Prior art keywords
rails
rail
fixing
leveling
bolts
Prior art date
Application number
PCT/ES2005/070044
Other languages
Spanish (es)
French (fr)
Inventor
Juan Francisco Meaza Gabay
Original Assignee
Gantry Española, S.A.
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gantry Española, S.A. filed Critical Gantry Española, S.A.
Priority to PCT/ES2005/070044 priority Critical patent/WO2006111589A1/en
Priority to EP05735163A priority patent/EP1873308A1/en
Publication of WO2006111589A1 publication Critical patent/WO2006111589A1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B9/00Fastening rails on sleepers, or the like
    • E01B9/66Rail fastenings allowing the adjustment of the position of the rails, so far as not included in the preceding groups
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B1/00Ballastway; Other means for supporting the sleepers or the track; Drainage of the ballastway
    • E01B1/002Ballastless track, e.g. concrete slab trackway, or with asphalt layers
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B2204/00Characteristics of the track and its foundations
    • E01B2204/06Height or lateral adjustment means or positioning means for slabs, sleepers or rails

Definitions

  • the object of the present invention is a railroad system in concrete plating as well as its installation system, which thanks to the elements that constitute the rail system allow at any time of the work the leveling of the rails so as their alignment at any time, ensuring the parallelism between lanes.
  • Concrete track tracks are known, they are mainly used for rail access to workshops, ports, hangars, garages and so on, where trains with high loads and slow speeds normally run.
  • this system does not allow a leveling in height during the work, with the consequent reduction of the traditional gauge, which in some cases is a clear inconvenience. Nor does it allow alignment between the rails or modification of the track width at any time during the work, as well as subsequent technical revisions without the need to lift the track.
  • the system of railroad tracks in a concrete plate object of the invention consists in firstly arranging a support bed or support base thereon, on this bed or base a support structure of the rails is arranged, which replace the Traditional naughty
  • the support structure of the rails consists of a rectangular steel plate or sheet that is arranged under the rails, serving as a support for the pampering, leaving the assembly formed by the sheet and the rails supported by adjustable bolts arranged on both sides of the rail, and not preferably facing each other.
  • adjustable parts for fixing the rails that are arranged on the steel plates are used. These regulating pieces allow the alignment of the rails, and ensure the parallelism between them, in addition to absorbing the lateral forces of the system.
  • the assembly process of the track system object of the invention comprises the following steps: - Laying of a base or bed where the entire track system will be supported.
  • This railroad system allows, as previously mentioned, a leveling of the rails' height during the work, by means of the nut under the sheet, a regulation of the alignment of each of the rails and the parallelism of the rails at any moment of the work before the final embedding of concrete, thanks to the use of the adjustable clips for fixing the rails to the steel plates.
  • the adjustable fixing clips are made up of elements that, once given the recommended tightening torque, ensure the locking of the system, the lateral adjustment of the fixing parts, allowing to guarantee the necessary track width.
  • Figure 1 shows a representation of the elements that make up the system of railroad tracks in concreted plate before proceeding to the concreting of the assembly.
  • Figure 2 shows the same previous figure that has been concreted up to half of the bolts.
  • FIG. 3 shows in detail the fixing of steel plates with rails, bolts and adjustable fixing elements.
  • Figure 4 shows in detail the constructive form of how an additional rail is arranged.
  • Figure 1 shows that the track system is arranged on a bed (10), according to the specifications of the designer, which serves as support for the whole system that is composed of a series of steel plates (2), arranged between the rails (1).
  • a bed (10) which serves as support for the whole system that is composed of a series of steel plates (2), arranged between the rails (1).
  • anchoring and leveling bolts (3) that allow height leveling. Said bolts (3) serve as support for the steel plates (2), and on these the rails (1) are fixed.
  • adjustable fixing clips (4) are used, which allow the regulation of the alignment of each of the rails, as well as the parallelism between the rails, throughout the assembly process of the tracks.
  • the adjustable fixing clips (4) are fixed to the wings (5) of the rails (1).
  • FIG 3 the connection between the different parts that make up the system is shown in more detail, where it is noteworthy how the bolts (3) are placed on both sides of the rail, and preferably in a non-facing manner.
  • the fixing and alignment clips (4) are also arranged on both sides of the rail (1), on its wings (5), and not facing each other.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Machines For Laying And Maintaining Railways (AREA)

