Method and means for installing load bearing piles in situ Download PDFInfo
- Publication number
- US3842608A US3842608A US00310049A US31004972A US3842608A US 3842608 A US3842608 A US 3842608A US 00310049 A US00310049 A US 00310049A US 31004972 A US31004972 A US 31004972A US 3842608 A US3842608 A US 3842608A
- Authority
- US
- United States
- Prior art keywords
- pile
- core
- cavity
- earth
- fluid
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/50—Piles comprising both precast concrete portions and concrete portions cast in situ
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/56—Screw piles
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D7/00—Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
- E02D7/26—Placing by using several means simultaneously
Definitions
- ABSTRACT Method of installing a preformed load-bearing pile in an earth situs, utilizing core of predetermined length and having screw-like ridge means externally along the length thereof.
- Pile core drilled into earth while supplying fluid jetting medium through said passage means to mix with drilled earth and to facilitate upward movement of earth, until pile cavity of requisite depth formed.
- Pile core further rotated in place while pumping fluid, self-hardenable, cementitious material through passage means, to urge cementitious material along said screw means, thereby to enlarge girth of pile cavity and form generally tubular body about the pile core.
- Tubular body sets and hardens with loadbearing pile core anchored therein, as composite pile body of correspondingly increased'load-bearing capacity.
- Lee A. Turzillo US. Pat. No. 3,354,657 relates to forming concrete piles in the earth by drilling a hollow cylindrical casing into the situs, while simultaneously pumping pressurized flushing fluid through the casing and an apertured bit on the lower end thereof, until a cavity of predetermined depth was formed, and thereafter pumping cement mortar through the-casing to occupy voids around the bit and the casing, as well as to fill the casing.
- the mortar which forms around the casing was limited in volume and shape, commensurate with the relatively low fluid pressures attainable in fluid cement mortar by prior art methods in general.
- a preformed load-bearing pile core having an external helical thread means, is screwed into the earth of a situs while simultaneously jetting water into the drilled earth to define a cavity of predetermined or appropriate depth.
- the thread means is adapted to convey the drilled earth material upwardly to the ground surface.
- the jetting fluid mixes with the adjacent earth materials to make the same sufficiently fluid to flow upwardly, aided by the lifting action of the helical thread means, while at the same time enlarging the cavity to a substantial extent.
- self-hardenable fluid cement mortar is pumped into the enlarged cavity around the pile core.
- FIG. 1 is vertical cross-section in an earth situs, illustrating an initial step in the method of the invention by which a preformed, reinforced pile core has been screwed to given-depth of pile cavity formed thereby in the situs, said pile core being shown broken away and in section to illustrate the internal structure thereof.
- FIG. 2 is a view corresponding to FIG. 1, illustrating intermediate fluid jetting step of the method, by which the formed pile cavity has been enlarged in girth around the pile core.
- FIG. 3 is a view corresponding to FIG. 2, by which fluid, self-hardening cementitious material has been pumped through the pile core while rotating the core, further to enlarge the cavity and fill the same with cementitious material which hardens to form a sturdy, core-reinforced, concrete pile in the situs.
- FIG. 4 is an enlarged cross section taken on the line 4-4 of FIG. 1.
- FIG. 5 is an enlarged cross-section taken on the line 5-5 of FIG. 3, to illustrate the resultant formation of a relatively large, hardened concrete pile, which is reinforced by the concrete filled, cavity-forming pile core.
- a preformed load-bearing core 10 of predetermined length For use in practicing the method of the invention, as for installing a load-bearing pile in an earth situs, a preformed load-bearing core 10 of predetermined length,
- a radially outwardly presented, screw-like thread means 12 either formed in the pipe or welded spirally along the length thereof.
- An axially centered metal conduit 13 is shown extending within the pipe 11 and connected to a drilling bit 14, affixed at the lower end of pipe 11, and a closure cap 15 may be affixed to the upper end of pipe 11.
- Suitable means 17 may be provided for attaching the core 10 onto a drill rig of known type (not shown).
- the closed space 18 defined between the pipe 11 and the conduit 13 within the fabricated core 10, is shown completely filled with a concrete mix 20, such as one part cement mortar to one part mason sand, which has been allowed to cure for about 48 hours, for example.
- Passage means 21, 21 may be suitably provided between the central conduit 13 and the screw-threaded outer casing, for passage of fluid materials fed through said central conduit, in a manner to be described later, but particularly for passage of fluid jetting water and/or air, as well as fluid cement mortar, at points near the lower end of the core 10.
- the pile core 10 serves as a preformed, reinforced pile body having a very substantial load-bearing capacity.
- the preformed pile core 10 is connected to the leads of a drilling rig supporting an auger-type drive means (not shown), and a pump or other source of water under pressure is connected to the central conduit 13 of the pile core.
- Rotation of the auger drive is started (at 52 RPM for example), simultaneously with operation of the water pump (approximately 20 GPM and 350 PSI), to drill the pile core into the earth situs to predetermined or appropriate depth as shown in-FIG. 1, whereby the screw means 12 carries the drilled earth material to the surface S and a cavity 23 is formed.
