JP6554696B1 - 電力需要予測システム、電力需要予測方法、及びプログラム - Google Patents
電力需要予測システム、電力需要予測方法、及びプログラム Download PDFInfo
- Publication number
- JP6554696B1 JP6554696B1 JP2018023493A JP2018023493A JP6554696B1 JP 6554696 B1 JP6554696 B1 JP 6554696B1 JP 2018023493 A JP2018023493 A JP 2018023493A JP 2018023493 A JP2018023493 A JP 2018023493A JP 6554696 B1 JP6554696 B1 JP 6554696B1
- Authority
- JP
- Japan
- Prior art keywords
- power
- load
- contract
- value
- target
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E40/00—Technologies for an efficient electrical power generation, transmission or distribution
- Y02E40/70—Smart grids as climate change mitigation technology in the energy generation sector
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
Landscapes
- Supply And Distribution Of Alternating Current (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
Description
A’=A×全量契約電力比×月負荷率比
次式により前記最大電力を切り取る基準電力B’を算出し、
基準電力B’=A’×(対象日負荷追随契約電力/対象日全量契約電力)
前記最大電力が出ている日と対象日の負荷追随契約状態の相違を反映するために、負荷追随契約電力比率rを次式により算出し、
r=(対象日負荷追随契約電力/最大電力日負荷追随契約電力)
前記基準値を次式により算出し、
基準値=(全量実績電力−基準電力)×r
前記予測部は、時間帯コードと、前記基準値と前記負荷追随実績電力との差分値との関数に時間帯コードを代入し、前記時間帯コードに対応する差分値を特定し、前記基準値に前記差分値を加算した値を負荷追随需要予測電力とする。
A’=A×全量契約電力比×月負荷率比
次式により前記最大電力を切り取る基準電力B’を算出し、
基準電力B’=A’×(対象日負荷追随契約電力/対象日全量契約電力)
前記最大電力が出ている日と対象日の負荷追随契約状態の相違を反映するために、負荷追随契約電力比率rを次式により算出し、
r=(対象日負荷追随契約電力/最大電力日負荷追随契約電力)
前記基準値を次式により算出し、
基準値=(全量実績電力−基準電力)×r
予測部が、時間帯コードと、前記基準値と前記負荷追随実績電力との差分値との関数に時間帯コードを代入し、前記時間帯コードに対応する差分値を特定し、前記基準値に前記差分値を加算した値を負荷追随需要予測電力とする。
A’=A×全量契約電力比×月負荷率比
次式により前記最大電力を切り取る基準電力B’を算出し、
基準電力B’=A’×(対象日負荷追随契約電力/対象日全量契約電力)
前記最大電力が出ている日と対象日の負荷追随契約状態の相違を反映するために、負荷追随契約電力比率rを次式により算出し、
r=(対象日負荷追随契約電力/最大電力日負荷追随契約電力)
前記基準値を次式により算出し、
基準値=(全量実績電力−基準電力)×r
前記予測部は、時間帯コードと、前記基準値と前記負荷追随実績電力との差分値との関数に時間帯コードを代入し、前記時間帯コードに対応する差分値を特定し、前記基準値に前記差分値を加算した値を負荷追随需要予測電力とする。
・ハードウェア、ソフトウェアの両面での負荷の軽いシステム
・予測手順が簡便なシステム
・電力部分供給の割合を問わず運用可能なシステム
A’=A×全量契約電力比×月負荷率比
例えば、過去のデータの取得日と対象日とで契約状況や月負荷率が異なる場合でも、上記演算によれば、それらの特徴を過去の最大電力Aに反映できる。そして、解析部11cは、過去の最大電力Aを切り取る基準電力B’を次式により算出する。
基準電力B’=A’×(対象日負荷追契約電力/対象日全量契約電力)
負荷追随契約電力比率r=(対象日負荷追随契約電力/最大電力日負荷追随契約電力)
そして、基準値を次式により算出する。
基準値=(全量実績電力−基準電力B’)×負荷追随契約電力比率r
従って、上記演算によれば、算出された基準値には、過去の最大電力が出ている日と対象日との負荷追随契約状況の違いが十分反映されることになる。
A’=A×全量契約電力比×月負荷率比
例えば、過去のデータの取得日と対象日とで契約状況や月負荷率が異なる場合でも、上記演算によれば、それらの特徴を過去の最大電力Aに反映できる。そして、解析部11cは、過去の最大電力Aを切り取る基準電力B’を次式により算出する。
基準電力B’=A’×(対象日負荷追契約電力/対象日全量契約電力)
負荷追契約電力比率r=(対象日負荷追契約電力/最大電力日負荷追契約電力)
そして、解析部11cは、基準値を次式により算出する。
基準値=(全量実績電力−基準電力B’)×負荷追契約電力比率r
実績値と基準予測値の差分平均 : 1.375
実績値と要素Aを反映した予測値との差分平均 : 0.25
実績値と要素Bを反映した予測値との差分平均 : 5.20833
となる。そして、例えば所定の割合を実績値と基準予測値との差分平均とした場合、それ以下である要素Aを影響因子とし、それ以上である要素Bは予測値の算出において考慮対象外とする。この影響因子か否かの棲み分けについては、例えば、図8に示されるような一覧で各要素の解析状態としてまとめられる。
・精度向上による部分供給の更なる普及を図ることができる。これにより、新電力の参入障壁の低減、インバランス・収支改善による経営健常化を実現する。
・需要と発電のバランスを改善することができる。即ち、電力部分供給によって変動が大きくなり不明瞭となっていた電力需要を明確にし、ミスマッチだった発電と需要とのバランスを改善することができる。
Claims (3)
- 少なくとも過去の電力データを解析する解析部と、
需要予測電力の予測を行う予測部と、
少なくとも電力データを記憶する記憶部と、を備え、
前記解析部は、前記過去の電力データから負荷追随実績電力を含む全量実績電力を特定し、対象日の所定日数以上前の最大電力が出ている日を抽出し、次式により前記最大電力を前記対象日の特徴を有するデータA’に変換し、
A’=A×全量契約電力比×月負荷率比