Abstract

Railroad track system on concreted slab that allows to adjust the height of the track, to align the rails (1) and to make them parallel at any time of the system assembly process, comprised of a bed (10), base or support on which are disposed the support means for the rails which consist of steel plates (2) set from rail to rail and supported by bolts (3) placed on either side of the rails, preferably not opposite each other, while the rails are attached to the steel plates adjustable pieces that allow to align each rail and to make the rails parallel. This system allows placing an additional rail in order to adjust the track gauge.

Description

SISTEMA DE VÍAS DE FERROCARRIL EN PLACA HORMIGONADA Y PROCEDIMIENTO DE INSTALACIÓN DEL MISMO RAILWAY SYSTEM IN CONCRETE PLATE AND INSTALLATION PROCEDURE OF THE SAME
DESCRIPCIÓNDESCRIPTION
OBJETO DE LA INVENCIÓNOBJECT OF THE INVENTION
Es objeto de la presente invención un sistema de vias de ferrocarril en placa hormigonada asi como el sistema de instalación del mismo, que gracias a los elementos que constituyen el sistema de vias permiten en cualquier momento de la obra la nivelación en altura de los railes asi como la alineación de los mismos en cualquier momento, asegurando el paralelismo entre carriles.The object of the present invention is a railroad system in concrete plating as well as its installation system, which thanks to the elements that constitute the rail system allow at any time of the work the leveling of the rails so as their alignment at any time, ensuring the parallelism between lanes.
En los sistemas de vias de ferrocarril en placa hormigonada todo queda cubierto por hormigón, salvo las cabezas de los propios railes.In the railroad systems in concrete plate everything is covered by concrete, except for the heads of the rails themselves.
Caracteriza a la presente invención los elementos empleados en el sistema de vias, cuyas características constructivas y técnicas son tales que permiten una nivelación en altura, una alineación de cada uno de los railes, y el paralelismo entre si de los railes.It characterizes the present invention the elements used in the track system, whose constructive and technical characteristics are such that they allow a leveling in height, an alignment of each of the rails, and the parallel between them of the rails.
Por lo tanto, la presente invención se circunscribe dentro del ámbito de los sistemas de vias que quedan cubiertos por hormigón excepto las cabezas de los propios railes .Therefore, the present invention is circumscribed within the scope of road systems that are covered by concrete except the heads of the rails themselves.
ANTECEDENTES DE LA INVENCIÓNBACKGROUND OF THE INVENTION
Las vias en placa hormigonada son conocidas, se utilizan principalmente para accesos ferroviarios a talleres, puertos, hangares, cocheras etcétera, donde normalmente discurren trenes con cargas elevadas y a velocidades lentas.Concrete track tracks are known, they are mainly used for rail access to workshops, ports, hangars, garages and so on, where trains with high loads and slow speeds normally run.
Tradicionalmente, en los sistemas de vias en placa hormigonada, se dispone un lecho de hormigón o balastro y sobre éste la traviesa de madera u hormigón, a la que se fija y atornilla el rail. Este sistema plantea varios inconvenientes : - El empleo de traviesas, su ajuste y disposición no es económicamente hablando la solución más rentable.Traditionally, in concrete track systems, a concrete or ballast bed is arranged and on it the wooden or concrete crossbar, to which the rail is fixed and screwed. This system poses several drawbacks: - The use of sleepers, their adjustment and arrangement is not economically speaking the most cost effective solution.
Por otro lado, este sistema no permite una nivelación en altura durante la obra, con la consiguiente reducción del gálibo tradicional, lo cual en algunos casos es un claro inconveniente. Tampoco permite la alineación entre los railes ni modificación del ancho de via en cualquier momento durante la obra, asi como las posteriores revisiones técnicas sin necesidad de levantar la via .On the other hand, this system does not allow a leveling in height during the work, with the consequent reduction of the traditional gauge, which in some cases is a clear inconvenience. Nor does it allow alignment between the rails or modification of the track width at any time during the work, as well as subsequent technical revisions without the need to lift the track.
