WO2009104267A1 - 電子部品の移載方法およびそれを実行するための制御プログラム - Google Patents

電子部品の移載方法およびそれを実行するための制御プログラム Download PDF

Info

Publication number
WO2009104267A1
WO2009104267A1 PCT/JP2008/052987 JP2008052987W WO2009104267A1 WO 2009104267 A1 WO2009104267 A1 WO 2009104267A1 JP 2008052987 W JP2008052987 W JP 2008052987W WO 2009104267 A1 WO2009104267 A1 WO 2009104267A1
Authority
WO
WIPO (PCT)
Prior art keywords
transfer
under test
area
electronic device
device under
Prior art date
Application number
PCT/JP2008/052987
Other languages
English (en)
French (fr)
Inventor
明寿 須田
健一 島田
Original Assignee
株式会社アドバンテスト
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社アドバンテスト filed Critical 株式会社アドバンテスト
Priority to PCT/JP2008/052987 priority Critical patent/WO2009104267A1/ja
Priority to TW098103198A priority patent/TWI398638B/zh
Publication of WO2009104267A1 publication Critical patent/WO2009104267A1/ja

Links

Images

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/28Testing of electronic circuits, e.g. by signal tracer
    • G01R31/2851Testing of integrated circuits [IC]
    • G01R31/2893Handling, conveying or loading, e.g. belts, boats, vacuum fingers

