WO2011071430A1 - Procédé et agencement de commande d'ordonnancement dans un système de télécommunication - Google Patents

Procédé et agencement de commande d'ordonnancement dans un système de télécommunication Download PDF

Info

Publication number
WO2011071430A1
WO2011071430A1 PCT/SE2009/051408 SE2009051408W WO2011071430A1 WO 2011071430 A1 WO2011071430 A1 WO 2011071430A1 SE 2009051408 W SE2009051408 W SE 2009051408W WO 2011071430 A1 WO2011071430 A1 WO 2011071430A1
Authority
WO
WIPO (PCT)
Prior art keywords
scheduling
scheduling loop
subset
grant
input signals
Prior art date
Application number
PCT/SE2009/051408
Other languages
English (en)
Inventor
Torbjörn WIGREN
Graham C Goodwin
Original Assignee
Telefonaktiebolaget L M Ericsson (Publ)
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Telefonaktiebolaget L M Ericsson (Publ) filed Critical Telefonaktiebolaget L M Ericsson (Publ)
Priority to US13/514,822 priority Critical patent/US8902835B2/en
Priority to EP09852112.3A priority patent/EP2510736B1/fr
Priority to CN2009801623327A priority patent/CN102598826A/zh
Priority to IN2243DEN2012 priority patent/IN2012DN02243A/en
Priority to PCT/SE2009/051408 priority patent/WO2011071430A1/fr
Publication of WO2011071430A1 publication Critical patent/WO2011071430A1/fr

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W72/00Local resource management
    • H04W72/50Allocation or scheduling criteria for wireless resources
    • H04W72/54Allocation or scheduling criteria for wireless resources based on quality criteria
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W72/00Local resource management
    • H04W72/50Allocation or scheduling criteria for wireless resources
    • H04W72/52Allocation or scheduling criteria for wireless resources based on load

