- Publication number
- WO2006106587A1 WO2006106587A1 PCT/JP2005/006352 JP2005006352W WO2006106587A1 WO 2006106587 A1 WO2006106587 A1 WO 2006106587A1 JP 2005006352 W JP2005006352 W JP 2005006352W WO 2006106587 A1 WO2006106587 A1 WO 2006106587A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- information
- parts
- procurement
- data
- building
- Prior art date
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
Definitions
- the present invention systematizes a building, and intensively produces and procure parts and components constituting the system, thereby improving the efficiency of a series of processes leading to the completion of the design capability of each building property. At the same time, it is possible to improve the quality of the building and reduce the construction cost, and in particular, pick up the parts necessary for the construction of the building without excess or deficiency, based on the design details of the ordered building.
- the present invention relates to a procurement preparation system and procurement preparation method for procurement in a timely manner.
- a building including a house is different from each other in shape and specification in order to correspond to a specific site or user, and has been constructed by one-piece production.
- single-product production it was necessary to start design from scratch each time an individual building was constructed.
- each time it was necessary to select the necessary building materials and procure market power. Therefore, each time, there is a problem in that it takes time for design work, construction material selection work and procurement work.
- Design work, building material selection work, and procurement work require specialized knowledge and experience, and the ability of the person in charge of the work is reflected in the quality of the work. Therefore, if such work is performed from the beginning every time a building is constructed, the quality and price of the building will be affected by the ability of the person in charge. In other words, it is not possible to perform appropriate design and selection of members when such a work is performed by a person with low ability. In addition, it is not possible to select a supplier who can provide building materials at an appropriate price, quality and delivery date. Therefore, there was a problem that the completed building did not meet customer requirements in terms of delivery time and quality, and the cost was within the budget.
- a systemized building is constructed using parts that have been standardized in advance. Also standard The design rules for how to apply the selected parts to the individual design conditions and design contents are prepared in advance. Accordingly, it is possible to reduce the time and effort required for the design work and the selection of necessary building materials, and it is possible to provide a building with a certain quality regardless of the ability of the person in charge.
- the present invention provides a specific means necessary for diversifying the specifications of a systemized building and supplying it more efficiently than before.
- the object is to provide a means that makes it possible to pick up corresponding parts without excess or deficiency and procure them in a timely manner according to the building design.
- the present invention is necessary for parts information storage means for storing information on procurement of parts and materials used for a building, outline shape information of an ordered building, information on the period of the building, and application of the building
- Property information storage means for storing property data including rough layout information of parts and members, and receiving property data search information from authorized users, and receiving the property data search information from the property information storage means Acquire property data corresponding to the property data acquisition means, and based on the property data, pick out and aggregate at least a part of the items and quantities of parts and materials required for the construction of the ordered building.
- Automatic pick-up means for creating pick-up information including extracted information extracted from the parts information storage means based on the picked-up item, and parts to be ordered based on the period information and pick-up information
- Ordering information automatic creation means for creating ordering information including the item item, quantity, and procurement schedule of the member.
- procurement information of parts / components is created in advance, and information created in design proposals and implementation designs to customers is stored and used, so that it is possible to use It is possible to automatically calculate the item, quantity, and procurement schedule of the part corresponding to the design content and provide it as ordering information. Therefore, parts corresponding to the design details of the building can be quickly and definitely picked up and ordered and procured on a schedule that can realize the scheduled period.
- the part information storage means stores procurement cost information of each part 'member
- the automatic pick-up means includes the procurement cost information in the extracted information. It can also be configured to create pick-up and retrieval information. With this configuration, it is possible to automatically calculate the procurement costs for parts and components in addition to the items, quantities, and procurement schedules for the parts corresponding to the design details of the building for which the order has been received. Therefore, convenience is further improved.
- the present invention further includes a field designating unit for receiving an input for designating a factory for ordering parts and components of a building, and the component information storage unit includes production cost information and production of each component / member. Schedule information is set for each factory and stored. And means for creating the pick-up information by including production cost information and production schedule information associated with the factory designated by the factory designation means in the extracted information, and the output means comprises the ordering information, It can also be configured to perform processing to send to the factory designated by the factory designation means.
- the schematic arrangement information may be configured to include sketch data.
- architecture it is very easy to show the layout of the main parts and materials that make up a building on the floor plan, and the floor plan uses what is generally used for building design and construction. Information creation and management can be simplified.
