WO2004050517A1 - コンテナ輸送調整管理システム及びコンテナ輸送調整管理方法 - Google Patents

コンテナ輸送調整管理システム及びコンテナ輸送調整管理方法 Download PDF

Info

Publication number
WO2004050517A1
WO2004050517A1 PCT/JP2003/015077 JP0315077W WO2004050517A1 WO 2004050517 A1 WO2004050517 A1 WO 2004050517A1 JP 0315077 W JP0315077 W JP 0315077W WO 2004050517 A1 WO2004050517 A1 WO 2004050517A1
Authority
WO
WIPO (PCT)
Prior art keywords
container
transport
schedule
containers
shipping company
Prior art date
Application number
PCT/JP2003/015077
Other languages
English (en)
French (fr)
Inventor
Kouji Imanishi
Original Assignee
Honda Motor Co.,Ltd.
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Honda Motor Co.,Ltd. filed Critical Honda Motor Co.,Ltd.
Priority to EP03775895A priority Critical patent/EP1566354A1/en
Priority to BRPI0316634-1A priority patent/BR0316634A/pt
Publication of WO2004050517A1 publication Critical patent/WO2004050517A1/ja

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/08Logistics, e.g. warehousing, loading or distribution; Inventory or stock management

Definitions

  • the present invention relates to a container transport coordination management system and a container transport coordination management method suitable for the transport coordination management of containers of the same shipping company.
  • FIG. 6 when transporting loaded Container 1 to location A, when Container 1 arrives at the container yard in the port for customs clearance, customs clearance is completed. Later, the truck receives container 1 at the container yard and transports container 1 to location A. When the cargo in container 1 is unloaded at location A, the empty container 1a is transported to the shipping company's container yard by the same truck as transport. Also, when the loaded container 2 is transported to the location B, the container 2 is transported to the location B in the same manner as described above, and when the load in the container 2 is released at the location B, the empty space is cleared. Container 2a is transported to the shipping company's container yard by the same truck as transport.
  • Fig. 7 for example, when exporting cargo from location A, empty containers 1a are transported from the shipping company's container yard to location A by truck, as shown in Figure 7.
  • the loaded container 1 is transported to the container yard in the port by the same truck as transport.
  • empty cargo 2a is transported from the shipping company's container yard to the location B by truck, and the loaded containers 2 are transported to the port B by the same truck as the transport. Transported to a container It is.
  • empty containers 1a and 2a are transported from the A and B lands to the shipping company's container yard when importing luggage, and from the shipping company's container yard when exporting luggage. And transported to B. For this reason, empty containers la and 2a must be transported between the shipping company's container yard and locations A and B, where the transport distance is long, and containers 1, 2, 1a and 2a must be transported. The efficiency of transportation is becoming worse, which hinders the reduction of power and transportation costs.
  • Patent Publication 200-212-176 proposes a system that allows importers and exporters to procure empty containers that can reduce import and export costs according to the volume of requested cargo. are doing. It has a mixed loading manager server that can send and receive data to and from the importer / exporter terminal, container transporter terminal, and customs broker terminal.
  • This mixed loading manager server includes the operation schedule of the container ship and the container capacity.
  • Container transporter file that stores the container transport information of the container transporter, etc.
  • the exporter / importer file that stores the cargo information such as the quantity of cargo requested by the importer / exporter, and the classified items, and the customs brokerage customs fees, etc.
  • Container space information and customs clearance costs that can reduce the import / export costs according to the volume of requested cargo by accessing the consolidation management server from the import / exporter terminal This makes it possible to search for import / export estimation information such as
  • the present invention has been made in view of such circumstances, and the same shipping company
  • the purpose of the present invention is to provide a container transport coordination management system and a container transport coordination management method that can increase the transport efficiency of containers and reduce transport costs. Disclosure of the invention
  • the container transport coordination and management system of the present invention when performing container transport coordination and management of the same shipping company, enters the container of the same shipping company loaded into the port, and after completing the customs clearance procedure at the container yard in the port, removes the container. After transporting to the A side, carrying out the luggage operation of the cargo in the container at the A side, transporting the empty container to the B side, and packing the luggage at the B side, This is a container transportation coordination management system that manages the transportation of the loaded container until it is transported to the container yard in the port where the customs clearance procedure is carried out.
  • the A site database which stores container specifications, the number of containers to be used, and various information indicating the shipping company to be used, the scheduled date for van filling based on export documents from the B site, and the container specifications to be used.
  • the number of containers to be used, and various information indicating the shipping company to be used are registered in the B-site database and the A-site database and the B-site database when the date of entry of the container is determined.
  • the container of the same shipping company that can be shared between the A side and the B side is grasped, and a container transport coordination management device that performs container transport coordination management, a container yard in the port, It is provided with terminals that are provided on the A side and B side and that can access the container transport coordination and management device.
  • the container transport coordinating and managing device determines the schedule of the outgoing van work on the A side and the schedule of the van filling work on the B side. create The schedule creation unit, a matching calculation unit that matches the schedule of the outgoing work created by the schedule creation unit with the schedule of the breading work, and a container transport schedule instruction based on the result matched by the matching calculation unit And an instruction issuing unit for issuing a certificate.
  • the container transport coordinating and managing equipment can be used when the arrival of the container is delayed, or when it is found that the container is damaged at the container yard in the port where the container was entered, or when there is damage to the container on the A side. In such a case, it is possible to provide a container transport coordinating section for adjusting so that another empty container of the same company as the container is used.
  • the matching calculation unit determines that the scheduled date of the van filling work on the B side is later than the scheduled date of the van exit work on the A side, or that the specifications of the loaded containers transported to the A side , Whether there is a container that meets the specifications of the container used on the B side, the number of loaded containers transported to the A side matches the number of containers used on the B side, or is transported to the A side.
  • the same or the same processing as the shipping company that uses the loaded container and the shipping company used on the B side can be performed.
  • the container transport coordination management method of the present invention when carrying out coordination control of container transport of the same shipping company, containers loaded by the same shipping company enter the port, and after the customs clearance procedure is completed at the container yard in the port, the container is removed. After transporting to the ground A side, carrying out the vanning work of the luggage in the container at the ground A side, transporting the empty container to the ground B side, and packing the luggage van at the ground B side.
  • This is a container transport coordination management method that manages the transport of the loaded container until it is transported to the container yard in the port where the customs clearance procedure is carried out.
  • Various information indicating the specifications, the number of containers to be used, and the shipping company to be used are registered in the A site database.
  • the process to be recorded and various information indicating the scheduled date of van filling work based on the export documents on the B side, the container specifications to be used, the number of containers to be used, and the shipping company to be used are registered in the B site database.
  • the same shipping company that can be shared between the A and B sites based on various information registered in the A site database and the B site database when the process and the port arrival date of the container are determined. It is characterized in that it has a process in which the container is identified and the container transport is coordinated and managed, and a process in which the coordinated management is confirmed from the container yard in the port and the A and B side. .
  • a process for creating a schedule for the outgoing van on the A side and a schedule for packing the van on the B side It has a process of matching the breading schedule created by the schedule creation unit with the schedule of the van filling work, and a process of issuing a container transport schedule instruction based on the matching result. It can be done.
  • the scheduled date for van stuffing on the B side is later than the scheduled date for the van departure work for the A land price, or if the specifications of the loaded containers to be transported to the A side are used on the B side, Whether there is a container that meets the container specifications, the number of loaded containers transported to the A side is a force that matches the number of containers used at the B side, and the loaded container ships transported to the A side
  • the company and the shipping company used on the B side can have the same or the same process as the shipping company. Monkey
  • the database for the A site is output based on the import documents of the A site. Register the scheduled date of the van operation, the specifications of the container to be used, the number of containers to be used, and various information indicating the shipping company to be used. Schedule the date of the van filling operation based on the export documents of the B site in the B site database. Register the container specifications to be used, the number of containers to be used, and various information indicating the shipping company to be used.
  • V and R are registered in the A and B land databases.
  • the container of the same shipping company that can be shared between the A side and the B side is grasped, and the coordination and management of the container transport is carried out. And container yard, to be accessed by providing et al were terminal location A and location B.