Definitions

  • the present invention relates to telecommunication systems in general, specifically to scheduling control in such systems.
  • scheduling of users is performed from the network side, and is therefore sometimes referred to as network-based multiuser scheduling.
  • scheduling normally worked as an operation unit in the network controller.
  • HSPA High Speed Packet Access
  • HSPA is generally based on High Speed Downlink Packet Access (HSDPA) in the downlink and Enhanced Uplink (EUL) in the uplink.
  • HSDPA High Speed Downlink Packet Access
  • EUL Enhanced Uplink
  • HSPAPA High Speed Uplink Packet Access
  • HSDPA is an enhancement to WCDMA (Wideband Code Division Multiple Access) that provides a smooth evolutionary path to higher data rates.
  • HSDPA is specified in 3GPP release 5, and includes additional transport and control channels such as High-Speed Downlink Shared Channel (HS-DSCH).
  • EUL is specified in 3GPP release 6 and includes additional transport and control channels such as the Enhanced Dedicated Channel (E-DCH).
  • HSDPA High Speed Downlink Packet Access
  • Fast scheduling is a mechanism that selects which user(s) to transmit to in a given Transmission Time Interval (TTI).
  • TTI Transmission Time Interval
  • the packet scheduler is a key element in the design of a HSDPA system as it controls the allocation of the shared resources among the users and largely determines the overall behavior of the system. In fact, the scheduler decides which users to serve and, in close cooperation with the link adaptation mechanism, which modulation, power and how many codes should be used for each user. This produces the actual end-user bit rate and system capacity.
  • the HS- DSCH downlink channel is shared between users using channel-dependent scheduling to take advantage of favorable channel conditions in order to make best user of the available radio resources.
  • scheduling typically involves allocating communication resources to users according to some priority order.
  • the scheduling algorithm generally determines the priorities of the user by using one or more metrics. Delay factors and optionally other factors based on radio channel quality are normally user to grant scheduling priorities to the users. For example, in MMTel services, the delay in the wireless access network is an important metric. It is known that so-called delay-sensitive schedulers for the downlink can achieve rather good performance for MMTel services such as Voice over IP traffic.
  • HSDPA packet scheduler for E-DCH in the uplink.
  • the scheduler will normally operate on a request-grant principle, where the user equipment (UE) requests permission to send data and the scheduler on the network side decides when and how many terminals will be allowed to do so.
  • a request for transmission will normally contain data about the state of the transmission data buffer and the queue at the terminal side and its available power margin.
  • the scheduler controls when and at which data rate the UE is allowed to transmit. By increasing the transmission power, the UE can transmit at a higher data rate.
  • the received power from a certain UE represents interference for other UE terminals.
  • the "shared resource" for EUL is typically the amount of tolerable interference in the cell.
  • the scheduler at Node B will allocate the UE with a value grant that corresponds to a maximum data rate.
  • EUL there are two mechanisms for transferring scheduling information from the UE to NodeB: out-band signaling and in-band signaling.
  • Out-band signaling is done through a single so-called “happy bit" transmitted on the Enhanced Dedicated Physical Control Channel (E-DPCCH).
  • In-band signaling provides more detailed information and is transmitted on the Enhanced Dedicated Physical Data Channel (E-DPDCH).
  • the scheduler function for the enhanced uplink schedules EUL traffic of multiple users.
  • EUL serves as a counterpart to the high-speed downlink packed access service in the WCDMA downlink.
  • EUL and HSDPA provide the backbone for the mobile broadband offer for the WCDMA cellular system.
  • the scheduler operates in a closed loop fashion, where transmission grants (control signals) are issued in response to transmission requests and air interface load (measurements).
  • the 3GPP standard provides channels with certain associated capacity, range, and delay properties. Notably, the control loop is dynamic, with nonlinear constraints and plenty of discrete ranges of various states.
  • the main problem with the existing scheduler functionality is that it does not account properly for the complicated multi-input-multi-output properties of the control loop, in fact the scheduler is designed without consideration of modern and systematic control theory, a fact that can be expected to lead to sub- optimal performance.
  • the present invention relates to scheduling control in a telecommunication system.
  • the present invention relates to an improved scheduling loop control for EUL.
  • a method of uplink scheduling control in a telecommunication system comprising a node and a plurality of associated user equipment, performing the steps of identifying S10 scheduling loop output signals, scheduling loop input signals, and scheduling loop system states, determining S20 a dynamic space state model representative of a scheduling loop in said system, based on at least a subset of said identified scheduling loop output and input signals and said scheduling loop system states. Subsequently, measuring S30 and storing S40 at least a subset of said identified scheduling loop output signals and said identified scheduling loop input signals. Finally, controlling S50 the plurality of user equipment of said scheduling loop based on optimization of a criterion dependent of said determined dynamic space state model, said stored scheduling loop input signal, and said stored scheduling loop output signals.
  • Fig. 1 is a schematic illustration of a telecommunication system in which the present invention can be implemented