Definitions

  • the present invention relates to an electronic component transfer method for transferring various electronic components such as semiconductor integrated circuit elements (hereinafter also referred to as IC devices) between trays, and a control device for the electronic component transfer device.
  • the present invention relates to a control program for causing a computer to execute.
  • an electronic component test apparatus is used to test the performance and function of the IC device in a packaged state.
  • a handler that constitutes the electronic component testing apparatus is provided in the test head in a state where the IC device is transferred from the customer tray to the test tray, the test tray is transported to the test head, and the IC device is accommodated in the test tray. Press the IC device into the socket. In this state, a tester constituting the electronic component test apparatus performs a test of the IC device via the test head. When the test is completed, the handler transfers the IC device again from the test tray to the customer tray while classifying the IC device based on the test result.
  • the customer tray is a tray for storing IC devices before or after the test.
  • the IC device before the test is supplied from the previous process to the handler while being accommodated in the customer tray, and the tested IC device is sent from the handler to the subsequent process while being accommodated in the customer tray.
  • the test tray is a dedicated tray that is circulated and conveyed in the handler.
  • the operation of removing IC devices from the prohibited portion of the test tray is performed by removing the IC devices one by one from the prohibited portion after reloading the IC devices from the customer tray to the test tray. For this reason, there is a problem that the transshipment work from the customer tray to the test tray becomes long.
  • the problem to be solved by the present invention is to provide an electronic component transfer method capable of shortening the transshipment work of electronic components and a control program for executing the method.
  • an electronic component transfer method for transferring an electronic device under test from a first storage means to a second storage means by a first transfer means.
  • the first holding step in which all the holding portions of the first transfer means hold the electronic device under test from the first accommodating means, and the first transfer means is the The first transfer means moves to the first area of the second accommodation means, and the first transfer means is the first area except for the prohibited portion where the accommodation of the electronic device under test is prohibited in the first area.
  • a first placement step for placing the electronic device under test in the area, and the first transfer means is moved to a second area of the second storage means to move the first area.
  • the first transfer means places the electronic device under test in the second region except for the prohibited portion in the second region. It is preferable to place it.
  • the second holding step in which the second transfer means holds all the electronic devices to be tested placed in the first region of the second housing means. Then, the second transfer means moves to the third accommodation means, and all the electronic devices to be tested that have been placed in the first area are placed at once in the third accommodation means. And a third placing step.
  • the second transfer means is configured to include the second transfer means.
  • the second transfer means is performing work other than the transfer work of the electronic device under test
  • the second area is the test object except for the prohibited portion.
  • the first transfer means further includes an adjustment step of moving the electronic device under test so that the electronic component is filled with the electronic component.
  • the first accommodating means is a customer tray capable of accommodating the electronic device under test
  • the second accommodating means temporarily accommodates the electronic device under test. It is a buffer
  • the third accommodating means is preferably a test tray capable of accommodating the electronic device under test.
  • the third housing means passes from the first housing means through the second housing means.
  • the electronic component under test while the electronic component under test is accommodated in the third accommodating means, the electronic component under test is pressed against the contact portion of the test head of the electronic component testing apparatus,
  • a test method for testing an electronic component including a test step for performing a test.
  • the electronic device under test is transferred from the first accommodation means to the second accommodation means by the electronic component transfer apparatus provided with the first transfer means.
  • a first holding step for holding the electronic device under test; and the first transfer means moves to the first area of the second housing means, and the electronic device under test is moved in the first area.
  • a first placing step in which the first transfer means places the electronic device under test in the first area, except for a prohibited portion where housing is prohibited; and the first transfer means.
  • the first transfer means places the electronic device under test in the second region except for the prohibited portion in the second region. It is preferable to place it.
  • the second transfer means possessed by the electronic component transporting device includes all the electronic devices under test placed in the first region of the second housing means.
  • a second holding step for holding, and the second transfer means moves to the third accommodating means, and all the electronic devices under test placed in the first area are It is preferable to cause the control device to further execute a third placement step of placing the accommodation means at a time.
  • the second transfer means is configured to include the second transfer means.
  • the second transfer means is performing work other than the transfer work of the electronic device under test
  • the second area is the test object except for the prohibited portion. It is preferable that the control device further execute an adjustment step in which the first transfer means moves the electronic device under test so that the electronic component is filled with the electronic component.
  • the first accommodating means is a customer tray capable of accommodating the electronic device under test
  • the second accommodating means temporarily accommodates the electronic device under test. It is a buffer
  • the third accommodating means is preferably a test tray capable of accommodating the electronic device under test.
  • the electronic component transfer for transferring the electronic device under test from the first storage means to the third storage means via the second storage means.
  • the control device is provided with an electronic component transfer device that executes the control program.
  • the electronic components corresponding to the prohibited portion are collected in the second region while being transferred to the first region. For this reason, since the number of times of touchdown of the first transfer means is reduced, it is possible to shorten the transshipment work of the electronic components.
  • FIG. 1 is a schematic cross-sectional view showing an electronic component testing apparatus according to an embodiment of the present invention.
  • FIG. 2 is a perspective view showing the electronic component testing apparatus of FIG.
  • FIG. 3 is a conceptual diagram showing a tray handling method in the electronic component testing apparatus of FIG.
  • FIG. 4 is an exploded perspective view showing a stocker used in the electronic component testing apparatus according to the embodiment of the present invention.
  • FIG. 5 is a perspective view showing a customer tray used in the electronic component testing apparatus according to the embodiment of the present invention.
  • FIG. 6 is an exploded perspective view showing a test tray used in the electronic component testing apparatus according to the embodiment of the present invention.
  • FIG. 7 is a plan view showing a loader unit of the electronic component testing apparatus in the embodiment of the present invention.
  • FIG. 8 is a block diagram showing a control system of the electronic component test apparatus in the embodiment of the present invention.
  • FIG. 9 is a plan view showing a buffer unit of the electronic component test apparatus according to the embodiment of the present invention.
  • FIG. 10 is a cross-sectional view taken along line XX in FIG.
  • FIG. 11 is a flowchart showing an IC device transfer method in the loader unit according to the embodiment of the present invention.
  • FIG. 12 is a schematic plan view showing a prohibited portion in the buffer unit according to the embodiment of the present invention.
  • FIG. 13 is a schematic plan view showing prohibited portions in the test tray of the embodiment of the present invention.
  • FIG. 1 is a schematic cross-sectional view showing the entire electronic component testing apparatus in the present embodiment
  • FIG. 2 is a perspective view of the electronic component testing apparatus in FIG. 1
  • FIG. 3 is a tray handling method in the electronic component testing apparatus in FIG. FIG.
  • FIG. 3 is a view for understanding a method of handling the tray in the electronic component testing apparatus, and there is actually a portion in which the members arranged in the vertical direction are shown in a plan view. Therefore, the mechanical (three-dimensional) structure will be described with reference to FIG.
  • the electronic component test apparatus tests (inspects) whether or not the IC device properly operates in a state where a high-temperature or low-temperature thermal stress is applied to the IC device, and the IC device is determined based on the test result. It is an apparatus for classifying, and includes a handler 1, a test head 5, and a tester 6. The test of the IC device by the electronic component test apparatus is performed in a state where the IC device is transferred from the customer tray KST to the test tray TST and mounted on the test tray TST.
  • the handler 1 includes a storage unit 200 that stores a customer tray KST that contains a pre-test or a tested IC device, and a customer tray KST supplied from the storage unit 200.
  • the IC device is mounted on the test tray TST, and the IC device is loaded in the test tray TST while applying a predetermined thermal stress to the loader unit 300 for feeding the test tray TST to the chamber unit 100 and the IC device.
  • an unloader unit 400 that unloads tested IC devices from the chamber unit 100 and replaces them while classifying them from the test tray TST to the customer tray KST.
  • the socket 50 mounted on the top of the test head 5 is connected to the tester 6 through the cable 7 shown in FIG.
  • the IC device electrically connected to the socket 50 is connected to the tester 6 via the cable 7, and a test signal is exchanged between the IC device and the tester 6.
  • a space 8 is formed in the lower portion of the handler 1, and the test head 5 is replaceably disposed in the space 8, and an opening 101 a formed in the main base (base) 101 of the handler 1.
  • the IC device and the socket 50 on the test head 5 can be brought into electrical contact with each other.
  • the socket 50 on the test head 5 is replaced with a socket suitable for the type after replacement.
  • handler 1 The following is a detailed description of each part of handler 1.
  • FIG. 4 is an exploded perspective view showing a stocker used in the electronic component testing apparatus in the embodiment of the present invention
  • FIG. 5 is a perspective view showing a customer tray used in the electronic component testing apparatus in the embodiment of the present invention.
  • the storage unit 200 stores a pre-test stocker 201 that stores a customer tray KST that stores an IC device before the test, and a customer tray KST that stores IC devices classified according to the test result.
  • these stockers 201 to 203 are provided with a frame-like tray support frame 204 and an elevator 205 that can move up and down in the tray support frame 204.
  • a plurality of customer trays KST are stacked and stored in the tray support frame 204, and the stacked customer trays KST are moved up and down by the elevator 205.
  • the customer tray KST has 80 storage units 33 for storing IC devices arranged in 10 rows and 8 columns. There are various sequence variations depending on the case.
  • the numbers of the pre-test stocker 201, the tested stocker 202, and the empty tray stocker 203 can be appropriately set as necessary.
  • two stockers STK-B are provided in the storage unit 200 as the pre-test stocker 201.
  • eight stockers STK-1, STK-2,..., STK-8 are provided in the storage unit 200 as the tested stockers 202, and can be sorted and stored in up to eight categories according to the test results. It is configured. In other words, in addition to the distinction between non-defective products and defective products, it can be classified into non-defective products that have a high operating speed, medium-speed products, low-speed products, or defective products that require retesting. It is possible. Further, the storage unit 200 is provided with two stockers STK-E as empty tray stockers 203.
  • ⁇ Loader unit 300> 6 is an exploded perspective view showing a test tray used in the electronic component test apparatus according to the embodiment of the present invention
  • FIG. 7 is a plan view showing a loader portion of the electronic component test apparatus according to the embodiment of the present invention
  • FIG. FIG. 9 is a plan view showing a buffer unit of the electronic component testing apparatus in the embodiment of the present invention
  • FIG. 10 is a sectional view taken along line XX in FIG. It is.
  • FIG. 6 only a part of the test tray TST is shown by a solid line, and the other parts are omitted by a one-dot chain line.
  • the above-described customer tray KST is carried below the two window portions 301 of the loader unit 300 by a tray transfer arm 205 provided between the storage unit 200 and the main base 101, and an elevator table (not shown) is provided. Ascending, the customer tray KST faces the loader unit 300 through the window unit 301.
  • the IC device loaded on the customer tray KST is once transferred to the buffer unit 350 by the first transfer arm 320 of the device transfer apparatus 310, and the second transfer arm 330 of the device transfer apparatus 310. However, the sample is transferred from the buffer unit 350 to the test tray TST located in the loader unit 300.
  • the test tray TST includes a plurality of parallel bars 13 provided at equal intervals in the rectangular frame 12, and a plurality of test trays TST are provided on both sides of the cross bars 13 and on the side 12 a of the frame 12 facing the cross bars 13.
  • Mounting pieces 14 are provided so as to protrude at equal intervals.
  • An insert accommodating portion 15 is configured by the space between the rails 13 or between the rails 13 and the side 12 a and the two attachment pieces 14.
  • Each insert accommodating portion 15 can accommodate one insert 16.
  • the insert 16 is attached to the two attachment pieces 14 in a floating state using a fastener 17. Therefore, attachment holes 19 for attaching the insert 16 to the attachment piece 14 are formed at both ends of the insert 16.
  • 256 such inserts 16 are attached to one test tray TST, and are arranged in 16 rows and 16 columns. The number and arrangement of inserts attached to the test tray can be arbitrarily set.
  • inserts 16 have the same shape and the same dimensions, and an IC device is accommodated in each insert 16.
  • the shape of the device accommodating portion 18 of the insert 16 depends on the shape of the IC device to be accommodated, and in the example shown in FIG.
  • the loader unit 300 transfers the IC device before the test from the customer tray KST to the test tray TST, and the transfer from the customer tray KST to the test tray TST. And a buffer unit 350 on which the IC device is temporarily placed.
  • the device transport apparatus 310 includes two Y-axis rails 311 that are installed on the main base 101 along the Y-axis direction, and a first transport arm 320 and a second transport arm 330 that are supported by the rails 311. And is composed of.
  • the first and second transfer arms 320 and 330 can move independently along the Y-axis direction by the driving force of the servo motor transmitted through the ball screw mechanism.
  • the first transfer arm 320 is movable along the X-axis direction to the movable arm 321 provided on the Y-axis rail 311 so as to be reciprocally movable between the window portion 301 and the buffer portion 350.
  • the movable head 322 is supported, and 32 suction pads 323 mounted on the movable head 322 are provided.
  • the 32 suction pads 323 are mounted on the movable head 322 in an array of 4 rows and 8 columns, and can be moved up and down independently by an actuator (not shown).
  • the first transfer arm 320 can simultaneously load 32 IC devices from the customer tray KST to the buffer unit 350 by using the suction pad 323.
  • the number and arrangement of the suction pads 323 attached to the first transfer arm 320 can be arbitrarily set.
  • the second transport arm 320 includes a movable arm 331 provided on the Y-axis rail 311 so as to be reciprocally movable between the buffer unit 350 and the test tray TST located in the loader unit 300, and a movable arm 331.
  • the movable head 332 is supported so as to be movable along the X-axis direction, and 32 suction pads 333 attached to the movable head 332 are provided.
