BROLLING OF METAL
    • B21B37/00Control devices or methods specially adapted for metal-rolling mills or the work produced thereby
    • B21B37/16Control of thickness, width, diameter or other transverse dimensions
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21BROLLING OF METAL
    • B21B37/00Control devices or methods specially adapted for metal-rolling mills or the work produced thereby
    • B21B37/16Control of thickness, width, diameter or other transverse dimensions
    • B21B37/18Automatic gauge control
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21BROLLING OF METAL
    • B21B37/00Control devices or methods specially adapted for metal-rolling mills or the work produced thereby
    • B21B37/58Roll-force control; Roll-gap control

Definitions

  • the present invention relates to plate thickness fluctuation caused by so-called roll eccentricity, etc., which occurs in relation to the rotation position of a work roll or the like in a plate thickness control device, plate thickness control method, plate thickness control program in a metal material rolling mill.
  • the present invention relates to a plate thickness control device, a plate thickness control method, and a plate thickness control program.
  • the thickness control method includes a monitor AGC that feeds back the measured value of the thickness gauge installed on the exit side of the rolling mill, and a gauge that uses the gauge meter thickness estimated from the rolling load and roll gap (gap between the upper and lower work rolls).
  • meter AGC Gage meter AGC: GM-AGC
  • MMC mill constant variable control by rolling load
  • Disturbances that hinder the improvement of sheet thickness accuracy include temperature fluctuations of the rolled material in hot rolling.
  • Disturbances common to hot rolling and cold rolling include other controls such as tension fluctuation due to deterioration of tension control, speed and roll gap changes by operator's manual intervention, roll structure and roll polishing system failure There is eccentricity.
  • roll eccentricity is caused by the shaft moving up and down when the keyway in a backup roll having an oil bearing receives a large rolling load of several hundred tons to a few thousand tons.
  • roll gap fluctuations occur.
  • a roll gap variation depending on roll rotation occurs due to, for example, asymmetry during roll polishing and uneven thermal expansion.
  • the work roll is referred to as a work roll (Work Roll: WR may be abbreviated), and the backup roll is referred to as a backup roll (Back UP Roll: BUR may be abbreviated). I will decide.
  • ⁇ Disturbances that depend on roll axis runout such as roll eccentricity cannot be detected by the roll gap detector.
  • the apparatus for setting the roll gap is controlled by feeding back the detection value by the roll gap detector so as to be a given gap.
  • the roll axis fluctuation does not appear in the detection value, it cannot be controlled.
  • disturbances that depend on roll axis runout appear in the rolling load because they change the actual roll gap. For this reason, it becomes big disturbances, such as said MMC using a rolling load, GM-AGC.
  • a rolling mill that rolls a metal material, resulting from roll eccentricity of the upper and lower work rolls and upper and lower backup rolls of the rolling stand.
  • It is a plate thickness control device that controls fluctuations in plate thickness, which is detected by a rolling load detector that detects the kiss roll load and rolling load, and a rolling load detector at multiple rotational positions of the upper and lower work rolls and the upper and lower backup rolls. Based on the kiss roll load, the fluctuation component of the kiss roll load due to the eccentricity of the upper work roll and the upper backup roll at each rotational position, and the lower work roll and the lower backup roll at each rotational position.
  • Kiss roll load fluctuation extraction means for separately extracting fluctuation components caused by roll eccentricity, The upper work roll and the upper backup roll at each rotational position of the rolling load detected by the rolling load detector at each rotational position based on each fluctuation component of the load at the kiss roll separately extracted by the load fluctuation extracting means at the time of rolling Rolling load vertical fluctuation extracting means for separately extracting the fluctuation component caused by roll eccentricity and the fluctuation component caused by roll eccentricity of the lower work roll and the lower backup roll at each rotational position, and rolling load vertical An operation amount for calculating a roll gap command value corresponding to each rotational position so as to reduce the plate thickness variation of the rolled metal material based on each variation component of the rolling load extracted separately by the variation extracting means.
  • a roll gap operating means for operating the roll gap, and the rolling load fluctuation caused by the rotation of the upper roll and the rolling load fluctuation caused by the rotation of the lower roll are accurately separated and separated.
  • a plate thickness control device that controls the roll gap according to each rolling load variation has been proposed (see, for example, Patent Document 1).
  • the occurrence of beats or beats will be described.
  • the upper and lower backup roll diameters are different, the upper backup roll rotation frequency is ⁇ T [rad / s] and the lower backup roll rotation frequency is ⁇ B [rad / s]. If there is no initial phase difference, the signal Y after superimposing the rotation of the upper and lower backup rolls is as follows.
  • the frequency of the sine wave (sin) is ⁇ T + ⁇ B [rad / s], and the frequency is high, that is, a short period and fine vibration appear.
  • the frequency of the cosine wave (cos) is ⁇ T ⁇ B [rad / s], and the frequency is low, that is, a long period and a large vibration appear.
  • FIG. 8B shows an example of the waveform of sin (w T t) and sin (w B t) superimposed (solid line) and cos ⁇ (w T ⁇ w B ) t / 2 ⁇ (dashed line). Show. The horizontal axis is time (s). It can be seen that the envelope of the superimposed waveform is represented by a long-period wave (broken line).
  • a plate thickness control device capable of operating the roll gap of the rolling stand using a rolling load measured during rolling without using a kiss roll load.
  • the purpose is to provide.
  • the first feature of the plate thickness control device is that a metal material is provided between the upper roll set of the upper roll set and the lower roll set of the lower work roll and the backup roll.
  • a thickness control device for controlling a thickness variation of a rolled material manufactured by rolling a rolling load detecting means for detecting a rolling load on the metal material, and a rolling detected by the rolling load detecting means
  • Rolling load vertical distribution means for distributing the load up and down based on the ratio of the upper rolling load generated in the upper roll set and the lower rolling load generated in the lower roll set;
  • the upper roll set and the front Rolling load up / down fluctuation value extracting means for extracting the upper rolling load fluctuation value and lower rolling load fluctuation value generated in relation to the rotation position of the lower roll set, and the rolling load up / down fluctuation value extracting means Based on the upper rolling load fluctuation value and the lower rolling load fluctuation value,
  • a second feature of the sheet thickness control apparatus is that the operation amount calculation means is configured to perform the rolling until the upper roll set and the lower roll set rotate for a predetermined time or more.
  • a work roll gap command value between the upper work roll and the lower work roll is calculated based on the upper rolling load fluctuation value and the lower rolling load fluctuation value separately extracted by the load vertical fluctuation value extraction means.
  • rolls of upper and lower backup rolls based on the integrated value of the rolling load fluctuation value calculated by the rolling load fluctuation value extraction means
  • a work flow between the upper work roll and the lower work roll is identified based on the identified roll knitting core quantity. Calculating a gap instruction value lies in.
  • a third feature of the sheet thickness control device is that the rolling load up-and-down distribution means has a ratio for vertically distributing the rolling load detected by the rolling load detection means, Immediately after exchanging the backup roll, it is set to 0.5, and after exchanging the backup roll, the subsequent rolled material is set based on the deviation of the rolling load in the operation amount calculating means of the current rolled material.
  • a fourth feature of the sheet thickness control apparatus is characterized in that the rolling load vertical distribution means has a ratio for vertically distributing the rolling load detected by the rolling load detection means, Immediately after exchanging the backup roll, set to 0.5, and after exchanging the backup roll, after the next rolled material, the amplitude of the periodic function using the integrated value of the rolling load fluctuation value in the operation amount calculation means of the current rolled material And setting a ratio to the sum of the amplitude for the upper roll set and the amplitude for the lower roll set.
  • the thickness control method is characterized in that a metal material is rolled between an upper roll set of an upper roll set and a lower roll set of a lower work roll and a backup roll.
  • a thickness control method for controlling a thickness variation of a rolled material manufactured by the method wherein a step of detecting a rolling load on the metal material, and the detected rolling load is generated in the upper roll set Based on the ratio of the upper rolling load and the lower rolling load generated in the lower roll set, the step of allocating up and down, the upper roll set and the lower roll set distributed up and down Based on the rolling load, the upper rolling load fluctuation value and the lower rolling load generated in relation to the rotational positions of the upper roll set and the lower roll set.
  • a work roll gap command value between the upper work roll and the lower work roll is calculated based on the extracted upper rolling load fluctuation value and lower rolling load fluctuation value. And a step of manipulating a work roll gap between the upper work roll and the lower work roll based on the calculated work roll gap command value.
  • the thickness control program is characterized by rolling a metal material between an upper roll set of an upper roll set and a lower roll set of a lower work roll and a backup roll.
  • the rolling load fluctuation component generated in relation to the roll rotation position such as roll eccentricity using the rolling load measured during rolling of the metal material without using the kiss roll load, that is, the roll A rolling load fluctuation component due to eccentricity or the like is extracted, and the roll gap of the rolling stand can be manipulated so as to reduce the rolling load fluctuation.
  • FIG. 1 is an overall configuration diagram showing a plate thickness control apparatus according to a first embodiment of the present invention.
  • a plate thickness control apparatus is a control apparatus including a rolling mill that rolls a rolled material 1 made of a metal material, and includes a housing 2, an upper work roll 3a, and a lower work roll 3a.
  • the work roll constituted by the side work roll 3b, the backup roll 4 constituted by the upper backup roll 4a and the lower backup roll 4b, the rolling means 5 for applying the rolling load to the rolled material 1, and the rolling load are detected.
  • Rolling load detection means 6 a roll rotation number detector 7 for detecting the rotation number of the roll, a roll reference position detector 8 for detecting a predetermined reference position every time the backup rolls 4a and 4b make one rotation, and a work roll A roll gap detector 9 that detects a gap between 3a and 3b, that is, a roll gap, is provided.
  • the upper work roll 3a and the upper backup roll 4a constitute the upper roll set of the present invention
  • the lower work roll 3b and the lower backup roll 4b constitute the lower roll set of the present invention.
  • the sheet thickness control apparatus includes a rolling load vertical distribution means 10, a rolling load vertical fluctuation extraction means 11, an operation amount calculation means 12, Roll gap operating means 13.
  • the rolling load up-and-down distribution means 10 uses the upper work roll 3a and the upper backup, which are upper roll sets, to detect the rolling load detected by the rolling load detection means 6 at a plurality of rotational positions of the work rolls 3a and 3b and the backup rolls 4a and 4b. Based on the ratio between the upper rolling load generated in the roll 4a and the lower rolling load generated in the lower work roll 3b and the lower backup roll 4b as the lower roll set, the upper and lower rolling loads are distributed vertically.
  • the rolling load up / down variation extracting means 11 relates to the rotational positions of the upper roll set and the lower roll set based on the rolling load of the upper roll set and the lower roll set distributed up and down by the rolling load up / down distribution means 10. Thus, the upper rolling load fluctuation value and the lower rolling load fluctuation value generated are extracted.
  • the operation amount calculation means 12 is based on the fluctuation components above and below the rolling load separately extracted by the rolling load vertical fluctuation extraction means 11 so as to reduce the plate thickness fluctuation of the rolled material 1 being rolled.
  • a roll gap command value corresponding to each rotational position is calculated.
  • the roll gap operating means 13 is for operating the roll gap corresponding to each rotational position based on the roll gap command value calculated by the operation amount calculating means 12.
  • the roll gap operating means 13 uses, for example, a value obtained by adding the roll gap correction amount calculated by the operation amount calculating means 12 to the roll gap amount obtained by MMC or GM-AGC as a set value of the roll gap. , Controlling the reduction means 5.
  • the plate thickness control apparatus is configured as described above, and the roll gap and speed are appropriately adjusted so that the rolled material 1 has a desired plate thickness on the exit side.
  • the work rolls 3a and 3b are rolled.
  • the work rolls 3a and 3b are supported by the upper backup roll 4a from above and the lower work rolls 3a and 3b are supported from below by the lower backup roll 4b. It is configured so that there is less deflection.
  • the backup rolls 4 a and 4 b are rotatably supported with respect to the rolling mill housing 2 and have a structure that can sufficiently withstand a rolling load applied to the rolled material 1.
  • roller-down means 5 There are two types of rolling-down means 5, one based on motor control (referred to as electric pressure reduction) and one based on hydraulic control (referred to as hydraulic pressure reduction). For this reason, in order to perform rolling load control corresponding to a wave component having a short period such as disturbance due to roll eccentricity, generally, hydraulic pressure reduction capable of high-speed response is employed. Further, the gap between the work rolls 3 a and 3 b, that is, the roll gap is adjusted by the reduction means 5.
  • the rolling load detection means 6 is, for example, a method of directly measuring a rolling load with a load cell (Load Cell) embedded between the rolling mill housing 2 and the reduction means 5 or a pressure detected by the hydraulic reduction means.
  • the rolling load is detected by a method of calculating the rolling load.
  • the roll rotation number detector 7 is provided on the work rolls 3a and 3b and the shaft (not shown) of the electric motor that drives the work rolls 3a and 3b, and detects the rotation number of the work rolls 3a and 3b. .
  • the roll rotation number detector 7 detects, for example, a pulse output unit that outputs a pulse corresponding to the rotation angle of the work rolls 3a and 3b, and a pulse output from the pulse output unit to detect the work rolls 3a and 3b. Is provided so as to be able to detect a more detailed rotation angle as well as the rotation number of the work rolls 3a and 3b.
  • the roll reference position detector 8 detects the reference position by, for example, detecting a detection object provided on the backup rolls 4a and 4b by a sensor such as a proximity switch every time the backup rolls 4a and 4b make one rotation. To do. Further, for example, by using a pulse generator (Pulse Generator), a pulse depending on the rotation angle of the backup rolls 4a and 4b is taken out, and the reference position is detected by detecting the rotation angle of the backup rolls 4a and 4b. .
  • FIG. 1 shows the case where the roll reference position detector 8 is attached only to the upper backup roll 4a, the roll reference position detector 8 is attached to the backup rolls 4a and 4b, and each of the backup rolls 4a and 4b. You may comprise so that a reference position may be detected.
  • the roll gap detector 9 is provided between, for example, the backup rolls 4a and 4b and the rolling-down means 5, and detects a roll gap that is indirectly formed between the work rolls 3a and 3b.
  • FIG. 2 is a diagram showing the concept of rolling load measured by the plate thickness control apparatus according to the first embodiment.
  • FIG. 2 shows a rolling load 101 when roll eccentricity does not occur, and a rolling load 102 when roll eccentricity occurs, and 1 in the backup rolls 4a and 4b from time t1 to time t2. This is the amount of rotation.
  • the rolling load 101 is time t, that is, the rotation of the roll, due to the temperature change or the plate thickness change of the rolled material 1 even when the roll eccentricity does not occur in the backup rolls 4a and 4b. Fluctuates with.
  • the rolling load 102 is obtained by superimposing the rolling load fluctuation due to other than roll eccentricity on the rolling load fluctuation component due to roll eccentricity.
  • the specific control in the plate thickness control apparatus described below accurately separates the rolling load fluctuation due to roll eccentricity and the rolling load fluctuation due to other than roll eccentricity, and the rolling load fluctuation due to roll eccentricity is separated from the main plate. It is a basic idea to control with a thickness control device and to control rolling load fluctuations other than roll eccentricity with the MMC or GM-AGC.
  • FIG. 3 is a diagram for explaining the positional relationship between the work rolls (WR) 3a and 3b and the backup rolls (BUR) 4a and 4b.
  • the backup rolls (BUR) 4a and 4b are provided with a position scale 14 for detecting the rotational position. Further, a reference position 4c that is preset in a part of the backup rolls (BUR) 4a and 4b and rotates in conjunction with the rotation of the backup rolls (BUR) 4a and 4b is shown.
  • the position scale 14 is provided, for example, immediately outside the backup rolls (BUR) 4a and 4b so as to surround the backup rolls (BUR) 4a and 4b, and the entire circumference of the backup rolls (BUR) 4a and 4b is n.
  • a scale is provided so as to be equally divided, that is, every predetermined angle (360 / n degrees) around the rotation axis of the backup rolls (BUR) 4a and 4b.
  • the reference position 14a (fixed reference position) of the position scale 14 is set to 0 and numbering is performed up to the (n-1) th.
  • the position scale 14 is provided to explain the rolling load up / down fluctuation extracting means 11 and the like, and the scale itself may not be attached to actual equipment.
  • ⁇ WT0 is the rotation angle of the work roll 3 when the reference position 4c of the backup rolls (BUR) 4a, 4b coincides with the fixed reference position 14a
  • ⁇ WT is the backup roll (BUR) 4a, 4b is the rotation angle of the work roll 3 after rotating by ⁇ BT .
  • represents an angle
  • the left side W of the subscript represents the work roll 3
  • B represents the backup roll 4
  • the right side T of the subscript represents the upper side
  • B represents the lower side.
  • the rotation angles of the backup rolls (BUR) 4a, 4b are the reference positions 4c of the backup rolls (BUR) 4a, 4b from the fixed reference position 14a to the backup rolls (BUR) 4a, 4b.
  • the rotation angle of the backup rolls (BUR) 4a and 4b is 90 degrees
  • the reference position 4c of the backup rolls (BUR) 4a and 4b is changed from the fixed reference position 14a to the backup rolls (BUR) 4a and 4b. It shows that it is in a position rotated 90 degrees in the direction of rotation.
  • the state in which the rotation angle of the backup rolls (BUR) 4a, 4b is at the closest scale of the position scale 14 (for example, the jth scale of the position scale 14) is the rotation angle of the backup rolls (BUR) 4a, 4b.
  • a description will be given assuming that the number is j.
  • the roll reference position detector 8 may be configured by a body.
  • the proximity sensor provided at the reference position 4c of the backup rolls (BUR) 4a, 4b is embedded in the reference position 14a by rotating together with the backup roll 4 and reaching the fixed reference position 14a.
  • the detected object is detected by the proximity sensor. That is, it is recognized that the reference position 4c of the backup rolls (BUR) 4a and 4b has passed the fixed reference position 14a.
  • the roll reference position detector 8 is not essential for the present invention.
  • the division positions from the fixed reference positions 0 to n ⁇ 1 are made equal to the division of the rolling load recording area (P 0 to P n-1 in FIG. 5) in FIG.
  • the rolling load at is stored in the recording area.
  • the calculation processing capability of the controller must be high, so it is necessary to pay attention to the contradictory relationship between the fineness of control and the calculation capability.
  • the backup roll rotation angle represents an angle at which the backup roll reference position moves from the fixed reference position according to the rotation of the backup rolls 4a and 4b.
  • the backup roll rotation angle being 90 degrees indicates that the backup roll reference position is 90 degrees in the rotation direction of the backup rolls 4a and 4b from the fixed reference position.
  • the backup roll rotation angle number is i.
  • FIG. 4 is a diagram showing a change in rolling load accompanying a change in the rotation angle of the backup roll.
  • the rolling load indicates P10
  • the rotation angle number of the backup roll 4 is The rolling load changes as P 11 , P 12 , P 13 ,.
  • the rotation angle number becomes 0 again from (n ⁇ 1)
  • the rolling load P 20 is collected, the rolling loads P 10 and P 20 are connected by the straight line 103.
  • This straight line 103 can be regarded as a rolling load excluding a rolling load fluctuation due to roll eccentricity. Therefore, the rolling load fluctuation due to roll eccentricity can be obtained from the difference between the rolling load P 11 , P 12 , P 13 ... P 20 measured at each rotation angle number and the straight line.
  • the actually measured value (actual value) of the rolling load P ij includes a noise component in addition to the rolling load fluctuation due to temperature fluctuation, plate thickness fluctuation, tension fluctuation, etc., and rolling load fluctuation due to roll eccentricity. There are many cases. For this reason, the actual value of the actual rolling load P ij is not distributed on a gentle curve as shown in FIG. 4, but the rolling load P i0 at the starting point and the rolling load P at the end point to be connected to obtain the straight line. It may be difficult to specify (i + 1) 0 .