- rotation of the pile core may be utilized to increase the depth of the cavity 23 if desired or necessary.
- Rotation of the pile core 10 and pumping of the mortar may be continued, with or without increasing the cavity depth, until the enlarged pile cavity around the pile core is completely filled with fluid mortar, as evidenced by the appearance of fluid cement mortar at the top of the cavity.
- such rotation of the pile core may be stopped while pumping of fluid mortar is continued for a short time, such as a few minutes, during which time the pile core 10 may be jetted downward a few more inches if desired.
- the cavity 23a may be further enlarged, as indicated at 23b in FIGS. 3 and S, correspondingly to increase the girth and load-bearing capacity of the tinished composite, cast-in-place pile P, as shown in FIGS. 3 and 5.
- the improved method is capable of use in a manner which greatly reduces the amount of time normally expended for installing load-bearing piles.
- a method of installing a reinforced cast-in-place, load-bearing pile in an earth situs comprising: the steps of drilling into the earth of the situs with an elongated, rigid core having exterior screw means thereon, while supplying a pressurized fluid medium through passage means in the core to mix with the drilled earth, to facilitate upward discharge of earth along said screw means, until a pile cavity of requisite depth and girth is formed; further rotating said pile core in place within the formed cavity while pumping fluid, self-hardenable, cementitious material through said passage means to force cementitious material along said screw means, thereby to enlarge thegirth of the pile cavity, and form a generally tubular body about the rigid core; and allowing said formed generally tubular body to set and harden in the cavity with said rigid pile core anchored therein, as a composite, formed-in-place, pile body of correspondingly increased load-bearing capacity.
- said rigid core includes a preformed rigid casing containing a filler body of hardened cementitious material adding to the loadbearing capacity of the resultant cast-in-place pile.
- said rigid core includes a preformed generally tubular, rigid casing and passage means for conducting fluid materials from the exterior to at least the inner end of the rigid core for passage of the fluid materials along said screw means.
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Piles And Underground Anchors (AREA)
Abstract
Method of installing a preformed load-bearing pile in an earth situs, utilizing core of predetermined length and having screwlike ridge means externally along the length thereof. Pile core drilled into earth while supplying fluid jetting medium through said passage means to mix with drilled earth and to facilitate upward movement of earth, until pile cavity of requisite depth formed. Pile core further rotated in place while pumping fluid, self-hardenable, cementitious material through passage means, to urge cementitious material along said screw means, thereby to enlarge girth of pile cavity and form generally tubular body about the pile core. Tubular body sets and hardens with loadbearing pile core anchored therein, as composite pile body of correspondingly increased load-bearing capacity.
Description
12% ite States Turzillo l 11 3,842,608 [451 Oct. 22, 1974 [76] Inventor: LeeA. Turzillo, 2078 Glengary Rd.,
- Akron, Ohio 44313 [22] Filed: Nov. 28, 1972 [21] Appl. No: 310,049
[ 56] References Cited UNITED STATES PATENTS 8/1965 Phares et al. 61/63 X 3,636,718 1/1972 Keats 61/5374 3,664,139 5/1972 Sexauer 61/5374 FOREIGN PATENTS OR APPLICATIONS 619,600 1/1927 France ..6l/53.74
Primary Examiner.la cob Shapiro [57] ABSTRACT Method of installing a preformed load-bearing pile in an earth situs, utilizing core of predetermined length and having screw-like ridge means externally along the length thereof. Pile core drilled into earth while supplying fluid jetting medium through said passage means to mix with drilled earth and to facilitate upward movement of earth, until pile cavity of requisite depth formed. Pile core further rotated in place while pumping fluid, self-hardenable, cementitious material through passage means, to urge cementitious material along said screw means, thereby to enlarge girth of pile cavity and form generally tubular body about the pile core. Tubular body sets and hardens with loadbearing pile core anchored therein, as composite pile body of correspondingly increased'load-bearing capacity.
4 Claims, 5 Drawing Figures METHOD AND MEANS FOR INSTALLING LOAD BEARING PILES INSITU BACKGROUND OF THE INVENTION In the past, numerous methods and means have been devised in which tubular casings were driven into an ties defined by the driven casings. This condition was to some extent modified by either forming a bulbous concrete body at the inner end of the casing prior to removal of the latter, and/or by jetting water around the casing to enlarge the cavity, and then pouring mortar around the formed pile to fill the resultant space between the pile and the wall of the enlargement, without attaining requisite skin friction for the enlarged pile body.