- the present invention is based on the fact that regular procurement request information is input, and is based on the rough shape information of the ordered building, the building period information, and the rough arrangement of parts and members necessary for the construction of the building.
- Part information storage means that stores information related to procurement of parts / materials in advance based on the picked-up items
- a step of creating ordering information including items, quantities, and procurement schedules of parts and parts to be ordered based on the construction period information of the building and the picked-up information is performed.
- FIG. 1 is an explanatory diagram showing an overall configuration of a procurement preparation system of the present embodiment.
- FIG. 2 is a block diagram showing a configuration of a procurement server in the procurement preparation system of the present embodiment.
- FIG. 3 is a block diagram showing a configuration of a procurement terminal in the procurement preparation system of the present embodiment.
- FIG. 4 is a block diagram showing a configuration of a property server in the procurement preparation system of the present embodiment.
- FIG. 5 is a flowchart showing procurement preparation data creation processing.
- FIG. 6 is an explanatory diagram showing a screen for selecting a transmission destination of procurement preparation data.
- FIG. 7 is an explanatory diagram showing a screen for inputting login information of a procurement preparation person in charge.
- FIG. 8 is an explanatory diagram showing a screen for selecting work contents.
- FIG. 9 is an explanatory diagram showing a screen for entering search information for searching for property data.
- FIG. 10 is an explanatory diagram showing a basic matter confirmation screen before creating work data.
- FIG. 11 is an explanatory diagram showing a basic matter confirmation and correction screen after creation of work data.
- FIG. 12 is an explanatory diagram showing a screen for inputting search information for searching for existing work data.
- FIG. 13 is an explanatory view showing a display screen of standard picking data.
- FIG. 14 is an explanatory diagram showing a detailed content display screen of standard picking data.
- FIG. 15 is an explanatory diagram showing an item addition screen for adding standard picking data.
- FIG. 16 is an explanatory view showing a display screen of bespoke data.
- FIG. 1 to 16 show an embodiment of the present invention, and FIG. 1 shows the entire procurement preparation system.
- Fig. 2 is a block diagram showing the configuration of the procurement server
- Fig. 3 is a block diagram showing the configuration of the procurement terminal
- Fig. 4 is a block diagram showing the configuration of the property server
- Fig. 5 is the procurement data.
- Flow chart showing the flow of creation processing Fig. 6 shows the screen for selecting the destination of procurement data
- Fig. 7 shows the screen for entering the login information for the procurement preparation staff
- Fig. 8 shows the screen for selecting work details
- Fig. 9 shows Screen for entering search information to search for property data
- Fig. 10 shows a screen for checking basic items before creating work data
- Fig. 11 shows a screen for checking and correcting basic items after creating work data
- Fig. 12 shows searching for existing work data Screen for entering search information to be used
- Fig. 13 is a screen for displaying standard picking data
- Fig. 14 is a screen for displaying details of standard picking data
- Fig. 15 is an item adding screen for adding standard picking data
- Fig. 16 is the display of bespoke data It is a screen.
- Buildings such as so-called industrial homes that have standardized the parts that make up the building, processed in advance at the factory, and minimized assembly at the site, are as shown in (1) to (5) below. It can be provided by preparing information and means. First, at the development stage of an industrialized house, (1) part information including specifications, shapes, constituent materials and procurement information of pre-standardized building components, and (2) how these parts are combined Whether a building with a specific shape or specified specifications will be realized! / Prepare design rules.
- the parts information and the design rules are provided in a state where they can be used as appropriate to the proposed designer who performs the work of reflecting the customer's request on the shape and specifications of the building.
- it can be provided as a design rule book, plan book, and case book.
- it can be provided as a database in which component information is registered.
- the set parts can be registered as items that can be placed on the drawing, and can be provided as CAD software with a function that prohibits placement without following the design rules.
- it can be provided as CAD software that holds information such as item, position, quantity, etc. of items placed on drawings in the drawing information.
- the procurement preparation system S of this embodiment corresponds to a part of the procurement preparation system (4) among the above (1) to (5).
- the data created in the previous process can be used.
- the data created in the previous process includes parts information including the procurement information of standard parts shown in (1) above. It also includes property data determined based on a meeting between the proposed designer and the customer.
- the property data includes outline shape information such as the floor plan and elevation of the building, period information such as the start date and completion date, and outline arrangement information of the parts and members constituting the building.