No permite la incorporación de carriles adicionales para anchos de vias diferentes.It does not allow the incorporation of additional lanes for widths of different tracks.
Por lo tanto, es objeto de la presente invención de sistema de vias de ferrocarril en placa hormigonada, conseguir un sistema que supere los anteriores inconvenientes, permitiendo una nivelación en altura, una alineación de cada uno de los railes y el paralelismo de los mismos en cualquier momento durante la obra, gracias al empleo de una pieza regulable de fijación, permitiendo la instalación de un tercer carril y quedando libre de mantenimiento . DESCRIPCIÓN DE LA INVENCIÓNTherefore, it is the object of the present invention of a railroad system in a concrete plate, to achieve a system that overcomes the previous drawbacks, allowing a leveling in height, an alignment of each of the rails and the parallelism thereof in any time during the work, thanks to the use of an adjustable fixing piece, allowing the installation of a third lane and being maintenance free. DESCRIPTION OF THE INVENTION
El sistema de vías de ferrocarril en placa hormigonada objeto de la invención consiste en disponer en primer lugar un lecho o base de sustentación de apoyo a los mismos, sobre este lecho o base se dispone una estructura de soporte de los raíles, que substituyen a las tradicionales traviesas .The system of railroad tracks in a concrete plate object of the invention consists in firstly arranging a support bed or support base thereon, on this bed or base a support structure of the rails is arranged, which replace the Traditional naughty
La estructura de soporte de los raíles consiste en una placa o chapa de acero rectangular que se dispone bajo los raíles, sirviendo de apoyo a los mimos, quedando el conjunto formado por la chapa y los raíles soportado por unos pernos regulables dispuestos a ambos lados del raíl, y no preferentemente de forma enfrentada.The support structure of the rails consists of a rectangular steel plate or sheet that is arranged under the rails, serving as a support for the pampering, leaving the assembly formed by the sheet and the rails supported by adjustable bolts arranged on both sides of the rail, and not preferably facing each other.
Por otro lado, se emplean unas piezas regulables de fijación de los raíles que se disponen sobre las placas de acero. Estas piezas de regulación permiten la alineación de los raíles, y aseguran el paralelismo entre ellos, además de absorber los esfuerzos laterales del sistema.On the other hand, adjustable parts for fixing the rails that are arranged on the steel plates are used. These regulating pieces allow the alignment of the rails, and ensure the parallelism between them, in addition to absorbing the lateral forces of the system.
El proceso de montajes del sistema de vías objeto de la invención, comprende los siguientes pasos: - Tendido de una base o lecho donde se sustentará todo el sistema de vías.The assembly process of the track system object of the invention comprises the following steps: - Laying of a base or bed where the entire track system will be supported.
Sobre dicho lecho inferior se disponen unos pernos roscados que sirven de soporte de las planchas de acero que están dispuestas de raíl a raíl y sirven de apoyo a los mismos. La nivelación se consigue con la tuerca que hay debajo de la chapa.On said lower bed there are threaded bolts that support the steel plates that are arranged from rail to rail and serve as support for them. The leveling is achieved with the nut under the plate.
Fijación de los raíles sobre las chapas, empleando unos clips regulables de fijación que bloquean lateralmente el carril y absorben los esfuerzos laterales, de modo que se garantiza el paralelismo de los railes en el tiempo. Sujeción o fijación del perno al sistema hasta la mitad de la altura del perno, lo que permite ajustes en altura.Fixing the rails on the plates, using adjustable fixing clips that laterally block the rail and absorb the lateral forces, so that the parallelism of the rails in time is guaranteed. Fastening or fixing the bolt to the system up to half the height of the bolt, which allows height adjustments.
