WO1996025558A1 - Station platform - Google Patents
Station platform Download PDFInfo
- Publication number
- WO1996025558A1 WO1996025558A1 PCT/EP1996/000682 EP9600682W WO9625558A1 WO 1996025558 A1 WO1996025558 A1 WO 1996025558A1 EP 9600682 W EP9600682 W EP 9600682W WO 9625558 A1 WO9625558 A1 WO 9625558A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- platform
- leg parts
- trough
- running
- longitudinal
- Prior art date
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01F—ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
- E01F1/00—Construction of station or like platforms or refuge islands or like islands in traffic areas, e.g. intersection or filling-station islands; Kerbs specially adapted for islands in traffic areas
Definitions
- the invention relates to a platform according to the preamble of the claim
- EP 0 357 1 61 describes a platform consisting at least partially of prefabricated concrete parts. There rest across
- Running plates are arranged on these, which cover the longitudinal beams transversely and between which there are joints to be cast.
- the side members have a rectangular cross-section and are only connected to each other via the running plates or the U-shaped concrete base.
- the present invention is therefore based on the problem of finding a solution in which one can get by with smaller concrete bases, which reduces the number of necessary concrete bases, which facilitates their installation and alignment and which enables small platforms to be installed quickly.
- Reinforced concrete parts are essentially used according to the invention, namely foundation bases, trough-shaped side members and running plates.
- the trough-shaped longitudinal members have a cross section which consists of an approximately horizontal base part and from these, extending upward and outwardly inclined leg parts.
- the leg parts should have an inclination of> 45 °, preferably approximately 60 ° to the horizontal.
- the ends of the base parts of such longitudinal members each rest on a foundation base.
- the upper sides of the leg parts form approximately a horizontal and support the running plates which extend transversely to the longitudinal member.
- the width of the running plate between two tracks is approximately 3 m.
- the length of a running plate in the direction of the central axis of the platform is approximately 2.5 m.
- a trough-shaped carrier has a length of about 5 m, so that it supports two running plates.
- trough-shaped carriers according to the invention can also be used
- Platforms are used, the width of which is formed by two juxtaposed running plates on one or two trough-shaped supports. In this case, too, it can be advantageous to reduce the number of foundation bases. Furthermore, trough-shaped girders can also be used for platforms lying next to a track. So far the
- the trough shape of the girder also provides an escape niche under the running plates, which can be designed to be larger in construction than in the case of running plates resting on parallel longitudinal beams
- FIG. 1 shows a platform between two tracks on average.
- 2 shows the side view of a partially assembled platform and 3: the top view of the platform according to FIG. 2.
- Fig. 1 shows the use of a platform according to the invention on a rocky surface.
- a sub-foundation 1 of lean concrete is placed and, as far as possible, aligned with respect to the height and direction relative to the tracks 1 and 2, of which only one rail 1 1 and 1 2 is shown.
- a sub-foundation can also be formed on the head of a bored pile or as a larger base made of lean concrete. If required, central drainage can be embedded in the lean concrete for both tracks.
- a prefabricated foundation base 2 made of reinforced concrete is placed on the sub-foundation 1.
- the foundation base 2 is aligned more precisely.
- the foundation base 2 is provided with a central blind hole 22. This serves among other things the anchoring of the on the foundation base 2 via elastic
- the hole 22 can also receive the foot of lamp posts 44 or masts for a roof above the platform.
- the carrier 3 consist of an approximately horizontal base part 31 whose ends rest on the foundation base 2. At the ends of the base part 31 there are approximately rectangular recesses 34 (see FIG. 3) which surround the hole 22 of the foundation base 2.
- outwardly inclined leg parts 32, 33 start from the base part 31.
- the leg parts extend to the running plates 4.
- a preferred angle for the inclination of the leg parts with respect to the horizontal is an angle of 60 °.
- the longitudinal beam can also be designed asymmetrically, which can be advantageous, for example, for platforms to be arranged on the side of a double track.
- Two running plates 4 rest one behind the other on a trough-shaped longitudinal member 3 (see FIGS. 2 and 3).
- Elastic bearings (not shown) can also be arranged between the upper ends of the leg parts 32, 33 and the running plates 4.
- the running plates 4 extend in one piece from one platform edge 41 to the other platform edge.
- the running plates On their underside, the running plates have a metallic connection socket (not shown) suitable for grounding for connecting the running plates to one another.
- the running plates 4 are preferably arranged with a gradient of 1.5% to 2% in the transverse direction of the platform. This can be achieved in that the length of one leg part is slightly smaller than that of the other leg part and that its upper sides have a corresponding inclination relative to the base part, so that the overlying running plate 4 receives the desired slope to a platform edge.
- the execution of this measure is not shown in the accompanying drawings.
- the foundation base 2 is set and aligned.
- the trough-shaped side members 3 are placed thereon.
