WO2011061970A1 - 在庫計画作成装置、在庫計画作成方法及び在庫計画作成プログラム - Google Patents

在庫計画作成装置、在庫計画作成方法及び在庫計画作成プログラム Download PDF

Info

Publication number
WO2011061970A1
WO2011061970A1 PCT/JP2010/062654 JP2010062654W WO2011061970A1 WO 2011061970 A1 WO2011061970 A1 WO 2011061970A1 JP 2010062654 W JP2010062654 W JP 2010062654W WO 2011061970 A1 WO2011061970 A1 WO 2011061970A1
Authority
WO
WIPO (PCT)
Prior art keywords
plan creation
inventory
region
demand
construction
Prior art date
Application number
PCT/JP2010/062654
Other languages
English (en)
French (fr)
Inventor
克就 池澤
学 長沼
圭志 松本
Original Assignee
株式会社日立製作所
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社日立製作所 filed Critical 株式会社日立製作所
Priority to CN2010800418934A priority Critical patent/CN102576433A/zh
Publication of WO2011061970A1 publication Critical patent/WO2011061970A1/ja

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/08Logistics, e.g. warehousing, loading or distribution; Inventory or stock management
    • G06Q10/087Inventory or stock management, e.g. order filling, procurement or balancing against orders
    • G06Q10/0875Itemisation or classification of parts, supplies or services, e.g. bill of materials