Finalización de la instalación con la alineación y verificación del paralelismo entre railes .Completion of the installation with the alignment and verification of the parallelism between rails.
Este sistema de vias de ferrocarril permite como anteriormente ya se ha comentado, una nivelación en altura de los railes durante la obra, mediante la tuerca que hay debajo de la chapa, una regulación de la alineación de cada uno de los railes y el paralelismo de los railes en cualquier momento de la obra antes del embebido final de hormigón, gracias al empleo de los clips regulables de fijación de los railes a las planchas de acero.This railroad system allows, as previously mentioned, a leveling of the rails' height during the work, by means of the nut under the sheet, a regulation of the alignment of each of the rails and the parallelism of the rails at any moment of the work before the final embedding of concrete, thanks to the use of the adjustable clips for fixing the rails to the steel plates.
Los clips regulables de fijación se componen de elementos que, una vez dado el par de apriete recomendado, aseguran el bloqueo del sistema, la regulación lateral de las piezas de fijación, permitiendo garantizar el ancho de via que sea necesario.The adjustable fixing clips are made up of elements that, once given the recommended tightening torque, ensure the locking of the system, the lateral adjustment of the fixing parts, allowing to guarantee the necessary track width.
Por otro lado, además del consiguiente ahorro al sustituir las tradicionales traviesas por un conjunto de planchas de acero y pernos, permite la disposición de carriles adicionales para el caso de que sea necesario una adaptación de anchos de via.On the other hand, in addition to the consequent savings when replacing the traditional sleepers with a set of steel plates and bolts, it allows the provision of additional rails in case an adaptation of track widths is necessary.
Con este sistema de vias, éstas quedarán exentas de todo mantenimiento, ya que la manipulación y ajustes solamente podrán realizarse durante la obra, puesto que una vez instalado no podrá realizarse reparación ni mantenimiento alguno, debido a que habría que levantar la via al quedar cubiertas de hormigón excepto las cabezas de las mismas.With this system of roads, these will be exempt from all maintenance, since the manipulation and adjustments can only be carried out during the work, since once installed it cannot be repaired or any maintenance, because it would be necessary to lift the road to be covered with concrete except their heads.
DESCRIPCIÓN DE LOS DIBUJOSDESCRIPTION OF THE DRAWINGS
Para complementar la descripción que seguidamente se va a realizar y con objeto de ayudar a una mejor comprensión de sus características, se acompaña a la presente memoria descriptiva, de un juego de planos en cuyas figuras, de forma ilustrativa y no limitativa, se representan los detalles más significativos de la invención.To complement the description that is going to be carried out below and in order to help a better understanding of its characteristics, this descriptive report is accompanied by a set of drawings in whose figures, in an illustrative and non-limiting manner, the most significant details of the invention.
La figura 1, muestra una representación de los elementos que componen el sistema de vías de ferrocarril en placa hormigonada antes de proceder al hormigonado del conjunto .Figure 1 shows a representation of the elements that make up the system of railroad tracks in concreted plate before proceeding to the concreting of the assembly.
La figura 2, muestra la misma figura anterior que se ha hormigonado hasta la mitad de los pernos .Figure 2 shows the same previous figure that has been concreted up to half of the bolts.
La figura 3, muestra en detalle la fijación de las planchas de acero con los railes, los pernos y los elementos regulables de fijación.Figure 3 shows in detail the fixing of steel plates with rails, bolts and adjustable fixing elements.
La figura 4, muestra en detalle la forma constructiva de cómo se dispone un rail adicional .Figure 4 shows in detail the constructive form of how an additional rail is arranged.
REALIZACIÓN PREFERENTE DE LA INVENCIÓNPREFERRED EMBODIMENT OF THE INVENTION
A la vista de las figuras se describe seguidamente un modo de realización preferente de la invención propuesta.In view of the figures, a preferred embodiment of the proposed invention is described below.