  • the A site database and the B site database may be provided in the same storage device (such as a file server), or they may be provided in separate storage devices.
  • the “container transport coordination management device” is composed of clients (terminal PCs, etc.).
  • FIG. 1 is a diagram for explaining the concept of the container transport coordination management system of the present invention.
  • FIG. 2 is a diagram showing an embodiment of the container transport coordination management system of the present invention.
  • FIG. 3 is a flowchart for explaining a container transport coordination management method by the container transport coordination management system of FIG.
  • FIG. 4 is a diagram for explaining a container transport coordination management method by the container transport coordination management system of FIG. ⁇
  • FIG. 5 is a diagram for explaining a container transport coordination management method by the container transport coordination management system of FIG.
  • Fig. 6 is a diagram for explaining the flow of container transportation when importing conventional packages.
  • Fig. 7 is a diagram for explaining the flow of container transport during the conventional export of luggage.
  • FIG. 1 is a diagram for explaining the concept of the container transportation coordination management system of the present invention
  • FIG. 2 is a diagram showing an embodiment of the container transportation coordination management system of the present invention
  • FIGS. 3 to 5 The figure is a diagram for explaining the container transportation coordination management method by the container transportation coordination management system of FIG.
  • the container transport coordination and management system of the present invention performs coordination and control of container transport by the same shipping company, and as shown in Fig. 1, first transports a loaded container 10 to the A location. When the container 10 arrives at the container yard in the port for customs clearance, after the customs clearance, the truck receives the container 10 at the container yard and transports the container 10 to the location A.
  • the container transport coordination management system shown in Fig. 2 is a container transport coordinator and management system 20; D / B (database) 30 for site A; DZB (database) 40 for site B; Terminal 50, terminal A on the side of A, and terminal 70 on the side of B are provided.
  • the container transport coordinating and managing device 20 is the same ship that can be shared between the A side and the B side based on various information recorded in the DZB 30 for the A area and the DZB 40 for the B area It grasps the company's containers and manages container transport coordination. It has a schedule creation section 21, a matching operation section 22, a container transport coordination section 23, and an instruction issuance section 24.
  • the schedule creation unit 21 creates a schedule for the outgoing van work (unloading work) on the A side based on various types of information on the A side registered in the DZB 30 for the Based on the various types of information for Land B registered in DZB 40, a schedule for bread filling (loading work) on Land B is created.
  • the matching operation unit 22 matches the schedule of the breading operation on the ground A side created by the schedule creation unit 21 with the schedule of the stuffing work on the ground on the ground B side. It will be described later.
  • the container transport coordinator 23 adjusts the schedule of the unloading work on the A side and the schedule of the breading work on the B side when the arrival of the port of the container 10 is delayed.
  • the container transport coordinating unit 23 when it is found that the container 10 is damaged at the container yard in the port where it entered, or when it is found that the container 10 is damaged on the ground A side, Adjust the schedule of the outgoing van work on the A side and the schedule of the breading work on the B side so that an empty container 10a of the same company different from the container 10 is used.
  • the instruction issuing unit 24 issues a container transport schedule instruction based on the result matched by the matching operation unit 23.
  • D / B30 for Land A various kinds of information indicating the scheduled van departure work on the side of Land A, the specifications of the container to be used, the number of containers to be used, the shipping company to be used, and the package are registered.
  • D / B40 for Site B various information indicating the scheduled date of the stuffing work at Site B, the container specifications to be used, the number of containers to be used, the shipping company to be used, and the luggage are registered.
  • the terminal 50 on the container yard side in the port is connected to the container transport coordinating and managing device 20 via the network, and checks the container transport schedule instruction issued by the instruction issuance unit 24. When it is found that container 10 is damaged at the container yard in the port where it entered, it is used to notify the fact.
  • the terminal 60 on the A side confirms the container transport schedule instruction, as described above, and notifies that the container 10 has been damaged on the A side, It is used when transmitting the above various information described in import documents.
  • Terminal 70 on the B side instructs container transportation schedule It is used when confirming documents and transmitting the various information described above in export documents.
  • DZB 30 for Land A already contains various information indicating the scheduled date of departure work at Site A, the container specifications to be used, the number of containers to be used, the shipping company to be used, and the luggage.
  • DZB40 for Site B has already registered various information indicating the expected date of breading work at Site B, the container specifications to be used, the number of containers to be used, the shipping company to be used, and the package.
  • the schedule creation unit 21 registers the location A registered in the DZB 30 for the location A. Based on the above-mentioned scheduled date of outgoing work, the container specifications to be used, the number of containers to be used, the shipping company to be used, and various types of information indicating the cargo, a schedule for the outgoing work at Site A is created (step 301 to 303).
  • the matching operation unit 22 creates a departure van on the side of the land created by the schedule creation unit 21. Matching is performed based on the work schedule and the bun filling work schedule on the B side (Step 307).
  • the matching here is that the scheduled date of the bun filling operation on the B side is later than the expected date of the unloading operation on the A side, or the specifications of the loaded containers 10 transported to the A side , Which conforms to the container specifications used on the B side Or the number of loaded containers 10 transported to the A side is equal to the number of containers used at the B side ⁇
  • the loaded containers 10 transported to the A side It is the same as that of the shipping company used on the side of the company B and the same.
  • NG is determined by such matching, a request is made for another empty container of the same company as the loaded container 10 transported to the A side.
  • the scheduled date for van stuffing on the B side is earlier than the scheduled date for van departure work on the A side, or if the specifications of the loaded containers 10 transported to the A side are If there is no container that can be used on the B side, or if the number of loaded containers 10 transported to the A side is less than the number of containers used on the B side, or A If the shipping company of the loaded containers 10 transported to the ground side is different from the shipping company used at the ground side B, if any or all of them are NG, the ground side requested at the ground side A respectively A request is made for another empty container of the same company as the loaded container 10 to be transported to (Step 308).
  • the container transportation adjustment unit 23 adjusts the container transportation (step 309).
  • the container transportation for example, if the arrival of container 10 in the port is delayed, the schedule of the departure work on the A side and the baking work on the B side will be adjusted.
  • the container 1 when the terminal 60 on the side of the A side is notified that there is damage to 0, the departure work on the side of the A side so that an empty container 10a from the same company as the container 10 is used. And the schedule of the breading work on the B side are coordinated.
  • the instruction issuing unit 24 issues a container transport schedule instruction matched by the matching calculation unit 22 (step 31). 0) c Then, by confirming the container transport schedule instruction with the terminal 50 on the container yard side in the port, the truck driver can carry out the container transport according to the container transport schedule .
  • the container storage space on the ground side A and the ground side B is four places each, and four loaded cargoes to be transported to the ground side A It is assumed that all containers 10 are used on the B side.
  • the container 10 to be loaded which has arrived at the 2nd place of the container storage space on the B side is to be loaded first, an empty container to be transported from the A side to the B side
  • the number of 10a is adjusted to be two, and two empty containers 10a are kept on standby at the A side, and from the A side at the scheduled time when the container accommodation space on the B side becomes vacant. It is possible to adjust the transportation so that the remaining empty container 10a is transported to the B side.
  • the scheduled date and time of the banking operation based on the import documents on the A side in D / B 30 for the A side Register the container specifications to be used, the number of containers to be used, and various information indicating the shipping company to be used.
  • the scheduled date of the van filling operation based on the export documents on the B site, Register the various information indicating the number of containers to be used and the shipping company to be used.When the port arrival date of the container is determined, it is registered in DZB30 for A and D / B40 for B Based on the various types of information available, the containers of the same shipping company that can be shared between the A and B sides are grasped, and the coordination and management of the container transport is performed. The results of the coordination and management are reported to the container yard in the port. And access by terminals 50-70 on the A side and B side. And it can be so.
  • the container 10a emptied on the ground A side is made available on the ground B side, the container 10a emptied on the ground A side will not be transferred to the shipping company's container yard. Since the transport is made to the B side, it is possible to increase the transportation efficiency of the container of the same company and to reduce the transportation cost.
  • the present invention is configured as described above, it is possible to increase the transportation efficiency of the container and reduce the transportation cost.