- Two running plates 4 are then arranged on each of the carriers. As far as the running plates 4 have a high dead weight, anchoring to the trough-shaped side members 3 is superfluous. in the
- Ramp area at the platform ends or, if necessary, on each running plate 4, a connection to the longitudinal member can be realized by conventional half-iron or dowels or metal sheets supporting the running plates 4 on the side.
- lamp posts 44 are anchored in every second foundation base 2.
- the running plates 4 are laid in such a way that between each two slices a narrow gap remains.
- connecting elements that snap together can be provided. If necessary, the gap in the spacing joints 43 is sealed with a sealing compound.
- Installation openings 42 can be provided in one or more of the running plates 4. This can be used, for example, to connect the lamps.
- the interior of the trough-shaped carrier can also contain other installation lines, not shown, for various purposes.
Abstract
Description
Claims
Priority Applications (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
AT96904815T ATE201076T1 (en) | 1995-02-17 | 1996-02-16 | USE OF TROW-SHAPED LONGITUDINAL BEAMS FOR QUICK ASSEMBLY OF A SMALL PLATFORM |
DE59606868T DE59606868D1 (en) | 1995-02-17 | 1996-02-16 | USE OF TROWLED SIDE RAILS FOR QUICK INSTALLATION OF A SMALL RAILWAY |
EP96904815A EP0756657B1 (en) | 1995-02-17 | 1996-02-16 | Use of trough-shaped carriers for rapid set-up of a small station platform |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE29503328.2 | 1995-02-17 | ||
DE29503328U DE29503328U1 (en) | 1995-02-17 | 1995-02-17 | platform |
Publications (1)
Publication Number | Publication Date |
---|---|
WO1996025558A1 true WO1996025558A1 (en) | 1996-08-22 |
Family
ID=8004593
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/EP1996/000682 WO1996025558A1 (en) | 1995-02-17 | 1996-02-16 | Station platform |
Country Status (7)
Country | Link |
---|---|
EP (1) | EP0756657B1 (en) |
AT (1) | ATE201076T1 (en) |
CZ (1) | CZ5762U1 (en) |
DE (2) | DE29503328U1 (en) |
HU (1) | HU9602790D0 (en) |
PL (1) | PL58270Y1 (en) |
WO (1) | WO1996025558A1 (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE19855511A1 (en) * | 1998-10-17 | 2000-05-04 | Euka Gmbh Ingenieur Consulting | Ready-made construction set for producing railway platform with foundations supporting at least one longitudinal bearer, on which lies at least one access plate, etc. |
EP1707674A2 (en) * | 2005-04-01 | 2006-10-04 | MSB-Management GmbH | Railway platform with roof |
KR101502496B1 (en) * | 2013-05-31 | 2015-03-13 | 아이에스동서 주식회사 | Prefabricated Railway Platform |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE19641800A1 (en) * | 1996-10-10 | 1998-04-23 | Hering Gmbh & Co Kg Verwaltung | Modular platform kit |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE2336411B1 (en) * | 1973-07-17 | 1975-01-23 | Sager & Woerner | Continuous V-sectioned concrete bridge girder - with full-width site-concrete slab engaging between cover slabs to top arm ends |
DE2520105A1 (en) * | 1975-05-06 | 1976-11-18 | Richard Dipl Ing Laumer | Composite construction interrupted reinforced concrete slab - has parts linked by girders with cutouts or latticed |
DE2932036A1 (en) * | 1979-08-07 | 1981-02-26 | Sager & Woerner | Reinforced or prestressed concrete multi field bridge - has continuation stress members linking girders into continuous entity under track slab |
FR2616166A1 (en) * | 1987-06-04 | 1988-12-09 | Sogelerg | Bridge with composite framework and method for its construction |
EP0357161A2 (en) * | 1988-08-01 | 1990-03-07 | Otto Frenzel Bauunternehmen | Railway platform |
WO1993008334A1 (en) * | 1991-10-23 | 1993-04-29 | Otto Frenzel Bauunternehmen | Railway station platform edge |
-
1995
- 1995-02-17 DE DE29503328U patent/DE29503328U1/en not_active Expired - Lifetime
-
1996
- 1996-02-16 DE DE59606868T patent/DE59606868D1/en not_active Expired - Lifetime
- 1996-02-16 WO PCT/EP1996/000682 patent/WO1996025558A1/en active IP Right Grant
- 1996-02-16 HU HU9602790A patent/HU9602790D0/en unknown
- 1996-02-16 AT AT96904815T patent/ATE201076T1/en active
- 1996-02-16 EP EP96904815A patent/EP0756657B1/en not_active Expired - Lifetime
- 1996-02-16 PL PL96105650U patent/PL58270Y1/en unknown
- 1996-02-16 CZ CZ19965740U patent/CZ5762U1/en not_active IP Right Cessation
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE2336411B1 (en) * | 1973-07-17 | 1975-01-23 | Sager & Woerner | Continuous V-sectioned concrete bridge girder - with full-width site-concrete slab engaging between cover slabs to top arm ends |