  • Fig. 2 is a graph illustrative of rise over thermal
  • Fig. 3 is a schematic flow chart of an embodiment of a method according to the present invention.
  • Fig. 4a-4b is a schematic block diagram of an embodiment of an arrangement according to the present invention.
  • Fig. 5 is a further schematic block diagram of an embodiment of an arrangement according to the present invention.
  • E-DPDCH Enhanced-Dedicated Physical Data Channel
  • a telecommunication system includes a plurality of radio network controllers (RNC) in communication with a core network.
  • RNC radio network controllers
  • Each RNC controls multiple of logical nodes Node B, and is responsible for call setup, quality of service handling and management of radio resources in the cells for which it is responsible.
  • RNC handles automatic retransmission requests (ARQ), retransmissions of erroneous data.
  • ARQ automatic retransmission requests
  • Each Node B is responsible for physical layer processing such as error-correcting coding, modulation, and spreading, as well as conversion from the baseband to the radio-frequency signal transmitted from the antenna.
  • a Node B is responsible for transmission and reception in one or several cells.
  • each Node B supports one or more user equipments (UE) within its cell coverage.
  • UE user equipment
  • the WCDMA enhanced uplink aims at scheduling traffic to times when the uplink interference situation is favorable, thereby utilizing air interface resources in a better way than before.
  • the air interface load is typically measured by the noise rise, over the thermal level, a quantity denoted rise over thermal (RoT).
  • RoT rise over thermal
  • the pole capacity is the limiting theoretical bit rate of the uplink, corresponding to an infinite noise rise.
  • E-DPDCH the uplink data channel
  • This channel supports a high rate. It is however not involved in the scheduling control as such, this is instead the task of the corresponding control channel, denoted E-DPCCH.
  • This channel e.g. carries rate requests (measurement signals), from each user equipment to the EUL scheduler.
  • E- AGCH absolute grants (control signals) to each UE.
  • E-RGCH relative grants (also control signals) from the node B to the UE.
  • E-HICH carries ACK/NACK information and is not directly involved in scheduling as such.
  • the grants mentioned above are the quantities signaled to each UE indicating what rate (actually power) it may use for its transmission.
  • the UE can, but need not, use its complete grant.
  • Relative grants are used to control the interference in neighbor cells - these can only decrease the current grant of the UE one step at a time. It is stressed that there are only a discrete number of grant levels that can be used.
  • the task of the scheduler is to schedule EUL user traffic, to enhance user and cell capacity, at the same time as it performs a plurality of tasks. These tasks include, keeping track of the air interface cell load, avoiding over-scheduling that may cause cell instability and loss of coverage, and keeping track of other available traffic, like transport resources and hardware.
  • the scheduler receives, measures and estimates quantities relevant for its scheduling operation, and transmits orders to UEs, primarily in the form of granted power/bitrates. When doing this the scheduler needs to operate within the constraints induced by the 3GPP standard, these constraints being e.g.
  • UEs are e.g. given the maximum bit rate as long as there are resources available, in an order defined by a priority list. Then, in case of lack of resources, overload handling is invoked. This overload handling reduces the priority of the UE with the best grant to a very low priority, thereby resulting in switching in case of conflicting high rate users. Since there is a dead time until rescheduling takes effect, this results in a loss of capacity.
  • Other aspects include the fact that scheduling is based solely on air interface load taking effect, i.e. previous scheduling commands for other UEs are not used for prediction of air interface load, a fact that causes further losses.
  • the UEs form an integral part of the scheduling control loop. In this aspect, it is not the data transfer on the E-DPDCH channel that is of interest. Rather it is the operation of the UE according to the 3GPP standard.
  • Each UE performs according to the following. Receiving absolute grants on the E-AGCH channel (control signal). There are four of these channels, however only one absolute grant can be transmitted per TTI on each channel. Hence, queues are used, which result in time varying delays.
  • UEs are also receiving relative grants on the E-RGCH channel (control signal). The relative grants can only reduce the scheduled grant of the UE by single steps. Additionally, these are used when forming the scheduled grant for the UE, this hence being based on the absolute and relative grants.
  • the scheduled grant is the actual grant used by the UE for transmission. Further, each user equipment uses the absolute grants and the relative grants, for computation of the power to be used for data transmission. This is expressed using beta factors that are computed as nonlinear functions of the scheduled grant, accounting also for the absolute output power level of the UE. There is a delay associated with this process, from the reception of absolute and relative grants, until the beta factor is utilized for transmission. Obviously, each user equipment also transmits user data, in accordance with the computed beta factor.
  • each user equipment performs determination and signaling of the happy bit (measurement signal) to the scheduler of the RBS, resident in the Node B. If not happy the UE requests a higher bit rate, determination and signaling of scheduled information (measurement signal) to the scheduler of the RBS.