Lee A. Turzillo US. Pat. No. 3,354,657, relates to forming concrete piles in the earth by drilling a hollow cylindrical casing into the situs, while simultaneously pumping pressurized flushing fluid through the casing and an apertured bit on the lower end thereof, until a cavity of predetermined depth was formed, and thereafter pumping cement mortar through the-casing to occupy voids around the bit and the casing, as well as to fill the casing. The mortar which forms around the casing, was limited in volume and shape, commensurate with the relatively low fluid pressures attainable in fluid cement mortar by prior art methods in general. Moreover, in order to provide cement-filled casings of the character described by prior methods, the load capacities of the finished piles were quite limited, and the periods required to produce the finished piles in condition for the intended load-bearing uses of the same were considerable, if not impractical for at least some purposes.
SUMMARY OF INVENTION In use of the method of the invention a preformed load-bearing pile core, having an external helical thread means, is screwed into the earth of a situs while simultaneously jetting water into the drilled earth to define a cavity of predetermined or appropriate depth. During this jetting procedure the thread means is adapted to convey the drilled earth material upwardly to the ground surface. The jetting fluid mixes with the adjacent earth materials to make the same sufficiently fluid to flow upwardly, aided by the lifting action of the helical thread means, while at the same time enlarging the cavity to a substantial extent. Upon discontinuance of the jetting procedure, self-hardenable fluid cement mortar is pumped into the enlarged cavity around the pile core. Continued rotation of the pile core, accompanied with such pumping of the mortar, is effective to increase the depth and/or the girth of the cavity. Rotation of the pile core can be continued with or without thereby producing a composite, reinforced pile body of high load-bearing capacity.
Objects of the invention will be manifest from the following brief description and the accompanying draw mgs.
Of the accompanying drawings:
FIG. 1 is vertical cross-section in an earth situs, illustrating an initial step in the method of the invention by which a preformed, reinforced pile core has been screwed to given-depth of pile cavity formed thereby in the situs, said pile core being shown broken away and in section to illustrate the internal structure thereof.
FIG. 2 is a view corresponding to FIG. 1, illustrating intermediate fluid jetting step of the method, by which the formed pile cavity has been enlarged in girth around the pile core.
FIG. 3 is a view corresponding to FIG. 2, by which fluid, self-hardening cementitious material has been pumped through the pile core while rotating the core, further to enlarge the cavity and fill the same with cementitious material which hardens to form a sturdy, core-reinforced, concrete pile in the situs.
FIG. 4 is an enlarged cross section taken on the line 4-4 of FIG. 1.
FIG. 5 is an enlarged cross-section taken on the line 5-5 of FIG. 3, to illustrate the resultant formation of a relatively large, hardened concrete pile, which is reinforced by the concrete filled, cavity-forming pile core.
For use in practicing the method of the invention, as for installing a load-bearing pile in an earth situs, a preformed load-bearing core 10 of predetermined length,
diameter, and load-supporting capacity is provided as ing an external pipe or casing 11 of heavy metal with increasing the cavity depth, until the enlarged pile cavity around the pile core is completely filled with fluid mortar to desired level in in reference to the top of the cavity. The fluid mortar, upon hardening in the formed cavity, is anchored to the earth and to the pile core,
radially outwardly presented, screw-like thread means 12, either formed in the pipe or welded spirally along the length thereof. An axially centered metal conduit 13 is shown extending within the pipe 11 and connected to a drilling bit 14, affixed at the lower end of pipe 11, and a closure cap 15 may be affixed to the upper end of pipe 11. Suitable means 17 may be provided for attaching the core 10 onto a drill rig of known type (not shown). The closed space 18 defined between the pipe 11 and the conduit 13 within the fabricated core 10, is shown completely filled with a concrete mix 20, such as one part cement mortar to one part mason sand, which has been allowed to cure for about 48 hours, for example. Passage means 21, 21 may be suitably provided between the central conduit 13 and the screw-threaded outer casing, for passage of fluid materials fed through said central conduit, in a manner to be described later, but particularly for passage of fluid jetting water and/or air, as well as fluid cement mortar, at points near the lower end of the core 10. The pile core 10 serves as a preformed, reinforced pile body having a very substantial load-bearing capacity.
In practice of the improved pile installing method, the preformed pile core 10, as best shown in FIGS. 1 and 4, is connected to the leads of a drilling rig supporting an auger-type drive means (not shown), and a pump or other source of water under pressure is connected to the central conduit 13 of the pile core. Rotation of the auger drive is started (at 52 RPM for example), simultaneously with operation of the water pump (approximately 20 GPM and 350 PSI), to drill the pile core into the earth situs to predetermined or appropriate depth as shown in-FIG. 1, whereby the screw means 12 carries the drilled earth material to the surface S and a cavity 23 is formed. When or if hard earth material is encountered in one way or another, it may be necessary to predrill a cavity of slightly smaller diameter than that to be drilled by the pile core.