  • the measured rolling loads P i0 , P i1 , P i2 , P i3 ... P (i + 1) regarded as a variation component of the difference [Delta] P ij between the n average value of rolling load P i0, P i1, P i2 , P i3 ... P i (n-1), due to roll eccentricity rolling force be able to.
  • the advantage of this method is that the collection of the actual value of the rolling load can be reduced to the (n-1) th section, and it is strong against fluctuations in the rolling load due to noise or the like. Note that it is also an effective means to reduce the noise component by filtering the actual value of the rolling load.
  • the rolled material 1 is an upper and lower work roll 3a whose gap and speed are appropriately adjusted so that a desired thickness is obtained on the exit side of the present apparatus. , 3b.
  • the work rolls 3a and 3b are supported by the backup rolls 4a and 4b so as to reduce the deflection in the roll width direction.
  • the backup rolls 4 a and 4 b are supported by the rolling mill housing 2 and have a structure that can withstand the rolling load of the rolled material 1.
  • the gap between the upper and lower work rolls 3 a and 3 b is adjusted by the rolling-down means 5.
  • reduction means 5 There are two types of reduction means 5, one based on electric motor control (referred to as electric reduction) and one based on hydraulic control (referred to as hydraulic reduction).
  • electric reduction electric motor control
  • hydraulic reduction hydraulic pressure reduction is often used because high-speed response is required to control disturbance such as roll eccentricity with a short cycle.
  • the rolling load detection means 6 detects the rolling load.
  • the rolling load is embedded between the rolling mill housing 2 and the rolling-down means 5 and uses a load cell (Load ⁇ ⁇ Cell) for directly measuring the rolling load, or the rolling load is detected from the pressure detected by the hydraulic rolling-down means. There is a way to calculate the rolling load.
  • the roll speed detector 7 is attached to the work rolls 3a and 3b or the motor shaft that drives the work rolls 3a and 3b, and detects the roll speed. Some can output a pulse corresponding to the roll rotation angle, and may be used to detect the roll rotation angle. If the ratio of the diameters of the work rolls 3a, 3b and the backup rolls 4a, 4b is known, if there is no slip between the work rolls 3a, 3b and the backup rolls 4a, 4b, the rotation speed and rotation angle of the work rolls 3a, 3b The rotation speed and rotation angle of the backup rolls 4a and 4b can be easily obtained.
  • the roll reference position detector 8 detects the reference position by a proximity switch or the like every time the backup rolls 4a and 4b make one rotation.
  • a pulse generator or the like may be attached to extract a pulse depending on the rotation angle, and the rotation angle itself may be detected, but it is possible to detect at least a reference position for each rotation.
  • FIG. 1 shows the case where the backup rolls 4a and 4b are attached to either or both of them.
  • the rotation angle of the work rolls 3a, 3b is known, the diameter ratio of the work rolls 3a, 3b and the backup rolls 4a, 4b can be determined from the diameter ratio of the backup rolls 4a, 4b.
  • the rotation angle can be calculated from the following equation.
  • the roll reference position detector 8 in FIG. 1 is not essential to the present invention.
  • the roll gap detector 9 is installed between the backup rolls 4a and 4b and the reduction means 5, and indirectly detects the gap between the work rolls 3a and 3b.
  • the rolling load upper and lower distribution means 10 assumes that the rolling load P detected by the rolling load detection means 6 is generated separately for the upper backup roll 4a and the lower backup roll 4b, and the upper backup roll.
  • the rolling load PT generated in 4 a and the rolling load P B generated in the lower backup roll 4 b are separated and output to the rolling load vertical fluctuation extracting means 11.
  • FIG. 5 is a block diagram showing in detail a configuration example of the rolling load up / down fluctuation extracting means 11 and the operation amount calculating means 12 of the sheet thickness control apparatus according to the first embodiment.
  • the rolling load up / down fluctuation extracting means 11 has an upper load fluctuation extracting means 111 and a lower load fluctuation extracting means 112.
  • the upper load fluctuation extracting unit 111 calculates fluctuation components caused by roll eccentricity of the rolling load PTj at a plurality of rotational positions of the upper backup roll 4a. To extract.
  • the lower load fluctuation extraction unit 112 is based on the rolling load P B separated by the rolling load up-and-down distribution unit 10 and changes due to roll eccentricity of the rolling load P Bj at a plurality of rotational positions of the lower backup roll 4b. The component is extracted.
  • the upper load fluctuation extracting unit 111 includes a rolling load recording unit 111a, an average value calculating unit 111b, and a deviation calculating unit 111c.
  • the lower load fluctuation extracting unit 112 includes a rolling load recording unit 112a, an average value calculating unit 112b, and a deviation calculating unit 112c.
  • the rolling load recording means 111a is n rolling load recording means provided corresponding to the respective rotation angle numbers of the backup rolls 4a and 4b.
  • Each rolling load recording means 111a, backup rolls 4a, 4b is rolling load P Tj when reaching the rotation angle number corresponding is recorded a predetermined time period.
  • the deviation calculating means 111c is provided corresponding to each rolling load recording means 111a, respectively, and the deviation ⁇ P Tj from the average value of the rolling load PTj recorded in the corresponding rolling load recording means 111a is calculated as a backup roll. Every time 4a and 4b rotate, it calculates and outputs. The same applies to the rolling load recording means 112a, the average value calculating means 112b, and the deviation calculating means 112c of the lower load fluctuation extracting means 112.
  • the operation amount calculation means 12 includes an upper addition means 121, a lower addition means 122, an upper switch 123, a lower switch 124, and a roll gap correction amount calculation means 125.
  • the upper addition means 121 adds the fluctuation component due to roll eccentricity of the rolling load PTj output from the upper load fluctuation extraction means 111 for each rotation angle number.
  • the lower addition means 122 adds the fluctuation component due to roll eccentricity of the rolling load P Bj output from the lower load fluctuation extraction means 112 for each rotation angle number.
  • Upper switch 123 has been added for each rotation angle numbers by an upper adder means 121, the fluctuation component due to roll eccentricity of a rolling load P Tj, i.e. the upper rolling load variation value of the backup roll 4a which is a deviation of the rolling load P Tj It is output according to the rotation angle number.
  • the lower switch 124 backs up the fluctuation component due to roll eccentricity of the rolling load P Bj added by the lower addition means 122 for each rotation angle number, that is, the lower rolling load fluctuation value that is the deviation of the rolling load P Bj. This is output according to the rotation angle number of the roll 4b.
  • the roll gap correction amount calculation means 125 calculates a roll gap correction amount according to the rotation angle number of the backup rolls 4a and 4b based on the output value of the upper switch 123 and the output value of the lower switch 124. is there.
  • the upper addition means 121 and the lower addition means 122, and the upper switch 123 and the lower switch 124 have the same configuration.
  • the upper addition means 121 includes a limit 121a, a switch 121b, and an adder 121c.
  • the limit 121a checks the upper and lower limits of the deviation ⁇ P Tj input from each deviation calculating means 111c.
  • the switch 121b is turned on every time the upper backup roll 4a makes one revolution, that is, every time the average value calculation means 111b finishes calculating, and simultaneously outputs the deviation ⁇ P Tj input from the limit 121a.
  • the adder 121c is provided corresponding to each rotation angle number of the upper backup roll 4a, and adds a deviation output from the switch 121b for each rotation angle number.
  • the upper switch 123 and the lower switch 124 have the same configuration.
  • the rolling load detection means 6 can only collect one value as the rolling load for one stand. Therefore, the rolling load vertical distribution means 10 generates the rolling load P detected by the rolling load detection means 6 by the following formula, for example, by the rolling load PT generated in the upper backup roll 4a and the lower backup roll 4b. to separated into a rolling load P B.
  • P T Rolling load generated in the upper backup roll 4a
  • P B Rolling load generated in the lower backup roll 4b
  • P Total rolling load actual value (detected value by the rolling and rolling load detecting means)
  • R Ratio of the total rolling load P to be distributed to the rolling load PT generated in the upper backup roll 4a.
  • the ratio R to the total rolling load P to be distributed to the rolling load PT generated in the upper backup roll 4a is a value in the vicinity of 0.5, that is, When the total rolling load actual value P is allocated to the rolling load generated in the backup rolls 4a and 4b, a value close to 1/2 of P is allocated to each of the upper and lower sides.
  • the rolling load fluctuation component due to roll eccentricity or the like by the other backup rolls 4a and 4b can be almost canceled by the upper and lower adders 121c and 122c. The reason for this will be described later.
  • the rolling load recording means 111a holds the rolling load at the backup roll rotation angle numbers 0, 1, 2,..., N ⁇ 1 for one rotation of the upper backup roll 4a.
  • the average value calculation means 111b calculates the average value when the rotation angle number n-1 is reached.
  • the deviation calculating means 111c determines the difference between the rolling load at the backup roll rotation angle numbers 0, 1, 2,..., N ⁇ 1 and the average value as the rolling load fluctuation due to roll eccentricity etc. Output to.
  • a straight line expression may be calculated from P 0 at the start point and P n at the end point, and the difference between the straight line and the rolling load at each position may be calculated.
  • Rolling load fluctuations due to roll eccentricity at the backup roll rotation angle number are checked with upper and lower limits at the limits 121a and 122a, and when the calculation of the average value is completed, the switches 121b and 122b are simultaneously turned on to determine the deviation of the rolling load.
  • a certain rolling load fluctuation value ⁇ P 0 , ⁇ P 1 ,..., ⁇ P n ⁇ 1 is sent to adders ( ⁇ 0 , ⁇ 1 , ⁇ 2 ,..., ⁇ n ⁇ 1 ) 121 c and 122 c and added together.
  • the adders ( ⁇ 0 , ⁇ 1 , ⁇ 2 ,..., ⁇ n-1 ) 121c and 122c are cleared to zero before the rolled material 1 is rolled, and the backup rolls 4a and 4b rotate once to calculate an average value. Every time is completed, the deviation of the rolling load is added once. This procedure is performed by the upper addition means 121 and the lower addition means 122.
  • the upper addition means 121 and the upper switch 123 constituting the operation amount calculation means 12 in FIG. 5 calculate the rolling load deviation (upper rolling load fluctuation value) ⁇ P AT by the upper backup roll 4a, while the lower addition means 122.
  • the lower switch 124 calculates a rolling load deviation (lower rolling load fluctuation value) ⁇ P BT by the lower backup roll 4b
  • the roll gap correction amount calculation means 125 calculates the upper backup roll for the upper backup roll by the following equations 6 and 7. and low gap correction amount [Delta] S T, calculates a lower row the gap correction amount for side backup roll [Delta] S B.
  • the roll gap correction amount [Delta] S is a manipulated variable, since the roll gap can not be vertically separately operated, the roll gap correction amount calculating means 125, as in the following equation 8, and the upper and lower rows gap correction amount [Delta] S T, Add ⁇ S B and output.
  • M Mill constant
  • Q Plastic coefficient of rolled material
  • ⁇ S B Low gap correction amount for lower backup roll
  • ⁇ S Low gap correction amount
  • ⁇ P AT Upper backup Rolling load deviation due to roll (upper rolling load fluctuation value)
  • ⁇ P BT Deviation of rolling load by lower backup roll (lower rolling load fluctuation value)
  • the roll gap operating means 13 gives the low gap correction amount ⁇ S according to Expression 8 to the reduction means 5 in addition to the roll gap amount such as MMC or GM-AGC.
  • r is a ratio represented by the following formula 10.
  • D T ⁇ D B that is, r ⁇ 1.
  • this assumption does not limit the validity of setting R to a value in the vicinity of 0.5, and r> 1 may be used. This is for convenience of explanation.
  • the axial movement distance is considered, since the axial movement distance is directly related to the fluctuation of the rolling load, it can be replaced with the fluctuation of the rolling load.
  • FIG. 6 is a diagram illustrating an example of temporal changes in roll eccentric amounts y 1 and y 2 [mm] of the backup rolls 4a and 4b.
  • T 0 T 0
  • the value accumulated in the upper roll adder 121c is the integrated value Y T (j) of the axial movement amount of the upper backup roll 4a at the position j of the upper backup roll 4a and the lower value at the position j of the upper backup roll 4a. This is the sum of the integrated values Y B (j) of the amount of axial movement of the side backup roll 4b. Since Y T (j) is an integrated value of the period T T with T 0 as an initial value, it is calculated by the following equation (13).
  • Y B (j) is also an integrated value of the period T T with T 0 as an initial value, and is therefore calculated by the following equation 14 and more specifically by the following equation 15.
  • equation 15 becomes the following equation 17.
  • the integrated value of the sin of the angle obtained by multiplying the full angle 2 ⁇ [rad] of the circle by ⁇ 1 / n and adding to ⁇ is zero. That is, every time m sin values are integrated, the integrated value Y B (j) of the axial movement amount of the lower backup roll 4b becomes zero.
  • 1 / (1-r) is not necessarily an integer depending on the ratio of the backup rolls 4a and 4b, but when 1 / (1-r) is a value close to an integer, Y B (j) becomes a value close to zero each time the sin value is integrated.
  • the beat Y which is a superposition of y 1 and y 2 , is expressed by the following Expression 18 as in Expression 1.
  • Equation 16 gives the beat long cycle m ⁇ T T, and the integrated value Y B (j) of the axial movement amount of the lower backup roll 4b becomes zero for each m ⁇ T T.
  • the integrated value Y T (j) of the axial center movement amount of the upper backup roll 4a is monotonously increased without the roll eccentricity control, and the lower backup roll 4a rotates each time the upper backup roll 4a rotates. Since the specific gravity of the integrated value Y B (j) of the axis 4 of the roll 4b with respect to Y T (j) decreases, the upper roll eccentricity of the upper backup roll 4a is added to the upper roll adder 121c shown in FIG. The components are mainly accumulated.
  • the roll eccentric component of the lower backup roll 4b is mainly accumulated in the lower roll adder 122c.
  • the ratio R to the total rolling load P to be allocated to the upper rolling load PT is a value in the vicinity of 0.5, that is, when the total rolling load actual value P is allocated to the rolling load generated in the backup rolls 4a and 4b. It can be seen that a value close to 1 ⁇ 2 of P may be distributed vertically.
  • roll rotation such as roll eccentricity
  • roll rotation is performed using a rolling load measured during rolling of a metal material without using a kiss roll load.
  • the rolling load fluctuation component generated in relation to the position, that is, the rolling load fluctuation component due to roll eccentricity or the like is extracted, and the roll gap of the rolling stand can be manipulated so as to reduce the rolling load fluctuation.
  • the board thickness control apparatus of 1st Embodiment when there exists fluctuation
  • Can control variable components that can not be analyzed by frequency analysis when not rolling, no thickness gauge is required, and there is no deterioration in accuracy due to tracking errors, and even if there is a difference in diameter between the backup rolls 4a and 4b, high accuracy
  • the plate thickness control device of the embodiment it is possible to provide a high-precision plate thickness control device, plate thickness control method, and plate thickness control program that facilitates roll management and that does not have equipment restrictions. .
  • the ratio R to the total rolling load P to be distributed to the rolling load PT generated on the upper backup roll 4a is set to a value in the vicinity of 0.5. Therefore, when the total rolling load actual value P is allocated to the rolling load generated in the backup rolls 4a and 4b, a value close to 1/2 of P is allocated to each of the upper and lower sides.
  • the rolling load fluctuation components due to roll eccentricity by the other backup rolls 4a and 4b can be almost canceled by the vessels 121c and 122c.
  • the fact that a large value is accumulated in the j-th adder 121c means that the eccentricity amount at the j-th position is large. The same applies to the lower adder 121c.
  • the values of the upper and lower adders 121c and 122c that is, the upper and lower
  • the roll eccentricity of each backup roll 4a, 4b is identified, and the frequency and period of roll eccentricity are calculated from the rotational speed based on this.
  • FIG. 7 is an explanatory diagram showing a change in the value stored in the adder 121c of the upper addition means 121. As shown in FIG.
  • the horizontal axis represents the number of the adder in the adder 121c
  • the vertical axis represents the value of each adder in the adder 121c
  • the value 201 (bar graph) of each adder in the adder 121c and each position.
  • Each adder 121c may contain noise or the like, and a sine wave can be obtained by a least square method or the like.
  • the operation amount calculation means 12 uses the load value stored in the adder 121c to calculate the upper work roll 3a and the lower work using the equation 8 for converting the load into the roll gap according to the second embodiment.
  • the work roll gap command value between the roll 3b is calculated, and the roll gap operation means 13 is based on the work roll gap command value calculated by the operation amount calculation means 12, and the upper work roll 3a and the lower work roll 3b Manipulate the work roll gap between.
  • the rolling load measured during the rolling of the metal material can be obtained without using the kiss roll load, similarly to the first embodiment.
  • the rolling stand is used to extract the rolling load fluctuation component generated in relation to the roll rotation position, such as roll eccentricity, that is, the rolling load fluctuation component due to roll eccentricity, etc., and to reduce the rolling load fluctuation.
  • the roll gap can be manipulated.
  • the values of the upper and lower adders 121c and 122c that is, the upper and lower backup rolls 4a and 4b, respectively.
  • Roll eccentricity amount can be identified, and since the frequency and cycle of roll eccentricity are calculated from the rotational speed of the backup rolls 4a and 4b, the frequency and cycle of roll eccentricity can be easily obtained.
  • the roll gap of the rolling stand can be manipulated so as to reduce the rolling load fluctuation, and the ratio R to the total rolling load P to be distributed to the upper rolling load PT is set to a value in the vicinity of 0.5.
  • R which is a ratio to the total rolling load P to be distributed to the upper rolling load PT
  • R which is a ratio to the total rolling load P to be distributed to the upper rolling load PT
  • the upper and lower backup rolls 4a, 4b roll eccentricity amount is a periodic function such as a sine wave as described above. Therefore, the ratio of the amplitude of the sine wave after the identification of the backup rolls 4a and 4b is used as the ratio of the next material as R.
  • the amplitude of the sine wave identified by the adder 121c of the upper backup roll 4a is 0.9
  • the amplitude of the sine wave identified by the adder 121c of the lower backup roll 4b Is 1.1
  • the ratio of the roll eccentricity of the backup rolls 4a and 4b can be obtained by calculating the absolute value of the value stored in the addition without identifying with a periodic function.
  • the rolling load up / down distribution means 10 sets the ratio R for distributing the rolling load detected by the rolling load detection means 6 up and down to 0.5 immediately after the backup roll replacement, After the replacement of the backup roll, after the next rolled material, the periodic function is calculated using the integrated values of the upper and lower rolling load fluctuation values ⁇ P AT and ⁇ P BT which are deviations of the rolling load in the operation amount calculation means 12 for the current rolled material.
  • the amplitude may be identified, and the ratio of the amplitude for the upper work roll 3a and the upper back-up roll 4a and the sum of the amplitudes for the lower work roll 3b and the lower back-up roll 4b may be set, or rolling
  • the ratio R for allocating the rolling load detected by the load detecting means 6 up and down is set to 0.5 immediately after the backup roll replacement, After the exchange of the roll-up roll, after the next rolled material, it may be set based on rolling load fluctuation values ⁇ P AT and ⁇ P BT which are deviations of the rolling load in the operation amount calculation means 12 of the current rolled material.
  • this ratio may contain noise, it is also possible to reduce the influence of noise by using a filter as shown in the following equation (20).
  • Equation 20 k: an index indicating the present k + 1: an index indicating what should be used next time k-1: an index indicating one time before the present c: a gain for filtering.
  • a metal material is measured during rolling without using a kiss roll load, as in the first and second embodiments.
  • the rolling load can be used to extract the rolling load fluctuation component generated in relation to the roll rotation position, such as roll eccentricity, and to operate the roll gap of the rolling stand so as to reduce this rolling load fluctuation.
  • R which is a ratio to the total rolling load P to be distributed to the upper rolling load PT , is set to a value in the vicinity of 0.5.
  • R which is a ratio to the total rolling load P to be distributed to the upper rolling load PT .
  • R which is a ratio to the total rolling load P to be distributed to the upper rolling load PT .
  • the roll eccentricity of the upper and lower backup rolls 4a and 4b is set to the value of the upper and lower adder 121c group. Since it can be identified by a periodic function such as a sine wave, the ratio of the amplitude of the sine wave after identification of the backup rolls 4a and 4b can be used as the ratio of the next material, and roll eccentricity can be easily performed. And the roll gap of the rolling stand can be manipulated so as to reduce rolling load fluctuations.
  • the present invention can be applied to a hot rolling apparatus for rolling a metal material hot.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Control Of Metal Rolling (AREA)