  • the 32 suction pads 333 are mounted on the movable head 332 downward in a 4 ⁇ 8 arrangement, and can be moved up and down independently by an actuator (not shown).
  • the second transport arm 330 can simultaneously load 32 IC devices from the buffer unit 350 to the test tray TST using the suction pad 333. Note that the number and arrangement of the suction pads 333 attached to the second transfer arm 330 can be arbitrarily set.
  • first and second transfer arms 320 and 330 are the same set of Y-axis rails so that the first transfer arm 320 is positioned on the lower side and the second transfer arm 330 is positioned on the upper side in FIG. 311 is supported in parallel.
  • the device transport apparatus 310 is connected to a control apparatus (control computer) 340.
  • the control device 340 can control the operations of the first transfer arm 320 and the second transfer arm 330 by sending a control signal to a servo motor (not shown).
  • a control program for controlling the first and second transfer arms 320 and 330 by the control device 340 is stored in a storage device 345 connected to the control device 340.
  • the buffer unit 350 is provided on the main base 101 of the loader unit 300 between the two window units 301 and the test tray TST located in the loader unit 300.
  • the buffer unit 350 is provided with 128 recesses 351 in an array of 8 rows and 16 columns.
  • the side surface 351 a of each recess 351 is inclined, and when the IC device is dropped into the recess 351 by the first transfer arm 320, the mutual positional relationship between the IC devices is accurately determined. It is like that. Note that the number and arrangement of the recesses 351 included in the buffer unit 350 can be arbitrarily set.
  • the first transfer arm 320 of the device transfer apparatus 310 transfers the IC device from the customer tray KST located in the window section 301 to the buffer section 350.
  • the second transfer arm 330 of the device transfer apparatus 310 transfers the IC device from the buffer unit 350 to the test tray TST located in the loader unit 300.
  • the exclusion from the prohibited portion is also performed at the same time.
  • test tray TST When the IC devices are accommodated in all the device accommodating portions 18 of the test tray TST, the test tray TST is carried into the chamber portion 100 by the tray transfer device 102.
  • the empty customer tray KST is lowered by the lifting table, and this empty tray is transferred to the tray transfer arm 205.
  • the tray transfer arm 250 temporarily stores this empty tray in the empty tray stocker 203.
  • the tray transfer arm 250 collects the full customer tray KST and also removes the window 401 from the empty tray stocker 203. Supply a new empty tray.
  • test tray TST is loaded into the chamber unit 100 after the IC device is loaded by the loader unit 300, and the test of each IC device is executed in a state of being mounted on the test tray TST.
  • the chamber unit 100 includes a soak chamber 110 that applies a target high-temperature or low-temperature heat stress to an IC device loaded on the test tray TST, and the soak chamber 110 has a heat stress.
  • a test chamber 120 that presses the IC device in a state of being applied to the test head 5 and an unsoak chamber 130 that removes thermal stress from the IC device that has been tested.
  • the soak chamber 110 is disposed so as to protrude above the test chamber 120.
  • a vertical transfer device is provided in the soak chamber 110, and a plurality of test trays TST are held by the vertical transfer device until the test chamber 120 is empty. Waiting while being. Mainly, a thermal stress of about ⁇ 55 to + 150 ° C. is applied to the IC device during this standby.
  • the test head 5 is disposed in the center of the test chamber 120, the test tray TST is carried above the test head 5, and the input / output terminals of the IC device are electrically connected to the contact pins of the socket 50 of the test head 5.
  • the IC device is tested by bringing it into contact.
  • the result of this test is stored in the storage device of the electronic component test apparatus at an address determined by, for example, the identification number assigned to the test tray TST and the IC device number assigned in the test tray TST.
  • the unsoak chamber 130 is also arranged so as to protrude above the test chamber 120, and as shown conceptually in FIG. 3, a vertical transfer device is provided therein. .
  • the unsoak chamber 130 when a high temperature is applied to the IC device in the soak chamber 110, the IC device is cooled to the room temperature by air blowing, and then the heat-removed IC device is carried out to the unloader unit 400.
  • the IC device is heated with warm air or a heater to return it to a temperature at which dew condensation does not occur, and then the removed IC device is unloaded. Carry out to 400.
  • An inlet for carrying the test tray TST from the main base 101 is formed in the upper part of the soak chamber 110.
  • an outlet for carrying out the test tray TST to the main base 101 is also formed in the upper part of the unsoak chamber 130.
  • a tray transfer device 102 for taking the test tray TST out and in and out of the chamber section 100 through these inlets and outlets is provided on the main base 101.
  • the tray transport device 102 is configured to transport the test tray TST using, for example, a rotating roller.
  • the test tray TST carried out from the unsoak chamber 130 is returned to the soak chamber 110 via the unloader unit 400 and the loader unit 300 by the tray conveying device 102.
  • Unloader unit 400 In the unloader unit 400, the tested IC devices are transshipped from the test tray TST carried out from the unsoak chamber 130 while being classified into customer trays according to the test results.
  • four windows 401 are opened in the main base 101 in the unloader unit 400.
  • the customer tray KST carried out from the storage unit 200 to the unloader unit 400 is disposed in the window 401 so as to face the upper surface of the main base 101.
  • the unloader unit 400 includes a device transfer device 410 that transfers a tested IC device from the test tray TST to the customer tray KST.
  • the device transport apparatus 410 includes two Y-axis rails 411 installed on the main base 101 along the Y-axis direction, and a movable rail 412 movable on the Y-axis rail 411 along the Y-axis direction.
  • the movable head 413 includes a movable head 413 supported by the movable rail 412 so as to be movable along the X-axis direction, and a plurality of suction pads (not shown) provided downwardly on the movable head 413. Each suction pad can be moved up and down by an actuator (not shown), and a plurality of IC devices can be simultaneously loaded from the customer tray KST to the test tray TST.
  • the movable rail 412 and the movable head 413 are moved by a driving force of a servo motor transmitted via, for example, a ball screw mechanism.
  • lift tables for raising and lowering the customer tray KST.
  • the customer tray KST that has been fully loaded with the tested IC devices is placed, the lifting table is lowered, and the tray transfer arm 205 receives this full tray.
  • the tray transfer arm 205 transfers the full tray to the tested stocker 202 according to the test result.
  • the four window parts 401 are formed in the unloader part 400, four categories (test results) can be classified in real time.
  • four categories with high occurrence frequency are always located in the window 401, and categories with low occurrence frequency are temporarily deposited in the buffer unit 402, at a predetermined timing, A customer tray KST corresponding to the category may be called to the window 401.
  • FIG. 11 is a flowchart showing a method of transferring an IC device in the loader unit according to the embodiment of the present invention
  • FIG. 12 is a schematic plan view showing a prohibited portion in the buffer unit according to the embodiment of the present invention
  • FIG. It is a schematic plan view which shows the prohibition part in the test tray of a form.
  • step S10 of FIG. 11 the first transport arm 320 approaches the customer tray KST located in the window portion 301 of the loader unit 300, and the first transport arm 320 moves from the customer tray KST to the IC device. Adsorb and hold. At this time, the first transfer arm 320 simultaneously holds 32 IC devices using 32 suction pads 323.
  • all the suction pads 323 included in the first transfer arm 320 simultaneously hold the IC device by one touchdown, but the first transfer arm 320 touches down a plurality of times. All the suction pads 323 may hold the IC device.
  • the first transfer arm 320 moves to the buffer unit 350 (step S20).
  • 128 concave portions 351 of the buffer unit 350 are divided into first to fourth zones 361 to 364.
  • Each of the areas 361 to 364 is assigned 32 concave portions 351 arranged in 4 rows and 8 columns.
  • the numbers shown in the recesses 351 are the numbers of the recesses 351 in the respective areas 361 to 364.
  • the first to third areas 361 to 363 are set as first areas (areas) 370 on which IC devices are placed at a time by the first transfer arm 320 except for the prohibited portions.
  • the fourth area 364 is set as a second area 380 in which IC devices not placed in the first to third areas 361 to 363 are collected.
  • inserts 16 are divided into first to eighth regions (regions) 21 to 28.
  • Each of the ranges 21 to 28 is assigned 32 inserts 16 arranged in 4 rows and 8 columns.
  • the numbers shown in the inserts 16 are the numbers of the inserts 16 in the respective ranges 21 to 28.
  • the test tray TST In the socket 50 attached to the test head 5, there is a failed socket that cannot be used for the test. Therefore, in the test tray TST, accommodation of the IC device into the insert 16 corresponding to the failed socket is prohibited. Specifically, in the present embodiment, as shown in FIG. 13, the 10th and 23rd inserts are prohibited portions in the first range 21.
  • the 28th insert is a prohibited portion.
  • the number and position of the prohibition part demonstrated by this embodiment are only examples, and are various according to the actual use condition etc. of an electronic component test apparatus.
  • the first transport arm 320 that has moved to the buffer unit 350 places the IC device in the first region 361 of the buffer unit 350 (step S30).
  • the first area 361 of the buffer unit 350 is associated with the first range 21 of the test tray TST, and a portion similar to the first range 21 is included as a prohibited portion of the first area 361. Is set.
  • the first transfer arm 320 does not place an IC device on the 10th and 23rd inserts 16 in the first section 361 of the buffer unit 350, and does not place an IC device on all other inserts 16. Is placed.
  • Step S40 the first transfer arm 320 moves to the fourth area 364 of the buffer unit 350 (step S40), and the two IC devices that have not been placed in the first area 361 are placed in the fourth area 364. (Step S50).
  • the first transfer arm 320 may place the IC device in the fourth area 364 at a time. Alternatively, even if the first transfer arm 320 divides the fourth area 364 into a plurality of times so that the empty recess 351 is filled with the IC device in the fourth area 364 (touch down), Good.
  • the first transfer arm 320 may place the IC device in the fourth area 364 while avoiding the prohibited portion in the fourth area 364.
  • the first transfer arm 320 is placed in the empty recess 351 in the fourth area 364 in the other areas 361 to 361.
  • the IC device may be moved from 363, or the IC device may be removed from the prohibited portion of the fourth area 364.
  • a work of pushing the test tray TST into the chamber unit 100 can be exemplified.
  • the fourth area 364 of the buffer unit 350 is associated with the first range 21 of the test tray TST supplied to the loader unit 300 several sheets later (specifically, two sheets later). ing.
  • the present invention is not particularly limited to this, and the fourth area 364 can be associated with any area 21 to 28 of the test tray TST.
  • the second transport arm 330 once transfers all IC devices placed in the first area 361 of the buffer unit 350 to the first range 21 of the test tray TST stopped in the loader unit 300. Transport to. At this time, in the present embodiment, since the IC device is not placed on the prohibited portion, the work of removing the IC device from the prohibited portion of the test tray TST is unnecessary.
  • the control device 340 determines whether or not the fourth area 364 of the buffer unit 350 is filled with an IC device (step S70). For example, the transfer result of the IC device by the first transfer arm 320 is stored in the storage device 345, and in step S70, the control device 340 refers to this storage, so that the fourth area 364 is the IC device. It can be determined whether it is satisfied.
  • the first transfer arm 320 transfers the IC device from the customer tray KST to all the suction pads 323. (Step S10), move to the buffer unit 350 (step S20), and place the IC device in the second area 362 excluding the prohibited portion (step S30).
  • the second area 362 of the buffer unit 350 is associated with the second range 22 of the test tray TST, and as shown in FIGS. No. 20 and No. 25 inserts 16 are set as prohibited portions.
  • the first transfer arm 320 moves to the fourth area 364 of the buffer unit 350 (step S40), and the IC device that has not been placed in the second area 362 is placed in the fourth area 364. (Step S50).
  • the second transport arm 430 transports all the IC devices placed in the second area 362 of the buffer unit 350 to the second range 22 of the test tray TST at a time (step S60).
  • control device 340 determines again whether or not the fourth area 364 of the buffer unit 350 is filled with the IC device (step S70).
  • first transfer arm 320 applies IC to all suction pads 323 from customer tray KST.
  • the device is held (step S10), moved to the buffer unit 350 (step S20), and the IC device is placed in the third area 363 except for the prohibited portion (step S30).
  • the third section 363 of the buffer unit 350 is associated with the third range 23 of the test tray TST, and the third section 363 is shown in FIGS. 12 and 13. No. 6 insert 16 is set as a prohibited portion.
  • the first transfer arm 320 moves to the fourth area 364 of the buffer unit 350 (step S40), and the IC device that has not been placed in the third area 363 is placed in the fourth area 364. (Step S50).
  • the second transport arm 330 transports all the IC devices placed in the third section 363 of the buffer unit 350 to the third range 23 of the test tray TST at a time.
  • step S70 determines again whether or not the fourth area 364 of the buffer unit 350 is filled with the IC device.
  • steps S10 to S60 are repeated until the fourth area 364 is filled with the IC device.
  • the first area 361 of the buffer unit 350 is associated with the fourth range 24 of the test tray TST
  • the second area 362 is associated with the fifth range 25.
  • the third zone 363 is associated with the sixth range 26 in the seventh cycle
  • the first zone 361 is associated with the seventh range 27, and in the eighth cycle, the second zone 363 Area 362 is associated with the eighth range 28.
  • the tray transfer device 102 sends out the test tray TST to the chamber unit 100, and a new test tray TST is unloaded from the unloader unit 400. Supplied.
  • the third, first, and second areas 363, 361, and 362 of the buffer unit 350 are changed to the first to eighth ranges of the new test tray TST. Correspond to 21 to 28 in order.
  • the association between the first to third areas 361 to 363 of the buffer unit 350 and the first to eighth ranges 21 to 28 of the test tray TST can be arbitrarily set.
  • the IC devices corresponding to the prohibited portion are collected in the fourth area 364.
  • the fourth area 364 has 30 parts excluding the forbidden parts. Since the recess 351 exists, when the IC devices are fully loaded on the two test trays TST, the fourth area 364 of the buffer unit 350 is filled with the IC devices.
  • step S70 when the control device 340 determines that the fourth area 364 of the buffer unit 350 is filled with the IC device (YES in step S70), for example, the third test tray TST is loaded.
  • the second transport arm 330 moves all the IC devices placed in the fourth area 364 of the buffer unit 350 to the first range 21 of the test tray TST. Place (step S80).
  • the second area 380 may be increased or decreased according to the number of failed sockets.
  • the third area 363 may be set as the second area 380 in addition to the fourth area 364.
  • the ranges 21 to 28 in which the second area 380 is associated with the test tray TST are excluded from the association with the first area 370 in advance.
  • the storage device 345 illustrated in FIG. 8 stores a control program for causing the control device 340 of the device transport apparatus 310 to execute the transfer method described above.
  • FIG. 11 shows each time the first transfer arm 320 transfers the IC device to the first to third areas 361 to 363 in order to understand the method of transferring the IC device in the loader unit 300 (step S10 to S50), the second transfer arm 330 has been described as being transferred from the buffer unit 350 to the test tray TST (step S60).
  • the present invention is not limited to this, and the first transfer arm 320 and the second transfer arm 330 are not limited to this.
  • the transshipment work can be performed independently of the transfer arm 330.
  • the prohibited portion IC devices corresponding to the above can be collected in the second region 380 (fourth area 364) of the buffer unit 350. For this reason, since the number of times of touchdown of the first transfer arm 320 is reduced, it is possible to shorten the transshipment work of the IC device.