In any event, when a said cavity 23 of requisite depth V and diameter has been formed by the rotating pile core (see FIG. 1), rotation of the pile core is continued while pumping jetting fluid through the conduit 21, and through jetting passages 21 at least adjacent the lower end of the pile core. This jetting fluid mixes with the adjacent earth materials to make the same sufficiently fluid to flow upwardly, aided by the lifting action of the helical screw threads 12, whereby the formed cavity 23 is substantially enlarged, as indicated at 230, in FIG. 2. After this jetting procedure is stopped, a concrete mix, including one part fluid cement mortar, one part mason sand, for example, may be pumped into the enlarged cavity 230, as shown in FIG. 2. In the latter method step continued rotation of the pile core, accompanied with pumping of the mortar, may be utilized to increase the depth of the cavity 23 if desired or necessary. Rotation of the pile core 10 and pumping of the mortar may be continued, with or without increasing the cavity depth, until the enlarged pile cavity around the pile core is completely filled with fluid mortar, as evidenced by the appearance of fluid cement mortar at the top of the cavity. At this point, such rotation of the pile core may be stopped while pumping of fluid mortar is continued for a short time, such as a few minutes, during which time the pile core 10 may be jetted downward a few more inches if desired. In this process of filling the enlarged pile cavity with cement mortar, it has been found that the cavity 23a may be further enlarged, as indicated at 23b in FIGS. 3 and S, correspondingly to increase the girth and load-bearing capacity of the tinished composite, cast-in-place pile P, as shown in FIGS. 3 and 5.
Because the pile core 10 can be completely preformed and conditioned in readiness for use as described above. the improved method is capable of use in a manner which greatly reduces the amount of time normally expended for installing load-bearing piles.
Modifications of the invention may be resorted to without departing from the spirit thereof or the scope of the appended claims.
What is claimed is:
l. A method of installing a reinforced cast-in-place, load-bearing pile in an earth situs, comprising: the steps of drilling into the earth of the situs with an elongated, rigid core having exterior screw means thereon, while supplying a pressurized fluid medium through passage means in the core to mix with the drilled earth, to facilitate upward discharge of earth along said screw means, until a pile cavity of requisite depth and girth is formed; further rotating said pile core in place within the formed cavity while pumping fluid, self-hardenable, cementitious material through said passage means to force cementitious material along said screw means, thereby to enlarge thegirth of the pile cavity, and form a generally tubular body about the rigid core; and allowing said formed generally tubular body to set and harden in the cavity with said rigid pile core anchored therein, as a composite, formed-in-place, pile body of correspondingly increased load-bearing capacity.
2. A method as in claim 1, wherein said rigid core includes a preformed rigid casing containing a filler body of hardened cementitious material adding to the loadbearing capacity of the resultant cast-in-place pile.
3. A method as in claim 1, wherein said rigid core includes a preformed generally tubular, rigid casing and passage means for conducting fluid materials from the exterior to at least the inner end of the rigid core for passage of the fluid materials along said screw means.
screw means toward the top of the cavity.
Claims (4)
1. A method of installing a reinforced cast-in-place, loadbearing pile in an earth situs, comprising: the steps of drilling into the earth of the situs with an elongated, rigid core having exterior screw means thereon, while supplying a pressurized fluid medium through passage means in the core to mix with the drilled earth, to facilitate upward discharge of earth along said screw means, until a pile cavity of requisite depth and girth is formed; further rotating said pile core in place within the formed cavity while pumping fluid, self-hardenable, cementitious material through said passage means to force cementitious material along said screw means, thereby to enlarge the girth of the pile cavity, and form a generally tubular body about the rigid core; and allowing said formed generally tubular body to set and harden in the cavity with said rigid pile core anchored therein, as a composite, formed-in-place, pile body of correspondingly increased load-bearing capacity.
2. A method as in claim 1, wherein said rigid core includes a preformed rigid casing containing a filler body of hardened cementitious material adding to the load-bearing capacity of the resultant cast-in-place pile.
3. A method as in claim 1, wherein said rigid core includes a preformed generally tubular, rigid casing and passage means for conducting fluid materials from the exterior to at least the inner end of the rigid core for passage of the fluid materials along said screw means.
4. A method as in claim 1, said upward movement of fluid cementitious material within the formed cavity being facilitated by rotation of the said rigid core forcibly to convey the fluid material upwardly along said screw means toward the top of the cavity.