En la figura 1 se muestra que el sistema de vías, está dispuesto sobre un lecho (10) , según especificaciones del proyectista, que sirve de soporte a todo el sistema que está compuesto de una serie de planchas de acero (2) , dispuestas entre los railes (1) . Sobre dicha plancha (2) y en sus extremos y a ambos lados del rail (1) se disponen unos pernos (3) de anclaje y nivelación que permiten la nivelación en altura. Dichos pernos (3) sirven de soporte de las planchas de acero (2), y sobre éstas se fijan los railes (1) .Figure 1 shows that the track system is arranged on a bed (10), according to the specifications of the designer, which serves as support for the whole system that is composed of a series of steel plates (2), arranged between the rails (1). On said plate (2) and at its ends and on both sides of the rail (1) there are anchoring and leveling bolts (3) that allow height leveling. Said bolts (3) serve as support for the steel plates (2), and on these the rails (1) are fixed.
Para la fijación de los railes (1) a las planchas de acero (2) se emplean unos clips (4) regulables de fijación, que permiten la regulación de la alineación de cada uno de los railes, asi como el paralelismo entre los railes, durante todo el proceso de montaje de las vias . Los clips (4) regulables de fijación se fijan a las alas (5) de los railes (1) .For fixing the rails (1) to the steel plates (2) adjustable fixing clips (4) are used, which allow the regulation of the alignment of each of the rails, as well as the parallelism between the rails, throughout the assembly process of the tracks. The adjustable fixing clips (4) are fixed to the wings (5) of the rails (1).
En la figura 2, se muestra la siguiente etapa de montaje del sistema donde hasta la mitad de la altura de los pernos (3) , se cubre con hormigón (6) u otro material, procediendo a la nivelación en altura, la alineación de cada uno de los railes, y el paralelismo entre los railes.In figure 2, the next stage of assembly of the system is shown where up to half the height of the bolts (3), it is covered with concrete (6) or other material, proceeding to the leveling in height, the alignment of each one of the rails, and the parallelism between the rails.
En la figura 3, se muestra con más detalle la unión entre las diferentes piezas que componen el sistema, donde es de destacar cómo los pernos (3) se colocan a ambos lados del rail, y preferentemente de manera no enfrentada. También los clips (4) de fijación y alineación se disponen a ambos lados del rail (1) , sobre sus alas (5) , y de modo no enfrentado.In figure 3, the connection between the different parts that make up the system is shown in more detail, where it is noteworthy how the bolts (3) are placed on both sides of the rail, and preferably in a non-facing manner. The fixing and alignment clips (4) are also arranged on both sides of the rail (1), on its wings (5), and not facing each other.
En la figura 4, se muestra que el sistema permite la disposición de un rail adicional (7) con el objetivo de permitir el ajuste de anchos de vias. En este caso observamos que en el espacio comprendido entre los dos railes (1) y el adicional (7) se dispone uno o varios pernos (8) asi como sendos clips (9) auxiliares de fijación y regulación, manteniéndose a ambos lados del conjunto formado por los dos railes, los pernos (3) asi como los clips (4) de fijación y alineación.In Figure 4, it is shown that the system allows the provision of an additional rail (7) in order to allow the adjustment of track widths. In this case we observe that in the space between the two rails (1) and the additional one (7) one or more bolts (8) are arranged as well as two auxiliary clips (9) for fixing and regulating, being kept on both sides of the assembly formed by the two rails, bolts (3) as well as fixing and alignment clips (4).
No altera la esencialidad de esta invención variaciones en materiales, forma, tamaño y disposición de los elementos componentes, descritos de manera no limitativa, bastando ésta para su reproducción por un experto It does not alter the essentiality of this invention variations in materials, shape, size and arrangement of the component elements, described in a non-limiting manner, this being sufficient for reproduction by an expert