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Hardware Design (AREA)
  • Microelectronics & Electronic Packaging (AREA)
  • General Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Testing Of Individual Semiconductor Devices (AREA)
  • Manipulator (AREA)

Abstract

 第1の搬送アーム320が有する全ての吸着パッド323が、カスタマトレイKSTからICデバイスを保持する第1の保持ステップと、第1の搬送アーム320がバッファ部350の第1の領域370に移動して、禁止部分を除いて第1の領域370にICデバイスを載置する第1の載置ステップと、第1の搬送アーム320がバッファ部350の第2の領域380に移動して、第1の領域370に載置されなかったICデバイスを第2の領域380に載置する第2の載置ステップと、を備えており、第1の保持ステップ、第1の載置ステップ及び第2の載置ステップを繰り返すことで、禁止部分に対応したICデバイスを第2の領域380に集める電子部品の移載方法。

Description

電子部品の移載方法およびそれを実行するための制御プログラム
 本発明は、半導体集積回路素子等の各種電子部品(以下、代表的にICデバイスとも称する。)をトレイ間で移し替える電子部品の移載方法、及び、それを電子部品移載装置の制御装置に実行させるための制御プログラムに関する。
 ICデバイスの製造過程では、パッケージングされた状態でのICデバイスの性能や機能を試験するために電子部品試験装置が用いられている。
 この電子部品試験装置を構成するハンドラ(Handler)は、カスタマトレイからテストトレイにICデバイスを積み替え、このテストトレイをテストヘッドに搬送し、テストトレイにICデバイスを収容した状態で、テストヘッドに設けられたソケットにICデバイスを押し付ける。この状態で、電子部品試験装置を構成するテスタ(Tester)がテストヘッドを介してICデバイスの試験を実施する。試験が終了したら、ハンドラは、ICデバイスを、試験結果に基づいて分類しながら、テストトレイからカスタマトレイに再び移し替える。
 なお、カスタマトレイは、試験前或いは試験後のICデバイスを収容するトレイである。試験前のICデバイスは、カスタマトレイに収容された状態で前工程からハンドラに供給され、試験済みのICデバイスは、カスタマトレイに収容された状態でハンドラから後工程に送り出される。一方、テストトレイは、ハンドラ内を循環搬送される専用のトレイである。
 ところで、テストヘッドに装着されたソケットの中には、寿命や故障によって使用できない故障ソケットが存在する場合がある。こうした故障ソケットではICデバイスを試験できないため、テストトレイにおいて故障ソケットに対応した位置(以下、単に、禁止部分とも称する。)からICデバイスを事前に除外しておく必要がある。
 テストトレイの禁止部分からICデバイスを除外する作業は、カスタマトレイからテストトレイにICデバイスを積み替えた後に、禁止部分からICデバイスを一つずつ取り除くことで行われている。そのため、カスタマトレイからテストトレイへの積替作業が長くなってしまうという問題があった。
 特に、電子部品試験装置において同時に試験可能なICデバイスの数(同時測定数)が増加すると、必然的に積替作業のスピードアップが要求されるため、この問題は特に顕著になる。
 本発明が解決しようとする課題は、電子部品の積替作業の短縮化を図ることが可能な電子部品の移載方法およびそれを実行するための制御プログラムを提供することである。
 (1)上記目的を達成するために、本発明によれば、第1の移載手段により第1の収容手段から第2の収容手段に被試験電子部品を移載する電子部品の移載方法であって、前記第1の移載手段が有する全ての保持部が、前記第1の収容手段から前記被試験電子部品を保持する第1の保持ステップと、前記第1の移載手段が前記第2の収容手段の第1の領域に移動して、前記第1の領域において前記被試験電子部品の収容が禁止されている禁止部分を除いて、前記第1の移載手段が前記第1の領域に前記被試験電子部品を載置する第1の載置ステップと、前記第1の移載手段が、前記第2の収容手段の第2の領域に移動して、前記第1の領域に載置されなかった前記被試験電子部品を、前記第2の領域に載置する第2の載置ステップと、を備えており、前記第1の保持ステップ、前記第1の載置ステップ、及び、前記第2の載置ステップを繰り返すことで、前記第1の領域の禁止部分に対応した前記被試験電子部品を前記第2の領域に集める電子部品の移載方法が提供される。
 上記発明においては特に限定されないが、前記第2の移載ステップにおいて、前記第2の領域における禁止部分を除いて、前記第1の移載手段が前記第2の領域に前記被試験電子部品を載置することが好ましい。
 上記発明においては特に限定されないが、第2の移載手段が、前記第2の収容手段の前記第1の領域に載置されている全ての前記被試験電子部品を保持する第2の保持ステップと、前記第2の移載手段が第3の収容手段に移動して、前記第1の領域に載置されていた全ての前記被試験電子部品を前記第3の収容手段に一度に載置する第3の載置ステップと、を備えていることが好ましい。
 上記発明においては特に限定されないが、前記第2の領域における禁止部分を除いて、前記第2の領域が前記被試験電子部品で満たされたら、前記第2の移載手段が、前記第2の収容手段の前記第2の領域に載置されている全ての前記被試験電子部品を保持する第3の保持ステップと、前記第2の移載手段が前記第3の収容手段に移動して、前記第2の領域に載置されていた全ての前記被試験電子部品を前記第3の収容手段に一度に載置する第4の載置ステップと、を備えていることが好ましい。
 上記発明においては特に限定されないが、前記第2の移載手段が前記被試験電子部品の移載作業以外の作業を行っている間に、前記第2の領域が禁止部分を除いて前記被試験電子部品で満たされるように、前記第1の移載手段が前記被試験電子部品を移動させる調整ステップをさらに備えていることが好ましい。
 上記発明においては特に限定されないが、前記第1の収容手段は、前記被試験電子部品を収容可能なカスタマトレイであり、前記第2の収容手段は、前記被試験電子部品を一時的に収容するバッファであり、前記第3の収容手段は、前記被試験電子部品を収容可能なテストトレイであることが好ましい。
 (2)上記目的を達成するために、本発明によれば、上記の電子部品の移載方法により、前記第1の収容手段から前記第2の収容手段を経由して前記第3の収容手段に搬送する搬送ステップと、前記被試験電子部品を前記第3の収容手段に収容したまま、前記被試験電子部品を電子部品試験装置のテストヘッドのコンタクト部に押し付けて、前記被試験電子部品のテストを行うテストステップと、を備えた電子部品の試験方法が提供される。
 (3)上記目的を達成するために、本発明によれば、第1の移載手段を備えた電子部品移載装置により、第1の収容手段から第2の収容手段に前記被試験電子部品を移載するために、前記電子部品移載装置の制御装置に実行させるための制御プログラムであって、前記第1の移載手段が有する全ての保持部が、前記第1の収容手段から前記被試験電子部品を保持する第1の保持ステップと、前記第1の移載手段が前記第2の収容手段の第1の領域に移動して、前記第1の領域において前記被試験電子部品の収容が禁止されている禁止部分を除いて、前記第1の移載手段が前記第1の領域に前記被試験電子部品を載置する第1の載置ステップと、前記第1の移載手段が、前記第2の収容手段の第2の領域に移動して、前記第1の領域に載置されなかった前記被試験電子部品を、前記第2の領域に載置する第2の載置ステップと、を前記制御装置に実行させ、前記第1の保持ステップ、前記第1の載置ステップ、及び、前記第2の載置ステップを繰り返すことで、前記第1の領域の禁止部分に対応した前記被試験電子部品を前記第2の領域に集めるように前記制御装置に実行させるための制御プログラムが提供される。
 上記発明においては特に限定されないが、前記第2の移載ステップにおいて、前記第2の領域における禁止部分を除いて、前記第1の移載手段が前記第2の領域に前記被試験電子部品を載置することが好ましい。
 上記発明においては特に限定されないが、前記電子部品搬送装置が有する第2の移載手段が、前記第2の収容手段の前記第1の領域に載置されている全ての前記被試験電子部品を保持する第2の保持ステップと、前記第2の移載手段が第3の収容手段に移動して、前記第1の領域に載置されていた全ての前記被試験電子部品を前記第3の収容手段に一度に載置する第3の載置ステップと、を前記制御装置にさらに実行させることが好ましい。
 上記発明においては特に限定されないが、前記第2の領域における禁止部分を除いて、前記第2の領域が前記被試験電子部品で満たされたら、前記第2の移載手段が、前記第2の収容手段の前記第1の領域に載置されている全ての前記被試験電子部品を保持する第3の保持ステップと、前記第2の移載手段が前記第3の収容手段に移動して、前記第2の領域に載置されていた全ての前記被試験電子部品を前記第3の収容手段に一度に載置する第4の載置ステップと、を前記制御装置にさらに実行させることが好ましい。
 上記発明においては特に限定されないが、前記第2の移載手段が前記被試験電子部品の移載作業以外の作業を行っている間に、前記第2の領域が禁止部分を除いて前記被試験電子部品で満たされるように、前記第1の移載手段が前記被試験電子部品を移動させる調整ステップを、前記制御装置にさらに実行させることが好ましい。
 上記発明においては特に限定されないが、前記第1の収容手段が、前記被試験電子部品を収容可能なカスタマトレイであり、前記第2の収容手段は、前記被試験電子部品を一時的に収容するバッファであり、前記第3の収容手段は、前記被試験電子部品を収容可能なテストトレイであることが好ましい。
 (4)上記目的を達成するために、本発明によれば、被試験電子部品を第1の収容手段から第2の収容手段を経由して第3の収容手段に移載する電子部品移載装置であって、前記被試験電子部品を前記第1の収容手段から前記第2の収容手段に移載する第1の移載手段と、前記被試験電子部品を前記第2の収容手段から前記第3の収容手段に移載する第2の移載手段と、前記第1及び前記第2の移載手段の動作を制御する制御装置と、上記の制御プログラムを記憶する記憶装置と、を備えており、前記制御装置は、前記制御プログラムを実行する電子部品移載装置が提供される。