Abstract

 金属材料に対する圧延荷重を検出する圧延荷重検出手段(6)と、検出された圧延荷重を上側ロールセットで発生している上側圧延荷重と、下側ロールセットで発生している下側圧延荷重との比に基づいて、上下に配分する圧延荷重上下配分手段(10)と、上下に配分された上側ロールセットおよび下側ロールセットの圧延荷重に基づいて、上側ロールセットおよび下側ロールセットの回転位置に関連して発生する上側圧延荷重変動値および下側圧延荷重変動値を抽出する圧延荷重上下変動値抽出手段(11)と、抽出された上側圧延荷重変動値および下側圧延荷重変動値に基づいて,上側ワークロール(3a)と下側ワークロール(3b)との間のワークロールギャップ指令値を演算する操作量演算手段(12)と、演算されたワークロールギャップ指令値に基づいて、上側ワークロール(3a)と下側ワークロール(3b)との間のワークロールギャップを操作するロールギャップ操作手段(13)とを有する。

Description

板厚制御装置、板厚制御方法、板厚制御プログラム
 本発明は、金属材料の圧延機における板厚制御装置、板厚制御方法、板厚制御プログラムにおいて、ワークロール等の回転位置に関連して発生する、いわゆるロール偏芯等に起因する板厚変動を制御する板厚制御装置、板厚制御方法、板厚制御プログラムに関する。
 薄板圧延や厚板圧延における品質制御のひとつに、圧延材の幅方向中央手段の板厚を制御する板厚制御(Automatic Gage Control:AGC)がある。板厚制御方法としては、圧延機出側に設置した板厚計の測定値をフィードバックするモニターAGC、圧延荷重やロールギャップ(上下側ワークロールの間隙)から推定したゲージメータ板厚を用いたゲージメータAGC(Gage meter AGC : GM-AGC)、圧延荷重によるミル定数可変制御(Mill Modulus Control: MMC)などがある。
 板厚精度の向上を阻害する外乱としては、熱間圧延においては圧延材の温度変動がある。熱間圧延、冷間圧延に共通な外乱としては、他の制御、たとえば張力制御の劣化による張力変動、オペレータの手介入による速度やロールギャップの変更、ロールの構造やロール研磨の制度不良によるロール偏芯等がある。
 このうちロール偏芯は、オイルベアリングを有するバックアップロールにおけるキー溝が、数百トンから2、3千トンという大きな圧延荷重を受けたときに上下に軸が移動することが原因となり、ロールの回転にあわせてロールギャップ変動が発生するものである。しかしながらキー溝のないロールでも、たとえばロール研磨時の非対称性、熱膨張の偏りなどの原因により、ロール回転に依存したロールギャップ変動は発生する。
 なお、ワークロール上下2個のみで構成されるいわゆる2Hiミルの場合でも、ワークロール上下2個、バックアップロール上下2個の4ロールで構成されるいわゆる4Hiミルの場合でも、ワークロール上下2個、中間ロール上下2個、バックアップロール上下2個の6ロールで構成されるいわゆる6Hiミルの場合でも、その他の場合でも以下は同様に考えることができる。表現上、ワークロールをワークロール(Work Roll : WRと略記する場合がある。)、バックアップロールをワークロール以外のロールとして、バックアップロール(Back UP Roll : BURと略記する場合がある。)と呼ぶことにする。
 ロール偏芯等のロール軸振れに依存した外乱は、ロールギャップ検出器により検出できない。ロールギャップを設定する装置は与えられたギャップになるようにロールギャップ検出器による検出値をフィードバックして制御するが、検出値にロール軸振れが現われないために、制御することができない。しかし、ロール軸振れに依存した外乱は実際のロールギャップを変化させるために、圧延荷重には現れる。このため圧延荷重を利用する上記MMC、GM‐AGCなどの大きな外乱になる。
 このロール偏芯等のロール軸振れに依存した外乱を低減するため、例えば、金属材料を圧延する圧延機に設けられ、圧延スタンドの上下側ワークロール及び上下側バックアップロールのロール偏芯に起因する板厚変動を制御する板厚制御装置であって、キスロール時荷重及び圧延荷重を検出する圧延荷重検出器と、上下側ワークロール及び上下側バックアップロールの複数の回転位置において圧延荷重検出器により検出されたキスロール時荷重に基づいて、キスロール時荷重の、各回転位置における上側ワークロール及び上側バックアップロールのロール偏芯に起因する変動成分と、各回転位置における下側ワークロール及び下側バックアップロールのロール偏芯に起因する変動成分とを別々に抽出するキスロール時荷重変動抽出手段と、キスロール時荷重変動抽出手段によって別々に抽出されたキスロール時荷重の各変動成分に基づいて、各回転位置において圧延荷重検出器により検出された圧延荷重の、各回転位置における上側ワークロール及び上側バックアップロールのロール偏芯に起因する変動成分と、各回転位置における下側ワークロール及び下側バックアップロールのロール偏芯に起因する変動成分とを別々に抽出する圧延荷重上下変動抽出手段と、圧延荷重上下変動抽出手段によって別々に抽出された圧延荷重の各変動成分に基づいて、圧延されている金属材料の板厚変動を低減させるように、各回転位置に対応したロールギャップ指令値を演算する操作量演算手段と、操作量演算手段によって演算されたロールギャップ指令値に基づいて、各回転位置に対応してロールギャップを操作するロールギャップ操作手段と、を備え、上側のロールが回転することによって生じる圧延荷重変動と下側のロールが回転することによって生じる圧延荷重変動とを的確に分離して、分離された各圧延荷重変動に応じてロールギャップを制御する板厚制御装置を提案している(例えば、特許文献1参照。)。
国際公開第2008/090596号
 ところで、上下のバックアップロールの直径に差がある場合、上下のバックアップロールの回転速度の差により、いわゆるビートまたはうなりという現象が発生するため、制御性能の劣化が生じる。
 ここで,ビートまたはうなりの発生を説明する。上下のバックアップロール径が異なるものとし,上側バックアップロールの回転周波数をω[rad/s],下側バックアップロールの回転周波数をω[rad/s]とし,簡単のため上下の振幅を1,また初期位相差はないものとすると,上下側バックアップロールの回転を重畳したあとの信号Yは以下となる。
Figure JPOXMLDOC01-appb-M000001
 正弦波(sin)の周波数はω+ω[rad/s]となって、周波数が高い、すなわち短周期、細かい振動が現れる。一方で,余弦波(cos)の周波数はωT-ωB[rad/s]となって、周波数が低い、すなわち長周期、大きな振動が現れる。
 図8(A)に,sin(wt)(実線)とsin(wt)(点線)それぞれの波形の一例を示す。なお、周波数は、w =5rad/s、w=4rad/sとした。また、図8(B)に、sin(wt)とsin(wt)の重畳(実線)と、cos{(wT -w)t/2}(破線)の波形の一例を示す。なお、横軸は時間(s)である。重畳された波形の包絡線が、長周期の波(破線)で表されていることがわかる。
 しかし、特許文献1記載の板厚制御装置では、圧延していないときに上下のワークロールを接触させて荷重を発生させる、いわゆるキスロール時荷重と、圧延しているときに発生する圧延荷重の両方を使用して、上側のバックアップロールで発生するロール偏芯成分と、下側のバックアップロールで発生するロール偏芯成分とを分離していたため、圧延をしていないときにキスロール時荷重を測定する必要があり、その分だけ手間や時間がかかる、という問題があった。
 そこで、本発明では、キスロール荷重を使用することなく、圧延中に測定する圧延荷重を用いて当該圧延スタンドのロールギャップを操作することができる板厚制御装置、板厚制御方法、板厚制御プログラムを提供することを目的とする。
 上記目的を達成するため、本発明に係る板厚制御装置の第1の特徴は、上側のロールセットの上側ロールセットと、下側ワークロールおよびバックアップロールの下側ロールセットとの間で金属材料を圧延することにより製造される圧延材の板厚変動を制御する板厚制御装置であって、前記金属材料に対する圧延荷重を検出する圧延荷重検出手段と、前記圧延荷重検出手段によって検出された圧延荷重を、前記上側ロールセットで発生している上側圧延荷重と、前記下側ロールセットで発生している下側圧延荷重との比に基づいて、上下に配分する圧延荷重上下配分手段と、前記圧延荷重上下配分手段によって上下に配分された前記上側ロールセットおよび前記下側ロールセットの前記圧延荷重に基づいて、前記上側ロールセットおよび前記下側ロールセットの回転位置に関連して発生する上側圧延荷重変動値および下側圧延荷重変動値を抽出する圧延荷重上下変動値抽出手段と、前記圧延荷重上下変動値抽出手段により抽出された前記上側圧延荷重変動値および下側圧延荷重変動値に基づいて、前記上側ワークロールと前記下側ワークロールとの間のワークロールギャップ指令値を演算する操作量演算手段と、前記操作量演算手段によって演算された前記ワークロールギャップ指令値に基づいて、前記上側ワークロールと前記下側ワークロールとの間のワークロールギャップを操作するロールギャップ操作手段と、を備えることにある。
 上記目的を達成するため、本発明に係る板厚制御装置の第2の特徴は、前記操作量演算手段は、前記上側ロールセットおよび前記下側ロールセットが所定時間以上回転するまでは、前記圧延荷重上下変動値抽出手段によって別々に抽出された前記上側圧延荷重変動値および下側圧延荷重変動値に基づいて、前記上側ワークロールと前記下側ワークロールとの間のワークロールギャップ指令値を演算し、前記上側ロールセットおよび前記下側ロールセットが所定時間以上回転した場合、前記圧延荷重上下変動値抽出手段によって演算された前記圧延荷重変動値の積算値に基づいて上下それぞれのバックアップロールのロール偏芯量を同定し、同定したロール編芯量に基づいて前記上側ワークロールと前記下側ワークロールとの間のワークロールギャップ指令値を演算する、ことにある。
 上記目的を達成するため、本発明に係る板厚制御装置の第3の特徴は、前記圧延荷重上下配分手段は、前記圧延荷重検出手段によって検出された圧延荷重を上下に配分する比を、前記バックアップロール交換直後は0.5に設定し、前記バックアップロール交換後、次の圧延材以降は、現在の圧延材の操作量演算手段における前記圧延荷重の偏差に基づいて設定する、ことにある。
 上記目的を達成するため、本発明に係る板厚制御装置の第4の特徴は、前記圧延荷重上下配分手段は、前記圧延荷重検出手段によって検出された圧延荷重を上下に配分する比を、前記バックアップロール交換直後は0.5に設定し、前記バックアップロール交換後、次の圧延材以降は、現在の圧延材の操作量演算手段における前記圧延荷重変動値の積算値を用いて周期関数の振幅を同定し、上側のロールセットに対する振幅と、下側ロールセットに対する振幅との合計値に対する比を設定する、ことにある。
 上記目的を達成するため、本発明に係る板厚制御方法の特徴は、上側のロールセットの上側ロールセットと、下側ワークロールおよびバックアップロールの下側ロールセットとの間で金属材料を圧延することにより製造される圧延材の板厚変動を制御する板厚制御方法であって、前記金属材料に対する圧延荷重を検出するステップと、検出された圧延荷重を、前記上側ロールセットで発生している上側圧延荷重と、前記下側ロールセットで発生している下側圧延荷重との比に基づいて、上下に配分するステップと、前記上下に配分された前記上側ロールセットおよび前記下側ロールセットの前記圧延荷重に基づいて、前記上側ロールセットおよび前記下側ロールセットの回転位置に関連して発生する上側圧延荷重変動値および下側圧延荷重変動値を抽出するステップと、前記抽出された前記上側圧延荷重変動値および下側圧延荷重変動値に基づいて、前記上側ワークロールと前記下側ワークロールとの間のワークロールギャップ指令値を演算するステップと、前記演算された前記ワークロールギャップ指令値に基づいて、前記上側ワークロールと前記下側ワークロールとの間のワークロールギャップを操作するステップと、を有することにある。
 上記目的を達成するため、本発明に係る板厚制御プログラムの特徴は、上側のロールセットの上側ロールセットと、下側ワークロールおよびバックアップロールの下側ロールセットとの間で金属材料を圧延することにより製造される圧延材の板厚変動を制御することをコンピュータに実行させるための板厚制御プログラムであって、前記金属材料に対する圧延荷重を検出するステップと、検出された圧延荷重を、前記上側ロールセットで発生している上側圧延荷重と、前記下側ロールセットで発生している下側圧延荷重との比に基づいて、上下に配分するステップと、前記上下に配分された前記上側ロールセットおよび前記下側ロールセットの前記圧延荷重に基づいて、前記上側ロールセットおよび前記下側ロールセットの回転位置に関連して発生する上側圧延荷重変動値および下側圧延荷重変動値を抽出するステップと、前記抽出された前記上側圧延荷重変動値および下側圧延荷重変動値に基づいて、前記上側ワークロールと前記下側ワークロールとの間のワークロールギャップ指令値を演算するステップと、前記演算された前記ワークロールギャップ指令値に基づいて、前記上側ワークロールと前記下側ワークロールとの間のワークロールギャップを操作するステップと、を、コンピュータに実行させることにある。
 本発明によれば、キスロール荷重を使用することなく、金属材料を圧延中に測定される圧延荷重を用いてロール偏芯等、ロール回転位置に関連して発生する圧延荷重の変動成分、すなわちロール偏芯等による圧延荷重変動成分を抽出し、この圧延荷重変動を低減するように、当該圧延スタンドのロールギャップを操作することができる。
本発明の第1の実施の形態に係る板厚制御装置を示す全体構成図である。 本発明の第1の実施の形態に係る板厚制御装置において、測定される圧延荷重の概念を示す図である。 本発明の第1の実施の形態に係る板厚制御装置に備えられた上下側バックアップロールの分割と上下側ワークロールとの関係を示す図である。 バックアップロール回転角度の変化に伴い圧延荷重が変化する様子と、ロール偏芯等による圧延荷重変動分を抽出する方法の一例を示す図である。 本発明の第1の実施の形態に係る板厚制御装置に備えられた圧延荷重上下変動抽出手段および操作量演算手段の構成例を詳細に示す構成図である。 上下側バックアップロールの回転の様子を説明するための図である。 本発明の第2の実施の形態に係る板厚制御装置における上側バックアップロールの加算器に蓄えられた値の変化を示す説明図である。 ビートの状態を示す説明図である。