- the data created in the previous process is acquired, and the necessary parts are calculated based on the layout information, and the picked-up data is created. Also, based on the calculated item, search for and acquire the procurement information on the necessary parts. Based on the picked-up data and procurement information, procurement preparation data including ordering information is created and transmitted to a manufacturing department such as a factory that actually procures parts.
- Part information including standardized parts procurement information is associated with, for example, a part symbol and registered in the part information database.
- Information registered in the parts information database is usually prepared at the development stage of industrialized houses, but may be added or changed as appropriate.
- the outline shape information, period information, and outline layout information are created with orders for individual buildings, and are registered in the property-specific information database as property data.
- floor plans and elevations based on various design plans are created, and these data are stored individually. After that, the building order is decided and the contract with the customer.
- the final plan, elevation, etc. are treated as outline shape information and registered in the property-specific information database.
- the confirmed start date and completion date are treated as construction period information and registered in the property-specific information database.
- the floor plan, elevation, construction start date, completion date, etc. before confirmation is also registered in the property-specific information database, and confirmation information is given only to the ordered property and confirmed! /, Information You can identify it! /
- the layout shows the layout and names of the parts and members that make up the building. Therefore, it is possible to pick up parts and parts items (symbols that identify parts and parts) and quantities required for actual building construction from the floor plan.
- the sketch includes schematic arrangement information of parts and members. It should be noted that the placement and names of parts and members on the plan are easy to use and easy to use, but are not limited to the plan and may be shown in another drawing. In addition, it is not necessary for the rough layout information to be described in all the plans.
- schematic shape information such as a plan view and an elevation view
- schematic layout information such as a floor plan that describes the layout and names of parts and members
- CAD data for example, Registered in the database.
- the schematic arrangement information may be created as data in a list form.
- CAD data and list data may be included. In short, it is only necessary to include information on the items and quantities of necessary parts and parts.
- CAD data and list data can be converted into text data, for example, and transferred to the procurement preparation system of this example.
- the procurement preparation system S includes a procurement server device 10, a procurement terminal 20, and a property server device 30.
- the procurement server device 10, the procurement terminal 20, and the property server device 30 are configured to be connectable to each other via a communication line I such as the Internet or a dedicated line network or a LAN.
- a communication line I such as the Internet or a dedicated line network or a LAN.
- the parts information database is stored in the storage unit 11 of the procurement server device 10 as described later, and the property-specific information database is stored in the storage unit 31 of the property server device 30.
- the power database may be stored in one server device.
- a plurality of property server devices 30 and procurement server devices 10 may be provided.
- a unified server device that integrates the procurement server device 10 and the property server device 30 is installed at the headquarters, and all terminals in each branch, each sales office, and each factory send and receive information to and from the unified server device.
- You may comprise.
- the procurement server device 10 may be installed in a production management center that supervises all factories, and the property server device 30 may be installed in each branch and each sales office. Further, the procurement server device 10 may be installed in each factory, and the property server device 30 may be installed in each branch and each sales office.
- the procurement server device 10 includes a storage unit 11 in which various data and programs are stored, a communication unit 12 having a modem power as an input / output interface with the communication line I, and a storage unit 11. And a control unit 13 having a CPU for reading out the stored program and performing various processes based on the program.
- the procurement server device 10 can be constituted by, for example, a personal computer, a workstation, a general-purpose computer, or the like. Further, the procurement server device 10 may be a single computer or may be configured as an information processing device having a plurality of computer powers.
- the communication line I can be a public line such as a telephone line network or a dedicated communication line.
- the storage unit 11 stores various programs and data. For example, parts information database and property-specific information using key information such as programs for registering and managing information in the parts information database, design request numbers that identify orders received, and parts symbols that identify parts and parts A program that retrieves and retrieves information from a database
- the storage unit 11 stores a parts information database.
- the information registered in the part information database includes the part symbol that can uniquely identify the part, the child part symbol that identifies the child parts and components that make up the part, and the parent part if there is a parent part that contains the part. Includes the parent part symbol to be identified, part material, shape, dimensions, machining data, strength data based on structural calculation, weight, joint data based on part's component assignment, etc.
- procurement information of each part is registered in the part information database.
- the procurement information includes, for example, the price, delivery date, supplier name, agency name, etc., if the part is a manufacturer-supplied product.