 本発明では、第1の保持ステップ~第2の載置ステップを繰り返すことで、第1の領域への移載を行いながら、禁止部分に対応した電子部品を第2の領域に集約する。このため、第1の移載手段のタッチダウン回数などが減少するので、電子部品の積替作業の短縮化を図ることができる。
図1は、本発明の実施形態における電子部品試験装置を示す概略断面図である。 図2は、図1の電子部品試験装置を示す斜視図である。 図3は、図1の電子部品試験装置におけるトレイの取り廻し方法を示す概念図である。 図4は、本発明の実施形態における電子部品試験装置に用いられるストッカを示す分解斜視図である。 図5は、本発明の実施形態における電子部品試験装置に用いられるカスタマトレイを示す斜視図である。 図6は、本発明の実施形態における電子部品試験装置に用いられるテストトレイを示す分解斜視図である。 図7は、本発明の実施形態における電子部品試験装置のローダ部を示す平面図である。 図8は、本発明の実施形態における電子部品試験装置の制御系を示すブロック図である。 図9は、本発明の実施形態における電子部品試験装置のバッファ部を示す平面図である。 図10は、図9のX-X線に沿った断面図である。 図11は、本発明の実施形態におけるローダ部でのICデバイスの移載方法を示すフローチャートである。 図12は、本発明の実施形態のバッファ部における禁止部分を示す概略平面図である。 図13は、本発明の実施形態のテストトレイにおける禁止部分を示す概略平面図である。
符号の説明
1…ハンドラ
 300…ローダ部
   301…窓部
  310…デバイス搬送装置
   320…第1の搬送アーム
   330…第2の搬送アーム
  340…制御装置
   345…記憶装置
  350…バッファ部
    351…凹部
   361~364…第1~第4の区域
   370…第1の領域
   380…第2の領域
TST…テストトレイ
 16…インサート
 21~28…第1~第8の範囲
KST…カスタマトレイ
 33…凹部
 以下、本発明の実施形態を図面に基づいて説明する。
 図1は本実施形態における電子部品試験装置の全体を示す概略断面図、図2は図1の電子部品試験装置の斜視図、図3は図1の電子部品試験装置におけるトレイの取り廻し方法を示す概念図である。
 なお、図3は電子部品試験装置におけるトレイの取り廻しの方法を理解するための図であり、実際には上下方向に並んで配置されている部材を平面的に示した部分もある。従って、その機械的(三次元的)構造は図2を参照して説明する。
 本実施形態における電子部品試験装置は、ICデバイスに高温又は低温の熱ストレスを印加した状態でICデバイスが適切に動作するか否かを試験(検査)し、当該試験結果に基づいてICデバイスを分類する装置であり、ハンドラ1、テストヘッド5及びテスタ6から構成されている。この電子部品試験装置によるICデバイスのテストは、カスタマトレイKSTからテストトレイTSTにICデバイスを載せ替え、テストトレイTSTに搭載した状態で実施される。
 本実施形態におけるハンドラ1は、図1~図3に示すように、試験前或いは試験済みのICデバイスを収容したカスタマトレイKSTを格納する格納部200と、格納部200から供給されるカスタマトレイKSTからテストトレイTSTにICデバイスを載せ替えて、そのテストトレイTSTをチャンバ部100に送り込むローダ部300と、ICデバイスに所定の熱ストレスを印加し、テストトレイTSTに収容したままの状態でICデバイスをテストヘッド5に押し付けるチャンバ部100と、試験済みのICデバイスをチャンバ部100から搬出し、テストトレイTSTからカスタマトレイKSTに分類しながら載せ替えるアンローダ部400と、を備えている。
 テストヘッド5の上部に装着されているソケット50は、図1に示すケーブル7を通じてテスタ6に接続されている。ICデバイスのテスト時には、ソケット50に電気的に接続されたICデバイスが、ケーブル7を介してテスタ6に接続され、ICデバイスとテスタ6との間で試験信号の授受を行う。図1に示すように、ハンドラ1の下部に空間8が形成されており、この空間8にテストヘッド5が交換可能に配置され、ハンドラ1のメインベース(基台)101に形成された開口101aを介して、ICデバイスとテストヘッド5上のソケット50とを電気的に接触させることが可能となっている。ICデバイスの品種交換の際には、テストヘッド5上のソケット50が、交換後の品種に適したソケットに交換される。
 以下にハンドラ1の各部について詳述する。
 <格納部200>
 図4は本発明の実施形態における電子部品試験装置に用いられるストッカを示す分解斜視図、図5は本発明の実施形態における電子部品試験装置に用いられるカスタマトレイを示す斜視図である。
 格納部200は、図2に示すように、試験前のICデバイスを収容したカスタマトレイKSTを格納する試験前ストッカ201と、試験結果に応じて分類されたICデバイスを収容したカスタマトレイKSTを格納する試験済ストッカ202と、ICデバイスを収容していない空のカスタマトレイKSTを格納する空トレイストッカ203と、を備えている。
 これらのストッカ201~203は、図4に示すように、枠状のトレイ支持枠204と、このトレイ支持枠204内を昇降可能となっているエレベータ205と、を備えている。トレイ支持枠204には、カスタマトレイKSTが複数積み重ねられて収容されており、この積み重ねられたカスタマトレイKSTがエレベータ205によって上下に移動するようになっている。
 本実施形態では、カスタマトレイKSTは、図5に示すように、ICデバイスを収容するための80個の収容部33が10行8列に配列されているが、実際には、ICデバイスの品種に応じて様々な配列のバリエーションが存在する。
 ストッカ201~203は同一構造となっているので、試験前ストッカ201、試験済ストッカ202及び空トレイストッカ203のそれぞれの数を、必要に応じて適宜数に設定することができる。
 本実施形態では、図2及び図3に示すように、試験前ストッカ201として、2つのストッカSTK-Bが格納部200に設けられている。一方、試験済ストッカ202として、8つのストッカSTK-1,STK-2,…,STK-8が格納部200に設けられており、試験結果に応じて最大8つの分類に仕分けして格納できるように構成されている。つまり、良品と不良品の区別のほかに、良品の中でも動作速度が高速なもの、中速なもの、低速なもの、或いは、不良品のなかでも再試験が必要なもの等に仕分けすることが可能となっている。さらに、格納部200には、空トレイストッカ203として、2つのストッカSTK-Eが設けられている。
 <ローダ部300>
 図6は本発明の実施形態における電子部品試験装置に用いられるテストトレイを示す分解斜視図、図7は本発明の実施形態における電子部品試験装置のローダ部を示す平面図、図8は本発明の実施形態における電子部品試験装置の制御系を示すブロック図、図9は本発明の実施形態における電子部品試験装置のバッファ部を示す平面図、図10は図9のX-X線に沿った断面図である。なお、図6では、テストトレイTSTの一部のみを実線で示し、その他の部分は一点鎖線により省略して図示している。
 上述したカスタマトレイKSTは、格納部200とメインベース101との間に設けられたトレイ移送アーム205によって、ローダ部300の2箇所の窓部301の下方に運ばれ、昇降テーブル(不図示)が上昇することで、カスタマトレイKSTが窓部301を介してローダ部300を臨むようになっている。そして、このローダ部300において、カスタマトレイKSTに積み込まれたICデバイスを、デバイス搬送装置310の第1の搬送アーム320がバッファ部350に一旦移送し、デバイス搬送装置310の第2の搬送アーム330が、このバッファ部350から、ローダ部300に位置しているテストトレイTSTに移送する。
 テストトレイTSTは、図6に示すように、方形フレーム12内に桟13が平行且つ等間隔に設けられ、これら桟13の両側、及び、桟13に対向するフレーム12の辺12aに、それぞれ複数の取付片14が等間隔に突出して設けられている。これら桟13の間又は桟13と辺12aとの間と、2つの取付片14とによって、インサート収容部15が構成されている。
 各インサート収容部15には、それぞれ1個のインサート16を収容することが可能となっている。このインサート16はファスナ17を用いて2つの取付片14にフローティング状態で取り付けられている。このため、インサート16の両端には、当該インサート16を取付片14に取り付けるための取付孔19が形成されている。こうしたインサート16は、図6に示すように、1枚のテストトレイTSTに256個取り付けられており、16行16列に配列されている。なお、テストトレイに取り付けられるインサートの数及び配列は任意に設定することができる。
 なお、インサート16は、同一形状、同一寸法とされており、それぞれのインサート16にICデバイスが収容される。インサート16のデバイス収容部18の形状は、収容するICデバイスの形状に依存し、図6に示す例では方形の凹部となっている。
 ローダ部300は、図2、図3及び図7に示すように、試験前のICデバイスをカスタマトレイKSTからテストトレイTSTに積み替えるデバイス搬送装置310と、カスタマトレイKSTからテストトレイTSTへの移送の間にICデバイスが一旦載置されるバッファ部350と、を備えている。
 デバイス搬送装置310は、メインベース101上にY軸方向に沿って架設された2本のY軸レール311と、このレール311に支持されている第1の搬送アーム320及び第2の搬送アーム330と、から構成されている。第1及び第2の搬送アーム320,330は、ボールネジ機構を介して伝達されるサーボモータの駆動力により、Y軸方向に沿ってそれぞれ独立して移動することが可能となっている。
 第1の搬送アーム320は、窓部301とバッファ部350との間を往復移動可能にY軸レール311上に設けられた可動アーム321と、可動アーム321にX軸方向に沿って移動可能に支持されている可動ヘッド322と、可動ヘッド322に装着された32個の吸着パッド323と、を備えている。
 32個の吸着パッド323は、4行8列の配列で可動ヘッド322に下向きで装着され、特に図示しないアクチュエータにより独立して上下動可能となっている。第1の搬送アーム320は、この吸着パッド323を用いて、32個のICデバイスをカスタマトレイKSTからバッファ部350に同時に積み替えることが可能となっている。なお、第1の搬送アーム320に装着される吸着パッド323の数及び配置は任意に設定することができる。