発明の実施するため形態
(第1の実施の形態)
 図1は、本発明の第1の実施の形態に係る板厚制御装置を示す全体構成図である。
 図1において、本発明の第1の実施の形態に係る板厚制御装置は、金属材料からなる圧延材1を圧延する圧延機を含む制御装置であり、ハウジング2と、上側ワークロール3a及び下側ワークロール3bによって構成されるワークロールと、上側バックアップロール4a及び下側バックアップロール4bによって構成されるバックアップロール4と、圧延材1に圧延荷重を作用させる圧下手段5と、圧延荷重を検出する圧延荷重検出手段6と、ロールの回転数を検出するロール回転数検出器7と、バックアップロール4a,4bが1回転する毎に所定の基準位置を検出するロール基準位置検出器8と、ワークロール3a,3bの間隙、即ち、ロールギャップを検出するロールギャップ検出器9とを備える。ここで、上側ワークロール3aおよび上側バックアップロール4aにより本発明の上側ロールセットを構成する一方、下側ワークロール3bおよび下側バックアップロール4bにより本発明の下側ロールセットを構成する。
 また、図1に示すように、本発明の第1の実施の形態に係る板厚制御装置は、圧延荷重上下配分手段10と、圧延荷重上下変動抽出手段11と、操作量演算手段12と、ロールギャップ操作手段13とを備えている。
 圧延荷重上下配分手段10は、ワークロール3a,3b及びバックアップロール4a,4bの複数の回転位置において圧延荷重検出手段6により検出された圧延荷重を、上側ロールセットである上側ワークロール3a及び上側バックアップロール4aで発生している上側圧延荷重と、下側ロールセットである下側ワークロール3b及び下側バックアップロール4bで発生している下側圧延荷重との比に基づいて、上下に配分する。
 圧延荷重上下変動抽出手段11は、圧延荷重上下配分手段10によって上下に配分された上側ロールセットおよび下側ロールセットの圧延荷重に基づいて、上側ロールセットおよび下側ロールセットの回転位置に関連して発生する上側圧延荷重変動値および下側圧延荷重変動値を抽出する。
 操作量演算手段12は、圧延荷重上下変動抽出手段11によって別々に抽出された圧延荷重の上下の各変動成分に基づいて、圧延されている圧延材1の板厚変動を低減させるように、上記各回転位置に対応したロールギャップ指令値を演算するものである。
 ロールギャップ操作手段13は、操作量演算手段12によって演算されたロールギャップ指令値に基づいて、上記各回転位置に対応してロールギャップを操作するものである。また、ロールギャップ操作手段13は、例えば、MMCやGM‐AGCによって得られたロールギャップ量に、上記操作量演算手段12によって演算されたロールギャップ修正量を加えた値をロールギャップの設定値として、圧下手段5を制御する。
 なお、以下の説明においては、一例として、上下2つのワークロール3a,3b及び上下2つのバックアップロール4a,4bの4ロールで構成される4Hiミルの場合について説明するが、これに限定されるものではなく、ワークロール上下2個のみで構成されるいわゆる2Hiミルの場合でも、ワークロール上下2個、中間ロール上下2個、バックアップロール上下2個の6ロールで構成されるいわゆる6Hiミルの場合でも、その他の場合でも同様に考えることができる。
 本発明の第1の実施の形態に係る板厚制御装置は、上記のように構成され、圧延材1は、出側で所望の板厚となるように、ロールギャップと速度とが適切に調整されたワークロール3a,3bによって圧延される。ここで、ワークロール3a,3bは、ワークロール3a,3bが上側バックアップロール4aに上方から支えられ、下側ワークロール3a,3bが下側バックアップロール4bに下方から支えられることにより、ロール幅方向のたわみが少なくなるように構成される。また、バックアップロール4a,4bは、圧延機ハウジング2に対して回動自在に支持されており、圧延材1に作用させる圧延荷重にも十分に耐え得る構造を成している。
 圧下手段5は、電動機制御によるもの(電動圧下という)、油圧制御によるもの(油圧圧下という)の2種類が存在するが、油圧圧下の方が高速応答を得やすい。このため、ロール偏芯による外乱のように短い周期の波成分に対応して圧延荷重制御を実施するには、一般に、高速応答が可能な油圧圧下が採用される。また、ワークロール3a,3bの間隙、即ち、ロールギャップは、圧下手段5によって調整される。
 圧延荷重検出手段6は、例えば、圧延機ハウジング2と圧下手段5との間に埋め込まれたロードセル(Load Cell)によって圧延荷重を直接的に測定する方法や、油圧圧下手段で検出される圧力から圧延荷重を計算する方法等によって、圧延荷重を検出するものである。
 ロール回転数検出器7は、ワークロール3a,3bやこのワークロール3a,3bを駆動する電動機の軸(図示せず)に設けられ、ワークロール3a,3b等の回転数を検出するものである。ここで、ロール回転数検出器7は、例えば、ワークロール3a,3bの回転角度に応じたパルスを出力するパルス出力手段と、パルス出力手段から出力されたパルスを検出してワークロール3a,3bの回転角度を演算する角度演算手段とを備えることにより、ワークロール3a,3bの回転数の検出とともに、より詳細な回転角度を検出できるように構成される。なお、ワークロール3a,3bとバックアップロール4a,4bとの直径の比が既知である場合、ロール回転数検出器7によって検出されたワークロール3a,3bの回転数と回転角度とに基づいて、ワークロール3a,3bとバックアップロール4a,4bとの間にスリップがない場合におけるバックアップロール4a,4bの回転数と回転角度とを容易に演算することができる。
 ロール基準位置検出器8は、例えば、バックアップロール4a,4bが1回転する度に、近接スイッチ等のセンサがバックアップロール4a,4bに設けられた被検出体を検出すること等によって基準位置を検出するものである。また、例えば、パルスジュネレータ(Pulse Generator)を利用することにより、バックアップロール4a,4bの回転角度に依存したパルスを取り出し、バックアップロール4a,4bの回転角度を検出することによって基準位置を検出する。なお、図1ではロール基準位置検出器8を上側バックアップロール4aにのみ取り付けた場合を示しているが、バックアップロール4a,4bにロール基準位置検出器8を取り付けて、バックアップロール4a,4bの各基準位置を検出するように構成しても良い。
 ロールギャップ検出器9は、例えば、バックアップロール4a,4bと圧下手段5との間に設けられ、間接的にワークロール3a,3bの間に形成されるロールギャップを検出するものである。
 次に、図2~図6を参照して、第1の実施の形態に係る板厚制御装置の動作について、特に、圧延荷重上下配分手段10、圧延荷重上下変動抽出手段11、操作量演算手段12の各構成及び動作を具体的に説明する。
 図2は、第1の実施の形態に係る板厚制御装置にて測定される圧延荷重の概念を示す図である。図2では、ロール偏芯が生じていない場合における圧延荷重101と、ロール偏芯が生じている場合における圧延荷重102とを示しており、t1時点からt2時点までがバックアップロール4a,4bにおける1回転分である。
 図2に示すように、圧延荷重101は、バックアップロール4a,4b等にロール偏芯が生じていない場合でも、圧延材1の温度変化や板厚変化等によって、時間t、即ち、ロールの回転とともに変動する。
 一方、バックアップロール4a,4b等にロール偏芯が生じている場合には、圧延荷重102は、ロール偏芯以外による圧延荷重変動に、ロール偏芯による圧延荷重の変動成分を重ね合わせたものとして表される。なお、以下に説明する板厚制御装置における具体的制御は、ロール偏芯による圧延荷重変動とロール偏芯以外による圧延荷重変動とを的確に分離するとともに、ロール偏芯による圧延荷重変動を本板厚制御装置で制御し、ロール偏芯以外による圧延荷重変動を上記MMCやGM‐AGCで制御することが基本的な考えである。
 次に、図3に基づいて、圧延荷重上下変動抽出手段11等の各構成及び動作を説明する際に必要な事項について説明する。
 図3は、ワークロール(WR)3a,3b及びバックアップロール(BUR)4a,4bの位置関係を説明するための図である。
 図3に示すように、バックアップロール(BUR)4a,4bには、回転位置検出用に位置目盛14が付されている。また、バックアップロール(BUR)4a,4bの一部に予め設定され、バックアップロール(BUR)4a,4bの回転に連動して回転する基準位置4cを示している。
 位置目盛14は、例えば、バックアップロール(BUR)4a,4bの周囲を取り囲むように、バックアップロール(BUR)4a,4bの直近外側に設けられ、バックアップロール(BUR)4a,4bの全周をn等分するように、即ち、バックアップロール(BUR)4a,4bの回転軸を中心として所定角度(360/n度)毎に、目盛が設けられる。そして、位置目盛14の基準位置14a(固定された基準位置)を0として、第(n-1)まで番号付けされる。なお、上記nは、例えばn=30~40程度の値が設定される。ここで、上記位置目盛14は圧延荷重上下変動抽出手段11等を説明するために設けられたものであり、実際の機器類に目盛自体は付されていなくても良い。
 ここで、θWT0は、バックアップロール(BUR)4a,4bの基準位置4cが、固定された基準位置14aに一致する際のワークロール3の回転角度、θWTは、バックアップロール(BUR)4a,4bがθBTだけ回転した後のワークロール3の回転角度である。ここで、上記θは角度を表し、添え字の左側Wはワークロール3、Bはバックアップロール4を、添え字の右側Tは上側、Bは下側をそれぞれ表している。なお、以下においては、バックアップロール(BUR)4a,4bの回転角度とは、バックアップロール(BUR)4a,4bの基準位置4cが、固定された基準位置14aからバックアップロール(BUR)4a,4bの回転に連動して移動する角度を表すものとする。例えば、バックアップロール(BUR)4a,4bの回転角度が90度であるとは、バックアップロール(BUR)4a,4bの基準位置4cが、固定された基準位置14aからバックアップロール(BUR)4a,4bの回転方向に90度の回転した位置にあることを示している。また、バックアップロール(BUR)4a,4bの回転角度が位置目盛14の最も近接する目盛(例えば、位置目盛14のj番目の目盛)にある状態を、バックアップロール(BUR)4a,4bの回転角度番号がjであるとして説明する。
 なお、上記バックアップロール(BUR)4a,4bの基準位置4c及び固定された基準位置14aに、近接センサ等のセンサとこのセンサによって検出される被検出体とを埋め込むことにより、上記センサ及び被検出体によってロール基準位置検出器8を構成しても良い。かかる場合、例えば、バックアップロール(BUR)4a,4bの基準位置4cに設けられた近接センサが、バックアップロール4とともに回転して固定された基準位置14aに達することにより、基準位置14aに埋め込まれた被検出体が上記近接センサによって検出される。即ち、バックアップロール(BUR)4a,4bの基準位置4cが、固定された基準位置14aを通過したと認識される。なお、ロール基準位置検出器8は、本発明には必須のものではない。
 固定された基準位置0からn-1までの分割位置を、後述する図5における圧延荷重の記録エリア(図5中のP~Pn-1)の区分に等しくして、これらの分割位置における圧延荷重を記録エリアに格納する。一般にn=30~90程度の値が用いられる。nを大きくするには、制御器の演算処理能力が高くなくてはならないので、制御の細かさと演算能力の相反関係には注意する必要がある。
 以下、バックアップロール回転角度とは、固定された基準位置からバックアップロール基準位置がバックアップロール4a,4bの回転にしたがって移動していく角度を表すものとする。例えば、バックアップロール回転角度が90度であるとは、固定された基準位置からバックアップロール基準位置がバックアップロール4a,4bの回転方向に90度の位置にあることを示す。またバックアップロール回転角度が前記位置目盛りの最も近い位置(たとえばi番目の位置目盛り)にあるとき、バックアップロール回転角度番号がiであるとする。
 次に、図4に基づいて、圧延荷重のロール偏芯に起因する変動成分を抽出する方法について説明する。
 図4は、バックアップロールの回転角度の変化に伴う圧延荷重の変動を示す図である。図4において、バックアップロール4の基準位置4cが基準位置14aにある場合、即ち、バックアップロール4の回転角度番号が0の場合、圧延荷重はP10を示しており、バックアップロール4の回転角度番号が1、2、3‥‥と進むにつれ、圧延荷重はP11、P12、P13‥‥と変化していく。そして、バックアップロール4が1回転して、回転角度番号が(n-1)から再び0となり、圧延荷重P20が採取された時点で圧延荷重P10とP20とを直線103で結ぶと、この直線103が、ロール偏芯による圧延荷重変動を除いた圧延荷重と見なすことができる。したがって、ロール偏芯による圧延荷重変動は、各回転角度番号において測定した圧延荷重P11、P12、P13…P20と上記直線との差から求めることができる。
 なお、実際に測定される圧延荷重Pijの値(実績値)には、温度変動・板厚変動・張力変動等による圧延荷重変動、ロール偏芯による圧延荷重変動に加え、ノイズ成分が含まれることが多い。このため、実際の圧延荷重Pijの実績値は図4に示すようななだらかな曲線上に分布する訳ではなく、上記直線を求めるために結ぶべき始点の圧延荷重Pi0と終点の圧延荷重P(i+1)0とを特定することが困難な場合もある。そこで、圧延荷重Pi0と圧延荷重P(i+1)0との変化が大きくないものと仮定すると、測定した各圧延荷重Pi0、Pi1、Pi2、Pi3…P(i+1)0と、圧延荷重Pi0、Pi1、Pi2、Pi3…Pi(n-1)のn個の平均値との差ΔPijを、圧延荷重のロール偏芯に起因する変動成分と見なすことができる。この方法の利点は、圧延荷重の実績値の採取を(n-1)区分目までに減少させることができ、また、ノイズ等による圧延荷重の変動にも強いことである。なお、圧延荷重の実績値にフィルタリング処理を施して、ノイズ成分を低減させることも有効な手段である。