- the part is a factory-made work, it includes the materials necessary for production, the suppliers, processing costs, production capacity, etc.
- the component information database corresponds to the component information storage means of the present invention.
- the parts information database is stored in the storage unit 11 of the procurement server device 10, and part of the database is stored in an external computer or storage device connected to the procurement server device 10 via the communication line I. As a configuration.
- the procurement terminal 20 is configured to transmit and receive various data between the procurement server device 10 and the property server device 30 via the communication line I.
- the person in charge of procurement transmits login information (ID and password), various search information, and various input information from the procurement terminal 20 to the procurement server device 10. Based on this, various data are also transmitted to the procurement terminal 20 for the procurement server device 10 and the procurement server device 10 displays the received data.
- the procurement terminal 20 includes an input unit 21 for a procurement preparation person to input data, a display unit 22 such as a CRT or LCD panel, and a communication line I. It includes a communication unit 23 that is an output interface such as a modem, a storage unit 24 that stores various data and programs, and a control unit 25 that includes a CPU that controls these units.
- the procurement terminal 20 is also configured with, for example, a personal computer. Further, instead of a personal computer, a workstation, a general-purpose computer, or the like can be used.
- the input unit 21 includes a mouse, a keyboard, and the like.
- the input unit 21 is A data capture device such as an electronic storage medium reader may be provided. With this configuration, electronic data to be transmitted to the procurement server device 10 can be taken into the procurement terminal 20. Further, the procurement terminal 20 may be connected to a printer device for printing documents such as a laser printer!
- the property server device 30 includes a storage unit 31 in which various data and programs are stored, a communication unit 3 2 having a modem and the like as an input / output interface with the communication line I, and a storage unit 31. And a control unit 33 having a CPU for reading out the program stored in the computer and performing various processes based on the program.
- the property server device 30 can be configured as an information processing device including a single personal computer, a plurality of personal computers, a workstation, a general-purpose computer, or the like, like the procurement server device 10 described above.
- the storage unit 31 stores a property-specific information database in which various data relating to the building for which an order has been received is registered.
- the property-specific information database is a database in which various design data proposed for customers and various data related to orders received are registered with the design request number as key information.
- the data registered in the property-specific information database is stored in the storage unit 31, and part of the data is stored in the storage server 31 and an external computer or storage device connected to the property server device 30 via the communication line I. It may be configured to be stored in
- the storage unit 31 stores information in the property-specific information database, manages and searches the registered information, and performs processing between the procurement server device 10 and the procurement terminal 20. Stores a program for data transmission / reception processing.
- the following information may be registered in the property-specific information database.
- the owner name, order branch name, design manager name, order date, order price, house product name, etc. can be registered as basic information of the ordered property.
- specifications such as the layout of wall and structural pillars, structural design data, and the components (equipment, color, material, specifications, product number, etc.) of each part.
- articles to be installed in buildings for example, grand pianos
- the usage and necessity of each room Noh soundproof room, home theater, etc.
- You can also register site information and ground information.
- This property-specific information database corresponds to the property information storage means of the present invention.
- the draft data is generated by the CAD system for creating the draft in the pre-procedure for creating the procurement preparation data by the procurement preparation system of this example, and is registered in the property-specific information database.
- CAD data for floor plans and elevations, bearing wall and structural column layout information, and data such as structural calculation results are based on the proposed design drawings proposed to the customer in the process of creating the floor plan. It is created by input to the CAD system to create the actual design drawing data, and is registered in the property-specific information database.
- the basic information of the ordered property and the specifications of the components, equipment, etc. of each part are converted into electronic data at the desired time, such as when creating a design proposal to be presented to the customer or at the time of contract.
- You may register in another information database.
- all of this information may be converted to electronic data, or some of the information is available in the form of printed documents, etc. You may check the contents by looking at.
- step SI the procurement preparation person in charge transmits, to the procurement server device 10, factory designation information for designating a factory to which the procurement preparation data is transmitted by a predetermined input.
- a selection screen as shown in FIG. 6 is displayed on the display unit 22 of the procurement terminal 20. The procurement officer selects a factory from the list and clicks the process start button. Thereby, the input data is transmitted to the procurement server device 10. Then, a login screen shown in FIG.
- step S2 the procurement preparation officer transmits login information to the procurement server device 10 by a predetermined input. For example, enter your ID and password on the login screen and click the process start button. Thereby, the input data is transmitted to the procurement server device 10.