Claims

REIVINDICACIONES
1.- Sistema de vías de ferrocarril en placa hormigonada que permite la nivelación en altura de la vía durante todo el transcurso de la obra así como la alineación de cada uno los raíles y el paralelismo entre ellos en cualquier momento de la obra, caracterizado porque consta de un lecho (10) , según especificaciones del proyectista, sobre el que se disponen los medios de anclaje y nivelación de los raíles (1), donde dichos medios de soporte y fijación consisten en unas planchas de acero (2) que van de raíl a raíl, que están soportadas por unos pernos (3) de anclaje y nivelación y que sobre dichas planchas se fijan los raíles (1) por medio de unos clips (4) regulables de fijación y alineación de los raíles garantizando el paralelismo entre los mismos.1.- System of railway tracks in concrete plate that allows the leveling in height of the track during the whole course of the work as well as the alignment of each one of the rails and the parallelism between them at any time of the work, characterized in that It consists of a bed (10), according to the specifications of the designer, on which the means for anchoring and leveling the rails (1) are arranged, where said support and fixing means consist of steel plates (2) ranging from rail to rail, which are supported by anchoring and leveling bolts (3) and that on said plates the rails (1) are fixed by means of adjustable clips (4) for fixing and aligning the rails guaranteeing the parallelism between the same.
2.- Sistemas de vías de ferrocarril en placa hormigonada, según la reivindicación 1, caracterizado porque permite la disposición de un raíl adicional (7) con el objetivo de permitir el ajuste de anchos de vías, teniendo en el espacio comprendido entre los dos raíles (1) y el adicional (7) dispuesto uno o varios pernos (8) así como sendos clips (9) auxiliares de fijación y regulación, manteniéndose a ambos lados del conjunto formado por los dos raíles, los pernos (3) de anclaje y nivelación así como los clips (4) regulables de fijación.2. Railroad systems in concrete plate, according to claim 1, characterized in that it allows the provision of an additional rail (7) in order to allow the adjustment of track widths, having in the space between the two rails (1) and the additional (7) arranged one or more bolts (8) as well as two auxiliary clips (9) for fixing and adjustment, keeping on both sides of the assembly formed by the two rails, the anchor bolts (3) and leveling as well as adjustable fixing clips (4).
3.- Procedimiento de instalación del sistema de ferrocarril de las reivindicaciones anteriores, caracterizado porque está compuesto de las siguientes etapas:3.- Installation procedure of the railway system of the preceding claims, characterized in that it is composed of the following steps:
Tendido de una base o lecho donde se sustentará todo el sistema de vías.Laying of a base or bed where the entire track system will be sustained.
Sobre dicho lecho inferior se disponen unos pernos roscados que sirven de soporte de las planchas de acero que están dispuestas de raíl a raíl y sirven de apoyo a los mismos. La nivelación se consigue con la tuerca que hay debajo de la chapa.On said lower bed there are threaded bolts that support the steel plates that are arranged on the rail to rail and support them. The leveling is achieved with the nut under the plate.
Fijación de los raíles sobre las chapas 5 empleando unos clips regulables de fijación que bloquean lateralmente el carril y absorben los esfuerzos laterales, de modo que se garantiza el paralelismo de los raíles en el tiempo. Sujeción o fijación del perno al sistema hastaFixing the rails on the plates 5 using adjustable fixing clips that laterally block the rail and absorb lateral forces, so that the parallelism of the rails over time is guaranteed. Fastening or fixing the bolt to the system until
10 la mitad de la altura del perno, lo que permite ajustes en altura.10 half the height of the bolt, allowing height adjustments.
Finalización de la instalación con la alineación y verificación del paralelismo entre raíles .Completion of the installation with the alignment and verification of the parallelism between rails.
15fifteen
20twenty
2525
30 30
PCT/ES2005/070044 2005-04-19 2005-04-19 Concrete slab railroad track system and method of installing same WO2006111589A1 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
PCT/ES2005/070044 WO2006111589A1 (en) 2005-04-19 2005-04-19 Concrete slab railroad track system and method of installing same
EP05735163A EP1873308A1 (en) 2005-04-19 2005-04-19 Concrete slab railroad track system and method of installing same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/ES2005/070044 WO2006111589A1 (en) 2005-04-19 2005-04-19 Concrete slab railroad track system and method of installing same