<板厚制御装置の動作>
 本発明の第1の実施の形態に係る板厚制御装置を説明する。
 本発明の第1の実施の形態に係る板厚制御装置では、本装置の出側で所望の板厚となるように、圧延材1は適切にギャップと速度を調整された上下のワークロール3a,3bによって圧延される。ワークロール3a,3bは、バックアップロール4a,4bに支えられ、ロール幅方向のたわみが少なくなるようにしている。バックアップロール4a,4bは、圧延機ハウジング2に支持され、圧延材1による圧延荷重に耐えうる構造となっている。
 上下のワークロール3a,3bのギャップは、圧下手段5によって調整される。圧下手段5は、電動機制御によるもの(電動圧下という)、油圧制御によるもの(油圧圧下という)の2種類あるが、後者の方が高速応答を得やすい。一般に短い周期のロール偏芯等の外乱を制御するには高速応答が必要なため、油圧圧下を用いることが多い。
 圧延荷重検出手段6は、圧延荷重を検出する。圧延荷重の検出方法としては、圧延機ハウジング2と圧下手段5の間に埋め込まれ、圧延荷重を直接的に測定するロードセル(Load Cell)を用いる方法や、油圧圧下手段において検出する圧力から圧延荷重を計算する方法がある。
 ロール回転数検出器7は、ワークロール3a,3bまたはワークロール3a,3bを駆動する電動機軸に取り付けられ、ロール回転数を検出する。ロール回転角度に応じたパルスを出力することが可能なものもあり、ロール回転角度の検出に用いられる場合もある。ワークロール3a,3bとバックアップロール4a,4bの直径の比がわかれば、ワークロール3a,3bとバックアップロール4a,4bの間にスリップがない場合、ワークロール3a,3bの回転数、回転角度からバックアップロール4a,4bの回転数、回転角度は容易に求められる。
 次に、ロール基準位置検出器8は、バックアップロール4a,4bが1回転する度に近接スイッチ等により、基準位置を検出する。またはパルスジェネレータ(Pulse Generator)などを取り付けて回転角度に依存してパルスを取り出し、回転角度そのものを検出してもよいが、少なくとも1回転ごとの基準位置を検出することが可能なものとする。バックアップロール4a,4bの両方あるいはいずれかに取り付けられたものが図1の場合である。しかしながら、ロール基準位置検出器8が取り付けられていなくても、ワークロール3a,3bの回転角度がわかれば、ワークロール3a,3bとバックアップロール4a,4bの直径比から、バックアップロール4a,4bの回転角度を次式から計算することができる。
Figure JPOXMLDOC01-appb-M000002
 ここで、θは、バックアップロール4a,4bの回転角[rad]、θは、ワークロール3a,3bの回転角[rad]、Dは、バックアップロール4a,4bの直径[mm]、Dは、ワークロール3a,3bの直径[mm]である。なお、前述の如く、図1におけるロール基準位置検出器8は、本発明には必須のものではない。
 次に、ロールギャップ検出器9は、バックアップロール4a,4bと圧下手段5の間に設置され、間接的にワークロール3a,3bのギャップを検出する。
 そして、圧延荷重上下配分手段10は、圧延荷重検出手段6によって検出された圧延荷重Pを、上側バックアップロール4aと、下側バックアップロール4bとに個別に発生するものと仮定して、上側バックアップロール4aに発生する圧延荷重Pと、下側バックアップロール4bに発生する圧延荷重Pとに分離して、圧延荷重上下変動抽出手段11に出力する。
 次に、図5に基づいて、上記圧延荷重上下変動抽出手段11および操作量演算手段12の具体的構成及び動作について説明する。
 図5は、第1の実施の形態に係る板厚制御装置の圧延荷重上下変動抽出手段11および操作量演算手段12の構成例を詳細に示す構成図である。
 図5において、圧延荷重上下変動抽出手段11は、上側荷重変動抽出手段111と、下側荷重変動抽出手段112とを有している。
 上側荷重変動抽出手段111は、圧延荷重上下配分手段10によって分離された圧延荷重Pに基づいて、上側バックアップロール4aの複数の回転位置における圧延荷重PTjのロール偏芯に起因する変動成分を抽出するものである。
 下側荷重変動抽出手段112は、圧延荷重上下配分手段10によって分離された圧延荷重Pに基づいて、下側バックアップロール4bの複数の回転位置における圧延荷重PBjのロール偏芯に起因する変動成分を抽出するものである。
 また、上側荷重変動抽出手段111は、圧延荷重記録手段111a、平均値演算手段111b、偏差演算手段111cを有している。同様に、下側荷重変動抽出手段112も、圧延荷重記録手段112a、平均値演算手段112b、偏差演算手段112cを備えている。
 圧延荷重記録手段111aは、バックアップロール4a,4bの各回転角度番号にそれぞれ対応して設けられたn個の圧延荷重記録手段である。各圧延荷重記録手段111aには、バックアップロール4a,4bが対応する回転角度番号に達した際の圧延荷重PTjが所定期間記録される。
 平均値演算手段111bは、各圧延荷重記録手段111aに記録された圧延荷重PTjに基づいて、バックアップロール4a,4bが一回転する間に検出されたn個の圧延荷重PTj(j=0~(n-1))の平均値を演算するものである。
 偏差演算手段111cは、各圧延荷重記録手段111aにそれぞれ対応して設けられ、夫々、対応する圧延荷重記録手段111aに記録された圧延荷重PTjの上記平均値からの偏差ΔPTjを、バックアップロール4a,4bが一回転する毎に演算して出力するものである。なお、下側荷重変動抽出手段112の圧延荷重記録手段112a、平均値演算手段112b、偏差演算手段112cも同様である。
 操作量演算手段12は、上側加算手段121、下側加算手段122、上側スイッチ123、下側スイッチ124、ロールギャップ修正量演算手段125を有する。
 上側加算手段121は、上側荷重変動抽出手段111から出力された、圧延荷重PTjのロール偏芯による変動成分を、回転角度番号毎に加算するものである。
 下側加算手段122は、下側荷重変動抽出手段112から出力された、圧延荷重PBjのロール偏芯による変動成分を、回転角度番号毎に加算するものである。
 上側スイッチ123は、上側加算手段121によって回転角度番号毎に加算された、圧延荷重PTjのロール偏芯による変動成分、すなわち圧延荷重PTjの偏差である上側圧延荷重変動値をバックアップロール4aの回転角度番号に応じて出力するものである。
 下側スイッチ124は、下側加算手段122によって回転角度番号毎に加算された、圧延荷重PBjのロール偏芯による変動成分、すなわち圧延荷重PBjの偏差である下側圧延荷重変動値をバックアップロール4bの回転角度番号に応じて出力するものである。
 ロールギャップ修正量演算手段125は、上側スイッチ123の出力値と下側スイッチ124の出力値とに基づいて、バックアップロール4a,4bの回転角度番号に応じたロールギャップの修正量を演算するものである。
 ここで、上側加算手段121と下側加算手段122、並びに、上側スイッチ123と下側スイッチ124とは、それぞれ同様の構成を有している。例えば、上側加算手段121には、リミット121a、スイッチ121b、加算器121cが備えられている。ここで、リミット121aは、各偏差演算手段111cから入力される偏差ΔPTjの上下限をチェックする。スイッチ121bは、上側バックアップロール4aが一回転する毎に、即ち、平均値演算手段111bでの平均値の演算が終了する毎にオンされて、リミット121aから入力される偏差ΔPTjを同時に出力する。加算器121cは、上側バックアップロール4aの各回転角度番号に対応して設けられ、スイッチ121bから出力される偏差を回転角度番号毎に加算するものである。上側スイッチ123と下側スイッチ124もそれぞれ同様の構成を有している。
 次に、図5に示す圧延荷重上下変動抽出手段11及び操作量演算手段12の動作について説明する。
 圧延荷重検出手段6では、1スタンド分の圧延荷重として1つの値しか採取することができない。そこで、圧延荷重上下配分手段10は、例えば、次式により、圧延荷重検出手段6によって検出された圧延荷重Pを、上側バックアップロール4aに発生する圧延荷重Pと、下側バックアップロール4bに発生する圧延荷重Pとに分離する。
Figure JPOXMLDOC01-appb-M000003
Figure JPOXMLDOC01-appb-M000004
ここで、
 P:上側バックアップロール4aに発生する圧延荷重
 P:下側バックアップロール4bに発生する圧延荷重
 P:トータル圧延荷重実績値(圧延圧延荷重検出手段による検出値)
 R:上側バックアップロール4aに発生する圧延荷重Pに配分すべきトータル圧延荷重Pに対する比
 である。
 ここで、第1の実施の形態では、具体的な値として、上側バックアップロール4aに発生する圧延荷重Pに配分すべきトータル圧延荷重Pに対する比Rは、0.5の近傍の値、すなわちトータル圧延荷重実績値Pをバックアップロール4a,4bに発生する圧延荷重に配分するときに、Pの1/2に近い値を上下それぞれに配分する。これにより、上下一方の加算器121c,122cにて、他方のバックアップロール4a,4bによるロール偏芯等による圧延荷重変動成分をほぼ打ち消すことができる。この理由については、後述する。
 次に、圧延荷重上下変動抽出手段11内では、圧延荷重記録手段111aは、バックアップロール回転角度番号0,1,2,…,n-1における圧延荷重を上側バックアップロール4aが1回転する間保持し、平均値演算手段111bは、回転角度番号n-1に到達した時点で、平均値を計算する。そして、偏差演算手段111cは、このバックアップロール回転角度番号0,1,2,…,n-1における圧延荷重と、平均値との差をロール偏芯等による圧延荷重変動として操作量演算手段12へ出力する。この場合において、平均値との差を取るのではなく、始点におけるPと終点におけるPから直線の式を演算し、その直線と各位置における圧延荷重の差を計算してもよい。
 バックアップロール回転角度番号におけるロール偏芯等による圧延荷重変動は、リミット121a,122aで上下限チェックされ、平均値の演算が終了した時点で、スイッチ121b,122bを同時にONして圧延荷重の偏差である圧延荷重変動値ΔP、ΔP、…、ΔPn-1を一斉にそれぞれ加算器(Σ、Σ、Σ、…、Σn-1)121c,122cに送りこみ、加算させる。
Figure JPOXMLDOC01-appb-M000005
ここで、
      Zj    :加算器Σjの値
      k     :加算回数(一般にバックアップロール4a,4bの回転数に一致)
      j=0~n-1
 加算器(Σ、Σ、Σ、…、Σn-1)121c,122cは、当該圧延材1が圧延される前にゼロクリアされ、バックアップロール4a,4bが1回転し平均値の演算が終了するごとに1回ずつ圧延荷重の偏差を加算する。この手順が、上側加算手段121および下側加算手段122で実施される。
 スイッチ123,124は、それぞれ、バックアップロール4a,4bの回転角度に対応して加算された圧延荷重の偏差である上側圧延荷重変動値ΔPAT、下側圧延荷重変動値ΔPBTを取り出す。
 つまり、バックアップロール基準位置が固定された基準位置0を通過した時点で、SWのみがONされ、加算器121cのΣからΔPA0が取り出される。バックアップロール基準位置が回転角度番号1に達した時点で、SWのみがONされ、加算器121cのΣからΔPA1が取り出される。この動作を、バックアップロール回転角度に対応したロール偏芯等による圧延荷重変動値のスイッチ123,124において繰り返し行う。
 なお、各位置において加算するのは、一般的な制御則から簡単に導くことができる。すなわち本制御対象のように、制御対象に積分系がない場合、制御器側に積分器を入れて定常偏差を除去することは、制御則の上から妥当である。制御対象が連続系ではなく、離散値系であるため、積分器ではなく加算器121c,122cとしているものである。
 そして、図5における操作量演算手段12を構成する上側加算手段121および上側スイッチ123が上側バックアップロール4aによる圧延荷重の偏差(上側圧延荷重変動値)ΔPATを算出する一方、下側加算手段122および下側スイッチ124が下側バックアップロール4bによる圧延荷重の偏差(下側圧延荷重変動値)ΔPBTを算出し、ロールギャップ修正量演算手段125が次の式6、式7により上側バックアップロール用ローギャップ修正量ΔSと、下側バックアップロール用ローギャップ修正量ΔSとを計算する。
Figure JPOXMLDOC01-appb-M000006
Figure JPOXMLDOC01-appb-M000007
 そして、操作量であるロールギャップ修正量ΔSは、ロールギャップも上下別々に操作できないので、ロールギャップ修正量演算手段125が、次の式8のように、上下のローギャップ修正量ΔSと、ΔSとを加算して出力する。
Figure JPOXMLDOC01-appb-M000008
 ここで、
      M:ミル定数
      Q:圧延材の塑性係数
      K:調整係数
      ΔS:上側バックアップロール用ローギャップ修正量
      ΔS:下側バックアップロール用ローギャップ修正量
      ΔS:ローギャップ修正量
      ΔPAT:上側バックアップロールによる圧延荷重の偏差(上側圧延荷重変動値)
      ΔPBT:下側バックアップロールによる圧延荷重の偏差(下側圧延荷重変動値)
 そして、ロールギャップ操作手段13は、式8によるローギャップ修正量ΔSを、MMCやGM-AGCなどのロールギャップ量に加えて、圧下手段5に与える。