- the procurement server device 10 performs user authentication based on the received login information. If the user is authenticated as a legitimate user, that is, a legitimate procurement preparation officer, the process is continued (step S2: Yes), and a menu bar for selecting work is displayed on the display unit 22. The On the other hand, if the authentication is not successful, the process is stopped (step S2: No), and an error message is displayed on the display unit 22.
- the user information (for example, the name of the person in charge of procurement preparation) specified by this ID is included in the procurement preparation data for the parts and components created and modified in this session. Added as creator information.
- the procurement preparation person in charge selects work contents and acquires property data of the ordered building property that is the target of the parts procurement work (steps S3 to S4).
- step S3 the procurement preparation person in charge selects either “create new” or “continue” partition correction from the work selection menu shown in FIG.
- the display unit 22 displays a menu bar for selecting an operation to be performed by the procurement preparation system S. If the procurement preparation data has not yet been created, and if the property is to create new procurement preparation data and create procurement preparation data, select “Create New”. On the other hand, select “continue” partition correction ”when adding or correcting existing procurement preparation data. It is also possible to select a work by inputting a predetermined command instead of selecting a menu.
- Step S3 When “Create New” is selected in Step S3, as shown in Fig. 9 (a) to (c), Enter the property data registration date (CADNET transmission date shown in Fig. 9 (a)), owner name, drawing number, etc., search, extract the property data for which procurement preparation data will be created, and enter the desired input Select by means (step S4).
- the desired property data can be identified from the property data accumulated in the property-specific information database.
- design request numbers that can uniquely identify each property are assigned to all properties. Therefore, by entering the design request number, the corresponding data can be extracted from the information stored in the property-specific information database. In addition, when the design request number is not available, it is possible to narrow down the target data by inputting various search conditions and specify the corresponding data.
- step S5 data used to create procurement preparation data is extracted from the specified property data and set as work data.
- the property data includes rough shape information, construction period information, and rough layout information, but the rough shape information (plan view, elevation view, etc.) is used to pick up parts / members to be used. It is not required for delivery. Therefore, in step S5, basic information such as the owner name and housing product name, construction period information, and rough layout information are extracted from the property data, and set in the work data.
- the work data is set, as shown in Fig. 11, a more detailed confirmation of basic items' correction screen is presented.
- step S3 if "continue 'partition correction" is selected in step S3, as shown in Fig. 12 (a) and (b), as the search conditions, the building classification of the property, the procurement preparation data destination factory name Enter the existing work data creation date (date of pick-up form in Fig. 12 (b)), owner name, etc., search, narrow down the relevant data, and select the relevant property.
- the procurement preparation data already created for the selected property and the procurement preparation data being created are selected and set as work data (step S6).
- step S7 new work data is created from the property data or selected from existing work data, and the work data that is the current work target is set.
- the basic items included in the work data are then presented on the basic item confirmation-correction screen shown in FIG. Check the contents here, and manually correct items Make corrections (step S7).
- the owner name, factory name, and partition person name can be changed.
- the work data includes “owner name”, “order number”, “product name”, “building classification”, “total area”, “CADNET transmission date”, “partition transmission destination”, “partitioner”. Information such as “fare”, “aggregation cost” and “total amount” is included.
- Order No.” corresponds to the design request number
- CADNET transmission date corresponds to the date on which the rough placement information such as the drawing is created and registered in the property-specific information database.
- the factory name specified in step S1 is set in “partition transmission destination”
- the procurement preparation person name logged in in step S2 is set in “sales person in charge”.
- the “fare” and “aggregation cost” can be set according to the designated factory name, for example, by setting different expenses for each factory in advance. “Total amount” is calculated based on the procurement cost of the parts and materials picked up based on this work data.
- Buttons for selecting items for various information processing operations are displayed on the basic item confirmation 'correction screen shown in Fig. 11. For example, “pick up standard”, “pick up bespoke”, “BMG”, “simple adjustment”, “print editing / send”, and the like.
- the person in charge of procurement preparation selects a work item by input means such as clicking these buttons (step S8). Each work is described below.
- “Selecting Standards” is the current work data included in the information included in the rough layout information?
- information on parts (standard members) set as standard products in advance is picked up, and the work for creating standard pick-up data by summing up quantities by item is performed.
- the standard pick-up data is created by first performing a rough automatic pick-up based on the data set as work data, and then making fine adjustments such as adding corrections.