 第2の搬送アーム320も同様に、バッファ部350とローダ部300に位置しているテストトレイTSTとの間を往復移動可能にY軸レール311上に設けられた可動アーム331と、可動アーム331にX軸方向に沿って移動可能に支持されている可動ヘッド332と、可動ヘッド332に装着された32個の吸着パッド333と、を備えている。
 32個の吸着パッド333は、4行8列の配列で可動ヘッド332に下向きで装着され、特に図示しないアクチュエータにより独立して上下動可能となっている。この第2の搬送アーム330は、この吸着パッド333を用いて、32個のICデバイスをバッファ部350からテストトレイTSTに同時に積み替えることが可能となっている。なお、第2の搬送アーム330に装着される吸着パッド333の数及び配置は任意に設定することができる。
 これら第1及び第2の搬送アーム320,330は、図7において第1の搬送アーム320が下側に位置し、第2の搬送アーム330が上側に位置するように、同一組のY軸レール311に並列に支持されている。
 図8に示すように、デバイス搬送装置310は制御装置(制御コンピュータ)340に接続されている。制御装置340は、特に図示しないサーボモータ等に制御信号を送出することで、第1の搬送アーム320及び第2の搬送アーム330の動作を制御可能となっている。制御装置340により第1及び第2の搬送アーム320,330を制御するための制御プログラムは、制御装置340に接続された記憶装置345に記憶されている。
 バッファ部350は、図2及び図3に示すように、ローダ部300のメインベース101上において、2箇所の窓部301とローダ部300に位置するテストトレイTSTとの間に設けられている。
 バッファ部350には、図9に示すように、8行16列の配列で128個の凹部351が設けられている。図10に示すように、それぞれの凹部351の側面351aが傾斜しており、第1の搬送アーム320により凹部351にICデバイスが落とし込まれると、ICデバイス間の相互の位置関係が正確に定まるようになっている。なお、バッファ部350が有する凹部351の数及び配置は任意に設定することができる。
 本実施形態では、デバイス搬送装置310の第1の搬送アーム320が、窓部301に位置するカスタマトレイKSTから、バッファ部350にICデバイスを移載する。次いで、デバイス搬送装置310の第2の搬送アーム330が、バッファ部350から、ローダ部300に位置するテストトレイTSTにICデバイスを移載する。本実施形態では、第1の搬送アーム320がカスタマトレイKSTからバッファ部350にICデバイスを積み替える際に、禁止部分からの除外も同時に行われる。
 テストトレイTSTの全てのデバイス収容部18にICデバイスが収容されると、トレイ搬送装置102により当該テストトレイTSTがチャンバ部100内に搬入される。
 一方、カスタマトレイKSTに搭載されていた全てのICデバイスがテストトレイTSTに積み替えられると、当該空のカスタマトレイKSTを昇降テーブルが下降させて、この空トレイをトレイ移送アーム205に受け渡す。トレイ移送アーム250は、この空トレイを空トレイストッカ203に一旦格納する。そして、アンローダ部400の窓部401に位置するカスタマトレイKSTがICデバイスで満載となったら、トレイ移送アーム250は、その満載のカスタマトレイKSTを回収するとともに、空トレイストッカ203からその窓部401に新たな空トレイを供給する。
 <チャンバ部100>
 上述したテストトレイTSTは、ローダ部300でICデバイスが積み込まれた後にチャンバ部100に送り込まれ、当該テストトレイTSTに搭載された状態で各ICデバイスのテストが実行される。
 チャンバ部100は、図2及び図3に示すように、テストトレイTSTに積み込まれたICデバイスに、目的とする高温又は低温の熱ストレスを印加するソークチャンバ110と、このソークチャンバ110で熱ストレスが印加された状態にあるICデバイスをテストヘッド5に押し付けるテストチャンバ120と、試験が終了したICデバイスから熱ストレスを除去するアンソークチャンバ130と、を備えている。
 ソークチャンバ110は、テストチャンバ120よりも上方に突出するように配置されている。そして、図3に概念的に示すように、このソークチャンバ110の内部には垂直搬送装置が設けられており、テストチャンバ120が空く迄の間、複数のテストトレイTSTがこの垂直搬送装置に保持されながら待機している。主として、この待機中に-55~+150℃程度の熱ストレスがICデバイスに印加される。
 テストチャンバ120には、その中央にテストヘッド5が配置されており、テストヘッド5の上方にテストトレイTSTが運ばれて、ICデバイスの入出力端子をテストヘッド5のソケット50のコンタクトピンに電気的に接触させることにより、ICデバイスのテストが実施される。
 この試験の結果は、例えば、テストトレイTSTに附された識別番号と、テストトレイTST内で割り当てられたICデバイスの番号と、で決定されるアドレスで、電子部品試験装置の記憶装置に記憶される。
 アンソークチャンバ130も、ソークチャンバ110と同様に、テストチャンバ120よりも上方に突出するように配置されており、図3に概念的に示すように、その内部に垂直搬送装置が設けられている。このアンソークチャンバ130では、ソークチャンバ110でICデバイスに高温を印加した場合には、ICデバイスを送風により冷却して室温に戻した後に、当該除熱されたICデバイスをアンローダ部400に搬出する。一方、ソークチャンバ110でICデバイスに低温を印加した場合には、ICデバイスを温風又はヒータ等で加熱して結露を生じない程度の温度に戻した後に、除熱されたICデバイスをアンローダ部400に搬出する。
 ソークチャンバ110の上部には、メインベース101からテストトレイTSTを搬入するための入口が形成されている。同様に、アンソークチャンバ130の上部にも、メインベース101にテストトレイTSTを搬出するための出口が形成されている。そして、メインベース101上には、これら入口及び出口を通じてテストトレイTSTをチャンバ部100から出し入れするためのトレイ搬送装置102が設けられている。このトレイ搬送装置102は、例えば回転ローラ等によりテストトレイTSTを搬送するように構成されている。このトレイ搬送装置102によって、アンソークチャンバ130から搬出されたテストトレイTSTが、アンローダ部400及びローダ部300を経由して、ソークチャンバ110に返送される。
 <アンローダ部400>
 アンローダ部400では、アンソークチャンバ130から運び出されたテストトレイTSTから、試験済みのICデバイスが、試験結果に応じてカスタマトレイに分類されながら積み替えられる。
 図2に示すように、アンローダ部400におけるメインベース101には、4つの窓部401が開口している。この窓部401には、格納部200からアンローダ部400に運び出されたカスタマトレイKSTが、メインベース101の上面に臨むように配置される。
 アンローダ部400は、試験済みのICデバイスをテストトレイTSTからカスタマトレイKSTに積み替えるデバイス搬送装置410を備えている。
 このデバイス搬送装置410は、メインベース101上にY軸方向に沿って架設された2本のY軸レール411と、このY軸レール411上をY軸方向に沿って移動可能な可動レール412と、可動レール412にX軸方向に沿って移動可能に支持されている可動ヘッド413と、可動ヘッド413に下向きに設けられた複数の吸着パッド(不図示)と、を備えている。それぞれの吸着パッドは、特に図示しないアクチュエータにより上下動可能となっており、複数のICデバイスをカスタマトレイKSTからテストトレイTSTに同時に積み替えることが可能となっている。なお、特に図示しないが、可動レール412及び可動ヘッド413は、例えば、ボールネジ機構を介して伝達されるサーボモータの駆動力によりそれぞれ移動するようになっている。
 図示は省略するが、アンローダ部400の4つの窓部401の下方には、カスタマトレイKSTを昇降させるための昇降テーブルがそれぞれ設けられている。ここでは、試験済みのICデバイスで満載となったカスタマトレイKSTを載せて昇降テーブルが下降し、この満載トレイをトレイ移送アーム205が受け取る。トレイ移送アーム205は、この満載トレイを、試験結果に応じた試験済ストッカ202に移送する。
 本実施形態では、4つの窓部401がアンローダ部400に形成されているため、4つのカテゴリ(試験結果)をリアルタイムに分類することができる。これに対し、5カテゴリ以上に対応する場合には、発生頻度の高い4カテゴリを窓部401に常時位置させ、発生頻度の低いカテゴリをバッファ部402に一時的に預けて、所定のタイミングで、そのカテゴリに対応したカスタマトレイKSTを窓部401に呼び出すようにしてもよい。
 以下に、本実施形態におけるローダ部300でのICデバイスの移載方法について、図11~図13を参照しながら説明する。
 図11は本発明の実施形態におけるローダ部でのICデバイスの移載方法を示すフローチャート、図12は本発明の実施形態のバッファ部における禁止部分を示す概略平面図、図13は本発明の実施形態のテストトレイにおける禁止部分を示す概略平面図である。
 先ず、図11のステップS10において、第1の搬送アーム320が、ローダ部300の窓部301に位置しているカスタマトレイKSTに接近し、第1の搬送アーム320が、カスタマトレイKSTからICデバイスを吸着保持する。この際、第1の搬送アーム320は、32個の吸着パッド323を用いて、32個のICデバイスを同時に保持する。
 なお、本実施形態では、第1の搬送アーム320が有する全ての吸着パッド323が、一度のタッチダウンで同時にICデバイスを吸着保持するが、第1の搬送アーム320が複数回タッチダウンすることで、全ての吸着パッド323がICデバイスを保持するようにしてもよい。
 次いで、第1の搬送アーム320がバッファ部350に移動する(ステップS20)。ここで、本実施形態では、図12に示すように、バッファ部350の128個の凹部351が、第1~第4の区域(zone)361~364に分割されている。各区域361~364には、4行8列に配列された32個の凹部351がそれぞれ割り当てられている。なお、同図中において凹部351内に示される数は、それぞれの区域361~364内における凹部351の番号である。
 第1~第3の区域361~363は、禁止部分を除いて、第1の搬送アーム320によりICデバイスが一度に載置される第1の領域(area)370として設定されている。一方、第4の区域364は、第1~第3の区域361~363に載置されなかったICデバイスが集約される第2の領域380として設定されている。