Priority Applications (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US00310049A US3842608A (en) | 1972-11-28 | 1972-11-28 | Method and means for installing load bearing piles in situ |
CA178,419A CA984165A (en) | 1972-11-28 | 1973-08-09 | Method and means for installing load-bearing piles in situ |
JP48107052A JPS49135408A (en) | 1972-11-28 | 1973-09-25 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US00310049A US3842608A (en) | 1972-11-28 | 1972-11-28 | Method and means for installing load bearing piles in situ |
Publications (1)
Publication Number | Publication Date |
---|---|
US3842608A true US3842608A (en) | 1974-10-22 |
Family
ID=23200785
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US00310049A Expired - Lifetime US3842608A (en) | 1972-11-28 | 1972-11-28 | Method and means for installing load bearing piles in situ |
Country Status (3)
Country | Link |
---|---|
US (1) | US3842608A (en) |
JP (1) | JPS49135408A (en) |
CA (1) | CA984165A (en) |
Cited By (47)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3924414A (en) * | 1974-08-22 | 1975-12-09 | Union Oil Co | Pile for use in offshore areas having a shifting layer of mud |
US3946570A (en) * | 1973-10-02 | 1976-03-30 | S.E.F.I. Sondages-Etanchements-Forages-Injections | Support and foundation composite pile for various works and method for manufacturing the same |
US3972198A (en) * | 1974-08-22 | 1976-08-03 | Union Oil Company Of California | Method of protecting a pile imbedded in offshore areas having a shifting layer of mud |
US4278363A (en) * | 1979-06-21 | 1981-07-14 | Conoco, Inc. | Rock bolt and installation system |
US4405262A (en) * | 1980-01-08 | 1983-09-20 | Masaya Nagashima | Method for erection of a temporary bridge, and a pile means therefor |
US4474243A (en) * | 1982-03-26 | 1984-10-02 | Exxon Production Research Co. | Method and apparatus for running and cementing pipe |
US4533279A (en) * | 1983-05-12 | 1985-08-06 | Fundemantum B.V. | Method for making a foundation pile |
US4637758A (en) * | 1982-03-11 | 1987-01-20 | Kabushiki Kaisha Komatsu Seisakusho | Method of driving hollow piles into the ground |
US4664555A (en) * | 1985-03-05 | 1987-05-12 | Dyckerhoff & Widmann Aktiengesellschaft | Tension member for a rock anchor or the like |
DE3617025A1 (en) * | 1986-05-21 | 1987-11-26 | Delmag Maschinenfabrik | PRE-PREPARED CONCRETE PILE AND METHOD AND DEVICE FOR ITS PLACING INTO THE GROUND |
DE3624943A1 (en) * | 1986-07-23 | 1988-01-28 | Delmag Maschinenfabrik | PRE-PREPARED CONCRETE PART AND METHOD FOR PUTTING IT INTO THE GROUND |
EP0311363A2 (en) * | 1987-10-05 | 1989-04-12 | Kawasaki Steel Corporation | Hollow steel pile, manufacturing method and pile driving method |
US4902171A (en) * | 1987-02-09 | 1990-02-20 | Soletanche | Process for reinforcing a driven tubular piling, the piling obtained by this process, an arrangement for implementing the process |
US4958962A (en) * | 1989-06-28 | 1990-09-25 | Halliburton Company | Methods of modifying the structural integrity of subterranean earth situs |
EP0542692A1 (en) * | 1991-11-14 | 1993-05-19 | Isolink Inc. | Device for anchoring construction parts to the ground |
GB2267926A (en) * | 1992-06-18 | 1993-12-22 | Elle Van | A tube for forming a pile |
US5396964A (en) * | 1992-10-01 | 1995-03-14 | Halliburton Company | Apparatus and method for processing soil in a subterranean earth situs |
US5575593A (en) * | 1994-07-11 | 1996-11-19 | Atlas Systems, Inc. | Method and apparatus for installing a helical pier with pressurized grouting |
US5586417A (en) * | 1994-11-23 | 1996-12-24 | Henderson; Allan P. | Tensionless pier foundation |
CN1039502C (en) * | 1992-12-04 | 1998-08-12 | 张平潮 | Reinforced concrete pile and its construction method |
NL1018702C2 (en) * | 2001-08-03 | 2003-02-04 | Verstraeten Funderingstech Bv | Method for installing a foundation pile in the soil, as well as a foundation pile and a chuck for this method, and a soil displacement drill. |
US20030190195A1 (en) * | 2002-04-03 | 2003-10-09 | Liberty Offshore Limited | Drilled pile |
US6672023B2 (en) | 2000-09-27 | 2004-01-06 | Allan P. Henderson | Perimeter weighted foundation for wind turbines and the like |
US20070003377A1 (en) * | 2003-07-29 | 2007-01-04 | Cable-Lock | Foundation pile having a spiral ridge and method of underpinning using same |
US20070092339A1 (en) * | 2005-10-20 | 2007-04-26 | Gray Mullins | Voided drilled shafts |
EA008306B1 (en) * | 2004-06-02 | 2007-04-27 | Альберт Иванович Архипов | Design of screw metal pile |