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Quality & Reliability (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Human Resources & Organizations (AREA)
  • Marketing (AREA)
  • Operations Research (AREA)
  • Development Economics (AREA)
  • Strategic Management (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

 コンテナの輸送効率を高め、併せて輸送コストの削減を図ることができるようにする。 同一の船会社のコンテナ輸送の調整管理を行うに際し、A地用D/B30にA地側の輸入書類に基づいた出バン作業の予定日、利用するコンテナ仕様、利用するコンテナ数、利用する船会社を示す各種情報を登録し、B地用D/B40にB地側の輸出書類に基づいたバン詰め作業の予定日、利用するコンテナ仕様、利用するコンテナ数、利用する船会社を示す各種情報を登録し、コンテナの入港日が決定されたとき、A地用D/B30及びB地用D/B40に登録されている各種情報に基づき、A地側とB地側との間で共用できる同一船会社のコンテナを把握し、コンテナの輸送の調整管理を行い、その調整管理された結果を、港内のコンテナヤードと、A地側及びB地側に設けらた端末50~70によってアクセスできるようにする。

Description

明細書 コンテナ輸送調整管理システム及びコンテナ輸送調整管理方法 技術分野
本発明は、 同一の船会社のコンテナの輸送調整管理に適したコンテナ 輸送調整管理システム及びコンテナ輸送調整管理方法に関する。 背景技術
荷物の輸入にあっては、 たとえば第 6図に示すように、 荷積みされた コンテナ 1を A地まで輸送する場合、 コンテナ 1が通関手続きのために 港内のコンテナヤードに到着すると、 通関手続き終了後、 トラックがそ のコンテナヤードにてコンテナ 1を受け取り、 そのコンテナ 1を A地ま で輸送する。 A地にて、 コンテナ 1内の荷が出されると、 その空となつ たコンテナ 1 aは輸送と同じトラックにより、 船会社のコンテナヤード まで輸送される。 また、 荷積みされたコンテナ 2を B地まで輸送する場 合も、 上記同様にそのコンテナ 2を B地まで輸送し、 B地にて、 コンテ ナ 2内の荷が出されると、 その空となったコンテナ 2 aは輸送と同じト ラックにより、 船会社のコンテナヤードまで輸送される。
一方、 荷物の輸出にあっては、 たとえば第 7図に示すように、 A地か らの荷物を輸出する場合、 船会社のコンテナヤードから空のコンテナ 1 aがトラックによって A地まで輸送され、 荷積みされたコンテナ 1は輸 送と同じトラックにより、 港内のコンテナヤードまで輸送される。 B地 からの荷物を輸送する場合も、 上記同様に、 船会社のコンテナヤードか ら空のコンテナ 2 aがトラックによって B地まで輸送され、 荷積みされ たコンテナ 2は輸送と同じトラックにより、 港内のコンテナまで輸送さ れる。
このように、空となったコンテナ 1 a , 2 aが荷物の輸入の際は A地、 B地から船会社のコンテナヤードまで輸送され、 荷物の輸出の際は船会 社のコンテナヤードから A地、 B地まで輸送される。 そのため、 輸送距 離の長い、 船会社のコンテナヤードと A地、 B地との間を空のコンテナ l a , 2 aを輸送しなければならず、 コンテナ 1, 2, 1 a , 2 aの輸 送効率が悪いものとなってなっているばかり力、 輸送コストの削減の妨 げとなっている。
ちなみに、 特許公開 2 0 0 2— 2 1 1 7 6 2では、 輸出入業者が、 依 頼貨物の容積に応じた輸出入コストの削減が可能な空コンテナを調達で きるようにしたシステムを提案している。 これは、 輸出入業者端末機、 コンテナ輸送業者端末機並びに通関業者端末機とデータの送受信が可能 な混載管理者サーバを有し、 この混載管理者サーバには、 コンテナ船の 運航予定、 コンテナ容量等のコンテナ輸送業者のコンテナ輸送情報を格 納したコンテナ輸送業者ファイルと、 輸出入業者の依頼貨物の数量、 分 類品目等の貨物情報を格納した輸出入業者ファイルと、 通関業者の通関 手数料等の通関情報を格納した通関業者ファイルとを備え、 輸出入業者 端末機から混載管理者サーバにアクセスして、 依頼貨物の容積に応じた 輸出入コストの削減が可能なコンテナ空間情報及び通関手続き費用等の 輸出入見積り情報を検索可能としたものである。
ところが、 上述した特許公開 2 0 0 2— 2 1 1 7 6 2では、 コンテナ に占める貨物の容積に応じた負担で済むようにして、 貨物 1個あたりに 掛かる通関手続き費用や輸出入の手続き費用等のコストを低減すること ができるが、 上述した空のコンテナ 1 a, 2 aの輸送効率を高めること は不可能である。
本発明は、 このような状況に鑑みてなされたものであり、 同一船会社 のコンテナの輸送効率を高め、 併せて輸送コストの削減を図ることがで きるコンテナ輸送調整管理システム及びコンテナ輸送調整管理方法を提 供することができるようにするものである。 発明の開示
本発明のコンテナ輸送調整管理システムは、 同一の船会社のコンテナ 輸送の調整管理を行うに際し、 荷積みされた同一の船会社のコンテナが 入港し港内のコンテナヤードにて通関手続き終了後、 コンテナを A地側 まで輸送し、 A地側にてコンテナ内の荷物の出バン作業を行い、 その空 のコンテナを B地側に輸送し、 B地側にて荷物のパン詰め作業を行った 後、 その荷積みのコンテナを通関手続きを行う港内のコンテナヤードへ 輸送するまでを管理するコンテナ輸送調整管理システムであって、 ' A地 側の輸入齊類に基づいた出バン作業の予定日、 利用するコンテナ仕様、 利用するコンテナ数、 利用する船会社を示す各種情報が登録される A地 用データベースと、 B地側の輸出書類に基づいたバン詰め作業の予定日、 利用するコンテナ仕様、 利用するコンテナ数、 利用する船会社を示す各 種情報が登録される B地用データベースと、 コンテナの入港日が決定さ れたとき、 A地用データベース及び B地用データベースに登録されてい る各種情報に基づき、 A地側と B地側との間で共用できる同一の船会社 のコンテナを把握し、 コンテナの輸送の調整管理を行うコンテナ輸送調 整管理装置と、港内のコンテナヤードと、 A地側及ぴ B地側に設けられ、 コンテナ輸送調整管理装置に対してアクセス可能な端末とを備えること を特徴とする。