次式により前記最大電力を切り取る基準電力B’を算出し、
基準電力B’=A’×(対象日負荷追随契約電力/対象日全量契約電力)
前記最大電力が出ている日と対象日の負荷追随契約状態の相違を反映するために、負荷追随契約電力比率rを次式により算出し、
r=(対象日負荷追随契約電力/最大電力日負荷追随契約電力)
前記基準値を次式により算出し、
基準値=(全量実績電力−基準電力)×r
前記予測部は、時間帯コードと、前記基準値と前記負荷追随実績電力との差分値との関数に時間帯コードを代入し、前記時間帯コードに対応する差分値を特定し、前記基準値に前記差分値を加算した値を負荷追随需要予測電力とする
電力需要予測システム。 - 解析部が、記憶部の過去の電力データから負荷追随実績電力を含む全量実績電力を特定し、対象日の所定日数以上前の最大電力が出ている日を抽出し、次式により前記最大電力を前記対象日の特徴を有するデータA’に変換し、
A’=A×全量契約電力比×月負荷率比
次式により前記最大電力を切り取る基準電力B’を算出し、
基準電力B’=A’×(対象日負荷追随契約電力/対象日全量契約電力)
前記最大電力が出ている日と対象日の負荷追随契約状態の相違を反映するために、負荷追随契約電力比率rを次式により算出し、
r=(対象日負荷追随契約電力/最大電力日負荷追随契約電力)
前記基準値を次式により算出し、
基準値=(全量実績電力−基準電力)×r
予測部が、時間帯コードと、前記基準値と前記負荷追随実績電力との差分値との関数に時間帯コードを代入し、前記時間帯コードに対応する差分値を特定し、前記基準値に前記差分値を加算した値を負荷追随需要予測電力とする
電力需要予測方法。 - コンピュータを、
少なくとも過去の電力データを解析する解析部と、
需要予測電力の予測を行う予測部と、
少なくとも電力データを記憶する記憶部と、して機能させ、
前記解析部は、前記過去の電力データから負荷追随実績電力を含む全量実績電力を特定し、対象日の所定日数以上前の最大電力が出ている日を抽出し、次式により前記最大電力を前記対象日の特徴を有するデータA’に変換し、
A’=A×全量契約電力比×月負荷率比
次式により前記最大電力を切り取る基準電力B’を算出し、
基準電力B’=A’×(対象日負荷追随契約電力/対象日全量契約電力)
前記最大電力が出ている日と対象日の負荷追随契約状態の相違を反映するために、負荷追随契約電力比率rを次式により算出し、
r=(対象日負荷追随契約電力/最大電力日負荷追随契約電力)
前記基準値を次式により算出し、
基準値=(全量実績電力−基準電力)×r
前記予測部は、時間帯コードと、前記基準値と前記負荷追随実績電力との差分値との関数に時間帯コードを代入し、前記時間帯コードに対応する差分値を特定し、前記基準値に前記差分値を加算した値を負荷追随需要予測電力とする
プログラム。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2018023493A JP6554696B1 (ja) | 2018-02-13 | 2018-02-13 | 電力需要予測システム、電力需要予測方法、及びプログラム |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2018023493A JP6554696B1 (ja) | 2018-02-13 | 2018-02-13 | 電力需要予測システム、電力需要予測方法、及びプログラム |
Publications (2)
Publication Number | Publication Date |
---|---|
JP6554696B1 true JP6554696B1 (ja) | 2019-08-07 |
JP2019140831A JP2019140831A (ja) | 2019-08-22 |
Family
ID=67539753
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2018023493A Active JP6554696B1 (ja) | 2018-02-13 | 2018-02-13 | 電力需要予測システム、電力需要予測方法、及びプログラム |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP6554696B1 (ja) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111105098A (zh) * | 2019-12-25 | 2020-05-05 | 北京华电天仁电力控制技术有限公司 | 一种单体用户算法自匹配的负荷预测方法和系统 |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2024121979A1 (ja) * | 2022-12-07 | 2024-06-13 | 三菱電機株式会社 | 需要予測装置、需要予測システム、及び需要予測方法 |
Family Cites Families (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP3778899B2 (ja) * | 2003-03-10 | 2006-05-24 | 大阪瓦斯株式会社 | 給電計画システム |
JP6086561B1 (ja) * | 2015-12-29 | 2017-03-01 | 株式会社Looop | 部分供給制御装置、部分供給方法および部分供給用プログラム |
-
2018
- 2018-02-13 JP JP2018023493A patent/JP6554696B1/ja active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111105098A (zh) * | 2019-12-25 | 2020-05-05 | 北京华电天仁电力控制技术有限公司 | 一种单体用户算法自匹配的负荷预测方法和系统 |
CN111105098B (zh) * | 2019-12-25 | 2023-11-03 | 国能信控互联技术有限公司 | 一种单体用户算法自匹配的负荷预测方法和系统 |
Also Published As
Publication number | Publication date |
---|---|
JP2019140831A (ja) | 2019-08-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US11398000B2 (en) | Methods and systems for machine-learning for prediction of grid carbon emissions | |
US7409303B2 (en) | Identifying energy drivers in an energy management system | |
