WO2009116249A1 PCT/JP2009/001088 JP2009001088W WO2009116249A1 WO 2009116249 A1 WO2009116249 A1 WO 2009116249A1 JP 2009001088 W JP2009001088 W JP 2009001088W WO 2009116249 A1 WO2009116249 A1 WO 2009116249A1
Authority
WO
WIPO (PCT)
Prior art keywords
boom
work
cylinder
condition
pump
Prior art date
Application number
PCT/JP2009/001088
Other languages
English (en)
French (fr)
Inventor
敬英 瀧口
松本智
齋藤芳明
Original Assignee
株式会社小松製作所
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社小松製作所 filed Critical 株式会社小松製作所
Priority to EP09722094.1A priority Critical patent/EP2267230B1/en
Priority to CN2009801185708A priority patent/CN102037194B/zh
Priority to US12/736,159 priority patent/US8725358B2/en
Priority to JP2010503763A priority patent/JP5591104B2/ja
Publication of WO2009116249A1 publication Critical patent/WO2009116249A1/ja

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/20Drives; Control devices
    • E02F9/22Hydraulic or pneumatic drives
    • E02F9/2246Control of prime movers, e.g. depending on the hydraulic load of work tools
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/20Drives; Control devices
    • E02F9/22Hydraulic or pneumatic drives
    • E02F9/2221Control of flow rate; Load sensing arrangements
    • E02F9/2232Control of flow rate; Load sensing arrangements using one or more variable displacement pumps
    • E02F9/2235Control of flow rate; Load sensing arrangements using one or more variable displacement pumps including an electronic controller
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/20Drives; Control devices
    • E02F9/22Hydraulic or pneumatic drives
    • E02F9/2278Hydraulic circuits
    • E02F9/2296Systems with a variable displacement pump

Definitions

  • the present invention relates to a work vehicle, a work vehicle control device, and a work vehicle hydraulic oil amount control method.
  • Patent Document 1 the following conditions (1) to (3), (1) the transmission is in the forward first speed stage position, (2) the working machine is in the excavation position, (3) vehicle travel It is determined that the excavation work is performed when at least one of the speeds equal to or lower than the set speed is satisfied.
  • Patent Document 2 as one method for solving the problems involved in the method disclosed in Patent Document 1, when the bottom pressure of the cylinder exceeds a predetermined value, it is determined that excavation work is started and hydraulic oil is supplied. Reduce the amount.
  • the wheel loader may perform loading work in addition to excavation work.
  • the loading operation of the wheel loader is an operation of scooping up a load such as earth and sand with a bucket of a working machine, lifting the bucket with a boom, and loading it on a truck bed or the like. Therefore, in this loading operation, it is considered desirable to increase the amount of hydraulic oil supplied to the work machine in order to increase the speed of lifting the load.
  • the cylinder bottom pressure may exceed a predetermined value in both loading work and excavation work. For this reason, when the technique of Patent Document 2 is applied to a work vehicle that performs both loading work and excavation work, there is a possibility that a large amount of operation is unnecessarily supplied to the cylinder during excavation work.
  • an object of the present invention is to prevent a working vehicle capable of performing both loading work and excavation work from unnecessarily supplying a large amount of hydraulic oil to the cylinder during excavation work. .
  • the work vehicle includes a cylinder (128) that operates the work machine (51), a first pump (120) that supplies hydraulic oil to the cylinder (128), and a loading operation.
  • Loading work detecting means (211) for detecting whether or not and a control unit (212, 213) are provided.
  • the control unit (212, 213) is configured when one or more first excavation work conditions are satisfied and a second excavation work condition that no loading operation is detected is satisfied. Then, oil amount reduction control for reducing the amount of hydraulic oil supplied from the first pump (120) is executed.
  • the control unit (212, 213) satisfies the second excavation work condition because the one or plural first excavation work conditions are satisfied but the loading operation is detected. If not, the oil amount reduction control may not be executed.
  • the plurality of first excavation work conditions are the following (A) and (B): (A) The speed stage designated for the transmission (112) is a predetermined speed stage and / or the detected vehicle speed is equal to or lower than the predetermined vehicle speed; (B) The hydraulic pressure on the bottom side of the cylinder (128) exceeds a predetermined value; It is.
  • control unit determines the amount of hydraulic oil supplied to the cylinder (128) when the loading operation is detected. Oil amount increase control is executed to increase compared to when no loading operation is detected.
  • the work vehicle outputs an output from the engine (101), a traveling system (103), a hydraulic system (104), and the engine (101) to the traveling system. (103) and a distributor (102) for distributing to the hydraulic device system (104).
  • the traveling system (103) includes a clutch (110) connected to the distributor (102).
  • the hydraulic system (104) comprises the cylinder (128) and one or more pumps driven via the distributor (102).
  • the one or more pumps include the first pump (120).
  • the controller (212, 213) performs the following controls (1) to (3) as the oil amount increase control: (1) Decreasing the clutch pressure of the clutch (110); (2) Increasing the flow rate of hydraulic fluid supplied from the first pump (120); (3) In addition to the hydraulic oil supplied from the first pump (120), the hydraulic oil is supplied to the cylinder (118) also from a second pump (121) included in the one or more pumps; Perform at least one of the following:
  • the traveling system (103) includes a torque converter (14) that converts torque transmitted between the engine (101) and wheels (18R, 18F), and the clutch (13). May be interposed between the distributor (102) and the torque converter (14), and may be connected in series to the engine (10) and the torque converter (14).
  • each condition group includes at least one condition that is being loaded.
  • the first condition group is a group of conditions related to the expression of the operator's intention.
  • the second condition group is a group of conditions related to the position of the work implement.
  • the third condition group is a group of conditions related to the state of the traveling system.
  • the loading operation detection unit (211) is in a loading operation when each condition selected one by one from at least two condition groups of the first to third condition groups is satisfied. To detect.
  • the work implement is a boom (51) that is rotatably provided on one side of a vehicle body, and the cylinder (128) rotates the boom (51). It is a boom cylinder (128) for making it move.
  • the first condition group includes the following conditions (a) and (b): (A) the boom lever (126) was operated to raise the boom (51); (B) The extension speed of the boom cylinder (128) is a positive value; Including at least one of
  • the second condition group includes the following conditions (c) and (d): (C) The angle of the boom (51) is not less than a predetermined angle; (D) the angle of the boom (51) is less than a predetermined maximum angle; Including at least one of
  • the third condition group includes the following conditions (e) to (h): (E) The ratio of the input rotational speed and the output rotational speed of the clutch (13) when the brake is off is equal to or greater than a predetermined value, or when the brake is on; (F) The speed stage set in the transmission (112) is a predetermined speed stage; (G) The travel range set for the transmission (112) has switched from reverse to forward; (H) the vehicle speed is greater than or equal to a predetermined speed; Including at least one of
  • the first condition group includes a condition that (x) the boom lever (126) is operated to raise the boom (51).
  • the second condition group includes a condition that (y) the angle of the boom (51) is a predetermined angle or more.
  • the loading operation detection unit (211) detects that the loading operation is being performed when both the condition (x) and the condition (y) are satisfied.
  • the hydraulic device system (104) includes one or more pumps (120, 121) that are driven via the distributor (102). ), A boom (51) that is rotatably provided on one side of the vehicle body (2), a bucket (52) that is rotatably provided on one side of the boom (51), and the boom is rotated.
  • a first control valve (123) for supplying hydraulic oil discharged from the first pump (120) to the bucket cylinder (129), and the boom shim via the first control valve (123).
  • a Sunda second pump capable of supplying hydraulic oil to the (128) (121).
  • the first pump (120) and the second pump (121) are included in the one or more pumps (120, 121).
  • the work vehicle includes a cylinder (128) that operates the boom (51), a first pump (120) that supplies hydraulic oil to the cylinder (128), a transmission (112), And a control unit (200).
  • the control unit 200 has the following conditions (A) and (B): (A) The speed stage designated for the transmission (112) is a predetermined speed stage and / or the detected vehicle speed is equal to or lower than the predetermined vehicle speed; (B) The hydraulic pressure on the bottom side of the cylinder (128) exceeds a predetermined value; Both of these are satisfied, and the following conditions (C) and (D): (C) the boom lever (126) was operated to raise the boom (51); (D) The angle of the boom (51) is not less than a predetermined angle; When at least one of the above is not satisfied, oil amount reduction control for reducing the amount of hydraulic oil supplied from the first pump (120) is executed. Instead of “when none of the conditions of (C) and (D) is satisfied”, “one at a time is selected from at least two
  • Each unit described above may be each means.
  • Each unit can be constructed by hardware, a computer program, or a combination thereof (for example, a part is realized by a computer program and the rest is realized by hardware).
  • the computer program is read and executed by a predetermined processor. Further, when information processing is performed by reading a computer program into a processor, a storage area existing on a hardware resource such as a memory may be used as appropriate.
  • the computer program may be installed in the computer from a recording medium such as a CD-ROM, or may be downloaded to the computer via a communication network.
  • FIG. 1 is an explanatory diagram schematically showing the overall configuration of the wheel loader.
  • the wheel loader is roughly divided into a mechanical structure 100 and a control structure (hereinafter referred to as a controller) 200.
  • the mechanical structure 100 will be described first, and then the controller 200 will be described.
  • the mechanical structure 100 includes, for example, an engine 101, an output distributor (PTO: Power Take Off) 102 that distributes the output of the engine 101 to the traveling system 103 and the hydraulic device system 104, and a traveling system for causing the wheel loader 1 to travel. 103 and a hydraulic device system 104 mainly for driving the work machine 5.
  • PTO Power Take Off
  • a hydraulic device system 104 mainly for driving the work machine 5.
  • FIG. 3 is a side view of the wheel loader 1.
  • the wheel loader 1 includes a vehicle body 2, a pair of left and right tires 3 provided in front and rear of the vehicle body 2, a machine room 4 provided in the rear of the vehicle body 2, a working machine 5 provided in front of the vehicle body 2, And a cab 6 provided in the center.
  • the vehicle body 2 includes a rear vehicle body 21, a front vehicle body 22, and a connecting portion 23 that connects the rear vehicle body 21 and the front vehicle body 22.
  • a pair of left and right steering cylinders 130 are provided between the rear vehicle body 21 and the front vehicle body 22.
  • the machine room 4 houses the engine 101, each pump 120, and the like.
  • the work implement 5 includes a boom 51 that is rotatably provided so as to extend forward from the front vehicle body 22, and a bucket 52 that is rotatably provided at the tip of the boom 51.
  • the wheel loader 1 is provided with a boom cylinder 128 for rotating the boom 51 in the vertical direction, and a bucket cylinder 129 for rotating the bucket 52.
  • the traveling system 103 includes, for example, a modulation clutch (hereinafter also referred to as “clutch”) 110, a torque converter 111, a transmission 112, and an axle 113.
  • the connection and disconnection of the clutch 110 are controlled by, for example, hydraulic pressure.
  • the clutch 110 is controlled by the hydraulic pressure specified by the control signal for specifying the hydraulic pressure.
  • the pressure applied to the modulation clutch 13 is referred to as “clutch pressure”.
  • the controller 200 transmits a control signal designating the clutch pressure.
  • the clutch is abbreviated as “Mod / C”, the torque converter as “T / C”, and the transmission as “T / M”.
  • the power (rotational torque) output from the engine 101 is transmitted to the tire 3 via the clutch 110, the torque converter 111, the transmission 112, and the axle 113.
  • the hydraulic system 104 includes, for example, a loader pump 120, a switch pump 121, a steering pump 122, a main valve 123, a load sensing (steering) valve (CLSS: Closed Center Load Sensing System) 124, a bucket A lever 125, a boom lever 126, a steering lever 127, a boom cylinder 128, a bucket cylinder 129, a steering cylinder 130, an auxiliary pump 131, and an auxiliary machine 132 are configured.
  • CLSS Closed Center Load Sensing System
  • the loader pump 120 corresponds to the “first pump”
  • the switch pump 121 corresponds to the “second pump”
  • the main valve 123 corresponds to the “first control valve”.
  • the load sensing valve 124 can also be referred to as a “second control valve”.
  • the loader pump 120 is a pump for supplying hydraulic oil to the boom cylinder 128 and the bucket cylinder 129.
  • the steering pump 122 is a pump for supplying hydraulic oil to the steering cylinder 130.
  • the switch pump 121 is a pump for supplying hydraulic oil to either the steering cylinder 130 or the boom cylinder 128 and the bucket cylinder 129.
  • Each pump 120, 121, 122 is configured as, for example, a swash plate hydraulic pump, and the angle of each swash plate is controlled by a control signal from the controller 200.
  • the load sensing valve 124 mechanically controls the supply destination and supply amount of the hydraulic oil discharged from the switch pump 121 according to the load.
  • the load sensing valve 124 can also be called a steering valve.
  • hydraulic oil discharged from the switch pump 121 is supplied to the steering cylinder 130 via the load sensing valve 124.
  • the switch pump 121 assists the steering pump 122 and operates to operate the steering cylinder 130 during traveling.
  • a CLSS valve is employed as an example of the load sensing valve (or steering valve) 124, but the present invention can also be applied to a configuration using other valves than the CLSS valve. .
  • hydraulic fluid discharged from the switch pump 121 is supplied to the boom cylinder 128 via the load sensing valve 124 and the main valve 123.
  • the switch pump 121 works to support the loader pump 120 and operate the boom cylinder 128.
  • the bucket lever 125 is a device for operating the bucket 52.
  • the boom lever 126 is a device for operating the boom 51.
  • the steering lever 127 is a device for operating the steering cylinder 130.
  • Each lever 125, 126, 127 includes, for example, an operation unit operated by an operator and a pilot pressure control valve that controls the pilot pressure according to the operation amount of the operation unit.
  • the main valve 123 supplies hydraulic oil discharged from the loader pump 120 (or both the loader pump 120 and the switch pump 121) in accordance with the pilot pressure input from the bucket lever 125 or the boom lever 126. Supply to bucket cylinder 129.
  • the auxiliary machine 132 is a device such as a cooling fan driven by a hydraulic motor, for example.
  • the auxiliary machine pump 131 is a pump for supplying hydraulic oil to the auxiliary machine 132.
  • Various sensors 140 are provided at predetermined positions in the mechanical structure 100.
  • the various sensors 140 are generic names of sensors 141 to 149 and 151 described later with reference to FIG.
  • Various states detected by the various sensors 140 are input to the controller 200 as electrical signals.
  • the controller 200 is configured as, for example, an electronic circuit including a calculation unit (for example, a CPU (Central Processing Unit)) 210, a memory 220, and an input / output interface unit 230.
  • the calculation unit 210 includes a work state detection unit 215 and a hydraulic oil amount control unit 212.
  • the work state detection unit 215 is a function that detects the work state of the wheel loader 1.
  • the hydraulic oil amount control unit 212 has a function of controlling the amount of hydraulic oil supplied to the boom cylinder 128.
  • the memory 220 is a storage medium that stores, for example, the program 221, the parameter 222, and the table 223.
  • the calculation unit 210 functions as the work state detection unit 215 and the hydraulic oil amount control unit 212 by reading the program 221 from the memory 220 and executing it (that is, detects the work state of the wheel loader 1 or the boom cylinder 128). The amount of hydraulic fluid supplied can be controlled).
  • the parameter 222 is a threshold value or a set value used by the work state detection unit 215 or the hydraulic oil amount control unit 212.
  • the table 223 is a table used by the work state detection unit 215 and the hydraulic oil amount control unit 212.
  • the input / output interface unit 230 is a circuit for transmitting and receiving electrical signals among the various sensors 140, the clutch 110, the transmission 112, the pumps 120 to 122, 131, and the like.
  • the calculation unit 210 receives signals from the various sensors 140 via the input / output interface unit 230.
  • the arithmetic unit 210 outputs a control signal to the clutch 110 and the pumps 120 to 122 and 131 via the input / output interface unit 230. Note that the configuration of the controller 200 described above is illustrated with a simplified structure to the extent necessary for understanding and implementation of the present invention, and the present invention is not limited to the above-described configuration.
  • FIG. 2 is an explanatory diagram focusing on the function of the controller 200.
  • the controller 200 is connected with a swash plate control cancel switch 150 operated by an operator and sensors 141 to 149 and 151 constituting various sensors 140.
  • the swash plate control cancel switch 150 is a switch for switching whether to execute the swash plate control or not.
  • the swash plate control cancel switch 150 is ON, the swash plate control is not executed (for example, the amount of hydraulic oil supplied to the boom cylinder 128 is increased (for example, set to the maximum value), and the swash plate control cancel switch 150 is OFF. In this case, the swash plate control is executed.
  • Travel range sensor 141 detects whether the travel range set in transmission 112 is forward (F), neutral (N), or reverse (R). The speed range set in the transmission 112 can also be detected by the travel range sensor 141.
  • the travel range sensor 141 need not be configured as a sensor. If a signal output from the transmission control circuit in the controller 200 toward the transmission 112 is used, the travel range and speed stage can be known.
  • the boom lever operation amount sensor 142 detects the operation direction and operation amount of the boom lever 126.
  • the boom angle sensor 143 detects the angle of the boom 51.
  • the engine speed sensor 144 detects the speed of the engine 101.
  • Clutch output rotational speed sensor 145 detects the rotational speed output from clutch 110.
  • Transmission output rotation speed sensor 146 detects the rotation speed output from transmission 112.
  • the brake pedal operation amount sensor 147 detects the operation amount of the brake pedal in the cab 6.
  • the accelerator pedal operation amount sensor 148 detects the operation amount of the accelerator pedal in the cab 6.
  • the vehicle speed meter 149 is an example of a vehicle speed detection unit, and detects the vehicle body speed (vehicle speed) of the wheel loader 1.
  • the boom bottom pressure sensor 151 is a pressure sensor provided on the bottom side of the boom cylinder 128, for example, and detects the hydraulic pressure on the bottom side of the boom cylinder 128 (hereinafter referred to as “boom bottom pressure”).
  • the work state detection unit 215 in the controller 200 includes a loading work detection unit 211 and an excavation work detection unit 213.
  • the loading operation detection unit 211 has a function of detecting whether or not the loading operation is being performed.
  • the loading operation detection unit 211 determines whether or not the loading operation is being performed by appropriately using signals from the sensors 141 to 149.
  • the excavation work detection unit 213 has a function of detecting whether or not excavation work is being performed. Whether the excavation work detection unit 213 is performing excavation work based on the signals from the swash plate control cancel switch 150, the travel range sensor 141, and the boom bottom pressure sensor 151, and the result of whether or not the loading work is being performed. Determine whether or not.
  • the hydraulic oil amount control unit 212 increases the boom angle by increasing the angle of the swash plate of the loader pump 120 and / or decreasing the clutch pressure of the clutch 110. The amount of hydraulic oil supplied to the cylinder 128 is increased. On the other hand, when it is detected that excavation work is being performed, the hydraulic oil amount control unit 212 reduces the amount of hydraulic oil supplied to the boom cylinder 128 by reducing the angle of the swash plate of the loader pump 120. .
  • the hydraulic oil amount control unit 212 includes, for example, a swash plate angle control unit 212A and a clutch pressure control unit 212B.
  • the swash plate angle control unit 212A outputs a control signal for controlling the angle of the swash plate of the loader pump 120.
  • the clutch pressure control unit 212B outputs a control signal for controlling the clutch pressure of the clutch 110.
  • a control signal for controlling the angle of the swash plate of the loader pump 120 is referred to as a “swash plate angle control signal”
  • a control signal for controlling the clutch pressure is referred to as a “clutch pressure control signal”.
  • the clutch pressure specified by the pressure control signal is referred to as “clutch command pressure”.
  • the angle of the swash plate of the loader pump 120 is controlled by ON / OFF of the relay 216, for example. Specifically, for example, when the relay 216 is switched from OFF to ON, the angle of the swash plate of the loader pump 120 decreases, and thus the amount of hydraulic oil supplied from the loader pump 120 to the boom cylinder 128 (For example, the amount of hydraulic oil supplied is less than the maximum amount). On the other hand, when the relay 216 is switched from ON to OFF, the angle of the swash plate of the loader pump 120 is increased, thereby increasing the amount of hydraulic oil supplied from the loader pump 120 to the boom cylinder 128 ( For example, the amount of hydraulic oil supplied is the maximum amount).
  • the swash plate angle control unit 212A turns off the relay 216 in order to increase the flow rate of the hydraulic oil discharged from the loader pump 120. Further, the swash plate angle control unit 212A turns on the relay 216 to reduce the flow rate of the hydraulic oil discharged from the loader pump 120 when the excavation work is detected. Note that the angle of the swash plate of the loader pump 120 may be controlled by a method other than ON / OFF of the relay 216.
  • a swash plate angle control signal representing the larger value may be selected and input to the loader pump 120.
  • the clutch pressure control unit 212B outputs a clutch pressure control signal for reducing the clutch pressure so that the output of the engine 101 is distributed to the work machine 5 side more when the loading operation is detected.
  • the clutch pressure control signal from the clutch pressure control unit 212B and the other clutch pressure control signal Of these, the clutch pressure control signal representing the smaller value may be selected and input to the clutch 110.
  • the clutch command pressure by the special brake corresponds to one of the other clutch pressure control signals.
  • FIG. 4 is an explanatory diagram showing the loading operation.
  • the operator lifts the boom 51 to above the loading platform of the dump truck 10 and rotates the bucket 52 in the dumping direction, thereby dropping the load in the bucket 52 onto the loading platform of the dump truck 10.
  • FIG. 5 is an explanatory diagram schematically showing a work flow of the wheel loader 1.
  • the wheel loader 1 repeats a standardized operation of excavating an excavation target 11 such as earth and sand and loading it on a transport unit such as a dump truck 10.
  • the operator causes the wheel loader 1 to travel toward the excavation target 11 with the bucket 52 lowered to a position close to the ground.
  • the operator causes the bucket 52 to enter the excavation target 11 and then rotates the bucket 52 in the tilt direction to accommodate the load in the bucket 52. That is, excavation work is performed in the first work process P1.
  • the operator lifts the bucket 52 containing the load by a predetermined amount from the ground, puts the wheel loader 1 in the traveling posture, and moves backward.
  • the operator approaches the dump truck 10 while raising the boom 51, and drops the load in the bucket 52 onto the loading platform of the dump truck 10 as shown in FIG. That is, the loading operation is performed in the third operation process P3.
  • FIG. 6 is an explanatory diagram schematically showing the angle of the boom 51 in the initial state where the loading operation is started.
  • the reference line A1-A1 is a case where the boom 51 passes through the pivot fulcrum and is parallel to the ground (horizontal plane) H.
  • a line connecting the pivot fulcrum of the boom 51 and the pivot fulcrum of the bucket 52 is A2-A2.
  • An angle formed by A1-A1 and A2-A2 is a boom angle ⁇ b.
  • the state in which the boom 51 is rotated by ⁇ 1 below the reference line A1-A1 is detected as negative, and the state in which the boom 51 is rotated upward is positive.
  • the value of ⁇ 1 is, for example, ⁇ 10 degrees. However, this value is an example and does not limit the present invention.
  • the loading operation is performed. It can be determined that it is a start. In this way, in the present embodiment, the rise of the boom 51 that is greater than the angle of the boom 51 during traveling is detected.
  • FIG. 6 The definition shown in FIG. 6 is an example, and the present invention is not limited to this.
  • FIG. 17 which will be described later, “Carry Position” defined in the SAE (Society of Automotive Engineers) standard may be used.
  • FIG. 7 shows a table T1 used for controlling the clutch command pressure.
  • Tables T1 and T2 illustrated in FIGS. 7 and 8 are examples of the table 223 illustrated in FIG.
  • the horizontal axis in FIG. 7 indicates the operation amount (%) of the boom lever 126, and the vertical axis in FIG. 7 indicates the clutch command pressure (kg / cm ⁇ 2).
  • the boom lever operation amount is a lever operation amount when the boom 51 is raised.
  • the thick solid line in the figure indicates the case where the operation amount of the accelerator pedal is 0%, and the alternate long and short dash line in the figure indicates the case where the operation amount of the accelerator pedal is 100%.
  • a value obtained by interpolation from the 0% characteristic indicated by the solid line and the 100% characteristic indicated by the alternate long and short dash line is used.
  • the clutch command pressure is increased and the output of the engine 101 is distributed more to the traveling system.
  • the clutch command pressure is reduced according to the boom lever operation amount. It is set so that the rate at which the clutch command pressure decreases increases as the amount of operation of the accelerator pedal increases. That is, in this embodiment, the greater the accelerator pedal operation amount, the more the engine 110 slides to distribute the output of the engine 101 to the work machine 5 side.
  • the clutch pressure command value for the left brake is compared with the command value obtained from the table T1, and the lower command value is adopted.
  • FIG. 8 shows a table T2 used for controlling the angle of the swash plate of the loader pump 120.
  • the horizontal axis in FIG. 8 indicates the boom lever operation amount (%), and the vertical axis in FIG. 8 indicates the target flow rate (%).
  • the boom lever operation amount is an operation amount when the boom 51 is raised.
  • the target flow rate is shown as a percentage of the maximum flow rate. It is set so that the flow rate required for the loader pump 120 increases as the boom lever operation amount increases.
  • FIG. 9 is a flowchart showing a process for detecting whether or not the loading operation is in progress.
  • the following flowcharts outline the processing to the extent necessary to understand and implement the present invention.
  • the loading operation detection unit 211 determines that the loading operation (step P3 in FIG. 5) has started when all of the following conditions are satisfied.
  • the loading operation detection unit 211 determines whether or not the boom lever 126 has been operated in the upward direction (S10).
  • the operation in the raising direction means an operation for raising the boom 51.
  • the boom lever 126 since it is necessary to lift the boom 51, it is determined whether or not the boom lever 126 has been operated in the upward direction.
  • the loading operation detection unit 211 determines whether or not the boom angle ⁇ b is larger than a preset angle ⁇ 1 (S11). For example, ⁇ 1 is set to ⁇ 10 degrees. In the loading operation, the boom 51 is moved up and approached to the dump truck 10, so it is determined whether or not the angle ⁇ b of the boom 51 is larger than the angle at the start of traveling.
  • the loading operation detection unit 211 determines whether or not the boom angle ⁇ b is smaller than a preset upper limit angle ⁇ max (S12). When the boom 51 has already risen to the upper limit, no more hydraulic oil is required, so it is confirmed that the boom angle ⁇ b is smaller than the upper limit value ⁇ max.
  • the loading operation detection unit 211 determines whether the speed ratio when the brake is off is greater than R1 or the brake is on (S13). When the brake is off, it means that the brake pedal is not operated.
  • the speed ratio is a value obtained by dividing the output rotational speed of the torque converter 111 by the input rotational speed of the torque converter 111. It may be a ratio between the input rotation speed of the clutch 110 and the output rotation speed of the clutch 110.
  • the brake is in an on state when the brake pedal is operated and the brake is effective.
  • the loading operation detection unit 211 determines that the loading operation is being performed when all of the above four conditions are satisfied (S14). At this time, the loading operation detection unit 211 writes a parameter 222 indicating that the loading operation is being performed in the memory 220. For example, the loading operation detection unit 211 sets the value of the loading operation flag stored in the memory 220 to a value (for example, “1”) indicating that the loading operation is being performed.
  • the loading work flag is a flag indicating whether or not loading work is in progress.
  • FIG. 10 is a flowchart showing a process for increasing the amount of hydraulic oil.
  • the hydraulic oil amount control unit 212 executes a plurality of oil amount increasing processes described below.
  • the clutch command pressure control unit 212B of the hydraulic oil amount control unit 212 uses the table T1 shown in FIG. 7 to apply the clutch 110 to the clutch 110 according to the boom lever operation amount and the accelerator pedal operation amount.
  • the clutch command pressure is determined (S21).
  • the clutch command pressure determined here is a value lower than the current clutch pressure, for example, a value for disengaging the clutch 110.
  • the clutch command pressure control unit 212B outputs a clutch pressure control signal indicating the determined clutch command pressure to the clutch 110 (S21).
  • the swash plate angle control unit 212A of the hydraulic oil amount control unit 212 turns off the relay 216.
  • the swash plate angle control unit 212A uses the table T2 shown in FIG. 8 to detect a target flow rate corresponding to the boom lever operation amount, and sets a swash plate angle for realizing the detected target flow rate.
  • a swash plate angle control signal is output to the loader pump 120 (S22). As a result, the amount of oil supplied to the boom cylinder 128 can be increased.
  • the swash plate angle control unit 212A sets the swash plate angle so that the discharge amount from the switch pump 121 increases, and outputs a control signal to the switch pump 121 (S23).
  • the swash plate angle of the switch pump 121 can be set based on this calculation formula.
  • the swash plate angle by the load sensing valve is a swash plate angle corresponding to the flow rate determined to be necessary for the operation of the steering cylinder 130.
  • the added amount corresponding to the boom lever operation amount is a swash plate angle corresponding to the flow rate determined to be necessary for assisting the loader pump 120.
  • the swash plate angle control unit 212A sets the swash plate angle of the auxiliary pump 131 so that the flow rate of the hydraulic oil discharged from the auxiliary pump 131 decreases, A control signal is output to the machine pump 131 (S24). If the auxiliary pump 131 is connected to the output distributor 102 via the pump clutch, the swash plate angle control unit 212A disengages the pump clutch instead of controlling the swash plate angle. Can be made. As a result, the output distributed to the auxiliary pump 131 is distributed to the loader pump 120.
  • the hydraulic oil amount control unit 212 may be configured to execute only the first oil amount increase process (S21) or the second oil amount increase process (S22).
  • the hydraulic oil amount control unit 212 may execute the first, second, and third oil amount increase processing (S21, S22, S23), or the first and second oil amount increase processing (S21, S22). ) May be executed, or only the first and third oil amount increase processing (S21, S23) or the second and third oil amount increase processing (S22, S23) may be executed.
  • FIG. 19 shows a flowchart of relay ON / OFF switching control.
  • the excavation work detection unit 213 of the controller 200 performs the determination A (S101).
  • the determination A is a determination as to whether or not the swash plate control cancel switch 150 is ON.
  • the swash plate angle control unit 212A turns off the relay 216 to increase the amount of oil supplied to the boom cylinder 128 (S110).
  • the excavation work detection unit 213 performs determination B (S102).
  • the determination B is a determination as to whether or not the relay 216 is turned on (for example, whether or not an electrical signal for turning on the relay 216 is output).
  • the excavation work detection unit 213 determines whether or not the first excavation work condition is satisfied. Specifically, the excavation work detection unit 213 performs determination C (S103), and when the result of determination C is affirmative (S103: YES), determination D is performed (S104).
  • the determination C is a determination as to whether or not the speed stage set in the transmission 112 is a predetermined speed stage (for example, the first forward speed).
  • the determination D is a determination as to whether or not the boom bottom pressure exceeds a first predetermined value.
  • Judgment E is a judgment as to whether or not the loading operation is being performed. In the determination E, for example, if the loading operation flag stored in the memory 220 is a predetermined value (for example, “1”), it is determined that the loading operation is being performed. Otherwise, it is determined that the loading operation is not being performed. .
  • the excavation work detection unit 213 determines that excavation work is in progress. In this case, the swash plate angle control unit 212A switches the relay 216 from OFF to ON (S106), thereby reducing the amount of hydraulic oil supplied to the boom cylinder 128.
  • the excavation work detection unit 213 When the result of the determination B is affirmative (S102: YES), the excavation work detection unit 213 has a plurality of the first excavation work conditions described above and the second excavation work that is not in the loading work. If any one of the conditions is not satisfied, it is determined that the excavation work is no longer being performed. Specifically, the excavation work detection unit 213 performs determination F (S107). The determination F is the same determination as the determination C, that is, whether or not the speed stage set in the transmission 112 is a predetermined speed stage (for example, the first forward speed). If the result of determination F is positive (S107: YES), the excavation work detection unit 213 performs determination G (S108). The determination G is a determination as to whether or not the boom bottom pressure is less than a second predetermined value.
  • the excavation work detection unit 213 performs determination H (S109).
  • the determination H is the same determination as the determination E, that is, whether or not the loading operation is being performed. If the result of determination H is negative (S109: NO), S110 is not performed and S101 is executed again. However, if the result of determination F is negative (S107: NO), the result of determination G is positive (S108: YES), or the result of determination H is positive (S109: YES).
  • the swash plate angle control unit 212A turns off the relay 216 (S110), thereby increasing the amount of hydraulic oil supplied to the boom cylinder 128.
  • the first predetermined value in S104 and the second predetermined value in S108 may be the same value or different values.
  • the second predetermined value is a value obtained by subtracting a predetermined hysteresis value (for example, 50 [kg / cm ⁇ 2]) from a first predetermined value (for example, 200 [kg / cm ⁇ 2]) (for example, 150 [kg). / cm ⁇ 2]) (that is, the second predetermined value ⁇ the first predetermined value may be satisfied).
  • S103, S104, and S105 are not limited to the order described above, and may be performed in any order (for example, S103 or S104 may be performed after S105).
  • S107, S108, and S109 may be performed in any order.
  • the vehicle speed meter 149 instead of or in addition to the first determination as to whether or not the speed stage set in the transmission 112 is a predetermined speed stage (for example, first forward speed), the vehicle speed meter 149 A second determination may be made as to whether or not the vehicle speed detected by the step is less than a predetermined vehicle speed.
  • the result of the second determination is positive instead of or in addition to the result of the first determination being positive, the result of the determination at S103 and / or S107 is positive.
  • the loading operation state can be automatically detected based on changes in predetermined parameters such as the boom lever operation amount and the boom angle. Therefore, control corresponding to the loading operation can be performed, and the performance of the wheel loader 1 is improved.
  • the flow rate of the hydraulic oil supplied to the boom cylinder 128 is increased during the loading operation. Therefore, the raising speed of the boom 51 can be increased, the time required for the loading operation can be shortened, and the working efficiency can be improved. In addition, since the flow rate of the hydraulic oil to the boom cylinder 128 is automatically increased at the start of the loading operation, the operator does not need to perform an extra operation such as operating the brake pedal. Improves.
  • loading is performed when all of the conditions (S10, S11) for positively detecting that loading is in progress and the conditions (S12, S13) for preventing erroneous detection are satisfied. It is determined that the work is started. Therefore, the start of the loading operation can be determined with higher reliability.
  • the first to fourth oil amount increasing processes (S21 to S24) are executed. Accordingly, more hydraulic oil can be supplied to the boom cylinder 128 and the boom 51 can be quickly raised.
  • the loading operation detection unit 211 determines whether the boom lever 126 is operated in the upward direction (S10) and whether the boom angle ⁇ b is larger than a predetermined value ⁇ 1. (S11) is determined, and when both conditions are satisfied, it is determined that the loading operation is being performed (S14).
  • This embodiment configured as described above also has the same effect as the first embodiment.
  • the control program can be simplified as compared with the first embodiment.
  • the loading operation detection unit 211 determines the first condition (S10) and the fourth condition (S13) described in the first embodiment, and both conditions are satisfied. In this case, it is determined that the loading operation is being performed (S14). Configuring this embodiment like this also achieves the same effects as the second embodiment.
  • the loading operation detection unit 211 determines whether the boom angle ⁇ b is larger than a predetermined value ⁇ 1 (S11) and whether the speed stage is set to the second forward speed. (S15) is determined, and if both conditions are satisfied, it is determined that the loading operation is being performed (S14).
  • the transmission 112 is often set to the second forward speed because the load is approached to the dump truck 10 while the load is accommodated in the bucket 52.
  • the present invention is not limited to the second forward speed. That is, in S15, it is determined whether or not a predetermined speed stage is set in advance.
  • the second speed is given as an example of the predetermined speed stage. Configuring this embodiment like this also achieves the same effects as the second embodiment.
  • the loading operation detection unit 211 determines whether or not the boom angle ⁇ b is larger than a predetermined value ⁇ 1 (S11) and whether or not the traveling range is switched from reverse to forward ( S16) is determined, and if both conditions are satisfied, it is determined that the loading operation is being performed (S14).
  • the loading operation detection unit 211 determines whether or not the boom angle ⁇ b is greater than a predetermined value ⁇ 1 (S11) and whether or not the angular velocity of the boom 51 is greater than 0. Each (S17) is determined, and when both conditions are satisfied, it is determined that the loading operation is being performed (S14).
  • the boom 51 is lifted while traveling toward the dump truck 10 at the same time.
  • the boom 51 rotates upward when the cylinder rod of the boom cylinder 128 extends.
  • the boom cylinder 128 rotates clockwise about the rotation fulcrum on the base end side. Therefore, it can be determined whether or not the boom 51 is rising by obtaining the angular velocity of the boom 51 based on the detection signal from the boom angle sensor 143.
  • the angular velocity of the boom 51 can also be detected as the angular velocity of the boom cylinder 128. Moreover, it may replace with an angular velocity and the structure which determines whether the extension speed of the cylinder rod of the boom cylinder 128 is 0 or more may be sufficient.
  • the extension speed of the cylinder rod may be calculated from the angular speed of the boom cylinder 128, or the extension speed of the cylinder rod may be calculated using a linear sensor that directly detects the displacement amount of the cylinder rod.
  • the loading operation detection unit 211 determines whether or not the travel range has been switched from reverse to forward (S16) and whether or not the angular velocity of the boom 51 is 0 or more (S17). ), And when both conditions are satisfied, it is determined that the loading operation is being performed (S14). Configuring this embodiment like this also achieves the same effects as the second embodiment.
  • the loading operation detection unit 211 determines whether or not the boom angle ⁇ b is “Carry Position” (S ⁇ b> 11 ⁇ / b> A). Since “Carry Position” is also defined in the SAE standard and the ISO standard, S11A may be rephrased as “determining whether or not“ Carry Position ”defined in the SAE or ISO standard has been reached”. Configuring this embodiment like this also achieves the same effects as the second embodiment.
  • the loading operation detection unit 211 determines whether or not the vehicle speed V exceeds a preset predetermined speed V ⁇ b> 1. (S18). When the boom angle ⁇ b exceeds ⁇ 1 (S11: YES) and the vehicle speed V exceeds V1, it can be determined that the loading operation is being performed.
  • the boom lever is operated in the upward direction, whether the boom angle is a predetermined value or more, whether the boom angle is “Carry ⁇ Position ”, Whether the angle is less than the upper limit angle, the speed ratio at the time of brake off is greater than or equal to a predetermined value, whether it is at a predetermined speed stage, the travel range has been switched from reverse to forward, or the boom angular velocity (boom cylinder angular velocity) is a predetermined value
  • the boom angular velocity boost cylinder angular velocity

Abstract

積込み作業と掘削作業の両方を行うことができる作業車両が掘削作業を行っている時にシリンダへ無駄に多くの作動油を供給してしまわないようにする。 一又は複数の第一の掘削作業条件が満たされており、且つ、積込み作業中が検出されていないという第二の掘削作業条件も満たされている場合に、制御部(200)が、作業機(51)を作動するシリンダ(128)に第一のポンプ(120)から供給される作動油の量を低減させる油量低減制御を実行する。

Description

作業車両、作業車両の制御装置、及び作業車両の作動油量制御方法
 本発明は、作業車両、作業車両の制御装置、及び作業車両の作動油量制御方法に関する。
 例えば、土木作業車両の一種であるホイールローダにおいて、掘削作業では油圧は必要とするが、吐出量は少量でよい場合がある。掘削作業であることを検出する方法として、例えば、特許文献1及び特許文献2に開示の方法がある。
 特許文献1によれば、以下の(1)乃至(3)の条件、(1)変速機は前進第1速度段位置にある、(2)作業機が掘削位置にある、(3)車両走行速度は設定速度以下である、のうち少なくとも1つの条件を満足した時に、掘削作業であると判断する。
 特許文献2によれば、特許文献1に開示の方法がかかえる問題点を解決する一方法として、シリンダのボトム圧が所定値を超えたときに、掘削作業開始と判断して、作動油の供給量を低減する。
米国特許第6073442号明細書 特開2004-251441号公報
 ホイールローダは、掘削作業の他に、積込み作業を行うことがある。ホイールローダの積込み作業とは、作業機のバケットで土砂等の積載物をすくい上げ、バケットをブームで持ち上げて、トラックの荷台等に積み込む作業である。従って、この積込み作業において、積載物を持ち上げる速度を高めるために、作業機に供給される作動油の量を増加させることが望ましいと考えられる。
 一方、掘削作業では、油圧を必要とするものの、シリンダへ供給する作動油の量は少しでよい場合がある。
 ここで、積込み作業と掘削作業の両方を行うことができる作業車両では、積込み作業でも掘削作業でも、シリンダのボトム圧が所定値を超えることが有り得る。このため、積込み作業と掘削作業の両方を行う作業車両に特許文献2の技術を適用した場合、掘削作業時に、シリンダへ無駄に多くの作動を供給してしまうおそれがある。
 従って、本発明の目的は、積込み作業と掘削作業の両方を行うことができる作業車両が掘削作業を行っている時にシリンダへ無駄に多くの作動油の供給してしまわないようにすることにある。
 本発明の他の目的は、後の説明から明らかになるであろう。
 この欄の記述において、カッコ内の符号は、添付の図面に記載の要素との対応関係を例示するものであるが、これは、単なる説明のための例示にすぎず、本発明の技術的範囲を限定する趣旨ではない。
 本発明の第一の観点に従う作業車両は、作業機(51)を作動するシリンダ(128)と、前記シリンダ(128)に作動油を供給する第一のポンプ(120)と、積込み作業中か否かを検出する積込み作業検出手段(211)と、制御部(212、213)とを備える。前記制御部(212、213)は、一又は複数の第一の掘削作業条件が満たされており、且つ、積込み作業中が検出されていないという第二の掘削作業条件が満たされている場合に、前記第一のポンプ(120)から供給される作動油の量を低減させる油量低減制御を実行する。なお、前記制御部(212、213)は、前記一又は複数の第一の掘削作業条件が満たされているものの、積込み作業中が検出されているため前記第二の掘削作業条件が満たされていない場合には、前記油量低減制御を非実行としても良い。
 これにより、積込み作業と掘削作業の両方を行うことができる作業車両が掘削作業を行っている時にシリンダへ無駄に多くの作動油の供給してしまわないようにすることができる。
 第二の観点では、前記第一の観点において、前記複数の第一の掘削作業条件は、以下の(A)及び(B):
(A)トランスミッション(112)に指定される速度段が所定の速度段である、及び/又は、検出された車速が所定の車速以下である;
(B)前記シリンダ(128)のボトム側の油圧が所定の値を超えている;
である。
 第三の観点では、前記第一又は第二の観点において、前記制御部(212、213)は、積込み作業中が検出された場合に、前記シリンダ(128)に供給される作動油の量を積込み作業中が検出されていない場合に比べて増加させる油量増加制御を実行する。
 第四の観点では、前記第三の観点において、作業車両が、エンジン(101)と、走行系(103)と、油圧装置系(104)と、前記エンジン(101)からの出力を前記走行系(103)と前記油圧装置系(104)とにそれぞれ分配する分配器(102)とを備える。前記走行系(103)が、前記分配器(102)に接続されたクラッチ(110)を備える。前記油圧装置系(104)が、前記シリンダ(128)と、前記分配器(102)を介して駆動される一以上のポンプとを備える。前記一以上のポンプには、前記第一のポンプ(120)が含まれている。前記制御部(212、213)は、前記油量増加制御として、以下の(1)乃至(3)の制御:
(1)前記クラッチ(110)のクラッチ圧を低下させる;
(2)前記第一のポンプ(120)から供給される作動油の流量を増加させる;
(3)前記第一のポンプ(120)から供給される作動油に加えて、前記一以上のポンプに含まれる第二のポンプ(121)からも前記シリンダ(118)に作動油を供給させる;
のうちの少なくとも一つを実行する。なお、例えば、前記走行系(103)が、前記エンジン(101)と車輪(18R,18F)との間で伝達されるトルクを変換するトルクコンバータ(14)を備えていて、前記クラッチ(13)が、前記分配器(102)と前記トルクコンバータ(14)との間に介在し、前記エンジン(10)と前記トルクコンバータ(14)とに直列に接続されていても良い。
 第五の観点では、前記第一乃至第四の観点のいずれかにおいて、第一乃至第三の条件グループのうちの少なくとも2つの条件グループがある。各条件グループは、積込み作業中であることの少なくとも一つの条件を含む。前記第一の条件グループは、オペレータの意思の表れに関する条件のグループである。前記第二の条件グループは、前記作業機の位置に関する条件のグループである。前記第三の条件グループは、前記走行系の状態に関する条件のグループである。前記積込み作業検出部(211)は、前記第一乃至第三の条件グループのうちの少なくとも2つの条件グループから1つずつ選択された各条件が満たされている場合に、積込み作業中であると検出する。
 第六の観点では、前記第五の観点において、前記作業機は、車体の一側に回動可能に設けられるブーム(51)であり、前記シリンダ(128)は、前記ブーム(51)を回動させるためのブームシリンダ(128)である。前記第一の条件グループは、以下の(a)及び(b)の条件:
(a)ブームレバー(126)が前記ブーム(51)を上昇させるべく操作された;
(b)前記ブームシリンダ(128)の伸長速度が正の値である;
のうちの少なくとも一つを含む。
 第七の観点では、前記第五又は第六の観点において、前記第二の条件グループは、以下の(c)及び(d)の条件:
(c)前記ブーム(51)の角度が所定角度以上である;
(d)前記ブーム(51)の角度が所定の最大角度未満である;
のうちの少なくとも一つを含む。
 第八の観点では、前記第五乃至第七のいずれかの観点において、前記第三の条件グループは、以下の(e)乃至(h)の条件:
(e)クラッチ(13)の入力回転数と出力回転数とのブレーキオフ時での比が所定値以上である、又は、ブレーキオン時である;
(f)トランスミッション(112)に設定される速度段が所定の速度段である;
(g)トランスミッション(112)に設定される走行レンジが後進から前進に切り替わった;
(h)車速が所定の速度以上である;
のうちの少なくとも一つを含む。
 第九の観点では、前記第五の観点において、前記第一の条件グループは、(x)ブームレバー(126)が前記ブーム(51)を上昇させるべく操作された、という条件を含む。前記第二の条件グループは、(y)前記ブーム(51)の角度が所定角度以上である、という条件を含む。前記積込み作業検出部(211)は、前記(x)の条件と前記(y)の条件の両方を満たした場合に、積込み作業中であると検出する。
 第十の観点では、前記第五乃至第九の観点のうちのいずれかにおいて、前記油圧装置系(104)が、前記分配器(102)を介して駆動される1以上のポンプ(120、121)と、車体(2)の一側に回動可能に設けられるブーム(51)と、このブーム(51)の一側に回動可能に設けられるバケット(52)と、前記ブームを回動させるためのブームシリンダ(128)と、前記バケットを回動させるためのバケットシリンダ(129)と、ブームレバー(126)及びバケットレバー(125)の操作量に応じて、前記ブームシリンダ(128)及び前記バケットシリンダ(129)に前記第一のポンプ(120)から吐出される作動油を供給する第一の制御弁(123)と、この第一の制御弁(123)を介して前記ブームシリンダ(128)に作動油を供給可能な第二のポンプ(121)とを備える。前記第一のポンプ(120)及び前記第二のポンプ(121)は、前記一以上のポンプ(120、121)に含まれている。
 第十一の観点では、作業車両は、ブーム(51)を作動するシリンダ(128)と、前記シリンダ(128)に作動油を供給する第一のポンプ(120)と、トランスミッション(112)と、制御部(200)とを備える。制御部200は、下記の条件(A)及び(B):
(A)トランスミッション(112)に指定される速度段が所定の速度段である、及び/又は、検出された車速が所定の車速以下である;
(B)前記シリンダ(128)のボトム側の油圧が所定の値を超えている;
の両方が満たされており、下記(C)及び(D)の条件:
(C)ブームレバー(126)が前記ブーム(51)を上昇させるべく操作された;
(D)前記ブーム(51)の角度が所定角度以上である;
の少なくとも一つが満たされていない場合に、前記第一のポンプ(120)から供給される作動油の量を低減させる油量低減制御を実行する。「(C)及び(D)の条件のいずれの条件も満たされていない場合」に代えて、「前述した第一乃至第三の条件グループのうちの少なくとも2つの条件グループから1つずつ選択された少なくとも一つの条件が満たされていない場合」が採用されても良い。
 前述した各部は、各手段であっても良い。各部は、ハードウェア、コンピュータプログラム又はそれらの組み合わせ(例えば一部をコンピュータプログラムにより実現し残りをハードウェアで実現すること)により構築することができる。コンピュータプログラムは、所定のプロセッサに読み込まれて実行される。また、コンピュータプログラムがプロセッサに読み込まれて行われる情報処理の際、適宜に、メモリ等のハードウェア資源上に存在する記憶域が使用されてもよい。また、コンピュータプログラムは、CD-ROM等の記録媒体から計算機にインストールされてもよいし、通信ネットワークを介して計算機にダウンロードされてもよい。
本発明の第一の実施例に係る作業車両が適用されたホイールローダの全体構成を示す説明図である。 コントローラの機能を模式的に示す説明図である。 ホイールローダの側面図である。 積込み作業時の様子を示す説明図である。 ホイールローダの作業工程を示す説明図である。 積込み作業時のブームの姿勢を定義するための説明図である。 クラッチ指令圧を設定するためのテーブルである。 ポンプの吐出量を設定するためのテーブルである。 積込み作業を検出する処理のフローチャートである。 作業機に供給する作動油量を増加させる処理のフローチャートである。 第2実施例に係る積込み作業検出処理のフローチャートである。 第3実施例に係る積込み作業検出処理のフローチャートである。 第4実施例に係る積込み作業検出処理のフローチャートである。 第5実施例に係る積込み作業検出処理のフローチャートである。 第6実施例に係る積込み作業検出処理のフローチャートである。 第7実施例に係る積込み作業検出処理のフローチャートである。 第8実施例に係る積込み作業検出処理のフローチャートである。 第9実施例に係る積込み作業検出処理のフローチャートである。 リレーON/OFFの切替え制御のフローチャートである。
符号の説明
 1:ホイールローダ、5:作業機、11:掘削対象
 以下、図を参照しながら、本発明の幾つかの実施例を詳細に説明する。
 以下、本発明の実施例を、作業車両としてのホイールローダに適用した場合を例に挙げて説明する。但し、本実施例は、ホイールローダ以外の他の作業車両にも適用することができる。
 図1は、ホイールローダの全体構成を模式的に示す説明図である。ホイールローダは、機械構造100と制御構造(以下、コントローラと呼ぶ)200とに大別される。先に機械構造100について説明し、次にコントローラ200について説明する。
 機械構造100は、例えば、エンジン101と、エンジン101の出力を走行系103及び油圧装置系104に分配する出力分配器(PTO:Power Take Off)102と、ホイールローダ1を走行させるための走行系103と、主に作業機5を駆動するための油圧装置系104とを備えている。このような構成になっているため、例えば、油圧装置系104において、後述のブームシリンダ128に供給される作動油の量を低減すれば、エンジン101からの出力のより多くを走行系103に分配することができる。
 ここで、図3を参照する。図3は、ホイールローダ1の側面図である。ホイールローダ1は、車体2と、車体2の前後に設けられる左右一対のタイヤ3と、車体2の後方に設けられる機械室4と、車体2の前方に設けられる作業機5と、車体2の中央部に設けられる運転室6とを備えている。
 車体2は、後部車体21と、前部車体22と、後部車体21と前部車体22とを連結する連結部23とを備える。後部車体21と前部車体22との間には、左右一対のステアリングシリンダ130が設けられている。オペレータが、運転室6内のステアリングレバー127(図1参照)を操作すると、この操作に応じて、一方のステアリングシリンダ130のシリンダロッドが伸長し、他方のステアリングシリンダ130のシリンダロッドが縮小する。これにより、ホイールローダ1は、進路を変えることができる。
 機械室4は、エンジン101や各ポンプ120等を収容する。作業機5は、前部車体22から前方に延びるようにして回動可能に設けられるブーム51と、このブーム51の先端に回動可能に設けられるバケット52とを備える。ホイールローダ1には、ブーム51を上下方向に回動させるためのブームシリンダ128と、バケット52を回動させるためのバケットシリンダ129とが備えられている。
 図1に戻る。走行系103は、例えば、モジュレーションクラッチ(以下、「クラッチ」とも呼ぶ)110と、トルクコンバータ111と、トランスミッション112と、アクスル113とを備えている。クラッチ110の接続や切離しは、例えば、油圧によって制御される。具体的には、例えば、油圧が指定された制御信号で指定されている油圧で、クラッチ110が制御される。以下、モジュレーションクラッチ13に対する圧力を、「クラッチ圧」と言う。コントローラ200が、クラッチ圧を指定した制御信号を送信する。説明の便宜上、図中では、クラッチを「Mod/C」、トルクコンバータを「T/C」、トランスミッションを「T/M」とそれぞれ略記する。エンジン101から出力された動力(回転トルク)は、クラッチ110、トルクコンバータ111、トランスミッション112及びアクスル113を介して、タイヤ3に伝達される。
 油圧装置系104は、例えば、ローダポンプ120と、スイッチポンプ121と、ステアリングポンプ122と、メインバルブ123と、ロードセンシング(ステアリング)バルブ(図中、CLSS:Closed Center Load Sensing System)124と、バケットレバー125と、ブームレバー126と、ステアリングレバー127と、ブームシリンダ128と、バケットシリンダ129と、ステアリングシリンダ130と、補機用ポンプ131と、補機132とを備えて構成される。
 ここで、ローダポンプ120は「第一のポンプ」に、スイッチポンプ121は「第二のポンプ」に、メインバルブ123は「第一の制御弁」に、それぞれ対応する。なお、ロードセンシングバルブ124は、「第二の制御弁」と呼ぶこともできる。
 ローダポンプ120は、ブームシリンダ128及びバケットシリンダ129に作動油を供給するためのポンプである。ステアリングポンプ122は、ステアリングシリンダ130に作動油を供給するためのポンプである。スイッチポンプ121は、ステアリングシリンダ130、または、ブームシリンダ128及びバケットシリンダ129のいずれかに、作動油を供給するためのポンプである。各ポンプ120,121,122は、例えば、それぞれ斜板型油圧ポンプとして構成され、それぞれの斜板の角度は、コントローラ200からの制御信号により制御される。
 ロードセンシングバルブ124は、負荷に応じて、スイッチポンプ121から吐出される作動油の供給先及び供給量を機械的に制御する。ロードセンシングバルブ124は、ステアリングバルブと呼ぶこともできる。通常の走行時には、スイッチポンプ121から吐出される作動油は、ロードセンシングバルブ124を介して、ステアリングシリンダ130に供給される。即ち、走行時において、スイッチポンプ121は、ステアリングポンプ122を支援し、ステアリングシリンダ130の作動のために働く。なお、本実施例では、ロードセンシングバルブ(あるいはステアリングバルブ)124の一例として、CLSSバルブを採用しているが、本発明はCLSSバルブ以外の他のバルブを用いた構成にも適用することができる。
 これに対し、作業時には、スイッチポンプ121から吐出される作動油は、ロードセンシングバルブ124及びメインバルブ123を介して、ブームシリンダ128に供給されるようになっている。即ち、積込み作業時において、スイッチポンプ121は、ローダポンプ120を支援し、ブームシリンダ128を作動させるために働く。
 バケットレバー125は、バケット52を操作するための装置である。ブームレバー126は、ブーム51を操作するための装置である。ステアリングレバー127は、ステアリングシリンダ130を操作するための装置である。各レバー125,126,127は、例えば、オペレータにより操作される操作部と、操作部の操作量に応じてパイロット圧を制御するパイロット圧制御弁とを備えて構成される。メインバルブ123は、バケットレバー125またはブームレバー126から入力されるパイロット圧に応じて、ローダポンプ120(または、ローダポンプ120及びスイッチポンプ121の両方)から吐出される作動油を、ブームシリンダ128やバケットシリンダ129に供給する。
 補機132とは、例えば、油圧モータで駆動する冷却ファン等のような装置である。補機用ポンプ131は、補機132に作動油を供給するためのポンプである。
 機械構造100内の所定位置には、各種センサ140が設けられている。各種センサ140は、図2と共に後述するセンサ141~149及び151の総称である。各種センサ140により検出された各種状態は、電気信号としてコントローラ200に入力される。
 コントローラ200は、例えば、演算部(例えばCPU(Central Processing Unit))210と、メモリ220と、入出力インターフェース部230とを備えた電子回路として構成される。演算部210は、作業状態検出部215と、作動油量制御部212とを備える。
 作業状態検出部215は、ホイールローダ1の作業状態を検出する機能である。作動油量制御部212は、ブームシリンダ128に供給する作動油の量を制御する機能である。
 メモリ220は、例えば、プログラム221と、パラメータ222及びテーブル223を記憶する記憶媒体である。演算部210は、メモリ220からプログラム221を読み込み実行することにより、作業状態検出部215及び作動油量制御部212として機能する(つまり、ホイールローダ1の作業状態を検出したり、ブームシリンダ128に供給される作動油の量を制御したりすることができる)。パラメータ222とは、作業状態検出部215や作動油量制御部212によって使用される閾値や設定値である。テーブル223とは、作業状態検出部215や作動油量制御部212によって使用されるテーブルである。
 入出力インターフェース部230は、各種センサ140、クラッチ110、トランスミッション112、各ポンプ120~122,131等の間で電気信号を送受するための回路である。演算部210は、入出力インターフェース部230を介して、各種センサ140からの信号を受領する。また、演算部210は、入出力インターフェース部230を介して、クラッチ110や各ポンプ120~122,131に制御信号を出力する。なお、上述したコントローラ200の構成は、本発明の理解及び実施に必要な程度で構造を簡素化して示しており、本発明は、上述の構成に限定されない。
 図2は、コントローラ200の機能に着目した説明図である。コントローラ200には、オペレータに操作される斜板制御キャンセルスイッチ150と、各種センサ140を構成する、センサ141~149及び151とが接続される。
 斜板制御キャンセルスイッチ150は、斜板制御を実行とするか非実行とするかを切り替えるためのスイッチである。斜板制御キャンセルスイッチ150がONの場合、斜板制御が非実行となり(例えば、ブームシリンダ128に供給される作動油の量を増加(例えば最大値とし)、斜板制御キャンセルスイッチ150がOFFの場合、斜板制御が実行となる。
 走行レンジセンサ141は、トランスミッション112に設定される走行レンジが、前進(F)、ニュートラル(N)、後進(R)のいずれであるかを検出する。走行レンジセンサ141によって、トランスミッション112に設定される速度段を検出することもできる。走行レンジセンサ141は、センサとして構成される必要はない。コントローラ200内のトランスミッション制御回路からトランスミッション112に向けて出力される信号を利用すれば、走行レンジや速度段を知ることができる。
 ブームレバー操作量センサ142は、ブームレバー126の操作方向及び操作量を検出する。ブーム角度センサ143は、ブーム51の角度を検出する。エンジン回転数センサ144は、エンジン101の回転数を検出する。クラッチ出力回転数センサ145は、クラッチ110から出力される回転数を検出する。トランスミッション出力回転数センサ146は、トランスミッション112から出力される回転数を検出する。ブレーキペダル操作量センサ147は、運転室6内のブレーキペダルの操作量を検出する。アクセルペダル操作量センサ148は、運転室6内のアクセルペダルの操作量を検出する。車速計149は、例えば、車速検出部の一例であり、ホイールローダ1の車体速度(車速)を検出する。ブームボトム圧センサ151は、例えば、ブームシリンダ128のボトム側に備えられた圧力センサであり、ブームシリンダ128のボトム側の油圧(以下、「ブームボトム圧」と言う)を検出する。
 コントローラ200内の作業状態検出部215は、積込み作業検出部211と、掘削作業検出部213とを備える。
 積込み作業検出部211は、積込み作業中であるか否かを検出する機能である。積込み作業検出部211は、各センサ141~149からの信号を適宜利用することにより、積込み作業中であるか否かを判定する。
 掘削作業検出部213は、掘削作業中であるか否かを検出する機能である。掘削作業検出部213は、斜板制御キャンセルスイッチ150、走行レンジセンサ141及びブームボトム圧センサ151からの信号と、積込み作業中であるか否かの結果とに基づいて、掘削作業中であるか否かを判定する。
 作動油量制御部212は、積込み作業中であることが検出されると、ローダポンプ120の斜板の角度を大きくすることにより、または/及び、クラッチ110のクラッチ圧を低下させることにより、ブームシリンダ128に供給される作動油の量を増加させる。一方、作動油量制御部212は、掘削作業中であることが検出されると、ローダポンプ120の斜板の角度を小さくすることにより、ブームシリンダ128に供給される作動油の量を低減させる。
 作動油量制御部212は、例えば、斜板角度制御部212Aと、クラッチ圧制御部212Bとを備える。斜板角度制御部212Aは、ローダポンプ120の斜板の角度を制御するための制御信号を出力する。クラッチ圧制御部212Bは、クラッチ110のクラッチ圧を制御するための制御信号を出力する。以下、ローダポンプ120の斜板の角度を制御するための制御信号を、「斜板角度制御信号」と言い、クラッチ圧を制御するための制御信号を、「クラッチ圧制御信号」と言い、クラッチ圧制御信号で指定されているクラッチ圧を、「クラッチ指令圧」と言う。
 ローダポンプ120の斜板の角度は、例えば、リレー216のON/OFFによって制御される。具体的には、例えば、リレー216がOFFからONに切り替えられた場合、ローダポンプ120の斜板の角度が小さくなり、以って、ローダポンプ120からブームシリンダ128へ供給される作動油の量が低減される(例えば、作動油の供給量は、その最大量未満となる)。一方、リレー216がONからOFFに切り替えられた場合、ローダポンプ120の斜板の角度が大きくなり、以って、ローダポンプ120からブームシリンダ128へ供給される作動油の量が増加される(例えば、供給される作動油の量が最大量となされる)。
 斜板角度制御部212Aは、積込み作業が検出された時に、ローダポンプ120から吐出される作動油の流量を増加させるべく、リレー216をOFFとする。また、斜板角度制御部212Aは、掘削作業が検出された時に、ローダポンプ120から吐出される作動油の流量を低減させるべく、リレー216をONとする。なお、ローダポンプ120の斜板の角度は、リレー216のON/OFF以外の方法で制御されても良い。また、例えば、斜板角度制御部212Aとは異なる他の斜板角度制御部から他の斜板角度制御信号が出力されている場合、斜板角度制御部212Aからの斜板角度制御信号と上記他の斜板角度制御信号とのうち、いずれか大きい方の値を表す斜板角度制御信号が選択されてローダポンプ120に入力されてもよい。
 クラッチ圧制御部212Bは、積込み作業が検出された時に、エンジン101の出力を作業機5側に多く配分させるべく、クラッチ圧を低下させるクラッチ圧制御信号を出力する。なお、クラッチ圧制御部212Bとは異なる他のクラッチ圧制御部から他のクラッチ圧制御信号が出力されている場合、クラッチ圧制御部212Bからのクラッチ圧制御信号と上記他のクラッチ圧制御信号とのうち、いずれか小さい方の値を表すクラッチ圧制御信号が選択されてクラッチ110に入力されてもよい。例えば、特殊なブレーキ(このような特殊ブレーキは、左ブレーキとも呼ばれる。)を搭載する作業車両の場合、特殊なブレーキによるクラッチ指令圧が、上記他のクラッチ圧制御信号の1つに該当する。
 図4は、積込み作業の様子を示す説明図である。オペレータは、ブーム51をダンプトラック10の荷台の上方まで持ち上げて、バケット52をダンプ方向に回動させることにより、バケット52内の積載物をダンプトラック10の荷台に落下させる。
 図5は、ホイールローダ1の作業の流れを模式的に示す説明図である。ホイールローダ1は、土砂等の掘削対象11を掘削して、ダンプトラック10のような運搬部に積み込むという定形化された作業を繰り返す。
 第1作業工程P1では、オペレータは、バケット52を地面に近い位置まで下げた状態で、ホイールローダ1を掘削対象11に向けて走行させる。オペレータは、バケット52を掘削対象11に突入させた後、バケット52をチルト方向に回動させて、バケット52に積載物を収容する。つまり、この第1作業工程P1で、掘削作業が行われる。
 第2作業工程P2では、オペレータは、積載物を収容したバケット52を地面から所定量だけ持ち上げて、ホイールローダ1を走行姿勢にし、後進する。
 第3作業工程P3では、オペレータは、ブーム51を上昇させながら、ダンプトラック10に接近し、図4に示すように、バケット52内の積載物をダンプトラック10の荷台に投下する。つまり、この第3作業工程P3で、積込み作業が行われる。
 第4作業工程P4では、オペレータは、ブーム51を下降させつつホイールローダ1を後進させる。その後、再び第1作業工程P1に移行する。
 図6は、積込み作業が開始された初期状態におけるブーム51の角度を模式的に示す説明図である。ブーム51の回動支点を通り、地面(水平面)Hに対して平行となる場合を基準線A1-A1とし、ブーム51の回動支点とバケット52の回動支点とを結ぶ線をA2-A2とする。A1-A1とA2-A2のなす角をブーム角度θbとする。ブーム51が基準線A1-A1よりも下側にθ1だけ回動した状態を、マイナス、上側に回動した状態をプラスとして、この実施例では、積込み開始の初期状態として検出する。θ1の値は、例えば、-10度である。しかし、この値は一例であって、本発明を限定するものではない。
 ブーム51の回動支点とバケット52の回動支点とを結ぶ線A2-A2が、基準線A1-A1からθ1だけ反時計回りに回動した位置よりも上側に位置する場合に、積込み作業の開始であると判定することができる。このようにして、本実施例では、走行時におけるブーム51の角度以上の、ブーム51の上昇を検出する。
 なお、図6に示す定義は一例であって、本発明はこれに限定されない。例えば、後述の図17に示すように、SAE(Society of Automotive Engineers)規格で定義されている「Carry Position」を用いることもできる。
 図7は、クラッチ指令圧を制御するために使用されるテーブルT1を示す。図7及び図8に示すテーブルT1,T2は、図1に示すテーブル223の一例である。図7中の横軸はブームレバー126の操作量(%)を示し、図7中の縦軸はクラッチ指令圧(kg/cm^2)を示す。ブームレバー操作量は、ブーム51を上昇させる場合のレバー操作量である。図中の太い実線はアクセルペダルの操作量が0%の場合を示し、図中の一点鎖線はアクセルペダルの操作量が100%の場合を示す。アクセルペダルの操作量が0%よりも多く、100%よりも少ない範囲内では、実線で示す0%の特性と一点鎖線で示す100%の特性から補間して求められる値を使用する。
 ブームレバー操作量が0~50%の範囲では、クラッチ指令圧を高くして、エンジン101の出力を走行系により多く分配する。ブームレバー操作量が50%を超えた場合、ブームレバー操作量に応じてクラッチ指令圧を低下させる。アクセルペダルの操作量が多くなるほど、クラッチ指令圧が低下する割合が大きくなるように設定されている。即ち、本実施例では、アクセルペダルの操作量が大きくなるほど、クラッチ110を滑らせて、エンジン101の出力を作業機5側により多く配分させる。左ブレーキでのクラッチ操作時は、左ブレーキによるクラッチ圧指令値とテーブルT1から求められる指令値とを比較し、いずれか低い方の指令値を採用する。
 図8は、ローダポンプ120の斜板の角度を制御するために使用されるテーブルT2を示す。図8中の横軸はブームレバー操作量(%)を、図8中の縦軸は目標流量(%)を、それぞれ示す。ブームレバー操作量は、ブーム51を上昇させる場合の操作量である。目標流量は、最大流量に対する割合で示されている。ブームレバー操作量が大きくなるほど、ローダポンプ120に要求される流量が大きくなるように設定されている。
 図9は、積込み作業中であるか否かを検出するための処理を示すフローチャートである。以下の各フローチャートは、本発明の理解及び実施に必要な程度で処理の概要を示す。積込み作業検出部211は、以下の各条件が全て満たされた場合に、積込み作業(図5中の工程P3)が開始されたと判定する。
 第1条件として、積込み作業検出部211は、ブームレバー126が上昇方向に操作されたか否かを判定する(S10)。上昇方向の操作とは、ブーム51を上昇させるための操作を意味する。積込み作業では、ブーム51を持ち上げる必要があるため、ブームレバー126が上昇方向に操作されたか否かが判定される。
 第2条件として、積込み作業検出部211は、ブーム角度θbが予め設定される所定角度θ1よりも大きいか否かを判定する(S11)。θ1は、例えば、-10度に設定される。積込み作業では、ブーム51を上昇させながらダンプトラック10に近づいていくため、ブーム51の角度θbが走行開始時の角度よりも大きくなったか否かを判定する。
 第3条件として、積込み作業検出部211は、ブーム角度θbが予め設定される上限角度θmaxよりも小さいか否かを判定する(S12)。ブーム51が既に上限まで上昇している場合、今以上の作動油を必要としないため、ブーム角度θbが上限値θmaxよりも小さいことを確認する。
 第4条件として、積込み作業検出部211は、ブレーキオフ時の速度比がR1よりも大きいか、または、ブレーキがオン状態であるかの、いずれかの場合であるかを判定する(S13)。ブレーキオフ時とは、ブレーキペダルが操作されていない場合を意味する。速度比とは、トルクコンバータ111の出力回転数をトルクコンバータ111の入力回転数で除算した値である。クラッチ110の入力回転数とクラッチ110の出力回転数との比であってもよい。ブレーキがオン状態とは、ブレーキペダルが操作されてブレーキが効いている状態である。
 ブレーキオフ時の速度比がR1(R1は、一例として0.3に設定される)よりも小さい場合(速度比<R1)は、ホイールローダ1が加速中の場合、または、図5に示す掘削作業中(工程P1)の場合のいずれかである。この場合、作業機に分配する油量は少なくて良い。
 積込み作業検出部211は、上記4条件が全て満たされた場合に、積込み作業中であると判定する(S14)。このとき、積込み作業検出部211は、積込み作業中であることを意味するパラメータ222をメモリ220に書き込む。例えば、積込み作業検出部211は、メモリ220に記憶されている積込み作業フラグの値を、積込み作業中であることを意味する値(例えば“1”)にする。積込み作業フラグとは、積込み作業中か否かを表すフラグである。
 図10は、作動油量を増加させるための処理を示すフローチャートである。積込み作業検出部211によって積込み作業中であると判定されると(S20:YES)、作動油量制御部212が、以下に述べる複数の油量増加処理を実行する。
 第1の油量増加処理では、作動油量制御部212のクラッチ指令圧制御部212Bは、図7に示すテーブルT1を用い、ブームレバー操作量及びアクセルペダル操作量に応じて、クラッチ110へのクラッチ指令圧を決定する(S21)。ここで決定されるクラッチ指令圧は、現在のクラッチ圧よりも低い値、例えば、クラッチ110を切り離すための値である。クラッチ指令圧制御部212Bは、クラッチ110に、決定したクラッチ指令圧を示すクラッチ圧制御信号を出力する(S21)。クラッチ指令圧を低下させることにより、油圧装置系へ分配されるエンジン動力が増加する。それにより、ブームシリンダ128に供給される油量を増加させることができる。
 第2の油量増加処理では、作動油量制御部212の斜板角度制御部212Aは、リレー216をターンオフする。或いは、斜板角度制御部212Aは、図8に示すテーブルT2を用いて、ブームレバー操作量に応じた目標流量を検出し、検出された目標流量を実現するための斜板角度を設定し、ローダポンプ120に斜板角度制御信号を出力する(S22)。これにより、ブームシリンダ128に供給される油量を増加させることができる。
 第3の油量増加処理では、斜板角度制御部212Aは、スイッチポンプ121からの吐出量が増大するように、斜板角度を設定し、スイッチポンプ121に制御信号を出力する(S23)。斜板角度制御部212Aは、例えば、「スイッチポンプ121の斜板角度(%)=ロードセンシングバルブ124により決定される斜板角度(%)+ブームレバー操作量に応じた加算分(%)」という算出式に基づいて、スイッチポンプ121の斜板角度を設定できる。
 ロードセンシングバルブによる斜板角度とは、ステアリングシリンダ130の操作のために必要と判断された流量に対応する斜板角度である。ブームレバー操作量に応じた加算分とは、ローダポンプ120を支援するために必要と判断された流量に対応する斜板角度である。上述の算出式の右辺の合計が100%を超えた場合、スイッチポンプ121の斜板角度は100%に制限される。
 第4の油量増加処理では、斜板角度制御部212Aは、補機用ポンプ131から吐出される作動油の流量が低下するように、補機用ポンプ131の斜板角度を設定し、補機用ポンプ131に制御信号を出力する(S24)。もしも、補機用ポンプ131がポンプ用クラッチを介して出力分配器102に接続されている場合、斜板角度制御部212Aは、斜板角度の制御に代えて、ポンプ用クラッチの係合を解除させることができる。これにより補機用ポンプ131に分配されていた出力がローダポンプ120に分配される。
 このように、第1~第4の油量増加処理を実施することにより、積込み作業中に、ブームシリンダ128により多量の作動油を供給することができ、ブーム51の上昇速度を高めることができる。
 本実施例では、第1~第4の油量増加処理をそれぞれ実行する場合を述べたが、本発明はこれに限らない。例えば、作動油量制御部212は、第1の油量増加処理(S21)または第2の油量増加処理(S22)のいずれかのみを実行する構成でもよい。作動油量制御部212は、第1、第2、第3の油量増加処理(S21,S22,S23)を実行してもよいし、第1と第2の油量増加処理(S21,S22)だけを実行してもよいし、第1と第3の油量増加処理(S21,S23)あるいは第2と第3の油量増加処理(S22,S23)だけを実行してもよい。
 図19は、リレーON/OFFの切替え制御のフローチャートを示す。
 コントローラ200の掘削作業検出部213が、判断Aを行う(S101)。判断Aは、斜板制御キャンセルスイッチ150がONか否かという判断である。判断Aの結果が肯定的である場合(S101:YES)、斜板角度制御部212Aが、リレー216をOFFとすることで、ブームシリンダ128に供給される油量を増加させる(S110)。
 判断Aの結果が否定的である場合(S101:NO)、掘削作業検出部213が、判断Bを行う(S102)。判断Bは、リレー216がONになっているか否か(例えば、リレー216をONにするための電気信号が出力されているか否か)という判断である。
 判断Bの結果が否定的である場合(S102:NO)、掘削作業検出部213が、第一の掘削作業条件が満たされているか否かの判断を実行する。具体的には、掘削作業検出部213が、判断Cを行い(S103)、判断Cの結果が肯定的である場合に(S103:YES)、判断Dを行う(S104)。判断Cは、トランスミッション112に設定される速度段が所定の速度段(例えば前進1速)であるか否かという判断である。判断Dは、ブームボトム圧が第一の所定値を超えているか否かという判断である。
 判断Cの結果と判断Dの結果がいずれも肯定的である場合(S103:YES、及び、S104:YES)、掘削作業検出部213が、判断Eを行う(S105)。判断Eは、積込み作業中か否かという判断である。判断Eでは、例えば、メモリ220に記憶されている積込み作業フラグが所定値(例えば“1”)であれば、積込み作業中と判断され、そうでなければ、積込み作業中ではないと判断される。
 判断Cの結果と判断Dの結果がいずれも肯定的であり、且つ、判断Eの結果が否定的である場合に(S105:NO)、掘削作業検出部213は、掘削作業中と判定する。この場合、斜板角度制御部212Aが、リレー216をOFFからONに切り替えることで(S106)、ブームシリンダ128に供給される作動油の量を低減する。
 一方、判断Cの結果と判断Dの結果がいずれも肯定的であり、且つ、判断Eの結果も肯定的である場合には(S105:YES)、掘削作業検出部213は、掘削作業中ではないと判定する。この場合、S106が行われず、S101が再度実行される。
 さて、判断Bの結果が肯定的である場合(S102:YES)、掘削作業検出部213が、前述した複数の第一の掘削作業条件と、積込み作業中ではないことである第二の掘削作業条件とのうち、一つでも満たされていない条件があれば、掘削作業中ではなくなったと判断する。具体的には、掘削作業検出部213は、判断Fを行う(S107)。判断Fは、判断Cと同じ判断、すなわち、トランスミッション112に設定される速度段が所定の速度段(例えば前進1速)であるか否かという判断である。判断Fの結果が肯定的であれば(S107:YES)、掘削作業検出部213は、判断Gを行う(S108)。判断Gは、ブームボトム圧が第二の所定値未満か否かという判断である。判断Gの結果が否定的であれば(S108:NO)、掘削作業検出部213は、判断Hを行う(S109)。判断Hは、判断Eと同じ判断、すなわち、積込み作業中か否かという判断である。判断Hの結果が否定的であれば(S109:NO)、S110が行われず、S101が再度実行される。しかし、判断Fの結果が否定的である(S107:NO)、判断Gの結果が肯定的である(S108:YES)、又は、判断Hの結果が肯定的である(S109:YES)ならば、斜板角度制御部212Aが、リレー216をOFFにすることで(S110)、ブームシリンダ128に供給される作動油の量を増加する。
 以上が、リレーON/OFFの切替え制御の流れである。
 なお、S104における第一の所定値と、S108における第二の所定値は同じ値であっても良いし異なる値であっても良い。例えば、第二の所定値は、第一の所定値(例えば200[kg/cm^2])から所定のヒステリシス値(例えば50[kg/cm^2])を差し引いた値(例えば150[kg/cm^2])であっても良い(つまり、第二の所定値<第一の所定値であっても良い)。
 また、例えば、S103、S104及びS105は、前述した順番に限らず、どのような順番で行われても良い(例えばS105の後にS103又はS104が行われても良い)。同様に、S107、S108及びS109も、どのような順番で行われても良い。
 また、例えば、S103及び/又はS107では、トランスミッション112に設定される速度段が所定の速度段(例えば前進1速)であるか否かの第一の判断に代えて又は加えて、車速計149によって検出された車速が所定の車速未満か否かの第二の判断が行われても良い。第一の判断の結果が肯定的であることに代えて又は加えて第二の判断の結果が肯定的である場合に、S103及び/又はS107の判断の結果が肯定的となる。
 本実施例は上述のように構成されるため、例えば、以下の効果を奏する。
 本実施例では、大まかに掘削作業条件が満たされており(具体的には、第一の掘削作業条件が満たされており)、積込み作業中が検出されていないときは(具体的には、第二の掘削作業条件が満たされていないときは)、ブームシリンダ128に供給される作動油の量を低減する処理が実行される。これにより、掘削作業時に、ブームシリンダ128に無駄に多くの作動油が供給されてしまわないようにすることができる。
 一方、本実施例では、大まかに掘削作業条件が満たされていても(具体的には、第一の掘削作業条件が満たされていても)、積込み作業中が検出されているときは(具体的には、第二の掘削作業条件が満たされていないときは)、ブームシリンダ128に供給される作動油の量を低減する処理が非実行とされる。これにより、ブームシリンダ128に供給される作動油の量が積込み作業中に低減されてしまわないようにすることができる。
 本実施例では、ブームレバー操作量やブーム角度等の所定のパラメータの変化に基づいて、積込み作業の状態を自動的に検出することができる。従って、積込み作業に対応する制御を行うことができ、ホイールローダ1の性能が向上する。
 本実施例では、積込み作業時に、ブームシリンダ128に供給する作動油の流量を増加させる。従って、ブーム51の上昇速度を高めて、積込み作業に要する時間を短縮することができ、作業効率を改善することができる。また、積込み作業の開始時に自動的にブームシリンダ128への作動油の流量を増加させるため、オペレータは、ブレーキペダルを操作する等のような余計な操作を行う必要がなく、積込み作業時の操作性が向上する。
 本実施例では、積込み作業中であることを積極的に検出するための条件(S10,S11)と、誤検出を防止するための条件(S12,S13)との全てを満たした場合に、積込み作業の開始であると判定する。従って、より高い信頼性で積込み作業の開始を判定することができる。
 本実施例では、積込み作業中であることが検出されると、第1~第4の油量増加処理(S21~S24)を実行する。従って、より多くの作動油をブームシリンダ128に供給して、ブーム51を速やかに上昇させることができる。
 以下、積込み作業を検出する処理の変形例を説明する。すなわち積込み作業検出部211の変形例である。以下の各実施例は、前記第1実施例の変形例に該当する。
 図11に示すように、第2実施例では、積込み作業検出部211は、ブームレバー126が上昇方向に操作されたか否か(S10)と、ブーム角度θbが所定値θ1よりも大きいか否か(S11)をそれぞれ判定し、両方の条件が成立した場合に積込み作業中であると判定する(S14)。
 このように構成される本実施例も前記第1実施例と同様の効果を奏する。本実施例では、積込み作業を検出する処理が第1実施例よりも簡略化されているため、第1実施例に比べて制御プログラムを簡素化することができる。
 図12に示すように、第3実施例では、積込み作業検出部211は、第1実施例で述べた第1条件(S10)及び第4条件(S13)をそれぞれ判定し、両条件が成立した場合に、積込み作業中であると判定する(S14)。このように構成される本実施例も前記第2実施例と同様の効果を奏する。
 図13に示すように、第4実施例では、積込み作業検出部211は、ブーム角度θbが所定値θ1よりも大きいか否か(S11)と、速度段が前進2速に設定されているか否か(S15)をそれぞれ判定し、両方の条件が成立した場合に積込み作業中であると判定する(S14)。積込み作業時には、バケット52に積載物を収容した状態でダンプトラック10に近づくため、トランスミッション112は前進2速に設定されることが多い。
 しかし、本発明は前進2速に限定されない。即ち、S15では、予め設定されている所定の速度段であるか否かを判定する。本実施例では、所定の速度段の一例として、2速を挙げる。このように構成される本実施例も前記第2実施例と同様の効果を奏する。
 図14に示すように、第5実施例では、積込み作業検出部211は、ブーム角度θbが所定値θ1よりも大きいか否か(S11)と、走行レンジが後進から前進に切り替わったか否か(S16)を判定し、両方の条件が成立した場合に積込み作業中であると判定する(S14)。
 図5に示すように、作業工程P2から作業工程P3に移行する場合は、後進から前進に走行レンジが切り替わるため、走行レンジの変化を積込み作業開始を検出するための情報の一つとして利用することができる。このように構成される本実施例も前記第2実施例と同様の効果を奏する。
 図15に示すように、第6実施例では、積込み作業検出部211は、ブーム角度θbが所定値θ1よりも大きいか否か(S11)と、ブーム51の角速度が0よりも大きいか否か(S17)をそれぞれ判定し、両方の条件が成立した場合に積込み作業中であると判定する(S14)。
 積込み作業時には、ダンプトラック10に向けて走行しながら、同時にブーム51を持ち上げていく。ブーム51は、ブームシリンダ128のシリンダロッドが伸長することにより、上方に回動する。ブームシリンダ128のシリンダロッドの伸長に応じて、ブームシリンダ128は、その基端側の回動支点を中心に時計回りに回動する。従って、ブーム角度センサ143からの検出信号に基づいて、ブーム51の角速度を求めることにより、ブーム51が上昇中であるか否かを判別できる。
 このように構成される本実施例も前記第2実施例と同様の効果を奏する。なお、ブーム51の角速度は、ブームシリンダ128の角速度として検出することもできる。また、角速度に代えて、ブームシリンダ128のシリンダロッドの伸長速度が0以上であるか否かを判定する構成でもよい。シリンダロッドの伸長速度は、ブームシリンダ128の角速度から算出してもよいし、シリンダロッドの変位量を直接検出するリニアセンサを用いてシリンダロッドの伸長速度を算出してもよい。
 図16に示すように、第7実施例では、積込み作業検出部211は、走行レンジが後進から前進に切り替わったか否か(S16)と、ブーム51の角速度が0以上であるか否か(S17)とをそれぞれ判定し、両方の条件が成立した場合に、積込み作業中であると判定する(S14)。このように構成される本実施例も前記第2実施例と同様の効果を奏する。
 図17に示すように、第8実施例では、図9中のS11に代えて、積込み作業検出部211は、ブーム角度θbが、「Carry Position」になったか否かを判定する(S11A)。「Carry Position」はSAE規格やISO規格でも定義されているため、S11Aは、「SAEまたはISO規格に定める「Carry Position」になったか否かを判定する」と言い換えてもよい。このように構成される本実施例も前記第2実施例と同様の効果を奏する。
 図18に示すように、第9実施例では、図13中のS15に代えて、積込み作業検出部211は、車速Vが、予め設定されている所定速度V1を上回っているか否かを判定する(S18)。ブーム角度θbがθ1を上回り(S11:YES)、かつ、車速VがV1を上回っている場合は、積込み作業中であると判定することができる。
 以上、本発明の幾つかの実施例を説明したが、これらの実施例は本発明の説明のための例示にすぎず、本発明の範囲をこれらの実施例にのみ限定する趣旨ではない。本発明は、その要旨を逸脱することなく、その他の様々な態様でも実施することができる。
 例えば、実施例では、積込み作業中であることを検出するための情報として、ブームレバーが上昇方向に操作されたか、ブーム角度が所定値以上か、ブーム角度が「Carry Position」になったか、ブーム角度が上限角度未満であるか、ブレーキオフ時の速度比が所定値以上であるか、所定の速度段か、走行レンジが後進から前進に切り替わったか、ブームの角速度(ブームシリンダ角速度)が所定値以上か、を例示的に列挙した。そして、実施例では、例示列挙された情報(パラメータ)を好適に結合させる例を複数説明した。本発明は、実施例として明示された結合に限られず、他の結合も本発明の範囲に含まれる。

Claims (12)

  1.  作業機(51)を作動するシリンダ(128)と、
     前記シリンダ(128)に作動油を供給する第一のポンプ(120)と、
     積込み作業中か否かを検出する積込み作業検出手段(211)と、
     一又は複数の第一の掘削作業条件が満たされており、且つ、積込み作業中が検出されていないという第二の掘削作業条件も満たされている場合に、前記第一のポンプ(120)から供給される作動油の量を低減させる油量低減制御を実行する制御部(212、213)と
    を備える作業車両。
  2.  前記複数の第一の掘削作業条件は、以下の(A)及び(B):
    (A)トランスミッション(112)に指定される速度段が所定の速度段である、及び/又は、検出された車速が所定の車速以下である;
    (B)前記シリンダ(128)のボトム側の油圧が所定の値を超えている;
    である、
    請求項1記載の作業車両。
  3.  前記制御部(212、213)は、積込み作業中が検出された場合に、前記シリンダ(128)に供給される作動油の量を積込み作業中が検出されていない場合に比べて増加させる油量増加制御を実行する、
    請求項1又は2に記載の作業車両。
  4.  エンジン(101)と、
     走行系(103)と、
     油圧装置系(104)と、
     前記エンジン(101)からの出力を前記走行系(103)と前記油圧装置系(104)とにそれぞれ分配する分配器(102)と
    を備え、
     前記走行系(103)が、前記分配器(102)に接続されたクラッチ(110)を備え、
     前記油圧装置系(104)が、前記シリンダ(128)と、前記分配器(102)を介して駆動される一以上のポンプとを備え、
     前記一以上のポンプには、前記第一のポンプ(120)が含まれており、
     前記制御部(212、213)は、前記油量増加制御として、以下の(1)乃至(3)の制御:
    (1)前記クラッチ(110)のクラッチ圧を低下させる;
    (2)前記第一のポンプ(120)から供給される作動油の流量を増加させる;
    (3)前記第一のポンプ(120)から供給される作動油に加えて、前記一以上のポンプに含まれる第二のポンプ(121)からも前記シリンダ(118)に作動油を供給させる;
    のうちの少なくとも一つを実行する、
    請求項3記載の作業車両。
  5.  第一乃至第三の条件グループのうちの少なくとも2つの条件グループがあり、各条件グループは、積込み作業中であることの少なくとも一つの条件を含み、
     前記第一の条件グループは、オペレータの意思の表れに関する条件のグループであり、
     前記第二の条件グループは、前記作業機の位置に関する条件のグループであり、
     前記第三の条件グループは、前記走行系の状態に関する条件のグループであり、
     前記積込み作業検出部(211)は、前記第一乃至第三の条件グループのうちの少なくとも2つの条件グループから1つずつ選択された各条件が満たされている場合に、積込み作業中であると検出する、
    請求項1乃至4のいずれか1項に記載の作業車両。
  6.  前記作業機(50)は、車体の一側に回動可能に設けられるブーム(51)であり、
     前記シリンダ(128)は、前記ブーム(51)を回動させるためのブームシリンダ(128)であり、
     前記第一の条件グループは、以下の(a)及び(b)の条件:
    (a)ブームレバー(126)が前記ブーム(51)を上昇させるべく操作された;
    (b)前記ブームシリンダ(128)の伸長速度が正の値である;
    のうちの少なくとも一つを含む、
    請求項5に記載の作業車両。
  7.  前記第二の条件グループは、以下の(c)及び(d)の条件:
    (c)前記ブーム(51)の角度が所定角度以上である;
    (d)前記ブーム(51)の角度が所定の最大角度未満である;
    のうちの少なくとも一つを含む、
    請求項5又は6に記載の作業車両。
  8.  前記第三の条件グループは、以下の(e)乃至(h)の条件:
    (e)クラッチ(13)の入力回転数と出力回転数とのブレーキオフ時での比が所定値以上である、又は、ブレーキオン時である;
    (f)トランスミッション(112)に設定される速度段が所定の速度段である;
    (g)トランスミッション(112)に設定される走行レンジが後進から前進に切り替わった;
    (h)車速が所定の速度以上である;
    のうちの少なくとも一つを含む、
    請求項5乃至7のうちのいずれか1項に記載の作業車両。
  9.  前記第一の条件グループは、(x)ブームレバー(126)が前記ブーム(51)を上昇させるべく操作された、という条件を含み、
     前記第二の条件グループは、(y)前記ブーム(51)の角度が所定角度以上である、という条件を含み、
     前記積込み作業検出部(211)は、前記(x)の条件と前記(y)の条件の両方を満たした場合に、積込み作業中であると検出する、
    請求項5記載の作業車両。
  10.  積込み作業中か否かを検出する積込み作業検出部(211)と、
     一又は複数の第一の掘削作業条件が満たされており、且つ、積込み作業中が検出されていないという第二の掘削作業条件も満たされている場合に、作業機(51)を作動するシリンダ(128)にポンプ(120)から供給される作動油の量を低減させる油量低減制御を実行する制御部(212、213)と
    を備える、作業車両の制御装置。
  11.  作業車両(1)の作動油量の供給を制御する方法において、
     一又は複数の第一の掘削作業条件が満たされており、且つ、積込み作業中が検出されていないという第二の掘削作業条件も満たされているか否かを判断し、
     その判断の結果が肯定的の場合に、作業機(51)を作動するシリンダ(128)にポンプ(120)から供給される作動油の量を低減させる油量低減制御を実行する
    作業車両の作動油量制御方法。
  12.  ブーム(51)を作動するシリンダ(128)と、
     前記シリンダ(128)に作動油を供給する第一のポンプ(120)と、
     トランスミッション(112)と、
     以下の条件(A)及び(B):
    (A)トランスミッション(112)に指定される速度段が所定の速度段である、及び/又は、検出された車速が所定の車速以下である;
    (B)前記シリンダ(128)のボトム側の油圧が所定の値を超えている;
    の両方が満たされており、以下の条件(C)及び(D)
    (C)ブームレバー(126)が前記ブーム(51)を上昇させるべく操作された;
    (D)前記ブーム(51)の角度が所定角度以上である;
    の少なくとも一つが満たされていない場合に、前記第一のポンプ(120)から供給される作動油の量を低減させる油量低減制御を実行する制御部(200)と
    を備える作業車両。
PCT/JP2009/001088 2008-03-21 2009-03-11 作業車両、作業車両の制御装置、及び作業車両の作動油量制御方法 WO2009116249A1 (ja)