 次に、上側バックアップロール4aに発生する圧延荷重Pに配分すべきトータル圧延荷重Pに対する比Rを、0.5の近傍の値とすることの妥当性を以下に述べる。
 バックアップロール4a,4bの回転周波数をω、ω[rad/s]、回転周期をT、T[s]とすると、次式9、すなわち、
Figure JPOXMLDOC01-appb-M000009
 また、rを以下の式10で表される比率とする。
Figure JPOXMLDOC01-appb-M000010
 ここでは、D<D、すなわちr<1と仮定する。ただし、この仮定はRを0.5の近傍の値とすることの妥当性の制約にはならず、r>1でもよい。説明の都合によるものである。
 バックアップロール4a,4bのロール偏芯量をそれぞれy、y[mm]とし、位相差をθとし、簡単のため振幅を1.0とすると、次式11のように書ける。
Figure JPOXMLDOC01-appb-M000011
 以下、軸心移動距離で考えるが、軸心移動距離が圧延荷重の変動に直結するため、圧延荷重変動に置き換えて考えることもできる。
 次に、前記式11の関係を、図6に示す。
 図6は、バックアップロール4a,4bのロール偏芯量y、y[mm]の時間変化の一例を示す図である。
 上側バックアップロール回転角度が固定基準位置から出発して、回転角度番号j(j=0~n-1)に達する時刻をTとすると、Tは以下の式で表される。
Figure JPOXMLDOC01-appb-M000012
 上側ロール用加算器121cに積算される値は、上側バックアップロール4aの位置jにおける上側バックアップロール4aの軸心移動量の積算値Y(j)と、同じく上側バックアップロール4aの位置jにおける下側バックアップロール4bの軸心移動量の積算値Y(j)の和である。Y(j)は、Tを初期値として周期Tの積算値であるので、次式13により計算される。
Figure JPOXMLDOC01-appb-M000013
 同様に、Y(j)も、Tを初期値として周期TTの積算値であるので、次式14により、より詳細には次式15により計算される。
Figure JPOXMLDOC01-appb-M000014
Figure JPOXMLDOC01-appb-M000015
ここで、
Figure JPOXMLDOC01-appb-M000016
となる整数mを決められると仮定すると、式16を式15に代入すると、式15は、次の式17となる。
Figure JPOXMLDOC01-appb-M000017
 ここで、円の全角2π[rad]を-1/n倍し、αに加算した角度のsinの積算値は0である。すなわちm個のsin値が積算されるごとに、下側バックアップロール4bの軸心移動量の積算値Y(j)はゼロとなる。
 また、式16において、バックアップロール4a,4b径の比により、必ずしも1/(1-r)は整数とならないが、1/(1-r)が整数に近い値となる場合に、その整数個のsin値が積算されるごとに、Y(j)はゼロに近い値となる。
さらに、ここで、y、yの重畳であるビートYは、式1と同様、次式18で表される。
Figure JPOXMLDOC01-appb-M000018
ωT>ωの場合、長周期の周波数(ωT-ω)/2は、T=T/rより、
Figure JPOXMLDOC01-appb-M000019
となる。
 すなわち、式16におけるmは、ビートの長周期m・Tを与え、m・Tごとに下側バックアップロール4bの軸心移動量の積算値Y(j)がゼロになる。
 また、式13より、上側バックアップロール4aの軸心移動量積算値YT(j)は、ロール偏芯制御なしの場合、単調増加であり、上側バックアップロール4aが回転するごとに、下側バックアップロール4bの軸心移動量積算値Y(j)のY(j)に対する比重は低下するため、図5に示した上側ロール用加算器121cには、上側バックアップロール4aの上側ロール偏芯成分が主に積算される。
 同様の考えにより、下側ロール用加算器122cには、下側バックアップロール4bのロール偏芯成分が主に積算される。
 従って、上側圧延荷重Pに配分すべきトータル圧延荷重Pに対する比Rは、0.5の近傍の値、すなわちトータル圧延荷重実績値Pをバックアップロール4a,4bに発生する圧延荷重に配分するときには、Pの1/2に近い値を上下それぞれに配分すればよいことがわかる。
 以上のように、第1の実施の形態の板厚制御装置によれば、キスロール荷重を使用することなく、金属材料を圧延中に測定される圧延荷重を用いて、ロール偏芯等、ロール回転位置に関連して発生する圧延荷重の変動成分、すなわちロール偏芯等による圧延荷重変動成分を抽出し、この圧延荷重変動を低減するように、当該圧延スタンドのロールギャップを操作することができる。
 これにより、第1の実施の形態の板厚制御装置によれば、ロール偏芯等による圧延荷重の変動がある場合、その圧延荷重変動を抑え、圧延荷重変動による板厚変動を抑えることができ、圧延していないときの周波数分析により分析できない変動成分も制御でき、板厚計も不要でトラッキング誤差による精度低下も生じず、またバックアップロール4a,4bの直径に径差があっても高精度に制御でき、さらにはキスロール荷重を計測する必要もなくなる。その結果、実施の形態の板厚制御装置によれば、ロール管理が容易になり、設備制約もない、高精度な板厚制御装置、板厚制御方法、板厚制御プログラムを提供することができる。
 特に、第1の実施の形態の板厚制御装置によれば、上側バックアップロール4aに発生する圧延荷重Pに配分すべきトータル圧延荷重Pに対する比Rを、0.5の近傍の値に設定するようにしたため、トータル圧延荷重実績値Pをバックアップロール4a,4bに発生する圧延荷重に配分するときに、Pの1/2に近い値を上下それぞれに配分することになり、上下一方の加算器121c,122cにて、他方のバックアップロール4a,4bによるロール偏芯等による圧延荷重変動成分をほぼ打ち消すことができる。
(第2の実施の形態)
 バックアップロール4a,4bが十分回転した後には、図5における、上側加算手段121および下側加算手段122のうち、加算器121c,122cの中には、上側バックアップロール4a,4bの偏芯に応じた値が蓄積されることは明白である。
 つまり、j番目の加算器121cに大きな値が蓄積されているということは、そのj番目の位置の偏芯量が大きいということである。下側の加算器121cでも同様である。
 従って、本発明の第2の実施の形態に係る板厚制御装置では、これを利用して、バックアップロール4a,4bが十分回転した後は、上下加算器121c,122c群の値、すなわち、上下それぞれのバックアップロール4a,4bのロール偏芯量を同定し、これに基づき回転速度からロール偏芯の周波数や周期を計算するものである。
 図7は、上側加算手段121の加算器121cに蓄えられた値の変化を示す説明図である。
 図7では、横軸に加算器121cにおける加算器の番号をとり、縦軸に加算器121cにおける各加算器の値をとり、加算器121cにおける各加算器の値201(棒グラフ)と、各位置における加算の値から同定した正弦波202とを示している。
 各加算器121cには、ノイズ等が含まれる場合があり、最小二乗法などで正弦波を求めることができる。
 そして、操作量演算手段12が、第2の実施の形態の荷重からロールギャップへの変換の式8を用いて、加算器121c内に蓄えられた荷重の値から上側ワークロール3aと下側ワークロール3bとの間のワークロールギャップ指令値を演算し、ロールギャップ操作手段13が操作量演算手段12によって演算されたワークロールギャップ指令値に基づいて、上側ワークロール3aと下側ワークロール3bとの間のワークロールギャップを操作する。
 以上のように、第2の実施の形態の板厚制御装置によれば、第1の実施の形態と同様に、キスロール荷重を使用することなく、金属材料を圧延中に測定される圧延荷重を用いて、ロール偏芯等、ロール回転位置に関連して発生する圧延荷重の変動成分、すなわちロール偏芯等による圧延荷重変動成分を抽出し、この圧延荷重変動を低減するように、当該圧延スタンドのロールギャップを操作することができる。
 特に、第2の実施の形態の板厚制御装置では、バックアップロール4a,4bが十分回転した後は、上下加算器121c,122c群の値、すなわち、上下それぞれの上下それぞれのバックアップロール4a,4bのロール偏芯量を同定できることになり、バックアップロール4a,4bの回転速度からロール偏芯の周波数や周期を計算するようにしたので、簡単にロール偏芯の周波数や周期を求めることができ、圧延荷重変動を低減するように、当該圧延スタンドのロールギャップを操作することができると共に、上側圧延荷重Pに配分すべきトータル圧延荷重Pに対する比であるRを0.5の近傍の値に設定するようにしたため、トータル圧延荷重実績値Pをバックアップロール4a,4bに発生する圧延荷重に配分するときに、Pの1/2に近い値を上下それぞれに配分することになり、上下一方の加算器121c,122cにて、他方のバックアップロール4a,4bによるロール偏芯等による圧延荷重変動成分をほぼ打ち消すことができる。
(第3の実施の形態)
 本発明の第3の実施の形態では、バックアップロール4a,4b交換直後は、上側圧延荷重Pに配分すべきトータル圧延荷重Pに対する比であるRを0.5と設定するが、バックアップロール4a,4bが十分回転した後、たとえば圧延材1本を圧延した後は、前記のごとく上下加算器121c群の値に上下それぞれのバックアップロール4a,4bロール偏芯量を正弦波などの周期的関数で同定することができるので、バックアップロール4a,4bの同定後の正弦波の振幅の比を次材の比を、Rとして利用する。
 例えば、バックアップロール4a,4b交換直後に圧延した結果、上側バックアップロール4aの加算器121cで同定した正弦波の振幅が0.9、下側バックアップロール4bの加算器121cで同定した正弦波の振幅が1.1であったとすると、R=0.9/(0.9+1.1)=0.45という比を次材に用いることができる。
 また、周期的関数で同定することなく、加算に蓄えられる値の絶対値を計算することで、バックアップロール4a,4bのロール偏芯量の比を求めることができる。例えば、バックアップロール4a,4b交換直後に圧延した結果、上側バックアップロール4aの加算器121cのバックアップロール4a,4bの各位置における値の絶対値を加算した結果が例えば9.0、下側バックアップロール4bの加算器121cのバックアップロール4a,4bの各位置における値の絶対値を加算した結果が例えば11.0であったとすると、R=9/(9+11)=0.45という比を次材に用いることができる。
 つまり、第3の実施の形態では、圧延荷重上下配分手段10は、圧延荷重検出手段6によって検出された圧延荷重を上下に配分する比Rを、バックアップロール交換直後は0.5に設定し、バックアップロール交換後、次の圧延材以降は、現在の圧延材についての操作量演算手段12における圧延荷重の偏差である上下の圧延荷重変動値ΔPAT,ΔPBTの積算値を用いて周期関数の振幅を同定し、上側ワークロール3aおよび上側ワバックアップロール4aに対する振幅と、下側ワークロール3bおよび下側バックアップロール4bに対する振幅の合計値に対する比を設定するようにしても良いし、あるいは、圧延荷重検出手段6によって検出された圧延荷重を上下に配分する比Rを、バックアップロール交換直後は0.5に設定し、バックアップロール交換後、次の圧延材以降は、現在の圧延材の操作量演算手段12における圧延荷重の偏差である圧延荷重変動値ΔPAT,ΔPBTに基づいて設定するようにしても良い。
 もちろん、この比にはノイズが含まれている虞があるので、次式20で示すようなフィルタを用いて、ノイズの影響を低減することも可能である。
Figure JPOXMLDOC01-appb-M000020
 ここで、式20において、
k: 現在を表すインデックス
k+1: 次回用いられるべきことを示すインデックス
k-1: 現在から1回前を表すインデックス
c: フィルタリングのためのゲイン
 である。
 以上のように、第3の実施の形態の板厚制御装置によれば、第1,第2の実施の形態と同様に、キスロール荷重を使用することなく、金属材料を圧延中に測定される圧延荷重を用いて、ロール偏芯等、ロール回転位置に関連して発生する圧延荷重の変動成分を抽出し、この圧延荷重変動を低減するように、当該圧延スタンドのロールギャップを操作することができると共に、バックアップロール4a,4b交換直後は、上側圧延荷重Pに配分すべきトータル圧延荷重Pに対する比であるRを0.5の近傍の値に設定するようにしたため、トータル圧延荷重実績値Pをバックアップロール4a,4bに発生する圧延荷重に配分するときに、Pの1/2に近い値を上下それぞれに配分することになり、上下一方の加算器121c,122cにて、他方のバックアップロール4a,4bによるロール偏芯等による圧延荷重変動成分をほぼ打ち消すことができる。
 特に、本発明の第3の実施の形態の板厚制御装置では、バックアップロール4a,4b交換直後は、上側圧延荷重Pに配分すべきトータル圧延荷重Pに対する比であるRを0.5と設定するが、バックアップロール4a,4bが十分回転した後、たとえば圧延材1本を圧延した後は、上下加算器121c群の値に上下の上下それぞれのバックアップロール4a,4bのロール偏芯量を正弦波などの周期的関数で同定することができるので、バックアップロール4a,4bの同定後の正弦波の振幅の比を次材の比を、Rとして利用することができ、簡単にロール偏芯の周波数や周期を求めることができ、圧延荷重変動を低減するように、当該圧延スタンドのロールギャップを操作することができる。
 3…ワークロール
 3a…上側ワークロール
 3b…下側ワークロール
 4…バックアップロール
 4a…上側バックアップロール
 4b…下側バックアップロール
 5…圧下手段
 6…圧延荷重検出手段
 7…ロール回転数検出器
 8…ロール基準位置検出器
 9…ロールギャップ検出器
 10…圧延荷重上下配分手段
 11…圧延荷重上下変動抽出手段
 12…操作量演算手段
 13…ロールギャップ操作手段
産業上の利用の可能性
 本発明は、熱間で金属材を圧延する熱間圧延装置に適用することができる。

