WO2002090018A1 - VERFAHREN ZUM VERTIKALEN STRANGGIEssEN EINES STAHLBANDES - Google Patents
VERFAHREN ZUM VERTIKALEN STRANGGIEssEN EINES STAHLBANDES Download PDFInfo
- Publication number
- WO2002090018A1 WO2002090018A1 PCT/AT2002/000139 AT0200139W WO02090018A1 WO 2002090018 A1 WO2002090018 A1 WO 2002090018A1 AT 0200139 W AT0200139 W AT 0200139W WO 02090018 A1 WO02090018 A1 WO 02090018A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- section
- strand
- cross
- gap
- casting
- Prior art date
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B22—CASTING; POWDER METALLURGY
- B22D—CASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
- B22D11/00—Continuous casting of metals, i.e. casting in indefinite lengths
- B22D11/12—Accessories for subsequent treating or working cast stock in situ
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B22—CASTING; POWDER METALLURGY
- B22D—CASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
- B22D11/00—Continuous casting of metals, i.e. casting in indefinite lengths
- B22D11/12—Accessories for subsequent treating or working cast stock in situ
- B22D11/1206—Accessories for subsequent treating or working cast stock in situ for plastic shaping of strands
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21B—ROLLING OF METAL
- B21B1/00—Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations
- B21B1/46—Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations for rolling metal immediately subsequent to continuous casting
- B21B1/463—Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations for rolling metal immediately subsequent to continuous casting in a continuous process, i.e. the cast not being cut before rolling
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21B—ROLLING OF METAL
- B21B2201/00—Special rolling modes
- B21B2201/14—Soft reduction
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21B—ROLLING OF METAL
- B21B2201/00—Special rolling modes
- B21B2201/18—Vertical rolling pass lines
Definitions
- the invention relates to a method for the vertical continuous casting of a steel strip, in which a strand with a parallelogram-shaped cross-section is first cast in a moving mold and then transferred from this initial cross-section with solidified longitudinal edges and a liquid core into a strip with a plane-parallel cross-section, in that one has already solidified , increasingly thicker shell of the strand is compressed by cooling in a deformation device without compressing the solidified longitudinal edges in the casting direction.
- the parallelogram-shaped cross-section of the strand is converted into a plane-parallel cross-section in a deformation device which is composed of a plurality of longitudinal beams opposite one another with respect to the strip, which form a gap between them with a parallelogram-shaped inlet cross-section and a plane-parallel outlet cross-section, with the aid of in the Longitudinal beam mounted form rollers.
- the longitudinal beams are pivotally mounted on the inlet side and are subjected to pressure in the sense of mutual pivoting, the condition for uniform cooling results in a thickness dependent on the passage speed of the strand through the mold and the shaping device for the pre-solidified strip in the area of the shaping device, if the shells are pressed against each other.
- the degree of solidification, which determines the strip thickness depends on the cooling duration, which is a function of the speed of the strip through the mold and the deformation device. This means that a constant casting speed must be ensured for a uniform, constant strip thickness.
- a constant casting speed has operational disadvantages with regard to the cooperation with an upstream steelworks and the possible immediate further processing of the preliminary strip in a subsequent rolling mill, because circumstances can occur in the steelworks as well as in the rolling mill that require a change in the casting speed or the casting performance do. Apart from this, temperature fluctuations in the molten steel can be expected, which also results in fluctuations in the thickness of the preliminary strip.
- the invention is therefore based on the object of avoiding these disadvantages and of designing a method of the type described at the outset such that, despite changes in the casting speed and the temperature of the molten steel, a constant strip thickness can be ensured without the risk of edge curling or cracking.
- the invention solves this problem in that the strand after compression into a band with a still liquid core during solidification of the core is only guided in a mold gap with a constant width corresponding to the thickness of the solidified longitudinal edges and is calibrated in the process.
- the final tape thickness is determined by the mold gap dimensions and not determined by the casting speed.
- the ferrostatic pressure effective in the area of the remaining liquid core ensures that the shells are in contact with the shaped elements defining the gap geometry. Different thicknesses of the liquid core resulting from different casting speeds can therefore not lead to different strip thicknesses if only care is taken to ensure that the core completely solidifies in the region of the constant thickness of the mold gap. It is essential here that no compression of the band associated with stretching can occur in the edge region.