US20070269273A1 (en) * | 2003-12-15 | 2007-11-22 | Henderson Allan P | Post-tension pile anchor foundation and method therefor |
US20070286687A1 (en) * | 2006-06-12 | 2007-12-13 | Cesare Melegari | Method and equipment for constructing micropiles in soil |
US20080008539A1 (en) * | 2006-07-05 | 2008-01-10 | Con-Tech Systems Ltd. | Void form for constructing post-tensioned foundation piles |
US20080273928A1 (en) * | 2007-05-03 | 2008-11-06 | Lrm Industries, Llc | Molded pile |
US7533505B2 (en) | 2003-01-06 | 2009-05-19 | Henderson Allan P | Pile anchor foundation |
US20100300752A1 (en) * | 2009-06-01 | 2010-12-02 | Massachusetts Institute Of Technology | Method and apparatus for penetrating particulate substrates |
RU2456408C1 (en) * | 2011-02-17 | 2012-07-20 | Федеральное Государственное Автономное Образовательное Учреждение Высшего Профессионального Образования "Сибирский Федеральный Университет" | Method to erect pile foundation |
RU2468148C2 (en) * | 2011-01-21 | 2012-11-27 | Государственное образовательное учреждение высшего профессионального образования "Саратовский государственный технический университет" (СГТУ) | Device for formation of wells for filling piles |
RU2489548C2 (en) * | 2011-11-01 | 2013-08-10 | Юрий Семенович Флягин | Screw injection anchor pile |
US20130247693A1 (en) * | 2011-09-28 | 2013-09-26 | Hydrochina Huadong Engineering Corporation | Method for Sampling Jointed Rock Mass |
RU2558832C1 (en) * | 2014-06-23 | 2015-08-10 | Юрий Анатольевич Бровцин | Method to erect screw pile in soil |
RU2569654C1 (en) * | 2014-06-23 | 2015-11-27 | Юрий Анатольевич Бровцин | Syringe-type screw pile |
RU2570584C1 (en) * | 2014-06-23 | 2015-12-10 | Юрий Анатольевич Бровцин | Screw pile |
RU2571873C1 (en) * | 2014-06-23 | 2015-12-27 | Юрий Анатольевич Бровцин | Screw pile in soil |
RU2571869C1 (en) * | 2014-06-23 | 2015-12-27 | Юрий Анатольевич Бровцин | Screw pile in soil with detachable tip |
RU2603314C1 (en) * | 2015-07-29 | 2016-11-27 | Общество с ограниченной ответственностью "НПП СК МОСТ" | Erection method of pile foundation for reinforcement |
RU192324U1 (en) * | 2019-05-07 | 2019-09-12 | Федеральное государственное бюджетное образовательное учреждение образования "Владимирский Государственный Университет имени Александра Григорьевича и Николая Григорьевича Столетовых" (ВлГУ) | Screw pile |
RU2706499C1 (en) * | 2018-07-26 | 2019-11-19 | Публичное акционерное общество "Татнефть" имени В.Д. Шашина | Pile structure of pumping units foundation |
US10738436B1 (en) | 2019-02-15 | 2020-08-11 | Montana Systems Inc. | Tubular foundation for onshore wind turbine generators |
US11441288B2 (en) * | 2017-09-20 | 2022-09-13 | Innogy Se | Pile and method of installing |
RU2804651C1 (en) * | 2023-01-24 | 2023-10-03 | Закрытое акционерное общество "Геотехника - С" | Method for constructing bored pile in soil |
-
1972
- 1972-11-28 US US00310049A patent/US3842608A/en not_active Expired - Lifetime
-
1973
- 1973-08-09 CA CA178,419A patent/CA984165A/en not_active Expired
- 1973-09-25 JP JP48107052A patent/JPS49135408A/ja active Pending
Cited By (60)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3946570A (en) * | 1973-10-02 | 1976-03-30 | S.E.F.I. Sondages-Etanchements-Forages-Injections | Support and foundation composite pile for various works and method for manufacturing the same |
US3924414A (en) * | 1974-08-22 | 1975-12-09 | Union Oil Co | Pile for use in offshore areas having a shifting layer of mud |
US3972198A (en) * | 1974-08-22 | 1976-08-03 | Union Oil Company Of California | Method of protecting a pile imbedded in offshore areas having a shifting layer of mud |
US4278363A (en) * | 1979-06-21 | 1981-07-14 | Conoco, Inc. | Rock bolt and installation system |
US4405262A (en) * | 1980-01-08 | 1983-09-20 | Masaya Nagashima | Method for erection of a temporary bridge, and a pile means therefor |
US4637758A (en) * | 1982-03-11 | 1987-01-20 | Kabushiki Kaisha Komatsu Seisakusho | Method of driving hollow piles into the ground |
US4474243A (en) * | 1982-03-26 | 1984-10-02 | Exxon Production Research Co. | Method and apparatus for running and cementing pipe |
US4533279A (en) * | 1983-05-12 | 1985-08-06 | Fundemantum B.V. | Method for making a foundation pile |
US4664555A (en) * | 1985-03-05 | 1987-05-12 | Dyckerhoff & Widmann Aktiengesellschaft | Tension member for a rock anchor or the like |
DE3617025A1 (en) * | 1986-05-21 | 1987-11-26 | Delmag Maschinenfabrik | PRE-PREPARED CONCRETE PILE AND METHOD AND DEVICE FOR ITS PLACING INTO THE GROUND |