Claims (6)

  1.  上側のロールセットの上側ロールセットと、下側ワークロールおよびバックアップロールの下側ロールセットとの間で金属材料を圧延することにより製造される圧延材の板厚変動を制御する板厚制御装置であって、
     前記金属材料に対する圧延荷重を検出する圧延荷重検出手段と、
     前記圧延荷重検出手段によって検出された圧延荷重を、前記上側ロールセットで発生している上側圧延荷重と、前記下側ロールセットで発生している下側圧延荷重との比に基づいて、上下に配分する圧延荷重上下配分手段と、
     前記圧延荷重上下配分手段によって上下に配分された前記上側ロールセットおよび前記下側ロールセットの前記圧延荷重に基づいて、前記上側ロールセットおよび前記下側ロールセットの回転位置に関連して発生する上側圧延荷重変動値および下側圧延荷重変動値を抽出する圧延荷重上下変動値抽出手段と、
     前記圧延荷重上下変動値抽出手段により抽出された前記上側圧延荷重変動値および下側圧延荷重変動値に基づいて、前記上側ワークロールと前記下側ワークロールとの間のワークロールギャップ指令値を演算する操作量演算手段と、
     前記操作量演算手段によって演算された前記ワークロールギャップ指令値に基づいて、前記上側ワークロールと前記下側ワークロールとの間のワークロールギャップを操作するロールギャップ操作手段と、
     を有することを特徴とする板厚制御装置。
  2.  請求項1記載の板厚制御装置において、
     前記操作量演算手段は、
     前記上側ロールセットおよび前記下側ロールセットが所定時間以上回転するまでは、前記圧延荷重上下変動値抽出手段によって抽出された前記上側圧延荷重変動値および下側圧延荷重変動値に基づいて、前記上側ワークロールと前記下側ワークロールとの間のワークロールギャップ指令値を演算し、
     前記上側ロールセットおよび前記下側ロールセットが所定時間以上回転した場合、前記圧延荷重上下変動値抽出手段によって演算された前記圧延荷重変動値の積算値に基づいて上下それぞれのバックアップロールのロール偏芯量を同定し、同定したロール編芯量に基づいて前記上側ワークロールと前記下側ワークロールとの間のワークロールギャップ指令値を演算する、
     ことを特徴とする板厚制御装置。
  3.  請求項1または請求項2のいずれか一の請求項に記載の板厚制御装置において、
     前記圧延荷重上下配分手段は、
     前記圧延荷重検出手段によって検出された圧延荷重を上下に配分する比を、前記バックアップロール交換直後は0.5に設定し、前記バックアップロール交換後、次の圧延材以降は、現在の圧延材の操作量演算手段における前記圧延荷重の偏差に基づいて設定する、
     ことを特徴とする板厚制御装置。
  4.  請求項1または請求項2のいずれか一の請求項に記載の板厚制御装置において、
     前記圧延荷重上下配分手段は、
     前記圧延荷重検出手段によって検出された圧延荷重を上下に配分する比を、前記バックアップロール交換直後は0.5に設定し、前記バックアップロール交換後、次の圧延材以降は、現在の圧延材の操作量演算手段における前記圧延荷重変動値の積算値を用いて周期関数の振幅を同定し、上側のロールセットに対する振幅と、下側ロールセットに対する振幅との合計値に対する比を設定する、
     ことを特徴とする板厚制御装置。
  5.  上側のロールセットの上側ロールセットと、下側ワークロールおよびバックアップロールの下側ロールセットとの間で金属材料を圧延することにより製造される圧延材の板厚変動を制御する板厚制御方法であって、
     前記金属材料に対する圧延荷重を検出するステップと、
     検出された圧延荷重を、前記上側ロールセットで発生している上側圧延荷重と、前記下側ロールセットで発生している下側圧延荷重との比に基づいて、上下に配分するステップと、
     前記上下に配分された前記上側ロールセットおよび前記下側ロールセットの前記圧延荷重に基づいて、前記上側ロールセットおよび前記下側ロールセットの回転位置に関連して発生する上側圧延荷重変動値および下側圧延荷重変動値を抽出するステップと、
     前記抽出された前記上側圧延荷重変動値および下側圧延荷重変動値に基づいて、前記上側ワークロールと前記下側ワークロールとの間のワークロールギャップ指令値を演算するステップと、
     前記演算された前記ワークロールギャップ指令値に基づいて、前記上側ワークロールと前記下側ワークロールとの間のワークロールギャップを操作するステップと、
     を有することを特徴とする板厚制御方法。
  6.  上側のロールセットの上側ロールセットと、下側ワークロールおよびバックアップロールの下側ロールセットとの間で金属材料を圧延することにより製造される圧延材の板厚変動を制御することをコンピュータに実行させるための板厚制御プログラムであって、
     前記金属材料に対する圧延荷重を検出するステップと、
     検出された圧延荷重を、前記上側ロールセットで発生している上側圧延荷重と、前記下側ロールセットで発生している下側圧延荷重との比に基づいて、上下に配分するステップと、
     前記上下に配分された前記上側ロールセットおよび前記下側ロールセットの前記圧延荷重に基づいて、前記上側ロールセットおよび前記下側ロールセットの回転位置に関連して発生する上側圧延荷重変動値および下側圧延荷重変動値を抽出するステップと、
     前記抽出された前記上側圧延荷重変動値および下側圧延荷重変動値に基づいて、前記上側ワークロールと前記下側ワークロールとの間のワークロールギャップ指令値を演算するステップと、
     前記演算された前記ワークロールギャップ指令値に基づいて、前記上側ワークロールと前記下側ワークロールとの間のワークロールギャップを操作するステップと、
     を、コンピュータに実行させるための板厚制御プログラム。
PCT/JP2010/057051 2010-04-21 2010-04-21 板厚制御装置、板厚制御方法、板厚制御プログラム Ceased WO2011132273A1 (ja)