Definitions

  • the present invention relates to an inventory plan creation device, an inventory plan creation method, and an inventory plan creation program.
  • Patent Document 1 discloses a technique for predicting demand for construction materials necessary for facility construction of social infrastructure such as electricity, gas, and communication.
  • the technique of Patent Document 1 is a technique for planning demand for electricity and gas meters based on the legal replacement period.
  • an object of the present invention is to provide an inventory plan creation device or the like that creates an inventory plan for construction materials, reflecting the economic situation of each region, natural conditions, and the construction advancement tendency of each construction contractor.
  • the inventory plan creation device of the present invention shows a first index indicating how much the construction demand has changed in each region in the most recent period, and how easily construction materials are exposed to natural disasters in each region.
  • the second index is stored, the past demand record of the construction material is acquired, the first index and the second index are acquired based on the area included in the acquired demand record, and the acquired first index Then, the actual demand is corrected using the second index, and an appropriate inventory level in the future is determined.
  • the actual demand includes an advance coefficient that is the ratio of the actual demand value to the expected value for each successive unit period, and the inventory planning device is included in the acquired actual demand. Review the distribution of the corrected demand record for each unit period using the advanced factor.
  • each invention of a claim was put together as invention which has relevance by the characteristic structure of the 2nd parameter
  • an inventory plan creation device or the like that creates an inventory plan for construction materials reflecting the economic situation and natural conditions of each region and the construction advancement tendency of each construction contractor.
  • the inventory plan creation apparatus 1 can access the general-purpose database 2 and the public statistical information 3 via the network 4.
  • the inventory plan creation device 1 is a general computer and includes a central control device 11, a main storage device 12, an auxiliary storage device 13, a communication device 14, an input device 15, and an output device 16. These are connected to each other by a bus.
  • the auxiliary storage device 13 stores a construction trend matrix 31, a deterioration factor matrix 32, a construction result 33 for each construction company, an inventory forecast 34, a replenishment plan 35, and a forward coefficient-forward month conversion scale 36 (details will be described later). Yes.
  • the data acquisition unit 21, the matrix creation unit 22, and the inventory plan creation unit 23 are programs. Thereafter, when the subject is described as “XX section”, the central controller 11 reads out each program from the auxiliary storage device 13 and loads it into the main storage device 12, and then the function of each program (detailed later). Shall be realized.
  • the inventory plan creation device 1 may have a configuration divided into a plurality of cases. For example, there may be one or more devices that store programs and one or more devices that store a master or the like.
  • the construction trend matrix 31 will be described with reference to FIG.
  • the general housing market level column 102 includes the general housing market level value
  • the condominium market level column 103 includes the condominium market level value, in association with the region code stored in the region code column 101.
  • the facility market level column 104 stores commercial facility market level values.
  • the region code in the region code column 101 is an identifier that uniquely identifies the region.
  • the region is a geographical range uniquely set by the user, and is typically an administrative region such as a prefectural municipality. However, there will be no overlap of regions. For example, hierarchical areas such as “Tokyo” and “Shinjuku-ku” do not coexist. “Tokyo” and “Kanagawa” can coexist.
  • the general housing market level value in the general housing market level column 102 is an index indicating how much the expected number of starts of a detached house is compared to the actual number of starts at the time of comparison. In the present embodiment, it is “an index indicating the expected number of starts of detached houses this year when the number of starts of detached houses in the previous year is 100”.
  • the condominium market level value in the condominium market level column 103 is an index indicating the level of the expected number of apartment starts in the apartment compared to the actual construction starts at the time of comparison. In the present embodiment, it is an “index indicating the expected number of housing starts for this year when the number of housing starts in the previous year is 100”.
  • the commercial facility market level value in the commercial facility market level column 104 is an index indicating the level of the expected number of starts in a store compared to the actual number of starts at the time of comparison. In the present embodiment, it is an “index indicating the expected number of start of stores this year when the number of start of stores in the previous year is 100”.
  • the construction material market is divided into “general housing”, “apartment”, and “commercial facility”, but the present invention is not limited to this division method.
  • it may be a market other than private demand such as “road” and “bridge”.
  • each value in the present embodiment is an index of the number of starts, but is not limited thereto.
  • it may be a rent level index or a sales price level index.
  • the “first index” corresponds to a general housing market level value, a condominium market level value, and a commercial facility market level value.
  • the deterioration factor matrix 32 will be described with reference to FIG.
  • the sea breeze column 114 has a tidal wind deterioration value
  • the snow cover column 115 has a snow cover deterioration value
  • the typhoon column 116 has a typhoon deterioration value.
  • the fault column 117 stores fault deterioration values
  • the outdoor installation rate column 118 stores outdoor installation rates.
  • the columns 114 to 117 belong to the upper environment column 112.
  • the outdoor installation rate column 118 belongs to the upper installation status column 113.
  • the region code in the region code column 111 is the same as the region code in FIG.
  • the sea breeze deterioration value in the sea breeze column 114 is an index indicating the degree of deterioration of the construction materials that have been constructed due to the sea breeze.
  • the sea breeze deterioration value “the number of reports on the previous year's sea breeze damage in the area” / “the number of reports on the previous year's sea breeze damage in all areas”. Therefore, the sum of the sea breeze degradation values in each region is “1.0”.
  • the outdoor installation rate in the outdoor installation rate column 118 is a rate at which construction materials that have already been installed are installed outdoors.
  • the outdoor installation rate “the number of construction materials installed outdoors in the area” / “the number of all construction materials installed in the area”.
  • each deterioration value may be calculated based on the number of reports at an arbitrary point in time, not the number of reports in the previous year.In addition to the number of reports, for example, the annual precipitation of meteorological observations, the number of typhoon landings, etc. Each deterioration value may be calculated based on a numerical value.
  • the vibration location installation rate “the number of construction materials installed within a predetermined distance from the railway line in the area” / “all installed in the area A rate such as “number of construction materials” may alternatively or additionally be used.
  • the “second index” corresponds to a sea breeze deterioration value, a snow cover deterioration value, a typhoon deterioration value, a fault deterioration value, and an outdoor installation rate.
  • the start record 33 for each construction company will be described with reference to FIG.
  • the start record 33 by construction contractor is associated with the contractor name stored in the contractor name field 121, the contractor address field 122 is the address of the contractor, the contractor code field 123 is the contractor code,
  • the region code column 124 stores a region code, the year column 125 stores a target year, and the result column 126 stores a result table.
  • the name of the contractor in the contractor name column 121 is the name of the contractor.
  • a “construction material consumer” corresponds to a contractor.
  • the “demand record” corresponds to the start record 33 for each construction company.
  • the contractor address in the contractor address field 122 is the address of the contractor.
  • the contractor shall perform the construction in the area including this address.
  • the contractor code in the contractor code column 123 is an identifier that uniquely identifies the contractor.
  • the region code in the region code column 124 is the same as the region code in FIG. Here, a region code for specifying a region including the construction company address is stored.
  • the target year in the year column 125 is a calendar year that is the subject of the performance table.
  • the January column 128 has the January scheduled value and the actual value
  • the February column 129 has the February scheduled value and the actual result.
  • the value is (the scheduled value and the actual value for each month until December), and the advance coefficient column 132 stores the advance coefficient.
  • the item in the item column 127 is the type of construction material. For example, “water meter”, “electric meter” and the like are illustrated in FIG. 4 as “item a” for simplification.
  • the scheduled value in the January column 128 is the quantity of items scheduled to start in January before January.
  • the actual value in the January column 128 is the quantity of items actually started in January.
  • the advance coefficient in the advance coefficient column 132 is an index calculated as follows.
  • the construction start result 33 shall exist every year, it does not matter as it exists every month and every week.
  • the column 128 in FIG. 4 is created for each week (day of the week).
  • the advance coefficient is the average value of the progress rate from January to December (1st to last day, Sunday to Saturday), but it may be a median or maximum value.
  • the inventory forecast 34 is a draft in which a construction material maker who delivers construction materials to one or a plurality of construction contractors forecasts stock for the current fiscal year.
  • the January column 152 shows the January forecast value
  • the February column 153 shows the February forecast value (until December, each The expected value of the month) is stored.
  • the items in the item column 151 are the same as the items in FIG.
  • the expected value in the January column 152 is a planned value of the quantity of the item to be sold to the contractor in January.
  • the planned values are not calculated by accumulating demand forecasts from the respective contractors, but are only temporary values created for the convenience of the supplier, such as production plans for construction material manufacturers.
  • the construction contractor who delivered the construction material from the construction material maker shall start the construction within the month without storing the construction material as stock. The same applies to the February column 153 to the December column.
  • the replenishment plan 35 is a table that stores how many items are short for which item in what month based on the quantity for each item obtained by accumulating the demand forecast from each construction company and the above-mentioned inventory forecast 34. It is.
  • the replenishment plan 35 in association with the items stored in the item column 161, the January replenishment value is displayed in the January column 162, and the replenishment value in February is stored in the February column 163 (until December). , The replenishment value for each month) is stored.
  • the items in the item column 161 are the same as the items in FIG.
  • the replenishment value required in the January column 162 is a shortage quantity in January. The same applies to the February column 163 to the December column.
  • FIG. 8A Prior to explaining the forward count-forward month conversion scale 36 in FIG. 7, construction advance will be described with reference to FIGS.
  • a gas meter or the like has a legal replacement time ("planned replacement month" in FIG. 8 (a)), and is replaced with a new one even if the physical useful life does not arrive.
  • the exchanges for all the quantities are not concentrated in the planned exchange month, but are exchanged in a distributed manner before and after that. This is because the gas meter or the like may deteriorate before the planned replacement month, and the replacement work may be delayed.
  • replacement is often performed ahead of schedule.
  • a contractor is forced to replace a gas meter in a month that exceeds his construction capacity (mainly the number of workers and financial capacity), (It may be the month before that)) Make a plan to do the replacement work ahead of schedule. In FIG. 8 (b), it is two months ahead.