  • the scheduled information is based on the amount of data in the RLC buffer, which allows the scheduler to make scheduling decisions for the UE, and determination and signaling of the transport format used (E-TFCI). This carries e.g. the actual beta factor applied by the UE, thereby supporting the load estimator that provides the scheduler with information of the current air-interface load.
  • UEs are typically divided into different categories depending on whether they support 10 ms TTIs (TTI is roughly the scheduling sampling period) only, or also 2 ms TTIs. Their maximal bit rates also affect the category of the UEs. The details appear in Table 1.
  • the model will usually involve delays. This implies that inputs applied at a given time do not have their effect until a later time. Thus, the model needs to be able to predict the response over the delay interval.
  • Equation (2) The desired future behaviour of the system from the current time k to time k+N is represented by a cost function J according to Equation (2) where E denotes expected value and ⁇ r, ⁇ denotes the desired "set-point" sequence.
  • control problem has been translated into the following optimization problem: minimize Equation (2) subject to the model Equation ( 1), and constraints (3).
  • Model predictive control typically solves the above mentioned control problem over a fixed horizon N for a known initial state. Then, the first input, Ufc, is applied. Next the state advances to x k+] , and the optimization is repeated. This introduces a "rolling horizon" aspect to the problem. In addition, feedback is introduced if one measures (or estimates) the current state and uses that as the basis of the optimization problem.
  • the MPC version of the previously described scheduling problem is difficult because (i) the model is nonlinear, (ii) the delays are random, (Hi) the cost function is non-quadratic, (iv) the disturbances are non-Gaussian and (v) the constraints are non-convex (e.g. they can include finite alphabet constraints to deal with quantization).
  • the overall problem with existing scheduling solutions for EUL in the RBS e.g. Node B is that the scheduling control loop is designed in an ad hoc manner, without respecting fundamental and existing principles for controller design. This leads to suboptimal performance in terms of cell capacity and may manifest itself in problems with stability.
  • the scheduler algorithm is not based on a dynamic model that account for nonlinear effects, loop delays, constraints, quantization and the fact that there is much uncertainty in available measurements.
  • Prediction of the effects of the air interface load is e.g. not used.
  • the scheduler algorithm is designed in an ad hoc manner, rather than by application of dynamic optimization techniques that account for all effects listed above. Obviously, performance will be less than what is possible, leading to a reduced cell capacity for EUL.
  • the scheduler algorithm does not simultaneously consider the scheduling of multiple UEs, and the effects of previous scheduling decisions, this being a fact that slows down the scheduler and reduces the utilization of resources. Put otherwise, cashing of scheduled decisions is not supported.
  • the greedy algorithms applied may cause switching between high bit rate users. Since there are dead times before scheduling resources are released, the UE s may not utilize all scheduled grants at 100% of the time. This also wastes cell capacity. • The principle to schedule users to the maximum bitrate conflicts with statistical multiplexing principles and reduces cell capacity. This follows since UEs do not utilize their scheduled grant at all times. To avoid this it is sometimes better to schedule more users at lower bit rates. Then the statistical effects make it possible to use the fact that on average a certain percentage of the cell capacity is free, despite the fact that the sum of the maximal bit rate of all users may have reached the load limit of the cell. The scheduler can then over schedule the cell, similar to when aircrafts are deliberately overbooked. This is however not utilized in the present scheduler algorithms.
  • An aim of the present invention is therefore to provide a scheduling functionality, or more specifically, a scheduling control which takes the above mentioned problems into consideration to more efficiently utilize the radio resources e.g. air interface load.
  • the basic concept of the present invention comprises a definition of a joint dynamic model of the collected effects of the 3GPP standard and the constraints of the radio interface for all EUL UEs in the telecommunication system, e.g. within the range of the Node B.
  • the dynamic model is then used for systematic design of an optimal scheduling control algorithm of MPC type, said MPC serving as a new and better EUL scheduling loop algorithm.
  • the beneficial effects of the present invention include an increased utilization of resources that can be used to increase the cell capacity and/ or the coverage of EUL cells.
  • a basic embodiment of the present invention will be described below, with reference to the flow chart of FIG. 3.
  • a process of controlling a scheduling loop in a telecommunication system comprising at least a node e.g. Node B and a plurality of user equipment (UE) the following steps are performed.
  • all relevant output, and input signals from/to the scheduling loop are identified S10, in the same step or in close cooperation with the step also the system states of the scheduling loop are determined.
  • a dynamic space state model is determined S20 for the scheduling loop.
  • the model can be viewed as a representation of the scheduling loop, which is determined based on at least a subset of the identified output/input signals and the determined system states.
  • At least a subset of the identified output/input signals is measured S30 and stored S40, preferably within the Node B but also potentially in some other system node.
  • the scheduling of the plurality of user equipment is controlled S50 based on optimization of a predetermined criterion which is dependent on the determined dynamic space state model together with the stored measured input and output signals.