- step S9 a rough automatic pick-up is performed.
- the items and quantities of parts / members included in the rough layout information included in the work data are extracted and aggregated.
- the part symbols placed on the drawing are automatically extracted from the CAD data of the sketch as rough layout information included in the work data, and the item and quantity counter To do.
- the part symbol and quantity data described in the configuration table column on the drawing are automatically extracted.
- the data aggregated for multiple plans is added up, and the item and quantity of parts used for the entire building are calculated.
- the list information is included in the rough layout information as described above, just list the list information.
- the created standard pick-up and data are displayed on the screen shown in FIG.
- the “symbol” shown in the column indicated by arrow B in FIG. 13 corresponds to the item (part symbol) of the part set as a standard product. In this way, the quantity is calculated for each item.
- step S10 fine adjustment such as correction and addition is performed on the standard picking data automatically created by the general automatic picking.
- the correction is performed as follows.
- the screen shifts to the detailed content display screen for each component shown in Fig. 14.
- the quantity of parts can be corrected. It is also possible to check the procurement information of parts.
- the work of picking up the standard and adding a new part to the data is performed, for example, as follows.
- the “Add Item Search” button is clicked on the screen of FIG. 13, the item addition screen shown in FIG. The surface is displayed. Enter the search information in the enlarged part, narrow down the standard parts that meet the conditions from the parts information database, and display them in the column marked A. The part selected and clicked can be added to the standard picking data.
- step S11 the standard members after addition and change are totaled. That is, after the addition and correction work is completed, the “total processing display” button on the screen of FIG. At this time, if the part has a child member, the child members are also counted together. In addition, when there is a change in a part for which an accessory or set is set, the quantity is adjusted accordingly. Then, the work data is updated including the collected data.
- parts can be picked up automatically by using the data created in the previous process almost automatically. In addition, mistakes in picking up and leakage can be prevented. In addition, by picking up the main parts, accessories and sets are adjusted automatically, so that waste can be saved. Therefore, the cost is reduced.
- “Pick-up by order” picks up information on parts set as bespoke parts (parts made by order) from the information included in the rough layout information from the current work data, and collects quantities by item. Pick up bespoke! ⁇ Create data.
- parts that do not meet the standards are designed when there is a special circumstance such as a design that cannot be realized without using parts that do not meet the standards, as requested by the customer.
- the bespoke data can be included in the property data. For example, when creating schematic layout information by writing part layout information on the floor plan, it is also possible to write a part code for a custom-made product that is replaced by a standard product part code.
- step S12 a roughly ordered part is selected. Specifically, when you click the “Pick up bespoke” button in Figure 11, the item and quantity of the symbol identified as a bespoke part from the CAD data and list information included in the rough layout information, as well as picking up the standard. Aggregate and create bespoke data. Then, the list shown in FIG. 16 is displayed.
- custom-ordered parts by, for example, a method such as including a special-ordered part-specific symbol not included in the standard part symbol.
- step S13 confirmation of detailed information, correction and correction of data
- step S14 tabulation and storage
- BMG based on the design details of each building, the work of counting the items and quantities of BMG parts created by the program that automatically designs the parts is performed each time (Step S16).
- BMG is an abbreviation for Building Material Generator.
- part design rules are programmed.
- the procurement preparation system By entering the building design details received in the BMG program, the necessary items and quantities of the parts, as well as the parts information such as shape and constituent materials, are generated. Therefore, the rough layout information includes BMG parts item and quantity information.
- BMG parts are pre-registered in the parts information database.
- the BMG program is used instead of searching the parts information database.
- the design information of the building is input to and processed. As a result, necessary part information is generated and acquired each time.
- step S16 BMG processing
- step S15 simple adjustment
- step S15 simple adjustment
- step S12 to S14 it is not necessary to pick up a special order (steps S12 to S14) if the design content does not require the use of custom parts. Therefore, the standard pick-up data is created at the minimum, and the total pick-up data can be created by adding custom pick-up data, data, and BMG member pick-up data as appropriate.
- an order list creation process is performed (step S17).
- the picked-up data is aggregated for each item, and order list data displaying the quantity and amount information for each item is created.
- amount information in addition to the total amount, the unit price for each part and the order amount subtotal can be attached as appropriate. If there is information on parts manufactured at a specific factory, other order list data including only that information can be automatically created and output.