  • a contractor makes a gas meter replacement plan without considering the construction capacity. It is assumed that the results are distributed as shown in the bar graphs of FIGS. 9A and 9B.
  • the construction contractor estimates his / her construction capacity.
  • the replacement plan considering the construction capacity is as shown by a rectangle 191 in FIG. 9A (actual variations occur in each month).
  • the construction capacity is q (q ⁇ p)
  • the replacement plan considering the construction capacity is a rectangle 192 in FIG. 9B.
  • the rectangle 192 is smaller in height than the rectangle 191 but has a larger width. In other words, the number of months ahead is large.
  • the advance coefficient-forward month conversion scale 36 includes an advance coefficient row 171 and a forward month number row 172.
  • Each column 173 to 182 stores the range of the forward coefficient and the number of forward months corresponding to the range.
  • the forward coefficient is the same as the forward coefficient in FIG.
  • the number of months in advance is a number (unit: month) that indicates how many months in advance the work to be performed in a certain month is based on that month when the contractor's construction capacity is not sufficient.
  • the number of advance months is “9.0 (months)” and takes the maximum value (column 173). ).
  • the advance coefficient is in the maximum range of “0.9 or more and 1.0 or less”
  • the number of advance months is “0.0 (month)” and takes the minimum value.
  • the correspondence relationship between the advance coefficient described here and the number of advance months is an example and is not limited to this. If the advance coefficient is “1.0”, the number of months in advance is “0.0”, and any correspondence relationship in which the corresponding number of months in advance increases as the advance coefficient decreases is acceptable. .
  • step S301 the data acquisition unit 21 of the inventory plan creation apparatus 1 acquires various data. Specifically, the data acquisition unit 21 accesses the general-purpose database 2 or the public statistical information 3 to acquire public information necessary for creating the construction trend matrix 31 and the deterioration factor matrix 32. Furthermore, the input device 15 accepts the input of the start record 33 and the stock forecast 34 for each construction company. The construction work start record 33 and the stock forecast 34 for each contractor are assumed to be already completed. After that, the acquired public information, the start record 33 for each construction company, and the stock forecast 34 are stored in the auxiliary storage device 13.
  • step S302 the matrix creation unit 22 of the inventory plan creation device 1 creates a matrix.
  • the matrix creation unit 22 first creates a construction trend matrix 31.
  • the public information acquired in step S301 is unified into a predetermined file format and format, data indicating a region included in the public information is extracted, and a regional code is associated with the public information.
  • public information having the same area code is grouped, and, from among them, for example, a character (number) string indicating “general housing”, “year”, and “number of starts” is obtained, and an expected value is calculated.
  • a specific processing method is not described here, the construction trend matrix 31 may be completed as a result by a known method.
  • the matrix creation unit 22 creates a deterioration factor matrix 32. Also for the deterioration factor matrix 32, the deterioration value is calculated by the method described in “First”. Although a specific processing method is not described here, the degradation factor matrix 32 may be completed as a result by a known method.
  • the outdoor installation rate in the installation status column 113 is not publicly available information, it is assumed that manual input is accepted from the input device 15 based on data obtained by the user visiting the site. .
  • the user sets “item”, “region code”, “number of construction materials installed outdoors in the region” and “installed in the region” on the mobile terminal (not shown) at the site. It is also possible to input “the number of all construction materials”.
  • the mobile terminal calculates the “outdoor installation rate” based on the above-described calculation formula, and transmits the “outdoor installation rate” together with the “item” and the “region code” to the inventory planning device 1 via the network 4. .
  • the auxiliary storage device 13 of the inventory plan creation device 1 stores this outdoor installation rate in association with “item” and “region code”, and the matrix creation unit 22 reads this in step S302.
  • step S ⁇ b> 303 the inventory plan creation unit 23 of the inventory plan creation device 1 creates a replenishment plan 35.
  • a replenishment plan 35 (FIG. 6) is created.
  • step S ⁇ b> 304 the inventory plan creation unit 23 of the inventory plan creation device 1 accepts the approval of the replenishment plan 35. Specifically, the inventory plan creation unit 23 displays the created replenishment plan 35 on the output device 16 and accepts the user's approval. Thereafter, the entire processing procedure is terminated.
  • step S401 the inventory plan creation unit 23 of the inventory plan creation apparatus 1 acquires a certain construction contractor code as an entry.
  • step S ⁇ b> 402 the inventory plan creation unit 23 creates a work format 37. Specifically, first, the inventory plan creation unit 23 searches the auxiliary storage device 13 using the construction company code as a search key, and obtains the construction work start record 33 (FIG. 4) of the construction company. Secondly, only the actual value from the January column 126 to the December column of the acquired start record 33 by construction contractor is left, and the scheduled value is deleted. Then, “1” is added to the target year and overwritten. At this stage, the start record 33 for each construction company is in the state shown in FIG. The start record 33 by construction contractor in this state is particularly referred to as “work format” 37. The heading “forecast” is stored in the January column 128 of the work format 37 or the like.
  • step S ⁇ b> 403 the inventory plan creation unit 23 performs correction using the construction trend matrix 31. Specifically, the inventory plan creation unit 23 first searches the construction trend matrix 31 (FIG. 2) using the region code on the work format 37 as a search key, and searches for the general housing market level value and the apartment of the corresponding record. Acquire the market level value and the commercial facility market level value. Here, the description will be continued assuming that “98.3”, “132.5”, and “101.4” of the record in the first line in FIG. 2 have been acquired. Second, the average value of the three acquired market level values is calculated. This average value is called “representative market level value”. Incidentally, the calculated representative market level value is “110.73”.
  • step S ⁇ b> 404 the inventory plan creation unit 23 performs correction using the deterioration factor matrix 32. Specifically, the inventory plan creation unit 23 first searches the deterioration factor matrix 32 (FIG. 3) using the area code on the work format 37 as a search key, and the seawater deterioration value and snow cover deterioration value of the corresponding record. Get typhoon deterioration value, fault deterioration value and outdoor installation rate. Here, the description is continued assuming that “0.0”, “0.2”, “0.0”, “0.5”, and “0.98” of the record in the first row in FIG. 3 have been acquired. . Secondly, an average value of the obtained four deterioration values is calculated.
  • This average value is referred to as “representative deterioration value”.
  • the calculated representative deterioration value is “0.175”.
  • all predicted values on the work format 37 are multiplied by “1 + representative deterioration value ⁇ outdoor installation rate”, and the calculation result is overwritten.
  • step S405 the inventory plan creation unit 23 performs correction using the advance coefficient. Specifically, first, the inventory plan creation unit 23 searches the forward coefficient-forward month conversion scale 36 (FIG. 7) using the forward coefficient on the work format 37 as a search key, and responds accordingly. Get the number of months ahead. Here, “1.0” is acquired for “item a”, “2.0” is acquired for “item b”, and “2.0” is acquired for “item c”. Secondly, the expected value on the work format 37 is moved over to the previous (left) column by the acquired number of previous months and overwritten. For example, it is assumed that the m month expected value is “X” and the acquired number of forward months is “s”. In this case, “X” is overwritten as the (ms) monthly expected value.
  • step S405 is repeated for each advance coefficient of all records on the work format 37, that is, for each item.
  • the work format is as shown in FIG.
  • the predicted value for each month in FIG. 14 has shifted to the left in January by one month.
  • the predicted value of each month in FIG. 14 has moved to the left in FIG. 15 by February.
  • step S406 the inventory plan creation unit 23 determines whether there is an unprocessed entry. Specifically, the inventory plan creation unit 23 returns to step S401 when an unprocessed construction contractor code remains (step S406 “YES”). In other cases (step S406 “NO”), the process proceeds to step S407. At the point of exiting the loop repeatedly, the work format 37 (FIG. 15) has been completed for each contractor.
  • the inventory plan creation unit 23 totals the predicted values of all the construction companies. Specifically, the inventory plan creation unit 23 first creates a “counting format” 38 in which the column is blank. The configuration of the tabulation format 38 is obtained by removing the advance coefficient column 132 from the result table 126 of the work format 37. Second, in each work format 37, an expected value of a certain month of a record of an item is acquired, and the total value thereof is stored in the column of the month of the record of the item on the aggregation format 38. This process is repeated for all items and months. At this stage, the aggregation format 38 is in the state shown in FIG. The “appropriate inventory level” corresponds to the aggregation format 38 at this stage.
  • step S ⁇ b> 408 the inventory plan creation unit 23 creates a replenishment plan 35. Specifically, the inventory plan creation unit 23 first reads the inventory forecast 34 (FIG. 5) from the auxiliary storage device 13. Second, an expected value for a certain month of a record of an item in the aggregation format 38 is acquired, and an expected value of the month of the record for the item in the inventory forecast 34 is subtracted from the acquired predicted value. Then, the value after deduction is stored in the month column of the record of the item in the aggregation format 38. This process is repeated for all items and months. When the value after deduction is a negative value, “0” is stored. Third, the totaling format 38 is stored in the auxiliary storage device 13 as the replenishment plan 35. Thereafter, the process returns to step S304.
  • the inventory forecast 34 FIG. 5
  • step S408 when the value after deduction of a certain month becomes a negative value (stock is surplus), it may be carried over to the next month.
  • the “second” in step S408 is read as follows. “Second, the January predicted value of the record of a certain item on the aggregation format 38 is acquired, and the predicted value of January of the record of that item in the inventory forecast 34 is subtracted from the acquired predicted value. Then, the value after the deduction is stored in the January column of the record of the item in the aggregation format 38.
  • the “representative market level value” is an average value of each market level value
  • the “representative deterioration value” is an average value of each deterioration value.
  • the weight of the general housing market level is W1
  • the weight of the condominium market level is W2
  • the weight of the sea breeze deterioration value is w1
  • the weight of the typhoon deterioration value is w3
  • each value is multiplied by the weight to add up the “representative market level value” and “representative deterioration value”. It may be calculated. In this case, a combination of W1, W2, and W3 and a combination of w1,
  • the work format 37 for each construction contractor at the completed stage may be stored in the auxiliary storage device 13. By doing so, it is possible to display the work format 37 for each region and each construction contractor on the output device 16 using the region code and the construction contractor code as a search key.
  • the inventory plan creation unit 23 may receive an input of a region code and then acquire a certain construction contractor code having the region code as an entry.
  • a table storing the contractor code in association with the area code is stored in the auxiliary storage device 13, and the inventory plan creation unit 23 acquires the contractor code using the received area code as a search key. To do. Further, it is assumed that the inventory forecast 34 is created for each region. In this way, the replenishment plan 35 can be created for each region and / or for each construction contractor.
  • the present invention is not limited to the above-described embodiment, and can be modified without departing from the gist of the present invention.