  • the optimization process comprises applying a model predictive control (MPC) process to the determined space state model.
  • MPC model predictive control
  • Absolute power grant reference (the end value after rate limited increase desired by the scheduler), denoted where the subscript SC denotes the serving cell, i denotes the i:th UE, the superscript A denotes Absolute, and the components of the set are the quantized grant levels.
  • states listed below are identified and utilized to describe the scheduling loop. Note that the states are sometimes very similar to the measurements defined above. The reason why states are introduced for the underlying true values is that various measurement errors, bit errors and other random uncertainties affect some of the measurements - the division between states and measurements then makes it possible to quantify the size and importance of the disturbance, this information being automatically exploited by MPC algorithms.
  • the serving grant (the actual granted air interface resources as seen in the UE)
  • the uplink cell load i.e. the rise over thermal [RoT). This quantity denotes the true value of measured RoT.
  • the next step according the present invention is to use the definitions above in order to write down the equations that describe the scheduling loop e.g. to determine the dynamic space state model of the scheduling loop. This is done for one UE, starting with the issued absolute grant reference and ending with measured results entering the scheduler algorithm
  • the first dynamics to be described is the rate limited step up of the absolute grant, towards the reference value. This can be described according to Equation (5) below
  • the function is intended to describe the rate limitation. Now, only one absolute grant can be transmitted for each TTI on the E-AGCH channel. Therefore, a varying time delay may affect the transmitted grant to the UE, as seen in the Node B, i.e. Equation (6).
  • time delays depend on which of the four channels that is used and the number of grants in the queue. There are time delays for both the absolute and the relative grants.
  • the error term is intended to model transmission errors from the Node B to the UE.
  • the scheduled grant is transformed to a power ratio by the UE, using a nonlinear table. Further, back off is applied when the UE becomes close to its maximum transmission power. There is also a dead time before the UE starts transmitting after the scheduled grant is received. This gives the model according to (7) .
  • the rules that affect the transmission of rate requests are as follows.
  • the UE sends "happy” in case the RLC buffer can be emptied within a specific time.
  • Scheduled information is sent as long as the UE has RLC buffer contents to send. It should be noted that the Node B may receive "happy” even though the buffer never gets empty, due to the delays. This is a typical example where the cashing of scheduling decision offered by MPC may give benefits.
  • the starting point are the uplink load factor definition and the relation between C/I and SIR, given by Equations (9) and ( 10) ,
  • the received power / SIR may need to be delayed to align with TFCI decoding.
  • the neighbor cell power can be related to the estimated RoT, thermal noise floor, and knowledge of the momentary scheduled and unscheduled loads.
  • the following equation 20 (13) results
  • Node B measurements that are subject to conventional measurement and estimation errors. These include the individual user power measurements, the lumped power measurements, and the J oT estimate
  • control signal constraints The final complicating factor of the scheduling problem that requires modeling is the constraints. These can be divided into control signal constraints and state constraints. Control signal constraints
  • FIG 4a and FIG 4b show a block diagram of the scheduling loop with the signaled quantities indicated
  • x(t) denotes the state vector
  • u(t) denotes the control signal vector
  • T denotes a vector of delays
  • w(t) denotes a system disturbance
  • y(t) denotes the measurements
  • e(t) denotes the measurement disturbance.
  • f(,) , h( ) and g(,) are functions built up from the dynamic models defined above.
  • constraints including quantization, absolute grants, relative grants, power constraints, stability constraints and coverage constraints.
  • the optimization strategies may include relaxation strategies for quantized inputs.
  • the arrangement is typically implemented in a radio base station e.g. Node B in a telecommunication system. However, it is also possible for specific systems, to have an arrangement that is distributed between multiple nodes in the system. For simplicity reasons, the arrangement will be described as a single unit.
  • the arrangement includes all necessary equipment for enabling receiving and processing any parameters needed for the execution of the invention.
  • the arrangement includes a generic input/output unit I/O for input and output signals to and from the arrangement.
  • the arrangement includes an identifier unit 10 for identification of output signals, input signals and system states for the scheduling loop. Further, the arrangement includes a determining unit 20 for determining a dynamic space state model for the scheduling loop based on the identified signals and states.
  • the arrangement includes a measurement unit 30 for measuring at least a subset of the identified output and input signals, and a storage unit 40 for storing the measured signals.
  • the arrangement includes a controller unit 50 for controlling the scheduling of the plurality of user equipment in the system based on optimization of a criterion dependent of the measured output and input signals and the dynamic space state model.
  • the arrangement is further adapted to enable all functionality of the earlier described method of controlling the scheduling loop in the telecommunication system.