Publications (1)

Publication Number Publication Date
WO2006111589A1 true WO2006111589A1 (en) 2006-10-26

Family

ID=35276421

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/ES2005/070044 WO2006111589A1 (en) 2005-04-19 2005-04-19 Concrete slab railroad track system and method of installing same

Country Status (2)

Country Link
EP (1) EP1873308A1 (en)
WO (1) WO2006111589A1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102009060812A1 (en) * 2009-12-28 2011-06-30 DB Bahnbau Gruppe GmbH, 10179 System for straightening a track of a fixed railroad track
WO2019047305A1 (en) * 2017-09-07 2019-03-14 朱秀青 Press bar extension device for track construction

Families Citing this family (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101538818B (en) * 2009-04-29 2011-07-06 成都普罗米新科技有限责任公司 Steel rail microadjuster
ES2363849B1 (en) * 2009-06-16 2012-06-19 Fcc Contrucción, S.A. INSTALLATION PROCEDURE FOR PLATE ROAD IN BITUBO TUNNELS.
DE102010020801B4 (en) 2010-05-18 2013-03-14 Wirthwein Ag rail fastening
DE102011108093B4 (en) * 2011-07-19 2020-03-05 Siemag Tecberg Gmbh Precast lane for inclined conveyor system for mining trucks
WO2013030723A1 (en) * 2011-08-26 2013-03-07 Rte Technologie Gmbh Lifting and alignment system
CN102995503B (en) * 2012-12-12 2016-01-20 中铁二十三局集团有限公司 A kind of non-fragment orbit pre-tensioned prestressing structure switching turnout plate
CN105133447B (en) * 2015-10-07 2016-07-13 李红卫 A kind of hydraulic pressure space adjuster
FR3062139B1 (en) * 2017-01-20 2019-04-05 Alstom Transport Technologies RAILWAY TRACK FOR URBAN RAILWAY VEHICLE AND METHOD OF MANUFACTURING SUCH RAILWAY
AT16434U1 (en) * 2018-05-02 2019-09-15 Edilon Sedra Gmbh DEVICE FOR LAYING TRACKS
DE202019102034U1 (en) 2019-04-09 2020-07-10 Alois Schranz Metall & Maschinenbau Alignment device for aligning rails in track construction
CN111809460B (en) * 2020-07-28 2021-11-26 河北冀科工程项目管理有限公司 Rapid high-precision high-speed rail wall type inspection pit track laying construction method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE554240C (en) * 1929-05-23 1932-07-06 William Patrick Day Process for the production of rail bedding from concrete
US5285964A (en) * 1992-05-22 1994-02-15 Etablissements Vape Method for constructing a railroad in concrete having vertical and lateral adjustment steps prior to concrete pouring
DE10107116A1 (en) * 2001-02-14 2002-10-24 Schreck Mieves Gmbh Railtrack grid aligner for ballast-free track tops uses slides adjusting along support as anchored to trough base to shift rails crossways into re-alignment.
DE10316143A1 (en) * 2003-01-21 2004-08-05 Pfleiderer Infrastrukturtechnik Gmbh & Co. Kg Spindle device for height adjustment of track gratings