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • General Physics & Mathematics (AREA)
  • Tourism & Hospitality (AREA)
  • Theoretical Computer Science (AREA)
  • General Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Marketing (AREA)
  • Physics & Mathematics (AREA)
  • Strategic Management (AREA)
  • Quality & Reliability (AREA)
  • Operations Research (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Development Economics (AREA)
  • Accounting & Taxation (AREA)
  • Finance (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Warehouses Or Storage Devices (AREA)

Abstract

【解決手段】本発明の在庫計画作成装置(1)は、地域毎に工事需要が直近の時期においてどの程度変化しているかを示す第1の指標と、地域毎に工事資材がどの程度自然災害にさらされ易いかを示す第2の指標と、を格納し、工事資材の過去における需要実績を取得し、取得した需要実績に含まれる地域に基づき第1の指標及び第2の指標を取得し、取得した第1の指標及び第2の指標を用いて、需要実績を補正し、将来における適切な在庫水準を決定する。また、需要実績には、連続する単位期間毎に、実際の需要値の当該需要値の予想値に対する比率である前倒係数が含まれており、在庫計画作成装置は、取得した需要実績に含まれる前倒係数を用いて、補正された需要実績の単位期間毎の配分を見直す。

Description

在庫計画作成装置、在庫計画作成方法及び在庫計画作成プログラム
 本発明は、在庫計画作成装置、在庫計画作成方法及び在庫計画作成プログラムに関する。
 企業が商品の在庫を適性水準に維持することは、財務の健全化、商機の確実な捕捉等の点から重要である。商品の需要に変動がある場合、需要に合わせて無駄のない在庫を保有することが必要となる。
 例えば、特許文献1には、電気、ガス、通信などの社会インフラの設備工事に必要となる工事資材の需要予測を行う技術が開示されている。
 特許文献1の技術は、電気やガスの計器の需要を、その法定交換時期に基づいて計画する技術である。
特開2006-277465号公報(請求項1等)
 しかしながら、すべての工事資材について、法定交換時期が定められているわけではなく、また、工事資材の需要は、地域毎の経済情勢、気候などの自然条件に左右される。さらに、実際に工事を行う工事業者の工事能力が小さい場合、工事業者は工事負担を平準化するために、時期的に前倒しで工事を行う傾向が強い。
 したがって、特許文献1の技術では、工事業者に工事資材を供給する工事資材メーカが、これらすべての要因を予想したうえで、工事資材の在庫計画を作成することができない。
 そこで、本発明は、地域毎の経済情勢、自然条件及び工事業者毎の工事前倒し傾向を反映して、工事資材の在庫計画を作成する在庫計画作成装置等を提供することを目的とする。
 本発明の在庫計画作成装置は、地域毎に工事需要が直近の時期においてどの程度変化しているかを示す第1の指標と、地域毎に工事資材がどの程度自然災害にさらされ易いかを示す第2の指標と、を格納し、工事資材の過去における需要実績を取得し、取得した需要実績に含まれる地域に基づき第1の指標及び第2の指標を取得し、取得した第1の指標及び第2の指標を用いて、需要実績を補正し、将来における適切な在庫水準を決定する。
 また、需要実績には、連続する単位期間毎に、実際の需要値の当該需要値の予想値に対する比率である前倒係数が含まれており、在庫計画作成装置は、取得した需要実績に含まれる前倒係数を用いて、補正された需要実績の単位期間毎の配分を見直す。
 なお、特許請求の範囲の各発明は、地域毎に工事資材がどの程度自然災害にさらされ易いかを示す第2の指標という特徴構成により関連性を持った発明としてまとめた。
 本発明によれば、地域毎の経済情勢、自然条件及び工事業者毎の工事前倒し傾向を反映して、工事資材の在庫計画を作成する在庫計画作成装置等を提供することが可能になる。
本実施形態に係る在庫計画作成装置の構成図である。 本実施形態に係る工事動向マトリクスの一例を示す図である。 本実施形態に係る劣化要因マトリクスの一例を示す図である。 本実施形態に係る工事業者別着工実績の一例を示す図である。 本実施形態に係る在庫予想の一例を示す図である。 本実施形態に係る補充計画の一例を示す図である。 本実施形態に係る前倒係数-前倒月数変換スケールの一例を示す図である。 本実施形態に係る工事の前倒しを説明する図である。 本実施形態に係る工事の前倒しを説明する図である。 本実施形態に係る全体処理手順のフローチャートである。 本実施形態に係る全体処理手順のステップS303の詳細フローチャートである。 本実施形態に係る作業フォーマットの一例を示す図である。 本実施形態に係る作業フォーマットの一例を示す図である。 本実施形態に係る作業フォーマットの一例を示す図である。 本実施形態に係る作業フォーマットの一例を示す図である。 本実施形態に係る集計フォーマットの一例を示す図である。
 以降、本発明を実施するための形態(「本実施形態」という)を、図等を参照しながら詳細に説明する。
 (在庫計画作成装置)
 図1に沿って、在庫計画作成装置1を説明する。
 在庫計画作成装置1は、ネットワーク4を介して汎用データベース2及び公開統計情報3に対してアクセス可能である。
 在庫計画作成装置1は、一般的なコンピュータであり、中央制御装置11、主記憶装置12、補助記憶装置13、通信装置14、入力装置15及び出力装置16を有する。これらはバスによって相互に接続されている。
 補助記憶装置13は、工事動向マトリクス31、劣化要因マトリクス32、工事業者別着工実績33、在庫予想34、補充計画35及び前倒係数-前倒月数変換スケール36(詳細後記)を格納している。
 データ取得部21及びマトリクス作成部22及び在庫計画作成部23はプログラムである。以降、「○○部は」と主体を記した場合は、中央制御装置11が、補助記憶装置13から各プログラムを読み出し、主記憶装置12にロードしたうえで、各プログラムの機能(詳細後記)を実現するものとする。
 図1では、在庫計画作成装置1が1台存在する構成とした。しかしながら、在庫計画作成装置1は、複数の筐体に分かれた構成であってもよい。例えば、プログラムを格納する1又は複数の装置と、マスタ等を格納する1又は複数の装置が存在するものとしてもよい。
(工事動向マトリクス)
 図2に沿って工事動向マトリクス31を説明する。
 工事動向マトリクス31には、地域コード欄101に記憶された地域コードに関連付けて、一般住宅市場水準欄102には一般住宅市場水準値が、マンション市場水準欄103にはマンション市場水準値が、商業施設市場水準欄104には商業施設市場水準値が、記憶されている。
 地域コード欄101の地域コードは、地域を一意に特定する識別子である。ここで地域とは、ユーザが独自に設定する地理上の範囲であり、典型的には都道府県市町村のような行政上の地域である。ただし、地域の重複はないものとする。例えば「東京都」及び「新宿区」のような階層的な地域は並存しない。「東京都」及び「神奈川県」は並存可能である。
 一般住宅市場水準欄102の一般住宅市場水準値は、戸建住宅の予想着工件数が比較対象とする時点の着工実績に比してどの程度の水準にあるかを示す指数である。本実施形態においては、「前年の戸建住宅の着工実績件数を100とした場合の、今年の戸建住宅の着工予想件数を示す指数」である。
 マンション市場水準欄103のマンション市場水準値は、集合住宅の予想着工件数が比較対象とする時点の着工実績に比してどの程度の水準にあるかを示す指数である。本実施形態においては、「前年の集合住宅の着工実績件数を100とした場合の、今年の集合住宅の着工予想件数を示す指数」である。
 商業施設市場水準欄104の商業施設市場水準値は、店舗の予想着工件数が比較対象とする時点の着工実績に比してどの程度の水準にあるかを示す指数である。本実施形態においては、「前年の店舗の着工実績件数を100とした場合の、今年の店舗の着工予想件数を示す指数」である。
 本実施形態では、工事資材の市場を「一般住宅」、「マンション」及び「商業施設」に分割したが、この分割方法に限定されない。例えば「道路」、「橋梁」のような民需以外の市場であってもよい。また、本実施形態における各値は、着工件数の指数としたが、これに限定されない。たとえば、賃貸料水準の指数、売買価格水準の指標であってもよい。
 なお、「第1の指標」には、一般住宅市場水準値、マンション市場水準値及び商業施設市場水準値が相当する。
(劣化要因マトリクス)
 図3に沿って劣化要因マトリクス32を説明する。
 劣化要因マトリクス32には、地域コード欄111に記憶された地域コードに関連付けて、潮風欄114には潮風劣化値が、積雪欄115には積雪劣化値が、台風欄116には台風劣化値が、断層欄117には断層劣化値が、屋外設置率欄118には屋外設置率が、記憶されている。欄114~117は、上位の環境欄112に属している。屋外設置率欄118は上位の設置状況欄113に属している。
 地域コード欄111の地域コードは、図2の地域コードと同様である。
 潮風欄114の潮風劣化値は、施工済の工事資材が潮風によって劣化する度合いを示した指数である。本実施形態においては、潮風劣化値=「当該地域での前年の潮風被害に関する報道件数」/「すべての地域での前年の潮風被害に関する報道件数」である。したがって、各地域の潮風劣化値を合計すると「1.0」となる。
 積雪欄115の積雪劣化値、台風欄116の台風劣化値、断層欄117の断層劣化値も全く同様である。