DE3624943A1 (en) * | 1986-07-23 | 1988-01-28 | Delmag Maschinenfabrik | PRE-PREPARED CONCRETE PART AND METHOD FOR PUTTING IT INTO THE GROUND |
US4902171A (en) * | 1987-02-09 | 1990-02-20 | Soletanche | Process for reinforcing a driven tubular piling, the piling obtained by this process, an arrangement for implementing the process |
EP0311363A2 (en) * | 1987-10-05 | 1989-04-12 | Kawasaki Steel Corporation | Hollow steel pile, manufacturing method and pile driving method |
EP0311363A3 (en) * | 1987-10-05 | 1989-11-15 | Kawasaki Steel Corporation | Hollow steel pile, manufacturing method and pile driving method |
US4958962A (en) * | 1989-06-28 | 1990-09-25 | Halliburton Company | Methods of modifying the structural integrity of subterranean earth situs |
EP0542692A1 (en) * | 1991-11-14 | 1993-05-19 | Isolink Inc. | Device for anchoring construction parts to the ground |
GB2267926A (en) * | 1992-06-18 | 1993-12-22 | Elle Van | A tube for forming a pile |
US5396964A (en) * | 1992-10-01 | 1995-03-14 | Halliburton Company | Apparatus and method for processing soil in a subterranean earth situs |
CN1039502C (en) * | 1992-12-04 | 1998-08-12 | 张平潮 | Reinforced concrete pile and its construction method |
US5575593A (en) * | 1994-07-11 | 1996-11-19 | Atlas Systems, Inc. | Method and apparatus for installing a helical pier with pressurized grouting |
US5586417A (en) * | 1994-11-23 | 1996-12-24 | Henderson; Allan P. | Tensionless pier foundation |
US5826387A (en) * | 1994-11-23 | 1998-10-27 | Henderson; Allan P. | Pier foundation under high unit compression |
US6672023B2 (en) | 2000-09-27 | 2004-01-06 | Allan P. Henderson | Perimeter weighted foundation for wind turbines and the like |
US20040098935A1 (en) * | 2000-09-27 | 2004-05-27 | Henderson Allan P. | Perimeter weighted foundation for wind turbines and the like |
WO2003012211A1 (en) * | 2001-08-03 | 2003-02-13 | Funderingstechnieken Verstraeten B.V. | Method for making a foundation pile |
NL1018702C2 (en) * | 2001-08-03 | 2003-02-04 | Verstraeten Funderingstech Bv | Method for installing a foundation pile in the soil, as well as a foundation pile and a chuck for this method, and a soil displacement drill. |
US20040028480A1 (en) * | 2001-08-03 | 2004-02-12 | Verstraeten Alexander Julien | Method for making a foundation pile |
US7429148B2 (en) | 2001-08-03 | 2008-09-30 | Funderingstechnieken Verstraeten B.V. | Method for making a foundation pile |
US20030190195A1 (en) * | 2002-04-03 | 2003-10-09 | Liberty Offshore Limited | Drilled pile |
US7533505B2 (en) | 2003-01-06 | 2009-05-19 | Henderson Allan P | Pile anchor foundation |
US20070003377A1 (en) * | 2003-07-29 | 2007-01-04 | Cable-Lock | Foundation pile having a spiral ridge and method of underpinning using same |
US7618217B2 (en) | 2003-12-15 | 2009-11-17 | Henderson Allan P | Post-tension pile anchor foundation and method therefor |
US20070269273A1 (en) * | 2003-12-15 | 2007-11-22 | Henderson Allan P | Post-tension pile anchor foundation and method therefor |
EA008306B1 (en) * | 2004-06-02 | 2007-04-27 | Альберт Иванович Архипов | Design of screw metal pile |
US20070092339A1 (en) * | 2005-10-20 | 2007-04-26 | Gray Mullins | Voided drilled shafts |
US8206064B2 (en) * | 2005-10-20 | 2012-06-26 | University Of South Florida | Voided drilled shafts |
US20070286687A1 (en) * | 2006-06-12 | 2007-12-13 | Cesare Melegari | Method and equipment for constructing micropiles in soil |
US20080008539A1 (en) * | 2006-07-05 | 2008-01-10 | Con-Tech Systems Ltd. | Void form for constructing post-tensioned foundation piles |
US20080273928A1 (en) * | 2007-05-03 | 2008-11-06 | Lrm Industries, Llc | Molded pile |
US7517174B2 (en) | 2007-05-03 | 2009-04-14 | Lrm Industries, Llc | Molded pile |
US8496410B2 (en) | 2009-06-01 | 2013-07-30 | Massachusetts Institute Of Technology | Method and apparatus for penetrating particulate substrates |
US20100300752A1 (en) * | 2009-06-01 | 2010-12-02 | Massachusetts Institute Of Technology | Method and apparatus for penetrating particulate substrates |
RU2468148C2 (en) * | 2011-01-21 | 2012-11-27 | Государственное образовательное учреждение высшего профессионального образования "Саратовский государственный технический университет" (СГТУ) | Device for formation of wells for filling piles |
EA020732B1 (en) * | 2011-02-17 | 2015-01-30 | Федеральное Государственное Автономное Образовательное Учреждение Высшего Профессионального Образования "Сибирский Федеральный Университет" | Method to erect pile foundation |
RU2456408C1 (en) * | 2011-02-17 | 2012-07-20 | Федеральное Государственное Автономное Образовательное Учреждение Высшего Профессионального Образования "Сибирский Федеральный Университет" | Method to erect pile foundation |
US20130247693A1 (en) * | 2011-09-28 | 2013-09-26 | Hydrochina Huadong Engineering Corporation | Method for Sampling Jointed Rock Mass |
US8984967B2 (en) * | 2011-09-28 | 2015-03-24 | Powerchina Huadong Engineering Corporation Limited | Method for sampling jointed rock mass |
RU2489548C2 (en) * | 2011-11-01 | 2013-08-10 | Юрий Семенович Флягин | Screw injection anchor pile |
RU2571869C1 (en) * | 2014-06-23 | 2015-12-27 | Юрий Анатольевич Бровцин | Screw pile in soil with detachable tip |
RU2569654C1 (en) * | 2014-06-23 | 2015-11-27 | Юрий Анатольевич Бровцин | Syringe-type screw pile |
RU2570584C1 (en) * | 2014-06-23 | 2015-12-10 | Юрий Анатольевич Бровцин | Screw pile |
RU2571873C1 (en) * | 2014-06-23 | 2015-12-27 | Юрий Анатольевич Бровцин | Screw pile in soil |
RU2558832C1 (en) * | 2014-06-23 | 2015-08-10 | Юрий Анатольевич Бровцин | Method to erect screw pile in soil |
RU2603314C1 (en) * | 2015-07-29 | 2016-11-27 | Общество с ограниченной ответственностью "НПП СК МОСТ" | Erection method of pile foundation for reinforcement |
US11441288B2 (en) * | 2017-09-20 | 2022-09-13 | Innogy Se | Pile and method of installing |
RU2706499C1 (en) * | 2018-07-26 | 2019-11-19 | Публичное акционерное общество "Татнефть" имени В.Д. Шашина | Pile structure of pumping units foundation |
US10738436B1 (en) | 2019-02-15 | 2020-08-11 | Montana Systems Inc. | Tubular foundation for onshore wind turbine generators |
RU192324U1 (en) * | 2019-05-07 | 2019-09-12 | Федеральное государственное бюджетное образовательное учреждение образования "Владимирский Государственный Университет имени Александра Григорьевича и Николая Григорьевича Столетовых" (ВлГУ) | Screw pile |
RU2804651C1 (en) * | 2023-01-24 | 2023-10-03 | Закрытое акционерное общество "Геотехника - С" | Method for constructing bored pile in soil |
RU2822841C1 (en) * | 2024-02-13 | 2024-07-15 | Акционерное общество "Производственное объединение "Возрождение" (АО "ПО "Возрождение") | Method for construction of bored pile without casing pipe |
Also Published As
Publication number | Publication date |
---|---|
JPS49135408A (en) | 1974-12-26 |
CA984165A (en) | 1976-02-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US3842608A (en) | Method and means for installing load bearing piles in situ | |
US3354657A (en) | Method for installing anchoring or supporting columns in situ | |
US3962879A (en) | Reinforced pile in earth situs and method of producing same | |
US3453832A (en) | Cast-in-place casings for concrete piles | |
US3363422A (en) | Method and apparatus for anchoring a tie-down bar in an earth situs | |
WO2018210019A1 (en) | Pile formation method for down-the-hole impact rotary jet composite piles | |
US3815368A (en) | Method for installing concrete anchor piles in situ | |
US4618289A (en) | Method of forming a cast-in-place support column | |
US3540225A (en) | Construction pile and a method of producing same in situ | |
CN108729440B (en) | Spiral high-spraying wing-expanding stirring bottom-expanding stiffness composite pile, construction method thereof and drilling machine | |
CN112746615B (en) | Brine stratum mucky soil cast-in-place pile construction is with protecting a device | |
WO1994002687A1 (en) | Apparatus and method for forming piles | |
US2555359A (en) | Pile structure and method of making same | |
CN106351585A (en) | Hole collapse and shrinkage prevention bidirectional spiral extrusion and expansion drilling tool and construction technology thereof | |
US3786641A (en) | Means for stabilizing structural layer overlying earth materials in situ | |
US3512365A (en) | Method of forming a pile in situ | |
US6120214A (en) | Process for constructing reinforced subterranean columns | |
CN109183790A (en) | A kind of Screw Pile and its construction tool and construction method | |
US3852971A (en) | Pile structure | |
US3438212A (en) | Apparatus for installing anchoring or supporting columns in situ | |
US20020008328A1 (en) | Pile formation | |
US3685303A (en) | Means for stabilizing structural layer overlying earth materials in situ | |
CN108049401A (en) | A kind of screw thread rammed bulb pile and its construction method | |
JP4811176B2 (en) | Construction method of ready-made piles | |
JP2782034B2 (en) | Ground consolidation strengthening method |