Priority Applications (4)

Application Number Priority Date Filing Date Title
EP09722094.1A EP2267230B1 (en) 2008-03-21 2009-03-11 Working vehicle, control device for working vehicle, and operating-oil amount control method for working vehicle
CN2009801185708A CN102037194B (zh) 2008-03-21 2009-03-11 作业车辆、作业车辆的控制装置以及作业车辆的液压油量控制方法
US12/736,159 US8725358B2 (en) 2008-03-21 2009-03-11 Working vehicle, control device for working vehicle, and hydraulic oil amount control method for working vehicle
JP2010503763A JP5591104B2 (ja) 2008-03-21 2009-03-11 作業車両、作業車両の制御装置、及び作業車両の作動油量制御方法

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2008072975 2008-03-21
JP2008-072975 2008-03-21

Publications (1)

Publication Number Publication Date
WO2009116249A1 true WO2009116249A1 (ja) 2009-09-24

Family

ID=41090664

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2009/001088 WO2009116249A1 (ja) 2008-03-21 2009-03-11 作業車両、作業車両の制御装置、及び作業車両の作動油量制御方法

Country Status (5)

Country Link
US (1) US8725358B2 (ja)
EP (1) EP2267230B1 (ja)
JP (1) JP5591104B2 (ja)
CN (1) CN102037194B (ja)
WO (1) WO2009116249A1 (ja)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102330447A (zh) * 2011-03-17 2012-01-25 陈海波 一种装载机专用大负载装载功率分配控制系统
WO2013021692A1 (ja) * 2011-08-08 2013-02-14 株式会社小松製作所 バックホーローダ
JP2015036495A (ja) * 2013-08-13 2015-02-23 日立建機株式会社 作業車両
JP2015158099A (ja) * 2014-02-25 2015-09-03 株式会社Kcm 産業用車両
EP2568148A4 (en) * 2010-05-07 2016-12-28 Komatsu Mfg Co Ltd UTILITY VEHICLE AND METHOD FOR CONTROLLING A UILITAR VEHICLE
WO2018199069A1 (ja) * 2017-04-28 2018-11-01 株式会社小松製作所 作業機械および作業機械の制御方法

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5562893B2 (ja) * 2011-03-31 2014-07-30 住友建機株式会社 ショベル
CN103781969B (zh) 2011-04-29 2016-08-31 哈尼施费格尔技术公司 控制工业机械的挖掘操作
WO2014078764A1 (en) * 2012-11-19 2014-05-22 Allison Transmission, Inc. Adjustable control of power take-off subsystem damping and system thereof
JP6419721B2 (ja) 2013-12-03 2018-11-07 株式会社小松製作所 作業車両
JP6986832B2 (ja) 2016-08-26 2021-12-22 株式会社小松製作所 ホイールローダおよびホイールローダの制御方法
JP2018077810A (ja) * 2016-11-11 2018-05-17 富士通株式会社 積載判定プログラム、積載判定方法及び積載判定装置

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2843002B2 (ja) * 1995-04-28 1999-01-06 住友建機株式会社 油圧ショベルのブーム上げ優先油圧回路
JP2004251441A (ja) * 2002-10-23 2004-09-09 Komatsu Ltd 作業車両の作業機用油圧ポンプの制御方法と制御装置
WO2007043290A1 (ja) * 2005-10-14 2007-04-19 Komatsu Ltd. 作業車両のエンジンおよび油圧ポンプの制御装置および方法

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2250611B (en) * 1990-11-24 1995-05-17 Samsung Heavy Ind System for automatically controlling quantity of hydraulic fluid of an excavator
US6073442A (en) * 1998-04-23 2000-06-13 Caterpillar Inc. Apparatus and method for controlling a variable displacement pump
JP2001152921A (ja) 1999-11-19 2001-06-05 Komatsu Ltd 積込作業車両

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2843002B2 (ja) * 1995-04-28 1999-01-06 住友建機株式会社 油圧ショベルのブーム上げ優先油圧回路
JP2004251441A (ja) * 2002-10-23 2004-09-09 Komatsu Ltd 作業車両の作業機用油圧ポンプの制御方法と制御装置
WO2007043290A1 (ja) * 2005-10-14 2007-04-19 Komatsu Ltd. 作業車両のエンジンおよび油圧ポンプの制御装置および方法

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2568148A4 (en) * 2010-05-07 2016-12-28 Komatsu Mfg Co Ltd UTILITY VEHICLE AND METHOD FOR CONTROLLING A UILITAR VEHICLE
CN102330447A (zh) * 2011-03-17 2012-01-25 陈海波 一种装载机专用大负载装载功率分配控制系统
WO2013021692A1 (ja) * 2011-08-08 2013-02-14 株式会社小松製作所 バックホーローダ
JP2013036220A (ja) * 2011-08-08 2013-02-21 Komatsu Ltd バックホーローダ
US8483917B2 (en) 2011-08-08 2013-07-09 Komatsu Ltd. Backhoe loader
GB2496763B (en) * 2011-08-08 2013-10-23 Komatsu Mfg Co Ltd Backhoe Loader
JP2015036495A (ja) * 2013-08-13 2015-02-23 日立建機株式会社 作業車両
JP2015158099A (ja) * 2014-02-25 2015-09-03 株式会社Kcm 産業用車両
WO2018199069A1 (ja) * 2017-04-28 2018-11-01 株式会社小松製作所 作業機械および作業機械の制御方法
JP2018188831A (ja) * 2017-04-28 2018-11-29 株式会社小松製作所 作業機械および作業機械の制御方法
US11408146B2 (en) 2017-04-28 2022-08-09 Komatsu Ltd. Work machine and method for controlling the same

Also Published As

Publication number Publication date
EP2267230A4 (en) 2016-10-05
JPWO2009116249A1 (ja) 2011-07-21
US8725358B2 (en) 2014-05-13
US20110040459A1 (en) 2011-02-17
CN102037194B (zh) 2013-12-04
CN102037194A (zh) 2011-04-27
EP2267230A1 (en) 2010-12-29
JP5591104B2 (ja) 2014-09-17
EP2267230B1 (en) 2017-10-11

Similar Documents

Publication Publication Date Title
JP5048068B2 (ja) 作業車両及び作業車両の作動油量制御方法
JP5591104B2 (ja) 作業車両、作業車両の制御装置、及び作業車両の作動油量制御方法
JP5204837B2 (ja) 作業車両、作業車両の制御装置、及び作業車両の制御方法
JP5228132B1 (ja) ホイールローダ
EP2413005B1 (en) Construction vehicle
JP5205408B2 (ja) 作業車両及び作業車両の制御方法
JP5996314B2 (ja) ホイールローダおよびホイールローダのエンジン制御方法
JP5192605B1 (ja) ホイールローダ
WO2015083753A1 (ja) 作業車両
WO2011102209A1 (ja) 作業車両及び作業車両の制御方法
WO2013145339A1 (ja) 作業車両及び作業車両の制御方法
JPWO2008146846A1 (ja) 作業車両の駆動力制御装置および駆動力制御方法
US9702117B2 (en) Work vehicle control method, work vehicle control device, and work vehicle
US9809948B2 (en) Work vehicle control method, work vehicle control device, and work vehicle
US11286646B2 (en) Loading vehicle
WO2010052831A1 (ja) 作業車両
JP3813576B2 (ja) ホイールローダ
EP3294581B1 (en) A working machine arranged with means to drive and control a hydraulic pump
KR102452805B1 (ko) 휠 로더의 제어 방법 및 시스템

Legal Events

Date Code Title Description
WWE Wipo information: entry into national phase

Ref document number: 200980118570.8

Country of ref document: CN

121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 09722094

Country of ref document: EP

Kind code of ref document: A1

WWE Wipo information: entry into national phase

Ref document number: 2010503763

Country of ref document: JP

REEP Request for entry into the european phase

Ref document number: 2009722094

Country of ref document: EP

WWE Wipo information: entry into national phase

Ref document number: 2009722094

Country of ref document: EP

NENP Non-entry into the national phase

Ref country code: DE

WWE Wipo information: entry into national phase

Ref document number: 12736159

Country of ref document: US