- the mold gap has a width corresponding to the thickness of the solidified longitudinal edges. Since the shell of the strand is transferred from a parallelogram-shaped cross-section to a plane-parallel cross-section without casting through in a co-rotating mold in the shaping device To compress longitudinal edges of the shell, these solidified longitudinal edges of the parallelogram-shaped cross section also determine the later thickness of the solidified band, so that there is no compression of the longitudinal edge associated with stretching before the band is completely solidified.
- the strip thickness can be slightly reduced while stretching, preferably by means of force-controlled and displacement-controlled rollers, which leads to a corresponding structural improvement.
- the solidified strip can be additionally reduced in thickness after calibration by continuous rolling, which can significantly reduce the rolling effort in the rolling mill.
- a continuous casting system consists of a mold with a parallelogram-shaped mold gap cross section, which runs along with the strand to be cast, and a subsequent deforming device with a plurality of mold gaps with a parallelogram inlet that are opposite one another with respect to the strand - And there is a plane-parallel discharge cross-section forming roles. It must be ensured that the deformation device is followed by a calibration device with a predetermined shape gap profile, which has a section with a constant mold gap thickness at least on the inlet side, so that the strip solidifies completely in the section of the mold gap with a constant thickness.
- the point of solidification of the strip along the mold gap will occur. If the casting speed is reduced, solidification of the strip in an initial section, that is to say in the upper region, and with increased casting speed in an end section, that is to say in the lower region of the mold gap of the calibration device.
- the calibration device has calibration rolls which limit the mold gap and can be adjusted to set the mold gap profile. Between these calibration rollers, not only can the thickness of the strip be advantageously determined while it is being solidified, but also a feed can be achieved if these calibration rollers are driven. Because of the advanced solidification of the belt, there is no need for a continuous belt guide, so that coolant can be applied to the belt between the calibration rollers.
- a thickness reduction for example in the order of 1 to 5%, can be carried out via the remaining outlet-side calibration rollers, which requires a correspondingly preset shape gap course.
- the calibration device can also extend far into the casting arch, which allows a reduction in the overall height.
- a reduction stand can additionally be provided on the discharge side of the calibration device, with the aid of which comparatively thin pre-strips can be fed to a connected rolling mill.
- Fig. 2 shows a simplified cross section of the calibration device on a larger scale 3 to 5 the essential cross-sectional changes of a strand cast according to the prior art during its forming into a band and the
- FIGS. 3 to 5 a representation corresponding to FIGS. 3 to 5 of the cross-sectional changes of a strand cast according to the invention during its forming into a band.
- the continuous casting installation shown for the vertical continuous casting of a steel strip 1 has a moving mold 2, a deformation device 4 adjoining it via a strand guide 3, and a calibration device 5, from which the strip 1 exits into a casting sheet 6 in order to move from a vertical one to be redirected into a horizontal course.
- the calibration device 5 can at least partially extend into the area of the casting curve 6, which allows a lower overall height.
- the moving mold 2 consists of two opposing, endlessly rotating plate chains 7, which enclose a constant mold gap between them, into which a pouring tube 8 attached to a casting container opens.
- the deformation device 4 has a plurality of longitudinal beams 12 which are opposite one another with respect to the strand 11 and form the gap between them and which are pivotally mounted on the inlet side about axes 13 and are acted upon by pressure cylinders 14 in the sense of mutual pivoting.
- the molding gap is limited by molding rollers 15.
- this deformation device 4 the shells 9 are guided against one another, displacing the liquid core upwards, until they are pressed against one another and form a continuously solidified band, the thickness of which remains at constant cooling conditions depends on the casting speed or the temperature of the molten steel.
- the shells 9 in the deformation device 4 are only brought together to form a pian parallel cross section with a still liquid core 16, as is shown in FIG. 8. Care must be taken to ensure that the longitudinal edges 10 are not subjected to any compression associated with stretching.
- the solidification of the liquid core 16 takes place only in the calibration device 5, which has a mold gap of constant thickness at least on the inlet side, in the area of which the liquid core 16 solidifies until a strip 1 of constant thickness is obtained according to FIG. 9.
- the shells 9 are pressed against the calibration device 5 by the ferrostatic pressure in the area of the liquid core 16, so that the predetermined mold gap width determines the strip thickness independently of the casting speed or the thickness of the liquid core 16.