また、 コンテナ輸送調整管理装置は、 A地用データベース及び B地用 データベースに登録されている各種情報に基づき、 A地側の出バン作業 のスケジュールと、 B地側のバン詰め作業のスケジュールとを作成する スケジュール作成部と、 スケジユール作成部によって作成された出バン 作業のスケジュールとパン詰め作業のスケジユーノレとからのマッチング をとるマッチング演算部と、 マッチング演算部によってマッチングされ た結果に基づき、 コンテナ輸送のスケジュール指示書を発行する指示書 発行部とを備えるようにすることができる。
また、 コンテナ輸送調整管理装置は、 コンテナの入港が遅れたとき、 又は入港した港内のコンテナヤードにてコンテナにダメージがあること が分かったとき、 又は A地側でコンテナにダメージがあることが分かつ たとき、 コンテナと同一会社の別の空のコンテナが利用されるように調 整を行うコンテナ輸送調整部を備えるようにすることができる。
また、 マッチング演算部は、 A地側の出バン作業の予定日より B地側 のバン詰め作業の予定日が遅いか、 A地側に輸送される荷積みされたコ ンテナの仕様の中に、 B地側で利用するコンテナ仕様に合うものがある か、 A地側に輸送される荷積みされたコンテナの数は B地側で利用する コンテナ数に合うか、 A地側に輸送される荷積みされたコンテナの船会 社と B地側で利用する船会社と同じか、 の処理を実行するようにするこ とができる。
本発明のコンテナ輸送調整管理方法は、 同一の船会社のコンテナ輸送 の調整管理を行うに際し、 荷積みされた同一の船会社のコンテナが入港 し港内のコンテナヤードにて通関手続き終了後、 コンテナを A地側まで 輸送し、 A地側にてコンテナ内の荷物の出バン作業を行い、 その空のコ ンテナを B地側に輸送し、 B地側にて荷物のバン詰め作業を行つた後、 その荷積みのコンテナを通関手続きを行う港内のコンテナヤードへ輸送 するまでを管理するコンテナ輸送調整管理方法であって、 A地側の輸入 書類に基づいた出パン作業の予定日、 利用するコンテナ仕様、 利用する コンテナ数、 利用する船会社を示す各種情報が A地用データベースに登 録される工程と、 B地側の輸出書類に基づいたバン詰め作業の予定日、 利用するコンテナ仕様、 利用するコンテナ数、 利用する船会社を示す各 種情報が B地用データベースに登録される工程と、 コンテナの入港日が 決定されたとき、 A地用データベース及び B地用データベースに登録さ れている各種情報に基づき、 A地側と B地側との間で共用できる同一の 船会社のコンテナが把握され、 コンテナの輸送の調整管理が行われるェ 程と、 調整管理が港内のコンテナヤードと、 A地側及び B地側とから確 認される工程とを有することを特徴とする。
また、 A地用データベース及び B地用データベースに登録されている 各種情報に基づき、 A地側の出バン作業のスケジュールと、 B地側のバ ン詰め作業のスケジュールとが作成される工程と、 スケジュール作成部 によって作成された出パン作業のスケジュールとバン詰め作業のスケジ ユールとからのマッチングがとられる工程と、 マッチングされた結果に 基づき、 コンテナ輸送のスケジュール指示書が発行される工程とを有す るようにすることができる。
また、 コンテナの入港が遅れたとき、 又は入港した港内のコンテナヤ ードにてコンテナにダメージがあることが分かったとき、 又は A地側で コンテナ^ダメージがあることが分かったとき、 コンテナと同一会社の 別の空のコンテナが利用されるように調整が行われる工程とを有するよ うにすることができる。
また、 A地価の出バン作業の予定日より B地側のバン詰め作業の予定 日が遅いか、 A地側に輸送される荷積みされたコンテナの仕様の中に、 B地側で利用するコンテナ仕様に合うものがあるか、 A地側に輸送され る荷積みされたコンテナの数は B地側で利用するコンテナ数に合う力 、 A地側に輸送される荷積みされたコンテナの船会社と B地側で利用する 船会社と同じか、 の処理が実行される工程を有するようにすることがで さる。
本発明に係るコンテナ輸送調整管理システム及びコンテナ輸送調整管 理方法においては、 同一の船会社のコンテナ輸送の調整管理を行うに際 し、 A地用データベースに A地側の輸入書類に基づいた出バン作業の予 定日、 利用するコンテナ仕様、 利用するコンテナ数、 利用する船会社を 示す各種情報を登録し、 B地用データベースに B地側の輸出書類に基づ いたバン詰め作業の予定日、 利用するコンテナ仕様、 利用するコンテナ 数、 利用する船会社を示す各種情報を登録し、 コンテナの入港日が決定 されたとき、 A地用データベース及び B地用データベースに登録されて V、る各種情報に基づき、 A地側と B地側との間で共用できる同一船会社 のコンテナを把握し、 コンテナの輸送の調整管理を行い、 その調整管理 された結果を、 港内のコンテナヤードと、 A地側及び B地側に設けらた 端末によってアクセスできるようにする。
なお、 本発明においては、 同一の記憶装置 (ファイルサーバ等) 内に、 A地用データベースと B地用データベースを設けてもよいし、 別個の記 憶装置内にそれらを設けても良い。
また、 「コンテナ輸送調整管理装置」は、データベースがファイルサー バの場合には、 クライアント (端末 P C等) で構成される。 図面の簡単な説明
第 1図は本発明のコンテナ輸送調整管理システムの概念を説明するため の図である。
第 2図は本発明のコンテナ輸送調整管理システムの一実施の形態を示す 図である。
第 3図は第 2図のコンテナ輸送調整管理システムによるコンテナ輸送調 整管理方法を説明するためのフローチヤ一トである。 第 4図は第 2図のコンテナ輸送調整管理システムによるコンテナ輸送調 整管理方法を説明するための図である。 ·
第 5図は第 2図のコンテナ輸送調整管理システムによるコンテナ輸送調 整管理方法を説明するための図である。
第 6図は従来の荷物の輸入の際のコンテナ搬送の流れを説明するための 図である。
第 7図は従来の荷物の輸出の際のコンテナ搬送の流れを説明するための 図である。 発明を実施するための最良の形態
以下、 本発明の実施の形態について説明する。