 一方、本実施形態におけるテストトレイTSTでは、図13に示すように、256個のインサート16が、第1~第8の範囲(region)21~28に分割されている。各範囲21~28には、4行8列に配列された32個のインサート16がそれぞれ割り当てられている。なお、同図中においてインサート16内に示される数は、それぞれの範囲21~28内におけるインサート16の番号である。
 テストヘッド5に装着されたソケット50の中には、試験に用いることができない故障ソケットが存在するため、テストトレイTSTでは故障ソケットに対応したインサート16へのICデバイスの収容が禁止されている。具体的には、本実施形態では、図13に示すように、第1の範囲21において第10番及び第23番のインサートが禁止部分となっている。
 同様に、第2の範囲22では第20番及び第25番のインサート、第3の範囲23では第6番のインサート、第4の範囲24では第18番及び第30番のインサート、第5の範囲25では第12番及び第31番のインサート、第6の範囲26では第2番及び第27番のインサート、第7の範囲27では第9番、第16番及び第26番のインサート、並びに、第8の範囲28では第28番のインサートが禁止部分となっている。なお、本実施形態で説明する禁止部分の数や位置は一例に過ぎず、電子部品試験装置の実際の使用状況等に応じて多様である。
 バッファ部350に移動した第1の搬送アーム320は、バッファ部350の第1の領域361にICデバイスを載置する(ステップS30)。この初回サイクルでは、バッファ部350の第1の領域361がテストトレイTSTの第1の範囲21に対応付けられており、第1の区域361の禁止部分として第1の範囲21と同様の部分が設定されている。すなわち、第1の搬送アーム320は、バッファ部350の第1の区域361の第10番及び第23番のインサート16にはICデバイスを載置せず、それ以外の全てのインサート16にICデバイスを載置する。
 次いで、第1の搬送アーム320はバッファ部350の第4の区域364に移動して(ステップS40)、第1の区域361に載置されなかった2つのICデバイスを第4の区域364に載置する(ステップS50)。
 この際、第1の搬送アーム320がICデバイスを第4の区域364に一度に載置してもよい。或いは、第4の区域364において空の凹部351をICデバイスで埋めるように、第1の搬送アーム320が第4の区域364に複数回に分けてICデバイスを載置(タッチダウン)してもよい。
 また、第4の区域364における禁止部分を避けて、第1の搬送アーム320が第4の区域364にICデバイスを載置してもよい。或いは、第2の搬送アーム330がICデバイスの積替作業以外の作業を行っている間に、第1の搬送アーム320が、第4の区域364における空の凹部351に、他の区域361~363からICデバイスを移動させたり、第4の区域364の禁止部分からICデバイスを取り除いてもよい。なお、第2の搬送アーム330の積替作業以外の作業の具体例としては、例えば、テストトレイTSTをチャンバ部100へ押し込む作業等を例示することができる。
 なお、本例では、バッファ部350の第4の区域364は、ローダ部300に数枚後(具体的には2枚後)に供給されるテストトレイTSTの第1の範囲21に対応付けられている。本発明においては特にこれに限定されず、第4の区域364を、テストトレイTSTの任意の領域21~28に対応付けることができる。
 次いで、第2の搬送アーム330が、バッファ部350の第1の区域361に載置されている全てのICデバイスを、ローダ部300に停止しているテストトレイTSTの第1の範囲21に一度に搬送する。この際、本実施形態では、禁止部分にICデバイスが載置されていないので、テストトレイTSTの禁止部分からICデバイスを除外する作業が不要となっている。
 次いで、制御装置340は、バッファ部350の第4の区域364がICデバイスで満たされているか否かを判断する(ステップS70)。例えば、第1の搬送アーム320によるICデバイスの移載実績を記憶装置345に記憶しておき、ステップS70において、制御装置340がこの記憶を参照することで、第4の区域364がICデバイスで満たされているか否かを判断することができる。
 バッファ部350の第4の区域364の凹部351がICデバイスで満たされていない場合には(ステップS70においてNO)、第1の搬送アーム320は、カスタマトレイKSTから全ての吸着パッド323にICデバイスを保持し(ステップS10)、バッファ部350に移動して(ステップS20)、禁止部分を除いて第2の区域362にICデバイスを載置する(ステップS30)。
 なお、この2回目のサイクルでは、バッファ部350の第2の区域362がテストトレイTSTの第2の範囲22に対応付けられており、図12及び図13に示すように、第2の区域362において第20番及び第25番のインサート16が禁止部分として設定されている。
 次いで、第1の搬送アーム320は、バッファ部350の第4の区域364に移動して(ステップS40)、第2の区域362に載置されなかったICデバイスを第4の区域364に載置する(ステップS50)。第2の搬送アーム430は、バッファ部350の第2の区域362に載置されている全てのICデバイスを、テストトレイTSTの第2の範囲22に一度に搬送する(ステップS60)。
 次いで、制御装置340は、バッファ部350の第4の区域364がICデバイスで満たされているか否かを再び判断する(ステップS70)。
 ここで、バッファ部350の第4の区域364がICデバイスで満たされていない場合には(ステップS70にてNO)、第1の搬送アーム320は、カスタマトレイKSTから全ての吸着パッド323にICデバイスを保持し(ステップS10)、バッファ部350に移動して(ステップS20)、禁止部分を除いて第3の区域363にICデバイスを載置する(ステップS30)。
 なお、この3回目のサイクルでは、バッファ部350の第3の区域363がテストトレイTSTの第3の範囲23に対応付けられており、図12及び図13に示すように、第3の区域363において第6番のインサート16が禁止部分として設定されている。
 次いで、第1の搬送アーム320は、バッファ部350の第4の区域364に移動して(ステップS40)、第3の区域363に載置されなかったICデバイスを第4の区域364に載置する(ステップS50)。第2の搬送アーム330は、バッファ部350の第3の区域363に載置されている全てのICデバイスを、テストトレイTSTの第3の範囲23に一度に搬送する。
 次いで、制御装置340は、バッファ部350の第4の区域364がICデバイスで満たされているか否かを再び判断する(ステップS70)。このステップS70において、第4の区域364がICデバイスで満たされるまで、ステップS10~S60を繰り返す。この繰り返しにおいて、4回目のサイクルではバッファ部350の第1の区域361をテストトレイTSTの第4の範囲24に対応付け、5回目のサイクルでは第2の区域362を第5の範囲25を対応付け、6回目のサイクルでは第3の区域363を第6の範囲26に対応付け、7回目のサイクルでは第1の区域361を第7の範囲27に対応付け、8回目のサイクルでは第2の区域362を第8の範囲28に対応付ける。
 テストトレイTSTにおいて禁止部分を除く全てのインサート16がICデバイスで満たされると、トレイ搬送装置102により、当該テストトレイTSTがチャンバ部100へと送り出されるとともに、新規なテストトレイTSTがアンローダ部400から供給される。
 そして、本実施形態において、第9~16回目のサイクルでは、バッファ部350の第3、第1及び第2の区域363、361,362を、新規なテストトレイTSTの第1~第8の範囲21~28に順に対応付ける。なお、バッファ部350の第1~第3の区域361~363と、テストトレイTSTの第1~第8の範囲21~28との対応付けは、任意に設定することができる。
 ステップS10~S50を繰り返すことで、禁止部分に対応したICデバイスが第4の区域364に集約される。本実施形態では、テストトレイTSTの第1~第8の範囲21~28に禁止部分が合計で15個存在していること、及び、第4の区域364には禁止部分を除いて30個の凹部351が存在していることから、2枚のテストトレイTSTにICデバイスを満載すると、バッファ部350の第4の区域364がICデバイスで満たされることとなる。
 ステップS70において、制御装置340により、バッファ部350の第4の区域364がICデバイスで満たされていると判断された場合には(ステップS70においてYES)、例えば3枚目のテストトレイTSTがローダ部300に供給されたら、第2の搬送アーム330が、バッファ部350の第4の区域364に載置されている全てのICデバイスを、当該テストトレイTSTの第1の範囲21に移動させて載置する(ステップS80)。
 なお、故障ソケットの数に応じて第2の領域380を増減させてもよい。例えば、テストヘッド5上の故障ソケットが多い場合には、第4の区域364に加えて、第3の区域363を第2の領域380として設定してもよい。因みに、テストトレイTSTにおいて第2の領域380が対応付けられる範囲21~28は、第1の領域370との対応付けから予め除外されている。
 以降、アンローダ部400からローダ部300に空のテストトレイTSTが供給される毎に、図11に示す処理を実行する。図8に示す記憶装置345には、以上に説明した移載方法をデバイス搬送装置310の制御装置340に実行させるための制御プログラムが保存されている。
 なお、図11は、ローダ部300におけるICデバイスの移載方法を理解するために、第1の搬送アーム320が第1~第3の区域361~363にICデバイスを移載するごとに(ステップS10~S50)、第2の搬送アーム330がバッファ部350からテストトレイTSTに移載(ステップS60)するように説明したが、特にこれに限定されず、第1の搬送アーム320と第2の搬送アーム330とは独立して積替作業を行うことが可能となっている。
 以上のように、本実施形態では、ステップS10~S50を繰り返すことで、バッファ部350の第1の領域370(第1~第3の区域361~363)への移載を行いながら、禁止部分に対応したICデバイスをバッファ部350の第2の領域380(第4の区域364)に集約することができる。このため、第1の搬送アーム320のタッチダウン回数等が減少するので、ICデバイスの積替作業の短縮化を図ることができる。
 なお、以上説明した実施形態は、本発明の理解を容易にするために記載されたものであって、本発明を限定するために記載されたものではない。したがって、上記の実施形態に開示された各要素は、本発明の技術的範囲に属する全ての設計変更や均等物をも含む趣旨である。