 屋外設置率欄118の屋外設置率は、施工済の工事資材が屋外に設置されている比率である。本実施形態では、屋外設置率=「当該地域において屋外に設置されている工事資材の数」/「当該地域において設置されているすべての工事資材の数」である。
 環境欄112については、「潮風」等の自然災害の類型は一例であり、これらの他にも「旱魃」、「津波」等があってもよい。さらに、各劣化値は、前年の報道件数ではなく、任意の時点の報道件数に基づき算出してもよい、さらに、報道件数以外にも、例えば気象台発表の年間降水量、台風上陸件数のような数値に基づいて、各劣化値を算出してもよい。
 設置状況欄113については、屋外設置率のほかに、振動箇所設置率=「当該地域において鉄道路線から所定の距離内に設置されている工事資材の数」/「当該地域において設置されているすべての工事資材の数」のような率を代替的又は追加的に使用してもよい。
 なお、「第2の指標」には、潮風劣化値、積雪劣化値、台風劣化値、断層劣化値、及び屋外設置率が相当する。
(工事業者別着工実績)
 図4に沿って工事業者別着工実績33を説明する。
 工事業者別着工実績33には、工事業者名欄121に記憶された工事業者名に関連付けて、工事業者住所欄122には工事業者の住所が、工事業者コード欄123には工事業者コードが、地域コード欄124には地域コードが、年度欄125には対象年度が、実績欄126には実績表が、記憶されている。
 工事業者名欄121の工事業者名は、工事業者の名称である。
 なお、「工事資材の需要者」には、工事業者が相当する。「需要実績」には、工事業者別着工実績33が相当する。
 工事業者住所欄122の工事業者住所は、工事業者の住所である。工事業者はこの住所を含む地域において、工事を行うものとする。
 工事業者コード欄123の工事業者コードは、工事業者を一意に特定する識別子である。
 地域コード欄124の地域コードは、図2の地域コードと同様である。ここでは、工事業者住所を含む地域を特定する地域コードが記憶される。
 年度欄125の対象年度は、実績表の対象となる暦年である。
 実績欄126の実績表においては、品目欄127に記憶された品目に関連付けて、1月欄128には1月の予定値と実績値が、2月欄129には2月の予定値と実績値が、(以下12月まで、各月の予定値と実績値が)、前倒係数欄132には前倒係数が、記憶されている。
 品目欄127の品目は、工事資材の種類である。例えば「水道メータ」、「電気メータ」等であるが、図4では単純化のため「品目a」等と記載している。
 1月欄128の予定値は、1月に着工するものとして1月より前の時点で予定していた品目の数量である。
 1月欄128の実績値は、1月に実際に着工した品目の数量である。
 2月欄129から12月欄についても全く同様である。
 前倒係数欄132の前倒係数は、以下のように算出される指数である。
 前倒係数=Σ(n月の実績値/n月の予定値)/12、
 n=1,2,・・・,12
 すなわち、月毎に、予定値に対してどれだけの工事進捗があたかを示す値(月別進捗率)が計算され、月別進捗率の平均値が前倒係数となる。前倒係数が大きいほど工事能力が大きいと評価される。
 なお、工事業者別着工実績33は、年度毎に存在するものとしたが、月毎、週毎に存在することとしてもかまわない。ただし、工事業者別着工実績33を月(週)毎に作成した場合は、図4の欄128等は週(曜日)ごとに作成されることとなる。
 さらに、前倒係数は、1月~12月(1日~末日、日曜日~土曜日)の進捗率の平均値としたが、中央値や最大値であってもかまわない。
(在庫予想)
 図5に沿って在庫予想34を説明する。
 在庫予想34は、工事資材を1又は複数の工事業者に対して納入する工事資材メーカが、今年度の在庫を予想した原案である。
 在庫予想34においては、品目欄151に記憶された品目に関連付けて、1月欄152には1月の予想値が、2月欄153には2月の予想値が(以下12月まで、各月の予想値が)、記憶されている。
 品目欄151の品目は、図4の品目と同様である。
 1月欄152の予想値は、1月に工事業者に対して販売するその品目の数量の計画値である。
 ここでの計画値は、各工事業者からの需要予想を積上げ計算したものではなく、専ら、工事資材メーカの生産計画等、供給者側の都合で作成した一応の値である。なお、工事資材メーカから工事資材を納入した工事業者は、在庫としてその工事資材を保管することなく、その月の内に着工するものとする。
 2月欄153から12月欄についても全く同様である。
(補充計画)
 図6に沿って補充計画35を説明する。
 補充計画35は、各工事業者からの需要予想を積上げ計算した品目毎の数量と、前記した在庫予想34とに基づいて、何月にどの品目についてどれだけの数量が不足するかを記憶した表である。
 補充計画35においては、品目欄161に記憶された品目に関連付けて、1月欄162には1月の要補充値が、2月欄163には2月の要補充値が(以下12月まで、各月の要補充値が)、記憶されている。
 品目欄161の品目は、図4の品目と同様である。
 1月欄162の要補充値は、1月における不足数量である。
 2月欄163から12月欄についても全く同様である。
(工事の前倒)
 図7の前倒計数-前倒月数変換スケール36を説明する前に、図8、9に沿って、工事の前倒しについて説明する。
 例えばガスメータ等は、法定の交換時期(図8(a)の「計画上の交換月」)が定められていて、仮に物理的な耐用年数が到来しなくとも、新品に交換される。
 図8(a)において、計画上の交換月にすべての数量についての交換が集中するわけではなく、その前後に分散して交換される。なぜならば、計画上の交換月以前にガスメータ等が劣化することもあり、交換工事が遅延することもあるからである。しかし一般的には、実際にガスメータ等が機能停止になった場合の不都合を勘案し、前倒しで交換が行われることが多い。
 図8(b)に注目すると、ある工事業者は、自らの工事能力(主に作業員数や財務力)を超過してある月にガスメータを交換せざるを得なくなりそうな場合、その前月(さらにその前月になることもある)に交換工事を前倒しで行う計画を立てる。図8(b)では、2ヶ月だけ前倒ししている。
 ある工事業者が、工事能力を考慮せずガスメータの交換計画を立てる。その結果が、図9(a)及び図9(b)の棒グラフのように分布していたとする。次に工事業者が、自らの工事能力を見積もる。工事能力がpのとき、工事能力を考慮した交換計画は、図9(a)の長方形191のようになる(現実には各月のばらつきが生じる)。
 工事能力がq(q<p)のとき、工事能力を考慮した交換計画は、図9(b)の長方形192のようになる。長方形192は、長方形191に比して、高さは小さいが、横幅は大きい。すなわち、前倒しされる月数が大きい。
(前倒係数-前倒月数変換スケール)
 図7に戻って、前倒係数-前倒月数変換スケール36を説明する。
 前倒係数-前倒月数変換スケール36は、前倒係数行171及び前倒月数行172を有する。そして、各欄173~182には、前倒係数の範囲と、その範囲に対応する前倒月数が記憶されている。
 前倒係数は、図4の前倒係数と同様である。
 前倒月数は、工事業者の工事能力が充分にないとき、ある月に行うべき工事をその月を基準として何ヶ月前の月に行うかを示す数(単位:月)である。
 図7の例では、前倒係数が「0.0以上0.1未満」という最小の範囲にある場合、前倒月数は、「9.0(月)」と最大値をとる(欄173)。前倒係数が「0.9以上1.0以下」という最大の範囲にある場合、前倒月数は、「0.0(月)」と最小値をとる。
 ここに記載した前倒係数と前倒月数との対応関係は、一例であってこれに限定されない。前倒係数が「1.0」であれば前倒月数が「0.0」となり、前倒係数が小さくなるにつれ、対応する前倒月数が増加するような対応関係であれば何でもよい。
(処理手順)
 図10に沿って、全体処理手順を説明する。
 ステップS301において、在庫計画作成装置1のデータ取得部21は、各種データを取得する。
 具体的には、データ取得部21は、汎用データベース2又は公開統計情報3にアクセスして、工事動向マトリックス31及び劣化要因マトリクス32を作成するのに必要な公開情報を取得する。
 さらに、入力装置15から、工事業者別着工実績33及び在庫予想34の入力を受け付ける。工事業者別着工実績33及び在庫予想34は、既に完成したものを受け付けるものとする。
 その後、取得した公開情報及び工事業者別着工実績33及び在庫予想34を補助記憶装置13に記憶する。
 ステップS302において、在庫計画作成装置1のマトリクス作成部22は、マトリクスを作成する。
 マトリクス作成部22は、第1に、工事動向マトリクス31を作成する。例えば、ステップS301において取得した公開情報を所定のファイル形式やフォーマットに統一し、公開情報に含まれる地域を示すデータを抽出し、公開情報に対して地域コードを対応付ける。そして同じ地域コードを有する公開情報をグループ化し、そのなかから例えば「一般住宅」、「年度」、「着工件数」を示す文字(数字)列を取得し、予想値を算出する。
 ここでは、具体的な処理方法は記載しないが、公知の方法によって、結果的に工事動向マトリクス31が完成すればよい。
 マトリクス作成部22は、第2に、劣化要因マトリクス32を作成する。劣化要因マトリクス32についてもまた「第1」に記したような方法で劣化値を算出する。ここでは、具体的な処理方法は記載しないが、公知の方法によって、結果的に劣化要因マトリクス32が完成すればよい。
 但し、設置状況欄113の屋外設置率は、一般に公開されている情報ではないので、ユーザが現地を視察して得たデータを元に、入力装置15から手作業での入力を受け付けるものとする。
 又は、ユーザが現場にて、携帯端末(図示せず)に対して「品目」、「地域コード」、「当該地域において屋外に設置されている工事資材の数」及び「当該地域において設置されているすべての工事資材の数」を入力することとしてもよい。この場合、携帯端末は、前記した計算式に基づき「屋外設置率」を算出し、「屋外設置率」を「品目」及び「地域コード」とともにネットワーク4を介して在庫計画作成装置1に送信する。在庫計画作成装置1の補助記憶装置13は、この屋外設置率を「品目」及び「地域コード」に関連付けて記憶しておき、ステップS302においてマトリクス作成部22がこれを読み出すものとする。