第 1図は、 本発明のコンテナ輸送調整管理システムの概念を説明する ための図、 第 2図は、 本発明のコンテナ輸送調整管理システムの一実施 の形態を示す図、 第 3図〜第 5図は、 第 2図のコンテナ輸送調整管理シ ステムによるコンテナ輸送調整管理方法を説明するための図である。 本発明のコンテナ輸送調整管理システムは、 同一の船会社のコンテナ 輸送の調整管理を行うものであり、 第 1図に示すように、 まず荷積みさ れたコンテナ 1 0を A地まで輸送する場合、 コンテナ 1 0が通関手続き のために港内のコンテナヤードに到着すると、 通関手続き終了後、 トラ ックがそのコンテナヤードにてコンテナ 1 0を受け取り、 そのコンテナ 1 0を A地まで輸送する。 A地にて、 コンテナ 1 0の出バン作業が行わ れると、 その空となったコンテナ 1 0 aは船会社のコンテナヤードまで の輸送距離に比べて遙かに近い、 B地まで輸送される。 B地にてバン詰 め作業が行われたコンテナ 1 0は、 A地までの輸送と同じトラックによ り、 港内のコンテナヤードまで輸送される。 このような、 同一の船会社 のコンテナ輸送の調整管理は、 後述の出バン作業のスケジュールとバン 詰め作業のスケジュールとのマツチングによって、 A地で空となるコン テナ 1 0 aが B地で用いられるとなったときに、 A地で空となったコン テナ 1 0 aを船会社のコンテナヤードに戻さずに、 B地まで輸送させる ようにしている。 これにより、 通常、 空となったコンテナ 1 0 aがその 都度、 A地、 B地から船会社のコンテナヤードまで戻されることが大幅 に少なく されるため、 コンテナ 1 0 , 1 0 aの輸送効率が大幅にアップ されるようになる。
次に、 第 2図により、 本発明のコンテナ輸送調整管理システムについ て説明する。
第 2図に示すコンテナ輸送調整管理システムは、 コンテナ輸送調整管 理装置 2 0、 A地用 D / B (データベース) 3 0、 B地用 D Z B (デー タベース) 4 0、 港内のコンテナヤード側の端末 5 0、 A地側の端末 6 0、 B地側の端末 7 0を備えている。
コンテナ輸送調整管理装置 2 0は、 A地用 D Z B 3 0及び B地用 D Z B 4 0に ¾録されている後述の各種情報に基づき、 A地側と B地側との 間で共用できる同一船会社のコンテナを把握し、 コンテナ輸送の調整管 理を行うものであり、 スケジュール作成部 2 1、マツチング演算部 2 2、 コンテナ輸送調整部 2 3、 指示書発行部 2 4を備えている。
スケジュール作成部 2 1は、 A地用 D Z B 3 0に登録されている後述 の A地用の各種情報に基づき、 A地側の出バン作業 (荷出し作業) のス ケジュールを作成し、 B地用 D Z B 4 0に登録されている後述の B地用 の各種情報に基づき、 B地側のパン詰め作業 (荷積み作業) のスケジュ ールを作成する。
マツチング演算部 2 2は、 スケジュール作成部 2 1によって作成され た A地側め出パン作業のスケジュールと B地側のバン詰め作業のスケジ ユールとからのマッチングをとるものであるが、 その詳細は、後述する。 コンテナ輸送調整部 2 3は、 コンテナ 1 0の入港が遅れたとき、 A地 側の出パン作業のスケジュール及び B地側のパン詰め作業のスケジユー ルを調整する。 また、 コンテナ輸送調整部 2 3は、 入港した港内のコン テナヤードにてコンテナ 1 0にダメージがあることが分かったとき、 又 は A地側でコンテナ 1 0にダメージがあることが分かったとき、 コンテ ナ 1 0とは別の同一会社の空のコンテナ 1 0 aが利用されるように A地 側の出バン作業のスケジュール及び B地側のパン詰め作業のスケジユー ルを調整する。
指示書発行部 2 4は、 マツチング演算部 2 3によってマッチングされ た結果に基づき、 コンテナ輸送のスケジュール指示書を発行する。
A地用 D / B 3 0には、 A地側の出バン作業の予定日、 利用するコン テナ仕様、 利用するコンテナ数、 利用する船会社、 荷物を示す各種情報 が登録される。
B地用 D / B 4 0には、 B地側のバン詰め作業の予定日、 利用するコ ンテナ仕様、 利用するコンテナ数、 利用する船会社、 荷物を示す各種情 報が登録される。
港内のコンテナヤード側の端末 5 0は、 ネッ トワークを介してコンテ ナ輸送調整管理装置 2 0に接続され、 指示書発行部 2 4によって発行さ れたコンテナ輸送のスケジュール指示書を確認したり、 入港した港内の コンテナヤードにてコンテナ 1 0にダメージがあることが分かったとき. そのことを通知したりする際に用いられる。
A地側の端末 6 0は、 上記同様に、 コンテナ輸送のスケジュール指示 書を確認したり、 A地側にてコンテナ 1 0にダメージがあることが分か つたとき、 そのことを通知したり、 輸入書類に記載される上述した各種 情報を送信したりする際に用いられる。
B地側の端末 7 0は、 上記同様に、 コンテナ輸送のスケジュール指示 書を確認したり、 輸出書類に記載される上述した各種情報を送信したり する際に用いられる。
次に、 このような構成のコンテナ輸送調整管理システムによるコンテ ナ輸送調整管理方法について説明する。 なお、 以下の説明においては、 A地用 D Z B 3 0に、 A地側の出バン作業の予定日、 利用するコンテナ 仕様、 利用するコンテナ数、 利用する船会社、 荷物を示す各種情報が既 に登録され、 B地用 D Z B 4 0には、 B地側のパン詰め作業の予定日、 利用するコンテナ仕様、 利用するコンテナ数、 利用する船会社、 荷物を 示す各種情報が既に登録されているものとする。
そしてまず、 第 3図に示すように、 コンテナ輸送調整管理装置 2 0に 対し、 指示書発行指示が出されると、 スケジュール作成部 2 1により、 A地用 D Z B 3 0に登録されている A地側の上述した出バン作業の予定 日、 利用するコンテナ仕様、 利用するコンテナ数、 利用する船会社、 荷 物を示す各種情報に基づき、 A地側の出バン作業のスケジュールが作成 される (ステップ 3 0 1 〜 3 0 3 )。 また、 スケジュール作成部 2 1によ り、 B地用 D / B 4 0に登録されている B地側の上述したバン詰め作業 の予定日、 利用するコンテナ仕様、 利用するコンテナ数、 利用する船会 社、 荷物を示す各種情報に基づき、 B地側のパン詰め作業のスケジユー ルが作成される (ステップ 3 0 4 , 3 0 5 )。