- shipping information indicating when it is necessary to ship the aggregated parts to the factory site can be calculated for each part, and the information can be written in the order list.
- information that indicates when raw materials should be procured can be written, taking into account information regarding the production capacity of the factory and the raw material procurement period.
- the created order list is output by printing or sending data to the factory (step S18).
- information on parts to be procured can be easily picked up and passed to the factory.
- the factory is first designated and the part picking data is created.
- the part may be picked up without designating the factory first.
- characteristics such as procurement costs by the factory can be adjusted together after picking up the parts.
- production is concentrated at one factory, it is not necessary to consider differences in procurement characteristics among factories.
- parts and members corresponding to the design contents of a building can be quickly and definitely picked up and can be procured according to a schedule capable of realizing a scheduled period. Accordingly, it is possible to appropriately manage the ordering and production management of parts while responding to various types of building specifications, and supply necessary parts to the site with appropriate quality, delivery time, and price.
Landscapes
- Business, Economics & Management (AREA)
- Engineering & Computer Science (AREA)
- Economics (AREA)
- Entrepreneurship & Innovation (AREA)
- Human Resources & Organizations (AREA)
- Marketing (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Strategic Management (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
Description
Claims
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
PCT/JP2005/006352 WO2006106587A1 (ja) | 2005-03-31 | 2005-03-31 | 調達準備システム及び調達準備方法 |
CNA2005800493629A CN101151628A (zh) | 2005-03-31 | 2005-03-31 | 采购预备系统和采购预备方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
PCT/JP2005/006352 WO2006106587A1 (ja) | 2005-03-31 | 2005-03-31 | 調達準備システム及び調達準備方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2006106587A1 true WO2006106587A1 (ja) | 2006-10-12 |
Family
ID=37073155
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/JP2005/006352 WO2006106587A1 (ja) | 2005-03-31 | 2005-03-31 | 調達準備システム及び調達準備方法 |
Country Status (2)
Country | Link |
---|---|
CN (1) | CN101151628A (ja) |
WO (1) | WO2006106587A1 (ja) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP3690793A4 (en) * | 2017-09-29 | 2021-09-01 | Hitachi Construction Machinery Co., Ltd. | COMPONENT PROCUREMENT SYSTEM AND COMPONENT PROCUREMENT PROCEDURE |
CN113763066A (zh) * | 2020-06-18 | 2021-12-07 | 北京京东振世信息技术有限公司 | 用于分析信息的方法和装置 |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103559546A (zh) * | 2013-11-26 | 2014-02-05 | 武钢集团昆明钢铁股份有限公司 | 一种利用备件装机量控制采购计划的管理系统与方法 |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2001188813A (ja) * | 1999-12-28 | 2001-07-10 | Asahi Kasei Corp | 住宅資材発注方法およびシステム |
JP2001188812A (ja) * | 1999-12-28 | 2001-07-10 | Asahi Kasei Corp | 工業化注文住宅設計方法およびシステム |
JP2001273418A (ja) * | 2000-03-24 | 2001-10-05 | Original Engineering Consultants Co Ltd | 建設実際原価算出システム |
JP2001283050A (ja) * | 2000-03-28 | 2001-10-12 | Daiwa House Ind Co Ltd | 住宅産業におけるユーザー参加型設計支援システム |
JP2002222221A (ja) * | 2000-11-24 | 2002-08-09 | Alfa Prime Japan:Kk | 住宅情報管理方法、住宅情報管理システム、決済支援方法および決済支援システム |
JP2002366607A (ja) * | 2001-06-05 | 2002-12-20 | Japan Science & Technology Corp | 住宅供給システム |
JP2004102929A (ja) * | 2002-09-12 | 2004-04-02 | Wood One:Kk | 住宅部材生産管理方法および装置 |
-
2005
- 2005-03-31 WO PCT/JP2005/006352 patent/WO2006106587A1/ja not_active Application Discontinuation