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE554240C (en) * 1929-05-23 1932-07-06 William Patrick Day Process for the production of rail bedding from concrete
US5285964A (en) * 1992-05-22 1994-02-15 Etablissements Vape Method for constructing a railroad in concrete having vertical and lateral adjustment steps prior to concrete pouring
DE10107116A1 (en) * 2001-02-14 2002-10-24 Schreck Mieves Gmbh Railtrack grid aligner for ballast-free track tops uses slides adjusting along support as anchored to trough base to shift rails crossways into re-alignment.
DE10316143A1 (en) * 2003-01-21 2004-08-05 Pfleiderer Infrastrukturtechnik Gmbh & Co. Kg Spindle device for height adjustment of track gratings

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102009060812A1 (en) * 2009-12-28 2011-06-30 DB Bahnbau Gruppe GmbH, 10179 System for straightening a track of a fixed railroad track
DE102009060812B4 (en) * 2009-12-28 2012-05-16 Db Bahnbau Gruppe Gmbh System for straightening a track of a fixed railroad track
WO2019047305A1 (en) * 2017-09-07 2019-03-14 朱秀青 Press bar extension device for track construction

Also Published As

Publication number Publication date
EP1873308A1 (en) 2008-01-02

Similar Documents

Publication Publication Date Title
WO2006111589A1 (en) Concrete slab railroad track system and method of installing same
AU2011351482B2 (en) Method for producing a slab trackway
RU2641572C2 (en) Method of transforming of roller on basis of ballast to wheel on basis of plates
KR101040102B1 (en) Establishment method of own extra prize train track rail
US20180148896A1 (en) Support for a panel of a section of guided transport track
ES2261112T3 (en) PROCEDURE FOR THE MANUFACTURE OF A FIXED FOOTWEAR FOR RAILWAYS ON RAILS.
ES2387965B1 (en) RECOVERY PROVISIONAL TRAVIESA.
CA3022814C (en) Device for setting up a level crossing
KR20160061551A (en) a assembling apparatus for elastomers type tram track skeleton
KR102197762B1 (en) A Special train for replacing gravel ballast to concrete ballast
US3317137A (en) Railroad crossing rail bed unit
ES2213243T3 (en) PROCEDURE AND DEVICE FOR TRANSPORTING A TRAVEL SECTION.
ES2936222T3 (en) Ballastless track section for rail vehicle
HUE029941T2 (en) Non-ballasted track for rail vehicles having an escape route
ES2258804T3 (en) PROCEDURE FOR THE CONSTRUCTION OF A FIXED ROAD BANK FOR GUIDED TRAFFICKING ON RAILS, AS WELL AS A FIXED VIA BANK TO CARRY OUT THE PROCEDURE.
ES2945957T3 (en) Modular supporting structure
US5465903A (en) Mounting plate for fixing elastomeric grade crossing panels to ties
RU2676772C1 (en) Railway crossing
WO2022011412A1 (en) Slab track adjustment plate and method of installation
ES2574538B1 (en) SYSTEM FOR CHANGE TO THREE RAILS IN ROADS IN PLATE OF POLIVALENT OR MONOVALENT TOUCH OF TWO RAILS AND PROCEDURE FOR SUCH SYSTEM
ES2222114T3 (en) DEVICE FOR RAILWAYS FOR THE PROVISIONING OF SHELVES SPECIALLY FOR THE STORAGE OF HEAVY PRODUCTS AND THEIR ASSEMBLY PROCEDURE.
KR20170075480A (en) Apparatus for supporting railway
CN216008055U (en) Rail guard for urban rail transit construction engineering
BR112020014241B1 (en) MODULAR SUPPORT STRUCTURE
ES2704178A1 (en) Concrete plinth for railway tracks, railway track that incorporates these sockets and method of installation of the track (Machine-translation by Google Translate, not legally binding)

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application
WWE Wipo information: entry into national phase

Ref document number: 2005735163

Country of ref document: EP

NENP Non-entry into the national phase

Ref country code: DE

NENP Non-entry into the national phase

Ref country code: RU

WWW Wipo information: withdrawn in national office

Country of ref document: RU

WWP Wipo information: published in national office

Ref document number: 2005735163

Country of ref document: EP