Priority Applications (5)

Application Number Priority Date Filing Date Title
JP2012511448A JP5637637B2 (ja) 2010-04-21 2010-04-21 板厚制御装置、板厚制御方法、板厚制御プログラム
CN201080066250.5A CN102858475B (zh) 2010-04-21 2010-04-21 板厚控制装置、板厚控制方法、板厚控制程序
AU2010351732A AU2010351732B2 (en) 2010-04-21 2010-04-21 Gage controller, gage control method, and gage control program
KR1020127027080A KR101414871B1 (ko) 2010-04-21 2010-04-21 판두께 제어 장치, 판두께 제어 방법, 판두께 제어 프로그램이 기록된 기록매체
PCT/JP2010/057051 WO2011132273A1 (ja) 2010-04-21 2010-04-21 板厚制御装置、板厚制御方法、板厚制御プログラム

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2010/057051 WO2011132273A1 (ja) 2010-04-21 2010-04-21 板厚制御装置、板厚制御方法、板厚制御プログラム

Publications (1)

Publication Number Publication Date
WO2011132273A1 true WO2011132273A1 (ja) 2011-10-27

Family

ID=44833832

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2010/057051 Ceased WO2011132273A1 (ja) 2010-04-21 2010-04-21 板厚制御装置、板厚制御方法、板厚制御プログラム

Country Status (5)

Country Link
JP (1) JP5637637B2 (ja)
KR (1) KR101414871B1 (ja)
CN (1) CN102858475B (ja)
AU (1) AU2010351732B2 (ja)
WO (1) WO2011132273A1 (ja)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9242283B2 (en) 2010-11-22 2016-01-26 Toshiba Mitsubishi-Electric Industrial Systems Corporation Control apparatus of rolling mill
TWI571328B (zh) * 2013-08-28 2017-02-21 東芝三菱電機產業系統股份有限公司 壓延機的板厚控制裝置
JP6766970B1 (ja) * 2019-06-14 2020-10-14 東芝三菱電機産業システム株式会社 板厚制御装置および板厚制御方法

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102013109218A1 (de) * 2013-08-26 2015-02-26 Sandvik Materials Technology Deutschland Gmbh Kaltpilgerwalzanlage und Verfahren zum Umformen einer Luppe zu einem Rohr
KR101912052B1 (ko) * 2014-11-11 2018-10-25 도시바 미쓰비시덴키 산교시스템 가부시키가이샤 플랜트의 제어 장치
US9676578B2 (en) * 2014-11-27 2017-06-13 Mitsubishi Electric Corporation Roller-to-roller conveyance control apparatus
CN104815849B (zh) * 2015-04-07 2016-11-30 首钢京唐钢铁联合有限责任公司 一种定宽机夹送辊位置控制系统精度补偿的方法
JP7131964B2 (ja) * 2018-05-24 2022-09-06 三菱重工業株式会社 推定装置、推定システム、推定方法およびプログラム
EP3914402B1 (en) * 2019-01-25 2025-09-24 Primetals Technologies Japan, Ltd. Rolling equipment and rolling method
CN115740037B (zh) * 2019-08-28 2026-03-20 株式会社Tmeic 辊状态监视装置
CN111389927B (zh) * 2020-03-05 2022-03-22 南京钢铁股份有限公司 单机架炉卷轧机薄规格钢板窄厚度公差控制方法
JP7151915B1 (ja) * 2020-11-16 2022-10-12 東芝三菱電機産業システム株式会社 連続圧延システム

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002282917A (ja) * 2001-03-28 2002-10-02 Toshiba Corp 圧延機の板厚制御装置
WO2006123394A1 (ja) * 2005-05-16 2006-11-23 Toshiba Mitsubishi-Electric Industrial Systems Corporation 板厚制御装置

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
BE793758A (fr) * 1972-01-06 1973-07-09 Westinghouse Electric Corp Procede et appareil de commande de calibre comprenant la correction d'ecart de calibre de piece travaillee pour laminoirs de metaux
US3803886A (en) * 1972-05-10 1974-04-16 Westinghouse Electric Corp System and method for controlling gauge and crown in a plate rolling mill
JPS6054802B2 (ja) * 1979-02-28 1985-12-02 三菱重工業株式会社 圧延機のロ−ル偏芯制御方法
JP2000140919A (ja) * 1998-11-05 2000-05-23 Furukawa Electric Co Ltd:The 板厚変動解析装置、および板厚制御装置とその制御方法、並びに板厚制御装置を備えた圧延機
JP2002018507A (ja) * 2000-07-06 2002-01-22 Mitsubishi Electric Corp 圧延プラントのロール偏心制御方法
KR100938747B1 (ko) * 2007-01-22 2010-01-26 도시바 미쓰비시덴키 산교시스템 가부시키가이샤 판 두께 제어 장치
CN101648217B (zh) * 2009-06-09 2011-07-20 中冶赛迪工程技术股份有限公司 一种基于轧辊旋转角度的偏心补偿方法及其设备

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002282917A (ja) * 2001-03-28 2002-10-02 Toshiba Corp 圧延機の板厚制御装置
WO2006123394A1 (ja) * 2005-05-16 2006-11-23 Toshiba Mitsubishi-Electric Industrial Systems Corporation 板厚制御装置

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9242283B2 (en) 2010-11-22 2016-01-26 Toshiba Mitsubishi-Electric Industrial Systems Corporation Control apparatus of rolling mill
TWI571328B (zh) * 2013-08-28 2017-02-21 東芝三菱電機產業系統股份有限公司 壓延機的板厚控制裝置
JP6766970B1 (ja) * 2019-06-14 2020-10-14 東芝三菱電機産業システム株式会社 板厚制御装置および板厚制御方法
WO2020250424A1 (ja) * 2019-06-14 2020-12-17 東芝三菱電機産業システム株式会社 板厚制御装置および板厚制御方法
TWI726543B (zh) * 2019-06-14 2021-05-01 日商東芝三菱電機產業系統股份有限公司 板厚控制裝置及板厚控制方法
US11383279B2 (en) 2019-06-14 2022-07-12 Toshiba Mitsubishi-Electric Industrial Systems Corporation Plate thickness control device and plate thickness control method

Also Published As

Publication number Publication date
CN102858475B (zh) 2015-11-25
AU2010351732A1 (en) 2012-11-08
CN102858475A (zh) 2013-01-02
AU2010351732B2 (en) 2015-03-05
KR20120130261A (ko) 2012-11-29
KR101414871B1 (ko) 2014-07-03
JPWO2011132273A1 (ja) 2013-07-18
JP5637637B2 (ja) 2014-12-10

Similar Documents

Publication Publication Date Title
JP5637637B2 (ja) 板厚制御装置、板厚制御方法、板厚制御プログラム
JP5598549B2 (ja) 圧延機の制御装置
CN112739468B (zh) 辊状态监视装置
JP5071376B2 (ja) 板厚制御装置
JP4673848B2 (ja) 板厚制御装置
JP5170240B2 (ja) 圧延機の板厚制御装置
JP6404195B2 (ja) プラント制御装置、圧延制御装置、プラント制御方法およびプラント制御プログラム
CN101443136A (zh) 抑制轧辊偏心影响的方法
JP7765517B2 (ja) 冷間圧延機のための拡張カルマンフィルタ状態推定を使用する動的ロール偏心識別及び制御アップグレード
CN110614277A (zh) 机械设备控制装置、机械设备控制方法以及程序
JP2014173996A (ja) ロールプレス設備に用いられるロールの形状測定方法およびロールプレス設備用ロール形状測定装置
JPWO2019039583A1 (ja) 圧延機及び圧延機の設定方法
CN105127214A (zh) 一种四辊轧机轧制过程中的轧机弹性变形预测方法
CN102513376A (zh) 四、六辊板带轧机辊系偏心相位辨识检测方法
JP2002282917A (ja) 圧延機の板厚制御装置
AU2007249130B2 (en) Gauge control system
JP2005118842A (ja) 圧延機の変形特性同定方法
JP2008114272A (ja) ゼンジミア圧延機における自動板厚制御方法及び自動板厚制御装置
KR100828015B1 (ko) 판 두께 제어 장치

Legal Events

Date Code Title Description
WWE Wipo information: entry into national phase

Ref document number: 201080066250.5

Country of ref document: CN

121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 10850216

Country of ref document: EP

Kind code of ref document: A1

WWE Wipo information: entry into national phase

Ref document number: 2012511448

Country of ref document: JP

ENP Entry into the national phase

Ref document number: 20127027080

Country of ref document: KR

Kind code of ref document: A

NENP Non-entry into the national phase

Ref country code: DE

ENP Entry into the national phase

Ref document number: 2010351732

Country of ref document: AU

Date of ref document: 20100421

Kind code of ref document: A

122 Ep: pct application non-entry in european phase

Ref document number: 10850216

Country of ref document: EP

Kind code of ref document: A1