US10816942B2 (en) | Managing time-substitutable electricity usage using dynamic controls | |
US7251589B1 (en) | Computer-implemented system and method for generating forecasts | |
US8010324B1 (en) | Computer-implemented system and method for storing data analysis models | |
Botterud et al. | Risk management and optimal bidding for a wind power producer | |
US20160072287A1 (en) | Comfort-driven optimization of electric grid utilization | |
US10816948B2 (en) | System, apparatus and method for energy management, for usage by consumers of energy from electric utility service providers, and monitoring and management of same | |
US20120150707A1 (en) | Systems and methods for providing energy efficient building equipment and services | |
WO2013102932A2 (en) | System and method facilitating forecasting, optimization and visualization of energy data for an industry | |
Hargreaves et al. | REFLEX: An adapted production simulation methodology for flexible capacity planning | |
JP2014124065A (ja) | 電力需要予測装置、プログラム | |
US11909210B2 (en) | Systems and methods for load management | |
JP2006235888A (ja) | 電力事業会社における収益予測及び収益計測のためのコンピュータ・システム、収益予測方法及び収益計測方法 | |
JP6554696B1 (ja) | 電力需要予測システム、電力需要予測方法、及びプログラム | |
Gonzales et al. | The investment effects of market integration: Evidence from renewable energy expansion in chile | |
Zepter et al. | Unit commitment under imperfect foresight–The impact of stochastic photovoltaic generation | |
US10742037B2 (en) | Managing consumer energy demand | |
Matos et al. | Operating reserve adequacy evaluation using uncertainties of wind power forecast | |
KR100648296B1 (ko) | 에너지 수요예측 방법 및 시스템 | |
Suciu et al. | Cloud-Based platform for enhancing energy consumption awareness and substantiating the adoption of energy efficiency measures within SMEs | |
KR102638339B1 (ko) | 지능형 수요 반응 입찰 관리 시스템 및 그 방법 | |
CN116011698B (zh) | 机组组合确定方法、装置、计算机设备和存储介质 | |
KR102342701B1 (ko) | 클러스터를 이용한 최적 발전 입찰량 결정시스템 및 방법 | |
Wang | Essays in energy economics and industrial organization |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20180315 |
|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20181029 |
|
A871 | Explanation of circumstances concerning accelerated examination |
Free format text: JAPANESE INTERMEDIATE CODE: A871 Effective date: 20181029 |
|
A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A821 Effective date: 20181030 |
|
A975 | Report on accelerated examination |
Free format text: JAPANESE INTERMEDIATE CODE: A971005 Effective date: 20181121 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20190115 |
|
A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20190307 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20190521 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20190614 |
|
R150 | Certificate of patent or registration of utility model |
Ref document number: 6554696 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
S531 | Written request for registration of change of domicile |
Free format text: JAPANESE INTERMEDIATE CODE: R313531 |
|
R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |