WO2002031746A1 - Systeme et procedes pour ordonnancer des moyens de production - Google Patents

Systeme et procedes pour ordonnancer des moyens de production Download PDF

Info

Publication number
WO2002031746A1
WO2002031746A1 PCT/US2001/031826 US0131826W WO0231746A1 WO 2002031746 A1 WO2002031746 A1 WO 2002031746A1 US 0131826 W US0131826 W US 0131826W WO 0231746 A1 WO0231746 A1 WO 0231746A1
Authority
WO
WIPO (PCT)
Prior art keywords
scheduling
resources
goal
route
resource
Prior art date
Application number
PCT/US2001/031826
Other languages
English (en)
Inventor
Myrick Crampton
George Zdravecky
Original Assignee
Manugistics, Inc.
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=22901451&utm_source=google_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=WO2002031746(A1) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Application filed by Manugistics, Inc. filed Critical Manugistics, Inc.
Priority to AU2002211651A priority Critical patent/AU2002211651A1/en
Publication of WO2002031746A1 publication Critical patent/WO2002031746A1/fr

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling

Abstract

L'invention concerne un système (170) et un procédé pour ordonnancer des moyens de production, sur la base d'objectifs d'acheminement et d'ordonnancement définis par rapport à un utilisateur (190). Ce système (170) comprend une base de données (172) et plusieurs modules (174-184). Des attribut et des contraintes peuvent être affectés aux moyens de production (188) et aux unités de gestion de stock pour faciliter la planification et l'ordonnancement des moyens de production (188). Des transitions en matière de moyens de production peuvent être limitées aux seules transitions souhaitables, par le séquençage de la production pour différents produits. Des en-cours de production excédentaires peuvent être minimisés par l'ordonnancement de commandes absorbant ces en-cours.
PCT/US2001/031826 2000-10-12 2001-10-12 Systeme et procedes pour ordonnancer des moyens de production WO2002031746A1 (fr)

Priority Applications (1)

Application Number Priority Date Filing Date Title
AU2002211651A AU2002211651A1 (en) 2000-10-12 2001-10-12 System and methods for scheduling manufacturing resources

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US23928000P 2000-10-12 2000-10-12
US60/239,280 2000-10-12

Publications (1)

Publication Number Publication Date
WO2002031746A1 true WO2002031746A1 (fr) 2002-04-18

Family

ID=22901451

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/US2001/031826 WO2002031746A1 (fr) 2000-10-12 2001-10-12 Systeme et procedes pour ordonnancer des moyens de production

Country Status (3)

Country Link
US (1) US6591153B2 (fr)
AU (1) AU2002211651A1 (fr)
WO (1) WO2002031746A1 (fr)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112633576A (zh) * 2020-12-22 2021-04-09 华中科技大学 应用于卷烟工厂生产排程的两阶段排程优化方法与系统

Families Citing this family (54)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3327235B2 (ja) * 1998-12-22 2002-09-24 トヨタ自動車株式会社 受注品納期管理システム
US6631606B2 (en) * 2000-01-18 2003-10-14 Dell Products L.P. System and method for accommodating atypical customer requirements in a mass customization manufacturing facility
US6714830B2 (en) * 2000-02-28 2004-03-30 Canon Kabushiki Kaisha Push-type scheduling for semiconductor fabrication
US6606529B1 (en) * 2000-06-09 2003-08-12 Frontier Technologies, Inc. Complex scheduling method and device
AU2002214663A1 (en) 2000-10-27 2002-05-06 Manugistics, Inc. System and method for ensuring order fulfillment
US20020123918A1 (en) * 2001-03-05 2002-09-05 Dell Products L.P. System and method for manufacturing and shipping products according to customer orders
US6615092B2 (en) * 2001-03-05 2003-09-02 Dell Products L.P. Method, system and facility for controlling resource allocation within a manufacturing environment
US7937280B1 (en) * 2001-04-02 2011-05-03 I2 Technologies Us, Inc. Planning and scheduling of maintenance, repair, and overhaul services
AU2002258918A1 (en) * 2001-04-20 2002-11-05 Radio Computing Services, Inc. Demand-based goal-driven scheduling system
US7248937B1 (en) * 2001-06-29 2007-07-24 I2 Technologies Us, Inc. Demand breakout for a supply chain
JP4073186B2 (ja) * 2001-09-20 2008-04-09 大日本スクリーン製造株式会社 基板処理装置のスケジュール作成方法及びそのプログラム
US20030061266A1 (en) * 2001-09-27 2003-03-27 Norman Ken Ouchi Project workflow system
WO2003058647A1 (fr) * 2001-12-28 2003-07-17 Yazaki Corporation Procede et systeme de production de cables electriques en fonction de la reception des commandes
US6728586B2 (en) * 2002-01-14 2004-04-27 Taiwan Semiconductor Manufacturing Co., Ltd Microelectronic fabrication production control method and system providing enhanced microelectronic fabrication facility utilization flexibility
AU2003223789A1 (en) * 2002-05-02 2003-11-17 Manugistics, Inc. Constraint-based production planning and scheduling
JP3982617B2 (ja) * 2002-05-17 2007-09-26 日本アイ・ビー・エム株式会社 生産計画生成システム、生産計画生成方法、プログラム
US8560363B1 (en) * 2002-06-19 2013-10-15 Jda Software Group, Inc. Continuous production planning using a transition matrix
US20040039735A1 (en) * 2002-06-19 2004-02-26 Ross Maria A. Computer-implemented method and system for performing searching for products and services
JP2004094900A (ja) * 2002-07-09 2004-03-25 National Institute Of Advanced Industrial & Technology 生産計画作成システム及び方法、並びにプログラム
US20040010448A1 (en) * 2002-07-12 2004-01-15 Miller William E. System and method for marketing advertising space on disposable consumer items
US20030061087A1 (en) * 2002-07-15 2003-03-27 Paul Srimuang Calendar scheduling of multiple persons resources and consumables with group access view restriction
US7184850B1 (en) 2002-09-06 2007-02-27 National Semiconductor Corporation System and method for allocating multi-function resources for a wetdeck process in semiconductor wafer fabrication
US7373211B1 (en) 2002-09-06 2008-05-13 National Semiconductor Corporation Graphical user interface for compliance monitoring in semiconductor wafer fabrication and method of operation
US6957113B1 (en) * 2002-09-06 2005-10-18 National Semiconductor Corporation Systems for allocating multi-function resources in a process system and methods of operating the same
DE10245658A1 (de) * 2002-09-30 2004-04-15 Koenig & Bauer Ag Verfahren und Vorrichtung zur automatischen Materialversorgung einer Bearbeitungsmaschine sowie Steuersystem und Druckerei mit einem Steuersystem
US8315898B2 (en) * 2002-10-30 2012-11-20 Palo Alto Research Center, Incorporated Planning and scheduling reconfigurable systems around off-line resources
US20040139431A1 (en) * 2002-12-30 2004-07-15 International Business Machines Corporation Determining graduated availability for meetings by individuals and groups
ITBO20030013A1 (it) * 2003-01-14 2004-07-15 Gd Spa Metodo per la gestione di un impianto per il confezionamento
US6856845B2 (en) * 2003-04-28 2005-02-15 Palo Alto Research Center Inc. Monitoring and reporting incremental job status system and method
US6772030B1 (en) * 2003-05-05 2004-08-03 Taiwan Semiconductor Mfg. Co., Ltd. Method of considering equipment constraints in a manufacturing planning system
US7043319B1 (en) * 2003-09-30 2006-05-09 National Semiconductor Corporation System and method for visualizing the use of resources in a process system
US7043320B1 (en) * 2003-10-16 2006-05-09 Jrg Software, Inc. Method and apparatus for planning a manufacturing schedule using an adaptive learning process
CA2461808A1 (fr) * 2004-03-24 2005-09-24 Clevor Technologies Inc. Systeme et methode pour elaborer un programme qui facilite l'atteinte d'un ou plusieurs objectifs d'affaire
US7451132B2 (en) * 2004-05-27 2008-11-11 Palo Alto Research Center Incorporated System and method for production planning utilizing on-line state-space planning
US6898475B1 (en) 2004-05-27 2005-05-24 Palo Alto Research Center Inc. System and method utilizing temporal constraints to coordinate multiple planning sessions
US7389279B2 (en) * 2005-06-24 2008-06-17 Palo Alto Research Center Incorporated System and method for time-aware path finding
US20080154425A1 (en) * 2006-04-27 2008-06-26 Velociti Alliance North America, Inc. Systems and methods for stamping packaged goods in the nature of cigarettes
US20070299731A1 (en) * 2006-06-26 2007-12-27 Erickson Steven C Manufacturing optimization in support of complex solution delivery
US20080144074A1 (en) * 2006-10-18 2008-06-19 Jie Lin Workflow processing system
US7979304B2 (en) 2007-01-04 2011-07-12 Advanced Micro Devices, Inc. Method of mapping dynamic market conditions to global manufacturing site analysis
US8086595B2 (en) * 2007-12-03 2011-12-27 Palo Alto Research Center Incorporated Systems and methods for solving multiple interacting state-space search problems
DE102007062986B4 (de) * 2007-12-21 2013-12-24 Abb Research Ltd. Verfahren und Einrichtung zur Client-Server-Kommunikation gemäß dem Standardprotokoll OPC UA
US20100076806A1 (en) * 2008-09-25 2010-03-25 Solar Turbines Incorporated Inventory management tool using a criticality measure
EP2290592A1 (fr) * 2009-08-31 2011-03-02 Siemens Aktiengesellschaft Procédé de planification assistée par ordinateur d'un système technique pour fabriquer un produit
US9224121B2 (en) * 2011-09-09 2015-12-29 Sap Se Demand-driven collaborative scheduling for just-in-time manufacturing
US10222789B2 (en) * 2014-04-30 2019-03-05 Hewlett-Packard Development Company, L.P. Scheduling manufacturing jobs
US20160307136A1 (en) * 2015-04-17 2016-10-20 Camelot ITLab GmbH System and method for high-mix wheels for capacity planning resource planning and material resource planning
PL414857A1 (pl) 2015-11-19 2017-05-22 Pro Business Solutions It Spółka Z Ograniczoną Odpowiedzialnością Spółka Komandytowa Sposób otrzymywania planogramów
WO2017109863A1 (fr) * 2015-12-22 2017-06-29 株式会社日立製作所 Dispositif d'hébergement de ressources, dispositif de gestion d'ordonnancement, et système d'hébergement de ressources
DE102017213583A1 (de) * 2017-08-04 2019-02-07 Siemens Aktiengesellschaft Verfahren zur Produktionsplanung
US10890898B2 (en) * 2017-11-03 2021-01-12 Drishti Technologies, Inc. Traceability systems and methods
CN113506081A (zh) * 2021-06-15 2021-10-15 刘俊艳 一种生产计划管理系统及其排产方法
CN114815761B (zh) * 2022-06-28 2022-10-11 成都秦川物联网科技股份有限公司 基于工业物联网的生产线适配方法及系统
CN115759569B (zh) * 2022-10-21 2024-04-16 荣耀终端有限公司 排产方法及电子设备