DE2520105A1 (en) * | 1975-05-06 | 1976-11-18 | Richard Dipl Ing Laumer | Composite construction interrupted reinforced concrete slab - has parts linked by girders with cutouts or latticed |
DE2932036A1 (en) * | 1979-08-07 | 1981-02-26 | Sager & Woerner | Reinforced or prestressed concrete multi field bridge - has continuation stress members linking girders into continuous entity under track slab |
FR2616166A1 (en) * | 1987-06-04 | 1988-12-09 | Sogelerg | Bridge with composite framework and method for its construction |
EP0357161A2 (en) * | 1988-08-01 | 1990-03-07 | Otto Frenzel Bauunternehmen | Railway platform |
WO1993008334A1 (en) * | 1991-10-23 | 1993-04-29 | Otto Frenzel Bauunternehmen | Railway station platform edge |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE19855511A1 (en) * | 1998-10-17 | 2000-05-04 | Euka Gmbh Ingenieur Consulting | Ready-made construction set for producing railway platform with foundations supporting at least one longitudinal bearer, on which lies at least one access plate, etc. |
EP1707674A2 (en) * | 2005-04-01 | 2006-10-04 | MSB-Management GmbH | Railway platform with roof |
EP1707674A3 (en) * | 2005-04-01 | 2008-04-16 | MSB-Management GmbH | Railway platform with roof |
KR101502496B1 (en) * | 2013-05-31 | 2015-03-13 | 아이에스동서 주식회사 | Prefabricated Railway Platform |
Also Published As
Publication number | Publication date |
---|---|
HU9602790D0 (en) | 1996-11-28 |
EP0756657A1 (en) | 1997-02-05 |
ATE201076T1 (en) | 2001-05-15 |
EP0756657B1 (en) | 2001-05-09 |
DE59606868D1 (en) | 2001-06-13 |
PL58270Y1 (en) | 2000-12-29 |
DE29503328U1 (en) | 1995-04-13 |
PL105650U1 (en) | 1997-03-17 |
CZ5762U1 (en) | 1997-02-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE3343696C2 (en) | ceiling | |
DE3936705C2 (en) | ||
EP0495334B1 (en) | Bent up bars for flat slab floors | |
DE2808809A1 (en) | FRAME APPLICABLE IN A STREET SURFACE AND METHOD FOR APPLYING IT | |
CH621593A5 (en) | Drainage channel | |
DE2128957A1 (en) | ||
DE2442660C3 (en) | Rail-level transition | |
DE19807141A1 (en) | Flood protection wall and erection system | |
DE4415363C1 (en) | A permanent way superstructure for railways, especially for bridges and processes for its manufacture | |
DE4205192C2 (en) | platform | |
DE10216914C1 (en) | Pile foundation for building roof support has upper and lower frames with spacing uprights to define gap between them | |
WO1996025558A1 (en) | Station platform | |
DE3808269A1 (en) | Method of constructing a retaining dam and prefabricated steel member, in particular for a retaining dam constructed according to this method | |
DE3320034A1 (en) | COMPONENT FOR PRODUCING A CARRIER OR THE LIKE | |
DE102005019034B4 (en) | shoring | |
EP0115881B1 (en) | Insulating element of synthetic material for the thermal insulation of a floor composed of multiple beams | |
EP1070800A1 (en) | Concrete slab shear reinforcement | |
EP3967827B1 (en) | Prefabricated concrete step | |
DE102004059248B4 (en) | Guide for small animals | |
DE2365729A1 (en) | SELF-SUPPORTING STRUCTURE AND PROCESS FOR ITS MANUFACTURING | |
DE2926488B2 (en) | Height-adjustable bearing for supporting an elevated floor or the like. | |
DE202021106638U1 (en) | bottom plate | |
EP1181415B1 (en) | Track | |
DE1033143B (en) | Groyne made of panel-shaped building elements placed on edge and inclined against the vertical | |
DE1900572A1 (en) | Components for viaducts, methods of building viaducts from such parts and here after-built viaducts |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
AK | Designated states |
Kind code of ref document: A1 Designated state(s): CZ HU PL RO SK |
|
AL | Designated countries for regional patents |
Kind code of ref document: A1 Designated state(s): AT BE CH DE DK ES FR GB GR IE IT LU MC NL PT SE |
|
WWE | Wipo information: entry into national phase |
Ref document number: PUV1996-5740 Country of ref document: CZ |
|
WWE | Wipo information: entry into national phase |
Ref document number: 1996904815 Country of ref document: EP |
|
121 | Ep: the epo has been informed by wipo that ep was designated in this application | ||
WWP | Wipo information: published in national office |
Ref document number: 1996904815 Country of ref document: EP |
|
WWG | Wipo information: grant in national office |
Ref document number: PUV1996-5740 Country of ref document: CZ |
|
WWG | Wipo information: grant in national office |
Ref document number: 1996904815 Country of ref document: EP |