次いで、 A地用の荷積みされたコンテナ 1 0の入港日が決定されると (ステップ 3 0 6 )、マツチング演算部 2 2により、スケジュール作成部 2 1によって作成された A地側の出バン作業のスケジュールと B地側の バン詰め作業のスケジュールとからのマツチングがとられる (ステップ 3 0 7 )。 ここでのマッチングは、 A地側の出パン作業の予定日より B地 側のバン詰め作業の予定日が遅いか、 A地側に輸送される荷積みされた コンテナ 1 0の仕様の中に、 B地側で利用するコンテナ仕様に合うもの があるか、 A地側に輸送される荷積みされたコンテナ 1 0の数は B地側 で利用するコンテナ数に合う力 \ A地側に輸送される荷積みされたコン テナ 1 0の船会社と B地側で利用する船会社と同じか、 の処理を実行す ることである。
そして、 このようなマッチングにより、 N Gとされた場合には、 A地 側に輸送される荷積みされたコンテナ 1 0と同一会社の別の空コンテナ の依頼が行われる。 すなわち、 たとえば A地側の出バン作業の予定日よ り B地側のバン詰め作業の予定日が早い場合、 又は A地側に輸送される 荷積みされたコンテナ 1 0の仕様の中に、 B地側で利用するコンテナ仕 様に合うものがない場合、 又は A地側に輸送される荷積みされたコンテ ナ 1 0の数が B地側で利用するコンテナ数に足りない場合、 又は A地側 に輸送される荷積みされたコンテナ 1 0の船会社と B地側で利用する船 会社とが違う場合の何れか又は全てが N Gである場合、 それぞれ B地側 で要望する A地側に輸送される荷積みされたコンテナ 1 0と同一会社の 別の空コンテナの依頼が行われる (ステップ 3 0 8 )。
これに対し、 マッチングが O Kである場合は、 コンテナ輸送調整部 2 3により、 コンテナ輸送の調整が行われる (ステップ 3 0 9 )。 ここでは、 たとえばコンテナ 1 0の入港が遅れたとき、 A地側の出バン作業のスケ ジュール及び B地側のパン詰め作業のスケジュールが調整される。また、 入港した港内のゴンテナヤードにて港内のコンテナヤード側の端末 5 0 からコンテナ 1 0にダメージがあることが通知されたとき、 又は港内の コンテナ ードからの出荷後、 A地側でコンテナ 1 0にダメージがある ことが A地側の端末 6 0によって通知されたとき、 コンテナ 1 0とは別 の同一会社の空のコンテナ 1 0 aが利用されるように A地側の出バン作 業のスケジュール及び B地側のパン詰め作業のスケジュールが調整され る。 このようにしてコンテナ輸送調整部 2 3により輸送調整が行われると、 指示書発行部 2 4により、 マッチング演算部 2 2によってマッチングさ れたコンテナ輸送のスケジュール指示書が発行される(ステップ 3 1 0 ) c そして、 そのコンテナ輸送のスケジュール指示書を、 港内のコンテナヤ ード側の端末 5 0によって確認することで、 トラックの運転手はコンテ ナ輸送のスケジュールに沿ったコンテナ輸送を行うことができる。
コンテナ輸送に際しては、 たとえば第 4図に示すように、 A地側及び B地側のコンテナ収'容スペースがそれぞれ 4力所であって、 A地側に輸 送される荷積みされた 4つのコンテナ 1 0が全て B地側でも利用される 場合を想定する。 この場合、 B地側のコンテナ収容スペースの 2力所に 先に到着しているこれから荷積みしようとしているコンテナ 1 0が収容 されている場合、 A地側から B地側に輸送する空のコンテナ 1 0 aの数 が 2つになるように調整され、 さらに A地側に 2つの空のコンテナ 1 0 aを待機させておき、 B地側のコンテナ収容スペースが空く予定時刻に A地側から B地側に残りの空のコンテナ 1 0 aを輸送させるような輸送 調整も可能である。
また、 第 5図に示すように、 B地側のコンテナ収容スペースの全てに 先に到着しているこれから荷積みしよう としていコンテナ 1 0が収容さ れており、 A地側から B地側に輸送する空のコンテナ 1 0 aの数が 2つ である場合には、 A地側に 2つの空のコンテナ 1 0 aを待機させておき、 B地側のコンテナ収容スペースが空く予定時刻に A地側から B地側に残 りの空のコンテナ 1 0 aを輸送させるような調整も可能である。 この場 合、 A地側の残り 2つの空のコンテナ 1 0 aは、 船会社のコンテナヤー ドに戻すような調整が行われる。 また、 A地側の端末 6 0によって空の コンテナ 1 0 aの何れかにダメージがあることが通知されると、 コンテ ナ輸送調整部 2 3により、 そのダメージのある空のコンテナ 1 0 aを船 会社のコンテナヤードに戻し、 その空のコンテナ 1 0 aと同一会社の別 の空コンテナを B地側に輸送するような調整も可能である。
このように、 本実施の形態では、 同一の船会社のコンテナ輸送の調整 管理を行うに際し、 A地用 D / B 3 0に A地側の輸入書類に基づいた出 バン作業の予定日、 利用するコンテナ仕様、 利用するコンテナ数、 利用 する船会社を示す各種情報を登録し、 B地用 D / B 4 0に B地側の輸出 書類に基づいたバン詰め作業の予定日、 利用するコンテナ仕様、 利用す るコンテナ数、 利用する船会社を示す各種情報を登録し、 コンテナの入 港日が決定されたとき、 A地用 D Z B 3 0及ぴ B地用 D / B 4 0に登録 されている各種情報に基づき、 A地側と B地側との間で共用できる同一 船会社のコンテナを把握し、 コンテナの輸送の調整管理を行い、 その調 整管理された結果を、 港内のコンテナヤードと、 A地側及ぴ B地側に設 けられた端末 5 0〜 7 0によってアクセスできるようにした。
これにより、 A地側で空になったコンテナ 1 0 aが B地側で利用可能 とされると、 A地側で空になったコンテナ 1 0 aを船会社のコンテナヤ ードまで さずに、 B地側に輸送するようにしたので、 同一会社のコン テナの輸送効率を高めることができるばかり力 輸送コストの削減が図 れる。
なお、 本実施の形態では、 荷積みされたコンテナ 1 0及び空になった コンテナ 1 0 aを A地、 B地の 2力所で輸送させる場合について説明し たが、 荷積みされたコンテナ 1 0及び空になったコンテナ 1 0 aの輸送 は 3力所以上であってもよいことは勿論である。 産業上の利用可能性
本発明は上記の如く構成したので、 コンテナの輸送効率を高め、 併せて 輸送コストの削減を図ることができる。