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Quality & Reliability (AREA)
  • Mobile Radio Communication Systems (AREA)

Abstract

Cette invention se rapporte à un procédé de commande d'ordonnancement de liaison montante dans un système de télécommunication qui comprend un nœud et une pluralité de matériels utilisateur associés, destiné à exécuter les étapes suivantes consistant à : identifier S10 des signaux de sortie de boucle d'ordonnancement, des signaux d'entrée de boucle d'ordonnancement et des états de système de boucle d'ordonnancement; déterminer S20 un modèle d'état d'espace dynamique représentatif d'une boucle d'ordonnancement dans ledit système, sur la base d'au moins un sous-ensemble desdits signaux de sortie et d'entrée de boucle d'ordonnancement et desdits états de système de boucle d'ordonnancement identifiés. Ensuite, le procédé comprend les étapes consistant à mesurer S30 et à stocker S40 au moins un sous-ensemble desdits signaux de sortie de boucle d'ordonnancement identifiés et desdits signaux d'entrée de boucle d'ordonnancement identifiés. Enfin, le procédé comprend l'étape consistant à commander S50 la pluralité de matériels utilisateurs de ladite boucle d'ordonnancement sur la base de l'optimisation d'un critère qui dépend dudit modèle d'état d'espace dynamique déterminé, desdits signaux d'entrée de boucle d'ordonnancement stockés et desdits signaux de sortie de boucle d'ordonnancement stockés.
PCT/SE2009/051408 2009-12-11 2009-12-11 Procédé et agencement de commande d'ordonnancement dans un système de télécommunication WO2011071430A1 (fr)

Priority Applications (5)

Application Number Priority Date Filing Date Title
US13/514,822 US8902835B2 (en) 2009-12-11 2009-12-11 Method and arrangement for scheduling control in a telecommunication system
EP09852112.3A EP2510736B1 (fr) 2009-12-11 2009-12-11 Procédé et agencement de commande d'ordonnancement dans un système de télécommunication
CN2009801623327A CN102598826A (zh) 2009-12-11 2009-12-11 用于调度电信系统中的控制的方法和设备
IN2243DEN2012 IN2012DN02243A (fr) 2009-12-11 2009-12-11
PCT/SE2009/051408 WO2011071430A1 (fr) 2009-12-11 2009-12-11 Procédé et agencement de commande d'ordonnancement dans un système de télécommunication

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/SE2009/051408 WO2011071430A1 (fr) 2009-12-11 2009-12-11 Procédé et agencement de commande d'ordonnancement dans un système de télécommunication

Publications (1)

Publication Number Publication Date
WO2011071430A1 true WO2011071430A1 (fr) 2011-06-16

Family

ID=44145782

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/SE2009/051408 WO2011071430A1 (fr) 2009-12-11 2009-12-11 Procédé et agencement de commande d'ordonnancement dans un système de télécommunication

Country Status (5)

Country Link
US (1) US8902835B2 (fr)
EP (1) EP2510736B1 (fr)
CN (1) CN102598826A (fr)
IN (1) IN2012DN02243A (fr)
WO (1) WO2011071430A1 (fr)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2012177189A1 (fr) * 2011-06-20 2012-12-27 Telefonaktiebolaget L M Ericsson (Publ) Procédés et dispositifs pour ordonnancer une transmission de liaison montante dans un système de radiocommunication cellulaire
WO2013172747A1 (fr) * 2012-05-14 2013-11-21 Telefonaktiebolaget L M Ericsson (Publ) Planification de liaison montante dans un système radio
WO2014062115A1 (fr) * 2012-10-19 2014-04-24 Telefonaktiebolaget L M Ericsson (Publ) Procédé, appareil et système d'estimation de brouillage et de bruit
WO2014081371A1 (fr) * 2012-11-26 2014-05-30 Telefonaktiebolaget L M Ericsson (Publ) Procédé, appareil et système pour signalisation de mesure d'interférence
WO2014129952A1 (fr) * 2013-02-25 2014-08-28 Telefonaktiebolaget L M Ericsson (Publ) Estimation de brouillages issus d'autres cellules sur la base d'utilisations d'octrois
WO2014158072A1 (fr) * 2013-03-29 2014-10-02 Telefonaktiebolaget L M Ericsson (Publ) Estimation d'interférence avec un tdm
US9295009B2 (en) 2012-05-23 2016-03-22 Telefonaktiebolaget L M Ericsson (Publ) Transcendental function look-up tables for thermal noise power floor estimation
WO2016122394A1 (fr) * 2015-01-30 2016-08-04 Telefonaktiebolaget Lm Ericsson (Publ) Procédé permettant d'améliorer l'efficacité en liaison montante de dispositifs à couverture limitée
WO2016120452A1 (fr) * 2015-01-30 2016-08-04 Telefonaktiebolaget Lm Ericsson (Publ) Procédé de multiplexage de canaux physiques de liaison montante pour obtenir une bonne couverture
CN110636632A (zh) * 2019-09-29 2019-12-31 京信通信系统(中国)有限公司 用户调度方法、装置、基站和存储介质