Claims (14)

  1.  第1の移載手段により第1の収容手段から第2の収容手段に被試験電子部品を移載する電子部品の移載方法であって、
     前記第1の移載手段が有する全ての保持部が、前記第1の収容手段から前記被試験電子部品を保持する第1の保持ステップと、
     前記第1の移載手段が前記第2の収容手段の第1の領域に移動して、前記第1の領域において前記被試験電子部品の収容が禁止されている禁止部分を除いて、前記第1の移載手段が前記第1の領域に前記被試験電子部品を載置する第1の載置ステップと、
     前記第1の移載手段が、前記第2の収容手段の第2の領域に移動して、前記第1の領域に載置されなかった前記被試験電子部品を、前記第2の領域に載置する第2の載置ステップと、を備えており、
     前記第1の保持ステップ、前記第1の載置ステップ、及び、前記第2の載置ステップを繰り返すことで、前記第1の領域の禁止部分に対応した前記被試験電子部品を前記第2の領域に集める電子部品の移載方法。
  2.  前記第2の移載ステップにおいて、前記第2の領域における禁止部分を除いて、前記第1の移載手段が前記第2の領域に前記被試験電子部品を載置する請求項1記載の電子部品の移載方法。
  3.  第2の移載手段が、前記第2の収容手段の前記第1の領域に載置されている全ての前記被試験電子部品を保持する第2の保持ステップと、
     前記第2の移載手段が第3の収容手段に移動して、前記第1の領域に載置されていた全ての前記被試験電子部品を前記第3の収容手段に一度に載置する第3の載置ステップと、を備えた請求項1又は2記載の電子部品の移載方法。
  4.  前記第2の領域における禁止部分を除いて、前記第2の領域が前記被試験電子部品で満たされたら、前記第2の移載手段が、前記第2の収容手段の前記第2の領域に載置されている全ての前記被試験電子部品を保持する第3の保持ステップと、
     前記第2の移載手段が前記第3の収容手段に移動して、前記第2の領域に載置されていた全ての前記被試験電子部品を前記第3の収容手段に一度に載置する第4の載置ステップと、を備えた請求項3記載の電子部品の移載方法。
  5.  前記第2の移載手段が前記被試験電子部品の移載作業以外の作業を行っている間に、前記第2の領域が禁止部分を除いて前記被試験電子部品で満たされるように、前記第1の移載手段が前記被試験電子部品を移動させる調整ステップをさらに備えた請求項3又は4記載の電子部品の移載方法。
  6.  前記第1の収容手段は、前記被試験電子部品を収容可能なカスタマトレイであり、
     前記第2の収容手段は、前記被試験電子部品を一時的に収容するバッファであり、
     前記第3の収容手段は、前記被試験電子部品を収容可能なテストトレイである請求項3~5の何れかに記載の電子部品の移載方法。
  7.  請求項3~6の何れかに記載の電子部品の移載方法により、前記第1の収容手段から前記第2の収容手段を経由して前記第3の収容手段に搬送する搬送ステップと、
     前記被試験電子部品を前記第3の収容手段に収容したまま、前記被試験電子部品を電子部品試験装置のテストヘッドのコンタクト部に押し付けて、前記被試験電子部品のテストを行うテストステップと、を備えた電子部品の試験方法。
  8.  第1の移載手段を備えた電子部品移載装置により、第1の収容手段から第2の収容手段に前記被試験電子部品を移載するために、前記電子部品移載装置の制御装置に実行させるための制御プログラムであって、
     前記第1の移載手段が有する全ての保持部が、前記第1の収容手段から前記被試験電子部品を保持する第1の保持ステップと、
     前記第1の移載手段が前記第2の収容手段の第1の領域に移動して、前記第1の領域において前記被試験電子部品の収容が禁止されている禁止部分を除いて、前記第1の移載手段が前記第1の領域に前記被試験電子部品を載置する第1の載置ステップと、
     前記第1の移載手段が、前記第2の収容手段の第2の領域に移動して、前記第1の領域に載置されなかった前記被試験電子部品を、前記第2の領域に載置する第2の載置ステップと、を前記制御装置に実行させ、
     前記第1の保持ステップ、前記第1の載置ステップ、及び、前記第2の載置ステップを繰り返すことで、前記第1の領域の禁止部分に対応した前記被試験電子部品を前記第2の領域に集めるように前記制御装置に実行させるための制御プログラム。
  9.  前記第2の移載ステップにおいて、前記第2の領域における禁止部分を除いて、前記第1の移載手段が前記第2の領域に前記被試験電子部品を載置する請求項8記載の制御プログラム。
  10.  前記電子部品搬送装置が有する第2の移載手段が、前記第2の収容手段の前記第1の領域に載置されている全ての前記被試験電子部品を保持する第2の保持ステップと、
     前記第2の移載手段が第3の収容手段に移動して、前記第1の領域に載置されていた全ての前記被試験電子部品を前記第3の収容手段に一度に載置する第3の載置ステップと、を前記制御装置にさらに実行させるための請求項8又は9記載の制御プログラム。
  11.  前記第2の領域における禁止部分を除いて、前記第2の領域が前記被試験電子部品で満たされたら、前記第2の移載手段が、前記第2の収容手段の前記第1の領域に載置されている全ての前記被試験電子部品を保持する第3の保持ステップと、
     前記第2の移載手段が前記第3の収容手段に移動して、前記第2の領域に載置されていた全ての前記被試験電子部品を前記第3の収容手段に一度に載置する第4の載置ステップと、を前記制御装置にさらに実行させるための請求項10記載の電子部品の制御プログラム。
  12.  前記第2の移載手段が前記被試験電子部品の移載作業以外の作業を行っている間に、前記第2の領域が禁止部分を除いて前記被試験電子部品で満たされるように、前記第1の移載手段が前記被試験電子部品を移動させる調整ステップを、前記制御装置にさらに実行させるための請求項10又は11記載の制御プログラム。
  13.  前記第1の収容手段が、前記被試験電子部品を収容可能なカスタマトレイであり、
     前記第2の収容手段は、前記被試験電子部品を一時的に収容するバッファであり、
     前記第3の収容手段は、前記被試験電子部品を収容可能なテストトレイである請求項10~12の何れかに記載の制御プログラム。
  14.  被試験電子部品を第1の収容手段から第2の収容手段を経由して第3の収容手段に移載する電子部品移載装置であって、
     前記被試験電子部品を前記第1の収容手段から前記第2の収容手段に移載する第1の移載手段と、
     前記被試験電子部品を前記第2の収容手段から前記第3の収容手段に移載する第2の移載手段と、
     前記第1及び前記第2の移載手段の動作を制御する制御装置と、
     請求項8~13の何れかに記載の制御プログラムを記憶する記憶装置と、を備えており、
     前記制御装置は、前記制御プログラムを実行する電子部品移載装置。
PCT/JP2008/052987 2008-02-21 2008-02-21 電子部品の移載方法およびそれを実行するための制御プログラム WO2009104267A1 (ja)

Priority Applications (2)

Application Number Priority Date Filing Date Title
PCT/JP2008/052987 WO2009104267A1 (ja) 2008-02-21 2008-02-21 電子部品の移載方法およびそれを実行するための制御プログラム
TW098103198A TWI398638B (zh) 2008-02-21 2009-02-02 A method of removing the electronic component, and a control program for carrying out the method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2008/052987 WO2009104267A1 (ja) 2008-02-21 2008-02-21 電子部品の移載方法およびそれを実行するための制御プログラム

Publications (1)

Publication Number Publication Date
WO2009104267A1 true WO2009104267A1 (ja) 2009-08-27

Family

ID=40985162

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2008/052987 WO2009104267A1 (ja) 2008-02-21 2008-02-21 電子部品の移載方法およびそれを実行するための制御プログラム

Country Status (2)

Country Link
TW (1) TWI398638B (ja)
WO (1) WO2009104267A1 (ja)

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2008012889A1 (en) * 2006-07-27 2008-01-31 Advantest Corporation Electronic component transfer method and electronic component handling device

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3417528B2 (ja) * 1996-04-05 2003-06-16 株式会社アドバンテスト Ic試験装置
JP4570208B2 (ja) * 2000-06-13 2010-10-27 株式会社アドバンテスト 試験済み電子部品の分類制御方法
WO2004108366A1 (ja) * 2003-06-06 2004-12-16 Advantest Corporation 搬送装置、電子部品ハンドリング装置および電子部品ハンドリング装置における搬送方法
JP5202297B2 (ja) * 2006-03-02 2013-06-05 株式会社アドバンテスト 移動装置及び電子部品試験装置
TWM313114U (en) * 2006-10-20 2007-06-01 Stack Devices Corp Carrying and loading device for electronic products

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2008012889A1 (en) * 2006-07-27 2008-01-31 Advantest Corporation Electronic component transfer method and electronic component handling device

Also Published As

Publication number Publication date
TW200942823A (en) 2009-10-16
TWI398638B (zh) 2013-06-11

Similar Documents

Publication Publication Date Title
JP4299383B2 (ja) Ic試験装置
JP3951436B2 (ja) Ic試験装置
JPH11297791A (ja) トレイ移送アーム及びこれを用いたトレイの移載装置、ic試験装置並びにトレイの取り廻し方法
KR101042655B1 (ko) 전자부품 이송방법 및 전자부품 핸들링 장치
WO1997005495A1 (fr) Testeur de dispositif a semi-conducteurs
JP4928470B2 (ja) 電子部品ハンドリング装置、電子部品試験装置、及び電子部品の試験方法
TWI601965B (zh) Component Processor
KR20210111681A (ko) 검사 장치
KR20230012520A (ko) 열전도성 웨이퍼를 사용하는 프로브 소자의 열적 안정화 장치 및 방법
JPWO2008142754A1 (ja) 電子部品試験装置及び電子部品試験方法
JP4222442B2 (ja) 電子部品試験装置用インサート
JP4570208B2 (ja) 試験済み電子部品の分類制御方法
JP5022375B2 (ja) トレイ搬送装置及びそれを備えた電子部品試験装置
JP2000187060A (ja) 電子部品試験装置
JP5314668B2 (ja) 電子部品移載装置およびそれを備えた電子部品試験装置
TWI490970B (zh) A pallet handling device, and an electronic component testing device provided with the device
WO2007135710A1 (ja) 電子部品試験装置
KR19990082894A (ko) 집적회로 시험장치
WO2009104267A1 (ja) 電子部品の移載方法およびそれを実行するための制御プログラム
JP2000162268A (ja) 電子部品の温度印加方法および電子部品試験装置
JP4180163B2 (ja) 電子部品試験装置用吸着装置
WO2008032396A1 (fr) Plateau d'essai et dispositif d'essai de composant électronique ainsi équipé
JP2002207065A (ja) 部品保持装置
WO2007083357A1 (ja) 電子部品試験装置及び電子部品の試験方法
KR20200122296A (ko) 키트-리스 픽 앤 플레이스 핸들러

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 08711770

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 08711770

Country of ref document: EP

Kind code of ref document: A1