Claims

請求の範囲
1 . 同一の船会社のコンテナ輸送の調整管理を行うに際し、 荷積みされ た前記同一の船会社のコンテナが入港し港内のコンテナヤードにて通関 手続き終了後、 前記コンテナを A地側まで輸送し、 A地側にて前記コン テナ内の荷物の出バン作業を行い、その空のコンテナを B地側に輸送し、 B地側にて荷物のバン詰め作業を行った後、 その荷積みのコンテナを通 関手続きを行う港内のコンテナヤードへ輸送するまでを管理するコンテ ナ輸送調整管理システムであって、
前記 A地側の輸入書類に基づいた出バン作業の予定日、 利用するコン テナ仕様、 利用するコンテナ数、 利用する船会社を示す各種情報が登録 される A地用データベースと、
前記 B地側の輸出書類に基づいたバン詰め作業の予定日、 利用するコ ンテナ仕様、 利用するコンテナ数、 利用する船会社を示す各種情報が登 録される B地用データベースと、
前記コンテナの入港日が決定されたとき、 前記 A地用データベース及 ぴ B地用データベースに登録されている各種情報に基づき、 A地側と B 地側との間で共用できる前記同一の船会社のコンテナを把握し、 前記コ ンテナの輸送の調整管理を行うコンテナ輸送調整管理装置と、
前記港内のコンテナヤードと、 前記 A地側及ぴ B地側に設けられ、 前 記コンテナ輸送調整管理装置に対してアクセス可能な端末とを備える ことを特徴とするコンテナ輸送調整管理システム。
2 . 前記コンテナ輸送調整管理装置は、
前記 A地用データベース及ぴ B地用データベースに登録されている各 種情報に基づき、 前記 A地側の出バン作業のスケジュールと、 前記 B地 側のバン詰め作業のスケジュールとを作成するスケジュール作成部と、 前記スケジユール作成部によって作成された出バン作業のスケジユー ルとバン詰め作業のスケジュールとからのマツチングをとるマッチング 演算部と、
前記マッチング演算部によってマッチングされた結果に基づき、 コン テナ輸送のスケジュール指示書を発行する指示書発行部とを備える ことを特徴とする請求の範囲第 1項に記載のコンテナ輸送調整管理シ ステム。
3 . 前記コンテナ輸送調整管理装置は、 前記コンテナの入港が遅れたと き、 又は入港した港内の前記コンテナヤードにて前記コンテナにダメ一 ジがあることが分かったとき、 又は前記 A地側で前記コンテナにダメー ジがある とが分かったとき、 前記コンテナと同一会社の別の空のコン テナが利用されるように調整を行うコンテナ輸送調整部を備えることを 特徴とする請求の範囲第 1項又は第 2項に記載のコンテナ輸送調整管理 システム。
4 . 前記マッチング演算部は、 前記 A地側の出バン作業の予定日より前 記 B地側のバン詰め作業の予定日が遅いか、 前記 A地側に輸送される荷 積みされたコンテナの仕様の中に、 前記 B地側で利用するコンテナ仕様 に合うものがあるか、 前記 A地側に輸送される荷積みされたコンテナの 数は前記 B地側で利用するコンテナ数に合うカ 前記 A地側に輸送され る荷積みされたコンテナの船会社と前記 B地側で利用する船会社と同じ カ の処理を実行することを特徴とする請求の範囲第 2項又は第 3項に 記載のコンテナ輸送調整管理システム。
5 . 同一の船会社のコンテナ輸送の調整管理を行うに際し、 荷積みされ た前記同一の船会社のコンテナが入港し港内のコンテナヤードにて通関 手続き終了後、 前記コンテナを A地側まで輸送し、 A地側にて前記コン テナ内の荷物の出バン作業を行い、その空のコンテナを B地側に輸送し、 B地側にて荷物のパン詰め作業を行つた後、 その荷積みのコンテナを通 関手続きを行う港内のコンテナヤードへ輸送するまでを管理するコンテ ナ輸送調整管理方法であって、
前記 A地側の輸入書類に基づいた出バン作業の予定日、 利用するコン テナ仕様、 利用するコンテナ数、 利用する船会社を示す各種情報が A地 用データベースに登録される工程と、 前記 B地側の輸出書類に基づいたバン詰め作業の予定日、 利用するコ ンテナ仕様、 利用するコンテナ数、 利用する船会社を示す各種情報が B 地用データベースに登録される工程と、
前記コンテナの入港日が決定されたとき、 前記 A地用データベース及 ぴ B地用データベースに登録されている各種情報に基づき、 A地側と B 地側との間で共用できる前記同一の船会社のコンテナが把握され、 前記 コンテナの輸送の調整管理が行われる工程と、
前記調整管理が前記港内のコンテナヤードと、 前記 A地側及び B地側 とから確認される工程とを有する
ことを特徴とするコンテナ輸送調整管理方法。
6 . 前記 A地用データベース及び B地用データベースに登録され ている各種情報に基づき、 前記 A地側の出バン作業のスケジュールと、 前記 B地側のバン詰め作業のスケジュールとが作成される工程と、 前記スケジュール作成部によって作成された出パン作業のスケジユー ノレとパン詰め作業のスケジュールとからのマツチングがとられる工程と、 前記マッチングされた結果に基づき、 コンテナ輸送のスケジュール指 示書が発行される工程とを有する
ことを特徴とする請求の範囲第 5項に記載のコンテナ輸送調整管理方 法。
7 . 前記コンテナの入港が遅れたとき、 又は入港した港内の前記コンテ ナヤ一ドにて前記コンテナにダメージがあることが分かったとき、 又は 前記 A地側で前記コンテナにダメージがあることが分かつたとき、 前記 コンテナと同一会社の別の空のコンテナが利用されるように調整が行わ れる工程とを有する
ことを特徴とする請求の範囲第 5項又は第 6項に記載のコンテナ輸送 調整管理方法。
8 . 前記 A地側の出バン作業の予定日より前記 B地側のバン詰め作業の 予定日が遅いか、 前記 A地側に輸送される荷積みされたコンテナの仕様 の中に、 前記 B地側で利用するコンテナ仕様に合うものがあるか、 前記 A地側に輸送される荷積みされたコンテナの数は前記 B地側で利用する コンテナ数に合う力、 前記 A地側に輸送される荷積みされたコンテナの 船会社と前記 B地側で利用する船会社と同じか、 の処理が実行されるェ 程を有することを特徴とする請求の範囲第 6項又は第 7項に記載のコン テナ輸送調整管理方法。
PCT/JP2003/015077 2002-11-29 2003-11-26 コンテナ輸送調整管理システム及びコンテナ輸送調整管理方法 WO2004050517A1 (ja)

Priority Applications (2)