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103179596B (zh) * 2013-03-12 2016-01-27 浙江大学 一种优化lqg控制与通信功率总消耗的方法
US9288752B2 (en) 2013-10-10 2016-03-15 At&T Intellectual Property I, L.P. Method and apparatus for reducing energy consumption of radio communications in a wireless sensor network
WO2015139182A1 (fr) * 2014-03-17 2015-09-24 华为技术有限公司 Équipement utilisateur, dispositif côté réseau, procédé de réglage de puissance et procédé de détermination de sg
US10536505B2 (en) * 2017-04-30 2020-01-14 Cisco Technology, Inc. Intelligent data transmission by network device agent

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2006038786A1 (fr) * 2004-10-07 2006-04-13 Samsung Electronics Co., Ltd. Appareil et procede pour effectuer une mesure et un rapport de la charge de la liaison montante dans un systeme de communication mobile cellulaire
WO2008143562A1 (fr) * 2007-05-22 2008-11-27 Telefonaktiebolaget Lm Ericsson (Publ) Estimation de charge dans des systèmes de télécommunication à diversité de récepteur
WO2009136825A1 (fr) * 2008-05-09 2009-11-12 Telefonaktiebolaget L M Ericsson (Publ) Affectation de ressources en ofdma de liaison ascendante

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20040185786A1 (en) * 2001-04-25 2004-09-23 Ramin Mirbaha Quality of service state predictor for and advanced mobile devices
US7684408B2 (en) * 2003-09-30 2010-03-23 Mitsubishi Denki Kabushiki Kaisha Communication mode control method, mobile communication system, base station control apparatus, base station, and mobile communication terminal
US8295951B2 (en) * 2007-12-21 2012-10-23 The University Of Florida Research Foundation, Inc. Systems and methods for offset-free model predictive control

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2006038786A1 (fr) * 2004-10-07 2006-04-13 Samsung Electronics Co., Ltd. Appareil et procede pour effectuer une mesure et un rapport de la charge de la liaison montante dans un systeme de communication mobile cellulaire
WO2008143562A1 (fr) * 2007-05-22 2008-11-27 Telefonaktiebolaget Lm Ericsson (Publ) Estimation de charge dans des systèmes de télécommunication à diversité de récepteur
WO2009136825A1 (fr) * 2008-05-09 2009-11-12 Telefonaktiebolaget L M Ericsson (Publ) Affectation de ressources en ofdma de liaison ascendante

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See also references of EP2510736A4 *

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9265066B2 (en) 2011-06-20 2016-02-16 Telefonaktiebolaget L M Ericsson Methods and devices for scheduling uplink transmission in a cellular radio system
WO2012177189A1 (fr) * 2011-06-20 2012-12-27 Telefonaktiebolaget L M Ericsson (Publ) Procédés et dispositifs pour ordonnancer une transmission de liaison montante dans un système de radiocommunication cellulaire
WO2013172747A1 (fr) * 2012-05-14 2013-11-21 Telefonaktiebolaget L M Ericsson (Publ) Planification de liaison montante dans un système radio
EP2850904A4 (fr) * 2012-05-14 2016-01-06 Ericsson Telefon Ab L M Planification de liaison montante dans un système radio
US9295009B2 (en) 2012-05-23 2016-03-22 Telefonaktiebolaget L M Ericsson (Publ) Transcendental function look-up tables for thermal noise power floor estimation
WO2014062115A1 (fr) * 2012-10-19 2014-04-24 Telefonaktiebolaget L M Ericsson (Publ) Procédé, appareil et système d'estimation de brouillage et de bruit
US9301172B2 (en) 2012-10-19 2016-03-29 Telefonaktiebolaget Lm Ericsson (Publ) Method, apparatus, and system for interference and noise estimation
WO2014081371A1 (fr) * 2012-11-26 2014-05-30 Telefonaktiebolaget L M Ericsson (Publ) Procédé, appareil et système pour signalisation de mesure d'interférence
US10225034B2 (en) 2012-11-26 2019-03-05 Telefonaktiebolaget Lm Ericsson (Publ) Method, apparatus, and system for interference metric signalling
WO2014129952A1 (fr) * 2013-02-25 2014-08-28 Telefonaktiebolaget L M Ericsson (Publ) Estimation de brouillages issus d'autres cellules sur la base d'utilisations d'octrois
US9007947B2 (en) 2013-02-25 2015-04-14 Telefonaktiebolaget L M Ericsson (Publ) Grant utilization based other cell interference estimation
US9001686B2 (en) 2013-03-29 2015-04-07 Telefonaktiebolaget L M Ericsson (Publ) Interference estimation with TDM
WO2014158072A1 (fr) * 2013-03-29 2014-10-02 Telefonaktiebolaget L M Ericsson (Publ) Estimation d'interférence avec un tdm
WO2016122394A1 (fr) * 2015-01-30 2016-08-04 Telefonaktiebolaget Lm Ericsson (Publ) Procédé permettant d'améliorer l'efficacité en liaison montante de dispositifs à couverture limitée
WO2016120452A1 (fr) * 2015-01-30 2016-08-04 Telefonaktiebolaget Lm Ericsson (Publ) Procédé de multiplexage de canaux physiques de liaison montante pour obtenir une bonne couverture
CN110636632A (zh) * 2019-09-29 2019-12-31 京信通信系统(中国)有限公司 用户调度方法、装置、基站和存储介质