- the mold gap width must, however, be selected in accordance with the thickness of the solidified longitudinal edges 10, so that stretching of the band 1 at the edge is avoided.
- the cooling, the speed of passage of the strand 11 through the mold 2 and the shaping device 4 and the length of the mold 2 and the shaping device 4 are coordinated with one another such that the strand 11 still has a liquid core 16 when it emerges from the shaping device 4 has, because the solidification of the tape 1 should only take place in the calibration device 5.
- the calibration rollers 17 of the calibration device 5 are adjusted via adjusting cylinders 18 to a shape gap course predetermined for the calibration process. Since there is considerable ferrostatic pressure in the area of the liquid core 16, the shells 9 of the band 1 in the area of the calibration device 5 are pressed against the calibration rollers 17, which ensures the desired calibration effect, the respective thickness of the liquid core 16 when the Band 1 in the calibration device 5 can vary.
- the calibration rollers 17 run over the belt width, as can be seen in FIG. 2.
- the schematically indicated drive 19 of the calibration rollers 17 supports the belt conveyor and is also suitable for a low rolling capacity after the solidification of the liquid core 16, so that after the belt 1 has completely solidified, the calibration rollers 17 are used for a slight reduction in thickness under a stretching effect can.
- a rolling stand 20 can be arranged directly after the calibration device 5. However, this roll stand 20 can also be provided following the casting arch 6, as is indicated by dash-dotted lines in FIG. 1.
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Continuous Casting (AREA)
- Metal Rolling (AREA)
Abstract
Description
Claims
Priority Applications (5)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020037014479A KR100907570B1 (ko) | 2001-05-07 | 2002-05-07 | 스틸 밴드의 수직 연속 주조 방법 |
US10/477,154 US6945311B2 (en) | 2001-05-07 | 2002-05-07 | Method for the vertical continuous casting of a steel strip |
JP2002587136A JP4232867B2 (ja) | 2001-05-07 | 2002-05-07 | 鋼帯の連続鋳造方法 |
EP02724033A EP1412110B1 (de) | 2001-05-07 | 2002-05-07 | Verfahren und anlage zum vertikalen stranggiessen eines stahlbandes |
DE10291923T DE10291923B4 (de) | 2001-05-07 | 2002-05-07 | Verfahren und Anlage zum vertikalen Stranggießen eines Stahlbandes |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
ATA723/2001 | 2001-05-07 | ||
AT0072301A AT410522B (de) | 2001-05-07 | 2001-05-07 | Verfahren und stranggiessanlage zum vertikalen stranggiessen eines stahlbandes |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2002090018A1 true WO2002090018A1 (de) | 2002-11-14 |
Family
ID=3679935
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/AT2002/000139 WO2002090018A1 (de) | 2001-05-07 | 2002-05-07 | VERFAHREN ZUM VERTIKALEN STRANGGIEssEN EINES STAHLBANDES |
Country Status (8)
Country | Link |
---|---|
US (1) | US6945311B2 (de) |
EP (1) | EP1412110B1 (de) |
JP (1) | JP4232867B2 (de) |
KR (1) | KR100907570B1 (de) |
CN (1) | CN1232369C (de) |
AT (1) | AT410522B (de) |
DE (1) | DE10291923B4 (de) |
WO (1) | WO2002090018A1 (de) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US8953087B2 (en) * | 2004-04-08 | 2015-02-10 | Flir Systems Trading Belgium Bvba | Camera system and associated methods |
DE102006048511A1 (de) * | 2006-10-13 | 2008-04-17 | Sms Demag Ag | Strangführungsvorrichtung und Verfahren für deren Betrieb |
CN105304188B (zh) * | 2014-06-26 | 2017-04-12 | 颜文辉 | 一种电缆或光缆用钢带 |
CN115164583A (zh) * | 2022-06-01 | 2022-10-11 | 上海二十冶建设有限公司 | 一种转底炉回转框架的安装方法 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0329639A1 (de) * | 1988-02-01 | 1989-08-23 | Anton Dipl.-Ing. Hulek | Verfahren und Anlage zum Stranggiessen von Stahl |