 ステップS303において、在庫計画作成装置1の在庫計画作成部23は、補充計画35を作成する。
 ステップS303の詳細は後記するが、結果として、補充計画35(図6)が作成される。
 ステップS304において、在庫計画作成装置1の在庫計画作成部23は、補充計画35の承認を受け付ける。
 具体的には、在庫計画作成部23は、作成された補充計画35を出力装置16に表示し、ユーザが承認するのを受け付ける。
 その後、全体処理手順を終了する。
(ステップS303の詳細)
 ステップS401において、在庫計画作成装置1の在庫計画作成部23は、ある1つの工事業者コードをエントリとして取得する。
 ステップS402において、在庫計画作成部23は、作業フォーマット37を作成する。
 具体的には、在庫計画作成部23は、第1に、工事業者コードを検索キーとして、補助記憶装置13を検索し、当該工事業者の工事業者別着工実績33(図4)を取得する。
 第2に、取得した工事業者別着工実績33の1月欄126から12月欄までの実績値のみを残し、予定値を消去する。そして、対象年度に「1」を加えて上書きする。この段階で、工事業者別着工実績33は図12の状態になっている。この状態の工事業者別着工実績33を特に「作業フォーマット」37という。
 作業フォーマット37の1月欄128等には「予想」の見出しが記憶されている。これは、前年度の実績値を出発点として今年度の予想値を作成する(詳細後記)という意味である。
 そこで、消去せずに残された前年度の「実績値」を以降では今年度の「予想値」と呼ぶ。
 ステップS403において、在庫計画作成部23は、工事動向マトリクス31を使用して補正を行う。
 具体的には、在庫計画作成部23は、第1に、作業フォーマット37上の地域コードを検索キーとして工事動向マトリクス31(図2)を検索し、該当したレコードの一般住宅市場水準値、マンション市場水準値及び商業施設市場水準値を取得する。ここでは、図2の1行目のレコードの「98.3」、「132.5」及び「101.4」が取得されたとして説明を続ける。
 第2に、取得した3つの市場水準値の平均値を算出する。この平均値を「代表市場水準値」という。ちなみに、算出された代表市場水準値は、「110.73」である。
 第3に、作業フォーマット37上のすべての予測値に対して、「代表市場水準値/100」を乗じ、その計算結果を上書きする。この段階で作業フォーマット37は図13の状態になっている。図13においては、すべての予想値が、図12の対応する予想値の「1.1073」倍(少数以下四捨五入)となっている。
 ステップS404において、在庫計画作成部23は、劣化要因マトリクス32を使用して補正を行う。
 具体的には、在庫計画作成部23は、第1に、作業フォーマット37上の地域コードを検索キーとして劣化要因マトリクス32(図3)を検索し、該当したレコードの潮風劣化値、積雪劣化値、台風劣化値、断層劣化値及び屋外設置率を取得する。ここでは、図3の1行目のレコードの、「0.0」、「0.2」、「0.0」、「0.5」及び「0.98」が取得されたとして説明を続ける。
 第2に、取得した4つの劣化値の平均値を算出する。この平均値を「代表劣化値」という。ちなみに、算出された代表劣化値は、「0.175」である。
 第3に、作業フォーマット37上のすべての予測値に対して、「1+代表劣化値×屋外設置率」を乗じ、その計算結果を上書きする。この段階で作業フォーマット37は図14の状態になっている。図14においては、すべての予想値が、図13の対応する予想値の「1.1715(=1+0.175×0.98)」倍(少数以下四捨五入)となっている。
 ステップS405において、在庫計画作成部23は、前倒係数を使用して補正を行う。
 具体的には、在庫計画作成部23は、第1に、作業フォーマット37上の前倒係数を検索キーとして、前倒係数-前倒月数変換スケール36(図7)を検索し、対応する前倒月数を取得する。ここでは、「品目a」について「1.0」が、「品目b」について「2.0」が、「品目c」について「2.0」が、取得されたとして説明を続ける。
 第2に、作業フォーマット37上の予想値を、取得した前倒月数だけ時間的に前(左)の欄に移し、上書きする。
 例えば、m月予想値が「X」、取得した前倒月数が「s」であるとする。この場合、(m-s)月予想値として「X」を上書きする。
 但しs≧mであるときは、今年度の(12-(s-m))月予想値として「X」を上書きする。
 ステップS405の処理は、作業フォーマット37上のすべてのレコードの前倒係数毎に、すなわち品目毎に繰り返す。この段階で作業フォーマットは図15の状態になっている。「品目a」については、図14における各月の予想値は、図15においては左へ1月分移動している。「品目b」及び「品目c」については、図14における各月の予想値は、図15においては左へ2月分移動している。
 ステップS406において、在庫計画作成部23は、未処理のエントリがあるか否かを判断する。
 具体的には、在庫計画作成部23は、未処理の工事業者コードが残っている場合(ステップS406“YES”)は、ステップS401に戻る。それ以外の場合(ステップS406“NO”)は、ステップS407に進む。
 繰り返しループを抜け出した時点において、各工事業者について作業フォーマット37(図15)が完成していることになる。
 ステップS407において、在庫計画作成部23は、すべての工事業者の予想値を集計する。
 具体的には、在庫計画作成部23は、第1に、欄が空白である「集計フォーマット」38を作成する。集計フォーマット38の構成は、作業フォーマット37の実績表126から前倒係数欄132を取り除いたものである。
 第2に、各作業フォーマット37の、ある品目のレコードのある月の予想値を取得しそれらの合計値を、集計フォーマット38上のその品目のレコードのその月の欄に記憶する。この処理は、すべての品目及び月について繰り返す。この段階で集計フォーマット38は図16の状態になっている。
 なお、「適切な在庫水準」には、この段階での集計フォーマット38が相当する。
 ステップS408において、在庫計画作成部23は、補充計画35を作成する。
 具体的には、在庫計画作成部23は、第1に補助記憶装置13から在庫予想34(図5)を読み出す。
 第2に、集計フォーマット38の、ある品目のレコードのある月の予想値を取得し、取得した予想値から、在庫予想34のその品目のレコードのその月の予想値を控除する。そして、控除後の値を、集計フォーマット38のその品目のレコードのその月欄に記憶する。この処理は、すべての品目及び月について繰り返す。なお、控除後の値が負値となった場合は、「0」を記憶するものとする。
 第3に、集計フォーマット38を補充計画35として、補助記憶装置13に記憶する。
 その後、ステップS304に戻る。
(変形例1)
 ステップS408において、ある月の控除後の値が負値(在庫が余剰)となった場合、次の月に繰り越すこととしてもよい。この場合、前記ステップS408の「第2」は以下のように読み替える。
 『第2に、集計フォーマット38上の、ある品目のレコードの1月の予想値を取得し、取得した予想値から、在庫予想34のその品目のレコードの1月の予想値を控除する。
 そして、控除後の値を、集計フォーマット38のその品目のレコードの1月欄に記憶する。このとき、控除後の値が負値である場合は、集計フォーマット38のその品目のレコードの1月欄に「0」を記憶した上で、その負値の絶対値を一時的に保持する。
 次に集計フォーマット38の、ある品目のレコードの2月の予想値を取得する。そして、取得した予想値から、在庫予想34のその品目のレコードの2月の予想値に一時的に保持した絶対値を加算した値を控除する。そして、控除後の値を、集計フォーマット38のその品目のレコードの2月欄に記憶する。以後12月まで当該処理を繰り返す。この処理は、すべての品目について繰り返す。』
(変形例2)
 前記のステップS403及びS404において、「代表市場水準値」は各市場水準値の平均値とし、「代表劣化値」は各劣化値の平均値とした。
 しかしながら、例えば、一般住宅市場水準値のウエイトをW1、マンション市場水準値のウエイトをW2、商業施設市場水準値のウエイトをW3とし(W1+W2+W3=1)、潮風劣化値のウエイトをw1、積雪劣化値のウエイトをw2、台風劣化値のウエイトをw3、断層劣化値のウエイトをw4とし(w1+w2+w3+w4=1)、それぞれの値にウエイトを乗じて合計し「代表市場水準値」及び「代表劣化値」を算出してもよい。この場合、地域コードに関連付けて、W1、W2及びW3の組合せ、及びw1、w2、w3及びw4の組合せを記憶しておいてもよい。
(変形例3)
 完成した段階の、各工事業者についての作業フォーマット37を、補助記憶装置13に記憶しておいてもよい。そのようにすれば、地域コード及び工事業者コードを検索キーとして、地域毎、及び工事業者毎の作業フォーマット37を出力装置16に表示することができる。
(変形例4)
 ステップS401において、在庫計画作成部23は、地域コードの入力を受け付けたうえで、その地域コードを有するある1つの工事業者コードをエントリとして取得することとしてもよい。この場合、地域コードに関連付けて工事業者コードを記憶した表が補助記憶装置13に格納されており、在庫計画作成部23は、受け付けた地域コードを検索キーとして、工事業者コードを取得するものとする。さらに、在庫予想34は、地域毎に作成されているものとする。
 このようにすれば、地域毎及び/又は工事業者毎に補充計画35を作成することができる。
 本発明は、前記した実施形態に限定されることなく、本発明の主旨を逸脱しない範囲で、変更実施が可能である。
 1   在庫計画作成装置
 2   汎用データベース
 3   公開統計情報
 4   ネットワーク
 11  中央制御装置(制御部)
 12  主記憶装置(記憶部)
 13  補助記憶装置(記憶部)
 14  通信装置
 15  入力装置
 16  出力装置
 21  データ取得部
 22  マトリクス作成部
 23  在庫計画作成部
 31  工事動向マトリクス
 32  劣化要因マトリクス
 33  工事業者別着工実績(需要実績)
 34  在庫予想
 35  補充計画
 36  前倒係数-前倒月数変換スケール
 37  作業フォーマット
 38  集計フォーマット