Also Published As

Publication number Publication date
EP2510736B1 (fr) 2018-06-27
US8902835B2 (en) 2014-12-02
EP2510736A4 (fr) 2017-07-05
US20120250649A1 (en) 2012-10-04
IN2012DN02243A (fr) 2015-08-21
CN102598826A (zh) 2012-07-18
EP2510736A1 (fr) 2012-10-17

Similar Documents

Publication Publication Date Title
US8902835B2 (en) Method and arrangement for scheduling control in a telecommunication system
JP4397928B2 (ja) ワイヤレス通信ネットワークの資源を、ネットワークのチャネルを介してユーザ機器に送信すべきトラヒックに割り当てる方法
US7876684B2 (en) Data flow amount control device and method
JP4788436B2 (ja) 無線リソース割り当て方法及びそれを用いる無線リソース割り当て装置並びに基地局
JP4302140B2 (ja) パケット送信制御装置及びパケット送信制御方法
US20140098778A1 (en) Scheduling concept
JP5039593B2 (ja) 無線通信システム、無線通信方法及び基地局
JP2007181196A (ja) 呼受付制御装置、呼受付制御方法
JP5204870B2 (ja) 移動通信システムにおける基地局及びリソース割当方法
EP2292059B1 (fr) Distribution d'utilisation de puissance e-dch de liaison descendante
JP2005130053A (ja) パケット送信制御装置及びパケット送信制御方法
EP2721894B1 (fr) Procédé et noeud pour ordonnancer une transmission de liaison montante dans un système de radiocommunication cellulaire
JP5135119B2 (ja) 基地局、上位局及び無線通信システム
Overbeck et al. Proactive resource management for predictive 5G uplink slicing
US9240870B2 (en) Queue splitting for parallel carrier aggregation scheduling
Teixeira et al. Adaptive packet scheduling for the uplink traffic in IEEE 802.16 e networks
CN101444132B (zh) 移动电信网络中的方法和设备
Khorov et al. Reliable low latency communications in LTE networks
KR101948412B1 (ko) Lte 환경에서 단기 지연 보장 및 장기 공평성 보장을 위한 패킷 스케줄링 방법 및 시스템
Northcote et al. Dimensioning Telstra's WCDMA (3G) network
JP4726068B2 (ja) パケット送信制御装置、パケット送信制御方法
Aniba et al. Fast packet scheduling assuring fairness and quality of service in HSDPA
WO2013172747A1 (fr) Planification de liaison montante dans un système radio
CN116250193A (zh) 完全资源分配
Razenberg et al. Reducing Interference in Dense Wireless Networks to Support Delay-Critical Traffic through Scheduling

Legal Events

Date Code Title Description
WWE Wipo information: entry into national phase

Ref document number: 200980162332.7

Country of ref document: CN

121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 09852112

Country of ref document: EP

Kind code of ref document: A1

WWE Wipo information: entry into national phase

Ref document number: 2243/DELNP/2012

Country of ref document: IN

WWE Wipo information: entry into national phase

Ref document number: 2009852112

Country of ref document: EP

WWE Wipo information: entry into national phase

Ref document number: 13514822

Country of ref document: US

NENP Non-entry into the national phase

Ref country code: DE