US4951734A (en) * | 1987-04-13 | 1990-08-28 | Thyssen Stahl Ag | Process for the production of a steel strip |
US4962808A (en) * | 1988-07-14 | 1990-10-16 | Thyssen Stahl Aktiegesellschaft | Method of producing a steel strip having a thickness of less than 10 mm |
US5339887A (en) * | 1991-09-19 | 1994-08-23 | Sms Schloemann-Siemag Aktiengesellschaft | Process for production of steel strip |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE4135214C2 (de) * | 1991-09-19 | 2000-12-14 | Sms Demag Ag | Verfahren und Anlage zur Herstellung von Stahlband |
AT401744B (de) * | 1993-10-14 | 1996-11-25 | Voest Alpine Ind Anlagen | Verfahren und anlage zum stranggiessen |
JP3008821B2 (ja) * | 1994-07-29 | 2000-02-14 | 住友金属工業株式会社 | 薄鋳片の連続鋳造方法および装置 |
US5620045A (en) * | 1995-04-24 | 1997-04-15 | Gerding; Charles C. | Continuous casting mold formed of plate elements |
AU3273399A (en) * | 1999-02-26 | 2000-09-14 | Giovanni Arvedi | In-line continuous cast-rolling process for thin slabs |
-
2001
- 2001-05-07 AT AT0072301A patent/AT410522B/de not_active IP Right Cessation
-
2002
- 2002-05-07 US US10/477,154 patent/US6945311B2/en not_active Expired - Fee Related
- 2002-05-07 WO PCT/AT2002/000139 patent/WO2002090018A1/de active IP Right Grant
- 2002-05-07 DE DE10291923T patent/DE10291923B4/de not_active Expired - Fee Related
- 2002-05-07 CN CNB028126890A patent/CN1232369C/zh not_active Expired - Fee Related
- 2002-05-07 JP JP2002587136A patent/JP4232867B2/ja not_active Expired - Fee Related
- 2002-05-07 EP EP02724033A patent/EP1412110B1/de not_active Expired - Lifetime
- 2002-05-07 KR KR1020037014479A patent/KR100907570B1/ko not_active IP Right Cessation
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4951734A (en) * | 1987-04-13 | 1990-08-28 | Thyssen Stahl Ag | Process for the production of a steel strip |
EP0329639A1 (de) * | 1988-02-01 | 1989-08-23 | Anton Dipl.-Ing. Hulek | Verfahren und Anlage zum Stranggiessen von Stahl |
US4962808A (en) * | 1988-07-14 | 1990-10-16 | Thyssen Stahl Aktiegesellschaft | Method of producing a steel strip having a thickness of less than 10 mm |
US5339887A (en) * | 1991-09-19 | 1994-08-23 | Sms Schloemann-Siemag Aktiengesellschaft | Process for production of steel strip |
Also Published As
Publication number | Publication date |
---|---|
ATA7232001A (de) | 2002-10-15 |
KR20030097852A (ko) | 2003-12-31 |
JP2004524167A (ja) | 2004-08-12 |
EP1412110A1 (de) | 2004-04-28 |
KR100907570B1 (ko) | 2009-07-14 |
EP1412110B1 (de) | 2005-09-21 |
DE10291923B4 (de) | 2011-06-30 |
US20040188057A1 (en) | 2004-09-30 |
CN1520344A (zh) | 2004-08-11 |
DE10291923D2 (de) | 2004-04-15 |
CN1232369C (zh) | 2005-12-21 |
US6945311B2 (en) | 2005-09-20 |
AT410522B (de) | 2003-05-26 |
JP4232867B2 (ja) | 2009-03-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP0326190B1 (de) | Anlage zum Herstellen eines Stahlbandes mit einer Dicke von 2 bis 25 mm | |
DE69202088T2 (de) | Vorrichtung und Verfahren zur Herstellung von warmgewalztem Stahl. | |
EP0415987A1 (de) | Verfahren zur kontinuierlichen herstellung von bandstahl oder stahlblech aus nach dem bogenstranggiessverfahren hergestellten flachprodukten. | |
EP3558563B1 (de) | Verfahren zur endlosen herstellung eines aufgewickelten warmbands in einer giess-walz-verbundanlage und giess-walz-verbundanlage | |
AT392029B (de) | Stranggiessanlage zum stranggiessen von stahl | |
AT409227B (de) | Verfahren und anlage zur herstellung von warmgewalztem stahlband aus einer stahlschmelze | |
DE69631434T2 (de) | Doppelbandstranggiessanlage und -verfahren | |