Claims (12)

  1.  工事資材の需要を予想し、適切な在庫水準を決定する在庫計画作成装置であって、
     地域毎に工事需要が直近の時期においてどの程度変化しているかを示す第1の指標と、
     地域毎に前記工事資材がどの程度自然災害にさらされ易いかを示す第2の指標と、
     を格納する記憶部と、
     前記工事資材の過去における需要実績を取得し、
     前記取得した需要実績に含まれる地域に基づき前記第1の指標及び前記第2の指標を取得し、
     前記取得した第1の指標及び第2の指標を用いて、前記需要実績を補正し、将来における前記適切な在庫水準を決定する制御部と、
     を備えること、
     を特徴とする在庫計画作成装置。
  2.  前記需要実績には、
     連続する単位期間毎に、実際の需要値の当該需要値の予想値に対する比率である前倒係数が含まれており、
     前記制御部は、
     前記取得した需要実績に含まれる前記前倒係数を用いて、前記補正された前記需要実績の前記単位期間毎の配分を見直すこと、
     を特徴とする請求の範囲第1項に記載の在庫計画作成装置。
  3.  前記第2の指標は、
     携帯端末装置を介して取得された、前記工事資材の使用場所においてのみ取得される情報を含むこと、
     を特徴とする請求の範囲第1項に記載の在庫計画作成装置。
  4.  前記需要実績には、
     前記地域を特定する情報及び前記工事資材の需要者を特定する情報が含まれており、
     前記制御部は、
     前記適切な在庫水準を前記地域毎及び前記需要者毎に作成したうえで前記記憶部に格納し、
     前記地域を特定する情報及び/又は前記需要者を特定する情報の入力を受け付けると、
     前記適切な在庫水準を前記地域毎及び/又は前記需要者毎に出力すること、
     を特徴とする請求の範囲第1項に記載の在庫計画作成装置。
  5.  工事資材の需要を予想し、適切な在庫水準を決定する在庫計画作成装置を用いた在庫計画作成方法であって、
     前記在庫計画作成装置の記憶部は、
     地域毎に工事需要が直近の時期においてどの程度変化しているかを示す第1の指標と、
     地域毎に前記工事資材がどの程度自然災害にさらされ易いかを示す第2の指標と、
     を格納し、
     前記在庫計画作成装置の制御部は、
     前記工事資材の過去における需要実績を取得し、
     前記取得した需要実績に含まれる地域に基づき前記第1の指標及び前記第2の指標を取得し、
     前記取得した第1の指標及び第2の指標を用いて、前記需要実績を補正し、将来における前記適切な在庫水準を決定すること、
     を特徴とする在庫計画作成方法。
  6.  前記需要実績には、
     連続する単位期間毎に、実際の需要値の当該需要値の予想値に対する比率である前倒係数が含まれており、
     前記在庫計画作成装置の制御部は、
     前記取得した需要実績に含まれる前記前倒係数を用いて、前記補正された前記需要実績の前記単位期間毎の配分を見直すこと、
     を特徴とする請求の範囲第5項に記載の在庫計画作成方法。
  7.  前記第2の指標は、
     携帯端末装置を介して取得された、前記工事資材の使用場所においてのみ取得される情報を含むこと、
     を特徴とする請求の範囲第5項に記載の在庫計画作成方法。
  8.  前記需要実績には、
     前記地域を特定する情報及び前記工事資材の需要者を特定する情報が含まれており、
     前記在庫計画作成装置の制御部は、
     前記適切な在庫水準を前記地域毎及び前記需要者毎に作成したうえで前記記憶部に格納し、
     前記地域を特定する情報及び/又は前記需要者を特定する情報の入力を受け付けると、
     前記適切な在庫水準を前記地域毎及び/又は前記需要者毎に出力すること、
     を特徴とする請求の範囲第5項に記載の在庫計画作成方法。
  9.  地域毎に工事需要が直近の時期においてどの程度変化しているかを示す第1の指標と、
     地域毎に工事資材がどの程度自然災害にさらされ易いかを示す第2の指標と、
     を格納し、
     前記工事資材の需要を予想し、適切な在庫水準を決定する在庫計画作成装置を機能させる在庫計画作成プログラムであって、
     前記在庫計画作成装置の制御部に対して、
     前記工事資材の過去における需要実績を取得し、
     前記取得した需要実績に含まれる地域に基づき前記第1の指標及び前記第2の指標を取得し、
     前記取得した第1の指標及び第2の指標を用いて、前記需要実績を補正し、将来における前記適切な在庫水準を決定する処理を実行させること、
     を特徴とする在庫計画作成プログラム。
  10.  前記需要実績には、
     連続する単位期間毎に、実際の需要値の当該需要値の予想値に対する比率である前倒係数が含まれており、
     前記在庫計画作成装置の制御部に対し、
     前記取得した需要実績に含まれる前記前倒係数を用いて、前記補正された前記需要実績の前記単位期間毎の配分を見直す処理を実行させること、
     を特徴とする請求の範囲第9項に記載の在庫計画作成プログラム。
  11.  前記第2の指標は、
     携帯端末装置を介して取得された、前記工事資材の使用場所においてのみ取得される情報を含むこと、
     を特徴とする請求の範囲第9項に記載の在庫計画作成プログラム。
  12.  前記需要実績には、
     前記地域を特定する情報及び前記工事資材の需要者を特定する情報が含まれており、
     前記在庫計画作成装置の制御部に対し、
     前記適切な在庫水準を前記地域毎及び前記需要者毎に作成したうえで前記記憶部に格納し、
     前記地域を特定する情報及び/又は前記需要者を特定する情報の入力を受け付けると、
     前記適切な在庫水準を前記地域毎及び/又は前記需要者毎に出力する処理を実行させること、
     を特徴とする請求の範囲第9項に記載の在庫計画作成プログラム。
PCT/JP2010/062654 2009-11-20 2010-07-28 在庫計画作成装置、在庫計画作成方法及び在庫計画作成プログラム WO2011061970A1 (ja)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010800418934A CN102576433A (zh) 2009-11-20 2010-07-28 在库计划生成装置、在库计划生成方法以及在库计划生成程序