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5369570A (en) * 1991-11-14 1994-11-29 Parad; Harvey A. Method and system for continuous integrated resource management
US5720157A (en) * 1996-03-28 1998-02-24 Si Handling Systems, Inc. Automatic order selection system and method of operating
US5764543A (en) * 1995-06-16 1998-06-09 I2 Technologies, Inc. Extensible model network representation system for process planning
US5983195A (en) * 1997-06-06 1999-11-09 Electronic Data Systems Corporation Method and system for scheduling product orders in a manufacturing facility

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4744028A (en) * 1985-04-19 1988-05-10 American Telephone And Telegraph Company, At&T Bell Laboratories Methods and apparatus for efficient resource allocation
JPH05233644A (ja) * 1991-12-05 1993-09-10 Internatl Business Mach Corp <Ibm> 計算機ベース製造システム内での素材の移送を最適化するための方法及びシステム
US5808891A (en) * 1996-07-30 1998-09-15 International Business Machines Corporation Method for creating a direct hot charge rolling production schedule at a steel plant
US5835377A (en) * 1997-03-24 1998-11-10 International Business Machines Corporation Method and system for optimized material movement within a computer based manufacturing system utilizing global positioning systems
US6415196B1 (en) * 1997-08-28 2002-07-02 Manugistics, Inc. Manufacturing scheduling process with improved modeling, scheduling and editing capabilities for solving finite capacity planning problems
US6308107B1 (en) * 1999-08-31 2001-10-23 Advanced Micro Devices, Inc. Realtime decision making system for reduction of time delays in an automated material handling system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5369570A (en) * 1991-11-14 1994-11-29 Parad; Harvey A. Method and system for continuous integrated resource management
US5764543A (en) * 1995-06-16 1998-06-09 I2 Technologies, Inc. Extensible model network representation system for process planning
US5720157A (en) * 1996-03-28 1998-02-24 Si Handling Systems, Inc. Automatic order selection system and method of operating
US5983195A (en) * 1997-06-06 1999-11-09 Electronic Data Systems Corporation Method and system for scheduling product orders in a manufacturing facility