EP1960136A1 (de) | Verfahren zum stranggiessen dünner metallbänder und stranggiessanlage | |
EP0353402B1 (de) | Verfahren zum Herstellen eines Stahlbandes mit einer Dicke von weniger als 10 mm | |
DE3440236C2 (de) | ||
EP3016762B1 (de) | Giesswalzanlage und verfahren zum herstellen von metallischem walzgut | |
DE4338805C2 (de) | Verfahren und Vorrichtung zum Betreiben einer Stranggießanlage | |
EP1412110B1 (de) | Verfahren und anlage zum vertikalen stranggiessen eines stahlbandes | |
DE1934302C3 (de) | Verfahren und Vorrichtung zum Warmwalzen von Metallbrammen | |
DE19746876C2 (de) | Verfahren und Vorrichtung zur Erzeugung von schmalem Warmband unterschiedlicher Breiten aus Dünnbrammen | |
DE10057876C1 (de) | Verfahren und Vorrichtung zur Herstellung von Warmband in einer Minihütte | |
EP1108484B1 (de) | Verfahren zur Formatdickenänderung des Gussstranges unterhalb der Kokille einer Stranggiessanlage | |
WO2002090019A1 (de) | VERFAHREN UND VORRICHTUNG ZUM STRANGGIEssEN VON BLÖCKEN, BRAMMEN ODER DÜNNBRAMMEN | |
DE3236284C2 (de) | Vorrichtung zur Herstellung von Stahlsträngen in einer Ovalbogenstranggießmaschine | |
EP1441871B1 (de) | Verfahren und giessmaschine zur produktion von gusssträngen im knüppel- oder blockformat | |
EP1381482B1 (de) | Verfahren und vorrichtung zum herstellen von strangguss-vormaterial | |
EP0745444B1 (de) | Verfahren und Anlage zur Herstellung von Dünnbrammen oder Bändern aus Stahl | |
EP1059125A2 (de) | Verfahren zum Herstellen von Metallband | |
DE69426362T2 (de) | Verfahren und vorrichtung zum doppelbandgiessen | |
DE10025080A1 (de) | Verfahren zum Herstellen von Metallband |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
AK | Designated states |
Kind code of ref document: A1 Designated state(s): AE AG AL AM AT AU AZ BA BB BG BR BY BZ CA CH CN CO CR CU CZ DE DK DM DZ EC EE ES FI GB GD GE GH GM HR HU ID IL IN IS JP KE KG KP KR KZ LC LK LR LS LT LU LV MA MD MG MK MN MW MX MZ NO NZ PL PT RO RU SD SE SG SI SK SL TJ TM TR TT TZ UA UG US UZ VN YU ZA ZW |
|
AL | Designated countries for regional patents |
Kind code of ref document: A1 Designated state(s): GH GM KE LS MW MZ SD SL SZ TZ UG ZM ZW AM AZ BY KG KZ MD RU TJ TM AT BE CH CY DE DK ES FI FR GB GR IE IT LU MC NL PT SE TR BF BJ CF CG CI CM GA GN GQ GW ML MR NE SN TD TG |
|
121 | Ep: the epo has been informed by wipo that ep was designated in this application | ||
DFPE | Request for preliminary examination filed prior to expiration of 19th month from priority date (pct application filed before 20040101) | ||
WWE | Wipo information: entry into national phase |
Ref document number: 2002587136 Country of ref document: JP |
|
WWE | Wipo information: entry into national phase |
Ref document number: 090962002 Country of ref document: AT Ref document number: 1020037014479 Country of ref document: KR |
|
WWE | Wipo information: entry into national phase |
Ref document number: 2002724033 Country of ref document: EP |
|
WWE | Wipo information: entry into national phase |
Ref document number: 028126890 Country of ref document: CN |
|
REF | Corresponds to |
Ref document number: 10291923 Country of ref document: DE Date of ref document: 20040415 Kind code of ref document: P |
|
WWE | Wipo information: entry into national phase |
Ref document number: 10291923 Country of ref document: DE |
|
WWP | Wipo information: published in national office |
Ref document number: 2002724033 Country of ref document: EP |
|
WWE | Wipo information: entry into national phase |
Ref document number: 10477154 Country of ref document: US |
|
WWG | Wipo information: grant in national office |
Ref document number: 2002724033 Country of ref document: EP |
|
REG | Reference to national code |
Ref country code: DE Ref legal event code: 8607 |