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2009-264530 2009-11-20
JP2009264530A JP2011108126A (ja) 2009-11-20 2009-11-20 在庫計画作成装置、在庫計画作成方法及び在庫計画作成プログラム

Publications (1)

Publication Number Publication Date
WO2011061970A1 true WO2011061970A1 (ja) 2011-05-26

Family

ID=44059455

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2010/062654 WO2011061970A1 (ja) 2009-11-20 2010-07-28 在庫計画作成装置、在庫計画作成方法及び在庫計画作成プログラム

Country Status (4)

Country Link
JP (1) JP2011108126A (ja)
KR (1) KR20120046310A (ja)
CN (1) CN102576433A (ja)
WO (1) WO2011061970A1 (ja)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6364800B2 (ja) 2014-02-10 2018-08-01 オムロン株式会社 監視装置及び監視方法
JP6021841B2 (ja) * 2014-03-11 2016-11-09 三菱電機株式会社 設備品需要予測装置及び設備品需要予測方法及び設備品需要予測プログラム
CN107146042B (zh) * 2016-03-01 2021-08-10 菜鸟智能物流控股有限公司 一种用于预定物流对象的物流调度方法及装置、电子设备
WO2018211668A1 (ja) * 2017-05-18 2018-11-22 三菱電機株式会社 教育計画立案装置および教育計画立案プログラム
CN108663668B (zh) * 2018-05-18 2022-03-22 西安电子科技大学 基于iaa的干扰加噪声协方差矩阵重构稳健波束形成方法
KR102494168B1 (ko) * 2020-10-05 2023-02-06 오스템임플란트 주식회사 재고 관리 방법 및 장치

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS62231306A (ja) * 1986-03-31 1987-10-09 Sumitomo Metal Ind Ltd 時系列変量制御方法及び装置
JP2004302576A (ja) * 2003-03-28 2004-10-28 Idemitsu Petrochem Co Ltd 製造支援装置、その方法、そのシステム、製造制御装置、製造装置、製造支援プログラム、および、そのプログラムを記録した記録媒体
JP2008204390A (ja) * 2007-02-22 2008-09-04 Mitsubishi Electric Corp 標準仕様選択装置

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1753006A (zh) * 2004-09-25 2006-03-29 鸿富锦精密工业(深圳)有限公司 出货自动排配系统及方法
JP2009140350A (ja) * 2007-12-07 2009-06-25 Hitachi Ltd サプライチェーン評価システム、方法、及びプログラム。

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS62231306A (ja) * 1986-03-31 1987-10-09 Sumitomo Metal Ind Ltd 時系列変量制御方法及び装置
JP2004302576A (ja) * 2003-03-28 2004-10-28 Idemitsu Petrochem Co Ltd 製造支援装置、その方法、そのシステム、製造制御装置、製造装置、製造支援プログラム、および、そのプログラムを記録した記録媒体
JP2008204390A (ja) * 2007-02-22 2008-09-04 Mitsubishi Electric Corp 標準仕様選択装置

Also Published As

Publication number Publication date
JP2011108126A (ja) 2011-06-02
CN102576433A (zh) 2012-07-11
KR20120046310A (ko) 2012-05-09

Similar Documents

Publication Publication Date Title
Conejo et al. Optimal involvement in futures markets of a power producer
Diaz et al. The importance of time resolution, operational flexibility and risk aversion in quantifying the value of energy storage in long-term energy planning studies
Fischer et al. Regulating the electricity sector in Latin America [with comments]
Nowak et al. A stochastic integer programming model for incorporating day-ahead trading of electricity into hydro-thermal unit commitment
WO2011061970A1 (ja) 在庫計画作成装置、在庫計画作成方法及び在庫計画作成プログラム
JP6132504B2 (ja) 小規模電力系統の発電計画策定システム及びその方法
JP4154373B2 (ja) 電力供給事業リスク管理支援システム
Hannum et al. Estimating the implied cost of carbon in future scenarios using a CGE model: The Case of Colorado
KR102055718B1 (ko) 변동비 반영시장의 시간대별 계통한계가격을 이용한 실시간 요금제 운영 장치 및 방법
Aouam et al. Robust strategies for natural gas procurement
US20190066235A1 (en) Systems and methods for energy management
Lamy et al. The role of energy storage in accessing remote wind resources in the Midwest
Anderson et al. Looking beyond bill savings to equity in renewable energy microgrid deployment
JP2020149475A (ja) 予測装置、予測方法及びコンピュータプログラム
Batidzirai et al. Willingness to pay for improved electricity supply reliability in Zambia
JP2010231375A (ja) 部品需要予測方法、部品需要予測システム
Anderson et al. REopt: A platform for energy system integration and optimization
JP2013123321A (ja) 停電計画策定システム
Yang et al. Optimizing diesel fuel supply chain operations to mitigate power outages for hurricane relief
Graeber et al. Optimising trans-national power generation and transmission investments: a Southern African example
JP6554696B1 (ja) 電力需要予測システム、電力需要予測方法、及びプログラム
Colelli et al. Power systems’ performance under high renewables’ penetration rates: a natural experiment due to the COVID-19 demand shock
JP2009181445A (ja) 温室効果ガス排出係数管理装置
Brown et al. Vietnam’s EVN Faces the Future: Time to Get Renewables Right
Newell et al. PJM CONE 2026/2027 Report

Legal Events

Date Code Title Description
WWE Wipo information: entry into national phase

Ref document number: 201080041893.4

Country of ref document: CN

121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 10831369

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 20127007053

Country of ref document: KR

Kind code of ref document: A

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 10831369

Country of ref document: EP

Kind code of ref document: A1