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112633576A (zh) * 2020-12-22 2021-04-09 华中科技大学 应用于卷烟工厂生产排程的两阶段排程优化方法与系统
CN112633576B (zh) * 2020-12-22 2022-04-29 华中科技大学 应用于卷烟工厂生产排程的两阶段排程优化方法与系统

Also Published As

Publication number Publication date
US6591153B2 (en) 2003-07-08
US20020107600A1 (en) 2002-08-08
AU2002211651A1 (en) 2002-04-22

Similar Documents

Publication Publication Date Title
US6591153B2 (en) System and methods for scheduling manufacturing resources
AU764982B2 (en) Method for computerized supply chain planning
US20040030428A1 (en) System and method for scheduling and sequencing supply chain resources
US8571912B2 (en) Method and system for allocating specific appointment time windows in a service industry
Chen et al. Supply chain scheduling: Conflict and cooperation in assembly systems
US8606386B2 (en) Multi-agent system for distributed manufacturing scheduling with Genetic Algorithms and Tabu Search
US7933793B2 (en) Constraint-based production planning and scheduling
US20020188499A1 (en) System and method for ensuring order fulfillment
US20030177050A1 (en) System and method for order group planning with attribute based planning
US20030149631A1 (en) System and method for order planning with attribute based planning
US20030126024A1 (en) System and method for replenishment by purchase with attribute based planning
US20030126023A1 (en) System and method for replenishment by manufacture with attribute based planning
US20060253312A1 (en) System and method for throughput measurement
US7580766B1 (en) Manufacturing resource planning by entity
JP5145835B2 (ja) 商品供給システム、商品供給方法及び商品供給プログラム
Miller et al. Integrating production and transportation scheduling decisions between two geographically separated plants
Mazziotti et al. Creating a flexible, simulation-based finite scheduling tool
Álvarez et al. A web-based approach for exceptions management in the supply chain
US20040122724A1 (en) System and method for generating priorities of manufacturing orders
JP2003345419A (ja) 回答方法及びシステム
JP4303449B2 (ja) 生産管理システム
US20040122749A1 (en) System and method for managing manufacturing orders
JP4349565B2 (ja) 生産計画方法
Salzarulo Vendor-managed inventory programs and their effect on supply chain performance
Roeleven et al. Optimizing inventory-production planning for enhanced efficiency in silo park at SABIC

Legal Events

Date Code Title Description
AK Designated states

Kind code of ref document: A1

Designated state(s): AE AG AL AM AT AU AZ BA BB BG BR BY BZ CA CH CN CO CR CU CZ DE DK DM DZ EC EE ES FI GB GD GE GH GM HR HU ID IL IN IS JP KE KG KP KR KZ LC LK LR LS LT LU LV MA MD MG MK MN MW MX MZ NO NZ PH PL PT RO RU SD SE SG SI SK SL TJ TM TR TT TZ UA UG UZ VN YU ZA ZW

AL Designated countries for regional patents

Kind code of ref document: A1

Designated state(s): GH GM KE LS MW MZ SD SL SZ TZ UG ZW AM AZ BY KG KZ MD RU TJ TM AT BE CH CY DE DK ES FI FR GB GR IE IT LU MC NL PT SE TR BF BJ CF CG CI CM GA GN GQ GW ML MR NE SN TD TG

121 Ep: the epo has been informed by wipo that ep was designated in this application
REG Reference to national code

Ref country code: DE

Ref legal event code: 8642

122 Ep: pct application non-entry in european phase
NENP Non-entry into the national phase

Ref country code: JP