Application Number Priority Date Filing Date Title
EP03775895A EP1566354A1 (en) 2002-11-29 2003-11-26 Container transportation adjustment/management system and container transportation adjustment/management method
BRPI0316634-1A BR0316634A (pt) 2002-11-29 2003-11-26 sistema de gerenciamento de coordenação de transporte de container e método de gerenciamento de coordenação de transporte de container

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2002-348589 2002-11-29
JP2002348589A JP2004182366A (ja) 2002-11-29 2002-11-29 コンテナ輸送調整管理システム及びコンテナ輸送調整管理方法

Publications (1)

Publication Number Publication Date
WO2004050517A1 true WO2004050517A1 (ja) 2004-06-17

Family

ID=32462925

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2003/015077 WO2004050517A1 (ja) 2002-11-29 2003-11-26 コンテナ輸送調整管理システム及びコンテナ輸送調整管理方法

Country Status (6)

Country Link
US (1) US20040143587A1 (ja)
EP (1) EP1566354A1 (ja)
JP (1) JP2004182366A (ja)
CN (1) CN1714032A (ja)
BR (1) BR0316634A (ja)
WO (1) WO2004050517A1 (ja)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109983486A (zh) * 2017-02-07 2019-07-05 匹配箱交换私人有限公司 用于交换运输集装箱的方法和系统
CN116957433A (zh) * 2023-05-17 2023-10-27 中远海运科技股份有限公司 一种集装箱资产物流管理方法及系统

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6733714B2 (en) * 2001-08-13 2004-05-11 Edwin J. Oakey Method for forming high-impact, transparent, distortion-free polymeric material
JP6670518B2 (ja) * 2016-05-23 2020-03-25 株式会社三井E&Sマシナリー コンテナマッチングシステム
US11315207B1 (en) * 2017-06-02 2022-04-26 Des Moines Area Metropolitan Planning Organization Cargo optimization systems, devices and related methods
CN109242379B (zh) * 2018-08-13 2022-07-26 中铁武汉勘察设计院有限公司 铁水联运铁路港湾站集装箱卸车和装车运输系统及方法
CN112163802A (zh) * 2020-09-04 2021-01-01 武汉理工大学 集装箱运输网络的路径的通行能力的计算方法
CN115159145B (zh) * 2022-06-29 2024-05-31 青岛港国际股份有限公司 一种可动态调控的先期机检系统及其机检方法

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002140405A (ja) * 2000-10-30 2002-05-17 Nissan Motor Co Ltd 求荷求車システムおよび求荷求車方法
JP2002169869A (ja) * 2000-12-01 2002-06-14 Oocl (Japan) Ltd 海上コンテナの陸上輸送効率化方法、海上コンテナの陸上輸送効率化システム、コンテナ保管施設
JP2002297728A (ja) * 2001-03-30 2002-10-11 Colpo Co Ltd 効率化された配送業務処理方法及び処理システム

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US19760A (en) * 1858-03-30 Rotary reciprocating knife for smoothing staves
US6356802B1 (en) * 2000-08-04 2002-03-12 Paceco Corp. Method and apparatus for locating cargo containers

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002140405A (ja) * 2000-10-30 2002-05-17 Nissan Motor Co Ltd 求荷求車システムおよび求荷求車方法
JP2002169869A (ja) * 2000-12-01 2002-06-14 Oocl (Japan) Ltd 海上コンテナの陸上輸送効率化方法、海上コンテナの陸上輸送効率化システム、コンテナ保管施設
JP2002297728A (ja) * 2001-03-30 2002-10-11 Colpo Co Ltd 効率化された配送業務処理方法及び処理システム

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109983486A (zh) * 2017-02-07 2019-07-05 匹配箱交换私人有限公司 用于交换运输集装箱的方法和系统
CN116957433A (zh) * 2023-05-17 2023-10-27 中远海运科技股份有限公司 一种集装箱资产物流管理方法及系统

Also Published As

Publication number Publication date
BR0316634A (pt) 2006-02-21
CN1714032A (zh) 2005-12-28
US20040143587A1 (en) 2004-07-22
EP1566354A1 (en) 2005-08-24
JP2004182366A (ja) 2004-07-02

Similar Documents

Publication Publication Date Title
Pollaris et al. Vehicle routing problems with loading constraints: state-of-the-art and future directions
US20150317598A1 (en) Multi-package delivery methods
Zhang et al. Heuristic-based truck scheduling for inland container transportation
Zhang et al. Multi-size container transportation by truck: modeling and optimization
Pang et al. Ship routing problem with berthing time clash avoidance constraints
CN110619502B (zh) 一种装载小型集装箱的车辆运输调度管理方法
KR102604656B1 (ko) 인공지능 플래닝 기술 기반 선사 선적 네트워크의 공컨테이너 재배치 최적화 시스템 및 방법
JP2008087958A (ja) 情報処理装置、情報処理方法、プログラム、及び記録媒体
Steenken et al. Stowage and transport optimization in ship planning
EP1577236A1 (en) Air mixed cargo control system and control method
Guo et al. Parallel machine scheduling with job synchronization to enable efficient material flows in hub terminals
WO2004050517A1 (ja) コンテナ輸送調整管理システム及びコンテナ輸送調整管理方法
KR102256008B1 (ko) 컨테이너 적하작업 지시정보 제공방법
Castellucci et al. Output maximization container loading problem with time availability constraints
Grzelak et al. Forecasting the demand for transport services on the example of a selected logistic operator
WO2022013966A1 (ja) コンテナ蔵置計画装置、コンテナ蔵置計画システム、及びコンテナ蔵置計画方法
Deniz et al. Simulation of multi-crane single and dual cycling strategies in a container terminal
CN111652551A (zh) 货物运输装箱方法及装置
JPH07334797A (ja) 荷運搬車両のルート・ダイヤ決定装置
WO2003094065A1 (fr) Dispositif de gestion de transport
JP6716852B2 (ja) コンテナ情報管理システム
JP3663342B2 (ja) 輸送管理装置、輸送管理方法およびその方法を実現するプログラムを記録した機械読取可能な記録媒体
Chang et al. Empty container reuse in the Los Angeles/Long Beach port area
JP3380299B2 (ja) バンニングレイアウトシステム
CN108470230B (zh) 货柜派遣作业分配系统与方法

Legal Events

Date Code Title Description
AK Designated states

Kind code of ref document: A1

Designated state(s): BR CN IN

AL Designated countries for regional patents

Kind code of ref document: A1

Designated state(s): BE GB IT

121 Ep: the epo has been informed by wipo that ep was designated in this application
WWE Wipo information: entry into national phase

Ref document number: 1313/DELNP/2005

Country of ref document: IN

WWE Wipo information: entry into national phase

Ref document number: 2003775895

Country of ref document: EP

WWE Wipo information: entry into national phase

Ref document number: 20038A38735

Country of ref document: CN

WWP Wipo information: published in national office

Ref document number: 2003775895

Country of ref document: EP

WWW Wipo information: withdrawn in national office

Ref document number: 2003775895

Country of ref document: EP

ENP Entry into the national phase

Ref document number: PI0316634

Country of ref document: BR