- 2005-03-31 CN CNA2005800493629A patent/CN101151628A/zh active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2001188813A (ja) * | 1999-12-28 | 2001-07-10 | Asahi Kasei Corp | 住宅資材発注方法およびシステム |
JP2001188812A (ja) * | 1999-12-28 | 2001-07-10 | Asahi Kasei Corp | 工業化注文住宅設計方法およびシステム |
JP2001273418A (ja) * | 2000-03-24 | 2001-10-05 | Original Engineering Consultants Co Ltd | 建設実際原価算出システム |
JP2001283050A (ja) * | 2000-03-28 | 2001-10-12 | Daiwa House Ind Co Ltd | 住宅産業におけるユーザー参加型設計支援システム |
JP2002222221A (ja) * | 2000-11-24 | 2002-08-09 | Alfa Prime Japan:Kk | 住宅情報管理方法、住宅情報管理システム、決済支援方法および決済支援システム |
JP2002366607A (ja) * | 2001-06-05 | 2002-12-20 | Japan Science & Technology Corp | 住宅供給システム |
JP2004102929A (ja) * | 2002-09-12 | 2004-04-02 | Wood One:Kk | 住宅部材生産管理方法および装置 |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP3690793A4 (en) * | 2017-09-29 | 2021-09-01 | Hitachi Construction Machinery Co., Ltd. | COMPONENT PROCUREMENT SYSTEM AND COMPONENT PROCUREMENT PROCEDURE |
US11443081B2 (en) | 2017-09-29 | 2022-09-13 | Hitachi Construction Machinery Co., Ltd. | Part procurement system and part procurement method |
CN113763066A (zh) * | 2020-06-18 | 2021-12-07 | 北京京东振世信息技术有限公司 | 用于分析信息的方法和装置 |
CN113763066B (zh) * | 2020-06-18 | 2023-11-03 | 北京京东振世信息技术有限公司 | 用于分析信息的方法和装置 |
Also Published As
Publication number | Publication date |
---|---|
CN101151628A (zh) | 2008-03-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20050102152A1 (en) | Commercial real estate property management system | |
US20150234377A1 (en) | Construction management system | |
JP2002024495A (ja) | スケジュール管理システム | |
US20070112788A1 (en) | Development management system | |
US11907879B2 (en) | System and method for renewable power system interconnection submission processing with the aid of a digital computer | |
US20030097288A1 (en) | Inspection schedule management support system and inspection schedule management support method | |
US20040064381A1 (en) | Method and system for supplying management and maintenance parts | |
WO2006106587A1 (ja) | 調達準備システム及び調達準備方法 | |
CA3038780C (en) | System and method for management of web order placement | |
JP2005100192A (ja) | 商品受発注在庫管理システム、及び商品受発注在庫管理装置 | |
JP5004878B2 (ja) | 建設関係図面等情報配布システム | |
JP2002259768A (ja) | 印刷物受発注システム | |
JP2001306718A (ja) | コンピュータ及び通信技術を使った情報関連事業を提供する事業システム | |
CN202276361U (zh) | 支持多种访问方式的协同办公系统 | |
KR20140122469A (ko) | 통합 업무 지원 서비스 시스템 및 방법 | |
JP2005011106A (ja) | 調達管理システム | |
JP2001117983A (ja) | 原価管理装置及び記録媒体 | |
JP2007309034A (ja) | 基礎用鉄筋管理システム | |
JP2005275688A (ja) | 生地生産計画管理システム | |
JP4871409B1 (ja) | サインメンテナンスシステムおよびサインメンテナンスシステムを利用したサインメンテナンス方法 | |
JP2011014111A (ja) | 物の管理情報と、人の管理情報との相互管理システム | |
US20050033636A1 (en) | Advertisement creation support system and advertisement creation support control method | |
JP4150495B2 (ja) | 協調設計方法及び協調設計システム | |
JP2004234281A (ja) | 住宅リフォーム見積システムおよび住宅リフォーム見積プログラム | |
JP2005284881A (ja) | 業務進捗状況管理システム |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
121 | Ep: the epo has been informed by wipo that ep was designated in this application | ||
WWE | Wipo information: entry into national phase |
Ref document number: 200580049362.9 Country of ref document: CN |
|
NENP | Non-entry into the national phase |
Ref country code: DE |
|
WWW | Wipo information: withdrawn in national office |
Country of ref document: DE |
|
NENP | Non-entry into the national phase |
Ref country code: RU |
|
WWW | Wipo information: withdrawn in national office |
Country of ref document: RU |
|
122 | Ep: pct application non-entry in european phase |
Ref document number: 05727249 Country of ref document: EP Kind code of ref document: A1 |
|
WWW | Wipo information: withdrawn in national office |
Ref document number: 5727249 Country of ref document: EP |
|
NENP | Non-entry into the national phase |
Ref country code: JP |